Colorado Department of Transporation 15:10 Monday, January 8, 2007 1 2006 Cost Data - Maintenance PROJECTS BID FROM 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20060112 NEIL'S EXCAVATION & GENERAL CONTRACTING 5 $320,971.17 105.30 MTCE 05-044 R5 - INLAID PAVEMENT MARKING 5 M 20060112 KOLBE STRIPING INC. 3 $1,597,589.00 92.19 MTCE 05-045 R5 - REGION WIDE EPOXY STRIPIN 5 M 20060112 DKS ENTERPRISES INC. 8 $155,210.50 88.51 MTCE 02-025 R2 - FY 06 SNOW GATES 2 P 20060126 DKS ENTERPRISES INC. 4 $152,041.00 80.87 MTCE 05-043 US 24 & MAIN ST IN BUENA VISTA 5 M 20060126 ADARAND CONSTRUCTORS, INC. 4 $650,042.70 91.18 MTCE 05-046 REGION 5, MAINTENANCE SECTION 5 M 20060126 AMERICAN CIVIL CONSTRUCTORS, INC. 5 $148,500.00 103.45 MTCE 06-064 I-270 OVER SH224, STR. E-17-QP 6 U 20060209 ROCKY MOUNTAIN ENTERPRISES, INC. 3 $192,872.00 100.30 MTCE 05-047 MONTE VISTA SIGNAL REPLACEMEN 5 U 20060216 FOUR CORNERS MATERIALS 1 $913,989.30 98.19 MTCE 05-048 US550 - MP 49.85 TO MP 56.00 5 M 20060309 UNITED RENTALS HIGHWAY TECHNOLOGIES 3 $738,917.75 94.24 MTCE 01-054 R1 FY 06 STRIPING WEST 1 M 20060309 INTERMOUNTAIN SLURRY SEAL, INC. 4 $1,036,575.00 85.57 MTCE 05-049 US 491B CHIP SEAL, MP 45.4 - 5 M 20060316 POWER ELECTRIC COMPANY 4 $220,384.18 63.59 MTCE 06-065 I25 - HOV / HOT LANES 6 U 20060323 K.E.C.I. COLORADO, INC. CONTRACT REJ - NO REASON GIVEN MTCE 02-024 CAŅON CITY CURB RAMPS 2 U 20060323 W.L. CONTRACTORS, INC. 5 $89,662.00 77.43 MTCE 06-066 SH 121, SIGNAL CABINET REPLACE 6 U 20060413 PAVETEC, INC. 3 $582,110.20 110.88 MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 1 R 20060413 UNITED RENTALS HIGHWAY TECHNOLOGIES 2 $148,562.60 63.48 MTCE 04-065 R4 I-25 FRONTAGE RD EPOXY 4 R 20060420 ARROW ELECTRIC SERVICE, INC. 3 $181,907.30 94.43 MTCE 02-029 US50 / PURCELL AND ELIZABETH S 2 P 20060420 ASPHALT PAVING CO. 4 $830,598.70 90.31 MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.62 6 R Colorado Department of Transporation 15:10 Monday, January 8, 2007 2 2006 Cost Data - Maintenance PROJECTS BID FROM 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20060504 UNITED RENTALS HIGHWAY TECHNOLOGIES 2 $1,355,395.98 76.66 MTCE 03-032 REGION WIDE, VARIOUS LOCATIONS 3 M 20060504 LAFARGE WEST, INC 1 $166,188.65 78.73 MTCE 04-066 US 85 MP 299.68 TO MP 301.00 4 R 20060511 UNITED RENTALS HIGHWAY TECHNOLOGIES 3 $1,944,605.34 94.57 MTCE 02-030 FY 07 REGION 2 STRIPING 2 P 20060518 UNITED RENTALS HIGHWAY TECHNOLOGIES 3 $139,877.00 67.11 MTCE 03-033 REGION 3 VARIOUS HIGHWAYS, GU 3 M 20060525 STURGEON ELECTRIC COMPANY, INC 4 $443,642.80 86.60 MTCE 01-057 VARIOUS, REGION 1 1 M 20060601 KOLBE STRIPING INC. 3 $1,320,161.00 84.21 MTCE 01-059 REGION WIDE 1 P 20060601 G.A. WESTERN CONSTRUCTION CO. 2 $952,059.00 102.92 MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, BR 3 M 20060608 DKS ENTERPRISES INC. 3 $426,600.00 115.27 MTCE 02-031 REGION 2 - FY07/08 LIGHTING 2 R 20060615 KOLBE STRIPING INC. 4 $403,304.15 86.14 MTCE 01-058 REGION WIDE 1 R 20060615 UNITED RENTALS HIGHWAY TECHNOLOGIES 3 $1,306,938.40 95.07 MTCE 04-069 FY07 R4 EPOXY EAST 4 R 20060615 KOLBE STRIPING INC. 3 $648,960.00 90.88 MTCE 04-070 FY07 R4 EPOXY WEST 4 R 20060622 UNITED RENTALS HIGHWAY TECHNOLOGIES 3 $177,504.00 94.87 MTCE 04-067 FY 07 REGION 4 STERLING SIGNS 4 U 20060622 ROCKY MOUNTAIN ENTERPRISES, INC. 4 $622,195.00 88.11 MTCE 04-068 FY 07 REGION 4 STENCIL MARKING 4 R 20060622 INTERMOUNTAIN SLURRY SEAL, INC. 2 $1,077,844.00 95.37 MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 81 5 M 20060629 ROCKY MOUNTAIN ENTERPRISES, INC. 2 $233,720.00 103.69 MTCE 06-070 R6 - SIGN POST REPLACEMENT 6 U 20060706 UNITED RENTALS HIGHWAY TECHNOLOGIES 2 $1,066,950.00 82.69 MTCE 06-069 VARIOUS LOCATIONS WITHIN REGIO 6 U 20060713 ROCKY MOUNTAIN ENTERPRISES, INC. 3 $504,725.36 100.93 MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 3 M Colorado Department of Transporation 15:10 Monday, January 8, 2007 3 2006 Cost Data - Maintenance PROJECTS BID FROM 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20060713 JALISCO INTERNATIONAL, INC. 2 $576,905.00 112.41 MTCE 06-068 REGION 6- C-470, I-70, US 287 6 U 20060720 G.A. WESTERN CONSTRUCTION CO. 1 $609,472.00 86.15 MTCE 03-036 REGION 3 I-70 STRUCTURE H-03- 3 M 20060720 LPZ INDUSTRIES, INC. 5 $105,840.00 85.89 MTCE 04-071 FY07 R4 US 287 PHASE 1 4 R 20060803 DKS ENTERPRISES INC. 2 $630,440.00 106.49 MTCE 06-071 I-25, SH 85 TO I-70 6 U 20060810 W.L. CONTRACTORS, INC. 5 $872,681.50 89.34 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FROM 1 M 20060831 DKS ENTERPRISES INC. 4 $325,535.50 80.98 MTCE 01-060 I-70 WEST 1 M 20060921 NEW DESIGN CONSTRUCTION CO. 5 $1,241,692.15 103.19 MTCE 04-072 I-25 SLAB REPLACEMENT MILEPOST 4 U 20060928 ALERT TRAFFIC CONTROL, INC. 5 $264,592.00 83.67 MTCE 04-074 R4 US 287 SIGNS PHASE 2 4 R 20061012 UNITED RENTALS HIGHWAY TECHNOLOGIES 5 $171,327.50 93.63 MTCE 06-074 SH 6 AT MP 280.996 6 U 20061019 KIEWIT WESTERN CO 3 $159,443.50 124.31 MTCE 03-041 REGION 3 SH 82 STRUCTURE H-09 3 M 20061020 KIEWIT WESTERN CO 4 $436,932.50 97.36 MTCE 02-032 SH115 2 20061026 FRONT RANGE STRIPING 3 $449,931.50 81.72 MTCE 04-075 FY07 REGION 4 SIGNS NE PHASE I 4 R 20061026 UNITED RENTALS HIGHWAY TECHNOLOGIES 1 $565,185.00 123.00 MTCE 04-076 FY07 R4 SIGNS NE PHASE 2 4 R 20061102 THE TRUESDELL CORPORATION 6 $357,488.00 99.64 MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) AN 3 M 20061116 LPZ INDUSTRIES, INC. 4 $139,052.00 63.32 MTCE 03-038 REGION WIDE VARIOUS LOCATIONS 3 M 20061130 HALLMARK, INC. 5 $151,985.00 78.45 MTCE 06-077 I-76 #E-17-GL & #E-17-GM; SH30 6 U 20061207 AMERICAN WEST CONSTRUCTION, LLC 17 $134,327.00 62.08 MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 6 U Colorado Department of Transporation 15:10 Monday, January 8, 2007 4 2006 Cost Data - Maintenance PROJECTS BID FROM 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20061228 BRANNAN SAND AND GRAVEL, LLC 7 $1,497,256.15 86.29 MTCE 06-072 C470 BOWLES TO KIPLING 6 U 20061228 INTEGRATED ELECTRIC, INC. 6 $256,124.00 90.54 MTCE 04-077 FY07 R4 BEACON REPLACEMENT 4 R ======= ================ ====== TOTALS 198 $29,696,814.38 91.28 Colorado Department of Transporation 15:10 Monday, January 8, 2007 1 2006 Cost Data - Maintenance BRIDGE COST PER SQUARE FOOT (01/01/06 THROUGH 12/31/06) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ BRIDGE REPAIR 060720 MTCE 03-036 M REGION 3 I-70 STRUCTURE H-03- H-03-AY 1127.0000 60.0000 67620.0 $350,526 $5.18 H-03-AY 1127.0000 60.0000 67620.0 $258,946 $3.83 061019 MTCE 03-041 M REGION 3 SH 82 STRUCTURE H-09 0.0000 0.0000 0.0 $47,441 0.0000 0.0000 0.0 $112,003 061102 MTCE 03-039 M REGION 3 I-70 #F-06-Y (EB) AN 0.0000 0.0000 0.0 $111,811 0.0000 0.0000 0.0 $245,677 WEIGHTED AVERAGE COST: NEW STRUCTURES 135240.0 $1,126,404 $8.33 Colorado Department of Transporation 15:10 Monday, January 8, 2007 1 2006 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 201-00000 Clearing and Grubbing 1 Lump Sum 40,000.00 40,000.00 202-00010 Removal of Tree 1 Each 4,000.00 4,000.00 202-00080 Removal of Guard Post 4 Each 2,160.00 540.00 202-00090 Removal of Delineator 4 Each 60.00 15.00 202-00150 Removal of Wall 4 Each 20,000.00 5,000.00 202-00170 Grinding And Texturing Concrete Pavement 401 Sq Yard 1,203.00 3.00 202-00190 Removal of Concrete Median Cover Material 94 Sq Yard 1,222.00 13.00 202-00195 Removal of Median Cover 185 Sq Yard 2,035.00 11.00 202-00203 Removal of Curb and Gutter 66 Lin Foot 924.00 14.00 202-00210 Removal of Concrete Pavement 4,011 Sq Yard 148,407.00 37.00 202-00220 Removal of Asphalt Mat 2,574 Sq Yard 22,580.00 8.77 202-00240 Removal of Asphalt Mat (Planing) 12,286 Sq Yard 117,362.56 9.55 202-00250 Removal of Pavement Marking 1,245,940 Sq Foot 381,719.20 0.31 202-00425 Removal of Bridge Railing 27 Lin Foot 2,430.00 90.00 202-00450 Removal of Portions of Present Structure (Class 1) 220 Sq Yard 13,200.00 60.00 202-00454 Removal of Portions of Present Structure (Class 2A) 220 Sq Yard 26,400.00 120.00 202-00495 Removal of Portions of Present Structure 1 Lump Sum 15,000.00 15,000.00 202-00502 Removal of Portions of Present Structure 68 Cubic Yard 236,254.00 3,474.32 202-00503 Removal of Portions of Present Structure 70 Sq Yard 16,800.00 240.00 202-00504 Removal of Expansion Device 2,344 Lin Foot 116,149.00 49.55 202-00700 Removal of Light Standard 2 Each 520.00 260.00 202-00750 Removal of Luminaire 117 Each 11,115.00 95.00 202-00806 Removal of Walkway 2,300 Lin Foot 63,250.00 27.50 202-00810 Removal of Ground Sign 4,063 Each 180,698.00 44.47 202-00821 Removal of Sign Panel 4,509 Each 149,459.20 33.15 202-00825 Removal of Flashing Beacon 128 Each 28,864.00 225.50 202-00827 Removal of Pull Box 2 Each 190.00 95.00 202-00828 Removal of Traffic Signal Equipment 3 Lump Sum 14,860.00 4,953.33 202-00840 Removal of Traffic Signal Pole 2 Each 5,400.00 2,700.00 202-00848 Removal of Traffic Signal Controller and Cabinet 30 Each 15,701.00 523.37 202-00900 Removal of Concrete Footing 1 Each 2,500.00 2,500.00 202-01000 Removal of Fence 1,000 Lin Foot 750.00 0.75 202-01030 Removal of Road Closure Gate 11 Each 5,709.00 519.00 202-01130 Removal of Guardrail Type 3 2,745 Lin Foot 7,274.25 2.65 202-01140 Removal of Guardrail Type 4 165 Lin Foot 1,402.50 8.50 202-01300 Removal of End Anchorage 47 Each 3,307.80 70.38 202-04002 Clean Culvert 3 Each 15,800.00 5,266.67 202-05019 Sawing Concrete (Special) 400 Lin Foot 1,200.00 3.00 Colorado Department of Transporation 15:10 Monday, January 8, 2007 2 2006 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 202-05150 Sandblasting 39,208 Sq Foot 10,277.00 0.26 202-05300 Removal and Disposal of Paint 1 Lump Sum 5,000.00 5,000.00 203-00060 Embankment Material (Complete In Place) 5,500 Cubic Yard 77,000.00 14.00 203-01500 Blading 16 Hour 2,800.00 175.00 203-01597 Potholing 58 Hour 6,100.00 105.17 203-01620 Sweeping 100 Hour 17,500.00 175.00 206-00000 Structure Excavation 750 Cubic Yard 10,500.00 14.00 206-00100 Structure Backfill (Class 1) 850 Cubic Yard 29,650.00 34.88 207-00205 Topsoil 312 Cubic Yard 2,184.00 7.00 208-00002 Erosion Log (12 Inch) 700 Lin Foot 3,100.00 4.43 208-00011 Erosion Bales (Weed Free) 39 Each 705.00 18.08 208-00020 Silt Fence 2,500 Lin Foot 3,075.00 1.23 208-00045 Concrete Washout Structure 25 Each 14,440.00 577.60 208-00050 Storm Drain Inlet Protection 42 Each 10,175.00 242.26 208-00070 Stabilized Construction Entrance 2 Each 2,259.95 1,129.98 208-00100 Sediment Removal and Disposal 1 Lump Sum 2,500.00 2,500.00 208-00205 Erosion Control Supervisor 217 Hour 21,965.20 101.22 208-00300 Temporary Berms 40 Lin Foot 600.00 15.00 210-00090 Reset Delineator 2 Each 136.90 68.45 210-00500 Rebuild Portions of Present Structure 21 Each 60,900.00 2,900.00 210-00750 Reset Light Standard 30 Each 14,773.50 492.45 210-00810 Reset Ground Sign 15 Each 2,025.00 135.00 210-00815 Reset Sign Panel 622 Each 16,810.00 27.03 210-01130 Reset Guardrail Type 3 1,500 Lin Foot 13,725.00 9.15 210-04200 Adjust Guardrail 11,530 Lin Foot 21,251.00 1.84 212-00006 Seeding (Native) 4 Acre 4,526.00 1,131.50 212-00032 Soil Conditioning 2 Acre 6,013.50 3,006.75 212-00047 Soil Preparation (Special) 2 Acre 8,500.00 4,250.00 213-00002 Mulching (Weed Free Hay) 1 Acre 1,716.00 1,716.00 213-00003 Mulching (Weed Free) 1 Acre 498.00 498.00 213-00004 Mulching (Weed Free Straw) 2 Acre 700.00 350.00 213-00061 Mulch Tackifier 750 Pound 2,114.00 2.82 216-00039 Soil Retention Blanket (Straw) 445 Sq Yard 1,246.00 2.80 217-00020 Herbicide Treatment 10 Hour 810.00 81.00 250-00010 Environmental Health and Safety Management 3 Lump Sum 9,135.00 3,045.00 250-00050 Monitoring Technician 72 Hour 6,192.00 86.00 250-00110 Health and Safety Officer 56 Hour 5,200.00 92.86 250-00120 Material Sampling and Delivery 24 Each 2,280.00 95.00 Colorado Department of Transporation 15:10 Monday, January 8, 2007 3 2006 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 250-00200 Material Handling (Stockpile) 74 Cubic Yard 3,304.00 44.65 250-00210 Solid Waste Disposal 74 Cubic Yard 2,760.00 37.30 250-00220 Hazardous Waste Disposal 42 Cubic Yard 1,930.00 45.95 304-06000 Aggregate Base Course (Class 6) 612 Ton 12,198.00 19.93 304-09000 Aggregate Base Course (Special) 2,405 Cubic Yard 32,467.50 13.50 403-00720 Hot Bituminous Pavement (Patching) (Asphalt) 1,194 Ton 217,340.00 182.03 403-00721 Hot Bituminous Pavement (Patching) (Asphalt) 462 Sq Yard 6,930.00 15.00 403-09210 Stone Matrix Asphalt 10,065 Ton 606,919.50 60.30 403-09221 Stone Matrix Asphalt (Fibers)(Asphalt) 17,156 Ton 1,190,454.84 69.39 403-33841 Hot Bituminous Pavement (Grading S) (100) (PG 64-22) 668 Ton 63,587.50 95.19 403-34701 Hot Bituminous Pavement (Grading SX) (75) 11,942 Ton 460,961.20 38.60 403-34721 Hot Bituminous Pavement (Grading SX) (75) (PG 58-28) 9,816 Ton 572,815.20 58.36 403-34801 Hot Bituminous Pavement (Grading SX) (100) 186 Ton 11,057.70 59.45 408-01000 Hot Poured Joint and Crack Sealant 0 Ton 1,760.00 409-02010 Cover Coat Material (Type II) 7,592 Ton 383,396.00 50.50 409-02015 Cover Coat Material (Type II) 385,283 Sq Yard 577,924.50 1.50 411-03355 Asphalt Cement Performance Grade (PG 58-34) 776 Ton 287,120.00 370.00 411-10255 Emulsified Asphalt (Slow-Setting) 29,065 Gallon 44,168.10 1.52 411-10275 Emulsified Asphalt (HFMS-2P) (High Float) (Polymerize 514,863 Gallon 414,217.88 0.80 420-00100 Geotextile (Erosion Control) (Class A) 380 Sq Yard 798.00 2.10 420-00110 Geotextile (Drainage) (Class A) 550 Sq Yard 1,925.00 3.50 503-00024 Drilled Caisson (24 Inch) 77 Lin Foot 6,699.00 87.00 503-00036 Drilled Caisson (36 Inch) 212 Lin Foot 36,900.00 174.06 503-00042 Drilled Caisson (42 Inch) 30 Lin Foot 5,700.00 190.00 503-00048 Drilled Caisson (48 Inch) 66 Lin Foot 30,360.00 460.00 503-00054 Drilled Caisson (54 Inch) 94 Lin Foot 33,060.00 351.70 506-00218 Riprap (18 Inch) 375 Cubic Yard 33,750.00 90.00 506-00224 Riprap (24 Inch) 1,944 Cubic Yard 92,340.00 47.50 509-00000 Structural Steel 6,805 Pound 31,762.50 4.67 509-08010 Alter and Erect Structural Steel 1 Lump Sum 94,700.00 94,700.00 509-08100 Provide Temporary Support 1 Lump Sum 13,500.00 13,500.00 509-90000 Paint Existing Structure(S) 1 Lump Sum 3,000.00 3,000.00 512-00102 Bearing Device (Type II) 20 Each 40,000.00 2,000.00 515-00120 Waterproofing (Membrane) 279 Sq Yard 4,464.00 16.00 515-00410 Concrete Sealer (Calcium Nitrite) 230 Sq Yard 11,500.00 50.00 518-01002 Bridge Expansion Device (0-2 Inch) 240 Lin Foot 18,720.00 78.00 518-01004 Bridge Expansion Device (0-4 Inch) 165 Lin Foot 35,580.00 215.64 518-01006 Bridge Expansion Device (0-6 Inch) 88 Lin Foot 96,800.00 1,100.00 Colorado Department of Transporation 15:10 Monday, January 8, 2007 4 2006 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 518-01015 Bridge Expansion Device (0-15 Inch) 34 Lin Foot 66,980.00 1,970.00 518-02100 Polymer Mortar End Dam 671 Cubic Foot 241,560.00 360.00 518-03100 Rapid Cure Silicone Joint Seal 1,872 Lin Foot 64,800.00 34.62 601-01000 Concrete Class B 3 Cubic Yard 661.00 220.33 601-03040 Concrete Class D (Bridge) 8 Cubic Yard 5,200.00 650.00 601-03041 Concrete Class D (Bridge) (Special) 25 Cubic Yard 40,000.00 1,600.00 601-03050 Concrete Class D (Wall) 60 Cubic Yard 40,500.00 675.00 601-04000 Concrete Class E 892 Cubic Yard 765,336.00 858.00 601-05035 Concrete Class S35 52 Cubic Yard 63,960.00 1,230.00 601-06020 Concrete (Patching) (Polymer) 16 Cubic Yard 159,900.00 9,993.75 601-06100 Concrete (Patching) 52 Cubic Yard 92,800.00 1,784.62 601-06150 Concrete (Patching) 630 Sq Foot 28,350.00 45.00 602-00020 Reinforcing Steel (Epoxy Coated) 21,400 Pound 57,750.00 2.70 603-10840 84 Inch Corrugated Steel Pipe 216 Lin Foot 59,400.00 275.00 606-00301 Guardrail Type 3 (6-3 Post Spacing) 28,329 Lin Foot 387,470.00 13.68 606-00740 Guardrail Type 7 (Style CE) 165 Lin Foot 23,100.00 140.00 606-01340 End Anchorage Type 3D 2 Each 2,720.00 1,360.00 606-02005 End Anchorage (Flared) 179 Each 253,981.50 1,418.89 606-10705 Bridge Rail Type 7 (Special) 27 Lin Foot 5,400.00 200.00 607-00005 End Post 2 Each 750.00 375.00 607-01100 Fence Barbed Wire With Treated Wooden Posts 1,000 Lin Foot 2,000.00 2.00 607-11525 Fence (Plastic) 200 Lin Foot 1,360.00 6.80 607-60270 20 Foot Gate Double (Chain Link) 1 Each 1,200.00 1,200.00 607-60620 Road Closure Gate 19 Each 123,860.00 6,518.95 607-60630 HOV Gate 10 Each 105,078.00 10,507.80 609-21010 Curb and Gutter Type 2 (Section I-B) 66 Lin Foot 2,640.00 40.00 609-21011 Curb and Gutter Type 2 (Section I-M) 216 Lin Foot 16,632.00 77.00 610-00020 Median Cover Material (Patterned Concrete) 1,955 Sq Foot 19,827.00 10.14 612-00001 Delineator (Type I) 55 Each 1,265.00 23.00 612-00003 Delineator (Type III) 55 Each 1,361.25 24.75 612-00010 Delineator (Special) 2 Each 42,440.00 21,220.00 612-00031 Delineator (Type I) (Extra Height) 1 Each 79.30 79.30 612-00033 Delineator (Type III) (Extra Height) 1 Each 82.00 82.00 612-00300 Steel Guard Post 1 Each 1,310.00 1,310.00 613-00001 Directional Boring Conduit 1,600 Lin Foot 22,720.00 14.20 613-00200 2 Inch Electrical Conduit 8,404 Lin Foot 95,696.00 11.39 613-00201 2 Inch Electrical Conduit (Jacked) 360 Lin Foot 9,360.00 26.00 613-00206 2 Inch Electrical Conduit (Bored) 450 Lin Foot 14,400.00 32.00 Colorado Department of Transporation 15:10 Monday, January 8, 2007 5 2006 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 613-00300 3 Inch Electrical Conduit 500 Lin Foot 5,750.00 11.50 613-00301 3 Inch Electrical Conduit (Jacked) 1,900 Lin Foot 35,025.00 18.43 613-00700 Inspection Trip 48 Each 28,800.00 600.00 613-01200 2 Inch Electrical Conduit (Plastic) 12,509 Lin Foot 152,949.50 12.23 613-01250 2-1/2 Inch Electrical Conduit (Plastic) 430 Lin Foot 6,450.00 15.00 613-01300 3 Inch Electrical Conduit (Plastic) 17,902 Lin Foot 227,240.00 12.69 613-04250 2-1/2 Inch Electrical Conduit (Liquidtight Flexible M 130 Lin Foot 3,185.00 24.50 613-06000 Meter Pole 10 Each 15,938.00 1,593.80 613-07000 Pull Box (Special) 32 Each 11,200.00 350.00 613-07010 Pull Box (Surface Mounted) 2 Each 1,200.00 600.00 613-07017 Pull Box (16"x14"x6") 1 Each 400.00 400.00 613-07034 Pull Box (24"x36"x18") 37 Each 31,202.50 843.31 613-07038 Pull Box (36"x48"x18") 3 Each 1,575.00 525.00 613-07040 Pull Box (30"x48"x24") 16 Each 17,984.00 1,124.00 613-10000 Wiring 9 Lump Sum 129,199.00 14,355.44 613-20100 Light Standard (Install Only) 65 Each 57,962.25 891.73 613-32300 Light Standard Steel (30 Foot) 11 Each 34,375.00 3,125.00 613-32400 Light Standard Steel (40 Foot) 10 Each 30,843.00 3,084.30 613-40010 Light Standard Foundation 15 Each 11,449.75 763.32 613-40020 Transformer Base Aluminum 10 Each 7,693.50 769.35 613-40030 Transformer Base Aluminum (Install Only) 65 Each 16,545.00 254.54 613-50010 Photoelectric Cell 1,300 Each 47,250.00 36.35 613-50200 Lighting System 20 Each 10,200.00 510.00 613-60000 Lamps 1,450 Each 91,200.00 62.90 613-60500 Underground Repair 80 Each 64,000.00 800.00 613-70255 Fuses 300 Each 16,115.00 53.72 613-70260 Fuse Holder 250 Each 29,392.50 117.57 613-70400 Luminaire High Pressure Sodium (400 Watt) 237 Each 103,914.00 438.46 613-70401 Luminaire High Pressure Sodium (400 Watt) (Install On 28 Each 5,417.80 193.49 613-72150 Luminaire High Pressure Sodium (Wall Type) (150 Watt) 20 Each 5,320.00 266.00 613-80010 Ballast Unit 10 Each 3,350.00 335.00 614-00011 Sign Panel (Class I) 7,555 Sq Foot 111,779.80 14.80 614-00012 Sign Panel (Class II) 18,289 Sq Foot 318,218.50 17.40 614-00013 Sign Panel (Class III) 14,630 Sq Foot 306,218.00 20.93 614-00025 Sign Panel (Class I) (Install Only) 18,683 Sq Foot 97,419.10 5.21 614-00027 Sign Panel (Class II) (Install Only) 15,985 Sq Foot 93,258.89 5.83 614-00028 Sign Panel (Class III) (Install Only) 4,707 Sq Foot 41,195.12 8.75 614-00200 Steel Sign Post (U-2) 33 Lin Foot 330.00 10.00 Colorado Department of Transporation 15:10 Monday, January 8, 2007 6 2006 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-00612 Steel Sign Post (W 6x12) 172 Lin Foot 6,160.00 35.81 614-00615 Steel Sign Post (W 6x15) 80 Lin Foot 2,800.00 35.00 614-00818 Steel Sign Post (W 8x18) 97 Lin Foot 5,500.50 56.71 614-01026 Steel Sign Post (W 10x26) 40 Lin Foot 1,880.00 47.00 614-01226 Steel Sign Post (W 12x26) 50 Lin Foot 2,550.00 51.00 614-01502 Steel Sign Support (2-Inch Round)(Post & Socket) 4,793 Lin Foot 57,516.00 12.00 614-01512 Steel Sign Support (2-Inch Round)(Post) 10,177 Lin Foot 131,529.60 12.92 614-01513 Steel Sign Support (2-Inch Round)(Post)(Install Only) 2,126 Lin Foot 9,567.00 4.50 614-01522 Steel Sign Support (2-Inch Round)(Socket) 937 Each 51,890.20 55.38 614-01523 Steel Sign Support (2-Inch Round)(Socket)(Install Onl 155 Each 4,340.00 28.00 614-01575 Steel Sign Support (2-1/2 Inch Round NP-40)(Post) 9,133 Lin Foot 131,084.60 14.35 614-01578 Steel Sign Support (2-1/2 Inch Round NP-40)(Slipbase) 852 Each 131,640.00 154.51 614-01582 Steel Sign Support (2-1/2 Inch Round)(Post and Slipba 26 Lin Foot 1,716.00 66.00 614-01585 Steel Sign Support (2-1/2 Inch Round Sch 80)(Post) 18,918 Lin Foot 441,101.00 23.32 614-01586 Steel Sign Support (2-1/2 In Rd Sch 80)(Post)(Install 2,892 Lin Foot 27,474.00 9.50 614-01588 Steel Sign Support (2-1/2 Inch Round Sch 80)(Slipbase 1,549 Each 258,167.00 166.67 614-01589 Steel Sign Supp (2-1/2 In Rd Sch 80)(Slip)(Install On 161 Each 10,465.00 65.00 614-03001 Concrete Footing (Type 1) 12 Each 11,600.00 966.67 614-03002 Concrete Footing (Type 2) 4 Each 4,000.00 1,000.00 614-03003 Concrete Footing (Type 3) 7 Each 7,770.00 1,110.00 614-03006 Concrete Footing (Type 6) 4 Each 7,200.00 1,800.00 614-03007 Concrete Footing (Type 7) 4 Each 8,000.00 2,000.00 614-10100 Sign Bridge Structure (Install Only) 1 Each 8,500.00 8,500.00 614-10128 Blankout Sign (Fiber Optic) 10 Each 121,300.00 12,130.00 614-10146 Variable Message Sign (LED) (Ground Mounted) 1 Each 89,500.00 89,500.00 614-10147 Variable Message Sign LED (Overhead) 2 Each 213,200.00 106,600.00 614-32400 Monotube Overhead Sign Cantilever (24 Inch Diameter) 2 Each 60,260.00 30,130.00 614-70336 Traffic Signal Face (12-12-12) 10 Each 5,250.00 525.00 614-72830 Communications Cabinet 14 Each 15,400.00 1,100.00 614-72875 Loop Detector Wire 5,000 Lin Foot 12,000.00 2.40 614-72886 Intersection Detection System (Camera) 2 Each 9,850.00 4,925.00 614-72887 Microwave Vehicle Radar Detector 4 Each 18,260.00 4,565.00 614-72896 Intersection Detection System (Camera)(Install Only) 4 Each 3,200.00 800.00 614-75216 Pedestrian Signal Face (16) (Install Only) 24 Each 4,640.00 193.33 614-75336 Traffic Signal Face (12-12-12) (Install Only) 22 Each 5,730.00 260.45 614-75560 Traffic Signal Face (12-12-12-12-12) (Install Only) 20 Each 5,320.00 266.00 614-75841 Traffic Signal Controller (Type 170) (Install Only) 3 Each 4,750.00 1,583.33 614-75848 Traffic Signal Controller and Cabinet (Install Only) 20 Each 9,600.00 480.00 Colorado Department of Transporation 15:10 Monday, January 8, 2007 7 2006 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-75860 Pedestrian Push Button (Install Only) 24 Each 5,400.00 225.00 614-75877 Loop Detector Wire Prefabricated (Special) (Install O 2,200 Lin Foot 7,810.00 3.55 614-80000 Flashing Beacon 104 Each 173,315.00 1,666.49 614-80002 Flashing Beacon (Install Only) 25 Each 13,275.00 531.00 614-80385 Rumble Strip 3,380 Lin Foot 10,140.00 3.00 614-81301 Traffic Signal-Light Pole (1 Mast Arm) (Install Only) 14 Each 33,000.00 2,357.14 614-85001 Impact Attenuator 3 Each 20,100.00 6,700.00 614-86105 Telemetry (Field) 1 Each 1,255.00 1,255.00 614-86705 Traffic Signal Equipment (Install Only) 160 Hour 18,592.00 116.20 614-86710 Traffic Signal Equipment 1 Lump Sum 2,040.00 2,040.00 614-86920 Modification of Traffic Signal Controller Cabinet 3 Each 2,946.00 982.00 614-87010 Fiber Optic Cable (Single Mode) (12 Fiber) 500 Lin Foot 2,250.00 4.50 614-87020 Optical Transceiver 6 Each 17,400.00 2,900.00 614-87028 Video Optical Transceiver 20 Each 46,000.00 2,300.00 614-87320 Closed Circuit Television 10 Each 30,000.00 3,000.00 614-87325 Closed Circuit Television Pole 6 Each 18,000.00 3,000.00 614-87350 Test Fiber Optic Cable 1 Lump Sum 2,500.00 2,500.00 614-87401 Fiber Optic Cable (Special) 350 Lin Foot 682.50 1.95 614-87406 Fiber Optic Cable (Single Mode) (6 Strands) 5,555 Lin Foot 22,220.00 4.00 614-87497 Fiber Optic Cable (Multi Mode) (96 Stands) 10,000 Lin Foot 13,500.00 1.35 620-00020 Sanitary Facility 1 Each 270.00 270.00 625-00000 Construction Surveying 2 Lump Sum 11,090.00 5,545.00 626-00000 Mobilization 49 Lump Sum 1,763,676.61 35,993.40 626-01000 Public Information Services 3 Lump Sum 7,039.98 2,346.66 627-00003 Thermoplastic Pavement Marking (Inlaid) 14,814 Sq Foot 111,105.00 7.50 627-00005 Epoxy Pavement Marking 182,450 Gallon 7,752,359.41 42.49 627-00011 Pavement Marking Paint (Waterborne) 3,562 Gallon 85,393.15 23.97 627-00012 Pavement Marking Paint (Low VOC Solvent Base) 1,862 Gallon 34,966.76 18.78 627-01001 Preformed Plastic Pavement Marking (Type I) 9,393 Sq Foot 104,144.40 11.09 627-01003 Preformed Plastic Pavement Marking (Type A) (Inlaid) 4,700 Sq Foot 57,575.00 12.25 627-01010 Preformed Plastic Pavement Marking (Type I)(Inlaid) 65,238 Sq Foot 590,478.00 9.05 627-02001 Preformed Plastic Pavement Marking (Type II) 25,000 Sq Foot 212,500.00 8.50 627-02010 Preformed Plastic Pavement Marking (Type II) (Inlaid) 112,097 Sq Foot 1,082,858.00 9.66 627-30324 Preformed Plastic Pavement Marking (Word-Symbol) (Typ 3,129 Sq Foot 64,300.95 20.55 627-30327 Preformed Plastic Pavement Marking (Word-Symbol) (Typ 541 Sq Foot 8,764.20 16.20 627-30329 Preformed Plastic Pavement Marking (Xwalk-Stop Line) 17,409 Sq Foot 171,130.47 9.83 627-30332 Preformed Plastic Pavement Marking (Xwalk-Stop Line) 720 Sq Foot 7,776.00 10.80 627-30405 Preformed Thermoplastic Pavement Marking (Word-Symbol 25,238 Sq Foot 275,412.00 10.91 Colorado Department of Transporation 15:10 Monday, January 8, 2007 8 2006 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 627-30410 Preformed Thermoplastic Pavement Marking (Xwalk-Stop 36,114 Sq Foot 289,720.00 8.02 630-00000 Flagging 15,644 Hour 322,612.00 20.62 630-00001 Pilot Car Operation 720 Hour 15,240.00 21.17 630-00003 Uniformed Traffic Control 1,310 Hour 100,477.00 76.70 630-00004 Traffic Control Vehicle 2 Each 2,752.01 1,376.01 630-00007 Traffic Control Inspection 260 Day 27,510.65 105.81 630-00012 Traffic Control Management 2,106 Day 765,053.10 363.27 630-00013 Traffic Control Management includes Flagging 30 Day 15,000.00 500.00 630-10005 Traffic Control 2 Lump Sum 25,500.00 12,750.00 630-80001 Flashing Beacon (Portable) 8 Each 4,626.02 578.25 630-80335 Barricade (Type 3 M-A) (Temporary) 44 Each 8,345.25 189.66 630-80341 Construction Traffic Sign (Panel Size A) 692 Each 38,574.10 55.74 630-80342 Construction Traffic Sign (Panel Size B) 1,074 Each 74,022.26 68.92 630-80343 Construction Traffic Sign (Panel Size C) 159 Each 12,203.04 76.75 630-80344 Construction Traffic Sign (Special) 351 Sq Foot 7,413.28 21.12 630-80350 Vertical Panel 450 Each 8,125.00 18.06 630-80354 Vertical Panel (With Light) (Steady Burn) 450 Each 10,450.00 23.22 630-80355 Portable Message Sign Panel 23 Each 97,406.02 4,235.04 630-80357 Advance Warning Flashing or Sequencing Arrow Panel (B 6 Each 3,930.00 655.00 630-80358 Advance Warning Flashing or Sequencing Arrow Panel (C 56 Each 54,186.82 967.62 630-80359 Portable Message Sign Panel 73 Day 9,470.00 129.73 630-80360 Drum Channelizing Device 1,120 Each 32,927.00 29.40 630-80363 Drum Channelizing Device (With Light) (Flashing) 20 Each 737.50 36.88 630-80364 Drum Channelizing Device (With Light) (Steady Burn) 205 Each 5,675.00 27.68 630-80376 Guardrail Type 7 (Temporary) 400 Lin Foot 7,200.00 18.00 630-80377 Portable Water Filled Barrier (Temporary) 1,500 Lin Foot 48,000.00 32.00 630-80380 Traffic Cone 7,120 Each 53,591.50 7.53 630-80510 Mobile Pavement Marking Zone 9 Lump Sum 37,585.00 4,176.11 630-80520 Mobile Pavement Marking Zone 210 Day 21,340.00 101.62 630-80560 Mobile Profilograph Operation Zone 1 Lump Sum 850.00 850.00 630-85006 Impact Attenuator (Sand Filled Plastic Barrel) (Tempo 2 Each 5,200.00 2,600.00 630-85040 Impact Attenuator (Truck Mounted Attenuator) (Tempora 26 Each 356,931.06 13,728.12 630-85041 Impact Attenuator (Truck Mounted Attenuator) 10 Day 1,500.00 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 1 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00000 Clear and Grub LUMP SUM =============================================== MTCE 02-032 SH115 10/20/06 1.00 45000.00 27466.47 40000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 45000.00 27466.47 40000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 45000.00 27466.47 40000.00 =============== 202-00010 Rem Tree Each =================================================== MTCE 02-032 SH115 10/20/06 1.00 2000.00 1565.09 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2000.00 1565.09 4000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 1565.09 4000.00 =============== 202-00080 Rem Guard Post Each =================================================== MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 4.00 75.00 458.24 540.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 75.00 458.24 540.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 75.00 458.24 540.00 =============== 202-00090 Rem Delineator Each =================================================== MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 4.00 12.00 40.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 12.00 40.00 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 12.00 40.00 15.00 =============== 202-00150 Rem Wall Each =================================================== MTCE 02-032 SH115 10/20/06 4.00 6000.00 1793.18 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 6000.00 1793.18 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 6000.00 1793.18 5000.00 =============== 202-00170 Grinding And Texturing Conc Pvmt Sq Yard ================================================ MTCE 04-072 I-25 SLAB REPLACEMENT MILEPOS 09/21/06 401.00 17.00 10.90 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 401.00 17.00 10.90 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 401.00 17.00 10.90 3.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 2 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00190 Rem of Conc Median Cover Matl Sq Yard ================================================ MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 94.00 14.00 17.03 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 94.00 14.00 17.03 13.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 94.00 14.00 17.03 13.00 =============== 202-00195 Rem of Median Cover Sq Yard ================================================ MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 185.00 13.00 16.33 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 185.00 13.00 16.33 11.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 185.00 13.00 16.33 11.00 =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 66.00 22.00 18.03 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 66.00 22.00 18.03 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66.00 22.00 18.03 14.00 =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ MTCE 04-072 I-25 SLAB REPLACEMENT MILEPOS 09/21/06 4,011.00 50.00 58.00 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,011.00 50.00 58.00 37.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,011.00 50.00 58.00 37.00 =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 04/13/06 279.00 14.00 31.67 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 279.00 14.00 31.67 20.00 MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 595.00 10.00 17.92 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 595.00 10.00 17.92 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 3 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ MTCE 02-032 SH115 10/20/06 1,700.00 7.80 2.73 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,700.00 7.80 2.73 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,574.00 8.98 7.52 8.77 =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 462.00 20.00 16.71 15.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 462.00 20.00 16.71 15.50 MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 397.00 25.00 41.50 61.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 397.00 25.00 41.50 61.00 MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 7,515.00 12.00 7.60 7.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,515.00 12.00 7.60 7.60 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 3,912.00 4.00 8.39 7.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,912.00 4.00 8.39 7.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,286.00 10.17 9.34 9.55 =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ MTCE 05-044 R5 - INLAID PAVEMENT MARKING 01/12/06 20,571.00 1.35 1.65 1.25 MTCE 01-054 R1 FY 06 STRIPING WEST 03/09/06 10,000.00 0.75 0.58 0.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30,571.00 1.15 1.41 1.14 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 4 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 750.00 2.50 2.73 2.20 MTCE 03-032 REGION WIDE, VARIOUS LOCATION 05/04/06 814,139.60 0.50 0.35 0.25 MTCE 02-030 FY 07 REGION 2 STRIPING 05/11/06 139,379.00 0.50 0.49 0.45 MTCE 01-059 REGION WIDE 06/01/06 10,000.00 0.90 0.65 0.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 964,268.60 0.51 0.39 0.28 MTCE 06-069 VARIOUS LOCATIONS WITHIN REGI 07/06/06 250,000.00 0.35 0.50 0.29 MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 100.00 3.00 11.25 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 250,100.00 0.35 0.50 0.29 MTCE 06-074 SH 6 AT MP 280.996 10/12/06 1,000.00 2.00 2.43 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,000.00 2.00 2.43 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,245,939.60 0.49 0.46 0.31 =============== 202-00425 Rem Bridge Railing Lin Foot =============================================== MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 27.00 45.00 73.20 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 27.00 45.00 73.20 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 45.00 73.20 90.00 =============== 202-00450 Rem Port Present Str (1) Sq Yard ================================================ MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 220.00 100.00 146.92 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 220.00 100.00 146.92 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 220.00 100.00 146.92 60.00 =============== 202-00454 Rem Port Present Str (2A) Sq Yard ================================================ MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 220.00 100.00 292.47 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 220.00 100.00 292.47 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 220.00 100.00 292.47 120.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 5 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00495 Rem Port Present Str LUMP SUM =============================================== MTCE 06-064 I-270 OVER SH224, STR. E-17-Q 01/26/06 1.00 4000.00 13914.14 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 4000.00 13914.14 15000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 4000.00 13914.14 15000.00 =============== 202-00502 Rem Port Present Str Cubic Yard ============================================= MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 31.00 1200.00 6020.50 5234.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 31.00 1200.00 6020.50 5234.00 MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 37.00 1200.00 2000.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 37.00 1200.00 2000.00 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 68.00 1200.00 4517.89 3474.32 =============== 202-00503 Rem Port Present Str Sq Yard ================================================ MTCE 06-077 I-76 #E-17-GL & #E-17-GM; SH3 11/30/06 70.00 300.00 583.60 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 70.00 300.00 583.60 240.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70.00 300.00 583.60 240.00 =============== 202-00504 Rem Exp Device Lin Foot =============================================== MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 1,569.00 100.00 19.00 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,569.00 100.00 19.00 21.00 MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 295.00 100.00 326.36 160.00 MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 480.00 120.00 75.00 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 775.00 112.39 213.60 107.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,344.00 104.10 68.48 49.55 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 6 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00700 Rem Light Standard Each =================================================== MTCE 01-057 VARIOUS, REGION 1 05/25/06 2.00 470.00 404.76 260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 470.00 404.76 260.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 470.00 404.76 260.00 =============== 202-00750 Rem Luminaire Each =================================================== MTCE 06-071 I-25, SH 85 TO I-70 08/03/06 117.00 150.00 98.98 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 117.00 150.00 98.98 95.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 117.00 150.00 98.98 95.00 =============== 202-00806 Rem Walkway Lin Foot =============================================== MTCE 06-071 I-25, SH 85 TO I-70 08/03/06 2,300.00 14.00 18.79 27.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,300.00 14.00 18.79 27.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,300.00 14.00 18.79 27.50 =============== 202-00810 Rem Ground Sign Each =================================================== MTCE 01-058 REGION WIDE 06/15/06 932.00 50.00 64.50 75.00 MTCE 04-067 FY 07 REGION 4 STERLING SIGNS 06/22/06 280.00 42.00 38.33 35.00 MTCE 06-070 R6 - SIGN POST REPLACEMENT 06/29/06 500.00 22.00 35.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,712.00 40.51 55.25 52.39 MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 07/13/06 670.00 25.00 53.33 35.00 MTCE 04-071 FY07 R4 US 287 PHASE 1 07/20/06 187.00 41.00 48.40 40.00 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 8.00 60.00 132.00 25.00 MTCE 04-074 R4 US 287 SIGNS PHASE 2 09/28/06 198.00 50.00 51.11 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,063.00 32.73 52.41 34.13 MTCE 04-075 FY07 REGION 4 SIGNS NE PHASE 10/26/06 508.00 42.00 45.00 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 7 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00810 Rem Ground Sign Each =================================================== MTCE 04-076 FY07 R4 SIGNS NE PHASE 2 10/26/06 355.00 42.00 55.00 55.00 MTCE 03-038 REGION WIDE VARIOUS LOCATIONS 11/16/06 425.00 30.00 51.25 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,288.00 38.04 48.96 42.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,063.00 37.69 52.68 44.47 =============== 202-00821 Rem Sign Panel Each =================================================== MTCE 05-046 REGION 5, MAINTENANCE SECTION 01/26/06 46.00 20.00 22.30 17.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 46.00 20.00 22.30 17.20 MTCE 01-058 REGION WIDE 06/15/06 114.00 50.00 46.00 50.00 MTCE 04-067 FY 07 REGION 4 STERLING SIGNS 06/22/06 335.00 30.00 36.67 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 449.00 35.08 39.58 38.81 MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 07/13/06 1,206.00 25.00 25.33 15.00 MTCE 04-071 FY07 R4 US 287 PHASE 1 07/20/06 184.00 15.00 34.00 20.00 MTCE 06-071 I-25, SH 85 TO I-70 08/03/06 97.00 300.00 292.85 380.00 MTCE 04-074 R4 US 287 SIGNS PHASE 2 09/28/06 435.00 35.00 28.93 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,922.00 40.18 35.13 34.80 MTCE 04-075 FY07 REGION 4 SIGNS NE PHASE 10/26/06 889.00 35.00 31.67 25.00 MTCE 04-076 FY07 R4 SIGNS NE PHASE 2 10/26/06 774.00 35.00 45.00 45.00 MTCE 03-038 REGION WIDE VARIOUS LOCATIONS 11/16/06 429.00 25.00 34.75 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,092.00 32.95 34.69 30.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,509.00 36.11 35.27 33.15 =============== 202-00825 Rem Flashing Beacon Each =================================================== MTCE 04-077 FY07 R4 BEACON REPLACEMENT 12/28/06 128.00 250.00 222.42 225.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 128.00 250.00 222.42 225.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 128.00 250.00 222.42 225.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 8 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00827 Rem of Pull Box Each =================================================== MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 2.00 130.00 133.33 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 130.00 133.33 95.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 130.00 133.33 95.00 =============== 202-00828 Rem Traf Sig Equipment LUMP SUM =============================================== MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 1.00 3500.00 11498.84 8860.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 1.00 5000.00 7944.70 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 4500.00 9366.36 4953.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4500.00 9366.36 4953.33 =============== 202-00840 Rem Traf Sig Pole Each =================================================== MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 2.00 950.00 2080.00 2700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 950.00 2080.00 2700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 950.00 2080.00 2700.00 =============== 202-00848 Rem Traf Sig Control+Cab Each =================================================== MTCE 06-065 I25 - HOV / HOT LANES 03/16/06 10.00 500.00 457.78 600.10 MTCE 06-066 SH 121, SIGNAL CABINET REPLAC 03/23/06 20.00 500.00 713.58 485.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 500.00 640.49 523.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 500.00 640.49 523.37 =============== 202-00900 Rem Conc Footing Each =================================================== MTCE 06-074 SH 6 AT MP 280.996 10/12/06 1.00 200.00 1614.20 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 200.00 1614.20 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 200.00 1614.20 2500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 9 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01000 Rem Fence Lin Foot =============================================== MTCE 02-032 SH115 10/20/06 1,000.00 1.50 1.11 0.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,000.00 1.50 1.11 0.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,000.00 1.50 1.11 0.75 =============== 202-01030 Rem of Road Closure Gate Each =================================================== MTCE 02-025 R2 - FY 06 SNOW GATES 01/12/06 9.00 400.00 766.63 561.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 400.00 766.63 561.00 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 2.00 500.00 1325.72 330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 500.00 1325.72 330.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 418.18 834.81 519.00 =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== MTCE 05-046 REGION 5, MAINTENANCE SECTION 01/26/06 2,745.00 2.25 2.09 2.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,745.00 2.25 2.09 2.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,745.00 2.25 2.09 2.65 =============== 202-01140 Rem Gdrail Ty 4 Lin Foot =============================================== MTCE 06-074 SH 6 AT MP 280.996 10/12/06 165.00 20.00 39.50 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 165.00 20.00 39.50 8.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 165.00 20.00 39.50 8.50 =============== 202-01300 Rem End Anchorage Each =================================================== MTCE 05-046 REGION 5, MAINTENANCE SECTION 01/26/06 46.00 140.00 94.93 59.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 46.00 140.00 94.93 59.30 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 10 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01300 Rem End Anchorage Each =================================================== MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 1.00 180.00 366.75 580.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 180.00 366.75 580.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 47.00 140.85 102.12 70.38 =============== 202-04002 Clean Culvert Each =================================================== MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 1.00 1000.00 2966.67 3800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 2966.67 3800.00 MTCE 02-032 SH115 10/20/06 2.00 2000.00 3433.62 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2000.00 3433.62 6000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1666.67 3306.27 5266.67 =============== 202-05019 Sawing Concrete (Spec) Lin Foot =============================================== MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 400.00 10.00 6.81 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 400.00 10.00 6.81 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 400.00 10.00 6.81 3.00 =============== 202-05150 Sandblasting Sq Foot ================================================ MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 100.00 10.00 10.75 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 10.00 10.75 5.00 MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 39,108.00 1.00 1.25 0.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 39,108.00 1.00 1.25 0.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39,208.00 1.02 1.25 0.26 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 11 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-05300 Rem and Disposal of Paint LUMP SUM =============================================== MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 10/19/06 1.00 10000.00 22333.33 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 10000.00 22333.33 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 22333.33 5000.00 =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= MTCE 02-032 SH115 10/20/06 5,500.00 16.00 15.45 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,500.00 16.00 15.45 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,500.00 16.00 15.45 14.00 =============== 203-01500 Blading Hour =================================================== MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 8.00 120.00 408.33 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 120.00 408.33 175.00 MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 8.00 175.00 170.00 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 175.00 170.00 175.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 147.50 313.00 175.00 =============== 203-01597 Potholing Hour =================================================== MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 10.00 245.00 180.23 125.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 18.00 200.00 178.11 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28.00 216.07 179.01 76.79 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 10.00 150.00 169.45 145.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 12 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== MTCE 01-060 I-70 WEST 08/31/06 20.00 180.00 204.88 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 170.00 191.25 131.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 58.00 192.24 186.11 105.17 =============== 203-01620 Sweeping Hour =================================================== MTCE 03-032 REGION WIDE, VARIOUS LOCATION 05/04/06 100.00 125.00 112.50 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 125.00 112.50 175.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 125.00 112.50 175.00 =============== 206-00000 Str Excav Cubic Yard ============================================= MTCE 02-032 SH115 10/20/06 750.00 11.30 15.90 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 750.00 11.30 15.90 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 750.00 11.30 15.90 14.00 =============== 206-00100 Str Bkfl (CL 1) Cubic Yard ============================================= MTCE 02-032 SH115 10/20/06 600.00 30.00 53.38 34.00 MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 250.00 40.00 30.89 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 850.00 32.94 39.01 34.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 850.00 32.94 39.01 34.88 =============== 207-00205 Topsoil Cubic Yard ============================================= MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 312.00 22.00 18.54 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 312.00 22.00 18.54 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 312.00 22.00 18.54 7.00 =============== 208-00002 Erosion Log (12 In) Lin Foot =============================================== MTCE 01-060 I-70 WEST 08/31/06 200.00 10.00 10.38 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 10.00 10.38 3.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 13 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00002 Erosion Log (12 In) Lin Foot =============================================== MTCE 02-032 SH115 10/20/06 500.00 9.30 9.27 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 500.00 9.30 9.27 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 700.00 9.50 9.59 4.43 =============== 208-00011 Erosion Bales (Weed Free) Each =================================================== MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 9.00 20.00 30.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 20.00 30.00 20.00 MTCE 01-060 I-70 WEST 08/31/06 30.00 25.00 29.31 17.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 25.00 29.31 17.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39.00 23.85 29.44 18.08 =============== 208-00020 Silt Fence Lin Foot =============================================== MTCE 02-032 SH115 10/20/06 1,500.00 2.10 3.04 1.25 MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 1,000.00 2.00 1.83 1.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,500.00 2.06 2.14 1.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,500.00 2.06 2.14 1.23 =============== 208-00045 Conc Washout Str Each =================================================== MTCE 06-064 I-270 OVER SH224, STR. E-17-Q 01/26/06 1.00 1000.00 782.58 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 782.58 500.00 MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 8.00 800.00 409.50 180.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 14 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00045 Conc Washout Str Each =================================================== MTCE 06-070 R6 - SIGN POST REPLACEMENT 06/29/06 3.00 600.00 875.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.00 745.45 536.45 199.09 MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 3.00 1000.00 825.00 1000.00 MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 2.00 1000.00 1500.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 1000.00 993.75 1200.00 MTCE 06-074 SH 6 AT MP 280.996 10/12/06 2.00 300.00 504.63 1000.00 MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 10/19/06 1.00 1500.00 1050.00 500.00 MTCE 02-032 SH115 10/20/06 1.00 700.00 1113.87 1500.00 MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 1.00 1500.00 1070.17 1000.00 MTCE 06-077 I-76 #E-17-GL & #E-17-GM; SH3 11/30/06 2.00 500.00 517.00 300.00 MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 1.00 500.00 464.60 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 725.00 642.82 718.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 800.00 656.54 577.60 =============== 208-00050 Storm Drain Inlet Protection Each =================================================== MTCE 06-064 I-270 OVER SH224, STR. E-17-Q 01/26/06 2.00 500.00 361.22 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 500.00 361.22 300.00 MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 17.00 300.00 156.50 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17.00 300.00 156.50 50.00 MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 19.00 350.00 233.36 250.00 MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 1.00 1000.00 925.00 925.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 382.50 251.09 283.75 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 15 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00050 Storm Drain Inlet Protection Each =================================================== MTCE 06-074 SH 6 AT MP 280.996 10/12/06 1.00 200.00 240.34 350.00 MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 10/19/06 1.00 1000.00 716.67 1500.00 MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 1.00 1000.00 627.00 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 733.33 508.12 1016.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42.00 379.76 266.39 242.26 =============== 208-00070 Stabilized Construction Entrance Each =================================================== MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 1.00 1500.00 1491.65 1100.00 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 1.00 1500.00 1619.99 1159.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1500.00 1529.08 1129.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1500.00 1529.08 1129.98 =============== 208-00100 Sediment Removal and Disposal LUMP SUM =============================================== MTCE 02-032 SH115 10/20/06 1.00 4000.00 21362.33 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 4000.00 21362.33 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 4000.00 21362.33 2500.00 =============== 208-00205 Erosion Control Supervisor Hour =================================================== MTCE 06-064 I-270 OVER SH224, STR. E-17-Q 01/26/06 8.00 75.00 65.83 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 75.00 65.83 45.00 MTCE 06-070 R6 - SIGN POST REPLACEMENT 06/29/06 36.00 80.00 80.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36.00 80.00 80.00 35.00 MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 30.00 80.00 65.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 80.00 65.00 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 16 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00205 Erosion Control Supervisor Hour =================================================== MTCE 06-074 SH 6 AT MP 280.996 10/12/06 32.00 85.00 52.12 95.00 MTCE 06-077 I-76 #E-17-GL & #E-17-GM; SH3 11/30/06 15.00 80.00 86.00 150.00 MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 16.00 80.00 100.52 56.00 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 80.00 80.00 80.88 161.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 143.00 81.12 81.93 133.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 217.00 80.55 80.48 101.22 =============== 208-00300 Temporary Berms Lin Foot =============================================== MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 40.00 30.00 37.53 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 30.00 37.53 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 30.00 37.53 15.00 =============== 210-00090 Res Delineator Each =================================================== MTCE 05-046 REGION 5, MAINTENANCE SECTION 01/26/06 2.00 50.00 33.18 68.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 50.00 33.18 68.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 50.00 33.18 68.45 =============== 210-00500 Reb Port Present Str Each =================================================== MTCE 06-077 I-76 #E-17-GL & #E-17-GM; SH3 11/30/06 21.00 5000.00 4674.20 2900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21.00 5000.00 4674.20 2900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 5000.00 4674.20 2900.00 =============== 210-00750 Res Light Standard Each =================================================== MTCE 01-057 VARIOUS, REGION 1 05/25/06 30.00 650.00 926.44 492.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 650.00 926.44 492.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 650.00 926.44 492.45 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 17 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00810 Res Ground Sign Each =================================================== MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 5.00 250.00 313.33 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 250.00 313.33 80.00 MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 07/13/06 5.00 150.00 275.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 150.00 275.00 200.00 MTCE 03-038 REGION WIDE VARIOUS LOCATIONS 11/16/06 5.00 250.00 326.25 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 250.00 326.25 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 216.67 307.00 135.00 =============== 210-00815 Res Sign Panel Each =================================================== MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 11.00 100.00 196.42 320.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 2.00 150.00 346.79 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 107.69 214.47 286.15 MTCE 01-058 REGION WIDE 06/15/06 6.00 120.00 100.00 100.00 MTCE 06-070 R6 - SIGN POST REPLACEMENT 06/29/06 500.00 20.00 39.50 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 506.00 21.19 40.92 20.95 MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 07/13/06 60.00 25.00 36.67 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 25.00 36.67 20.00 MTCE 03-038 REGION WIDE VARIOUS LOCATIONS 11/16/06 43.00 30.00 85.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 43.00 30.00 85.00 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 622.00 23.97 51.78 27.03 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 18 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01130 Res Gdrail Ty 3 Lin Foot =============================================== MTCE 03-033 REGION 3 VARIOUS HIGHWAYS, G 05/18/06 1,500.00 20.00 14.68 9.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,500.00 20.00 14.68 9.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,500.00 20.00 14.68 9.15 =============== 210-04200 Adj Gdrail Lin Foot =============================================== MTCE 05-046 REGION 5, MAINTENANCE SECTION 01/26/06 11,030.00 2.25 1.69 1.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,030.00 2.25 1.69 1.70 MTCE 03-033 REGION 3 VARIOUS HIGHWAYS, G 05/18/06 500.00 12.00 6.15 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 500.00 12.00 6.15 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,530.00 2.67 1.83 1.84 =============== 212-00006 Seeding (Native) Acre =================================================== MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 0.30 2200.00 3333.33 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.30 2200.00 3333.33 2500.00 MTCE 01-060 I-70 WEST 08/31/06 0.70 2000.00 1999.50 1380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.70 2000.00 1999.50 1380.00 MTCE 02-032 SH115 10/20/06 2.00 725.00 773.75 850.00 MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 0.60 1200.00 1827.15 1850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.60 834.62 1364.12 1080.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.60 1175.00 1526.28 1257.22 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 19 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00032 Soil Conditioning Acre =================================================== MTCE 01-060 I-70 WEST 08/31/06 0.70 3500.00 15210.00 4425.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.70 3500.00 15210.00 4425.00 MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 0.60 2500.00 4603.40 4860.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.60 2500.00 4603.40 4860.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.30 3038.46 6887.90 4625.77 =============== 212-00047 Soil Preparation (Spec) Acre =================================================== MTCE 02-032 SH115 10/20/06 2.00 3200.00 4343.75 4250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 3200.00 4343.75 4250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3200.00 4343.75 4250.00 =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 0.30 2000.00 3500.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.30 2000.00 3500.00 2500.00 MTCE 01-060 I-70 WEST 08/31/06 0.70 2500.00 2235.25 1380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.70 2500.00 2235.25 1380.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2350.00 2542.89 1716.00 =============== 213-00003 Mulching (Weed Free) Acre =================================================== MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 0.60 1200.00 1388.32 830.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.60 1200.00 1388.32 830.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.60 1200.00 1388.32 830.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 20 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00004 Mulching (Weed Free Straw) Acre =================================================== MTCE 02-032 SH115 10/20/06 2.00 600.00 490.00 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 600.00 490.00 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 600.00 490.00 350.00 =============== 213-00061 Mulch Tackifier Pound ================================================== MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 50.00 8.00 10.33 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 8.00 10.33 12.00 MTCE 01-060 I-70 WEST 08/31/06 140.00 6.00 7.19 2.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 140.00 6.00 7.19 2.30 MTCE 02-032 SH115 10/20/06 400.00 3.10 3.30 2.00 MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 160.00 5.00 5.27 2.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 560.00 3.64 4.54 2.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 750.00 4.37 5.01 2.82 =============== 216-00039 Soil Reten Blanket (Straw) Sq Yard ================================================ MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 445.00 4.00 3.27 2.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 445.00 4.00 3.27 2.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 445.00 4.00 3.27 2.80 =============== 217-00020 Herbicide Treatment Hour =================================================== MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 10.00 75.00 176.47 81.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 75.00 176.47 81.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 75.00 176.47 81.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 21 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00010 Envir Health/Safety Mngmt LUMP SUM =============================================== MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 1.00 3500.00 4478.27 4535.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 1.00 4000.00 2471.23 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3750.00 3618.11 2767.50 MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 10/19/06 1.00 3000.00 1750.00 3600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 3000.00 1750.00 3600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 3500.00 3057.68 3045.00 =============== 250-00050 Monitoring Technician Hour =================================================== MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 16.00 75.00 127.49 172.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 24.00 150.00 112.39 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 120.00 119.49 98.80 MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 10/19/06 32.00 85.00 66.67 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 32.00 85.00 66.67 70.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72.00 104.44 97.63 86.00 =============== 250-00110 Health and Safety Officer Hour =================================================== MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 20.00 135.00 159.52 150.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 20.00 150.00 176.22 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 142.50 166.68 100.00 MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 10/19/06 16.00 130.00 121.67 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 130.00 121.67 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56.00 138.93 155.19 92.86 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 22 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00120 Material Sampling and Delivery Each =================================================== MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 8.00 150.00 190.50 185.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 16.00 185.00 157.56 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 173.33 170.74 95.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 173.33 170.74 95.00 =============== 250-00200 Material Handling (Stockpile) Cubic Yard ============================================= MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 34.00 30.00 76.72 56.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 40.00 40.00 54.34 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 74.00 35.41 66.23 44.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 74.00 35.41 66.23 44.65 =============== 250-00210 Solid Waste Disposal Cubic Yard ============================================= MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 34.00 100.00 57.22 40.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 40.00 40.00 97.25 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 74.00 67.57 75.98 37.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 74.00 67.57 75.98 37.30 =============== 250-00220 Hazardous Waste Disposal Cubic Yard ============================================= MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 34.00 150.00 69.72 45.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 8.00 40.00 247.95 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 42.00 129.05 96.46 45.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42.00 129.05 96.46 45.95 =============== 304-06000 ABC (CL 6) Ton ==================================================== MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 12.00 35.00 163.83 16.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 35.00 163.83 16.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 23 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06000 ABC (CL 6) Ton ==================================================== MTCE 02-032 SH115 10/20/06 600.00 22.00 18.74 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 600.00 22.00 18.74 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 612.00 22.25 20.88 19.93 =============== 304-09000 ABC (Spec) Cubic Yard ============================================= MTCE 05-048 US550 - MP 49.85 TO MP 56.00 02/16/06 2,405.00 19.00 13.50 13.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,405.00 19.00 13.50 13.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,405.00 19.00 13.50 13.50 =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 04/13/06 87.00 175.00 255.67 342.00 MTCE 04-066 US 85 MP 299.68 TO MP 301.00 05/04/06 16.00 175.00 135.75 135.75 MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 64.00 250.00 337.00 368.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 167.00 203.74 276.63 332.20 MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 5.00 250.00 350.00 300.00 MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 812.00 150.00 176.00 176.00 MTCE 04-072 I-25 SLAB REPLACEMENT MILEPOS 09/21/06 10.00 225.00 410.60 343.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 827.00 151.51 191.45 178.77 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 200.00 150.00 91.77 70.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 150.00 91.77 70.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,194.00 158.56 152.21 182.03 =============== 403-00721 HMA (Patching) (Asph) Sq Yard ================================================ MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 462.00 50.00 20.76 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 462.00 50.00 20.76 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 462.00 50.00 20.76 15.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 24 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-09210 SMA Ton ==================================================== MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 10,065.00 62.00 69.30 60.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10,065.00 62.00 69.30 60.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,065.00 62.00 69.30 60.30 =============== 403-09221 SMA (Fibers)(Asph) Ton ==================================================== MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 17,156.00 71.00 77.01 69.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17,156.00 71.00 77.01 69.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,156.00 71.00 77.01 69.39 =============== 403-33841 HMA (Gr S) (100) (PG 64-22) Ton ==================================================== MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 42.50 200.00 260.00 305.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 42.50 200.00 260.00 305.00 MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 150.00 100.00 111.25 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 150.00 100.00 111.25 100.00 MTCE 02-032 SH115 10/20/06 475.00 77.00 100.29 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 475.00 77.00 100.29 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 667.50 90.00 110.45 95.26 =============== 403-34701 HMA (Gr SX) (75) Ton ==================================================== MTCE 05-048 US550 - MP 49.85 TO MP 56.00 02/16/06 11,942.00 35.00 38.60 38.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,942.00 35.00 38.60 38.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,942.00 35.00 38.60 38.60 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 25 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34721 HMA (Gr SX) (75) (PG 58-28) Ton ==================================================== MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 04/13/06 7,416.00 54.00 63.07 59.70 MTCE 04-066 US 85 MP 299.68 TO MP 301.00 05/04/06 2,400.00 66.00 54.20 54.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9,816.00 56.93 62.20 58.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,816.00 56.93 62.20 58.36 =============== 403-34801 HMA (Gr SX) (100) Ton ==================================================== MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 186.00 130.00 68.88 59.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 186.00 130.00 68.88 59.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 186.00 130.00 68.88 59.45 =============== 408-01000 Hot Joint-Crack Sealant Ton ==================================================== MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 04/13/06 0.32 5000.00 9533.33 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.32 5000.00 9533.33 5500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.32 5000.00 9533.33 5500.00 =============== 409-02010 CC Matl (Ty II) Ton ==================================================== MTCE 05-049 US 491B CHIP SEAL, MP 45.4 03/09/06 7,592.00 45.00 46.53 50.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,592.00 45.00 46.53 50.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,592.00 45.00 46.53 50.50 =============== 409-02015 CC Matl (Ty II) Sq Yard ================================================ MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 8 06/22/06 385,283.00 0.80 1.15 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 385,283.00 0.80 1.15 1.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 385,283.00 0.80 1.15 1.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 26 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-03355 Asph Cem (PG 58-34) Ton ==================================================== MTCE 05-048 US550 - MP 49.85 TO MP 56.00 02/16/06 776.00 355.00 370.00 370.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 776.00 355.00 370.00 370.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 776.00 355.00 370.00 370.00 =============== 411-10255 Emul Asph (SS) Gallon ================================================= MTCE 05-048 US550 - MP 49.85 TO MP 56.00 02/16/06 10,842.00 2.50 1.80 1.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,842.00 2.50 1.80 1.80 MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 04/13/06 5,360.00 1.50 2.27 1.50 MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 10,938.00 1.75 1.36 1.25 MTCE 04-066 US 85 MP 299.68 TO MP 301.00 05/04/06 1,750.00 1.50 1.55 1.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18,048.00 1.65 1.60 1.35 MTCE 02-032 SH115 10/20/06 175.00 2.80 2.97 1.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 175.00 2.80 2.97 1.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29,065.00 1.97 1.65 1.52 =============== 411-10275 Emul Asph (HFMS-2P) Gallon ================================================= MTCE 05-049 US 491B CHIP SEAL, MP 45.4 03/09/06 314,516.00 1.75 1.32 0.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 314,516.00 1.75 1.32 0.68 MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 8 06/22/06 200,347.00 2.00 1.88 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 200,347.00 2.00 1.88 1.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 514,863.00 1.85 1.45 0.80 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 27 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00100 Geotextile (Er Cont) (CL A) Sq Yard ================================================ MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 380.00 5.00 8.31 2.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 380.00 5.00 8.31 2.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 380.00 5.00 8.31 2.10 =============== 420-00110 Geotextile (Drain) (CL A) Sq Yard ================================================ MTCE 02-032 SH115 10/20/06 550.00 6.00 3.50 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 550.00 6.00 3.50 3.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 550.00 6.00 3.50 3.50 =============== 503-00024 Drilled Caisson (24 In) Lin Foot =============================================== MTCE 02-025 R2 - FY 06 SNOW GATES 01/12/06 77.00 110.00 106.88 87.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 77.00 110.00 106.88 87.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 77.00 110.00 106.88 87.00 =============== 503-00036 Drilled Caisson (36 In) Lin Foot =============================================== MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 60.00 375.00 416.17 235.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 152.00 295.00 331.27 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 212.00 317.64 360.55 174.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 212.00 317.64 360.55 174.06 =============== 503-00042 Drilled Caisson (42 In) Lin Foot =============================================== MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 30.00 500.00 726.60 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 500.00 726.60 190.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 500.00 726.60 190.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 28 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00048 Drilled Caisson (48 In) Lin Foot =============================================== MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 66.00 1000.00 1053.60 460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 66.00 1000.00 1053.60 460.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66.00 1000.00 1053.60 460.00 =============== 503-00054 Drilled Caisson (54 In) Lin Foot =============================================== MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 42.00 765.00 341.67 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 42.00 765.00 341.67 230.00 MTCE 06-074 SH 6 AT MP 280.996 10/12/06 52.00 400.00 519.31 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 52.00 400.00 519.31 450.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 94.00 563.09 461.32 351.70 =============== 506-00218 Riprap (18 In) Cubic Yard ============================================= MTCE 02-032 SH115 10/20/06 375.00 100.00 75.42 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 375.00 100.00 75.42 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 375.00 100.00 75.42 90.00 =============== 506-00224 Riprap (24 In) Cubic Yard ============================================= MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 1,944.00 70.00 74.52 47.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,944.00 70.00 74.52 47.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,944.00 70.00 74.52 47.50 =============== 509-00000 Str Steel Pound ================================================== MTCE 06-064 I-270 OVER SH224, STR. E-17-Q 01/26/06 5,900.00 5.00 7.71 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,900.00 5.00 7.71 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 29 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 509-00000 Str Steel Pound ================================================== MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 10/19/06 905.00 10.00 3.17 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 905.00 10.00 3.17 2.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,805.00 5.66 7.33 4.67 =============== 509-08010 Alter-Erect Str Steel LUMP SUM =============================================== MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 10/19/06 1.00 5000.00 97446.67 94700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 97446.67 94700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 97446.67 94700.00 =============== 509-08100 Provide Temporary Support LUMP SUM =============================================== MTCE 06-064 I-270 OVER SH224, STR. E-17-Q 01/26/06 1.00 30000.00 27200.00 13500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 30000.00 27200.00 13500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 30000.00 27200.00 13500.00 =============== 509-90000 Paint Existing Str(S) LUMP SUM =============================================== MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 10/19/06 1.00 25000.00 14000.00 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 25000.00 14000.00 3000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 14000.00 3000.00 =============== 512-00102 Bearing Device (Type II) Each =================================================== MTCE 06-064 I-270 OVER SH224, STR. E-17-Q 01/26/06 20.00 1100.00 1874.64 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 1100.00 1874.64 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 1100.00 1874.64 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 30 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 515-00120 Waterproofing (Membrane) Sq Yard ================================================ MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 04/13/06 279.00 12.00 18.85 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 279.00 12.00 18.85 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 279.00 12.00 18.85 16.00 =============== 515-00410 Concrete Sealer (Calcium Nitrite) Sq Yard ================================================ MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 160.00 70.00 30.39 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 160.00 70.00 30.39 50.00 MTCE 06-077 I-76 #E-17-GL & #E-17-GM; SH3 11/30/06 70.00 75.00 68.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 70.00 75.00 68.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 230.00 71.52 50.04 50.00 =============== 518-01002 Br Expan Device (0-2 In) Lin Foot =============================================== MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 240.00 130.00 78.00 78.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 240.00 130.00 78.00 78.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 240.00 130.00 78.00 78.00 =============== 518-01004 Br Expan Device (0-4 In) Lin Foot =============================================== MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 105.00 200.00 262.90 180.00 MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 60.00 200.00 278.00 278.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 165.00 200.00 266.25 215.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 165.00 200.00 266.25 215.64 =============== 518-01006 Br Expan Device (0-6 In) Lin Foot =============================================== MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 88.00 1200.00 1284.79 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 88.00 1200.00 1284.79 1100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 88.00 1200.00 1284.79 1100.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 31 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 518-01015 Br Expan Device (0-15 In) Lin Foot =============================================== MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 34.00 2000.00 2383.50 1970.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 34.00 2000.00 2383.50 1970.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 2000.00 2383.50 1970.00 =============== 518-02100 Polymer Mortar End Dam Cubic Foot ============================================= MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 671.00 500.00 390.50 360.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 671.00 500.00 390.50 360.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 671.00 500.00 390.50 360.00 =============== 518-03100 Rapid Cure Silicone Jt Seal Lin Foot =============================================== MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 1,683.00 50.00 39.00 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,683.00 50.00 39.00 33.00 MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 189.00 44.00 49.00 49.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 189.00 44.00 49.00 49.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,872.00 49.39 39.53 34.62 =============== 601-01000 Conc CL B Cubic Yard ============================================= MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 2.00 500.00 262.03 247.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 500.00 262.03 247.00 MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 1.00 800.00 349.00 167.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 800.00 349.00 167.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 600.00 285.75 220.33 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 32 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03040 Conc CL D (Bridge) Cubic Yard ============================================= MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 8.00 1200.00 1590.00 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 1200.00 1590.00 650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 1200.00 1590.00 650.00 =============== 601-03041 Conc CL D (Bridge) (Spec) Cubic Yard ============================================= MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 25.00 1250.00 1322.12 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 1250.00 1322.12 1600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 1250.00 1322.12 1600.00 =============== 601-03050 Conc CL D (Wall) Cubic Yard ============================================= MTCE 02-032 SH115 10/20/06 60.00 600.00 791.30 675.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60.00 600.00 791.30 675.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 600.00 791.30 675.00 =============== 601-04000 Conc CL E Cubic Yard ============================================= MTCE 04-072 I-25 SLAB REPLACEMENT MILEPOS 09/21/06 892.00 700.00 904.60 858.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 892.00 700.00 904.60 858.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 892.00 700.00 904.60 858.00 =============== 601-05035 Conc CL S35 Cubic Yard ============================================= MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 52.00 2000.00 1230.00 1230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 52.00 2000.00 1230.00 1230.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 2000.00 1230.00 1230.00 =============== 601-06020 Conc (Patching) (Polymer) Cubic Yard ============================================= MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 15.60 2000.00 8776.67 10250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.60 2000.00 8776.67 10250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.60 2000.00 8776.67 10250.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 33 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-06100 Conc (Patching) Cubic Yard ============================================= MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 36.00 2800.00 1361.13 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 36.00 2800.00 1361.13 1600.00 MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 16.00 1500.00 2062.85 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 1500.00 2062.85 2200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 2400.00 1762.11 1784.62 =============== 601-06150 Conc (Patching) Sq Foot ================================================ MTCE 06-077 I-76 #E-17-GL & #E-17-GM; SH3 11/30/06 630.00 30.00 51.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 630.00 30.00 51.00 45.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 630.00 30.00 51.00 45.00 =============== 602-00020 Reinf Steel (Epoxy) Pound ================================================== MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 700.00 6.00 3.75 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 700.00 6.00 3.75 3.50 MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 4,000.00 5.00 2.30 3.00 MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 13,000.00 2.00 2.80 2.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17,000.00 2.71 2.61 2.85 MTCE 02-032 SH115 10/20/06 2,700.00 2.40 2.13 2.00 MTCE 06-077 I-76 #E-17-GL & #E-17-GM; SH3 11/30/06 1,000.00 3.00 2.96 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,700.00 2.56 2.39 1.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21,400.00 2.79 2.56 2.70 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 34 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-10840 84 In CSP Lin Foot =============================================== MTCE 02-032 SH115 10/20/06 216.00 250.00 256.79 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 216.00 250.00 256.79 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 216.00 250.00 256.79 275.00 =============== 606-00301 Gdrail Ty 3 (6-3) Lin Foot =============================================== MTCE 05-046 REGION 5, MAINTENANCE SECTION 01/26/06 26,230.00 15.00 14.31 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26,230.00 15.00 14.31 13.00 MTCE 03-033 REGION 3 VARIOUS HIGHWAYS, G 05/18/06 600.00 33.00 22.90 20.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 600.00 33.00 22.90 20.75 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 225.00 30.00 25.74 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 225.00 30.00 25.74 38.00 MTCE 02-032 SH115 10/20/06 1,274.00 19.00 22.22 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,274.00 19.00 22.22 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28,329.00 15.68 14.92 13.68 =============== 606-00740 Gdrail Ty 7 (Sty CE) Lin Foot =============================================== MTCE 06-074 SH 6 AT MP 280.996 10/12/06 165.00 100.00 293.72 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 165.00 100.00 293.72 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 165.00 100.00 293.72 140.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 35 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01340 End Anchor Ty 3D Each =================================================== MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 2.00 900.00 914.34 1360.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 900.00 914.34 1360.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 900.00 914.34 1360.00 =============== 606-02005 End Anchor (Flared) Each =================================================== MTCE 05-046 REGION 5, MAINTENANCE SECTION 01/26/06 158.00 1400.00 1354.03 1334.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 158.00 1400.00 1354.03 1334.25 MTCE 03-033 REGION 3 VARIOUS HIGHWAYS, G 05/18/06 16.00 2000.00 2100.38 1950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 2000.00 2100.38 1950.00 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 1.00 1700.00 2109.55 3170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1700.00 2109.55 3170.00 MTCE 02-032 SH115 10/20/06 4.00 1650.00 2633.05 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1650.00 2633.05 2200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 179.00 1460.89 1439.71 1418.89 =============== 606-10705 Brdg Rail Ty 7 (Spec) Lin Foot =============================================== MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 27.00 200.00 379.61 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 27.00 200.00 379.61 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 200.00 379.61 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 36 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-00005 End Post Each =================================================== MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 2.00 150.00 319.21 375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 150.00 319.21 375.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 150.00 319.21 375.00 =============== 607-01100 Fence BW TWP Lin Foot =============================================== MTCE 02-032 SH115 10/20/06 1,000.00 2.50 5.19 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,000.00 2.50 5.19 2.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,000.00 2.50 5.19 2.00 =============== 607-11525 Fence (Plastic) Lin Foot =============================================== MTCE 01-060 I-70 WEST 08/31/06 200.00 4.00 3.16 6.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 4.00 3.16 6.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 4.00 3.16 6.80 =============== 607-60270 20 Ft Gate D (CL) Each =================================================== MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 1.00 800.00 1441.32 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 800.00 1441.32 1200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 800.00 1441.32 1200.00 =============== 607-60620 Road Closure Gate Each =================================================== MTCE 02-025 R2 - FY 06 SNOW GATES 01/12/06 11.00 5200.00 6013.38 4300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 5200.00 6013.38 4300.00 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 8.00 10000.00 10319.33 9570.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 10000.00 10319.33 9570.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 7221.05 7358.99 6518.95 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 37 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-60630 HOV Gate Each =================================================== MTCE 06-065 I25 - HOV / HOT LANES 03/16/06 10.00 25000.00 22434.45 10507.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 25000.00 22434.45 10507.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 25000.00 22434.45 10507.80 =============== 609-21010 C and G Ty 2 I-B Lin Foot =============================================== MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 66.00 28.00 82.81 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 66.00 28.00 82.81 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66.00 28.00 82.81 40.00 =============== 609-21011 C and G Ty 2 I-M Lin Foot =============================================== MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 216.00 30.00 52.33 77.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 216.00 30.00 52.33 77.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 216.00 30.00 52.33 77.00 =============== 610-00020 Median Cover (Pattern Conc) Sq Foot ================================================ MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 1,116.00 10.00 17.00 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,116.00 10.00 17.00 11.00 MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 839.00 15.00 11.27 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 839.00 15.00 11.27 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,955.00 12.15 15.09 10.14 =============== 612-00001 Delin (Ty I) Each =================================================== MTCE 05-046 REGION 5, MAINTENANCE SECTION 01/26/06 55.00 18.00 20.71 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 55.00 18.00 20.71 23.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55.00 18.00 20.71 23.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 38 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00003 Delin (Ty III) Each =================================================== MTCE 05-046 REGION 5, MAINTENANCE SECTION 01/26/06 55.00 20.00 22.26 24.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 55.00 20.00 22.26 24.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55.00 20.00 22.26 24.75 =============== 612-00010 Delin (Spec) Each =================================================== MTCE 06-065 I25 - HOV / HOT LANES 03/16/06 2.00 17500.00 19938.75 21220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 17500.00 19938.75 21220.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 17500.00 19938.75 21220.00 =============== 612-00031 Delin (Ty I) (Extra Ht) Each =================================================== MTCE 05-046 REGION 5, MAINTENANCE SECTION 01/26/06 1.00 35.00 57.29 79.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 35.00 57.29 79.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 35.00 57.29 79.30 =============== 612-00033 Delin (Ty III) (Extra Ht) Each =================================================== MTCE 05-046 REGION 5, MAINTENANCE SECTION 01/26/06 1.00 37.00 59.38 82.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 37.00 59.38 82.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 37.00 59.38 82.00 =============== 612-00300 Steel Guard Post Each =================================================== MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 1.00 750.00 760.23 1310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 750.00 760.23 1310.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 750.00 760.23 1310.00 =============== 613-00001 Direct Bor Cond Lin Foot =============================================== MTCE 02-025 R2 - FY 06 SNOW GATES 01/12/06 1,600.00 12.10 15.71 14.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,600.00 12.10 15.71 14.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,600.00 12.10 15.71 14.20 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 39 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00200 2 In Elec Cond Lin Foot =============================================== MTCE 02-025 R2 - FY 06 SNOW GATES 01/12/06 250.00 13.00 15.51 10.20 MTCE 06-065 I25 - HOV / HOT LANES 03/16/06 300.00 14.00 11.27 5.76 MTCE 06-066 SH 121, SIGNAL CABINET REPLAC 03/23/06 300.00 14.00 13.40 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 850.00 13.71 13.75 8.56 MTCE 01-057 VARIOUS, REGION 1 05/25/06 5,000.00 9.50 13.59 10.55 MTCE 02-031 REGION 2 - FY07/08 LIGHTING 06/08/06 2,000.00 14.00 14.67 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,000.00 10.79 13.84 11.25 MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 54.00 30.00 19.50 17.00 MTCE 01-060 I-70 WEST 08/31/06 500.00 22.00 16.94 17.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 554.00 22.78 17.07 17.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,404.00 11.87 14.03 11.39 =============== 613-00201 2 In Elec Cond (Jacked) Lin Foot =============================================== MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 360.00 20.00 25.81 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 360.00 20.00 25.81 26.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 360.00 20.00 25.81 26.00 =============== 613-00206 2 In Elec Cond (Bored) Lin Foot =============================================== MTCE 01-060 I-70 WEST 08/31/06 450.00 25.00 29.43 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 450.00 25.00 29.43 32.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 450.00 25.00 29.43 32.00 =============== 613-00300 3 In Elec Cond Lin Foot =============================================== MTCE 06-066 SH 121, SIGNAL CABINET REPLAC 03/23/06 500.00 15.00 15.19 11.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 500.00 15.00 15.19 11.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 500.00 15.00 15.19 11.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 40 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00301 3 In Elec Cond (Jacked) Lin Foot =============================================== MTCE 01-057 VARIOUS, REGION 1 05/25/06 1,500.00 15.50 16.95 14.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,500.00 15.50 16.95 14.55 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 400.00 25.00 29.91 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 400.00 25.00 29.91 33.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,900.00 17.50 20.19 18.43 =============== 613-00700 Insp Trip Each =================================================== MTCE 02-031 REGION 2 - FY07/08 LIGHTING 06/08/06 48.00 800.00 1933.33 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 48.00 800.00 1933.33 600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48.00 800.00 1933.33 600.00 =============== 613-01200 2 In Elec Cond (P) Lin Foot =============================================== MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 20.00 20.00 32.70 33.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 554.00 13.00 17.29 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 574.00 13.24 18.00 13.70 MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 575.00 15.00 18.83 10.50 MTCE 01-057 VARIOUS, REGION 1 05/25/06 7,500.00 8.50 11.07 12.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,075.00 8.96 11.49 12.26 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 270.00 8.00 12.47 11.00 MTCE 01-060 I-70 WEST 08/31/06 3,590.00 11.00 11.92 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,860.00 10.79 11.96 11.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,509.00 9.72 11.87 12.23 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 41 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-01250 2-1/2 In Elec Cond (P) Lin Foot =============================================== MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 300.00 17.00 18.89 15.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 130.00 16.00 33.11 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 430.00 16.70 22.38 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 430.00 16.70 22.38 15.00 =============== 613-01300 3 In Elec Cond (P) Lin Foot =============================================== MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 600.00 20.00 22.82 15.50 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 702.00 17.00 22.20 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,302.00 18.38 22.53 17.93 MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 1,150.00 14.00 20.00 12.00 MTCE 01-057 VARIOUS, REGION 1 05/25/06 5,000.00 9.50 12.38 10.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,150.00 10.34 13.50 11.07 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 10,450.00 9.00 14.01 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,450.00 9.00 14.01 13.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,902.00 10.14 14.34 12.69 =============== 613-04250 2-1/2 In Elec Cond (Liquidtight Flx Met) Lin Foot =============================================== MTCE 01-060 I-70 WEST 08/31/06 130.00 70.00 31.48 24.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 130.00 70.00 31.48 24.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 130.00 70.00 31.48 24.50 =============== 613-06000 Meter Pole Each =================================================== MTCE 01-057 VARIOUS, REGION 1 05/25/06 10.00 1400.00 2219.77 1593.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 1400.00 2219.77 1593.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 1400.00 2219.77 1593.80 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 42 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07000 Pull Box (Spec) Each =================================================== MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 32.00 760.00 733.73 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 32.00 760.00 733.73 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 760.00 733.73 350.00 =============== 613-07010 Pull Box (Surf Mtd) Each =================================================== MTCE 01-060 I-70 WEST 08/31/06 2.00 400.00 474.30 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 400.00 474.30 600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 400.00 474.30 600.00 =============== 613-07017 Pull Box (16"x14"x6") Each =================================================== MTCE 02-025 R2 - FY 06 SNOW GATES 01/12/06 1.00 650.00 466.13 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 650.00 466.13 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 650.00 466.13 400.00 =============== 613-07034 Pull Box (24"x36"x18") Each =================================================== MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 1.00 850.00 770.00 420.00 MTCE 01-057 VARIOUS, REGION 1 05/25/06 10.00 500.00 875.93 1028.25 MTCE 02-031 REGION 2 - FY07/08 LIGHTING 06/08/06 10.00 750.00 866.67 690.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21.00 635.71 867.77 838.21 MTCE 01-060 I-70 WEST 08/31/06 16.00 700.00 921.13 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 700.00 921.13 850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37.00 663.51 892.70 843.31 =============== 613-07038 Pull Box (36"x48"x18") Each =================================================== MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 3.00 1250.00 908.33 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1250.00 908.33 525.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1250.00 908.33 525.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 43 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07040 Pull Box (30"x48"x24") Each =================================================== MTCE 06-066 SH 121, SIGNAL CABINET REPLAC 03/23/06 16.00 900.00 952.61 1124.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 900.00 952.61 1124.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 900.00 952.61 1124.00 =============== 613-10000 Wiring LUMP SUM =============================================== MTCE 02-025 R2 - FY 06 SNOW GATES 01/12/06 1.00 10000.00 14286.63 10400.00 MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 1.00 12000.00 6920.77 6885.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 1.00 3500.00 10425.84 16500.00 MTCE 06-065 I25 - HOV / HOT LANES 03/16/06 1.00 5000.00 5366.00 12994.00 MTCE 06-066 SH 121, SIGNAL CABINET REPLAC 03/23/06 1.00 5000.00 8757.09 4220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 6500.00 9991.87 11249.83 MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 1.00 3500.00 8800.00 3700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3500.00 8800.00 3700.00 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 1.00 45000.00 56793.60 28000.00 MTCE 01-060 I-70 WEST 08/31/06 1.00 20000.00 37412.50 30050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 32500.00 48179.78 29025.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 11944.44 18712.78 14361.00 =============== 613-20100 Inst Light Std Each =================================================== MTCE 01-057 VARIOUS, REGION 1 05/25/06 5.00 300.00 501.94 492.45 MTCE 02-031 REGION 2 - FY07/08 LIGHTING 06/08/06 60.00 350.00 1308.33 925.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 65.00 346.15 1227.69 891.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65.00 346.15 1227.69 891.73 =============== 613-32300 Light Std Steel (30 Ft) Each =================================================== MTCE 02-025 R2 - FY 06 SNOW GATES 01/12/06 11.00 3300.00 3639.88 3125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 3300.00 3639.88 3125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 3300.00 3639.88 3125.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 44 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-32400 Light Std Steel (40 Ft) Each =================================================== MTCE 01-057 VARIOUS, REGION 1 05/25/06 10.00 3000.00 3267.14 3084.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 3000.00 3267.14 3084.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 3000.00 3267.14 3084.30 =============== 613-40010 Light Std Foundation Each =================================================== MTCE 01-057 VARIOUS, REGION 1 05/25/06 5.00 1000.00 914.63 879.95 MTCE 02-031 REGION 2 - FY07/08 LIGHTING 06/08/06 10.00 850.00 985.00 705.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15.00 900.00 956.85 763.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 900.00 956.85 763.32 =============== 613-40020 Transformer Base Alum Each =================================================== MTCE 01-057 VARIOUS, REGION 1 05/25/06 10.00 900.00 787.05 769.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 900.00 787.05 769.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 900.00 787.05 769.35 =============== 613-40030 Inst Transformer Base Alum Each =================================================== MTCE 01-057 VARIOUS, REGION 1 05/25/06 5.00 100.00 228.36 249.00 MTCE 02-031 REGION 2 - FY07/08 LIGHTING 06/08/06 60.00 70.00 391.67 255.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 65.00 72.31 375.34 254.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65.00 72.31 375.34 254.54 =============== 613-50010 Photoel Cell Each =================================================== MTCE 01-057 VARIOUS, REGION 1 05/25/06 1,000.00 60.00 49.07 21.75 MTCE 02-031 REGION 2 - FY07/08 LIGHTING 06/08/06 300.00 75.00 88.33 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,300.00 63.46 56.28 36.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,300.00 63.46 56.28 36.35 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 45 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-50200 Lighting System Each =================================================== MTCE 02-031 REGION 2 - FY07/08 LIGHTING 06/08/06 20.00 350.00 353.33 510.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 350.00 353.33 510.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 350.00 353.33 510.00 =============== 613-60000 Lmps Each =================================================== MTCE 01-057 VARIOUS, REGION 1 05/25/06 1,000.00 75.00 58.63 43.95 MTCE 02-031 REGION 2 - FY07/08 LIGHTING 06/08/06 450.00 100.00 110.00 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,450.00 82.76 71.59 62.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,450.00 82.76 71.59 62.90 =============== 613-60500 Underground Rep Each =================================================== MTCE 02-031 REGION 2 - FY07/08 LIGHTING 06/08/06 80.00 400.00 933.33 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 80.00 400.00 933.33 800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 400.00 933.33 800.00 =============== 613-70255 Fus Each =================================================== MTCE 01-057 VARIOUS, REGION 1 05/25/06 50.00 50.00 42.94 17.30 MTCE 02-031 REGION 2 - FY07/08 LIGHTING 06/08/06 250.00 40.00 60.33 61.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 300.00 41.67 56.67 53.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 300.00 41.67 56.67 53.72 =============== 613-70260 Fus Holder Each =================================================== MTCE 01-057 VARIOUS, REGION 1 05/25/06 50.00 100.00 71.61 87.85 MTCE 02-031 REGION 2 - FY07/08 LIGHTING 06/08/06 200.00 60.00 98.33 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 250.00 68.00 91.65 117.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 68.00 91.65 117.57 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 46 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-70400 Lumin HPS (400 W) Each =================================================== MTCE 02-025 R2 - FY 06 SNOW GATES 01/12/06 11.00 730.00 416.75 321.00 MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 4.00 650.00 454.77 375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 708.67 422.60 335.40 MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 2.00 550.00 458.33 405.00 MTCE 01-057 VARIOUS, REGION 1 05/25/06 20.00 410.00 424.96 353.65 MTCE 02-031 REGION 2 - FY07/08 LIGHTING 06/08/06 200.00 530.00 531.67 455.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 222.00 519.37 518.58 445.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 237.00 531.35 505.95 438.46 =============== 613-70401 Inst Lumin HPS (400 W) Each =================================================== MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 8.00 200.00 255.66 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 200.00 255.66 200.00 MTCE 01-057 VARIOUS, REGION 1 05/25/06 20.00 190.00 222.84 190.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 190.00 222.84 190.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 192.86 230.42 193.49 =============== 613-72150 Lumin HPS (WT) (150 W) Each =================================================== MTCE 01-057 VARIOUS, REGION 1 05/25/06 20.00 385.00 352.23 266.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 385.00 352.23 266.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 385.00 352.23 266.00 =============== 613-80010 Ballast Un Each =================================================== MTCE 02-031 REGION 2 - FY07/08 LIGHTING 06/08/06 10.00 300.00 428.33 335.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 300.00 428.33 335.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 300.00 428.33 335.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 47 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00011 Sign Panel (CL I) Sq Foot ================================================ MTCE 02-025 R2 - FY 06 SNOW GATES 01/12/06 66.00 17.00 22.75 29.50 MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 75.00 17.00 33.92 38.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 75.00 12.00 28.88 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 216.00 15.26 27.24 29.15 MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 41.00 20.00 26.27 21.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 41.00 20.00 26.27 21.80 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 25.50 25.00 66.59 26.00 MTCE 04-074 R4 US 287 SIGNS PHASE 2 09/28/06 1,289.00 17.00 14.58 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,314.50 17.16 15.59 14.23 MTCE 04-075 FY07 REGION 4 SIGNS NE PHASE 10/26/06 3,865.00 14.00 13.67 14.00 MTCE 04-076 FY07 R4 SIGNS NE PHASE 2 10/26/06 2,118.00 14.00 15.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,983.00 14.00 13.87 14.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,554.50 14.62 15.13 14.80 =============== 614-00012 Sign Panel (CL II) Sq Foot ================================================ MTCE 04-074 R4 US 287 SIGNS PHASE 2 09/28/06 4,234.00 19.00 18.25 16.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,234.00 19.00 18.25 16.50 MTCE 04-075 FY07 REGION 4 SIGNS NE PHASE 10/26/06 7,475.00 16.00 16.83 16.50 MTCE 04-076 FY07 R4 SIGNS NE PHASE 2 10/26/06 6,580.00 16.00 19.00 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14,055.00 16.00 17.32 17.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,289.00 16.69 17.72 17.40 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 48 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00013 Sign Panel (CL III) Sq Foot ================================================ MTCE 06-071 I-25, SH 85 TO I-70 08/03/06 13,500.00 23.00 21.56 20.80 MTCE 04-074 R4 US 287 SIGNS PHASE 2 09/28/06 596.00 22.00 21.67 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14,096.00 22.96 21.57 20.85 MTCE 04-075 FY07 REGION 4 SIGNS NE PHASE 10/26/06 348.00 20.00 22.00 22.00 MTCE 04-076 FY07 R4 SIGNS NE PHASE 2 10/26/06 186.00 20.00 25.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 534.00 20.00 22.45 23.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,630.00 22.85 21.60 20.93 =============== 614-00025 Inst Sign Panel (CL I) Sq Foot ================================================ MTCE 01-058 REGION WIDE 06/15/06 3,113.86 6.00 7.75 6.00 MTCE 04-067 FY 07 REGION 4 STERLING SIGNS 06/22/06 2,366.00 3.25 6.67 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,479.86 4.81 7.36 5.14 MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 07/13/06 8,894.49 5.00 4.92 6.00 MTCE 04-071 FY07 R4 US 287 PHASE 1 07/20/06 1,331.00 5.00 6.40 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,225.49 5.00 5.21 5.61 MTCE 03-038 REGION WIDE VARIOUS LOCATIONS 11/16/06 2,978.00 6.00 5.38 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,978.00 6.00 5.38 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,683.35 5.10 5.89 5.21 =============== 614-00027 Inst Sign Panel (CL II) Sq Foot ================================================ MTCE 01-058 REGION WIDE 06/15/06 5,424.01 8.00 9.25 7.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 49 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00027 Inst Sign Panel (CL II) Sq Foot ================================================ MTCE 04-067 FY 07 REGION 4 STERLING SIGNS 06/22/06 2,139.00 4.25 7.33 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,563.01 6.94 8.81 6.15 MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 07/13/06 3,268.26 6.00 6.50 7.00 MTCE 04-071 FY07 R4 US 287 PHASE 1 07/20/06 1,913.00 6.00 8.00 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,181.26 6.00 7.24 5.89 MTCE 03-038 REGION WIDE VARIOUS LOCATIONS 11/16/06 3,241.00 7.00 6.75 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,241.00 7.00 6.75 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,985.27 6.65 7.87 5.83 =============== 614-00028 Inst Sign Panel (CL III) Sq Foot ================================================ MTCE 01-058 REGION WIDE 06/15/06 107.44 11.00 15.25 8.00 MTCE 04-067 FY 07 REGION 4 STERLING SIGNS 06/22/06 247.00 5.50 15.33 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 354.44 7.17 15.30 9.39 MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 07/13/06 2,114.40 8.00 9.08 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,114.40 8.00 9.08 9.00 MTCE 06-074 SH 6 AT MP 280.996 10/12/06 462.00 10.00 9.06 10.00 MTCE 03-038 REGION WIDE VARIOUS LOCATIONS 11/16/06 1,777.00 8.00 11.00 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,239.00 8.41 10.53 8.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,707.84 8.13 10.32 8.75 =============== 614-00200 Steel Sign Post (U-2) Lin Foot =============================================== MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 33.00 15.00 50.48 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 33.00 15.00 50.48 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.00 15.00 50.48 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 50 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00612 Steel Sign Post (W 6x12) Lin Foot =============================================== MTCE 04-074 R4 US 287 SIGNS PHASE 2 09/28/06 32.00 30.00 40.05 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 32.00 30.00 40.05 35.00 MTCE 04-076 FY07 R4 SIGNS NE PHASE 2 10/26/06 140.00 30.00 36.00 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 140.00 30.00 36.00 36.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 172.00 30.00 38.16 35.81 =============== 614-00615 Steel Sign Post (W 6x15) Lin Foot =============================================== MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 07/13/06 80.00 35.00 39.17 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 80.00 35.00 39.17 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 35.00 39.17 35.00 =============== 614-00818 Steel Sign Post (W 8x18) Lin Foot =============================================== MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 96.50 53.00 73.13 57.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 96.50 53.00 73.13 57.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 96.50 53.00 73.13 57.00 =============== 614-01026 Steel Sign Post (W 10x26) Lin Foot =============================================== MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 07/13/06 40.00 60.00 65.67 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 60.00 65.67 47.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 60.00 65.67 47.00 =============== 614-01226 Steel Sign Post (W 12x26) Lin Foot =============================================== MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 07/13/06 50.00 63.00 73.67 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 63.00 73.67 51.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 63.00 73.67 51.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 51 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01502 Steel Sign Supp (2-In Rd)(Po&Sock) Lin Foot =============================================== MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 07/13/06 4,793.00 14.00 15.67 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,793.00 14.00 15.67 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,793.00 14.00 15.67 12.00 =============== 614-01512 Steel Sign Supp (2-In Rd)(Post) Lin Foot =============================================== MTCE 01-058 REGION WIDE 06/15/06 4,076.00 15.00 11.65 14.60 MTCE 04-067 FY 07 REGION 4 STERLING SIGNS 06/22/06 1,480.00 10.00 10.00 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,556.00 13.67 11.30 13.91 MTCE 04-071 FY07 R4 US 287 PHASE 1 07/20/06 1,038.00 11.00 12.60 8.00 MTCE 04-074 R4 US 287 SIGNS PHASE 2 09/28/06 318.00 12.00 11.90 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,356.00 11.23 12.44 8.94 MTCE 04-075 FY07 REGION 4 SIGNS NE PHASE 10/26/06 2,020.00 10.00 11.67 11.00 MTCE 04-076 FY07 R4 SIGNS NE PHASE 2 10/26/06 1,245.00 10.00 16.00 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,265.00 10.00 12.41 12.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,177.00 12.17 11.75 12.92 =============== 614-01513 Steel Sign Supp (2-In Rd)(Post)(Install) Lin Foot =============================================== MTCE 03-038 REGION WIDE VARIOUS LOCATIONS 11/16/06 2,126.00 12.00 6.88 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,126.00 12.00 6.88 4.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,126.00 12.00 6.88 4.50 =============== 614-01522 Steel Sign Supp (2-In Rd)(Sock) Each =================================================== MTCE 01-058 REGION WIDE 06/15/06 424.00 80.00 51.33 58.30 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 52 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01522 Steel Sign Supp (2-In Rd)(Sock) Each =================================================== MTCE 04-067 FY 07 REGION 4 STERLING SIGNS 06/22/06 143.00 40.00 43.33 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 567.00 69.91 49.71 57.47 MTCE 04-071 FY07 R4 US 287 PHASE 1 07/20/06 98.00 40.00 60.20 45.00 MTCE 04-074 R4 US 287 SIGNS PHASE 2 09/28/06 26.00 60.00 67.23 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 124.00 44.19 61.67 46.05 MTCE 04-075 FY07 REGION 4 SIGNS NE PHASE 10/26/06 174.00 55.00 51.67 50.00 MTCE 04-076 FY07 R4 SIGNS NE PHASE 2 10/26/06 72.00 55.00 68.00 68.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 246.00 55.00 53.65 55.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 937.00 62.59 52.63 55.38 =============== 614-01523 Steel Sign Supp (2-In Rd)(Sock)(Install) Each =================================================== MTCE 03-038 REGION WIDE VARIOUS LOCATIONS 11/16/06 155.00 50.00 43.25 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 155.00 50.00 43.25 28.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 155.00 50.00 43.25 28.00 =============== 614-01575 Steel Sign Supp (2-1/2 In Rd NP40)(Po) Lin Foot =============================================== MTCE 01-058 REGION WIDE 06/15/06 5,743.00 18.00 14.80 12.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,743.00 18.00 14.80 12.20 MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 07/13/06 3,390.00 18.00 20.00 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,390.00 18.00 20.00 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,133.00 18.00 16.40 14.35 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 53 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01578 Steel Sign Supp (2-1/2 In Rd NP40)(Slip) Each =================================================== MTCE 01-058 REGION WIDE 06/15/06 550.00 170.00 166.50 146.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 550.00 170.00 166.50 146.00 MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 07/13/06 302.00 170.00 206.67 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 302.00 170.00 206.67 170.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 852.00 170.00 178.22 154.51 =============== 614-01582 Steel Sign Supp (2-1/2 In Rd)(Po&Slip) Lin Foot =============================================== MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 26.00 30.00 37.00 66.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.00 30.00 37.00 66.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 30.00 37.00 66.00 =============== 614-01585 Steel Sign Supp (2-1/2 In Rd 80 )(Po) Lin Foot =============================================== MTCE 04-067 FY 07 REGION 4 STERLING SIGNS 06/22/06 1,783.00 20.00 24.00 23.00 MTCE 06-070 R6 - SIGN POST REPLACEMENT 06/29/06 5,450.00 23.00 20.00 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,233.00 22.26 21.32 23.00 MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 07/13/06 16.00 23.00 38.33 30.00 MTCE 04-071 FY07 R4 US 287 PHASE 1 07/20/06 1,166.00 18.00 23.60 21.00 MTCE 04-074 R4 US 287 SIGNS PHASE 2 09/28/06 2,162.00 22.00 22.55 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,344.00 20.61 22.96 21.69 MTCE 04-075 FY07 REGION 4 SIGNS NE PHASE 10/26/06 4,599.00 25.00 23.33 22.00 MTCE 04-076 FY07 R4 SIGNS NE PHASE 2 10/26/06 3,742.00 25.00 27.00 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,341.00 25.00 24.12 24.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,918.00 23.18 22.83 23.32 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 54 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01586 Steel Sign Supp(2-1/2 In Rd 80)(Po)(Ins) Lin Foot =============================================== MTCE 03-038 REGION WIDE VARIOUS LOCATIONS 11/16/06 2,892.00 15.00 13.88 9.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,892.00 15.00 13.88 9.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,892.00 15.00 13.88 9.50 =============== 614-01588 Steel Sign Supp (2-1/2 In Rd 80)(Slip) Each =================================================== MTCE 04-067 FY 07 REGION 4 STERLING SIGNS 06/22/06 139.00 190.00 176.67 175.00 MTCE 06-070 R6 - SIGN POST REPLACEMENT 06/29/06 500.00 130.00 167.50 155.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 639.00 143.05 170.20 159.35 MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 07/13/06 4.00 150.00 225.00 175.00 MTCE 04-071 FY07 R4 US 287 PHASE 1 07/20/06 96.00 175.00 189.00 155.00 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 22.00 135.00 237.95 31.00 MTCE 04-074 R4 US 287 SIGNS PHASE 2 09/28/06 182.00 190.00 208.40 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 304.00 180.76 204.52 149.28 MTCE 04-075 FY07 REGION 4 SIGNS NE PHASE 10/26/06 326.00 175.00 180.00 160.00 MTCE 04-076 FY07 R4 SIGNS NE PHASE 2 10/26/06 280.00 175.00 210.00 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 606.00 175.00 186.68 183.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,549.00 162.95 187.54 166.67 =============== 614-01589 Steel Sign Supp (2.5 In Rd Sch 80)(Ins) Each =================================================== MTCE 03-038 REGION WIDE VARIOUS LOCATIONS 11/16/06 161.00 80.00 97.50 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 161.00 80.00 97.50 65.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 161.00 80.00 97.50 65.00 =============== 614-03001 Conc Footing (Ty 1) Each =================================================== MTCE 04-074 R4 US 287 SIGNS PHASE 2 09/28/06 2.00 800.00 1078.60 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 800.00 1078.60 800.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 55 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-03001 Conc Footing (Ty 1) Each =================================================== MTCE 04-076 FY07 R4 SIGNS NE PHASE 2 10/26/06 10.00 750.00 1000.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 750.00 1000.00 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 758.33 1039.30 966.67 =============== 614-03002 Conc Footing (Ty 2) Each =================================================== MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 07/13/06 4.00 1000.00 1000.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 1000.00 1000.00 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1000.00 1000.00 1000.00 =============== 614-03003 Conc Footing (Ty 3) Each =================================================== MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 7.00 1300.00 1139.20 1110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 1300.00 1139.20 1110.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 1300.00 1139.20 1110.00 =============== 614-03006 Conc Footing (Ty 6) Each =================================================== MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 07/13/06 4.00 1600.00 1600.00 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 1600.00 1600.00 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1600.00 1600.00 1800.00 =============== 614-03007 Conc Footing (Ty 7) Each =================================================== MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 07/13/06 4.00 1750.00 2000.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 1750.00 2000.00 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1750.00 2000.00 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 56 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-10100 Inst Sign Brdg Str Each =================================================== MTCE 06-074 SH 6 AT MP 280.996 10/12/06 1.00 15000.00 9318.20 8500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 15000.00 9318.20 8500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 9318.20 8500.00 =============== 614-10128 Blankout Sign (Fib Opt) Each =================================================== MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 10.00 10000.00 11937.34 12130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 10000.00 11937.34 12130.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 10000.00 11937.34 12130.00 =============== 614-10146 VMS (LED) (Ground Mounted) Each =================================================== MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 1.00 107000.00 96313.10 89500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 107000.00 96313.10 89500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 107000.00 96313.10 89500.00 =============== 614-10147 VMS LED (Overhead) Each =================================================== MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 2.00 120000.00 121355.96 106600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 120000.00 121355.96 106600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 120000.00 121355.96 106600.00 =============== 614-32400 Monotube Overhead Sign Cant (24 In Dia) Each =================================================== MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 2.00 30500.00 33702.21 30130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 30500.00 33702.21 30130.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 30500.00 33702.21 30130.00 =============== 614-70336 Traf Sig Face (12-12-12) Each =================================================== MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 10.00 750.00 596.00 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 750.00 596.00 525.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 750.00 596.00 525.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 57 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72830 Communications Cabinet Each =================================================== MTCE 01-060 I-70 WEST 08/31/06 14.00 1800.00 997.50 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 1800.00 997.50 1100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 1800.00 997.50 1100.00 =============== 614-72875 Loop Detect Wire Lin Foot =============================================== MTCE 01-057 VARIOUS, REGION 1 05/25/06 5,000.00 2.85 2.48 2.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,000.00 2.85 2.48 2.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,000.00 2.85 2.48 2.40 =============== 614-72886 Intersection Detect Sys (Camera) Each =================================================== MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 2.00 5500.00 3981.67 4925.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 5500.00 3981.67 4925.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5500.00 3981.67 4925.00 =============== 614-72887 Detect (Microwave Veh) Each =================================================== MTCE 01-060 I-70 WEST 08/31/06 4.00 8000.00 3859.00 4565.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 8000.00 3859.00 4565.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 8000.00 3859.00 4565.00 =============== 614-72896 Inst Intersect Detect Sys (Camera) Each =================================================== MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 4.00 800.00 922.67 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 800.00 922.67 800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 800.00 922.67 800.00 =============== 614-75216 Inst Ped Sig Face (16) Each =================================================== MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 8.00 180.00 199.61 220.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 58 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-75216 Inst Ped Sig Face (16) Each =================================================== MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 16.00 130.00 219.40 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 146.67 211.48 193.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 146.67 211.48 193.33 =============== 614-75336 Inst Traf Sig Face (12-12-12) Each =================================================== MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 6.00 150.00 329.68 155.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 16.00 175.00 352.39 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 168.18 344.82 260.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 168.18 344.82 260.45 =============== 614-75560 Inst Traf Sig Face (12-12-12-12-12) Each =================================================== MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 8.00 250.00 384.68 215.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 12.00 250.00 416.34 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 250.00 401.44 266.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 250.00 401.44 266.00 =============== 614-75841 Inst Traf Sig Ctrler (Ty 170) Each =================================================== MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 1.00 2300.00 2200.24 3650.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 2.00 2000.00 2322.66 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 2100.00 2273.69 1583.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2100.00 2273.69 1583.33 =============== 614-75848 Inst Traf Sig Ctrler + Cab Each =================================================== MTCE 06-066 SH 121, SIGNAL CABINET REPLAC 03/23/06 20.00 1500.00 1345.78 480.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 1500.00 1345.78 480.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 1500.00 1345.78 480.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 59 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-75860 Inst Ped Push Button Each =================================================== MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 8.00 55.00 114.18 75.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 16.00 55.00 171.24 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 55.00 148.41 225.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 55.00 148.41 225.00 =============== 614-75877 Inst Prefab Loop Detect (Spec) Lin Foot =============================================== MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 2,200.00 6.50 3.83 3.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,200.00 6.50 3.83 3.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,200.00 6.50 3.83 3.55 =============== 614-80000 Flash Beacon Each =================================================== MTCE 04-076 FY07 R4 SIGNS NE PHASE 2 10/26/06 1.00 2500.00 8000.00 8000.00 MTCE 04-077 FY07 R4 BEACON REPLACEMENT 12/28/06 103.00 1750.00 2010.57 1605.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 104.00 1757.21 2020.24 1666.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 104.00 1757.21 2020.24 1666.49 =============== 614-80002 Inst Flash Beacon Each =================================================== MTCE 04-077 FY07 R4 BEACON REPLACEMENT 12/28/06 25.00 300.00 1147.17 531.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.00 300.00 1147.17 531.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 300.00 1147.17 531.00 =============== 614-80385 Rumble Strip Lin Foot =============================================== MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 04/13/06 3,380.00 1.50 2.10 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,380.00 1.50 2.10 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,380.00 1.50 2.10 3.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 60 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81301 Inst Sig-Light Pole (1) Each =================================================== MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 4.00 2700.00 2277.70 2600.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 8.00 2700.00 1755.07 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 2700.00 1964.12 2066.67 MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 2.00 3000.00 3400.00 4100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 3000.00 3400.00 4100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 2742.86 2151.41 2357.14 =============== 614-85001 Impact Atten Each =================================================== MTCE 03-033 REGION 3 VARIOUS HIGHWAYS, G 05/18/06 3.00 16000.00 8146.95 6700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 16000.00 8146.95 6700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 16000.00 8146.95 6700.00 =============== 614-86105 Telemetry (Field) Each =================================================== MTCE 01-060 I-70 WEST 08/31/06 1.00 5500.00 1495.50 1255.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5500.00 1495.50 1255.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5500.00 1495.50 1255.00 =============== 614-86705 Inst Traf Sig Equip Hour =================================================== MTCE 01-057 VARIOUS, REGION 1 05/25/06 160.00 90.00 110.98 116.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 160.00 90.00 110.98 116.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 160.00 90.00 110.98 116.20 =============== 614-86710 Traffic Sig Equip LUMP SUM =============================================== MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 1.00 5000.00 3646.39 2040.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 3646.39 2040.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 3646.39 2040.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 61 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86920 Mod Traf Sig Ctrler Cab Each =================================================== MTCE 06-066 SH 121, SIGNAL CABINET REPLAC 03/23/06 3.00 3000.00 1603.71 982.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 3000.00 1603.71 982.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 3000.00 1603.71 982.00 =============== 614-87010 Fiber Optic Cable (S Mode) (12 Fiber) Lin Foot =============================================== MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 500.00 4.00 9.34 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 500.00 4.00 9.34 4.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 500.00 4.00 9.34 4.50 =============== 614-87020 Optic Transceiver Each =================================================== MTCE 01-060 I-70 WEST 08/31/06 6.00 2000.00 3028.75 2900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 2000.00 3028.75 2900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 2000.00 3028.75 2900.00 =============== 614-87028 Video Optic Transceiver Each =================================================== MTCE 01-060 I-70 WEST 08/31/06 20.00 3500.00 2572.50 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 3500.00 2572.50 2300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 3500.00 2572.50 2300.00 =============== 614-87320 CCTV Each =================================================== MTCE 01-060 I-70 WEST 08/31/06 10.00 4000.00 3613.25 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 4000.00 3613.25 3000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 4000.00 3613.25 3000.00 =============== 614-87325 CCTV Pole Each =================================================== MTCE 01-060 I-70 WEST 08/31/06 6.00 3500.00 2761.25 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 3500.00 2761.25 3000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 3500.00 2761.25 3000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 62 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87350 Test Fiber Optic Cable LUMP SUM =============================================== MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 1.00 2800.00 2536.67 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2800.00 2536.67 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2800.00 2536.67 2500.00 =============== 614-87401 Fiber Optic Cable (Spec) Lin Foot =============================================== MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 350.00 2.80 3.15 1.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 350.00 2.80 3.15 1.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 350.00 2.80 3.15 1.95 =============== 614-87406 Fiber Optic Cable (S Mode) (6 S) Lin Foot =============================================== MTCE 01-060 I-70 WEST 08/31/06 5,555.00 3.50 4.63 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,555.00 3.50 4.63 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,555.00 3.50 4.63 4.00 =============== 614-87497 Fiber Optic Cable (M Mode) (96 S) Lin Foot =============================================== MTCE 01-057 VARIOUS, REGION 1 05/25/06 10,000.00 1.90 3.66 1.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10,000.00 1.90 3.66 1.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,000.00 1.90 3.66 1.35 =============== 620-00020 Sanitary Facility Each =================================================== MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 1.00 2000.00 791.43 270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2000.00 791.43 270.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 791.43 270.00 =============== 625-00000 Const Surveying LUMP SUM =============================================== MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 1.00 6000.00 4566.67 2190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 6000.00 4566.67 2190.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 63 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 625-00000 Const Surveying LUMP SUM =============================================== MTCE 06-074 SH 6 AT MP 280.996 10/12/06 1.00 3500.00 4387.60 8900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 3500.00 4387.60 8900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4750.00 4454.75 5545.00 =============== 626-00000 Mobilization LUMP SUM =============================================== MTCE 05-045 R5 - REGION WIDE EPOXY STRIPI 01/12/06 1.00 20000.00 23833.33 1500.00 MTCE 05-044 R5 - INLAID PAVEMENT MARKING 01/12/06 1.00 30000.00 28437.00 2185.00 MTCE 02-025 R2 - FY 06 SNOW GATES 01/12/06 1.00 10000.00 11447.75 8000.00 MTCE 05-046 REGION 5, MAINTENANCE SECTION 01/26/06 1.00 20000.00 27110.00 27740.00 MTCE 06-064 I-270 OVER SH224, STR. E-17-Q 01/26/06 1.00 10000.00 14857.03 14340.00 MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 1.00 10000.00 12452.21 10100.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 1.00 10000.00 25860.48 42000.00 MTCE 05-048 US550 - MP 49.85 TO MP 56.00 02/16/06 1.00 75000.00 34300.00 34300.00 MTCE 05-049 US 491B CHIP SEAL, MP 45.4 03/09/06 1.00 75000.00 150567.28 222748.12 MTCE 01-054 R1 FY 06 STRIPING WEST 03/09/06 1.00 12000.00 3666.67 5000.00 MTCE 06-065 I25 - HOV / HOT LANES 03/16/06 1.00 10000.00 10924.25 28097.00 MTCE 06-066 SH 121, SIGNAL CABINET REPLAC 03/23/06 1.00 5000.00 4638.03 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 23916.67 27139.57 33250.84 MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 04/13/06 1.00 33000.00 42000.00 30000.00 MTCE 04-065 R4 I-25 FRONTAGE RD EPOXY 04/13/06 1.00 8000.00 2250.00 1000.00 MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 1.00 50000.00 43929.70 33000.00 MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 1.00 14000.00 44800.00 25000.00 MTCE 03-032 REGION WIDE, VARIOUS LOCATION 05/04/06 1.00 50000.00 40000.00 5000.00 MTCE 04-066 US 85 MP 299.68 TO MP 301.00 05/04/06 1.00 20000.00 5892.50 5892.50 MTCE 02-030 FY 07 REGION 2 STRIPING 05/11/06 1.00 25000.00 53333.33 10000.00 MTCE 03-033 REGION 3 VARIOUS HIGHWAYS, G 05/18/06 1.00 16000.00 15161.67 12000.00 MTCE 01-057 VARIOUS, REGION 1 05/25/06 1.00 35000.00 8225.00 2400.00 MTCE 01-059 REGION WIDE 06/01/06 1.00 5000.00 19916.67 10000.00 MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 1.00 20000.00 81766.00 114500.00 MTCE 01-058 REGION WIDE 06/15/06 1.00 30000.00 45750.00 15000.00 MTCE 04-069 FY07 R4 EPOXY EAST 06/15/06 1.00 10000.00 15133.33 10000.00 MTCE 04-070 FY07 R4 EPOXY WEST 06/15/06 1.00 10000.00 12066.67 17000.00 MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 8 06/22/06 1.00 100000.00 92500.00 125000.00 MTCE 04-068 FY 07 REGION 4 STENCIL MARKIN 06/22/06 1.00 15000.00 27225.00 37000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 64 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00000 Mobilization LUMP SUM =============================================== MTCE 04-067 FY 07 REGION 4 STERLING SIGNS 06/22/06 1.00 25000.00 30831.67 19000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17.00 27411.76 33452.52 27752.50 MTCE 06-069 VARIOUS LOCATIONS WITHIN REGI 07/06/06 1.00 16000.00 62500.00 100000.00 MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 07/13/06 1.00 45000.00 77712.67 135000.00 MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 1.00 50000.00 102276.25 110000.00 MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 1.00 64000.00 80000.00 80000.00 MTCE 04-071 FY07 R4 US 287 PHASE 1 07/20/06 1.00 10000.00 27080.00 20000.00 MTCE 06-071 I-25, SH 85 TO I-70 08/03/06 1.00 36000.00 49644.50 12800.00 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 1.00 70000.00 53848.40 14800.00 MTCE 01-060 I-70 WEST 08/31/06 1.00 25000.00 18231.50 14000.00 MTCE 04-072 I-25 SLAB REPLACEMENT MILEPOS 09/21/06 1.00 150000.00 129000.00 124000.00 MTCE 04-074 R4 US 287 SIGNS PHASE 2 09/28/06 1.00 40000.00 38430.00 40000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 50600.00 60491.10 65060.00 MTCE 06-074 SH 6 AT MP 280.996 10/12/06 1.00 12000.00 24949.00 12825.00 MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 10/19/06 1.00 15000.00 27200.00 14000.00 MTCE 04-075 FY07 REGION 4 SIGNS NE PHASE 10/26/06 1.00 60000.00 45000.00 20000.00 MTCE 04-076 FY07 R4 SIGNS NE PHASE 2 10/26/06 1.00 50000.00 62800.00 62800.00 MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 1.00 40000.00 56099.47 20000.00 MTCE 03-038 REGION WIDE VARIOUS LOCATIONS 11/16/06 1.00 28000.00 24000.00 9500.00 MTCE 06-077 I-76 #E-17-GL & #E-17-GM; SH3 11/30/06 1.00 24000.00 22779.40 25000.00 MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 1.00 15000.00 18531.01 4500.00 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 1.00 185000.00 131385.57 58648.99 MTCE 04-077 FY07 R4 BEACON REPLACEMENT 12/28/06 1.00 20000.00 18179.33 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 44900.00 40253.35 24227.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 49.00 34857.14 38730.95 35993.40 =============== 626-01000 Public Info Services LUMP SUM =============================================== MTCE 05-049 US 491B CHIP SEAL, MP 45.4 03/09/06 1.00 2500.00 3500.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2500.00 3500.00 5000.00 MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 8 06/22/06 1.00 5000.00 1750.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5000.00 1750.00 1500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 65 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-01000 Public Info Services LUMP SUM =============================================== MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 1.00 5000.00 2922.14 539.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 2922.14 539.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 4166.67 2919.61 2346.66 =============== 627-00003 Thermoplastic Pvmt Mkg (Inlaid) Sq Foot ================================================ MTCE 02-030 FY 07 REGION 2 STRIPING 05/11/06 14,814.00 11.00 9.17 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14,814.00 11.00 9.17 7.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,814.00 11.00 9.17 7.50 =============== 627-00005 Epoxy Pvmt Mkg Gallon ================================================= MTCE 05-045 R5 - REGION WIDE EPOXY STRIPI 01/12/06 38,929.00 44.00 45.20 41.00 MTCE 05-048 US550 - MP 49.85 TO MP 56.00 02/16/06 435.00 75.00 61.00 61.00 MTCE 05-049 US 491B CHIP SEAL, MP 45.4 03/09/06 1,700.00 75.00 69.25 75.00 MTCE 01-054 R1 FY 06 STRIPING WEST 03/09/06 12,745.00 46.00 43.82 41.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 53,809.00 45.70 45.92 42.46 MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 04/13/06 167.00 100.00 123.17 76.00 MTCE 04-065 R4 I-25 FRONTAGE RD EPOXY 04/13/06 3,566.00 61.00 44.18 41.10 MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 413.00 65.00 78.06 88.00 MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 8.00 350.00 241.00 210.00 MTCE 03-032 REGION WIDE, VARIOUS LOCATION 05/04/06 20,116.03 45.00 49.40 42.80 MTCE 04-066 US 85 MP 299.68 TO MP 301.00 05/04/06 57.00 100.00 103.45 103.45 MTCE 02-030 FY 07 REGION 2 STRIPING 05/11/06 37,823.00 43.00 44.58 43.73 MTCE 01-059 REGION WIDE 06/01/06 12,145.00 43.50 46.88 42.00 MTCE 04-069 FY07 R4 EPOXY EAST 06/15/06 31,504.00 43.00 42.91 40.85 MTCE 04-070 FY07 R4 EPOXY WEST 06/15/06 15,774.00 44.00 40.90 40.00 MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 8 06/22/06 2,575.00 70.00 52.50 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 124,148.03 44.77 44.83 42.28 MTCE 06-069 VARIOUS LOCATIONS WITHIN REGI 07/06/06 4,000.00 43.00 51.00 42.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 66 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00005 Epoxy Pvmt Mkg Gallon ================================================= MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 10.00 200.00 432.50 425.00 MTCE 04-072 I-25 SLAB REPLACEMENT MILEPOS 09/21/06 10.00 400.00 480.40 345.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,020.00 44.28 54.61 43.71 MTCE 06-074 SH 6 AT MP 280.996 10/12/06 10.00 120.00 275.40 350.00 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 463.00 75.00 81.74 84.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 473.00 75.95 84.68 90.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 182,450.03 45.12 45.57 42.49 =============== 627-00011 Pvmt Mkg Paint (Waterborne) Gallon ================================================= MTCE 05-048 US550 - MP 49.85 TO MP 56.00 02/16/06 700.00 35.00 35.00 35.00 MTCE 05-049 US 491B CHIP SEAL, MP 45.4 03/09/06 1,200.00 35.00 22.75 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,900.00 35.00 24.31 28.68 MTCE 04-066 US 85 MP 299.68 TO MP 301.00 05/04/06 57.00 70.00 28.75 28.75 MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 8 06/22/06 1,575.00 30.00 15.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,632.00 31.40 15.24 10.65 MTCE 04-072 I-25 SLAB REPLACEMENT MILEPOS 09/21/06 10.00 325.00 615.89 1250.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 325.00 615.89 1250.44 MTCE 06-074 SH 6 AT MP 280.996 10/12/06 20.00 50.00 119.75 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 50.00 119.75 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,562.00 34.25 25.44 23.97 =============== 627-00012 Pvmt Mkg Paint (Low VOC Solvent Base) Gallon ================================================= MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 826.00 40.00 21.24 16.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 826.00 40.00 21.24 16.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 67 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00012 Pvmt Mkg Paint (Low VOC Solvent Base) Gallon ================================================= MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 20.00 200.00 308.75 315.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 200.00 308.75 315.00 MTCE 02-032 SH115 10/20/06 10.00 90.00 190.63 200.00 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 1,006.00 35.00 16.90 12.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,016.00 35.54 17.88 14.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,862.00 39.29 20.06 18.78 =============== 627-01001 Preform Plastic Pvmt Mkg (Ty I) Sq Foot ================================================ MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 5,400.00 11.00 10.39 11.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,400.00 11.00 10.39 11.30 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 3,993.00 11.00 10.91 10.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,993.00 11.00 10.91 10.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,393.00 11.00 10.68 11.09 =============== 627-01003 Preform Plastic Pvmt Mkg (Ty A) (Inlaid) Sq Foot ================================================ MTCE 02-030 FY 07 REGION 2 STRIPING 05/11/06 4,700.00 13.00 13.08 12.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,700.00 13.00 13.08 12.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,700.00 13.00 13.08 12.25 =============== 627-01010 Preform Plastic Pvmt Mkg (TY I)(Inlaid) Sq Foot ================================================ MTCE 01-054 R1 FY 06 STRIPING WEST 03/09/06 15,980.00 10.00 10.42 10.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15,980.00 10.00 10.42 10.75 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 68 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-01010 Preform Plastic Pvmt Mkg (TY I)(Inlaid) Sq Foot ================================================ MTCE 01-059 REGION WIDE 06/01/06 49,258.00 11.00 9.41 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 49,258.00 11.00 9.41 8.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65,238.00 10.76 9.66 9.05 =============== 627-02001 Preform Plastic Pvmt Mkg (Ty II) Sq Foot ================================================ MTCE 06-069 VARIOUS LOCATIONS WITHIN REGI 07/06/06 25,000.00 10.50 9.00 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25,000.00 10.50 9.00 8.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25,000.00 10.50 9.00 8.50 =============== 627-02010 Preform Plastic Pvmt Mkg (Ty II)(Inlaid) Sq Foot ================================================ MTCE 01-054 R1 FY 06 STRIPING WEST 03/09/06 1,540.00 12.00 11.08 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,540.00 12.00 11.08 12.00 MTCE 03-032 REGION WIDE, VARIOUS LOCATION 05/04/06 18,150.00 18.00 13.75 12.50 MTCE 01-059 REGION WIDE 06/01/06 42,042.00 11.50 10.58 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60,192.00 13.46 11.29 10.06 MTCE 06-069 VARIOUS LOCATIONS WITHIN REGI 07/06/06 50,000.00 12.00 10.75 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50,000.00 12.00 10.75 9.00 MTCE 06-074 SH 6 AT MP 280.996 10/12/06 365.00 25.00 27.25 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 365.00 25.00 27.25 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 112,097.00 12.83 11.19 9.66 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 69 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30324 Preform Plastic Pvmt Mkg (WS) (TY I) Sq Foot ================================================ MTCE 05-044 R5 - INLAID PAVEMENT MARKING 01/12/06 3,129.00 11.25 20.91 20.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,129.00 11.25 20.91 20.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,129.00 11.25 20.91 20.55 =============== 627-30327 Preform Plastic Pvmt Mkg (WS) (Ty III) Sq Foot ================================================ MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 541.00 16.00 16.20 16.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 541.00 16.00 16.20 16.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 541.00 16.00 16.20 16.20 =============== 627-30329 Preform Plastic Pvmt Mkg (XS) (TY I) Sq Foot ================================================ MTCE 05-044 R5 - INLAID PAVEMENT MARKING 01/12/06 17,409.00 9.25 13.82 9.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17,409.00 9.25 13.82 9.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,409.00 9.25 13.82 9.83 =============== 627-30332 Preform Plastic Pvmt Mkg (XS) (Ty III) Sq Foot ================================================ MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 720.00 12.00 10.76 10.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 720.00 12.00 10.76 10.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 720.00 12.00 10.76 10.80 =============== 627-30405 Preform Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ MTCE 05-049 US 491B CHIP SEAL, MP 45.4 03/09/06 918.00 20.00 16.75 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 918.00 20.00 16.75 15.00 MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 72.00 16.00 21.33 16.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 70 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30405 Preform Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ MTCE 02-030 FY 07 REGION 2 STRIPING 05/11/06 1,770.00 15.00 15.83 15.50 MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 8 06/22/06 1,655.00 20.00 16.50 15.00 MTCE 04-068 FY 07 REGION 4 STENCIL MARKIN 06/22/06 20,823.00 12.00 11.13 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24,320.00 12.77 11.62 10.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25,238.00 13.04 11.81 10.91 =============== 627-30410 Preform Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 104.00 11.50 16.00 10.00 MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 8 06/22/06 300.00 13.00 12.50 10.00 MTCE 04-068 FY 07 REGION 4 STENCIL MARKIN 06/22/06 35,710.00 10.00 9.07 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36,114.00 10.03 9.10 8.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36,114.00 10.03 9.10 8.02 =============== 630-00000 Flagging Hour =================================================== MTCE 05-044 R5 - INLAID PAVEMENT MARKING 01/12/06 1,200.00 22.00 24.10 25.50 MTCE 05-046 REGION 5, MAINTENANCE SECTION 01/26/06 800.00 24.00 21.33 22.00 MTCE 06-064 I-270 OVER SH224, STR. E-17-Q 01/26/06 80.00 22.00 24.39 23.00 MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 400.00 25.00 25.08 27.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 500.00 24.00 21.27 19.50 MTCE 05-048 US550 - MP 49.85 TO MP 56.00 02/16/06 400.00 23.00 21.00 21.00 MTCE 05-049 US 491B CHIP SEAL, MP 45.4 03/09/06 1,000.00 23.00 14.88 8.50 MTCE 06-065 I25 - HOV / HOT LANES 03/16/06 240.00 25.00 22.23 19.28 MTCE 06-066 SH 121, SIGNAL CABINET REPLAC 03/23/06 40.00 25.00 22.10 24.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,660.00 23.30 21.27 19.98 MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 04/13/06 200.00 24.00 30.27 30.00 MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 160.00 25.00 20.06 19.25 MTCE 03-032 REGION WIDE, VARIOUS LOCATION 05/04/06 644.00 30.00 30.00 40.00 MTCE 04-066 US 85 MP 299.68 TO MP 301.00 05/04/06 300.00 24.00 25.30 25.30 MTCE 03-033 REGION 3 VARIOUS HIGHWAYS, G 05/18/06 400.00 25.00 28.63 14.00 MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 1,000.00 28.00 37.00 40.00 MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 8 06/22/06 1,000.00 20.00 12.00 6.00 MTCE 04-068 FY 07 REGION 4 STENCIL MARKIN 06/22/06 1,500.00 24.00 20.81 19.25 MTCE 04-067 FY 07 REGION 4 STERLING SIGNS 06/22/06 500.00 22.00 19.42 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 71 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00000 Flagging Hour =================================================== MTCE 06-070 R6 - SIGN POST REPLACEMENT 06/29/06 80.00 23.00 20.50 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,784.00 24.58 23.39 23.28 MTCE 06-069 VARIOUS LOCATIONS WITHIN REGI 07/06/06 480.00 25.00 15.00 10.00 MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 07/13/06 400.00 24.00 27.67 24.00 MTCE 04-071 FY07 R4 US 287 PHASE 1 07/20/06 100.00 24.00 23.00 19.00 MTCE 06-071 I-25, SH 85 TO I-70 08/03/06 100.00 25.00 24.80 26.50 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 40.00 24.00 28.78 29.00 MTCE 01-060 I-70 WEST 08/31/06 100.00 24.00 22.62 18.50 MTCE 04-072 I-25 SLAB REPLACEMENT MILEPOS 09/21/06 1,500.00 30.00 20.26 21.85 MTCE 04-074 R4 US 287 SIGNS PHASE 2 09/28/06 500.00 23.00 19.53 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,220.00 26.82 20.78 17.46 MTCE 06-074 SH 6 AT MP 280.996 10/12/06 20.00 22.00 23.14 30.00 MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 10/19/06 250.00 28.00 26.00 25.00 MTCE 04-075 FY07 REGION 4 SIGNS NE PHASE 10/26/06 500.00 22.00 14.33 10.00 MTCE 04-076 FY07 R4 SIGNS NE PHASE 2 10/26/06 500.00 22.00 25.00 25.00 MTCE 03-038 REGION WIDE VARIOUS LOCATIONS 11/16/06 80.00 25.00 24.00 20.00 MTCE 06-077 I-76 #E-17-GL & #E-17-GM; SH3 11/30/06 80.00 23.00 20.70 27.50 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 500.00 24.00 20.76 18.73 MTCE 04-077 FY07 R4 BEACON REPLACEMENT 12/28/06 50.00 24.00 27.12 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,980.00 23.47 20.70 19.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,644.00 24.52 21.68 20.62 =============== 630-00001 Pilot Car Operation Hour =================================================== MTCE 05-048 US550 - MP 49.85 TO MP 56.00 02/16/06 120.00 40.00 32.00 32.00 MTCE 05-049 US 491B CHIP SEAL, MP 45.4 03/09/06 300.00 40.00 30.00 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 420.00 40.00 30.18 22.00 MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 8 06/22/06 300.00 30.00 25.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 300.00 30.00 25.00 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 720.00 35.83 28.56 21.17 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 72 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00003 Uniformed Traf Ctrl Hour =================================================== MTCE 06-066 SH 121, SIGNAL CABINET REPLAC 03/23/06 100.00 60.00 81.45 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 60.00 81.45 120.00 MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 130.00 60.00 84.08 82.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 130.00 60.00 84.08 82.50 MTCE 06-069 VARIOUS LOCATIONS WITHIN REGI 07/06/06 240.00 80.00 55.00 55.00 MTCE 06-071 I-25, SH 85 TO I-70 08/03/06 640.00 80.00 75.85 80.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 880.00 80.00 70.16 73.33 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 200.00 80.00 67.02 66.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 80.00 67.02 66.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,310.00 76.49 72.19 76.70 =============== 630-00004 Traf Ctrl Vehicle Each =================================================== MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 1.00 3000.00 1351.71 1650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3000.00 1351.71 1650.00 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 1.00 3000.00 1898.86 1102.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 3000.00 1898.86 1102.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3000.00 1699.90 1376.01 =============== 630-00007 Traf Ctrl Inspection Day ==================================================== MTCE 02-025 R2 - FY 06 SNOW GATES 01/12/06 5.00 130.00 87.53 109.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 73 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00007 Traf Ctrl Inspection Day ==================================================== MTCE 06-064 I-270 OVER SH224, STR. E-17-Q 01/26/06 7.00 100.00 104.14 120.00 MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 6.00 150.00 84.16 50.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 12.00 100.00 56.12 25.00 MTCE 05-048 US550 - MP 49.85 TO MP 56.00 02/16/06 8.00 125.00 100.00 100.00 MTCE 05-049 US 491B CHIP SEAL, MP 45.4 03/09/06 10.00 90.00 78.75 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48.00 111.46 82.71 68.44 MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 04/13/06 4.00 100.00 140.67 140.00 MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 24.00 125.00 66.72 55.00 MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 12.00 85.00 125.00 60.00 MTCE 04-066 US 85 MP 299.68 TO MP 301.00 05/04/06 3.00 100.00 97.75 97.75 MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 45.00 170.00 186.50 170.00 MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 8 06/22/06 6.00 130.00 85.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 94.00 139.89 123.26 114.40 MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 16.00 170.00 50.00 50.00 MTCE 01-060 I-70 WEST 08/31/06 10.00 90.00 84.89 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26.00 139.23 74.92 51.92 MTCE 06-074 SH 6 AT MP 280.996 10/12/06 10.00 100.00 97.60 50.00 MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 10/19/06 10.00 125.00 127.33 132.00 MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 20.00 125.00 180.00 290.00 MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 4.00 100.00 108.20 115.00 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 16.00 100.00 81.81 82.65 MTCE 04-077 FY07 R4 BEACON REPLACEMENT 12/28/06 32.00 120.00 84.13 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 92.00 115.11 110.09 131.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 260.00 125.81 106.60 105.81 =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== MTCE 05-044 R5 - INLAID PAVEMENT MARKING 01/12/06 40.00 450.00 459.00 570.00 MTCE 02-025 R2 - FY 06 SNOW GATES 01/12/06 25.00 600.00 429.94 380.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 74 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== MTCE 05-046 REGION 5, MAINTENANCE SECTION 01/26/06 40.00 425.00 478.10 467.50 MTCE 06-064 I-270 OVER SH224, STR. E-17-Q 01/26/06 22.00 450.00 402.65 520.00 MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 20.00 450.00 458.59 435.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 40.00 425.00 344.88 125.00 MTCE 05-048 US550 - MP 49.85 TO MP 56.00 02/16/06 17.00 425.00 450.00 450.00 MTCE 05-049 US 491B CHIP SEAL, MP 45.4 03/09/06 17.00 425.00 350.00 200.00 MTCE 06-065 I25 - HOV / HOT LANES 03/16/06 60.00 450.00 454.09 259.35 MTCE 06-066 SH 121, SIGNAL CABINET REPLAC 03/23/06 50.00 450.00 451.98 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 331.00 452.72 436.04 370.85 MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 04/13/06 20.00 500.00 683.33 670.00 MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 13.00 450.00 597.68 605.00 MTCE 03-032 REGION WIDE, VARIOUS LOCATION 05/04/06 23.00 600.00 400.00 300.00 MTCE 04-066 US 85 MP 299.68 TO MP 301.00 05/04/06 10.00 500.00 546.25 546.25 MTCE 02-030 FY 07 REGION 2 STRIPING 05/11/06 20.00 450.00 400.00 200.00 MTCE 03-033 REGION 3 VARIOUS HIGHWAYS, G 05/18/06 50.00 400.00 528.07 150.00 MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 150.00 500.00 576.50 545.00 MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 8 06/22/06 17.00 400.00 350.00 100.00 MTCE 04-068 FY 07 REGION 4 STENCIL MARKIN 06/22/06 90.00 450.00 631.25 600.00 MTCE 04-067 FY 07 REGION 4 STERLING SIGNS 06/22/06 50.00 450.00 320.00 250.00 MTCE 06-070 R6 - SIGN POST REPLACEMENT 06/29/06 10.00 450.00 437.50 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 453.00 470.09 537.84 441.67 MTCE 06-069 VARIOUS LOCATIONS WITHIN REGI 07/06/06 100.00 450.00 400.00 100.00 MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 07/13/06 215.00 500.00 358.33 100.00 MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 40.00 450.00 632.50 825.00 MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 40.00 575.00 525.00 525.00 MTCE 04-071 FY07 R4 US 287 PHASE 1 07/20/06 55.00 450.00 351.00 125.00 MTCE 06-071 I-25, SH 85 TO I-70 08/03/06 80.00 500.00 683.00 651.00 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 30.00 450.00 715.65 547.00 MTCE 01-060 I-70 WEST 08/31/06 30.00 460.00 433.34 345.00 MTCE 04-072 I-25 SLAB REPLACEMENT MILEPOS 09/21/06 160.00 450.00 477.00 460.00 MTCE 04-074 R4 US 287 SIGNS PHASE 2 09/28/06 100.00 300.00 370.80 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 850.00 455.94 442.72 314.49 MTCE 06-074 SH 6 AT MP 280.996 10/12/06 30.00 550.00 466.45 600.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 75 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 10/19/06 25.00 575.00 433.33 500.00 MTCE 04-075 FY07 REGION 4 SIGNS NE PHASE 10/26/06 100.00 400.00 303.33 90.00 MTCE 04-076 FY07 R4 SIGNS NE PHASE 2 10/26/06 100.00 400.00 600.00 600.00 MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 50.00 575.00 459.67 400.00 MTCE 03-038 REGION WIDE VARIOUS LOCATIONS 11/16/06 40.00 450.00 418.75 225.00 MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 10.00 550.00 584.17 450.00 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 37.00 600.00 517.64 440.80 MTCE 04-077 FY07 R4 BEACON REPLACEMENT 12/28/06 80.00 400.00 344.00 320.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 472.00 460.43 429.72 370.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,106.00 459.48 453.51 363.27 =============== 630-00013 Traf Ctrl Mgmt with Flagging Day ==================================================== MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 30.00 600.00 485.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 600.00 485.00 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 600.00 485.00 500.00 =============== 630-10005 Traf Ctrl LUMP SUM =============================================== MTCE 02-031 REGION 2 - FY07/08 LIGHTING 06/08/06 1.00 25000.00 63000.00 5500.00 MTCE 01-058 REGION WIDE 06/15/06 1.00 30000.00 48000.00 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 27500.00 54428.57 12750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 27500.00 54428.57 12750.00 =============== 630-80001 Flash Beacon (Port) Each =================================================== MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 6.00 800.00 299.36 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 800.00 299.36 220.00 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 2.00 1100.00 1103.46 1653.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1100.00 1103.46 1653.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 875.00 595.61 578.25 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 76 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80335 Barricade (3 M-A) (Temp) Each =================================================== MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 6.00 300.00 149.68 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 300.00 149.68 110.00 MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 12.00 250.00 292.50 365.00 MTCE 06-071 I-25, SH 85 TO I-70 08/03/06 5.00 250.00 195.50 116.00 MTCE 04-072 I-25 SLAB REPLACEMENT MILEPOS 09/21/06 3.00 100.00 182.35 143.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 227.50 238.98 269.56 MTCE 06-074 SH 6 AT MP 280.996 10/12/06 8.00 250.00 114.70 150.00 MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 2.00 200.00 189.67 235.00 MTCE 06-077 I-76 #E-17-GL & #E-17-GM; SH3 11/30/06 4.00 250.00 176.00 100.00 MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 4.00 250.00 91.54 56.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 244.44 118.63 127.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44.00 244.32 149.82 189.66 =============== 630-80341 Const Traf Sign (A) Each =================================================== MTCE 05-044 R5 - INLAID PAVEMENT MARKING 01/12/06 49.00 50.00 22.80 44.00 MTCE 06-064 I-270 OVER SH224, STR. E-17-Q 01/26/06 24.00 60.00 59.07 65.00 MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 4.00 85.00 56.05 45.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 60.00 50.00 55.87 25.00 MTCE 05-048 US550 - MP 49.85 TO MP 56.00 02/16/06 5.00 80.00 50.00 50.00 MTCE 05-049 US 491B CHIP SEAL, MP 45.4 03/09/06 59.00 45.00 43.00 100.00 MTCE 06-065 I25 - HOV / HOT LANES 03/16/06 6.00 70.00 63.58 99.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 207.00 51.71 43.04 58.67 MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 04/13/06 3.00 80.00 40.83 40.00 MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 18.00 75.00 44.62 44.00 MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 3.00 50.00 79.33 60.00 MTCE 03-032 REGION WIDE, VARIOUS LOCATION 05/04/06 4.00 52.00 110.00 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 77 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80341 Const Traf Sign (A) Each =================================================== MTCE 04-066 US 85 MP 299.68 TO MP 301.00 05/04/06 8.00 65.00 46.00 46.00 MTCE 02-030 FY 07 REGION 2 STRIPING 05/11/06 3.00 60.00 70.00 10.00 MTCE 03-033 REGION 3 VARIOUS HIGHWAYS, G 05/18/06 8.00 80.00 43.60 10.00 MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 8.00 60.00 96.25 57.50 MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 8 06/22/06 59.00 50.00 52.50 65.00 MTCE 04-068 FY 07 REGION 4 STENCIL MARKIN 06/22/06 40.00 75.00 97.50 60.00 MTCE 04-067 FY 07 REGION 4 STERLING SIGNS 06/22/06 32.00 65.00 46.67 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 186.00 63.43 66.23 53.90 MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 41.00 60.00 62.50 70.00 MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 24.00 70.00 37.50 37.50 MTCE 04-071 FY07 R4 US 287 PHASE 1 07/20/06 11.00 65.00 51.00 25.00 MTCE 06-071 I-25, SH 85 TO I-70 08/03/06 10.00 60.00 40.50 26.00 MTCE 01-060 I-70 WEST 08/31/06 6.00 55.00 43.50 44.00 MTCE 04-072 I-25 SLAB REPLACEMENT MILEPOS 09/21/06 16.00 65.00 84.75 86.25 MTCE 04-074 R4 US 287 SIGNS PHASE 2 09/28/06 16.00 60.00 49.60 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 124.00 62.78 58.72 50.56 MTCE 06-074 SH 6 AT MP 280.996 10/12/06 51.00 60.00 40.32 40.00 MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 10/19/06 16.00 60.00 39.00 22.00 MTCE 04-075 FY07 REGION 4 SIGNS NE PHASE 10/26/06 18.00 60.00 56.67 45.00 MTCE 04-076 FY07 R4 SIGNS NE PHASE 2 10/26/06 18.00 60.00 100.00 100.00 MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 8.00 60.00 54.67 85.00 MTCE 06-077 I-76 #E-17-GL & #E-17-GM; SH3 11/30/06 34.00 60.00 67.40 70.00 MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 4.00 60.00 52.19 56.00 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 24.00 70.00 68.15 71.63 MTCE 04-077 FY07 R4 BEACON REPLACEMENT 12/28/06 2.00 70.00 136.77 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 175.00 61.49 56.76 57.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 692.00 59.32 54.57 55.74 =============== 630-80342 Const Traf Sign (B) Each =================================================== MTCE 02-025 R2 - FY 06 SNOW GATES 01/12/06 16.00 70.00 64.19 107.00 MTCE 05-046 REGION 5, MAINTENANCE SECTION 01/26/06 16.00 40.00 44.22 55.00 MTCE 06-064 I-270 OVER SH224, STR. E-17-Q 01/26/06 38.00 75.00 77.11 85.00 MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 30.00 65.00 89.24 87.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 78 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80342 Const Traf Sign (B) Each =================================================== MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 19.00 60.00 56.16 25.00 MTCE 05-048 US550 - MP 49.85 TO MP 56.00 02/16/06 44.00 80.00 60.00 60.00 MTCE 05-049 US 491B CHIP SEAL, MP 45.4 03/09/06 58.00 55.00 43.00 100.00 MTCE 06-065 I25 - HOV / HOT LANES 03/16/06 10.00 75.00 68.95 99.80 MTCE 06-066 SH 121, SIGNAL CABINET REPLAC 03/23/06 6.00 75.00 31.23 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 237.00 65.86 61.79 77.96 MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 04/13/06 19.00 90.00 47.00 47.00 MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 54.00 75.00 56.77 60.50 MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 20.00 55.00 70.67 70.00 MTCE 04-066 US 85 MP 299.68 TO MP 301.00 05/04/06 34.00 75.00 86.25 86.25 MTCE 02-030 FY 07 REGION 2 STRIPING 05/11/06 48.00 75.00 41.67 5.00 MTCE 03-033 REGION 3 VARIOUS HIGHWAYS, G 05/18/06 30.00 80.00 48.95 15.00 MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 56.00 90.00 129.00 69.00 MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 8 06/22/06 53.00 50.00 50.00 65.00 MTCE 04-068 FY 07 REGION 4 STENCIL MARKIN 06/22/06 6.00 85.00 87.50 60.00 MTCE 04-067 FY 07 REGION 4 STERLING SIGNS 06/22/06 3.00 75.00 58.33 40.00 MTCE 06-070 R6 - SIGN POST REPLACEMENT 06/29/06 8.00 80.00 80.00 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 331.00 73.94 64.72 53.09 MTCE 06-069 VARIOUS LOCATIONS WITHIN REGI 07/06/06 15.00 75.00 55.00 10.00 MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 07/13/06 25.00 50.00 75.00 75.00 MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 43.00 80.00 122.50 190.00 MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 60.00 80.00 37.50 37.50 MTCE 04-071 FY07 R4 US 287 PHASE 1 07/20/06 13.00 75.00 61.00 35.00 MTCE 06-071 I-25, SH 85 TO I-70 08/03/06 30.00 70.00 94.75 107.00 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 10.00 50.00 81.65 72.00 MTCE 01-060 I-70 WEST 08/31/06 22.00 65.00 62.75 44.00 MTCE 04-072 I-25 SLAB REPLACEMENT MILEPOS 09/21/06 44.00 75.00 118.25 97.75 MTCE 04-074 R4 US 287 SIGNS PHASE 2 09/28/06 13.00 70.00 65.40 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 275.00 72.11 87.08 82.25 MTCE 06-074 SH 6 AT MP 280.996 10/12/06 32.00 75.00 56.21 65.00 MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 10/19/06 18.00 70.00 49.00 22.00 MTCE 04-075 FY07 REGION 4 SIGNS NE PHASE 10/26/06 13.00 70.00 60.00 55.00 MTCE 04-076 FY07 R4 SIGNS NE PHASE 2 10/26/06 13.00 70.00 100.00 100.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 79 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80342 Const Traf Sign (B) Each =================================================== MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 18.00 70.00 58.17 75.00 MTCE 03-038 REGION WIDE VARIOUS LOCATIONS 11/16/06 15.00 50.00 40.00 25.00 MTCE 06-077 I-76 #E-17-GL & #E-17-GM; SH3 11/30/06 16.00 75.00 89.80 95.00 MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 24.00 75.00 63.76 56.00 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 52.00 90.00 83.91 71.63 MTCE 04-077 FY07 R4 BEACON REPLACEMENT 12/28/06 30.00 85.00 95.30 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 231.00 76.71 71.52 66.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,074.00 72.29 70.96 68.92 =============== 630-80343 Const Traf Sign (C) Each =================================================== MTCE 06-064 I-270 OVER SH224, STR. E-17-Q 01/26/06 12.00 75.00 92.14 95.00 MTCE 05-048 US550 - MP 49.85 TO MP 56.00 02/16/06 8.00 80.00 70.00 70.00 MTCE 05-049 US 491B CHIP SEAL, MP 45.4 03/09/06 4.00 80.00 46.75 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 77.50 81.39 89.17 MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 04/13/06 11.00 100.00 52.83 52.00 MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 8.00 85.00 64.86 71.50 MTCE 03-033 REGION 3 VARIOUS HIGHWAYS, G 05/18/06 4.00 100.00 54.00 18.00 MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 8.00 110.00 141.75 80.50 MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 8 06/22/06 4.00 74.00 57.50 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 35.00 95.89 71.24 61.71 MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 8.00 100.00 120.00 185.00 MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 8.00 90.00 37.50 37.50 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 10.00 60.00 92.10 72.00 MTCE 01-060 I-70 WEST 08/31/06 13.00 75.00 65.25 44.00 MTCE 04-072 I-25 SLAB REPLACEMENT MILEPOS 09/21/06 28.00 85.00 137.25 97.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 67.00 81.72 110.65 86.70 MTCE 06-074 SH 6 AT MP 280.996 10/12/06 9.00 80.00 79.74 65.00 MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 10/19/06 4.00 80.00 92.33 22.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 80 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80343 Const Traf Sign (C) Each =================================================== MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 4.00 80.00 66.67 100.00 MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 8.00 80.00 70.12 56.00 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 8.00 120.00 85.20 71.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 33.00 89.70 75.47 63.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 159.00 85.86 88.49 76.75 =============== 630-80344 Const Traf Sign (Spec) Sq Foot ================================================ MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 120.00 20.00 17.34 16.50 MTCE 03-032 REGION WIDE, VARIOUS LOCATION 05/04/06 39.00 20.00 30.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 159.00 20.00 19.11 22.26 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 64.00 20.00 22.60 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 64.00 20.00 22.60 29.00 MTCE 06-077 I-76 #E-17-GL & #E-17-GM; SH3 11/30/06 64.00 10.00 19.80 15.00 MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 32.00 20.00 24.82 11.00 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 32.00 25.00 17.95 22.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 128.00 16.25 21.93 15.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 351.00 18.63 21.24 21.12 =============== 630-80350 Vert Panel Each =================================================== MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 50.00 70.00 28.75 34.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 70.00 28.75 34.50 MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 300.00 50.00 10.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 300.00 50.00 10.00 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 81 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80350 Vert Panel Each =================================================== MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 10/19/06 50.00 50.00 21.00 18.00 MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 50.00 50.00 39.17 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 50.00 33.11 34.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 450.00 52.22 24.44 18.06 =============== 630-80354 Vert Panel (Light) (SB) Each =================================================== MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 50.00 50.00 36.50 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 50.00 36.50 46.00 MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 300.00 40.00 15.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 300.00 40.00 15.00 15.00 MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 10/19/06 50.00 50.00 25.83 20.00 MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 50.00 50.00 47.67 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 50.00 40.39 36.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 450.00 43.33 30.97 23.22 =============== 630-80355 Port Mesg Panel Each =================================================== MTCE 06-064 I-270 OVER SH224, STR. E-17-Q 01/26/06 2.00 5000.00 1882.17 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5000.00 1882.17 2500.00 MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 2.00 6500.00 2331.31 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 6500.00 2331.31 2200.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 82 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80355 Port Mesg Panel Each =================================================== MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 6.00 3000.00 5075.00 6300.00 MTCE 06-071 I-25, SH 85 TO I-70 08/03/06 2.00 6000.00 6881.00 5512.00 MTCE 04-072 I-25 SLAB REPLACEMENT MILEPOS 09/21/06 2.00 10000.00 11620.00 11500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 5000.00 7870.15 7182.40 MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 10/19/06 2.00 7500.00 2200.00 2100.00 MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 2.00 7500.00 2012.50 375.00 MTCE 06-077 I-76 #E-17-GL & #E-17-GM; SH3 11/30/06 1.00 5000.00 3680.00 3500.00 MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 2.00 3000.00 1330.02 560.00 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 2.00 7000.00 3424.14 3306.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 6111.11 2097.31 1798.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 5565.22 3400.04 4235.04 =============== 630-80357 Flash Arrow Panel (B Ty) Each =================================================== MTCE 05-044 R5 - INLAID PAVEMENT MARKING 01/12/06 2.00 600.00 733.00 365.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 600.00 733.00 365.00 MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 4.00 500.00 1708.33 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 500.00 1708.33 800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 533.33 1265.00 655.00 =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== MTCE 06-064 I-270 OVER SH224, STR. E-17-Q 01/26/06 2.00 1200.00 700.72 1100.00 MTCE 06-065 I25 - HOV / HOT LANES 03/16/06 2.00 1000.00 440.00 665.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 1100.00 584.85 882.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 83 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 04/13/06 2.00 1000.00 583.33 600.00 MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 4.00 1100.00 554.71 550.00 MTCE 03-032 REGION WIDE, VARIOUS LOCATION 05/04/06 2.00 1200.00 450.00 750.00 MTCE 02-030 FY 07 REGION 2 STRIPING 05/11/06 3.00 1000.00 733.33 500.00 MTCE 03-033 REGION 3 VARIOUS HIGHWAYS, G 05/18/06 1.00 1200.00 511.42 100.00 MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 2.00 1250.00 4087.50 3450.00 MTCE 04-068 FY 07 REGION 4 STENCIL MARKIN 06/22/06 2.00 1200.00 1500.00 2000.00 MTCE 04-067 FY 07 REGION 4 STERLING SIGNS 06/22/06 1.00 1500.00 1200.00 1500.00 MTCE 06-070 R6 - SIGN POST REPLACEMENT 06/29/06 1.00 1200.00 700.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18.00 1144.44 1011.99 1105.56 MTCE 06-069 VARIOUS LOCATIONS WITHIN REGI 07/06/06 2.00 500.00 425.00 100.00 MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 4.00 1200.00 877.50 930.00 MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 2.00 3500.00 1875.00 1875.00 MTCE 04-071 FY07 R4 US 287 PHASE 1 07/20/06 1.00 1500.00 1650.00 750.00 MTCE 06-071 I-25, SH 85 TO I-70 08/03/06 4.00 1500.00 1988.50 1777.00 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 2.00 800.00 971.00 730.00 MTCE 01-060 I-70 WEST 08/31/06 1.00 1200.00 701.25 545.00 MTCE 04-072 I-25 SLAB REPLACEMENT MILEPOS 09/21/06 2.00 5000.00 1520.00 1150.00 MTCE 04-074 R4 US 287 SIGNS PHASE 2 09/28/06 1.00 1000.00 921.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19.00 1794.74 1231.21 1070.16 MTCE 06-074 SH 6 AT MP 280.996 10/12/06 5.00 1200.00 468.76 250.00 MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 10/19/06 1.00 2000.00 670.00 510.00 MTCE 04-075 FY07 REGION 4 SIGNS NE PHASE 10/26/06 1.00 1500.00 1750.00 2000.00 MTCE 04-076 FY07 R4 SIGNS NE PHASE 2 10/26/06 1.00 1500.00 2500.00 2500.00 MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 1.00 2000.00 504.17 200.00 MTCE 06-077 I-76 #E-17-GL & #E-17-GM; SH3 11/30/06 1.00 1000.00 714.00 1000.00 MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 1.00 1200.00 611.01 600.00 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 2.00 1600.00 909.27 1046.91 MTCE 04-077 FY07 R4 BEACON REPLACEMENT 12/28/06 2.00 1200.00 354.92 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 1386.67 644.77 694.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56.00 1426.79 886.44 967.62 =============== 630-80359 Port Mesg Panel Day ==================================================== MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 04/13/06 20.00 150.00 118.33 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 150.00 118.33 120.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 84 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80359 Port Mesg Panel Day ==================================================== MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 40.00 200.00 125.00 125.00 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 3.00 270.00 247.70 290.00 MTCE 01-060 I-70 WEST 08/31/06 10.00 200.00 127.10 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 53.00 203.96 145.26 133.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 73.00 189.18 134.84 129.73 =============== 630-80360 Drum Channel Dev Each =================================================== MTCE 05-044 R5 - INLAID PAVEMENT MARKING 01/12/06 45.00 35.00 23.40 22.00 MTCE 05-046 REGION 5, MAINTENANCE SECTION 01/26/06 20.00 15.00 22.17 22.00 MTCE 06-064 I-270 OVER SH224, STR. E-17-Q 01/26/06 50.00 40.00 45.45 45.00 MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 20.00 45.00 45.09 35.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 35.00 40.00 49.78 25.00 MTCE 05-049 US 491B CHIP SEAL, MP 45.4 03/09/06 10.00 65.00 20.50 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 180.00 37.92 35.97 29.75 MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 04/13/06 100.00 50.00 23.67 24.00 MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 100.00 45.00 31.49 27.50 MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 40.00 37.00 62.33 65.00 MTCE 03-033 REGION 3 VARIOUS HIGHWAYS, G 05/18/06 100.00 50.00 17.63 5.00 MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 50.00 50.00 49.50 45.00 MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 8 06/22/06 10.00 26.00 6.50 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 400.00 46.85 30.28 26.28 MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 100.00 45.00 57.00 70.00 MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 100.00 50.00 10.00 10.00 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 10.00 40.00 38.31 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 210.00 47.14 40.90 40.24 MTCE 06-074 SH 6 AT MP 280.996 10/12/06 30.00 40.00 41.73 32.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 85 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80360 Drum Channel Dev Each =================================================== MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 10/19/06 50.00 50.00 18.33 25.00 MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 75.00 50.00 37.17 33.00 MTCE 06-077 I-76 #E-17-GL & #E-17-GM; SH3 11/30/06 25.00 45.00 44.60 25.00 MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 100.00 45.00 21.90 22.00 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 50.00 50.00 30.13 22.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 330.00 47.20 27.04 26.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,120.00 45.57 30.03 29.40 =============== 630-80363 Drum Channel Dev (Light) (F) Each =================================================== MTCE 05-046 REGION 5, MAINTENANCE SECTION 01/26/06 5.00 20.00 27.71 27.50 MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 5.00 60.00 52.07 40.00 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 10.00 45.00 66.83 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 42.50 51.44 36.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 42.50 51.44 36.88 =============== 630-80364 Drum Channel Dev (Light) (SB) Each =================================================== MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 50.00 50.00 57.00 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 50.00 57.00 46.00 MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 100.00 50.00 15.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 50.00 15.00 15.00 MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 10/19/06 25.00 50.00 21.67 27.00 MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 30.00 50.00 43.67 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 55.00 50.00 37.20 34.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 205.00 50.00 36.67 27.68 =============== 630-80376 Gdrail Ty 7 (Temp) Lin Foot =============================================== MTCE 06-074 SH 6 AT MP 280.996 10/12/06 400.00 30.00 25.58 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 400.00 30.00 25.58 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 400.00 30.00 25.58 18.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 86 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80377 Port Water Filled Barrier (Temp) Lin Foot =============================================== MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 1,500.00 60.00 49.58 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,500.00 60.00 49.58 32.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,500.00 60.00 49.58 32.00 =============== 630-80380 Traffic Cone Each =================================================== MTCE 05-044 R5 - INLAID PAVEMENT MARKING 01/12/06 100.00 12.00 13.33 3.65 MTCE 02-025 R2 - FY 06 SNOW GATES 01/12/06 50.00 12.00 7.57 9.65 MTCE 05-046 REGION 5, MAINTENANCE SECTION 01/26/06 50.00 8.00 6.10 5.50 MTCE 06-064 I-270 OVER SH224, STR. E-17-Q 01/26/06 150.00 10.00 12.41 8.00 MTCE 05-043 US 24 & MAIN ST IN BUENA VIST 01/26/06 200.00 10.00 4.55 7.50 MTCE 05-047 MONTE VISTA SIGNAL REPLACEME 02/09/06 200.00 10.00 10.52 7.00 MTCE 05-048 US550 - MP 49.85 TO MP 56.00 02/16/06 200.00 10.00 4.00 4.00 MTCE 05-049 US 491B CHIP SEAL, MP 45.4 03/09/06 250.00 10.00 9.00 1.00 MTCE 06-065 I25 - HOV / HOT LANES 03/16/06 100.00 12.00 7.79 9.31 MTCE 06-066 SH 121, SIGNAL CABINET REPLAC 03/23/06 50.00 15.00 6.25 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,350.00 10.48 8.76 5.60 MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 04/13/06 200.00 7.00 12.00 12.00 MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 500.00 15.00 8.14 7.15 MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 800.00 8.00 14.33 2.00 MTCE 04-066 US 85 MP 299.68 TO MP 301.00 05/04/06 200.00 10.00 5.75 5.75 MTCE 02-030 FY 07 REGION 2 STRIPING 05/11/06 100.00 12.00 13.33 10.00 MTCE 03-033 REGION 3 VARIOUS HIGHWAYS, G 05/18/06 200.00 10.00 10.65 8.00 MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 100.00 15.00 19.63 17.25 MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 8 06/22/06 250.00 12.00 3.88 1.00 MTCE 04-068 FY 07 REGION 4 STENCIL MARKIN 06/22/06 150.00 12.00 12.00 11.00 MTCE 04-067 FY 07 REGION 4 STERLING SIGNS 06/22/06 150.00 15.00 8.00 3.00 MTCE 06-070 R6 - SIGN POST REPLACEMENT 06/29/06 100.00 12.00 5.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,750.00 11.00 10.82 5.78 MTCE 06-069 VARIOUS LOCATIONS WITHIN REGI 07/06/06 200.00 12.00 9.00 8.00 MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 07/13/06 25.00 15.00 15.00 10.00 MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 300.00 15.00 13.00 15.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 87 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80380 Traffic Cone Each =================================================== MTCE 04-071 FY07 R4 US 287 PHASE 1 07/20/06 100.00 12.00 10.80 7.00 MTCE 06-071 I-25, SH 85 TO I-70 08/03/06 250.00 12.00 14.45 13.50 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO 08/10/06 150.00 11.00 11.17 15.00 MTCE 01-060 I-70 WEST 08/31/06 200.00 12.00 3.55 3.00 MTCE 04-072 I-25 SLAB REPLACEMENT MILEPOS 09/21/06 200.00 15.00 16.50 11.50 MTCE 04-074 R4 US 287 SIGNS PHASE 2 09/28/06 100.00 12.00 7.10 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,525.00 12.93 11.01 10.41 MTCE 06-074 SH 6 AT MP 280.996 10/12/06 200.00 12.00 10.44 8.00 MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 10/19/06 200.00 15.00 5.33 10.00 MTCE 04-075 FY07 REGION 4 SIGNS NE PHASE 10/26/06 100.00 12.00 6.67 5.00 MTCE 04-076 FY07 R4 SIGNS NE PHASE 2 10/26/06 100.00 12.00 8.00 8.00 MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 200.00 15.00 7.94 9.00 MTCE 03-038 REGION WIDE VARIOUS LOCATIONS 11/16/06 45.00 12.00 8.00 7.00 MTCE 06-077 I-76 #E-17-GL & #E-17-GM; SH3 11/30/06 50.00 11.00 12.50 10.00 MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 100.00 15.00 7.78 6.00 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 400.00 12.00 13.22 12.12 MTCE 04-077 FY07 R4 BEACON REPLACEMENT 12/28/06 100.00 10.00 15.29 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,495.00 12.84 10.30 9.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,120.00 11.70 10.30 7.53 =============== 630-80510 Mobile Pvmt Mkg Zone LUMP SUM =============================================== MTCE 05-048 US550 - MP 49.85 TO MP 56.00 02/16/06 1.00 1200.00 2800.00 2800.00 MTCE 05-049 US 491B CHIP SEAL, MP 45.4 03/09/06 1.00 1500.00 5675.00 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1350.00 5100.00 6400.00 MTCE 04-065 R4 I-25 FRONTAGE RD EPOXY 04/13/06 1.00 8500.00 2250.00 1000.00 MTCE 02-029 US50 / PURCELL AND ELIZABETH 04/20/06 1.00 2500.00 2416.67 1600.00 MTCE 03-032 REGION WIDE, VARIOUS LOCATION 05/04/06 1.00 30000.00 15000.00 5000.00 MTCE 04-069 FY07 R4 EPOXY EAST 06/15/06 1.00 10000.00 9800.00 10000.00 MTCE 04-070 FY07 R4 EPOXY WEST 06/15/06 1.00 10000.00 6733.33 1000.00 MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 8 06/22/06 1.00 6000.00 3723.75 4747.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 11166.67 6586.50 3891.25 MTCE 04-072 I-25 SLAB REPLACEMENT MILEPOS 09/21/06 1.00 10000.00 1467.50 1437.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 1467.50 1437.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 8855.56 5265.40 4176.11 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 88 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80520 Mobile Pvmt Mkg Zone Day ==================================================== MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 5.00 600.00 434.63 110.00 MTCE 02-030 FY 07 REGION 2 STRIPING 05/11/06 150.00 450.00 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 155.00 454.84 114.24 100.32 MTCE 06-069 VARIOUS LOCATIONS WITHIN REGI 07/06/06 40.00 1000.00 675.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 1000.00 675.00 100.00 MTCE 06-074 SH 6 AT MP 280.996 10/12/06 5.00 500.00 495.00 250.00 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 10.00 2000.00 132.59 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 1500.00 227.96 119.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 210.00 633.33 200.54 101.62 =============== 630-80560 Mobile Profilograph Oper Zone LUMP SUM =============================================== MTCE 05-048 US550 - MP 49.85 TO MP 56.00 02/16/06 1.00 2500.00 850.00 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2500.00 850.00 850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2500.00 850.00 850.00 =============== 630-85006 Impact Atten (Sand Fill) (Temp) Each =================================================== MTCE 06-074 SH 6 AT MP 280.996 10/12/06 2.00 5000.00 4388.60 2600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 5000.00 4388.60 2600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5000.00 4388.60 2600.00 =============== 630-85040 Impact Atten (T-M-A) (Temp) Each =================================================== MTCE 06-064 I-270 OVER SH224, STR. E-17-Q 01/26/06 2.00 6000.00 5107.24 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 6000.00 5107.24 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 89 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85040 Impact Atten (T-M-A) (Temp) Each =================================================== MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 04/13/06 1.00 8000.00 8266.67 7000.00 MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 04/20/06 1.00 12000.00 7570.86 8250.00 MTCE 03-033 REGION 3 VARIOUS HIGHWAYS, G 05/18/06 1.00 15000.00 22895.00 32000.00 MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B 06/01/06 2.00 20000.00 24000.00 34500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 15000.00 15697.75 23250.00 MTCE 06-069 VARIOUS LOCATIONS WITHIN REGI 07/06/06 3.00 10500.00 12500.00 10000.00 MTCE 06-068 REGION 6- C-470, I-70, US 287 07/13/06 2.00 8000.00 7400.00 6000.00 MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 07/20/06 2.00 30000.00 13250.00 13250.00 MTCE 06-071 I-25, SH 85 TO I-70 08/03/06 4.00 12000.00 27727.50 23500.00 MTCE 04-072 I-25 SLAB REPLACEMENT MILEPOS 09/21/06 2.00 22500.00 28590.00 19550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 15423.08 21294.00 15507.69 MTCE 06-074 SH 6 AT MP 280.996 10/12/06 2.00 15000.00 7161.00 10800.00 MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A 11/02/06 1.00 20000.00 9961.00 1336.00 MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 12/07/06 1.00 10000.00 3920.34 1125.00 MTCE 06-072 C470 BOWLES TO KIPLING 12/28/06 2.00 15000.00 6205.00 5510.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 15000.00 6061.53 5846.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 14519.23 11827.25 13728.12 =============== 630-85041 Impact Atten (T-M-A) Day ==================================================== MTCE 01-060 I-70 WEST 08/31/06 10.00 1000.00 312.50 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 1000.00 312.50 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 1000.00 312.50 150.00 =============== 700-70010 F/A Minor Contract Revisions Force Acct ============================================= MTCE 05-045 R5 - REGION WIDE EPOXY STRIPI . 1.00 114000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 90 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70010 F/A Minor Contract Revisions Force Acct ============================================= MTCE 05-044 R5 - INLAID PAVEMENT MARKING . 1.00 30000.00 . . MTCE 02-025 R2 - FY 06 SNOW GATES . 1.00 10000.00 . . MTCE 05-046 REGION 5, MAINTENANCE SECTION . 1.00 10000.00 . . MTCE 06-064 I-270 OVER SH224, STR. E-17-Q . 1.00 5000.00 . . MTCE 05-043 US 24 & MAIN ST IN BUENA VIST . 1.00 5000.00 . . MTCE 05-047 MONTE VISTA SIGNAL REPLACEME . 1.00 10000.00 . . MTCE 05-048 US550 - MP 49.85 TO MP 56.00 . 1.00 50000.00 . . MTCE 05-049 US 491B CHIP SEAL, MP 45.4 . 1.00 50000.00 . . MTCE 01-054 R1 FY 06 STRIPING WEST . 1.00 10000.00 . . MTCE 06-065 I25 - HOV / HOT LANES . 1.00 10000.00 . . MTCE 06-066 SH 121, SIGNAL CABINET REPLAC . 1.00 7500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 25958.33 . . MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 . 1.00 40000.00 . . MTCE 04-065 R4 I-25 FRONTAGE RD EPOXY . 1.00 5000.00 . . MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 . 1.00 30000.00 . . MTCE 02-029 US50 / PURCELL AND ELIZABETH . 1.00 5000.00 . . MTCE 03-032 REGION WIDE, VARIOUS LOCATION . 1.00 20000.00 . . MTCE 04-066 US 85 MP 299.68 TO MP 301.00 . 1.00 20000.00 . . MTCE 02-030 FY 07 REGION 2 STRIPING . 1.00 20000.00 . . MTCE 03-033 REGION 3 VARIOUS HIGHWAYS, G . 1.00 16000.00 . . MTCE 01-057 VARIOUS, REGION 1 . 1.00 45000.00 . . MTCE 01-059 REGION WIDE . 1.00 50000.00 . . MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B . 1.00 75000.00 . . MTCE 04-069 FY07 R4 EPOXY EAST . 1.00 5000.00 . . MTCE 04-070 FY07 R4 EPOXY WEST . 1.00 5000.00 . . MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 8 . 1.00 50000.00 . . MTCE 04-068 FY 07 REGION 4 STENCIL MARKIN . 1.00 10000.00 . . MTCE 04-067 FY 07 REGION 4 STERLING SIGNS . 1.00 10000.00 . . MTCE 06-070 R6 - SIGN POST REPLACEMENT . 1.00 22000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17.00 25176.47 . . MTCE 06-069 VARIOUS LOCATIONS WITHIN REGI . 1.00 25000.00 . . MTCE 03-035 REGION WIDE VARIOUS LOCATIONS . 1.00 20000.00 . . MTCE 06-068 REGION 6- C-470, I-70, US 287 . 1.00 50000.00 . . MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 . 1.00 60000.00 . . MTCE 04-071 FY07 R4 US 287 PHASE 1 . 1.00 5000.00 . . MTCE 06-071 I-25, SH 85 TO I-70 . 1.00 20000.00 . . MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO . 1.00 30000.00 . . MTCE 01-060 I-70 WEST . 1.00 10000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 91 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70010 F/A Minor Contract Revisions Force Acct ============================================= MTCE 04-072 I-25 SLAB REPLACEMENT MILEPOS . 1.00 130000.00 . . MTCE 04-074 R4 US 287 SIGNS PHASE 2 . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 35500.00 . . MTCE 06-074 SH 6 AT MP 280.996 . 1.00 5000.00 . . MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 . 1.00 18000.00 . . MTCE 04-075 FY07 REGION 4 SIGNS NE PHASE . 1.00 5000.00 . . MTCE 04-076 FY07 R4 SIGNS NE PHASE 2 . 1.00 5000.00 . . MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A . 1.00 30000.00 . . MTCE 03-038 REGION WIDE VARIOUS LOCATIONS . 1.00 10000.00 . . MTCE 06-077 I-76 #E-17-GL & #E-17-GM; SH3 . 1.00 18000.00 . . MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & . 1.00 27000.00 . . MTCE 06-072 C470 BOWLES TO KIPLING . 1.00 100000.00 . . MTCE 04-077 FY07 R4 BEACON REPLACEMENT . 1.00 10000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 22800.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 49.00 26989.80 . . =============== 700-70011 F/A Partnering Force Acct ============================================= MTCE 04-066 US 85 MP 299.68 TO MP 301.00 . 1.00 500.00 . . MTCE 03-033 REGION 3 VARIOUS HIGHWAYS, G . 1.00 500.00 . . MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B . 1.00 500.00 . . MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 8 . 1.00 500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 500.00 . . MTCE 06-068 REGION 6- C-470, I-70, US 287 . 1.00 500.00 . . MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 . 1.00 500.00 . . MTCE 04-072 I-25 SLAB REPLACEMENT MILEPOS . 1.00 500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 500.00 . . MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 . 1.00 500.00 . . MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A . 1.00 500.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 92 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70011 F/A Partnering Force Acct ============================================= MTCE 03-038 REGION WIDE VARIOUS LOCATIONS . 1.00 200.00 . . MTCE 06-077 I-76 #E-17-GL & #E-17-GM; SH3 . 1.00 500.00 . . MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & . 1.00 500.00 . . MTCE 06-072 C470 BOWLES TO KIPLING . 1.00 2000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 700.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 592.31 . . =============== 700-70012 F/A Asph Pvmt Incentive Force Acct ============================================= MTCE 05-048 US550 - MP 49.85 TO MP 56.00 . 1.00 17320.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 17320.00 . . MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 . 1.00 14741.00 . . MTCE 04-066 US 85 MP 299.68 TO MP 301.00 . 1.00 7900.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 11320.50 . . MTCE 06-072 C470 BOWLES TO KIPLING . 1.00 86000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 86000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 31490.25 . . =============== 700-70014 F/A Incentive Force Acct ============================================= MTCE 03-032 REGION WIDE, VARIOUS LOCATION . 28.00 1778.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28.00 1778.00 . . MTCE 03-035 REGION WIDE VARIOUS LOCATIONS . 1.00 24978.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 24978.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 93 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70014 F/A Incentive Force Acct ============================================= MTCE 03-038 REGION WIDE VARIOUS LOCATIONS . 1.00 10320.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 10320.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 2836.07 . . =============== 700-70016 F/A Fuel Cost Adjustment Force Acct ============================================= MTCE 05-045 R5 - REGION WIDE EPOXY STRIPI . 1.00 9000.00 . . MTCE 05-044 R5 - INLAID PAVEMENT MARKING . 1.00 2000.00 . . MTCE 02-025 R2 - FY 06 SNOW GATES . 1.00 200.00 . . MTCE 05-048 US550 - MP 49.85 TO MP 56.00 . 1.00 5000.00 . . MTCE 05-049 US 491B CHIP SEAL, MP 45.4 . 1.00 5000.00 . . MTCE 06-065 I25 - HOV / HOT LANES . 1.00 1000.00 . . MTCE 06-066 SH 121, SIGNAL CABINET REPLAC . 1.00 1000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 3314.29 . . MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 . 1.00 4300.00 . . MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 . 1.00 4489.00 . . MTCE 02-029 US50 / PURCELL AND ELIZABETH . 1.00 100.00 . . MTCE 04-066 US 85 MP 299.68 TO MP 301.00 . 1.00 1800.00 . . MTCE 02-030 FY 07 REGION 2 STRIPING . 1.00 100.00 . . MTCE 02-031 REGION 2 - FY07/08 LIGHTING . 1.00 100.00 . . MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 8 . 1.00 8500.00 . . MTCE 06-070 R6 - SIGN POST REPLACEMENT . 1.00 300.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 2461.13 . . MTCE 06-069 VARIOUS LOCATIONS WITHIN REGI . 1.00 1800.00 . . MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 . 1.00 3500.00 . . MTCE 06-071 I-25, SH 85 TO I-70 . 1.00 1000.00 . . MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO . 1.00 10000.00 . . MTCE 01-060 I-70 WEST . 1.00 3000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 3860.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 94 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70016 F/A Fuel Cost Adjustment Force Acct ============================================= MTCE 06-074 SH 6 AT MP 280.996 . 1.00 1000.00 . . MTCE 06-072 C470 BOWLES TO KIPLING . 1.00 30000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 15500.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 4235.86 . . =============== 700-70021 F/A On-the-Job Trainee Hour =================================================== MTCE 04-069 FY07 R4 EPOXY EAST . 625.00 0.80 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 625.00 0.80 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 625.00 0.80 . . =============== 700-70022 F/A OJT Colorado Training Program Force Acct ============================================= MTCE 01-054 R1 FY 06 STRIPING WEST . 1.00 200.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 200.00 . . MTCE 04-065 R4 I-25 FRONTAGE RD EPOXY . 1.00 150.00 . . MTCE 01-059 REGION WIDE . 1.00 200.00 . . MTCE 04-069 FY07 R4 EPOXY EAST . 1.00 500.00 . . MTCE 04-070 FY07 R4 EPOXY WEST . 1.00 300.00 . . MTCE 04-068 FY 07 REGION 4 STENCIL MARKIN . 1.00 300.00 . . MTCE 04-067 FY 07 REGION 4 STERLING SIGNS . 1.00 150.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 266.67 . . MTCE 04-071 FY07 R4 US 287 PHASE 1 . 1.00 300.00 . . MTCE 04-074 R4 US 287 SIGNS PHASE 2 . 1.00 200.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 250.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 255.56 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 95 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70025 F/A Quality Incentive Pymt Force Acct ============================================= MTCE 05-048 US550 - MP 49.85 TO MP 56.00 . 1.00 18260.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 18260.00 . . MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 . 1.00 38707.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 38707.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 28483.50 . . =============== 700-70028 F/A ESB Program Force Acct ============================================= MTCE 05-045 R5 - REGION WIDE EPOXY STRIPI . 1.00 7500.00 . . MTCE 05-044 R5 - INLAID PAVEMENT MARKING . 1.00 5000.00 . . MTCE 02-025 R2 - FY 06 SNOW GATES . 1.00 1000.00 . . MTCE 05-046 REGION 5, MAINTENANCE SECTION . 1.00 500.00 . . MTCE 06-064 I-270 OVER SH224, STR. E-17-Q . 1.00 5000.00 . . MTCE 05-043 US 24 & MAIN ST IN BUENA VIST . 1.00 5000.00 . . MTCE 05-047 MONTE VISTA SIGNAL REPLACEME . 1.00 500.00 . . MTCE 05-048 US550 - MP 49.85 TO MP 56.00 . 1.00 5000.00 . . MTCE 05-049 US 491B CHIP SEAL, MP 45.4 . 1.00 5000.00 . . MTCE 01-054 R1 FY 06 STRIPING WEST . 1.00 5000.00 . . MTCE 06-065 I25 - HOV / HOT LANES . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 4045.45 . . MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 . 1.00 5000.00 . . MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 . 1.00 5000.00 . . MTCE 02-029 US50 / PURCELL AND ELIZABETH . 1.00 5000.00 . . MTCE 03-032 REGION WIDE, VARIOUS LOCATION . 1.00 7500.00 . . MTCE 04-066 US 85 MP 299.68 TO MP 301.00 . 1.00 5000.00 . . MTCE 02-030 FY 07 REGION 2 STRIPING . 1.00 5000.00 . . MTCE 03-033 REGION 3 VARIOUS HIGHWAYS, G . 1.00 5000.00 . . MTCE 01-057 VARIOUS, REGION 1 . 1.00 5000.00 . . MTCE 01-059 REGION WIDE . 1.00 5000.00 . . MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, B . 1.00 5000.00 . . MTCE 02-031 REGION 2 - FY07/08 LIGHTING . 1.00 5000.00 . . MTCE 04-069 FY07 R4 EPOXY EAST . 1.00 5000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 96 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70028 F/A ESB Program Force Acct ============================================= MTCE 04-070 FY07 R4 EPOXY WEST . 1.00 5000.00 . . MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 8 . 1.00 7500.00 . . MTCE 04-068 FY 07 REGION 4 STENCIL MARKIN . 1.00 5000.00 . . MTCE 04-067 FY 07 REGION 4 STERLING SIGNS . 1.00 5000.00 . . MTCE 06-070 R6 - SIGN POST REPLACEMENT . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17.00 5294.12 . . MTCE 06-069 VARIOUS LOCATIONS WITHIN REGI . 1.00 7500.00 . . MTCE 03-035 REGION WIDE VARIOUS LOCATIONS . 1.00 5000.00 . . MTCE 06-068 REGION 6- C-470, I-70, US 287 . 1.00 5000.00 . . MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 . 1.00 5000.00 . . MTCE 04-071 FY07 R4 US 287 PHASE 1 . 1.00 5000.00 . . MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO . 1.00 7500.00 . . MTCE 01-060 I-70 WEST . 1.00 5000.00 . . MTCE 04-072 I-25 SLAB REPLACEMENT MILEPOS . 1.00 7500.00 . . MTCE 04-074 R4 US 287 SIGNS PHASE 2 . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 5833.33 . . MTCE 03-041 REGION 3 SH 82 STRUCTURE H-0 . 1.00 5000.00 . . MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) A . 1.00 5000.00 . . MTCE 03-038 REGION WIDE VARIOUS LOCATIONS . 1.00 5000.00 . . MTCE 06-077 I-76 #E-17-GL & #E-17-GM; SH3 . 1.00 5000.00 . . MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & . 1.00 5000.00 . . MTCE 06-072 C470 BOWLES TO KIPLING . 1.00 7500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 5416.67 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43.00 5104.65 . . =============== 700-70034 F/A Force Acct ============================================= MTCE 05-049 US 491B CHIP SEAL, MP 45.4 . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 . . MTCE 03-033 REGION 3 VARIOUS HIGHWAYS, G . 1.00 10000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 97 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70034 F/A Force Acct ============================================= MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 8 . 1.00 13000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 11500.00 . . MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO . 1.00 10000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 9500.00 . . =============== 700-70035 F/A Force Acct ============================================= MTCE 01-057 VARIOUS, REGION 1 . 1.00 10000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 10000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 . . =============== 700-70036 F/A Force Acct ============================================= MTCE 01-057 VARIOUS, REGION 1 . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 . . =============== 700-70042 F/A RR Flagging Force Acct ============================================= MTCE 03-036 REGION 3 I-70 STRUCTURE H-03 . 1.00 10000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 . . =============== 700-70060 F/A Adjust Force Acct ============================================= MTCE 05-047 MONTE VISTA SIGNAL REPLACEME . 1.00 1000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 98 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70072 F/A Obtain Power from PSCO Force Acct ============================================= MTCE 01-060 I-70 WEST . 1.00 10000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 . . =============== 700-70190 F/A Elec Serv Force Acct ============================================= MTCE 02-025 R2 - FY 06 SNOW GATES . 1.00 2000.00 . . MTCE 05-043 US 24 & MAIN ST IN BUENA VIST . 1.00 2000.00 . . MTCE 05-047 MONTE VISTA SIGNAL REPLACEME . 1.00 2500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 2166.67 . . MTCE 01-053 VARIOUS LOCATIONS ON I-70 FRO . 1.00 100000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 100000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 26625.00 . . =============== 700-70220 F/A Phone Serv Force Acct ============================================= MTCE 05-043 US 24 & MAIN ST IN BUENA VIST . 1.00 2000.00 . . MTCE 05-047 MONTE VISTA SIGNAL REPLACEME . 1.00 1000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1500.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1500.00 . . =============== 700-70380 F/A Erosion Ctrl Force Acct ============================================= MTCE 06-064 I-270 OVER SH224, STR. E-17-Q . 1.00 1000.00 . . MTCE 06-066 SH 121, SIGNAL CABINET REPLAC . 1.00 2500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1750.00 . . MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.6 . 1.00 2000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 99 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70380 F/A Erosion Ctrl Force Acct ============================================= MTCE 02-031 REGION 2 - FY07/08 LIGHTING . 1.00 2000.00 . . MTCE 06-070 R6 - SIGN POST REPLACEMENT . 1.00 2000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 2000.00 . . MTCE 06-068 REGION 6- C-470, I-70, US 287 . 1.00 2000.00 . . MTCE 06-071 I-25, SH 85 TO I-70 . 1.00 500.00 . . MTCE 01-060 I-70 WEST . 1.00 1000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1166.67 . . MTCE 06-074 SH 6 AT MP 280.996 . 1.00 2000.00 . . MTCE 06-077 I-76 #E-17-GL & #E-17-GM; SH3 . 1.00 1000.00 . . MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & . 1.00 2000.00 . . MTCE 06-072 C470 BOWLES TO KIPLING . 1.00 2000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1750.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 1666.67 . . =============== 700-70589 F/A Environ Health & Safety Mgmt Force Acct ============================================= MTCE 02-025 R2 - FY 06 SNOW GATES . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 . . MTCE 02-029 US50 / PURCELL AND ELIZABETH . 1.00 1000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3000.00 . . =============== 700-73351 F/A Force Acct ============================================= MTCE 01-057 VARIOUS, REGION 1 . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:43 Tuesday, January 9, 2007 100 ITEM UNIT COSTS BY PROJECTS -- 2006 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-73352 F/A Force Acct ============================================= MTCE 01-057 VARIOUS, REGION 1 . 1.00 20000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 20000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 20000.00 . .