2010 COST DATA (ANNUAL REPORT) MAINTENANCE TABLE OF CONTENTS PAGE BRIDGE COSTS PER SQUARE FOOT 1 INDEX & AVG UNIT PRICES 2 ITEM UNIT COSTS 40 PROJECT BID (JANUARY-DECEMBER 2010) 1400 Appendix A – 2010 Maintenance Type Projects * released on the CDOT web-site Colorado Department of Transportation 13:30 Tuesday, February 22, 2011 1 2010 Cost Data - Maintenance BRIDGE COST PER SQUARE FOOT (01/01/10 THROUGH 12/31/10) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ BRIDGE REPAIR 100211 MTCE 0701-204 M PILE REPAIR G-04-AE, 070A MM 6 G-04-AE 244.0000 38.0000 9272.0 $25,100 $2.71 G-04-AE 244.0000 38.0000 9272.0 $80,358 $8.67 100826 MTCE R500-110 M US 160A MP 85.7 TO MP 88.0 P-05-S 502.0000 84.0000 42168.0 $395,137 $9.37 WEIGHTED AVERAGE COST: NEW STRUCTURES 60712.0 $500,594 $8.25 Colorado Department of Transportation 13:30 Tuesday, February 22, 2011 1 2010 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 202-00026 Removal of Slope and Ditch Paving 45 Sq Yard 10,800.00 240.00 202-00070 Removal of Barricade 1 Each 200.00 200.00 202-00200 Removal of Sidewalk 67 Sq Yard 2,785.99 41.58 202-00203 Removal of Curb and Gutter 309 Lin Foot 6,897.00 22.32 202-00206 Removal of Concrete Curb Ramp 159 Sq Yard 7,951.50 50.01 202-00210 Removal of Concrete Pavement 3,750 Sq Yard 91,312.50 24.35 202-00220 Removal of Asphalt Mat 66 Sq Yard 1,650.00 25.00 202-00240 Removal of Asphalt Mat (Planing) 125,920 Sq Yard 172,790.40 1.37 202-00250 Removal of Pavement Marking 1,373,991 Sq Foot 322,193.77 0.23 202-00450 Removal of Portions of Present Structure (Class 1) 54 Sq Yard 10,586.70 196.05 202-00453 Removal of Portions of Present Structure (Class 2) 27 Sq Yard 9,752.13 361.19 202-00503 Removal of Portions of Present Structure 234 Sq Yard 145,430.22 621.50 202-00700 Removal of Light Standard 5 Each 1,200.00 240.00 202-00750 Removal of Luminaire 120 Each 7,680.00 64.00 202-00806 Removal of Walkway 1,121 Lin Foot 34,751.00 31.00 202-00810 Removal of Ground Sign 1,745 Each 42,279.10 24.23 202-00821 Removal of Sign Panel 1,053 Each 50,858.90 48.30 202-00827 Removal of Pull Box 17 Each 850.00 50.00 202-00828 Removal of Traffic Signal Equipment 1 Lump Sum 1,800.00 1,800.00 202-00831 Removal of Traffic Signal Head 14 Each 1,400.00 100.00 202-00848 Removal of Traffic Signal Controller and Cabinet 12 Each 2,076.00 173.00 202-00855 Removal of Traffic Signal Controller Cabinet 1 Each 550.00 550.00 202-00895 Removal of Impact Attenuator 1 Each 1,470.00 1,470.00 202-00900 Removal of Concrete Footing 1 Each 1,000.00 1,000.00 202-01300 Removal of End Anchorage 2 Each 552.00 276.00 202-05100 Sandblasting Reinforcing Steel 93 Sq Yard 668.67 7.19 202-05150 Sandblasting 41,174 Sq Foot 9,058.28 0.22 203-00010 Unclassified Excavation (Complete In Place) 25 Cubic Yard 2,750.00 110.00 203-01500 Blading 25 Hour 3,444.40 137.78 203-01510 Backhoe 9 Hour 900.00 100.00 203-01565 Hydraulic Excavator 80 Hour 12,800.00 160.00 203-01594 Combination Loader 20 Hour 2,294.40 114.72 203-01597 Potholing 34 Hour 8,440.00 248.24 203-01622 Sweeping (With Pickup Broom) 100 Hour 3,500.00 35.00 203-02330 Laborer 100 Hour 4,500.00 45.00 206-00000 Structure Excavation 72 Cubic Yard 10,872.00 151.00 206-00200 Structure Backfill (Class 2) 90 Cubic Yard 10,710.00 119.00 206-01750 Shoring 1 Lump Sum 18,300.00 18,300.00 Colorado Department of Transportation 13:30 Tuesday, February 22, 2011 2 2010 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 208-00002 Erosion Log (12 Inch) 3,350 Lin Foot 17,100.00 5.10 208-00003 Erosion Log (18 Inch) 200 Lin Foot 1,732.00 8.66 208-00011 Erosion Bales (Weed Free) 20 Each 270.00 13.50 208-00020 Silt Fence 400 Lin Foot 688.00 1.72 208-00034 Gravel Bag 1,060 Lin Foot 6,755.00 6.37 208-00045 Concrete Washout Structure 17 Each 10,705.00 629.71 208-00050 Storm Drain Inlet Protection 20 Each 720.00 36.00 208-00051 Storm Drain Inlet Protection 456 Lin Foot 7,822.00 17.15 208-00103 Removal and Disposal of Sediment (Labor) 114 Hour 4,787.50 42.00 208-00105 Removal and Disposal of Sediment (Equipment) 55 Hour 5,500.00 100.00 208-00205 Erosion Control Supervisor 124 Hour 7,722.50 62.28 210-00300 Reset Brick Pavers 89 Sq Yard 3,115.00 35.00 210-00451 Repair Overhead Sign Structure 1 Each 2,210.00 2,210.00 210-00500 Rebuild Portions of Present Structure 23 Each 70,316.50 3,057.24 210-00750 Reset Light Standard 20 Each 11,200.00 560.00 210-00810 Reset Ground Sign 51 Each 14,330.00 280.98 210-00815 Reset Sign Panel 126 Each 7,462.00 59.22 210-00825 Reset Flashing Beacon 2 Each 502.00 251.00 210-00827 Reset Pull Box 2 Each 100.00 50.00 210-00831 Reset Traffic Signal Head 8 Each 3,200.00 400.00 210-00865 Reset Pedestrian Signal Head 1 Each 390.00 390.00 210-00870 Reset Coordination Unit 1 Each 930.00 930.00 210-01130 Reset Guardrail Type 3 1,963 Lin Foot 24,380.46 12.42 210-04000 Adjust Structure 2 Each 550.00 275.00 210-04010 Adjust Manhole 13 Each 12,210.00 939.23 210-04050 Adjust Valve Box 19 Each 8,508.04 447.79 212-00006 Seeding (Native) 7 Acre 4,193.00 599.00 212-00032 Soil Conditioning 2 Acre 3,420.00 1,710.00 213-00002 Mulching (Weed Free Hay) 3 Acre 1,982.50 660.83 213-00009 Flexible Growth Medium 4 Acre 10,325.00 2,581.25 213-00012 Spray-on Mulch Blanket 0 Acre 1,250.00 213-00061 Mulch Tackifier 350 Pound 1,240.00 3.54 216-00042 Soil Retention Blanket (Biodegradable Straw/Coconut) 50 Sq Yard 150.00 3.00 250-00010 Environmental Health and Safety Management 1 Lump Sum 2,500.00 2,500.00 304-06007 Aggregate Base Course (Class 6) 9 Cubic Yard 1,080.00 120.00 403-00720 Hot Bituminous Pavement (Patching) (Asphalt) 458 Ton 73,346.00 160.14 403-34721 Hot Bituminous Pavement (Grading SX) (75) (PG 58-28) 44 Ton 6,600.00 150.00 403-34731 Hot Bituminous Pavement (Grading SX) (75) (PG 58-34) 3,874 Ton 395,148.00 102.00 Colorado Department of Transportation 13:30 Tuesday, February 22, 2011 3 2010 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 403-34741 Hot Bituminous Pavement (Grading SX) (75) (PG 64-22) 13,289 Ton 1,142,604.20 85.98 411-10255 Emulsified Asphalt (Slow-Setting) 13,882 Gallon 39,765.28 2.86 503-00018 Drilled Caisson (18 Inch) 4 Lin Foot 780.00 195.00 503-00048 Drilled Caisson (48 Inch) 44 Lin Foot 11,308.00 257.00 504-04410 Block Facing 30 Sq Foot 4,200.00 140.00 506-00000 Riprap 8 Cubic Yard 440.00 55.00 507-00000 Concrete Slope and Ditch Paving 15 Cubic Yard 8,550.00 570.00 507-00100 Concrete Slope and Ditch Paving (Reinforced) 15 Cubic Yard 6,503.00 433.53 509-00000 Structural Steel 9,550 Pound 22,442.50 2.35 509-00010 Structural Steel (Special) 3,340 Pound 12,191.00 3.65 509-08100 Provide Temporary Support 1 Lump Sum 12,445.00 12,445.00 509-90002 Paint Existing Structure (Special) 5 Gallon 1,135.00 227.00 515-00120 Waterproofing (Membrane) 4,575 Sq Yard 60,527.25 13.23 515-00400 Concrete Sealer 120 Sq Yard 1,464.00 12.20 515-00410 Concrete Sealer (Calcium Nitrite) 147 Sq Yard 4,226.25 28.75 518-01004 Bridge Expansion Device (0-4 Inch) 200 Lin Foot 69,000.00 345.00 601-01000 Concrete Class B 4 Cubic Yard 450.00 112.50 601-03000 Concrete Class D 6 Cubic Yard 2,934.00 489.00 601-03020 Concrete Class D (Miscellaneous) 9 Cubic Yard 13,500.00 1,500.00 601-03040 Concrete Class D (Bridge) 33 Cubic Yard 24,477.75 741.75 601-03540 Concrete Class DT (Deck Topping) 2 Cubic Yard 6,635.50 3,317.75 601-04000 Concrete Class E 828 Cubic Yard 507,564.00 613.00 601-06150 Concrete (Patching) 1,998 Sq Foot 80,808.30 40.44 602-00020 Reinforcing Steel (Epoxy Coated) 1,766 Pound 3,223.00 1.83 603-00024 Prepare Culvert Pipe (24 Inch) 330 Lin Foot 7,260.00 22.00 603-00025 Culvert Lining (24 Inch)(Special) 330 Lin Foot 75,900.00 230.00 603-00035 Prepare Culvert Pipe (36 Inch) 1,482 Lin Foot 44,460.00 30.00 603-00036 Culvert Lining (36 Inch) 1,482 Lin Foot 423,852.00 286.00 603-00060 Culvert Lining (60 Inch) 250 Lin Foot 148,500.00 594.00 603-00061 Prepare Culvert Pipe (60 Inch) 250 Lin Foot 10,000.00 40.00 604-00305 Inlet Type C (5 Foot) 1 Each 4,000.00 4,000.00 604-00510 Inlet Type D (10 Foot) 1 Each 8,500.00 8,500.00 604-31015 Manhole Box Base (15 Foot) 1 Each 17,200.00 17,200.00 604-50200 Manhole Ring and Cover 1 Each 4,000.00 4,000.00 606-00301 Guardrail Type 3 (6-3 Post Spacing) 325 Lin Foot 4,342.00 13.36 606-01340 End Anchorage Type 3D 1 Each 700.00 700.00 606-02003 End Anchorage (Nonflared) 1 Each 1,765.00 1,765.00 606-02005 End Anchorage (Flared) 2 Each 4,600.00 2,300.00 Colorado Department of Transportation 13:30 Tuesday, February 22, 2011 4 2010 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 607-11525 Fence (Plastic) 1,700 Lin Foot 5,100.00 3.00 607-11580 Fence (Temporary) 410 Lin Foot 1,640.00 4.00 608-00000 Concrete Sidewalk 48 Sq Yard 1,872.00 39.00 608-00010 Concrete Curb Ramp 102 Sq Yard 9,624.00 94.35 608-00016 Truncated Domes (Install Only) 252 Sq Foot 6,048.00 24.00 609-21020 Curb and Gutter Type 2 (Section II-B) 177 Lin Foot 4,956.00 28.00 609-21900 Curb and Gutter Type 2 Special 132 Lin Foot 2,772.00 21.00 613-00201 2 Inch Electrical Conduit (Jacked) 3,000 Lin Foot 57,000.00 19.00 613-00206 2 Inch Electrical Conduit (Bored) 120 Lin Foot 2,040.00 17.00 613-00301 3 Inch Electrical Conduit (Jacked) 1,000 Lin Foot 24,000.00 24.00 613-01100 1 Inch Electrical Conduit (Plastic) 30 Lin Foot 900.00 30.00 613-01200 2 Inch Electrical Conduit (Plastic) 26,865 Lin Foot 223,400.00 8.32 613-01300 3 Inch Electrical Conduit (Plastic) 3,155 Lin Foot 36,325.00 11.51 613-06000 Meter Pole 20 Each 40,500.00 2,025.00 613-07026 Pull Box (16"x24"x12") 45 Each 7,200.00 160.00 613-07034 Pull Box (24"x36"x18") 60 Each 53,400.00 890.00 613-07039 Pull Box (30"x48"x18") 2 Each 725.00 362.50 613-07040 Pull Box (30"x48"x24") 14 Each 12,040.00 860.00 613-07050 Pull Box (13"x24"x18") Deep 25 Each 16,250.00 650.00 613-10000 Wiring 4 Lump Sum 42,070.60 10,517.65 613-20100 Light Standard (Install Only) 25 Each 6,500.00 260.00 613-32400 Light Standard Steel (40 Foot) 20 Each 28,600.00 1,430.00 613-40010 Light Standard Foundation 10 Each 9,450.00 945.00 613-40020 Transformer Base Aluminum 25 Each 11,875.00 475.00 613-50010 Photoelectric Cell 1,000 Each 21,000.00 21.00 613-60000 Lamps 1,000 Each 34,000.00 34.00 613-70255 Fuses 50 Each 800.00 16.00 613-70260 Fuse Holder 50 Each 2,050.00 41.00 613-70400 Luminaire High Pressure Sodium (400 Watt) 50 Each 17,900.00 358.00 614-00011 Sign Panel (Class I) 2,816 Sq Foot 31,337.00 11.13 614-00012 Sign Panel (Class II) 9,068 Sq Foot 150,691.15 16.62 614-00013 Sign Panel (Class III) 17,672 Sq Foot 364,016.07 20.60 614-00025 Sign Panel (Class I) (Install Only) 895 Sq Foot 6,128.70 6.85 614-00026 Sign Panel (Class I) (Install Only) 837 Each 17,953.65 21.45 614-00027 Sign Panel (Class II) (Install Only) 8,968 Sq Foot 45,082.75 5.03 614-00028 Sign Panel (Class III) (Install Only) 9,805 Sq Foot 39,220.00 4.00 614-00029 Sign Panel (Class II) (Install Only) 725 Each 22,090.75 30.47 614-00041 Sign Post (Special) 1 Each 3,450.00 3,450.00 Colorado Department of Transportation 13:30 Tuesday, February 22, 2011 5 2010 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-00612 Steel Sign Post (W 6x12) 156 Lin Foot 5,255.52 33.69 614-00615 Steel Sign Post (W 6x15) 459 Lin Foot 16,595.28 36.16 614-00818 Steel Sign Post (W 8x18) 72 Lin Foot 3,125.52 43.41 614-00821 Steel Sign Post (W 8x21) 174 Lin Foot 8,351.76 48.00 614-01022 Steel Sign Post (W 10x22) 200 Lin Foot 9,605.20 48.03 614-01026 Steel Sign Post (W 10x26) 160 Lin Foot 8,114.60 50.72 614-01226 Steel Sign Post (W 12x26) 133 Lin Foot 7,171.50 53.92 614-01503 Steel Sign Support (2-Inch Round)(Post and Socket) 401 Each 41,006.26 102.26 614-01512 Steel Sign Support (2-Inch Round)(Post) 3,112 Lin Foot 6,974.00 2.24 614-01522 Steel Sign Support (2-Inch Round)(Socket) 406 Each 26,082.00 64.24 614-01573 Steel Sign Support (2-1/2 Inch Round NP-40)(Post & Sl 441 Each 125,304.10 284.14 614-01575 Steel Sign Support (2-1/2 Inch Round NP-40)(Post) 1,316 Lin Foot 26,320.00 20.00 614-01578 Steel Sign Support (2-1/2 Inch Round NP-40)(Slipbase) 94 Each 15,510.00 165.00 614-01583 Steel Sign Support (2-1/2 Inch Round)(Post & Slipbase 191 Each 66,954.02 350.54 614-01585 Steel Sign Support (2-1/2 Inch Round Sch 80) (Post) 8,014 Lin Foot 123,585.00 15.42 614-01588 Steel Sign Support (2-1/2 Inch Round Sch 80)(Slipbase 719 Each 101,660.00 141.39 614-03001 Concrete Footing (Type 1) 4 Each 2,627.16 656.79 614-03002 Concrete Footing (Type 2) 20 Each 14,863.56 743.18 614-03003 Concrete Footing (Type 3) 4 Each 3,702.12 925.53 614-03004 Concrete Footing (Type 4) 8 Each 7,998.32 999.79 614-03005 Concrete Footing (Type 5) 10 Each 13,710.00 1,371.00 614-03006 Concrete Footing (Type 6) 4 Each 3,140.00 785.00 614-03007 Concrete Footing (Type 7) 5 Each 9,725.00 1,945.00 614-10050 Modification of Overhead Sign Structure 1 Each 1,875.00 1,875.00 614-10110 LED Warning Sign System (_Signs) 5 Each 113,750.00 22,750.00 614-32000 Monotube Overhead Sign Cantilever (20 Inch Diameter) 1 Each 24,745.00 24,745.00 614-32400 Monotube Overhead Sign Cantilever (24 Inch Diameter) 1 Each 30,249.00 30,249.00 614-70112 Traffic Signal Face (12) 15 Each 14,925.00 995.00 614-70150 Pedestrian Signal Face (16) (Countdown) 4 Each 2,500.00 625.00 614-70336 Traffic Signal Face (12-12-12) 15 Each 10,485.00 699.00 614-70448 Traffic Signal Face (12-12-12-12) 4 Each 2,200.00 550.00 614-72830 Communications Cabinet 1 Each 8,000.00 8,000.00 614-72860 Pedestrian Push Button 12 Each 3,380.00 281.67 614-72875 Loop Detector Wire 10,000 Lin Foot 30,000.00 3.00 614-72886 Intersection Detection System (Camera) 2 Each 9,000.00 4,500.00 614-72887 Microwave Vehicle Radar Detector 4 Each 28,800.00 7,200.00 614-75848 Traffic Signal Controller and Cabinet (Install Only) 12 Each 13,692.00 1,141.00 614-75882 Traffic Signal Vehicle Detector (Magnetic Type) 6 Each 2,400.00 400.00 Colorado Department of Transportation 13:30 Tuesday, February 22, 2011 6 2010 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-80000 Flashing Beacon 24 Each 29,640.00 1,235.00 614-80001 Flashing Beacon (Solar Powered) 2 Each 1,000.00 500.00 614-80313 Barricade (Type 3 F-C) 1 Each 750.00 750.00 614-84450 Traffic Signal Pedestal Pole Steel (Install Only) 1 Each 500.00 500.00 614-85001 Impact Attenuator 1 Each 16,600.00 16,600.00 614-85005 Impact Attenuator (Sand Filled Plastic Barrel) 2 Each 7,220.00 3,610.00 614-86003 Spread Spectrum Radio (Contact Closure) 3 Each 7,950.00 2,650.00 614-86091 Traffic Signal Repeater (Install Only) 3 Each 1,200.00 400.00 614-86246 Controller (Type 170E-HC11) 3 Each 44,150.00 14,716.67 614-86705 Traffic Signal Equipment (Install Only) 120 Hour 14,400.00 120.00 614-86800 Uninterrupted Power Supply 3 Each 16,550.00 5,516.67 614-87350 Test Fiber Optic Cable 1 Lump Sum 2,150.00 2,150.00 614-87406 Fiber Optic Cable (Single Mode) (6 Strands) 2,000 Lin Foot 4,000.00 2.00 614-87424 Fiber Optic Cable (Single Mode) (24 Strands) 2,000 Lin Foot 4,500.00 2.25 614-87606 Terminate Fiber Optic Cable (6 Strand) 2 Each 4,600.00 2,300.00 614-87624 Terminate Fiber Optic Cable (24 Strand) 2 Each 6,000.00 3,000.00 616-30036 36 Inch Trash Guard 1 Each 10,000.00 10,000.00 620-00020 Sanitary Facility 7 Each 2,825.00 403.57 625-00000 Construction Surveying 2 Lump Sum 3,620.00 1,810.00 625-00001 Construction Surveying (Hourly) 8 Hour 960.00 120.00 626-00000 Mobilization 29 Lump Sum 747,087.31 25,761.63 626-01000 Public Information Services 5 Lump Sum 10,694.00 2,138.80 627-00003 Thermoplastic Pavement Marking (Inlaid) 19,482 Sq Foot 121,762.50 6.25 627-00005 Epoxy Pavement Marking 152,121 Gallon 5,094,360.67 33.49 627-00007 Epoxy Pavement Marking (Special) 5,234 Gallon 360,847.50 68.94 627-00011 Pavement Marking Paint (Waterborne) 580 Gallon 22,563.40 38.90 627-00032 Raised Flexible Pavement Marker (Temporary) 2,000 Each 3,000.00 1.50 627-00080 Polyurea Pavement Marking (Inlaid) 228 Gallon 60,420.00 265.00 627-01001 Preformed Plastic Pavement Marking (Type I) 600 Sq Foot 4,980.00 8.30 627-01010 Preformed Plastic Pavement Marking (Type I)(Inlaid) 49,709 Sq Foot 411,885.00 8.29 627-02010 Preformed Plastic Pavement Marking (Type II) (Inlaid) 103,600 Sq Foot 876,475.00 8.46 627-30210 Thermoplastic Pavement Marking (Xwalk-Stopline) 280 Sq Foot 3,360.00 12.00 627-30324 Preformed Plastic Pavement Marking (Word-Symbol) (Typ 2,396 Sq Foot 47,299.97 19.74 627-30329 Preformed Plastic Pavement Marking (Xwalk-Stop Line) 10,682 Sq Foot 113,059.94 10.58 627-30405 Preformed Thermoplastic Pavement Marking (Word-Symbol 34,508 Sq Foot 280,615.25 8.13 627-30407 Preformed Thermoplastic Pavement Marking (Word-Symbol 2,675 Sq Foot 22,737.50 8.50 627-30410 Preformed Thermoplastic Pavement Marking (Xwalk-Stop 96,302 Sq Foot 444,949.02 4.62 627-30411 Preformed Thermoplastic Pavement Marking (Xwalk-Stop 22,708 Sq Foot 124,894.00 5.50 Colorado Department of Transportation 13:30 Tuesday, February 22, 2011 7 2010 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 630-00000 Flagging 7,904 Hour 152,882.90 19.34 630-00001 Pilot Car Operation 320 Hour 12,889.60 40.28 630-00003 Uniformed Traffic Control 148 Hour 11,816.00 79.84 630-00007 Traffic Control Inspection 174 Day 13,516.52 77.68 630-00012 Traffic Control Management 897 Day 280,049.40 312.21 630-00015 Uniformed Traffic Control Coordination 4 Hour 272.00 68.00 630-00025 Traffic Control Vehicle 100 Hour 1,030.00 10.30 630-80001 Flashing Beacon (Portable) 4 Each 424.00 106.00 630-80305 Flagging Station Light 8 Each 440.00 55.00 630-80335 Barricade (Type 3 M-A) (Temporary) 21 Each 1,258.80 59.94 630-80337 Barricade (Type 3 M-C) (Temporary) 2 Each 314.00 157.00 630-80341 Construction Traffic Sign (Panel Size A) 452 Each 7,205.40 15.94 630-80342 Construction Traffic Sign (Panel Size B) 638 Each 14,378.30 22.54 630-80343 Construction Traffic Sign (Panel Size C) 113 Each 4,565.10 40.40 630-80344 Construction Traffic Sign (Special) 337 Sq Foot 5,754.80 17.08 630-80348 Construction Information Sign 4 Each 420.00 105.00 630-80350 Vertical Panel 30 Each 390.00 13.00 630-80355 Portable Message Sign Panel 18 Each 43,722.00 2,429.00 630-80357 Advance Warning Flashing or Sequencing Arrow Panel (B 10 Each 2,605.00 260.50 630-80358 Advance Warning Flashing or Sequencing Arrow Panel (C 29 Each 14,856.56 512.30 630-80359 Portable Message Sign Panel 126 Day 37,246.00 295.60 630-80360 Drum Channelizing Device 590 Each 6,645.00 11.26 630-80363 Drum Channelizing Device (With Light) (Flashing) 3 Each 108.00 36.00 630-80364 Drum Channelizing Device (With Light) (Steady Burn) 80 Each 1,602.50 20.03 630-80370 Concrete Barrier (Temporary) 210 Lin Foot 6,843.00 32.59 630-80380 Traffic Cone 4,165 Each 18,795.50 4.51 630-80510 Mobile Pavement Marking Zone 3 Lump Sum 3,200.00 1,066.67 630-80520 Mobile Pavement Marking Zone 104 Day 9,000.00 86.54 630-85040 Impact Attenuator (Truck Mounted Attenuator) (Tempora 10 Each 53,454.33 5,345.43 630-85041 Impact Attenuator (Truck Mounted Attenuator) 250 Day 23,900.00 95.60 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 1 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00026 Rem S and D Pave Sq Yard ================================================ MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 45.00 200.00 244.61 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 45.00 200.00 244.61 240.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 200.00 244.61 240.00 =============== 202-00070 Rem Barricade Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 1.00 400.00 447.67 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 400.00 447.67 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 400.00 447.67 200.00 =============== 202-00200 Rem Sidewalk Sq Yard ================================================ MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 40.00 14.00 24.38 16.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 3.00 30.00 175.39 243.33 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 24.00 20.00 34.33 59.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 67.00 16.87 38.12 41.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 67.00 16.87 38.12 41.58 =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 132.00 8.00 9.38 8.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 177.00 8.00 23.67 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 309.00 8.00 16.54 22.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 309.00 8.00 16.54 22.32 =============== 202-00206 Rem Conc Curb Ramp Sq Yard ================================================ MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 27.00 12.00 27.75 25.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 132.30 15.00 35.00 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 159.30 14.49 33.45 49.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 159.30 14.49 33.45 49.92 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 2 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 3,750.00 35.00 34.99 24.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,750.00 35.00 34.99 24.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,750.00 35.00 34.99 24.35 =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 66.00 40.00 33.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 66.00 40.00 33.00 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66.00 40.00 33.00 25.00 =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 18,072.00 1.75 2.07 2.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18,072.00 1.75 2.07 2.40 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 107,848.00 1.20 1.20 1.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 107,848.00 1.20 1.20 1.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 125,920.00 1.28 1.49 1.37 =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ MTCE R300-162 R300-162 R3 FY10 REGION WIDE 03/04/10 2,000.00 0.50 0.96 0.80 MTCER300-164 REGION 3, SH 50 A AND D, 90 B 03/04/10 25,383.00 0.80 1.23 0.75 MTCER200-170 REGION II REGION-WIDE 03/11/10 1,752.00 2.00 2.23 2.51 MTCER100-177 REGION 1 FY'10 EAST STRIPING 03/18/10 100,000.00 0.25 0.30 0.20 MTCER100-170 REGION 1 FY 10 WEST STRIPING 03/25/10 50,000.00 0.20 0.29 0.10 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 25,000.00 1.00 0.90 0.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 204,135.00 0.42 0.54 0.31 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 7,000.00 1.00 1.18 0.80 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 3 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 12,500.00 0.15 1.27 0.30 MTCER200-169 REGION II REGION-WIDE 05/06/10 623,356.00 0.20 0.23 0.25 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 67,000.00 0.40 0.63 0.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 709,856.00 0.23 0.31 0.25 MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 07/22/10 360,000.00 0.35 0.21 0.14 MTCE R100-180 WESTERN PORTION OF REGION 1 08/12/10 100,000.00 0.20 0.32 0.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 460,000.00 0.32 0.24 0.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,373,991.00 0.28 0.34 0.24 =============== 202-00450 Rem Port Present Str (1) Sq Yard ================================================ MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 54.00 200.00 196.05 196.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 54.00 200.00 196.05 196.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54.00 200.00 196.05 196.05 =============== 202-00453 Rem Port Present Str (2) Sq Yard ================================================ MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 27.00 360.00 361.19 361.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 27.00 360.00 361.19 361.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 360.00 361.19 361.19 =============== 202-00503 Rem Port Present Str Sq Yard ================================================ MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 168.00 250.00 441.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 168.00 250.00 441.00 150.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 66.00 1850.00 1821.67 1821.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 66.00 1850.00 1821.67 1821.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 234.00 701.28 564.47 621.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 4 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00700 Rem Light Standard Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 5.00 300.00 211.50 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 300.00 211.50 240.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 300.00 211.50 240.00 =============== 202-00750 Rem Luminaire Each =================================================== MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 120.00 80.00 118.50 64.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 120.00 80.00 118.50 64.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 80.00 118.50 64.00 =============== 202-00806 Rem Walkway Lin Foot =============================================== MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 1,121.00 12.00 25.25 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,121.00 12.00 25.25 31.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,121.00 12.00 25.25 31.00 =============== 202-00810 Rem Ground Sign Each =================================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 838.00 25.00 38.59 14.00 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 655.00 20.00 36.89 15.82 MTCER200-170 REGION II REGION-WIDE 03/11/10 18.00 100.00 48.00 100.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 197.00 40.00 55.00 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,708.00 25.60 39.14 21.49 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 13.00 50.00 90.00 95.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 5.00 260.00 82.00 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18.00 108.33 87.78 103.33 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 16.00 65.00 144.29 45.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 5 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00810 Rem Ground Sign Each =================================================== MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 3.00 600.00 782.50 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19.00 149.47 206.05 195.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,745.00 27.81 41.64 21.74 =============== 202-00821 Rem Sign Panel Each =================================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 10.00 50.00 82.17 5.00 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 430.00 10.00 14.16 11.23 MTCER200-170 REGION II REGION-WIDE 03/11/10 14.00 100.00 30.67 25.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 100.00 15.00 33.75 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 554.00 13.90 19.23 14.85 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 6.00 40.00 58.33 65.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 65.00 13.00 33.33 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 71.00 15.28 35.45 46.69 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 337.00 30.00 99.86 10.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 91.00 250.00 496.25 395.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 428.00 76.78 152.85 91.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,053.00 39.55 68.83 40.29 =============== 202-00827 Rem of Pull Box Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 17.00 120.00 67.17 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 120.00 67.17 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 120.00 67.17 50.00 =============== 202-00828 Rem Traf Sig Equipment LUMP SUM =============================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 1.00 4000.00 1466.67 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 4000.00 1466.67 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 4000.00 1466.67 1800.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 6 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00831 Rem Traf Sig Head Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 14.00 100.00 90.67 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 100.00 90.67 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 100.00 90.67 100.00 =============== 202-00848 Rem Traf Sig Control+Cab Each =================================================== MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 12.00 400.00 545.50 173.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 400.00 545.50 173.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 400.00 545.50 173.00 =============== 202-00855 Rem Traf Sig Control Cab Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 1200.00 535.75 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1200.00 535.75 550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1200.00 535.75 550.00 =============== 202-00895 Rem of Impact Attenuator Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 1.00 1000.00 1175.25 1470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 1175.25 1470.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 1175.25 1470.00 =============== 202-00900 Rem Conc Footing Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 500.00 587.50 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 500.00 587.50 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 500.00 587.50 1000.00 =============== 202-01300 Rem End Anchorage Each =================================================== MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 2.00 225.00 276.00 276.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 225.00 276.00 276.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 225.00 276.00 276.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 7 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-05100 Sandblasting Reinf Steel Sq Yard ================================================ MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 93.00 8.00 7.19 7.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 93.00 8.00 7.19 7.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93.00 8.00 7.19 7.19 =============== 202-05150 Sandblasting Sq Foot ================================================ MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 41,174.00 0.25 0.22 0.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 41,174.00 0.25 0.22 0.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 41,174.00 0.25 0.22 0.22 =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 25.00 40.00 92.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 25.00 40.00 92.00 110.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 40.00 92.00 110.00 =============== 203-01500 Blading Hour =================================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 10.00 100.00 96.67 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 100.00 96.67 140.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 5.00 200.00 150.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 200.00 150.00 200.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 10.00 105.00 104.44 104.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 105.00 104.44 104.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 122.00 112.63 137.78 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 8 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01510 Backhoe Hour =================================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 9.00 150.00 120.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 150.00 120.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 150.00 120.00 100.00 =============== 203-01565 Hydraulic Excavator Hour =================================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 80.00 150.00 157.50 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 80.00 150.00 157.50 160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 150.00 157.50 160.00 =============== 203-01594 Combination Loader Hour =================================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 10.00 110.00 78.33 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 110.00 78.33 125.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 10.00 105.00 104.44 104.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 105.00 104.44 104.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 107.50 84.86 114.72 =============== 203-01597 Potholing Hour =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 10.00 180.00 179.25 270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 180.00 179.25 270.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 8.00 100.00 199.67 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 100.00 199.67 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 9 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 8.00 400.00 402.50 402.50 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 8.00 180.00 200.00 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 290.00 240.50 258.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 212.94 207.52 248.24 =============== 203-01622 Sweeping (With Pickup Broom) Hour =================================================== MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 100.00 120.00 103.33 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 120.00 103.33 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 120.00 103.33 35.00 =============== 203-02330 Laborer Hour =================================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 100.00 45.00 55.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 45.00 55.00 45.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 45.00 55.00 45.00 =============== 206-00000 Str Excav Cubic Yard ============================================= MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 72.00 20.00 244.45 151.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 72.00 20.00 244.45 151.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72.00 20.00 244.45 151.00 =============== 206-00200 Str Bkfl (CL 2) Cubic Yard ============================================= MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 90.00 30.00 134.98 119.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 90.00 30.00 134.98 119.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90.00 30.00 134.98 119.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 10 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01750 Shoring LUMP SUM =============================================== MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 1.00 15000.00 47765.43 18300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 15000.00 47765.43 18300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 47765.43 18300.00 =============== 208-00002 Erosion Log (12 In) Lin Foot =============================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 500.00 4.00 5.01 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 500.00 4.00 5.01 5.50 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 100.00 4.00 37.67 8.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 150.00 4.00 8.00 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 250.00 4.00 19.87 8.60 MTCE R100-184 VARIOUS LOCATIONS 09/02/10 2,000.00 5.00 6.98 3.95 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 100.00 5.00 7.00 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,100.00 5.00 6.98 3.90 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 500.00 5.00 6.13 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 500.00 5.00 6.13 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,350.00 4.78 7.30 5.10 =============== 208-00003 Erosion Log (18 In) Lin Foot =============================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 100.00 10.00 10.33 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 10.00 10.33 11.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 11 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00003 Erosion Log (18 In) Lin Foot =============================================== MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 100.00 6.00 6.32 6.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 6.00 6.32 6.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 8.00 9.33 8.66 =============== 208-00011 Erosion Bales (Weed Free) Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 20.00 15.00 23.25 13.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 15.00 23.25 13.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 15.00 23.25 13.50 =============== 208-00020 Silt Fence Lin Foot =============================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 200.00 2.00 2.33 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 200.00 2.00 2.33 2.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 200.00 1.50 1.44 1.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 1.50 1.44 1.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 400.00 1.75 2.11 1.72 =============== 208-00034 Gravel Bag Lin Foot =============================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 50.00 6.00 5.65 3.60 MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 60.00 8.00 7.69 17.00 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 300.00 6.00 6.55 3.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 410.00 6.29 6.60 5.38 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 50.00 12.00 46.17 18.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 12.00 46.17 18.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 12 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00034 Gravel Bag Lin Foot =============================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 500.00 8.00 8.13 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 500.00 8.00 8.13 5.25 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 100.00 7.00 7.63 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 7.00 16.96 9.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,060.00 7.43 10.20 6.51 =============== 208-00045 Conc Washout Str Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 5.00 600.00 614.50 510.00 MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 1500.00 387.50 550.00 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 1.00 500.00 930.00 440.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 1.00 500.00 830.00 600.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 1.00 350.00 2172.11 1825.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 650.00 989.97 662.78 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 1.00 250.00 425.00 550.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 1.00 600.00 273.33 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 425.00 349.17 450.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 1.00 1200.00 1150.00 1150.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 2.00 500.00 638.75 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 733.33 695.56 480.00 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 3.00 750.00 825.00 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 750.00 860.00 975.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 655.88 870.22 678.06 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 13 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00050 Storm Drain Inlet Protection Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 20.00 200.00 103.25 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 200.00 103.25 36.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 200.00 103.25 36.00 =============== 208-00051 Storm Drain Inlet Protection (Type 1) Lin Foot =============================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 200.00 10.00 7.00 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 200.00 10.00 7.00 7.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 56.00 30.00 41.17 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 56.00 30.00 41.17 12.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 200.00 30.00 28.75 28.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 30.00 28.75 28.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 456.00 21.23 17.42 17.15 =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 10.00 50.00 39.00 30.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 10.00 35.00 40.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 42.50 39.43 32.50 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 4.00 30.00 39.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 30.00 39.00 50.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 10.00 52.00 51.75 51.75 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 14 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 60.00 50.00 50.00 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 70.00 50.29 50.13 43.39 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 20.00 54.00 55.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 54.00 61.75 39.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 114.00 48.86 49.63 40.88 =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 5.00 80.00 91.67 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 80.00 91.67 85.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 5.00 5.00 115.00 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 5.00 115.00 115.00 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 45.00 80.00 115.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 45.00 80.00 115.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55.00 73.18 111.82 100.00 =============== 208-00205 Erosion Control Supervisor Hour =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 70.00 60.00 41.54 40.15 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 24.00 55.00 75.25 63.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 94.00 58.72 50.14 45.98 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 20.00 60.00 158.33 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 60.00 158.33 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 15 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00205 Erosion Control Supervisor Hour =================================================== MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 10.00 60.00 83.75 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 60.00 83.75 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 124.00 59.03 66.61 62.28 =============== 210-00300 Res Brick Pavers Sq Yard ================================================ MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 89.00 75.00 52.25 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 89.00 75.00 52.25 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 89.00 75.00 52.25 35.00 =============== 210-00451 Rep Overhead Sign Str Each =================================================== MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 1.00 3000.00 5875.00 2210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3000.00 5875.00 2210.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 5875.00 2210.00 =============== 210-00500 Reb Port Present Str Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 18.00 3000.00 6101.50 3856.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 5.00 500.00 881.78 181.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 23.00 2456.52 4566.29 3057.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 2456.52 4566.29 3057.24 =============== 210-00750 Res Light Standard Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 20.00 400.00 452.50 560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 400.00 452.50 560.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 400.00 452.50 560.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 16 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00810 Res Ground Sign Each =================================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 1.00 300.00 283.33 330.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 50.00 150.00 233.75 280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 51.00 152.94 234.48 280.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 51.00 152.94 235.63 276.48 =============== 210-00815 Res Sign Panel Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 1.00 150.00 186.00 302.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 18.00 100.00 40.67 25.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 100.00 25.00 51.75 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 119.00 37.39 50.99 60.94 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 7.00 60.00 278.57 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 60.00 278.57 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 126.00 38.65 69.36 61.03 =============== 210-00825 Res Flashing Beacon Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 1.00 1200.00 1018.57 302.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 1.00 500.00 1112.50 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 850.00 1065.53 251.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 850.00 1078.32 625.50 =============== 210-00827 Res Pull Box Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 2.00 200.00 191.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 200.00 191.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 200.00 191.00 50.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 17 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00831 Res Traf Sig Head Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 8.00 300.00 263.50 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 300.00 263.50 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 300.00 263.50 400.00 =============== 210-00865 Res Ped Sig Head Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 100.00 192.50 390.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 100.00 192.50 390.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 100.00 192.50 390.00 =============== 210-00870 Res Coordination Unit Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 500.00 646.75 930.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 500.00 646.75 930.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 500.00 646.75 930.00 =============== 210-01130 Res Gdrail Ty 3 Lin Foot =============================================== MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 1,963.00 10.00 12.42 12.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,963.00 10.00 12.42 12.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,963.00 10.00 12.42 12.42 =============== 210-04000 Adj Structure Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 2.00 150.00 287.50 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 150.00 287.50 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 150.00 287.50 275.00 =============== 210-04010 Adj Manhole Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 500.00 618.75 850.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 18 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04010 Adj Manhole Each =================================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 8.00 650.00 926.67 880.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 633.33 882.68 876.67 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 4.00 1000.00 2290.00 1080.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1000.00 2290.00 1080.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 746.15 1195.42 939.23 =============== 210-04050 Adj Valve Box Each =================================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 5.00 450.00 546.67 540.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 450.00 546.67 540.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 14.00 400.00 414.86 414.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 400.00 414.86 414.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 413.16 483.04 447.79 =============== 212-00006 Seeding (Native) Acre =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 0.50 800.00 1921.00 1416.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 3.50 500.00 706.67 490.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 537.50 858.46 605.75 MTCE R100-184 VARIOUS LOCATIONS 09/02/10 1.00 500.00 1315.00 1170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 500.00 1315.00 1170.00 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 0.50 800.00 790.00 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.50 800.00 1583.33 850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.50 554.55 964.93 740.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 19 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00032 Soil Conditioning Acre =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 1.00 2500.00 2570.00 2220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2500.00 2570.00 2220.00 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 0.50 2000.00 2300.00 2400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.50 2000.00 2300.00 2400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.50 2333.33 2480.00 2280.00 =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 0.50 800.00 1943.33 1475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.50 800.00 1943.33 1475.00 MTCE R100-184 VARIOUS LOCATIONS 09/02/10 1.00 1300.00 687.50 645.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1300.00 687.50 645.00 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 0.50 800.00 1075.00 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.50 800.00 1741.67 850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1050.00 1553.75 893.00 =============== 213-00009 Flexible Growth Medium Acre =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 3.50 2500.00 3737.00 2950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.50 2500.00 3737.00 2950.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.50 2500.00 3737.00 2950.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 20 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00012 Spray-on Mulch Blanket Acre =================================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 0.25 2000.00 4150.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.25 2000.00 4150.00 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.25 2000.00 4150.00 5000.00 =============== 213-00061 Mulch Tackifier Pound ================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 50.00 5.00 10.53 10.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 5.00 10.53 10.40 MTCE R100-184 VARIOUS LOCATIONS 09/02/10 200.00 3.50 2.83 2.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 3.50 2.83 2.35 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 100.00 2.20 5.38 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 2.20 6.88 2.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 350.00 3.34 6.40 3.23 =============== 216-00042 Soil Retent Blanket (BioD S/C) Sq Yard ================================================ MTCE R100-184 VARIOUS LOCATIONS 09/02/10 50.00 10.00 3.75 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 10.00 3.75 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 10.00 3.75 3.00 =============== 250-00010 Envir Health/Safety Mngmt LUMP SUM =============================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 1.00 10000.00 1925.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 10000.00 1925.00 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 1925.00 2500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 21 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06007 ABC (CL 6) Cubic Yard ============================================= MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 9.00 50.00 110.50 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 50.00 110.50 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 50.00 110.50 120.00 =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 20.00 275.00 220.75 300.00 MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 22.00 175.00 208.75 210.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 200.00 130.00 144.67 144.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 13.00 300.00 278.25 146.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 255.00 153.92 175.58 162.03 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 3.00 450.00 341.00 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 450.00 341.00 450.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 200.00 150.00 153.39 153.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 150.00 153.39 153.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 458.00 154.15 196.88 161.81 =============== 403-34721 HMA (Gr SX) (75) (PG 58-28) Ton ==================================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 44.00 300.00 162.33 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 44.00 300.00 162.33 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44.00 300.00 162.33 150.00 =============== 403-34731 HMA (Gr SX) (75) (PG 58-34) Ton ==================================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 3,874.00 100.00 108.23 102.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,874.00 100.00 108.23 102.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,874.00 100.00 108.23 102.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 22 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34741 HMA (Gr SX) (75) (PG 64-22) Ton ==================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 40.00 165.00 190.42 146.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 165.00 190.42 146.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 13,249.00 86.00 85.80 85.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,249.00 86.00 85.80 85.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,289.00 86.24 87.66 85.98 =============== 411-10255 Emul Asph (SS) Gallon ================================================= MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 13.00 6.00 13.25 22.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 3,528.00 2.00 2.07 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,541.00 2.01 2.12 3.07 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 13.00 2.00 13.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 2.00 13.00 30.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 10,328.00 3.00 2.76 2.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,328.00 3.00 2.76 2.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,882.00 2.75 2.46 2.86 =============== 503-00018 Drilled Caisson (18 In) Lin Foot =============================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 4.00 180.00 136.00 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 180.00 136.00 195.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 180.00 136.00 195.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 23 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00048 Drilled Caisson (48 In) Lin Foot =============================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 44.00 325.00 531.58 257.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 44.00 325.00 531.58 257.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44.00 325.00 531.58 257.00 =============== 504-04410 Block Facing Sq Foot ================================================ MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 30.00 65.00 99.00 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 65.00 99.00 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 65.00 99.00 140.00 =============== 506-00000 Riprap Cubic Yard ============================================= MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 8.00 120.00 145.37 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 120.00 145.37 55.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 120.00 145.37 55.00 =============== 507-00000 Conc S and D Pave Cubic Yard ============================================= MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 15.00 400.00 668.66 570.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 400.00 668.66 570.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 400.00 668.66 570.00 =============== 507-00100 Conc S and D Pave (Reinf) Cubic Yard ============================================= MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 2.00 550.00 1178.50 294.00 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 13.00 450.00 903.61 455.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 463.33 940.26 433.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 463.33 940.26 433.53 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 24 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 509-00000 Str Steel Pound ================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 9,550.00 2.50 2.71 2.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,550.00 2.50 2.71 2.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,550.00 2.50 2.71 2.35 =============== 509-00010 Str Steel (Spec) Pound ================================================== MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 3,340.00 5.00 12.55 3.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,340.00 5.00 12.55 3.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,340.00 5.00 12.55 3.65 =============== 509-08100 Provide Temporary Support LUMP SUM =============================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 1.00 25000.00 23556.25 12445.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 25000.00 23556.25 12445.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 23556.25 12445.00 =============== 509-90002 Paint Existing Structure (Special) Gallon ================================================= MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 5.00 100.00 1018.29 227.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 100.00 1018.29 227.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 100.00 1018.29 227.00 =============== 515-00120 Waterproofing (Membrane) Sq Yard ================================================ MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 4,575.00 12.00 13.23 13.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,575.00 12.00 13.23 13.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,575.00 12.00 16.66 13.96 =============== 515-00400 Concrete Sealer Sq Yard ================================================ MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 120.00 10.00 12.05 12.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 10.00 12.05 12.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 10.00 12.05 12.20 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 25 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 515-00410 Concrete Sealer (Calcium Nitrite) Sq Yard ================================================ MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 147.00 52.00 28.75 28.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 147.00 52.00 28.75 28.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 147.00 52.00 28.75 28.75 =============== 518-01004 Br Expan Device (0-4 In) Lin Foot =============================================== MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 200.00 410.00 345.00 345.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 410.00 345.00 345.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 410.00 345.00 345.00 =============== 601-01000 Conc CL B Cubic Yard ============================================= MTCER200-170 REGION II REGION-WIDE 03/11/10 3.75 500.00 333.50 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.75 500.00 333.50 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.75 500.00 333.50 120.00 =============== 601-03000 Conc CL D Cubic Yard ============================================= MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 6.00 800.00 596.50 489.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 800.00 596.50 489.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 800.00 596.50 489.00 =============== 601-03020 Conc CL D (Misc) Cubic Yard ============================================= MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 9.00 2000.00 1925.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 2000.00 1925.00 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 2000.00 1925.00 1500.00 =============== 601-03040 Conc CL D (Bridge) Cubic Yard ============================================= MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 33.00 800.00 741.75 741.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 33.00 800.00 741.75 741.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.00 800.00 1302.53 880.14 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 26 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03540 Conc CL DT (Deck Topping) Cubic Yard ============================================= MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 2.00 3000.00 3317.75 3317.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 3000.00 3317.75 3317.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3000.00 3317.75 3317.75 =============== 601-04000 Conc CL E Cubic Yard ============================================= MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 828.00 730.00 692.80 613.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 828.00 730.00 692.80 613.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 828.00 730.00 692.80 613.00 =============== 601-06150 Conc (Patching) Sq Foot ================================================ MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 1,512.00 60.00 58.73 47.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,512.00 60.00 58.73 47.90 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 486.00 70.00 17.25 17.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 486.00 70.00 17.25 17.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,998.00 62.43 55.64 40.44 =============== 602-00020 Reinf Steel (Epoxy) Pound ================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 1,400.00 2.10 2.48 1.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,400.00 2.10 2.48 1.91 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 366.00 1.25 2.25 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 366.00 1.25 3.60 2.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,766.00 1.92 2.80 2.20 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 27 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-00024 Prep Culvert Pipe (24 In) Lin Foot =============================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 330.00 10.00 17.50 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 330.00 10.00 17.50 22.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 330.00 10.00 17.50 22.00 =============== 603-00025 Culvert Lining (24 Inch)(Special) Lin Foot =============================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 330.00 400.00 317.50 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 330.00 400.00 317.50 230.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 330.00 400.00 317.50 230.00 =============== 603-00035 Prep Culvert Pipe (36 In) Lin Foot =============================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 1,482.00 10.00 18.50 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,482.00 10.00 18.50 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,482.00 10.00 18.50 30.00 =============== 603-00036 Culvert Lining (36 In) Lin Foot =============================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 1,482.00 350.00 300.50 286.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,482.00 350.00 300.50 286.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,482.00 350.00 300.50 286.00 =============== 603-00060 Culvert Lining (60 In) Lin Foot =============================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 250.00 800.00 684.50 594.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 250.00 800.00 684.50 594.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 800.00 684.50 594.00 =============== 603-00061 Prep Culvert Pipe (60 In) Lin Foot =============================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 250.00 10.00 45.50 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 250.00 10.00 45.50 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 10.00 45.50 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 28 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-00305 Inlet Ty C (5 Ft) Each =================================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 1.00 5000.00 3712.50 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 3712.50 4000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 3712.50 4000.00 =============== 604-00510 Inlet Ty D (10 Ft) Each =================================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 1.00 5000.00 8562.50 8500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 8562.50 8500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 8562.50 8500.00 =============== 604-31015 MH Box Base (15 Ft) Each =================================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 1.00 25000.00 21600.00 17200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 25000.00 21600.00 17200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 21600.00 17200.00 =============== 604-50200 MH R and C Each =================================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 1.00 1500.00 3900.00 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1500.00 3900.00 4000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1500.00 3900.00 4000.00 =============== 606-00301 Gdrail Ty 3 (6-3) Lin Foot =============================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 325.00 17.00 13.80 13.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 325.00 17.00 13.80 13.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 325.00 17.00 13.95 13.96 =============== 606-01340 End Anchor Ty 3D Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 1.00 700.00 725.63 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 700.00 725.63 700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 700.00 675.74 700.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 29 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-02003 End Anchor (Nonflared) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 1.00 1800.00 1807.45 1765.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1800.00 1807.45 1765.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1800.00 1807.45 1765.00 =============== 606-02005 End Anchor (Flared) Each =================================================== MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 2.00 1600.00 2300.00 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1600.00 2300.00 2300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1600.00 1598.62 1645.45 =============== 607-11525 Fence (Plastic) Lin Foot =============================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 200.00 4.00 3.67 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 200.00 4.00 3.67 3.00 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 1,500.00 2.50 2.25 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,500.00 2.50 2.25 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,700.00 2.68 2.49 3.00 =============== 607-11580 Fence (Temp) Lin Foot =============================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 410.00 4.00 2.60 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 410.00 4.00 2.60 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 410.00 4.00 2.60 4.00 =============== 608-00000 Conc Sidewalk Sq Yard ================================================ MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 40.00 65.00 38.25 34.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 30 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00000 Conc Sidewalk Sq Yard ================================================ MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 8.00 60.00 72.67 64.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48.00 64.17 42.74 39.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48.00 64.17 42.74 39.00 =============== 608-00010 Conc Curb Ramp Sq Yard ================================================ MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 54.00 80.00 114.75 100.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 48.00 100.00 96.67 88.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 102.00 89.41 107.52 94.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 102.00 89.41 107.52 94.35 =============== 608-00016 Inst Truncated Domes Sq Foot ================================================ MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 252.00 20.00 14.67 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 252.00 20.00 14.67 24.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 252.00 20.00 14.67 24.00 =============== 609-21020 C and G Ty 2 II-B Lin Foot =============================================== MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 177.00 20.00 34.33 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 177.00 20.00 34.33 28.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 177.00 20.00 34.33 28.00 =============== 609-21900 C and G Ty 2 (Spec) Lin Foot =============================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 132.00 25.00 21.50 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 132.00 25.00 21.50 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 132.00 25.00 21.50 21.00 =============== 613-00201 2 In Elec Cond (Jacked) Lin Foot =============================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 3,000.00 9.00 15.00 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,000.00 9.00 15.00 19.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,000.00 9.00 15.00 19.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 31 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00206 2 In Elec Cond (Bored) Lin Foot =============================================== MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 120.00 15.00 17.00 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 15.00 17.00 17.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 15.00 17.00 17.00 =============== 613-00301 3 In Elec Cond (Jacked) Lin Foot =============================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 1,000.00 12.00 19.50 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,000.00 12.00 19.50 24.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,000.00 12.00 19.50 24.00 =============== 613-01100 1 In Elec Cond (P) Lin Foot =============================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 30.00 28.00 18.73 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 28.00 18.73 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 28.00 18.73 30.00 =============== 613-01200 2 In Elec Cond (P) Lin Foot =============================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 550.00 8.00 11.38 10.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 10,535.00 6.50 8.53 8.00 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 300.00 8.00 9.75 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,385.00 6.61 8.64 8.18 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 480.00 10.00 13.93 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 480.00 10.00 13.93 9.00 MTCE R100-184 VARIOUS LOCATIONS 09/02/10 15,000.00 8.00 7.70 8.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15,000.00 8.00 7.70 8.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26,865.00 7.45 8.43 8.32 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 32 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-01300 3 In Elec Cond (P) Lin Foot =============================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 525.00 10.00 12.75 11.00 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 600.00 9.00 11.44 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,125.00 9.47 12.05 12.60 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 30.00 35.00 26.47 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 35.00 26.47 35.00 MTCE R100-184 VARIOUS LOCATIONS 09/02/10 2,000.00 7.50 9.53 10.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,000.00 7.50 9.53 10.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,155.00 8.46 11.03 11.51 =============== 613-06000 Meter Pole Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 20.00 1500.00 1837.50 2025.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 1500.00 1837.50 2025.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 1500.00 1837.50 2025.00 =============== 613-07026 Pull Box (16"x24"x12") Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 45.00 350.00 403.50 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 45.00 350.00 403.50 160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 350.00 403.50 160.00 =============== 613-07034 Pull Box (24"x36"x18") Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 60.00 850.00 895.00 890.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 850.00 895.00 890.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 850.00 895.00 890.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 33 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07039 Pull Box (30"x48"x18") Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 2.00 500.00 776.42 362.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 500.00 776.42 362.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 500.00 776.42 362.50 =============== 613-07040 Pull Box (30"x48"x24") Each =================================================== MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 14.00 650.00 973.50 860.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 650.00 973.50 860.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 650.00 973.50 860.00 =============== 613-07050 Pull Box (13"x24"x18") Deep Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 25.00 600.00 600.00 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 600.00 600.00 650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 600.00 600.00 650.00 =============== 613-10000 Wiring LUMP SUM =============================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 4500.00 4085.25 5000.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 1.00 7500.00 26244.60 17455.60 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 1.00 3000.00 6711.00 11615.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 5000.00 14332.33 11356.87 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 1.00 10000.00 4413.33 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 10000.00 4413.33 8000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 6250.00 12581.92 10517.65 =============== 613-20100 Inst Light Std Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 25.00 500.00 221.50 260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 500.00 221.50 260.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 500.00 221.50 260.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 34 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-32400 Light Std Steel (40 Ft) Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 20.00 2800.00 2272.50 1430.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 2800.00 2272.50 1430.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 2800.00 2272.50 1430.00 =============== 613-40010 Light Std Foundation Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 10.00 750.00 926.50 945.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 750.00 926.50 945.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 750.00 926.50 945.00 =============== 613-40020 Transformer Base Alum Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 25.00 650.00 434.50 475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 650.00 434.50 475.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 650.00 434.50 475.00 =============== 613-50010 Photoel Cell Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 1,000.00 27.00 43.00 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,000.00 27.00 43.00 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,000.00 27.00 43.00 21.00 =============== 613-60000 Lmps Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 1,000.00 30.00 49.50 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,000.00 30.00 49.50 34.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,000.00 30.00 49.50 34.00 =============== 613-70255 Fus Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 50.00 40.00 11.63 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 40.00 11.63 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 40.00 11.63 16.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 35 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-70260 Fus Holder Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 50.00 80.00 41.50 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 80.00 41.50 41.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 80.00 41.50 41.00 =============== 613-70400 Lumin HPS (400 W) Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 50.00 350.00 386.50 358.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 350.00 386.50 358.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 350.00 386.50 358.00 =============== 614-00011 Sign Panel (CL I) Sq Foot ================================================ MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 2,626.00 13.00 11.81 11.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 190.00 18.00 19.98 12.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,816.00 13.34 12.15 11.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,816.00 13.34 12.52 11.07 =============== 614-00012 Sign Panel (CL II) Sq Foot ================================================ MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 7,536.00 15.70 15.97 16.50 MTCER200-170 REGION II REGION-WIDE 03/11/10 677.00 19.00 21.25 15.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,213.00 15.97 16.24 16.42 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 408.00 20.00 22.33 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 408.00 20.00 22.33 17.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 447.00 18.00 24.74 19.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 447.00 18.00 24.74 19.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,068.00 16.25 16.34 15.09 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 36 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00013 Sign Panel (CL III) Sq Foot ================================================ MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 809.00 18.50 19.72 17.25 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 3,999.00 16.00 20.55 19.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,808.00 16.42 20.34 18.86 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 12,864.00 20.00 24.69 21.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12,864.00 20.00 24.69 21.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,672.00 19.03 22.23 19.26 =============== 614-00025 Inst Sign Panel (CL I) Sq Foot ================================================ MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 675.00 5.00 8.25 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 675.00 5.00 8.25 5.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 130.50 16.00 10.17 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 130.50 16.00 10.17 17.00 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 89.20 5.00 11.17 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 89.20 5.00 11.17 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 894.70 6.60 5.30 4.24 =============== 614-00026 Inst Sign Panel (CL I) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 837.00 18.00 29.33 21.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 837.00 18.00 29.33 21.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 837.00 18.00 29.33 21.45 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 37 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00027 Inst Sign Panel (CL II) Sq Foot ================================================ MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 1,128.00 5.00 14.44 8.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,128.00 5.00 14.44 8.25 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 118.50 22.00 14.17 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 118.50 22.00 14.17 25.00 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 7,721.00 5.00 5.61 4.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,721.00 5.00 5.61 4.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,967.50 5.22 6.15 5.02 =============== 614-00028 Inst Sign Panel (CL III) Sq Foot ================================================ MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 9,805.00 6.00 7.41 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,805.00 6.00 7.41 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,805.00 6.00 7.41 4.03 =============== 614-00029 Inst Sign Panel (CL II) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 725.00 33.00 42.08 30.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 725.00 33.00 42.08 30.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 725.00 33.00 42.08 30.47 =============== 614-00041 Sign Post (Spec) Each =================================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 1.00 1300.00 1504.67 3450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1300.00 1504.67 3450.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1300.00 1504.67 3450.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 38 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00612 Steel Sign Post (W 6x12) Lin Foot =============================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 72.00 35.00 38.63 32.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 72.00 35.00 38.63 32.16 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 84.00 34.00 49.57 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 84.00 34.00 49.57 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 156.00 34.46 40.22 31.47 =============== 614-00615 Steel Sign Post (W 6x15) Lin Foot =============================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 324.00 35.00 44.20 33.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 324.00 35.00 44.20 33.72 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 135.00 36.00 56.18 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 135.00 36.00 56.18 42.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 459.00 35.29 44.69 34.68 =============== 614-00818 Steel Sign Post (W 8x18) Lin Foot =============================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 72.00 45.00 51.56 43.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 72.00 45.00 51.56 43.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72.00 45.00 44.36 38.75 =============== 614-00821 Steel Sign Post (W 8x21) Lin Foot =============================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 144.00 45.00 57.92 47.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 144.00 45.00 57.92 47.79 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 39 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00821 Steel Sign Post (W 8x21) Lin Foot =============================================== MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 30.00 50.00 57.99 49.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 50.00 57.99 49.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 174.00 45.86 53.02 46.19 =============== 614-01022 Steel Sign Post (W 10x22) Lin Foot =============================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 180.00 50.00 61.40 47.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 180.00 50.00 61.40 47.14 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 20.00 52.00 71.12 56.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 52.00 71.12 56.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 50.20 57.01 49.22 =============== 614-01026 Steel Sign Post (W 10x26) Lin Foot =============================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 70.00 55.00 68.63 56.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70.00 55.00 68.63 56.78 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 90.00 65.00 84.50 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 90.00 65.00 84.50 46.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 160.00 60.63 66.67 52.44 =============== 614-01226 Steel Sign Post (W 12x26) Lin Foot =============================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 90.00 60.00 74.49 56.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 90.00 60.00 74.49 56.75 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 40 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01226 Steel Sign Post (W 12x26) Lin Foot =============================================== MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 43.00 70.00 86.75 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 43.00 70.00 86.75 48.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 133.00 63.23 67.34 56.45 =============== 614-01503 Steel Sign Supp (2-In Rd)(Po&Sock) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 401.00 65.00 103.83 102.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 401.00 65.00 103.83 102.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 401.00 65.00 104.50 102.14 =============== 614-01512 Steel Sign Supp (2-In Rd)(Post) Lin Foot =============================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 3,082.00 7.00 6.22 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,082.00 7.00 6.22 2.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 30.00 14.00 14.83 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 14.00 14.83 27.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,112.00 7.07 6.25 2.24 =============== 614-01522 Steel Sign Supp (2-In Rd)(Sock) Each =================================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 328.00 66.00 67.15 54.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 75.00 41.50 83.25 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 403.00 61.44 68.50 63.49 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 3.00 80.00 97.33 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 80.00 97.33 165.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 406.00 61.58 68.57 64.24 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 41 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01573 Steel Sign Supp (2-1/2 Rd NP40)(Po&Slip) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 431.00 270.00 309.63 286.10 MTCER200-170 REGION II REGION-WIDE 03/11/10 10.00 250.00 323.25 199.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 441.00 269.55 309.94 284.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 441.00 269.55 321.85 285.25 =============== 614-01575 Steel Sign Supp (2-1/2 In Rd NP40)(Po) Lin Foot =============================================== MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 1,316.00 14.00 21.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,316.00 14.00 21.00 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,316.00 14.00 21.00 20.00 =============== 614-01578 Steel Sign Supp (2-1/2 In Rd NP40)(Slip) Each =================================================== MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 94.00 130.00 208.75 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 94.00 130.00 208.75 165.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 94.00 130.00 208.75 165.00 =============== 614-01583 Stl Sign Supp (2-1/2 In Rd 80)(Po&Slip) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 122.00 300.00 396.24 360.91 MTCER200-170 REGION II REGION-WIDE 03/11/10 9.00 300.00 397.33 267.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 131.00 300.00 396.31 354.46 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 60.00 300.00 448.00 342.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 300.00 448.00 342.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 191.00 300.00 412.10 355.08 =============== 614-01585 Steel Sign Supp (2-1/2 In Rd 80) (Post) Lin Foot =============================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 7,470.00 18.00 17.11 14.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,470.00 18.00 17.11 14.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 42 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01585 Steel Sign Supp (2-1/2 In Rd 80) (Post) Lin Foot =============================================== MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 290.00 25.00 21.00 18.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 194.00 23.00 32.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 484.00 24.20 25.41 28.82 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 60.00 23.00 33.76 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 23.00 33.76 22.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,014.00 18.41 17.36 15.42 =============== 614-01588 Steel Sign Supp (2-1/2 In Rd 80)(Slip) Each =================================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 677.00 180.00 162.67 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 677.00 180.00 162.67 130.00 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 24.00 250.00 296.67 250.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 16.00 145.00 280.50 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 208.00 290.20 330.00 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 2.00 200.00 419.83 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 200.00 419.83 225.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 719.00 181.61 165.41 141.39 =============== 614-03001 Conc Footing (Ty 1) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 4.00 800.00 887.93 656.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 800.00 887.93 656.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 800.00 783.07 691.36 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 43 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-03002 Conc Footing (Ty 2) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 18.00 900.00 972.38 692.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 900.00 972.38 692.42 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 2.00 1100.00 1430.83 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1100.00 1430.83 1200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 920.00 942.42 746.90 =============== 614-03003 Conc Footing (Ty 3) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 4.00 1000.00 1117.89 925.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 1000.00 1117.89 925.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1000.00 990.89 861.62 =============== 614-03004 Conc Footing (Ty 4) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 8.00 1050.00 1271.25 999.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 1050.00 1271.25 999.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 1050.00 1193.12 969.92 =============== 614-03005 Conc Footing (Ty 5) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 10.00 1200.00 1516.42 1371.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 1200.00 1516.42 1371.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 1200.00 1420.99 1212.92 =============== 614-03006 Conc Footing (Ty 6) Each =================================================== MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 4.00 1800.00 1172.75 785.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 1800.00 1172.75 785.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1800.00 1565.92 1061.67 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 44 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-03007 Conc Footing (Ty 7) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 5.00 1300.00 2028.48 1945.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 1300.00 2028.48 1945.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1300.00 1987.97 1609.62 =============== 614-10050 Mod Overhead Sign Str Each =================================================== MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 1.00 1000.00 3503.75 1875.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1000.00 3503.75 1875.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 3503.75 1875.00 =============== 614-10110 LED Warning Sign System (_Signs) Each =================================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 5.00 16000.00 31943.33 22750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 16000.00 31943.33 22750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 16000.00 31943.33 22750.00 =============== 614-32000 Monotube Overhead Sign Cant (20 In Dia) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 1.00 28000.00 25905.87 24745.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 28000.00 25905.87 24745.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 28000.00 25905.87 24745.00 =============== 614-32400 Monotube Overhead Sign Cant (24 In Dia) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 1.00 35000.00 31421.03 30249.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 35000.00 31421.03 30249.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 35000.00 31421.03 30249.00 =============== 614-70112 Traf Sig Face (12) Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 15.00 400.00 866.33 995.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 400.00 866.33 995.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 400.00 866.33 995.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 45 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70150 Ped Sig Face (16) (Countdown) Each =================================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 4.00 690.00 719.67 625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 690.00 719.67 625.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 690.00 719.67 625.00 =============== 614-70336 Traf Sig Face (12-12-12) Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 3.00 600.00 722.33 495.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 600.00 722.33 495.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 12.00 700.00 761.33 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 700.00 761.33 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 680.00 748.33 699.00 =============== 614-70448 Traf Sig Face (12-12-12-12) Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 4.00 900.00 826.50 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 900.00 826.50 550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 900.00 826.50 550.00 =============== 614-72830 Communications Cabinet Each =================================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 1.00 2000.00 7613.33 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2000.00 7613.33 8000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 7613.33 8000.00 =============== 614-72860 Ped Push Button Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 8.00 120.00 197.25 285.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 120.00 197.25 285.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 46 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72860 Ped Push Button Each =================================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 4.00 130.00 238.00 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 130.00 238.00 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 123.33 208.36 281.67 =============== 614-72875 Loop Detect Wire Lin Foot =============================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 10,000.00 2.50 4.68 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,000.00 2.50 4.68 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,000.00 2.50 4.68 3.00 =============== 614-72886 Intersection Detect Sys (Camera) Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 2.00 5700.00 5725.00 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5700.00 5725.00 4500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5700.00 5725.00 4500.00 =============== 614-72887 Detect (Microwave Veh) Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 4.00 6500.00 7461.00 7200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 6500.00 7461.00 7200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 6500.00 7461.00 7200.00 =============== 614-75848 Inst Traf Sig Ctrler + Cab Each =================================================== MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 12.00 650.00 1505.00 1141.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 650.00 1505.00 1141.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 650.00 1505.00 1141.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 47 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-75882 Inst Sig Veh Detect (Magnetic) Each =================================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 6.00 250.00 2004.00 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 250.00 2004.00 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 250.00 2004.00 400.00 =============== 614-80000 Flash Beacon Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 24.00 1100.00 3352.00 1235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 1100.00 3352.00 1235.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 1100.00 3352.00 1235.00 =============== 614-80001 Flash Beacon (Solar Pwred) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 2.00 4000.00 4478.17 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 4000.00 4478.17 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4000.00 4478.17 500.00 =============== 614-80313 Barricade (Ty 3 F-C) Each =================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 1.00 1200.00 1235.33 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1200.00 1235.33 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1200.00 1235.33 750.00 =============== 614-84450 Inst Traf Sig Ped Pole Steel Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 1200.00 512.50 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1200.00 512.50 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1200.00 512.50 500.00 =============== 614-85001 Impact Atten Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 1.00 22500.00 15943.75 16600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 22500.00 15943.75 16600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 22500.00 15943.75 16600.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 48 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-85005 Impact Atten (Sand Barrel Array) Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 2.00 5000.00 3783.75 3610.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5000.00 3783.75 3610.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5000.00 3783.75 3610.00 =============== 614-86003 Spread Spectrum Radio (Contact Closure) Each =================================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 3.00 3000.00 2895.33 2650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 3000.00 2895.33 2650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 3000.00 2895.33 2650.00 =============== 614-86091 Inst Traf Sig Repeater Each =================================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 3.00 125.00 718.67 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 125.00 718.67 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 125.00 718.67 400.00 =============== 614-86246 Ctrler (Ty 170E-HC11) Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 14300.00 16335.00 15150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 14300.00 16335.00 15150.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 2.00 12500.00 15766.67 14500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 12500.00 15766.67 14500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 13100.00 15994.00 14716.67 =============== 614-86705 Inst Traf Sig Equip Hour =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 120.00 150.00 176.00 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 120.00 150.00 176.00 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 150.00 176.00 120.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 49 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86800 Uninterrupted Power Supply Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 6000.00 5686.75 5150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 6000.00 5686.75 5150.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 2.00 4500.00 6273.33 5700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 4500.00 6273.33 5700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 5000.00 6038.70 5516.67 =============== 614-87350 Test Fiber Optic Cable LUMP SUM =============================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 1.00 2500.00 3450.00 2150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2500.00 3450.00 2150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2500.00 3450.00 2150.00 =============== 614-87406 Fiber Optic Cable (S Mode) (6 S) Lin Foot =============================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 2,000.00 2.00 2.13 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,000.00 2.00 2.13 2.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,000.00 2.00 2.13 2.00 =============== 614-87424 Fiber Optic Cable (S Mode) (24 S) Lin Foot =============================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 2,000.00 2.50 2.38 2.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,000.00 2.50 2.38 2.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,000.00 2.50 2.38 2.25 =============== 614-87606 Term FO Cable (6 Strand) Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 2.00 500.00 1695.50 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 500.00 1695.50 2300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 500.00 1695.50 2300.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 50 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87624 Term FO Cable (24 Strand) Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 2.00 2000.00 2094.00 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2000.00 2094.00 3000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2000.00 2094.00 3000.00 =============== 616-30036 36 In Trash Guard Each =================================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 1.00 1500.00 6287.50 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1500.00 6287.50 10000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1500.00 6287.50 10000.00 =============== 620-00020 Sanitary Facility Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 600.00 425.00 600.00 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 1.00 1000.00 634.15 250.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 2.00 1000.00 1073.33 220.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 1.00 650.00 585.66 730.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 850.00 693.37 404.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 2.00 400.00 402.50 402.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 400.00 402.50 402.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 721.43 772.09 603.13 =============== 625-00000 Const Surveying LUMP SUM =============================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 1.00 3000.00 4120.05 2120.00 MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 1500.00 1972.50 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2250.00 3261.03 1810.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2250.00 5243.59 2206.67 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 51 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 625-00001 Const Surveying (Hour) Hour =================================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 8.00 135.00 114.00 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 135.00 114.00 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 135.00 114.00 120.00 =============== 626-00000 Mobilization LUMP SUM =============================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 1.00 20000.00 43808.20 51000.00 MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 1.00 36000.00 23583.75 34105.00 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 1.00 40000.00 44390.11 53484.00 MTCER400-247 HWYS 6J,7C,34A,42A,59B,61A,63 02/04/10 1.00 250.00 679.60 300.00 MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 1.00 7500.00 13883.75 9500.00 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 1.00 10000.00 23356.61 12300.00 MTCE R300-162 R300-162 R3 FY10 REGION WIDE 03/04/10 1.00 500.00 8409.80 1000.00 R500-111 REGION 5 VARIOUS US AND STATE 03/04/10 1.00 10000.00 13399.80 250.00 MTCER300-164 REGION 3, SH 50 A AND D, 90 B 03/04/10 1.00 5000.00 17200.00 1000.00 MTCER400-248 SOUTHWEST REGION 4- SOUTH OF 03/04/10 1.00 15000.00 31916.67 3000.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 1.00 10000.00 27672.33 15376.00 MTCER100-177 REGION 1 FY'10 EAST STRIPING 03/18/10 1.00 500.00 5590.00 1000.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 1.00 35000.00 88333.33 64000.00 MTCER100-170 REGION 1 FY 10 WEST STRIPING 03/25/10 1.00 1000.00 2700.00 300.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 1.00 10000.00 57675.00 43700.00 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 1.00 3009.00 2330.25 1924.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 1.00 45000.00 60879.87 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 14632.88 29429.53 17837.59 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 1.00 8000.00 11666.67 5000.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 1.00 30000.00 41750.00 44000.00 MTCER200-169 REGION II REGION-WIDE 05/06/10 1.00 5000.00 23966.67 7500.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 1.00 12000.00 22233.33 13700.00 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 1.00 5000.00 31036.33 58645.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 12000.00 26437.21 25769.06 MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 07/22/10 1.00 15000.00 34833.33 4500.00 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 1.00 10000.00 36637.60 45000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 52 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00000 Mobilization LUMP SUM =============================================== MTCE R100-180 WESTERN PORTION OF REGION 1 08/12/10 1.00 15000.00 7000.00 1000.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 1.00 145000.00 140000.00 140000.00 MTCE R100-184 VARIOUS LOCATIONS 09/02/10 1.00 13000.00 17196.50 9503.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 1.00 25000.00 24910.38 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 37166.67 32799.88 37500.50 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 1.00 50000.00 56500.00 90000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 50000.00 103733.33 84666.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 20060.66 34604.45 29389.91 =============== 626-01000 Public Info Services LUMP SUM =============================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 1.00 3000.00 1547.25 645.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 1.00 2000.00 7000.00 2000.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 1.00 3000.00 4219.54 4870.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 2666.67 4072.80 2505.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 1.00 3000.00 3666.67 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3000.00 3666.67 1500.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 1.00 2000.00 1679.00 1679.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2000.00 1679.00 1679.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 2600.00 3892.19 2138.80 =============== 627-00003 Thermoplastic Pvmt Mkg (Inlaid) Sq Foot ================================================ MTCER200-169 REGION II REGION-WIDE 05/06/10 19,482.00 6.70 6.42 6.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19,482.00 6.70 6.42 6.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,482.00 6.70 6.42 6.25 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 53 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00005 Epoxy Pvmt Mkg Gallon ================================================= MTCER400-247 HWYS 6J,7C,34A,42A,59B,61A,63 02/04/10 16,329.00 34.00 34.95 32.50 MTCE R300-162 R300-162 R3 FY10 REGION WIDE 03/04/10 33,516.00 33.00 34.09 31.42 R500-111 REGION 5 VARIOUS US AND STATE 03/04/10 38,820.00 34.00 34.76 31.95 MTCER200-170 REGION II REGION-WIDE 03/11/10 42.00 90.00 108.50 102.00 MTCER100-177 REGION 1 FY'10 EAST STRIPING 03/18/10 6,650.00 31.00 36.53 34.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 30.00 50.00 105.00 100.00 MTCER100-170 REGION 1 FY 10 WEST STRIPING 03/25/10 12,760.00 33.50 35.13 32.20 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 27.00 200.00 131.67 116.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 108,174.00 33.51 34.80 32.09 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 80.00 75.00 141.67 150.00 MTCER200-169 REGION II REGION-WIDE 05/06/10 28,596.00 33.00 34.18 34.75 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 65.00 65.00 107.16 58.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28,741.00 33.19 34.70 35.12 MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 07/22/10 4,500.00 36.00 44.50 38.50 MTCE R100-180 WESTERN PORTION OF REGION 1 08/12/10 10,500.00 37.00 40.17 40.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 206.00 100.00 97.75 97.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15,206.00 37.56 41.72 40.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 152,121.00 33.86 35.26 33.49 =============== 627-00007 Epoxy Pvmt Mkg (Spec) Gallon ================================================= MTCER200-169 REGION II REGION-WIDE 05/06/10 3,134.00 64.00 105.42 71.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,134.00 64.00 105.42 71.25 MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 07/22/10 2,100.00 80.00 116.83 65.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,100.00 80.00 116.83 65.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,234.00 70.42 110.00 68.94 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 54 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00011 Pvmt Mkg Paint (Waterborne) Gallon ================================================= MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 140.00 45.00 45.67 42.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 27.00 200.00 77.68 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 167.00 70.06 57.40 44.10 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 413.00 25.00 36.80 36.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 413.00 25.00 36.80 36.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 580.00 37.97 58.53 47.90 =============== 627-00032 Raised Flex Pvmt Marker (Temp) Each =================================================== MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 2,000.00 0.50 1.48 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,000.00 0.50 1.48 1.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,000.00 0.50 1.48 1.50 =============== 627-00080 Polyurea Pvmt Mkg (IL) Gallon ================================================= MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 228.00 418.50 503.75 265.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 228.00 418.50 503.75 265.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 228.00 418.50 503.75 265.00 =============== 627-01001 Preform Plastic Pvmt Mkg (Ty I) Sq Foot ================================================ MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 07/22/10 600.00 9.00 8.50 8.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 600.00 9.00 8.50 8.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 600.00 9.00 8.50 8.30 =============== 627-01010 Preform Plastic Pvmt Mkg (TY I)(Inlaid) Sq Foot ================================================ MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 4,639.00 15.00 10.33 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,639.00 15.00 10.33 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 55 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-01010 Preform Plastic Pvmt Mkg (TY I)(Inlaid) Sq Foot ================================================ MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 9,870.00 8.00 9.87 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9,870.00 8.00 9.87 8.50 MTCE R100-180 WESTERN PORTION OF REGION 1 08/12/10 35,200.00 8.00 8.50 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 35,200.00 8.00 8.50 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 49,709.00 8.65 8.94 8.29 =============== 627-02010 Preform Plastic Pvmt Mkg (Ty II)(Inlaid) Sq Foot ================================================ MTCER100-177 REGION 1 FY'10 EAST STRIPING 03/18/10 2,250.00 8.00 11.69 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,250.00 8.00 11.69 9.00 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 9,500.00 9.00 11.50 10.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 1,850.00 11.00 10.53 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11,350.00 9.33 11.34 9.76 MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 07/22/10 85,000.00 9.00 8.95 8.30 MTCE R100-180 WESTERN PORTION OF REGION 1 08/12/10 5,000.00 8.00 8.58 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 90,000.00 8.94 8.93 8.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 103,600.00 8.97 9.27 8.46 =============== 627-30210 Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 280.00 11.00 12.53 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 280.00 11.00 12.53 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 280.00 11.00 12.53 12.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 56 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30324 Preform Plastic Pvmt Mkg (WS) (TY I) Sq Foot ================================================ MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 626.50 18.00 21.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 626.50 18.00 21.00 20.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 820.00 15.00 21.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 820.00 15.00 21.00 15.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 948.50 20.00 23.69 23.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 948.50 20.00 23.69 23.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,395.00 17.76 21.48 19.75 =============== 627-30329 Preform Plastic Pvmt Mkg (XS) (TY I) Sq Foot ================================================ MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 2,720.00 10.00 11.67 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,720.00 10.00 11.67 12.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 5,800.00 10.00 11.17 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,800.00 10.00 11.17 10.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 2,162.00 12.00 10.37 10.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,162.00 12.00 10.37 10.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,682.00 10.40 11.25 10.58 =============== 627-30405 Preform Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ MTCER400-248 SOUTHWEST REGION 4- SOUTH OF 03/04/10 16,710.00 7.00 7.85 7.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 57 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30405 Preform Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ MTCER200-170 REGION II REGION-WIDE 03/11/10 309.00 14.00 13.75 14.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 4,316.00 7.00 11.38 10.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21,335.00 7.10 8.45 8.15 MTCER200-169 REGION II REGION-WIDE 05/06/10 5,563.00 8.50 8.65 8.25 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 133.00 27.00 14.33 16.00 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 6,727.00 7.00 7.69 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12,423.00 7.89 8.11 7.93 MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 07/22/10 750.00 15.00 11.67 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 750.00 15.00 11.67 11.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34,508.00 7.56 8.40 8.13 =============== 627-30407 Preform Thermoplastic Pvmt Mkg (WS)(Sp) Sq Foot ================================================ MTCER300-164 REGION 3, SH 50 A AND D, 90 B 03/04/10 2,675.00 8.00 9.65 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,675.00 8.00 9.65 8.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,675.00 8.00 9.65 8.50 =============== 627-30410 Preform Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ MTCER400-248 SOUTHWEST REGION 4- SOUTH OF 03/04/10 31,618.00 4.50 5.42 4.65 MTCER200-170 REGION II REGION-WIDE 03/11/10 144.00 10.00 21.21 21.75 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 7,968.00 5.00 7.25 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 39,730.00 4.62 5.74 5.08 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 230.00 16.00 11.40 12.00 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 56,282.00 5.50 5.34 4.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 56,512.00 5.54 5.36 4.29 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 58 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30410 Preform Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 07/22/10 60.00 12.00 10.67 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 12.00 10.67 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 96,302.00 5.17 5.55 4.62 =============== 627-30411 Preform Thermoplastic Pvmt Mkg (XS)(Sp) Sq Foot ================================================ MTCER300-164 REGION 3, SH 50 A AND D, 90 B 03/04/10 22,708.00 6.00 7.26 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22,708.00 6.00 7.26 5.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22,708.00 6.00 7.26 5.50 =============== 630-00000 Flagging Hour =================================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 500.00 20.00 16.46 13.50 MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 160.00 22.00 21.83 22.30 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 640.00 15.00 16.72 19.08 MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 640.00 20.00 20.00 18.00 MTCER300-164 REGION 3, SH 50 A AND D, 90 B 03/04/10 80.00 18.00 16.40 12.00 MTCER400-248 SOUTHWEST REGION 4- SOUTH OF 03/04/10 700.00 10.00 15.26 12.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 100.00 20.00 21.00 7.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 1,000.00 21.00 21.67 19.00 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 20.00 21.00 31.25 71.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 1,014.00 26.00 14.58 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,854.00 19.40 16.83 18.10 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 120.00 20.00 18.83 21.50 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 300.00 22.00 20.33 21.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 100.00 26.00 24.63 20.50 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 30.00 20.00 18.35 23.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 550.00 22.18 20.64 21.15 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 100.00 20.00 16.61 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 59 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00000 Flagging Hour =================================================== MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 2,000.00 15.00 20.70 20.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,100.00 15.24 19.64 20.67 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 400.00 25.00 22.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 400.00 25.00 17.66 11.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,904.00 18.77 17.28 18.01 =============== 630-00001 Pilot Car Operation Hour =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 320.00 25.00 30.81 40.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 320.00 25.00 30.81 40.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 320.00 25.00 28.23 20.64 =============== 630-00003 Uniformed Traf Ctrl Hour =================================================== MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 48.00 50.00 92.50 117.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48.00 50.00 92.50 117.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 100.00 65.00 67.50 62.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 65.00 67.50 62.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 148.00 60.14 75.61 79.84 =============== 630-00007 Traf Ctrl Inspection Day ==================================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 34.00 55.00 81.23 10.00 MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 20.00 110.00 65.03 53.10 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 32.00 50.00 33.64 59.36 MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 10.00 90.00 93.50 99.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 60 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00007 Traf Ctrl Inspection Day ==================================================== MTCER200-170 REGION II REGION-WIDE 03/11/10 20.00 75.00 75.08 50.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 8.00 80.00 103.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 124.00 70.24 68.47 48.48 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 15.00 100.00 315.00 95.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 8.00 120.00 120.00 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23.00 106.96 247.17 84.57 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 10.00 330.00 46.00 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 330.00 46.00 46.00 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 17.00 150.00 190.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 150.00 122.66 86.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 174.00 97.82 96.05 70.05 =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 85.00 250.00 337.20 50.00 MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 60.00 550.00 465.75 398.00 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 90.00 200.00 363.67 424.00 MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 20.00 400.00 466.50 480.00 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 20.00 550.00 740.97 420.00 MTCER300-164 REGION 3, SH 50 A AND D, 90 B 03/04/10 30.00 400.00 349.00 150.00 MTCER400-248 SOUTHWEST REGION 4- SOUTH OF 03/04/10 50.00 175.00 417.50 100.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 50.00 400.00 409.50 350.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 15.00 550.00 500.00 500.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 50.00 300.00 488.75 480.00 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 20.00 300.00 301.25 82.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 39.00 600.00 503.26 456.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 529.00 349.05 408.22 306.64 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 15.00 450.00 583.33 450.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 61 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 30.00 500.00 478.33 450.00 MTCER200-169 REGION II REGION-WIDE 05/06/10 25.00 150.00 306.67 300.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 20.00 550.00 518.33 500.00 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 60.00 400.00 324.14 286.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 150.00 403.33 394.49 366.28 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 90.00 400.00 288.14 60.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 28.00 400.00 506.00 506.00 MTCE R100-184 VARIOUS LOCATIONS 09/02/10 15.00 650.00 615.00 635.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 50.00 450.00 454.00 361.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 183.00 434.15 343.41 257.61 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 35.00 400.00 412.50 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35.00 400.00 424.73 282.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 897.00 377.48 398.83 301.21 =============== 630-00015 Uniformed Traf Ctrl Coordination Hour =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 4.00 50.00 56.00 68.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 50.00 56.00 68.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 50.00 56.00 68.00 =============== 630-00025 Traf Ctrl Vehicle Hour =================================================== MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 100.00 18.00 13.95 10.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 18.00 13.95 10.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 18.00 13.95 10.30 =============== 630-80001 Flash Beacon (Port) Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 4.00 800.00 165.00 106.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 800.00 165.00 106.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 800.00 165.00 106.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 62 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80305 Flagging Station Light Each =================================================== MTCER400-248 SOUTHWEST REGION 4- SOUTH OF 03/04/10 4.00 50.00 379.17 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 50.00 379.17 10.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 4.00 800.00 265.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 800.00 265.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 425.00 341.11 55.00 =============== 630-80335 Barricade (3 M-A) (Temp) Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 8.00 180.00 93.75 96.00 MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 2.00 165.00 112.00 78.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 3.00 100.00 59.55 61.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 159.23 82.15 85.15 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 2.00 205.00 93.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 205.00 93.00 45.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 6.00 100.00 86.45 10.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 100.00 86.45 10.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 146.67 83.88 59.94 =============== 630-80337 Barricade (3 M-C) (Temp) Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 2.00 300.00 193.00 157.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 300.00 193.00 157.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 300.00 193.00 157.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 63 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80341 Const Traf Sign (A) Each =================================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 6.00 50.00 31.05 5.00 MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 46.00 65.00 26.49 15.95 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 15.00 20.00 12.53 21.20 MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 42.00 35.00 38.50 26.00 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 9.00 20.00 37.11 5.50 MTCER300-164 REGION 3, SH 50 A AND D, 90 B 03/04/10 36.00 20.00 73.10 10.00 MTCER400-248 SOUTHWEST REGION 4- SOUTH OF 03/04/10 60.00 40.00 26.67 10.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 29.00 40.00 31.00 20.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 76.00 10.00 17.67 16.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 8.00 20.00 25.00 10.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 20.00 40.00 28.38 42.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 347.00 32.39 31.77 17.04 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 4.00 50.00 50.00 50.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 28.00 20.00 41.67 10.00 MTCER200-169 REGION II REGION-WIDE 05/06/10 4.00 15.00 28.67 25.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 4.00 40.00 35.67 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 24.50 40.60 16.30 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 18.00 20.00 13.00 13.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 34.00 10.00 5.75 5.75 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 9.00 40.00 21.95 10.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 61.00 17.38 13.39 8.56 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 4.00 60.00 28.50 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 60.00 18.91 19.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 452.00 29.91 29.71 16.11 =============== 630-80342 Const Traf Sign (B) Each =================================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 30.00 50.00 29.42 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 64 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80342 Const Traf Sign (B) Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 42.00 75.00 30.31 21.25 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 40.00 20.00 22.13 31.80 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 14.00 25.00 46.60 5.50 MTCER400-248 SOUTHWEST REGION 4- SOUTH OF 03/04/10 24.00 40.00 26.67 10.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 35.00 50.00 41.42 35.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 70.00 20.00 21.33 22.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 8.00 25.00 25.00 10.00 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 14.00 65.00 28.50 53.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 44.00 55.00 34.49 42.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 321.00 41.87 30.30 25.21 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 20.00 50.00 50.00 50.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 8.00 30.00 41.67 10.00 MTCER200-169 REGION II REGION-WIDE 05/06/10 24.00 15.00 28.67 25.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 38.00 40.00 39.00 23.00 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 40.00 15.00 10.43 11.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 130.00 28.62 28.32 23.25 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 82.00 30.00 15.14 13.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 50.00 15.00 5.75 5.75 MTCE R100-184 VARIOUS LOCATIONS 09/02/10 10.00 85.00 82.50 115.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 33.00 50.00 21.95 10.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 175.00 32.63 17.43 16.25 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 12.00 70.00 31.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 70.00 39.60 30.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 638.00 37.16 28.61 23.92 =============== 630-80343 Const Traf Sign (C) Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 8.00 85.00 34.14 26.55 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 4.00 25.00 20.23 42.40 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 65 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80343 Const Traf Sign (C) Each =================================================== MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 4.00 30.00 46.60 5.50 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 8.00 30.00 25.00 10.00 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 4.00 65.00 55.75 162.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 28.00 70.00 35.05 42.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 56.00 60.00 34.54 41.51 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 10.00 50.00 51.67 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 50.00 51.67 55.00 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 8.00 40.00 16.64 13.00 MTCE R100-184 VARIOUS LOCATIONS 09/02/10 10.00 85.00 85.50 105.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 21.00 60.00 21.95 10.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 39.00 62.31 28.04 35.14 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 8.00 80.00 33.50 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 80.00 21.38 27.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 113.00 61.33 32.94 39.05 =============== 630-80344 Const Traf Sign (Spec) Sq Foot ================================================ MTCER200-168 REGION 2 REGIONWIDE 01/14/10 20.00 15.00 10.58 8.50 MTCER200-170 REGION II REGION-WIDE 03/11/10 112.00 20.00 14.08 15.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 32.00 15.00 13.67 10.00 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 32.00 15.00 16.88 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 196.00 17.86 13.98 15.64 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 84.00 18.00 33.33 20.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 9.00 40.00 40.67 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 93.00 20.13 34.04 19.23 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 66 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80344 Const Traf Sign (Spec) Sq Foot ================================================ MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 32.00 20.00 23.00 23.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 16.00 20.00 11.70 10.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48.00 20.00 15.47 18.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 337.00 18.79 23.00 25.26 =============== 630-80348 Const Info Sign Each =================================================== MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 4.00 200.00 87.00 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 200.00 87.00 105.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 200.00 87.00 105.00 =============== 630-80350 Vert Panel Each =================================================== MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 30.00 10.00 12.07 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 10.00 12.07 13.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 10.00 12.07 13.00 =============== 630-80355 Port Mesg Panel Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 6.00 5000.00 1784.25 903.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 4.00 2000.00 3612.50 2200.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 4.00 4000.00 1392.87 2070.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 3857.14 1983.75 1607.00 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 2.00 1500.00 3622.75 6491.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1500.00 3622.75 6491.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 2.00 2500.00 4705.25 4121.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2500.00 4705.25 4121.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 3444.44 2764.18 2786.10 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 67 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80357 Flash Arrow Panel (B Ty) Each =================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 2.00 250.00 254.67 265.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 2.00 250.00 376.00 200.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 2.00 150.00 200.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 216.67 292.27 255.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 2.00 500.00 416.67 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 500.00 416.67 250.00 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 2.00 110.00 287.50 287.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 110.00 287.50 287.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 252.00 280.63 163.19 =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 2.00 350.00 707.00 175.00 MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 2.00 800.00 582.75 319.00 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 1.00 500.00 1059.50 566.00 MTCER300-164 REGION 3, SH 50 A AND D, 90 B 03/04/10 1.00 500.00 497.00 10.00 MTCER400-248 SOUTHWEST REGION 4- SOUTH OF 03/04/10 2.00 300.00 378.33 20.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 4.00 1500.00 711.25 295.00 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 1.00 500.00 231.25 658.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 2.00 1000.00 501.21 730.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 826.67 590.71 326.80 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 2.00 800.00 600.00 750.00 MTCER200-169 REGION II REGION-WIDE 05/06/10 2.00 100.00 283.33 200.00 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 2.00 250.00 546.20 584.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 383.33 483.48 511.59 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 2.00 1000.00 539.29 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 68 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== MTCE R100-184 VARIOUS LOCATIONS 09/02/10 1.00 85.00 1280.00 525.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 4.00 750.00 471.25 415.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 726.43 551.56 455.00 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 1.00 1500.00 1960.00 3700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1500.00 1922.50 2433.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 733.97 640.08 595.37 =============== 630-80359 Port Mesg Panel Day ==================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 6.00 75.00 136.00 191.00 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 20.00 120.00 98.12 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26.00 109.62 109.88 86.38 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 100.00 60.00 250.00 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 60.00 250.00 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 126.00 70.24 168.73 224.61 =============== 630-80360 Drum Channel Dev Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 50.00 35.00 24.31 21.25 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 50.00 15.00 18.00 16.00 MTCE0361-096 US 34 BUSINESS AT US 36 IN ES 02/11/10 50.00 25.00 27.00 26.00 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 10.00 20.00 14.25 11.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 50.00 20.00 16.63 10.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 150.00 10.00 10.67 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 360.00 17.92 17.46 12.98 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 30.00 30.00 40.67 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 30.00 40.67 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 69 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80360 Drum Channel Dev Each =================================================== MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 150.00 5.00 1.15 1.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 150.00 5.00 1.15 1.15 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 50.00 50.00 28.50 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 50.00 20.67 21.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 590.00 17.97 17.92 11.90 =============== 630-80363 Drum Channel Dev (Light) (F) Each =================================================== MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 3.00 50.00 31.50 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 50.00 31.50 36.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 50.00 31.50 36.00 =============== 630-80364 Drum Channel Dev (Light) (SB) Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 50.00 55.00 29.31 21.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 55.00 29.31 21.25 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 20.00 50.00 41.67 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 50.00 41.67 10.00 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 10.00 50.00 30.50 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 50.00 30.50 34.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 53.13 32.04 20.03 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 70 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80370 Conc Barrier (Temp) Lin Foot =============================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 60.00 40.00 43.14 26.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 40.00 43.14 26.55 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 150.00 30.00 31.50 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 150.00 30.00 31.50 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 210.00 32.86 36.67 32.59 =============== 630-80380 Traffic Cone Each =================================================== MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR 01/07/10 150.00 10.00 6.81 3.00 MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 150.00 8.00 8.11 7.45 MTCER200-168 REGION 2 REGIONWIDE 01/14/10 300.00 4.00 4.92 8.50 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 125.00 10.00 6.13 2.20 MTCER300-164 REGION 3, SH 50 A AND D, 90 B 03/04/10 60.00 5.00 8.70 10.00 MTCER400-248 SOUTHWEST REGION 4- SOUTH OF 03/04/10 150.00 7.00 4.17 2.00 MTCER200-170 REGION II REGION-WIDE 03/11/10 50.00 5.00 5.88 5.00 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 03/25/10 400.00 5.00 2.33 1.00 MTCE R300-160 070A , 070F, 070G, 070H, 006E 03/25/10 400.00 5.00 4.75 1.00 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 03/25/10 50.00 8.00 8.16 20.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 200.00 5.00 9.11 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,035.00 5.97 5.94 4.44 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 300.00 8.00 9.00 7.00 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 04/29/10 300.00 10.00 8.33 5.00 MTCER200-169 REGION II REGION-WIDE 05/06/10 200.00 3.00 4.00 5.00 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 150.00 10.00 5.33 5.00 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 150.00 5.00 7.01 7.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,100.00 7.50 7.13 5.82 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 100.00 5.00 6.21 6.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 71 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80380 Traffic Cone Each =================================================== MTCE R500-110 US 160A MP 85.7 TO MP 88.0 08/26/10 500.00 3.00 0.29 0.29 MTCE R100-184 VARIOUS LOCATIONS 09/02/10 80.00 8.00 9.50 12.00 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 300.00 8.00 7.84 4.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 980.00 5.14 6.02 3.01 MTCE 0703-366 EJMT CULVERT REPAIR 10/14/10 50.00 40.00 6.50 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 40.00 4.22 2.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,165.00 6.59 6.03 4.30 =============== 630-80510 Mobile Pvmt Mkg Zone LUMP SUM =============================================== MTCER400-247 HWYS 6J,7C,34A,42A,59B,61A,63 02/04/10 1.00 250.00 719.60 500.00 MTCE R300-162 R300-162 R3 FY10 REGION WIDE 03/04/10 1.00 500.00 2509.80 1500.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 1.00 2500.00 1288.07 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1083.33 1459.98 1066.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1083.33 1459.98 1066.67 =============== 630-80520 Mobile Pvmt Mkg Zone Day ==================================================== MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 04/01/10 4.00 500.00 1000.00 1000.00 MTCER200-169 REGION II REGION-WIDE 05/06/10 100.00 100.00 61.67 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 104.00 115.38 97.76 86.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 104.00 115.38 97.76 86.54 =============== 630-85040 Impact Atten (T-M-A) (Temp) Each =================================================== MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP 01/14/10 2.00 12000.00 7080.00 4780.00 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 02/11/10 1.00 5000.00 5115.04 2200.00 MTCER300-164 REGION 3, SH 50 A AND D, 90 B 03/04/10 1.00 3000.00 8425.00 5000.00 MTCE R400-243 I-25 MP 249 TO MP 282 03/25/10 2.00 13000.00 11284.56 9100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 9666.67 9209.92 5826.67 COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 72 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85040 Impact Atten (T-M-A) (Temp) Each =================================================== MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS 05/06/10 1.00 10000.00 6080.00 8500.00 MTCE R300-166 R3 FY11 REGION WIDE 06/03/10 1.00 2000.00 5063.58 1754.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 6000.00 5499.19 5127.17 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 09/09/10 2.00 8000.00 6455.00 4120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 8000.00 6455.00 4120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 8600.00 8249.63 5345.43 =============== 630-85041 Impact Atten (T-M-A) Day ==================================================== MTCER200-168 REGION 2 REGIONWIDE 01/14/10 20.00 225.00 329.17 530.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 225.00 329.17 530.00 MTCER200-169 REGION II REGION-WIDE 05/06/10 50.00 100.00 101.67 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 100.00 101.67 50.00 MTCER300-163 REGION 3, I-70A FROM MILE MAR 07/22/10 180.00 90.00 134.14 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 180.00 90.00 134.14 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 102.80 179.20 142.81 =============== 700-70010 F/A Minor Contract Revisions Force Acct ============================================= MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR . 1.00 10000.00 . . MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP . 1.00 50000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 73 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70010 F/A Minor Contract Revisions Force Acct ============================================= MTCER200-168 REGION 2 REGIONWIDE . 1.00 50000.00 . . MTCER400-247 HWYS 6J,7C,34A,42A,59B,61A,63 . 1.00 5000.00 . . MTCE0361-096 US 34 BUSINESS AT US 36 IN ES . 1.00 14000.00 . . MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM . 1.00 25000.00 . . MTCE R300-162 R300-162 R3 FY10 REGION WIDE . 1.00 10000.00 . . R500-111 REGION 5 VARIOUS US AND STATE . 1.00 70000.00 . . MTCER400-248 SOUTHWEST REGION 4- SOUTH OF . 1.00 25000.00 . . MTCER200-170 REGION II REGION-WIDE . 1.00 10000.00 . . MTCER100-177 REGION 1 FY'10 EAST STRIPING . 1.00 25000.00 . . MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP . 1.00 50000.00 . . MTCER100-170 REGION 1 FY 10 WEST STRIPING . 1.00 15000.00 . . MTCE R300-160 070A , 070F, 070G, 070H, 006E . 1.00 10000.00 . . MTCER600-364 VARIOUS LOCATIONS IN REGION 6 . 1.00 5000.00 . . MTCE R400-243 I-25 MP 249 TO MP 282 . 1.00 50000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 26500.00 . . MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE . 1.00 5000.00 . . MTCE160A-015 DURANGO, CORTEZ, & IGNACIO . 1.00 20000.00 . . MTCER200-169 REGION II REGION-WIDE . 1.00 10000.00 . . MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS . 1.00 15000.00 . . MTCE R300-166 R3 FY11 REGION WIDE . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 11000.00 . . MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 . 1.00 50500.00 . . MTCE R100-180 WESTERN PORTION OF REGION 1 . 1.00 25000.00 . . MTCE R500-110 US 160A MP 85.7 TO MP 88.0 . 1.00 50000.00 . . MTCE R100-184 VARIOUS LOCATIONS . 1.00 30000.00 . . MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 . 1.00 24500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 36000.00 . . MTCE 0703-366 EJMT CULVERT REPAIR . 1.00 25000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 25000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 25333.33 . . =============== 700-70011 F/A Partnering Force Acct ============================================= MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP . 1.00 500.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 74 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70011 F/A Partnering Force Acct ============================================= MTCER200-168 REGION 2 REGIONWIDE . 1.00 100.00 . . MTCER400-247 HWYS 6J,7C,34A,42A,59B,61A,63 . 1.00 500.00 . . MTCE0361-096 US 34 BUSINESS AT US 36 IN ES . 1.00 1000.00 . . MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM . 1.00 500.00 . . R500-111 REGION 5 VARIOUS US AND STATE . 1.00 100.00 . . MTCER400-248 SOUTHWEST REGION 4- SOUTH OF . 1.00 500.00 . . MTCER200-170 REGION II REGION-WIDE . 1.00 100.00 . . MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP . 1.00 500.00 . . MTCE R300-160 070A , 070F, 070G, 070H, 006E . 1.00 100.00 . . MTCER600-364 VARIOUS LOCATIONS IN REGION 6 . 1.00 200.00 . . MTCE R400-243 I-25 MP 249 TO MP 282 . 1.00 500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 383.33 . . MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE . 1.00 500.00 . . MTCE160A-015 DURANGO, CORTEZ, & IGNACIO . 1.00 100.00 . . MTCER200-169 REGION II REGION-WIDE . 1.00 150.00 . . MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS . 1.00 750.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 375.00 . . MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 . 1.00 200.00 . . MTCE R500-110 US 160A MP 85.7 TO MP 88.0 . 1.00 500.00 . . MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 . 1.00 200.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 300.00 . . MTCE 0703-366 EJMT CULVERT REPAIR . 1.00 1500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1500.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 425.00 . . =============== 700-70016 F/A Fuel Cost Adjustment Force Acct ============================================= MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP . 1.00 1250.00 . . MTCER200-168 REGION 2 REGIONWIDE . 1.00 100.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 75 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70016 F/A Fuel Cost Adjustment Force Acct ============================================= MTCER400-247 HWYS 6J,7C,34A,42A,59B,61A,63 . 1.00 500.00 . . MTCE0361-096 US 34 BUSINESS AT US 36 IN ES . 1.00 1000.00 . . MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM . 1.00 500.00 . . MTCE R300-162 R300-162 R3 FY10 REGION WIDE . 1.00 500.00 . . R500-111 REGION 5 VARIOUS US AND STATE . 1.00 10000.00 . . MTCER400-248 SOUTHWEST REGION 4- SOUTH OF . 1.00 500.00 . . MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP . 1.00 3000.00 . . MTCE R300-160 070A , 070F, 070G, 070H, 006E . 1.00 100.00 . . MTCER600-364 VARIOUS LOCATIONS IN REGION 6 . 1.00 200.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 1604.55 . . MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE . 1.00 500.00 . . MTCE160A-015 DURANGO, CORTEZ, & IGNACIO . 1.00 3000.00 . . MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS . 1.00 500.00 . . MTCE R300-166 R3 FY11 REGION WIDE . 1.00 500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 1125.00 . . MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 . 1.00 800.00 . . MTCE R500-110 US 160A MP 85.7 TO MP 88.0 . 1.00 12000.00 . . MTCE R100-184 VARIOUS LOCATIONS . 1.00 2000.00 . . MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 . 1.00 300.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 3775.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 1960.53 . . =============== 700-70018 F/A Road Smooth Incentive Force Acct ============================================= MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP . 1.00 9000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 9000.00 . . MTCE R500-110 US 160A MP 85.7 TO MP 88.0 . 1.00 19000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 19000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 14000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 76 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70019 F/A Asphalt Cement Cost Adjustment Force Acct ============================================= MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP . 1.00 15000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 15000.00 . . MTCE R500-110 US 160A MP 85.7 TO MP 88.0 . 1.00 28000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 28000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 21500.00 . . =============== 700-70022 F/A OJT Colorado Training Program Force Acct ============================================= MTCE 0703-366 EJMT CULVERT REPAIR . 1.00 500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 500.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 500.00 . . =============== 700-70025 F/A Quality Incentive Pymt Force Acct ============================================= MTCE0361-096 US 34 BUSINESS AT US 36 IN ES . 1.00 1600.00 . . MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP . 1.00 16000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 8800.00 . . MTCE R500-110 US 160A MP 85.7 TO MP 88.0 . 1.00 67000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 67000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 28200.00 . . =============== 700-70028 F/A ESB Program Force Acct ============================================= MTCE R400-221 US 6 52B 71E 71F IN WELD, MOR . 1.00 5000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 77 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70028 F/A ESB Program Force Acct ============================================= MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP . 1.00 5000.00 . . MTCER200-168 REGION 2 REGIONWIDE . 1.00 5000.00 . . MTCER400-247 HWYS 6J,7C,34A,42A,59B,61A,63 . 1.00 5000.00 . . MTCE0361-096 US 34 BUSINESS AT US 36 IN ES . 1.00 5000.00 . . MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM . 1.00 5000.00 . . MTCE R300-162 R300-162 R3 FY10 REGION WIDE . 1.00 5000.00 . . R500-111 REGION 5 VARIOUS US AND STATE . 1.00 7500.00 . . MTCER400-248 SOUTHWEST REGION 4- SOUTH OF . 1.00 5000.00 . . MTCER200-170 REGION II REGION-WIDE . 1.00 5000.00 . . MTCER100-177 REGION 1 FY'10 EAST STRIPING . 1.00 5000.00 . . MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP . 1.00 5000.00 . . MTCER100-170 REGION 1 FY 10 WEST STRIPING . 1.00 5000.00 . . MTCE R300-160 070A , 070F, 070G, 070H, 006E . 1.00 5000.00 . . MTCER600-364 VARIOUS LOCATIONS IN REGION 6 . 1.00 5000.00 . . MTCE R400-243 I-25 MP 249 TO MP 282 . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 5156.25 . . MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE . 1.00 5000.00 . . MTCE160A-015 DURANGO, CORTEZ, & IGNACIO . 1.00 5000.00 . . MTCER200-169 REGION II REGION-WIDE . 1.00 5000.00 . . MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS . 1.00 5000.00 . . MTCE R300-166 R3 FY11 REGION WIDE . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 5000.00 . . MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 . 1.00 7500.00 . . MTCE R100-180 WESTERN PORTION OF REGION 1 . 1.00 5000.00 . . MTCE R500-110 US 160A MP 85.7 TO MP 88.0 . 1.00 5000.00 . . MTCE R100-184 VARIOUS LOCATIONS . 1.00 5000.00 . . MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 5500.00 . . MTCE 0703-366 EJMT CULVERT REPAIR . 1.00 7500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 7500.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 5277.78 . . COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 78 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70031 F/A INTERIM SURFACE REPAIR Force Acct ============================================= MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 . . MTCE R500-110 US 160A MP 85.7 TO MP 88.0 . 1.00 25000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 15000.00 . . =============== 700-70034 F/A Force Acct ============================================= MTCE R100-184 VARIOUS LOCATIONS . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 . . =============== 700-70035 F/A Force Acct ============================================= MTCE R100-184 VARIOUS LOCATIONS . 1.00 10000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 . . =============== 700-70036 F/A Force Acct ============================================= MTCE R100-184 VARIOUS LOCATIONS . 1.00 2000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 . . =============== 700-70060 F/A Adjust Force Acct ============================================= MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP . 1.00 2000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 79 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70060 F/A Adjust Force Acct ============================================= MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP . 1.00 2000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2000.00 . . MTCE R500-110 US 160A MP 85.7 TO MP 88.0 . 1.00 2000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2000.00 . . =============== 700-70081 F/A Provide Force Acct ============================================= MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 . . =============== 700-70130 F/A Repair Force Acct ============================================= MTCE R500-110 US 160A MP 85.7 TO MP 88.0 . 1.00 2500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2500.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2500.00 . . =============== 700-70380 F/A Erosion Ctrl Force Acct ============================================= MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SP . 1.00 3000.00 . . MTCER200-168 REGION 2 REGIONWIDE . 1.00 1500.00 . . MTCE0361-096 US 34 BUSINESS AT US 36 IN ES . 1.00 1000.00 . . MTCER400-248 SOUTHWEST REGION 4- SOUTH OF . 1.00 500.00 . . MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP . 1.00 1000.00 . . MTCER600-364 VARIOUS LOCATIONS IN REGION 6 . 1.00 2500.00 . . MTCE R400-243 I-25 MP 249 TO MP 282 . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 2071.43 . . MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE . 1.00 2000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 13:48 Tuesday, February 22, 2011 80 ITEM UNIT COSTS BY PROJECTS -- 2010 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70380 F/A Erosion Ctrl Force Acct ============================================= MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS . 1.00 2500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2250.00 . . MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 . 1.00 1000.00 . . MTCE R500-110 US 160A MP 85.7 TO MP 88.0 . 1.00 1000.00 . . MTCE R100-184 VARIOUS LOCATIONS . 1.00 5000.00 . . MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 . 1.00 2000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 2250.00 . . MTCE 0703-366 EJMT CULVERT REPAIR . 1.00 25000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 25000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 3785.71 . . =============== 700-73351 F/A Force Acct ============================================= MTCE0361-096 US 34 BUSINESS AT US 36 IN ES . 1.00 600.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 600.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 600.00 . . Colorado Department of Transportation 13:30 Tuesday, February 22, 2011 1 2010 Cost Data - Maintenance PROJECTS BID FROM 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20100107 ROCKY MOUNTAIN ENTERPRISES, INC. 10 $462,488.25 84.78 MTCE R400-221 US 6 52B 71E 71F IN WELD, MORG 4 R 20100114 ABCO CONTRACTING, INC. 4 $333,872.90 74.36 MTCE R600-360 R6 US6 OVER SH95,I-76 OVER SPL 6 U 20100114 RMD HOLDINGS, LTD dba NATIONWIDE CONSTRU 6 $652,162.56 111.87 MTCER200-168 REGION 2 REGIONWIDE 2 L 20100204 HIGHWAY TECHNOLOGIES 5 $531,492.50 95.65 MTCER400-247 HWYS 6J,7C,34A,42A,59B,61A,63A 4 R 20100211 G.A. WESTERN CONSTRUCTION CO. 4 $105,707.50 114.34 MTCE 0701-204 PILE REPAIR G-04-AE, 070A MM 6 3 M 20100211 STURGEON ELECTRIC COMPANY, INC 4 $142,693.00 103.98 MTCE0361-096 US 34 BUSINESS AT US 36 IN EST 4 M 20100304 ROADSAFE TRAFFIC SYSTEMS, INC 6 $289,968.70 98.22 MTCER400-248 SOUTHWEST REGION 4- SOUTH OF S 4 R 20100304 KOLBE STRIPING INC. 5 $1,057,172.72 95.41 MTCE R300-162 R300-162 R3 FY10 REGION WIDE 3 U 20100304 ROADSAFE TRAFFIC SYSTEMS, INC 5 $1,240,549.00 93.28 R500-111 REGION 5 VARIOUS US AND STATE 5 M 20100304 ROADSAFE TRAFFIC SYSTEMS, INC 5 $179,098.75 89.14 MTCER300-164 REGION 3, SH 50 A AND D, 90 B, 3 R 20100311 ARROW ELECTRIC SERVICE, INC. 6 $266,052.11 107.51 MTCER200-170 REGION II REGION-WIDE 2 R 20100318 KOLBE STRIPING INC. 4 $267,350.00 107.09 MTCER100-177 REGION 1 FY'10 EAST STRIPING 1 R 20100325 COLORADO CONSTRUCTORS, INC. 9 $699,864.70 77.58 MTCE R400-243 I-25 MP 249 TO MP 282 4 R 20100325 ROADSAFE TRAFFIC SYSTEMS, INC 4 $416,172.00 94.92 MTCER100-170 REGION 1 FY 10 WEST STRIPING 1 R 20100325 HIGHWAY TECHNOLOGIES 4 $345,962.00 117.59 MTCE R300-160 070A , 070F, 070G, 070H, 006E, 3 U 20100325 TETRA TECH CONSTRUCTION SERVICES, INC 4 $69,219.00 138.44 MTCER600-364 VARIOUS LOCATIONS IN REGION 6 6 U 20100325 UNITED COMPANIES OF MESA COUNTY 3 $724,849.30 107.18 MTCE R500-107 US 550 R5 OURAY MP 93.0 TO MP 5 M Colorado Department of Transportation 13:30 Tuesday, February 22, 2011 2 2010 Cost Data - Maintenance PROJECTS BID FROM 01/01/10 THROUGH 12/31/10 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20100401 HIGHWAY TECHNOLOGIES 3 $199,441.00 126.94 MTCER600-367 SH 83: FAIR PL TO HAMPDEN AVE 6 U 20100429 KOLBE STRIPING INC. 3 $249,510.00 99.40 MTCE160A-015 DURANGO, CORTEZ, & IGNACIO 5 U 20100506 ROADSAFE TRAFFIC SYSTEMS, INC 3 $1,565,104.75 106.35 MTCER200-169 REGION II REGION-WIDE 2 P 20100506 STURGEON ELECTRIC COMPANY, INC 3 $293,980.00 120.50 MTCER100-179 US 40 EMPIRE TO BERTHOUD PASS, 1 M 20100603 ROCKY MOUNTAIN ENTERPRISES, INC. 4 $402,061.07 94.80 MTCE R300-166 R3 FY11 REGION WIDE 3 R 20100722 ROCKY MOUNTAIN ENTERPRISES, INC. 7 $158,833.45 81.95 MTCER300-163 REGION 3, I-70A FROM MILE MARK 3 M 20100722 ROADSAFE TRAFFIC SYSTEMS, INC 3 $1,084,910.00 86.56 MTCE R600-374 VARIOUS LOCATIONS IN REGION 6 6 U 20100812 KOLBE STRIPING INC. 3 $772,600.00 103.69 MTCE R100-180 WESTERN PORTION OF REGION 1 1 M 20100826 OLDCASTLE SW GROUP, INC. 1 $1,979,321.44 98.49 MTCE R500-110 US 160A MP 85.7 TO MP 88.0 5 M 20100902 STURGEON ELECTRIC COMPANY, INC 2 $588,888.00 105.27 MTCE R100-184 VARIOUS LOCATIONS 1 20100909 DKS ENTERPRISES INC. 4 $470,055.15 106.61 MTCE R600-375 VARIOUS LOCATIONS IN REGION 6 6 U 20101014 AMERICAN CIVIL CONSTRUCTORS, INC. 2 $946,949.00 88.88 MTCE 0703-366 EJMT CULVERT REPAIR 1 ======= ================ ====== TOTALS 126 $16,496,328.85 97.20