Specification Changes Under Consideration
Listed below are proposed changes to the 2005 Standard Specifications under consideration by the CDOT Specification Committee. Read the proposed change by clicking on the appropriate Description title in the list below to open the document in MS Word. » Standard Special Provisions To Be Incorporated Into The 2010 Standard Specifications «
Proposed Changes
Proposed New Standard Special Provisions | ||
Log No. | Description | Date Comments are Due: |
FASTER-1 | FASTER Reports | January 26, 2011 |
203-6 | Imported Material for Embankment - 2nd Review | January 26, 2011 |
106-14 |
Glass Beads in Pavement Marking - 2nd Review | January 26, 2011 |
105-81 | Contractor Submittals Traffic Signal Pedestal Pole | December 15, 2010 |
101-14 | Water Quality Control Under One Acre of Disturbance | November 30, 2010 |
Proposed Revisions to Existing Standard Special Provisions | ||
Log No. | Description | Date Comments are Due: |
105-82 | Disputes and Claims for Contract Adjustments | January 26, 2011 |
107-11 | Responsibility for Damage Claims, Insurance Types and Coverage Limits | January 26, 2011 |
627-9 | Pavement with Waterborne and Low VOC Paint | January 13, 2010 |
612-5 | Delineators | December 27, 2010 |
412-15 | PCCP Consolidating and Finishing | December 15, 2010 |
601-76 | Concrete Finishing | December 15, 2010 |
603-6 | Revision of Sections 603, 617, and 624, Culvert and Sewer Pipe - Table 624 - 1 | December 15, 2010 |
Proposed New Project Special Provision Worksheet | ||
Log No. | Description | Date Comments are Due: |
240-2A | Protection of Migratory Birds | December 17, 2010 |
240-2B | Protection of Migratory Birds | December 17, 2010 |
240-2C | Protection of Migratory Birds | December 17, 2010 |
Proposed Revision to Existing Project Special Provision Worksheet | ||
Log No. | Description | Date Comments are Due: |
Proposed New Sample Project Special Provisions | ||
Proposed Revised Sample Project Special Provisions | ||
CDOT Specification Committee
In reviewing and commenting on these documents, please consider using the Reviewing toolbar and associated reviewing tools that are available in MS Word . Please click here for instructions on how to utilize this feature to review documents.
Comments and proposals for revising or creating new special provisions from concerned parties will be considered. CDOT personnel should direct these to their Specification Committee Region or Staff Branch Representative. Current Committee members are listed below. A completed Specification Revision Submittal Form is required by the Specifications Unit, which can be obtained by clicking here. Contractors who are members of Colorado Contractors Association (CCA) should direct their comments to Eldon Strong at CCA. Others not formally represented may address their comments directly to the CDOT Standards and Specifications Unit at the address indicated below.
Chairman: Jeff Wassenaar (Project Development Branch Manager)
Secretary: Larry Brinck (Standards & Specifications Engineer)
Region Representatives:
Region 1: Russel Cox
Region 2: Robert Burch
Region 3: Ron Alexander
Region 4: Brett Locke
Region 5: Dale Martinez
Region 6: Jake Koenig
Staff Representatives:
Project Development Branch: Neil Lacey
Specifications: Larry Brinck
Bridge Branch: Mahmood Hasan
Materials Branch: Jim Zufall
Traffic Engineering: KC Matthews
Maintenance: Mark Mueller
Contracts & Market Analysis: John Eddy
Others Receiving Drafts for Comment:
Federal Highway Administration (FHWA): Donna Harmelink
State Attorney General's Office: Leo Milan
Colorado Contractors Association (CCA): Jim Moody
CDOT STANDARDS AND SPECIFICATIONS UNIT:
Larry Brinck
Standards and Specifications Engineer
CDOT Standards and Specifications Unit
4201 East Arkansas, Room 290
Denver CO 80222
Telephone: 303-757-9474
updated by: Mohan Sagar, Specifications Engineer