Business Center

Design Engineering Services

Date: July 9, 2009. Location: NH 0505-043 (17073) - US 50, Las Animas to Lamar - Design Projects. NH 0504-053 (16004) - US 50, East of Pueblo Safety Project

NOTE: All documents described here are located to the left under Quick Links unless otherwise linked on the page.

Thank you for your interest and response in performing engineering services for the above-captioned project of the Colorado Department of Transportation (CDOT).

We will not hold an interview for this selection, which means CDOT intends to hire up to one (1) consultant team for this work. Please submit six (6) copies of your Statement of Interest (SOI)/Work Plan (WP) submittal to accommodate the members of the board.  Please refer to the SOI/WP instructions to ensure compliance with the page and exhibit limits for the SOI/WP sections of your submittal.  Submit all copies of Statement of Interest/Work Plan by the due date and time as stated in the "Invitation for Consultant Services."

Note: For the Capacity factor included in the Statement of Interest portion of the consultant's submittal, and described in the SOI/WP Preparation Instructions For Consultants, the prime firm must show, for the prime firm or any member of its team, capacity in the following disciplines:  BR - Bridge Design; CE -Civil Engineering; En - Environmental Engineering; GL - Geological Engineering; GE - Geotechnical Engineering; HD - Highway and Street Design; HY - Hydraulics; LA - Landscape Architecture; MT - Materials Testing; SO - Soils Engineering; and TR - Traffic Engingeering.  

By submitting an SOI/WP on this project the consultant is deemed to agree to the process described herein.  You must be on the CDOT's list of pre-qualified consultants to be considered on this project.

CDOT will notify you of the result of the selection by electronic mail.  Please include e-mail address or fax number in your cover letter. 

For a complete consultant selection package for this project, please print the following documents located to the left under Quick Links:

  • Notice to Consultants

  •  Key Event Schedule

  •  Invitation For Consultants

  • Scope of Work
    • Drainage Assessment Report Vols 1 and 2 Appendix A.pdf
    • Drainage Assessment Report Vols 1 and 2 Appendix B.pdf
    • Drainage Assessment Report Vols 1 and 2 Appendix C.pdf
    • Drainage Assessment Report Vols 1 and 2 Appendix D.pdf
    • Drainage Assessment Report Vols 1 and 2 Appendix E.pdf
    • Drainage Assessment Report Vols 1 and 2 Appendix F.pdf
    • Drainage Assessment Report Vols 1 and 2.pdf
    • Existing Conditions Report Appendices.pdf
    • Existing Conditions Report.pdf
    • LAJUNTAdrainage.pdf
    • SAFETY ASSESSMENT STUDY SH 50B.pdf
    • Abbreviated Safety Analysis, SH 50B, MP 329.00 to MP 359.00.pdf
    • Abbreviated Safety Analysis, SH 50B, MP 386.00 to 397.00, Las Animas West.pdf
    • Accident Summary Report, MP 400 to MP 427.pdf
    • US 50 Traffic Conditions.pdf
    • US 50 Vision Report.pdf 

          NOTE: Maps were not added to this webpage due to the size and number of maps, however a disc of the maps may be
          obtained from the CDOT Project Manager shown below. 

If your firm is interested in submitting a Statement of Interest for this project, please sign-up by clicking the mailbox icon.  Indicate your firm's name, this project number and/or project name.  The Sign-up list will be used by the Contracting Officer to notify consultants of any amendments and/or additional project information.   

  • Consultant Scoring Form

  • Statement of Interest (SOI) Instructions

 

Please refer to the following links and CDOT website addresses for the most up-to-date UDBE/DBE and ESB Consultant Lists and Information.




  •  ESB List  (www.dot.state.co.us/dbe_esb/esb.txt)

It is recommended that the SOI/WP be prepared in a 10 or 12 point font only.  If a smaller font is used, it may reflect negatively on your scores. A page for the submittal is a standard 8-1/2 x 11 inch sheet and printed on one side only. If there is any conflict between these Instructions and the guidelines in the Public Advertisement (Notice to Consultants), the information in the Public Advertisement takes precedence.

 


Colorado: The Official State Web Portal