Business Center

2400v Medium Volt MCC Replacement

Date: March 11, 2010. Project Info: IM 0703-348 (17148). 2400v Medium Volt MCC Replacement Construction Management/General Contractor (design support and construction). Location: Eisenhower/Johnson Tunnels

NOTE: All documents described here are located to the left under Quick Links unless otherwise linked on the page.

Thank you for your interest and response in performing engineering services for the above-captioned project of the Colorado Department of Transportation (CDOT).

We will use the "interview process" for this selection, which means CDOT will short-list no less than three firms based on the Statement of Interest (SOI)/Proposal submittal.  Short-listed firms will be invited for a presentation/interview.  Please submit six (6) copies of your SOI/Proposal to accommodate the members of the board.  Please refer to the SOI/Proposal instructions to ensure compliance with the page and exhibit limits for the SOI/Proposal sections of your submittal.  Submit all copies of Statement of Interest/Proposal by the due date and time as stated in the "Invitation for Consultant Services."

Note: For the Capacity factor included in the Statement of Interest portion of the consultant's submittal, and described in the SOI/WP Preparation Instructions For Consultants, the prime firm must show, for the prime firm or any member of its team, capacity in the following disciplines:  Licensed Professional Engineers (PE) or Professional Land Surveyors (PLS) who are registered with the Colorado State Board of Registration for Professional Engineers and Land Surveyors.  National Institute for Certification in Engineering Technology (NICET)  or other certifications may be required for project inspectors, electrical technicians and testers.

By submitting an SOI/Proposal on this project the consultant is deemed to agree to the process described herein.  You must be on the CDOT's list of pre-qualified contractors to be considered on this project.

CDOT will notify you of the result of the selection by electronic mail.  Please include e-mail address or fax number in your cover letter. 

For a complete consultant selection package for this project, please print the following documents located to the left under Quick Links:

  • Notice to Contractors

  • Key Event Schedule

  • Invitation For Contractors

  • Scope of Work - Book 1
  • SOI Proposal Instructions - Book 2

If your firm is interested in submitting a Statement of Interest for this project, please sign-up by contacting the contracting officer.  Indicate your firm's name, this project number and/or project name.  The Sign-up list will be used by the Contracting Officer to notify consultants of any amendments and/or additional project information.   

  • Book 2 Appendix B - CM/GC Contract Template

  • Conceptual Design Evaluation Report

 

  • White Paper - Sole Sourcing of MCC Equipment

 

  • I-70 -3(80) 220 As-Builts (EJMT Tunnel)

 

  • Final Report EJMT Power Study

 

  • EJMT Electrical Inspection Report Volume

 

  • 2400V MCC 15% Plans

Please refer to the following links and CDOT website addresses for the most up-to-date UDBE/DBE and ESB Consultant Lists and Information.




It is recommended that the SOI/WP be prepared in a 10 or 12 point font only.  If a smaller font is used, it may reflect negatively on your scores. A page for the submittal is a standard 8-1/2 x 11 inch sheet and printed on one side only. If there is any conflict between these Instructions and the guidelines in the Public Advertisement (Notice to Consultants), the information in the Public Advertisement takes precedence.

 


Colorado: The Official State Web Portal