Transfer of Stormwater Permit to Contractor
2012-2. April 26, 2012. This design bulletin provides information to assist design staff in implementing revised Policy Memo 27.
Design Bulletin PM 27lez.docx — 868.9 KB
Design Bulletin PM 27lez.docx — 868.9 KB