Bid Results for Recently Let Projects

Bid results and status for projects that recently went to bid

ALL DESIGN-BID-BUILD PROJECTS PROPOSALS ARE OPENED THROUGH AND PUBLISHED ON THE BID EXPRESS SITE. RESULTS WILL ALSO BE POSTED HERE. MEETINGS TO REVIEW THESE ELECTRONIC RESULTS WERE DISCONTINUED OCTOBER, 2015.

Letting Dates Project Name and Description Low Bidder/Award Winner Bid Tabulation
Sep 21

AQC R100-258 (21125) ~ On Federal Boulevard, work consists of updating the signal interconnect in Arapahoe and Denver Counties.

Paonia Inc. Pending

MTCE R500-193 (22029R) ~ In Region 5 on various highways, work consists of crack sealing in La Plata, Montezuma, Montrose, Ouray, and San Miguel Counties.

A-1 Chipseal Company Pending

SHE 0831-119 (21184) ~ On SH 83/Parker Road, work consists of installation of a raised center median and street lighting in Arapahoe County.

Jalisco International, Inc. Pending
Sep 14

MP R200-244 (21980) ~ In the Southeastern part of Colorado, work consists of highway sign removal and replacement along SH 287 and other nearby highways in Baca, Bent, Cheyenne, Kiowa and Prowers Counties.

Workzone Traffic Control Inc. Bid Tab
Sep 7 ER R400-322 (20187) ~ On SH 60 from MP 11.38 to MP 12.04 and on SH 257 from MP 0.05 to 0.30, work consists of channel construction, bridge removals and bridge installations, roadway resurfacing and HMA pavement, waterline replacement, excavation, signing, striping, traffic control in Weld County.  Flatiron Constructors Inc. Bid Tab
NHPP 006A-059 (20848) ~ Along US 6 in Clear Creek Canyon from SH 93 to SH 119, work consists of rock fall mitigation including rock scaling, removal of scaled rock, installation of rock reinforcement, rock anchors, mesh anchors, and wire mesh in Clear Creek and Jefferson Counties. Project Cancelled N/A

NHPP 0821-108 (21814) ~ On SH 82 at MP 45.3, work consists of installing an Over Length Vehicle Detection System (OLVDS) with in-pavement loops, traffic counter, signal cabinet, sign and flashing beacons, and conduit with wiring in Pitkin County.

Interface Communications Company Bid Tab
Aug 31

NHPP R100-291 (22039) ~ On I-225 southbound from Yosemite to I-25, works consists of restriping to add another through lane, shoulder widening with HMA, guardrail, and final signing in Denver County.

K.E.C.I. Colorado Inc. Bid Tab

MTCE 092A-027 (21981) ~ On SH 92 at structure I-06-A, work consists of repair and resurface of deck and approach slab in Delta County.

Rejected N/A
Aug 24

ER 012A-047 (21399) ~ On SH 12 and SH 160, work consists of structure repairs of P-17-L at MP 51.46 and culvert relining in Las Animas County.

Myers and Sons Bid Tab

MTCE R500-193 (22029) ~ In Region 5 on various highways, work consists of crack sealing in Montezuma County.

Rejected N/A
Aug 17

NHPP R100-242 (20872) ~ In Region 1 at various locations, work consists of rehabilitation of drainage culverts ranging in sizes from 48” to 84” in diameter and one 8’X8” box culvert using a spray lining method in Boulder, Douglas, Elbert and Jefferson Counties.

American West Construction LLC Bid Tab

MTCE 131A-039 (22052R) ~ On SH 131 from MP .053 to MP 68.721 (MP 51.43 to MP 56 is a no work zone), work consists of hot poured joint & crack sealant, and traffic control in Eagle and Routt Counties.

Diamond Drilling & Sawing Co. Bid Tab
Aug 10 MTCE 0705-085 (22211) ~ On I-70 from MM 328 to MM 395.1, work consists of removing and installing epoxy pavement markings in Arapahoe, Elbert, Lincoln and Kit Carson Counties. Kolbe Striping Inc. Bid Tab
Aug 3 IM 0762-052 (19963) ~ On I-76 from MP 28.98 to MP 36.61, work consists of installation of a fiber optic cable backbone on the north side of I-76 to include Ethernet switches, node equipment, lateral fiber optic cable, cameras, adjusting device poles, installation of caissons, conduit, pull boxes, manholes and communication cabinets in Adams, Jefferson, Logan, Morgan, Sedgwick, Washington, and Weld Counties. Dillie & Kuhn Inc. Bid Tab

ARCHIVED BID TABS:  2017 2016 2015 2014 2013  

*In the event that less than three bidders propose on a project and the low apparent bidder is beyond the statutory limit above the engineer's estimate, the project will be reviewed and potentially may be awarded with the authorization of the Department's Executive Director.



Contact Us

Construction Contracts
Marci Gray, Manager
[email protected]
303-757-9297

RB Simmons, Contract Administrator
[email protected]
303-757-9416