You are here: Home Business Center Design & Construction Project Support Construction Specifications 2011 Construction Specifications Specification Changes Under Consideration 2017-08-30 2017-08-30 https://www.codot.gov/business/designsupport/cdot-construction-specifications/2011-Specs/specs-changes-under-consideration/2017-08-30 https://www.codot.gov/@@site-logo/siteLogo.png 2017-08-30 Revision of Section 106 - Conformity to the Contract Of Hot Mix Asphalt (Less Than 5000 Tons With Volumetric Verification) Revision of Sections 105 and 106 - Conformity to the Contract of Hot Mix Asphalt (Voids Acceptance)
2017-08-30 https://www.codot.gov/business/designsupport/cdot-construction-specifications/2011-Specs/specs-changes-under-consideration/2017-08-30 https://www.codot.gov/@@site-logo/siteLogo.png 2017-08-30 Revision of Section 106 - Conformity to the Contract Of Hot Mix Asphalt (Less Than 5000 Tons With Volumetric Verification) Revision of Sections 105 and 106 - Conformity to the Contract of Hot Mix Asphalt (Voids Acceptance)
Revision of Section 106 - Conformity to the Contract Of Hot Mix Asphalt (Less Than 5000 Tons With Volumetric Verification)