R3 PS I-70 Exit 203 & Eastbound Auxiliary Lane Design Engineering Services

R3 PS I-70 Exit 203 & Eastbound Auxiliary Lane Design Engineering Services. 1st Date of Publication: 1/25/2018. SOI Submission Deadline: 2/15/2018. Number of SOIs/WPs to submit: seven (7) or submit electronically through the CDOT RFx Vendor portal RFx #6000195.