Business Center

Scheduled Bid Openings

Design-Bid-Build Construction Project Advertisements

*Twelve new projects advertised February 13, 2020

CDOT posts new advertisements on a bi-weekly schedule. Our next advertisement date is February 27, 2020. A schedule of future planned advertisement dates is available by clicking on this link - Bid Advertisement Calendar.
Electronic plans and specifications are available to registered contractors at B2G. Please be sure to do an account lookup if you are new to the system as many vendors have been entered by CDOT into the system. This will allow you to reset the password if the proper contacts were entered. Upon registration, you can find the plans and specifications or the plan holders list for each project under the "View" menu by selecting "My Bid Solicitations". 
Prime contractors are directed to our Rules Governing Construction Bidding for CDOT Projects which details the requirements of Prequalification in Section 2
All Design-Bid-Build proposals are processed electronically via Bid Express.  Primes must obtain a Digital ID for an agent identified in your prequalification registration. 
EBSx software is available here: AASHTOWare Project Bids (https://bids.cloverleaf.net/) and please remember to hit enter after creating your profile.  For any technical difficulties with Project Bids or the Bid Express website, contact customer service at 888-352-2439 or at [email protected]
Thank you for your interest in our construction projects.  We look forward to working with you.

February 27

NHPP 0091-044 (21778) ~ The project is located in Summit county in Region 3.  The reconstruction of SH 9 between MP 94.8 to MP 96.15.  The project includes widening, noise walls, pedestrian underpass, pipe lining, signal replacement and round about construction at Water Dance Drive & 8th.  The project engineer is Grant Anderson 303-512-5601.

*A MANDATORY PRE-BID CONFERENCE WILL BE HELD ON 2/6/2020 BEGINNING AT 1:00 PM AT THE CDOT OFFICE LOCATED AT 1198 S. ADAMS AVE. SILVERTHORNE, CO 80498.

27Feb001.EBSx

27Feb001.001x

Revision 1

Q&A

Sign-In

Pre-Bid Slides

STR 0101-027 (22997) ~ The project is located in Otero county in Region 2.  SH 10 OVERLAY LA JUNTA WEST MP 46.6 TO 71.97. This project consists of 1.0" HMA leveling course, 1.5" HMA overlay and surgical repairs at selected locations. The project also includes roto-milling, bridge repair, placing shoulder material, seeding, mulching, removal and replacement of guardrail, removal and replacement of bridge rail, delineators, signing, rumble strips and striping. The project engineer is Brian Long 719-336-3228

27Feb002.EBSx

27Feb002.001x

Revision 1

Q&A

NHPP 0702-359 (20934) ~ This project is located in Garfield county in Region 3.  The work included removal and replacement of tunnel lighting, replacement of drainage, and traffic control.  The project engineer Peter Lombardi 970-328-9962.

*A MANDATORY PRE-BID CONFERENCE WILL BE HELD ON TUESDAY FEBRUARY 11, 2020 BEGINNING AT 10:00AM AT THE CDOT RESIDENCY AT 202 CENTENNIAL ST, GLENWOOD SPRINGS, CO. BIDS WILL BE ACCEPTED ONLY FROM PRE-QUALIFIED BIDDERS WHO ATTEND THE MANDATORY PRE-BID CONFERENCE.

27Feb003.EBSx

MTCE 072A-045 (22702) ~ The project is located in Boulder county in Region 4 near the Town of Ward with the main elements of the work including chip seal and replacement of pavement markings.  The project engineer is Tim Miles 970-350-2120.

Project Canceled

C 0402-094  (21848) ~ This project is located in Region 3.  This project will replace the traffic signal equipment, signal poles and mast arms, and vehicle detection for 2 locations on US40 in Grand County, CO at MM 184.53 in Kremmling, and MM 212.06 in Granby. Other work includes pedestrian curb ramp replacement, signing and striping, and temporary traffic control. The project engineer is Zane Znamenacek 970-683-6278.  

27Feb005.EBSx

NH 0242-085 (21903) ~ The project is located in El Paso county in Region 2.  Resurfacing from West of Chipita Park to West of Manitou on US 24. Limits are from M.P. 291.38 to M.P. 296.60. Resurfacing will include 2.25 Inches of milling and 2.25 Inches of Asphalt Pavement Overlay. Other work items include, replace 3 runs of guardrail, add or replace over 400 signs, replace the 2 curb ramps and paving on the island at Fountain Ave. in Cascade, replace and/or update all delineators, and replace a few runs of curb and gutter at the businesses on the west end of the project. The project engineer is Scott Schnake 719-527-5807.

27Feb006.EBSx

Revision 1

Revision 2

March 5

*NHPP 0171-105 (20626) ~ This project is located in Region 5 on SH 17 between mileposts 84.5 and 118.37 in both Alamosa and Saguache counties. The work consists of widening the existing roadway with earthwork, base course, and heating and remixing treatment. This work is followed with a 2.0" HMA overlay and shouldering. The project also has minor culvert extensions, traffic control, erosion control, signing, and striping. The project engineer is Jason Velasquez 719-587-6509.

05Mar001.EBSx

*C 0641-106 (23407) ~ This project is located in Region 3 Rio Blanco county.  This is a surface treatment along SH64 between MP 43 to MP 61.  The work includes the placement of a 1” leveling and 1.5” overlay.  The project engineer is Clinton Moyer 970-826-5189.

05Mar002.EBSx

*NHPP 145A-080 (23000) ~ The project is located in Region 5 in San Miguel county.  This project is MP 71.51 to MP 84.24: overlay adjusting guardrail on Keystone Hill, and four culvert improvements at MP 77.11, MP 78.04, MP 79.98, MP 80.2 for debris flow mitigation.  Intersection improvements at CR 58P in sawpit.  The project engineer is Jason Fullerton 970-385-8370. 

THIS PROJECT HAS AN OPTIONAL ON-SITE JOB SHOWING ON FEBRUARY 26TH AT KEYSTONE HILL OVERLOOK AT 10:30 AM. NOTIFICATION OF PLANNED ATTENDANCE IS REQUESTED BY FEBRUARY 24TH.

05Mar003.EBSx

*STR 2871-038 (22910) ~ This project is located in Region 2 in Baca county and will add two passing lanes on US 287 south of Springfield. A northbound passing lane will be between MP 3 and MP 5 and a southbound passing lane will be between MP 23 AND 25. The work includes excavation, removal of existing concrete and asphalt pavements, aggregate base course, concrete paving, signing, and striping.  The project engineer is Brian Long 719-336-3228.

05Mar004.EBSx

*NHPP 0502-082 (22554) ~ This project is located in Region 3 in Gunnison county.  This project is a chip seal project on US HWY 50 from MP 116.7 to 123.0 it starts again on MP 127.00 to MP139, then starts again on MP 154 to MP 156, then MP158.05 to MP 181.6.  The project engineer is Raelene Shelly 970-683-6420. 

05Mar005.EBSx

*CC 080-030 (20955) ~ This project it located in Region 3 in Garfield & Mesa county.  This project is a culvert replacement in various locations.  The project engineer is Robert Beck 970-683-6351. 

Mandatory Pre-Bid meeting, February 26, 2020 beginning at 1:00 P.M. CDOT Bookcliff Conference Room 2328 G Road Grand Junction, CO 81506

05Mar006.EBSx

*BR 025A-046 (22823) ~ This project is located in Region 2 in Pueblo county.  This project involves bridge removal of structure and construction of CBE structure and adding 2 lance SB I-25 detour removal of detour lane.  The project engineer is Jennifer Billings 719-548-5753.

05Mar007.EBSx

*STR R300-249 (22805) ~ This project is located in Region 3 in Grand & Jackson counties.  This project consists of improvements to bring existing curb ramps into compliance with PROWAG requirements. The work to be performed includes improvements to curb ramps, curb and gutter and sidewalks. Curb ramp replacements are located in various areas throughout the towns of Fraser, Granby, Hot Sulphur Springs, Kremmling, Walden and Winter Park. The project engineer is Grant Anderson 303-512-5601. 

A mandatory pre-bid meeting will be held at the Mountain Residency on February 19th, 2020 at 9:30 AM. 1198 South Adams Avenue, Silverthorne, CO 80498.

05Mar008.EBSx

Sign In 

Presentation

*MTCE R300-255 (23098) ~ This project is located in Region 3 over all counties.  The project is sign replacement.  This project will consist of removal and replacement of highway signs, posts, and bases on State Highways 50A from mile point (MP) 34.62 to 165.601 plus the frontage roads, on 50D from MP 0.0 to 1.539, 70E from MP 0.0 to 0.222, 91A from MP 0.0 to 22.605, 131A from MP 0.0 to 0.323, 131B from MP 0.053 to 68.721, 134A from MP 0.0 to 27.163, 317A from MP 0.0 to 12.237, and 550B from MP 117.514 to 130.209, The project engineer is Bill Crawford 970-683-7532. 

05Mar009.EBSx

*CC 080-037 (23266) ~ This project is located in Region 3 in Mesa county.  This project includes updates to various curb ramps on North Avenue to reflect current standards.  The project engineer is Robert Beck 970-683-6351. 

A MANDATORY PRE-BID CONFERENCE WILL BE HELD ON 18 FEBRUARY 2020 AT 10:00 AM IN THE BOOKCLIFF CONFERENCE ROOM AT THE CDOT GRAND JUNCTION OFFICE LOCATED AT 2328 G ROAD, GRAND JUNCTION, CO, 81505, TO PRESENT A BRIEF OVERVIEW OF THE PROJECT AND TO ANSWER QUESTIONS FROM PROSPECTIVE BIDDERS. BIDS WILL BE ACCEPTED ONLY FROM PRE-QUALIFIED BIDDERS WHO ATTEND THE MANDATORY PRE-BID CONFERENCE.

05Mar010.EBSx

March 12

*NH 050A-034 (22079) ~ This project is located in Region 2 in Pueblo county.  Project will include construction of a new interchange and structure with corresponding roadway work at Purcell Blvd, widening of westbound US 50 between Purcell Blvd and Pueblo Blvd, and construction of a pond within the interchange footprint. Work will include removal of asphalt mat, installation of drainage items, paving, resurfacing, signal removal and installation, ped improvements at McCulloch Blvd, traffic control, and other items as indicated in the plans and specs. The project engineer is Daniel Dahlke 719-562-5509.

12Mar001.EBSx

*HPP 0501-067 (21471) ~ This project is located in Region 3 in Delta county.  This project is US50 and SH92 Delta intersection to conform with the City of Delta Access Control Plan.  The project engineer is Raelene Shelly 970-683-6420. 

A Mandatory Pre-Bid Conference will be held on February 25, 2020, beginning at 10:30 AM, at the Montrose Road & Bridge Office, 63160 LaSalle Rd, Montrose, CO, 81401. Bids will only be accepted from qualified bidders who attend the mandatory Pre-Bid Conference.

12Mar002.EBSx

Colorado: The Official State Web Portal