2010 COST DATA (ANNUAL REPORT) CONSTRUCTION TABLE OF CONTENTS PAGE BRIDGE COSTS PER SQUARE FOOT 1 INDEX & AVG UNIT PRICES 2 ITEM UNIT COSTS 40 PROJECT BID (JANUARY-DECEMBER 2010) 697 Appendix A – 2010 Construction Type Projects * released on the CDOT web-site Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 1 2010 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/10 THROUGH 12/31/10) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ BRIDGE REPAIR 100204 IM 0703-352 M I-70 WEST EJMT TO BAKERVILLE 144.0000 44.5000 6408.0 $32,543 $5.08 F-13-J 144.0000 44.5000 6408.0 $33,263 $5.19 F-13-O 292.0000 42.7500 12483.0 $113,748 $9.11 F-13-P 277.0000 41.0000 11357.0 $67,330 $5.93 F-13-T 216.0000 36.5000 7884.0 $140,412 $17.81 100218 ES20504-060 R US 50B: EAST OF JCT 96 TO HUER K-19-U 306.0000 30.0000 9180.0 $184,179 $20.06 K-19-Q 306.0000 30.0000 9180.0 $89,920 $9.80 L-19-H 406.0000 32.0000 12992.0 $87,121 $6.71 100318 STA0853-065 U ON US 85 IN WELD COUNTY C-18-BL 303.0000 30.0000 9090.0 $177,218 $19.50 C-18-BM 307.0000 30.0000 9210.0 $180,673 $19.62 C-18-BK 344.0000 30.0000 10320.0 $174,442 $16.90 100325 STA157A-010 R SH 157A IN BOULDER COUNTY E-16-HX 185.0000 50.0000 9250.0 $107,416 $11.61 E-16-HY 153.0000 42.0000 6426.0 $52,138 $8.11 D-16-CX 152.0000 100.0000 15200.0 $30,347 $2.00 D-16-CV 185.0000 88.0000 16280.0 $35,834 $2.20 D-16-CU 154.0000 70.0000 10780.0 $117,478 $10.90 100708 C025A-011 U I-25/SANTA FE F-16-DT F-16-DT 337.0000 52.0000 17524.0 $147,319 $8.41 WEIGHTED AVERAGE COST: NEW STRUCTURES 179972.0 $1,771,381 $9.84 BRIDGE DECK REPLACEMENT 100708 FBR0242-047 M US 24 AT MILE MARKER 270.8 AND I-15-Y 52.8000 35.0000 1848.0 $1,961,700 $1,061.53 WEIGHTED AVERAGE COST: NEW STRUCTURES 1848.0 $1,961,700 $1,061.53 CONCRETE SLAB AND GIRDER 100701 ES4 0853-072 R SH 85 WYOMING SOUTH-STRUCTURES A-17-W 69.0000 30.0000 2070.0 $27,638 $13.35 100923 ES1 0705-078 P I-70, AGATE TO KANSAS BORDER G-28-H 94.0000 38.5000 3619.0 $4,484 $1.24 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 2 2010 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/10 THROUGH 12/31/10) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ G-28-L 94.0000 38.5000 3619.0 $17,884 $4.94 G-28-N 94.0000 38.5000 3619.0 $13,484 $3.73 G-28-O 95.0000 38.5000 3657.5 $17,884 $4.89 G-28-K 94.0000 38.5000 3619.0 $17,884 $4.94 G-28-M 93.0000 38.5000 3580.5 $17,884 $4.99 100930 STA 119A-051 M SH 119 FROM SOUTH BLACK HAWK C E-15-AM 446.0000 81.0000 36126.0 $3,363,175 $93.10 101223 FBR0253-209 U I-25: 84TH AVENUE BRIDGE REPLA E-17-ACR 257.5800 127.0000 32712.7 $718,253 $21.96 WEIGHTED AVERAGE COST: NEW STRUCTURES 92622.7 $4,198,570 $45.33 PRESTRES GIRDER (BOX SECTION) 100318 FBR 069A-026 L 0.5 MILES S/O THE TOWN OF FARI N-16-Q 106.0000 43.0000 4558.0 $711,639 $156.13 101118 FBR 0241-053 M US-24 MP 171 NORTH OF LEADVILL G-11-G 0.0000 0.0000 0.0 $2,756,332 G-11-G 134.8600 43.0000 5799.0 $1,869,532 $322.39 101202 FBR030A-029 U SH30 (HAVANA ST.) AT CHERRY CR F-17-WP 137.8800 106.0000 14615.3 $1,443,793 $98.79 F-17-WD 137.8800 106.0000 14615.3 $81,611 $5.58 101223 FBR0253-209 U I-25: 84TH AVENUE BRIDGE REPLA E-17-ACR 257.5833 127.0000 32713.1 $2,630,716 $80.42 WEIGHTED AVERAGE COST: NEW STRUCTURES 72300.6 $9,493,624 $131.31 MAJOR STRUCTURE CBC OR PIPES 100701 ES4 0853-072 R SH 85 WYOMING SOUTH-STRUCTURES A-17-X 39.3300 90.0000 3539.7 $299,458 $84.60 A-17-Y 34.5000 90.0000 3105.0 $304,219 $97.98 101118 C052A-035 R SH 52/CR 11 WELD CO D-17-AV 24.0000 82.0000 1968.0 $71,273 $36.22 WEIGHTED AVERAGE COST: NEW STRUCTURES 8612.7 $674,950 $78.37 ROLLED STEEL GIRDER 100610 FBR5502-068 M US 550 ON RED MOUNTAIN PASS SO P-05-B 86.6700 39.0000 3380.1 $1,399,722 $414.10 WEIGHTED AVERAGE COST: NEW STRUCTURES 3380.1 $1,399,722 $414.10 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 3 2010 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/10 THROUGH 12/31/10) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ TIMBER BRIDGE (GLUELAM) 100603 FBR138A-008 P REGION 4 VARIOUS LOCATIONS A-24-C 38.0000 28.0000 1064.0 $65,937 $61.97 WEIGHTED AVERAGE COST: NEW STRUCTURES 1064.0 $65,937 $61.97 PEDESTRIAN OR BIKEWAY BRIDGE 100930 STA 119A-051 M SH 119 FROM SOUTH BLACK HAWK C E15-AN 142.5000 10.0000 1425.0 $260,150 $182.56 WEIGHTED AVERAGE COST: NEW STRUCTURES 1425.0 $260,150 $182.56 MISCELLANEOUS 100318 ES6 0852-103 - CONCRETE ALT R US 85 / C-470 INTERCHANGE (STA F-16_YE, F-16-WY 1728.8300 33.0000 57051.4 $5,441,000 $95.37 100401 BR M356-022 U 80TH OVER US36 ON WESTMINISTER 0.0000 0.0000 0.0 $2,630,306 100603 FBR138A-008 P REGION 4 VARIOUS LOCATIONS A-26-F 0.0000 0.0000 0.0 $79,808 100624 FBR 0703-357 M STR. F-14-AZ WEST OF IDAHO SPR F-14-AZ 125.0000 40.0000 5000.0 $852,484 $170.50 WEIGHTED AVERAGE COST: NEW STRUCTURES 62051.4 $9,003,597 $145.10 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 1 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 201-00000 Clearing and Grubbing 23 Lump Sum 526,607.72 22,895.99 201-00001 Clearing and Grubbing 88 Acre 167,506.50 1,903.48 201-00002 Clearing 1 Lump Sum 4,800.00 4,800.00 201-00005 Removal of Debris 5 Lump Sum 28,141.16 5,628.23 202-00000 Removal of Structures and Obstructions 5 Lump Sum 14,304.45 2,860.89 202-00001 Removal of Structure 88 Each 94,791.00 1,077.17 202-00003 Removal of Structure (Special) 1 Lump Sum 3,000.00 3,000.00 202-00008 Tree Trimming 140 Hour 12,417.00 88.69 202-00010 Removal of Tree 586 Each 117,197.92 200.00 202-00015 Removal of Headwall 19 Each 12,699.60 668.40 202-00019 Removal of Inlet 109 Each 54,506.24 500.06 202-00020 Removal of Concrete Box Culvert 1 Each 8,800.00 8,800.00 202-00021 Removal of Manhole 39 Each 16,524.14 423.70 202-00023 Removal of Embankment Protector Type 3 9 Each 3,175.00 352.78 202-00024 Removal of Embankment Protector Type 5 4 Each 680.00 170.00 202-00026 Removal of Slope and Ditch Paving 7,300 Sq Yard 43,009.56 5.89 202-00027 Removal of Riprap 694 Sq Yard 9,770.50 14.08 202-00030 Removal of Water Service 75 Each 15,149.00 201.99 202-00031 Removal of Fire Hydrant 8 Each 5,069.00 633.63 202-00032 Removal of Valve 5 Each 2,000.00 400.00 202-00033 Removal of Pipe 276 Each 33,968.15 123.07 202-00035 Removal of Pipe 36,056 Lin Foot 550,651.14 15.27 202-00037 Removal of End Section 42 Each 8,628.63 205.44 202-00040 Removal of Electrical Conduit 2,196 Lin Foot 7,890.00 3.59 202-00070 Removal of Barricade 1 Each 75.00 75.00 202-00080 Removal of Guard Post 42 Each 6,069.00 144.50 202-00090 Removal of Delineator 6,731 Each 38,019.34 5.65 202-00150 Removal of Wall 16 Each 13,600.00 850.00 202-00155 Removal of Wall 2,942 Lin Foot 51,538.00 17.52 202-00160 Removal of Wall 9,692 Sq Foot 39,536.80 4.08 202-00165 Removal of Wall 1 Lump Sum 22,000.00 22,000.00 202-00170 Grinding And Texturing Concrete Pavement 638 Sq Yard 3,975.60 6.23 202-00190 Removal of Concrete Median Cover Material 13,498 Sq Yard 68,660.48 5.09 202-00195 Removal of Median Cover 4,278 Sq Yard 32,277.26 7.54 202-00200 Removal of Sidewalk 28,022 Sq Yard 201,284.80 7.18 202-00201 Removal of Curb 19,236 Lin Foot 61,852.92 3.22 202-00202 Removal of Gutter 4,271 Lin Foot 47,067.58 11.02 202-00203 Removal of Curb and Gutter 115,791 Lin Foot 451,402.62 3.90 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 2 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 202-00204 Removal of Curb, Gutter and Sidewalk 75 Lin Foot 487.50 6.50 202-00205 Removal of Wheel Stop 5 Each 565.00 113.00 202-00206 Removal of Concrete Curb Ramp 2,332 Sq Yard 31,617.31 13.56 202-00207 Removal of Brick Pavers 230 Sq Yard 3,703.00 16.10 202-00210 Removal of Concrete Pavement 138,562 Sq Yard 1,274,213.14 9.20 202-00212 Removal of Concrete Pavement 1,716 Sq Yard 15,083.64 8.79 202-00215 Removal of Concrete Pavement (Planing) 221,220 Sq Yard 769,154.92 3.48 202-00220 Removal of Asphalt Mat 397,048 Sq Yard 1,327,929.04 3.34 202-00226 Removal of Asphalt Mat (Special) 3,434 Sq Yard 15,957.22 4.65 202-00240 Removal of Asphalt Mat (Planing) 3,556,267 Sq Yard 4,792,624.58 1.35 202-00246 Removal of Asphalt Mat (Planing) (Special) 9,111 Sq Yard 85,105.80 9.34 202-00250 Removal of Pavement Marking 559,265 Sq Foot 400,379.74 0.72 202-00300 Removal Of Building(s) 1 Lump Sum 55,275.00 55,275.00 202-00400 Removal of Bridge 10 Each 574,525.00 57,452.50 202-00420 Removal of Pedestrian Rail 217 Lin Foot 915.50 4.22 202-00425 Removal of Bridge Railing 6,373 Lin Foot 38,330.93 6.01 202-00450 Removal of Portions of Present Structure (Class 1) 296 Sq Yard 38,186.00 129.01 202-00453 Removal of Portions of Present Structure (Class 2) 4,544 Sq Yard 652,830.55 143.67 202-00460 Removal of Portions of Present Structure (Class 3) 285 Sq Yard 76,235.66 267.49 202-00480 Removal Of Portions Of Present Structure (Special) 48 Sq Yard 7,608.00 158.50 202-00495 Removal of Portions of Present Structure 7 Lump Sum 159,608.44 22,801.21 202-00500 Removal of Portions of Present Structure 7 Each 14,372.70 2,053.24 202-00503 Removal of Portions of Present Structure 625 Sq Yard 169,642.32 271.43 202-00504 Removal of Expansion Device 5,197 Lin Foot 213,234.71 41.03 202-00520 Removal of Expansion Joint Material 338 Lin Foot 3,613.22 10.69 202-00700 Removal of Light Standard 49 Each 17,066.86 348.30 202-00710 Removal of Power Pole 9 Each 3,690.00 410.00 202-00805 Removal of Overhead Sign Structure 6 Each 17,968.34 2,994.72 202-00810 Removal of Ground Sign 797 Each 61,652.66 77.36 202-00815 Removal of Sign (Special) 2 Each 530.00 265.00 202-00821 Removal of Sign Panel 321 Each 19,510.84 60.78 202-00823 Removal of Dynamic Message Sign 2 Each 9,240.00 4,620.00 202-00825 Removal of Flashing Beacon 9 Each 2,414.00 268.22 202-00827 Removal of Pull Box 49 Each 3,847.00 78.51 202-00828 Removal of Traffic Signal Equipment 12 Lump Sum 42,756.12 3,563.01 202-00831 Removal of Traffic Signal Head 13 Each 525.00 40.38 202-00840 Removal of Traffic Signal Pole 32 Each 14,829.00 463.41 202-00848 Removal of Traffic Signal Controller and Cabinet 7 Each 3,009.30 429.90 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 3 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 202-00858 Removal of Pedestal Pole 6 Each 1,089.00 181.50 202-00860 Removal of Pedestrian Push Button 8 Each 168.00 21.00 202-00890 Removal of Span Wire Cable 715 Lin Foot 596.05 0.83 202-00895 Removal of Impact Attenuator 7 Each 12,670.11 1,810.02 202-00900 Removal of Concrete Footing 96 Each 34,340.00 357.71 202-00950 Removal of Concrete Foundation and Slab 91 Sq Yard 1,512.50 16.62 202-01000 Removal of Fence 305,294 Lin Foot 140,321.87 0.46 202-01010 Removal Of Silt Fence 900 Lin Foot 1,030.00 1.14 202-01020 Removal of Sound Barrier Fence 4,430 Lin Foot 46,973.90 10.60 202-01130 Removal of Guardrail Type 3 73,540 Lin Foot 143,865.68 1.96 202-01140 Removal of Guardrail Type 4 38,058 Lin Foot 380,771.70 10.01 202-01150 Removal of Guardrail Type 5 4,035 Lin Foot 10,192.24 2.53 202-01170 Removal of Guardrail Type 7 3,479 Lin Foot 47,316.37 13.60 202-01180 Removal of Median Barrier 2,636 Lin Foot 65,900.00 25.00 202-01200 Removal of Tensioned Cable Barrier 18,041 Lin Foot 16,670.65 0.92 202-01300 Removal of End Anchorage 497 Each 58,719.53 118.15 202-01400 Removal of Cattle Guard 2 Each 2,465.00 1,232.50 202-04000 Plug Structure 8 Each 3,890.00 486.25 202-04001 Plug Culvert 57 Each 59,013.87 1,035.33 202-04002 Clean Culvert 72 Each 136,515.90 1,896.05 202-04003 Clean Culvert (Special) 160 Each 54,164.00 338.53 202-04004 Plug Culvert (Special) 6 Each 5,445.30 907.55 202-04005 Clean Valve Box 202 Each 19,661.00 97.33 202-04010 Clean Inlet 4 Each 1,400.00 350.00 202-04100 Abandon Well 36 Each 69,847.68 1,940.21 202-05004 Sawing Concrete (4 Inch) 338 Lin Foot 2,166.58 6.41 202-05006 Sawing Concrete (6 Inch) 55 Lin Foot 266.75 4.85 202-05008 Sawing Concrete (8 Inch) 6,100 Lin Foot 17,446.00 2.86 202-05026 Sawing Asphalt Material (6 Inch) 4,172 Lin Foot 8,005.64 1.92 202-05030 Sawing Asphalt Material (10 Inch) 7,907 Lin Foot 11,745.83 1.49 202-05100 Sandblasting Reinforcing Steel 683 Sq Yard 5,828.50 8.53 202-05150 Sandblasting 102,551 Sq Foot 52,707.30 0.51 202-06000 Removal of Detour 1 Lump Sum 10,000.00 10,000.00 202-07000 Obliterate Old Road 1 Lump Sum 25,000.00 25,000.00 203-00000 Unclassified Excavation 6,627 Cubic Yard 109,365.25 16.50 203-00010 Unclassified Excavation (Complete In Place) 469,219 Cubic Yard 4,370,073.20 9.31 203-00012 Unclassified Excavation (Complete In Place) (Special) 2,809 Cubic Yard 42,135.00 15.00 203-00040 Unclassified Excavation (Special) 8,252 Cubic Yard 146,570.12 17.76 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 4 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 203-00060 Embankment Material (Complete In Place) 1,113,756 Cubic Yard 7,494,305.60 6.73 203-00061 Embankment Material (Complete In Place) 20 Ton 640.00 32.00 203-00062 Embankment Material (Complete In Place) (Special) 75,575 Cubic Yard 824,749.05 10.91 203-00100 Muck Excavation 21,925 Cubic Yard 275,450.43 12.56 203-00210 Borrow (Complete In Place) 500 Cubic Yard 10,000.00 20.00 203-00400 Rock Excavation 3,880 Cubic Yard 182,206.40 46.96 203-00440 Rock Excavation (Special) 306 Cubic Yard 35,190.00 115.00 203-00450 Rock Removal 3 Each 12,000.00 4,000.00 203-00710 Clay Plating (Complete In Place) 862 Cubic Yard 28,583.92 33.16 203-00850 Expanded Polystyrene Fill (Complete In Place) 66,261 Cubic Yard 3,736,457.79 56.39 203-01100 Proof Rolling 937 Hour 81,805.14 87.31 203-01120 Vibratory Rolling 40 Hour 5,525.80 138.15 203-01140 Rolling 289 Hour 26,418.50 91.41 203-01500 Blading 4,490 Hour 469,708.82 104.61 203-01510 Backhoe 235 Hour 28,074.10 119.46 203-01515 Backhoe (Landscaping) 272 Hour 30,465.20 112.00 203-01525 Backhoe (Special) 60 Hour 9,000.00 150.00 203-01550 Dozing 1,148 Hour 161,516.64 140.69 203-01551 Dozing (Heavy) 283 Hour 55,878.07 197.45 203-01555 Dozing (Landscaping) 172 Hour 18,929.76 110.06 203-01565 Hydraulic Excavator 200 Hour 28,787.20 143.94 203-01582 Truck (Dump) 604 Hour 64,902.50 107.45 203-01590 Front End Loader (Rubber Tire) 447 Hour 48,319.64 108.10 203-01592 Front End Loader (Special) 68 Hour 10,880.00 160.00 203-01594 Combination Loader 1,104 Hour 92,472.42 83.76 203-01597 Potholing 4,399 Hour 694,562.87 157.89 203-01620 Sweeping 421 Hour 65,861.00 156.44 203-01622 Sweeping (With Pickup Broom) 3,270 Hour 396,350.00 121.21 203-02300 Rock Scaler 780 Hour 63,944.00 81.98 203-02330 Laborer 880 Hour 35,074.20 39.86 206-00000 Structure Excavation 257,435 Cubic Yard 2,005,618.73 7.79 206-00050 Structure Backfill (Special) 1,924 Cubic Yard 236,202.00 122.77 206-00060 Structure Backfill (Special) (Flow-Fill) 121 Cubic Yard 14,520.00 120.00 206-00065 Structure Backfill (Flow-Fill) 4,644 Cubic Yard 599,372.71 129.06 206-00066 Structure Backfill (Flowable Fly Ash) 3,431 Cubic Yard 243,670.00 71.02 206-00100 Structure Backfill (Class 1) 198,240 Cubic Yard 3,306,918.23 16.68 206-00200 Structure Backfill (Class 2) 3,863 Cubic Yard 64,004.52 16.57 206-00360 Mechanical Reinforcement of Soil 116,782 Cubic Yard 2,051,407.56 17.57 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 5 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 206-00505 Filter Material (Special) 2,597 Cubic Yard 155,820.00 60.00 206-00510 Filter Material (Class A) 1,235 Cubic Yard 57,345.00 46.43 206-00520 Filter Material (Class B) 20,886 Cubic Yard 763,973.12 36.58 206-01000 Bed Course Material 1,163 Cubic Yard 42,199.35 36.28 206-01500 Cofferdam 2 Lump Sum 35,360.00 17,680.00 206-01600 Temporary Excavation Support 1 Lump Sum 95,000.00 95,000.00 206-01750 Shoring 5 Lump Sum 493,500.00 98,700.00 206-01781 Shoring (Area 1) 8 Lump Sum 303,505.75 37,938.22 206-01782 Shoring (Area 2) 7 Lump Sum 334,381.60 47,768.80 206-01783 Shoring (Area 3) 2 Lump Sum 30,840.00 15,420.00 206-01784 Shoring (Area 4) 2 Lump Sum 30,450.00 15,225.00 206-01785 Shoring (Area 5) 1 Lump Sum 79,000.00 79,000.00 207-00205 Topsoil 82,836 Cubic Yard 990,181.61 11.95 207-00210 Stockpile Topsoil 20,134 Cubic Yard 46,158.50 2.29 207-00305 Wetland Topsoil 1,275 Cubic Yard 23,144.00 18.15 207-00310 Stockpile Wetland Topsoil 1,218 Cubic Yard 12,811.00 10.52 207-00405 Topsoil (Special) 591 Cubic Yard 31,795.80 53.80 207-01110 Planter Soil Mix 1,380 Cubic Yard 55,200.00 40.00 208-00000 Ditch Guard 1,430 Lin Foot 14,523.00 10.16 208-00002 Erosion Log (12 Inch) 146,554 Lin Foot 539,790.78 3.68 208-00003 Erosion Log (18 Inch) 75,157 Lin Foot 346,718.95 4.61 208-00004 Silt Berm 3,441 Lin Foot 33,732.00 9.80 208-00005 Erosion Log 11,320 Lin Foot 42,907.00 3.79 208-00007 Erosion Log (8 Inch) 5,026 Lin Foot 16,767.50 3.34 208-00009 Erosion Log (20 Inch) 812 Lin Foot 4,466.00 5.50 208-00010 Erosion Bales 30 Each 580.00 19.33 208-00011 Erosion Bales (Weed Free) 10,281 Each 91,621.62 8.91 208-00015 Sand Bag 305 Each 6,515.00 21.36 208-00020 Silt Fence 152,552 Lin Foot 171,240.11 1.12 208-00030 Sediment Basin 7 Each 242,022.00 34,574.57 208-00033 Sediment Trap 48 Each 44,382.00 924.63 208-00034 Gravel Bag 21,882 Lin Foot 116,851.60 5.34 208-00040 Check Dam 150 Each 40,335.00 268.90 208-00041 Rock Check Dam 80 Each 16,000.00 200.00 208-00045 Concrete Washout Structure 280 Each 169,628.36 605.82 208-00050 Storm Drain Inlet Protection 1,027 Each 139,040.55 135.39 208-00051 Storm Drain Inlet Protection 4,807 Lin Foot 31,059.44 6.46 208-00052 Storm Drain Inlet Protection (Type 2) 305 Lin Foot 4,130.00 13.54 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 6 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 208-00060 Temporary Slope Drain 1,870 Lin Foot 15,540.00 8.31 208-00070 Stabilized Construction Entrance 333 Each 402,727.51 1,209.39 208-00103 Removal and Disposal of Sediment (Labor) 8,331 Hour 305,562.91 36.68 208-00105 Removal and Disposal of Sediment (Equipment) 6,822 Hour 430,869.96 63.16 208-00106 Sweeping (Sediment Removal) 158 Hour 10,440.00 66.08 208-00107 Removal of Trash 25 Hour 625.00 25.00 208-00110 Sediment Removal and Disposal 20 Cubic Yard 700.00 35.00 208-00205 Erosion Control Supervisor 12,523 Hour 604,569.04 48.28 208-00206 Erosion Control Supervisor 6,178 Day 555,007.85 89.84 208-00300 Temporary Berms 10,583 Lin Foot 30,597.56 2.89 208-00400 Water Control 4 Lump Sum 101,035.00 25,258.75 209-00000 Water 82 M Gallon 2,460.00 30.00 209-00100 Water (Landscaping) 43 M Gallon 5,590.00 130.00 209-00200 Time-Released Water Product 1,007 Each 4,980.00 4.95 209-00600 Dust Palliative (Magnesium Chloride) 69,229 Gallon 71,850.68 1.04 210-00001 Reset Structure 8 Each 16,816.28 2,102.04 210-00010 Reset Mailbox Structure 42 Each 4,520.00 107.62 210-00011 Reset Mailbox Structure (Type 1) 99 Each 18,573.74 187.61 210-00012 Reset Mailbox Structure (Type 2) 5 Each 962.60 192.52 210-00013 Reset Mailbox Structure (Type 3) 9 Each 2,092.24 232.47 210-00015 Reset End Section 2 Each 650.00 325.00 210-00035 Reset Water Meter 28 Each 21,714.00 775.50 210-00050 Reset Fire Hydrant 5 Each 16,888.00 3,377.60 210-00060 Reset Marker 60 Each 4,635.16 77.25 210-00065 Reset Monument (Type 3A) 3 Each 1,856.00 618.67 210-00090 Reset Delineator 50 Each 1,402.00 28.04 210-00410 Modify Bridge Expansion Device 4 Each 23,870.00 5,967.50 210-00415 Repair Rail Expansion Joint 1 Each 2,500.00 2,500.00 210-00425 Reset Bridge Railing 614 Lin Foot 9,445.68 15.38 210-00427 Reset Pipe Handrailing 70 Lin Foot 525.00 7.50 210-00473 Reset TV Cameras 1 Each 406.00 406.00 210-00475 Reset Closed Circuit Television Pole 1 Each 5,076.00 5,076.00 210-00500 Rebuild Portions of Present Structure 4 Each 40,000.00 10,000.00 210-00510 Rebuild Portions of Present Structure 1 Lump Sum 18,083.63 18,083.63 210-00520 Rebuild Portions of Present Structure 51 Sq Yard 10,368.30 203.30 210-00750 Reset Light Standard 30 Each 33,725.00 1,124.17 210-00760 Reset Luminaire 8 Each 1,346.00 168.25 210-00805 Reset Overhead Sign Structure 1 Each 2,155.13 2,155.13 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 7 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 210-00806 Reset Over Height Vehicle Detector 1 Each 2,560.00 2,560.00 210-00810 Reset Ground Sign 337 Each 63,827.40 189.40 210-00815 Reset Sign Panel 132 Each 13,517.71 102.41 210-00820 Reset Variable Message Sign 1 Each 2,155.13 2,155.13 210-00825 Reset Flashing Beacon 1 Each 100.00 100.00 210-00827 Reset Pull Box 31 Each 6,843.00 220.74 210-00830 Reset Traffic Signal Face 30 Each 3,257.00 108.57 210-00831 Reset Traffic Signal Head 1 Each 90.00 90.00 210-00848 Reset Traffic Signal Controller and Cabinet 2 Each 4,400.00 2,200.00 210-00855 Reset Traffic Signal Controller Cabinet 1 Each 500.00 500.00 210-00858 Reset Pedestal Pole 1 Each 1,100.00 1,100.00 210-00865 Reset Pedestrian Signal Head 2 Each 228.00 114.00 210-00866 Reset Fire Preemption Unit and Timer 6 Each 3,298.00 549.67 210-00867 Reset Fire Preemption Unit 4 Each 5,090.00 1,272.50 210-00870 Reset Coordination Unit 1 Each 434.00 434.00 210-00890 Reset Intersection Detection System (Camera) 2 Each 984.00 492.00 210-00900 Reset Traffic Counter (Temp) 1 Each 9,000.00 9,000.00 210-00910 Reset Traffic Counter (Permanent) 1 Each 3,800.00 3,800.00 210-01000 Reset Fence 2,959 Lin Foot 19,419.85 6.56 210-01001 Modify Fence 3,504 Lin Foot 11,589.96 3.31 210-01011 Reset Gate 12 Each 4,705.00 392.08 210-01025 Reset Snow Fence 2,640 Lin Foot 8,052.00 3.05 210-01050 Reset Chain Link Fence 320 Lin Foot 12,800.00 40.00 210-01130 Reset Guardrail Type 3 7,184 Lin Foot 51,418.10 7.16 210-01131 Reset Guardrail Type 3 (Special)(2 Foot) 100 Lin Foot 1,500.00 15.00 210-01132 Reset Guardrail Type 3 (Special)(1 Foot) 50 Lin Foot 750.00 15.00 210-01136 Reset Guardrail Type 3 (Double) 100 Lin Foot 1,400.00 14.00 210-01140 Reset Guardrail Type 4 2,250 Lin Foot 31,095.00 13.82 210-01170 Reset Guardrail Type 7 2,560 Lin Foot 28,671.00 11.20 210-01180 Reset Guardrail (Special) 3,105 Lin Foot 25,305.75 8.15 210-01200 Reset End Anchorage 1 Each 825.00 825.00 210-01300 Reset Impact Attenuator 2 Each 8,600.00 4,300.00 210-01700 Reset Sprinkler Head 240 Each 2,880.00 12.00 210-01710 Reset Valve 2 Each 4,400.00 2,200.00 210-01720 Reset Air Vent 3 Each 1,273.50 424.50 210-02510 Relay Sprinkler System 1 Lump Sum 1,500.00 1,500.00 210-02900 Relay Riprap 15 Cubic Yard 1,552.50 103.50 210-03100 Replace Concrete Pavement 11,864 Sq Yard 1,397,068.00 117.76 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 8 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 210-04000 Adjust Structure 22 Each 3,735.00 169.77 210-04010 Adjust Manhole 316 Each 132,541.00 419.43 210-04015 Modify Manhole 9 Each 12,294.00 1,366.00 210-04016 Modify Manhole (Special) 1 Each 5,200.00 5,200.00 210-04020 Modify Inlet 96 Each 150,738.07 1,570.19 210-04025 Modify Structure 7 Each 18,034.00 2,576.29 210-04030 Modify Guardrail 26,673 Lin Foot 102,353.30 3.84 210-04050 Adjust Valve Box 482 Each 85,377.30 177.13 210-04200 Adjust Guardrail 10,997 Lin Foot 62,234.25 5.66 211-00212 1-1/2 Inch Core Drilled Hole 195 Lin Foot 55,380.00 284.00 211-01111 Rock Reinforcement (Dowels) 4,500 Lin Foot 208,000.00 46.22 211-01115 Rock Reinforcement (Number 10) 1,485 Lin Foot 95,285.00 64.16 211-01200 Rock Anchor 231 Lin Foot 11,550.00 50.00 211-01300 Rock Anchor 163 Each 42,675.00 261.81 211-03005 Dewatering 4 Lump Sum 88,500.00 22,125.00 212-00006 Seeding (Native) 512 Acre 232,483.93 454.07 212-00007 Seeding (Native) (Hydraulic) 7 Acre 9,620.00 1,374.29 212-00009 Seeding (Temporary) 1 Acre 170.00 170.00 212-00011 Seeding (Lawn) 1 Acre 1,500.00 1,500.00 212-00025 Seeding (Shrubs) 2 Pound 475.00 237.50 212-00028 Seeding (Wetlands) 1 Acre 2,046.69 2,046.69 212-00032 Soil Conditioning 398 Acre 579,757.72 1,456.68 212-00047 Soil Preparation (Special) 0 Acre 1,869.60 212-00050 Sod 117,817 Sq Foot 118,083.82 1.00 212-01200 Landscape Restoration 1 Lump Sum 918.75 918.75 213-00000 Mulching 0 Acre 1,125.00 213-00001 Mulching 264 Ton 28,002.48 106.07 213-00002 Mulching (Weed Free Hay) 322 Acre 132,950.11 412.89 213-00003 Mulching (Weed Free) 42 Acre 21,144.25 503.43 213-00004 Mulching (Weed Free Straw) 117 Acre 67,064.99 573.21 213-00005 Mulching (Decorative) 9,539 Cubic Foot 59,388.90 6.23 213-00008 Mulching (Wood Chip) 289 Cubic Foot 2,597.63 8.99 213-00009 Flexible Growth Medium 34 Acre 90,447.76 2,660.23 213-00011 Mulching (Hydraulic) 8 Acre 13,507.92 1,688.49 213-00012 Spray-on Mulch Blanket 8 Acre 23,650.00 2,956.25 213-00061 Mulch Tackifier 110,915 Pound 179,911.98 1.62 213-00065 Inorganic Mulch 2,198 Cubic Yard 138,047.50 62.81 213-00070 Landscape Weed Barrier Fabric 20,779 Sq Yard 18,403.70 0.89 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 9 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 213-00100 Soil Binder 130 Acre 69,450.20 534.23 213-00150 Bonded Fiber Matrix 0 Acre 400.00 213-00300 Concrete Landscape Border 4,773 Lin Foot 23,865.00 5.00 213-00460 Metal Landscape Border (3/16x4 Inch) 40 Lin Foot 400.00 10.00 213-00462 Metal Landscape Border (3/16 X 5-1/2 Inch) 3,725 Lin Foot 23,467.50 6.30 213-00700 Landscape Boulder 342 Each 12,654.00 37.00 214-00000 Landscape Maintenance 6 Lump Sum 70,455.00 11,742.50 214-00205 Deciduous Tree (5 Gallon Container) 50 Each 2,840.00 56.80 214-00210 Deciduous Tree (1 Inch Caliper) 37 Each 4,255.00 115.00 214-00215 Deciduous Tree (1.5 Inch Caliper) 60 Each 20,250.00 337.50 214-00220 Deciduous Tree (2 Inch Caliper) 27 Each 9,218.00 341.41 214-00225 Deciduous Tree (2.5 Inch Caliper) 19 Each 7,477.98 393.58 214-00230 Deciduous Tree (3 Inch Caliper) 3 Each 1,612.50 537.50 214-00262 Deciduous Tree (6 Foot) (Furnish Only) 100 Each 22,500.00 225.00 214-00280 Deciduous Tree (8 Foot) 115 Each 13,225.00 115.00 214-00301 Deciduous Shrub (Tubeling) 265 Each 901.00 3.40 214-00310 Deciduous Shrub (1 Gallon Container) 524 Each 6,344.00 12.11 214-00320 Deciduous Shrub (2 Gallon Container) 65 Each 910.00 14.00 214-00350 Deciduous Shrub (5 Gallon Container) 1,575 Each 56,306.91 35.75 214-00450 Evergreen Tree (5 Gallon Container) 72 Each 4,344.20 60.34 214-00504 Evergreen Tree (4 Foot) (Ball and Burlap) 24 Each 7,200.00 300.00 214-00507 Evergreen Tree (6 Foot) (Ball and Burlap) (Furnish On 61 Each 13,725.00 225.00 214-00650 Evergreen Shrub (5 Gallon Container) 355 Each 12,780.00 36.00 214-00901 Perennials (Tubeling) 1,000 Each 5,750.00 5.75 214-00908 Perennials (1 Quart Container) 1,793 Each 35,501.40 19.80 214-00910 Perennials (1 Gallon Container) 51 Each 535.50 10.50 214-01010 Brush Layer Cutting 43,361 Each 31,676.60 0.73 214-01015 Willow Cuttings 1,250 Each 1,812.50 1.45 214-01200 Plant (Tubeling) 14,507 Each 23,211.50 1.60 215-00000 Transplant Shrub 32 Each 940.00 29.38 215-00001 Transplant Shrub 175 Sq Yard 2,100.00 12.00 215-00010 Transplant Tree 49 Each 3,133.00 63.94 215-00060 Transplant Tree (3 to 6 Inch) 34 Each 23,460.00 690.00 215-00100 Transplant Tree (Over 6 Inch) 5 Each 5,000.00 1,000.00 215-00600 Transplant Plug 25 Each 900.00 36.00 216-00021 Soil Retention Blanket (Class 1) 100,999 Sq Yard 153,378.00 1.52 216-00022 Soil Retention Blanket (Class 2) 1,000 Sq Yard 4,750.00 4.75 216-00030 Soil Retention Blanket (Special) 12,337 Sq Yard 39,582.65 3.21 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 10 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 216-00039 Soil Retention Blanket (Straw) 36,231 Sq Yard 55,071.12 1.52 216-00041 Soil Retention Blanket (Straw/Coconut) 300,323 Sq Yard 430,965.92 1.44 216-00042 Soil Retention Blanket (Biodegradable Straw/Coconut) 177,090 Sq Yard 228,513.66 1.29 216-00045 Soil Retention Mat (Cellular) 25,201 Sq Yard 1,338,929.13 53.13 216-00201 Soil Retention Blanket (Straw-Coconut) 11,776 Sq Yard 24,124.60 2.05 216-00303 Turf Reinforcement Mat (Class 3) 3,000 Sq Yard 20,100.00 6.70 217-00000 Herbicide Treatment 26,230 Sq Yard 5,217.91 0.20 217-00010 Pre-Emergent Herbicide 60 Sq Yard 516.00 8.60 217-00015 Noxious Weed Management 9,680 Sq Yard 1,452.00 0.15 217-00020 Herbicide Treatment 557 Hour 45,542.40 81.76 240-00100 Prairie Dog Management 1 Lump Sum 6,500.00 6,500.00 250-00010 Environmental Health and Safety Management 6 Lump Sum 16,800.00 2,800.00 250-00050 Monitoring Technician 161 Hour 14,729.00 91.48 250-00110 Health and Safety Officer 540 Hour 53,220.00 98.56 250-00120 Material Sampling and Delivery 5 Each 2,192.00 438.40 250-00210 Solid Waste Disposal 22 Cubic Yard 3,300.00 150.00 250-00220 Hazardous Waste Disposal 8,099 Cubic Yard 155,190.00 19.16 250-00310 Water Treatment 11 M Gallon 3,937.71 357.97 304-01000 Aggregate Base Course (Class 1) 3,903 Ton 54,642.00 14.00 304-01005 Aggregate Base Course (Class 1) 11,803 Cubic Yard 300,701.28 25.48 304-02000 Aggregate Base Course (Class 2) 57,516 Ton 930,050.61 16.17 304-02005 Aggregate Base Course (Class 2) 3,808 Cubic Yard 108,566.08 28.51 304-03000 Aggregate Base Course (Class 3) 74,432 Ton 1,062,375.86 14.27 304-03005 Aggregate Base Course (Class 3) 17,318 Cubic Yard 356,874.00 20.61 304-05000 Aggregate Base Course (Class 5) 4,466 Ton 100,256.70 22.45 304-06000 Aggregate Base Course (Class 6) 161,845 Ton 2,798,666.47 17.29 304-06007 Aggregate Base Course (Class 6) 48,382 Cubic Yard 1,445,439.95 29.88 304-06008 Aggregate Base Course (Class 6) (Special) 9,987 Cubic Yard 230,043.90 23.03 304-06009 Aggregate Base Course (Class 6) (Special) 50,382 Ton 783,210.70 15.55 304-07000 Aggregate Base Course (Class 7) 9,606 Ton 161,144.64 16.78 304-07009 Aggregate Base Course (Class 7) (Special) 2,872 Ton 51,565.50 17.95 304-09000 Aggregate Base Course (Special) 12,789 Cubic Yard 309,335.60 24.19 304-09006 Aggregate Base Course (Special) 85 Sq Yard 862.75 10.15 304-09014 Aggregate Base Course (Special) 55,819 Ton 1,091,263.30 19.55 304-09055 Aggregate Base Course (Blotter Material) 105 Ton 3,445.00 32.81 306-01000 Reconditioning 6,142 Sq Yard 84,426.00 13.75 307-00000 Hydrated Lime 3,563 Ton 496,397.16 139.32 307-00212 Processing Lime Treated Subgrade (12 Inch) 143,962 Sq Yard 319,595.64 2.22 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 11 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 310-00608 Full Depth Reclamation of Hot Mix Asphalt Pavement (0 200,927 Sq Yard 342,455.05 1.70 310-00610 Full Depth Reclamation of Hot Mix Asphalt Pavement (8 578,623 Sq Yard 1,296,399.95 2.24 310-00614 Full Depth Reclamation Of Hot Mix Asphalt Pavement (1 9,621 Sq Yard 27,419.85 2.85 310-00700 Asphalt Emulsion Full Depth Reclamation 156,030 Sq Yard 390,075.00 2.50 403-00720 Hot Bituminous Pavement (Patching) (Asphalt) 26,004 Ton 2,692,330.59 103.54 403-00721 Hot Bituminous Pavement (Patching) (Asphalt) 2,111 Sq Yard 119,875.77 56.79 403-00800 Emergency Pothole Repair 40 Ton 8,801.60 220.04 403-02000 Hot Bituminous Pavement (Special) 529 Ton 36,007.89 68.07 403-09210 Stone Matrix Asphalt 44,366 Ton 3,625,969.48 81.73 403-09221 Stone Matrix Asphalt (Fibers)(Asphalt) 22,138 Ton 1,926,887.85 87.04 403-09500 Furnish Hot Bituminous Pavement 6,608 Ton 439,432.00 66.50 403-33721 Hot Bituminous Pavement (Grading S) (75) (PG 58-28) 34,001 Ton 1,687,273.50 49.62 403-33741 Hot Bituminous Pavement (Grading S) (75) (PG 64-22) 41,702 Ton 2,675,068.20 64.15 403-33751 Hot Bituminous Pavement (Grading S) (75) (PG 64-28) 46,700 Ton 2,757,764.44 59.05 403-33841 Hot Bituminous Pavement (Grading S) (100) (PG 64-22) 56,587 Ton 2,766,632.34 48.89 403-33871 Hot Bituminous Pavement (Grading S) (100) (PG 76-28) 92,764 Ton 5,587,169.85 60.23 403-34701 Hot Bituminous Pavement (Grading SX) (75) 434,767 Ton 13,346,763.92 30.70 403-34721 Hot Bituminous Pavement (Grading SX) (75) (PG 58-28) 112,101 Ton 6,323,556.85 56.41 403-34731 Hot Bituminous Pavement (Grading SX) (75) (PG 58-34) 692 Ton 228,360.00 330.00 403-34741 Hot Bituminous Pavement (Grading SX) (75) (PG 64-22) 4,132 Ton 243,833.58 59.01 403-34751 Hot Bituminous Pavement (Grading SX) (75) (PG 64-28) 112,716 Ton 7,314,519.67 64.89 403-34771 Hot Bituminous Pavement (Grading SX) (75) (PG 76-28) 1,725 Ton 101,775.00 59.00 403-34801 Hot Bituminous Pavement (Grading SX) (100) 3,887 Ton 315,744.50 81.23 403-34841 Hot Bituminous Pavement (Grading SX) (100) (PG 64-22) 307,613 Ton 15,905,595.80 51.71 403-34851 Hot Bituminous Pavement (Grading SX) (100) (PG 64-28) 15,384 Ton 1,083,697.36 70.44 403-34861 Hot Mix Asphalt (Grading SX) (100) (PG 70-28) 37,357 Ton 2,118,141.90 56.70 403-34871 Hot Bituminous Pavement (Grading SX) (100) (PG 76-28) 73,980 Ton 4,303,204.03 58.17 405-00000 Heating and Scarifying Treatment 147,687 Sq Yard 299,804.61 2.03 405-00100 Heating and Remixing Treatment 330,426 Sq Yard 1,817,343.00 5.50 408-01000 Hot Poured Joint and Crack Sealant 57 Ton 224,500.00 3,938.60 409-01010 Cover Coat Material (Type I) 5,697 Ton 227,880.00 40.00 409-01015 Cover Coat Material (Type I) 984,263 Sq Yard 733,492.65 0.75 409-02015 Cover Coat Material (Type II) 257,451 Sq Yard 193,088.25 0.75 409-02030 Cover Coat Material (Type I) Special 541,388 Sq Yard 801,254.24 1.48 411-03342 Asphalt Cement Performance Grade (PG 64-28) 2,796 Ton 1,915,260.00 685.00 411-03345 Asphalt Cement Performance Grade (PG 76-28) 245 Ton 214,500.00 875.51 411-03352 Asphalt Cement Performance Grade (PG 58-28) 15,966 Ton 7,942,563.19 497.47 411-03354 Asphalt Cement Performance Grade (PG 64-22) 2,504 Ton 1,209,200.00 482.91 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 12 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 411-03355 Asphalt Cement Performance Grade (PG 58-34) 7,458 Ton 4,910,207.98 658.38 411-10216 Emulsified Asphalt (CRS-2P) 289,431 Gallon 599,810.35 2.07 411-10217 Emulsified Asphalt (CRS-2P) 2,026 Ton 792,050.00 390.94 411-10253 Emulsified Asphalt (CSS-1H) 16,571 Gallon 49,391.50 2.98 411-10255 Emulsified Asphalt (Slow-Setting) 511,317 Gallon 1,183,013.81 2.31 411-10258 Emulsified Asphalt (Rapid-Setting)(Polymerized) 1,183 Ton 605,696.00 512.00 411-10300 Emulsified Asphalt (Prime Coat) 2,138 Gallon 4,276.00 2.00 411-90010 Asphalt Rejuvenating Agent 27,985 Gallon 90,563.00 3.24 411-90040 Recycling Agent 517,637 Gallon 905,864.75 1.75 412-00190 Concrete Pavement (Patching) 12,536 Sq Yard 870,611.45 69.45 412-00600 Concrete Pavement (6 Inch) 8,434 Sq Yard 400,687.84 47.51 412-00605 Concrete Pavement (6 Inch) (Fast Track) 393 Sq Yard 20,101.95 51.15 412-00800 Concrete Pavement (8 Inch) 77,965 Sq Yard 2,313,329.65 29.67 412-00805 Concrete Pavement (8 Inch) (Fast Track) 3,359 Sq Yard 230,024.40 68.48 412-00900 Concrete Pavement (9 Inch) 24,110 Sq Yard 804,068.50 33.35 412-00950 Concrete Pavement (9-1/2 Inch) 21,006 Sq Yard 1,116,224.40 53.14 412-00951 Concrete Pavement (9-1/2 Inch) (Special) 1,069 Sq Yard 96,210.00 90.00 412-00952 Concrete Pavement (9 1/2 Inch) (Fast Track) 4,786 Sq Yard 349,206.00 72.96 412-00975 Concrete Pavement (9-3/4 Inch) 54,999 Sq Yard 2,239,628.25 40.72 412-00976 Concrete Pavement (9-3/4) (Class E) 8,979 Sq Yard 455,616.30 50.74 412-00977 Concrete Pavement (9-3/4 Inch)(Special) 937 Sq Yard 68,073.05 72.65 412-01000 Concrete Pavement (10 Inch) 115,476 Sq Yard 3,961,544.00 34.31 412-01020 Concrete Pavement (10 Inch) (Fast Track) 3,837 Sq Yard 245,615.00 64.01 412-01025 Concrete Pavement (10-1/4 Inch) 46 Sq Yard 2,852.00 62.00 412-01075 Concrete Pavement (10-3/4 Inch) 230,312 Sq Yard 6,448,736.00 28.00 412-01100 Concrete Pavement (11 Inch) 34,606 Sq Yard 2,087,097.00 60.31 412-01120 Concrete Pavement (11 Inch) (Fast Track) 170 Sq Yard 15,657.00 92.10 412-01300 Concrete Pavement (13 Inch) 115,325 Sq Yard 3,094,169.75 26.83 412-01325 Concrete Pavement (13 Inch)(Fast Track) 2,000 Sq Yard 65,140.00 32.57 412-14000 Sawing and Sealing Concrete Pavement Joints 325,000 Lin Foot 467,000.00 1.44 412-15000 Routing and Sealing Concrete Pavement Cracks 15,500 Lin Foot 71,400.00 4.61 412-15050 Cross Stitching 1,181 Each 40,402.75 34.21 412-15060 Repair Concrete Cracks (Stitch) 1,134 Each 113,400.00 100.00 412-16000 Cleaning and Sealing Concrete Pavement Joints 785 Lin Foot 3,925.00 5.00 412-18050 Rubbilization of Concrete Pavement 306,029 Sq Yard 1,066,804.20 3.49 412-19000 Hot Poured Concrete Joint Sealant 24,489 Lin Foot 256,900.00 10.49 420-00000 Geomembrane 28,118 Sq Yard 157,562.80 5.60 420-00102 Geotextile (Erosion Control) (Class 1) 882 Sq Yard 2,566.70 2.91 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 13 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 420-00103 Geotextile (Erosion Control) (Class 2) 3,209 Sq Yard 7,829.00 2.44 420-00112 Geotextile (Drainage) (Class 1) 5,286 Sq Yard 15,965.73 3.02 420-00113 Geotextile (Drainage) (Class 2) 80,495 Sq Yard 87,847.67 1.09 420-00132 Geotextile (Separator) (Class 1) 19,375 Sq Yard 41,723.30 2.15 420-00133 Geotextile (Separator) (Class 2) 2,353 Sq Yard 15,659.00 6.65 420-00200 Geotextile (Weed Barrier) 3,417 Sq Yard 5,592.65 1.64 420-00201 Geotextile (Weed Barrier) (Special) 400 Sq Yard 1,120.00 2.80 420-00300 Geotextile (Reinforcement) 9,750 Sq Yard 29,932.50 3.07 420-00500 Geotextile (Paving) 61,014 Sq Yard 61,014.00 1.00 420-00510 Geotextile (Crack Reduction) (High Density) 826 Sq Yard 12,390.00 15.00 502-00100 Drilling Hole to Facilitate Pile Driving 1,596 Lin Foot 71,820.00 45.00 502-00460 Pile Tip 156 Each 25,972.00 166.49 502-02000 Dynamic Load Testing 1 Lump Sum 6,000.00 6,000.00 502-11253 Steel Piling (HP 12x53) 542 Lin Foot 35,230.00 65.00 502-11274 Steel Piling (HP 12x74) 2,592 Lin Foot 125,568.00 48.44 502-11489 Steel Piling (HP 14x89) 3,520 Lin Foot 237,520.00 67.48 502-14117 Steel Piling (HP 14x117) 1,078 Lin Foot 83,006.00 77.00 503-00000 Ground Improvement 33,556 Sq Foot 369,116.00 11.00 503-00018 Drilled Caisson (18 Inch) 88 Lin Foot 10,310.04 117.16 503-00024 Drilled Caisson (24 Inch) 1,204 Lin Foot 105,999.00 88.04 503-00025 Drilled Caisson (24 Inch)(Special) 40 Lin Foot 66,080.00 1,652.00 503-00030 Drilled Caisson (30 Inch) 1,327 Lin Foot 175,375.00 132.16 503-00036 Drilled Caisson (36 Inch) 1,521 Lin Foot 434,800.95 285.87 503-00037 Drilled Caisson (36 Inch)(Special) 100 Lin Foot 220,000.00 2,200.00 503-00042 Drilled Caisson (42 Inch) 276 Lin Foot 106,338.90 385.29 503-00048 Drilled Caisson (48 Inch) 1,530 Lin Foot 451,769.00 295.27 503-00054 Drilled Caisson (54 Inch) 738 Lin Foot 438,376.88 594.01 503-00055 Drilled Caisson (54 Inch)(Special) 240 Lin Foot 548,880.00 2,287.00 503-00060 Drilled Caisson (60 Inch) 2,078 Lin Foot 270,000.00 129.93 503-00072 Drilled Caisson (72 Inch) 230 Lin Foot 113,620.00 494.00 503-00200 Caisson (Special) 60 Lin Foot 30,000.00 500.00 503-01060 Micropile (6 Inch) 9,527 Lin Foot 599,875.52 62.97 503-02000 Verification Test Pile 15 Each 108,775.00 7,251.67 504-03411 Retaining Wall (Boulder) 3,873 Sq Foot 118,005.00 30.47 504-03500 Retaining Wall (Design Build) 460 Sq Foot 163,300.00 355.00 504-04410 Block Facing 40,546 Sq Foot 612,452.96 15.11 504-04420 Precast Panel Facing 142,975 Sq Foot 2,490,394.50 17.42 504-04430 Reinforced Concrete Facing 2,816 Sq Foot 69,667.84 24.74 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 14 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 504-05000 Wire Mesh Facing 3,850 Sq Foot 87,202.50 22.65 504-06100 Ground Nailed Wall 20,863 Sq Foot 374,540.64 17.95 504-06400 Soil Nail Wall 3,686 Sq Foot 251,116.00 68.13 504-08050 Stone Landscape Wall 2,826 Sq Foot 119,104.00 42.15 504-08150 Soldier Pile Wall 1,543 Sq Foot 146,585.00 95.00 504-08255 Masonry Landscape Wall (Dry Stack) 1,519 Sq Foot 38,139.70 25.11 506-00000 Riprap 23 Cubic Yard 1,768.86 76.91 506-00010 Riprap (Special) 8,726 Cubic Yard 574,473.00 65.83 506-00030 Grouted Riprap 66 Cubic Yard 8,250.00 125.00 506-00035 Grouted Riprap 232 Sq Yard 14,882.80 64.15 506-00036 Grouted Riprap (36 Inch) (Special) 20 Cubic Yard 3,980.00 199.00 506-00050 Slope Mattress 93 Cubic Yard 33,622.29 361.53 506-00100 Riprap (Gabions) 87 Cubic Yard 27,157.92 312.16 506-00206 Riprap (6 Inch) 2,788 Cubic Yard 125,612.10 45.05 506-00209 Riprap (9 Inch) 1,739 Cubic Yard 102,000.03 58.65 506-00212 Riprap (12 Inch) 2,144 Cubic Yard 176,193.55 82.18 506-00218 Riprap (18 Inch) 1,035 Cubic Yard 83,050.00 80.24 506-00224 Riprap (24 Inch) 1,066 Cubic Yard 49,972.00 46.88 506-00225 Riprap (24 Inch) (Special) 422 Cubic Yard 11,394.00 27.00 506-00236 Riprap (36 Inch) 598 Cubic Yard 16,146.00 27.00 506-00237 Riprap (36 Inch) (Special) 1,348 Cubic Yard 36,396.00 27.00 506-00243 Riprap (42 Inch) (Special) 3,081 Cubic Yard 221,905.00 72.02 506-01020 Geogrid Reinforcement 75,509 Sq Yard 283,497.31 3.75 507-00000 Concrete Slope and Ditch Paving 415 Cubic Yard 117,424.96 282.95 507-00100 Concrete Slope and Ditch Paving (Reinforced) 1,082 Cubic Yard 321,116.92 296.78 507-00101 Concrete Slope and Ditch Paving (Reinforced 28,246 Lin Foot 343,608.04 12.16 507-00350 Grouted Riprap Slope and Ditch Paving 147 Cubic Yard 29,340.00 199.59 507-00400 Bituminous Slope and Ditch Paving (Asphalt) 988 Ton 105,901.66 107.19 507-00550 Concrete Lined Ditch 3,223 Lin Foot 56,456.40 17.52 509-00000 Structural Steel 223,345 Pound 506,510.50 2.27 509-00001 Structural Steel (Galvanized) 11,679 Pound 54,211.55 4.64 509-08100 Provide Temporary Support 1 Lump Sum 15,000.00 15,000.00 509-90002 Paint Existing Structure (Special) 144 Gallon 23,001.90 159.74 509-90003 Paint Structural Steel 3 Lump Sum 110,780.18 36,926.73 510-00144 Structural Plate Pipe (144 Inch) 30 Lin Foot 28,170.00 939.00 512-00101 Bearing Device (Type I) 20 Each 20,000.00 1,000.00 512-00103 Bearing Device (Type III) 6 Each 43,500.00 7,250.00 513-00600 Bridge Drain 4 Each 12,000.00 3,000.00 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 15 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 513-00690 Bridge Drain (Special) 3 Each 6,300.00 2,100.00 514-00000 Pipe Railing 1,814 Lin Foot 119,432.00 65.84 514-00100 Hand Rail 1,391 Lin Foot 159,965.00 115.00 514-00200 Pedestrian Railing (Steel) 2,348 Lin Foot 376,895.00 160.52 514-00201 Pedestrian Railing (Steel)(Special) 653 Lin Foot 60,460.00 92.59 514-00300 Traffic Railing (Steel) 150 Lin Foot 22,500.00 150.00 514-01040 Bikeway Railing (Steel) 1,423 Lin Foot 120,462.00 84.65 515-00120 Waterproofing (Membrane) 34,366 Sq Yard 471,034.07 13.71 515-00400 Concrete Sealer 8,711 Sq Yard 46,036.35 5.28 515-00410 Concrete Sealer (Calcium Nitrite) 1,199 Sq Yard 38,804.60 32.36 518-00000 Bridge Compression Joint Sealer 621 Lin Foot 43,476.68 70.01 518-00100 Waterstop 974 Lin Foot 4,870.00 5.00 518-00106 Waterstop (6 Inch) 282 Lin Foot 1,254.00 4.45 518-00112 Waterstop (12 Inch) 321 Lin Foot 8,988.00 28.00 518-01001 Bridge Expansion Joint (Asphaltic Plug) 3,651 Lin Foot 405,832.74 111.16 518-01002 Bridge Expansion Device (0-2 Inch) 813 Lin Foot 159,726.46 196.47 518-01004 Bridge Expansion Device (0-4 Inch) 2,085 Lin Foot 322,641.59 154.74 518-01005 Bridge Expansion Device (0-4 Inch)(with Snow Plow Pla 165 Lin Foot 36,418.80 220.72 518-02010 Elastomeric Concrete End Dam 245 Cubic Foot 120,050.00 490.00 518-02100 Polymer Mortar End Dam 122 Cubic Foot 62,321.50 510.83 518-03000 Sawing and Sealing Bridge Joint 3,505 Lin Foot 41,797.50 11.93 518-03100 Rapid Cure Silicone Joint Seal 373 Lin Foot 14,330.19 38.42 519-01000 Epoxy Resin (Injection) 46 Lin Foot 3,686.44 80.14 519-01300 Polyurethane Resin 73,042 Pound 466,626.62 6.39 519-03000 Thin Bonded Epoxy Overlay 1,384 Sq Yard 60,974.00 44.06 601-01000 Concrete Class B 800 Cubic Yard 229,122.35 286.40 601-01010 Concrete Class BZ 88 Cubic Yard 17,600.00 200.00 601-01025 Concrete Class B (Miscellaneous) 71 Cubic Yard 21,442.00 302.00 601-01040 Concrete Class B (Bridge) 105 Cubic Yard 37,590.00 358.00 601-01050 Concrete Class B (Wall) 370 Cubic Yard 167,531.56 452.79 601-03000 Concrete Class D 6,404 Cubic Yard 2,033,268.50 317.50 601-03030 Concrete Class D (Box Culvert) 2,732 Cubic Yard 1,081,195.98 395.75 601-03040 Concrete Class D (Bridge) 10,008 Cubic Yard 3,972,850.85 396.97 601-03041 Concrete Class D (Bridge) (Special) 492 Cubic Yard 409,518.60 832.35 601-03050 Concrete Class D (Wall) 6,513 Cubic Yard 2,801,588.85 430.15 601-03540 Concrete Class DT (Deck Topping) 726 Cubic Yard 199,581.27 274.91 601-04000 Concrete Class E 13 Cubic Yard 10,140.91 780.07 601-05016 Concrete Class P 464 Cubic Yard 118,371.00 255.11 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 16 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 601-05020 Concrete Class R 10 Cubic Yard 2,240.00 224.00 601-06100 Concrete (Patching) 50 Cubic Yard 71,220.00 1,424.40 601-06150 Concrete (Patching) 5,700 Sq Foot 430,822.00 75.58 601-21000 Precast Wall Segment 6 Each 60,000.00 10,000.00 601-26000 Precast Concrete Cap (Decorative) (Special) 4 Each 18,000.00 4,500.00 601-40005 Cut Stone Veneer 4,405 Sq Foot 116,732.50 26.50 601-40006 Cut Stone Veneer (Slab) 160 Sq Foot 6,648.00 41.55 601-40010 Masonry Wall 3,450 Sq Foot 34,120.50 9.89 601-40210 Concrete Finish (Special) 3,160 Sq Foot 24,742.80 7.83 601-40250 Bridge Deck Finish (Sawed Grooves) 699 Sq Yard 2,796.00 4.00 601-40300 Structural Concrete Coating 8,473 Sq Yard 77,037.31 9.09 601-40301 Structural Concrete Coating 10,457 Sq Foot 24,394.15 2.33 601-40302 Structural Concrete Coating (Anti-Graffiti) 5,767 Sq Foot 8,242.10 1.43 601-40400 Structural Concrete Stain 24,856 Sq Yard 127,613.80 5.13 601-40401 Structural Concrete Stain 169,047 Sq Foot 179,502.62 1.06 602-00000 Reinforcing Steel 1,195,988 Pound 928,165.73 0.78 602-00020 Reinforcing Steel (Epoxy Coated) 2,658,162 Pound 2,110,867.26 0.79 602-00030 Reinforcing (Fiber Reinforced Polymer)(Surface) 182 M Kip Foot 354,900.00 1,950.00 603-00001 Annular Space Grouting 79 Cubic Yard 54,242.00 686.61 603-00018 Culvert Lining (18 inch) 102 Lin Foot 20,400.00 200.00 603-00024 Prepare Culvert Pipe (24 Inch) 190 Lin Foot 1,900.00 10.00 603-00025 Culvert Lining (24 Inch)(Special) 190 Lin Foot 30,875.00 162.50 603-00030 Culvert Lining (30 Inch) 405 Lin Foot 60,056.00 148.29 603-00036 Culvert Lining (36 Inch) 127 Lin Foot 30,962.60 243.80 603-00040 Culvert Lining (40 Inch) 140 Lin Foot 33,600.00 240.00 603-00042 Culvert Lining (42 Inch) 324 Lin Foot 97,200.00 300.00 603-00048 Culvert Lining (48 Inch) 277 Lin Foot 124,513.50 449.51 603-00054 Culvert Lining (54 Inch) 200 Lin Foot 72,000.00 360.00 603-00060 Culvert Lining (60 Inch) 392 Lin Foot 198,100.00 505.36 603-00078 Culvert Lining (78 Inch) 322 Lin Foot 152,950.00 475.00 603-01125 12 Inch Reinforced Concrete Pipe (Complete In Place) 143 Lin Foot 8,102.00 56.66 603-01150 15 Inch Reinforced Concrete Pipe 1,550 Lin Foot 76,735.00 49.51 603-01155 15 Inch Reinforced Concrete Pipe (Complete In Place) 1,292 Lin Foot 90,067.68 69.71 603-01180 18 Inch Reinforced Concrete Pipe 6,998 Lin Foot 313,835.00 44.85 603-01185 18 Inch Reinforced Concrete Pipe (Complete In Place) 13,082 Lin Foot 598,090.26 45.72 603-01240 24 Inch Reinforced Concrete Pipe 6,618 Lin Foot 341,794.00 51.65 603-01245 24 Inch Reinforced Concrete Pipe (Complete In Place) 7,893 Lin Foot 444,404.09 56.30 603-01300 30 Inch Reinforced Concrete Pipe 778 Lin Foot 72,764.00 93.53 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 17 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 603-01305 30 Inch Reinforced Concrete Pipe (Complete In Place) 948 Lin Foot 94,970.30 100.18 603-01360 36 Inch Reinforced Concrete Pipe 646 Lin Foot 77,720.00 120.31 603-01365 36 Inch Reinforced Concrete Pipe (Complete In Place) 4,620 Lin Foot 543,657.88 117.67 603-01420 42 Inch Reinforced Concrete Pipe 1,752 Lin Foot 204,432.00 116.68 603-01425 42 Inch Reinforced Concrete Pipe (Complete In Place) 456 Lin Foot 47,654.00 104.50 603-01480 48 Inch Reinforced Concrete Pipe 1,603 Lin Foot 234,672.50 146.40 603-01485 48 Inch Reinforced Concrete Pipe (Complete In Place) 3,509 Lin Foot 346,036.69 98.61 603-01545 54 Inch Reinforced Concrete Pipe (Complete In Place) 3,969 Lin Foot 490,366.50 123.55 603-01605 60 Inch Reinforced Concrete Pipe (Complete In Place) 3,372 Lin Foot 502,160.76 148.92 603-01720 72 Inch Reinforced Concrete Pipe 193 Lin Foot 94,537.19 489.83 603-01725 72 Inch Reinforced Concrete Pipe (Complete In Place) 146 Lin Foot 35,770.00 245.00 603-01785 78 Inch Reinforced Concrete Pipe (Complete In Place) 449 Lin Foot 130,210.00 290.00 603-01840 84 Inch Reinforced Concrete Pipe 54 Lin Foot 28,350.00 525.00 603-01905 90 Inch Reinforced Concrete Pipe (Complete In Place) 334 Lin Foot 120,240.00 360.00 603-02180 23x14 Inch Reinforced Concrete Pipe Elliptical 60 Lin Foot 4,500.00 75.00 603-02185 23x14 Inch Reinforced Concrete Pipe (Complete In Plac 128 Lin Foot 14,720.00 115.00 603-02240 30x19 Inch Reinforced Concrete Pipe Elliptical 43 Lin Foot 4,730.00 110.00 603-02245 30x19 Inch Reinforced Concrete Pipe Elliptical 810 Lin Foot 41,755.50 51.55 603-02300 38x24 Inch Reinforced Concrete Pipe Elliptical 98 Lin Foot 12,250.00 125.00 603-02305 38x24 Inch Reinforced Concrete Pipe Elliptical 219 Lin Foot 37,230.00 170.00 603-02480 60x38 Inch Reinforced Concrete Pipe Elliptical 862 Lin Foot 148,671.50 172.47 603-03180 18 Inch Reinforced Concrete Pipe Special 115 Lin Foot 4,197.50 36.50 603-03240 24 Inch Reinforced Concrete Pipe Special 254 Lin Foot 11,607.80 45.70 603-03360 36 Inch Reinforced Concrete Pipe Special 124 Lin Foot 10,775.60 86.90 603-03480 48 Inch Reinforced Concrete Pipe Special 48 Lin Foot 24,480.00 510.00 603-03780 78 Inch Reinforced Concrete Pipe Special 40 Lin Foot 6,800.00 170.00 603-05015 15 Inch Reinforced Concrete End Section 5 Each 2,630.00 526.00 603-05018 18 Inch Reinforced Concrete End Section 53 Each 34,128.00 643.92 603-05024 24 Inch Reinforced Concrete End Section 47 Each 27,324.74 581.38 603-05030 30 Inch Reinforced Concrete End Section 4 Each 2,905.00 726.25 603-05036 36 Inch Reinforced Concrete End Section 17 Each 18,600.00 1,094.12 603-05042 42 Inch Reinforced Concrete End Section 2 Each 2,500.00 1,250.00 603-05048 48 Inch Reinforced Concrete End Section 8 Each 10,750.00 1,343.75 603-05054 54 Inch Reinforced Concrete End Section 1 Each 1,500.00 1,500.00 603-05060 60 Inch Reinforced Concrete End Section 2 Each 4,120.00 2,060.00 603-05124 30x19 Inch Reinforced Concrete End Section Elliptical 6 Each 4,326.24 721.04 603-05130 38x24 Inch Reinforced Concrete End Section Elliptical 2 Each 3,000.00 1,500.00 603-05148 60x38 Inch Reinforced Concrete End Section Elliptical 1 Each 1,770.00 1,770.00 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 18 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 603-07240 24 Inch Reinforced Concrete Pipe (Jacked) 128 Lin Foot 37,120.00 290.00 603-07360 36 Inch Reinforced Concrete Pipe (Jacked) 238 Lin Foot 113,050.00 475.00 603-07480 48 Inch Reinforced Concrete Pipe (Jacked) 125 Lin Foot 77,500.00 620.00 603-07540 54 Inch Reinforced Concrete Pipe (Jacked) 320 Lin Foot 182,400.00 570.00 603-10120 12 Inch Corrugated Steel Pipe 1,326 Lin Foot 45,315.00 34.17 603-10180 18 Inch Corrugated Steel Pipe 1,943 Lin Foot 100,260.90 51.60 603-10240 24 Inch Corrugated Steel Pipe 1,332 Lin Foot 84,622.80 63.53 603-10300 30 Inch Corrugated Steel Pipe 706 Lin Foot 43,521.98 61.65 603-10360 36 Inch Corrugated Steel Pipe 904 Lin Foot 56,838.80 62.87 603-10420 42 Inch Corrugated Steel Pipe 6 Lin Foot 687.36 114.56 603-10480 48 Inch Corrugated Steel Pipe 1,295 Lin Foot 110,371.10 85.23 603-10600 60 Inch Corrugated Steel Pipe 105 Lin Foot 23,327.85 222.17 603-10720 72 Inch Corrugated Steel Pipe 62 Lin Foot 7,502.00 121.00 603-10840 84 Inch Corrugated Steel Pipe 72 Lin Foot 15,104.16 209.78 603-15024 24 Inch Equivalent Corrugated Steel Pipe Arch 140 Lin Foot 7,280.00 52.00 603-15054 54 Inch Equivalent Corrugated Steel Pipe Arch 55 Lin Foot 6,837.05 124.31 603-30012 12 Inch Steel End Section 1 Each 312.00 312.00 603-30018 18 Inch Steel End Section 55 Each 14,851.56 270.03 603-30024 24 Inch Steel End Section 24 Each 7,550.00 314.58 603-30030 30 Inch Steel End Section 15 Each 9,326.38 621.76 603-30036 36 Inch Steel End Section 27 Each 17,647.20 653.60 603-30048 48 Inch Steel End Section 26 Each 33,620.62 1,293.10 603-30060 60 Inch Steel End Section 1 Each 2,097.76 2,097.76 603-31324 24 Inch Equivalent Arch Steel End Section 8 Each 2,136.00 267.00 603-50004 4 Inch Plastic Pipe 1,090 Lin Foot 28,450.00 26.10 603-50008 8 Inch Plastic Pipe 1,626 Lin Foot 100,820.00 62.00 603-50010 10 Inch Plastic Pipe 788 Lin Foot 39,098.00 49.62 603-50012 12 Inch Plastic Pipe 1,199 Lin Foot 80,089.00 66.80 603-50015 15 Inch Plastic Pipe 527 Lin Foot 19,974.00 37.90 603-50018 18 Inch Plastic Pipe 550 Lin Foot 26,530.00 48.24 603-50024 24 Inch Plastic Pipe 390 Lin Foot 18,720.00 48.00 603-50036 36 Inch Plastic Pipe 18 Lin Foot 1,080.00 60.00 603-61180 18 Inch Flexible Pipe 122 Lin Foot 4,270.00 35.00 603-70502 5x2 Foot Concrete Box Culvert (Precast) 40 Lin Foot 15,000.00 375.00 603-70806 8x6 Foot Concrete Box Culvert (Precast) 302 Lin Foot 128,505.00 425.51 603-71005 10x5 Foot Concrete Box Culvert (Precast) 80 Lin Foot 88,640.80 1,108.01 603-71006 10x6 Foot Concrete Box Culvert (Precast) 67 Lin Foot 36,649.00 547.00 603-71010 10x10 Foot Concrete Box Culvert (Precast) 39 Lin Foot 29,260.00 750.26 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 19 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 603-72008 20x8 Foot Concrete Box Culvert (Precast) 42 Lin Foot 81,900.00 1,950.00 603-80790 12X8 Foot Concrete Arch Culvert (Precast) 83 Lin Foot 130,725.00 1,575.00 603-82006 6 Inch Ductile Iron Pipe 135 Lin Foot 9,490.50 70.30 603-82008 8 Inch Ductile Iron Pipe 160 Lin Foot 12,352.00 77.20 603-82012 12 Inch Ductile Iron Pipe 633 Lin Foot 46,588.80 73.60 603-82016 16 Inch Ductile Iron Pipe 184 Lin Foot 45,659.20 248.15 604-00305 Inlet Type C (5 Foot) 54 Each 134,690.15 2,494.26 604-00310 Inlet Type C (10 Foot) 11 Each 34,300.00 3,118.18 604-00315 Inlet Type C (15 Foot) 1 Each 3,850.00 3,850.00 604-00350 Inlet Type C (Special) 13 Each 83,303.30 6,407.95 604-00505 Inlet Type D (5 Foot) 18 Each 53,201.36 2,955.63 604-00506 Inlet Type D (Special) (5 Foot) 1 Each 4,700.00 4,700.00 604-00510 Inlet Type D (10 Foot) 8 Each 33,700.00 4,212.50 604-00511 Inlet Type D (Special) (10 Foot) 2 Each 8,600.00 4,300.00 604-00515 Inlet Type D (15 Foot) 5 Each 31,600.00 6,320.00 604-00520 Inlet Type D (20 Foot) 1 Each 5,200.00 5,200.00 604-00550 Inlet Type D (Special) 5 Each 25,800.00 5,160.00 604-00605 Inlet Type D (Double) (5 Foot) 1 Each 3,000.00 3,000.00 604-00610 Inlet Type D (Double) (10 Foot) 1 Each 8,200.00 8,200.00 604-13006 Inlet Type 13 (5 Foot) (Special) 2 Each 5,555.00 2,777.50 604-16005 Inlet Type 16 (5 Foot) 17 Each 47,170.00 2,774.71 604-16010 Inlet Type 16 (10 Foot) 2 Each 7,260.00 3,630.00 604-16050 Inlet Type 16 (Single) (Special) 5 Each 11,002.50 2,200.50 604-16505 Inlet Type 16 (Double) (5 Foot) 23 Each 97,960.00 4,259.13 604-16510 Inlet Type 16 (Double) (10 Foot) 1 Each 5,315.00 5,315.00 604-16515 Inlet Type 16 (Double) (15 Foot) 1 Each 6,480.00 6,480.00 604-16605 Inlet Type 16 (Triple) (5 Foot) 7 Each 39,018.00 5,574.00 604-16610 Inlet Type 16 (Triple) (10 Foot) 2 Each 14,372.00 7,186.00 604-16650 Inlet Type 16 (Triple) (Special) 1 Each 7,552.00 7,552.00 604-19000 Inlet Special 11 Each 36,900.00 3,354.55 604-19105 Inlet Type R L 5 (5 Foot) 61 Each 204,316.00 3,349.44 604-19110 Inlet Type R L 5 (10 Foot) 17 Each 72,010.00 4,235.88 604-19205 Inlet Type R L 10 (5 Foot) 29 Each 126,184.00 4,351.17 604-19210 Inlet Type R L 10 (10 Foot) 20 Each 112,615.00 5,630.75 604-19215 Inlet Type R L 10 (15 Foot) 1 Each 8,500.00 8,500.00 604-19305 Inlet Type R L 15 (5 Foot) 10 Each 50,160.00 5,016.00 604-19310 Inlet Type R L 15 (10 Foot) 10 Each 64,788.00 6,478.80 604-19405 Inlet Type R Special (5 Foot) 4 Each 26,800.00 6,700.00 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 20 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 604-19505 Inlet Type R L 20 (5 Foot) 3 Each 15,504.00 5,168.00 604-19600 Inlet (Sand Filter) 1 Each 17,000.00 17,000.00 604-19704 Inlet Special (Trench Drain) (4 Inch Width) 13 Lin Foot 1,807.00 139.00 604-20000 Outlet Structure 2 Each 60,528.97 30,264.49 604-20001 Outlet Structure 1 Lump Sum 41,000.00 41,000.00 604-20002 Outlet Structure (Special) 1 Lump Sum 7,048.00 7,048.00 604-20010 Settling Basin 5 Each 99,052.00 19,810.40 604-25000 Vane Grate Inlet Special 7 Each 23,776.00 3,396.57 604-25005 Vane Grate Inlet (5 Foot) 12 Each 41,726.65 3,477.22 604-25010 Vane Grate Inlet (10 Foot) 13 Each 45,876.45 3,528.96 604-25011 Vane Grate Inlet Special (10 Foot) 1 Each 15,543.85 15,543.85 604-25015 Vane Grate Inlet (15 Foot) 1 Each 5,800.00 5,800.00 604-26005 Vane Grate Inlet (Double) (5 Foot) 19 Each 93,971.95 4,945.89 604-26010 Vane Grate Inlet (Double) (10 Foot) 25 Each 149,441.00 5,977.64 604-26015 Vane Grate Inlet (Double) (15 Foot) 1 Each 6,200.00 6,200.00 604-26020 Vane Grate Inlet (Double) (20 Foot) 1 Each 8,290.09 8,290.09 604-30000 Manhole Slab Base (Special) 1 Each 4,600.00 4,600.00 604-30005 Manhole Slab Base (5 Foot) 47 Each 113,631.00 2,417.68 604-30010 Manhole Slab Base (10 Foot) 119 Each 381,175.00 3,203.15 604-30015 Manhole Slab Base (15 Foot) 26 Each 95,147.00 3,659.50 604-30020 Manhole Slab Base (20 Foot) 8 Each 40,200.00 5,025.00 604-30025 Manhole Slab Base (25 Foot) 1 Each 5,800.00 5,800.00 604-31000 Manhole Box Base (Special) 2 Each 31,000.00 15,500.00 604-31005 Manhole Box Base (5 Foot) 2 Each 6,153.62 3,076.81 604-31010 Manhole Box Base (10 Foot) 32 Each 212,226.80 6,632.09 604-31015 Manhole Box Base (15 Foot) 21 Each 150,367.08 7,160.34 604-31020 Manhole Box Base (20 Foot) 4 Each 42,984.42 10,746.11 604-31025 Manhole Box Base (25 Foot) 1 Each 13,000.00 13,000.00 604-39000 Manhole Special 8 Each 115,086.00 14,385.75 604-39010 Manhole Special (10 Foot) 4 Each 25,340.00 6,335.00 604-39011 Manhole Special (10 Foot) (Install Only) 3 Each 2,400.00 800.00 604-39015 Manhole Special (15 Foot) 4 Each 30,400.00 7,600.00 604-39020 Manhole Special (20 Foot) 1 Each 3,100.00 3,100.00 604-39050 Manhole (Traffic Management System) 10 Each 22,000.00 2,200.00 604-83108 8 Inch Plastic Pipe Sewer (Polyvinyl Chloride) 329 Lin Foot 17,963.40 54.60 605-00004 4 Inch Non-Perforated Pipe Underdrain 240 Lin Foot 2,576.00 10.73 605-00040 4 Inch Perforated Pipe Underdrain 15,630 Lin Foot 120,381.06 7.70 605-00060 6 Inch Perforated Pipe Underdrain 1,130 Lin Foot 16,600.00 14.69 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 21 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 605-01030 3 Inch Horizontal Drain 6,234 Lin Foot 115,636.56 18.55 605-18000 Strip Drain, Horizontal 330 Lin Foot 775.50 2.35 605-82100 Pipe Edge Drain 21,026 Lin Foot 140,000.01 6.66 605-82200 French Drain 898 Lin Foot 30,675.00 34.16 605-83500 Geocomposite Underdrain 330 Lin Foot 2,887.50 8.75 605-84000 Subsurface Drain Outlet 1,175 Lin Foot 27,279.90 23.22 605-85000 Surface Sand Filter 6,030 Sq Foot 4,281.30 0.71 606-00301 Guardrail Type 3 (6-3 Post Spacing) 112,465 Lin Foot 1,567,775.54 13.94 606-00305 Guardrail Type 3 (Special) 4,900 Lin Foot 72,116.00 14.72 606-00350 Guardrail Type 3 (Double) (6-3 Post Spacing) 463 Lin Foot 9,787.50 21.14 606-00501 Precast Guardrail (Install Only) 2,220 Lin Foot 36,800.00 16.58 606-00601 Guardrail Type 6 (6-3 Post Spacing) 32 Lin Foot 3,360.00 105.00 606-00650 Guardrail Type 6 (Double) (6-3 Post Spacing) 600 Lin Foot 3,000.00 5.00 606-00705 Guardrail Type 7 (Special) 2,698 Lin Foot 630,604.00 233.73 606-00710 Guardrail Type 7 (Style CA) 45,282 Lin Foot 1,919,205.07 42.38 606-00716 Guardrail Type 7 (Style CA) (Special) 5,025 Lin Foot 324,782.00 64.63 606-00720 Guardrail Type 7 (Style CC) 16,456 Lin Foot 534,638.60 32.49 606-00730 Guardrail Type 7 (Style CD) 989 Lin Foot 62,081.05 62.77 606-00740 Guardrail Type 7 (Style CE) 7,269 Lin Foot 308,199.62 42.40 606-00741 Guardrail Type 7 (Style CE) (Special) 67 Lin Foot 6,030.00 90.00 606-00750 Guardrail Type 7 (Style CL) 30 Lin Foot 3,900.00 130.00 606-01340 End Anchorage Type 3D 118 Each 62,647.64 530.91 606-01370 Transition Type 3G 150 Each 177,860.63 1,185.74 606-01380 Transition Type 3H 38 Each 20,563.09 541.13 606-01385 Transition Type 3J 9 Each 6,726.53 747.39 606-01390 End Anchorage Type 3K 12 Each 12,135.01 1,011.25 606-01395 Transition Type 3L 44 Each 30,942.68 703.24 606-01460 Median Terminal 28 Each 90,976.66 3,249.17 606-02000 End Anchorage (Special) 3 Each 3,315.00 1,105.00 606-02003 End Anchorage (Nonflared) 139 Each 246,127.98 1,770.70 606-02005 End Anchorage (Flared) 331 Each 490,994.96 1,483.37 606-10200 Bridge Rail (Special) 252 Lin Foot 9,324.00 37.00 606-10700 Bridge Rail Type 7 4,090 Lin Foot 304,779.03 74.52 606-10705 Bridge Rail Type 7 (Special) 4,470 Lin Foot 384,250.00 85.96 606-10742 Bridge Rail Type 7 (42") 330 Lin Foot 26,400.00 80.00 606-11010 Bridge Rail Type 10R 5,483 Lin Foot 409,218.49 74.63 606-11015 Bridge Rail Type 10R (Special) 775 Lin Foot 106,740.75 137.73 606-11030 Bridge Rail Type 10M 2,070 Lin Foot 281,748.00 136.11 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 22 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 606-11032 Bridge Rail Type 10M (Special) 391 Lin Foot 90,450.00 231.33 606-20010 Tensioned Cable Barrier 91,518 Lin Foot 831,148.92 9.08 606-20013 Tensioned Cable Barrier (TL-3) 2,480 Lin Foot 41,540.00 16.75 606-20014 Tensioned Cable Barrier (TL-4) 68,570 Lin Foot 536,322.50 7.82 606-21010 End Anchorage (Tensioned Cable Barrier) 140 Each 350,140.12 2,501.00 606-99998 Guardrail (Special) 200 Sq Foot 20,000.00 100.00 606-99999 Guardrail Type 7 (Precast) 1,164 Lin Foot 70,849.60 60.87 607-00000 Line Post 60 Each 3,160.00 52.67 607-00005 End Post 343 Each 60,019.48 174.98 607-00010 Corner and Line Brace Post 750 Each 185,676.96 247.57 607-00015 End Post (Special) 26 Each 6,680.00 256.92 607-00020 Corner and Line Brace Post (Special) 78 Each 28,800.00 369.23 607-01000 Fence Barbed Wire with Metal Posts 206,843 Lin Foot 259,884.14 1.26 607-01010 Fence Barbed Wire with Metal Posts (Special) 16,748 Lin Foot 25,947.25 1.55 607-11200 Fence Combination Wire With Metal Posts 19,141 Lin Foot 29,625.00 1.55 607-11300 Fence Combination Wire With Treated Wooden Posts 784 Lin Foot 2,195.20 2.80 607-11350 Fence Deer 30,249 Lin Foot 284,713.00 9.41 607-11360 Fence Deer (Special) 36,228 Lin Foot 284,389.80 7.85 607-11450 Fence Split Cedar 1,201 Lin Foot 10,809.00 9.00 607-11525 Fence (Plastic) 28,743 Lin Foot 69,674.70 2.42 607-11530 Fence (Special) 11,291 Lin Foot 186,347.70 16.50 607-11580 Fence (Temporary) 12,525 Lin Foot 35,305.70 2.82 607-11672 Fence Wood (Sound Barrier) (72 Inch) 388 Lin Foot 30,108.80 77.60 607-15000 Fence Concrete (Sound Barrier) 47,560 Sq Foot 1,802,524.00 37.90 607-21300 Fence Barrier With Metal Posts 211 Lin Foot 633.00 3.00 607-32000 Fence Picket Snow 1,927 Lin Foot 9,153.25 4.75 607-52905 End Post (Chain Link) 3 Each 356.18 118.73 607-52910 Corner and Line Brace Post (Chain Link) 10 Each 1,595.70 159.57 607-53001 Fence Chain Link (PVC Coated) 45 Lin Foot 2,970.00 66.00 607-53137 Fence Chain Link (Special) (36 Inch) 882 Lin Foot 19,010.00 21.55 607-53148 Fence Chain Link (48 Inch) 252 Lin Foot 14,238.00 56.50 607-53161 Fence Chain Link (Special) (60 Inch) 356 Lin Foot 8,900.00 25.00 607-53172 Fence Chain Link (72 Inch) 3,375 Lin Foot 39,087.10 11.58 607-53185 Fence Chain Link (Special) (84 Inch) 16 Lin Foot 592.00 37.00 607-53197 Fence Chain Link (Special) (96 Inch) 354 Lin Foot 17,700.00 50.00 607-55030 Mesh Post 5 Each 23,250.00 4,650.00 607-55031 Mesh Post (Special) 36 Each 48,240.00 1,340.00 607-55040 Mesh Anchor 238 Each 51,652.00 217.03 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 23 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 607-55050 Mesh Anchor (Special) 140 Each 108,349.00 773.92 607-55060 Mesh Pin 30 Each 1,245.00 41.50 607-55100 Wire Mesh 181,025 Sq Foot 267,111.70 1.48 607-55101 Cable Net 87,100 Sq Foot 990,028.00 11.37 607-55102 Cable Net (5/16 Inch) 77,800 Sq Foot 496,160.00 6.38 607-55103 Cable Net (Special) 39,850 Sq Foot 237,280.00 5.95 607-55105 Cable Net Extension 1,200 Sq Foot 12,180.00 10.15 607-56001 Fence (Animal Protection) 1,694 Lin Foot 19,410.00 11.46 607-60001 Pedestrian Gate (Special) 10 Each 5,500.00 550.00 607-60002 Game Ramp 18 Each 126,500.00 7,027.78 607-60112 12 Foot Gate 1 Each 419.60 419.60 607-60116 16 Foot Gate 15 Each 8,120.00 541.33 607-60117 16 Foot Gate (Special) 13 Each 20,716.00 1,593.54 607-60120 20 Foot Gate 3 Each 2,700.00 900.00 607-60121 20 Foot Gate (Special) 1 Each 1,827.00 1,827.00 607-60153 3 Foot Gate (Special) 7 Each 7,602.00 1,086.00 607-60230 30 Foot Gate Single (Chain Link) 2 Each 8,700.00 4,350.00 607-60274 24 Foot Gate Double (Chain Link) 1 Each 1,181.25 1,181.25 607-60316 16 Foot Gate Twin 1 Each 280.00 280.00 607-60320 20 Foot Gate Twin 1 Each 1,500.00 1,500.00 607-61224 24 Foot Gate Double Screen 1 Each 1,770.00 1,770.00 608-00000 Concrete Sidewalk 13,275 Sq Yard 385,187.37 29.02 608-00003 Concrete Sidewalk (Fast Track) 58 Sq Yard 1,557.30 26.85 608-00005 Concrete Sidewalk (Special) 77 Sq Yard 3,465.00 45.00 608-00006 Concrete Sidewalk (6 Inch) 28,172 Sq Yard 816,847.15 29.00 608-00010 Concrete Curb Ramp 3,679 Sq Yard 292,843.02 79.60 608-00011 Curb Ramp (Fast Track) 180 Sq Yard 8,280.00 46.00 608-00012 Curb Ramp (Special) 133 Sq Yard 14,998.00 112.77 608-00015 Truncated Domes 2,689 Sq Foot 120,493.86 44.81 608-00026 Concrete Bikeway (6 Inch) 5,478 Sq Yard 186,043.00 33.96 608-00100 Reinforced Grass/Concrete Porous Pavement 423 Sq Yard 44,415.00 105.00 608-00350 Concrete Sidewalk (Colored) 1,548 Sq Yard 67,028.40 43.30 608-01550 Place Asphalt Millings 19,582 Sq Yard 62,074.94 3.17 608-10000 Sidewalk Drain 23 Lin Foot 5,842.00 254.00 608-10010 Sidewalk Drain 3 Each 1,672.00 557.33 609-20010 Curb Type 2 (Section B) 1,507 Lin Foot 25,911.49 17.19 609-21010 Curb and Gutter Type 2 (Section I-B) 46,338 Lin Foot 479,438.22 10.35 609-21011 Curb and Gutter Type 2 (Section I-M) 6,885 Lin Foot 96,688.43 14.04 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 24 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 609-21020 Curb and Gutter Type 2 (Section II-B) 54,795 Lin Foot 723,800.57 13.21 609-21021 Curb and Gutter Type 2 (Section II-M) 54,243 Lin Foot 566,482.08 10.44 609-21023 Curb and Gutter Type 2 (Section II-B) (Special) 3,614 Lin Foot 55,682.05 15.41 609-21110 Curb and Gutter Type 2 (Section I-B) (Special) 29,138 Lin Foot 281,897.55 9.67 609-23000 Gutter (Special) 728 Lin Foot 24,024.00 33.00 609-24000 Gutter Type 2 Special 928 Lin Foot 33,881.00 36.51 609-24002 Gutter Type 2 (2 Foot) 783 Lin Foot 8,746.00 11.17 609-24003 Gutter Type 2 (3 Foot) 74 Lin Foot 1,628.00 22.00 609-24004 Gutter Type 2 (4 Foot) 282 Lin Foot 5,988.00 21.23 609-24006 Gutter Type 2 (6 Foot) 141 Lin Foot 4,794.00 34.00 609-24008 Gutter Type 2 (8 Foot) 535 Lin Foot 22,673.80 42.38 609-31010 Curb and Gutter Type 2 (Section I-B) (Fast Track) 450 Lin Foot 5,220.00 11.60 609-31020 Curb and Gutter Type 2 (Section II-B) (Fast Track) 6,012 Lin Foot 96,943.80 16.13 609-40011 Curb Type 4 (Section M) 369 Lin Foot 4,059.00 11.00 609-40110 Curb (Median) Type 4 (Section B) 682 Lin Foot 13,844.60 20.30 609-40130 Curb (Median) (Special) 3,338 Lin Foot 52,072.80 15.60 609-60011 Curb Type 6 (Section M) 39,502 Lin Foot 303,089.69 7.67 609-71000 Curb (Special) 2,474 Lin Foot 52,530.24 21.23 610-00010 Median Cover Material (Decorative) 25,997 Sq Foot 152,898.91 5.88 610-00020 Median Cover Material (Patterned Concrete) 121,231 Sq Foot 496,522.11 4.10 610-00024 Median Cover Material (4 Inch Patterned Concrete) 138,619 Sq Foot 525,849.36 3.79 610-00026 Median Cover Material (6 Inch Patterned Concrete) 8,111 Sq Foot 50,991.25 6.29 610-00030 Median Cover Material (Concrete) 38,593 Sq Foot 136,310.44 3.53 610-00040 Median Cover Material (Bituminous) 1,515 Ton 138,001.20 91.09 610-00051 Median Cover Material (Stone) (Special) 22 Ton 2,200.00 100.00 611-00013 12 Foot Deer Guard 2 Each 33,900.00 16,950.00 611-00017 16 Foot Deer Guard 4 Each 91,497.00 22,874.25 611-00019 18 Foot Deer Guard 2 Each 49,000.00 24,500.00 611-00024 24 Foot Cattle Guard 1 Each 17,458.84 17,458.84 611-00025 24 Foot Deer Guard 1 Each 31,000.00 31,000.00 611-00029 28 Ft Deer Guard 3 Each 105,750.00 35,250.00 611-00033 32 Foot Deer Guard 1 Each 40,750.00 40,750.00 611-00085 84 Foot Deer Guard 2 Each 160,541.64 80,270.82 612-00001 Delineator (Type I) 6,324 Each 100,367.31 15.87 612-00002 Delineator (Type II) 1,843 Each 33,028.29 17.92 612-00003 Delineator (Type III) 1,205 Each 22,841.20 18.96 612-00010 Delineator (Special) 20 Each 3,500.00 175.00 612-00021 Delineator (Type I) (Barrier) 43 Each 814.00 18.93 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 25 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 612-00022 Delineator (Type II) (Barrier) 254 Each 2,892.76 11.39 612-00031 Delineator (Type I) (Extra Height) 1,114 Each 23,880.90 21.44 612-00032 Delineator (Type II) (Extra Height) 5 Each 217.50 43.50 612-00033 Delineator (Type III) (Extra Height) 59 Each 2,212.90 37.51 612-00041 Delineator (Flexible) (Type I) 1,823 Each 52,185.40 28.63 612-00042 Delineator (Flexible) (Type II) 200 Each 6,918.20 34.59 612-00043 Delineator (Flexible) (Type III) 432 Each 13,617.70 31.52 612-00060 Reflector (Median Barrier) 45 Each 1,040.00 23.11 612-00070 Reflector Strip (4 Inch) 25 Each 1,000.00 40.00 612-00075 Reflector Strip (6 Inch) 3,997 Each 61,326.60 15.34 612-00260 Location Marker (Fiber Optic)(Dome) 207 Each 13,864.50 66.98 612-00270 Location Marker (Utility)(Flat Slat) 73 Each 1,460.00 20.00 612-01080 Barrier Striping (6 Inch) 5,808 Lin Foot 11,956.00 2.06 612-15000 Install Marker 1 Each 160.00 160.00 613-00025 1-1/4 Inch HDPE Conduit 100 Lin Foot 1,000.00 10.00 613-00026 1-1/4 Inch HDPE Conduit (Bored) 4,209 Lin Foot 41,908.55 9.96 613-00050 1/2 Inch Electrical Conduit 40 Lin Foot 284.40 7.11 613-00075 3/4 Inch Electrical Conduit 505 Lin Foot 3,382.05 6.70 613-00100 1 Inch Electrical Conduit 1,104 Lin Foot 12,234.00 11.08 613-00150 1-1/2 Inch Electrical Conduit 6,136 Lin Foot 36,509.20 5.95 613-00200 2 Inch Electrical Conduit 17,960 Lin Foot 171,653.80 9.56 613-00201 2 Inch Electrical Conduit (Jacked) 1,253 Lin Foot 13,016.95 10.39 613-00206 2 Inch Electrical Conduit (Bored) 204,339 Lin Foot 1,241,988.50 6.08 613-00300 3 Inch Electrical Conduit 1,906 Lin Foot 21,493.60 11.28 613-00301 3 Inch Electrical Conduit (Jacked) 2,100 Lin Foot 24,785.20 11.80 613-00306 3 Inch Electrical Conduit (Bored) 18,781 Lin Foot 231,953.99 12.35 613-00402 4 Inch Electrical Conduit (Install Only) 570 Lin Foot 15,960.00 28.00 613-00408 4 Inch Electrical Conduit (Bored) 600 Lin Foot 13,000.00 21.67 613-00600 6 Inch Electrical Conduit 240 Lin Foot 8,640.00 36.00 613-00602 6 Inch Electrical Conduit (Install Only) 500 Lin Foot 19,000.00 38.00 613-01100 1 Inch Electrical Conduit (Plastic) 1,100 Lin Foot 13,050.00 11.86 613-01200 2 Inch Electrical Conduit (Plastic) 138,433 Lin Foot 1,094,270.15 7.90 613-01201 2 Inch Electrical Conduit (Plastic) (Special) 1,515 Lin Foot 23,081.25 15.24 613-01250 2-1/2 Inch Electrical Conduit (Plastic) 600 Lin Foot 6,600.00 11.00 613-01300 3 Inch Electrical Conduit (Plastic) 13,090 Lin Foot 132,237.30 10.10 613-01301 3 Inch Electrical Conduit (Plastic) (Special) 1,775 Lin Foot 29,287.50 16.50 613-01400 4 Inch Electrical Conduit (Plastic) 11,938 Lin Foot 115,913.00 9.71 613-01600 6 Inch Electrical Conduit (Plastic) 2,532 Lin Foot 43,560.00 17.20 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 26 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 613-03491 Electrical Conduit (Plastic)(Multiduct) 36,777 Lin Foot 182,046.15 4.95 613-03492 Electrical Conduit (Plastic)(Multiduct)(Bored) 25,580 Lin Foot 179,060.00 7.00 613-04120 1 Inch Electrical Conduit (Liquidtight Flexible Metal 80 Lin Foot 3,480.00 43.50 613-04250 2-1/2 Inch Electrical Conduit (Liquidtight Flexible M 160 Lin Foot 5,300.00 33.13 613-05150 Wildlife Detection System 1 Lump Sum 476,000.00 476,000.00 613-06000 Meter Pole 1 Each 1,522.00 1,522.00 613-07000 Pull Box (Special) 141 Each 46,852.76 332.29 613-07016 Pull Box (16"x16"x6") 10 Each 7,400.00 740.00 613-07017 Pull Box (16"x14"x6") 25 Each 22,023.50 880.94 613-07018 Pull Box (18"x12"x8") 12 Each 2,700.00 225.00 613-07023 Pull Box (24"x36"x24") 188 Each 147,115.40 782.53 613-07026 Pull Box (16"x24"x12") 14 Each 10,730.00 766.43 613-07034 Pull Box (24"x36"x18") 163 Each 129,025.50 791.57 613-07038 Pull Box (36"x48"x18") 96 Each 68,930.00 718.02 613-07039 Pull Box (30"x48"x18") 1 Each 1,000.00 1,000.00 613-07040 Pull Box (30"x48"x24") 40 Each 38,276.00 956.90 613-07070 EMS Ball Marker 8 Each 82.88 10.36 613-08100 Electric Vault (6'x5'x6.5') Deep 8 Each 77,032.70 9,629.09 613-10000 Wiring 37 Lump Sum 446,004.38 12,054.17 613-10010 Wiring (Special) 3 Lump Sum 23,900.00 7,966.67 613-12000 Luminaire Fluorescent (Tunnel) 26 Each 8,242.00 317.00 613-15000 Floodlight 8 Each 14,000.00 1,750.00 613-16000 Luminaire (Special) 122 Each 182,310.00 1,494.34 613-16010 Light Standard and Luminaire (Decorative) 12 Each 139,360.00 11,613.33 613-16025 Luminaire (Special) (LED) (Step Light) 23 Each 27,600.00 1,200.00 613-30005 Light Standard and Luminaire (Pedestrian) 95 Each 284,800.00 2,997.89 613-30300 Light Standard Aluminum (30 Foot) 8 Each 13,840.00 1,730.00 613-30350 Light Standard Aluminum (35 Foot) 1 Each 3,856.00 3,856.00 613-30352 Light Standard Aluminum (35 Foot) (2-Arm) 11 Each 19,800.00 1,800.00 613-32300 Light Standard Steel (30 Foot) 4 Each 9,720.00 2,430.00 613-32350 Light Standard Steel (35 Foot) 20 Each 70,280.00 3,514.00 613-32400 Light Standard Steel (40 Foot) 2 Each 4,400.00 2,200.00 613-34180 Light Standard Metal (18 Foot) 19 Each 45,600.00 2,400.00 613-34300 Light Standard Metal (30 Foot) 10 Each 30,000.00 3,000.00 613-34302 Light Standard Metal (30 Foot) (2 Arm) 4 Each 10,254.52 2,563.63 613-34350 Light Standard Metal (35 Foot) 85 Each 272,602.00 3,207.08 613-34353 Light Standard Metal (35 Foot) (2 Arm) 28 Each 77,500.00 2,767.86 613-34400 Light Standard Metal (40 Foot) 79 Each 192,676.32 2,438.94 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 27 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 613-40000 Concrete Foundation Pad 43 Each 41,645.00 968.49 613-40010 Light Standard Foundation 226 Each 192,543.06 851.96 613-40012 Light Standard Foundation Special 93 Each 41,850.00 450.00 613-40020 Transformer Base Aluminum 11 Each 3,300.00 300.00 613-50010 Photoelectric Cell 2 Each 108.00 54.00 613-50100 Lighting Control Center 17 Each 110,303.30 6,488.43 613-50105 Lighting Control Center (Pedestal Only) 12 Each 32,279.60 2,689.97 613-50150 Secondary Service Pedestal 1 Each 416.00 416.00 613-50210 Temporary Lighting 2 Lump Sum 19,900.00 9,950.00 613-50375 Solar Collection System 6 Each 84,000.00 14,000.00 613-70150 Luminaire High Pressure Sodium (150 Watt) 33 Each 59,058.00 1,789.64 613-70250 Luminaire High Pressure Sodium (250 Watt) 230 Each 150,277.50 653.38 613-70400 Luminaire High Pressure Sodium (400 Watt) 77 Each 26,593.77 345.37 613-72150 Luminaire High Pressure Sodium (Wall Type) (150 Watt) 8 Each 4,176.00 522.00 613-74000 Light Mast Arm 8 Each 12,800.00 1,600.00 614-00011 Sign Panel (Class I) 5,697 Sq Foot 86,112.04 15.12 614-00012 Sign Panel (Class II) 10,221 Sq Foot 181,712.18 17.78 614-00013 Sign Panel (Class III) 10,842 Sq Foot 262,829.53 24.24 614-00026 Sign Panel (Class I) (Install Only) 8 Each 182.00 22.75 614-00035 Sign Panel (Special) 47 Sq Foot 1,698.90 36.15 614-00040 Sign Post (Special) 44 Lin Foot 1,496.00 34.00 614-00044 Timber Sign Post 4x4 Inch 75 Lin Foot 651.00 8.68 614-00200 Steel Sign Post (U-2) 5,245 Lin Foot 21,146.36 4.03 614-00214 Steel Sign Post (1.75x1.75 Inch Tubing) 132 Lin Foot 2,112.00 16.00 614-00216 Steel Sign Post (2x2 Inch Tubing) 1,351 Lin Foot 16,587.50 12.28 614-00612 Steel Sign Post (W 6x12) 362 Lin Foot 13,700.00 37.85 614-00615 Steel Sign Post (W 6x15) 502 Lin Foot 21,291.70 42.41 614-00818 Steel Sign Post (W 8x18) 283 Lin Foot 16,161.50 57.11 614-00821 Steel Sign Post (W 8x21) 108 Lin Foot 7,164.00 66.33 614-01022 Steel Sign Post (W 10x22) 34 Lin Foot 1,836.00 54.00 614-01026 Steel Sign Post (W 10x26) 284 Lin Foot 18,571.50 65.39 614-01226 Steel Sign Post (W 12x26) 66 Lin Foot 3,696.00 56.00 614-01502 Steel Sign Support (2-Inch Round)(Post & Socket) 110 Lin Foot 1,870.00 17.00 614-01503 Steel Sign Support (2-Inch Round)(Post and Socket) 160 Each 15,551.61 97.20 614-01512 Steel Sign Support (2-Inch Round)(Post) 1,423 Lin Foot 10,808.27 7.60 614-01522 Steel Sign Support (2-Inch Round)(Socket) 144 Each 6,708.58 46.59 614-01554 Steel Sign Post (4 Inch Round) (Slipbase) 86 Lin Foot 11,610.00 135.00 614-01572 Steel Sign Support (2-1/2 Inch Round NP-40)(Post & Sl 155 Lin Foot 6,782.20 43.76 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 28 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-01573 Steel Sign Support (2-1/2 Inch Round NP-40)(Post & Sl 332 Each 102,732.97 309.44 614-01575 Steel Sign Support (2-1/2 Inch Round NP-40)(Post) 1,447 Lin Foot 27,985.66 19.34 614-01578 Steel Sign Support (2-1/2 Inch Round NP-40)(Slipbase) 100 Each 21,126.33 211.26 614-01582 Steel Sign Support (2-1/2 Inch Round)(Post and Slipba 306 Lin Foot 13,464.00 44.00 614-01583 Steel Sign Support (2-1/2 Inch Round)(Post & Slipbase 215 Each 84,255.79 391.89 614-01585 Steel Sign Support (2-1/2 Inch Round Sch 80) (Post) 2,085 Lin Foot 41,309.50 19.81 614-01588 Steel Sign Support (2-1/2 Inch Round Sch 80)(Slipbase 184 Each 38,975.94 211.83 614-03001 Concrete Footing (Type 1) 34 Each 38,860.00 1,142.94 614-03002 Concrete Footing (Type 2) 26 Each 34,676.00 1,333.69 614-03003 Concrete Footing (Type 3) 16 Each 23,040.00 1,440.00 614-03004 Concrete Footing (Type 4) 6 Each 8,180.00 1,363.33 614-03005 Concrete Footing (Type 5) 4 Each 8,240.00 2,060.00 614-03006 Concrete Footing (Type 6) 12 Each 19,040.00 1,586.67 614-03007 Concrete Footing (Type 7) 3 Each 4,950.00 1,650.00 614-07000 Mask Sign Legend 1 Each 318.00 318.00 614-07105 Modification of Sign Legend 3 Each 783.00 261.00 614-10110 LED Warning Sign System (_Signs) 6 Each 30,000.00 5,000.00 614-10120 Variable Message Sign 1 Each 98,706.00 98,706.00 614-10122 Portable Message Sign Panel (Special) 1 Each 19,000.05 19,000.05 614-10125 Variable Message Sign (Ground Mounted) 1 Each 103,250.00 103,250.00 614-10129 Blankout Sign (Fiber Optic) (Variable Speed Limit) 1 Each 9,900.00 9,900.00 614-10138 Full Matrix Variable Message Sign LED (Ground Mounted 2 Each 100,000.00 50,000.00 614-10146 Variable Message Sign (LED) (Ground Mounted) 3 Each 52,800.00 17,600.00 614-10147 Variable Message Sign LED (Overhead) 5 Each 612,412.00 122,482.40 614-10148 Variable Message Sign LED (Speed Radar) 7 Each 147,000.00 21,000.00 614-10160 Signal Head Backplates 22 Each 2,310.00 105.00 614-10320 System Integration and Testing 1 Lump Sum 10,000.00 10,000.00 614-30110 Butterfly Structure 2 Each 45,639.48 22,819.74 614-30205 VMS Butterfly Support (Roadside) 1 Each 17,600.00 17,600.00 614-31275 Monotube Overhead Sign Cantilever (12.75 Inch Diamete 1 Each 18,000.00 18,000.00 614-31600 Monotube Overhead Sign Cantilever (16 Inch Diameter) 3 Each 78,770.60 26,256.87 614-31800 Monotube Overhead Sign Cantilever (18 Inch Diameter) 7 Each 145,047.44 20,721.06 614-32000 Monotube Overhead Sign Cantilever (20 Inch Diameter) 7 Each 201,171.52 28,738.79 614-32400 Monotube Overhead Sign Cantilever (24 Inch Diameter) 12 Each 352,471.40 29,372.62 614-41800 Monotube Overhead Sign Bridge (18 Inch Diameter) 2 Each 100,000.00 50,000.00 614-42000 Monotube Overhead Sign Bridge (20 Inch Diameter) 1 Each 41,285.09 41,285.09 614-50010 Downhill Truck Speed Advisory System 1 Each 165,000.00 165,000.00 614-70000 Programmable Traffic Signal Face 4 Each 13,644.00 3,411.00 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 29 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-70117 Pedestrian Signal Face (16) 128 Each 59,200.00 462.50 614-70150 Pedestrian Signal Face (16) (Countdown) 152 Each 80,020.00 526.45 614-70216 Traffic Signal Face (8-8) 6 Each 2,433.78 405.63 614-70328 Traffic Signal Face (12-8-8) 6 Each 3,650.70 608.45 614-70336 Traffic Signal Face (12-12-12) 451 Each 281,650.40 624.50 614-70448 Traffic Signal Face (12-12-12-12) 6 Each 4,203.34 700.56 614-70450 Traffic Signal Face (12-12-12-12)(Install Only) 2 Each 500.00 250.00 614-70560 Traffic Signal Face (12-12-12-12-12) 57 Each 56,060.50 983.52 614-72740 Blank Out Sign(LED)(Single Faced) 8 Each 103,200.00 12,900.00 614-72765 Traffic Signal (24 Inch x 24 Inch Blankout LED Sign) 2 Each 10,000.00 5,000.00 614-72830 Communications Cabinet 3 Each 5,025.00 1,675.00 614-72855 Traffic Signal Controller Cabinet 6 Each 79,398.39 13,233.07 614-72858 Pedestal Pole (3 Foot 6 Inch) 6 Each 5,959.50 993.25 614-72860 Pedestrian Push Button 68 Each 10,600.00 155.88 614-72861 Pedestrian Push Button (Install Only) 4 Each 88.00 22.00 614-72862 Pedestrian Push Button (3 foot 6 In) (Install Only) 9 Each 8,370.00 930.00 614-72864 Fire Preemption Unit 2 Each 6,550.00 3,275.00 614-72866 Fire Preemption Unit and Timer 8 Each 39,993.00 4,999.13 614-72871 Loop Detector Wire (Prefab) Special 10,372 Lin Foot 79,565.20 7.67 614-72872 Loop Detector (Micro Type) 4 Each 3,902.00 975.50 614-72875 Loop Detector Wire 22,166 Lin Foot 76,155.36 3.44 614-72876 Traffic Signal Vehicle Detector Amplifier (Loop Type) 8 Each 2,604.00 325.50 614-72878 Traffic Signal Vehicle Detector Amplifier (Loop Type) 18 Each 12,957.76 719.88 614-72880 Traffic Signal Vehicle Detector Amplifier (Loop Type) 2 Each 4,000.00 2,000.00 614-72882 Traffic Signal Vehicle Detector (Micro Type) 2 Each 1,180.00 590.00 614-72885 Traffic Signal Vehicle Detector (Special) 2 Each 4,600.00 2,300.00 614-72886 Intersection Detection System (Camera) 40 Each 218,844.42 5,471.11 614-72887 Microwave Vehicle Radar Detector 13 Each 108,860.90 8,373.92 614-72889 Traffic Signal Vehicle Detector (Micro Type) (Non-Inv 16 Each 14,052.00 878.25 614-72895 Vehicle Detection System (Single Camera) 14 Each 87,206.00 6,229.00 614-72896 Intersection Detection System (Camera)(Install Only) 14 Each 14,750.00 1,053.57 614-75216 Pedestrian Signal Face (16) (Install Only) 4 Each 560.00 140.00 614-75336 Traffic Signal Face (12-12-12) (Install Only) 6 Each 1,200.00 200.00 614-75848 Traffic Signal Controller and Cabinet (Install Only) 4 Each 2,705.00 676.25 614-75855 Traffic Signal Controller Cabinet (Install Only) 1 Each 2,300.00 2,300.00 614-75868 Fire Preemption Unit (Install Only) 6 Each 3,300.00 550.00 614-80000 Flashing Beacon 25 Each 35,225.40 1,409.02 614-80001 Flashing Beacon (Solar Powered) 23 Each 88,055.00 3,828.48 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 30 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-80010 Travel Time Indicator 5 Each 7,475.00 1,495.00 614-80311 Barricade (Type 3 F-A) 1 Each 700.00 700.00 614-80312 Barricade (Type 3 F-B) 1 Each 500.00 500.00 614-80321 Barricade (Type 3 M-A) 4 Each 44.00 11.00 614-80385 Rumble Strip 926,385 Lin Foot 166,579.73 0.18 614-80391 Rumble Strip (Grinding)(Asphalt) 173,367 Lin Foot 21,411.30 0.12 614-81011 Traffic Signal-Light Pole Steel (1 Mast Arm) (Install 12 Each 41,200.00 3,433.33 614-81120 Traffic Signal-Light Pole Steel (1-20 Foot Mast Arm) 1 Each 11,809.00 11,809.00 614-81125 Traffic Signal-Light Pole Steel (1-25 Foot Mast Arm) 9 Each 90,747.00 10,083.00 614-81130 Traffic Signal-Light Pole Steel (1-30 Foot Mast Arm) 9 Each 90,588.00 10,065.33 614-81135 Traffic Signal-Light Pole Steel (1-35 Foot Mast Arm) 6 Each 66,864.00 11,144.00 614-81140 Traffic Signal-Light Pole Steel (1-40 Foot Mast Arm) 7 Each 85,308.93 12,186.99 614-81145 Traffic Signal-Light Pole Steel (1-45 Foot Mast Arm) 6 Each 68,165.00 11,360.83 614-81150 Traffic Signal-Light Pole Steel (1-50 Foot Mast Arm) 14 Each 165,969.10 11,854.94 614-81155 Traffic Signal-Light Pole Steel (1-55 Foot Mast Arm) 8 Each 98,158.00 12,269.75 614-81160 Traffic Signal Light Pole Steel (1-60 Mast Arm Foot) 4 Each 69,394.00 17,348.50 614-81165 Traffic Signal-Light Pole Steel (1-65 Foot Mast Arm) 5 Each 75,443.43 15,088.69 614-81175 Traffic Signal-Light Pole Steel (1-75 Foot Mast Arm) 4 Each 87,298.00 21,824.50 614-81240 Traffic Signal-Light Pole Steel (2-40 Foot Mast Arm) 1 Each 22,000.00 22,000.00 614-81260 Traffic Signal Light Pole Steel (2-60 Foot Mast Arm) 1 Each 30,000.00 30,000.00 614-81265 Traffic Signal-Light Pole Steel (2-65 Foot Mast Arm) 1 Each 31,000.00 31,000.00 614-82010 Traffic Signal Pole Steel (1 Mast Arm) 6 Each 67,466.00 11,244.33 614-82011 Traffic Signal Pole Steel (1 Mast Arm) (Install Only) 5 Each 22,900.00 4,580.00 614-84000 Traffic Signal Pedestal Pole Steel 16 Each 21,967.81 1,372.99 614-84100 Traffic Signal Pedestal Pole Aluminum 16 Each 22,820.72 1,426.30 614-85001 Impact Attenuator 9 Each 203,178.00 22,575.33 614-85003 Impact Attenuator (Low Maintenance) 12 Each 234,395.76 19,532.98 614-86000 Traffic Signal Controller (Master) 2 Each 28,020.00 14,010.00 614-86002 Spread Spectrum Radio 1 Each 2,068.00 2,068.00 614-86105 Telemetry (Field) 16 Each 56,635.00 3,539.69 614-86106 Telemetry (Field)(Install Only) 1 Each 425.00 425.00 614-86239 Traffic Signal Controller (Solid State) (Full-Actuate 3 Each 7,173.00 2,391.00 614-86245 Controller (Type 170E) 1 Each 21,150.00 21,150.00 614-86246 Controller (Type 170E-HC11) 12 Each 217,515.75 18,126.31 614-86250 Ramp Metering Controller 5 Each 41,737.98 8,347.60 614-86741 Weather Monitoring System 2 Each 94,800.00 47,400.00 614-86752 Fold-Over Tower (ITS) 2 Each 16,770.00 8,385.00 614-86756 Anti-Icing System 1 Lump Sum 400,000.00 400,000.00 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 31 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-86800 Uninterrupted Power Supply 6 Each 32,789.50 5,464.92 614-87006 Fiber Optic Termination Panel - 6 Fiber 6 Each 1,420.00 236.67 614-87010 Fiber Optic Cable (Single Mode) (12 Fiber) 16,640 Lin Foot 52,545.50 3.16 614-87011 Fiber Optic Cable (Single Mode) (24 Fiber) 410 Lin Foot 1,886.00 4.60 614-87015 Buffer Tube Fan Out Kit 6 Each 1,235.00 205.83 614-87020 Optical Transceiver 51 Each 82,226.30 1,612.28 614-87021 Optic Transceiver (Install Only) 59 Each 5,725.00 97.03 614-87025 Optical Transceiver Chassis 2 Each 2,440.00 1,220.00 614-87028 Video Optical Transceiver 21 Each 45,756.00 2,178.86 614-87144 Fiber Optic Termination Panel-144 Fiber 1 Each 5,995.00 5,995.00 614-87320 Closed Circuit Television 16 Each 57,516.82 3,594.80 614-87325 Closed Circuit Television Pole 8 Each 23,516.58 2,939.57 614-87333 Closed Circuit Television Camera (Traffic Surveillanc 3 Each 8,625.00 2,875.00 614-87350 Test Fiber Optic Cable 13 Lump Sum 46,856.11 3,604.32 614-87401 Fiber Optic Cable (Special) 76,700 Lin Foot 38,350.00 0.50 614-87406 Fiber Optic Cable (Single Mode) (6 Strands) 8,980 Lin Foot 27,628.75 3.08 614-87407 Fiber Optic Cable (Multi Mode) (6 Strands) 500 Lin Foot 4,000.00 8.00 614-87412 Fiber Optic Cable (Single Mode) (12 Strands) (Install 7,431 Lin Foot 4,029.63 0.54 614-87413 Fiber Optic Cable (Multi Mode) (12 Strands) 500 Lin Foot 2,250.00 4.50 614-87424 Fiber Optic Cable (Single Mode) (24 Strands) 1,940 Lin Foot 5,387.50 2.78 614-87495 Fiber Optic Cable (Single Mode) (96 Strands) (Install 139,025 Lin Foot 70,537.50 0.51 614-87496 Fiber Optic Cable (Single Mode) (96 Strands) 107,350 Lin Foot 176,881.50 1.65 614-87497 Fiber Optic Cable (Multi Mode) (96 Stands) 1,000 Lin Foot 7,350.00 7.35 614-87498 Fiber Optic Cable (Single Mode) (144 Strands) 68,800 Lin Foot 124,528.00 1.81 614-87499 Fiber Optic Cable (Single Mode) (Install Only) 4,050 Lin Foot 6,503.50 1.61 614-87506 Splice Fiber Optic Cable (6 Strand) 156 Each 33,187.12 212.74 614-87524 Splice Fiber Optic Cable (24 Strand) 2 Each 2,500.00 1,250.00 614-87548 Splice Fiber Optic Cable (48 Strand) 1 Each 3,045.00 3,045.00 614-87660 Video Enc/Dec 2 Each 19,900.00 9,950.00 615-00030 Embankment Protector Type 3 39 Each 73,534.43 1,885.50 615-00050 Embankment Protector Type 5 23 Each 21,982.08 955.74 615-00150 Embankment Protector (Special) 4 Each 17,871.00 4,467.75 615-21805 18 Inch Slide Headgate (5 Foot Frame) 2 Each 4,460.00 2,230.00 615-80000 Stream Restoration 1 Lump Sum 750,000.00 750,000.00 616-00240 24 Inch Concrete Siphon Pipe 60 Lin Foot 8,400.00 140.00 616-21180 18 Inch Welded Steel Siphon Pipe 154 Lin Foot 27,412.00 178.00 616-21240 24 Inch Welded Steel Siphon Pipe 154 Lin Foot 28,798.00 187.00 616-30018 18 Inch Trash Guard 2 Each 800.00 400.00 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 32 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 616-30024 24 Inch Trash Guard 4 Each 1,940.00 485.00 616-30036 36 Inch Trash Guard 3 Each 3,404.00 1,134.67 616-30499 Trash Guard Special 2 Each 18,000.00 9,000.00 616-50032 4 Inch Valve and Valve Box 3 Each 3,039.00 1,013.00 617-00012 12 Inch Culvert Pipe 206 Lin Foot 4,171.50 20.25 617-00018 18 Inch Culvert Pipe 72 Lin Foot 5,256.00 73.00 617-03000 Detour Culvert Pipe 1 Lump Sum 10,000.00 10,000.00 618-00142 Prestressed Concrete I (BT42) 4,411 Lin Foot 529,320.00 120.00 618-00163 Prestressed Concrete I (BT63) 631 Lin Foot 132,510.00 210.00 618-01992 Prestressed Concrete Box (Depth Less Than 32 Inches) 13,388 Sq Foot 535,520.00 40.00 618-01994 Prestressed Concrete Box (Depth 32" Through 48") 33,102 Sq Foot 1,697,926.00 51.29 618-01996 Prestressed Concrete Box (Depth Greater Than 48 Inche 30,505 Sq Foot 1,365,098.75 44.75 618-05025 Prestressed Concrete Unit (Special) 272 Sq Foot 42,222.00 155.23 618-06034 Prestressed Concrete Slab (Depth 6" Through 13") 5,100 Sq Foot 295,800.00 58.00 618-08900 Ground Anchor 9,410 Lin Foot 379,062.20 40.28 618-09030 Performance Test 9 Each 75,600.00 8,400.00 618-09040 Anchor Test 3 Each 2,400.00 800.00 618-10000 Precast Concrete U Girder (Pre-Tensioned) 2,341 Lin Foot 819,350.00 350.00 619-00001 Water Meter 66 Each 29,535.00 447.50 619-00007 Connect To Existing Waterline 2 Each 5,400.00 2,700.00 619-06060 6 Inch Ductile Iron Pipe 70 Lin Foot 13,340.00 190.57 619-06080 8 Inch Ductile Iron Pipe 96 Lin Foot 12,260.00 127.71 619-06100 10 Inch Ductile Iron Pipe 30 Lin Foot 9,240.00 308.00 619-06120 12 Inch Ductile Iron Pipe 991 Lin Foot 94,125.00 94.98 619-06160 16 Inch Ductile Iron Pipe 2,010 Lin Foot 182,910.00 91.00 619-06161 16 Inch Ductile Iron Pipe (Auger Bored) 180 Lin Foot 10,980.00 61.00 619-06240 24 Inch Ductile Iron Pipe 197 Lin Foot 96,530.00 490.00 619-10000 Temporary Water Line 337 Lin Foot 43,810.00 130.00 619-10060 6 Inch Welded Steel Pipe 168 Lin Foot 67,200.00 400.00 619-10187 18 Inch Welded Steel Pipe (Jacked) 110 Lin Foot 38,500.00 350.00 619-10220 22 Inch Welded Steel Pipe 10 Lin Foot 2,000.00 200.00 619-10247 24 Inch Welded Steel Pipe (Jacked) 207 Lin Foot 74,277.28 358.83 619-10270 27 Inch Welded Steel Pipe 849 Lin Foot 254,700.00 300.00 619-10307 30 Inch Welded Steel Pipe (Jacked) 225 Lin Foot 78,750.00 350.00 619-10600 60 Inch Welded Steel Pipe 80 Lin Foot 48,800.00 610.00 619-10607 60 Inch Welded Steel Pipe (Jacked) 80 Lin Foot 149,840.00 1,873.00 619-40060 3/4 Inch Copper Pipe 3,638 Lin Foot 48,385.40 13.30 619-40080 1 Inch Copper Pipe 214 Lin Foot 3,789.00 17.71 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 33 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 619-40120 1-1/2 Inch Copper Pipe 14 Lin Foot 1,355.20 96.80 619-50060 3/4 Inch Plastic Pipe 6,200 Lin Foot 6,200.00 1.00 619-50080 1 Inch Plastic Pipe 7,843 Lin Foot 23,235.60 2.96 619-50120 1-1/2 Inch Plastic Pipe 7,950 Lin Foot 29,812.50 3.75 619-50160 2 Inch Plastic Pipe 7,320 Lin Foot 25,100.00 3.43 619-50240 3 Inch Plastic Pipe 1,142 Lin Foot 5,652.90 4.95 619-50320 4 Inch Plastic Pipe 2,485 Lin Foot 28,630.00 11.52 619-50480 6 Inch Plastic Pipe 185 Lin Foot 3,700.00 20.00 619-50640 8 Inch Plastic Pipe 121 Lin Foot 10,285.00 85.00 619-50960 12 Inch Plastic Pipe 664 Lin Foot 53,120.00 80.00 619-51280 16 Inch Plastic Pipe 91 Lin Foot 10,010.00 110.00 619-51290 18 Inch Plastic Pipe 1,837 Lin Foot 202,070.00 110.00 619-71508 1 Inch Air and Vacuum Valve 1 Each 2,100.00 2,100.00 619-71516 2 Inch Air and Vacuum Valve 4 Each 18,800.00 4,700.00 619-72644 18 Inch Pressure Regulating Valve 1 Each 44,000.00 44,000.00 619-73008 1 Inch Blow Off 2 Each 900.00 450.00 619-73016 2 Inch Blow Off 3 Each 6,620.00 2,206.67 619-73048 6 Inch Tangential Blow Off 4 Each 14,400.00 3,600.00 619-73050 6 Inch Blow Off Valve and Vault 1 Each 14,000.00 14,000.00 619-75048 6 Inch Gate Valve 5 Each 7,804.00 1,560.80 619-75064 8 Inch Gate Valve 3 Each 3,998.00 1,332.67 619-75096 12 Inch Gate Valve 13 Each 29,400.00 2,261.54 619-75116 16 Inch Gate Valve 15 Each 133,995.00 8,933.00 619-76128 16 Inch Butterfly Valve 1 Each 5,200.00 5,200.00 619-76144 18 Inch Butterfly Valve 4 Each 25,600.00 6,400.00 619-76192 24 Inch Butterfly Valve 1 Each 11,000.00 11,000.00 619-77300 Corporation Stop 2 Each 3,460.00 1,730.00 619-77400 Curb Stop and Box 66 Each 6,633.00 100.50 619-78048 6 Inch Fire Hydrant 8 Each 94,394.00 11,799.25 620-00001 Field Office (Class 1) 13 Each 147,707.01 11,362.08 620-00002 Field Office (Class 2) 57 Each 1,058,057.21 18,562.41 620-00005 Field Office (Special) 4 Each 94,767.00 23,691.75 620-00011 Field Laboratory (Class 1) 7 Each 63,100.00 9,014.29 620-00012 Field Laboratory (Class 2) 71 Each 1,026,974.91 14,464.44 620-00020 Sanitary Facility 154 Each 215,673.41 1,400.48 621-00425 Detour 4 Lump Sum 664,717.26 166,179.32 621-00450 Detour Pavement 88,576 Sq Yard 2,516,378.66 28.41 621-00500 Temporary Bridge 1 Lump Sum 46,000.00 46,000.00 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 34 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 621-00600 Pedestrian Overpass 1 Lump Sum 132,000.00 132,000.00 622-00024 Entry Sign 1 Each 25,000.00 25,000.00 622-00155 Planter Box (Special) 1 Each 750.00 750.00 622-00250 Bench 2 Each 3,200.00 1,600.00 622-00270 Bollard 4 Each 1,600.00 400.00 622-00715 Monitoring Wells 250 Lin Foot 12,500.00 50.00 623-00156 Irrigation Bubbler 2,233 Each 20,208.65 9.05 623-00164 Drip Emitter 2,700 Each 2,295.00 0.85 623-00186 3/4 Inch Flush Unit 39 Each 429.00 11.00 623-00187 3/4 Inch Air Relief Unit 4 Each 93.60 23.40 623-00205 4 Inch Pop-Up Spray Sprinkler 18 Each 270.00 15.00 623-00332 4 Inch Pop-Up Rotary Sprinkler 17 Each 510.00 30.00 623-00610 10 Inch Plastic Pipe 330 Lin Foot 10,725.00 32.50 623-01708 1 Inch Backflow Preventer 4 Each 5,869.00 1,467.25 623-02008 1 Inch Drain Valve 4 Each 93.60 23.40 623-02016 2 Inch Drain Valve 1 Each 450.00 450.00 623-03008 1 Inch Manual Control Valve 33 Each 1,485.00 45.00 623-03106 3/4 Inch Automatic Control Valve 6 Each 1,110.00 185.00 623-03108 1 Inch Automatic Control Valve 21 Each 2,650.20 126.20 623-03110 1-1/4 Inch Automatic Control Valve 2 Each 7,600.00 3,800.00 623-03112 1-1/2 Inch Automatic Control Valve 16 Each 1,345.60 84.10 623-04000 Control Wire 24 Volt 148,511 Lin Foot 27,377.20 0.18 623-04002 Power Source Wire 620 Lin Foot 713.00 1.15 623-04003 Controller Communication Cable 3,900 Lin Foot 3,315.00 0.85 623-04008 1 Inch Quick-Coupler Valve 30 Each 6,611.30 220.38 623-05008 1 Inch Gate Valve 4 Each 163.60 40.90 623-05016 2 Inch Gate Valve 14 Each 3,080.00 220.00 623-07008 1 Inch Water Meter 2 Each 5,258.00 2,629.00 623-07500 Soil Moisture Sensor 2 Each 526.00 263.00 623-07600 1-1/2 Inch Flow Sensor 2 Each 280.00 140.00 623-07601 1 Inch Flow Sensor 2 Each 1,900.00 950.00 623-08112 12 Station Automatic Controller 2 Each 9,600.00 4,800.00 623-08124 24 Station Automatic Controller 2 Each 14,022.00 7,011.00 623-08200 Master Controller 3 Each 11,902.00 3,967.33 623-09900 Sprinkler System 3 Lump Sum 126,012.70 42,004.23 624-12024 24 Inch Culvert Pipe (CR 2) 186 Lin Foot 19,530.00 105.00 624-20012 12 Inch Drainage Pipe (Class 0) 690 Lin Foot 28,290.00 41.00 624-20018 18 Inch Drainage Pipe (Class 0) 437 Lin Foot 25,491.50 58.33 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 35 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 624-20024 24 Inch Drainage Pipe (Class 0) 200 Lin Foot 6,840.00 34.20 624-20300 Detour Drainage Pipe (Class 0) 72 Lin Foot 3,350.16 46.53 624-20301 Detour Drainage Pipe (Class 0) 4 Lump Sum 102,200.00 25,550.00 624-22024 24 Inch Drainage Pipe (Class 2) 40 Lin Foot 4,800.00 120.00 624-23036 36 Inch Drainage Pipe (Class 3) 136 Lin Foot 13,056.00 96.00 624-23060 60 Inch Drainage Pipe (Class 3) 127 Lin Foot 22,860.00 180.00 624-25018 18 Inch Drainage Pipe (Class 5) 40 Lin Foot 8,000.00 200.00 624-25024 24 Inch Drainage Pipe (Class 5) 30 Lin Foot 6,750.00 225.00 624-25036 36 Inch Drainage Pipe (Class 5) 2,705 Lin Foot 622,150.00 230.00 624-25048 48 Inch Drainage Pipe (Class 5) 272 Lin Foot 68,000.00 250.00 624-27018 18 Inch Drainage Pipe (Class 7) 560 Lin Foot 37,520.00 67.00 624-27036 36 Inch Drainage Pipe (Class 7) 529 Lin Foot 92,575.00 175.00 624-28016 15 Inch Drainage Pipe (Class 8) (Complete in Place) 652 Lin Foot 25,297.60 38.80 624-28019 18 Inch Drainage Pipe (Class 8) (Complete in Place) 1,308 Lin Foot 47,742.00 36.50 624-28025 24 Inch Drainage Pipe (Class 8) (Complete in Place) 376 Lin Foot 16,769.60 44.60 624-28031 30 Inch Drainage Pipe (Class 8) (Complete in Place) 343 Lin Foot 20,305.60 59.20 624-28037 36 Inch Drainage Pipe (Class 8) (Complete in Place) 332 Lin Foot 26,460.40 79.70 624-28043 42 Inch Drainage Pipe (Class 8) (Complete in Place) 18 Lin Foot 2,304.00 128.00 624-28049 48 Inch Drainage Pipe (Class 8) (Complete in Place) 79 Lin Foot 8,769.00 111.00 624-28055 54 Inch Drainage Pipe (Class 8) (Complete in Place) 725 Lin Foot 110,925.00 153.00 624-29036 36 Inch Drainage Pipe (Class 9) 104 Lin Foot 15,808.00 152.00 624-29048 48 Inch Drainage Pipe (Class 9) 136 Lin Foot 41,854.00 307.75 624-47024 24 Inch Equivalent Drainage Pipe Elliptical (Class 7) 108 Lin Foot 16,200.00 150.00 624-47042 42 Inch Equivalent Drainage Pipe Elliptical (Class 7) 176 Lin Foot 52,800.00 300.00 624-48043 42 In Equivalent Drainage Pipe Elliptical (Class 8) 528 Lin Foot 63,360.00 120.00 624-48055 54 Inch Equivalent Drainage Pipe Elliptical (Class 8) 480 Lin Foot 83,760.00 174.50 625-00000 Construction Surveying 72 Lump Sum 1,780,171.62 24,724.61 625-00001 Construction Surveying (Hourly) 1,256 Hour 121,462.20 96.71 625-00015 Settlement Instrumentation 2 Lump Sum 21,900.00 10,950.00 626-00000 Mobilization 122 Lump Sum 21,196,010.43 173,737.79 626-01000 Public Information Services 68 Lump Sum 527,946.17 7,763.91 627-00001 Pavement Marking Paint 21,890 Gallon 583,641.09 26.66 627-00002 Thermoplastic Pavement Marking 2,606 Sq Foot 6,619.24 2.54 627-00003 Thermoplastic Pavement Marking (Inlaid) 4,888 Sq Foot 56,826.00 11.63 627-00005 Epoxy Pavement Marking 33,412 Gallon 1,945,196.05 58.22 627-00011 Pavement Marking Paint (Waterborne) 9,124 Gallon 306,610.02 33.60 627-00012 Pavement Marking Paint (Low VOC Solvent Base) 13,093 Gallon 382,698.84 29.23 627-00025 4 Inch Pavement Marking Tape (Removable) 1,000 Lin Foot 5,000.00 5.00 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 36 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 627-00026 8 In Pavement Marking Tape (Removable) 250 Lin Foot 5,500.00 22.00 627-00030 Raised Pavement Marker (Temporary) 8,641 Each 18,893.75 2.19 627-00031 Raised Pavement Marker 92 Each 920.00 10.00 627-00032 Raised Flexible Pavement Marker (Temporary) 4,281 Each 4,281.00 1.00 627-00060 Preformed Plastic Pavement Marking (60 Mils) 3,507 Sq Foot 30,510.90 8.70 627-00080 Polyurea Pavement Marking (Inlaid) 1,750 Gallon 341,250.00 195.00 627-00090 Pavement Marking (Special) 9,240 Sq Foot 81,312.00 8.80 627-01001 Preformed Plastic Pavement Marking (Type I) 27,995 Sq Foot 259,187.88 9.26 627-01010 Preformed Plastic Pavement Marking (Type I)(Inlaid) 58,066 Sq Foot 532,543.40 9.17 627-02001 Preformed Plastic Pavement Marking (Type II) 17,655 Sq Foot 187,555.32 10.62 627-02010 Preformed Plastic Pavement Marking (Type II) (Inlaid) 34,961 Sq Foot 360,339.42 10.31 627-03001 Preformed Plastic Pavement Marking (Type III) 12,634 Sq Foot 95,582.00 7.57 627-30205 Thermoplastic Pavement Marking (Word-Symbol) 1,006 Sq Foot 14,438.56 14.35 627-30210 Thermoplastic Pavement Marking (Xwalk-Stopline) 1,270 Sq Foot 12,194.88 9.60 627-30324 Preformed Plastic Pavement Marking (Word-Symbol) (Typ 4,341 Sq Foot 82,746.46 19.06 627-30327 Preformed Plastic Pavement Marking (Word-Symbol) (Typ 3,991 Sq Foot 51,288.18 12.85 627-30329 Preformed Plastic Pavement Marking (Xwalk-Stop Line) 4,035 Sq Foot 41,373.00 10.25 627-30331 Preformed Plastic Pavement Marking (Xwalk - Stop Line 100 Sq Foot 1,200.00 12.00 627-30332 Preformed Plastic Pavement Marking (Xwalk-Stop Line) 31,360 Sq Foot 241,773.51 7.71 627-30405 Preformed Thermoplastic Pavement Marking (Word-Symbol 27,143 Sq Foot 217,183.54 8.00 627-30407 Preformed Thermoplastic Pavement Marking (Word-Symbol 281 Sq Foot 5,324.95 18.95 627-30410 Preformed Thermoplastic Pavement Marking (Xwalk-Stop 40,334 Sq Foot 255,102.53 6.32 627-30411 Preformed Thermoplastic Pavement Marking (Xwalk-Stop 2,354 Sq Foot 30,180.70 12.82 627-40003 Methyl Methacrylate Pavement Marking (Inlaid) 28,124 Sq Foot 129,296.00 4.60 628-00001 Bridge Girder and Deck Unit 1 Each 150,000.00 150,000.00 628-00140 Bridge Girder and Deck Unit (140 Feet to 145 Feet) 1 Each 145,000.00 145,000.00 629-01001 Survey Monument (Type 1) 201 Each 21,592.90 107.43 629-01002 Survey Monument (Type 2) 13 Each 6,696.25 515.10 629-01004 Survey Monument (Type 4) 12 Each 870.00 72.50 629-01005 Survey Monument (Type 5) 5 Each 432.85 86.57 629-01006 Survey Monument (Type 6) 6 Each 460.35 76.73 629-01011 Survey Monument (Type 1A) 13 Each 975.00 75.00 629-01031 Survey Monument (Type 3A) 3 Each 660.92 220.31 629-01065 Survey Monument (Type 5S) 3 Each 217.50 72.50 629-01110 Locate Monuments 443 Hour 41,392.48 93.44 629-01210 Adjust Monument Box 9 Each 3,951.42 439.05 630-00000 Flagging 253,658 Hour 5,238,038.77 20.65 630-00001 Pilot Car Operation 9,765 Hour 324,015.40 33.18 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 37 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 630-00003 Uniformed Traffic Control 7,844 Hour 427,332.00 54.48 630-00004 Traffic Control Vehicle 26 Each 80,085.36 3,080.21 630-00007 Traffic Control Inspection 5,141 Day 624,801.56 121.53 630-00012 Traffic Control Management 11,886 Day 5,416,385.76 455.69 630-00015 Uniformed Traffic Control Coordination 2,009 Hour 13,863.68 6.90 630-00020 Traffic Control Vehicle 20 Day 1,442.00 72.10 630-80001 Flashing Beacon (Portable) 160 Each 79,658.98 497.87 630-80002 Flashing Beacon (Solar) 128 Each 71,413.96 557.92 630-80305 Flagging Station Light 6 Each 2,440.00 406.67 630-80331 Barricade (Type 3 F-A) (Temporary) 1 Each 200.00 200.00 630-80335 Barricade (Type 3 M-A) (Temporary) 338 Each 32,143.03 95.10 630-80336 Barricade (Type 3 M-B) (Temporary) 107 Each 17,068.50 159.52 630-80337 Barricade (Type 3 M-C) (Temporary) 16 Each 2,694.00 168.38 630-80338 Barricade (Type 3 M-D) (Temporary) 21 Each 2,422.30 115.35 630-80341 Construction Traffic Sign (Panel Size A) 5,061 Each 171,252.48 33.84 630-80342 Construction Traffic Sign (Panel Size B) 6,071 Each 264,032.74 43.49 630-80343 Construction Traffic Sign (Panel Size C) 1,116 Each 52,642.36 47.17 630-80344 Construction Traffic Sign (Special) 11,929 Sq Foot 180,314.67 15.12 630-80348 Construction Information Sign 2 Each 700.00 350.00 630-80350 Vertical Panel 700 Each 20,355.00 29.08 630-80355 Portable Message Sign Panel 241 Each 975,402.58 4,047.31 630-80356 Advance Warning Flashing or Sequencing Arrow Panel (A 2 Each 1,400.00 700.00 630-80357 Advance Warning Flashing or Sequencing Arrow Panel (B 16 Each 9,663.00 603.94 630-80358 Advance Warning Flashing or Sequencing Arrow Panel (C 183 Each 176,275.67 963.26 630-80359 Portable Message Sign Panel 4,476 Day 193,839.12 43.31 630-80360 Drum Channelizing Device 15,069 Each 308,688.80 20.49 630-80363 Drum Channelizing Device (With Light) (Flashing) 831 Each 21,724.27 26.14 630-80364 Drum Channelizing Device (With Light) (Steady Burn) 805 Each 17,122.58 21.27 630-80365 Portable Message Sign Panel (State Furnished) 2 Each 3.00 1.50 630-80367 Portable Traffic Speed Monitor 12 Each 36,275.00 3,022.92 630-80370 Concrete Barrier (Temporary) 127,262 Lin Foot 2,695,525.24 21.18 630-80375 Concrete Barrier (Temporary) (Install Only) 1,510 Lin Foot 10,370.00 6.87 630-80378 Glare Screen (Temporary) 5,100 Lin Foot 66,657.00 13.07 630-80380 Traffic Cone 29,056 Each 165,578.04 5.70 630-80384 Tubular Marker 175 Each 1,982.25 11.33 630-80390 Channelizing Device (Special) 2,030 Each 18,207.50 8.97 630-80391 Channelizing Device (Fixed) 570 Each 21,960.00 38.53 630-80393 Stackable Vertical Panels 760 Each 8,529.00 11.22 Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 38 2010 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 630-80401 Delineator (Type I) (Temporary) 30 Each 2,580.00 86.00 630-80430 Rumble Strip (Portable) 32 Each 46,684.00 1,458.88 630-80510 Mobile Pavement Marking Zone 26 Lump Sum 32,992.87 1,268.96 630-80520 Mobile Pavement Marking Zone 46 Day 19,682.30 427.88 630-80560 Mobile Profilograph Operation Zone 3 Lump Sum 3,825.00 1,275.00 630-80570 Mobile Profilograph Operation Zone 6 Day 9,000.00 1,500.00 630-85006 Impact Attenuator (Sand Filled Plastic Barrel) (Tempo 47 Each 105,040.34 2,234.90 630-85010 Impact Attenuator (Temporary) 144 Each 278,664.90 1,935.17 630-85040 Impact Attenuator (Truck Mounted Attenuator) (Tempora 76 Each 739,424.71 9,729.27 630-85041 Impact Attenuator (Truck Mounted Attenuator) 364 Day 111,055.00 305.10 630-86800 Traffic Signal (Temporary) 2 Lump Sum 20,250.00 10,125.00 630-86810 Traffic Signal (Temporary) 14 Each 262,763.16 18,768.80 631-00100 Highway Design & Construction 2 Lump Sum 4,833,078.00 2,416,539.00 631-10000 Alternate Bridge Design and Construction 1 Lump Sum 5,441,000.00 5,441,000.00 641-10000 Shotcrete 415 Sq Yard 75,720.35 182.46 900-00005 Added Item (Day)/ 6 Day 60,000.00 10,000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 1 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00026 Rem S and D Pave Sq Yard ================================================ MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 45.00 200.00 244.61 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 45.00 200.00 244.61 240.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 200.00 244.61 240.00 =============== 202-00070 Rem Barricade Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 1.00 400.00 447.67 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 400.00 447.67 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 400.00 447.67 200.00 =============== 202-00200 Rem Sidewalk Sq Yard ================================================ MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 40.00 14.00 24.38 16.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 3.00 30.00 175.39 243.33 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 24.00 20.00 34.33 59.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 67.00 16.87 38.12 41.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 67.00 16.87 38.12 41.58 =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 132.00 8.00 9.38 8.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 177.00 8.00 23.67 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 309.00 8.00 16.54 22.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 309.00 8.00 16.54 22.32 =============== 202-00206 Rem Conc Curb Ramp Sq Yard ================================================ MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 27.00 12.00 27.75 25.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 132.30 15.00 35.00 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 159.30 14.49 33.45 49.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 159.30 14.49 33.45 49.92 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 2 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 3,750.00 35.00 34.99 24.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,750.00 35.00 34.99 24.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,750.00 35.00 34.99 24.35 =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 66.00 40.00 33.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 66.00 40.00 33.00 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66.00 40.00 33.00 25.00 =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 18,072.00 1.75 2.07 2.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18,072.00 1.75 2.07 2.40 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 107,848.00 1.20 1.20 1.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 107,848.00 1.20 1.20 1.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 125,920.00 1.28 1.49 1.37 =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ MTCE R300-162 R300-162 R3 FY10 REGION WIDE 03/04/10 2,000.00 0.50 0.96 0.80 MTCER300-164 REGION 3, SH 50 A AND D, 90 B 03/04/10 25,383.00 0.80 1.23 0.75 MTCER200-170 REGION II REGION-WIDE 03/11/10 1,752.00 2.00 2.23 2.51 MTCER100-177 REGION 1 FY'10 EAST STRIPING 03/18/10 100,000.00 0.25 0.30 0.20 MTCER100-170 REGION 1 FY 10 WEST STRIPING 03/25/10 50,000.00 0.20 0.29 0.10 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 25,000.00 1.00 0.90 0.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 204,135.00 0.42 0.54 0.31 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 7,000.00 1.00 1.18 0.80 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 3 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 12,500.00 0.15 1.27 0.30 MTCER200-169 REGION II REGION-WIDE 05/06/10 623,356.00 0.20 0.23 0.25 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 67,000.00 0.40 0.63 0.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 709,856.00 0.23 0.31 0.25 MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 07/22/10 360,000.00 0.35 0.21 0.14 MTCE R100-180 WESTERN PORTION OF REGION 1 08/12/10 100,000.00 0.20 0.32 0.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 460,000.00 0.32 0.24 0.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,373,991.00 0.28 0.34 0.24 =============== 202-00450 Rem Port Present Str (1) Sq Yard ================================================ MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 54.00 200.00 196.05 196.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 54.00 200.00 196.05 196.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54.00 200.00 196.05 196.05 =============== 202-00453 Rem Port Present Str (2) Sq Yard ================================================ MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 27.00 360.00 361.19 361.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 27.00 360.00 361.19 361.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 360.00 361.19 361.19 =============== 202-00503 Rem Port Present Str Sq Yard ================================================ MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 168.00 250.00 441.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 168.00 250.00 441.00 150.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 66.00 1850.00 1821.67 1821.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 66.00 1850.00 1821.67 1821.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 234.00 701.28 564.47 621.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 4 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00700 Rem Light Standard Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 5.00 300.00 211.50 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 300.00 211.50 240.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 300.00 211.50 240.00 =============== 202-00750 Rem Luminaire Each =================================================== MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 120.00 80.00 118.50 64.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 120.00 80.00 118.50 64.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 80.00 118.50 64.00 =============== 202-00806 Rem Walkway Lin Foot =============================================== MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 1,121.00 12.00 25.25 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,121.00 12.00 25.25 31.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,121.00 12.00 25.25 31.00 =============== 202-00810 Rem Ground Sign Each =================================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 838.00 25.00 38.59 14.00 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 655.00 20.00 36.89 15.82 MTCER200-170 REGION II REGION-WIDE 03/11/10 18.00 100.00 48.00 100.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 197.00 40.00 55.00 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,708.00 25.60 39.14 21.49 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 13.00 50.00 90.00 95.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 5.00 260.00 82.00 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18.00 108.33 87.78 103.33 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 16.00 65.00 144.29 45.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 5 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00810 Rem Ground Sign Each =================================================== MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 3.00 600.00 782.50 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19.00 149.47 206.05 195.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,745.00 27.81 41.64 21.74 =============== 202-00821 Rem Sign Panel Each =================================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 10.00 50.00 82.17 5.00 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 430.00 10.00 14.16 11.23 MTCER200-170 REGION II REGION-WIDE 03/11/10 14.00 100.00 30.67 25.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 100.00 15.00 33.75 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 554.00 13.90 19.23 14.85 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 6.00 40.00 58.33 65.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 65.00 13.00 33.33 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 71.00 15.28 35.45 46.69 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 337.00 30.00 99.86 10.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 91.00 250.00 496.25 395.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 428.00 76.78 152.85 91.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,053.00 39.55 68.83 40.29 =============== 202-00827 Rem of Pull Box Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 17.00 120.00 67.17 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 120.00 67.17 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 120.00 67.17 50.00 =============== 202-00828 Rem Traf Sig Equipment LUMP SUM =============================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 1.00 4000.00 1466.67 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 4000.00 1466.67 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 4000.00 1466.67 1800.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 6 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00831 Rem Traf Sig Head Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 14.00 100.00 90.67 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 100.00 90.67 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 100.00 90.67 100.00 =============== 202-00848 Rem Traf Sig Control+Cab Each =================================================== MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 12.00 400.00 545.50 173.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 400.00 545.50 173.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 400.00 545.50 173.00 =============== 202-00855 Rem Traf Sig Control Cab Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 1200.00 535.75 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1200.00 535.75 550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1200.00 535.75 550.00 =============== 202-00895 Rem of Impact Attenuator Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 1.00 1000.00 1175.25 1470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 1175.25 1470.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 1175.25 1470.00 =============== 202-00900 Rem Conc Footing Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 500.00 587.50 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 500.00 587.50 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 500.00 587.50 1000.00 =============== 202-01300 Rem End Anchorage Each =================================================== MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 2.00 225.00 276.00 276.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 225.00 276.00 276.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 225.00 276.00 276.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 7 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-05100 Sandblasting Reinf Steel Sq Yard ================================================ MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 93.00 8.00 7.19 7.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 93.00 8.00 7.19 7.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93.00 8.00 7.19 7.19 =============== 202-05150 Sandblasting Sq Foot ================================================ MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 41,174.00 0.25 0.22 0.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 41,174.00 0.25 0.22 0.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 41,174.00 0.25 0.22 0.22 =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 25.00 40.00 92.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 25.00 40.00 92.00 110.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 40.00 92.00 110.00 =============== 203-01500 Blading Hour =================================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 10.00 100.00 96.67 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 100.00 96.67 140.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 5.00 200.00 150.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 200.00 150.00 200.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 10.00 105.00 104.44 104.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 105.00 104.44 104.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 122.00 112.63 137.78 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 8 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01510 Backhoe Hour =================================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 9.00 150.00 120.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 150.00 120.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 150.00 120.00 100.00 =============== 203-01565 Hydraulic Excavator Hour =================================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 80.00 150.00 157.50 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 80.00 150.00 157.50 160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 150.00 157.50 160.00 =============== 203-01594 Combination Loader Hour =================================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 10.00 110.00 78.33 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 110.00 78.33 125.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 10.00 105.00 104.44 104.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 105.00 104.44 104.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 107.50 84.86 114.72 =============== 203-01597 Potholing Hour =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 10.00 180.00 179.25 270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 180.00 179.25 270.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 8.00 100.00 199.67 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 100.00 199.67 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 9 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 8.00 400.00 402.50 402.50 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 8.00 180.00 200.00 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 290.00 240.50 258.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 212.94 207.52 248.24 =============== 203-01622 Sweeping (With Pickup Broom) Hour =================================================== MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 100.00 120.00 103.33 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 120.00 103.33 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 120.00 103.33 35.00 =============== 203-02330 Laborer Hour =================================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 100.00 45.00 55.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 45.00 55.00 45.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 45.00 55.00 45.00 =============== 206-00000 Str Excav Cubic Yard ============================================= MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 72.00 20.00 244.45 151.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 72.00 20.00 244.45 151.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72.00 20.00 244.45 151.00 =============== 206-00200 Str Bkfl (CL 2) Cubic Yard ============================================= MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 90.00 30.00 134.98 119.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 90.00 30.00 134.98 119.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90.00 30.00 134.98 119.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 10 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01750 Shoring LUMP SUM =============================================== MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 1.00 15000.00 47765.43 18300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 15000.00 47765.43 18300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 47765.43 18300.00 =============== 208-00002 Erosion Log (12 In) Lin Foot =============================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 500.00 4.00 5.01 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 500.00 4.00 5.01 5.50 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 100.00 4.00 37.67 8.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 150.00 4.00 8.00 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 250.00 4.00 19.87 8.60 MTCE R100-184 VARIOUS LOCATIONS 09/02/10 2,000.00 5.00 6.98 3.95 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 100.00 5.00 7.00 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,100.00 5.00 6.98 3.90 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 500.00 5.00 6.13 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 500.00 5.00 6.13 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,350.00 4.78 7.30 5.10 =============== 208-00003 Erosion Log (18 In) Lin Foot =============================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 100.00 10.00 10.33 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 10.00 10.33 11.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 11 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00003 Erosion Log (18 In) Lin Foot =============================================== MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 100.00 6.00 6.32 6.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 6.00 6.32 6.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 8.00 9.33 8.66 =============== 208-00011 Erosion Bales (Weed Free) Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 20.00 15.00 23.25 13.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 15.00 23.25 13.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 15.00 23.25 13.50 =============== 208-00020 Silt Fence Lin Foot =============================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 200.00 2.00 2.33 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 200.00 2.00 2.33 2.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 200.00 1.50 1.44 1.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 1.50 1.44 1.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 400.00 1.75 2.11 1.72 =============== 208-00034 Gravel Bag Lin Foot =============================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 50.00 6.00 5.65 3.60 MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 60.00 8.00 7.69 17.00 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 300.00 6.00 6.55 3.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 410.00 6.29 6.60 5.38 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 50.00 12.00 46.17 18.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 12.00 46.17 18.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 12 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00034 Gravel Bag Lin Foot =============================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 500.00 8.00 8.13 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 500.00 8.00 8.13 5.25 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 100.00 7.00 7.63 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 7.00 16.96 9.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,060.00 7.43 10.20 6.51 =============== 208-00045 Conc Washout Str Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 5.00 600.00 614.50 510.00 MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 1500.00 387.50 550.00 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 1.00 500.00 930.00 440.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 1.00 500.00 830.00 600.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 1.00 350.00 2172.11 1825.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 650.00 989.97 662.78 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 1.00 250.00 425.00 550.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 1.00 600.00 273.33 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 425.00 349.17 450.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 1.00 1200.00 1150.00 1150.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 2.00 500.00 638.75 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 733.33 695.56 480.00 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 3.00 750.00 825.00 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 750.00 860.00 975.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 655.88 870.22 678.06 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 13 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00050 Storm Drain Inlet Protection Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 20.00 200.00 103.25 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 200.00 103.25 36.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 200.00 103.25 36.00 =============== 208-00051 Storm Drain Inlet Protection (Type 1) Lin Foot =============================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 200.00 10.00 7.00 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 200.00 10.00 7.00 7.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 56.00 30.00 41.17 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 56.00 30.00 41.17 12.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 200.00 30.00 28.75 28.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 30.00 28.75 28.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 456.00 21.23 17.42 17.15 =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 10.00 50.00 39.00 30.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 10.00 35.00 40.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 42.50 39.43 32.50 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 4.00 30.00 39.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 30.00 39.00 50.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 10.00 52.00 51.75 51.75 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 14 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 60.00 50.00 50.00 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 70.00 50.29 50.13 43.39 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 20.00 54.00 55.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 54.00 61.75 39.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 114.00 48.86 49.63 40.88 =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 5.00 80.00 91.67 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 80.00 91.67 85.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 5.00 5.00 115.00 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 5.00 115.00 115.00 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 45.00 80.00 115.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 45.00 80.00 115.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55.00 73.18 111.82 100.00 =============== 208-00205 Erosion Control Supervisor Hour =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 70.00 60.00 41.54 40.15 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 24.00 55.00 75.25 63.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 94.00 58.72 50.14 45.98 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 20.00 60.00 158.33 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 60.00 158.33 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 15 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00205 Erosion Control Supervisor Hour =================================================== MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 10.00 60.00 83.75 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 60.00 83.75 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 124.00 59.03 66.61 62.28 =============== 210-00300 Res Brick Pavers Sq Yard ================================================ MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 89.00 75.00 52.25 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 89.00 75.00 52.25 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 89.00 75.00 52.25 35.00 =============== 210-00451 Rep Overhead Sign Str Each =================================================== MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 1.00 3000.00 5875.00 2210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3000.00 5875.00 2210.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 5875.00 2210.00 =============== 210-00500 Reb Port Present Str Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 18.00 3000.00 6101.50 3856.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 5.00 500.00 881.78 181.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 23.00 2456.52 4566.29 3057.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 2456.52 4566.29 3057.24 =============== 210-00750 Res Light Standard Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 20.00 400.00 452.50 560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 400.00 452.50 560.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 400.00 452.50 560.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 16 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00810 Res Ground Sign Each =================================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 1.00 300.00 283.33 330.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 50.00 150.00 233.75 280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 51.00 152.94 234.48 280.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 51.00 152.94 235.63 276.48 =============== 210-00815 Res Sign Panel Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 1.00 150.00 186.00 302.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 18.00 100.00 40.67 25.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 100.00 25.00 51.75 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 119.00 37.39 50.99 60.94 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 7.00 60.00 278.57 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 60.00 278.57 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 126.00 38.65 69.36 61.03 =============== 210-00825 Res Flashing Beacon Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 1.00 1200.00 1018.57 302.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 1.00 500.00 1112.50 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 850.00 1065.53 251.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 850.00 1078.32 625.50 =============== 210-00827 Res Pull Box Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 2.00 200.00 191.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 200.00 191.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 200.00 191.00 50.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 17 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00831 Res Traf Sig Head Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 8.00 300.00 263.50 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 300.00 263.50 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 300.00 263.50 400.00 =============== 210-00865 Res Ped Sig Head Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 100.00 192.50 390.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 100.00 192.50 390.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 100.00 192.50 390.00 =============== 210-00870 Res Coordination Unit Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 500.00 646.75 930.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 500.00 646.75 930.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 500.00 646.75 930.00 =============== 210-01130 Res Gdrail Ty 3 Lin Foot =============================================== MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 1,963.00 10.00 12.42 12.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,963.00 10.00 12.42 12.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,963.00 10.00 12.42 12.42 =============== 210-04000 Adj Structure Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 2.00 150.00 287.50 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 150.00 287.50 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 150.00 287.50 275.00 =============== 210-04010 Adj Manhole Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 500.00 618.75 850.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 18 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04010 Adj Manhole Each =================================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 8.00 650.00 926.67 880.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 633.33 882.68 876.67 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 4.00 1000.00 2290.00 1080.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1000.00 2290.00 1080.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 746.15 1195.42 939.23 =============== 210-04050 Adj Valve Box Each =================================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 5.00 450.00 546.67 540.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 450.00 546.67 540.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 14.00 400.00 414.86 414.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 400.00 414.86 414.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 413.16 483.04 447.79 =============== 212-00006 Seeding (Native) Acre =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 0.50 800.00 1921.00 1416.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 3.50 500.00 706.67 490.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 537.50 858.46 605.75 MTCE R100-184 VARIOUS LOCATIONS 09/02/10 1.00 500.00 1315.00 1170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 500.00 1315.00 1170.00 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 0.50 800.00 790.00 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.50 800.00 1583.33 850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.50 554.55 964.93 740.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 19 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00032 Soil Conditioning Acre =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 1.00 2500.00 2570.00 2220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2500.00 2570.00 2220.00 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 0.50 2000.00 2300.00 2400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.50 2000.00 2300.00 2400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.50 2333.33 2480.00 2280.00 =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 0.50 800.00 1943.33 1475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.50 800.00 1943.33 1475.00 MTCE R100-184 VARIOUS LOCATIONS 09/02/10 1.00 1300.00 687.50 645.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1300.00 687.50 645.00 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 0.50 800.00 1075.00 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.50 800.00 1741.67 850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1050.00 1553.75 893.00 =============== 213-00009 Flexible Growth Medium Acre =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 3.50 2500.00 3737.00 2950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.50 2500.00 3737.00 2950.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.50 2500.00 3737.00 2950.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 20 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00012 Spray-on Mulch Blanket Acre =================================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 0.25 2000.00 4150.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.25 2000.00 4150.00 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.25 2000.00 4150.00 5000.00 =============== 213-00061 Mulch Tackifier Pound ================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 50.00 5.00 10.53 10.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 5.00 10.53 10.40 MTCE R100-184 VARIOUS LOCATIONS 09/02/10 200.00 3.50 2.83 2.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 3.50 2.83 2.35 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 100.00 2.20 5.38 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 2.20 6.88 2.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 350.00 3.34 6.40 3.23 =============== 216-00042 Soil Retent Blanket (BioD S/C) Sq Yard ================================================ MTCE R100-184 VARIOUS LOCATIONS 09/02/10 50.00 10.00 3.75 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 10.00 3.75 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 10.00 3.75 3.00 =============== 250-00010 Envir Health/Safety Mngmt LUMP SUM =============================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 1.00 10000.00 1925.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 10000.00 1925.00 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 1925.00 2500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 21 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06007 ABC (CL 6) Cubic Yard ============================================= MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 9.00 50.00 110.50 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 50.00 110.50 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 50.00 110.50 120.00 =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 20.00 275.00 220.75 300.00 MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 22.00 175.00 208.75 210.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 200.00 130.00 144.67 144.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 13.00 300.00 278.25 146.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 255.00 153.92 175.58 162.03 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 3.00 450.00 341.00 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 450.00 341.00 450.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 200.00 150.00 153.39 153.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 150.00 153.39 153.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 458.00 154.15 196.88 161.81 =============== 403-34721 HMA (Gr SX) (75) (PG 58-28) Ton ==================================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 44.00 300.00 162.33 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 44.00 300.00 162.33 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44.00 300.00 162.33 150.00 =============== 403-34731 HMA (Gr SX) (75) (PG 58-34) Ton ==================================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 3,874.00 100.00 108.23 102.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,874.00 100.00 108.23 102.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,874.00 100.00 108.23 102.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 22 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34741 HMA (Gr SX) (75) (PG 64-22) Ton ==================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 40.00 165.00 190.42 146.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 165.00 190.42 146.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 13,249.00 86.00 85.80 85.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,249.00 86.00 85.80 85.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,289.00 86.24 87.66 85.98 =============== 411-10255 Emul Asph (SS) Gallon ================================================= MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 13.00 6.00 13.25 22.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 3,528.00 2.00 2.07 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,541.00 2.01 2.12 3.07 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 13.00 2.00 13.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 2.00 13.00 30.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 10,328.00 3.00 2.76 2.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,328.00 3.00 2.76 2.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,882.00 2.75 2.46 2.86 =============== 503-00018 Drilled Caisson (18 In) Lin Foot =============================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 4.00 180.00 136.00 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 180.00 136.00 195.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 180.00 136.00 195.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 23 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00048 Drilled Caisson (48 In) Lin Foot =============================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 44.00 325.00 531.58 257.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 44.00 325.00 531.58 257.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44.00 325.00 531.58 257.00 =============== 504-04410 Block Facing Sq Foot ================================================ MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 30.00 65.00 99.00 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 65.00 99.00 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 65.00 99.00 140.00 =============== 506-00000 Riprap Cubic Yard ============================================= MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 8.00 120.00 145.37 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 120.00 145.37 55.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 120.00 145.37 55.00 =============== 507-00000 Conc S and D Pave Cubic Yard ============================================= MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 15.00 400.00 668.66 570.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 400.00 668.66 570.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 400.00 668.66 570.00 =============== 507-00100 Conc S and D Pave (Reinf) Cubic Yard ============================================= MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 2.00 550.00 1178.50 294.00 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 13.00 450.00 903.61 455.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 463.33 940.26 433.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 463.33 940.26 433.53 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 24 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 509-00000 Str Steel Pound ================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 9,550.00 2.50 2.71 2.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,550.00 2.50 2.71 2.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,550.00 2.50 2.71 2.35 =============== 509-00010 Str Steel (Spec) Pound ================================================== MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 3,340.00 5.00 12.55 3.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,340.00 5.00 12.55 3.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,340.00 5.00 12.55 3.65 =============== 509-08100 Provide Temporary Support LUMP SUM =============================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 1.00 25000.00 23556.25 12445.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 25000.00 23556.25 12445.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 23556.25 12445.00 =============== 509-90002 Paint Existing Structure (Special) Gallon ================================================= MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 5.00 100.00 1018.29 227.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 100.00 1018.29 227.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 100.00 1018.29 227.00 =============== 515-00120 Waterproofing (Membrane) Sq Yard ================================================ MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 4,575.00 12.00 13.23 13.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,575.00 12.00 13.23 13.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,575.00 12.00 16.66 13.96 =============== 515-00400 Concrete Sealer Sq Yard ================================================ MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 120.00 10.00 12.05 12.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 10.00 12.05 12.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 10.00 12.05 12.20 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 25 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 515-00410 Concrete Sealer (Calcium Nitrite) Sq Yard ================================================ MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 147.00 52.00 28.75 28.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 147.00 52.00 28.75 28.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 147.00 52.00 28.75 28.75 =============== 518-01004 Br Expan Device (0-4 In) Lin Foot =============================================== MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 200.00 410.00 345.00 345.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 410.00 345.00 345.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 410.00 345.00 345.00 =============== 601-01000 Conc CL B Cubic Yard ============================================= MTCER200-170 REGION II REGION-WIDE 03/11/10 3.75 500.00 333.50 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.75 500.00 333.50 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.75 500.00 333.50 120.00 =============== 601-03000 Conc CL D Cubic Yard ============================================= MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 6.00 800.00 596.50 489.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 800.00 596.50 489.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 800.00 596.50 489.00 =============== 601-03020 Conc CL D (Misc) Cubic Yard ============================================= MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 9.00 2000.00 1925.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 2000.00 1925.00 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 2000.00 1925.00 1500.00 =============== 601-03040 Conc CL D (Bridge) Cubic Yard ============================================= MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 33.00 800.00 741.75 741.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 33.00 800.00 741.75 741.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.00 800.00 1302.53 880.14 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 26 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03540 Conc CL DT (Deck Topping) Cubic Yard ============================================= MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 2.00 3000.00 3317.75 3317.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 3000.00 3317.75 3317.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3000.00 3317.75 3317.75 =============== 601-04000 Conc CL E Cubic Yard ============================================= MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 828.00 730.00 692.80 613.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 828.00 730.00 692.80 613.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 828.00 730.00 692.80 613.00 =============== 601-06150 Conc (Patching) Sq Foot ================================================ MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 1,512.00 60.00 58.73 47.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,512.00 60.00 58.73 47.90 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 486.00 70.00 17.25 17.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 486.00 70.00 17.25 17.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,998.00 62.43 55.64 40.44 =============== 602-00020 Reinf Steel (Epoxy) Pound ================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 1,400.00 2.10 2.48 1.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,400.00 2.10 2.48 1.91 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 366.00 1.25 2.25 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 366.00 1.25 3.60 2.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,766.00 1.92 2.80 2.20 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 27 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-00024 Prep Culvert Pipe (24 In) Lin Foot =============================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 330.00 10.00 17.50 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 330.00 10.00 17.50 22.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 330.00 10.00 17.50 22.00 =============== 603-00025 Culvert Lining (24 Inch)(Special) Lin Foot =============================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 330.00 400.00 317.50 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 330.00 400.00 317.50 230.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 330.00 400.00 317.50 230.00 =============== 603-00035 Prep Culvert Pipe (36 In) Lin Foot =============================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 1,482.00 10.00 18.50 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,482.00 10.00 18.50 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,482.00 10.00 18.50 30.00 =============== 603-00036 Culvert Lining (36 In) Lin Foot =============================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 1,482.00 350.00 300.50 286.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,482.00 350.00 300.50 286.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,482.00 350.00 300.50 286.00 =============== 603-00060 Culvert Lining (60 In) Lin Foot =============================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 250.00 800.00 684.50 594.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 250.00 800.00 684.50 594.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 800.00 684.50 594.00 =============== 603-00061 Prep Culvert Pipe (60 In) Lin Foot =============================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 250.00 10.00 45.50 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 250.00 10.00 45.50 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 10.00 45.50 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 28 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-00305 Inlet Ty C (5 Ft) Each =================================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 1.00 5000.00 3712.50 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 3712.50 4000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 3712.50 4000.00 =============== 604-00510 Inlet Ty D (10 Ft) Each =================================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 1.00 5000.00 8562.50 8500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 8562.50 8500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 8562.50 8500.00 =============== 604-31015 MH Box Base (15 Ft) Each =================================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 1.00 25000.00 21600.00 17200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 25000.00 21600.00 17200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 21600.00 17200.00 =============== 604-50200 MH R and C Each =================================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 1.00 1500.00 3900.00 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1500.00 3900.00 4000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1500.00 3900.00 4000.00 =============== 606-00301 Gdrail Ty 3 (6-3) Lin Foot =============================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 325.00 17.00 13.80 13.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 325.00 17.00 13.80 13.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 325.00 17.00 13.95 13.96 =============== 606-01340 End Anchor Ty 3D Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 1.00 700.00 725.63 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 700.00 725.63 700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 700.00 675.74 700.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 29 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-02003 End Anchor (Nonflared) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 1.00 1800.00 1807.45 1765.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1800.00 1807.45 1765.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1800.00 1807.45 1765.00 =============== 606-02005 End Anchor (Flared) Each =================================================== MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 2.00 1600.00 2300.00 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1600.00 2300.00 2300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1600.00 1598.62 1645.45 =============== 607-11525 Fence (Plastic) Lin Foot =============================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 200.00 4.00 3.67 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 200.00 4.00 3.67 3.00 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 1,500.00 2.50 2.25 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,500.00 2.50 2.25 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,700.00 2.68 2.49 3.00 =============== 607-11580 Fence (Temp) Lin Foot =============================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 410.00 4.00 2.60 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 410.00 4.00 2.60 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 410.00 4.00 2.60 4.00 =============== 608-00000 Conc Sidewalk Sq Yard ================================================ MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 40.00 65.00 38.25 34.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 30 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00000 Conc Sidewalk Sq Yard ================================================ MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 8.00 60.00 72.67 64.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48.00 64.17 42.74 39.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48.00 64.17 42.74 39.00 =============== 608-00010 Conc Curb Ramp Sq Yard ================================================ MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 54.00 80.00 114.75 100.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 48.00 100.00 96.67 88.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 102.00 89.41 107.52 94.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 102.00 89.41 107.52 94.35 =============== 608-00016 Inst Truncated Domes Sq Foot ================================================ MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 252.00 20.00 14.67 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 252.00 20.00 14.67 24.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 252.00 20.00 14.67 24.00 =============== 609-21020 C and G Ty 2 II-B Lin Foot =============================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 177.00 20.00 34.33 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 177.00 20.00 34.33 28.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 177.00 20.00 34.33 28.00 =============== 609-21900 C and G Ty 2 (Spec) Lin Foot =============================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 132.00 25.00 21.50 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 132.00 25.00 21.50 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 132.00 25.00 21.50 21.00 =============== 613-00201 2 In Elec Cond (Jacked) Lin Foot =============================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 3,000.00 9.00 15.00 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,000.00 9.00 15.00 19.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,000.00 9.00 15.00 19.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 31 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00206 2 In Elec Cond (Bored) Lin Foot =============================================== MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 120.00 15.00 17.00 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 15.00 17.00 17.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 15.00 17.00 17.00 =============== 613-00301 3 In Elec Cond (Jacked) Lin Foot =============================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 1,000.00 12.00 19.50 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,000.00 12.00 19.50 24.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,000.00 12.00 19.50 24.00 =============== 613-01100 1 In Elec Cond (P) Lin Foot =============================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 30.00 28.00 18.73 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 28.00 18.73 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 28.00 18.73 30.00 =============== 613-01200 2 In Elec Cond (P) Lin Foot =============================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 550.00 8.00 11.38 10.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 10,535.00 6.50 8.53 8.00 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 300.00 8.00 9.75 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,385.00 6.61 8.64 8.18 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 480.00 10.00 13.93 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 480.00 10.00 13.93 9.00 MTCE R100-184 VARIOUS LOCATIONS 09/02/10 15,000.00 8.00 7.70 8.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15,000.00 8.00 7.70 8.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26,865.00 7.45 8.43 8.32 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 32 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-01300 3 In Elec Cond (P) Lin Foot =============================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 525.00 10.00 12.75 11.00 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 600.00 9.00 11.44 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,125.00 9.47 12.05 12.60 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 30.00 35.00 26.47 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 35.00 26.47 35.00 MTCE R100-184 VARIOUS LOCATIONS 09/02/10 2,000.00 7.50 9.53 10.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,000.00 7.50 9.53 10.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,155.00 8.46 11.03 11.51 =============== 613-06000 Meter Pole Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 20.00 1500.00 1837.50 2025.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 1500.00 1837.50 2025.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 1500.00 1837.50 2025.00 =============== 613-07026 Pull Box (16"x24"x12") Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 45.00 350.00 403.50 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 45.00 350.00 403.50 160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 350.00 403.50 160.00 =============== 613-07034 Pull Box (24"x36"x18") Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 60.00 850.00 895.00 890.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 850.00 895.00 890.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 850.00 895.00 890.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 33 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07039 Pull Box (30"x48"x18") Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 2.00 500.00 776.42 362.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 500.00 776.42 362.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 500.00 776.42 362.50 =============== 613-07040 Pull Box (30"x48"x24") Each =================================================== MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 14.00 650.00 973.50 860.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 650.00 973.50 860.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 650.00 973.50 860.00 =============== 613-07050 Pull Box (13"x24"x18") Deep Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 25.00 600.00 600.00 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 600.00 600.00 650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 600.00 600.00 650.00 =============== 613-10000 Wiring LUMP SUM =============================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 4500.00 4085.25 5000.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 1.00 7500.00 26244.60 17455.60 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 1.00 3000.00 6711.00 11615.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 5000.00 14332.33 11356.87 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 1.00 10000.00 4413.33 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 10000.00 4413.33 8000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 6250.00 12581.92 10517.65 =============== 613-20100 Inst Light Std Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 25.00 500.00 221.50 260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 500.00 221.50 260.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 500.00 221.50 260.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 34 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-32400 Light Std Steel (40 Ft) Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 20.00 2800.00 2272.50 1430.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 2800.00 2272.50 1430.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 2800.00 2272.50 1430.00 =============== 613-40010 Light Std Foundation Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 10.00 750.00 926.50 945.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 750.00 926.50 945.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 750.00 926.50 945.00 =============== 613-40020 Transformer Base Alum Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 25.00 650.00 434.50 475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 650.00 434.50 475.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 650.00 434.50 475.00 =============== 613-50010 Photoel Cell Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 1,000.00 27.00 43.00 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,000.00 27.00 43.00 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,000.00 27.00 43.00 21.00 =============== 613-60000 Lmps Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 1,000.00 30.00 49.50 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,000.00 30.00 49.50 34.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,000.00 30.00 49.50 34.00 =============== 613-70255 Fus Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 50.00 40.00 11.63 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 40.00 11.63 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 40.00 11.63 16.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 35 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-70260 Fus Holder Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 50.00 80.00 41.50 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 80.00 41.50 41.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 80.00 41.50 41.00 =============== 613-70400 Lumin HPS (400 W) Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 50.00 350.00 386.50 358.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 350.00 386.50 358.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 350.00 386.50 358.00 =============== 614-00011 Sign Panel (CL I) Sq Foot ================================================ MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 2,626.00 13.00 11.81 11.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 190.00 18.00 19.98 12.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,816.00 13.34 12.15 11.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,816.00 13.34 12.52 11.07 =============== 614-00012 Sign Panel (CL II) Sq Foot ================================================ MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 7,536.00 15.70 15.97 16.50 MTCER200-170 REGION II REGION-WIDE 03/11/10 677.00 19.00 21.25 15.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,213.00 15.97 16.24 16.42 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 408.00 20.00 22.33 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 408.00 20.00 22.33 17.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 447.00 18.00 24.74 19.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 447.00 18.00 24.74 19.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,068.00 16.25 16.34 15.09 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 36 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00013 Sign Panel (CL III) Sq Foot ================================================ MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 809.00 18.50 19.72 17.25 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 3,999.00 16.00 20.55 19.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,808.00 16.42 20.34 18.86 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 12,864.00 20.00 24.69 21.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12,864.00 20.00 24.69 21.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,672.00 19.03 22.23 19.26 =============== 614-00025 Inst Sign Panel (CL I) Sq Foot ================================================ MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 675.00 5.00 8.25 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 675.00 5.00 8.25 5.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 130.50 16.00 10.17 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 130.50 16.00 10.17 17.00 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 89.20 5.00 11.17 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 89.20 5.00 11.17 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 894.70 6.60 5.30 4.24 =============== 614-00026 Inst Sign Panel (CL I) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 837.00 18.00 29.33 21.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 837.00 18.00 29.33 21.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 837.00 18.00 29.33 21.45 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 37 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00027 Inst Sign Panel (CL II) Sq Foot ================================================ MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 1,128.00 5.00 14.44 8.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,128.00 5.00 14.44 8.25 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 118.50 22.00 14.17 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 118.50 22.00 14.17 25.00 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 7,721.00 5.00 5.61 4.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,721.00 5.00 5.61 4.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,967.50 5.22 6.15 5.02 =============== 614-00028 Inst Sign Panel (CL III) Sq Foot ================================================ MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 9,805.00 6.00 7.41 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,805.00 6.00 7.41 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,805.00 6.00 7.41 4.03 =============== 614-00029 Inst Sign Panel (CL II) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 725.00 33.00 42.08 30.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 725.00 33.00 42.08 30.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 725.00 33.00 42.08 30.47 =============== 614-00041 Sign Post (Spec) Each =================================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 1.00 1300.00 1504.67 3450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1300.00 1504.67 3450.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1300.00 1504.67 3450.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 38 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00612 Steel Sign Post (W 6x12) Lin Foot =============================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 72.00 35.00 38.63 32.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 72.00 35.00 38.63 32.16 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 84.00 34.00 49.57 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 84.00 34.00 49.57 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 156.00 34.46 40.22 31.47 =============== 614-00615 Steel Sign Post (W 6x15) Lin Foot =============================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 324.00 35.00 44.20 33.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 324.00 35.00 44.20 33.72 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 135.00 36.00 56.18 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 135.00 36.00 56.18 42.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 459.00 35.29 44.69 34.68 =============== 614-00818 Steel Sign Post (W 8x18) Lin Foot =============================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 72.00 45.00 51.56 43.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 72.00 45.00 51.56 43.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72.00 45.00 44.36 38.75 =============== 614-00821 Steel Sign Post (W 8x21) Lin Foot =============================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 144.00 45.00 57.92 47.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 144.00 45.00 57.92 47.79 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 39 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00821 Steel Sign Post (W 8x21) Lin Foot =============================================== MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 30.00 50.00 57.99 49.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 50.00 57.99 49.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 174.00 45.86 53.02 46.19 =============== 614-01022 Steel Sign Post (W 10x22) Lin Foot =============================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 180.00 50.00 61.40 47.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 180.00 50.00 61.40 47.14 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 20.00 52.00 71.12 56.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 52.00 71.12 56.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 50.20 57.01 49.22 =============== 614-01026 Steel Sign Post (W 10x26) Lin Foot =============================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 70.00 55.00 68.63 56.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70.00 55.00 68.63 56.78 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 90.00 65.00 84.50 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 90.00 65.00 84.50 46.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 160.00 60.63 66.67 52.44 =============== 614-01226 Steel Sign Post (W 12x26) Lin Foot =============================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 90.00 60.00 74.49 56.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 90.00 60.00 74.49 56.75 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 40 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01226 Steel Sign Post (W 12x26) Lin Foot =============================================== MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 43.00 70.00 86.75 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 43.00 70.00 86.75 48.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 133.00 63.23 67.34 56.45 =============== 614-01503 Steel Sign Supp (2-In Rd)(Po&Sock) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 401.00 65.00 103.83 102.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 401.00 65.00 103.83 102.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 401.00 65.00 104.50 102.14 =============== 614-01512 Steel Sign Supp (2-In Rd)(Post) Lin Foot =============================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 3,082.00 7.00 6.22 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,082.00 7.00 6.22 2.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 30.00 14.00 14.83 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 14.00 14.83 27.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,112.00 7.07 6.25 2.24 =============== 614-01522 Steel Sign Supp (2-In Rd)(Sock) Each =================================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 328.00 66.00 67.15 54.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 75.00 41.50 83.25 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 403.00 61.44 68.50 63.49 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 3.00 80.00 97.33 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 80.00 97.33 165.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 406.00 61.58 68.57 64.24 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 41 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01573 Steel Sign Supp (2-1/2 Rd NP40)(Po&Slip) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 431.00 270.00 309.63 286.10 MTCER200-170 REGION II REGION-WIDE 03/11/10 10.00 250.00 323.25 199.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 441.00 269.55 309.94 284.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 441.00 269.55 321.85 285.25 =============== 614-01575 Steel Sign Supp (2-1/2 In Rd NP40)(Po) Lin Foot =============================================== MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 1,316.00 14.00 21.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,316.00 14.00 21.00 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,316.00 14.00 21.00 20.00 =============== 614-01578 Steel Sign Supp (2-1/2 In Rd NP40)(Slip) Each =================================================== MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 94.00 130.00 208.75 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 94.00 130.00 208.75 165.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 94.00 130.00 208.75 165.00 =============== 614-01583 Stl Sign Supp (2-1/2 In Rd 80)(Po&Slip) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 122.00 300.00 396.24 360.91 MTCER200-170 REGION II REGION-WIDE 03/11/10 9.00 300.00 397.33 267.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 131.00 300.00 396.31 354.46 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 60.00 300.00 448.00 342.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 300.00 448.00 342.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 191.00 300.00 412.10 355.08 =============== 614-01585 Steel Sign Supp (2-1/2 In Rd 80) (Post) Lin Foot =============================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 7,470.00 18.00 17.11 14.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,470.00 18.00 17.11 14.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 42 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01585 Steel Sign Supp (2-1/2 In Rd 80) (Post) Lin Foot =============================================== MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 290.00 25.00 21.00 18.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 194.00 23.00 32.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 484.00 24.20 25.41 28.82 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 60.00 23.00 33.76 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 23.00 33.76 22.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,014.00 18.41 17.36 15.42 =============== 614-01588 Steel Sign Supp (2-1/2 In Rd 80)(Slip) Each =================================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 677.00 180.00 162.67 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 677.00 180.00 162.67 130.00 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 24.00 250.00 296.67 250.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 16.00 145.00 280.50 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 208.00 290.20 330.00 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 2.00 200.00 419.83 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 200.00 419.83 225.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 719.00 181.61 165.41 141.39 =============== 614-03001 Conc Footing (Ty 1) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 4.00 800.00 887.93 656.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 800.00 887.93 656.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 800.00 783.07 691.36 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 43 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-03002 Conc Footing (Ty 2) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 18.00 900.00 972.38 692.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 900.00 972.38 692.42 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 2.00 1100.00 1430.83 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1100.00 1430.83 1200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 920.00 942.42 746.90 =============== 614-03003 Conc Footing (Ty 3) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 4.00 1000.00 1117.89 925.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 1000.00 1117.89 925.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1000.00 990.89 861.62 =============== 614-03004 Conc Footing (Ty 4) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 8.00 1050.00 1271.25 999.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 1050.00 1271.25 999.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 1050.00 1193.12 969.92 =============== 614-03005 Conc Footing (Ty 5) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 10.00 1200.00 1516.42 1371.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 1200.00 1516.42 1371.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 1200.00 1420.99 1212.92 =============== 614-03006 Conc Footing (Ty 6) Each =================================================== MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 4.00 1800.00 1172.75 785.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 1800.00 1172.75 785.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1800.00 1565.92 1061.67 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 44 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-03007 Conc Footing (Ty 7) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 5.00 1300.00 2028.48 1945.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 1300.00 2028.48 1945.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1300.00 1987.97 1609.62 =============== 614-10050 Mod Overhead Sign Str Each =================================================== MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 1.00 1000.00 3503.75 1875.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1000.00 3503.75 1875.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 3503.75 1875.00 =============== 614-10110 LED Warning Sign System (_Signs) Each =================================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 5.00 16000.00 31943.33 22750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 16000.00 31943.33 22750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 16000.00 31943.33 22750.00 =============== 614-32000 Monotube Overhead Sign Cant (20 In Dia) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 1.00 28000.00 25905.87 24745.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 28000.00 25905.87 24745.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 28000.00 25905.87 24745.00 =============== 614-32400 Monotube Overhead Sign Cant (24 In Dia) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 1.00 35000.00 31421.03 30249.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 35000.00 31421.03 30249.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 35000.00 31421.03 30249.00 =============== 614-70112 Traf Sig Face (12) Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 15.00 400.00 866.33 995.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 400.00 866.33 995.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 400.00 866.33 995.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 45 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70150 Ped Sig Face (16) (Countdown) Each =================================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 4.00 690.00 719.67 625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 690.00 719.67 625.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 690.00 719.67 625.00 =============== 614-70336 Traf Sig Face (12-12-12) Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 3.00 600.00 722.33 495.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 600.00 722.33 495.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 12.00 700.00 761.33 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 700.00 761.33 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 680.00 748.33 699.00 =============== 614-70448 Traf Sig Face (12-12-12-12) Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 4.00 900.00 826.50 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 900.00 826.50 550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 900.00 826.50 550.00 =============== 614-72830 Communications Cabinet Each =================================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 1.00 2000.00 7613.33 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2000.00 7613.33 8000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 7613.33 8000.00 =============== 614-72860 Ped Push Button Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 8.00 120.00 197.25 285.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 120.00 197.25 285.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 46 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72860 Ped Push Button Each =================================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 4.00 130.00 238.00 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 130.00 238.00 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 123.33 208.36 281.67 =============== 614-72875 Loop Detect Wire Lin Foot =============================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 10,000.00 2.50 4.68 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,000.00 2.50 4.68 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,000.00 2.50 4.68 3.00 =============== 614-72886 Intersection Detect Sys (Camera) Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 2.00 5700.00 5725.00 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5700.00 5725.00 4500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5700.00 5725.00 4500.00 =============== 614-72887 Detect (Microwave Veh) Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 4.00 6500.00 7461.00 7200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 6500.00 7461.00 7200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 6500.00 7461.00 7200.00 =============== 614-75848 Inst Traf Sig Ctrler + Cab Each =================================================== MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 12.00 650.00 1505.00 1141.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 650.00 1505.00 1141.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 650.00 1505.00 1141.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 47 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-75882 Inst Sig Veh Detect (Magnetic) Each =================================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 6.00 250.00 2004.00 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 250.00 2004.00 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 250.00 2004.00 400.00 =============== 614-80000 Flash Beacon Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 24.00 1100.00 3352.00 1235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 1100.00 3352.00 1235.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 1100.00 3352.00 1235.00 =============== 614-80001 Flash Beacon (Solar Pwred) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 2.00 4000.00 4478.17 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 4000.00 4478.17 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4000.00 4478.17 500.00 =============== 614-80313 Barricade (Ty 3 F-C) Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 1.00 1200.00 1235.33 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1200.00 1235.33 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1200.00 1235.33 750.00 =============== 614-84450 Inst Traf Sig Ped Pole Steel Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 1200.00 512.50 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1200.00 512.50 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1200.00 512.50 500.00 =============== 614-85001 Impact Atten Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 1.00 22500.00 15943.75 16600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 22500.00 15943.75 16600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 22500.00 15943.75 16600.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 48 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-85005 Impact Atten (Sand Barrel Array) Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 2.00 5000.00 3783.75 3610.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5000.00 3783.75 3610.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5000.00 3783.75 3610.00 =============== 614-86003 Spread Spectrum Radio (Contact Closure) Each =================================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 3.00 3000.00 2895.33 2650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 3000.00 2895.33 2650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 3000.00 2895.33 2650.00 =============== 614-86091 Inst Traf Sig Repeater Each =================================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 3.00 125.00 718.67 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 125.00 718.67 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 125.00 718.67 400.00 =============== 614-86246 Ctrler (Ty 170E-HC11) Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 14300.00 16335.00 15150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 14300.00 16335.00 15150.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 2.00 12500.00 15766.67 14500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 12500.00 15766.67 14500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 13100.00 15994.00 14716.67 =============== 614-86705 Inst Traf Sig Equip Hour =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 120.00 150.00 176.00 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 120.00 150.00 176.00 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 150.00 176.00 120.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 49 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86800 Uninterrupted Power Supply Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 6000.00 5686.75 5150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 6000.00 5686.75 5150.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 2.00 4500.00 6273.33 5700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 4500.00 6273.33 5700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 5000.00 6038.70 5516.67 =============== 614-87350 Test Fiber Optic Cable LUMP SUM =============================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 1.00 2500.00 3450.00 2150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2500.00 3450.00 2150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2500.00 3450.00 2150.00 =============== 614-87406 Fiber Optic Cable (S Mode) (6 S) Lin Foot =============================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 2,000.00 2.00 2.13 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,000.00 2.00 2.13 2.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,000.00 2.00 2.13 2.00 =============== 614-87424 Fiber Optic Cable (S Mode) (24 S) Lin Foot =============================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 2,000.00 2.50 2.38 2.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,000.00 2.50 2.38 2.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,000.00 2.50 2.38 2.25 =============== 614-87606 Term FO Cable (6 Strand) Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 2.00 500.00 1695.50 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 500.00 1695.50 2300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 500.00 1695.50 2300.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 50 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87624 Term FO Cable (24 Strand) Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 2.00 2000.00 2094.00 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2000.00 2094.00 3000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2000.00 2094.00 3000.00 =============== 616-30036 36 In Trash Guard Each =================================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 1.00 1500.00 6287.50 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1500.00 6287.50 10000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1500.00 6287.50 10000.00 =============== 620-00020 Sanitary Facility Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 600.00 425.00 600.00 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 1.00 1000.00 634.15 250.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 2.00 1000.00 1073.33 220.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 1.00 650.00 585.66 730.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 850.00 693.37 404.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 2.00 400.00 402.50 402.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 400.00 402.50 402.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 721.43 772.09 603.13 =============== 625-00000 Const Surveying LUMP SUM =============================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 1.00 3000.00 4120.05 2120.00 MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 1500.00 1972.50 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2250.00 3261.03 1810.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2250.00 5243.59 2206.67 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 51 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 625-00001 Const Surveying (Hour) Hour =================================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 8.00 135.00 114.00 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 135.00 114.00 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 135.00 114.00 120.00 =============== 626-00000 Mobilization LUMP SUM =============================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 1.00 20000.00 43808.20 51000.00 MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 1.00 36000.00 23583.75 34105.00 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 1.00 40000.00 44390.11 53484.00 MTCER400-247 HWYS 6J,7C,34A,42A,59B,61A,63 02/04/10 1.00 250.00 679.60 300.00 MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 7500.00 13883.75 9500.00 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 1.00 10000.00 23356.61 12300.00 MTCE R300-162 R300-162 R3 FY10 REGION WIDE 03/04/10 1.00 500.00 8409.80 1000.00 R500-111 REGION 5 VARIOUS US AND STATE 03/04/10 1.00 10000.00 13399.80 250.00 MTCER300-164 REGION 3, SH 50 A AND D, 90 B 03/04/10 1.00 5000.00 17200.00 1000.00 MTCER400-248 SOUTHWEST REGION 4- SOUTH OF 03/04/10 1.00 15000.00 31916.67 3000.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 1.00 10000.00 27672.33 15376.00 MTCER100-177 REGION 1 FY'10 EAST STRIPING 03/18/10 1.00 500.00 5590.00 1000.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 1.00 35000.00 88333.33 64000.00 MTCER100-170 REGION 1 FY 10 WEST STRIPING 03/25/10 1.00 1000.00 2700.00 300.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 1.00 10000.00 57675.00 43700.00 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 1.00 3009.00 2330.25 1924.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 1.00 45000.00 60879.87 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 14632.88 29429.53 17837.59 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 1.00 8000.00 11666.67 5000.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 1.00 30000.00 41750.00 44000.00 MTCER200-169 REGION II REGION-WIDE 05/06/10 1.00 5000.00 23966.67 7500.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 1.00 12000.00 22233.33 13700.00 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 1.00 5000.00 31036.33 58645.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 12000.00 26437.21 25769.06 MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 07/22/10 1.00 15000.00 34833.33 4500.00 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 1.00 10000.00 36637.60 45000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 52 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00000 Mobilization LUMP SUM =============================================== MTCE R100-180 WESTERN PORTION OF REGION 1 08/12/10 1.00 15000.00 7000.00 1000.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 1.00 145000.00 140000.00 140000.00 MTCE R100-184 VARIOUS LOCATIONS 09/02/10 1.00 13000.00 17196.50 9503.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 1.00 25000.00 24910.38 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 37166.67 32799.88 37500.50 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 1.00 50000.00 56500.00 90000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 50000.00 103733.33 84666.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 20060.66 34604.45 29389.91 =============== 626-01000 Public Info Services LUMP SUM =============================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 1.00 3000.00 1547.25 645.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 1.00 2000.00 7000.00 2000.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 1.00 3000.00 4219.54 4870.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 2666.67 4072.80 2505.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 1.00 3000.00 3666.67 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3000.00 3666.67 1500.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 1.00 2000.00 1679.00 1679.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2000.00 1679.00 1679.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 2600.00 3892.19 2138.80 =============== 627-00003 Thermoplastic Pvmt Mkg (Inlaid) Sq Foot ================================================ MTCER200-169 REGION II REGION-WIDE 05/06/10 19,482.00 6.70 6.42 6.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19,482.00 6.70 6.42 6.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,482.00 6.70 6.42 6.25 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 53 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00005 Epoxy Pvmt Mkg Gallon ================================================= MTCER400-247 HWYS 6J,7C,34A,42A,59B,61A,63 02/04/10 16,329.00 34.00 34.95 32.50 MTCE R300-162 R300-162 R3 FY10 REGION WIDE 03/04/10 33,516.00 33.00 34.09 31.42 R500-111 REGION 5 VARIOUS US AND STATE 03/04/10 38,820.00 34.00 34.76 31.95 MTCER200-170 REGION II REGION-WIDE 03/11/10 42.00 90.00 108.50 102.00 MTCER100-177 REGION 1 FY'10 EAST STRIPING 03/18/10 6,650.00 31.00 36.53 34.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 30.00 50.00 105.00 100.00 MTCER100-170 REGION 1 FY 10 WEST STRIPING 03/25/10 12,760.00 33.50 35.13 32.20 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 27.00 200.00 131.67 116.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 108,174.00 33.51 34.80 32.09 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 80.00 75.00 141.67 150.00 MTCER200-169 REGION II REGION-WIDE 05/06/10 28,596.00 33.00 34.18 34.75 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 65.00 65.00 107.16 58.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28,741.00 33.19 34.70 35.12 MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 07/22/10 4,500.00 36.00 44.50 38.50 MTCE R100-180 WESTERN PORTION OF REGION 1 08/12/10 10,500.00 37.00 40.17 40.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 206.00 100.00 97.75 97.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15,206.00 37.56 41.72 40.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 152,121.00 33.86 35.26 33.49 =============== 627-00007 Epoxy Pvmt Mkg (Spec) Gallon ================================================= MTCER200-169 REGION II REGION-WIDE 05/06/10 3,134.00 64.00 105.42 71.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,134.00 64.00 105.42 71.25 MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 07/22/10 2,100.00 80.00 116.83 65.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,100.00 80.00 116.83 65.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,234.00 70.42 110.00 68.94 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 54 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00011 Pvmt Mkg Paint (Waterborne) Gallon ================================================= MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 140.00 45.00 45.67 42.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 27.00 200.00 77.68 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 167.00 70.06 57.40 44.10 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 413.00 25.00 36.80 36.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 413.00 25.00 36.80 36.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 580.00 37.97 58.53 47.90 =============== 627-00032 Raised Flex Pvmt Marker (Temp) Each =================================================== MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 2,000.00 0.50 1.48 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,000.00 0.50 1.48 1.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,000.00 0.50 1.48 1.50 =============== 627-00080 Polyurea Pvmt Mkg (IL) Gallon ================================================= MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 228.00 418.50 503.75 265.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 228.00 418.50 503.75 265.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 228.00 418.50 503.75 265.00 =============== 627-01001 Preform Plastic Pvmt Mkg (Ty I) Sq Foot ================================================ MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 07/22/10 600.00 9.00 8.50 8.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 600.00 9.00 8.50 8.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 600.00 9.00 8.50 8.30 =============== 627-01010 Preform Plastic Pvmt Mkg (TY I)(Inlaid) Sq Foot ================================================ MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 4,639.00 15.00 10.33 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,639.00 15.00 10.33 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 55 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-01010 Preform Plastic Pvmt Mkg (TY I)(Inlaid) Sq Foot ================================================ MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 9,870.00 8.00 9.87 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9,870.00 8.00 9.87 8.50 MTCE R100-180 WESTERN PORTION OF REGION 1 08/12/10 35,200.00 8.00 8.50 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 35,200.00 8.00 8.50 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 49,709.00 8.65 8.94 8.29 =============== 627-02010 Preform Plastic Pvmt Mkg (Ty II)(Inlaid) Sq Foot ================================================ MTCER100-177 REGION 1 FY'10 EAST STRIPING 03/18/10 2,250.00 8.00 11.69 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,250.00 8.00 11.69 9.00 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 9,500.00 9.00 11.50 10.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 1,850.00 11.00 10.53 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11,350.00 9.33 11.34 9.76 MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 07/22/10 85,000.00 9.00 8.95 8.30 MTCE R100-180 WESTERN PORTION OF REGION 1 08/12/10 5,000.00 8.00 8.58 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 90,000.00 8.94 8.93 8.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 103,600.00 8.97 9.27 8.46 =============== 627-30210 Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 280.00 11.00 12.53 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 280.00 11.00 12.53 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 280.00 11.00 12.53 12.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 56 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30324 Preform Plastic Pvmt Mkg (WS) (TY I) Sq Foot ================================================ MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 626.50 18.00 21.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 626.50 18.00 21.00 20.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 820.00 15.00 21.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 820.00 15.00 21.00 15.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 948.50 20.00 23.69 23.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 948.50 20.00 23.69 23.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,395.00 17.76 21.48 19.75 =============== 627-30329 Preform Plastic Pvmt Mkg (XS) (TY I) Sq Foot ================================================ MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 2,720.00 10.00 11.67 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,720.00 10.00 11.67 12.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 5,800.00 10.00 11.17 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,800.00 10.00 11.17 10.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 2,162.00 12.00 10.37 10.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,162.00 12.00 10.37 10.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,682.00 10.40 11.25 10.58 =============== 627-30405 Preform Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ MTCER400-248 SOUTHWEST REGION 4- SOUTH OF 03/04/10 16,710.00 7.00 7.85 7.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 57 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30405 Preform Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ MTCER200-170 REGION II REGION-WIDE 03/11/10 309.00 14.00 13.75 14.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 4,316.00 7.00 11.38 10.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21,335.00 7.10 8.45 8.15 MTCER200-169 REGION II REGION-WIDE 05/06/10 5,563.00 8.50 8.65 8.25 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 133.00 27.00 14.33 16.00 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 6,727.00 7.00 7.69 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12,423.00 7.89 8.11 7.93 MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 07/22/10 750.00 15.00 11.67 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 750.00 15.00 11.67 11.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34,508.00 7.56 8.40 8.13 =============== 627-30407 Preform Thermoplastic Pvmt Mkg (WS)(Sp) Sq Foot ================================================ MTCER300-164 REGION 3, SH 50 A AND D, 90 B 03/04/10 2,675.00 8.00 9.65 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,675.00 8.00 9.65 8.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,675.00 8.00 9.65 8.50 =============== 627-30410 Preform Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ MTCER400-248 SOUTHWEST REGION 4- SOUTH OF 03/04/10 31,618.00 4.50 5.42 4.65 MTCER200-170 REGION II REGION-WIDE 03/11/10 144.00 10.00 21.21 21.75 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 7,968.00 5.00 7.25 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 39,730.00 4.62 5.74 5.08 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 230.00 16.00 11.40 12.00 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 56,282.00 5.50 5.34 4.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 56,512.00 5.54 5.36 4.29 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 58 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30410 Preform Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 07/22/10 60.00 12.00 10.67 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 12.00 10.67 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 96,302.00 5.17 5.55 4.62 =============== 627-30411 Preform Thermoplastic Pvmt Mkg (XS)(Sp) Sq Foot ================================================ MTCER300-164 REGION 3, SH 50 A AND D, 90 B 03/04/10 22,708.00 6.00 7.26 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22,708.00 6.00 7.26 5.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22,708.00 6.00 7.26 5.50 =============== 630-00000 Flagging Hour =================================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 500.00 20.00 16.46 13.50 MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 160.00 22.00 21.83 22.30 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 640.00 15.00 16.72 19.08 MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 640.00 20.00 20.00 18.00 MTCER300-164 REGION 3, SH 50 A AND D, 90 B 03/04/10 80.00 18.00 16.40 12.00 MTCER400-248 SOUTHWEST REGION 4- SOUTH OF 03/04/10 700.00 10.00 15.26 12.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 100.00 20.00 21.00 7.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 1,000.00 21.00 21.67 19.00 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 20.00 21.00 31.25 71.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 1,014.00 26.00 14.58 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,854.00 19.40 16.83 18.10 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 120.00 20.00 18.83 21.50 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 300.00 22.00 20.33 21.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 100.00 26.00 24.63 20.50 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 30.00 20.00 18.35 23.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 550.00 22.18 20.64 21.15 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 100.00 20.00 16.61 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 59 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00000 Flagging Hour =================================================== MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 2,000.00 15.00 20.70 20.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,100.00 15.24 19.64 20.67 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 400.00 25.00 22.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 400.00 25.00 17.66 11.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,904.00 18.77 17.28 18.01 =============== 630-00001 Pilot Car Operation Hour =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 320.00 25.00 30.81 40.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 320.00 25.00 30.81 40.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 320.00 25.00 28.23 20.64 =============== 630-00003 Uniformed Traf Ctrl Hour =================================================== MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 48.00 50.00 92.50 117.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48.00 50.00 92.50 117.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 100.00 65.00 67.50 62.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 65.00 67.50 62.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 148.00 60.14 75.61 79.84 =============== 630-00007 Traf Ctrl Inspection Day ==================================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 34.00 55.00 81.23 10.00 MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 20.00 110.00 65.03 53.10 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 32.00 50.00 33.64 59.36 MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 10.00 90.00 93.50 99.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 60 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00007 Traf Ctrl Inspection Day ==================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 20.00 75.00 75.08 50.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 8.00 80.00 103.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 124.00 70.24 68.47 48.48 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 15.00 100.00 315.00 95.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 8.00 120.00 120.00 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23.00 106.96 247.17 84.57 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 10.00 330.00 46.00 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 330.00 46.00 46.00 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 17.00 150.00 190.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 150.00 122.66 86.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 174.00 97.82 96.05 70.05 =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 85.00 250.00 337.20 50.00 MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 60.00 550.00 465.75 398.00 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 90.00 200.00 363.67 424.00 MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 20.00 400.00 466.50 480.00 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 20.00 550.00 740.97 420.00 MTCER300-164 REGION 3, SH 50 A AND D, 90 B 03/04/10 30.00 400.00 349.00 150.00 MTCER400-248 SOUTHWEST REGION 4- SOUTH OF 03/04/10 50.00 175.00 417.50 100.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 50.00 400.00 409.50 350.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 15.00 550.00 500.00 500.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 50.00 300.00 488.75 480.00 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 20.00 300.00 301.25 82.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 39.00 600.00 503.26 456.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 529.00 349.05 408.22 306.64 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 15.00 450.00 583.33 450.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 61 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 30.00 500.00 478.33 450.00 MTCER200-169 REGION II REGION-WIDE 05/06/10 25.00 150.00 306.67 300.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 20.00 550.00 518.33 500.00 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 60.00 400.00 324.14 286.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 150.00 403.33 394.49 366.28 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 90.00 400.00 288.14 60.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 28.00 400.00 506.00 506.00 MTCE R100-184 VARIOUS LOCATIONS 09/02/10 15.00 650.00 615.00 635.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 50.00 450.00 454.00 361.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 183.00 434.15 343.41 257.61 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 35.00 400.00 412.50 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35.00 400.00 424.73 282.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 897.00 377.48 398.83 301.21 =============== 630-00015 Uniformed Traf Ctrl Coordination Hour =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 4.00 50.00 56.00 68.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 50.00 56.00 68.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 50.00 56.00 68.00 =============== 630-00025 Traf Ctrl Vehicle Hour =================================================== MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 100.00 18.00 13.95 10.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 18.00 13.95 10.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 18.00 13.95 10.30 =============== 630-80001 Flash Beacon (Port) Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 4.00 800.00 165.00 106.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 800.00 165.00 106.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 800.00 165.00 106.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 62 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80305 Flagging Station Light Each =================================================== MTCER400-248 SOUTHWEST REGION 4- SOUTH OF 03/04/10 4.00 50.00 379.17 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 50.00 379.17 10.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 4.00 800.00 265.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 800.00 265.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 425.00 341.11 55.00 =============== 630-80335 Barricade (3 M-A) (Temp) Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 8.00 180.00 93.75 96.00 MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 2.00 165.00 112.00 78.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 3.00 100.00 59.55 61.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 159.23 82.15 85.15 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 2.00 205.00 93.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 205.00 93.00 45.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 6.00 100.00 86.45 10.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 100.00 86.45 10.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 146.67 83.88 59.94 =============== 630-80337 Barricade (3 M-C) (Temp) Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 2.00 300.00 193.00 157.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 300.00 193.00 157.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 300.00 193.00 157.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 63 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80341 Const Traf Sign (A) Each =================================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 6.00 50.00 31.05 5.00 MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 46.00 65.00 26.49 15.95 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 15.00 20.00 12.53 21.20 MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 42.00 35.00 38.50 26.00 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 9.00 20.00 37.11 5.50 MTCER300-164 REGION 3, SH 50 A AND D, 90 B 03/04/10 36.00 20.00 73.10 10.00 MTCER400-248 SOUTHWEST REGION 4- SOUTH OF 03/04/10 60.00 40.00 26.67 10.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 29.00 40.00 31.00 20.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 76.00 10.00 17.67 16.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 8.00 20.00 25.00 10.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 20.00 40.00 28.38 42.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 347.00 32.39 31.77 17.04 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 4.00 50.00 50.00 50.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 28.00 20.00 41.67 10.00 MTCER200-169 REGION II REGION-WIDE 05/06/10 4.00 15.00 28.67 25.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 4.00 40.00 35.67 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 24.50 40.60 16.30 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 18.00 20.00 13.00 13.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 34.00 10.00 5.75 5.75 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 9.00 40.00 21.95 10.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 61.00 17.38 13.39 8.56 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 4.00 60.00 28.50 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 60.00 18.91 19.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 452.00 29.91 29.71 16.11 =============== 630-80342 Const Traf Sign (B) Each =================================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 30.00 50.00 29.42 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 64 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80342 Const Traf Sign (B) Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 42.00 75.00 30.31 21.25 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 40.00 20.00 22.13 31.80 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 14.00 25.00 46.60 5.50 MTCER400-248 SOUTHWEST REGION 4- SOUTH OF 03/04/10 24.00 40.00 26.67 10.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 35.00 50.00 41.42 35.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 70.00 20.00 21.33 22.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 8.00 25.00 25.00 10.00 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 14.00 65.00 28.50 53.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 44.00 55.00 34.49 42.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 321.00 41.87 30.30 25.21 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 20.00 50.00 50.00 50.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 8.00 30.00 41.67 10.00 MTCER200-169 REGION II REGION-WIDE 05/06/10 24.00 15.00 28.67 25.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 38.00 40.00 39.00 23.00 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 40.00 15.00 10.43 11.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 130.00 28.62 28.32 23.25 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 82.00 30.00 15.14 13.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 50.00 15.00 5.75 5.75 MTCE R100-184 VARIOUS LOCATIONS 09/02/10 10.00 85.00 82.50 115.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 33.00 50.00 21.95 10.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 175.00 32.63 17.43 16.25 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 12.00 70.00 31.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 70.00 39.60 30.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 638.00 37.16 28.61 23.92 =============== 630-80343 Const Traf Sign (C) Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 8.00 85.00 34.14 26.55 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 4.00 25.00 20.23 42.40 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 65 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80343 Const Traf Sign (C) Each =================================================== MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 4.00 30.00 46.60 5.50 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 8.00 30.00 25.00 10.00 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 4.00 65.00 55.75 162.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 28.00 70.00 35.05 42.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 56.00 60.00 34.54 41.51 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 10.00 50.00 51.67 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 50.00 51.67 55.00 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 8.00 40.00 16.64 13.00 MTCE R100-184 VARIOUS LOCATIONS 09/02/10 10.00 85.00 85.50 105.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 21.00 60.00 21.95 10.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 39.00 62.31 28.04 35.14 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 8.00 80.00 33.50 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 80.00 21.38 27.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 113.00 61.33 32.94 39.05 =============== 630-80344 Const Traf Sign (Spec) Sq Foot ================================================ MTCER200-168 REGION 2 REGIONWIDE 01/14/10 20.00 15.00 10.58 8.50 MTCER200-170 REGION II REGION-WIDE 03/11/10 112.00 20.00 14.08 15.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 32.00 15.00 13.67 10.00 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 32.00 15.00 16.88 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 196.00 17.86 13.98 15.64 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 84.00 18.00 33.33 20.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 9.00 40.00 40.67 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 93.00 20.13 34.04 19.23 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 66 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80344 Const Traf Sign (Spec) Sq Foot ================================================ MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 32.00 20.00 23.00 23.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 16.00 20.00 11.70 10.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48.00 20.00 15.47 18.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 337.00 18.79 23.00 25.26 =============== 630-80348 Const Info Sign Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 4.00 200.00 87.00 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 200.00 87.00 105.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 200.00 87.00 105.00 =============== 630-80350 Vert Panel Each =================================================== MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 30.00 10.00 12.07 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 10.00 12.07 13.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 10.00 12.07 13.00 =============== 630-80355 Port Mesg Panel Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 6.00 5000.00 1784.25 903.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 4.00 2000.00 3612.50 2200.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 4.00 4000.00 1392.87 2070.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 3857.14 1983.75 1607.00 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 2.00 1500.00 3622.75 6491.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1500.00 3622.75 6491.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 2.00 2500.00 4705.25 4121.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2500.00 4705.25 4121.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 3444.44 2764.18 2786.10 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 67 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80357 Flash Arrow Panel (B Ty) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 2.00 250.00 254.67 265.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 2.00 250.00 376.00 200.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 2.00 150.00 200.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 216.67 292.27 255.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 2.00 500.00 416.67 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 500.00 416.67 250.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 2.00 110.00 287.50 287.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 110.00 287.50 287.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 252.00 280.63 163.19 =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 2.00 350.00 707.00 175.00 MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 2.00 800.00 582.75 319.00 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 1.00 500.00 1059.50 566.00 MTCER300-164 REGION 3, SH 50 A AND D, 90 B 03/04/10 1.00 500.00 497.00 10.00 MTCER400-248 SOUTHWEST REGION 4- SOUTH OF 03/04/10 2.00 300.00 378.33 20.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 4.00 1500.00 711.25 295.00 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 1.00 500.00 231.25 658.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 2.00 1000.00 501.21 730.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 826.67 590.71 326.80 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 2.00 800.00 600.00 750.00 MTCER200-169 REGION II REGION-WIDE 05/06/10 2.00 100.00 283.33 200.00 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 2.00 250.00 546.20 584.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 383.33 483.48 511.59 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 2.00 1000.00 539.29 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 68 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 1.00 85.00 1280.00 525.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 4.00 750.00 471.25 415.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 726.43 551.56 455.00 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 1.00 1500.00 1960.00 3700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1500.00 1922.50 2433.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 733.97 640.08 595.37 =============== 630-80359 Port Mesg Panel Day ==================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 6.00 75.00 136.00 191.00 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 20.00 120.00 98.12 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26.00 109.62 109.88 86.38 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 100.00 60.00 250.00 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 60.00 250.00 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 126.00 70.24 168.73 224.61 =============== 630-80360 Drum Channel Dev Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 50.00 35.00 24.31 21.25 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 50.00 15.00 18.00 16.00 MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 50.00 25.00 27.00 26.00 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 10.00 20.00 14.25 11.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 50.00 20.00 16.63 10.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 150.00 10.00 10.67 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 360.00 17.92 17.46 12.98 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 30.00 30.00 40.67 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 30.00 40.67 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 69 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80360 Drum Channel Dev Each =================================================== MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 150.00 5.00 1.15 1.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 150.00 5.00 1.15 1.15 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 50.00 50.00 28.50 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 50.00 20.67 21.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 590.00 17.97 17.92 11.90 =============== 630-80363 Drum Channel Dev (Light) (F) Each =================================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 3.00 50.00 31.50 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 50.00 31.50 36.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 50.00 31.50 36.00 =============== 630-80364 Drum Channel Dev (Light) (SB) Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 50.00 55.00 29.31 21.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 55.00 29.31 21.25 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 20.00 50.00 41.67 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 50.00 41.67 10.00 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 10.00 50.00 30.50 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 50.00 30.50 34.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 53.13 32.04 20.03 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 70 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80370 Conc Barrier (Temp) Lin Foot =============================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 60.00 40.00 43.14 26.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 40.00 43.14 26.55 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 150.00 30.00 31.50 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 150.00 30.00 31.50 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 210.00 32.86 36.67 32.59 =============== 630-80380 Traffic Cone Each =================================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 150.00 10.00 6.81 3.00 MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 150.00 8.00 8.11 7.45 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 300.00 4.00 4.92 8.50 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 125.00 10.00 6.13 2.20 MTCER300-164 REGION 3, SH 50 A AND D, 90 B 03/04/10 60.00 5.00 8.70 10.00 MTCER400-248 SOUTHWEST REGION 4- SOUTH OF 03/04/10 150.00 7.00 4.17 2.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 50.00 5.00 5.88 5.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 400.00 5.00 2.33 1.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 400.00 5.00 4.75 1.00 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 50.00 8.00 8.16 20.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 200.00 5.00 9.11 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,035.00 5.97 5.94 4.44 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 300.00 8.00 9.00 7.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 300.00 10.00 8.33 5.00 MTCER200-169 REGION II REGION-WIDE 05/06/10 200.00 3.00 4.00 5.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 150.00 10.00 5.33 5.00 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 150.00 5.00 7.01 7.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,100.00 7.50 7.13 5.82 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 100.00 5.00 6.21 6.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 71 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80380 Traffic Cone Each =================================================== MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 500.00 3.00 0.29 0.29 MTCE R100-184 VARIOUS LOCATIONS 09/02/10 80.00 8.00 9.50 12.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 300.00 8.00 7.84 4.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 980.00 5.14 6.02 3.01 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 50.00 40.00 6.50 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 40.00 4.22 2.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,165.00 6.59 6.03 4.30 =============== 630-80510 Mobile Pvmt Mkg Zone LUMP SUM =============================================== MTCER400-247 HWYS 6J,7C,34A,42A,59B,61A,63 02/04/10 1.00 250.00 719.60 500.00 MTCE R300-162 R300-162 R3 FY10 REGION WIDE 03/04/10 1.00 500.00 2509.80 1500.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 1.00 2500.00 1288.07 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1083.33 1459.98 1066.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1083.33 1459.98 1066.67 =============== 630-80520 Mobile Pvmt Mkg Zone Day ==================================================== MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 4.00 500.00 1000.00 1000.00 MTCER200-169 REGION II REGION-WIDE 05/06/10 100.00 100.00 61.67 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 104.00 115.38 97.76 86.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 104.00 115.38 97.76 86.54 =============== 630-85040 Impact Atten (T-M-A) (Temp) Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 2.00 12000.00 7080.00 4780.00 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 1.00 5000.00 5115.04 2200.00 MTCER300-164 REGION 3, SH 50 A AND D, 90 B 03/04/10 1.00 3000.00 8425.00 5000.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 2.00 13000.00 11284.56 9100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 9666.67 9209.92 5826.67 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 72 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85040 Impact Atten (T-M-A) (Temp) Each =================================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 1.00 10000.00 6080.00 8500.00 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 1.00 2000.00 5063.58 1754.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 6000.00 5499.19 5127.17 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 2.00 8000.00 6455.00 4120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 8000.00 6455.00 4120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 8600.00 8249.63 5345.43 =============== 630-85041 Impact Atten (T-M-A) Day ==================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 20.00 225.00 329.17 530.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 225.00 329.17 530.00 MTCER200-169 REGION II REGION-WIDE 05/06/10 50.00 100.00 101.67 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 100.00 101.67 50.00 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 180.00 90.00 134.14 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 180.00 90.00 134.14 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 102.80 179.20 142.81 =============== 700-70010 F/A Minor Contract Revisions Force Acct ============================================= MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR . 1.00 10000.00 . . MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP . 1.00 50000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 73 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70010 F/A Minor Contract Revisions Force Acct ============================================= MTCER200-168 REGION 2 REGIONWIDE . 1.00 50000.00 . . MTCER400-247 HWYS 6J,7C,34A,42A,59B,61A,63 . 1.00 5000.00 . . MTCE0361-096 US 34 BUSINESS AT US 36 IN ES . 1.00 14000.00 . . MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM . 1.00 25000.00 . . MTCE R300-162 R300-162 R3 FY10 REGION WIDE . 1.00 10000.00 . . R500-111 REGION 5 VARIOUS US AND STATE . 1.00 70000.00 . . MTCER400-248 SOUTHWEST REGION 4- SOUTH OF . 1.00 25000.00 . . MTCER200-170 REGION II REGION-WIDE . 1.00 10000.00 . . MTCER100-177 REGION 1 FY'10 EAST STRIPING . 1.00 25000.00 . . MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP . 1.00 50000.00 . . MTCER100-170 REGION 1 FY 10 WEST STRIPING . 1.00 15000.00 . . MTCE R300-160 070A , 070F, 070G, 070H, 006E . 1.00 10000.00 . . MTCER600-364 VARIOUS LOCATIONS IN REGION 6 . 1.00 5000.00 . . MTCE R400-243 I-25 MP 249 TO MP 282 . 1.00 50000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 26500.00 . . MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE . 1.00 5000.00 . . MTCE160A-015 DURANGO, CORTEZ, & IGNACIO . 1.00 20000.00 . . MTCER200-169 REGION II REGION-WIDE . 1.00 10000.00 . . MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS . 1.00 15000.00 . . MTCE R300-166 R3 FY11 REGION WIDE . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 11000.00 . . MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 . 1.00 50500.00 . . MTCE R100-180 WESTERN PORTION OF REGION 1 . 1.00 25000.00 . . MTCE R500-110 US 160A MP 85.7 TO MP 88.0 . 1.00 50000.00 . . MTCE R100-184 VARIOUS LOCATIONS . 1.00 30000.00 . . MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 . 1.00 24500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 36000.00 . . MTCE 0703-366 EJMT CULVERT REPAIR . 1.00 25000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 25000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 25333.33 . . =============== 700-70011 F/A Partnering Force Acct ============================================= MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP . 1.00 500.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 74 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70011 F/A Partnering Force Acct ============================================= MTCER200-168 REGION 2 REGIONWIDE . 1.00 100.00 . . MTCER400-247 HWYS 6J,7C,34A,42A,59B,61A,63 . 1.00 500.00 . . MTCE0361-096 US 34 BUSINESS AT US 36 IN ES . 1.00 1000.00 . . MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM . 1.00 500.00 . . R500-111 REGION 5 VARIOUS US AND STATE . 1.00 100.00 . . MTCER400-248 SOUTHWEST REGION 4- SOUTH OF . 1.00 500.00 . . MTCER200-170 REGION II REGION-WIDE . 1.00 100.00 . . MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP . 1.00 500.00 . . MTCE R300-160 070A , 070F, 070G, 070H, 006E . 1.00 100.00 . . MTCER600-364 VARIOUS LOCATIONS IN REGION 6 . 1.00 200.00 . . MTCE R400-243 I-25 MP 249 TO MP 282 . 1.00 500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 383.33 . . MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE . 1.00 500.00 . . MTCE160A-015 DURANGO, CORTEZ, & IGNACIO . 1.00 100.00 . . MTCER200-169 REGION II REGION-WIDE . 1.00 150.00 . . MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS . 1.00 750.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 375.00 . . MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 . 1.00 200.00 . . MTCE R500-110 US 160A MP 85.7 TO MP 88.0 . 1.00 500.00 . . MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 . 1.00 200.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 300.00 . . MTCE 0703-366 EJMT CULVERT REPAIR . 1.00 1500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1500.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 425.00 . . =============== 700-70016 F/A Fuel Cost Adjustment Force Acct ============================================= MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP . 1.00 1250.00 . . MTCER200-168 REGION 2 REGIONWIDE . 1.00 100.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 75 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70016 F/A Fuel Cost Adjustment Force Acct ============================================= MTCER400-247 HWYS 6J,7C,34A,42A,59B,61A,63 . 1.00 500.00 . . MTCE0361-096 US 34 BUSINESS AT US 36 IN ES . 1.00 1000.00 . . MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM . 1.00 500.00 . . MTCE R300-162 R300-162 R3 FY10 REGION WIDE . 1.00 500.00 . . R500-111 REGION 5 VARIOUS US AND STATE . 1.00 10000.00 . . MTCER400-248 SOUTHWEST REGION 4- SOUTH OF . 1.00 500.00 . . MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP . 1.00 3000.00 . . MTCE R300-160 070A , 070F, 070G, 070H, 006E . 1.00 100.00 . . MTCER600-364 VARIOUS LOCATIONS IN REGION 6 . 1.00 200.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 1604.55 . . MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE . 1.00 500.00 . . MTCE160A-015 DURANGO, CORTEZ, & IGNACIO . 1.00 3000.00 . . MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS . 1.00 500.00 . . MTCE R300-166 R3 FY11 REGION WIDE . 1.00 500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 1125.00 . . MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 . 1.00 800.00 . . MTCE R500-110 US 160A MP 85.7 TO MP 88.0 . 1.00 12000.00 . . MTCE R100-184 VARIOUS LOCATIONS . 1.00 2000.00 . . MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 . 1.00 300.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 3775.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 1960.53 . . =============== 700-70018 F/A Road Smooth Incentive Force Acct ============================================= MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP . 1.00 9000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 9000.00 . . MTCE R500-110 US 160A MP 85.7 TO MP 88.0 . 1.00 19000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 19000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 14000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 76 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70019 F/A Asphalt Cement Cost Adjustment Force Acct ============================================= MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP . 1.00 15000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 15000.00 . . MTCE R500-110 US 160A MP 85.7 TO MP 88.0 . 1.00 28000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 28000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 21500.00 . . =============== 700-70022 F/A OJT Colorado Training Program Force Acct ============================================= MTCE 0703-366 EJMT CULVERT REPAIR . 1.00 500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 500.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 500.00 . . =============== 700-70025 F/A Quality Incentive Pymt Force Acct ============================================= MTCE0361-096 US 34 BUSINESS AT US 36 IN ES . 1.00 1600.00 . . MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP . 1.00 16000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 8800.00 . . MTCE R500-110 US 160A MP 85.7 TO MP 88.0 . 1.00 67000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 67000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 28200.00 . . =============== 700-70028 F/A ESB Program Force Acct ============================================= MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR . 1.00 5000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 77 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70028 F/A ESB Program Force Acct ============================================= MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP . 1.00 5000.00 . . MTCER200-168 REGION 2 REGIONWIDE . 1.00 5000.00 . . MTCER400-247 HWYS 6J,7C,34A,42A,59B,61A,63 . 1.00 5000.00 . . MTCE0361-096 US 34 BUSINESS AT US 36 IN ES . 1.00 5000.00 . . MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM . 1.00 5000.00 . . MTCE R300-162 R300-162 R3 FY10 REGION WIDE . 1.00 5000.00 . . R500-111 REGION 5 VARIOUS US AND STATE . 1.00 7500.00 . . MTCER400-248 SOUTHWEST REGION 4- SOUTH OF . 1.00 5000.00 . . MTCER200-170 REGION II REGION-WIDE . 1.00 5000.00 . . MTCER100-177 REGION 1 FY'10 EAST STRIPING . 1.00 5000.00 . . MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP . 1.00 5000.00 . . MTCER100-170 REGION 1 FY 10 WEST STRIPING . 1.00 5000.00 . . MTCE R300-160 070A , 070F, 070G, 070H, 006E . 1.00 5000.00 . . MTCER600-364 VARIOUS LOCATIONS IN REGION 6 . 1.00 5000.00 . . MTCE R400-243 I-25 MP 249 TO MP 282 . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 5156.25 . . MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE . 1.00 5000.00 . . MTCE160A-015 DURANGO, CORTEZ, & IGNACIO . 1.00 5000.00 . . MTCER200-169 REGION II REGION-WIDE . 1.00 5000.00 . . MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS . 1.00 5000.00 . . MTCE R300-166 R3 FY11 REGION WIDE . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 5000.00 . . MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 . 1.00 7500.00 . . MTCE R100-180 WESTERN PORTION OF REGION 1 . 1.00 5000.00 . . MTCE R500-110 US 160A MP 85.7 TO MP 88.0 . 1.00 5000.00 . . MTCE R100-184 VARIOUS LOCATIONS . 1.00 5000.00 . . MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 5500.00 . . MTCE 0703-366 EJMT CULVERT REPAIR . 1.00 7500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 7500.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 5277.78 . . COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 78 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70031 F/A INTERIM SURFACE REPAIR Force Acct ============================================= MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 . . MTCE R500-110 US 160A MP 85.7 TO MP 88.0 . 1.00 25000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 15000.00 . . =============== 700-70034 F/A Force Acct ============================================= MTCE R100-184 VARIOUS LOCATIONS . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 . . =============== 700-70035 F/A Force Acct ============================================= MTCE R100-184 VARIOUS LOCATIONS . 1.00 10000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 . . =============== 700-70036 F/A Force Acct ============================================= MTCE R100-184 VARIOUS LOCATIONS . 1.00 2000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 . . =============== 700-70060 F/A Adjust Force Acct ============================================= MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP . 1.00 2000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 79 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70060 F/A Adjust Force Acct ============================================= MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP . 1.00 2000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2000.00 . . MTCE R500-110 US 160A MP 85.7 TO MP 88.0 . 1.00 2000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2000.00 . . =============== 700-70081 F/A Provide Force Acct ============================================= MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 . . =============== 700-70130 F/A Repair Force Acct ============================================= MTCE R500-110 US 160A MP 85.7 TO MP 88.0 . 1.00 2500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2500.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2500.00 . . =============== 700-70380 F/A Erosion Ctrl Force Acct ============================================= MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP . 1.00 3000.00 . . MTCER200-168 REGION 2 REGIONWIDE . 1.00 1500.00 . . MTCE0361-096 US 34 BUSINESS AT US 36 IN ES . 1.00 1000.00 . . MTCER400-248 SOUTHWEST REGION 4- SOUTH OF . 1.00 500.00 . . MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP . 1.00 1000.00 . . MTCER600-364 VARIOUS LOCATIONS IN REGION 6 . 1.00 2500.00 . . MTCE R400-243 I-25 MP 249 TO MP 282 . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 2071.43 . . MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE . 1.00 2000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 80 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70380 F/A Erosion Ctrl Force Acct ============================================= MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS . 1.00 2500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2250.00 . . MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 . 1.00 1000.00 . . MTCE R500-110 US 160A MP 85.7 TO MP 88.0 . 1.00 1000.00 . . MTCE R100-184 VARIOUS LOCATIONS . 1.00 5000.00 . . MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 . 1.00 2000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 2250.00 . . MTCE 0703-366 EJMT CULVERT REPAIR . 1.00 25000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 25000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 3785.71 . . =============== 700-73351 F/A Force Acct ============================================= MTCE0361-096 US 34 BUSINESS AT US 36 IN ES . 1.00 600.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 600.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 600.00 . . Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 1 2010 Cost Data PROJECTS BID FROM 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20100107 INTERMOUNTAIN SLURRY SEAL, INC. 4 $1,453,413.00 86.81 ES4 0343-030 SH 34: BRUSH TO AKRON 4 P 20100114 AMERICAN CIVIL CONSTRUCTORS, INC. 11 $6,422,888.00 85.20 ES3 0702-297 I-70 EDWARDS INTERCHANGE 3 M 20100128 FOUR CORNERS MATERIALS 7 $5,293,814.51 87.98 ES51602-123 US 160 FLORIDA RIVER TO 1 MILE 5 R 20100128 KOLBE STRIPING INC. 6 $354,835.00 64.96 MTCER100-171 MTCE FY10 R1 STENCIL SOUTH 1 R 20100128 VILLALOBOS CONCRETE INC. 5 $2,059,265.97 83.22 NH 0821-088 SH 82 IN GARFIELD COUNTY MP 0. 3 M 20100128 COULSON EXCAVATING COMPANY 6 $436,930.00 87.99 STA2873-156 WEST OF SH 287 & LCR 17 INTERS 4 R 20100128 COULSON EXCAVATING COMPANY 5 $9,384,771.55 104.28 IM0253-210 I-25 RUBB NB & SB N OF LCR 36 4 R 20100204 ASPHALT SPECIALTIES CO., INC. 5 $2,955,811.15 88.62 IM 0703-352 I-70 WEST EJMT TO BAKERVILLE 1 M 20100204 LAFARGE NORTH AMERICA, INC 4 $6,051,601.78 95.28 IM0251-337 TRINIDAD - NORTH 2 R 20100204 DILLIE & KUHN, INC. 11 $561,154.86 78.62 MP0211-001 SH16A, SH21A, US24A, SH67D & U 2 R 20100204 APC SOUTHERN CONSTRUCTION COMPANY, LLC 7 $4,527,417.86 93.49 ES1 0243-079 US 24 WEST OF LIMON 1 P 20100211 BRANNAN SAND AND GRAVEL, LLC 6 $403,509.27 85.86 CCR600-330 CHATFIELD STATE PARK MAIN RD. 6 R 20100211 NCB, LLC 15 $332,453.00 71.47 ES1 2854-120 US 285 MM 172.3 1 M 20100218 LAFARGE NORTH AMERICA, INC 4 $2,801,243.94 100.39 ES4 0061-080 WASHINGTON AND LOGAN COUNTY 4 R 20100218 ROCKY MOUNTAIN MATERIALS & ASPHALT, INC. 6 $4,406,202.39 91.21 ES20504-060 US 50B: EAST OF JCT 96 TO HUER 2 R 20100225 LAFARGE NORTH AMERICA, INC 8 $4,608,918.98 79.04 ES30141-021 MP 0-23, JACKSON COUNTY, SH 14 3 M 20100225 LAFARGE NORTH AMERICA, INC 8 $3,332,949.85 80.20 ES30141-021 MP 0-23, JACKSON COUNTY, SH 14 3 M Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 2 2010 Cost Data PROJECTS BID FROM 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20100304 APC SOUTHERN CONSTRUCTION COMPANY, LLC 6 $5,165,043.41 98.73 ES5 1602-125 US 160 SHAW CREEK TO DEL NORTE 5 R 20100304 LAFARGE NORTH AMERICA, INC 6 $1,509,306.60 77.31 ES6 002A-003 SH 2, 62ND AVE. TO QUEBEC PARK 6 U 20100311 INTERFACE COMMUNICATIONS, COMPANY 4 $70,059.48 87.77 STAR400-249 SH 257 MP 9.558 AND SH 7B MP 5 4 R 20100311 KOLBE STRIPING INC. 4 $585,181.00 116.61 MPR200-172 SH287 A & B AND US50 B 2 P 20100318 LAFARGE NORTH AMERICA, INC 5 $3,299,328.29 92.90 STA0853-065 ON US 85 IN WELD COUNTY 4 U 20100318 STURGEON ELECTRIC COMPANY, INC 4 $577,954.00 101.16 C0703-356 I-70, EAST OF SILVERTHORN TO L 1 M 20100318 WALSENBURG SAND AND GRAVEL 7 $1,837,111.00 104.92 FBR 069A-026 0.5 MILES S/O THE TOWN OF FARI 2 L 20100318 EDWARD KRAEMER & SONS INC. 5 $17,172,771.47 31.38 ES6 0852-103 - CONCRETE ALT US 85 / C-470 INTERCHANGE (STA 6 R ES6 0852-103 - DEFAULT ALT US 85 / C-470 INTERCHANGE (STA 6 R ES6 0852-103 - STEEL ALT US 85 / C-470 INTERCHANGE (STA 6 R 20100318 FLATIRON CONSTRUCTORS, INC. 4 $620,830.00 84.08 ER 0702-307 I-70 MP 124-126 IN GARFIELD CO 3 M 20100325 BRANNAN SAND AND GRAVEL, LLC 6 $2,378,047.60 89.14 STA157A-010 SH 157A IN BOULDER COUNTY 4 R 20100401 STRUCTURES, INC. 8 $6,959,186.05 87.91 BR M356-022 80TH OVER US36 ON WESTMINISTER 6 U 20100401 LAFARGE NORTH AMERICA, INC 6 $3,808,889.81 92.81 NHC010-100 SH2, ALAMEDA TO MLK 6 U 20100401 SCHMIDT CONSTRUCTION COMPANY 3 $2,641,487.47 91.06 STA R200-167 SH 21 BRADLEY RD. TO N/O DRENN 2 R 20100401 STURGEON ELECTRIC COMPANY, INC 4 $122,513.00 90.87 C0703-355 I-70, EAST OF SILVER PLUME TO 1 M 20100401 UNITED COMPANIES OF MESA COUNTY 3 $849,450.25 94.45 STA 0241-054 SH 24 BATTLE MOUNTAIN CHIP SEA 3 M 20100408 LAFARGE NORTH AMERICA, INC 6 $2,662,412.20 88.57 STA2854-119 US 285 DEER CREEK TO RICHMOND 1 M 20100408 ELAM CONSTRUCTION, INC. 3 $3,529,926.50 95.92 NH5502-067 US 550 NORTH OF DURANGO ON MOL 5 M Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 3 2010 Cost Data PROJECTS BID FROM 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20100408 BRANNAN SAND AND GRAVEL, LLC 4 $4,268,360.97 80.01 IM0253-211 I-25 NB AND SB AT WCR 32 4 L 20100415 HAMON CONTRACTORS, INC. 6 $16,421,806.87 87.37 STU 0831-107 PARKER RD (SH 83) AND ARAPAHOE 6 U 20100415 ZAK DIRT, INC. 7 $2,894,701.75 80.23 NH 2873-157 SH 287:BROOMFIELD TO LAFAYETTE 6 R 20100415 CRUZ CONSTRUCTION, INC. 7 $427,135.50 77.01 C0761-205 I-76 NORTH OF WCR 8 IN WELD CO 4 L 20100422 INTERMOUNTAIN SLURRY SEAL, INC. 4 $588,793.08 96.40 NH 1603-026 US 160 FORT GARLAND EAST 5 R 20100422 APC SOUTHERN CONSTRUCTION COMPANY, LLC 2 $805,394.81 94.32 IM0704-219 I70 WEST OF SIEBERT - EAST 1 P 20100422 INTERFACE COMMUNICATIONS, COMPANY 2 $182,171.81 102.14 C3921-011 SH 392 AND CR 31 INTERSECTION 4 R 20100422 W.L. CONTRACTORS, INC. 3 $218,837.75 94.92 C0931-028 INTERSECTION OF SH 93 AND SH 1 4 R 20100429 INTERSTATE HIGHWAY CONSTRUCTION 6 $20,293,515.37 95.34 IM 2254-074 I-225: MISSISSIPPI TO 2ND AVE 6 U 20100429 ARROW ELECTRIC SERVICE, INC. 6 $415,249.90 95.47 SHE045A-008 SH45(PUEBLO BLVD.) AND GOODNIG 2 U 20100429 LAFARGE NORTH AMERICA, INC 5 $5,399,788.69 83.49 IM0252-406 ON I-25 1 MI. S. OF PUEBLO THR 2 U 20100506 CASTLE ROCK CONST. CO. OF COLO, LLC 4 $10,000,000.00 101.76 NH R100-131 HUGO-EAST 1 P 20100506 MIDWEST ROCKFALL, INC. 5 $1,012,145.00 82.87 STA145A-044 SH 145 ON NORWOOD HILL IN SAN 5 M 20100506 MOUNTAIN CONSTRUCTORS, INC. 6 $484,338.95 110.26 SHE2873-152 1.5 MILES WEST OF I-25 IN LARI 4 R 20100506 OLDCASTLE SW GROUP, INC. 5 $1,283,923.65 88.75 NH0402-078 US40&SH131 GRAND&ROUTT COUNTIE 3 M 20100513 COLORADO BORING. CO. 8 $294,642.88 59.04 STAR600-359 SH 7, SH 72, SH 177, SH 287 6 L 20100513 PAVETEC, INC. 4 $3,915,572.76 100.33 NH 2851-005 US 285 LA JARA TO ALAMOSA 5 R Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 4 2010 Cost Data PROJECTS BID FROM 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20100513 ASPHALT SPECIALTIES CO., INC. 7 $507,335.30 111.74 SHE085A-011 US 85 & 144TH AVENUE INTERSECT 6 R 20100513 OLDCASTLE SW GROUP, INC. 8 $1,398,999.00 97.47 C0701-205 I-70 EXIT 37 MESA COUNTY 3 L 20100513 WATERFORD CORPORATION 3 $1,128,603.25 103.66 C 0821-091 SH 82 MP 10-16 3 M 20100520 W.L. CONTRACTORS, INC. 5 $236,502.80 98.00 SHE0821-089 SH82 @ BRUSH CK. SIGNAL IMPROV 3 R 20100520 APC SOUTHERN CONSTRUCTION COMPANY, LLC 3 $4,859,868.06 93.35 NH 1603-028 US 160 MP 240.3 E TO FT GARLAN 5 P 20100527 ZAK DIRT, INC. 11 $649,545.50 96.79 STA1381-006 US 138 EAST OF STERLING 4 P 20100527 LAFARGE NORTH AMERICA, INC 3 $4,343,627.51 96.76 STA0362-029 US 36 KANSAS STATE LINE WEST ( 4 P 20100527 LAWSON CONSTRUCTION COMPANY 3 $8,237,445.21 112.28 NH0701-202 I-70B WIDENING EAST OF 24 ROAD 3 U 20100527 CONTRACT MANAGEMENT, INC. dba US ROADS 4 $303,303.00 94.80 NH050A-012 SANTA FE AT ILEX IN PUEBLO 2 U 20100527 EARTH CONTRACTORS, INC 5 $147,800.00 73.28 NH 0841-007 2 MI NORTH OF NM STATE LINE ON 5 M 20100603 ZAK DIRT, INC. 4 $593,177.45 112.76 FBR138A-008 REGION 4 VARIOUS LOCATIONS 4 P 20100610 ALERT TRAFFIC CONTROL, INC. 5 $123,642.50 74.54 BR1602-126 US 550/160 SOUTH OF DURANGO AT 5 M 20100610 AMERICAN CIVIL CONSTRUCTORS, INC. 5 $3,491,481.00 92.29 FBR5502-068 US 550 ON RED MOUNTAIN PASS SO 5 M 20100610 INTERFACE COMMUNICATIONS, COMPANY 5 $172,629.84 91.48 C056A-004 SH 56 AND 4TH ST IN BERTHOUD 4 R 20100610 AMERICAN CIVIL CONSTRUCTORS, INC. 5 $2,834,922.00 110.73 IM0704-221 I-70 FROM WEST OF COLORADO BLV 6 U 20100610 COLORADO CONSTRUCTORS, INC. 8 $2,040,049.60 99.40 IM0703-358 8 MILES EAST MILE MARKER 205.5 1 M 20100617 APC CONSTRUCTION CO., LLC 5 $830,035.85 94.24 STA128A-005 SH128: MCCASLIN TO ELDORADO 6 R Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 5 2010 Cost Data PROJECTS BID FROM 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20100617 APC CONSTRUCTION CO., LLC 5 $715,892.15 91.61 STA072A-032 5.4 MILES WEST OF SH 93 ON SH 1 R 20100617 TONY J. BELTRAMO & SONS, INC. 6 $432,535.05 96.05 SHE0504-059 SH50B AT BONFORTE BLVD. IN PUE 2 U 20100617 DIAMOND SURFACE, INC. 8 $1,112,535.62 134.23 IM 0762-046 I-76, BRUSH TO STERLING 4 R 20100617 K.E.C.I. COLORADO, INC. 2 $934,987.00 122.36 SHE R100-175 US 6 (MP 259), SH 9 (MP 109), 1 20100624 STRUCTURES, INC. 7 $2,908,694.00 84.47 FBR096A-039 SH 96: WEST OF HASWELL 2 P 20100624 SEMA CONSTRUCTION, INC. 4 $1,524,680.50 108.89 FBR 0703-357 STR. F-14-AZ WEST OF IDAHO SPR 1 M 20100701 CONNELL RESOURCES, INC. 5 $6,373,187.25 102.72 ES4 0853-072 SH 85 WYOMING SOUTH-STRUCTURES 4 R 20100701 BRANNAN SAND AND GRAVEL, LLC 4 $1,719,481.25 109.96 STA2854-118 US 285 TURKEY CREEK CANYON 1 M 20100708 MOUNTAIN CONSTRUCTORS, INC. 5 $543,250.87 100.65 SHE0073-008 SH7 AT YORK ST 6 P 20100708 NEW DESIGN CONSTRUCTION CO. 6 $2,238,350.22 101.13 SHE4701-120 C-470 ACRES G TO I-25 MEDIAN C 6 R 20100708 SEMA CONSTRUCTION, INC. 1 $2,006,630.00 84.22 FBR0242-047 US 24 AT MILE MARKER 270.8 AND 2 M 20100708 STRUCTURES, INC. 5 $271,164.00 88.88 C025A-011 I-25/SANTA FE F-16-DT 6 U 20100715 TRICON 2, LLC 5 $2,954,000.00 74.10 NH 1602-109 US 160 JACKSON MTN SLIDE REPAI 5 M 20100715 TRICON 2, LLC 4 $684,000.00 105.13 C 0132-018 US40 & SH13 MOFFAT COUNTY CULV 3 R 20100715 ROCK SOLID SOLUTIONS CORPORATION 6 $767,243.50 73.86 C 0821-090 SH 82 SHALE BLUFFS MP 35.2 - M 3 M 20100722 STURGEON ELECTRIC COMPANY, INC 3 $556,425.00 114.87 SHE R300-161 070A 124-125 GARFIELD_040A 140 3 M 20100722 CONTRACT MANAGEMENT, INC. dba US ROADS 6 $269,274.50 107.64 C021A-001 POWERS BLVD. AND DUBLIN 2 U Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 6 2010 Cost Data PROJECTS BID FROM 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20100729 CRUZ CONSTRUCTION, INC. 6 $597,486.70 78.16 C0252-410 I-25, TOMAH RD INTERCHAGE TO P 1 P 20100805 K.E.C.I. COLORADO, INC. 3 $448,904.00 112.26 SHE006A-044 US6, 19TH TO HERITAGE RD, GOLD 6 R 20100805 SEMA CONSTRUCTION, INC. CONTRACT REJ - NO REASON GIVEN FBR 0241-053 US-24 MP 171.0 3 M 20100819 INTERFACE COMMUNICATIONS, COMPANY 5 $769,809.00 80.78 STA R600-381 I-70@32ND AVE, C470@ALAMEDA AN 6 P 20100819 TLM CONSTRUCTORS, INC. 8 $273,461.00 98.04 IM0761-207 I 76 WEST BOUND IN MORGAN COUN 4 R 20100826 MAYS CONCRETE, INC 4 $685,104.62 60.61 IM 0702-302 I-70 HANGING LAKE TUNNELS MP 1 3 M 20100902 TRICON 2, LLC 2 $2,100,000.00 116.37 NH 4912-001 NORTH OF CORTEZ 5 M 20100902 ROCKY MOUNTAIN MATERIALS & ASPHALT, INC. 5 $3,899,982.32 89.11 ES21151-025 SH 115 M.P. 8.9 TO M.P. 37.0, 2 R 20100909 HAMON CONTRACTORS, INC. 7 $2,333,728.50 109.90 STA083A-036 SH 83: E-470 TO PEORIA 6 U 20100909 SEMA CONSTRUCTION, INC. 5 $10,280,721.20 103.03 NH1601-061 ON U.S. 160 MP 11.50 TO MP 17. 5 R 20100909 DKS ENTERPRISES INC. 6 $978,397.50 94.80 ES6 0853-079 SH 85- I-76 TO SH 7 6 R 20100909 ASPHALT SPECIALTIES CO., INC. 5 $3,172,153.70 119.26 IM0703-361 I-70 MM 242 TO MM 247 1 M 20100916 NEW DESIGN CONSTRUCTION CO. 10 $3,107,176.94 99.34 STA177A-007 UNIVERSITY BLVD: C470, DRY CR 6 U 20100916 TEZAK HEAVY EQUIPMENT CO., INC. 3 $3,919,895.28 65.95 NH050A-013 MONTROSE CO US 50 MM 103.1 - 1 3 R 20100916 TEZAK HEAVY EQUIPMENT CO., INC. 3 $3,835,029.55 65.42 NH050A-013 MONTROSE CO US 50 MM 103.1 - 1 3 R 20100916 TEZAK HEAVY EQUIPMENT CO., INC. 3 $3,794,755.66 66.47 NH050A-013 MONTROSE CO US 50 MM 103.1 - 1 3 R 20100923 OLDCASTLE SW GROUP, INC. 3 $3,509,854.00 106.91 ES35502-069 SH 550 MM 117.43 - 126.5 MONTR 3 L Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 7 2010 Cost Data PROJECTS BID FROM 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20100923 INTERSTATE HIGHWAY CONSTRUCTION 11 $1,766,906.69 78.78 ES1 0705-078 I-70, AGATE TO KANSAS BORDER 1 P 20100930 AMERICAN CIVIL CONSTRUCTORS, INC. 6 $15,693,969.00 100.23 STA 119A-051 SH 119 FROM SOUTH BLACK HAWK C 1 M 20100930 R.E. MONKS CONSTRUCTION COMPANY LLC 4 $3,567,183.63 85.63 NH1151-023 SH115A MP 38.3 TO 41.5 2 R 20101007 TONY J. BELTRAMO & SONS, INC. 2 $1,917,447.55 96.19 SHE 0503-071 US 50 - FORTINO/MORRIS TO BALT 2 L 20101007 LAWSON CONSTRUCTION COMPANY 5 $2,501,868.20 88.86 IM 0702-305 I-70 MP 117 - MP 126.5 GLENWOO 3 M 20101014 OLDCASTLE SW GROUP, INC. 2 $2,303,405.59 106.72 NH 4912-001 NORTH OF CORTEZ 5 M 20101014 OLDCASTLE SW GROUP, INC. 3 $3,689,980.50 101.14 ES35502-069 SH 550 MM 117.43 - 126.5 MONTR 3 M 20101021 CONNELL RESOURCES, INC. 6 $2,320,885.10 109.89 STA0712-014 ON SH 71 IN MORGAN COUNTY 4 R 20101028 HEYL CONSTRUCTION, INC 4 $307,297.50 103.99 C0501-058 SH 50 GJ DUCK POND PARK CULVER 3 R 20101104 TONY J. BELTRAMO & SONS, INC. 8 $837,157.75 95.05 NH0504-062 ROCKY FORD 2 P 20101104 OLDCASTLE SW GROUP, INC. 4 $888,005.50 94.52 NH0701-208 I70B CHIP SEAL - GRAND JCT EAS 3 U 20101118 AMERICAN CIVIL CONSTRUCTORS, INC. 4 $2,745,766.00 111.21 NH1602-124 WEST SIDE OF WOLF CREEK PASS 5 M 20101118 AMERICAN CIVIL CONSTRUCTORS, INC. 8 $4,660,864.00 90.11 FBR 0241-053 US-24 MP 171 NORTH OF LEADVILL 3 M 20101118 LAFARGE NORTH AMERICA, INC 12 $1,136,181.00 90.72 C052A-035 SH 52/CR 11 WELD CO 4 R 20101118 A & S CONSTRUCTION CO. 3 $2,883,475.47 83.20 STA0505-044 US 50 M.P. 400.0 TO M.P. 405.2 2 R 20101202 CASTLE ROCK CONST. CO. OF COLO, LLC 8 $6,319,919.23 104.48 STA086A-047 ON FOUNDERS PARKWAY (SH 86) IN 1 P 20101202 ZAK DIRT, INC. 8 $3,177,128.20 91.81 FBR030A-029 SH30 (HAVANA ST.) AT CHERRY CR 6 U Colorado Department of Transportation 13:28 Tuesday, February 22, 2011 8 2010 Cost Data PROJECTS BID FROM 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20101209 COLORADO BORING. CO. 7 $740,306.35 66.74 SHE 0852-104 SH 85 FROM MP 184.67 TO MP 200 1 20101209 CRUZ CONSTRUCTION, INC. 3 $1,609,873.35 87.74 FSAR600-386 I270,I25-IVANHOE & US285,C470- 6 U 20101209 MIDWEST ROCKFALL, INC. 5 $703,581.00 91.49 IM0703-367 I-70 MM 212-213, MM 226 TO MM 1 M 20101216 SCOTT CONTRACTING INC. 7 $7,848,824.71 100.32 STU C0881-024 FEDERAL BLVD (SH88) ALAMEDA TO 6 U 20101223 KIEWIT INFRASTRUCTURE CO. 6 $5,430,545.00 102.90 NH160A-011 US160, JCT SH3 TO FLORIDA RIVE 5 M 20101223 ZAK DIRT, INC. 8 $8,051,589.59 90.97 FBR0253-209 I-25: 84TH AVENUE BRIDGE REPLA 6 U ======= ================ ====== TOTALS 669 $360,802,978.64 85.02