-
CDOT Pipe Material Selection Policy
2010-1. March 2, 2010. This policy provides additional performance criteria for the selection of pipes in highway projects by CDOT designers.
Located in
Business Center
/
…
/
Design Bulletins
/
Superseded Design Bulletins
-
American Recovery and Reinvestment Act (ARRA) Projects
2009-4. March 20, 2009. Provides guidance on preparing projects that are funded with ARRA funds for advertisement.
Located in
Business Center
/
…
/
Design Bulletins
/
Superseded Design Bulletins
-
Signature Projects
2009-3. February 26, 2009. Adds section 1.12, Signature Projects, to the Project Development Manual
Located in
Business Center
/
…
/
Design Bulletins
/
Superseded Design Bulletins
-
Stimulus Project Guidance
2009-2. February 26, 2009. Provides guidance on applying the new federal economic recovery stimulus funds on CDOT projects.
Located in
Business Center
/
…
/
Design Bulletins
/
Superseded Design Bulletins
-
Work-Hour and Project Cost Estimating
2009-1. March 1, 2009. (Superseded by DB 2013-2, Revised on July 28, 2011 and on August 04, 2009)
Located in
Business Center
/
…
/
Design Bulletins
/
Superseded Design Bulletins
-
Revision to Stormwater Management Plan
2007-2. June 29, 2007.
Located in
Business Center
/
…
/
Design Bulletins
/
Superseded Design Bulletins
-
Overlay Exemption from MS4 requirements
2007-1. June 6, 2007. Superseded by: 2007-5.
Located in
Business Center
/
…
/
Design Bulletins
/
Superseded Design Bulletins
-
Preliminary Soil Survey
2006-3. September 21, 2006.
Located in
Business Center
/
…
/
Design Bulletins
/
Superseded Design Bulletins
-
Force Account Construction Method
2006-1. March 10, 2006.
Located in
Business Center
/
…
/
Design Bulletins
/
Superseded Design Bulletins
-
Safety Considerations on 3R Projects
2005-1. March 2, 2005. (Revised on July 20, 2006).
Located in
Business Center
/
…
/
Design Bulletins
/
Superseded Design Bulletins