Colorado Department of Transportation 13:09 Monday, January 22, 2018 1 2017 Cost Data PROJECTS BID FROM 01/01/17 THROUGH 12/31/17 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20170105 Casper Electric, Inc. 2 $3,060,140.82 65.71 NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 3 M 20170112 OLDCASTLE SW GROUP, INC. 4 $1,192,574.70 86.02 NHPP1602-145 US 160 S. Fork to Monte Vista 5 P 20170119 BRANNAN SAND AND GRAVEL, LLC 3 $5,232,750.15 94.53 NHPP R600-440 US40 (COLFAX BLVD) COLORADO BL 1 R 20170119 COULSON EXCAVATING COMPANY 4 $5,571,866.50 103.44 STA060A-019 SH 60 Resurfacing US 287 to Mi 4 U 20170119 MAIN ELECTRIC LTD 2 $4,442,658.57 98.65 NHPP1602-155 US 160 Wolf Creek Fiber Optic 5 M 20170119 A and S CONSTRUCTION CO. 2 $4,447,000.00 92.65 NH1604-013 US 160C Overlay, Jct. SH 389 E 2 P 20170119 ACME CONCRETE PAVING, INC. 3 $4,900,000.00 75.24 NHPP5502-093 US 160/550 PCCP DIAMOND GRINDI 5 M 20170126 FLATIRON CONSTRUCTORS, INC. 6 $5,671,562.95 84.65 STM0243-089 Midpoint: Station 1019+50 Cent 2 R STM0243-089 Midpoint: Station 1019+50 Cent 2 R 20170126 CC ENTRPRS TRAFFIC CONTROL SPECIALISTS 4 $227,668.00 65.70 MTCER100-274 MTCE R1 FY 17 SH 119 Signing 1 M 20170209 Myers and Sons Construction, LP 7 $1,499,000.00 63.66 NHPP145A-063 SH 145 Wall Failure MP 76.05 5 M 20170209 APC SOUTHERN CONSTRUCTION COMPANY, LLC 3 $6,945,725.04 91.60 STR0092-023 SH 9 NORTH MP 101.6 TO 107, US 3 M 20170209 HABITAT CONSTRUCTION, LLC 7 $483,898.96 120.97 IM025A-039 I-25 Critical Culvert at MP 12 2 P 20170209 ALL COWBOY EROSION CONTROL, LLC 6 $169,515.65 80.51 STA0931-032 SH 93 Erosion Correction 4 M 20170216 ESCO CONSTRUCTION CO. 3 $2,067,578.68 92.28 NHPPR100-249 Region 1 FY 17 US 040A Wall Re 1 M 20170216 INNOVATIVE MARKING SYSTEMS, INC. 4 $1,736,040.00 98.11 MTCER500-191 R5 FY17 Striping 5 M 20170302 OLDCASTLE SW GROUP, INC. 3 $6,947,000.00 95.94 NHPP4912-006 US 491 Surface Treatment MP 27 5 R 20170302 ROCK and CO. 5 $1,999,484.00 83.61 NHPP5502-087 US 550 Cribwell Repair MM 68.7 5 M Colorado Department of Transportation 13:09 Monday, January 22, 2018 2 2017 Cost Data PROJECTS BID FROM 01/01/17 THROUGH 12/31/17 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20170302 FLATIRON CONSTRUCTORS, INC. 5 $6,996,496.46 94.85 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRING 3 P 20170302 SIMON CONTRACTORS 5 $10,582,629.50 86.54 STA0853-101 US 85 FROM EATON (MP 275.5) TO 4 P 20170302 STURGEON ELECTRIC COMPANY, INC 3 $4,311,059.00 108.11 NHPP 0701-230 Midpoint WB Bore 3 M 20170302 Myers and Sons Construction, LP 4 $1,736,068.00 64.30 BR0252-449 I-25 Woodmen NB 2 R 20170302 TRICON 2, LLC 7 $4,860,000.00 103.40 SHE160A-031 SH 160 Passing Lanes 2 M 20170302 STURGEON ELECTRIC COMPANY, INC 5 $1,257,319.00 84.72 MTCER300-233 MTCE R3 FY17/18 Signal Replace 3 M 20170309 ASPHALT SPECIALTIES CO., INC. 4 $4,181,604.00 77.19 STA2873-180 US 287 (Federal) Resurfacing-1 1 R 20170309 A and S CONSTRUCTION CO. 3 $8,931,917.00 92.16 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN G 3 M 20170309 ASPHALT SPECIALTIES CO., INC. 3 $787,779.00 128.07 STA2873-183 US 287 Repairs at LCR 17 4 R 20170309 KOLBE STRIPING INC. 3 $1,802,361.28 82.67 MTCER300-239 070A MP 0-75,131-173; 040A, 00 3 M 20170317 KIEWIT INFRASTRUCTURE CO. 1 $11,636,336.92 100.00 ER0341-089 PR US 34 Big Thompson Canyon P 4 M 20170323 APC CONSTRUCTION CO., LLC 3 $4,358,821.17 108.61 STA0362-035 US 36: Strasburg to Byers 1 R 20170323 SIMON CONTRACTORS 5 $4,673,587.40 108.47 STA0243-087 US 24 El Paso-Elbert CL Paving 4 P 20170323 EWING TRUCKING & CONSTRUCTION 5 $482,898.75 97.52 STE 0702-357 I-70 West Vail Pass Basin 3 M 20170323 HAMILTON CONSTRUCTION CO. 5 $758,895.50 64.83 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 1 M 20170323 ROADSAFE TRAFFIC SYSTEMS, INC 3 $892,264.00 80.36 MTCER300-240 MTCE R3 FY 17/18 REGION WIDE S 3 M 20170323 ROADSAFE TRAFFIC SYSTEMS, INC 3 $123,245.85 75.22 MTCE2873-191 R4 FY 17 Stencils #1 4 U Colorado Department of Transportation 13:09 Monday, January 22, 2018 3 2017 Cost Data PROJECTS BID FROM 01/01/17 THROUGH 12/31/17 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20170330 W.L. CONTRACTORS, INC. 3 $1,078,435.90 83.71 SHER100-246 FY17 R1 Traffic Signal Replace 1 U 20170330 MARTIN MARIETTA MATERIALS 4 $10,400,280.57 115.56 STA067A-039 SH 67 Divide to Cripple Creek 2 M 20170330 Mark Construction, Inc. 4 $506,600.00 101.75 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE S 3 M 20170330 ROADSAFE TRAFFIC SYSTEMS, INC 2 $1,745,197.93 101.37 SW01-932 I-70 MP 146 TO 259 1 M 20170406 BRANNAN SAND AND GRAVEL, LLC 2 $3,512,564.85 127.36 STA095A-017 SH 95 Sheridan Resurfacing 25t 1 U 20170406 APC CONSTRUCTION CO., LLC 1 $5,286,017.40 129.61 STA095A-018 SH 95 Sheridan Resurfacing: Ha 1 R 20170406 SIMON CONTRACTORS 2 $7,860,100.56 92.97 STA006A-057 SH 6 EAST OF STERLING 4 P 20170406 APC SOUTHERN CONSTRUCTION COMPANY, LLC 3 $7,330,067.22 86.24 STA 0503-089 US 50 - Royal Gorge West_SH9 J 2 M 20170413 APC CONSTRUCTION CO., LLC 3 $2,928,620.50 103.69 STA0404-055 SH 40 Colfax Resurfacing I-70 1 U 20170413 HAMILTON CONSTRUCTION CO. 8 $2,996,540.15 84.85 NHPP0703-433 EJMT S Bore Barrier, Handrail, 1 M 20170420 LAWRENCE CONSTRUCTION CO. 12 $10,200,000.00 75.56 STA0503-085 US 50 BNSF Railroad to Purcell 2 R 20170420 CASTLE ROCK CONST. CO. OF COLO, LLC 5 $9,113,519.94 93.95 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUEB 2 R 20170427 TEZAK HEAVY EQUIPMENT CO., INC. 3 $337,348.73 91.80 STRR500-169 R5 US 84 MP 14.67 Priority Cul 5 R 20170427 ABCO CONTRACTING, INC. 4 $4,174,637.50 89.38 NHPP0704-240 Package C (I-70 and I-25) Brid 1 U 20170427 OLDCASTLE SW GROUP, INC. 1 $5,669,488.30 89.26 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 3 U 20170427 TECHNOLOGY CONSTRUCTORS, INC. 3 $3,608,729.00 102.39 STAR500-190 R5 Signal Replacement Chaffee 5 U 20170504 AMERICAN WEST CONSTRUCTION, LLC 4 $1,149,975.00 95.50 BR0361-117 US 36 Culvert Repair MP 11.95 4 M Colorado Department of Transportation 13:09 Monday, January 22, 2018 4 2017 Cost Data PROJECTS BID FROM 01/01/17 THROUGH 12/31/17 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20170504 HAMON INFRASTRUCTURE, INC. 3 $8,980,000.00 107.01 NHPPC120-026 US 85: I-76 to 168th 1 R 20170504 PAONIA, INC 2 $1,280,180.50 97.57 STAR400-348 Region 4 Controller and Cabine 4 U 20170511 INTERSTATE SEALANT & CONCRETE, INC. 2 $1,398,949.50 100.76 STAR100-255 R1 FY18 CRACK SEAL 1 U 20170518 DILLIE AND KUHN, INC. 3 $148,001.35 75.47 AQC088A-035 Traffic Signal/Fiber Optic Ins 00 U 20170518 PAONIA, INC 2 $528,333.00 98.94 STM0211-026 SH21 AND MESA RIDGE PKWY SIGNA 2 U 20170601 SEMA CONSTRUCTION, INC. 4 $4,665,993.90 92.96 STA0703-437 I-70: 32ND TO 44TH 1 R 20170601 INNOVATIVE MARKING SYSTEMS, INC. 3 $2,515,106.00 76.22 MPR200-235 FY 2018 PAVEMENT MARKING PROJE 2 R 20170601 T-P ENTERPRISES INC. 2 $501,307.23 111.40 STMR200-240 REGION WIDE EROSION CONTROL 2 R 20170608 TLM CONSTRUCTORS, INC. 4 $775,026.00 132.48 STR050A-031 Storm Sewer on US 50C at James 2 R 20170615 KIRKLAND CONSTRUCTION, LLLP 5 $495,861.00 75.54 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 5 M 20170615 MCATEE CONSTRUCTION CO. 3 $1,305,182.30 89.48 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 4 P 20170615 KIRKLAND CONSTRUCTION, LLLP 4 $1,132,110.00 107.56 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 3 M 20170615 OLDCASTLE SW GROUP, INC. 1 $651,475.00 94.65 MTCE141A-048 SH 141A WHITEWATER IN MESA COU 3 R 20170622 AMERICAN CIVIL CONSTRUCTORS, LLC dba A 6 $7,680,036.00 92.38 ER0361-115 US 36 Bridges 4 R 20170622 INTERFACE COMMUNICATIONS COMPANY 5 $1,039,500.00 97.02 STA0072-019 SH 7 FROM US 287 TO 75TH STREE 4 R 20170622 OLDCASTLE SW GROUP, INC. 1 $1,452,622.00 95.47 MTCE142A-002 SH 142 CHIPSEAL 5 P 20170622 PAONIA, INC 2 $1,799,255.80 89.73 MTCE0253-259 I25 FROM MP 229.29 TO MP 244.5 4 R Colorado Department of Transportation 13:09 Monday, January 22, 2018 5 2017 Cost Data PROJECTS BID FROM 01/01/17 THROUGH 12/31/17 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20170622 KOLBE STRIPING INC. 3 $191,060.00 104.66 MTCER300-243 R3 FY18 REGION WIDE ROUNDABOUT 3 M 20170628 KIEWIT INFRASTRUCTURE CO. 1 $1,340,450.75 100.00 ER0341-093 PR US 34 BIG THOMPSON CANYON P 4 M 20170706 SEMA CONSTRUCTION, INC. 5 $3,510,879.70 75.60 NHPP2853-003 US 285 MP 143.1- 148.0 5 R 20170706 TLM CONSTRUCTORS, INC. 10 $383,432.00 96.81 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT M 4 P 20170713 CONNELL RESOURCES, INC. 2 $704,924.68 95.62 NHPP 2873-185 US 287: Ted's Place Intersecti 4 R 20170713 STURGEON ELECTRIC COMPANY, INC 2 $938,992.00 111.44 ITSSW01-834 ITS CAMERA PROJECT FY17 00 R 20170720 OLDCASTLE SW GROUP, INC. 3 $3,399,704.70 105.44 IM0701-212 I-70 EXIT 49 GRAND MESA 3 M 20170720 JALISCO INTERNATIONAL, INC. 3 $556,584.00 115.95 SHE0141-024 SH 14 Poudre Canyon Guardrail 4 M 20170720 JALISCO INTERNATIONAL, INC. 1 $3,058,740.74 89.64 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9. 1 R 20170720 STURGEON ELECTRIC COMPANY, INC 2 $2,392,395.00 91.66 CR100-283 REGION 1 TRAFFIC SIGNAL CONTRO 1 U 20170727 JHL CONSTRUCTORS, INC 13 $3,827,189.24 113.58 BR0362-037 US 36 at MP 140.1 and MP 140.9 4 P 20170727 AMERICAN WEST CONSTRUCTION, LLC 3 $693,270.00 107.71 ER0141-028 PR SH 14 REPAIR WEST OF RUSTIC 4 R 20170727 DILLIE AND KUHN, INC. 5 $1,884,034.20 75.07 ITS0761-227 ITS FIBER OPTICS ON I76 DENVER 00 P 20170803 DILLIE AND KUHN, INC. 6 $747,597.10 67.19 IM0762-052 FIBER OPTICS AND ITS DEVICES I 4 P 20170810 KOLBE STRIPING INC. 3 $1,563,795.20 96.07 MTCE0705-085 FY 18 I-70 EPOXY FROM MM 328 T 4 P 20170817 AMERICAN WEST CONSTRUCTION, LLC 2 $1,974,757.00 103.56 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 1 R 20170817 Dykhuis Drilling Corp. 3 $659,492.00 86.70 MTCE131A-039 SH 131 MP 0.053-68.721 IN EAGL 3 M Colorado Department of Transportation 13:09 Monday, January 22, 2018 6 2017 Cost Data PROJECTS BID FROM 01/01/17 THROUGH 12/31/17 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20170821 SEMA CONSTRUCTION, INC. 2 $248,491.00 8610.2 CR100-292 I25/ORCHARD EMERGENCY REPAIR 1 U 20170824 Myers and Sons Construction, LP 3 $1,120,000.00 112.11 ER012A-047 P-17-L Scour Critical SH 12 an 2 M 20170831 K.E.C.I. COLORADO, INC. 2 $685,567.00 146.30 NHPPR100-291 I-225 SB RESTRIPING I-25 TO YO 1 R 20170901 KIEWIT INFRASTRUCTURE CO. 1 $108,016,757.11 108.67 ER0341-090 PR US 34 BIG THOMPSON CANYON P 4 M 20170907 FLATIRON CONSTRUCTORS, INC. 11 $5,998,304.55 90.29 BRR400-354 Little-T Channel Work and SH 6 4 R ERR400-322 PR SH 60 and SH 257 Structures 4 R 20170907 INTERFACE COMMUNICATIONS COMPANY 3 $167,983.00 73.67 NHPP0821-108 SH 82 MP 45 OLVDS 3 M 20170914 WORK ZONE TRAFFIC CONTROL 3 $507,743.00 81.89 MPR200-244 REGION 2 FY18 SIGNING PROJECT 2 P 20170921 PAONIA, INC 3 $111,608.00 88.01 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE FE 00 U 20170921 JALISCO INTERNATIONAL, INC. 5 $1,910,511.65 81.13 SHE0831-119 SH83 LIGHTING: DAYTON TO MISSI 1 U 20170921 A-1 CHIPSEAL COMPANY 5 $233,723.14 48.80 MTCE R500-193 R5 FY 18 Regionwide MTCE Crack 5 R 20171005 SIMON CONTRACTORS 7 $599,401.00 85.63 STA094A-034 Critical Culvert Project on SH 2 R 20171005 Dykhuis Drilling Corp. 3 $548,510.00 109.70 MTCE0705-084 I-70 CRACK SEAL KANSAS STATE L 4 P 20171012 ROCK SOLID SOLUTIONS CORPORATION 2 $1,564,594.00 91.13 C0702-372 I-70 GWC Rockfall Fence Improv 3 M 20171019 PAONIA, INC 6 $1,854,526.73 115.18 ITSSW01-636 VMS AND LUS UPGRADE FY 17 00 M 20171026 NORAA CONCRETE CONSTRUCTION CORPORATION 2 $435,528.00 71.24 CR100-286 R1 CURB RAMPS-PH 1 1 U 20171109 Kilgore Companies, LLC dba Elam Construc 3 $5,095,866.05 128.57 SHE340A-018 SH 340 REDLANDS PARKWAY ROUNDA 3 R 20171116 ANDERSON DRILLING, INC 8 $1,327,746.00 77.02 C133A-042 SH 133 McClure Pass Slip 3 M Colorado Department of Transportation 13:09 Monday, January 22, 2018 7 2017 Cost Data PROJECTS BID FROM 01/01/17 THROUGH 12/31/17 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20171130 ZAK DIRT, INC. 6 $880,200.00 71.88 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORATI 1 M 20171130 BRANNAN SAND AND GRAVEL, LLC 5 $11,118,295.52 82.32 NHPP0252-447 I-25: MILE POST 194.04 TO MILE 1 R 20171130 APC SOUTHERN CONSTRUCTION COMPANY, LLC 3 $5,333,761.30 88.90 IM025A-037 I25 S. Trinidad Resurface and 2 R 20171130 OLDCASTLE SW GROUP, INC. 4 $1,251,868.12 89.33 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 3 M 20171130 MORTON ELECTRIC, INC. 5 $1,396,424.00 139.64 ITSSW01-831 ITS WEATHER STATION UPGRADES F 00 M 20171130 DILLIE AND KUHN, INC. 4 $242,899.50 80.97 ITSSW02-003 ITS FIBER INSTALLATIONS FOR HQ 00 P 20171207 APC SOUTHERN CONSTRUCTION COMPANY, LLC 5 $6,727,609.67 83.68 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 19 3 M 20171207 ABCO CONTRACTING, INC. 3 $542,288.00 144.79 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 3 M 20171208 Myers and Sons Construction, LP 1 $1,084,421.91 98.34 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACEM 3 M 20171211 KIEWIT INFRASTRUCTURE CO. 1 $870,457.55 93.16 CC0341-100 US 34 BIG THOMPSON CANYON MOOD 4 M 20171214 DRILL TECH DRILLING AND SHORING, INC. 3 $3,026,578.38 95.86 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 1 M 20171221 TEZAK HEAVY EQUIPMENT CO., INC. 7 $3,068,335.40 94.05 BR3852-018 POA SCOUR US 385 4 P ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 4 P 20171221 TONY J. BELTRAMO AND SONS, INC. 6 $1,762,738.75 80.12 STA050A-027 US 50C Storm Sewer 21st LANE 2 R 20171221 OLDCASTLE SW GROUP, INC. 4 $4,753,678.20 82.44 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 3 M 20171221 DIAMOND SURFACE, INC. 2 $584,574.62 116.94 FSA0361-122 I-70 at Limon, US 40, US 287, 4 P ======= ================ ====== TOTALS 446 $440,113,099.44 96.11 Colorado Department of Transportation 13:09 Monday, January 22, 2018 1 2017 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/17 THROUGH 12/31/17) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ BRIDGE REPAIR 170309 NHPP 0502-075 M US50 MP 127.0 TO MP 139.1 IN G 0300 993.0000 30.0000 29790.0 $674,676 $22.65 0301 1503.0000 30.0000 45090.0 $667,588 $14.81 170427 NHPP 0701-238 U I-70B MP 4.20 TO MP 4.69, US6 H-02-J 150.0000 31.5000 4725.0 $224,954 $47.61 171130 NHPP0252-447 R I-25: MILE POST 194.04 TO MILE F-17-CO 214.0000 118.0000 25252.0 $176,405 $6.99 F-17-DE 168.0000 106.0000 17808.0 $151,214 $8.49 F-17-IV 249.0000 132.3000 32942.7 $153,074 $4.65 F-17-DK 181.0000 140.0000 25340.0 $300,887 $11.87 F-17-JU 160.0000 67.8000 10848.0 $177,420 $16.36 171207 MTCE092A-027 M MTCE R3 FY18 SH 92 STR I-06-A 0300 278.4890 34.0000 9468.6 $307,813 $32.51 WEIGHTED AVERAGE COST: NEW STRUCTURES 201264.3 $2,834,031 $14.08 CONCRETE SLAB AND GIRDER 170406 STA 0503-089 M US 50 - Royal Gorge West_SH9 J 0304 US 50 K-15-W 275.0000 40.0000 11000.0 $67,624 $6.15 170727 BR0362-037 P US 36 at MP 140.1 and MP 140.9 0300 150.0000 43.0000 6450.0 $715,844 $110.98 0301 68.0000 43.0000 2924.0 $477,404 $163.27 WEIGHTED AVERAGE COST: NEW STRUCTURES 20374.0 $1,260,871 $61.89 CONCRETE SLAB BRIDGE 170309 STA2873-180 R US 287 (Federal) Resurfacing-1 0300 29.0000 89.6000 2598.4 $35,812 $13.78 170907 ERR400-322 R PR SH 60 and SH 257 Structures 0300 0.0452 40.0000 1.8 $1,393,789 $770,901.00 0301 0.0393 40.0000 1.6 $1,293,392 $822,768.45 WEIGHTED AVERAGE COST: NEW STRUCTURES 2601.8 $2,722,993 $1,046.59 FABRICATED STEEL GIRDER 170302 BR0252-449 R I-25 Woodmen NB 0304 324.0000 72.0000 23328.0 $166,646 $7.14 WEIGHTED AVERAGE COST: NEW STRUCTURES 23328.0 $166,646 $7.14 Colorado Department of Transportation 13:09 Monday, January 22, 2018 2 2017 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/17 THROUGH 12/31/17) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ MISCELLANEOUS 170330 STA067A-039 M SH 67 Divide to Cripple Creek I-16-AA 24.0000 25.0000 600.0 $104,842 $174.74 WEIGHTED AVERAGE COST: NEW STRUCTURES 600.0 $104,842 $174.74 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 1 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00000 Clear and Grub LUMP SUM =============================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 1.00 30000.00 58467.86 40000.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1.00 15000.00 29235.54 15000.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 1.00 7500.00 33787.06 13159.44 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 20000.00 37220.00 45000.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 1.00 20000.00 57068.72 10000.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1.00 20000.00 37580.00 16900.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 1.00 25000.00 38468.60 35000.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 1.00 20000.00 25918.80 16594.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1.00 2000.00 13107.00 6100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 18950.00 38304.72 21972.60 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 1.00 2000.00 10478.57 11300.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 75000.00 51145.17 62214.25 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 1.00 10000.00 12757.27 14271.81 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 10000.00 10000.00 10000.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1.00 80000.01 69057.34 65000.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 1.00 5000.00 39035.80 8000.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 1.00 10000.00 11005.00 5000.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 1.00 30000.00 43500.00 10000.00 ER0361-115 US 36 Bridges 06/22/17 1.00 85000.00 94333.33 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 34111.11 45862.12 23420.67 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1.00 20000.00 83400.00 150000.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 1.00 6000.00 6750.00 1500.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1.00 2000.00 2350.00 2350.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 40000.00 48528.55 25000.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1.00 6500.00 14866.67 15000.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 1.00 6000.00 5794.50 5000.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1.00 27500.00 69333.33 20000.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 28894.82 100000.00 100000.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1.00 45000.00 71126.61 50000.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 20210.54 49948.44 40983.33 STA094A-034 Critical Culvert Project on S 10/05/17 1.00 5000.00 6555.55 1600.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 2 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00000 Clear and Grub LUMP SUM =============================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 15000.00 2353200.00 24600.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1.00 22500.00 31779.95 45000.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 10000.00 43169.89 8509.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 13125.00 390825.17 19927.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31.00 22840.46 88071.65 27648.36 =============== 201-00001 Clear and Grub Acre =================================================== NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 0.50 5000.00 79323.33 37970.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.50 5000.00 79323.33 37970.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 1.30 7000.00 16177.50 22500.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 0.50 57530.00 57530.00 57530.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.80 21036.11 19804.91 32230.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.30 17550.00 32204.58 33478.26 =============== 201-00005 Rem of Debris LUMP SUM =============================================== ER0361-115 US 36 Bridges 06/22/17 1.00 10000.00 6855.80 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 10000.00 6855.80 25000.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 6608.05 4000.00 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 6608.05 4000.00 4000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 8304.03 6447.83 14500.00 =============== 202-00000 Rem Str and Obstructions LUMP SUM =============================================== IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 5000.00 15796.07 12500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5000.00 15796.07 12500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 3 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00000 Rem Str and Obstructions LUMP SUM =============================================== STA094A-034 Critical Culvert Project on S 10/05/17 1.00 22500.00 10824.20 7500.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 150.00 2336.83 710.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 11325.00 8277.99 4105.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 9216.67 10012.93 6903.50 =============== 202-00001 Rem Structure Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 8.00 5000.00 7817.63 7500.00 STM0243-089 Midpoint: Station 1019+50 Cen STA0362-035 US 36: Strasburg to Byers 03/23/17 1.00 2000.00 2139.61 1750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 4666.67 7268.14 6350.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 13.00 1500.00 3704.15 1750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 1500.00 3704.15 1750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 2795.45 4855.03 3027.78 =============== 202-00002 Rem of Structure (Spec) Each =================================================== STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 1.00 150.00 6703.21 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 150.00 6703.21 2200.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 18086.47 35000.00 35000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 18086.47 35000.00 35000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 9118.24 11419.34 18600.00 =============== 202-00003 Rem of Structure (Spec) LUMP SUM =============================================== NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1.00 17790.00 5544.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 17790.00 5544.00 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 17790.00 5544.00 2500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 4 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00008 Tree Trimming Hour =================================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 8.00 250.00 239.46 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 250.00 239.46 250.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 12.00 385.00 385.00 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 385.00 385.00 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 331.00 312.23 310.00 =============== 202-00010 Rem Tree Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 6.00 400.00 1809.27 220.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 25.00 600.00 504.00 250.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 5.00 1000.00 1257.45 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.00 622.22 774.45 300.30 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 8.00 500.00 1002.51 307.54 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 16.00 325.00 933.75 840.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 24.00 300.00 667.00 675.00 ER0361-115 US 36 Bridges 06/22/17 185.00 350.00 385.82 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 233.00 348.28 449.26 256.87 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 4.00 500.00 840.92 1200.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 10.00 350.00 741.67 825.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 4.00 330.00 1720.00 2300.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 219.00 437.97 485.00 485.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 3.00 400.00 933.45 800.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 240.00 433.06 606.36 545.27 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 30.00 350.00 1666943.33 300.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 5 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00010 Rem Tree Each =================================================== NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 250.00 500.00 237.19 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 280.00 483.93 94579.05 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 789.00 434.71 44746.63 362.12 =============== 202-00013 Rem Erosion Mat Sq Yard ================================================ STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 120.00 6.00 0.78 0.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 120.00 6.00 0.78 0.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 6.00 0.78 0.50 =============== 202-00015 Rem Headwall Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 3.00 900.00 565.00 565.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 4.00 750.00 1545.00 1100.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 1.00 3000.00 2501.80 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 1087.50 1621.83 886.88 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 582.19 2200.00 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 582.19 2200.00 2200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 1031.35 1644.96 1032.78 =============== 202-00019 Rem Inlet Each =================================================== STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 2.00 800.00 1325.20 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 800.00 1325.20 600.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2.00 1000.00 1141.98 1041.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 10.00 800.01 1359.52 1700.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 6 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00019 Rem Inlet Each =================================================== ER0361-115 US 36 Bridges 06/22/17 3.00 1000.00 673.44 625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15.00 866.67 1115.49 1397.13 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 33.00 444.78 460.00 460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 33.00 444.78 460.00 460.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 1000.00 923.67 720.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1000.00 923.67 720.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 51.00 593.68 945.07 746.22 =============== 202-00020 Rem CBC Each =================================================== ER0361-115 US 36 Bridges 06/22/17 1.00 30000.00 26960.69 15738.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 30000.00 26960.69 15738.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 30000.00 26960.69 15738.00 =============== 202-00021 Rem Manhole Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 800.00 1280.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 800.00 1280.00 1500.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 800.00 515.00 515.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 800.00 515.00 515.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 800.00 1210.45 1171.67 =============== 202-00023 Rem Emb Prot Ty 3 Each =================================================== STA006A-057 SH 6 EAST OF STERLING 04/06/17 5.00 583.00 888.79 950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 583.00 888.79 950.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 7 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00023 Rem Emb Prot Ty 3 Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 1139.94 2000.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1139.94 2000.00 2000.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 500.00 600.33 500.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 3.00 450.00 1185.58 456.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 462.50 1039.27 467.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 590.49 1015.62 862.03 =============== 202-00024 Rem Emb Prot Ty 5 Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 1139.94 3100.00 3100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1139.94 3100.00 3100.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 4.00 550.00 1259.02 477.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 550.00 1259.02 477.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 667.99 1400.63 1001.64 =============== 202-00025 Rem Ditch Lining Lin Foot =============================================== NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 120.00 15.00 18.75 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 120.00 15.00 18.75 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 15.00 18.75 10.00 =============== 202-00026 Rem S and D Pave Sq Yard ================================================ STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 328.00 50.00 15.21 12.76 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 8 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00026 Rem S and D Pave Sq Yard ================================================ ER0361-115 US 36 Bridges 06/22/17 2.00 55.00 171.97 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 330.00 50.03 15.68 12.80 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 252.00 20.00 24.33 16.02 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 252.00 20.00 24.33 16.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 582.00 37.03 18.35 14.20 =============== 202-00027 Rem Riprap Sq Yard ================================================ STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 1,200.00 20.00 18.54 14.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 22.00 40.00 63.40 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,222.00 20.36 19.68 13.86 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 164.00 10.00 20.07 18.95 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 125.00 44.00 19.05 19.04 ER0361-115 US 36 Bridges 06/22/17 2,084.00 17.00 15.29 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,373.00 17.94 15.99 16.36 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 240.00 20.00 18.88 30.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 240.00 20.00 18.88 30.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 284.00 25.00 28.68 33.32 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 284.00 25.00 28.68 33.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,119.00 19.26 18.05 18.22 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 9 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00028 Rem of Eros Cntrl BMPS (Spec) LUMP SUM =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 75752.04 100000.00 100000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 75752.04 100000.00 100000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 75752.04 100000.00 100000.00 =============== 202-00031 Rem of Fire Hydrant Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 1150.00 1190.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1150.00 1190.00 1500.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 3.00 2000.00 5330.00 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 2000.00 5330.00 6000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1660.00 3151.05 4200.00 =============== 202-00032 Rem Valve Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 5.00 750.00 820.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 750.00 820.00 300.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 3.00 1500.00 4636.67 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1500.00 4636.67 3000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 1031.25 1830.29 1312.50 =============== 202-00033 Rem Pipe Each =================================================== SHE160A-031 SH 160 Passing Lanes 03/02/17 1.00 500.00 1384.77 500.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 7.00 1500.00 1764.80 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 1375.00 1694.10 1112.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 10 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00033 Rem Pipe Each =================================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 2.00 500.00 1349.13 1030.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 500.00 1349.13 1030.00 STA094A-034 Critical Culvert Project on S 10/05/17 1.00 3000.00 2086.37 2000.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 1.00 3000.00 6824.85 6073.92 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 3000.00 4455.61 4036.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 1500.00 2087.41 1586.16 =============== 202-00035 Rem Pipe Lin Foot =============================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 63.00 30.00 61.50 50.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 484.00 45.00 36.26 20.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 100.00 100.00 57.77 55.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 288.00 40.00 35.60 13.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 6.00 25.00 137.41 62.50 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 6.00 100.00 212.20 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 947.00 48.51 43.61 25.83 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 145.00 25.00 28.81 20.82 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 299.00 75.00 74.67 24.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 15.00 60.00 73.11 34.32 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1,622.00 30.00 9.50 9.50 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 48.00 35.00 34.90 25.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 104.00 170.00 56.80 15.00 ER0361-115 US 36 Bridges 06/22/17 316.00 40.00 29.86 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,549.00 42.22 33.09 15.42 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 3,800.00 17.81 30.00 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 11 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00035 Rem Pipe Lin Foot =============================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1,062.00 22.00 15.94 17.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,862.00 18.73 19.39 27.16 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 137.00 25.00 17.33 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 137.00 25.00 17.33 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,495.00 29.20 26.62 23.27 =============== 202-00037 Rem of End Section Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 8.00 300.00 269.18 150.00 STM0243-089 Midpoint: Station 1019+50 Cen IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 1.00 350.00 692.17 505.16 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 13.00 300.00 526.00 300.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 9.00 475.00 416.46 100.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 5.00 300.00 359.40 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.00 345.14 434.22 204.07 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 8.00 225.00 423.28 226.62 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 2.00 1000.00 315.00 150.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 7.00 400.00 690.00 690.00 ER0361-115 US 36 Bridges 06/22/17 2.00 450.00 366.44 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19.00 394.74 427.70 402.26 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 6.00 178.51 675.00 675.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 178.51 675.00 675.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 2.00 300.00 310.33 480.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 12 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00037 Rem of End Section Each =================================================== ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 2.00 450.00 698.15 564.04 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 375.00 581.80 522.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65.00 346.09 444.71 332.97 =============== 202-00040 Rem Elec Conduit Lin Foot =============================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 318.00 10.00 4.23 8.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 318.00 10.00 4.23 8.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 318.00 10.00 4.23 8.20 =============== 202-00047 Rem Elec Equipment LUMP SUM =============================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 1.00 5000.00 3589.65 3650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 3589.65 3650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 3589.65 3650.00 =============== 202-00055 Rem of FO Cable Lin Foot =============================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 500.00 1.50 1.05 1.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 500.00 1.50 1.05 1.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 500.00 1.50 1.05 1.05 =============== 202-00080 Rem Guard Post Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 160.00 759.00 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 160.00 759.00 95.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 160.00 759.00 95.00 =============== 202-00090 Rem Delineator Each =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 100.00 50.00 29.21 8.41 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 13 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00090 Rem Delineator Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 450.00 7.00 5.63 6.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 340.00 7.00 4.90 5.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 158.00 7.00 11.51 25.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 8.00 30.00 19.67 10.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 19.00 15.00 12.95 20.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 99.00 5.00 5.98 5.56 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 2.00 20.00 15.50 22.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 250.00 6.50 10.27 21.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 426.00 6.50 6.13 5.60 STA2873-183 US 287 Repairs at LCR 17 03/09/17 51.00 10.00 5.17 4.50 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 7.00 20.00 22.73 7.50 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 168.00 10.00 6.60 5.50 STA0362-035 US 36: Strasburg to Byers 03/23/17 10.00 10.00 15.93 11.68 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 5.00 15.00 36.50 60.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 1,126.00 5.00 5.51 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,219.00 7.84 7.04 7.73 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 1,651.00 5.00 2.55 1.56 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 53.00 5.00 11.30 3.30 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 114.00 6.50 5.75 9.88 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 30.00 6.00 5.25 5.25 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 4.00 25.00 77.75 20.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 10.00 10.01 82.99 80.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 300.00 14.00 39.43 6.50 ER0361-115 US 36 Bridges 06/22/17 18.00 10.00 13.87 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,180.00 6.43 10.05 3.26 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 10.00 10.00 20.95 20.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 38.00 8.00 10.50 12.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 14.00 10.00 30.67 75.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 2.00 10.00 19.00 25.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 2,725.00 5.00 5.25 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,789.00 5.09 6.05 5.76 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 26.00 5.00 18.83 5.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 14 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00090 Rem Delineator Each =================================================== C133A-042 SH 133 McClure Pass Slip 11/16/17 16.00 12.00 74.13 30.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 30.00 13.00 94.80 100.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 340.00 7.50 5.67 5.10 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 380.00 6.50 5.60 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 792.00 7.24 13.63 9.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,980.00 6.59 8.57 6.19 =============== 202-00150 Rem Wall Each =================================================== NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 2.00 30000.00 69420.00 36100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 30000.00 69420.00 36100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 30000.00 69420.00 36100.00 =============== 202-00155 Rem Wall Lin Foot =============================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 142.00 40.00 31.91 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 142.00 40.00 31.91 20.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 82.00 20.00 39.50 39.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 82.00 20.00 39.50 39.50 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 100.00 35.00 41.00 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 35.00 41.00 13.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 324.00 33.40 35.44 22.77 =============== 202-00165 Rem Wall LUMP SUM =============================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1.00 5000.00 17503.74 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 17503.74 5000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 15 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00165 Rem Wall LUMP SUM =============================================== ER0361-115 US 36 Bridges 06/22/17 1.00 16000.00 5996.95 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 16000.00 5996.95 6000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 10500.00 12192.92 5500.00 =============== 202-00170 Grinding And Texturing Conc Pvmt Sq Yard ================================================ NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 149,514.00 7.50 9.83 8.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 149,514.00 7.50 9.83 8.90 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 10.00 100.00 472.78 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 100.00 472.78 150.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 280.00 20.00 43.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 280.00 20.00 43.00 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 149,804.00 7.53 9.99 8.94 =============== 202-00175 Rem Concrete LUMP SUM =============================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 1000.00 1130.00 1130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 1130.00 1130.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1.00 5000.00 2111.32 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 2111.32 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3000.00 1971.13 1315.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 16 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00190 Rem of Conc Median Cover Matl Sq Yard ================================================ STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 280.00 15.00 1.24 1.07 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 133.00 9.00 21.80 10.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 137.00 16.00 24.67 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 550.00 13.80 13.40 7.94 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1,315.00 10.00 8.50 8.50 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 840.00 15.00 17.50 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,155.00 11.95 13.55 7.14 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 10.00 20.00 60.50 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 20.00 60.50 13.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 483.00 12.00 9.05 7.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 483.00 12.00 9.05 7.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,198.00 12.30 12.85 7.37 =============== 202-00195 Rem of Median Cover Sq Yard ================================================ STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 5,297.00 9.00 4.48 5.75 STA0362-035 US 36: Strasburg to Byers 03/23/17 6.00 12.00 81.23 58.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,303.00 9.00 4.53 5.81 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 179.00 25.00 32.19 35.20 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 101.00 15.00 16.02 15.79 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 1,024.00 9.75 10.67 4.37 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 16.00 50.00 172.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,320.00 12.71 13.93 11.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,623.00 9.74 6.44 6.88 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 17 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00200 Rem Sidewalk Sq Yard ================================================ NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 227.60 35.00 31.82 38.50 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 3,361.00 12.00 20.85 14.50 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 136.00 17.00 27.13 20.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 228.00 30.00 92.57 85.70 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 524.00 25.00 18.60 4.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 135.00 15.00 27.26 20.50 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 199.00 12.00 33.27 19.50 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 6.00 20.00 270.43 330.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 76.00 12.00 47.40 40.67 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 27.00 12.00 35.33 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,919.60 15.51 25.98 19.19 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 488.00 10.50 30.00 30.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 288.00 20.00 16.01 11.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 19.00 12.80 27.92 30.62 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 441.00 25.00 33.67 33.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 192.00 20.00 28.00 28.00 ER0361-115 US 36 Bridges 06/22/17 5.00 13.00 82.08 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,433.00 18.18 29.18 27.05 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 370.00 25.00 8.50 8.50 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 65.00 20.00 28.60 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 435.00 24.25 13.73 12.46 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 718.00 25.00 23.75 25.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 763.00 15.00 8.55 7.65 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 7.00 25.00 172.68 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,488.00 19.87 15.59 16.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,275.60 17.22 24.44 19.71 =============== 202-00201 Rem Curb Lin Foot =============================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 22.00 7.00 13.43 9.30 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 18 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00201 Rem Curb Lin Foot =============================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 31.00 15.00 18.50 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 53.00 11.68 16.74 21.41 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 53.00 10.00 21.60 21.60 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 763.00 15.00 12.69 10.20 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 1,963.00 3.00 4.67 3.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,779.00 6.43 6.43 5.45 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 78.00 13.00 12.00 12.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 400.00 10.00 15.00 12.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1,188.00 4.29 17.00 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,666.00 6.07 15.87 15.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,498.00 6.36 8.92 9.39 =============== 202-00202 Rem Gutter Lin Foot =============================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 300.00 15.00 16.50 10.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 278.00 13.00 13.26 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 578.00 14.04 14.76 10.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 25.00 14.00 42.26 67.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 80.00 25.00 28.67 22.00 ER0361-115 US 36 Bridges 06/22/17 41.00 12.00 28.05 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 146.00 19.47 29.65 28.30 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 75.00 25.00 12.50 12.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 75.00 25.00 12.50 12.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 19 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00202 Rem Gutter Lin Foot =============================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 85.00 20.00 7.50 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 85.00 20.00 7.50 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 884.00 16.44 16.49 12.85 =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 416.00 10.00 14.18 13.50 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 4,940.00 6.00 10.57 7.20 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 180.00 15.00 23.00 25.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 1,182.00 15.00 15.00 15.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 2,966.00 6.00 19.44 16.07 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 869.00 6.00 10.70 4.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 14,183.00 7.00 5.22 4.25 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 688.00 6.00 13.60 10.50 STA0362-035 US 36: Strasburg to Byers 03/23/17 175.00 7.00 29.71 29.05 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 432.00 7.00 11.42 9.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26,031.00 7.10 8.34 7.34 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 1,360.00 8.00 15.00 15.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 2,360.00 12.00 10.94 10.20 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 237.00 8.00 15.06 17.90 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 398.00 5.00 7.56 7.37 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 1,239.00 7.00 5.97 2.36 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 640.00 20.00 19.33 12.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2,065.00 6.00 5.50 5.50 STA0703-437 I-70: 32ND TO 44TH 06/01/17 60.00 12.00 36.95 50.00 ER0361-115 US 36 Bridges 06/22/17 41.00 8.00 15.68 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,400.00 9.29 9.76 9.18 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 306.00 15.00 8.00 8.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 626.00 12.00 12.50 12.50 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 8.00 11.74 70.00 70.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 20 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 25.00 12.00 25.35 12.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 965.00 12.95 12.00 11.54 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 1,086.00 12.00 10.50 12.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 2,006.00 6.00 4.35 3.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,092.00 8.11 5.98 6.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38,488.00 7.81 8.46 7.80 =============== 202-00204 Rem C, G and Sidewalk Lin Foot =============================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 552.00 11.00 23.94 20.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 16.00 40.00 66.40 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 568.00 11.82 25.42 19.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 568.00 11.82 25.42 19.66 =============== 202-00206 Rem Conc Curb Ramp Sq Yard ================================================ NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 133.30 18.00 32.57 38.50 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 937.00 16.00 18.03 12.50 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 52.00 30.00 26.80 30.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 422.00 25.00 113.49 103.91 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 140.00 15.00 34.20 6.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 48.00 30.00 33.57 40.25 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 237.00 25.00 38.04 27.50 STA0362-035 US 36: Strasburg to Byers 03/23/17 24.00 30.00 74.03 40.67 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 65.00 21.00 27.17 23.50 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 1.80 20.00 791.37 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,060.10 19.94 43.22 37.69 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 294.00 25.00 63.30 63.30 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 361.00 20.00 62.68 81.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 291.00 27.00 47.16 29.90 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 21 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00206 Rem Conc Curb Ramp Sq Yard ================================================ NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 8.00 30.00 140.00 140.00 ER0361-115 US 36 Bridges 06/22/17 8.00 35.00 65.80 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 962.00 23.85 56.20 60.49 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 209.00 35.00 20.00 20.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 3.00 40.00 101.80 15.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 212.00 35.07 25.48 19.93 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 70.00 35.00 27.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 70.00 35.00 27.00 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,304.10 22.37 45.13 42.82 =============== 202-00207 Rem of Brick Pavers Sq Yard ================================================ STE 0702-357 I-70 West Vail Pass Basin 03/23/17 32.00 25.00 59.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32.00 25.00 59.00 45.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 25.00 59.00 45.00 =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 1,382.00 15.00 20.98 14.50 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 79.00 20.00 28.80 40.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 18.00 25.00 79.83 58.09 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 11.00 15.00 34.33 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,490.00 15.39 22.32 16.53 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 120.00 17.00 66.60 66.60 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 204.00 18.00 28.85 11.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 22 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 98.00 23.00 49.61 29.90 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 28.00 50.00 74.33 36.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 17.00 20.00 155.75 133.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 96.00 20.00 11.75 11.75 STAR400-348 Region 4 Controller and Cabin 05/04/17 37.00 40.00 40.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 600.00 21.84 48.31 32.05 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 2,350.00 20.00 50.32 30.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 35.00 40.00 48.50 57.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 61.00 20.00 30.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,446.00 20.29 50.26 30.39 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 6.00 50.00 49.92 80.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 56.00 12.00 65.60 26.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 62.00 15.68 64.08 31.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,598.00 18.84 45.96 26.13 =============== 202-00212 Rem Conc Pavement (Spec) Sq Yard ================================================ STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 39,824.00 8.00 7.37 7.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 39,824.00 8.00 7.37 7.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39,824.00 8.00 7.37 7.40 =============== 202-00215 Rem Conc Pvmt (Planing) Sq Yard ================================================ STA2873-183 US 287 Repairs at LCR 17 03/09/17 845.00 7.00 17.50 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 845.00 7.00 17.50 10.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 845.00 7.00 17.50 10.50 =============== 202-00217 Rem Conc Pvmt (Planing) (Spec) Sq Yard ================================================ BR0252-449 I-25 Woodmen NB 03/02/17 3,294.00 40.00 31.50 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,294.00 40.00 31.50 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 23 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00217 Rem Conc Pvmt (Planing) (Spec) Sq Yard ================================================ NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 2,753.00 55.00 30.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,753.00 55.00 30.00 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,047.00 46.83 30.82 24.55 =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 71.10 25.00 48.69 74.50 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 60.00 5.00 64.58 39.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 11,349.00 4.00 4.29 4.50 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 4,666.00 12.00 10.08 10.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1,489.00 40.00 19.10 9.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 12,565.00 5.50 9.00 10.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 2,890.00 10.00 6.60 5.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 431.00 30.00 48.60 45.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 9,850.00 10.00 4.02 4.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 367.00 6.00 19.76 23.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 5,163.00 4.50 9.51 5.50 STA0362-035 US 36: Strasburg to Byers 03/23/17 2,778.00 6.50 9.94 7.15 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 127.00 7.00 65.40 50.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 96.00 7.00 32.33 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 51,902.10 8.04 8.53 7.27 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 100.00 7.00 27.60 27.60 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 42.00 7.00 133.58 130.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 50.00 11.00 34.46 35.30 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 23,832.00 5.00 6.64 4.41 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 1,110.00 20.00 19.80 8.40 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 11,069.00 10.00 3.35 3.35 STAR400-348 Region 4 Controller and Cabin 05/04/17 12.00 65.00 42.50 45.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 155.00 10.00 29.00 35.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 8,379.00 7.00 11.84 20.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 920.00 7.50 10.96 10.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 31.00 50.00 69.40 75.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 561.00 10.00 63.75 50.00 ER0361-115 US 36 Bridges 06/22/17 10,940.00 7.50 5.32 2.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 57,201.00 7.18 7.24 7.07 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 24 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 201.00 15.00 12.75 10.50 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 17.00 7.50 50.00 50.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 4,153.00 8.00 8.31 3.40 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 999.00 7.25 8.57 5.27 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 22,740.00 6.44 8.00 8.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 11,316.00 5.00 4.56 4.00 BRR400-354 Little-T Channel Work and SH SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 10,640.00 7.50 10.18 6.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50,066.00 6.52 6.68 6.31 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 44.00 9.00 25.00 30.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 9,902.00 4.00 2.25 3.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 4,363.00 4.50 12.44 4.25 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1,049.00 6.40 19.33 7.00 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 3,700.00 8.00 7.05 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19,058.00 5.03 6.94 4.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 178,227.10 7.02 7.40 6.68 =============== 202-00222 Removal of Detour Pavement Sq Yard ================================================ ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 5,546.00 10.83 20.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,546.00 10.83 20.00 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,546.00 10.83 20.00 20.00 =============== 202-00226 Rem of Asph Mat (Special) Sq Yard ================================================ STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 75,070.00 6.00 5.53 4.70 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 35.00 20.00 245.60 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 75,105.00 6.01 5.62 4.78 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 1,852.00 13.00 10.66 4.37 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 25 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00226 Rem of Asph Mat (Special) Sq Yard ================================================ STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 47.00 73.00 74.07 35.70 NHPPC120-026 US 85: I-76 to 168th 05/04/17 15.00 18.00 644.09 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,914.00 14.51 17.18 16.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 77,019.00 6.22 5.80 5.08 =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 110,387.00 3.00 5.60 3.95 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 4,543.00 12.00 17.35 17.69 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 6,461.00 10.00 5.68 7.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 90,464.00 2.20 3.00 3.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 13,780.00 3.50 3.09 2.00 STM0243-089 Midpoint: Station 1019+50 Cen STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 309,270.00 3.50 2.39 1.53 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 146,866.00 1.50 1.77 1.20 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 79,176.00 2.50 2.32 1.79 SHE160A-031 SH 160 Passing Lanes 03/02/17 37,673.00 2.00 2.61 1.98 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1,761.00 35.00 7.29 8.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 50,879.00 2.75 2.16 1.90 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 4,849.00 3.60 6.72 10.15 STA2873-183 US 287 Repairs at LCR 17 03/09/17 5,460.00 3.50 8.90 6.70 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 208,650.00 2.00 2.46 2.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 11,374.00 4.00 2.96 3.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 123,850.00 2.75 3.09 2.33 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 9,174.00 1.06 4.57 3.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,214,617.00 2.74 2.76 2.22 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 121,543.00 2.75 5.00 5.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 78,724.00 3.50 4.80 4.40 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 239,934.00 1.50 1.64 1.62 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 107,753.00 2.75 3.38 2.80 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 31,716.00 5.00 1.97 1.20 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 187,614.00 1.71 2.00 1.11 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 7,259.00 10.00 6.33 6.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 40,195.00 3.00 2.40 2.40 NHPPC120-026 US 85: I-76 to 168th 05/04/17 280,420.00 2.75 2.69 1.70 STA0703-437 I-70: 32ND TO 44TH 06/01/17 99,181.00 3.50 2.45 1.30 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 270.00 35.00 36.60 30.00 ER0361-115 US 36 Bridges 06/22/17 34,178.00 4.00 2.34 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,228,787.00 2.61 2.47 2.22 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 26 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 2,723.00 5.50 7.05 6.60 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 29,364.00 6.00 2.50 2.50 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 56.00 20.00 118.33 100.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 3,816.00 3.50 3.86 2.21 CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 900.00 1.00 15.32 15.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 407,624.00 1.70 2.00 2.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 4,867.00 2.50 2.65 2.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 449,350.00 2.03 2.39 2.10 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 5,290.00 8.00 2.50 2.50 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 472,201.00 4.00 3.30 2.52 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 260,437.00 2.25 1.73 1.38 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 1,016.00 2.50 17.00 11.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 368,985.00 2.50 2.26 1.49 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 1,896.00 5.00 9.47 7.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,109,825.00 3.11 2.69 1.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,002,579.00 2.72 2.64 2.12 =============== 202-00241 Rem of Asph Mat (Planing)(Spec) Cubic Yard ============================================= STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 4,139.00 1.71 7.60 8.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,139.00 1.71 7.60 8.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,139.00 1.71 7.60 8.75 =============== 202-00246 Rem Asphalt Mat (Planing)(Special) Sq Yard ================================================ NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 719.00 10.00 23.87 30.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 128.00 8.00 34.56 25.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 249.00 7.00 42.16 21.50 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 8,320.00 15.00 7.59 12.61 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 263.00 9.00 26.96 25.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 27 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00246 Rem Asphalt Mat (Planing)(Special) Sq Yard ================================================ STA0362-035 US 36: Strasburg to Byers 03/23/17 3,568.00 3.00 15.06 11.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13,247.00 11.16 12.11 13.83 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 890.00 3.00 25.10 25.10 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 192.00 5.00 30.62 38.40 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 577.00 12.00 32.50 32.50 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1,892.00 3.00 20.02 15.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 8,915.00 3.00 15.46 13.00 ER0361-115 US 36 Bridges 06/22/17 809.00 7.00 13.80 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,275.00 3.66 16.39 15.07 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 3,184.00 10.00 6.00 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,184.00 10.00 6.00 6.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 1,528.00 10.00 23.26 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,528.00 10.00 23.26 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31,234.00 7.80 14.86 13.37 =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 130.00 2.50 2.60 2.75 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 83,610.00 1.00 0.84 0.80 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 31,200.00 2.00 1.59 1.20 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 310.00 12.00 6.58 12.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 16,927.00 1.35 1.03 0.91 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 50,167.00 2.00 0.99 0.80 SHE160A-031 SH 160 Passing Lanes 03/02/17 27,941.00 1.00 1.32 1.06 NHPP 0701-230 Midpoint WB Bore 03/02/17 2,600.00 6.00 2.95 2.50 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 18,300.00 1.50 1.23 1.20 STA2873-183 US 287 Repairs at LCR 17 03/09/17 9,740.00 1.75 1.68 1.30 MTCER300-239 070A MP 0-75,131-173; 040A, 0 03/09/17 1,318,586.00 0.62 0.49 0.48 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 28 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 4,000.00 2.00 1.68 1.65 MTCER300-240 MTCE R3 FY 17/18 REGION WIDE 03/23/17 3,158.00 2.00 1.94 0.85 MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 11,693.00 1.50 3.90 1.45 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 220.00 2.50 6.20 4.35 SW01-932 I-70 MP 146 TO 259 03/30/17 940,669.00 0.53 0.59 0.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,519,251.00 0.68 0.64 0.55 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 1,181.00 0.60 2.19 2.05 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2,500.00 1.00 2.76 2.81 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 3,795.00 3.00 4.40 4.20 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 3,376.00 3.00 3.00 3.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 600.00 6.00 3.63 1.00 MPR200-235 FY 2018 PAVEMENT MARKING PROJ 06/01/17 2,120,100.00 0.40 0.60 0.42 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 54,439.00 0.80 0.83 0.70 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 70,207.00 1.25 0.75 0.75 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 300.00 5.00 19.84 60.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 500.00 4.00 19.60 50.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 494.00 3.00 5.00 5.00 MTCER300-243 R3 FY18 REGION WIDE ROUNDABOU 06/22/17 4,000.00 5.00 4.30 5.00 ER0361-115 US 36 Bridges 06/22/17 1,500.00 0.75 2.99 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,262,992.00 0.46 0.65 0.48 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 26,000.00 1.00 0.85 0.75 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 13,034.00 1.50 1.30 1.35 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 366.00 0.60 6.00 6.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 840.00 5.00 10.13 3.40 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 1,001.00 4.00 3.67 4.50 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 1,100.00 3.00 3.97 3.97 MTCE0705-085 FY 18 I-70 EPOXY FROM MM 328 08/10/17 638,968.00 0.51 0.53 0.50 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 12,700.00 1.00 2.13 2.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 169,685.00 2.45 2.10 2.10 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 2,200.00 3.50 4.55 4.25 BRR400-354 Little-T Channel Work and SH SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 6,664.00 0.65 2.17 1.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 872,558.00 0.94 0.79 0.89 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 1,448.00 5.00 3.75 3.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 29 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 6,250.00 2.00 2.00 2.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 91,165.00 1.25 1.88 0.52 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 32,800.00 1.00 1.49 1.35 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 59,448.00 1.00 0.95 1.14 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 1,360.00 5.05 4.40 4.40 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 13,500.00 3.00 0.95 0.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 205,971.00 1.33 1.44 0.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,860,772.00 0.66 0.71 0.59 =============== 202-00254 Rem of Pvmt Mkg (12 In) Sq Foot ================================================ STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2,260.00 3.00 3.49 3.50 STM0243-089 Midpoint: Station 1019+50 Cen STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 8,550.00 2.50 1.23 1.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,810.00 2.60 1.58 1.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,810.00 2.60 1.58 1.47 =============== 202-00260 Rem of Pvmt Mkg (On-Call) Sq Foot ================================================ SW01-932 I-70 MP 146 TO 259 03/30/17 54,000.00 0.65 0.66 0.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 54,000.00 0.65 0.66 0.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54,000.00 0.65 0.66 0.56 =============== 202-00300 Rem Bldg(s) LUMP SUM =============================================== NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1.00 10000.00 3992.17 3200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 10000.00 3992.17 3200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 3992.17 3200.00 =============== 202-00400 Rem Bridge Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 100000.00 100131.42 85840.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 100000.00 100131.42 85840.86 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 30 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00400 Rem Bridge Each =================================================== BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 2.00 40000.00 41042.80 27763.89 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 65519.75 125000.00 125000.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 2.00 50000.00 66809.02 65000.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 49103.95 54324.72 62105.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 57586.63 63335.87 66061.44 =============== 202-00420 Rem Ped Rail Lin Foot =============================================== NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 8,440.00 10.00 5.27 2.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,440.00 10.00 5.27 2.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,440.00 10.00 5.27 2.10 =============== 202-00425 Rem Bridge Railing Lin Foot =============================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 52.00 25.00 28.30 20.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 52.00 50.00 23.35 20.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 140.00 30.00 55.21 65.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 808.00 20.00 41.66 26.26 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 216.00 25.00 58.46 61.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,268.00 23.39 46.03 35.96 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 87.00 50.00 232.18 191.55 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 10.00 25.00 165.25 58.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 330.00 30.00 20.50 20.50 NHPPC120-026 US 85: I-76 to 168th 05/04/17 5.00 20.00 479.43 250.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 187.00 60.00 17.17 16.00 ER0361-115 US 36 Bridges 06/22/17 40.00 50.00 14.21 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 659.00 42.22 65.10 43.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,927.00 29.83 50.83 38.53 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 31 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00426 Rem Bridge Railing (Spec) Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 71.00 46.00 48.00 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 71.00 46.00 48.00 48.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 71.00 46.00 48.00 48.00 =============== 202-00450 Rem Port Present Str (1) Sq Yard ================================================ BR0252-449 I-25 Woodmen NB 03/02/17 564.00 140.00 82.25 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 564.00 140.00 82.25 40.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 1,035.00 180.00 72.25 88.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,035.00 180.00 72.25 88.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,599.00 165.89 75.78 71.07 =============== 202-00453 Rem Port Present Str (2) Sq Yard ================================================ NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 207.00 300.00 285.91 300.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 8.00 300.00 571.40 975.00 BR0252-449 I-25 Woodmen NB 03/02/17 136.00 270.00 251.25 205.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 1,904.00 250.00 167.95 175.84 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 14.00 300.00 422.92 350.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 154.00 600.00 467.33 349.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,423.00 278.09 204.32 202.78 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 46.00 510.00 506.00 506.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 148.00 350.00 250.17 248.50 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 19.00 300.00 596.64 600.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 396.00 350.00 218.50 135.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 32.00 400.00 360.00 360.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 215.00 575.00 297.17 160.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 1,366.00 500.00 247.33 280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,222.00 467.59 250.13 249.02 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 32 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00453 Rem Port Present Str (2) Sq Yard ================================================ NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 26.00 500.00 325.00 325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26.00 500.00 325.00 325.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 153.00 300.00 473.72 430.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 115.00 325.00 273.12 294.35 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 19.00 350.00 415.00 245.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 287.00 313.33 411.55 363.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,958.00 366.22 241.69 233.44 =============== 202-00460 Rem Port Present Str (3) Sq Yard ================================================ NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 7.00 450.00 608.41 600.00 BR0252-449 I-25 Woodmen NB 03/02/17 54.00 505.00 400.00 400.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 95.00 500.00 401.67 420.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 29.00 700.00 741.18 641.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 185.00 530.92 454.94 455.70 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 58.00 550.00 394.60 403.80 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 2.00 444.00 1814.14 1700.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 70.00 700.00 440.25 195.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 17.00 500.00 300.00 300.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 43.00 600.00 747.13 650.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 107.00 550.00 509.05 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 297.00 589.02 505.00 643.84 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 3.00 750.00 1200.00 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 750.00 1200.00 1200.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 33 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00460 Rem Port Present Str (3) Sq Yard ================================================ NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 15.00 600.00 1202.32 850.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 12.00 450.00 606.58 659.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 27.00 533.33 1009.11 765.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 512.00 566.03 520.94 585.53 =============== 202-00495 Rem Port Present Str LUMP SUM =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 5000.00 14550.00 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 14550.00 15000.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 15000.00 22574.69 15072.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 15000.00 22574.69 15072.01 STA094A-034 Critical Culvert Project on S 10/05/17 1.00 15000.00 6029.81 6800.00 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 1.00 8893.70 15143.60 15143.60 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 1.00 30000.00 14937.77 25694.38 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 17964.57 10794.44 15879.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 14778.74 15798.84 15542.00 =============== 202-00500 Rem Port Present Str Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 20.00 206.05 775.00 775.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 206.05 775.00 775.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 5000.00 1187.00 2460.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 34 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00500 Rem Port Present Str Each =================================================== NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 2.00 14920.65 18766.75 18766.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 11613.77 8218.90 13331.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 1694.01 2263.78 2412.76 =============== 202-00502 Rem Port Present Str Cubic Yard ============================================= NHPP 0701-230 Midpoint WB Bore 03/02/17 4.00 2000.00 4891.92 2665.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 2000.00 4891.92 2665.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 4.30 327.34 2300.00 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.30 327.34 2300.00 2300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.30 1133.44 4208.16 2475.90 =============== 202-00503 Rem Port Present Str Sq Yard ================================================ NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 47.00 300.00 533.41 450.00 BR0252-449 I-25 Woodmen NB 03/02/17 1.00 400.00 1718.75 1775.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48.00 302.08 581.79 477.60 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 46.00 300.00 870.00 870.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 46.00 300.00 870.00 870.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 14.00 850.00 421.80 365.40 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 3.00 500.00 2800.00 2700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 788.24 841.48 777.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 111.00 375.68 717.70 686.13 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 35 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00504 Rem Exp Device Lin Foot =============================================== BR0252-449 I-25 Woodmen NB 03/02/17 257.00 231.00 225.75 155.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 360.00 200.00 184.92 193.76 STA0362-035 US 36: Strasburg to Byers 03/23/17 112.00 400.00 355.28 305.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 729.00 241.66 225.51 197.20 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 59.00 195.00 141.69 220.50 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 718.00 350.00 302.13 151.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 42.00 150.00 80.00 80.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 349.00 350.00 178.13 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,168.00 334.98 252.23 139.71 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 271.00 475.00 150.00 150.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 351.00 152.83 150.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 622.00 293.20 150.00 150.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 583.00 300.00 312.24 230.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 90.00 120.00 279.33 88.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 673.00 275.93 309.45 211.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,192.00 293.07 257.15 169.88 =============== 202-00520 Rem of Exp Joint Matl Lin Foot =============================================== STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 60.00 60.00 58.34 51.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 60.00 58.34 51.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 60.00 58.34 51.77 =============== 202-00700 Rem Light Standard Each =================================================== STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 2.00 400.00 357.50 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 36 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00700 Rem Light Standard Each =================================================== STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 1.00 800.00 2143.40 717.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 533.33 1349.67 372.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 533.33 1349.67 372.33 =============== 202-00705 Rem Light Standard Foundation Each =================================================== SHE160A-031 SH 160 Passing Lanes 03/02/17 3.00 500.00 916.85 777.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 500.00 916.85 777.78 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 26.00 250.00 485.00 485.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 2.00 400.00 620.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28.00 260.71 503.00 486.07 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 4.00 500.00 1078.64 950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 500.00 1078.64 950.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 500.00 1213.67 840.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 500.00 1213.67 840.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 313.89 777.96 571.76 =============== 202-00710 Rem Power Pole Each =================================================== STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 3.00 445.00 6060.00 6060.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 445.00 6060.00 6060.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 445.00 6060.00 6060.00 =============== 202-00725 Rem Ex Lighting Sys LUMP SUM =============================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 1.00 131000.00 75938.00 66200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 131000.00 75938.00 66200.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 37 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00725 Rem Ex Lighting Sys LUMP SUM =============================================== IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 10000.00 6500.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 6500.00 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 70500.00 41219.00 35600.00 =============== 202-00750 Rem Luminaire Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 150.00 158.00 140.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 426.00 100.00 196.83 128.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 427.00 100.12 196.68 128.03 STA0703-437 I-70: 32ND TO 44TH 06/01/17 20.00 200.00 196.57 520.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 200.00 196.57 520.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 4.00 160.00 650.00 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 160.00 650.00 1100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 451.00 105.08 199.32 154.03 =============== 202-00805 Rem Overhead Sign Str Each =================================================== MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 8.00 5000.00 4303.50 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 5000.00 4303.50 5000.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 1.00 4000.00 5035.83 5000.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 1.00 5000.00 7134.70 6250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 4500.00 5989.86 5625.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 4900.00 4990.54 5125.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 38 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00806 Rem Walkway Lin Foot =============================================== NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 8,769.00 25.00 11.66 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,769.00 25.00 11.66 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,769.00 25.00 11.66 6.00 =============== 202-00810 Rem Ground Sign Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 3.00 100.00 215.06 220.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 243.00 93.00 65.31 70.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 130.00 75.00 74.59 85.00 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 58.00 80.00 78.13 75.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 2.00 150.00 185.82 107.25 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 17.00 120.00 103.69 53.56 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 5.00 150.00 122.20 19.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 17.00 150.00 170.36 255.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 46.00 90.53 69.07 33.33 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 151.00 85.00 101.77 260.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 4.00 150.00 184.33 145.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 2.00 90.88 120.93 85.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 5.00 100.00 120.00 80.00 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 311.00 55.00 63.75 65.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 97.00 72.00 74.03 90.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,091.00 78.18 76.53 101.38 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 8.00 95.00 100.00 100.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 169.00 75.00 44.57 31.22 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 13.00 100.00 60.96 44.14 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 6.00 50.00 43.51 31.50 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 1.00 200.00 421.67 480.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 31.00 100.00 135.00 135.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 8.00 100.00 105.00 100.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 33.00 100.00 159.19 110.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 252.00 80.00 140.50 200.00 ER0361-115 US 36 Bridges 06/22/17 16.00 90.00 84.63 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 537.00 82.00 95.28 126.06 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 10.00 100.00 221.00 100.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 39 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00810 Rem Ground Sign Each =================================================== NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 41.00 100.00 107.50 160.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 4.00 100.00 151.67 180.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 2.00 60.00 500.00 350.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 10.00 94.00 210.00 200.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 393.00 151.52 79.00 79.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 709.00 50.00 100.00 60.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 4.00 110.00 185.20 76.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,173.00 86.95 101.97 72.35 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 6.00 100.00 610.00 1000.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 7.00 2000.00 2968.33 50.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 18.00 100.00 55.67 82.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 11.00 85.00 127.02 100.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 10.00 100.00 108.80 100.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 2.00 100.00 184.50 178.50 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 5.00 60.00 154.91 207.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 59.00 319.24 565.32 191.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,860.00 87.47 102.13 95.85 =============== 202-00815 Rem of Sign (Special) Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 4.00 150.00 200.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 150.00 200.00 200.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 2.00 1000.00 2547.00 2547.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1000.00 2547.00 2547.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 433.33 982.33 982.33 =============== 202-00821 Rem Sign Panel Each =================================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 2.00 200.00 116.20 105.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 31.00 47.52 62.88 100.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 40 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00821 Rem Sign Panel Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 8.00 50.00 163.11 45.00 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 671.00 40.00 46.25 45.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 3.00 58.00 71.28 42.85 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 65.00 44.60 26.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 33.00 40.00 44.04 35.70 SHE160A-031 SH 160 Passing Lanes 03/02/17 1.00 59.18 107.56 111.11 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 1,950.00 20.00 21.50 6.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 27.00 55.00 44.58 24.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,728.00 26.13 29.06 17.44 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 20.00 50.00 76.50 76.50 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 34.00 40.00 39.82 31.22 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 2.00 39.00 66.44 82.70 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 10.00 100.00 53.08 33.10 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 16.00 60.00 50.00 50.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 13.00 50.00 62.22 60.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 10.00 35.00 142.50 200.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 15.00 75.00 406.75 1100.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 15.00 60.00 192.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 135.00 54.99 117.68 204.95 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 2.00 100.00 175.00 175.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 18.00 52.00 160.00 100.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 6.00 151.52 157.00 157.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 389.00 45.00 21.00 8.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 3.00 100.00 130.24 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 418.00 47.49 27.33 15.92 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 13.00 75.00 60.27 40.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 75.00 60.27 40.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,294.00 30.22 31.90 25.03 =============== 202-00823 Rem Dynamic Message Sign Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 113.00 750.00 1300.20 950.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 113.00 750.00 1300.20 950.40 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 41 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00823 Rem Dynamic Message Sign Each =================================================== ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 2.00 2000.00 3743.83 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2000.00 3743.83 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 115.00 771.74 1423.41 1020.83 =============== 202-00825 Rem Flashing Beacon Each =================================================== STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 6.00 850.00 457.50 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 850.00 457.50 200.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 1.00 450.00 466.67 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 450.00 466.67 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 792.86 459.33 185.71 =============== 202-00827 Rem of Pull Box Each =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 1.00 500.00 785.50 1071.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 4.00 200.00 213.07 135.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 8.00 300.00 251.00 215.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 1.00 100.00 269.25 222.22 NHPP 0701-230 Midpoint WB Bore 03/02/17 23.00 200.00 201.36 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 37.00 227.03 230.39 274.52 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 7.00 250.00 130.42 110.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 6.00 175.00 110.00 110.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 6.00 200.00 290.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19.00 210.53 148.00 233.16 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 42 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00827 Rem of Pull Box Each =================================================== ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 1.00 250.00 457.50 165.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 1.00 250.00 415.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 250.00 436.25 122.50 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 250.00 603.33 510.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 10.00 200.00 323.10 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 204.55 342.65 273.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 69.00 219.57 220.63 258.11 =============== 202-00828 Rem Traf Sig Equipment LUMP SUM =============================================== STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1.00 1500.00 2908.91 2651.74 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 20000.00 14560.00 13000.00 MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 1.00 75000.00 144008.00 86000.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 1.00 7500.00 36371.67 12615.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 26000.00 56917.61 28566.69 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 1.00 7500.00 16900.00 16900.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 1.00 14600.00 14425.20 5925.60 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 15000.00 5400.00 5400.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1.00 5000.00 6742.69 6500.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 1.00 4000.00 5330.00 1650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 11611.11 11422.24 6675.33 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1.00 15000.00 25000.00 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 15000.00 25000.00 25000.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 5000.00 6133.67 8400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 6133.67 8400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 15233.33 27547.53 13849.65 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 43 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00830 Rem Traf Sig Face Each =================================================== STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 52.00 60.00 48.68 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 52.00 60.00 48.68 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 60.00 48.68 60.00 =============== 202-00831 Rem Traf Sig Head Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 6.00 175.00 160.50 70.00 STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 175.00 160.50 70.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 1.00 200.00 87.05 82.70 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 250.00 171.37 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 225.00 154.51 123.85 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 6.00 110.00 110.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 110.00 110.00 110.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 6.00 250.00 192.50 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 250.00 192.50 185.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 183.00 160.34 131.04 =============== 202-00832 Rem of Sign Panel (Spec) Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 3.00 500.00 400.00 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 500.00 400.00 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 500.00 400.00 400.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 44 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00840 Rem Traf Sig Pole Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2.00 3000.00 1100.71 1102.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 3000.00 1100.71 1102.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3000.00 1100.71 1102.00 =============== 202-00845 Rem Traf Sig Controller Each =================================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 2.00 750.00 233.67 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 750.00 233.67 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 750.00 233.67 140.00 =============== 202-00848 Rem Traf Sig Control+Cab Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 1000.00 703.11 661.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 16.00 700.00 1567.50 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17.00 717.65 1331.76 2391.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 717.65 1331.76 2391.82 =============== 202-00855 Rem Traf Sig Control Cab Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 8.00 1000.00 1155.00 360.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 1000.00 1155.00 360.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 24.00 1250.00 1255.00 1010.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 24.00 1250.00 1255.00 1010.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 1187.50 1230.00 847.50 =============== 202-00858 Rem Pedestal Pole Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 1.00 325.00 2535.82 6670.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 325.00 2535.82 6670.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 45 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00858 Rem Pedestal Pole Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 1500.00 337.25 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1500.00 337.25 275.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 1.00 325.00 487.50 475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 325.00 487.50 475.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 716.67 742.91 2473.33 =============== 202-00860 Rem Ped Push Button Each =================================================== STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 9.00 35.00 30.17 26.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 35.00 30.17 26.52 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 5.00 100.00 45.50 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 100.00 45.50 41.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 58.21 34.32 31.69 =============== 202-00870 Rem Coordination Unit Each =================================================== IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 1.00 100.00 5402.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 100.00 5402.00 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 100.00 5402.00 2500.00 =============== 202-00888 Rem Video Detect Sys Each =================================================== STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 8.00 250.00 816.00 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 250.00 816.00 230.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 250.00 816.00 230.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 46 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00889 Rem of Detect Warning Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 1.00 200.00 625.75 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 200.00 625.75 1000.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 1.00 1000.00 248.00 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1000.00 248.00 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 600.00 415.89 637.50 =============== 202-00895 Rem of Impact Attenuator Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 17.00 2097.63 2783.00 2783.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17.00 2097.63 2783.00 2783.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 6.00 1260.00 331.73 195.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 1260.00 331.73 195.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 1879.12 1522.35 2107.92 =============== 202-00950 Rem Conc Found/Slab Sq Yard ================================================ ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 2.00 450.32 2000.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 450.32 2000.00 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 450.32 2000.00 2000.00 =============== 202-01000 Rem Fence Lin Foot =============================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 68.00 3.00 10.50 10.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 132.00 5.00 11.40 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 47 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01000 Rem Fence Lin Foot =============================================== STM0243-089 Midpoint: Station 1019+50 Cen IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 242.00 3.50 4.11 1.40 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 560.00 25.00 9.75 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,002.00 15.68 8.11 2.34 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 12.00 25.00 35.33 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 25.00 35.33 48.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 20,654.00 1.00 0.88 0.45 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 2,021.00 2.00 1.92 1.70 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 371.00 3.00 2.83 1.50 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 732.00 1.50 3.40 3.25 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23,778.00 1.13 1.24 0.66 C133A-042 SH 133 McClure Pass Slip 11/16/17 402.00 3.00 7.86 20.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 214.00 2.00 10.58 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 616.00 2.65 8.54 14.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25,408.00 1.75 1.70 1.09 =============== 202-01010 Rem Silt Fence Lin Foot =============================================== STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 123.00 5.50 0.68 0.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 123.00 5.50 0.68 0.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 123.00 5.50 0.68 0.30 =============== 202-01015 Rem Rockfall Fence Lin Foot =============================================== C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 685.00 100.00 210.00 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 685.00 100.00 210.00 195.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 685.00 100.00 210.00 195.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 48 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01030 Rem of Road Closure Gate Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2.00 1000.00 1064.90 700.00 STM0243-089 Midpoint: Station 1019+50 Cen SHE160A-031 SH 160 Passing Lanes 03/02/17 1.00 900.00 1163.75 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 966.67 1117.62 850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 966.67 1117.62 850.00 =============== 202-01035 Rem of Gate Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2.00 200.00 709.16 400.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 350.00 272.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 250.00 527.01 450.00 ER0361-115 US 36 Bridges 06/22/17 1.00 350.00 176.79 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 350.00 176.79 135.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 10.00 400.00 133.65 150.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 2.00 250.00 263.07 226.65 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1.00 200.00 141.70 122.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 361.54 173.35 159.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 341.18 213.96 194.39 =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 450.00 6.00 4.18 6.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 416.00 10.00 34.03 62.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 3,034.00 8.50 4.39 4.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1,225.00 6.00 7.11 6.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1,119.00 5.00 5.32 3.34 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 49 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 3,263.00 7.00 5.50 6.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 2,959.00 4.00 3.55 3.32 SHE160A-031 SH 160 Passing Lanes 03/02/17 475.00 505.00 13.98 5.56 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1,743.00 5.00 8.29 7.50 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 81.00 4.00 22.97 8.75 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 19,796.00 5.00 3.53 3.64 STA0362-035 US 36: Strasburg to Byers 03/23/17 990.00 3.00 4.85 4.47 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1,670.00 3.50 8.02 10.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 9,931.00 3.30 3.88 4.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 47,152.00 9.96 5.03 4.90 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 3,317.00 3.00 2.27 1.56 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 914.00 2.00 4.58 3.31 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 5,250.00 4.75 3.37 3.15 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 757.00 4.00 4.25 4.25 NHPPC120-026 US 85: I-76 to 168th 05/04/17 5,772.00 3.00 1.57 1.50 STA0703-437 I-70: 32ND TO 44TH 06/01/17 1,671.00 3.00 5.86 6.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 418.00 4.70 4.50 4.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 288.00 7.00 9.22 14.00 ER0361-115 US 36 Bridges 06/22/17 674.00 4.50 3.88 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19,061.00 3.62 3.31 2.89 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1,650.00 10.00 4.44 3.50 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 2,500.00 4.00 4.55 6.75 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 352.00 5.00 7.83 7.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 50.00 3.23 28.90 29.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 19,329.00 3.00 3.15 3.15 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1,229.00 5.00 4.39 4.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25,110.00 3.69 4.06 3.68 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 55.00 5.00 18.17 45.90 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1,138.00 4.00 4.33 4.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 12,534.00 4.50 4.58 4.14 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 15,320.00 5.00 4.14 4.23 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 9,309.00 5.00 3.44 3.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 38,356.00 4.81 4.11 4.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 129,679.00 6.29 4.32 4.11 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 50 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01140 Rem Gdrail Ty 4 Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1,970.00 27.00 19.80 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,970.00 27.00 19.80 4.00 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 8,819.00 20.00 26.22 24.75 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 57.00 25.00 185.75 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,876.00 20.03 26.73 26.07 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 10.00 25.00 176.96 170.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 2,759.00 15.00 28.01 31.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,769.00 15.04 28.54 32.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,615.00 20.02 26.28 24.09 =============== 202-01170 Rem Gdrail Ty 7 Lin Foot =============================================== SHE160A-031 SH 160 Passing Lanes 03/02/17 114.00 60.00 40.50 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 114.00 60.00 40.50 10.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 24.00 35.00 99.94 50.00 ER0361-115 US 36 Bridges 06/22/17 650.00 25.00 7.51 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 674.00 25.36 9.73 12.39 CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 160.00 1.00 96.29 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 160.00 1.00 96.29 55.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 160.00 20.00 28.13 15.62 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 51 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01170 Rem Gdrail Ty 7 Lin Foot =============================================== NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 268.00 15.00 93.38 100.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 60.00 20.00 90.30 60.90 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 40.00 20.00 77.69 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 528.00 17.46 68.63 69.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,476.00 22.57 36.74 37.43 =============== 202-01180 Rem Median Barrier Lin Foot =============================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 1,450.00 30.00 36.06 22.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,450.00 30.00 36.06 22.80 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 915.00 85.00 9.31 7.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 915.00 85.00 9.31 7.51 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 156.00 25.00 22.00 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 156.00 25.00 22.00 27.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 220.00 50.00 102.18 108.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 220.00 50.00 102.18 108.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,741.00 49.68 30.70 24.77 =============== 202-01300 Rem End Anchorage Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 8.00 300.00 254.55 300.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 2.00 500.00 333.69 228.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 8.00 400.00 238.53 206.84 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 16.00 210.00 295.00 275.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 3.00 156.00 468.06 444.44 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 52 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01300 Rem End Anchorage Each =================================================== NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 2.00 300.00 403.00 350.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 54.00 300.00 184.37 190.40 STA0362-035 US 36: Strasburg to Byers 03/23/17 4.00 250.00 411.81 226.63 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 2.00 250.00 464.00 750.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 34.00 330.00 229.65 242.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 133.00 300.36 254.13 239.55 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 71.00 300.00 228.69 156.08 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 6.00 500.00 301.29 215.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 8.00 270.00 394.75 372.75 NHPPC120-026 US 85: I-76 to 168th 05/04/17 31.00 250.00 130.33 125.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 19.00 250.00 374.82 210.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 4.00 300.00 521.00 825.00 ER0361-115 US 36 Bridges 06/22/17 8.00 300.00 227.46 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 147.00 289.52 257.98 192.37 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 2.00 300.00 427.00 500.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 2.00 300.00 466.67 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 300.00 441.88 450.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 7.00 200.00 140.33 205.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 1.00 250.00 879.00 225.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 35.00 240.00 232.37 212.10 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 40.00 250.00 315.33 221.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 83.00 241.57 286.42 216.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 367.00 282.72 265.54 217.68 =============== 202-01400 Removal of Cattle Guard Each =================================================== NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1.00 2500.00 2140.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2500.00 2140.00 2500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 53 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01400 Removal of Cattle Guard Each =================================================== STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 1.00 4000.00 7990.34 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 4000.00 7990.34 7500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3250.00 4740.15 5000.00 =============== 202-04000 Plug Structure Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 800.00 1820.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 800.00 1820.00 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 800.00 1820.00 5000.00 =============== 202-04001 Plug Culvert Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 4.00 750.00 3241.54 2000.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 3.00 500.00 3900.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 642.86 3582.12 3800.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 1000.00 760.00 760.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 3.00 3500.00 1702.50 890.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 2875.00 1630.00 857.50 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 1000.00 2892.00 875.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 1.00 2000.00 11212.77 17699.40 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1500.00 8716.54 9287.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 1461.54 4081.48 3727.67 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 54 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04002 Clean Culvert Each =================================================== IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 2.00 1750.00 3094.95 322.65 STA0931-032 SH 93 Erosion Correction 02/09/17 2.00 2500.00 4517.41 2175.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 8.00 2500.00 2934.25 2812.50 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 16.00 2000.00 1466.00 2900.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 1.00 5000.00 3514.45 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29.00 2258.62 2401.04 2703.29 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 61.00 800.00 2266.72 1025.15 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 7.00 2500.00 2005.89 1574.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 1.00 1850.00 3265.68 797.04 NHPPC120-026 US 85: I-76 to 168th 05/04/17 24.00 700.01 1516.26 1200.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 10.00 2500.00 1786.16 2400.00 ER0361-115 US 36 Bridges 06/22/17 6.00 2500.00 2665.32 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 109.00 1146.33 2080.55 1276.60 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 3.00 1500.00 7933.33 15000.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 2.00 3500.00 1994.45 1000.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 2300.00 3718.64 9400.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 10.00 2000.00 3249.10 3250.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 5.00 2550.00 3713.23 4139.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 2183.33 3356.21 3546.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 158.00 1485.44 2356.00 2011.03 =============== 202-04003 Clean Culvert (Spec) Each =================================================== STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 42.00 1500.00 1292.70 1200.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 3.00 1500.00 2133.33 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 45.00 1500.00 1335.44 1220.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 55 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04003 Clean Culvert (Spec) Each =================================================== SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 20.00 300.00 1068.40 1275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 300.00 1068.40 1275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65.00 1130.77 1239.04 1236.92 =============== 202-04005 Clean Valve Box Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 175.00 300.00 270.48 75.50 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 6.00 307.14 294.57 290.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 1.00 390.00 761.74 589.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 182.00 300.73 274.20 85.40 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 79.00 300.00 196.00 196.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 80.00 280.00 125.05 75.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 46.00 258.00 184.34 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 205.00 282.77 161.62 147.43 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 4.00 250.00 365.00 365.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 250.00 365.00 365.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 391.00 290.79 229.10 120.78 =============== 202-04006 Clean Culvert Hour =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 80.00 300.00 350.00 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 80.00 300.00 350.00 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 300.00 350.00 350.00 =============== 202-04010 Clean Inlet Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 162.00 600.00 958.90 252.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 56 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04010 Clean Inlet Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 2.00 1000.00 1324.00 2500.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 33.00 1000.00 960.67 892.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 2.00 900.00 1976.94 1769.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 199.00 673.37 974.26 395.97 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 10.00 600.00 1130.00 1130.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 37.00 1000.00 366.83 150.00 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 113.00 1200.00 638.15 480.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 5.00 731.00 1530.44 1500.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 10.00 1250.00 693.75 785.00 ER0361-115 US 36 Bridges 06/22/17 1.00 2500.00 689.75 625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 176.00 1120.77 638.87 494.69 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 7.00 1000.00 1000.00 1000.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 393.19 1286.00 1286.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 924.15 1035.75 1035.75 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 178.00 1000.00 548.46 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 178.00 1000.00 548.46 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 561.00 920.94 687.42 367.54 =============== 202-04050 Clean Exp Joint Lin Foot =============================================== BR0252-449 I-25 Woodmen NB 03/02/17 965.00 20.00 22.00 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 965.00 20.00 22.00 11.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 60.00 45.00 27.22 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 45.00 27.22 6.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 57 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04050 Clean Exp Joint Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 84.00 50.00 29.00 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 84.00 50.00 29.00 29.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,109.00 23.62 22.44 12.09 =============== 202-05004 Sawing Concrete (4 In) Lin Foot =============================================== NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 375.00 6.00 3.50 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 375.00 6.00 3.50 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 375.00 6.00 3.50 4.00 =============== 202-05008 Sawing Concrete (8 In) Lin Foot =============================================== STAR400-348 Region 4 Controller and Cabin 05/04/17 94.00 10.00 138.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 94.00 10.00 138.00 250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 94.00 10.00 138.00 250.00 =============== 202-05026 Sawing Asphalt Mat (6 In) Lin Foot =============================================== IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1,930.00 3.50 3.33 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,930.00 3.50 3.33 3.50 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 8,513.00 3.00 3.07 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,513.00 3.00 3.07 1.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,443.00 3.09 3.09 1.46 =============== 202-05030 Sawing Asphalt Mat (10 In) Lin Foot =============================================== STAR400-348 Region 4 Controller and Cabin 05/04/17 21.00 10.00 144.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21.00 10.00 144.00 250.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 58 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-05030 Sawing Asphalt Mat (10 In) Lin Foot =============================================== SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 18,036.00 5.00 3.89 2.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18,036.00 5.00 3.89 2.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,057.00 5.01 3.96 2.89 =============== 202-05100 Sandblasting Reinf Steel Sq Yard ================================================ NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 47.00 40.00 38.00 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 47.00 40.00 38.00 38.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 42.00 40.00 55.67 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 42.00 40.00 55.67 42.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 89.00 40.00 50.87 39.89 =============== 202-06530 Clean Drain Pipe (Spec) Each =================================================== STA2873-183 US 287 Repairs at LCR 17 03/09/17 10.00 2000.00 2202.00 3380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 2000.00 2202.00 3380.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 2000.00 2202.00 3380.00 =============== 202-07200 Rem of Temporary Stream Crossing Each =================================================== ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 2.00 30000.00 30000.00 30000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 30000.00 30000.00 30000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 30000.00 30000.00 30000.00 =============== 203-00000 Uncl Excav Cubic Yard ============================================= NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 598.00 25.00 36.39 52.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 59 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00000 Uncl Excav Cubic Yard ============================================= NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 24.00 100.00 311.20 75.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 212.00 112.00 89.83 41.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 834.00 49.27 70.69 50.02 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 1,403.00 36.00 36.41 8.49 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 18,900.00 17.25 17.25 17.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20,303.00 18.55 20.74 16.64 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 30.00 60.00 72.50 60.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 9,946.00 26.00 25.01 20.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 41.00 100.00 214.00 62.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 2,510.00 22.00 17.67 4.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 556.00 45.00 23.67 40.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 171.00 50.22 85.00 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,254.00 26.66 24.47 18.87 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 50.00 200.00 250.00 250.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 2,909.00 30.00 27.44 13.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,959.00 32.87 29.33 17.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37,350.00 23.25 25.27 18.27 =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 19.40 30.00 36.65 30.25 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 2,864.00 13.00 24.13 10.00 STA0931-032 SH 93 Erosion Correction 02/09/17 81.00 275.00 85.08 125.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 685.00 43.00 110.71 97.48 SHE160A-031 SH 160 Passing Lanes 03/02/17 12,496.00 20.00 12.38 13.23 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 280.00 25.00 87.75 47.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 400.00 46.50 58.68 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16,825.40 21.70 17.11 18.58 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 60 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 30.00 30.00 129.00 129.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 72,044.00 20.00 9.17 2.10 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 19,740.00 5.00 13.35 9.77 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 240.00 100.00 183.00 144.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 2,646.00 30.01 36.39 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 94,700.00 17.36 9.95 4.74 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 2,385.00 15.00 24.20 17.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 115.00 80.00 96.50 90.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 423,391.00 26.94 46.00 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 425,891.00 26.89 45.43 45.85 C133A-042 SH 133 McClure Pass Slip 11/16/17 930.00 40.00 81.88 68.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 9,653.00 15.00 16.70 8.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1,293.00 35.10 21.72 13.15 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 353.00 100.00 75.23 91.16 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 5,709.00 20.58 24.50 24.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17,938.00 21.19 25.21 18.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 555,354.40 24.92 20.85 37.13 =============== 203-00012 Uncl Excav (CIP) (Spec) Cubic Yard ============================================= ER0361-115 US 36 Bridges 06/22/17 10,155.00 20.00 11.18 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10,155.00 20.00 11.18 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,155.00 20.00 11.18 12.00 =============== 203-00014 Uncl Ex (River Bttm Matl Salv and Repl) Cubic Yard ============================================= ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 20,558.00 33.95 50.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20,558.00 33.95 50.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,558.00 33.95 50.00 50.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 61 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00015 Uncl Ex (Channel Grading) Cubic Yard ============================================= ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 5,675.00 62.06 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,675.00 62.06 100.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,675.00 62.06 100.00 100.00 =============== 203-00040 Uncl Excav (Spec) Cubic Yard ============================================= CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 3,991.00 22.63 30.87 30.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,991.00 22.63 30.87 30.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,991.00 22.63 30.87 30.87 =============== 203-00050 Unsuitable Material Cubic Yard ============================================= STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 1,330.00 17.00 16.99 10.00 STM0243-089 Midpoint: Station 1019+50 Cen SHE160A-031 SH 160 Passing Lanes 03/02/17 150.00 300.00 48.47 62.50 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 500.00 35.00 49.88 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,980.00 42.98 31.35 22.83 NHPPC120-026 US 85: I-76 to 168th 05/04/17 5.00 40.01 241.19 40.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 25.00 50.00 71.66 71.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 48.34 110.78 66.34 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 50.00 20.00 49.18 11.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 20.00 49.18 11.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,060.00 42.50 33.20 23.37 =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 40,557.00 19.00 25.15 31.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 62 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 149.00 75.00 77.20 65.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 3,215.00 25.00 37.59 44.45 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 9,787.00 26.00 45.40 38.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 20.00 100.00 176.02 116.58 SHE160A-031 SH 160 Passing Lanes 03/02/17 37,442.00 17.00 20.64 25.34 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 15,466.00 14.00 12.68 7.10 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 2,992.00 30.00 36.35 26.60 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 300.00 15.00 72.33 67.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 585.00 30.00 75.56 84.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 110,513.00 18.85 24.08 26.21 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 5,722.00 3.00 13.94 7.71 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 678.00 55.00 56.94 53.83 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 21,008.00 15.00 6.00 6.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 750.00 40.00 49.00 60.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 1,000.00 14.50 35.81 35.79 ER0361-115 US 36 Bridges 06/22/17 25,700.00 14.00 19.18 7.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 54,858.00 14.11 18.10 8.66 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 16.00 16.00 178.59 250.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 8,084.00 12.00 26.98 55.29 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 800.00 30.00 14.00 10.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 657.00 30.00 44.00 65.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 16,389.00 11.00 15.41 17.00 BRR400-354 Little-T Channel Work and SH SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 2,444.00 20.00 44.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 28,390.00 13.04 20.81 30.07 STA094A-034 Critical Culvert Project on S 10/05/17 1,962.00 18.00 21.51 30.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 6,125.00 20.00 21.33 13.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 5.00 100.00 276.67 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,092.00 19.56 21.53 17.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 201,853.00 16.77 22.06 21.12 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 63 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00062 Emb Matl (CIP) (Spec) Cubic Yard ============================================= BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 78.00 50.00 94.50 130.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 700.00 5.75 5.75 5.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 778.00 10.19 33.11 18.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 778.00 10.19 33.11 18.21 =============== 203-00066 Emb Matl (CIP) (R40) Cubic Yard ============================================= STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 62,478.00 25.00 22.83 13.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 62,478.00 25.00 22.83 13.02 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 8,453.00 13.50 25.70 26.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,453.00 13.50 25.70 26.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70,931.00 23.63 23.15 14.57 =============== 203-00100 Muck Excav Cubic Yard ============================================= NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1,581.00 20.00 35.20 45.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 200.00 40.00 41.57 60.42 NHPP 0701-230 Midpoint WB Bore 03/02/17 15.00 55.00 60.38 55.60 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 11.00 120.00 250.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,807.00 23.11 36.60 47.74 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1,000.00 20.00 27.00 27.00 ER0361-115 US 36 Bridges 06/22/17 700.00 40.00 25.10 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,700.00 28.24 25.46 25.35 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 20.00 70.00 100.00 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 64 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00100 Muck Excav Cubic Yard ============================================= IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 100.00 50.00 84.79 180.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1,002.00 25.00 27.00 38.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 580.00 30.00 32.56 42.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,702.00 28.70 33.14 47.61 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 250.00 50.00 31.50 28.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 200.00 40.00 40.00 35.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 11.00 200.00 167.06 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 461.00 49.24 41.17 32.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,670.00 28.45 33.10 39.74 =============== 203-00400 Rock Excav Cubic Yard ============================================= NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1,876.00 50.00 44.80 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,876.00 50.00 44.80 24.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 748.00 60.00 37.28 23.17 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 887.00 60.00 129.38 80.00 ER0361-115 US 36 Bridges 06/22/17 1,425.00 80.00 34.78 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,060.00 69.31 51.77 52.14 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 529.00 70.00 104.74 90.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 30.00 55.00 171.00 163.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 559.00 69.19 108.30 93.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,495.00 62.71 52.69 46.78 =============== 203-00440 Rock Excav (Spec) Cubic Yard ============================================= NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 551.00 120.00 188.00 105.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 65 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00440 Rock Excav (Spec) Cubic Yard ============================================= ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 1,537.00 190.00 190.00 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,088.00 171.53 188.72 167.57 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1,422.00 85.84 75.00 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,422.00 85.84 75.00 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,510.00 136.81 160.42 130.07 =============== 203-00500 Rock Fill Cubic Yard ============================================= ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 5,990.00 11.75 11.75 11.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,990.00 11.75 11.75 11.75 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 29.00 100.00 246.67 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29.00 100.00 246.67 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,019.00 12.18 15.11 12.13 =============== 203-00510 Rock Fill (Spec) Cubic Yard ============================================= NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 615.00 75.00 42.30 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 615.00 75.00 42.30 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 615.00 75.00 42.30 4.00 =============== 203-00600 Stripping Cubic Yard ============================================= ER0361-115 US 36 Bridges 06/22/17 3,345.00 20.00 12.10 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,345.00 20.00 12.10 19.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,345.00 20.00 12.10 19.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 66 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01100 Proof Rolling Hour =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 5.00 100.00 128.25 150.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 40.00 120.00 111.99 78.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 25.00 140.00 131.92 135.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 8.00 120.00 196.04 200.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 78.00 125.13 128.23 125.67 STA006A-057 SH 6 EAST OF STERLING 04/06/17 20.00 138.00 106.22 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 138.00 106.22 95.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 20.00 120.00 109.00 110.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 100.00 114.40 100.00 100.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 4.00 125.00 120.75 78.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 124.00 115.65 107.43 100.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 222.00 120.99 118.97 107.43 =============== 203-01500 Blading Hour =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 50.00 150.00 158.68 130.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 5.00 150.50 195.75 150.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 80.00 150.00 174.73 115.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 20.00 145.00 166.64 135.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 18.00 145.00 127.00 100.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 40.00 120.00 154.12 128.62 SHE160A-031 SH 160 Passing Lanes 03/02/17 60.00 120.00 166.26 125.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 20.00 125.00 142.33 120.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 10.00 200.00 206.33 185.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 20.00 187.00 187.00 187.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 60.00 130.00 185.14 160.13 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 40.00 140.00 170.25 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 423.00 140.43 167.21 133.14 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 67 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01500 Blading Hour =================================================== STA006A-057 SH 6 EAST OF STERLING 04/06/17 200.00 135.00 162.34 145.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 20.00 150.00 124.31 152.92 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 300.00 50.00 143.46 140.90 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 160.00 134.00 155.00 100.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 10.00 150.00 90.00 90.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 55.00 150.00 181.43 181.33 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 10.00 150.00 175.60 125.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 15.00 150.00 197.80 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 770.00 103.82 148.35 135.39 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 40.00 150.00 149.00 175.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 20.00 125.00 112.67 95.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 100.00 150.00 146.41 169.98 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 100.00 175.82 190.00 190.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 70.00 145.00 135.71 102.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 330.00 155.25 144.20 157.69 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 40.00 150.00 180.10 140.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 40.00 150.00 155.77 193.87 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 40.00 145.00 138.03 90.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 100.00 130.00 161.96 170.71 BR3852-018 POA SCOUR US 385 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 100.00 110.00 112.50 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 320.00 130.63 145.23 112.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,843.00 126.08 149.84 134.95 =============== 203-01510 Backhoe Hour =================================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 40.00 150.00 166.00 135.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 30.00 145.00 128.40 62.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 20.00 150.00 191.00 145.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 68 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01510 Backhoe Hour =================================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 10.00 150.00 179.20 132.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 120.00 130.00 140.40 75.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 10.00 135.00 107.33 80.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 20.00 207.00 207.00 207.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 40.00 160.00 140.10 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 290.00 146.00 148.82 101.45 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 80.00 150.00 184.00 184.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 20.00 140.00 110.23 138.20 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 300.00 50.00 127.21 127.17 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 160.00 163.00 151.00 100.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 40.00 135.00 152.50 110.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 55.00 135.00 141.64 141.56 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 20.00 140.00 114.75 100.00 ER0361-115 US 36 Bridges 06/22/17 100.00 125.00 137.83 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 775.00 108.39 133.33 134.61 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 25.00 135.00 118.00 79.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 10.00 165.00 201.67 165.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 70.00 175.00 137.67 103.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 120.00 202.38 210.00 210.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 70.00 140.00 139.22 96.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 295.00 174.10 146.23 144.93 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 30.00 150.00 70.67 136.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 10.00 120.00 163.06 160.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 10.00 135.00 115.85 75.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 100.00 130.00 154.86 134.04 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 150.00 133.67 145.54 132.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,510.00 130.96 138.71 130.02 =============== 203-01525 Backhoe (Spec) Hour =================================================== C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 40.00 200.00 132.50 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 200.00 132.50 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 200.00 132.50 140.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 69 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01550 Dozing Hour =================================================== ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 20.00 154.00 154.00 154.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 154.00 154.00 154.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 300.00 50.00 165.62 174.61 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 160.00 193.00 157.00 100.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 55.00 143.00 148.50 148.42 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 10.00 180.00 206.25 150.00 ER0361-115 US 36 Bridges 06/22/17 100.00 150.00 148.83 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 625.00 112.87 162.28 154.47 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 40.00 180.00 157.41 169.98 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 10.00 200.00 203.33 165.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 40.00 200.00 165.33 96.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 110.00 171.52 165.00 165.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 70.00 160.00 151.04 100.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 270.00 175.06 156.29 138.66 C133A-042 SH 133 McClure Pass Slip 11/16/17 10.00 140.00 209.13 250.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 100.00 160.00 180.35 115.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 100.00 165.00 177.65 153.57 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 210.00 161.43 180.65 139.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,125.00 137.59 164.24 147.93 =============== 203-01565 Hydraulic Excavator Hour =================================================== STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 20.00 170.00 160.06 200.18 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 16.00 175.00 149.98 119.94 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 20.00 200.00 176.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 56.00 182.14 165.40 159.33 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 70 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01565 Hydraulic Excavator Hour =================================================== NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 40.00 200.00 162.00 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 200.00 162.00 175.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 180.00 200.00 169.50 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 180.00 200.00 169.50 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 276.00 196.38 167.92 135.95 =============== 203-01580 Truck Hour =================================================== NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 40.00 125.00 105.74 108.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 125.00 105.74 108.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 125.00 105.74 108.69 =============== 203-01582 Truck (Dump) Hour =================================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 40.00 125.00 130.44 135.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 10.00 104.00 107.81 83.28 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 20.00 150.00 134.00 150.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 10.00 120.00 107.33 80.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 20.00 118.00 118.00 118.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 40.00 150.00 122.35 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 140.00 132.86 126.07 114.23 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 24.00 130.00 132.44 97.31 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 55.00 110.00 127.24 127.17 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 20.00 125.00 138.40 120.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 20.00 140.00 135.00 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 119.00 121.60 133.07 118.74 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 71 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01582 Truck (Dump) Hour =================================================== NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 40.00 115.00 115.00 120.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 100.00 109.37 135.00 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 140.00 110.98 121.67 130.71 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 40.00 125.00 107.50 110.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 10.00 100.00 128.13 135.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 200.00 200.00 292.00 239.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 10.00 120.00 96.25 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 260.00 181.54 247.38 209.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 659.00 145.38 172.37 155.95 =============== 203-01590 Front End Loader (Rubber) Hour =================================================== NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 10.00 125.00 154.67 120.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 20.00 159.00 159.00 159.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 147.67 156.40 146.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 90.00 130.00 143.55 143.47 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 10.00 160.00 133.75 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 133.00 141.77 139.12 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 40.00 150.00 130.00 125.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 100.00 150.19 160.00 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 140.00 150.14 140.00 150.00 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 40.00 200.00 165.00 155.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 72 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01590 Front End Loader (Rubber) Hour =================================================== C133A-042 SH 133 McClure Pass Slip 11/16/17 10.00 120.00 165.63 175.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 140.00 165.00 145.04 110.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 160.00 250.00 215.83 280.50 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 10.00 125.00 145.91 97.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 360.00 204.31 169.55 192.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 630.00 178.25 162.07 172.21 =============== 203-01594 Combination Loader Hour =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 60.00 125.00 148.91 57.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 40.00 120.00 117.27 135.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 40.00 125.00 131.84 115.52 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 38.00 150.00 85.20 62.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 20.00 110.00 154.35 118.42 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 40.00 120.00 155.00 110.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 120.00 130.00 114.40 110.00 BR0252-449 I-25 Woodmen NB 03/02/17 10.00 150.00 149.50 90.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 20.00 110.00 110.00 110.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 10.00 150.00 131.95 100.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 40.00 125.00 151.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 438.00 127.40 126.90 108.22 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 160.00 120.00 125.40 100.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 30.00 130.00 128.65 120.95 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 50.00 105.00 125.29 125.22 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 15.00 160.00 120.40 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 255.00 120.59 125.31 107.41 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 40.00 120.00 98.00 95.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 10.00 125.00 130.00 125.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 40.00 154.00 137.00 118.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 94.00 115.00 102.00 71.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 100.00 105.01 110.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 284.00 118.03 107.26 96.63 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 73 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01594 Combination Loader Hour =================================================== STA094A-034 Critical Culvert Project on S 10/05/17 40.00 125.00 112.53 130.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 30.00 120.00 78.00 136.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 40.00 125.00 151.38 226.89 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 40.00 300.00 196.93 180.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 150.00 170.67 133.96 170.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,127.00 129.26 124.54 113.56 =============== 203-01597 Potholing Hour =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 150.00 200.00 249.16 166.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 160.00 250.00 178.99 157.98 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 10.00 300.00 275.90 245.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 10.00 225.00 250.25 200.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 100.00 220.00 248.76 186.36 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 40.00 250.00 163.75 150.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 20.00 300.00 254.05 185.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 40.00 220.00 272.52 262.55 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 20.00 250.00 250.33 301.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 138.00 250.00 268.60 200.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 8.00 200.00 267.01 280.50 NHPP 0701-230 Midpoint WB Bore 03/02/17 20.00 300.00 304.75 225.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 40.00 225.00 218.40 205.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 40.00 300.00 300.43 268.80 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 120.00 200.00 227.14 200.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 100.00 200.00 296.71 265.36 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 10.00 250.00 313.45 175.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 40.00 215.00 233.20 200.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 60.00 200.00 218.33 155.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 40.00 280.00 271.14 265.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,166.00 230.23 246.02 200.42 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 200.00 200.00 192.00 192.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 30.00 215.00 190.06 170.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 60.00 450.00 252.10 256.29 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 40.00 208.00 211.59 210.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 74 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 100.00 100.00 207.59 250.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 30.00 230.00 215.86 224.30 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 80.00 300.00 376.67 420.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 8.00 250.00 289.24 142.73 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 100.00 200.00 300.00 300.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 180.00 200.00 205.00 175.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 10.00 200.00 241.50 320.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 120.00 200.00 228.59 325.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 80.00 180.00 232.50 150.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 2.00 400.00 420.84 420.63 STA0703-437 I-70: 32ND TO 44TH 06/01/17 100.00 220.00 183.00 240.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 40.00 250.00 239.55 185.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 25.00 350.00 447.60 400.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 25.00 240.00 356.25 400.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 150.00 200.00 198.00 200.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 250.00 170.00 155.60 168.00 ER0361-115 US 36 Bridges 06/22/17 100.00 225.00 217.97 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,730.00 210.18 215.68 230.46 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 40.00 250.00 312.00 250.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 70.00 220.00 225.00 300.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 30.00 225.00 250.00 250.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 20.00 220.00 199.33 320.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 120.00 225.00 197.50 245.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 250.00 170.00 161.99 160.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 10.00 235.00 226.82 226.64 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 24.00 180.00 167.83 160.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 10.00 660.00 300.00 300.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 20.00 250.00 237.50 300.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 80.00 275.00 250.00 250.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 80.00 200.00 223.48 200.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 16.00 350.00 180.57 1.70 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 80.00 225.00 246.20 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 850.00 218.73 206.50 213.45 STA094A-034 Critical Culvert Project on S 10/05/17 24.00 200.00 226.82 275.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 40.00 200.00 198.52 150.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 90.00 200.00 212.00 330.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 10.00 300.00 260.34 250.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 75 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 10.00 200.00 242.05 225.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 40.00 225.00 247.12 185.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 40.00 150.00 170.75 200.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 100.00 250.00 125.25 180.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 25.00 300.00 314.93 284.67 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 100.00 300.00 264.69 270.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 20.00 230.00 276.37 197.10 BR3852-018 POA SCOUR US 385 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 100.00 260.00 230.00 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 599.00 240.23 219.89 209.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,345.00 221.38 221.85 216.37 =============== 203-01598 Potholing (Spec) Each =================================================== ER0361-115 US 36 Bridges 06/22/17 1.00 15000.00 8662.50 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 15000.00 8662.50 25000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 8662.50 25000.00 =============== 203-01620 Sweeping Hour =================================================== BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 20.00 130.00 135.91 73.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 130.00 135.91 73.66 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 10.00 200.00 361.50 593.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 200.00 361.50 593.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 153.33 159.25 246.94 =============== 203-01622 Sweeping (With Pickup Broom) Hour =================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 20.00 150.00 290.00 230.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 100.00 150.00 145.00 140.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 80.00 150.00 158.31 100.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 76 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01622 Sweeping (With Pickup Broom) Hour =================================================== STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 120.00 190.00 155.76 140.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 30.00 190.00 138.67 205.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 350.00 167.14 161.77 141.57 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 96.00 200.00 184.80 179.40 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 20.00 100.00 167.40 167.31 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 10.00 170.00 222.62 175.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 20.00 25.00 225.00 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 146.00 160.27 189.82 183.69 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 30.00 150.00 242.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 150.00 242.00 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 526.00 164.26 173.62 156.59 =============== 203-02300 Rock Scaler Hour =================================================== C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 96.00 120.00 232.50 115.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 1,826.00 125.00 195.67 194.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,922.00 124.75 196.91 190.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,922.00 124.75 196.91 190.05 =============== 203-02324 Blast Vibration Monitoring LUMP SUM =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 29290.80 45000.00 45000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 29290.80 45000.00 45000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 29290.80 45000.00 45000.00 =============== 203-02330 Laborer Hour =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 180.00 45.00 76.00 60.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 77 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-02330 Laborer Hour =================================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 10.00 60.00 66.24 70.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 60.00 46.30 60.50 50.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 40.00 50.00 48.84 55.00 STA0931-032 SH 93 Erosion Correction 02/09/17 40.00 40.00 43.47 22.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 40.00 50.00 59.17 52.51 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 100.00 35.00 38.60 35.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 40.00 45.00 55.13 54.40 SHE160A-031 SH 160 Passing Lanes 03/02/17 60.00 60.00 55.98 43.75 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 20.00 60.00 57.60 50.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 50.00 45.00 52.19 55.60 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 120.00 40.00 35.22 35.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 20.00 61.00 61.00 61.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 90.00 50.00 59.90 60.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 20.00 42.00 53.85 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 890.00 45.83 51.75 48.86 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 80.00 50.00 50.40 50.40 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 10.00 50.00 50.24 60.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 80.00 40.00 38.06 36.30 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 32.00 50.00 56.22 48.67 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 50.00 45.00 26.00 26.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 5.00 42.00 49.00 80.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 20.00 50.50 42.97 40.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 20.00 55.00 52.20 50.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 40.00 45.00 51.00 50.00 ER0361-115 US 36 Bridges 06/22/17 20.00 45.00 38.57 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 357.00 46.41 44.12 43.12 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 40.00 50.00 46.60 35.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 10.00 50.00 50.33 46.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 80.00 39.60 58.00 50.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 180.00 42.99 65.00 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 310.00 43.25 55.81 56.65 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 20.00 50.00 112.50 50.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 30.00 40.00 41.67 93.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 78 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-02330 Laborer Hour =================================================== NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 40.00 42.00 48.64 40.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 40.00 60.00 52.54 87.70 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 50.00 37.48 44.56 44.56 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 120.00 70.00 113.00 131.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 300.00 55.18 74.84 89.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,857.00 47.02 54.17 55.62 =============== 206-00000 Str Excav Cubic Yard ============================================= STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 29.00 25.00 58.63 50.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 3,152.00 33.00 16.92 15.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 975.00 35.00 41.50 50.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 87.00 40.00 37.20 17.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 5.00 300.00 90.88 50.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 6.00 125.00 149.80 75.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 1,608.00 55.00 55.00 55.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 96.00 16.00 53.25 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,958.00 39.37 29.90 38.41 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1,490.00 20.00 19.70 13.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 152.00 35.00 43.58 19.75 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 4,316.00 15.00 12.00 12.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 41.00 150.00 211.80 100.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 639.00 30.00 84.88 80.00 ER0361-115 US 36 Bridges 06/22/17 4,389.00 15.00 22.67 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11,027.00 17.32 24.76 21.29 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 4,125.00 22.00 22.25 17.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 774.00 30.00 37.33 30.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 27.00 80.00 264.67 25.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 2,472.00 20.00 14.29 18.13 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 74.00 45.00 243.00 150.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 353.00 60.00 42.67 67.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 72.00 60.33 100.00 100.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 741.00 35.00 19.89 15.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 79 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00000 Str Excav Cubic Yard ============================================= BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,638.00 25.51 19.77 22.22 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 220.00 25.00 20.67 27.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 120.00 25.00 52.14 32.55 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 340.00 25.00 38.29 28.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25,963.00 25.21 23.34 24.80 =============== 206-00010 Str Excav (Spec) Cubic Yard ============================================= NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1,046.00 40.00 49.89 50.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1,559.00 40.00 48.40 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,605.00 40.00 49.12 51.20 ER0361-115 US 36 Bridges 06/22/17 11,003.00 27.00 12.12 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11,003.00 27.00 12.12 19.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,608.00 29.49 19.02 25.16 =============== 206-00050 Str Bkfl (Spec) Cubic Yard ============================================= NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1,666.00 40.00 77.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,666.00 40.00 77.00 50.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 41.00 350.00 319.20 80.00 ER0361-115 US 36 Bridges 06/22/17 3,345.00 65.00 16.99 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,386.00 68.45 20.04 24.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,052.00 59.07 36.63 33.03 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 80 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00060 Str Bkfl (Spec) (Flow-Fill) Cubic Yard ============================================= STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 33.00 0.99 249.38 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 33.00 0.99 249.38 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.00 0.99 249.38 140.00 =============== 206-00065 Str Bkfl (Flow-Fill) Cubic Yard ============================================= NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 10.00 275.00 340.53 200.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 338.00 210.00 289.00 160.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 9.00 180.00 243.00 200.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 816.00 328.00 328.00 328.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 10.00 200.00 408.28 499.37 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 276.00 155.00 331.80 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,459.00 265.78 316.74 273.83 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 6.00 1000.00 466.50 424.51 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 15.00 200.00 419.07 336.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1,403.00 100.00 105.00 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,424.00 104.85 125.10 108.78 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 104.00 345.19 280.00 280.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 32.00 300.00 196.68 180.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 136.00 334.56 215.68 256.47 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 75.00 175.00 222.00 200.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 6.00 250.00 715.70 750.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 30.00 250.00 382.41 207.03 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 164.00 200.00 275.16 359.12 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 275.00 199.73 278.19 307.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,294.00 193.53 259.99 204.59 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 81 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00100 Str Bkfl (CL 1) Cubic Yard ============================================= STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 8.00 68.75 90.00 50.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 408.00 50.00 53.64 45.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 774.00 60.00 69.05 55.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 94.00 60.00 69.80 35.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 2.00 100.00 315.80 90.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 108.00 84.00 84.00 84.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,394.00 59.04 66.79 54.36 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2,139.00 35.00 38.00 35.55 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 90.00 70.00 107.22 76.67 ER0361-115 US 36 Bridges 06/22/17 1,551.00 50.00 47.97 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,780.00 41.99 41.16 43.69 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1,629.00 35.00 65.70 50.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 415.00 50.00 61.09 57.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 1,290.00 45.00 62.61 58.93 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 30.00 85.00 281.50 335.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 311.00 32.00 74.33 51.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 251.00 87.71 250.00 250.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1,034.00 55.00 48.97 40.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,960.00 45.81 61.05 62.73 STA094A-034 Critical Culvert Project on S 10/05/17 1,625.00 30.00 33.92 40.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 320.00 50.00 27.75 23.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 575.00 90.00 109.30 70.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 120.00 55.00 75.41 71.68 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,640.00 46.63 55.05 45.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,774.00 46.29 53.34 52.68 =============== 206-00200 Str Bkfl (CL 2) Cubic Yard ============================================= STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 132.00 40.00 37.98 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 82 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00200 Str Bkfl (CL 2) Cubic Yard ============================================= STM0243-089 Midpoint: Station 1019+50 Cen ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 279.00 55.00 55.00 55.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 72.00 32.00 61.30 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 483.00 47.47 49.92 47.59 ER0361-115 US 36 Bridges 06/22/17 108.00 35.00 27.59 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 108.00 35.00 27.59 18.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 136.00 50.00 44.43 58.93 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 14.00 37.45 150.00 150.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 386.00 55.00 18.54 15.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 536.00 53.27 26.44 29.67 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 444.00 30.00 38.36 28.58 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 444.00 30.00 38.36 28.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,571.00 43.66 32.29 33.48 =============== 206-00360 Mechanical Reinforcement of Soil Cubic Yard ============================================= STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 729.00 25.00 36.58 19.46 ER0361-115 US 36 Bridges 06/22/17 1,286.00 20.00 17.97 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,015.00 21.81 27.86 19.80 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 658.00 25.00 49.30 30.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 1,290.00 20.00 21.74 36.26 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 237.00 32.32 40.00 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 83 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00360 Mechanical Reinforcement of Soil Cubic Yard ============================================= ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1,034.00 20.00 20.68 20.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,219.00 21.93 24.36 30.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,234.00 21.88 25.55 26.10 =============== 206-00510 Filter Matl (CL A) Cubic Yard ============================================= STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 1,330.00 80.00 63.40 52.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 137.00 75.00 150.67 132.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 106.00 120.00 78.50 50.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,573.00 82.26 71.24 63.90 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 63.00 100.00 80.36 59.43 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 784.00 60.00 138.00 150.00 ER0361-115 US 36 Bridges 06/22/17 1,652.00 60.00 72.56 78.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,499.00 61.01 87.85 100.12 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1,200.00 65.00 80.00 110.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 10.00 96.00 346.50 525.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 412.00 80.00 71.77 60.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,622.00 69.00 76.08 99.86 C133A-042 SH 133 McClure Pass Slip 11/16/17 32.00 120.00 152.41 32.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 647.00 95.00 61.30 59.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 679.00 96.18 71.91 58.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,373.00 72.04 80.32 89.34 =============== 206-00520 Filter Matl (CL B) Cubic Yard ============================================= NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 8.00 120.00 111.00 70.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 84 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00520 Filter Matl (CL B) Cubic Yard ============================================= STE 0702-357 I-70 West Vail Pass Basin 03/23/17 25.00 70.00 113.35 106.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 33.00 82.12 112.78 97.65 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 306.00 68.00 95.67 88.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 306.00 68.00 95.67 88.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 200.00 313.67 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 200.00 313.67 240.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 340.00 69.76 98.87 89.38 =============== 206-01750 Shoring LUMP SUM =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 10000.00 10440.00 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 10440.00 10000.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 1.00 20000.00 44597.37 56292.12 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 1.00 45000.00 37809.20 3000.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 1.00 22000.00 14762.50 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 29000.00 31824.01 23097.37 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1.00 100000.00 101000.00 125000.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 110000.00 67899.38 25000.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1.00 10000.00 68433.33 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 73333.33 83090.74 50433.33 C133A-042 SH 133 McClure Pass Slip 11/16/17 1.00 200000.00 240469.88 70000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 200000.00 240469.88 70000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 64625.00 90884.59 37574.02 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 85 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01781 Shoring (A 1) LUMP SUM =============================================== ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 1.00 155750.00 155750.00 155750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 155750.00 155750.00 155750.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 10000.00 22953.66 10725.00 ER0361-115 US 36 Bridges 06/22/17 1.00 25000.00 50210.00 15200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 17500.00 32039.11 12962.50 STA094A-034 Critical Culvert Project on S 10/05/17 1.00 10000.00 13316.60 13000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 10000.00 13316.60 13000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 50187.50 31756.54 48668.75 =============== 206-01782 Shoring (A 2) LUMP SUM =============================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 10000.00 21842.16 10725.00 ER0361-115 US 36 Bridges 06/22/17 1.00 35000.00 28843.33 13500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 22500.00 24175.88 12112.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 22500.00 24175.88 12112.50 =============== 206-01783 Shoring (A 3) LUMP SUM =============================================== ER0361-115 US 36 Bridges 06/22/17 1.00 25000.00 24689.67 6318.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 25000.00 24689.67 6318.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 24689.67 6318.00 =============== 207-00205 Topsoil Cubic Yard ============================================= NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 1,786.00 20.00 52.00 59.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 86 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00205 Topsoil Cubic Yard ============================================= STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 12,996.00 12.00 10.54 5.00 STM0243-089 Midpoint: Station 1019+50 Cen IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 203.00 20.00 41.92 49.23 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 215.00 25.00 37.80 10.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 5,063.00 12.00 12.14 15.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 561.00 50.00 69.00 95.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 411.00 12.00 69.89 53.07 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 60.00 16.00 51.50 60.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 35.00 11.00 60.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21,330.00 13.89 16.15 20.80 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 52.00 10.00 121.00 121.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 7,744.00 10.00 9.51 8.24 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 8,070.00 12.50 10.02 4.12 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 83.00 55.00 93.67 100.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 250.00 15.00 18.61 9.82 STAR400-348 Region 4 Controller and Cabin 05/04/17 4.00 150.00 97.50 125.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 2,100.00 15.00 6.31 1.25 NHPPC120-026 US 85: I-76 to 168th 05/04/17 11,610.00 10.00 32.55 20.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 5.00 100.00 64.47 100.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 1,650.00 13.00 47.48 47.45 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 110.00 20.00 23.40 14.00 ER0361-115 US 36 Bridges 06/22/17 6,450.00 13.00 16.84 24.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 940.00 68.00 68.00 68.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 39,068.00 12.98 15.40 16.60 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1,076.00 30.00 10.85 5.50 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 241.00 14.00 60.00 45.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 115.00 30.00 60.00 72.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 5.00 75.00 102.67 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,437.00 27.47 19.19 17.51 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 654.00 15.00 24.50 26.50 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 637.00 20.00 28.25 27.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,291.00 17.47 26.35 27.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 63,126.00 13.71 15.83 17.96 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 87 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00210 Stockpile Topsoil Cubic Yard ============================================= SHE160A-031 SH 160 Passing Lanes 03/02/17 815.00 7.00 9.18 10.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 60.00 9.00 26.01 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 875.00 7.14 9.92 11.10 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 250.00 15.00 16.07 12.22 STAR400-348 Region 4 Controller and Cabin 05/04/17 109.00 25.00 110.00 150.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 2,100.00 10.00 4.19 1.25 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 110.00 15.00 10.51 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,569.00 11.34 7.76 8.88 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1,076.00 15.00 7.85 3.50 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 41.00 7.00 36.33 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,117.00 14.71 8.49 5.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,561.00 11.36 8.60 8.36 =============== 207-00305 Wetland Topsoil Cubic Yard ============================================= NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 95.00 25.00 52.60 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 95.00 25.00 52.60 40.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 13.00 30.00 36.90 42.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 30.00 36.90 42.71 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 12.00 30.00 128.33 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 30.00 128.33 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 26.04 56.44 41.29 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 88 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00310 Stockpile Wetland Topsoil Cubic Yard ============================================= STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 13.00 45.00 33.57 42.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 45.00 33.57 42.71 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 12.00 30.00 78.33 50.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 11.00 20.00 181.00 178.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23.00 25.22 127.43 111.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 32.36 93.54 86.48 =============== 207-00405 Topsoil (Spec) Cubic Yard ============================================= ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 69,446.00 40.84 48.00 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 69,446.00 40.84 48.00 48.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 1,722.00 20.89 34.67 34.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,722.00 20.89 34.67 34.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 71,168.00 40.36 47.68 47.68 =============== 208-00001 Silt Dike Lin Foot =============================================== STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 615.00 10.00 10.16 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 615.00 10.00 10.16 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 615.00 10.00 10.16 9.00 =============== 208-00002 Erosion Log Type 1 (12 In) Lin Foot =============================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 50.00 8.00 4.75 4.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 89 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00002 Erosion Log Type 1 (12 In) Lin Foot =============================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 2,240.00 4.00 5.00 4.99 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 1,500.00 5.00 6.06 8.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2,000.00 4.50 3.64 3.25 STM0243-089 Midpoint: Station 1019+50 Cen STA0931-032 SH 93 Erosion Correction 02/09/17 530.00 5.00 5.33 3.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1,200.00 5.00 4.85 3.52 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 6,900.00 5.00 4.36 3.77 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 4,610.00 5.00 5.53 4.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 1,000.00 3.50 4.12 3.77 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 30.00 5.00 6.56 6.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 1,170.00 5.00 3.90 4.10 BR0252-449 I-25 Woodmen NB 03/02/17 330.00 5.00 7.50 6.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 3,000.00 6.50 6.83 2.50 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 250.00 9.00 9.00 9.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 140.00 15.00 9.13 12.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 80.00 4.50 17.00 15.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 2,000.00 9.00 7.36 6.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27,030.00 5.38 5.32 4.38 STA006A-057 SH 6 EAST OF STERLING 04/06/17 300.00 5.00 5.38 5.50 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 200.00 4.00 5.96 4.88 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 300.00 10.00 7.84 6.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 5,000.00 5.00 3.49 3.15 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 60.00 25.00 21.00 12.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 134.00 5.00 5.53 5.09 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1,000.00 5.00 4.60 4.60 STAR400-348 Region 4 Controller and Cabin 05/04/17 540.00 7.00 21.50 8.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1,000.00 5.00 7.21 8.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 100.00 7.00 10.50 8.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 216.00 4.50 4.17 3.20 STA0703-437 I-70: 32ND TO 44TH 06/01/17 100.00 5.00 14.32 16.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 140.00 5.00 9.68 20.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 1,000.00 8.00 9.41 20.00 ER0361-115 US 36 Bridges 06/22/17 8,057.00 5.00 4.17 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18,147.00 5.37 4.80 5.10 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 500.00 5.00 6.10 5.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 30.00 8.00 11.50 11.50 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1,600.00 5.00 4.58 4.50 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 100.00 5.00 10.19 15.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 90 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00002 Erosion Log Type 1 (12 In) Lin Foot =============================================== SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 800.00 10.00 6.17 5.50 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 2,000.00 8.00 4.34 4.50 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 5,639.00 5.25 4.04 4.25 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 660.00 5.00 6.00 5.50 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 700.00 5.00 5.15 4.50 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 1,000.00 6.60 12.00 13.50 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1,509.00 4.82 6.58 6.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 2,500.00 13.15 13.00 13.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 9,497.00 6.00 4.23 4.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 400.00 10.00 8.67 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26,935.00 6.66 4.51 5.60 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 200.00 5.00 7.57 5.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 3,820.00 5.00 3.23 4.40 C133A-042 SH 133 McClure Pass Slip 11/16/17 520.00 8.00 6.33 6.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 12,493.00 5.00 5.29 4.75 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 300.00 5.00 16.78 5.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 800.00 5.00 5.94 6.50 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 100.00 6.00 9.47 10.35 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 2,090.00 8.51 7.00 7.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 600.00 8.00 13.80 9.40 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 4,810.00 5.00 4.71 3.62 BR3852-018 POA SCOUR US 385 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 90.00 5.00 8.29 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25,823.00 5.42 5.34 4.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 97,935.00 5.74 4.90 5.00 =============== 208-00004 Silt Berm Lin Foot =============================================== STA0931-032 SH 93 Erosion Correction 02/09/17 120.00 13.00 16.08 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 13.00 16.08 10.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 615.00 6.00 10.16 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 615.00 6.00 10.16 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 735.00 7.14 12.34 9.16 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 91 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00007 Erosion Log Type 2 (8 In) Lin Foot =============================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1,300.00 10.00 5.16 3.03 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 216.00 6.00 6.00 5.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,516.00 9.43 5.18 3.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,516.00 9.43 5.18 3.37 =============== 208-00008 Erosion Log Type 2 (12 In) Lin Foot =============================================== SHE160A-031 SH 160 Passing Lanes 03/02/17 16,045.00 4.00 5.07 5.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16,045.00 4.00 5.07 5.97 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 130.00 8.00 8.81 6.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 100.00 9.00 9.53 3.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 230.00 8.43 9.04 4.96 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 300.00 8.00 7.50 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 300.00 8.00 7.50 10.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 80.00 9.00 6.33 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 80.00 9.00 6.33 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,655.00 4.16 5.12 6.02 =============== 208-00009 Erosion Log Type 2 (18 In) Lin Foot =============================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 225.00 8.00 8.94 8.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 730.00 7.50 8.45 7.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 955.00 7.62 8.57 7.63 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 92 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00009 Erosion Log Type 2 (18 In) Lin Foot =============================================== STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 216.00 6.75 12.55 11.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 216.00 6.75 12.55 11.40 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 390.00 10.00 14.50 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 390.00 10.00 14.50 12.00 STA094A-034 Critical Culvert Project on S 10/05/17 240.00 6.00 12.53 4.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 40.00 10.00 10.00 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 280.00 6.57 12.37 4.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,841.00 7.86 10.10 8.51 =============== 208-00011 Erosion Bales (Weed Free) Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 40.00 23.00 19.82 16.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 40.00 15.00 23.34 23.18 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 193.00 24.00 29.20 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 273.00 22.53 27.55 24.76 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 40.00 20.00 28.50 30.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 13.00 17.00 23.61 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 53.00 19.26 27.82 27.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 326.00 22.00 27.59 25.16 =============== 208-00012 Erosion Log Type 1 (9 In) Lin Foot =============================================== STA0362-035 US 36: Strasburg to Byers 03/23/17 350.00 10.00 14.38 6.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 350.00 10.00 14.38 6.49 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 93 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00012 Erosion Log Type 1 (9 In) Lin Foot =============================================== STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 2,080.00 6.00 5.32 3.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,080.00 6.00 5.32 3.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,430.00 6.58 6.15 3.59 =============== 208-00013 Erosion Log Type 1 (20 In) Lin Foot =============================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 2,900.00 8.00 7.06 10.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1,465.00 10.00 8.61 5.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,365.00 8.67 7.66 8.42 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 45.00 8.00 9.71 10.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 45.00 8.00 9.71 10.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,410.00 8.66 7.72 8.44 =============== 208-00015 Sand Bag Each =================================================== STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 50.00 22.00 6.08 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 22.00 6.08 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 22.00 6.08 5.00 =============== 208-00019 Silt Fence (Reinforced)(Special) Lin Foot =============================================== ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 1,020.00 60.00 60.00 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,020.00 60.00 60.00 60.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 237.00 67.89 65.00 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 237.00 67.89 65.00 65.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,257.00 61.49 60.94 60.94 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 94 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00020 Silt Fence Lin Foot =============================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 500.00 2.00 2.01 1.75 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 1,955.00 3.00 2.60 2.20 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 250.00 3.00 3.91 5.75 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 40,000.00 1.50 1.24 1.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 6,900.00 2.00 2.72 3.07 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 1,200.00 2.00 2.28 1.87 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 650.00 5.00 3.11 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 51,455.00 1.69 1.52 1.65 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 200.00 2.00 2.42 2.10 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 6,900.00 2.00 1.63 1.38 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 5,000.00 1.40 1.22 1.05 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 124.00 20.00 15.00 4.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 100.00 5.00 2.65 2.36 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 1,230.00 1.25 1.48 1.10 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 520.00 2.50 2.56 2.50 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 300.00 5.00 6.56 15.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 500.00 2.00 1.00 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14,874.00 1.98 1.67 1.59 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 3,000.00 2.00 2.64 2.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 300.00 1.50 9.00 13.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 50.00 2.00 6.19 7.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 2,000.00 4.00 5.60 3.50 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 250.00 4.00 7.60 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,600.00 2.78 4.02 3.44 STA094A-034 Critical Culvert Project on S 10/05/17 325.00 2.00 3.19 1.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 12,493.00 1.25 2.36 2.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 1,262.00 5.32 5.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14,080.00 1.63 2.44 2.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 86,009.00 1.80 1.90 1.92 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 95 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00021 Silt Fence (Reinf) Lin Foot =============================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 900.00 10.00 4.46 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 900.00 10.00 4.46 2.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 900.00 10.00 4.46 2.50 =============== 208-00023 Erosion Log (Type 3)(12 In) Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 67,202.00 5.90 7.00 7.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 6,358.00 7.00 5.14 4.50 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 73,560.00 6.00 6.05 6.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 73,560.00 6.00 6.05 6.78 =============== 208-00024 Erosion Log (Type 3)(20 In) Lin Foot =============================================== BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 1,410.00 10.00 9.38 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,410.00 10.00 9.38 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,410.00 10.00 9.38 9.00 =============== 208-00026 Coir Roll Lin Foot =============================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 512.00 15.00 14.94 15.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 512.00 15.00 14.94 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 512.00 15.00 14.94 15.00 =============== 208-00033 Sediment Trap Each =================================================== SHE160A-031 SH 160 Passing Lanes 03/02/17 2.00 200.00 1744.94 2875.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 200.00 1744.94 2875.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 200.00 1744.94 2875.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 96 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00035 Aggregate Bag Lin Foot =============================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 150.00 8.00 25.00 30.00 NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 80.00 15.00 6.84 7.75 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 564.00 7.50 10.54 7.60 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 760.00 2.00 6.96 6.92 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 200.00 5.00 7.68 7.65 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 1,570.00 8.00 6.68 8.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 100.00 6.50 8.44 8.50 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 200.00 7.00 10.25 10.00 STA0931-032 SH 93 Erosion Correction 02/09/17 300.00 10.00 7.75 5.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 200.00 9.00 7.32 5.36 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 120.00 10.00 9.55 6.15 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 224.00 12.00 8.89 8.25 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 100.00 8.00 6.66 6.79 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 213.00 10.00 10.17 15.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 174.00 7.50 8.90 17.75 BR0252-449 I-25 Woodmen NB 03/02/17 100.00 10.00 12.75 7.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 200.00 9.00 8.13 10.08 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 200.00 8.00 14.50 19.30 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 120.00 7.00 7.00 7.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 500.00 8.00 6.98 6.20 STA0362-035 US 36: Strasburg to Byers 03/23/17 20.00 8.00 23.50 26.53 MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 200.00 10.00 19.17 7.50 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 120.00 10.00 9.87 5.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 62.00 8.00 20.67 21.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 30.00 71.00 29.54 8.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,507.00 7.98 8.94 8.98 STA006A-057 SH 6 EAST OF STERLING 04/06/17 100.00 7.51 8.41 5.25 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 700.00 10.00 10.90 10.90 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 70.00 10.00 17.12 15.60 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 500.00 10.00 12.08 7.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 300.00 8.00 13.15 13.50 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 400.00 10.00 6.73 5.52 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 150.00 7.50 5.55 5.25 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 540.00 25.00 22.33 14.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 125.00 11.00 18.13 9.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 100.00 10.00 4.30 4.30 STAR400-348 Region 4 Controller and Cabin 05/04/17 204.00 10.00 23.50 6.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 300.00 8.00 7.63 6.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 500.00 10.00 8.19 4.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 200.00 15.00 12.50 7.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 97 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00035 Aggregate Bag Lin Foot =============================================== AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 540.00 11.00 5.76 9.25 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 25.00 9.00 6.76 4.80 STA0703-437 I-70: 32ND TO 44TH 06/01/17 100.00 9.00 25.39 27.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 36.00 20.00 15.55 27.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 100.00 7.60 10.33 3.00 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 400.00 10.00 3.00 3.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 100.00 10.00 15.43 25.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 80.00 10.00 9.54 6.70 ER0361-115 US 36 Bridges 06/22/17 56.00 8.00 9.69 10.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 375.00 12.00 12.00 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,001.00 11.43 10.82 8.95 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 200.00 8.00 7.50 10.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 700.00 8.00 7.80 7.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 100.00 10.00 12.00 12.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 200.00 10.00 5.00 3.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 150.00 10.00 14.27 22.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 30.00 7.00 9.83 10.50 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 500.00 10.00 6.63 7.50 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 500.00 8.00 6.74 7.37 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 700.00 10.00 7.28 7.50 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 1,000.00 13.20 9.63 7.85 MTCE131A-039 SH 131 MP 0.053-68.721 IN EAG 08/17/17 400.00 10.00 7.33 13.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 12.00 8.00 32.50 40.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 9,060.00 10.88 12.00 12.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 421.00 7.50 6.93 5.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 540.00 12.00 13.02 6.05 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 16.00 12.00 18.67 15.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 648.00 9.00 12.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15,177.00 10.51 9.09 10.50 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 100.00 8.00 13.02 5.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 200.00 12.00 19.00 8.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 254.00 9.00 2.97 3.40 C133A-042 SH 133 McClure Pass Slip 11/16/17 200.00 10.00 8.17 8.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 400.00 10.00 6.75 5.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 500.00 20.00 6.58 6.90 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 512.00 8.00 10.00 10.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 100.00 10.00 22.65 9.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 98 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00035 Aggregate Bag Lin Foot =============================================== ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 232.00 8.00 6.75 6.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 50.00 8.00 5.83 3.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 100.00 9.00 10.24 20.70 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 600.00 12.00 18.17 15.50 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 200.00 5.00 8.69 5.00 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 300.00 10.00 7.33 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,748.00 10.92 9.58 8.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31,433.00 10.21 9.51 9.63 =============== 208-00036 Aggregate Bag (Special) Lin Foot =============================================== ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 200.00 15.00 15.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 200.00 15.00 15.00 15.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 43,695.00 13.73 15.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 43,695.00 13.73 15.00 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43,895.00 13.74 15.00 15.00 =============== 208-00041 Rock Check Dam Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 20.00 800.00 130.15 250.00 STA0931-032 SH 93 Erosion Correction 02/09/17 49.00 750.00 785.00 670.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 500.00 385.60 108.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 4.00 1050.00 1050.00 1050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 75.00 772.67 701.30 563.28 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 10.00 200.00 711.40 750.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 10.00 75.00 669.71 669.31 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 1.00 500.00 1297.60 1500.00 ER0361-115 US 36 Bridges 06/22/17 5.00 450.00 1018.33 1550.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 5.00 2303.00 2303.00 2303.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 31.00 548.87 886.52 1127.68 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 99 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00041 Rock Check Dam Each =================================================== ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1.00 3500.00 1216.67 750.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 330.00 545.98 700.00 700.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 3.00 750.00 1619.34 542.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 334.00 556.66 787.13 698.73 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 1.00 6318.00 3850.00 3850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 6318.00 3850.00 3850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 441.00 605.91 767.89 712.99 =============== 208-00045 Conc Washout Str Each =================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 1.00 1500.00 948.75 950.00 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 4.00 1500.00 2137.70 966.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 3.00 1000.00 1036.50 973.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 2.00 2000.00 2524.08 3000.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 4.00 1000.00 1639.14 800.00 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 4.00 1100.00 1000.00 500.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1.00 2000.00 1802.58 2000.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 1.00 1500.00 1453.91 1760.90 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1.00 850.00 5479.87 5034.62 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 3.00 2000.00 903.33 1480.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 700.00 1156.00 900.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 1.00 800.00 1665.18 935.35 SHE160A-031 SH 160 Passing Lanes 03/02/17 2.00 1320.00 2130.46 1000.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1.00 4400.00 1360.00 800.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 2.00 1200.00 1104.00 1300.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 2.00 1500.00 2006.67 1120.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 2.00 1117.61 1804.93 1700.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 1.00 59200.00 59200.00 59200.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 1.00 1500.00 4253.49 1140.73 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 3.00 1500.00 743.33 1200.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 1.00 2050.00 1598.75 1771.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 42.00 2794.65 1994.54 2751.39 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 100 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00045 Conc Washout Str Each =================================================== STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 6.00 2000.00 884.14 802.43 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 4.00 1500.00 1654.73 736.14 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 4.00 1250.00 1352.00 750.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 5.00 4000.00 2951.67 1200.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 2.00 1500.00 1662.50 1500.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 1.00 1650.00 1625.92 1047.75 NHPPC120-026 US 85: I-76 to 168th 05/04/17 4.00 1500.00 1558.03 1400.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 1.00 2000.00 291.00 400.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 1.00 799.99 895.51 894.94 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 1.00 2000.00 2280.00 2000.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 1.00 1400.00 1000.00 500.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 2.00 1000.00 708.80 262.00 ER0361-115 US 36 Bridges 06/22/17 8.00 1500.00 1088.33 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 1846.25 1437.75 938.15 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 2.00 2000.00 1540.00 1000.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 10.00 1200.00 553.50 607.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 1.00 2500.00 2433.33 1000.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 4.00 1600.00 493.50 400.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 1.00 1250.00 2329.59 1699.83 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 2.00 1090.00 652.00 500.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 3.00 6050.00 897.00 450.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1.00 1200.00 1690.33 2221.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 2.00 83097.41 80000.00 80000.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 2.00 1500.00 1294.16 500.00 BRR400-354 Little-T Channel Work and SH AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 1.00 700.00 284.00 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29.00 7502.58 2469.52 6135.93 STA094A-034 Critical Culvert Project on S 10/05/17 1.00 1250.00 1296.65 1900.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 8.00 500.00 783.17 500.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 3.00 1500.00 1273.67 820.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 1.00 1600.00 2092.13 2500.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 1460.00 2707.50 1522.50 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 1.00 4000.00 3310.55 1552.74 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 1.00 3825.25 3300.00 3300.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 101 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00045 Conc Washout Str Each =================================================== ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 6.00 1500.00 1523.42 878.93 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22.00 1347.06 1356.32 1023.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 133.00 3296.51 1770.18 2656.73 =============== 208-00046 Pre-fab Conc Washout Str Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 5.00 2000.00 3048.88 1860.00 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 1.00 1000.00 1022.50 500.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 10.00 1500.00 963.75 1200.00 STA0931-032 SH 93 Erosion Correction 02/09/17 1.00 1650.00 1134.50 750.00 BR0252-449 I-25 Woodmen NB 03/02/17 2.00 2000.00 1187.50 1250.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 2.00 2000.00 1986.80 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21.00 1697.62 1512.38 1335.71 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 3.00 2500.00 6460.00 6460.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 3.00 2200.00 2214.13 1510.00 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 2.00 3000.00 1573.17 2250.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 2.00 1805.00 2147.83 2170.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 4.00 2000.00 1200.00 1200.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 5.00 700.00 280.00 150.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 4.00 2000.00 1352.50 1000.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 2.00 2500.00 3465.48 6200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 25.00 1928.40 1850.53 2188.00 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 1.00 1500.00 2284.37 2500.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 3.00 1500.00 850.00 500.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 2.00 2500.00 3125.00 3125.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 2.00 1600.00 1110.93 2100.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 1.00 2200.00 495.00 445.00 CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 1.00 1.00 263.00 525.00 NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 1.00 1000.00 1268.33 705.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 2.00 1400.00 1679.40 2100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 1553.92 1535.96 1563.46 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 2.00 5000.00 2775.00 1800.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 102 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00046 Pre-fab Conc Washout Str Each =================================================== CR100-286 R1 CURB RAMPS-PH 1 10/26/17 1.00 2500.00 2100.00 1200.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 2.00 2500.00 2019.62 900.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 14.00 250.00 749.00 600.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 3.00 1600.00 473.75 500.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 1.00 1500.00 1553.33 460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 23.00 1186.96 972.98 737.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 82.00 1601.96 1409.02 1463.84 =============== 208-00051 Storm Drain Inlet Protection (Type I) Lin Foot =============================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 300.00 20.00 12.85 20.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 18.00 25.00 27.71 50.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 160.00 20.00 8.10 5.36 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 14.00 20.00 15.87 9.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 20.00 10.00 8.24 9.00 BR0252-449 I-25 Woodmen NB 03/02/17 24.00 10.00 31.25 20.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 300.00 15.00 14.78 19.00 MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 100.00 12.00 26.67 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 936.00 17.17 15.03 16.29 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 70.00 10.00 15.20 15.20 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 20.00 11.00 24.83 22.60 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 20.00 20.00 14.80 14.29 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 100.00 11.00 21.81 12.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 55.00 20.00 4.75 4.75 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 7.00 150.00 13.54 12.50 ER0361-115 US 36 Bridges 06/22/17 259.00 10.00 6.65 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 531.00 13.48 10.58 9.24 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 60.00 20.00 26.00 26.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 100.00 12.00 17.88 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 160.00 15.00 19.75 25.38 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 121.00 15.00 2.97 3.40 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 103 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00051 Storm Drain Inlet Protection (Type I) Lin Foot =============================================== STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 84.00 13.00 10.08 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 205.00 14.18 7.10 4.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,832.00 15.58 12.61 13.76 =============== 208-00052 Storm Drain Inlet Protection (Type II) Lin Foot =============================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 300.00 50.00 61.24 37.50 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 2.00 40.00 149.60 200.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 80.00 30.00 35.59 31.06 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 50.00 35.00 10.62 5.15 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 350.00 22.64 52.10 19.00 MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 100.00 45.00 61.67 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 882.00 35.89 51.30 25.56 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 350.00 50.00 58.00 58.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 325.00 50.00 60.26 55.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 10.00 55.00 99.40 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 685.00 50.07 61.00 57.34 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 60.00 55.00 30.00 30.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 100.00 50.00 46.38 82.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 42.00 55.00 53.67 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 202.00 52.52 46.21 54.70 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 6.00 25.00 25.75 26.25 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 52.00 23.10 27.43 27.43 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 24.00 50.00 62.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 82.00 31.11 50.55 26.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,851.00 42.74 52.98 40.55 =============== 208-00053 Storm Drain Inlet Protect (Ty I)(84 In) Each =================================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 3.00 250.00 311.30 275.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 104 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00053 Storm Drain Inlet Protect (Ty I)(84 In) Each =================================================== STA0362-035 US 36: Strasburg to Byers 03/23/17 1.00 1000.00 1495.39 383.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 437.50 459.31 302.08 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 2.00 20.00 250.27 230.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 10.00 300.00 225.39 211.18 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 300.00 20.00 106.38 50.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 55.00 333.73 347.59 NHPPC120-026 US 85: I-76 to 168th 05/04/17 5.00 100.01 222.21 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 318.00 30.17 115.34 61.85 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1.00 750.00 213.48 216.00 BRR400-354 Little-T Channel Work and SH SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 27.00 120.00 234.00 310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 28.00 142.50 232.45 306.64 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 6.00 120.00 337.50 175.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 13.00 250.00 165.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19.00 208.95 197.34 123.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 369.00 52.32 140.95 86.22 =============== 208-00054 Storm Drain Inlet Protection (Type II) Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 162.00 40.00 162.65 131.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 33.00 250.00 193.67 216.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 6.00 53.50 220.33 64.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 201.00 74.88 169.46 142.96 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 150.00 50.00 328.38 130.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 105 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00054 Storm Drain Inlet Protection (Type II) Each =================================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 4.00 400.00 398.33 360.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 5.00 100.01 412.13 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 159.00 60.38 332.78 148.99 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 6.00 250.00 387.50 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 250.00 387.50 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 366.00 71.45 243.20 147.74 =============== 208-00055 Rigid Inlet Prot Device Each =================================================== STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 4.00 165.00 249.09 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 165.00 249.09 230.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 165.00 249.09 230.00 =============== 208-00056 Storm Drain Inlet Protection (Type III) Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 2.00 50.00 484.50 800.00 STA0931-032 SH 93 Erosion Correction 02/09/17 1.00 1250.00 383.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 450.00 441.00 583.33 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 4.00 300.00 150.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 300.00 150.00 150.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 8.00 350.00 178.33 148.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 350.00 178.33 148.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 6.00 500.00 400.00 300.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 106 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00056 Storm Drain Inlet Protection (Type III) Each =================================================== NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 155.00 250.00 467.06 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 161.00 259.32 466.04 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 176.00 267.61 435.88 294.51 =============== 208-00060 Temporary Slope Drain Lin Foot =============================================== STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 246.00 14.50 55.68 55.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 246.00 14.50 55.68 55.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 246.00 14.50 55.68 55.65 =============== 208-00070 Vehicle Tracking Pad Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 2.00 1750.00 3061.85 2550.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 2.00 2500.00 3016.75 3033.50 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 1.00 2000.00 6238.43 6500.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 6.00 2000.00 2237.71 2500.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1.00 3500.00 2929.78 1950.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 1.00 2200.00 2349.11 2005.77 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 1.00 3000.00 2213.33 2340.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 2500.00 2060.00 1500.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 1.00 1000.00 1794.68 2033.88 SHE160A-031 SH 160 Passing Lanes 03/02/17 4.00 2290.00 2970.31 2250.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 2.00 4000.00 4292.00 3750.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 2.00 2000.00 1860.00 1350.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 4.00 3825.00 3825.00 3825.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 1.00 2500.00 3521.17 3272.76 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 1.00 5000.00 3618.90 2200.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1.00 2500.00 4100.00 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32.00 2614.38 2907.89 2774.81 STA006A-057 SH 6 EAST OF STERLING 04/06/17 1.00 1996.00 1663.07 1750.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 2.00 2500.00 1483.43 2050.29 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 4.00 2500.00 2804.14 1334.52 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 4.00 2000.00 2730.00 2250.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 2.00 2500.00 1883.39 1350.17 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 107 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00070 Vehicle Tracking Pad Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2.00 2000.00 1000.00 1000.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 3.00 1540.00 1952.01 1950.74 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 1.00 3500.00 3199.20 2000.00 ER0361-115 US 36 Bridges 06/22/17 12.00 1500.00 2266.67 1900.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 1.00 8335.00 8335.00 8335.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 2139.09 2464.10 1996.13 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 2.00 2000.00 2250.00 3000.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 2500.00 2220.23 1825.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 2.00 2000.00 2745.82 3682.97 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1.00 2500.00 3821.33 1964.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 89.00 2963.04 4200.00 4200.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 4.00 2000.00 2524.26 2800.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 1.00 2000.00 2341.33 2174.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 2867.11 3392.74 4043.29 STA094A-034 Critical Culvert Project on S 10/05/17 1.00 2000.00 2635.82 1500.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 4.00 2000.00 622.00 765.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1.00 2500.00 3102.17 3300.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 2.00 3000.00 2979.00 2250.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 2270.00 1966.67 1500.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 1.00 5514.51 3600.00 3600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 2628.45 2149.17 1746.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 174.00 2673.02 2873.44 3310.73 =============== 208-00071 Maint Aggregate (Veh Track Pad) Cubic Yard ============================================= ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 370.00 56.00 56.00 56.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 28.00 75.00 80.80 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 398.00 57.34 62.81 59.10 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 80.00 40.00 40.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 80.00 40.00 40.00 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 108 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00071 Maint Aggregate (Veh Track Pad) Cubic Yard ============================================= ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 8,240.00 65.77 80.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,240.00 65.77 80.00 80.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 30.00 100.00 141.92 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30.00 100.00 141.92 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,748.00 65.27 79.70 78.55 =============== 208-00075 Pre-fab Vehicle Track Pad Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 1.00 1000.00 1429.99 800.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 4.00 1750.00 1330.00 2000.00 STA0931-032 SH 93 Erosion Correction 02/09/17 3.00 1650.00 2264.54 575.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 1618.75 1802.83 1315.63 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 2.00 1500.00 1730.00 2200.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 2.00 1000.01 2424.88 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 1250.01 2027.81 2600.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 2.00 1500.00 1325.00 1250.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1.00 1000.00 3366.67 2850.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 2.00 2000.00 2600.00 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 1600.00 2384.62 2270.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 9.00 2300.00 2354.63 1602.42 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 109 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00075 Pre-fab Vehicle Track Pad Each =================================================== BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 2300.00 2354.63 1602.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 1794.23 2163.75 1796.03 =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 8.00 28.00 56.94 55.00 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 145.00 45.00 153.98 107.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 20.00 100.00 70.53 66.05 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 8.00 100.00 73.91 70.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 120.00 55.00 66.75 50.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 200.00 65.00 53.16 33.00 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 10.00 55.00 81.25 55.00 STA0931-032 SH 93 Erosion Correction 02/09/17 50.00 40.00 55.57 22.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 60.00 60.00 54.17 52.51 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 40.00 65.00 65.60 99.80 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 80.00 50.00 41.40 35.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 10.00 45.00 55.70 56.10 SHE160A-031 SH 160 Passing Lanes 03/02/17 270.00 55.00 52.26 43.75 NHPP 0701-230 Midpoint WB Bore 03/02/17 8.00 40.00 65.17 54.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 20.00 60.00 35.22 40.00 BR0252-449 I-25 Woodmen NB 03/02/17 15.00 50.00 57.75 35.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 30.00 45.00 51.37 61.60 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 15.00 55.50 124.75 80.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 20.00 44.00 44.00 44.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 10.00 40.00 84.46 45.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 20.00 60.00 72.58 60.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 52.00 50.00 87.90 65.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 30.00 42.00 70.00 30.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 20.00 45.00 91.63 35.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,261.00 54.63 64.82 54.63 STA006A-057 SH 6 EAST OF STERLING 04/06/17 20.00 45.00 46.27 40.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 25.00 55.00 126.00 126.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 80.00 65.00 127.13 116.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 200.00 70.00 50.42 51.26 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 10.00 110.00 58.99 60.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 20.00 51.00 143.77 125.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 400.00 50.00 53.24 127.02 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 110 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 80.00 54.00 44.06 36.30 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 40.00 80.00 61.67 60.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 20.00 60.00 54.56 48.67 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 26.00 50.00 95.00 95.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 42.00 40.00 55.00 50.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 90.00 50.00 55.50 40.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 40.00 40.01 138.41 45.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 10.00 90.00 62.50 40.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 10.00 100.00 29.89 48.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 10.00 65.00 44.05 35.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 5.00 75.00 61.30 40.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 5.00 55.00 62.00 76.00 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 20.00 60.00 40.00 40.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 20.00 70.00 51.40 50.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 40.00 50.00 77.68 50.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 40.00 40.00 36.80 32.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 8.00 25.00 55.00 55.00 ER0361-115 US 36 Bridges 06/22/17 220.00 55.00 38.22 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,481.00 56.11 54.04 74.12 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 40.00 50.00 47.80 35.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 20.00 60.00 91.00 82.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 40.00 60.00 40.50 28.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 40.00 75.00 85.00 85.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 50.00 55.00 52.98 60.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 60.00 65.00 83.75 60.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 20.00 85.00 63.33 70.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 40.00 60.00 42.65 48.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 50.00 50.00 66.86 62.33 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 140.00 66.00 124.00 50.00 MTCE131A-039 SH 131 MP 0.053-68.721 IN EAG 08/17/17 20.00 55.00 46.33 49.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 60.00 55.00 69.83 42.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1,200.00 42.99 50.00 50.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 140.00 50.00 40.67 38.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 6.00 50.00 56.33 34.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 2.00 75.00 57.67 50.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 40.00 55.00 54.20 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,968.00 49.15 55.44 50.87 STA094A-034 Critical Culvert Project on S 10/05/17 10.00 55.00 45.32 58.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 111 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 8.00 50.00 58.33 75.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 30.00 100.00 93.50 42.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 40.00 50.00 31.67 60.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 30.00 55.00 60.38 75.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 20.00 60.00 48.75 40.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 10.00 52.00 60.29 40.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 40.00 100.00 152.20 65.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 20.00 45.00 61.67 75.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 28.00 50.00 70.99 45.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 40.00 60.00 57.54 87.70 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 12.00 150.00 155.67 50.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 40.00 50.00 52.25 35.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 40.00 60.00 75.36 67.74 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 368.00 65.82 73.00 59.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,078.00 53.75 58.85 59.30 =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 8.00 65.00 132.94 135.00 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 145.00 92.00 224.52 183.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 20.00 100.00 81.93 162.15 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 8.00 200.00 129.88 16.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 240.00 120.00 127.00 150.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 200.00 100.00 104.59 63.00 STM0243-089 Midpoint: Station 1019+50 Cen STA0931-032 SH 93 Erosion Correction 02/09/17 20.00 100.00 117.17 45.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 60.00 100.00 125.01 105.02 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 40.00 120.00 121.67 167.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 60.00 125.00 99.00 60.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 4.00 140.00 119.90 137.70 SHE160A-031 SH 160 Passing Lanes 03/02/17 320.00 109.00 124.84 100.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 8.00 110.00 236.00 108.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 20.00 110.00 86.78 80.00 BR0252-449 I-25 Woodmen NB 03/02/17 35.00 110.00 102.50 65.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 20.00 105.00 120.63 138.88 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 5.00 99.30 387.59 125.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 20.00 110.00 110.00 110.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 4.00 100.00 161.32 65.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 28.00 100.00 181.00 200.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 30.00 95.00 80.00 50.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 20.00 60.00 168.87 212.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,315.00 107.21 129.59 119.56 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 112 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== STA006A-057 SH 6 EAST OF STERLING 04/06/17 20.00 90.00 90.04 75.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 15.00 100.00 241.00 241.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 80.00 120.00 242.26 220.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 80.00 120.00 152.92 153.77 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 10.00 175.00 140.00 125.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 10.00 97.00 223.42 238.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 400.00 50.00 115.80 112.97 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 80.00 110.00 98.40 100.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 40.00 150.00 108.33 150.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 10.00 120.00 118.18 89.54 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 13.00 100.00 155.00 155.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 42.00 85.00 65.00 50.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 20.00 110.00 116.25 110.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 20.00 175.00 60.00 35.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 10.00 150.00 43.84 65.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 108.00 92.00 182.51 182.41 STA0703-437 I-70: 32ND TO 44TH 06/01/17 10.00 120.00 103.75 110.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 5.00 125.00 149.20 135.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 5.00 112.00 145.00 225.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 10.00 160.00 89.20 50.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 40.00 120.00 208.63 50.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 10.00 140.00 50.60 48.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 8.00 135.00 135.00 135.00 ER0361-115 US 36 Bridges 06/22/17 220.00 110.00 106.60 89.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,266.00 93.75 119.87 120.56 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 20.00 130.00 96.00 95.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 20.00 110.00 70.50 41.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 8.00 140.00 132.50 125.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 40.00 150.00 160.00 160.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 25.00 135.00 142.38 150.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 60.00 175.00 93.75 80.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 8.00 200.00 132.00 150.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 40.00 150.00 69.13 65.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 100.00 120.00 110.30 96.32 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 124.00 115.50 165.50 115.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 60.00 115.00 113.00 69.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1,200.00 105.29 110.00 110.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 70.00 100.00 104.81 62.00 BRR400-354 Little-T Channel Work and SH COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 113 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 2.00 150.00 77.67 75.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 40.00 110.00 106.00 118.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,817.00 112.64 110.42 105.51 STA094A-034 Critical Culvert Project on S 10/05/17 10.00 110.00 105.30 125.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 8.00 125.00 121.33 75.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 40.00 120.00 63.00 93.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 20.00 110.00 136.65 160.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 10.00 110.00 139.58 110.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 40.00 150.00 225.60 110.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 20.00 80.00 123.33 100.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 40.00 120.00 148.57 107.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 188.00 120.21 145.13 109.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,586.00 106.18 121.93 113.73 =============== 208-00106 Sweeping (Sediment Removal) Hour =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 290.00 160.00 212.26 136.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 20.00 300.00 216.92 215.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 480.00 125.00 142.00 100.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 200.00 150.00 183.76 120.00 STM0243-089 Midpoint: Station 1019+50 Cen STA0931-032 SH 93 Erosion Correction 02/09/17 40.00 140.00 157.59 65.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 40.00 160.00 178.35 210.04 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 40.00 200.00 151.00 148.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 56.00 200.00 152.00 130.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 40.00 100.00 235.35 291.04 SHE160A-031 SH 160 Passing Lanes 03/02/17 330.00 150.00 162.59 87.50 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 20.00 150.00 236.00 145.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 4.00 150.00 321.75 75.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 20.00 145.00 135.80 160.00 BR0252-449 I-25 Woodmen NB 03/02/17 35.00 150.00 141.25 65.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 120.00 135.92 155.01 135.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 30.00 164.00 164.00 164.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 144.00 140.00 143.85 95.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 100.00 150.00 215.58 235.88 MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 40.00 140.00 145.00 20.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 40.00 200.00 181.80 200.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 24.00 160.00 152.80 150.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 38.00 135.92 171.33 204.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 114 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00106 Sweeping (Sediment Removal) Hour =================================================== STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 100.00 225.00 202.11 195.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,251.00 151.20 167.29 127.95 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 215.00 155.00 144.00 144.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 80.00 170.00 181.73 130.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 144.00 200.00 158.13 179.40 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 100.00 128.00 172.05 135.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 800.00 50.00 133.44 109.70 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 80.00 140.00 182.00 70.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 40.00 165.00 143.75 145.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 8.00 130.00 130.99 117.97 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 40.00 150.00 240.00 240.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 21.00 150.00 115.00 50.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 80.00 140.00 116.50 130.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 100.00 150.01 157.31 125.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 100.00 160.00 117.50 150.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 20.00 200.00 111.82 135.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 10.00 160.00 163.58 220.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 5.00 150.00 131.18 125.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 40.00 150.00 215.88 100.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 80.00 135.00 103.60 63.00 ER0361-115 US 36 Bridges 06/22/17 440.00 150.00 125.43 135.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 20.00 208.00 208.00 208.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,423.00 120.52 135.80 126.90 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 20.00 140.00 167.17 138.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 20.00 150.00 138.50 177.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 40.00 140.00 106.00 87.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 40.00 175.00 200.00 200.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 50.00 150.00 155.17 190.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 60.00 175.00 140.00 140.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 16.00 200.00 187.67 175.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 40.00 175.00 123.29 135.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 12.00 176.00 151.50 135.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 10.00 150.00 116.33 69.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 5.00 155.00 177.50 130.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1,800.00 170.00 175.00 175.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 120.00 140.00 152.27 140.00 BRR400-354 Little-T Channel Work and SH AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 8.00 150.00 93.00 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 115 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00106 Sweeping (Sediment Removal) Hour =================================================== SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 150.00 140.00 161.40 155.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,391.00 165.62 160.75 168.10 STA094A-034 Critical Culvert Project on S 10/05/17 10.00 145.00 127.04 125.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 16.00 150.00 165.83 100.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 50.00 165.00 147.50 45.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 40.00 150.00 69.67 93.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 18.00 200.00 172.63 90.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 40.00 165.00 189.76 150.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 28.00 125.00 104.38 58.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 12.00 150.00 106.50 100.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 4.00 150.00 101.67 100.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 40.00 160.00 248.58 232.91 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 2.00 102.39 79.44 79.44 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 20.00 120.00 179.38 125.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 40.00 155.00 171.10 155.17 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 320.00 154.39 163.18 118.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,385.00 145.94 150.69 140.35 =============== 208-00107 Rem Trash Hour =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 145.00 70.00 153.98 107.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 20.00 50.00 80.25 75.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 200.00 65.00 96.09 50.00 STM0243-089 Midpoint: Station 1019+50 Cen STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 40.00 80.00 109.17 52.51 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 40.00 100.00 112.00 136.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 40.00 100.00 92.00 95.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 4.00 100.00 71.00 87.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 20.00 80.00 72.82 160.00 BR0252-449 I-25 Woodmen NB 03/02/17 35.00 50.00 69.50 50.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 20.00 50.00 85.70 61.60 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 20.00 68.62 157.80 115.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 10.00 193.00 193.00 193.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 40.00 55.00 87.78 45.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 4.00 100.00 205.35 300.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 20.00 90.00 156.80 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 658.00 72.65 109.59 88.02 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 116 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00107 Rem Trash Hour =================================================== STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 50.00 95.00 164.00 164.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 20.00 100.00 84.59 153.77 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 30.00 75.00 121.64 120.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 300.00 75.00 86.48 133.95 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 80.00 87.00 53.52 39.60 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 26.00 75.00 48.00 48.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 20.00 90.00 212.25 40.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 5.00 100.00 59.00 100.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 2.00 145.00 28.89 45.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 93.00 90.00 62.60 35.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 10.00 100.00 98.76 110.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 5.00 150.00 102.28 105.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 16.00 220.00 127.00 50.00 ER0361-115 US 36 Bridges 06/22/17 24.00 85.00 49.72 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 681.00 86.17 85.76 99.13 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 20.00 50.00 67.24 75.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 10.00 60.00 45.67 23.33 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 50.00 55.00 76.82 65.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 25.00 82.00 87.67 48.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 4.00 85.00 67.50 40.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 600.00 143.20 190.00 190.00 NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 10.00 60.00 56.33 34.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 2.00 150.00 41.00 10.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 120.00 85.00 99.00 67.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 841.00 123.38 123.35 153.08 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 5.00 70.00 97.50 45.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 40.00 80.00 35.33 71.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 15.00 100.00 132.35 40.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 40.00 125.00 192.80 150.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 4.00 50.00 111.00 133.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 40.00 80.00 118.70 103.52 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 2.00 105.20 75.63 75.63 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 20.00 50.00 95.63 75.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 40.00 70.00 103.38 76.15 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 117 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00107 Rem Trash Hour =================================================== BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 206.00 84.76 118.22 92.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,386.00 95.43 101.22 115.66 =============== 208-00207 Erosion Control Management Day ==================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 145.00 150.00 277.27 137.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 100.00 220.00 559.13 610.26 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 12.00 175.00 301.50 500.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 75.00 200.00 159.16 100.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 150.00 215.00 237.25 300.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 400.00 150.00 186.07 33.00 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 60.00 85.00 180.00 30.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 20.00 200.00 365.36 135.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 60.00 250.00 258.10 95.90 STA0931-032 SH 93 Erosion Correction 02/09/17 25.00 200.00 215.50 150.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 20.00 200.00 258.33 452.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 200.00 450.00 203.60 50.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 120.00 180.00 332.92 394.74 SHE160A-031 SH 160 Passing Lanes 03/02/17 130.00 200.00 238.81 75.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 36.00 350.00 336.00 550.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 132.00 200.00 171.80 155.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 15.00 250.00 403.33 504.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 40.00 225.00 381.67 440.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 10.00 1200.00 254.30 95.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 190.00 214.00 357.51 471.75 MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 5.00 300.00 616.67 150.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 36.00 500.00 290.90 250.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 18.00 250.00 412.60 250.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 8.00 1200.00 585.00 405.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,007.00 230.10 251.31 226.70 STA006A-057 SH 6 EAST OF STERLING 04/06/17 30.00 150.00 307.54 510.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 85.00 225.00 340.00 340.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 80.00 250.00 360.38 330.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 150.00 300.00 200.84 102.51 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 70.00 300.00 335.23 309.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 300.00 300.00 159.77 238.53 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 218.00 300.00 224.80 109.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 118 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00207 Erosion Control Management Day ==================================================== STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 27.00 300.00 356.36 145.07 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 90.00 200.00 140.00 140.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 90.00 200.00 189.50 40.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 150.00 200.01 185.90 100.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 4.00 250.00 202.40 350.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 150.00 250.00 186.83 45.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 16.00 250.00 440.20 500.00 ER0361-115 US 36 Bridges 06/22/17 200.00 185.00 139.03 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,660.00 252.18 187.14 174.21 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 115.00 230.00 185.00 35.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 7.00 1000.00 549.50 870.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 23.00 165.00 222.50 115.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 40.00 275.00 285.00 285.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 160.00 200.00 138.85 115.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 7.00 500.00 493.33 380.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 225.00 300.00 290.12 380.65 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 50.00 235.00 225.50 339.97 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 41.00 200.00 300.00 300.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 12.00 250.00 317.00 250.00 CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 6.00 1.00 75.50 150.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 90.00 221.67 440.94 142.82 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 3.00 275.00 300.00 100.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 210.00 175.00 134.83 50.00 BRR400-354 Little-T Channel Work and SH AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 4.00 250.00 178.00 50.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 120.00 300.00 154.77 134.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,113.00 241.44 199.49 183.29 STA094A-034 Critical Culvert Project on S 10/05/17 14.00 305.00 167.99 125.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 16.00 225.00 246.67 16.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 10.00 150.00 440.00 280.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 200.00 250.00 98.67 120.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 20.00 300.00 303.43 290.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 50.00 300.00 205.06 175.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 205.00 250.00 289.80 325.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 100.00 250.00 188.33 100.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 28.00 225.00 736.21 150.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 5.00 300.00 656.75 400.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 35.00 320.00 498.67 585.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 683.00 257.13 258.49 214.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,463.00 242.50 218.38 199.41 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 119 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00300 Temporary Berms Lin Foot =============================================== STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 246.00 2.75 5.63 5.62 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 375.00 15.00 15.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 621.00 10.15 9.68 11.28 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 380.00 10.00 20.07 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 380.00 10.00 20.07 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,001.00 10.09 15.58 16.49 =============== 208-00301 Temporary Diversion Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 11,064.00 175.26 275.00 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,064.00 175.26 275.00 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,064.00 175.26 275.00 275.00 =============== 208-00303 Temporary Diversion (Special) Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 3,087.00 284.28 275.00 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,087.00 284.28 275.00 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,087.00 284.28 275.00 275.00 =============== 208-00400 Water Control LUMP SUM =============================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1.00 50000.00 39777.80 25000.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 6000.00 26360.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 28000.00 34187.05 13500.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 25000.00 41533.93 33500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 120 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00400 Water Control LUMP SUM =============================================== STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 1.00 15000.00 14559.30 15177.90 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 1.00 30000.00 13450.60 2500.00 ER0361-115 US 36 Bridges 06/22/17 1.00 75000.00 124785.60 150000.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 1.00 339940.00 339940.00 339940.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 96988.00 62888.58 108223.58 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1.00 20000.00 35647.33 10942.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 20000.00 35647.33 10942.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 70117.50 52742.34 72382.49 =============== 208-00500 Swale Protect Type 1 Lin Foot =============================================== ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 40.00 40.45 40.45 40.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 40.45 40.45 40.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 40.45 40.45 40.45 =============== 208-00521 Temp Stream Crossing Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 139501.45 230000.00 230000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 139501.45 230000.00 230000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 139501.45 230000.00 230000.00 =============== 210-00001 Res Structure Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 1500.00 2260.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 2260.00 2500.00 ER0361-115 US 36 Bridges 06/22/17 3.00 1500.00 1277.87 620.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1500.00 1277.87 620.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 121 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00001 Res Structure Each =================================================== ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1.00 1500.00 3616.67 3100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1500.00 3616.67 3100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1500.00 1736.60 1492.00 =============== 210-00010 Res Mailbox Str Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 250.00 351.60 516.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 250.00 351.60 516.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 18.00 2035.24 3800.00 3800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 2035.24 3800.00 3800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 1941.28 3050.35 3627.16 =============== 210-00011 Res Mailbox Str (Ty 1) Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 4.00 500.00 332.59 350.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 43.00 250.00 166.75 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 47.00 271.28 174.12 185.32 STA006A-057 SH 6 EAST OF STERLING 04/06/17 4.00 225.00 327.02 260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 225.00 327.02 260.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 51.00 267.65 180.63 191.18 =============== 210-00012 Res Mailbox Str (Ty 2) Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 1.00 550.00 435.12 450.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 122 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00012 Res Mailbox Str (Ty 2) Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 3.00 300.00 362.50 300.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 4.00 400.00 424.73 408.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 381.25 396.81 372.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 381.25 396.81 372.75 =============== 210-00013 Res Mailbox Str (Ty 3) Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 3.00 450.00 518.25 500.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 2.00 425.00 475.23 433.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 440.00 503.91 473.40 ER0361-115 US 36 Bridges 06/22/17 1.00 550.00 425.00 565.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 550.00 425.00 565.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 458.33 484.18 488.67 =============== 210-00014 Res Mailbox Str (Ty 4) Each =================================================== NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 40.00 350.00 475.74 459.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 350.00 475.74 459.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 350.00 475.74 459.00 =============== 210-00015 Res End Section Each =================================================== SHE160A-031 SH 160 Passing Lanes 03/02/17 1.00 500.00 716.04 625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 500.00 716.04 625.00 ER0361-115 US 36 Bridges 06/22/17 1.00 1500.00 704.96 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1500.00 704.96 700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1000.00 711.29 662.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 123 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00030 Res Water Service Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 3500.00 1975.00 2700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3500.00 1975.00 2700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3500.00 1975.00 2700.00 =============== 210-00037 Reset Irrigation Pump Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 30.00 789.84 1300.00 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 789.84 1300.00 1300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 789.84 1300.00 1300.00 =============== 210-00060 Res Marker Each =================================================== STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 4.00 200.00 358.37 525.10 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1.00 500.00 179.80 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 260.00 305.85 470.08 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 2.00 500.00 260.00 415.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 500.00 260.00 415.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 328.57 297.11 454.34 =============== 210-00065 Res Monument (Ty 3A) Each =================================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 4.00 750.00 1035.00 1080.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 750.00 1035.00 1080.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 30.00 2500.00 2625.00 2625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 2500.00 2625.00 2625.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 2294.12 2170.71 2443.24 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 124 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00090 Res Delineator Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 4.00 50.00 41.61 100.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 11.00 25.00 22.90 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 31.67 27.12 45.73 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 2.00 200.00 83.37 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 200.00 83.37 50.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 1.00 90.00 165.00 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 90.00 165.00 54.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 53.61 38.55 46.67 =============== 210-00425 Res Bridge Railing Lin Foot =============================================== STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 20.00 110.00 222.13 371.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 110.00 222.13 371.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 110.00 222.13 371.39 =============== 210-00473 Res TV Cameras Each =================================================== STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 4.00 1000.00 1341.00 1260.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 1200.00 850.00 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 1040.00 1317.62 1178.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 2.00 1000.00 2090.17 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1000.00 2090.17 1250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 1028.57 1598.55 1198.57 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 125 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00476 Reset MVRD Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2.00 2000.00 1662.18 1765.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 4.00 1000.00 1795.00 1680.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 1333.33 1722.55 1708.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1333.33 1722.55 1708.33 =============== 210-00479 Res Radio Com Antenna Each =================================================== STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 1.00 700.00 671.00 671.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 1000.00 850.00 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 850.00 760.50 760.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 850.00 760.50 760.50 =============== 210-00500 Reb Port Present Str Each =================================================== NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 4.00 5000.00 1587.50 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 5000.00 1587.50 1300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 5000.00 1587.50 1300.00 =============== 210-00510 Reb Port Present Str LUMP SUM =============================================== ER0361-115 US 36 Bridges 06/22/17 1.00 10000.00 11827.78 7350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 10000.00 11827.78 7350.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 1.00 5000.00 10009.00 9500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 10009.00 9500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 7500.00 11001.06 8425.00 =============== 210-00520 Reb Port Present Str Sq Yard ================================================ NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 47.00 200.00 1070.45 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 47.00 200.00 1070.45 1200.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 126 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00520 Reb Port Present Str Sq Yard ================================================ STA0703-437 I-70: 32ND TO 44TH 06/01/17 2.00 2000.00 5772.45 11900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2000.00 5772.45 11900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 49.00 273.47 1439.23 1636.73 =============== 210-00530 Rebuild Port of Present Str Sq Foot ================================================ BR0252-449 I-25 Woodmen NB 03/02/17 4.00 2153.00 606.25 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 2153.00 606.25 525.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 24.00 350.00 389.92 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24.00 350.00 389.92 1000.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 24.00 450.00 814.14 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24.00 450.00 814.14 900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 534.85 651.30 917.31 =============== 210-00750 Res Light Standard Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 1.00 1500.00 3930.00 5000.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 6.00 2000.00 460.00 405.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 3.00 1350.00 2285.52 1666.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 1755.00 1454.70 1243.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 26.00 1200.00 650.00 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.00 1200.00 650.00 650.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 127 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00750 Res Light Standard Each =================================================== IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 4.00 2500.00 2000.00 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 2500.00 2000.00 1200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 1468.75 1304.92 853.25 =============== 210-00760 Res Luminaire Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2.00 300.00 381.84 320.00 STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 300.00 381.84 320.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 300.00 381.84 320.00 =============== 210-00810 Res Ground Sign Each =================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 3.00 360.00 337.99 261.50 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 23.00 215.00 284.45 159.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 10.00 300.00 287.55 275.10 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 11.00 225.00 194.25 200.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1.00 500.00 459.03 230.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 8.00 275.00 246.25 139.26 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 23.00 300.00 202.00 260.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 7.00 360.00 390.69 388.89 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 2.00 275.00 269.20 210.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 4.00 237.00 457.69 437.98 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 5.00 350.00 342.50 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 97.00 276.99 275.70 249.85 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 4.00 250.00 230.00 230.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 7.00 250.00 215.08 150.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 3.00 400.00 344.73 364.18 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 2.00 110.00 452.37 367.50 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 15.00 450.00 598.33 600.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 3.00 350.00 325.00 325.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 128 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00810 Res Ground Sign Each =================================================== NHPPC120-026 US 85: I-76 to 168th 05/04/17 96.00 180.01 103.70 100.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 2.00 800.00 440.00 100.00 ER0361-115 US 36 Bridges 06/22/17 2.00 300.00 402.25 396.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 134.00 234.71 195.14 181.82 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 6.00 260.00 200.00 200.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1.00 350.00 325.00 325.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 3.00 280.00 525.00 400.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 13.00 100.00 333.33 400.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 12.00 300.00 276.04 308.00 BRR400-354 Little-T Channel Work and SH SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 6.00 200.00 293.02 102.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 41.00 215.85 287.46 298.37 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 1.00 215.00 200.00 250.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 13.00 300.00 185.33 275.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 5.00 200.00 412.50 437.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19.00 269.21 246.71 316.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 291.00 248.40 247.67 229.71 =============== 210-00815 Res Sign Panel Each =================================================== STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 2.00 300.00 171.34 241.02 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 10.00 300.00 236.00 338.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 5.00 170.00 97.36 52.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 4.00 250.00 230.00 120.00 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 10.00 100.00 81.25 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 31.00 208.06 146.48 190.39 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 1.00 300.00 153.00 153.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 8.00 300.00 154.23 75.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 5.00 180.00 176.15 88.44 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 129 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00815 Res Sign Panel Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2.00 150.00 79.47 33.10 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 24.00 200.00 283.33 210.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 8.00 300.00 124.48 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 48.00 231.25 201.04 151.28 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 5.00 250.00 235.00 235.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 1.00 216.00 185.00 150.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 60.00 263.00 263.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 13.00 105.00 143.33 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 144.55 157.40 131.40 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 150.00 86.67 109.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 200.00 130.80 122.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 175.00 108.73 115.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 101.00 205.85 173.46 158.64 =============== 210-00825 Res Flashing Beacon Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 8.00 2000.00 720.00 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 2000.00 720.00 240.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 3.00 2000.00 1838.37 2206.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 2000.00 1838.37 2206.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 2000.00 1494.26 776.18 =============== 210-00827 Res Pull Box Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 135.00 650.00 253.50 195.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 130 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00827 Res Pull Box Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 500.00 451.00 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 136.00 648.90 255.91 196.51 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 14.00 550.00 177.00 177.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 3.00 550.00 399.53 380.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 4.00 348.00 707.50 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21.00 511.52 378.51 267.52 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 2.00 650.00 490.00 480.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 700.00 759.00 776.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 666.67 605.29 578.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 160.00 631.20 269.85 212.99 =============== 210-00831 Res Traf Sig Head Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 24.00 1500.00 780.00 360.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 1500.00 780.00 360.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 4.00 300.00 341.76 270.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 8.00 600.00 917.00 236.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 500.00 533.51 247.33 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 2.00 3880.95 5280.00 5280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 3880.95 5280.00 5280.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38.00 1309.52 708.30 583.37 =============== 210-00840 Res Traf Sig Pole Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2.00 3000.00 4193.14 2510.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 131 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00840 Res Traf Sig Pole Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3000.00 4193.14 2510.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3000.00 4193.14 2510.00 =============== 210-00847 Res Trav Time Ind Each =================================================== ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 2.00 1000.00 2415.17 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1000.00 2415.17 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1000.00 2415.17 1500.00 =============== 210-00848 Res Traf Sig Control+Cab Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 3500.00 2515.84 2427.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3500.00 2515.84 2427.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3500.00 2515.84 2427.63 =============== 210-00860 Res Ped Push Button Each =================================================== STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 2.00 100.00 1450.00 1450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 100.00 1450.00 1450.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 100.00 1450.00 1450.00 =============== 210-00865 Res Ped Sig Head Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2.00 300.00 266.24 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 300.00 266.24 220.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 300.00 266.24 220.00 =============== 210-00867 Res Fire Preempt Unit Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 700.00 916.00 815.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 132 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00867 Res Fire Preempt Unit Each =================================================== SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 4.00 800.00 1008.33 375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 766.67 966.36 521.67 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2.00 1000.00 1050.00 1050.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 2.00 700.00 544.52 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 850.00 670.89 787.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 800.00 887.57 628.00 =============== 210-00890 Res Int Detect Sys (Camera) Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 5.00 750.00 1157.89 1213.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 3.00 800.00 1050.00 1050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 768.75 1152.75 1151.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 768.75 1152.75 1151.88 =============== 210-01000 Res Fence Lin Foot =============================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 25.00 25.00 120.91 95.50 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 20.00 40.00 46.35 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 45.00 31.67 78.30 55.72 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1,117.00 6.00 7.82 7.45 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 62.00 25.00 104.50 90.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 144.00 7.00 13.86 8.58 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 30.00 20.00 19.37 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,353.00 7.29 9.81 11.63 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 335.00 19.40 9.00 7.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 133 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01000 Res Fence Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 60.00 20.00 153.00 153.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 395.00 19.49 17.11 29.18 STA094A-034 Critical Culvert Project on S 10/05/17 76.00 20.00 10.51 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 76.00 20.00 10.51 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,869.00 10.97 11.07 16.21 =============== 210-01011 Res Gate Each =================================================== ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1.00 620.00 900.00 600.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1.00 1000.00 408.63 366.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 810.00 513.92 483.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 810.00 513.92 483.00 =============== 210-01050 Res C L Fence Lin Foot =============================================== STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 13.00 20.00 60.41 36.24 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 520.00 20.00 17.00 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 533.00 20.00 20.03 17.47 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 62.00 35.00 25.64 23.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 62.00 35.00 25.64 23.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 595.00 21.56 23.11 18.05 =============== 210-01130 Res Gdrail Ty 3 Lin Foot =============================================== NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 50.00 8.80 155.00 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 8.80 155.00 130.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 8.80 155.00 130.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 134 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01180 Reset Guardrail (Special) Lin Foot =============================================== NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 890.00 12.00 15.62 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 890.00 12.00 15.62 10.00 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 11,700.00 2.77 3.38 3.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11,700.00 2.77 3.38 3.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,590.00 3.42 6.75 3.85 =============== 210-01190 Reset Tensioned Cable Barrier Lin Foot =============================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1,270.00 55.00 18.81 15.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,270.00 55.00 18.81 15.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,270.00 55.00 18.81 15.44 =============== 210-01200 Res End Anchorage Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 4.00 2000.00 1009.08 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 2000.00 1009.08 450.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 1.00 2000.00 2029.72 2289.15 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 1.00 2000.00 2850.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2000.00 2357.83 3644.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 2000.00 1527.83 1514.86 =============== 210-02510 Relay Sprinkler System LUMP SUM =============================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 6000.00 3690.33 5470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 6000.00 3690.33 5470.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 6000.00 3690.33 5470.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 135 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-02900 Relay Riprap Cubic Yard ============================================= STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 679.00 50.00 37.83 53.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 679.00 50.00 37.83 53.46 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 60.00 100.00 34.60 70.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 100.00 34.60 70.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 739.00 54.06 37.59 54.80 =============== 210-03100 Replace Conc Pvmt Sq Yard ================================================ NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 998.00 500.00 340.67 255.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 998.00 500.00 340.67 255.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 998.00 500.00 340.67 255.00 =============== 210-04000 Adj Structure Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 5.00 2250.00 3317.66 1200.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 17.00 650.00 2061.67 2400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 1013.64 2347.12 2127.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 1013.64 2347.12 2127.27 =============== 210-04010 Adj Manhole Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 334.00 1100.00 893.39 750.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 18.00 500.00 2491.67 3000.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 15.00 700.00 777.50 750.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 38.00 800.00 1583.40 1050.19 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 5.00 600.00 1164.00 500.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 3.00 650.00 740.10 940.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 28.00 850.00 742.64 550.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 136 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04010 Adj Manhole Each =================================================== STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 8.00 800.00 1511.28 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 449.00 1007.68 1013.16 877.45 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 101.00 500.00 664.00 664.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 148.00 900.00 822.24 1090.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 99.00 500.00 732.43 700.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 2.00 1200.00 1101.67 720.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 8.00 800.00 800.00 800.00 ER0361-115 US 36 Bridges 06/22/17 6.00 800.00 555.46 395.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 364.00 678.02 754.01 845.86 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 32.00 850.00 650.00 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 32.00 850.00 650.00 650.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 1.00 1100.00 525.00 550.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 10.00 800.00 628.67 865.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 10.00 850.00 986.38 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21.00 838.10 844.26 1033.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 866.00 859.18 917.42 859.55 =============== 210-04015 Modify Manhole Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 12.00 1500.00 2523.91 1210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 1500.00 2523.91 1210.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2.00 1500.00 1825.00 1825.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1500.00 1825.00 1825.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 1500.00 2487.13 1297.86 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 137 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04020 Modify Inlet Each =================================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 40.00 510.00 3389.38 3387.50 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 1.00 3000.00 2418.00 1420.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 41.00 570.73 3350.52 3339.51 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 3.00 3000.00 5976.43 6700.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 3.00 2000.00 3360.00 1000.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 1.00 6000.00 5918.33 4200.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 1.00 2000.00 3446.25 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 2875.00 4207.09 3725.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 4.00 1800.00 2925.42 1776.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1800.00 2925.42 1776.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 53.00 1011.32 3464.96 3279.72 =============== 210-04025 Modify Structure Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 1000.00 1825.00 1825.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 1825.00 1825.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 1825.00 1825.00 =============== 210-04027 Modify Str (Spec) Each =================================================== NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 1.00 15000.00 36594.82 27858.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 15000.00 36594.82 27858.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 36594.82 27858.06 =============== 210-04030 Modify Guardrail Lin Foot =============================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 400.00 27.00 25.90 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 400.00 27.00 25.90 22.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 138 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04030 Modify Guardrail Lin Foot =============================================== STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 10,957.00 10.00 4.97 4.16 STA0703-437 I-70: 32ND TO 44TH 06/01/17 5,256.00 20.00 7.80 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,213.00 13.24 6.07 4.43 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 200.00 8.00 14.56 13.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 8.00 14.56 13.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,813.00 13.51 6.45 4.96 =============== 210-04035 Modify Guardrail (Spec) Lin Foot =============================================== SHE160A-031 SH 160 Passing Lanes 03/02/17 625.00 15.00 8.86 10.11 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 11,977.00 8.00 2.41 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,602.00 8.35 3.02 2.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,602.00 8.35 3.02 2.88 =============== 210-04050 Adj Valve Box Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 345.00 800.00 560.00 650.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 3.00 250.00 1208.33 1100.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 82.00 250.00 462.00 350.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 41.00 400.00 1013.38 840.15 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 5.00 500.00 560.00 250.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 12.00 342.00 442.85 250.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 2.00 275.00 1597.28 493.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 490.00 654.70 579.09 603.95 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 155.00 350.00 362.00 362.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 160.00 500.00 520.10 690.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 139 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04050 Adj Valve Box Each =================================================== STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 91.00 350.00 488.34 450.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 6.00 1400.00 1200.00 360.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 4.00 250.00 280.00 280.00 ER0361-115 US 36 Bridges 06/22/17 6.00 400.00 380.96 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 422.00 421.56 486.72 503.65 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 8.00 500.00 400.00 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 500.00 400.00 400.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 8.00 400.00 175.33 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 400.00 175.33 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 928.00 545.16 543.61 552.58 =============== 210-04200 Adj Gdrail Lin Foot =============================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 450.00 10.00 8.23 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 450.00 10.00 8.23 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 450.00 10.00 8.23 6.00 =============== 211-00100 Drilling Hole Lin Foot =============================================== STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 240.00 40.00 61.63 47.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 240.00 40.00 61.63 47.20 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1,785.00 436.89 525.00 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,785.00 436.89 525.00 525.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,025.00 389.85 362.95 468.37 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 140 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 211-00225 4 Inch Core Drilled Hole Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 643.00 195.35 235.00 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 643.00 195.35 235.00 235.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 643.00 195.35 235.00 235.00 =============== 211-01115 Rock Reinf (No.10) Lin Foot =============================================== ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 500.00 94.00 94.00 94.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 500.00 94.00 94.00 94.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 1,925.00 150.00 167.67 196.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,925.00 150.00 167.67 196.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,425.00 138.45 161.80 174.97 =============== 211-01300 Rock Anchor Each =================================================== IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 6.00 2000.00 3610.41 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 2000.00 3610.41 4500.00 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 98.00 2500.00 2737.50 1250.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 4.00 1500.00 2093.17 3967.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 102.00 2460.78 2700.33 1356.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 108.00 2435.19 2772.81 1531.20 =============== 211-02275 Cement Grout Cubic Yard ============================================= STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 20.00 300.00 575.17 974.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 300.00 575.17 974.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 141 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 211-02275 Cement Grout Cubic Yard ============================================= NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 77.00 500.00 1399.74 1150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 77.00 500.00 1399.74 1150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 97.00 458.76 1304.96 1113.71 =============== 211-02277 Cement Grout (Voids) Cubic Yard ============================================= NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 85.00 550.00 1025.00 1900.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 8.00 500.00 1566.67 2800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 93.00 545.70 1092.01 1977.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93.00 545.70 1092.01 1977.42 =============== 211-03005 Dewatering LUMP SUM =============================================== ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 1.00 178100.00 178100.00 178100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 178100.00 178100.00 178100.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 25000.00 37099.32 13700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 25000.00 37099.32 13700.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1.00 10000.00 41233.33 42600.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 1551626.05 5000000.00 5000000.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1.00 80000.00 112263.64 110000.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 547208.68 423906.67 1717533.33 STA094A-034 Critical Culvert Project on S 10/05/17 1.00 10000.00 6402.38 5000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 142 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 211-03005 Dewatering LUMP SUM =============================================== CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 1.00 64723.65 10000.00 10000.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 1.00 57500.00 59246.65 28559.92 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 53827.48 50062.28 21817.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 166369.52 120697.06 395768.54 =============== 212-00005 Seeding (Native) Pound ================================================== STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 0.10 250.00 6465.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.10 250.00 6465.00 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.10 250.00 6465.00 2000.00 =============== 212-00006 Seeding (Native) Acre =================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 0.50 1500.00 1513.14 1000.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 7.00 1200.00 2430.73 2461.45 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 16.00 550.00 211.76 200.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 0.20 3000.00 7087.50 2000.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 38.00 700.00 790.22 440.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 0.23 4000.00 5576.73 4000.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 0.40 2000.00 11539.14 1888.00 STA0931-032 SH 93 Erosion Correction 02/09/17 0.45 3000.00 3001.17 1725.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 0.90 5000.00 1350.02 662.57 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.27 4300.00 957.20 761.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 0.50 6000.00 1572.80 1279.08 SHE160A-031 SH 160 Passing Lanes 03/02/17 9.34 635.00 585.49 635.56 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 0.36 5000.00 2730.00 2100.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 0.84 3000.00 1122.62 1350.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 13.40 900.00 328.25 315.00 BR0252-449 I-25 Woodmen NB 03/02/17 0.60 2500.00 6075.00 2500.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 0.20 5000.00 6625.00 5600.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 0.10 915.91 10916.62 9300.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 0.15 10000.00 10291.32 5200.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 0.90 1000.00 10195.19 12088.58 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 0.10 8000.00 11450.00 6850.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1.00 1000.00 1895.00 925.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 0.10 1000.00 11788.33 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 93.54 1012.22 1022.30 891.76 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 143 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00006 Seeding (Native) Acre =================================================== STA006A-057 SH 6 EAST OF STERLING 04/06/17 0.50 850.00 2258.37 2100.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 0.02 1000.00 83300.00 83300.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 0.10 1000.00 50152.85 45600.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 14.40 500.00 964.88 943.46 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 15.00 730.00 1109.82 866.25 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 0.20 12000.00 16256.67 16800.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 0.49 1700.00 1672.66 1517.99 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 16.30 750.00 875.00 875.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 0.10 7500.00 5600.00 2800.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 1.30 1000.00 1194.50 840.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 14.40 1000.00 1767.05 2190.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 135.00 500.00 227.03 250.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 0.20 2500.00 3745.00 6425.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 0.30 3000.00 4922.20 15000.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 0.70 3000.00 6660.00 15000.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 0.10 8000.00 5990.00 3100.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 0.29 3000.00 4864.20 2258.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 0.10 1500.00 2400.00 2400.00 ER0361-115 US 36 Bridges 06/22/17 5.85 800.00 1138.69 1400.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 0.75 1195.00 1195.00 1195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 206.10 625.90 817.58 704.15 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 6.00 1000.00 1870.00 1300.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 0.72 800.00 2757.00 3200.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 0.01 15000.00 61000.00 65000.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 0.20 4000.00 6000.00 6000.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 4000.00 1506.67 1100.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 0.10 3000.00 6175.00 8050.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 0.10 5000.00 6936.67 6400.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 11.00 1500.00 1413.79 1800.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 2.62 1000.00 994.49 849.92 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1.00 1750.00 883.33 900.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 2.40 1300.00 1487.42 2000.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 1.30 902.00 11500.00 3000.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1.20 723.33 2950.00 1750.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 27.60 365.00 384.00 384.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 11.20 1000.00 653.15 543.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 0.20 10000.00 5158.33 2350.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 0.12 10000.00 1833.33 2500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 144 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00006 Seeding (Native) Acre =================================================== AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 0.10 2000.00 3330.00 3100.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 0.10 700.00 19962.86 9200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 66.97 942.22 1173.01 999.04 STA094A-034 Critical Culvert Project on S 10/05/17 0.30 1000.00 3260.79 2500.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 0.35 4000.00 7246.67 714.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.40 2000.00 1183.67 2365.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 0.60 2000.00 1887.44 2070.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1.00 1200.00 1257.96 900.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 0.50 1500.00 3666.67 3000.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 0.80 5000.00 14359.00 4700.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 0.38 5000.00 2539.00 2375.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 5.07 800.00 877.79 446.00 BR3852-018 POA SCOUR US 385 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 1.00 900.00 2529.17 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.40 1623.33 2315.28 1436.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 378.01 807.62 1025.29 821.37 =============== 212-00007 Seeding (Native) (Hydraulic) Acre =================================================== NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 0.50 5000.00 2147.00 289.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.50 5000.00 2147.00 289.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.50 5000.00 2147.00 289.00 =============== 212-00009 Seeding (Temporary) Acre =================================================== STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 15.00 630.00 395.68 446.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15.00 630.00 395.68 446.25 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 2.23 750.00 680.54 623.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.23 750.00 680.54 623.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.23 645.53 475.09 469.16 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 145 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00011 Seeding (Lawn) Acre =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 0.10 4300.00 8046.40 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.10 4300.00 8046.40 11000.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 0.01 20000.00 9309.17 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.01 20000.00 9309.17 8000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.11 5188.68 8090.28 10830.19 =============== 212-00012 Seeding (Furnished) Acre =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 21.20 60.00 63.00 63.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21.20 60.00 63.00 63.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.20 60.00 63.00 63.00 =============== 212-00022 Seeding (Riparian) Acre =================================================== ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 3.40 4060.00 4060.00 4060.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.40 4060.00 4060.00 4060.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 4.30 1850.00 861.00 861.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 0.87 1500.00 1340.39 750.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.17 1791.10 1191.77 842.32 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 6.00 11000.00 1091.35 900.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 1.53 1534.69 1587.58 1587.58 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 0.28 3000.00 2832.71 474.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 146 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00022 Seeding (Riparian) Acre =================================================== BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.81 8858.91 1197.00 1019.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.38 5631.99 1367.22 1594.66 =============== 212-00028 Seeding (Wetlands) Acre =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 0.20 4300.00 9860.00 7700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.20 4300.00 9860.00 7700.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 0.02 3000.00 40103.05 36809.14 ER0361-115 US 36 Bridges 06/22/17 0.16 5000.00 5967.63 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.18 4771.43 8036.44 14835.33 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 0.10 8000.00 15866.67 9000.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 0.10 7000.00 37200.00 24400.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 13.30 1850.00 2310.00 2310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.50 1933.70 3110.36 2523.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.88 2003.60 3846.68 2753.09 =============== 212-00032 Soil Conditioning Acre =================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 0.50 1000.00 2807.31 3000.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 7.00 1200.00 973.50 747.00 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 16.00 2500.00 925.50 100.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 0.20 3000.00 13522.50 7000.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 38.00 2500.00 2660.29 1875.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 0.23 8000.00 10204.56 4000.00 STA0931-032 SH 93 Erosion Correction 02/09/17 0.45 3500.00 6850.51 5150.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 0.90 5000.00 6097.07 2699.96 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 0.50 3000.00 5394.33 3940.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.37 4300.00 3980.00 3500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 147 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00032 Soil Conditioning Acre =================================================== NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 0.50 6000.00 5400.10 5518.20 SHE160A-031 SH 160 Passing Lanes 03/02/17 9.34 2770.00 3036.97 3794.44 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 0.36 6000.00 8042.00 7500.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 0.84 3000.00 4693.13 7250.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 13.40 3000.00 775.95 495.00 BR0252-449 I-25 Woodmen NB 03/02/17 0.60 2500.00 10812.50 2500.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 0.10 2277.89 18904.99 6000.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 0.15 10000.00 20466.53 20500.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 0.10 7000.00 15335.00 14550.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1.00 3000.00 4624.00 3500.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 0.10 3000.00 21838.33 52000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 92.64 2645.57 2561.35 1768.59 STA006A-057 SH 6 EAST OF STERLING 04/06/17 0.50 2732.00 3807.34 1100.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 0.02 3000.00 137700.00 137700.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 14.40 3000.00 2998.83 2913.15 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 15.00 2700.00 2972.40 2772.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 0.20 15000.00 18458.33 19200.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 0.49 3000.00 8703.76 8011.27 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 16.30 1500.00 3800.00 3800.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 0.10 10000.00 5600.00 2800.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 1.30 2800.00 2622.50 2400.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 0.01 20000.00 15386.67 8000.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 32.00 2550.00 3010.74 2780.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 0.30 6000.00 8857.00 15000.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 0.70 8000.00 4910.00 10000.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 0.10 10000.00 5990.00 3100.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 0.29 4000.00 7447.20 5400.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 0.10 4000.00 6700.00 6700.00 ER0361-115 US 36 Bridges 06/22/17 6.01 3000.00 2636.39 1800.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 6.00 6350.00 6350.00 6350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 93.81 2840.61 3154.43 3319.06 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 6.00 1600.00 4280.00 4600.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 0.72 2700.00 2757.00 3200.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 0.01 20000.00 61000.00 65000.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 6000.00 1713.00 2450.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 0.10 10000.00 6175.00 8050.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 0.10 9000.00 3483.33 3550.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 11.00 3000.00 1939.81 2124.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 148 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00032 Soil Conditioning Acre =================================================== BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 2.62 2800.00 3082.03 3682.97 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 2.40 2800.00 2580.58 2300.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 1.30 4290.00 13500.00 7000.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1.20 2658.33 7400.00 2500.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 53.10 5150.00 5410.00 5410.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 11.20 2500.00 2603.48 2610.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 0.20 10000.00 8036.00 2333.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 0.10 2000.00 8533.33 3100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 91.05 4164.00 3315.44 4416.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 0.35 4000.00 6649.50 714.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.40 5000.00 3278.67 6940.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 0.60 3000.00 3294.10 5200.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 8.00 3000.00 4103.31 3500.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 0.80 6000.00 10158.50 5900.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 0.38 5000.00 2789.00 2375.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 1.83 2340.01 3070.00 3070.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 5.35 2600.00 3314.00 2338.00 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.71 3158.32 3995.24 3465.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 296.21 3206.47 3091.35 3277.34 =============== 212-00050 Sod Sq Foot ================================================ STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 300.00 5.00 3.55 3.50 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 29,565.00 1.25 1.63 1.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29,865.00 1.29 1.65 1.42 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 7,218.00 1.00 0.80 0.80 STAR400-348 Region 4 Controller and Cabin 05/04/17 282.00 2.50 5.00 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,500.00 1.06 1.10 0.81 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 800.00 5.00 5.00 4.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 149 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00050 Sod Sq Foot ================================================ AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 412.00 5.00 4.50 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,212.00 5.00 4.78 3.83 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 372.00 2.00 2.23 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 372.00 2.00 2.23 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38,949.00 1.37 1.68 1.40 =============== 212-00900 Compost Cubic Yard ============================================= ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 260.00 125.00 39.34 40.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 260.00 125.00 39.34 40.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 427.00 15.15 15.15 15.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 427.00 15.15 15.15 15.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 687.00 56.72 36.20 24.55 =============== 212-01200 Landscape Restoration LUMP SUM =============================================== SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 1.00 7500.00 13400.00 12700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 7500.00 13400.00 12700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 7500.00 13400.00 12700.00 =============== 213-00000 Mulching Acre =================================================== ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1.00 1750.00 1775.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1750.00 1775.00 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1750.00 1775.00 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 150 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 16.00 750.00 1.02 1.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 34.00 750.00 493.26 311.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 0.23 3000.00 7071.62 4000.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 13.40 900.00 360.45 405.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 0.10 748.69 17271.77 7050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 63.73 789.66 459.86 264.39 STA006A-057 SH 6 EAST OF STERLING 04/06/17 0.50 850.00 2258.37 2100.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 7.50 750.00 828.47 584.84 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 0.20 12000.00 18075.00 18600.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 14.40 800.01 1676.92 962.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 0.01 10000.00 11235.00 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 22.61 886.05 1189.09 1019.95 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 1.30 2695.00 9000.00 5500.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 0.20 625.00 4166.67 5000.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 0.12 10000.00 750.00 750.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 0.10 2000.00 2196.67 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.72 2923.55 6950.52 4840.12 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 8.00 2000.00 750.53 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 2000.00 750.53 550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 96.06 951.36 797.51 608.90 =============== 213-00003 Mulching (Weed Free) Acre =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 7.00 1000.00 1868.16 1836.32 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 0.90 5000.00 2144.59 696.28 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.37 4300.00 1125.20 761.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 151 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00003 Mulching (Weed Free) Acre =================================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 0.84 1500.00 1436.83 1650.00 BR0252-449 I-25 Woodmen NB 03/02/17 0.60 1500.00 8500.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.71 2036.81 2070.48 1474.85 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 0.10 1500.00 24826.14 22600.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 14.00 1200.00 540.00 540.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 0.20 2000.00 3445.00 4000.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 0.29 2500.00 5534.60 2233.00 ER0361-115 US 36 Bridges 06/22/17 0.05 1500.00 20148.20 37000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.64 1239.75 1772.26 896.01 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 0.72 1000.00 2757.00 3200.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 0.20 40000.00 6000.00 6000.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 0.10 1000.00 6175.00 8050.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 4.85 750.00 869.13 679.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.87 2122.23 943.19 1295.85 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 5.35 800.00 1186.29 615.00 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.35 800.00 1186.29 615.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37.57 1563.44 1341.77 1098.88 =============== 213-00004 Mulching (Weed Free Straw) Acre =================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 0.50 2000.00 1175.59 1000.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 0.50 550.00 1616.59 1559.58 SHE160A-031 SH 160 Passing Lanes 03/02/17 9.34 595.00 650.51 875.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.34 660.76 682.46 914.65 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 0.37 1500.00 2536.71 2310.13 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 152 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00004 Mulching (Weed Free Straw) Acre =================================================== STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 38.00 880.00 444.03 410.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 0.30 2000.00 2455.40 600.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 0.10 2000.00 1900.00 1900.00 ER0361-115 US 36 Bridges 06/22/17 0.58 2500.00 2101.96 3300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 39.35 921.09 580.97 475.70 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 6.00 1000.00 1300.00 1000.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 8.50 900.00 544.83 415.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.50 941.38 728.27 657.07 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 1.00 650.00 1493.33 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 650.00 1493.33 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65.19 880.15 689.99 593.71 =============== 213-00007 Mulching (Wood Strand) Acre =================================================== STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 1.00 5500.00 1299.60 1200.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 6.00 8265.00 8265.00 8265.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 7870.00 6523.65 7255.71 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 5.70 9700.00 10185.00 10185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.70 9700.00 10185.00 10185.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 0.93 8030.45 7800.00 7800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.93 8030.45 7800.00 7800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.63 8646.24 8031.29 8517.87 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 153 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00011 Mulching (Hydraulic) Acre =================================================== ER0361-115 US 36 Bridges 06/22/17 4.10 2500.00 1175.83 440.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.10 2500.00 1175.83 440.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.10 2500.00 1175.83 440.00 =============== 213-00012 Spray-on Mulch Blanket Acre =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 0.40 4000.00 14600.00 5500.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 4.00 3500.00 3270.86 2600.00 STM0243-089 Midpoint: Station 1019+50 Cen STA0931-032 SH 93 Erosion Correction 02/09/17 0.34 4000.00 5760.51 3035.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 0.20 5000.00 15624.33 20000.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 0.40 3500.00 18086.86 22997.79 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1.00 4000.00 5530.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.34 3684.54 5713.27 5560.14 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 30.00 1.70 2513.00 2835.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2.00 4000.00 4800.00 4800.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 0.10 12000.00 3950.00 2200.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 1.50 3500.00 3131.25 3100.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 3.50 3200.00 3043.23 2810.00 ER0361-115 US 36 Bridges 06/22/17 2.90 3500.00 3062.76 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 896.28 2632.65 2900.63 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 5000.00 4816.67 3400.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 11.00 5000.00 2678.16 2640.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 47.70 4500.00 4950.00 4950.00 NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 0.20 10000.00 6130.00 7915.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 0.10 4000.00 23482.28 5100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 4617.50 3869.69 4510.80 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 0.69 4000.00 2972.00 5615.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 154 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00012 Spray-on Mulch Blanket Acre =================================================== C133A-042 SH 133 McClure Pass Slip 11/16/17 0.60 5000.00 5024.76 4200.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 8.00 4000.00 3074.26 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.29 4064.59 3241.03 2841.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 115.63 3234.64 3285.71 3847.56 =============== 213-00013 Spray-on Mulch Blanket Pound ================================================== NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1,080.00 10.00 2.46 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,080.00 10.00 2.46 2.50 STA094A-034 Critical Culvert Project on S 10/05/17 900.00 4.00 3.57 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 900.00 4.00 3.57 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,980.00 7.27 3.06 3.18 =============== 213-00061 Mulch Tackifier Pound ================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 50.00 6.00 5.82 3.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 700.00 3.00 5.41 5.32 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 3,282.00 3.00 0.57 0.10 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 6,800.00 2.75 2.34 2.10 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 23.00 50.00 29.40 10.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 200.00 4.00 4.51 3.48 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 474.00 5.50 3.12 3.25 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 50.00 60.00 7.39 7.96 SHE160A-031 SH 160 Passing Lanes 03/02/17 929.00 3.00 3.28 2.11 NHPP 0701-230 Midpoint WB Bore 03/02/17 168.00 10.00 8.89 9.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 2,680.00 3.00 2.08 2.10 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 20.00 2.61 23.94 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15,376.00 3.32 2.52 1.95 STA006A-057 SH 6 EAST OF STERLING 04/06/17 100.00 3.00 11.03 10.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 155 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00061 Mulch Tackifier Pound ================================================== STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 30.00 5.00 27.63 25.20 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1,504.00 5.00 2.54 3.20 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 3,000.00 2.50 1.82 3.05 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 30.00 40.00 61.67 60.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 74.00 10.00 6.66 5.97 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2,800.00 2.75 2.70 2.70 NHPPC120-026 US 85: I-76 to 168th 05/04/17 3,100.00 2.01 3.08 2.40 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 20.00 25.00 23.26 30.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 9,832.00 2.25 1.95 1.80 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 30.00 11.00 14.39 20.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 58.00 8.00 24.54 5.58 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 1.00 6.00 7.00 7.00 ER0361-115 US 36 Bridges 06/22/17 10.00 3.00 15.59 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20,589.00 2.66 2.58 2.54 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 3,000.00 3.00 3.63 3.20 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 30.00 15.00 36.00 36.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 20.00 10.00 41.63 15.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 2,200.00 3.00 2.70 3.20 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 970.00 3.00 3.20 2.72 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 200.00 20.00 5.50 6.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 480.00 3.00 4.25 4.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 260.00 6.60 81.50 13.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 50.00 2.50 13.17 15.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1,694.00 3.50 2.04 1.80 BRR400-354 Little-T Channel Work and SH MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 24.00 25.00 22.67 8.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 1.00 500.00 147.33 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,929.00 3.75 3.69 3.49 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 3,000.00 3.00 2.43 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,000.00 3.00 2.43 2.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 47,894.00 3.10 2.89 2.57 =============== 213-00065 Inorg Mulch Cubic Yard ============================================= NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 4.00 70.00 170.00 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 70.00 170.00 170.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 70.00 170.00 170.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 156 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00070 Landscape Weed Barr Fabric Sq Yard ================================================ STAR500-190 R5 Signal Replacement Chaffee 04/27/17 59.00 15.00 15.67 12.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 38.00 4.00 3.00 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 97.00 10.69 13.43 8.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 97.00 10.69 13.43 8.47 =============== 213-00150 Bonded Fiber Matrix Acre =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 20.00 3000.00 2829.57 2400.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 0.50 5000.00 4520.00 3130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.50 3048.78 2865.03 2434.76 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 0.50 5000.00 6086.46 5620.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.50 5000.00 6086.46 5620.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 3095.24 2909.47 2579.55 =============== 213-00705 Landscape Boulder (Special) Each =================================================== CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 134.00 192.37 134.52 134.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 134.00 192.37 134.52 134.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 134.00 192.37 134.52 134.52 =============== 214-00000 Landscape Maintenance LUMP SUM =============================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 1.00 10000.00 15542.42 10310.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 1.00 5000.00 5926.67 1480.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 7500.00 10734.55 5895.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1.00 30000.01 10035.91 6720.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 157 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00000 Landscape Maintenance LUMP SUM =============================================== ER0361-115 US 36 Bridges 06/22/17 1.00 22500.00 47615.00 18000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 26250.01 35088.64 12360.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 1.00 15000.00 8333.60 9000.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1.00 5000.00 9833.33 14000.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1.00 30000.00 23846.76 17025.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 16666.67 17551.70 13341.67 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1.00 12000.00 62708.33 55000.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 1.00 5000.00 4538.75 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 8500.00 39440.50 28250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 14944.45 25183.92 14781.67 =============== 214-00001 Landscape Maintenance (2018) LUMP SUM =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 126500.00 125000.00 125000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 126500.00 125000.00 125000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 126500.00 125000.00 125000.00 =============== 214-00002 Landscape Maintenance (2019) LUMP SUM =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 173000.00 225000.00 225000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 173000.00 225000.00 225000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 173000.00 225000.00 225000.00 =============== 214-00003 Landscape Maintenance (2020) LUMP SUM =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 75000.00 125000.00 125000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 75000.00 125000.00 125000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 75000.00 125000.00 125000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 158 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00004 Landscape Maintenance (Cedar Cove) LUMP SUM =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 75000.00 175000.00 175000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 75000.00 175000.00 175000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 75000.00 175000.00 175000.00 =============== 214-00005 Landscape Maintenance (24 Month) LUMP SUM =============================================== NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1.00 5000.00 11948.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 11948.00 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 11948.00 2000.00 =============== 214-00145 Plant Protect Fence Lin Foot =============================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1,000.00 5.00 2.40 2.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,000.00 5.00 2.40 2.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,000.00 5.00 2.40 2.65 =============== 214-00155 Plant (B and B) Each =================================================== ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 662.00 40.00 40.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 662.00 40.00 40.00 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 662.00 40.00 40.00 40.00 =============== 214-00201 Deciduous Tree (Tubeling) Each =================================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 247.00 10.00 12.55 9.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 247.00 10.00 12.55 9.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 70.00 25.00 10.33 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 70.00 25.00 10.33 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 317.00 13.31 12.26 8.78 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 159 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00210 Deciduous Tree (1 In C) Each =================================================== NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 40.00 250.00 78.26 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 250.00 78.26 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 250.00 78.26 80.00 =============== 214-00215 Deciduous Tree (1.5 In C) Each =================================================== STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 5.00 330.00 1306.50 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 330.00 1306.50 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 330.00 1306.50 1000.00 =============== 214-00230 Deciduous Tree (3 In C) Each =================================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 3.00 600.00 672.55 692.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 600.00 672.55 692.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 600.00 672.55 692.00 =============== 214-00280 Deciduous Tree (8 Ft) Each =================================================== ER0361-115 US 36 Bridges 06/22/17 35.00 500.00 460.71 460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 35.00 500.00 460.71 460.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 500.00 460.71 460.00 =============== 214-00301 Deciduous Shrub (Tubeling) Each =================================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 649.00 10.00 8.74 8.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 649.00 10.00 8.74 8.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1,360.00 15.00 8.64 8.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,360.00 15.00 8.64 8.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,009.00 13.38 8.69 8.47 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 160 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00350 Deciduous Shrub (5 Gal) Each =================================================== ER0361-115 US 36 Bridges 06/22/17 1,105.00 45.00 33.54 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,105.00 45.00 33.54 24.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,105.00 45.00 33.54 24.00 =============== 214-00410 Evergreen Tree (1 Gal) Each =================================================== NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 20.00 100.00 36.74 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 100.00 36.74 26.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 100.00 36.74 26.00 =============== 214-00901 Perennials (Tubeling) Each =================================================== CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 108.00 2.89 3.00 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 108.00 2.89 3.00 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 108.00 2.89 3.00 3.00 =============== 214-01010 Brush Layer Cutting Each =================================================== STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 40.00 6.00 5.19 4.56 ER0361-115 US 36 Bridges 06/22/17 1,385.00 5.50 5.83 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,425.00 5.51 5.82 9.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,425.00 5.51 5.82 9.85 =============== 214-01011 Live Brush Mattress Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 2,261.00 10.00 26.50 26.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,261.00 10.00 26.50 26.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,261.00 10.00 26.50 26.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 161 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-01013 Live Willow Stakes Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 31,619.00 7.45 8.00 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 31,619.00 7.45 8.00 8.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 441.00 20.00 21.74 21.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 441.00 20.00 21.74 21.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32,060.00 7.62 8.19 8.19 =============== 214-01014 Live Willow Brush Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 30,532.00 7.45 4.00 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30,532.00 7.45 4.00 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30,532.00 7.45 4.00 4.00 =============== 214-01015 Willow Cuttings Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1,100.00 7.00 5.58 5.79 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 105.00 7.00 4.63 3.50 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 3,160.00 9.50 9.50 9.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,365.00 8.81 6.29 8.42 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 350.00 10.00 5.33 6.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 959.00 5.00 3.70 3.50 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,309.00 6.34 3.85 4.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,674.00 8.24 5.30 7.44 =============== 214-01018 Live Brush Soil Lift Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 10,744.00 5.00 45.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,744.00 5.00 45.00 45.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,744.00 5.00 45.00 45.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 162 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-01019 Single Soil Lift Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 2,540.00 5.00 40.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,540.00 5.00 40.00 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,540.00 5.00 40.00 40.00 =============== 214-01025 Dormant Log Cutting Each =================================================== NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 50.00 60.00 86.83 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 60.00 86.83 85.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 60.00 86.83 85.00 =============== 214-01032 Large Woody Material Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 341.00 1355.33 1665.00 1665.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 341.00 1355.33 1665.00 1665.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 20.00 919.12 1600.00 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 919.12 1600.00 1600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 361.00 1331.16 1661.40 1661.40 =============== 214-01225 Inst Plant (Bareroot) Each =================================================== ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 850.00 7.50 7.50 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 850.00 7.50 7.50 7.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 850.00 7.50 7.50 7.50 =============== 214-01227 Rootwad Each =================================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 19.00 4000.00 1838.81 300.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 163 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-01227 Rootwad Each =================================================== BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19.00 4000.00 1838.81 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 4000.00 1838.81 300.00 =============== 214-01229 Wetland Sod Mat Sq Foot ================================================ ER0361-115 US 36 Bridges 06/22/17 6,581.00 10.00 6.17 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,581.00 10.00 6.17 5.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 4,950.00 8.00 6.80 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,950.00 8.00 6.80 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,531.00 9.14 6.44 5.86 =============== 214-01401 Nursery Stock Container (DRC #10) Each =================================================== ER0361-115 US 36 Bridges 06/22/17 4,700.00 3.00 3.53 3.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,700.00 3.00 3.53 3.25 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 7,867.00 4.60 5.00 5.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 4,108.00 4.00 3.86 3.25 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,975.00 4.39 4.03 4.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,675.00 4.00 3.86 4.08 =============== 214-01402 Nursery Stock Container (DRC # 40) Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 5,792.00 15.00 16.00 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,792.00 15.00 16.00 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,792.00 15.00 16.00 16.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 164 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-01403 Nursery Stock Container (DRC # 60) Each =================================================== BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 80.00 45.00 30.63 26.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 80.00 45.00 30.63 26.50 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 2,446.00 15.50 17.00 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,446.00 15.50 17.00 17.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 499.00 9.34 10.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 499.00 9.34 10.00 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,025.00 15.26 17.27 16.10 =============== 214-01404 Nursery Stock Container (DRC # 180) Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 206.00 27.50 29.00 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 206.00 27.50 29.00 29.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 206.00 27.50 29.00 29.00 =============== 215-00000 Transplant Shrub Each =================================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 10.00 100.00 190.60 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 100.00 190.60 75.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 15.00 200.00 149.03 137.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15.00 200.00 149.03 137.08 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 7.00 800.00 256.67 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 800.00 256.67 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 300.00 187.05 131.44 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 165 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00030 Soil Reten Blanket (Spec) Sq Yard ================================================ ER0361-115 US 36 Bridges 06/22/17 2,800.00 4.50 8.19 2.30 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 5,535.00 12.00 12.00 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,335.00 9.48 9.13 8.74 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 3,019.00 10.10 9.00 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,019.00 10.10 9.00 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,354.00 9.65 9.11 8.81 =============== 216-00041 Soil Reten Blanket (S/C) Sq Yard ================================================ STE 0702-357 I-70 West Vail Pass Basin 03/23/17 484.00 5.00 5.65 3.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 484.00 5.00 5.65 3.25 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 240.00 8.00 5.28 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 240.00 8.00 5.28 10.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 2,360.00 3.00 3.09 2.51 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,360.00 3.00 3.09 2.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,084.00 3.70 3.53 3.21 =============== 216-00042 Soil Retent Blanket (BioD S/C) Sq Yard ================================================ STAR500-190 R5 Signal Replacement Chaffee 04/27/17 385.00 15.00 12.33 11.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 618.00 5.00 4.31 3.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,003.00 8.84 7.39 6.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,003.00 8.84 7.39 6.64 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 166 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00047 Soil Wrap (Coir and Jute) Sq Yard ================================================ ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 1,350.00 13.50 13.50 13.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,350.00 13.50 13.50 13.50 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 49,672.00 6.25 6.50 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 49,672.00 6.25 6.50 6.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 51,022.00 6.44 6.69 6.69 =============== 216-00070 Geocell Confinement Sys Sq Yard ================================================ NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 79.00 30.00 132.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 79.00 30.00 132.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 79.00 30.00 132.00 50.00 =============== 216-00101 Soil Reten Blanket (S-C)(PhotoD Cl 1) Sq Yard ================================================ NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 400.00 2.00 3.35 3.40 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 730.00 3.00 5.48 3.70 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 968.00 3.03 10.42 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,098.00 2.82 7.00 4.36 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1,000.00 5.01 27.06 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,000.00 5.01 27.06 2.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 2,470.00 3.70 3.20 3.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,470.00 3.70 3.20 3.25 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 167 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00101 Soil Reten Blanket (S-C)(PhotoD Cl 1) Sq Yard ================================================ NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 100.00 10.00 6.80 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 10.00 6.80 5.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,668.00 3.72 8.71 3.48 =============== 216-00201 Soil Reten Blanket (S-C)(BioD Cl 1) Sq Yard ================================================ STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 970.00 3.00 3.75 4.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 800.00 5.00 2.72 2.30 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 449.00 5.00 5.39 3.50 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 1,700.00 2.75 5.63 4.48 STA0931-032 SH 93 Erosion Correction 02/09/17 520.00 3.00 4.69 3.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 3,025.00 2.50 3.10 2.60 SHE160A-031 SH 160 Passing Lanes 03/02/17 14,809.00 2.00 2.76 2.91 STA0362-035 US 36: Strasburg to Byers 03/23/17 773.00 2.50 5.96 5.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 23,046.00 2.36 3.16 3.11 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 145.00 2.50 11.60 11.60 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 33,300.00 3.00 2.15 2.04 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2,000.00 3.00 2.70 2.70 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 1,400.00 3.50 2.14 1.80 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 9,218.00 2.25 2.02 1.86 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 21.00 10.00 24.70 50.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 3,200.00 4.00 4.10 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 49,284.00 2.94 2.22 2.27 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 4,000.00 3.00 3.32 2.25 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 450.00 4.50 4.13 4.25 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 100.00 3.50 7.45 7.75 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 20.00 5.50 15.70 17.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 5,343.00 6.88 4.96 3.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 10,345.00 2.50 2.22 2.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 168 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00201 Soil Reten Blanket (S-C)(BioD Cl 1) Sq Yard ================================================ BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20,258.00 3.81 2.68 2.41 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 1,750.00 2.00 4.35 4.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 3,351.00 3.00 2.30 3.60 C133A-042 SH 133 McClure Pass Slip 11/16/17 310.00 5.00 3.85 5.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 675.00 2.75 9.67 10.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 4,000.00 2.00 4.02 2.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 1,800.00 2.50 3.28 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11,886.00 2.48 3.86 3.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 104,474.00 2.93 2.60 2.64 =============== 216-00211 Soil Reten Blanket (Exc)(BioD Cl 1) Sq Yard ================================================ CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 100.00 5.00 8.38 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 5.00 8.38 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 5.00 8.38 6.00 =============== 216-00221 Soil Reten Blanket (C)(BioD Cl 1) Sq Yard ================================================ CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 1,000.00 5.45 5.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,000.00 5.45 5.00 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,000.00 5.45 5.00 5.00 =============== 216-00301 Turf Reinf Mat (Cl 1) Sq Yard ================================================ STA0931-032 SH 93 Erosion Correction 02/09/17 100.00 6.00 14.22 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 6.00 14.22 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 6.00 14.22 18.00 =============== 216-00302 Turf Reinf Mat (Cl 2) Sq Yard ================================================ C133A-042 SH 133 McClure Pass Slip 11/16/17 310.00 5.00 8.98 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 310.00 5.00 8.98 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 310.00 5.00 8.98 6.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 169 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00303 Turf Reinf Mat (Cl 3) Sq Yard ================================================ STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 2,458.00 4.75 4.86 4.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,458.00 4.75 4.86 4.48 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 525.00 9.00 11.07 7.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 525.00 9.00 11.07 7.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,983.00 5.50 6.36 5.06 =============== 217-00000 Herbicide Treatment Sq Yard ================================================ STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 23,965.00 0.30 0.04 0.03 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 300.00 1.20 3.36 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24,265.00 0.31 0.14 0.09 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 400.00 120.00 125.00 125.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1,801.00 1.00 1.76 2.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,201.00 22.63 4.19 24.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26,466.00 2.17 1.31 2.11 =============== 217-00015 Noxious Weed Management Sq Yard ================================================ STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1,230.00 80.00 3.17 7.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,230.00 80.00 3.17 7.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,230.00 80.00 3.17 7.72 =============== 217-00020 Herbicide Treatment Hour =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 5.00 130.00 181.40 101.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 170 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 217-00020 Herbicide Treatment Hour =================================================== NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 40.00 100.00 68.87 67.60 SHE160A-031 SH 160 Passing Lanes 03/02/17 12.00 143.00 168.49 166.67 BR0252-449 I-25 Woodmen NB 03/02/17 4.00 150.00 271.25 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 61.00 114.20 127.53 103.43 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 20.00 100.00 115.00 115.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 10.00 150.01 103.36 99.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 5.00 142.00 213.00 425.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 35.00 120.29 143.01 154.71 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 12.00 303.00 1090.00 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 303.00 1090.00 180.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 10.00 100.00 304.82 350.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 40.00 120.00 181.40 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 116.00 209.88 230.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 158.00 130.46 202.90 160.66 =============== 218-00000 Noxious Weed Management LUMP SUM =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 46800.00 75000.00 75000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 46800.00 75000.00 75000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 46800.00 75000.00 75000.00 =============== 240-00000 Wildlife Biologist Hour =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 8.00 128.00 185.63 131.25 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 20.00 150.00 156.45 112.90 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 171 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 240-00000 Wildlife Biologist Hour =================================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 15.00 150.00 126.61 100.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 40.00 85.00 135.34 136.53 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 40.00 100.00 110.33 121.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 8.00 120.00 204.00 125.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 15.00 200.00 119.70 95.88 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 15.00 100.00 227.00 220.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 40.00 150.00 247.65 215.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 40.00 105.04 99.39 100.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 120.00 100.00 168.69 117.94 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 10.00 120.00 166.15 150.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 5.00 285.00 150.97 236.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 376.00 116.92 157.55 133.72 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 16.00 100.00 104.00 104.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 8.00 101.00 135.44 125.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 20.00 150.00 155.33 156.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 40.00 100.00 90.00 95.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 40.00 115.00 103.24 79.72 NHPPC120-026 US 85: I-76 to 168th 05/04/17 120.00 100.01 89.83 95.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 60.00 100.00 108.07 100.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 40.00 150.00 111.63 50.00 ER0361-115 US 36 Bridges 06/22/17 226.00 105.00 91.25 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 570.00 108.31 96.51 96.09 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 30.00 120.00 172.50 145.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 40.00 120.00 115.00 115.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 40.00 110.00 124.67 200.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 120.00 100.00 153.32 140.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 20.00 143.00 257.50 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 250.00 110.64 153.72 148.20 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 36.00 100.00 154.67 200.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 20.00 120.00 132.02 120.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 120.00 120.00 140.62 120.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 10.00 105.00 206.67 270.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 80.00 125.00 124.33 123.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 266.00 118.23 140.68 137.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,462.00 112.73 127.38 122.19 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 172 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 240-00001 Wildlife Biologist Day ==================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 25.00 500.00 985.00 985.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 25.00 500.00 985.00 985.00 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 5.00 1000.00 928.75 950.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 2.00 500.00 588.67 765.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 2.00 500.00 1210.42 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 777.78 1005.82 1031.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 573.53 996.69 997.21 =============== 240-00010 Rem of Nests Hour =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 100.00 90.00 113.19 100.00 STM0243-089 Midpoint: Station 1019+50 Cen IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 8.00 100.00 181.33 247.80 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 40.00 115.00 89.67 101.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 10.00 120.00 219.40 102.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 10.00 100.00 241.97 138.89 NHPP 0701-230 Midpoint WB Bore 03/02/17 40.00 120.00 132.13 145.00 BR0252-449 I-25 Woodmen NB 03/02/17 24.00 100.00 116.75 95.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 40.00 105.45 81.31 72.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 5.00 149.00 149.00 149.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 120.00 115.00 176.88 112.04 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 10.00 145.00 155.92 113.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 407.00 108.14 140.29 111.24 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 16.00 120.00 99.00 99.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 80.00 110.00 79.10 67.30 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 10.00 100.00 149.48 132.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 8.00 120.00 174.00 222.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 40.00 120.00 105.00 200.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 20.00 90.00 135.00 135.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 120.00 100.01 86.32 90.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 60.00 45.00 130.47 96.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 10.00 105.00 135.80 83.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 173 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 240-00010 Rem of Nests Hour =================================================== NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 40.00 150.00 86.19 50.00 ER0361-115 US 36 Bridges 06/22/17 44.00 100.00 76.95 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 448.00 101.41 100.04 101.42 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 10.00 105.00 167.50 135.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 40.00 120.00 78.00 78.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 40.00 110.00 118.00 190.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 20.00 99.00 217.50 85.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 20.00 120.00 91.46 131.39 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 10.00 75.00 150.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 140.00 109.86 125.23 127.84 STA094A-034 Critical Culvert Project on S 10/05/17 20.00 100.00 77.47 70.00 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 8.00 150.00 253.75 260.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 36.00 100.00 137.17 200.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 40.00 120.00 121.80 90.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 8.00 125.00 148.33 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 112.00 112.50 121.57 134.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,107.00 106.07 119.64 111.75 =============== 240-00020 Netting Sq Yard ================================================ NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 800.00 10.00 12.15 14.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 500.00 10.00 10.59 6.00 STM0243-089 Midpoint: Station 1019+50 Cen SHE160A-031 SH 160 Passing Lanes 03/02/17 10.00 10.00 116.94 161.11 NHPP 0701-230 Midpoint WB Bore 03/02/17 560.00 10.00 14.98 16.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,870.00 10.00 14.19 14.54 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 942.00 30.00 10.27 9.32 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 50.00 75.00 28.62 7.17 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 200.00 15.00 20.36 34.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 174 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 240-00020 Netting Sq Yard ================================================ NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 750.00 8.00 18.00 18.00 ER0361-115 US 36 Bridges 06/22/17 900.00 13.00 7.70 4.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,842.00 18.55 11.33 11.85 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 13.00 8.00 95.33 123.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 500.00 21.34 20.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 513.00 21.00 25.45 22.61 STA094A-034 Critical Culvert Project on S 10/05/17 225.00 10.00 8.01 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 225.00 10.00 8.01 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,450.00 15.49 12.29 13.58 =============== 240-00100 Prairie Dog Mgmt LUMP SUM =============================================== ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 1.00 2000.00 6175.00 11850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2000.00 6175.00 11850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 6175.00 11850.00 =============== 250-00010 Envir Health/Safety Mngmt LUMP SUM =============================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 1.00 3500.00 6444.00 5388.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 1.00 5000.00 4736.67 5410.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1.00 6000.00 17540.00 12000.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 1.00 5000.00 5170.50 5335.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1.00 3500.00 4117.20 3400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 4600.00 8634.02 6306.60 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 5000.00 4812.24 4406.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 175 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00010 Envir Health/Safety Mngmt LUMP SUM =============================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 1.00 6000.00 5441.67 4200.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 5000.00 10000.00 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 5333.33 5254.49 6202.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1.00 8500.00 2600.00 2600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 8500.00 2600.00 2600.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 5000.00 5418.67 6255.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 1.00 10000.00 6972.80 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 7500.00 6390.00 4377.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 5681.82 6775.48 5590.36 =============== 250-00050 Monitoring Technician Hour =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 8.00 110.00 115.69 121.38 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 10.00 120.00 213.49 380.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 50.00 100.00 147.75 120.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 80.00 75.00 97.51 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 148.00 88.38 119.42 113.32 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 40.00 75.00 89.37 82.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 80.00 100.00 105.33 116.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 20.00 100.00 115.00 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 140.00 92.86 95.24 106.14 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 12.00 95.00 85.00 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 95.00 85.00 85.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 176 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00050 Monitoring Technician Hour =================================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 50.00 100.00 135.33 305.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 100.00 135.33 305.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 350.00 92.06 108.19 136.86 =============== 250-00100 Environmental Health and Safety LUMP SUM =============================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 1.00 6000.00 6187.70 4800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 6000.00 6187.70 4800.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1.00 3500.00 4869.69 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 3500.00 4869.69 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4750.00 5309.02 3650.00 =============== 250-00110 Health and Safety Officer Hour =================================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 5.00 200.00 233.66 390.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 20.00 200.00 307.00 220.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 50.00 110.00 265.24 120.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 80.00 100.00 121.69 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 155.00 119.35 193.05 133.87 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 40.00 100.00 113.42 102.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 10.00 120.00 169.67 204.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 20.00 120.00 130.00 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 70.00 108.57 117.23 124.57 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 4.00 120.00 115.00 115.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 177 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00110 Health and Safety Officer Hour =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 80.00 87.14 80.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 84.00 88.70 81.67 81.67 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 50.00 120.00 157.00 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 120.00 157.00 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 359.00 110.17 152.32 149.94 =============== 250-00120 Material Sampling and Delivery Each =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 2.00 600.00 353.25 106.50 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 5.00 200.00 439.74 235.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 4.00 100.00 582.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 236.36 503.82 198.91 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 5.00 100.00 196.47 111.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 5.00 300.00 377.67 414.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 200.00 232.71 262.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 219.05 325.46 229.19 =============== 250-00200 Material Handling (Stockpile) Cubic Yard ============================================= NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 10.00 125.00 113.75 102.50 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 1.00 80.00 1980.10 1125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 120.91 357.19 195.45 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 50.00 50.00 58.98 397.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 12.00 200.00 98.33 120.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 50.00 35.00 30.50 30.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 112.00 59.38 58.97 203.71 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 178 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00200 Material Handling (Stockpile) Cubic Yard ============================================= SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 555.00 35.00 15.17 29.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 555.00 35.00 15.17 29.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 678.00 40.42 31.14 60.97 =============== 250-00210 Solid Waste Disposal Cubic Yard ============================================= NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 10.00 500.00 302.85 105.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 500.00 302.85 105.70 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 50.00 50.00 59.32 35.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 12.00 1000.00 178.33 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 62.00 233.87 66.06 51.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72.00 270.83 73.28 58.99 =============== 250-00220 Hazardous Waste Disposal Cubic Yard ============================================= NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 1.00 300.00 2563.43 1275.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 1.00 500.00 2666.33 605.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 400.00 2614.88 940.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 50.00 750.00 211.32 21.14 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 12.00 2000.00 318.00 164.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 50.00 100.00 37.25 37.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 112.00 593.75 204.23 43.64 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 555.00 100.00 11.57 19.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 555.00 100.00 11.57 19.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 669.00 183.56 74.27 26.46 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 179 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-01000 ABC (CL 1) Ton ==================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 519.00 25.00 41.05 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 519.00 25.00 41.05 24.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 14.36 200.00 145.83 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.36 200.00 145.83 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 533.36 29.71 43.32 25.37 =============== 304-01005 ABC (CL 1) Cubic Yard ============================================= NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 8.00 260.00 272.67 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 260.00 272.67 200.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 2,159.00 36.00 40.67 58.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,159.00 36.00 40.67 58.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,167.00 36.83 41.52 58.52 =============== 304-02000 ABC (CL 2) Ton ==================================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1,311.00 45.00 42.61 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,311.00 45.00 42.61 41.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 2,691.00 18.00 24.05 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,691.00 18.00 24.05 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,002.00 26.84 31.57 24.19 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 180 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-03000 ABC (CL 3) Ton ==================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 12,221.00 18.00 19.00 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12,221.00 18.00 19.00 19.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,221.00 18.00 19.00 19.00 =============== 304-03005 ABC (CL 3) Cubic Yard ============================================= STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 2,182.00 30.00 48.38 38.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,182.00 30.00 48.38 38.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,182.00 30.00 48.38 38.50 =============== 304-03006 ABC (CL 3) (Spec) Ton ==================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 25.00 20.00 67.60 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 20.00 67.60 19.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 20.00 67.60 19.00 =============== 304-04000 ABC (CL 4) Ton ==================================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 600.00 30.00 42.57 30.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 600.00 30.00 42.57 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 600.00 30.00 42.57 30.00 =============== 304-06000 ABC (CL 6) Ton ==================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 11.60 100.00 60.32 46.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 20.00 100.00 108.92 115.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 14,656.00 30.00 25.92 25.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 246.00 50.00 62.27 45.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 181 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06000 ABC (CL 6) Ton ==================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 13,419.00 25.00 35.11 25.30 SHE160A-031 SH 160 Passing Lanes 03/02/17 10,617.00 27.00 26.42 24.92 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 236.00 50.00 89.00 60.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 41,377.00 24.00 19.42 20.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 346.00 35.00 72.25 54.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 126.00 20.00 95.20 150.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 600.00 60.00 39.10 29.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 81,654.60 26.12 24.99 22.78 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 64.00 30.00 58.40 58.40 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 78.00 20.00 168.61 160.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 22,531.43 20.00 22.94 22.51 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 1,115.00 70.00 66.33 58.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 6,458.00 28.00 28.00 28.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 2.00 200.00 93.25 93.20 ER0361-115 US 36 Bridges 06/22/17 4,157.00 25.00 32.07 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 34,405.43 23.76 24.35 26.46 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 10.00 50.00 255.42 100.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1,081.00 15.00 28.65 23.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 160.00 45.00 51.00 37.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 49.00 17.00 38.00 38.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 80.00 80.00 161.67 50.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 152.00 40.00 71.40 96.32 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 36.60 35.00 62.50 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,568.60 24.55 46.92 35.08 C133A-042 SH 133 McClure Pass Slip 11/16/17 961.00 60.00 63.19 38.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 500.00 15.00 90.20 70.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 5.39 200.00 202.91 150.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 5.00 200.00 245.74 214.17 BR3852-018 POA SCOUR US 385 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 769.00 35.00 46.33 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,240.39 42.03 63.13 45.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 119,869.02 25.72 25.73 24.57 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 182 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06007 ABC (CL 6) Cubic Yard ============================================= NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 302.00 75.00 51.70 70.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 1,510.00 30.00 51.25 25.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 162.00 40.00 58.25 45.76 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 244.00 25.00 133.66 130.69 NHPP 0701-230 Midpoint WB Bore 03/02/17 15.00 90.00 53.83 54.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 3.00 280.00 454.67 200.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 61.00 30.45 101.66 46.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 1,808.00 30.00 62.50 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,105.00 33.82 61.69 53.58 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 840.00 50.00 56.37 37.11 STAR400-348 Region 4 Controller and Cabin 05/04/17 6.00 125.00 160.00 225.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 27.00 60.00 128.50 150.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1,416.00 32.00 61.59 65.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 187.00 80.00 132.63 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,476.00 42.26 67.93 57.23 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1,781.00 54.00 64.02 60.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 85.00 50.00 93.33 100.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1,773.00 60.00 53.51 40.00 BRR400-354 Little-T Channel Work and SH SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 606.00 35.00 56.80 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,245.00 53.71 56.22 51.02 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 250.00 60.00 39.00 48.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1,648.00 49.00 44.17 64.50 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 836.00 70.00 62.50 70.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 20.00 60.00 80.67 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,754.00 56.45 51.05 64.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,580.00 46.17 58.48 55.67 =============== 304-06008 ABC (CL 6) (Spec) Cubic Yard ============================================= STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 588.00 40.00 74.25 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 588.00 40.00 74.25 17.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 183 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06008 ABC (CL 6) (Spec) Cubic Yard ============================================= STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 13,540.00 25.00 13.96 3.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,540.00 25.00 13.96 3.30 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 164.00 70.00 63.73 53.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 164.00 70.00 63.73 53.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,292.00 26.13 17.18 4.43 =============== 304-06009 ABC (CL 6) (Spec) Ton ==================================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 74.00 60.00 66.49 65.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 277.00 32.00 34.70 32.64 STA2873-183 US 287 Repairs at LCR 17 03/09/17 165.00 50.00 58.00 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 516.00 41.77 43.37 44.11 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 166.00 50.00 72.75 50.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 166.00 50.00 72.75 50.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 682.00 43.77 46.11 45.67 =============== 304-06011 ABC (CL 6)(Spec)(Install Only) Cubic Yard ============================================= ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 20,543.00 34.08 50.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20,543.00 34.08 50.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,543.00 34.08 50.00 50.00 =============== 304-07000 ABC (CL 7) Ton ==================================================== NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 6,053.00 20.00 26.67 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,053.00 20.00 26.67 25.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 184 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-07000 ABC (CL 7) Ton ==================================================== STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 6,367.00 25.00 29.06 22.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,367.00 25.00 29.06 22.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,420.00 22.56 28.07 23.72 =============== 304-07005 ABC (CL 7) Cubic Yard ============================================= C133A-042 SH 133 McClure Pass Slip 11/16/17 19.00 90.00 167.56 71.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19.00 90.00 167.56 71.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 90.00 167.56 71.00 =============== 304-07009 ABC (CL 7) (Spec) Ton ==================================================== STA006A-057 SH 6 EAST OF STERLING 04/06/17 4,214.00 20.00 23.63 23.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,214.00 20.00 23.63 23.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,214.00 20.00 23.63 23.75 =============== 304-08000 ABC (Shoulder Material) Ton ==================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 8,470.00 20.00 26.41 22.00 STM0243-089 Midpoint: Station 1019+50 Cen STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 3,851.00 30.00 35.29 28.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,321.00 23.13 29.45 24.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,321.00 23.13 29.45 24.91 =============== 304-08002 ABC (Shoulder Material) Cubic Yard ============================================= STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 1,781.00 30.00 37.80 44.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,781.00 30.00 37.80 44.41 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 185 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-08002 ABC (Shoulder Material) Cubic Yard ============================================= IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1,260.00 35.00 36.63 41.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,260.00 35.00 36.63 41.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,041.00 32.07 37.32 43.37 =============== 304-09000 ABC (Spec) Cubic Yard ============================================= STA0362-035 US 36: Strasburg to Byers 03/23/17 606.00 20.00 97.05 59.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 606.00 20.00 97.05 59.99 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 620.00 20.00 51.55 44.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 620.00 20.00 51.55 44.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,226.00 20.00 74.04 52.24 =============== 304-09006 ABC (Spec) Sq Yard ================================================ STAR500-190 R5 Signal Replacement Chaffee 04/27/17 59.00 60.00 54.00 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 59.00 60.00 54.00 52.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 59.00 60.00 54.00 52.00 =============== 304-09014 ABC (Spec) Ton ==================================================== NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 6,857.00 20.00 30.15 23.21 SHE160A-031 SH 160 Passing Lanes 03/02/17 1,626.00 35.00 29.16 32.64 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 5,005.00 29.00 26.61 27.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 464.00 50.00 76.45 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13,952.00 25.97 30.25 26.59 ER0361-115 US 36 Bridges 06/22/17 3.00 30.00 154.75 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 30.00 154.75 60.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 186 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-09014 ABC (Spec) Ton ==================================================== NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 222.00 15.00 48.10 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 222.00 15.00 48.10 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,177.00 25.80 30.60 26.73 =============== 304-09100 ABC (RAP) Ton ==================================================== NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 112.70 80.00 65.50 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 112.70 80.00 65.50 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 112.70 80.00 65.50 80.00 =============== 306-01000 Reconditioning Sq Yard ================================================ STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 11,174.00 5.00 2.63 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,174.00 5.00 2.63 2.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,174.00 5.00 2.63 2.00 =============== 307-00000 Hydrated Lime Ton ==================================================== NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 692.00 200.00 211.06 211.59 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 878.00 300.00 256.09 273.28 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 1,118.00 250.00 261.13 276.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,688.00 253.46 248.37 258.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,688.00 253.46 248.37 258.74 =============== 310-00608 Full Depth Reclam. of HMA Pvmt (0-8 in.) Sq Yard ================================================ STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 168,437.00 1.00 2.52 1.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 168,437.00 1.00 2.52 1.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 168,437.00 1.00 2.52 1.46 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 187 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 310-00610 Full Depth Reclam. of HMA Pvmt (8-12 in) Sq Yard ================================================ STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 151,070.00 3.50 3.17 2.25 STM0243-089 Midpoint: Station 1019+50 Cen STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 68,747.00 3.30 2.47 2.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 219,817.00 3.44 2.90 2.51 STA006A-057 SH 6 EAST OF STERLING 04/06/17 296,674.00 2.80 1.66 1.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 296,674.00 2.80 1.66 1.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 516,491.00 3.07 2.39 2.10 =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 15.30 400.00 316.25 350.00 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 71.00 175.00 363.68 225.00 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 793.00 125.00 142.15 150.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 5.00 500.00 380.74 265.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 100.00 150.00 225.00 200.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 400.00 175.00 161.76 155.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 446.00 300.00 267.27 250.00 STA0931-032 SH 93 Erosion Correction 02/09/17 1.00 750.00 991.00 805.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 212.00 250.00 469.85 462.76 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 286.00 150.00 188.40 190.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 100.00 170.00 243.13 200.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 432.00 300.00 337.00 275.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 500.00 170.00 161.65 130.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 306.30 163.00 313.33 540.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1,000.00 175.00 157.64 150.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 500.00 165.00 212.00 150.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 215.00 180.00 224.63 200.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 50.00 200.00 402.65 325.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 145.00 150.00 253.20 205.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 50.00 195.00 275.00 265.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 105.00 150.00 191.50 176.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,732.60 186.76 224.70 211.88 STA006A-057 SH 6 EAST OF STERLING 04/06/17 100.00 165.00 170.87 165.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 188 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 30.00 215.00 174.00 174.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 150.00 225.00 388.46 410.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 597.00 150.00 159.48 133.43 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 20.00 220.00 652.41 250.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 20.00 183.00 229.18 175.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 100.00 250.00 250.43 275.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 472.00 175.00 242.65 236.25 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 975.00 150.00 150.33 156.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 50.00 200.00 300.00 275.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 237.00 220.00 150.00 150.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 3.20 400.00 305.00 200.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 175.00 200.00 233.00 260.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 26.00 215.00 301.88 320.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 50.00 180.00 235.00 220.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 40.00 240.00 403.60 300.00 ER0361-115 US 36 Bridges 06/22/17 159.00 200.00 206.63 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,204.20 175.57 213.72 194.82 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1,320.00 150.00 166.00 140.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 200.00 150.00 155.00 110.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 100.00 200.00 260.00 260.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 59.00 200.00 443.33 280.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 10.00 250.00 383.65 283.31 CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 12.00 1.00 386.17 420.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 676.00 202.04 210.00 210.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 300.00 175.00 167.82 153.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,677.00 168.62 176.82 166.25 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 10.00 200.00 200.00 180.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 56.00 200.00 192.00 275.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 20.00 300.00 369.70 250.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 1,500.00 250.00 176.40 135.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 462.00 195.50 149.46 128.37 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 10.00 400.00 928.73 1181.20 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 6.90 250.00 292.50 300.00 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 822.00 280.00 190.83 97.00 FSA0361-122 I-70 at Limon, US 40, US 287, 12/21/17 100.00 200.00 300.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,986.90 247.88 184.61 134.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,600.70 193.48 204.27 183.61 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 189 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-00721 HMA (Patching) (Asph) Sq Yard ================================================ NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 4,543.00 50.00 58.36 66.71 NHPP 0701-230 Midpoint WB Bore 03/02/17 16,500.00 25.00 30.06 24.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21,043.00 30.40 34.45 33.61 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 257.00 120.00 77.00 76.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 1,180.00 50.00 43.12 39.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 561.00 225.00 214.88 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,998.00 108.14 89.28 65.10 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 16.00 400.00 325.00 230.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 40.00 66.00 230.00 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 56.00 161.43 243.10 169.29 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 617.00 100.00 132.71 64.82 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 4,363.00 20.00 42.94 33.75 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 2,068.00 70.00 32.17 34.83 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 70.00 200.00 143.81 100.17 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7,118.00 43.23 51.39 37.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30,215.00 38.80 45.27 36.84 =============== 403-00800 Emerg Pothole Rep Ton ==================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 15.00 275.00 894.88 750.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 10.00 310.20 1066.31 785.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 289.08 975.55 764.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 289.08 975.55 764.00 =============== 403-09210 SMA Ton ==================================================== ER0361-115 US 36 Bridges 06/22/17 317.00 150.00 208.42 255.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 317.00 150.00 208.42 255.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 317.00 150.00 208.42 255.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 190 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-09221 SMA (Fibers)(Asph) Ton ==================================================== NHPPC120-026 US 85: I-76 to 168th 05/04/17 30,924.00 100.00 107.83 103.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 10,166.00 100.00 131.28 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 41,090.00 100.00 114.98 107.21 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 64,825.00 123.00 116.81 97.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 64,825.00 123.00 116.81 97.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 105,915.00 114.08 116.28 101.11 =============== 403-09500 Furnish HMA Ton ==================================================== STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 2,658.00 100.00 87.96 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,658.00 100.00 87.96 85.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,658.00 100.00 87.96 85.00 =============== 403-32851 HMA (Gr SG) (100) (PG 64-28) Ton ==================================================== CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 150.00 1.00 280.88 295.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 150.00 1.00 280.88 295.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 1.00 280.88 295.00 =============== 403-33721 HMA (Gr S) (75) (PG 58-28) Ton ==================================================== ER0361-115 US 36 Bridges 06/22/17 2,998.00 90.00 93.58 96.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,998.00 90.00 93.58 96.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 20,033.00 83.57 92.00 92.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20,033.00 83.57 92.00 92.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23,031.00 84.41 92.75 92.52 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 191 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-33741 HMA (Gr S) (75) (PG 64-22) Ton ==================================================== STA0362-035 US 36: Strasburg to Byers 03/23/17 751.00 87.00 121.25 99.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 751.00 87.00 121.25 99.60 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 52.00 150.00 293.00 285.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 52.00 150.00 293.00 285.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 803.00 91.08 135.77 111.61 =============== 403-33751 HMA (Gr S) (75) (PG 64-28) Ton ==================================================== STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 46,722.00 72.00 72.92 61.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 46,722.00 72.00 72.92 61.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 46,722.00 72.00 72.92 61.00 =============== 403-33841 HMA (Gr S) (100) (PG 64-22) Ton ==================================================== STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 122.00 98.15 125.52 98.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 122.00 98.15 125.52 98.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 122.00 98.15 125.52 98.00 =============== 403-34651 HMA (Gr SX) (50) (PG 64-28) Ton ==================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 54,822.00 88.76 98.00 98.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 54,822.00 88.76 98.00 98.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54,822.00 88.76 98.00 98.00 =============== 403-34701 HMA (Gr SX) (75) Ton ==================================================== STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 34,387.00 80.00 76.11 82.33 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 192 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34701 HMA (Gr SX) (75) Ton ==================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 24,338.00 55.00 63.90 63.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 34,860.00 55.00 61.08 56.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 93,585.00 64.19 66.83 67.50 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1,816.00 75.00 93.67 76.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,816.00 75.00 93.67 76.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 4,043.00 75.00 53.67 80.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 322.00 150.00 172.00 300.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 138.00 190.00 272.67 318.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 40,293.00 85.00 68.69 72.43 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 25,958.00 65.00 67.25 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 70,754.00 77.59 68.75 67.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 166,155.00 70.01 67.99 67.48 =============== 403-34721 HMA (Gr SX) (75) (PG 58-28) Ton ==================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 4,794.00 85.00 91.02 86.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 31,118.00 75.00 77.17 70.60 SHE160A-031 SH 160 Passing Lanes 03/02/17 7,409.00 98.00 100.62 99.44 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 84.00 120.00 216.92 176.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 43,405.00 80.12 87.07 76.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43,405.00 80.12 87.07 76.93 =============== 403-34724 HMA (GrSX)(75)(PG 58-28)(4 In) Sq Yard ================================================ STM0243-089 Midpoint: Station 1019+50 Cen . 65,444.00 19.00 16.47 . STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 65,444.00 19.00 16.47 . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65,444.00 19.00 16.47 . COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 193 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34741 HMA (Gr SX) (75) (PG 64-22) Ton ==================================================== STA2873-183 US 287 Repairs at LCR 17 03/09/17 3,619.00 87.00 103.33 85.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 23,652.00 70.00 83.67 72.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27,271.00 72.26 85.32 73.73 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 19.10 100.00 382.50 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19.10 100.00 382.50 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27,290.10 72.28 85.41 73.88 =============== 403-34751 HMA (Gr SX) (75) (PG 64-28) Ton ==================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 35,728.00 77.00 92.25 72.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 7,397.00 75.00 105.80 89.17 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 24,597.00 77.00 78.94 66.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 21,268.00 76.00 95.95 90.35 STA0362-035 US 36: Strasburg to Byers 03/23/17 18,331.00 90.00 103.08 87.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 107,321.00 78.88 92.57 78.15 STA006A-057 SH 6 EAST OF STERLING 04/06/17 78,299.00 82.00 86.28 81.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 1,128.00 130.00 138.33 125.00 ER0361-115 US 36 Bridges 06/22/17 5,459.00 95.00 101.28 107.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 84,886.00 83.47 89.74 83.26 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 4,583.00 75.00 92.50 88.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 1,493.00 135.00 136.60 143.35 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 4,418.00 105.00 81.01 72.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,494.00 96.17 96.35 89.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 202,701.00 81.70 92.23 80.86 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 194 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34771 HMA (Gr SX) (75) (PG 76-28) Ton ==================================================== NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 18,465.00 90.00 87.11 82.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18,465.00 90.00 87.11 82.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,465.00 90.00 87.11 82.48 =============== 403-34801 HMA (Gr SX) (100) Ton ==================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 16,797.00 55.00 51.25 51.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,797.00 55.00 51.25 51.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,797.00 55.00 51.25 51.25 =============== 403-34821 HMA (Gr SX) (100) (PG 58-28) Ton ==================================================== STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 28,182.00 75.00 65.37 64.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28,182.00 75.00 65.37 64.45 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 35,000.00 75.00 77.75 81.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35,000.00 75.00 77.75 81.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 63,182.00 75.00 72.23 73.76 =============== 403-34824 HMA (Gr SX)(100)(PG 58-28)(Special) Ton ==================================================== STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 5,052.00 100.00 71.64 69.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,052.00 100.00 71.64 69.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,052.00 100.00 71.64 69.93 =============== 403-34841 HMA (Gr SX) (100) (PG 64-22) Ton ==================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 23,571.09 80.00 75.15 78.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 195 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34841 HMA (Gr SX) (100) (PG 64-22) Ton ==================================================== NHPPC120-026 US 85: I-76 to 168th 05/04/17 2,439.00 90.00 116.50 110.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 1,311.00 75.00 149.06 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 27,321.09 80.65 77.49 83.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27,321.09 80.65 77.49 83.83 =============== 403-34851 HMA (Gr SX) (100) (PG 64-28) Ton ==================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 6,932.00 90.00 84.28 79.00 STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,932.00 90.00 84.28 79.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,932.00 90.00 84.28 79.00 =============== 403-34854 HMA (Gr SX)(100)(PG 64-28)(2 In) Sq Yard ================================================ STM0243-089 Midpoint: Station 1019+50 Cen . 65,444.00 10.00 8.90 . STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 65,444.00 10.00 8.90 . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65,444.00 10.00 8.90 . =============== 403-34871 HMA (Gr SX) (100) (PG 76-28) Ton ==================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 16,679.00 100.00 113.28 90.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 59.00 150.00 386.00 398.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 25,680.00 95.00 84.51 74.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 42,418.00 97.04 94.27 81.04 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 20,209.00 92.00 84.50 84.50 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 11,368.00 80.00 111.49 124.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 14,838.00 92.00 99.32 78.20 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 11,622.87 90.00 90.20 94.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 3,322.00 110.00 102.72 98.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 61,359.87 90.37 94.23 92.86 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 196 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34871 HMA (Gr SX) (100) (PG 76-28) Ton ==================================================== NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 4,678.00 98.00 115.00 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,678.00 98.00 115.00 115.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 108,455.87 93.31 94.49 89.19 =============== 403-36721 HMA (Gr ST)(75)(PG 58-28) Ton ==================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 32,628.00 85.00 87.65 75.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 4,833.00 95.00 93.43 75.44 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 49,755.00 80.00 89.33 80.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 87,216.00 82.70 89.15 78.22 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 28,710.00 75.00 74.77 70.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28,710.00 75.00 74.77 70.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 115,926.00 80.79 85.75 76.26 =============== 403-40000 HMA Safety Edge Lin Foot =============================================== STM0243-089 Midpoint: Station 1019+50 Cen . 31,000.00 1.25 0.92 . STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 31,000.00 1.25 0.92 . NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 9,408.00 4.00 1.33 0.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,408.00 4.00 1.33 0.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40,408.00 1.89 0.99 0.65 =============== 405-00100 Heating and Remixing Treatment Sq Yard ================================================ STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 177,212.00 5.00 5.22 4.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 177,212.00 5.00 5.22 4.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 177,212.00 5.00 5.22 4.95 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 197 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 405-00101 Heating and Remixing Treatment (Special) Sq Yard ================================================ NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 372.00 75.00 134.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 372.00 75.00 134.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 372.00 75.00 134.00 50.00 =============== 406-09500 Cold Bitum Pvmt (Recycle) Sq Yard ================================================ NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 167,860.00 2.50 4.03 3.94 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 265,917.00 4.50 4.45 3.85 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 338,682.00 2.60 5.08 5.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 772,459.00 3.23 4.69 4.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 772,459.00 3.23 4.69 4.46 =============== 408-01000 Hot Joint-Crack Sealant Ton ==================================================== STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 10.00 3875.00 3919.61 4910.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 227.00 4500.00 4312.50 4340.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 237.00 4473.63 4288.15 4364.05 MTCE131A-039 SH 131 MP 0.053-68.721 IN EAG 08/17/17 96.00 4600.00 4440.00 3720.00 MTCE R500-193 R5 FY 18 Regionwide MTCE Crac 09/21/17 42.43 6940.00 7232.00 3398.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 138.43 5317.23 5624.29 3621.30 MTCE0705-084 I-70 CRACK SEAL KANSAS STATE 10/05/17 105.00 3500.00 4229.33 3548.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 105.00 3500.00 4229.33 3548.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 480.43 4503.91 4788.28 3971.69 =============== 408-01100 Joint Sealant Lin Foot =============================================== BR0252-449 I-25 Woodmen NB 03/02/17 1,103.00 15.00 21.25 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,103.00 15.00 21.25 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,103.00 15.00 21.25 9.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 198 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 409-01015 CC Matl (Ty I) Sq Yard ================================================ NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 37,946.00 1.00 0.97 0.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 37,946.00 1.00 0.97 0.95 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 191,097.00 0.80 0.75 0.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 191,097.00 0.80 0.75 0.75 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 134,235.00 1.00 1.22 1.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 134,235.00 1.00 1.22 1.15 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 231,481.00 1.15 0.99 0.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 231,481.00 1.15 0.99 0.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 594,759.00 0.99 1.04 0.91 =============== 409-02015 CC Matl (Ty II) Sq Yard ================================================ NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 386,957.00 1.05 0.95 0.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 386,957.00 1.05 0.95 0.90 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 508,035.00 1.00 0.90 0.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 508,035.00 1.00 0.90 0.90 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 134,235.00 1.00 1.29 1.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 134,235.00 1.00 1.29 1.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,029,227.00 1.02 1.02 0.95 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 199 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 409-02030 CC Matl (Ty I) (Special) Sq Yard ================================================ STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 256,990.00 2.50 1.73 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 256,990.00 2.50 1.73 2.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 256,990.00 2.50 1.73 2.00 =============== 411-03342 Asph Cem (PG 64-28) Ton ==================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 213.00 700.00 444.40 457.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 213.00 700.00 444.40 457.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 9.00 600.00 692.33 817.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 1,609.00 600.00 470.20 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,618.00 600.00 471.13 302.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,831.00 611.63 467.35 320.81 =============== 411-03345 Asph Cem (PG 76-28) Ton ==================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 461.00 675.00 340.00 340.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 461.00 675.00 340.00 340.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 461.00 675.00 340.00 340.00 =============== 411-03352 Asph Cem (PG 58-28) Ton ==================================================== C133A-042 SH 133 McClure Pass Slip 11/16/17 20.00 600.00 578.95 500.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 2,418.00 485.00 406.64 361.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,438.00 485.94 408.89 362.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,438.00 485.94 408.89 362.34 =============== 411-03354 Asph Cem (PG 64-22) Ton ==================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 547.00 475.00 300.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 547.00 475.00 300.00 300.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 200 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-03354 Asph Cem (PG 64-22) Ton ==================================================== IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 109.00 475.00 340.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 109.00 475.00 340.00 300.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 246.00 425.00 215.33 370.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 246.00 425.00 215.33 370.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 902.00 461.36 269.35 319.09 =============== 411-03355 Asph Cem (PG 58-34) Ton ==================================================== STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 2,064.00 600.00 485.00 485.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1,248.00 500.00 443.40 457.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 2,161.00 450.00 451.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,473.00 517.97 459.62 484.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,473.00 517.97 459.62 484.54 =============== 411-10216 Emul Asph (CRS-2P) Gallon ================================================= NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 210,174.00 2.00 1.63 1.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 210,174.00 2.00 1.63 1.55 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 254,017.00 1.55 1.60 1.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 254,017.00 1.55 1.60 1.60 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 136,920.00 3.00 2.20 2.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 136,920.00 3.00 2.20 2.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 601,111.00 2.04 1.85 1.74 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 201 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-10217 Emulsified Asphalt (CRS-2P) Ton ==================================================== STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 622.00 300.00 407.33 447.00 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 372.00 450.00 425.00 425.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 994.00 356.14 410.27 438.77 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 487.00 450.00 493.75 440.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 487.00 450.00 493.75 440.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,481.00 387.00 449.12 439.17 =============== 411-10253 Emul Asph (CSS-1H) Gallon ================================================= STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 15,630.00 6.00 3.73 3.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15,630.00 6.00 3.73 3.68 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 18,449.00 6.00 2.92 3.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18,449.00 6.00 2.92 3.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34,079.00 6.00 3.19 3.36 =============== 411-10255 Emul Asph (SS) Gallon ================================================= NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 27,861.00 1.75 1.73 1.15 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 5,519.00 3.50 6.02 3.00 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 19,001.00 4.00 2.79 3.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 24,644.00 3.00 3.23 2.80 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 9,991.00 4.00 3.57 3.30 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 24,763.00 3.00 3.06 2.85 SHE160A-031 SH 160 Passing Lanes 03/02/17 8,208.00 3.50 5.86 8.61 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 121.00 10.00 16.40 13.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 15,272.00 4.00 3.95 5.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 18,180.00 3.00 3.21 2.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 202 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-10255 Emul Asph (SS) Gallon ================================================= STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 23,662.00 2.00 3.33 0.95 STA0362-035 US 36: Strasburg to Byers 03/23/17 8,284.00 4.50 4.27 5.50 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 19.00 5.00 20.55 17.50 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 45,634.00 3.00 3.27 3.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 231,159.00 3.03 3.37 3.08 STA006A-057 SH 6 EAST OF STERLING 04/06/17 14,834.00 2.80 2.86 2.63 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 6,124.00 4.50 5.00 5.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 28,198.00 3.00 3.43 3.28 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 5,388.00 4.50 3.79 3.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 15,694.00 3.00 7.75 8.55 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 1,899.00 3.60 9.97 9.45 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 391.00 15.00 14.33 14.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 5,746.00 4.00 4.85 4.85 NHPPC120-026 US 85: I-76 to 168th 05/04/17 14,020.00 4.00 4.73 3.60 STA0703-437 I-70: 32ND TO 44TH 06/01/17 5,346.00 4.50 7.66 7.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 35,562.00 1.15 2.15 2.15 ER0361-115 US 36 Bridges 06/22/17 3,143.00 5.00 11.85 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 136,345.00 2.92 5.94 4.29 CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 100.00 1.00 4.89 6.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 10.00 4.00 13.00 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 110.00 1.27 5.62 6.45 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1,494.00 5.00 3.10 3.30 C133A-042 SH 133 McClure Pass Slip 11/16/17 222.00 20.00 8.34 18.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 219.00 15.00 65.59 4.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 23,657.00 3.00 3.39 3.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 13,022.00 3.20 2.61 3.09 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 51.00 5.00 8.00 10.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 15,278.00 5.00 2.91 2.00 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 370.00 15.00 11.17 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 54,313.00 3.87 3.48 2.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 421,927.00 3.10 4.14 3.45 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 203 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-10300 Emul Asph (Prime Coat) Gallon ================================================= C133A-042 SH 133 McClure Pass Slip 11/16/17 228.00 8.00 9.09 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 228.00 8.00 9.09 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 228.00 8.00 9.09 18.00 =============== 411-90010 Asph Rejuvenating Agent Gallon ================================================= STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 10,633.00 3.50 3.05 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10,633.00 3.50 3.05 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,633.00 3.50 3.05 3.00 =============== 411-90040 Recycling Agent Gallon ================================================= NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 209,825.00 1.80 1.81 2.12 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 372,283.00 2.20 1.61 1.80 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 626,806.00 1.65 2.16 2.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,208,914.00 1.85 1.96 2.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,208,914.00 1.85 1.96 2.17 =============== 412-00190 Conc Pvmt (Patching) Sq Yard ================================================ SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 11.00 150.00 96.67 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 150.00 96.67 170.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 150.00 96.67 170.00 =============== 412-00600 Conc Pvmt (6 In) Sq Yard ================================================ STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 268.00 100.00 83.13 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 268.00 100.00 83.13 85.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 116.00 75.00 419.00 419.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 204 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-00600 Conc Pvmt (6 In) Sq Yard ================================================ STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 133.00 75.00 201.55 35.40 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 15.00 120.00 147.33 112.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 264.00 77.56 254.91 208.30 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 35.00 80.00 93.00 101.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 23.00 150.00 105.00 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 58.00 107.76 95.97 102.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 590.00 90.72 129.95 141.90 =============== 412-00605 Conc Pvmt (6 In) (Fast Track) Sq Yard ================================================ NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 121.00 62.00 143.52 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 121.00 62.00 143.52 105.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 121.00 62.00 143.52 105.00 =============== 412-00800 Conc Pvmt (8 In) Sq Yard ================================================ NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 89.00 40.00 118.44 87.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 39.00 80.00 164.82 174.07 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 41.00 85.00 115.31 165.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 14.00 200.00 283.37 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 183.00 70.85 142.51 143.15 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 92.00 73.00 286.33 239.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 92.00 73.00 286.33 239.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 275.00 71.57 179.85 175.22 =============== 412-00805 Conc Pvmt (8 In) (Fast Track) Sq Yard ================================================ STAR500-190 R5 Signal Replacement Chaffee 04/27/17 856.00 191.36 165.53 144.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 856.00 191.36 165.53 144.15 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 205 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-00805 Conc Pvmt (8 In) (Fast Track) Sq Yard ================================================ MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 2,350.00 90.00 109.04 87.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,350.00 90.00 109.04 87.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,206.00 117.06 114.61 102.26 =============== 412-00825 Conc Pvmt (8-1/4 In) Sq Yard ================================================ STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 65,444.00 30.00 33.09 33.00 STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 65,444.00 30.00 33.09 33.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 127,640.00 34.00 44.50 31.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 127,640.00 34.00 44.50 31.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 193,084.00 32.64 41.18 32.27 =============== 412-00835 Conc Pvmt (8 1/4 In) (Fast Track) Sq Yard ================================================ STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 32,865.00 45.00 64.21 36.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32,865.00 45.00 64.21 36.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32,865.00 45.00 64.21 36.86 =============== 412-00900 Conc Pvmt (9 In) Sq Yard ================================================ SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 2,272.00 80.00 55.67 71.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,272.00 80.00 55.67 71.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,272.00 80.00 55.67 71.00 =============== 412-00901 Conc Pvmt (9 In) (Spec) Sq Yard ================================================ SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 551.00 150.00 67.67 81.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 551.00 150.00 67.67 81.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 551.00 150.00 67.67 81.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 206 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-01120 Conc Pvmt (11 In) (Fast Track) Sq Yard ================================================ NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 1,115.00 70.00 190.99 150.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 10,632.00 105.00 120.23 136.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,747.00 101.68 124.42 137.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,747.00 101.68 124.42 137.33 =============== 412-01255 Conc Pvmt (12 In) (Spec) Sq Yard ================================================ NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 17.00 200.00 623.75 765.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17.00 200.00 623.75 765.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 200.00 623.75 765.00 =============== 412-02000 Conc Safety Edge Lin Foot =============================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 31,000.00 2.00 1.40 1.25 STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 31,000.00 2.00 1.40 1.25 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 52,300.00 2.00 5.04 1.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 52,300.00 2.00 5.04 1.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 83,300.00 2.00 3.87 1.52 =============== 412-05000 Partial Depth Repair of Conc Pvmt Sq Foot ================================================ NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 1,425.00 100.00 197.06 163.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,425.00 100.00 197.06 163.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,425.00 100.00 197.06 163.75 =============== 412-10000 Sawing Conc Pvmt Lin Foot =============================================== NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 626.00 10.00 7.00 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 626.00 10.00 7.00 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 626.00 10.00 7.00 6.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 207 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-14000 Sawing and Sealing Joints Lin Foot =============================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 212,834.00 4.00 2.25 2.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 212,834.00 4.00 2.25 2.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 212,834.00 4.00 2.25 2.10 =============== 412-15000 Routing and Sealing Cracks Lin Foot =============================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 2,469.00 10.00 4.82 6.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,469.00 10.00 4.82 6.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,469.00 10.00 4.82 6.25 =============== 412-15050 Cross Stitching Each =================================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 1,055.00 65.00 40.01 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,055.00 65.00 40.01 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,055.00 65.00 40.01 30.00 =============== 412-15060 Rep Conc Cr (Stitch) Each =================================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 65.00 250.00 296.67 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 65.00 250.00 296.67 165.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65.00 250.00 296.67 165.00 =============== 412-18050 Rubbil of Conc Pvmt Sq Yard ================================================ STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 22,916.00 4.00 1.77 1.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22,916.00 4.00 1.77 1.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22,916.00 4.00 1.77 1.95 =============== 412-19000 Hot Conc Joint Sealant Lin Foot =============================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 33,936.00 20.00 5.97 6.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 33,936.00 20.00 5.97 6.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33,936.00 20.00 5.97 6.75 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 208 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00000 Geomembrane Sq Yard ================================================ NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 410.00 12.00 76.97 88.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 410.00 12.00 76.97 88.90 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 110.00 19.00 38.40 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 110.00 19.00 38.40 25.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 448.00 16.00 24.10 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 448.00 16.00 24.10 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 968.00 14.65 42.23 49.75 =============== 420-00102 Geotextile (Er Cont) (CL 1) Sq Yard ================================================ STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 324.00 5.00 6.90 2.00 STM0243-089 Midpoint: Station 1019+50 Cen IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 200.00 6.50 5.73 2.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 524.00 5.57 6.25 2.36 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2,910.00 5.00 3.69 4.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 142.00 10.00 8.25 8.25 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 615.00 3.75 3.15 3.15 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 50.00 10.00 12.61 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,717.00 5.05 3.75 4.05 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 204.00 7.54 8.17 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 204.00 7.54 8.17 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 209 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00102 Geotextile (Er Cont) (CL 1) Sq Yard ================================================ STA094A-034 Critical Culvert Project on S 10/05/17 875.00 5.00 2.80 2.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 922.00 8.00 3.91 4.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 11.00 5.85 37.84 35.53 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 5,476.00 4.00 3.96 2.90 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7,284.00 4.63 3.83 2.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,729.00 4.86 3.90 3.43 =============== 420-00103 Geotextile (Er Cont) (CL 2) Sq Yard ================================================ BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 120.00 15.00 24.75 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 120.00 15.00 24.75 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 15.00 24.75 7.00 =============== 420-00112 Geotextile (Drain) (CL 1) Sq Yard ================================================ NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 460.00 5.00 8.14 6.25 SHE160A-031 SH 160 Passing Lanes 03/02/17 14.00 10.00 92.99 37.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 474.00 5.15 10.99 7.17 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 34.00 5.00 15.74 8.20 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 5,531.00 1.50 2.79 2.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,565.00 1.52 3.25 2.81 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 2,274.00 4.50 4.14 4.82 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 2,580.00 4.30 3.92 2.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 5,751.00 4.00 2.45 2.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,605.00 4.18 3.06 2.60 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 210 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00112 Geotextile (Drain) (CL 1) Sq Yard ================================================ SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 5.00 10.00 55.33 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 10.00 55.33 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,649.00 3.32 3.31 2.81 =============== 420-00113 Geotextile (Drain) (CL 2) Sq Yard ================================================ STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 22.00 2.00 69.08 50.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 900.00 5.00 4.63 2.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 7.00 2.00 114.83 61.50 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 211.00 5.00 8.50 2.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 32.00 4.00 16.98 12.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,172.00 4.90 7.77 4.50 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 150.00 10.00 22.75 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 150.00 10.00 22.75 10.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 195.00 5.00 3.50 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 195.00 5.00 3.50 5.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,517.00 5.42 9.27 5.46 =============== 420-00114 Geotextile (Drain) (CL 3) Sq Yard ================================================ IM025A-037 I25 S. Trinidad Resurface and 11/30/17 3,301.00 4.00 3.35 3.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,301.00 4.00 3.35 3.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,301.00 4.00 3.35 3.05 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 211 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00132 Geotextile (Separator) (CL 1) Sq Yard ================================================ STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2,680.00 2.50 3.50 1.50 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 6,898.00 5.00 2.86 2.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 25.00 40.00 43.56 10.08 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 875.00 4.00 4.32 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,478.00 4.36 3.18 2.28 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 278.00 5.00 4.06 4.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 278.00 5.00 4.06 4.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 4,363.00 2.15 3.54 1.40 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 25.00 20.00 34.88 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,388.00 2.25 3.72 1.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,144.00 3.76 3.36 2.13 =============== 420-00134 Geotextile (Separator) (CL 3) Sq Yard ================================================ NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 2,793.00 3.00 5.90 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,793.00 3.00 5.90 5.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 67.00 10.00 8.14 5.61 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 67.00 10.00 8.14 5.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,860.00 3.16 5.99 5.01 =============== 420-00200 Geotextile (Weed Barrier) Sq Yard ================================================ NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 79.00 10.00 10.24 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 79.00 10.00 10.24 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 79.00 10.00 10.24 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 212 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00520 Geogrid Pvmt Reinf Sq Yard ================================================ ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 29,651.00 2.85 5.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29,651.00 2.85 5.00 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29,651.00 2.85 5.00 5.00 =============== 501-00200 Steel Sheet Pile (Ty II) Sq Foot ================================================ ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 498.00 80.00 62.67 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 498.00 80.00 62.67 50.00 STA094A-034 Critical Culvert Project on S 10/05/17 8,360.00 25.00 29.90 24.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,360.00 25.00 29.90 24.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,858.00 28.09 30.71 26.22 =============== 502-00100 Drill Hole Fac Pile Driving Lin Foot =============================================== ER0361-115 US 36 Bridges 06/22/17 493.00 70.00 259.43 285.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 493.00 70.00 259.43 285.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1,302.00 125.00 69.73 50.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,302.00 125.00 69.73 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,795.00 109.89 102.20 114.54 =============== 502-00460 Pile Tip Each =================================================== ER0361-115 US 36 Bridges 06/22/17 26.00 160.00 184.07 164.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.00 160.00 184.07 164.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 213 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 502-00460 Pile Tip Each =================================================== BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 24.00 140.00 177.18 96.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 24.00 140.00 177.18 96.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 150.40 179.48 131.51 =============== 502-00500 CJP Splice Each =================================================== BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 6.00 400.00 349.51 291.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 400.00 349.51 291.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 400.00 349.51 291.80 =============== 502-11274 Steel Pile (HP 12x74) Lin Foot =============================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 581.00 70.00 91.41 69.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 581.00 70.00 91.41 69.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 581.00 70.00 91.41 69.13 =============== 502-11489 Steel Pile (HP 14x89) Lin Foot =============================================== ER0361-115 US 36 Bridges 06/22/17 571.00 115.00 117.51 102.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 571.00 115.00 117.51 102.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 855.00 100.00 83.82 23.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 2,040.00 90.00 77.75 87.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,895.00 92.95 79.76 68.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,466.00 96.59 83.26 73.68 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 214 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00012 Drilled Caisson (12 In) Lin Foot =============================================== STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 10.50 200.01 162.37 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.50 200.01 162.37 160.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 4.00 200.00 1216.48 129.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 200.00 1216.48 129.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.50 200.01 724.56 151.53 =============== 503-00018 Drilled Caisson (18 In) Lin Foot =============================================== STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 8.00 118.87 141.75 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 118.87 141.75 145.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 18.00 200.00 237.30 220.50 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 5.00 400.00 195.00 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23.00 243.48 233.07 222.57 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 10.00 150.00 195.00 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 150.00 195.00 195.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 41.00 196.36 209.81 200.71 =============== 503-00024 Drilled Caisson (24 In) Lin Foot =============================================== ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 12.00 165.00 675.00 350.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 7.00 175.00 1250.00 1250.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 26.00 400.00 757.58 425.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 45.00 302.33 765.42 533.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 302.33 765.42 533.33 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 215 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00030 Drilled Caisson (30 In) Lin Foot =============================================== ER0361-115 US 36 Bridges 06/22/17 66.00 450.00 743.89 478.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 66.00 450.00 743.89 478.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 1,036.00 350.00 403.07 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,036.00 350.00 403.07 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,102.00 355.99 418.61 310.66 =============== 503-00036 Drilled Caisson (36 In) Lin Foot =============================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 38.00 500.00 399.21 295.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 19.00 450.00 498.00 460.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 76.00 400.00 324.60 320.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 114.00 400.00 450.00 325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 247.00 419.23 403.87 332.08 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 75.00 350.00 324.00 324.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 45.00 350.00 393.75 346.13 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 38.00 350.00 366.75 341.25 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 361.00 600.00 883.00 1174.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 76.00 450.00 475.00 475.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 95.00 350.00 363.02 350.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 76.00 350.00 592.50 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 766.00 477.74 621.62 782.26 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 72.00 350.00 625.00 500.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 190.00 350.00 470.00 470.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1,433.00 375.00 579.26 450.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 64.00 400.00 511.88 500.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 214.00 1714.23 2404.00 2404.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,973.00 517.75 647.92 667.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,986.00 499.34 615.17 671.23 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 216 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00037 Drilled Caisson (36 In)(Spec) Lin Foot =============================================== STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 49.00 450.00 383.00 383.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 49.00 450.00 383.00 383.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 49.00 450.00 383.00 383.00 =============== 503-00042 Drilled Caisson (42 In) Lin Foot =============================================== ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 21.00 390.00 862.50 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21.00 390.00 862.50 525.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 390.00 862.50 525.00 =============== 503-00048 Drilled Caisson (48 In) Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 63.00 550.00 605.00 560.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 84.00 475.00 666.67 380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 147.00 507.14 632.41 457.14 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 250.00 450.00 467.26 388.32 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 42.00 425.00 422.25 393.75 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 19.00 750.00 1233.33 2050.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 63.00 400.00 414.78 400.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 21.00 300.00 650.00 775.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 320.00 385.00 787.00 950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 715.00 418.60 524.44 696.56 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 21.00 550.00 600.00 600.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 84.00 450.00 904.82 511.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 105.00 470.00 899.07 529.42 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 256.00 700.00 1186.00 977.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 217 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00048 Drilled Caisson (48 In) Lin Foot =============================================== NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 24.00 600.00 761.86 825.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 280.00 691.43 1155.27 963.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,247.00 494.63 728.19 714.31 =============== 503-00054 Drilled Caisson (54 In) Lin Foot =============================================== SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 21.00 500.00 740.00 490.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21.00 500.00 740.00 490.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 51.00 550.00 620.68 579.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 63.00 575.00 568.85 519.75 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 21.00 380.00 755.00 950.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 86.00 535.00 1146.50 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 221.00 535.14 690.58 955.76 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 299.00 500.00 557.54 470.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 299.00 500.00 557.54 470.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 53.00 650.00 807.76 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 53.00 650.00 807.76 900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 594.00 526.46 605.80 689.80 =============== 503-00060 Drilled Caisson (60 In) Lin Foot =============================================== ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 312.00 4810.00 4810.00 4810.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 312.00 4810.00 4810.00 4810.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 312.00 4810.00 4810.00 4810.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 218 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00212 Soil Mixing Cubic Yard ============================================= ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 14,752.00 208.32 260.00 260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14,752.00 208.32 260.00 260.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,752.00 208.32 260.00 260.00 =============== 503-00214 Soil Mixing (Overtopping) Cubic Yard ============================================= ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 7,482.00 142.33 220.00 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,482.00 142.33 220.00 220.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,482.00 142.33 220.00 220.00 =============== 503-00310 CSL Testing Each =================================================== IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 50.00 1000.00 393.64 340.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 2.00 4000.00 2758.02 1699.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 52.00 1115.38 742.92 392.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 1115.38 742.92 392.30 =============== 503-01060 M pile (6 In) Lin Foot =============================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 3,540.00 100.00 51.82 33.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 220.00 200.00 87.00 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,760.00 105.85 53.31 34.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,760.00 105.85 53.31 34.29 =============== 503-01070 M Pile (7 In) Lin Foot =============================================== NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 430.00 300.00 128.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 430.00 300.00 128.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 430.00 300.00 128.00 100.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 219 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-02000 Verification Test Pile Each =================================================== NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 2.00 5000.00 2934.00 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5000.00 2934.00 6000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5000.00 2934.00 6000.00 =============== 504-03411 Retaining Wall (Boulder) Sq Foot ================================================ CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 621.00 42.98 25.56 25.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 621.00 42.98 25.56 25.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 621.00 42.98 25.56 25.56 =============== 504-04410 Block Facing Sq Foot ================================================ NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 10,136.00 75.00 73.83 84.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,136.00 75.00 73.83 84.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,136.00 75.00 73.83 84.00 =============== 504-04440 Facing (Special) Sq Foot ================================================ NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 1,569.00 300.00 121.67 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,569.00 300.00 121.67 135.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 435.00 85.00 189.53 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 435.00 85.00 189.53 55.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,004.00 253.33 150.51 117.63 =============== 504-05000 Wire Mesh Facing Sq Foot ================================================ NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1,159.00 25.00 34.60 35.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 220 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 504-05000 Wire Mesh Facing Sq Foot ================================================ NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 5,084.00 35.00 48.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,243.00 33.14 44.76 39.07 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1,212.00 40.00 43.95 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,212.00 40.00 43.95 37.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,455.00 34.26 44.63 38.73 =============== 504-06300 Ground Nail Lin Foot =============================================== IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 2,785.00 45.00 39.09 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,785.00 45.00 39.09 47.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,785.00 45.00 39.09 47.00 =============== 504-06310 Ground Nail (10 Foot) Each =================================================== NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 79.00 800.00 397.00 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 79.00 800.00 397.00 225.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 79.00 800.00 397.00 225.00 =============== 504-06315 Ground Nail (15 Foot) Each =================================================== NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 85.00 1700.00 989.00 995.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 313.00 1000.00 536.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 398.00 1149.50 632.75 409.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 398.00 1149.50 632.75 409.11 =============== 504-06320 Ground Nail (20 Foot) Each =================================================== NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 42.00 2250.00 1354.00 1325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 42.00 2250.00 1354.00 1325.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42.00 2250.00 1354.00 1325.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 221 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 504-06400 Soil Nail Wall Sq Foot ================================================ IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 4,590.00 10.50 22.46 19.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,590.00 10.50 22.46 19.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,590.00 10.50 22.46 19.50 =============== 504-06410 Verification Testing Each =================================================== IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 2.00 2500.00 2197.90 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2500.00 2197.90 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2500.00 2197.90 500.00 =============== 504-08255 Masonry Landscape Wall (Dry Stack) Sq Foot ================================================ NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 50.00 45.00 104.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 45.00 104.00 35.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 175.00 30.00 74.80 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 175.00 30.00 74.80 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 225.00 33.33 86.97 46.67 =============== 506-00010 Riprap (Special) Cubic Yard ============================================= ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 350.00 74.00 74.00 74.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 350.00 74.00 74.00 74.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 2,631.00 67.92 70.96 70.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,631.00 67.92 70.96 70.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,981.00 68.63 71.31 71.31 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 222 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00030 Grouted Riprap Cubic Yard ============================================= NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 48.00 250.00 376.45 300.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 70.00 350.00 417.65 411.34 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 118.00 309.32 392.29 366.05 ER0361-115 US 36 Bridges 06/22/17 1,846.00 175.00 136.03 119.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,846.00 175.00 136.03 119.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,964.00 183.07 148.07 133.84 =============== 506-00035 Grouted Riprap Sq Yard ================================================ STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 2.00 1000.00 590.62 590.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1000.00 590.62 590.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1000.00 590.62 590.33 =============== 506-00050 Slope Mattress Cubic Yard ============================================= NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 4.00 100.00 1795.00 1875.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 100.00 1795.00 1875.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 100.00 1795.00 1875.00 =============== 506-00206 Riprap (6 In) Cubic Yard ============================================= STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 8.00 450.00 263.50 200.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 48.00 95.00 132.35 150.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 56.00 145.71 142.44 157.73 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 52.00 100.00 107.44 98.72 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 223 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00206 Riprap (6 In) Cubic Yard ============================================= STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 85.00 110.00 103.19 97.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 137.00 106.20 106.53 97.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 193.00 117.67 118.87 115.17 =============== 506-00207 Rip Rap (6 In) Ton ==================================================== STE 0702-357 I-70 West Vail Pass Basin 03/23/17 1,900.00 60.00 84.30 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,900.00 60.00 84.30 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,900.00 60.00 84.30 75.00 =============== 506-00209 Riprap (9 In) Cubic Yard ============================================= STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 388.00 100.00 90.03 80.00 STM0243-089 Midpoint: Station 1019+50 Cen STA0931-032 SH 93 Erosion Correction 02/09/17 5.00 125.00 308.38 210.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1,615.00 100.00 111.26 100.69 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 15.00 115.00 183.00 100.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 5.00 150.00 178.75 156.94 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 17.00 100.00 196.91 155.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,045.00 100.29 110.09 99.46 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 99.00 100.00 105.02 75.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 40.00 150.00 170.00 170.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 11.00 150.00 317.25 310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 150.00 117.00 114.41 117.57 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 354.00 120.00 99.57 111.06 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 62.00 135.00 223.67 206.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 416.00 122.24 104.39 125.21 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 60.00 120.00 201.70 103.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60.00 120.00 201.70 103.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,671.00 105.09 110.53 104.98 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 224 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00210 Riprap (9 In) Ton ==================================================== STA006A-057 SH 6 EAST OF STERLING 04/06/17 5.00 200.00 258.77 260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 200.00 258.77 260.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 200.00 258.77 260.00 =============== 506-00212 Riprap (12 In) Cubic Yard ============================================= STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 108.00 125.00 107.84 100.00 STM0243-089 Midpoint: Station 1019+50 Cen IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 107.00 125.00 139.16 106.81 STA0362-035 US 36: Strasburg to Byers 03/23/17 8.00 70.00 511.73 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 223.00 123.03 136.64 103.84 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 10.00 180.00 240.99 232.96 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 115.00 60.00 102.88 98.43 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 19.00 200.00 131.07 125.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 30.00 190.00 249.40 200.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 535.00 41.00 41.00 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 709.00 56.61 98.74 62.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 45.00 120.00 201.00 248.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1,737.00 80.00 82.81 100.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,782.00 81.01 83.64 103.74 STA094A-034 Critical Culvert Project on S 10/05/17 461.00 100.00 82.53 62.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 123.00 120.00 117.00 150.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 3.00 125.00 377.13 431.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 587.00 104.32 86.79 82.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,301.00 82.75 87.16 90.76 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 225 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00213 Riprap (12 Inch)(Install Only) Cubic Yard ============================================= ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 23,591.00 61.73 90.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23,591.00 61.73 90.00 90.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 832.00 68.12 70.00 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 832.00 68.12 70.00 70.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24,423.00 61.95 89.32 89.32 =============== 506-00218 Riprap (18 In) Cubic Yard ============================================= STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 30.00 160.00 106.28 125.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 293.00 150.00 183.51 95.00 STA0931-032 SH 93 Erosion Correction 02/09/17 11.00 150.00 256.25 155.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 7.00 80.00 308.33 470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 341.00 149.44 183.21 106.46 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2,326.00 100.00 80.87 58.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,326.00 100.00 80.87 58.88 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 1,072.00 95.00 102.72 111.06 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1,835.00 105.00 104.00 105.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 20.00 200.00 484.00 650.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 4,983.00 92.00 85.93 103.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,910.00 95.70 90.63 105.94 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 926.00 85.00 142.95 142.68 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 226 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00218 Riprap (18 In) Cubic Yard ============================================= BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 926.00 85.00 142.95 142.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,503.00 97.30 93.11 99.39 =============== 506-00222 Riprap (18 In) (Spec) (CIP) Cubic Yard ============================================= ER0361-115 US 36 Bridges 06/22/17 3,345.00 120.00 94.11 108.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,345.00 120.00 94.11 108.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,345.00 120.00 94.11 108.00 =============== 506-00224 Riprap (24 In) Cubic Yard ============================================= STA0931-032 SH 93 Erosion Correction 02/09/17 30.00 175.00 291.07 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 175.00 291.07 250.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 46.00 180.00 206.56 129.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 46.00 180.00 206.56 129.68 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 76.00 125.00 141.17 140.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 76.00 125.00 141.17 140.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 553.00 53.43 71.00 71.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 9,850.00 175.00 180.36 165.41 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10,403.00 168.54 179.49 160.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,555.00 168.29 179.37 160.37 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 227 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00227 Riprap (24 In) (Install Only) Cubic Yard ============================================= ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 19,404.00 54.19 90.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19,404.00 54.19 90.00 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,404.00 54.19 90.00 90.00 =============== 506-00236 Riprap (36 In) Cubic Yard ============================================= ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 4,093.00 91.70 180.00 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,093.00 91.70 180.00 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,093.00 91.70 180.00 180.00 =============== 506-00237 Riprap (36 In) (Spec) Cubic Yard ============================================= ER0361-115 US 36 Bridges 06/22/17 555.00 165.00 247.52 252.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 555.00 165.00 247.52 252.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 555.00 165.00 247.52 252.00 =============== 506-00243 Riprap (42 In) (Spec) Cubic Yard ============================================= ER0361-115 US 36 Bridges 06/22/17 128.00 200.00 286.73 255.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 128.00 200.00 286.73 255.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 128.00 200.00 286.73 255.00 =============== 506-00319 Riprap (18 Inch) (Install Only) Cubic Yard ============================================= ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 11,579.00 53.78 90.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,579.00 53.78 90.00 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,579.00 53.78 90.00 90.00 =============== 506-00409 Soil Riprap (9 In) Cubic Yard ============================================= NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 32.00 115.00 155.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32.00 115.00 155.00 100.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 228 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00409 Soil Riprap (9 In) Cubic Yard ============================================= IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 291.00 100.00 169.91 98.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 291.00 100.00 169.91 98.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 323.00 101.49 167.60 98.20 =============== 506-00412 Soil Riprap (12 In) Cubic Yard ============================================= STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 50.00 120.00 126.60 130.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 54.00 150.00 110.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 104.00 135.58 116.53 109.49 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 816.00 87.00 76.86 88.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 816.00 87.00 76.86 88.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1,070.00 100.00 84.82 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,070.00 100.00 84.82 70.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,990.00 96.53 81.20 79.06 =============== 506-00418 Soil Riprap (18 In) Cubic Yard ============================================= ER0361-115 US 36 Bridges 06/22/17 1,540.00 85.00 81.60 74.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,540.00 85.00 81.60 74.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,540.00 85.00 81.60 74.00 =============== 506-00424 Soil Riprap (24 In) Cubic Yard ============================================= ER0361-115 US 36 Bridges 06/22/17 5,156.00 95.00 106.43 89.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,156.00 95.00 106.43 89.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 229 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00424 Soil Riprap (24 In) Cubic Yard ============================================= ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 2,483.00 95.00 143.80 122.87 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,483.00 95.00 143.80 122.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,639.00 95.00 119.87 100.01 =============== 506-00512 Riprap (12 In)(Furnish) Ton ==================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 7,846.00 61.73 43.00 43.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,846.00 61.73 43.00 43.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,846.00 61.73 43.00 43.00 =============== 506-00518 Riprap (18 In)(Furnish) Ton ==================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 4,764.00 53.78 45.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,764.00 53.78 45.00 45.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,764.00 53.78 45.00 45.00 =============== 506-00524 Riprap (24 In)(Furnish) Ton ==================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 6,833.00 53.93 59.00 59.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,833.00 53.93 59.00 59.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,833.00 53.93 59.00 59.00 =============== 506-00600 In-Channel Boulder Feature (Riffle) Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 23.00 9550.00 13160.00 13160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23.00 9550.00 13160.00 13160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 9550.00 13160.00 13160.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 230 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00601 In-Channel Boulder Feature (Step) Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 63.00 7190.10 4000.00 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 63.00 7190.10 4000.00 4000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 63.00 7190.10 4000.00 4000.00 =============== 506-00602 In-Channel Boulder Feature (Bldr Cascde) Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 152.00 197.14 233.00 233.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 152.00 197.14 233.00 233.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 152.00 197.14 233.00 233.00 =============== 506-00603 In-Chan Bldr Featre (Hbitat Bldr Field) Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 61.00 6005.22 9160.00 9160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 61.00 6005.22 9160.00 9160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 61.00 6005.22 9160.00 9160.00 =============== 506-00612 Matrix Riprap (12 In) Cubic Yard ============================================= ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 2,320.00 160.11 200.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,320.00 160.11 200.00 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,320.00 160.11 200.00 200.00 =============== 506-00618 Matrix Riprap (18 In) Cubic Yard ============================================= ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 8,584.00 137.79 200.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,584.00 137.79 200.00 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,584.00 137.79 200.00 200.00 =============== 506-00700 Void-Filled Riprap Cubic Yard ============================================= ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 360.00 91.41 195.00 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 360.00 91.41 195.00 195.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 360.00 91.41 195.00 195.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 231 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-01020 Geogrid Reinforce Sq Yard ================================================ STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2,680.00 5.00 4.59 1.50 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 2,170.00 3.50 6.33 6.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 983.00 6.00 17.20 10.60 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1,156.00 5.00 3.76 2.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 12,870.00 3.25 7.17 4.86 NHPP 0701-230 Midpoint WB Bore 03/02/17 90.00 9.00 13.34 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19,949.00 3.78 6.98 4.89 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1,385.00 5.00 2.75 2.75 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 30.00 50.00 71.13 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,415.00 5.95 8.20 3.75 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 4,363.00 3.50 4.38 2.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,363.00 3.50 4.38 2.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25,727.00 3.85 6.70 4.35 =============== 507-00000 Conc S and D Pave Cubic Yard ============================================= NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 25.00 600.00 809.64 625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 600.00 809.64 625.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1,011.00 550.00 909.68 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,011.00 550.00 909.68 900.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 2.00 1000.00 950.00 950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1000.00 950.00 950.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 232 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 507-00000 Conc S and D Pave Cubic Yard ============================================= SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 8.00 450.00 358.67 420.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 450.00 358.67 420.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,046.00 551.29 900.20 889.85 =============== 507-00100 Conc S and D Pave (Reinf) Cubic Yard ============================================= NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 4.00 400.00 1853.38 1020.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 400.00 1853.38 1020.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 10.00 750.00 1019.19 636.00 ER0361-115 US 36 Bridges 06/22/17 2.00 750.00 902.67 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 750.00 1008.60 613.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 662.50 1079.00 715.00 =============== 507-00300 Gr Rubble S and D Pave Cubic Yard ============================================= NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 35.00 600.00 458.47 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 35.00 600.00 458.47 185.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 31.00 400.00 555.67 622.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 31.00 400.00 555.67 622.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66.00 506.06 485.21 390.26 =============== 507-00350 Gr Riprap S and D Pave Cubic Yard ============================================= STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 580.00 300.00 237.01 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 233 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 507-00350 Gr Riprap S and D Pave Cubic Yard ============================================= STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 580.00 300.00 237.01 200.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 139.00 250.00 441.67 490.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 139.00 250.00 441.67 490.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 719.00 290.33 271.88 293.96 =============== 507-00400 Bitum S and D Pave (Asph) Ton ==================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 7.00 200.00 520.00 520.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 200.00 520.00 520.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 22.00 375.00 466.67 300.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 6.00 350.00 436.20 509.95 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 15.00 212.00 223.00 223.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 36.00 300.00 239.02 205.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 79.00 307.97 293.37 258.03 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 2.00 575.00 500.00 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 575.00 500.00 700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 88.00 305.45 298.34 288.92 =============== 507-00700 S and D Pave (Spec) Cubic Yard ============================================= ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 89.00 130.00 887.33 1587.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 89.00 130.00 887.33 1587.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 89.00 130.00 887.33 1587.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 234 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 508-00520 Insulation Material (2 In) Sq Foot ================================================ NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 1,260.00 15.00 9.05 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,260.00 15.00 9.05 7.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,260.00 15.00 9.05 7.50 =============== 509-00001 Str Steel (Galv) Pound ================================================== NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 104,743.00 4.00 4.21 3.50 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 230.00 6.40 29.10 14.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 104,973.00 4.01 4.24 3.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 104,973.00 4.01 4.24 3.52 =============== 509-00003 Str Steel (Install Only) Pound ================================================== ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 820,836.00 1.75 1.75 1.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 820,836.00 1.75 1.75 1.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 820,836.00 1.75 1.75 1.75 =============== 509-08121 Temp Bridge Deck Lin Foot =============================================== NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 394.00 200.00 861.00 862.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 394.00 200.00 861.00 862.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 394.00 200.00 861.00 862.00 =============== 509-08201 Retrofit/Repair Type I Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 22.00 500.00 907.79 674.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 22.00 500.00 907.79 674.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 500.00 907.79 674.41 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 235 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 509-08202 Retrofit/Repair Ty II Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 20.00 5500.00 1842.90 2280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 5500.00 1842.90 2280.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 5500.00 1842.90 2280.00 =============== 509-50410 Metal Panels (New) Sq Foot ================================================ NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 190.00 40.66 21.86 21.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 190.00 40.66 21.86 21.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 190.00 40.66 21.86 21.86 =============== 510-20100 Str PA(Spec) Lin Foot =============================================== NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 69.00 10000.00 1675.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 69.00 10000.00 1675.00 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 69.00 10000.00 1675.00 1500.00 =============== 512-00101 Bearing Device (Type I) Each =================================================== ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 32.00 5141.00 5141.00 5141.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32.00 5141.00 5141.00 5141.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 5141.00 5141.00 5141.00 =============== 512-00120 Bearing Repair Corbel Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 8.00 5000.00 7015.86 6400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 5000.00 7015.86 6400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 5000.00 7015.86 6400.00 =============== 514-00054 Ped Railing (54 In) Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 28.00 200.00 306.80 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28.00 200.00 306.80 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 200.00 306.80 300.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 236 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 514-00100 Hand Rail Lin Foot =============================================== NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 8,535.00 100.00 47.39 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,535.00 100.00 47.39 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,535.00 100.00 47.39 40.00 =============== 515-00120 Waterproofing (Membrane) Sq Yard ================================================ NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 719.00 20.00 20.43 21.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 128.00 20.00 34.65 45.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 600.00 19.00 20.22 27.20 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 8,320.00 22.00 15.24 15.68 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 263.00 18.00 25.36 21.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 2,840.00 17.00 23.72 21.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,870.00 20.54 18.16 18.25 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 890.00 20.00 34.70 34.70 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 1,854.00 20.00 16.51 15.53 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 192.00 22.00 36.44 45.10 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1,512.00 20.00 19.86 16.83 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 567.00 19.00 20.50 20.50 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1,592.00 17.00 18.37 15.90 STA0703-437 I-70: 32ND TO 44TH 06/01/17 8,915.00 20.00 16.38 16.00 ER0361-115 US 36 Bridges 06/22/17 2,182.00 20.00 16.90 18.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17,704.00 19.72 17.77 17.72 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 2,578.00 20.00 18.50 18.50 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 1,325.00 22.00 16.84 20.30 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 2,861.00 50.00 52.00 52.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 2,355.00 20.00 15.85 15.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,119.00 29.70 18.47 28.37 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 1,528.00 20.00 23.10 25.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 237 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 515-00120 Waterproofing (Membrane) Sq Yard ================================================ NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 70.00 40.00 79.37 46.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,598.00 20.88 25.56 25.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 41,291.00 22.23 18.41 20.56 =============== 515-00400 Concrete Sealer Sq Yard ================================================ ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 2,861.00 15.00 15.00 15.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1,067.00 12.00 16.50 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,928.00 14.19 15.98 16.36 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 125.00 25.00 12.25 12.25 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 93.00 10.00 54.33 113.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 218.00 18.60 41.31 55.23 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 227.00 14.00 16.00 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 227.00 14.00 16.00 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,373.00 14.40 17.14 18.28 =============== 518-00000 Brdg Compress Joint Sealer Lin Foot =============================================== NHPPC120-026 US 85: I-76 to 168th 05/04/17 124.00 85.00 159.37 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 124.00 85.00 159.37 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 124.00 85.00 159.37 75.00 =============== 518-00010 Rdwy Compress Joint Sealer Lin Foot =============================================== NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 672.00 85.00 106.00 113.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 672.00 85.00 106.00 113.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 672.00 85.00 106.00 113.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 238 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 518-00100 Waterstop Lin Foot =============================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 150.00 1.00 40.42 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 150.00 1.00 40.42 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 1.00 40.42 10.00 =============== 518-01001 Br Expan Joint (Asphaultic Plug) Lin Foot =============================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 176.00 200.00 192.96 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 176.00 200.00 192.96 250.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 60.00 250.00 173.14 129.42 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 160.00 250.00 289.84 157.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 220.00 250.00 268.41 149.84 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 351.00 91.15 44.00 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 351.00 91.15 44.00 44.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 747.00 163.58 205.82 123.71 =============== 518-01002 Br Expan Device (0-2 In) Lin Foot =============================================== BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 160.00 325.00 154.72 255.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 160.00 325.00 154.72 255.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 160.00 325.00 154.72 255.16 =============== 518-01004 Br Expan Device (0-4 In) Lin Foot =============================================== BR0252-449 I-25 Woodmen NB 03/02/17 257.00 300.00 317.50 235.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 239 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 518-01004 Br Expan Device (0-4 In) Lin Foot =============================================== NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 360.00 500.00 373.70 392.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 162.00 363.00 363.00 363.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 108.00 400.00 414.96 373.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 887.00 404.85 355.91 338.90 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 152.00 375.00 206.69 214.76 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 59.00 325.00 368.90 283.50 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 615.00 425.00 401.75 245.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 42.00 500.00 340.00 340.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 255.00 450.00 343.40 480.00 ER0361-115 US 36 Bridges 06/22/17 128.00 325.00 285.08 310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,251.00 411.59 321.05 300.88 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 266.00 450.00 260.00 260.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 160.00 275.00 218.19 230.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 426.00 384.27 223.68 248.73 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 90.00 300.00 481.67 395.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 90.00 300.00 481.67 395.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,654.00 401.17 315.43 308.41 =============== 518-01009 Br Expan Device (0-9 In) Lin Foot =============================================== NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 103.00 2200.00 2295.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 103.00 2200.00 2295.00 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 103.00 2200.00 2295.00 2500.00 =============== 518-01060 Br Expan Device (Gland) (0-4 In) Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 84.00 98.51 67.00 67.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 84.00 98.51 67.00 67.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 84.00 98.51 67.00 67.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 240 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 518-01254 Expansion Joint (FRP) Lin Foot =============================================== NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 20,588.00 7.00 5.79 4.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20,588.00 7.00 5.79 4.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,588.00 7.00 5.79 4.05 =============== 518-02030 Polyester Conc End Dam Cubic Foot ============================================= NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 31.00 200.00 265.00 265.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 31.00 200.00 265.00 265.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 180.00 200.00 318.33 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 180.00 200.00 318.33 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 211.00 200.00 315.44 192.49 =============== 518-03000 Saw and Seal Br Joint Lin Foot =============================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 156.00 25.00 25.91 33.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 126.00 22.00 20.90 26.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 221.00 25.00 20.13 25.50 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 180.00 26.00 34.20 35.84 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 204.00 30.00 18.65 41.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 80.00 25.00 51.16 45.05 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 241.00 25.00 21.66 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,208.00 25.68 24.03 31.67 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 300.00 30.00 20.33 14.50 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 111.00 22.50 33.30 16.80 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 1,288.00 21.00 22.13 19.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 175.00 30.00 12.50 12.50 STA0703-437 I-70: 32ND TO 44TH 06/01/17 1,158.00 22.00 18.11 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,032.00 22.85 20.75 18.48 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 241 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 518-03000 Saw and Seal Br Joint Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1,456.00 35.00 37.00 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,456.00 35.00 37.00 37.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 3,394.00 25.00 21.66 24.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 61.00 30.00 41.33 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,455.00 25.09 21.87 23.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,151.00 26.00 22.42 25.22 =============== 519-03035 Place Thin Bond Overlay (Poly Conc) Sq Yard ================================================ BR0252-449 I-25 Woodmen NB 03/02/17 12,206.00 55.00 33.88 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,206.00 55.00 33.88 30.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 20,258.00 30.00 24.75 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20,258.00 30.00 24.75 25.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 1,040.00 50.00 91.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,040.00 50.00 91.00 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33,504.00 39.73 29.65 28.53 =============== 519-03055 Furnish Thin Bond Overlay (Poly Conc) Cubic Foot ============================================= BR0252-449 I-25 Woodmen NB 03/02/17 7,377.00 105.00 105.50 88.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,377.00 105.00 105.50 88.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 242 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 519-03055 Furnish Thin Bond Overlay (Poly Conc) Cubic Foot ============================================= NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 14,411.00 90.00 95.38 91.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14,411.00 90.00 95.38 91.50 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 897.00 115.00 136.67 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 897.00 115.00 136.67 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22,685.00 95.87 99.94 91.69 =============== 601-01000 Conc CL B Cubic Yard ============================================= STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 56.00 700.00 786.80 800.00 STM0243-089 Midpoint: Station 1019+50 Cen STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 0.30 500.00 6916.06 8800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 56.30 698.93 833.35 884.81 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 11.60 500.00 1199.94 1710.42 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 17.00 1600.00 2089.82 974.47 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2.00 1000.00 685.00 685.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 3.00 1000.00 785.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 33.60 1130.95 1411.16 1146.63 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 121.60 2639.77 6100.00 6100.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 5.00 1000.00 1585.49 1780.00 BRR400-354 Little-T Channel Work and SH SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 4.00 1000.00 662.60 615.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 130.60 2526.77 4283.90 5766.62 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 36.00 700.00 498.67 420.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 36.00 700.00 498.67 420.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 256.50 1686.34 1913.96 3640.29 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 243 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-01030 Conc CL B (Box) Cubic Yard ============================================= ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 50.00 850.00 1140.50 1033.51 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 850.00 1140.50 1033.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 850.00 1140.50 1033.51 =============== 601-01050 Conc CL B (Wall) Cubic Yard ============================================= BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 16.80 1100.00 1621.50 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.80 1100.00 1621.50 3000.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 35.00 1650.00 1496.00 1570.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 35.00 1650.00 1496.00 1570.00 STA094A-034 Critical Culvert Project on S 10/05/17 43.00 800.00 1600.10 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 43.00 800.00 1600.10 1400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 94.80 1166.98 1586.75 1746.31 =============== 601-03000 Conc CL D Cubic Yard ============================================= NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 2.00 1200.00 2542.08 505.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 1.10 1500.00 2063.75 2500.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 20.00 1500.00 641.88 600.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 39.00 1400.00 965.00 1000.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 7.00 1000.00 1409.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 69.10 1384.23 924.52 893.78 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 2.00 3769.13 2272.00 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 244 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03000 Conc CL D Cubic Yard ============================================= ER0361-115 US 36 Bridges 06/22/17 3.00 1000.00 1432.29 760.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 2107.65 1584.97 1256.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 34.00 1000.00 1120.00 950.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 30.00 400.00 911.80 680.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 64.00 718.75 1065.69 823.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 138.10 1102.01 998.83 874.29 =============== 601-03030 Conc CL D (Box) Cubic Yard ============================================= STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 608.00 820.00 623.32 507.52 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 14.00 2000.00 1900.00 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 622.00 846.56 635.45 511.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 622.00 846.56 635.45 511.85 =============== 601-03040 Conc CL D (Bridge) Cubic Yard ============================================= ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 1,455.00 2710.00 2710.00 2710.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,455.00 2710.00 2710.00 2710.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 4.00 2000.00 2969.25 3882.74 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 850.00 750.00 674.33 571.86 ER0361-115 US 36 Bridges 06/22/17 618.00 600.00 702.47 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,472.00 690.42 683.81 613.66 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 38.00 1400.00 1533.33 600.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 757.00 600.00 680.99 574.55 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 118.00 1993.30 3000.00 3000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 245 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03040 Conc CL D (Bridge) Cubic Yard ============================================= ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1,175.00 550.00 661.75 675.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,088.00 665.16 686.30 768.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,015.00 1265.84 762.13 1286.39 =============== 601-03041 Conc CL D (Bridge) (Spec) Cubic Yard ============================================= STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 30.00 2000.00 1613.48 1475.44 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 6.00 1600.00 8511.25 656.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36.00 1933.33 3337.92 1338.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 1933.33 3337.92 1338.91 =============== 601-03050 Conc CL D (Wall) Cubic Yard ============================================= STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 3.00 1500.00 1590.75 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1500.00 1590.75 2500.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 1.00 750.00 2141.00 3000.00 ER0361-115 US 36 Bridges 06/22/17 34.00 1000.00 1259.17 765.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 35.00 992.86 1280.26 828.86 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 287.00 600.00 743.04 480.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 287.00 600.00 743.04 480.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 32.00 800.00 595.33 900.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 81.00 1600.00 1826.98 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 113.00 1373.45 1668.05 1115.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 438.00 837.10 1186.99 685.55 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 246 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03052 Conc CL D (Wall) (C) Cubic Yard ============================================= SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 24.00 850.00 1062.00 865.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24.00 850.00 1062.00 865.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 850.00 1062.00 865.00 =============== 601-03057 Conc CL DR Cubic Yard ============================================= STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 1.00 700.00 2999.00 3650.00 BR0252-449 I-25 Woodmen NB 03/02/17 45.00 1752.00 1487.50 1050.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 4.00 1500.00 1739.49 3600.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 22.00 1000.00 1764.05 1321.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 72.00 1493.61 1599.27 1310.59 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 6.00 1000.00 6530.00 6530.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 7.00 1509.00 2808.63 2800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 1274.08 3635.60 4521.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 85.00 1460.04 1786.28 1801.67 =============== 601-03540 Conc CL DT (Deck Topping) Cubic Yard ============================================= NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 8.00 1000.00 640.00 640.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 1000.00 640.00 640.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 1000.00 640.00 640.00 =============== 601-04000 Conc CL E Cubic Yard ============================================= IM025A-037 I25 S. Trinidad Resurface and 11/30/17 33.00 750.00 593.35 680.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 33.00 750.00 593.35 680.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.00 750.00 593.35 680.05 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 247 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-06100 Conc (Patching) Cubic Yard ============================================= NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 28.00 1000.00 1534.08 1500.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 4.00 8000.00 4874.25 2825.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 4.00 2000.00 2636.00 2950.00 BR0252-449 I-25 Woodmen NB 03/02/17 14.00 1700.00 2000.00 1700.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 238.00 1500.00 1888.73 1971.20 STA0362-035 US 36: Strasburg to Byers 03/23/17 13.00 2783.00 2547.01 1666.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 301.00 1611.23 1958.76 1925.96 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 210.00 2000.00 1811.25 1375.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 33.00 1000.00 3208.56 2500.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 182.00 2500.00 2222.62 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 425.00 2136.47 2073.89 1644.35 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 29.00 2500.00 1800.00 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29.00 2500.00 1800.00 1800.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 58.00 2500.00 3277.90 2400.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 447.00 200.00 42.10 53.29 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 4.00 1800.00 5966.67 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 509.00 474.66 656.51 351.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,264.00 1350.54 1497.88 1194.45 =============== 601-06150 Conc (Patching) Sq Foot ================================================ STA0362-035 US 36: Strasburg to Byers 03/23/17 10.00 150.00 739.18 915.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 150.00 739.18 915.83 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 400.00 250.00 90.87 80.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 248 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-06150 Conc (Patching) Sq Foot ================================================ STAR400-348 Region 4 Controller and Cabin 05/04/17 195.00 185.00 82.50 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 595.00 228.70 89.96 73.45 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 23.00 323.27 500.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23.00 323.27 500.00 500.00 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 200.00 90.20 109.90 109.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 90.20 109.90 109.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 828.00 196.92 98.52 104.27 =============== 601-06165 Conc (Patching)(Fast Curing) Cubic Foot ============================================= STA0362-035 US 36: Strasburg to Byers 03/23/17 54.00 300.00 345.37 329.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 54.00 300.00 345.37 329.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54.00 300.00 345.37 329.12 =============== 601-13001 Str Conc Stain (Special) Sq Yard ================================================ ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 295.00 45.00 71.00 71.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 295.00 45.00 71.00 71.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 295.00 45.00 71.00 71.00 =============== 601-21010 Precast Concrete Unit Cubic Yard ============================================= ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 20.00 2075.31 1775.00 1775.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 2075.31 1775.00 1775.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 2075.31 1775.00 1775.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 249 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-25730 Precast Deck Panel (3 In) Sq Yard ================================================ ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 83.00 207.00 180.00 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 83.00 207.00 180.00 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 83.00 207.00 180.00 180.00 =============== 601-40005 Cut Stone Veneer Sq Foot ================================================ BR0252-449 I-25 Woodmen NB 03/02/17 116.00 71.00 72.50 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 116.00 71.00 72.50 85.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 116.00 71.00 72.50 85.00 =============== 601-40300 Struct Conc Coating Sq Yard ================================================ NHPP 0701-230 Midpoint WB Bore 03/02/17 4,750.00 30.00 68.71 50.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,750.00 30.00 68.71 50.80 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 3,880.00 10.00 17.54 11.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 59.00 7.00 35.75 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,939.00 9.96 17.67 11.22 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1,181.00 15.00 21.56 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,181.00 15.00 21.56 23.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,870.00 20.21 32.78 31.68 =============== 601-40400 Struct Conc Stain Sq Yard ================================================ ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 1,765.00 25.00 25.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,765.00 25.00 25.00 25.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 250 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-40400 Struct Conc Stain Sq Yard ================================================ MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 11.00 70.00 76.67 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 70.00 76.67 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,776.00 25.28 25.95 25.03 =============== 601-51005 Galvanic Anodes Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 827.00 50.00 30.80 25.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 36.00 50.00 46.87 49.00 BR0252-449 I-25 Woodmen NB 03/02/17 945.00 40.00 22.75 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,808.00 44.77 25.89 22.86 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 1,030.00 50.00 36.02 31.06 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1,055.00 45.00 39.38 35.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 6,815.00 41.00 22.69 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,900.00 42.52 25.50 23.82 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 15.00 45.00 40.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 45.00 40.00 40.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 840.00 30.00 33.94 32.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 635.00 52.00 31.65 30.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,475.00 39.47 33.23 31.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,198.00 42.49 26.59 24.64 =============== 601-51007 Galvanic Anodes (Install Only) Each =================================================== STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 70.00 12.00 12.19 32.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 251 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-51007 Galvanic Anodes (Install Only) Each =================================================== STA0362-035 US 36: Strasburg to Byers 03/23/17 690.00 10.00 18.49 16.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 760.00 10.18 17.74 17.68 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 230.00 20.00 89.30 89.30 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 105.00 43.00 44.72 40.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 235.00 10.01 20.51 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 570.00 20.12 39.27 50.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,330.00 14.44 25.22 31.71 =============== 602-00000 Reinf Steel Pound ================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 1,404.00 2.00 2.55 3.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 36.00 3.00 18.23 10.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 765.00 4.00 3.06 3.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 3,495.00 1.25 1.58 2.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 280.00 2.00 12.49 2.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 40.00 1.00 11.04 10.75 BR0252-449 I-25 Woodmen NB 03/02/17 1,154.00 1.00 2.25 1.50 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 10,462.00 1.00 2.17 2.24 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 70.00 3.00 3.89 5.50 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 73,922.00 1.90 1.90 1.90 STA0362-035 US 36: Strasburg to Byers 03/23/17 840.00 1.00 1.89 1.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 92,468.00 1.77 2.13 1.97 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 230.00 2.00 5.40 5.40 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 875.00 3.50 2.49 2.33 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 120,530.00 1.00 0.89 0.88 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1,505.00 1.00 3.24 1.25 STA0703-437 I-70: 32ND TO 44TH 06/01/17 9,655.00 1.00 1.70 1.60 ER0361-115 US 36 Bridges 06/22/17 19,510.00 1.10 1.22 0.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 152,305.00 1.03 0.94 0.95 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1,972.00 2.00 2.74 1.20 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 252 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 602-00000 Reinf Steel Pound ================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 3,151.00 1.32 1.50 1.50 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 472.00 2.00 1.49 4.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,595.00 1.62 2.17 1.61 STA094A-034 Critical Culvert Project on S 10/05/17 2,800.00 2.00 1.99 2.50 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 6,170.00 2.00 1.38 1.70 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 915.00 1.25 2.82 3.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 83.00 1.20 11.72 10.15 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 105.00 1.00 2.37 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10,073.00 1.91 1.88 2.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 260,441.00 1.34 1.07 1.37 =============== 602-00011 Reinf Steel (HP) Pound ================================================== BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 113,529.00 1.75 3.37 0.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 113,529.00 1.75 3.37 0.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 113,529.00 1.75 3.37 0.90 =============== 602-00020 Reinf Steel (Epoxy) Pound ================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 264.00 3.00 5.89 10.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 3,954.00 3.00 2.65 2.00 STM0243-089 Midpoint: Station 1019+50 Cen BR0252-449 I-25 Woodmen NB 03/02/17 1,122.00 3.00 2.75 2.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 1,502.00 2.50 3.26 3.36 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 298,966.00 2.00 2.00 2.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 1,705.00 1.50 2.13 1.58 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1,348.00 1.00 2.27 1.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 308,861.00 2.01 2.07 2.01 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 361.00 5.00 3.00 2.85 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 253 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 602-00020 Reinf Steel (Epoxy) Pound ================================================== STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 500.00 2.00 5.30 6.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 143,665.00 1.30 1.07 0.95 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 17,680.00 1.25 2.10 2.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 2,290.00 2.50 2.78 2.08 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1,042.00 2.50 2.00 2.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 1,922.00 1.00 2.13 1.80 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 738.00 10.00 4.30 7.00 ER0361-115 US 36 Bridges 06/22/17 97,595.00 1.20 1.03 1.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 265,793.00 1.30 1.11 1.16 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 2,873.00 1.25 1.25 1.25 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 50,744.00 1.50 1.98 1.90 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 6,442.00 2.50 2.00 1.50 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 23,046.00 0.94 1.61 1.61 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 283,566.00 1.00 0.93 1.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 366,671.00 1.09 0.99 1.17 C133A-042 SH 133 McClure Pass Slip 11/16/17 8,360.00 2.00 2.02 2.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 3,800.00 1.50 2.84 3.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 700.00 2.00 2.75 2.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 2,000.00 1.10 2.45 3.65 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14,860.00 1.75 2.25 2.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 956,185.00 1.46 1.11 1.46 =============== 602-00210 Welded Wire Fabric Sq Yard ================================================ NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1,655.00 30.00 41.57 35.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 4,436.00 26.00 25.40 12.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1,628.00 15.00 14.20 12.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,719.00 24.54 27.69 17.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,719.00 24.54 27.69 17.04 =============== 603-00000 Culvert Lining Lin Foot =============================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 166.00 1000.00 890.33 1370.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 166.00 1000.00 890.33 1370.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 166.00 1000.00 890.33 1370.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 254 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-00001 Annular Space Grouting Cubic Yard ============================================= STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 3.00 750.00 858.22 534.65 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 10.00 540.00 924.50 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 588.46 912.33 661.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 588.46 912.33 661.84 =============== 603-00010 Culvert Lining Sq Foot ================================================ NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 656.00 57.20 115.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 656.00 57.20 115.00 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 656.00 57.20 115.00 80.00 =============== 603-00026 Culvert Lining (24 In) Lin Foot =============================================== IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 285.00 350.00 287.00 106.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 285.00 350.00 287.00 106.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 285.00 350.00 287.00 106.00 =============== 603-00036 Culvert Lining (36 In) Lin Foot =============================================== BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 90.00 285.00 412.00 480.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 90.00 285.00 412.00 480.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90.00 285.00 412.00 480.00 =============== 603-00042 Culvert Lining (42 Inch) Lin Foot =============================================== STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 101.00 400.00 482.47 362.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 101.00 400.00 482.47 362.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 101.00 400.00 482.47 362.41 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 255 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-00052 Culvert Lining (48 In)(Spray App) Lin Foot =============================================== NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 1,960.00 425.00 562.50 400.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 218.00 400.00 499.67 424.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,178.00 422.50 553.52 402.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,178.00 422.50 553.52 402.40 =============== 603-00058 Culvert Lining (54 In)(Spray App) Lin Foot =============================================== NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 305.00 550.00 582.50 440.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 305.00 550.00 582.50 440.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 305.00 550.00 582.50 440.00 =============== 603-00060 Culvert Lining (60 In) Lin Foot =============================================== STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 10.00 600.00 625.01 660.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 600.00 625.01 660.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 600.00 625.01 660.03 =============== 603-00062 Culvert Lining (60 Inch)(Special) Lin Foot =============================================== STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 6.00 1400.00 712.92 713.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 1400.00 712.92 713.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1400.00 712.92 713.77 =============== 603-00065 Culvert Lining (60 In)(Spray App) Lin Foot =============================================== ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 365.00 450.00 494.00 432.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 365.00 450.00 494.00 432.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 365.00 450.00 494.00 432.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 256 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-00088 Culvert Lining (84 In)(Spray App) Lin Foot =============================================== NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 422.00 850.00 987.50 575.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 422.00 850.00 987.50 575.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 422.00 850.00 987.50 575.00 =============== 603-01150 15 In RCP Lin Foot =============================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 34.00 70.00 105.00 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 34.00 70.00 105.00 105.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 70.00 105.00 105.00 =============== 603-01180 18 In RCP Lin Foot =============================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 415.00 80.00 46.00 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 415.00 80.00 46.00 46.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 415.00 80.00 46.00 46.00 =============== 603-01185 18 In RCP (CIP) Lin Foot =============================================== STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 30.00 100.00 250.85 230.31 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 276.00 100.00 69.97 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 306.00 100.00 81.04 50.54 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 20.00 120.00 161.60 125.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 48.00 90.00 183.49 150.00 ER0361-115 US 36 Bridges 06/22/17 57.00 110.00 124.72 92.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 125.00 103.92 152.65 119.55 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 65.00 145.00 258.33 125.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 257 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01185 18 In RCP (CIP) Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 119.00 129.55 380.00 380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 184.00 135.01 304.44 289.92 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 62.00 90.00 159.11 157.33 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 299.00 120.00 170.14 166.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 361.00 114.85 169.11 165.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 976.00 112.59 147.19 146.92 =============== 603-01240 24 In RCP Lin Foot =============================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 905.00 90.00 65.00 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 905.00 90.00 65.00 65.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 905.00 90.00 65.00 65.00 =============== 603-01245 24 In RCP (CIP) Lin Foot =============================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 780.00 110.00 136.95 95.00 STM0243-089 Midpoint: Station 1019+50 Cen SHE160A-031 SH 160 Passing Lanes 03/02/17 8.00 175.00 181.02 236.11 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 280.00 120.00 87.66 38.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,068.00 113.11 121.17 73.33 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 584.00 140.00 120.73 91.20 ER0361-115 US 36 Bridges 06/22/17 20.00 150.00 189.41 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 604.00 140.33 121.89 91.99 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 319.00 329.21 625.00 625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 319.00 329.21 625.00 625.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 258 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01245 24 In RCP (CIP) Lin Foot =============================================== STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 159.00 125.00 197.42 179.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 159.00 125.00 197.42 179.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,150.00 153.70 140.11 189.32 =============== 603-01305 30 In RCP (CIP) Lin Foot =============================================== STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 22.00 120.00 237.80 265.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 22.00 120.00 237.80 265.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 356.00 416.81 605.00 605.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 356.00 416.81 605.00 605.00 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 21.00 230.00 234.79 199.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21.00 230.00 234.79 199.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 399.00 390.61 457.98 564.92 =============== 603-01360 36 In RCP Lin Foot =============================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 214.00 100.00 135.00 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 214.00 100.00 135.00 135.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 214.00 100.00 135.00 135.00 =============== 603-01365 36 In RCP (CIP) Lin Foot =============================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 360.00 150.00 211.12 130.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 259 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01365 36 In RCP (CIP) Lin Foot =============================================== STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 360.00 150.00 211.12 130.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 2,620.00 327.25 485.00 485.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,620.00 327.25 485.00 485.00 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 1,266.00 240.00 232.35 211.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,266.00 240.00 232.35 211.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,246.00 286.21 287.70 384.00 =============== 603-01420 42 In RCP Lin Foot =============================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 694.00 110.00 217.00 217.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 694.00 110.00 217.00 217.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 694.00 110.00 217.00 217.00 =============== 603-01425 42 In RCP (CIP) Lin Foot =============================================== STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 78.00 225.00 265.32 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 78.00 225.00 265.32 275.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 461.00 471.28 675.00 675.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 461.00 471.28 675.00 675.00 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 28.00 280.00 346.46 219.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 28.00 280.00 346.46 219.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 567.00 427.95 464.04 597.49 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 260 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01480 48 In RCP Lin Foot =============================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 131.00 250.00 396.00 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 131.00 250.00 396.00 235.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 131.00 250.00 396.00 235.00 =============== 603-01485 48 In RCP (CIP) Lin Foot =============================================== IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 122.00 275.00 326.34 281.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 122.00 275.00 326.34 281.55 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 1,221.00 180.00 302.95 325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,221.00 180.00 302.95 325.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 316.00 374.35 590.00 590.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 316.00 374.35 590.00 590.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,659.00 224.01 318.16 372.28 =============== 603-01545 54 In RCP (CIP) Lin Foot =============================================== STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 2,465.00 365.00 328.49 294.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,465.00 365.00 328.49 294.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,465.00 365.00 328.49 294.95 =============== 603-01600 60 In RCP Lin Foot =============================================== ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 126.00 300.00 310.70 325.93 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 126.00 300.00 310.70 325.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 126.00 300.00 310.70 325.93 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 261 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01605 60 In RCP (CIP) Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 76.00 302.31 660.00 660.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 152.00 350.00 307.07 280.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 228.00 334.10 322.41 406.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 228.00 334.10 322.41 406.67 =============== 603-01725 72 In RCP (CIP) Lin Foot =============================================== IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 96.00 500.00 532.94 528.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 96.00 500.00 532.94 528.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 96.00 500.00 532.94 528.39 =============== 603-02185 23x14 In RCP (CIP) Lin Foot =============================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 68.00 150.00 146.07 93.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 68.00 150.00 146.07 93.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 68.00 150.00 146.07 93.68 =============== 603-02245 30x19 In RCP (CIP) Lin Foot =============================================== ER0361-115 US 36 Bridges 06/22/17 67.00 200.00 158.88 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 67.00 200.00 158.88 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 67.00 200.00 158.88 150.00 =============== 603-02300 38x24 In RCP Lin Foot =============================================== STE 0702-357 I-70 West Vail Pass Basin 03/23/17 26.00 250.00 278.40 152.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26.00 250.00 278.40 152.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 250.00 278.40 152.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 262 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05018 18 In RCES Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 3.00 1500.00 974.00 800.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 10.00 1000.00 1005.83 260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 1115.38 998.49 384.62 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 3.00 1200.00 1400.00 1400.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 1.00 1500.00 1994.44 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 1275.00 1771.53 1300.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 9.00 1037.92 2125.00 2125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 1037.92 2125.00 2125.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 1500.00 1741.83 1725.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1500.00 1741.83 1725.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 1127.45 1216.76 1150.02 =============== 603-05024 24 In RCES Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 16.00 1200.00 1152.55 1000.00 STM0243-089 Midpoint: Station 1019+50 Cen STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 3.00 1400.00 1169.63 380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19.00 1231.58 1156.16 830.91 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 11.00 2000.00 1810.95 1042.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 9.00 1400.00 1575.00 1575.00 ER0361-115 US 36 Bridges 06/22/17 1.00 1500.00 1711.26 1700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21.00 1719.05 1792.43 1301.76 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 263 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05024 24 In RCES Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 3.00 1170.92 2275.00 2275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1170.92 2275.00 2275.00 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 1.00 1600.00 1308.50 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1600.00 1308.50 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44.00 1468.47 1587.01 1244.50 =============== 603-05030 30 In RCES Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 5.00 1393.92 2770.00 2770.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 1393.92 2770.00 2770.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1393.92 2770.00 2770.00 =============== 603-05036 36 In RCES Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 6.00 2000.00 1921.98 1500.00 STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 2000.00 1921.98 1500.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2.00 1600.00 2600.00 2600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1600.00 2600.00 2600.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 19.00 1657.92 3140.00 3140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19.00 1657.92 3140.00 3140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 1729.65 2505.28 2890.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 264 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05042 42 In RCES Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 5.00 1764.92 3290.00 3290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 1764.92 3290.00 3290.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1764.92 3290.00 3290.00 =============== 603-05048 48 In RCES Each =================================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 5.00 2500.00 3175.97 2450.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 1.00 3000.00 7957.07 13212.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 2583.33 3972.82 4243.79 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 1.00 2050.00 3916.14 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2050.00 3916.14 2300.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 3.00 1883.92 3370.00 3370.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1883.92 3370.00 3370.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 2320.18 3930.98 3787.27 =============== 603-05060 60 In RCES Each =================================================== ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 2.00 3500.00 3446.78 3662.43 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 3500.00 3446.78 3662.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3500.00 3446.78 3662.43 =============== 603-05072 72 In RCES Each =================================================== IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 1.00 5000.00 10603.54 20399.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 10603.54 20399.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 10603.54 20399.21 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 265 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05118 23x14 In RCES Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 2000.00 2028.68 551.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2000.00 2028.68 551.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 2028.68 551.48 =============== 603-07360 36 In RCP (Jacked) Lin Foot =============================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 166.00 300.00 1463.73 775.00 STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 166.00 300.00 1463.73 775.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 90.00 1850.00 1591.25 1360.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 90.00 1850.00 1591.25 1360.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 256.00 844.92 1512.52 1079.34 =============== 603-07540 54 In RCP (Jacked) Lin Foot =============================================== BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 222.00 1950.00 1744.50 1475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 222.00 1950.00 1744.50 1475.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 222.00 1950.00 1744.50 1475.00 =============== 603-10120 12 In CSP Lin Foot =============================================== STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 10.00 100.00 143.16 270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 100.00 143.16 270.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 380.00 60.00 47.78 39.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 380.00 60.00 47.78 39.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 390.00 61.03 51.79 45.26 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 266 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-10150 15 In CSP Lin Foot =============================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 9.00 125.00 228.75 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 125.00 228.75 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 125.00 228.75 200.00 =============== 603-10180 18 In CSP Lin Foot =============================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 20.00 120.00 259.72 170.00 STM0243-089 Midpoint: Station 1019+50 Cen STA0931-032 SH 93 Erosion Correction 02/09/17 50.00 80.00 128.72 58.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 35.00 79.00 118.94 169.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 105.00 87.29 138.61 110.85 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 45.00 300.00 133.00 144.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 45.00 300.00 133.00 144.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 115.00 37.47 240.00 240.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 40.00 120.00 82.77 130.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 155.00 58.77 115.35 211.61 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 10.00 80.00 356.33 268.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 80.00 356.33 268.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 315.00 103.41 133.40 172.13 =============== 603-10240 24 In CSP Lin Foot =============================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 8.00 120.00 434.48 100.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 267 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-10240 24 In CSP Lin Foot =============================================== STM0243-089 Midpoint: Station 1019+50 Cen SHE160A-031 SH 160 Passing Lanes 03/02/17 93.00 105.00 131.08 180.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 101.00 106.19 142.08 177.24 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 103.00 120.00 93.14 66.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 103.00 120.00 93.14 66.30 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 81.00 120.35 445.00 445.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 81.00 120.35 445.00 445.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 285.00 115.20 124.87 213.76 =============== 603-10300 30 In CSP Lin Foot =============================================== SHE160A-031 SH 160 Passing Lanes 03/02/17 7.00 110.00 191.97 191.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 110.00 191.97 191.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 110.00 191.97 191.67 =============== 603-10360 36 In CSP Lin Foot =============================================== NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 95.00 100.00 277.30 61.87 SHE160A-031 SH 160 Passing Lanes 03/02/17 25.00 115.00 169.15 236.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 103.13 232.70 98.17 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 152.00 71.94 175.00 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 152.00 71.94 175.00 175.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 272.00 85.70 218.93 141.10 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 268 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-10480 48 In CSP Lin Foot =============================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 59.00 150.00 216.50 150.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 31.00 180.00 210.97 354.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 90.00 160.33 213.66 220.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90.00 160.33 213.66 220.33 =============== 603-10600 60 In CSP Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 62.00 531.73 385.00 385.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 62.00 531.73 385.00 385.00 STA094A-034 Critical Culvert Project on S 10/05/17 250.00 296.00 159.47 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 250.00 296.00 159.47 95.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 312.00 342.84 167.19 152.63 =============== 603-15084 84 In Equiv CSPA Lin Foot =============================================== NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 7.00 600.00 842.50 1085.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 600.00 842.50 1085.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 600.00 842.50 1085.00 =============== 603-30012 12 In SES Each =================================================== IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 450.00 1035.83 507.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 450.00 1035.83 507.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 450.00 1035.83 507.50 =============== 603-30018 18 In SES Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 4.00 750.00 570.87 650.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 269 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-30018 18 In SES Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen STA0931-032 SH 93 Erosion Correction 02/09/17 2.00 400.00 1147.09 185.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 2.00 535.00 582.72 472.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 608.75 740.02 435.74 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 2.00 1500.00 930.00 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1500.00 930.00 450.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 4.00 450.00 491.54 105.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 450.00 491.54 105.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 690.71 633.57 327.87 =============== 603-30024 24 In SES Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2.00 650.00 688.83 700.00 STM0243-089 Midpoint: Station 1019+50 Cen SHE160A-031 SH 160 Passing Lanes 03/02/17 3.00 670.00 641.60 531.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 662.00 652.27 573.44 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2.00 500.00 704.23 334.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 500.00 704.23 334.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 615.71 674.94 493.63 =============== 603-30030 30 In SES Each =================================================== SHE160A-031 SH 160 Passing Lanes 03/02/17 1.00 690.00 827.12 590.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 690.00 827.12 590.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 690.00 827.12 590.28 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 270 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-30036 36 In SES Each =================================================== SHE160A-031 SH 160 Passing Lanes 03/02/17 2.00 710.00 1032.85 661.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 710.00 1032.85 661.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 710.00 1032.85 661.11 =============== 603-30048 48 In SES Each =================================================== SHE160A-031 SH 160 Passing Lanes 03/02/17 1.00 2000.00 1533.75 708.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2000.00 1533.75 708.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 1533.75 708.33 =============== 603-31330 30 In Equiv Arch SES Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 800.00 1020.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 800.00 1020.00 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 800.00 1020.00 1000.00 =============== 603-31336 36 In Equiv Arch SES Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 900.00 1224.00 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 900.00 1224.00 1300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 900.00 1224.00 1300.00 =============== 603-50004 4 In Plastic Pipe Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 75.00 25.00 46.60 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 75.00 25.00 46.60 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75.00 25.00 46.60 35.00 =============== 603-50006 6 In Plastic Pipe Lin Foot =============================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 16.00 40.00 88.76 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 40.00 88.76 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 40.00 88.76 100.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 271 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-50008 8 In Plastic Pipe Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 14.00 80.00 79.40 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 80.00 79.40 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 80.00 79.40 25.00 =============== 603-50012 12 In Plastic Pipe Lin Foot =============================================== STA0362-035 US 36: Strasburg to Byers 03/23/17 36.00 300.00 117.00 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.00 300.00 117.00 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 300.00 117.00 60.00 =============== 603-50015 15 In Plastic Pipe Lin Foot =============================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 68.00 100.00 115.18 62.00 ER0361-115 US 36 Bridges 06/22/17 123.00 100.00 150.20 134.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 191.00 100.00 131.81 108.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 191.00 100.00 131.81 108.37 =============== 603-50018 18 In Plastic Pipe Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 5.00 90.00 265.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 90.00 265.00 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 90.00 265.00 200.00 =============== 603-50024 24 In Plastic Pipe Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 57.00 100.00 91.60 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 57.00 100.00 91.60 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 57.00 100.00 91.60 60.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 272 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-70502 5x2 Ft CBC (Precast) Lin Foot =============================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 8.00 500.00 890.00 890.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 500.00 890.00 890.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 500.00 890.00 890.00 =============== 603-70604 6x4 Ft CBC (Precast) Lin Foot =============================================== NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 96.00 1500.00 1350.20 910.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 96.00 1500.00 1350.20 910.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 96.00 1500.00 1350.20 910.00 =============== 603-70805 8x5 Ft CBC (Precast) Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 186.00 1026.75 1700.00 1700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 186.00 1026.75 1700.00 1700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 186.00 1026.75 1700.00 1700.00 =============== 604-00305 Inlet Ty C (5 Ft) Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2.00 5000.00 4301.36 4250.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 4.00 4000.00 3330.00 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 4333.33 3581.83 4050.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 3500.00 3825.96 4537.41 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 3000.00 4000.00 4000.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 10.00 3300.01 5077.41 4000.00 ER0361-115 US 36 Bridges 06/22/17 1.00 4000.00 4190.87 2100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 3346.16 4640.39 3895.19 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 4.00 4489.76 12000.00 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 4489.76 12000.00 12000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 273 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-00305 Inlet Ty C (5 Ft) Each =================================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 4000.00 3045.33 5285.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 4000.00 3045.33 5285.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 3810.80 4593.07 5398.80 =============== 604-00310 Inlet Ty C (10 Ft) Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 4300.00 4790.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 4300.00 4790.00 5000.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2.00 4500.00 4300.00 4300.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 1.00 5250.00 5359.36 4000.00 ER0361-115 US 36 Bridges 06/22/17 2.00 4700.00 5505.33 3100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 4730.00 5340.04 3760.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 4.00 6840.00 14000.00 14000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 6840.00 14000.00 14000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 5531.00 6478.96 7980.00 =============== 604-00320 Inlet Ty C (20 Ft) Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2.00 8000.00 17929.36 9000.00 STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 8000.00 17929.36 9000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 8000.00 17929.36 9000.00 =============== 604-00505 Inlet Ty D (5 Ft) Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 6.00 5600.00 4435.00 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 5600.00 4435.00 4000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 274 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-00505 Inlet Ty D (5 Ft) Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 12.00 4899.85 13500.00 13500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 4899.85 13500.00 13500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 5133.23 7025.00 10333.33 =============== 604-00506 Inlet Ty D (Spec) (5 Ft) Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2.00 5000.00 6941.08 6823.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 5000.00 6941.08 6823.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5000.00 6941.08 6823.15 =============== 604-00510 Inlet Ty D (10 Ft) Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 3.00 6000.00 5814.00 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 6000.00 5814.00 6000.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 4.00 5000.00 5620.00 5620.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 1.00 6000.00 6466.05 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 5200.00 6090.03 5496.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 14.00 8795.31 17500.00 17500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 8795.31 17500.00 17500.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 6000.00 4850.33 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 6000.00 4850.33 7500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 7527.58 9794.42 12955.65 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 275 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-00515 Inlet Ty D (15 Ft) Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2.00 6500.00 16890.16 8000.00 STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 6500.00 16890.16 8000.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 13474.28 22000.00 22000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 13474.28 22000.00 22000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 8824.76 17528.89 15000.00 =============== 604-00550 Inlet Ty D (Spec) Each =================================================== STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 1.00 8000.00 10405.20 8500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 8000.00 10405.20 8500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 8000.00 10405.20 8500.00 =============== 604-00605 Inlet Ty D (D) (5 Ft) Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 10000.00 19000.00 19000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 19000.00 19000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 19000.00 19000.00 =============== 604-00610 Inlet Ty D (D) (10 Ft) Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 4.00 12266.51 26100.00 26100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 12266.51 26100.00 26100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 12266.51 26100.00 26100.00 =============== 604-13005 Inlet Ty 13 (5 Ft) Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 3200.00 3280.00 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3200.00 3280.00 4000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 276 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-13005 Inlet Ty 13 (5 Ft) Each =================================================== SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 1.00 5000.00 8766.67 6800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5000.00 8766.67 6800.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 3500.00 6421.00 4263.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 3500.00 6421.00 4263.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 3725.00 4897.69 4765.75 =============== 604-13010 Inlet Ty 13 (10 Ft) Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 3600.00 4290.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3600.00 4290.00 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3600.00 4290.00 5000.00 =============== 604-16005 Inlet Ty 16 (5 Ft) Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 4200.00 4420.00 5000.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 2.00 4500.00 5411.79 6300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 4400.00 5081.20 5866.67 ER0361-115 US 36 Bridges 06/22/17 1.00 4500.00 5045.46 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 4500.00 5045.46 2500.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 5000.00 3535.33 6755.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 3535.33 6755.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 4540.00 4879.03 5371.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 277 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-19000 Inlet Spec Each =================================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1.00 15000.00 28257.67 13500.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1.00 8500.00 11872.42 10979.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 11750.00 23342.10 12239.88 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 3500.00 5200.00 5200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3500.00 5200.00 5200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 9000.00 21692.82 9893.25 =============== 604-19010 Inlet Spec (10 Ft) Each =================================================== STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1.00 12500.00 7849.38 7739.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 12500.00 7849.38 7739.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 12500.00 7849.38 7739.39 =============== 604-19015 Inlet Spec (15 Ft) Each =================================================== STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 2.00 8000.00 13865.00 10300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 8000.00 13865.00 10300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 8000.00 13865.00 10300.00 =============== 604-19105 Inlet Ty R L5 (5 Ft) Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 6500.00 5315.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 6500.00 5315.00 5000.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2.00 4000.00 6450.00 6450.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 278 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-19105 Inlet Ty R L5 (5 Ft) Each =================================================== ER0361-115 US 36 Bridges 06/22/17 1.00 5000.00 5817.49 3700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 4333.33 5975.62 5533.33 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 3.00 5000.00 3428.67 6150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 5000.00 3428.67 6150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 4928.57 4783.54 5721.43 =============== 604-19110 Inlet Ty R L5 (10 Ft) Each =================================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 3.00 6000.00 4103.67 6935.00 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 2.00 6000.00 9755.00 6700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 6000.00 7333.00 6841.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 6000.00 7333.00 6841.00 =============== 604-19115 Inlet Ty R L5 (15 Ft) Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 7000.00 8442.00 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 7000.00 8442.00 10000.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 7000.00 7600.33 12200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 7000.00 7600.33 12200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 7000.00 8126.38 11100.00 =============== 604-19205 Inlet Ty R L10 (5 Ft) Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 7000.00 11000.00 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 7000.00 11000.00 11000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 279 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-19205 Inlet Ty R L10 (5 Ft) Each =================================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 2.00 5500.00 5083.67 6250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 5500.00 5083.67 6250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 6000.00 5928.86 7833.33 =============== 604-19210 Inlet Ty R L10 (10 Ft) Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 7500.00 8956.02 11450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 7500.00 8956.02 11450.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 4.00 6500.00 4570.33 4610.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 6500.00 4570.33 4610.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 6700.00 6763.18 5978.00 =============== 604-19305 Inlet Ty R L15 (5 Ft) Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2.00 8000.00 12400.00 12400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 8000.00 12400.00 12400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 8000.00 12400.00 12400.00 =============== 604-19310 Inlet Ty R L15 (10 Ft) Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 13103.45 25000.00 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 13103.45 25000.00 25000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 13103.45 25000.00 25000.00 =============== 604-19710 Inlet Spec (Trench) (10 Inch) Lin Foot =============================================== NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 325.00 150.00 79.30 137.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 325.00 150.00 79.30 137.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 325.00 150.00 79.30 137.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 280 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-20000 Outlet Structure Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 12000.00 6451.00 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 12000.00 6451.00 10000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 12000.00 6451.00 10000.00 =============== 604-25000 Vane Grate Inlet Spec Each =================================================== ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 2.00 12527.00 12527.00 12527.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 12527.00 12527.00 12527.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 8.00 7500.00 4997.83 6000.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 7500.00 4997.83 6000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 8505.40 5165.14 7305.40 =============== 604-30005 MH Slab Base (5 Ft) Each =================================================== STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 5.00 4500.00 5848.33 4200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 4500.00 5848.33 4200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 4500.00 5848.33 4200.00 =============== 604-30010 MH Slab Base (10 Ft) Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 3.00 4200.00 4279.00 4000.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 1.00 5000.00 6135.80 3560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 4400.00 4743.20 3890.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 5000.00 4941.47 3982.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 281 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-30010 MH Slab Base (10 Ft) Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2.00 5000.00 6000.00 6000.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 9.00 5000.00 5215.00 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 5000.00 5180.75 5456.83 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 3.00 7388.10 17000.00 17000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 7388.10 17000.00 17000.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 3.00 4000.00 3562.00 6540.00 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 10.00 5300.00 11256.67 8500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 5000.00 10253.01 8047.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 5148.88 7833.52 7395.69 =============== 604-30015 MH Slab Base (15 Ft) Each =================================================== STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 5.00 7500.00 6395.26 9500.00 ER0361-115 US 36 Bridges 06/22/17 1.00 7500.00 8506.18 5600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 7500.00 6803.83 8850.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 13354.00 22500.00 22500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 13354.00 22500.00 22500.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 2.00 6000.00 4507.00 6780.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 6000.00 4507.00 6780.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 7817.11 6854.23 9906.67 =============== 604-30020 MH Slab Base (20 Ft) Each =================================================== IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 1.00 8000.00 9370.02 12289.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 8000.00 9370.02 12289.56 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 282 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-30020 MH Slab Base (20 Ft) Each =================================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 8000.00 5358.67 7050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 8000.00 5358.67 7050.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 8000.00 8166.61 9669.78 =============== 604-30025 MH Slab Base (25 Ft) Each =================================================== IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 1.00 10000.00 10313.22 12946.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 10313.22 12946.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 10313.22 12946.09 =============== 604-31010 MH Box Base (10 Ft) Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 8000.00 9240.00 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 8000.00 9240.00 10000.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 10000.00 12000.00 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 10000.00 12000.00 12000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 9000.00 9700.00 11000.00 =============== 604-31015 MH Box Base (15 Ft) Each =================================================== IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 1.00 12500.00 19074.60 20516.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 12500.00 19074.60 20516.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 12500.00 19074.60 20516.66 =============== 604-31020 MH Box Base (20 Ft) Each =================================================== IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 1.00 15000.00 20241.87 21500.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 15000.00 20241.87 21500.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 20241.87 21500.51 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 283 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-39000 MH Spec Each =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 17.00 9900.00 8682.50 7554.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 9900.00 8682.50 7554.00 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 1.00 9000.00 21785.00 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 9000.00 21785.00 15000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 9850.00 10647.88 7967.67 =============== 604-39050 MH (TMS) Each =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 6.00 9800.00 8818.75 7837.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 9800.00 8818.75 7837.50 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 4.00 4800.00 6515.20 4824.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 4800.00 6515.20 4824.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 12.00 5000.00 6369.12 7625.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 3.00 5500.00 5983.17 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 5100.00 6280.05 7600.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 1.00 4800.00 7389.50 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 4800.00 7389.50 6000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 6126.92 6627.46 7166.19 =============== 604-50065 Place Grating and Frame Lin Foot =============================================== NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 40.00 100.00 217.36 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 100.00 217.36 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 100.00 217.36 125.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 284 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-50110 Place IG and F Each =================================================== NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 3.00 500.00 1356.68 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 500.00 1356.68 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 500.00 1356.68 1000.00 =============== 604-51012 12 In Slot Pipe Inlet Lin Foot =============================================== IM025A-037 I25 S. Trinidad Resurface and 11/30/17 14.00 225.00 608.62 395.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 225.00 608.62 395.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 225.00 608.62 395.85 =============== 604-51018 18 In Slot Pipe Inlet Lin Foot =============================================== IM025A-037 I25 S. Trinidad Resurface and 11/30/17 19.00 250.00 662.10 426.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19.00 250.00 662.10 426.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 250.00 662.10 426.30 =============== 604-85000 FRP Walkway Sq Foot ================================================ NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 23,650.00 12.50 27.33 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23,650.00 12.50 27.33 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23,650.00 12.50 27.33 16.00 =============== 605-00004 4 In Underdrain Lin Foot =============================================== NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 50.00 25.00 45.50 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 25.00 45.50 55.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 25.00 45.50 55.00 =============== 605-00040 4 In PP Underdrain Lin Foot =============================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 425.00 25.00 43.75 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 285 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 605-00040 4 In PP Underdrain Lin Foot =============================================== NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 752.00 10.00 8.38 4.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,177.00 15.42 28.49 13.48 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 90.00 90.00 44.65 60.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 414.00 25.00 16.97 2.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 504.00 36.61 24.33 13.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,681.00 21.77 27.48 13.35 =============== 605-00060 6 In PP Underdrain Lin Foot =============================================== NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 1,658.00 30.00 45.90 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,658.00 30.00 45.90 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,658.00 30.00 45.90 25.00 =============== 605-00080 8 In PP Underdrain Lin Foot =============================================== IM025A-037 I25 S. Trinidad Resurface and 11/30/17 2,285.00 50.00 38.65 30.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,285.00 50.00 38.65 30.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,285.00 50.00 38.65 30.96 =============== 605-82100 Pipe Edge Drain Lin Foot =============================================== STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 10,375.00 15.00 14.31 9.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,375.00 15.00 14.31 9.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,375.00 15.00 14.31 9.75 =============== 605-83002 Geocomp Drain (w/ Pipe) Sq Yard ================================================ IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 201.00 25.00 47.31 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 201.00 25.00 47.31 53.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 201.00 25.00 47.31 53.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 286 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 605-83500 Geocomp Underdrain Lin Foot =============================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 433.00 10.00 62.19 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 433.00 10.00 62.19 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 433.00 10.00 62.19 35.00 =============== 605-84000 Subsurface Drain Outlet Lin Foot =============================================== NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 12.00 50.00 256.00 258.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 540.00 50.00 32.44 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 552.00 50.00 35.38 30.07 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 9.00 200.00 71.96 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 200.00 71.96 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 561.00 52.41 35.74 30.55 =============== 605-84100 Subsurface Drain Outlet Str Each =================================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 17.00 500.00 608.63 625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 500.00 608.63 625.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 5.00 1000.00 4396.25 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 1000.00 4396.25 5000.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 9.00 1000.00 313.00 530.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 1000.00 313.00 530.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31.00 725.81 1016.89 1303.06 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 287 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00301 Gdrail Ty 3 (6-3) Lin Foot =============================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 2,075.00 32.00 24.22 21.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 5,475.00 24.00 27.63 30.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1,350.00 70.00 50.49 42.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1,119.00 40.00 25.62 23.23 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 3,339.00 36.00 23.87 21.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 2,963.00 25.00 23.96 22.44 SHE160A-031 SH 160 Passing Lanes 03/02/17 75.00 55.00 36.09 32.22 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1,765.00 80.00 66.60 48.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 343.75 25.00 33.17 29.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 26,538.00 28.00 20.71 21.28 STA0362-035 US 36: Strasburg to Byers 03/23/17 2,976.00 22.00 31.06 28.18 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1,670.00 25.00 35.60 30.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 25.00 23.00 121.67 85.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 13,187.00 25.70 21.57 22.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 62,900.75 29.81 26.26 24.21 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 4,175.00 25.00 22.60 20.81 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2,236.00 25.00 23.20 21.51 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 3,075.00 28.00 25.40 24.41 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 925.00 35.00 23.50 23.50 NHPPC120-026 US 85: I-76 to 168th 05/04/17 9,325.00 20.00 22.15 21.25 STA0703-437 I-70: 32ND TO 44TH 06/01/17 1,671.00 22.00 33.85 34.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 450.00 30.00 31.63 23.90 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 3,576.00 25.00 23.66 24.42 ER0361-115 US 36 Bridges 06/22/17 894.00 24.00 27.18 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26,327.00 23.79 24.20 23.20 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 2,088.00 30.00 27.75 28.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 2,300.00 28.00 48.82 47.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 2,535.00 23.00 35.47 35.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 700.00 40.00 23.82 23.34 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 94.00 30.00 44.00 50.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 25,653.50 27.72 29.50 29.50 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 675.00 27.00 24.81 23.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 34,045.50 27.77 30.64 30.80 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 385.00 30.00 43.74 51.94 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 288 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00301 Gdrail Ty 3 (6-3) Lin Foot =============================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1,244.00 24.00 21.00 30.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 300.00 25.00 34.10 27.50 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 15,460.00 25.00 24.20 20.60 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 15,113.00 35.00 33.29 33.46 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 10,681.00 25.00 21.31 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 43,183.00 28.52 27.75 25.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 166,456.25 28.11 26.85 25.81 =============== 606-00305 Gdrail Ty 3 (Spec) Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1,843.75 75.80 82.00 82.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,843.75 75.80 82.00 82.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,843.75 75.80 82.00 82.00 =============== 606-00350 Gdrail Ty 3 (D) (6-3) Lin Foot =============================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 50.00 40.00 47.11 44.12 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 1,325.00 25.00 42.21 40.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,375.00 25.55 42.61 40.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,375.00 25.55 42.61 40.21 =============== 606-00705 Gdrail Ty 7 (Spec) Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1,400.00 80.00 92.60 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,400.00 80.00 92.60 85.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 480.00 206.04 299.76 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 480.00 206.04 299.76 250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,880.00 112.18 145.49 127.13 =============== 606-00710 Gdrail Ty 7 (Sty CA) Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 410.00 90.00 128.00 78.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 289 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00710 Gdrail Ty 7 (Sty CA) Lin Foot =============================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 1,450.00 70.00 74.01 66.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,860.00 74.41 91.30 69.03 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 10.00 200.00 134.09 60.67 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 25.00 120.00 160.00 160.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 24.00 200.00 543.56 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 59.00 166.10 299.88 167.57 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 135.00 95.00 55.00 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 135.00 95.00 55.00 55.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 165.00 120.00 67.67 100.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 60.00 100.00 184.43 223.30 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 2,759.00 70.00 126.79 117.95 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 251.00 108.00 111.70 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,235.00 76.06 124.59 117.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,289.00 76.96 116.49 99.48 =============== 606-00716 Gdrail Ty 7 (Sty CA) (Spec) Lin Foot =============================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 138.00 200.00 140.87 69.49 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 60.00 150.00 160.00 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 198.00 184.85 141.54 96.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 198.00 184.85 141.54 96.92 =============== 606-00720 Gdrail Ty 7 (Sty CC) Lin Foot =============================================== STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 90.00 89.00 150.27 149.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 90.00 89.00 150.27 149.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90.00 89.00 150.27 149.35 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 290 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00745 Gdrail Ty 7 (Sty CE)(Conc Glare Screen) Lin Foot =============================================== CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 160.00 1.00 404.80 425.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 160.00 1.00 404.80 425.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 160.00 1.00 404.80 425.00 =============== 606-00900 Gdrail (Spec) Lin Foot =============================================== NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 57.00 175.00 263.75 335.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 57.00 175.00 263.75 335.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 28.00 300.00 393.14 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 28.00 300.00 393.14 240.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 85.00 216.18 312.97 303.71 =============== 606-01320 End Anchor Ty 3B Each =================================================== NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 7.00 1000.00 1360.33 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 1000.00 1360.33 1400.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 1.00 1000.00 3233.33 3400.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 5.00 958.40 1006.00 1006.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 965.33 1841.25 1405.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 984.00 1493.00 1402.31 =============== 606-01340 End Anchor Ty 3D Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 3.00 1250.00 1209.25 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 291 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01340 End Anchor Ty 3D Each =================================================== STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1.00 1100.00 1162.11 1023.57 SHE160A-031 SH 160 Passing Lanes 03/02/17 2.00 1300.00 1294.20 1541.11 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1.00 2500.00 2246.00 1890.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 4.00 1000.00 1422.50 1900.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1.00 1000.00 1193.00 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 1245.83 1382.78 1707.98 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 1250.00 2118.64 1047.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2.00 2500.00 2200.00 2200.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 7.00 900.00 1252.34 1200.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 2.00 1000.00 2493.27 1100.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 17.00 1100.00 1736.00 2500.00 ER0361-115 US 36 Bridges 06/22/17 3.00 1200.00 966.31 1030.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 1151.56 1605.12 1926.16 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 1200.00 2966.67 2800.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 1.00 1000.00 1347.00 1300.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 1.00 1450.00 1900.00 2000.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 5.00 1034.00 1085.00 1085.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1.00 1500.00 899.84 818.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 1146.67 1336.01 1371.44 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 2.00 1250.00 2689.00 5000.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 1200.00 1617.00 2400.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 13.00 1200.00 1304.34 1113.02 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 13.00 1200.00 1730.85 1154.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29.00 1203.45 1684.82 1443.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 82.00 1183.17 1569.88 1662.81 =============== 606-01370 Transition Ty 3G Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 20.00 2000.00 1636.36 1600.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 292 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01370 Transition Ty 3G Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 3.00 1750.00 1524.00 2100.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 8.00 1500.00 1825.00 1650.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 3.00 2000.00 2188.45 2400.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 12.00 2500.00 2579.27 2150.07 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 12.00 2220.00 1576.06 1689.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 58.00 2067.07 1874.73 1806.36 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 7.00 2200.00 2762.48 2887.45 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 6.00 2000.00 1879.86 1764.73 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 7.00 2200.00 2680.60 2541.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 4.00 2500.00 1860.00 1860.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 6.00 2300.00 1907.91 1830.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 7.00 2500.00 2657.78 2000.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 4.00 2200.00 1691.67 1575.00 ER0361-115 US 36 Bridges 06/22/17 3.00 1800.00 1736.98 1865.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 44.00 2234.09 2187.26 2111.42 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 2.00 1750.00 3527.00 3500.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 8.00 2300.00 1882.91 1884.55 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 73.00 1784.20 1874.00 1874.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 9.00 2000.00 1425.77 1303.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 92.00 1849.42 1755.10 1854.41 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 2.00 2500.00 1917.00 2800.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 3.00 2000.00 2132.26 1796.79 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 12.00 3000.00 3379.05 2395.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 2764.71 3112.47 2337.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 211.00 2063.21 2038.88 1933.70 =============== 606-01371 Transition Ty 3G (Spec) Each =================================================== NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 8.00 3000.00 3440.33 3528.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 3000.00 3440.33 3528.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 3000.00 3440.33 3528.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 293 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01380 Transition Ty 3H Each =================================================== STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 1.00 1000.00 1006.30 910.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 1006.30 910.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 1000.00 1541.11 1544.14 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 5.00 1600.00 1466.90 1396.50 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2.00 1500.00 980.00 980.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 5.00 2000.00 1204.09 1155.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 4.00 2000.00 1306.65 1400.00 ER0361-115 US 36 Bridges 06/22/17 4.00 1100.00 1141.04 1220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21.00 1638.10 1313.60 1273.41 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 3.00 1200.00 1311.75 1035.25 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 1.00 2200.00 1603.89 1319.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1450.00 1416.09 1106.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 1584.62 1312.70 1233.72 =============== 606-01385 Transition Ty 3J Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 1.00 1500.00 1701.75 2500.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 1500.00 1600.00 1600.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 1.00 1500.00 1269.85 1250.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 1.00 1000.00 1463.66 1566.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 1375.00 1500.60 1729.00 ER0361-115 US 36 Bridges 06/22/17 2.00 1250.00 785.72 845.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1250.00 785.72 845.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 27.00 1159.00 1216.00 1216.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 294 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01385 Transition Ty 3J Each =================================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 2.00 1500.00 1181.26 1109.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29.00 1182.52 1200.40 1208.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 1208.37 1205.81 1247.31 =============== 606-01390 End Anchor Ty 3K Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 4.00 1500.00 1621.25 2500.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 1.00 1200.00 605.48 640.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 1440.00 1418.10 2128.10 ER0361-115 US 36 Bridges 06/22/17 3.00 1900.00 1444.12 1550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1900.00 1444.12 1550.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1.00 1750.00 1500.00 1800.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 6.00 1433.00 1505.00 1505.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 2.00 1500.00 1542.14 1437.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 1483.11 1529.00 1522.67 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 1700.00 1744.40 1233.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1700.00 1744.40 1233.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 1552.67 1487.11 1679.32 =============== 606-01395 Transition Ty 3L Each =================================================== SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 1.00 1500.00 1960.00 2055.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 1960.00 2055.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 295 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01395 Transition Ty 3L Each =================================================== STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 4.00 1400.00 1180.17 1040.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 1400.00 1180.17 1040.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1420.00 1336.14 1243.42 =============== 606-01460 Median Terminal Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2.00 4000.00 4431.43 4246.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 4.00 4200.00 4547.35 4352.25 NHPPC120-026 US 85: I-76 to 168th 05/04/17 6.00 3500.00 4367.85 4190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 3816.67 4450.36 4253.42 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 5.00 4500.00 4788.41 4365.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 4500.00 4788.41 4365.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 4017.65 4516.22 4286.30 =============== 606-02003 End Anchor (Nonflared) Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 24.00 2500.00 2487.10 2400.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 10.00 2100.00 3780.00 3500.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 2000.00 2160.00 2000.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 2.00 3000.00 2728.59 2692.80 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 3.00 2500.00 2981.95 2800.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 14.00 2500.00 2854.67 2464.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 1.00 2100.00 3678.33 3760.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 18.00 2000.00 2075.11 2215.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 74.00 2318.92 2684.83 2547.45 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 6.00 3500.00 3353.81 2861.44 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 296 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-02003 End Anchor (Nonflared) Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 3.00 2500.00 1945.88 1676.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 4.00 2500.00 2675.00 2675.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 7.00 3000.00 2542.76 2440.00 ER0361-115 US 36 Bridges 06/22/17 2.00 2400.00 2683.50 2900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 22.00 2922.73 2491.43 2535.30 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 10.00 2350.00 3874.00 3800.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 79.00 3197.00 3357.00 3357.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1.00 2500.00 2737.90 2578.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 90.00 3095.14 3429.50 3397.57 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 1.00 2500.00 6203.88 20000.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 2.00 2200.00 2072.00 3115.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 2500.00 2810.69 2432.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 2350.00 3872.49 7165.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 190.00 2757.17 2878.72 3045.95 =============== 606-02005 End Anchor (Flared) Each =================================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 2.00 2500.00 3651.44 3305.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 7.00 4000.00 2422.51 2476.72 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 16.00 2000.00 2265.00 2000.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 1.00 3000.00 2764.37 2816.67 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1.00 8500.00 3890.00 3810.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 1.00 2200.00 2447.30 2400.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 25.00 2500.00 2310.33 2240.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 16.00 2500.00 2981.45 2748.60 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 26.00 2215.00 2122.16 2246.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 95.00 2513.58 2428.01 2351.02 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 54.00 2600.00 3056.99 2720.97 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 297 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-02005 End Anchor (Flared) Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 2500.00 2035.60 1875.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 8.00 2750.00 2604.80 2478.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 6.00 2200.00 2277.10 2185.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 5.00 2200.00 3106.85 2500.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 4.00 2900.00 3510.00 1930.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 18.00 2200.00 2304.17 2527.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 96.00 2503.13 2840.15 2577.72 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 3.00 4000.00 2600.00 2400.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 8.00 2650.00 2163.27 2193.92 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 1.00 2800.00 3250.00 3500.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 26.00 2761.00 2899.00 2899.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 9.00 2500.00 2337.94 2183.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 47.00 2772.04 2346.79 2622.82 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 5.00 2500.00 3028.00 3000.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 4.00 2500.00 1817.00 2700.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 1.00 2500.00 2408.36 3000.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 20.00 2300.00 2454.82 1864.46 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 26.00 2500.00 3360.96 3004.80 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 30.00 2500.00 3310.95 4200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 86.00 2453.49 3098.64 3142.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 324.00 2532.02 2699.65 2667.58 =============== 606-02007 End Anchor (Flared) (Spec) Each =================================================== NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1.00 3000.00 2308.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3000.00 2308.00 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 2308.00 2000.00 =============== 606-10200 Brdg Rail (Spec) Lin Foot =============================================== NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 8,819.00 50.00 102.06 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,819.00 50.00 102.06 100.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 298 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-10200 Brdg Rail (Spec) Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 134.00 301.00 378.00 378.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 134.00 301.00 378.00 378.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,953.00 53.76 102.58 104.16 =============== 606-10300 Brdg Rail Ty 3 Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 561.00 196.43 206.00 206.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 561.00 196.43 206.00 206.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 561.00 196.43 206.00 206.00 =============== 606-10305 Brdg Rail Ty 3 (Spec) Lin Foot =============================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 518.00 120.00 125.34 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 518.00 120.00 125.34 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 518.00 120.00 125.34 120.00 =============== 606-10400 Brdg Rail Ty 4 Lin Foot =============================================== NHPPC120-026 US 85: I-76 to 168th 05/04/17 5.00 250.00 1249.79 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 250.00 1249.79 350.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 18.00 350.00 215.00 215.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 350.00 215.00 215.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 328.26 685.36 244.35 =============== 606-10405 Brdg Rail Ty 4 (Spec) Lin Foot =============================================== NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 10.00 250.00 282.50 295.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 250.00 282.50 295.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 250.00 282.50 295.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 299 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-11000 Brdg Rail Ty 10 Lin Foot =============================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 467.00 150.00 211.92 186.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 467.00 150.00 211.92 186.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 467.00 150.00 211.92 186.16 =============== 606-11010 Brdg Rail Ty 10R Lin Foot =============================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 52.00 150.00 545.71 500.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 52.00 200.00 291.75 335.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 65.00 150.00 219.05 205.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 742.00 145.00 357.53 292.99 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 216.00 175.00 382.83 397.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,127.00 153.81 352.90 319.44 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 87.00 250.00 325.36 216.08 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 187.00 225.00 153.00 143.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 274.00 232.94 207.73 166.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,401.00 169.28 326.67 289.47 =============== 606-11030 Brdg Rail Ty 10M Lin Foot =============================================== ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 1,454.00 305.00 305.00 305.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,454.00 305.00 305.00 305.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 135.00 210.00 361.67 250.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 618.00 175.00 183.04 106.07 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1,088.00 190.00 165.98 300.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,841.00 186.43 176.58 231.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,295.00 238.75 185.12 263.78 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 300 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-11032 Brdg Rail Ty 10M (Spec) Lin Foot =============================================== STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 65.00 200.00 422.30 535.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 65.00 200.00 422.30 535.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 330.00 200.00 175.00 175.00 ER0361-115 US 36 Bridges 06/22/17 400.00 200.00 232.67 215.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 730.00 200.00 225.70 196.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 795.00 200.00 246.61 224.56 =============== 606-11902 Bridge Rail Bolt Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 5.00 40.48 0.00 0.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 40.48 0.00 0.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 40.48 0.00 0.00 =============== 606-20014 Tensioned Cable Barrier (TL-4) Lin Foot =============================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 5,042.00 15.00 18.58 17.65 NHPPC120-026 US 85: I-76 to 168th 05/04/17 25,971.00 11.00 11.94 11.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 31,013.00 11.65 14.84 12.46 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 530.00 40.00 27.05 25.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 530.00 40.00 27.05 25.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31,543.00 12.13 14.98 12.67 =============== 606-21010 End Anchor (Tens Cab Bar) Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 4.00 4000.00 4011.40 3281.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 301 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-21010 End Anchor (Tens Cab Bar) Each =================================================== NHPPC120-026 US 85: I-76 to 168th 05/04/17 36.00 4000.00 2085.65 1995.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 4000.00 2678.19 2123.60 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 2.00 6400.00 13048.79 11146.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 6400.00 13048.79 11146.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42.00 4114.29 3062.28 2553.26 =============== 606-99999 Gdrail Ty 7 (Precast) Lin Foot =============================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 140.00 100.00 84.60 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 140.00 100.00 84.60 65.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 140.00 100.00 84.60 65.00 =============== 607-00000 Line Post Each =================================================== ER0361-115 US 36 Bridges 06/22/17 2.00 55.00 40.14 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 55.00 40.14 41.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 56.00 150.00 68.25 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 56.00 150.00 68.25 35.00 STA094A-034 Critical Culvert Project on S 10/05/17 9.00 77.00 33.39 112.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 77.00 33.39 112.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 67.00 137.36 61.11 45.52 =============== 607-00005 End Post Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 4.00 250.00 203.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 250.00 203.00 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 302 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-00005 End Post Each =================================================== BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 8.00 200.00 269.50 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 200.00 269.50 28.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 29.00 400.00 482.00 800.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 4.00 225.00 276.45 277.64 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 6.00 250.00 248.83 213.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 39.00 358.97 382.85 656.12 STA094A-034 Critical Culvert Project on S 10/05/17 1.00 240.00 323.09 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 240.00 323.09 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 323.85 365.15 515.63 =============== 607-00010 Corner and Line Br Post Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 1.00 250.00 440.75 500.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 2.00 50.00 387.91 447.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 116.67 399.65 464.91 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 8.00 350.00 338.00 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 350.00 338.00 28.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 67.00 500.00 634.00 800.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 6.00 225.00 319.78 334.30 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 303 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-00010 Corner and Line Br Post Each =================================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 7.00 300.00 297.95 275.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 80.00 461.88 531.17 719.14 STA094A-034 Critical Culvert Project on S 10/05/17 4.00 265.00 398.88 200.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 4.00 500.00 449.88 500.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 2.00 300.00 426.25 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 366.00 426.10 430.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 101.00 433.27 505.36 628.21 =============== 607-01000 Fence BW MP Lin Foot =============================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 75.00 10.00 11.15 12.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 68.00 4.00 8.23 10.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 132.00 6.00 9.96 4.00 STM0243-089 Midpoint: Station 1019+50 Cen IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 255.00 6.00 6.35 3.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 530.00 6.31 7.43 5.72 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 1,000.00 3.00 10.00 7.00 ER0361-115 US 36 Bridges 06/22/17 48.00 2.50 3.82 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,048.00 2.98 9.59 6.86 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 330.00 4.00 6.72 21.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 763.00 4.00 2.97 3.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,093.00 4.00 3.59 8.43 STA094A-034 Critical Culvert Project on S 10/05/17 222.00 3.50 5.79 8.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 304 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-01000 Fence BW MP Lin Foot =============================================== C133A-042 SH 133 McClure Pass Slip 11/16/17 386.00 10.00 10.22 20.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 16.00 20.00 24.25 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 624.00 7.94 8.95 15.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,295.00 4.79 6.41 8.97 =============== 607-01100 Fence BW TWP Lin Foot =============================================== STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 32.00 5.00 22.39 24.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 5.00 22.39 24.18 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 2,021.00 8.00 5.30 7.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,021.00 8.00 5.30 7.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,053.00 7.95 5.36 7.35 =============== 607-11200 Fence CW MP Lin Foot =============================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 415.00 3.00 5.35 4.75 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 415.00 3.00 5.35 4.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 415.00 3.00 5.35 4.75 =============== 607-11350 Fence Deer Lin Foot =============================================== NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 20,300.00 12.00 11.70 9.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20,300.00 12.00 11.70 9.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,300.00 12.00 11.70 9.50 =============== 607-11455 Fence Wood Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 416.00 25.00 50.20 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 416.00 25.00 50.20 32.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 416.00 25.00 50.20 32.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 305 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-11525 Fence (Plastic) Lin Foot =============================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 200.00 3.50 8.98 3.75 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 1,000.00 3.50 6.80 5.20 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 260.00 6.00 5.09 4.18 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 300.00 5.00 2.79 3.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 200.00 5.00 3.94 3.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 525.00 7.00 4.90 5.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 150.00 3.00 5.43 4.47 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 200.00 5.00 10.00 7.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 3,350.00 4.00 3.90 3.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 200.00 3.50 4.29 3.76 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 250.00 5.00 5.24 2.75 NHPP 0701-230 Midpoint WB Bore 03/02/17 1,440.00 3.00 2.63 3.50 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 2,000.00 3.25 3.58 4.75 BR0252-449 I-25 Woodmen NB 03/02/17 1,500.00 5.00 4.15 3.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 250.00 3.72 5.78 3.80 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 200.00 10.00 10.00 10.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 100.00 5.00 5.97 3.10 STA0362-035 US 36: Strasburg to Byers 03/23/17 50.00 4.00 10.20 11.50 MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 300.00 3.50 20.00 5.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 150.00 5.00 6.95 6.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1,600.00 4.00 4.48 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14,225.00 4.14 4.60 4.08 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 1,000.00 4.00 4.10 4.10 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 1,000.00 4.00 4.13 3.75 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 200.00 4.00 4.39 5.13 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 200.00 4.00 7.92 5.90 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 300.00 3.50 3.05 3.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 200.00 5.00 6.67 5.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 298.00 4.00 3.94 2.31 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 500.00 3.00 1.15 1.15 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 2,850.00 3.00 1.88 1.50 NHPPC120-026 US 85: I-76 to 168th 05/04/17 100.00 4.01 5.72 5.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 600.00 7.50 3.39 3.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 500.00 5.00 4.77 5.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 300.00 6.00 4.46 5.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 400.00 2.00 4.21 4.03 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 100.00 4.00 6.00 6.00 ER0361-115 US 36 Bridges 06/22/17 385.00 3.50 2.95 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,933.00 3.88 3.24 3.02 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 306 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-11525 Fence (Plastic) Lin Foot =============================================== NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 400.00 5.00 3.73 2.50 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 300.00 4.00 5.38 2.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 500.00 5.00 2.50 2.50 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1,800.00 3.00 4.09 4.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 300.00 5.00 5.73 6.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 1,000.00 5.00 4.53 4.20 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 500.00 5.00 4.46 4.20 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 100.00 5.50 10.50 15.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 786.00 3.83 3.25 3.50 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 10,000.00 5.70 8.50 8.50 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 3,083.00 5.00 3.34 2.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 1,000.00 5.00 4.71 1.88 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 46.00 5.00 7.07 5.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 100.00 3.50 8.60 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19,915.00 5.10 4.48 5.84 STA094A-034 Critical Culvert Project on S 10/05/17 200.00 3.00 4.21 5.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 150.00 5.00 4.93 5.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 560.00 3.00 2.30 2.90 C133A-042 SH 133 McClure Pass Slip 11/16/17 200.00 5.00 5.28 5.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1,800.00 5.00 2.94 1.95 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 500.00 5.00 3.86 2.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 200.00 3.00 4.67 5.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 150.00 10.00 5.71 2.50 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 850.00 10.00 4.93 4.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 1,262.00 6.07 7.00 7.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 200.00 5.00 11.90 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,072.00 5.73 4.07 3.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 49,145.00 4.68 4.26 4.58 =============== 607-11575 Rock Fall Fence Lin Foot =============================================== IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 565.00 175.00 320.48 310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 565.00 175.00 320.48 310.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 307 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-11575 Rock Fall Fence Lin Foot =============================================== C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 685.00 1000.00 1100.00 1150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 685.00 1000.00 1100.00 1150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,250.00 627.10 668.91 770.32 =============== 607-11580 Fence (Temp) Lin Foot =============================================== STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 365.00 4.00 10.07 8.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 365.00 4.00 10.07 8.20 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 200.00 2.00 8.50 12.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 1,857.00 7.00 4.70 4.82 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 644.00 3.50 5.08 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,701.00 5.80 4.79 5.39 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 200.00 3.50 16.50 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 3.50 16.50 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,266.00 5.45 5.16 5.56 =============== 607-20000 Safety Screen Each =================================================== NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 4.00 20000.00 29322.67 28543.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 20000.00 29322.67 28543.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 20000.00 29322.67 28543.00 =============== 607-53005 Fence CL (Spec) Lin Foot =============================================== STA0362-035 US 36: Strasburg to Byers 03/23/17 120.00 50.00 262.17 274.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 50.00 262.17 274.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 50.00 262.17 274.51 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 308 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-53137 Fence CL (Spec) (36 In) Lin Foot =============================================== NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 214.00 65.00 77.44 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 214.00 65.00 77.44 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 214.00 65.00 77.44 40.00 =============== 607-53148 Fence CL (48 In) Lin Foot =============================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 3,000.00 15.50 19.76 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,000.00 15.50 19.76 14.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 230.00 50.00 32.70 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 230.00 50.00 32.70 26.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,230.00 17.96 21.23 14.85 =============== 607-53161 Fence CL (Spec) (60 In) Lin Foot =============================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 214.00 36.00 105.00 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 214.00 36.00 105.00 105.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 214.00 36.00 105.00 105.00 =============== 607-55050 Mesh Anchor (Spec) Each =================================================== NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 303.00 1000.00 1991.00 1827.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 303.00 1000.00 1991.00 1827.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 303.00 1000.00 1991.00 1827.00 =============== 607-55100 Wire Mesh Sq Foot ================================================ NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 285,725.00 5.00 3.89 2.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 285,725.00 5.00 3.89 2.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 285,725.00 5.00 3.89 2.91 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 309 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-56001 Fence (Animal Protect) Lin Foot =============================================== CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 600.00 7.82 8.00 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 600.00 7.82 8.00 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 600.00 7.82 8.00 8.00 =============== 607-60002 Game Ramp Each =================================================== NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 12.00 12000.00 10600.00 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 12000.00 10600.00 7500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 12000.00 10600.00 7500.00 =============== 607-60005 5 Ft Gate Walk Each =================================================== NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1.00 1000.00 1680.00 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1000.00 1680.00 1200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 1680.00 1200.00 =============== 607-60112 12 Ft Gate Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 500.00 1360.00 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 500.00 1360.00 850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 500.00 1360.00 850.00 =============== 607-60120 20 Ft Gate Each =================================================== IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 1.00 1500.00 1335.90 1502.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 1335.90 1502.27 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 2.00 750.00 713.69 736.60 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 310 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-60120 20 Ft Gate Each =================================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1.00 1000.00 447.69 422.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 833.33 634.61 631.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1000.00 746.18 849.37 =============== 607-60266 16 Ft Gate D (CL) Each =================================================== NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1.00 1600.00 2040.00 2600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1600.00 2040.00 2600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1600.00 2040.00 2600.00 =============== 607-60620 Road Closure Gate Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 4.00 13000.00 19395.14 13700.00 STM0243-089 Midpoint: Station 1019+50 Cen SHE160A-031 SH 160 Passing Lanes 03/02/17 1.00 11000.00 16408.33 16666.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 12600.00 18309.03 14688.89 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 2.00 17000.00 16627.61 15607.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 17000.00 16627.61 15607.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 13857.14 17948.73 15056.47 =============== 608-00000 Conc Sidewalk Sq Yard ================================================ NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 227.60 70.00 74.17 65.00 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 2,363.00 30.00 75.48 60.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 412.00 65.00 66.06 70.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 93.00 75.00 126.07 122.12 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 223.00 65.00 73.16 49.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 74.00 60.00 90.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,392.60 41.12 75.35 63.40 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 311 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00000 Conc Sidewalk Sq Yard ================================================ STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 579.00 75.00 73.73 35.40 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 19.00 61.50 57.24 43.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 598.00 74.57 72.48 35.65 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 359.00 75.00 69.00 68.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1,866.00 40.00 24.00 26.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 7.00 150.00 310.93 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,232.00 45.97 30.36 33.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,222.60 46.08 59.84 49.83 =============== 608-00003 Conc Sidewalk (Fast Track) Sq Yard ================================================ NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 1,243.00 100.00 126.84 89.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,243.00 100.00 126.84 89.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,243.00 100.00 126.84 89.00 =============== 608-00006 Conc Sidewalk (6 In) Sq Yard ================================================ NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 3,012.00 60.00 66.60 60.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 46.00 50.00 102.82 156.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 79.00 45.00 94.83 58.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,137.00 59.48 67.57 61.36 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 413.00 60.00 129.00 129.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 24.00 55.00 138.74 119.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 240.00 80.00 84.67 79.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 4,564.00 42.00 37.50 37.50 ER0361-115 US 36 Bridges 06/22/17 50.00 50.00 94.14 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,291.00 45.26 53.32 47.34 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 312 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00006 Conc Sidewalk (6 In) Sq Yard ================================================ NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 465.00 75.00 50.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 465.00 75.00 50.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,893.00 51.83 63.28 52.43 =============== 608-00010 Conc Curb Ramp Sq Yard ================================================ NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 133.10 160.00 156.45 148.50 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 658.00 125.00 199.10 150.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 201.00 140.00 153.75 125.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 539.00 120.00 110.89 104.98 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 258.00 150.00 135.60 153.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 195.00 135.00 124.08 88.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 292.00 150.00 169.41 135.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 16.00 200.00 319.84 600.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 95.00 140.00 234.86 290.49 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 80.00 150.00 161.67 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,467.10 135.26 156.64 140.01 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 560.00 150.00 286.00 286.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 359.00 240.00 255.49 260.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 273.00 150.00 257.82 179.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 46.00 135.00 134.72 128.61 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 306.00 180.00 175.00 165.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 276.00 120.00 90.00 90.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 29.00 150.01 181.38 225.00 ER0361-115 US 36 Bridges 06/22/17 31.00 130.00 166.19 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,880.00 166.97 215.58 209.91 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 295.00 250.00 125.00 125.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 1.00 1000.00 494.60 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 296.00 252.53 131.16 125.42 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 313 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00010 Conc Curb Ramp Sq Yard ================================================ CR100-286 R1 CURB RAMPS-PH 1 10/26/17 603.00 150.00 141.00 120.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 544.00 120.00 67.00 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,147.00 135.77 98.45 112.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,790.10 151.65 159.84 156.59 =============== 608-00011 Curb Ramp (Fast Track) Sq Yard ================================================ NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 287.00 180.00 265.27 186.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 287.00 180.00 265.27 186.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 287.00 180.00 265.27 186.00 =============== 608-00015 Detectable Warnings Sq Foot ================================================ NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 244.00 45.00 136.62 105.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 128.00 75.00 85.00 71.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 822.00 60.00 125.15 123.19 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 269.00 60.00 92.40 107.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 43.00 50.00 88.77 56.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 100.00 55.00 60.70 80.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 42.00 50.00 100.02 105.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 10.00 60.00 146.37 58.09 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 176.00 100.00 177.19 334.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,834.00 62.15 116.41 130.28 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 276.00 70.00 180.00 180.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 331.00 100.00 99.14 40.70 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 522.00 70.00 138.74 119.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 50.00 50.01 49.08 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,179.00 77.57 128.09 108.80 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 64.00 125.00 38.00 38.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 314 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00015 Detectable Warnings Sq Foot ================================================ SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 11.00 130.00 58.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 75.00 125.73 47.24 39.03 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 191.00 125.00 91.00 62.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 116.00 60.00 37.67 67.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 307.00 100.44 65.58 63.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,395.00 72.38 114.99 114.80 =============== 608-00050 Brick Pavers Sq Foot ================================================ NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 305.00 30.00 23.60 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 305.00 30.00 23.60 51.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 305.00 30.00 23.60 51.00 =============== 608-00350 Conc Sidewalk (C) Sq Yard ================================================ STAR500-190 R5 Signal Replacement Chaffee 04/27/17 287.00 90.00 100.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 287.00 90.00 100.00 110.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 287.00 90.00 100.00 110.00 =============== 608-01550 Place Asph Millings Sq Yard ================================================ NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 500.00 15.00 20.10 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 500.00 15.00 20.10 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 500.00 15.00 20.10 40.00 =============== 608-01600 Aggregate Walkway Sq Yard ================================================ NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 18.00 20.00 76.80 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 20.00 76.80 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 20.00 76.80 14.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 315 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-10000 Sidewalk Drain Lin Foot =============================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 6.00 250.00 507.00 336.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 250.00 507.00 336.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 250.00 507.00 336.00 =============== 608-10010 Sidewalk Drain Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 1.00 2000.00 3002.75 3200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2000.00 3002.75 3200.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 1.00 3000.00 697.74 520.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3000.00 697.74 520.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2500.00 2234.41 1860.00 =============== 609-20010 Curb Ty 2 B Lin Foot =============================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 143.00 17.00 95.62 67.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 44.00 35.00 48.19 50.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 8.00 35.00 80.27 58.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 195.00 21.80 81.76 62.80 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 145.00 28.50 23.04 34.21 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 107.00 70.00 35.67 27.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 51.00 30.00 18.45 18.45 STAR400-348 Region 4 Controller and Cabin 05/04/17 92.00 35.00 35.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 395.00 41.45 27.74 30.41 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 226.00 30.00 16.33 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 226.00 30.00 16.33 26.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 816.00 33.58 37.88 36.93 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 316 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-21000 Concrete Curb Stop Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 8.00 120.00 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 120.00 100.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 120.00 100.00 100.00 =============== 609-21010 C and G Ty 2 I-B Lin Foot =============================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 36.00 15.00 36.85 25.75 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 180.00 35.00 56.67 65.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1,205.00 30.00 35.36 34.28 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 232.00 40.00 27.20 23.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 537.00 20.00 28.48 33.50 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 303.00 21.42 29.64 20.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 222.00 20.00 57.11 46.47 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 225.00 20.00 29.33 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,940.00 26.68 34.16 33.92 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 216.00 20.00 53.69 31.50 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 282.00 22.00 63.19 35.80 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2,487.00 22.00 11.00 11.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 11.00 40.00 37.00 30.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 83.00 30.01 47.83 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,079.00 22.14 28.92 15.42 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 93.00 30.00 32.00 32.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 18,197.00 25.00 21.52 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18,290.00 25.03 21.53 14.09 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 32.00 15.00 36.00 32.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1,745.00 20.00 15.47 23.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,777.00 19.91 15.71 23.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26,086.00 24.52 22.73 17.13 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 317 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-21011 C and G Ty 2 I-M Lin Foot =============================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2,686.00 30.00 24.57 18.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 589.00 40.00 28.45 23.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 2,339.00 20.00 32.53 34.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,614.00 26.88 28.92 27.73 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1,851.00 20.00 20.94 16.63 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 1,115.00 16.50 22.85 34.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,966.00 18.68 21.32 23.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,580.00 24.05 24.85 25.97 =============== 609-21020 C and G Ty 2 II-B Lin Foot =============================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 416.00 40.00 40.33 30.00 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 5,216.00 15.00 36.85 25.75 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 1,968.00 24.00 30.44 35.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1,601.00 30.00 35.36 34.28 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1,202.00 40.00 31.30 29.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 474.00 24.00 51.02 97.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 688.00 22.00 37.37 24.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 87.00 24.00 70.21 63.91 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 207.00 22.00 35.67 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,859.00 22.88 35.84 32.05 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 1,359.00 25.00 83.60 83.60 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 2,285.00 32.00 57.26 32.80 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 220.00 25.00 77.45 53.80 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 760.00 40.00 37.67 33.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1,756.00 24.00 17.75 17.75 NHPPC120-026 US 85: I-76 to 168th 05/04/17 98.00 35.01 49.50 40.00 ER0361-115 US 36 Bridges 06/22/17 213.00 22.00 42.54 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,691.00 28.88 50.20 39.87 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 204.00 30.00 32.00 28.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 318 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-21020 C and G Ty 2 II-B Lin Foot =============================================== NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 408.00 37.00 39.00 39.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 8.00 52.29 68.00 68.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 620.00 34.89 35.82 35.75 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 372.00 40.00 31.00 32.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 3,098.00 24.00 17.17 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,470.00 25.72 18.19 25.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22,640.00 25.42 35.81 33.50 =============== 609-21021 C and G Ty 2 II-M Lin Foot =============================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 137.00 32.00 35.86 50.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 160.00 30.00 56.83 55.70 STA0362-035 US 36: Strasburg to Byers 03/23/17 22.00 35.00 69.48 69.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 319.00 31.20 47.09 54.22 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 314.00 20.00 27.06 24.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 314.00 20.00 27.06 24.36 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 98.00 40.00 32.00 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 98.00 40.00 32.00 28.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 731.00 27.57 31.58 37.88 =============== 609-21023 C and G Ty 2 II-B (Spec) Lin Foot =============================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 61.00 40.00 17.50 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 61.00 40.00 17.50 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 61.00 40.00 17.50 25.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 319 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-21900 C and G Ty 2 (Spec) Lin Foot =============================================== STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 61.00 35.00 108.34 89.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 61.00 35.00 108.34 89.60 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 415.00 40.00 20.33 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 415.00 40.00 20.33 33.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 476.00 39.36 31.61 40.25 =============== 609-23000 Gutter (Special) Lin Foot =============================================== NHPPC120-026 US 85: I-76 to 168th 05/04/17 35.00 40.01 65.67 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 35.00 40.01 65.67 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 40.01 65.67 80.00 =============== 609-24002 Gutter Ty 2 (2 Ft) Lin Foot =============================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 70.00 80.00 46.33 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 70.00 80.00 46.33 29.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70.00 80.00 46.33 29.00 =============== 609-24003 Gutter Ty 2 (3 Ft) Lin Foot =============================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 295.00 50.00 52.67 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 295.00 50.00 52.67 38.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 295.00 50.00 52.67 38.00 =============== 609-24004 Gutter Ty 2 (4 Ft) Lin Foot =============================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 57.00 30.00 49.71 55.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 320 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-24004 Gutter Ty 2 (4 Ft) Lin Foot =============================================== STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 880.00 35.00 34.62 33.21 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 383.00 40.00 48.30 55.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 196.00 40.00 45.46 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,516.00 36.72 41.61 44.94 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 55.00 35.00 131.25 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 55.00 35.00 131.25 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,571.00 36.66 44.90 48.27 =============== 609-24006 Gutter Ty 2 (6 Ft) Lin Foot =============================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 78.00 50.00 58.16 40.25 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 186.00 50.00 63.06 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 264.00 50.00 61.89 57.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 264.00 50.00 61.89 57.69 =============== 609-24008 Gutter Ty 2 (8 Ft) Lin Foot =============================================== STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 42.00 65.00 89.48 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 42.00 65.00 89.48 170.00 ER0361-115 US 36 Bridges 06/22/17 41.00 52.00 107.05 77.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 41.00 52.00 107.05 77.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 83.00 58.58 98.95 124.06 =============== 609-24010 Gutter Ty 2 (10 Ft) Lin Foot =============================================== STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 40.00 70.00 109.66 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 70.00 109.66 185.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 70.00 109.66 185.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 321 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-24100 Gutter Ty 2 Variable Lin Foot =============================================== STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 70.00 65.00 83.11 67.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 70.00 65.00 83.11 67.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 90.00 80.00 90.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 90.00 80.00 90.00 90.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 70.00 55.00 21.58 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 70.00 55.00 21.58 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 230.00 67.83 55.15 63.22 =============== 609-31025 C and G Ty 2 II-M (Fast Track) Lin Foot =============================================== STA0703-437 I-70: 32ND TO 44TH 06/01/17 60.00 45.00 49.53 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 45.00 49.53 52.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 45.00 49.53 52.00 =============== 609-40010 Curb Ty 4 B Lin Foot =============================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 11.00 25.00 18.45 18.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.00 25.00 18.45 18.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 25.00 18.45 18.45 =============== 609-40120 Curb Median Special Sq Yard ================================================ SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 154.00 40.00 70.80 68.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 154.00 40.00 70.80 68.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 154.00 40.00 70.80 68.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 322 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-60011 Curb Ty 6 M Lin Foot =============================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 373.00 200.00 23.67 20.00 STA0931-032 SH 93 Erosion Correction 02/09/17 129.00 25.00 32.12 32.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 221.00 25.00 27.60 22.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 1,804.00 15.00 14.95 10.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,527.00 43.69 20.01 13.99 STA006A-057 SH 6 EAST OF STERLING 04/06/17 2,114.00 13.00 9.01 9.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 3,987.00 8.00 7.97 7.92 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 40.00 25.00 23.75 23.75 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 75.00 20.00 32.00 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,216.00 9.95 8.71 8.57 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 180.00 20.00 26.78 14.17 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 4,821.00 42.00 45.00 45.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 473.00 17.00 16.58 15.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,474.00 39.12 29.59 41.39 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 70.00 25.00 86.46 60.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 47.00 30.00 30.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 117.00 27.01 70.25 41.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,334.00 27.18 18.90 22.33 =============== 609-70020 Curb (8 In Vert) Lin Foot =============================================== STA0931-032 SH 93 Erosion Correction 02/09/17 30.00 50.00 147.55 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 50.00 147.55 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 50.00 147.55 75.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 323 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-70040 Curb (Composite Material) Lin Foot =============================================== IM025A-037 I25 S. Trinidad Resurface and 11/30/17 2,364.00 5.00 6.22 5.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,364.00 5.00 6.22 5.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,364.00 5.00 6.22 5.66 =============== 609-71000 Curb (Special) Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 102.00 40.00 27.15 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 102.00 40.00 27.15 23.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 102.00 40.00 27.15 23.00 =============== 610-00020 Median Cover (Pattern Conc) Sq Foot ================================================ STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 280.00 25.00 19.99 19.28 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 640.00 8.52 17.27 22.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 920.00 13.54 17.94 21.52 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 4,250.00 9.00 9.22 12.60 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 1,141.00 20.00 19.33 17.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 9,000.00 8.00 4.25 4.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14,391.00 9.25 8.92 7.73 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 41.00 20.00 22.57 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 41.00 20.00 22.57 17.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,352.00 9.53 9.82 8.58 =============== 610-00024 Median Cover (4 In Pattern Conc) Sq Foot ================================================ STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 9,619.00 10.00 8.65 7.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9,619.00 10.00 8.65 7.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,619.00 10.00 8.65 7.67 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 324 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 610-00030 Median Cover Matl (Conc) Sq Foot ================================================ NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 970.00 11.00 16.40 11.25 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 3,316.00 10.00 9.32 5.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1,785.00 15.00 11.20 13.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 3,482.00 9.00 9.34 6.80 STA0362-035 US 36: Strasburg to Byers 03/23/17 12.00 25.00 110.36 232.39 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 1,234.00 9.00 10.17 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,799.00 10.50 10.32 8.55 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 2,430.00 11.50 7.45 10.77 STAR400-348 Region 4 Controller and Cabin 05/04/17 125.00 25.00 15.00 9.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 723.00 10.01 13.87 15.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 840.00 13.00 19.00 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,118.00 11.95 9.62 12.93 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 482.00 14.00 9.00 9.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 65,969.00 8.00 6.88 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 66,451.00 8.04 6.88 5.28 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 818.00 6.00 6.17 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 818.00 6.00 6.17 11.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 82,186.00 8.54 7.38 6.10 =============== 610-00055 Median Cover Matl (Stone) Sq Foot ================================================ SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 22,583.00 3.00 1.77 2.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22,583.00 3.00 1.77 2.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22,583.00 3.00 1.77 2.70 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 325 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 611-00017 16 Ft Deer Gd Each =================================================== NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 5.00 30000.00 27900.00 27500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 30000.00 27900.00 27500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 30000.00 27900.00 27500.00 =============== 611-00025 24 Ft Deer Gd Each =================================================== NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 7.00 50000.00 39000.00 35000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 50000.00 39000.00 35000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 50000.00 39000.00 35000.00 =============== 611-00036 36 Ft Cattle Gd Each =================================================== STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 1.00 30000.00 24263.36 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 30000.00 24263.36 25000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 30000.00 24263.36 25000.00 =============== 611-00037 35 Ft Deer Guard Each =================================================== NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 2.00 70000.00 56400.00 50000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 70000.00 56400.00 50000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 70000.00 56400.00 50000.00 =============== 612-00001 Delin (Ty I) Each =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 100.00 25.00 37.62 25.23 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 224.00 20.00 19.89 16.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 21.00 30.00 31.02 21.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 300.00 25.00 24.81 21.42 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 103.00 24.00 23.90 22.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 326 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00001 Delin (Ty I) Each =================================================== NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 279.00 25.00 22.42 21.42 SHE160A-031 SH 160 Passing Lanes 03/02/17 88.00 25.00 17.85 13.89 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 292.00 24.00 21.80 20.16 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 5.00 25.00 49.85 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,412.00 24.00 22.85 20.79 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 702.00 24.00 16.34 13.01 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 10.00 28.00 51.16 62.30 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 139.00 25.00 16.85 14.35 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 132.00 25.00 14.32 13.13 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 38.00 24.00 22.50 22.50 STA0703-437 I-70: 32ND TO 44TH 06/01/17 150.00 26.00 57.77 25.00 ER0361-115 US 36 Bridges 06/22/17 17.00 24.00 22.68 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,188.00 24.51 21.39 15.58 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 6.00 35.00 64.85 100.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 8.00 24.00 25.00 23.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1,900.00 27.00 42.00 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,914.00 27.01 42.14 42.10 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 5.00 25.00 33.00 50.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 32.00 24.00 17.92 26.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 34.00 25.00 27.31 26.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 10.00 50.00 79.04 90.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 64.00 27.50 21.48 22.44 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 336.00 25.00 23.42 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 481.00 25.79 25.05 24.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,995.00 25.45 25.29 28.23 =============== 612-00002 Delin (Ty II) Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 24.00 25.00 22.29 19.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 327 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00002 Delin (Ty II) Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 48.00 30.00 26.62 23.57 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 37.00 26.00 25.35 23.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 79.00 27.00 25.15 24.48 SHE160A-031 SH 160 Passing Lanes 03/02/17 59.00 27.00 19.62 15.56 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 51.00 26.00 22.88 21.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 298.00 27.03 22.84 21.50 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 10.00 29.00 53.55 64.60 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 20.00 30.00 18.12 15.45 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 76.00 28.00 15.48 14.70 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 51.00 26.00 24.75 24.75 STA0703-437 I-70: 32ND TO 44TH 06/01/17 75.00 27.00 59.13 28.00 ER0361-115 US 36 Bridges 06/22/17 23.00 27.00 24.19 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 255.00 27.41 30.01 23.66 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 21.00 26.00 28.00 25.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 2.00 31.00 58.00 50.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 75.00 31.50 45.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 98.00 30.31 37.82 40.82 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 10.00 55.00 79.72 90.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 12.00 30.00 23.16 24.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22.00 41.36 56.04 54.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 673.00 28.12 27.82 26.28 =============== 612-00003 Delin (Ty III) Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 48.00 30.00 26.33 24.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 6.00 40.00 39.61 29.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 22.00 35.00 28.77 25.71 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 328 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00003 Delin (Ty III) Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 27.00 28.00 26.55 24.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 23.00 30.27 21.46 17.78 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 83.00 28.00 23.93 22.40 STA2873-183 US 287 Repairs at LCR 17 03/09/17 10.00 45.00 41.33 36.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 46.00 25.00 28.52 26.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1.00 37.00 96.95 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 266.00 29.56 26.84 24.95 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 290.00 28.00 18.55 16.65 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 9.00 30.00 19.57 16.55 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 38.00 34.00 16.76 16.80 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 2.00 30.00 53.65 44.95 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 10.00 28.00 26.00 26.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 75.00 40.00 60.52 32.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 3.00 30.00 179.20 20.00 ER0361-115 US 36 Bridges 06/22/17 7.00 30.00 25.70 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 434.00 30.70 28.51 19.85 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 4.00 45.00 82.95 100.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 24.00 66.00 37.65 60.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 750.00 33.00 47.00 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 778.00 34.08 47.33 47.67 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 3.00 30.00 27.72 8.33 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 15.00 28.00 20.00 30.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 2.00 28.00 30.91 30.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 10.00 55.00 87.32 100.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 4.00 35.00 24.49 24.48 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 82.00 27.00 26.46 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 116.00 29.91 32.48 32.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,594.00 32.10 32.42 35.36 =============== 612-00010 Delin (Spec) Each =================================================== SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 180.00 85.00 103.33 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 180.00 85.00 103.33 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 180.00 85.00 103.33 15.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 329 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00021 Delin (Ty I) (Barrier) Each =================================================== BR0252-449 I-25 Woodmen NB 03/02/17 10.00 50.00 136.25 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 50.00 136.25 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 50.00 136.25 40.00 =============== 612-00022 Delin (Ty II) (Barrier) Each =================================================== BR0252-449 I-25 Woodmen NB 03/02/17 4.00 50.00 172.50 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 50.00 172.50 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 50.00 172.50 40.00 =============== 612-00031 Delin (Ty I) (Extra Ht) Each =================================================== NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 47.00 50.00 57.00 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 47.00 50.00 57.00 47.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 32.00 35.00 39.13 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 32.00 35.00 39.13 44.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 79.00 43.92 50.70 45.78 =============== 612-00033 Delin (Ty III) (Extra Ht) Each =================================================== NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1.00 65.00 90.40 89.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 65.00 90.40 89.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 24.00 60.00 39.88 41.41 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 11.00 42.00 44.19 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35.00 54.34 41.04 44.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 54.64 42.50 45.97 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 330 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00036 Delin (Flex) (Sq Base) Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 528.00 75.00 89.65 90.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 1,126.00 56.00 78.51 84.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,654.00 62.07 80.63 86.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,654.00 62.07 80.63 86.12 =============== 612-00037 Delin (Flex) (Flat Mount) Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 126.00 80.00 69.15 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 126.00 80.00 69.15 70.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 39.00 90.00 83.67 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 39.00 90.00 83.67 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 165.00 82.36 73.75 57.24 =============== 612-00039 Delin (Flex) (Surf Mount) Each =================================================== STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 5.00 75.00 101.33 96.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 75.00 101.33 96.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 75.00 101.33 96.30 =============== 612-00041 Delin (Flex) (Ty I) Each =================================================== STA0362-035 US 36: Strasburg to Byers 03/23/17 10.00 80.00 98.54 52.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 80.00 98.54 52.55 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 435.00 74.00 61.74 57.23 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 331 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00041 Delin (Flex) (Ty I) Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 4.00 55.00 86.00 86.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 3.00 50.00 80.00 50.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 50.00 50.01 98.52 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 492.00 71.26 65.65 61.26 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 45.00 75.00 99.00 83.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 6.00 100.00 89.37 84.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 51.00 77.94 96.59 83.12 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 448.00 75.00 68.77 66.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 448.00 75.00 68.77 66.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,001.00 73.36 68.65 64.54 =============== 612-00042 Delin (Flex) (Ty II) Each =================================================== STA0362-035 US 36: Strasburg to Byers 03/23/17 10.00 70.00 102.69 58.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 70.00 102.69 58.39 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 27.00 76.00 64.45 60.35 NHPPC120-026 US 85: I-76 to 168th 05/04/17 50.00 55.01 100.62 97.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 77.00 62.37 87.94 84.15 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 38.00 95.00 104.50 89.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 222.00 60.00 103.31 86.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 260.00 65.12 103.38 86.44 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 84.00 85.00 72.80 71.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 84.00 85.00 72.80 71.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 431.00 68.61 96.74 82.45 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 332 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00043 Delin (Flex) (Ty III) Each =================================================== STA0362-035 US 36: Strasburg to Byers 03/23/17 10.00 100.00 106.84 64.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 100.00 106.84 64.24 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 197.00 78.00 69.16 63.47 NHPPC120-026 US 85: I-76 to 168th 05/04/17 50.00 60.01 101.66 98.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 247.00 74.36 75.74 70.46 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 12.00 95.00 109.75 94.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 95.00 109.75 94.50 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 28.00 95.00 75.47 71.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 28.00 95.00 75.47 71.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 297.00 78.00 77.70 71.31 =============== 612-00046 Delin (Flex) (Spec) (Ty I) Each =================================================== SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 161.00 90.00 96.83 15.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 161.00 90.00 96.83 15.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 161.00 90.00 96.83 15.50 =============== 612-00048 Delin (Flex) (Spec) (Ty III) Each =================================================== SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 85.00 95.00 105.33 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 85.00 95.00 105.33 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 85.00 95.00 105.33 16.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 333 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00050 Reflector (Type-3) Each =================================================== STA0703-437 I-70: 32ND TO 44TH 06/01/17 100.00 65.00 89.88 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 65.00 89.88 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 65.00 89.88 10.00 =============== 612-00070 Reflector Strip (4 In) Each =================================================== STA0703-437 I-70: 32ND TO 44TH 06/01/17 13.00 20.00 101.02 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 20.00 101.02 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 20.00 101.02 21.00 =============== 612-00101 Delin (Drv Conc Inst) (Ty I) Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 170.00 90.00 112.75 135.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 225.00 85.00 97.60 83.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 12.00 110.00 157.67 140.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 122.00 100.00 118.90 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 529.00 90.63 107.99 110.69 STA006A-057 SH 6 EAST OF STERLING 04/06/17 249.00 102.00 114.79 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 249.00 102.00 114.79 135.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 34.00 90.00 109.62 103.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 34.00 90.00 109.62 103.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 812.00 94.09 109.19 117.82 =============== 612-00102 Delin (Drv Conc Inst) (Ty II) Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 100.00 90.00 117.00 140.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 334 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00102 Delin (Drv Conc Inst) (Ty II) Each =================================================== STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 77.00 80.00 102.65 83.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 18.00 110.00 162.67 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 195.00 87.90 113.35 117.95 STA006A-057 SH 6 EAST OF STERLING 04/06/17 23.00 108.00 122.54 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23.00 108.00 122.54 140.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 2.00 90.00 125.75 154.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 90.00 125.75 154.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 220.00 90.02 114.12 120.59 =============== 612-00103 Delin (Drv Conc Inst) (Ty III) Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 70.00 90.00 121.75 145.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 49.00 90.00 104.30 83.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 19.00 110.00 172.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 138.00 92.75 119.33 123.67 STA006A-057 SH 6 EAST OF STERLING 04/06/17 18.00 105.00 127.67 145.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 9.00 125.00 108.25 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 27.00 111.67 117.96 116.67 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 3.00 90.00 156.10 257.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 90.00 156.10 257.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 168.00 95.74 120.95 124.93 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 335 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00260 Loc Mark (Fib Opt)(Dome) Each =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 54.00 125.00 129.50 134.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 54.00 125.00 129.50 134.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 1.00 105.00 58.00 1.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 3.00 100.00 73.95 120.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 53.00 90.00 78.60 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 57.00 90.79 78.30 55.61 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 11.00 120.00 147.50 95.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 108.00 75.00 97.31 95.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 43.00 60.00 124.14 95.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 2.00 200.00 85.67 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 164.00 75.61 106.94 94.76 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 1.00 100.00 74.17 100.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 9.00 80.00 102.20 36.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 7.00 80.00 119.39 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 81.18 106.16 86.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 292.00 88.03 102.65 93.90 =============== 612-00270 Loc Mark (Util)(Flat Slat) Each =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 35.00 110.00 102.47 94.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 35.00 110.00 102.47 94.94 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 13.00 85.00 82.50 115.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 336 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00270 Loc Mark (Util)(Flat Slat) Each =================================================== ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 8.00 70.00 74.19 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21.00 79.29 77.47 99.76 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 11.00 80.00 54.83 100.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 23.00 75.00 87.80 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 34.00 76.62 75.78 51.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90.00 90.22 82.02 79.58 =============== 612-15000 Inst Marker Each =================================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 2.00 100.00 200.12 75.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 100.00 200.12 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 100.00 200.12 75.00 =============== 613-00050 1/2 In Elec Cond Lin Foot =============================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 106.00 18.00 32.03 14.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 106.00 18.00 32.03 14.05 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 10.00 7.00 30.03 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 7.00 30.03 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 116.00 17.05 31.59 14.39 =============== 613-00100 1 In Elec Cond Lin Foot =============================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 1,270.00 20.00 38.24 16.47 NHPP 0701-230 Midpoint WB Bore 03/02/17 204.00 15.00 88.76 72.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,474.00 19.31 48.05 24.16 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 337 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00100 1 In Elec Cond Lin Foot =============================================== NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 160.00 15.00 44.00 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 160.00 15.00 44.00 44.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,634.00 18.89 47.85 26.10 =============== 613-00125 1-1/4 In Elec Cond Lin Foot =============================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 276.00 28.00 42.02 19.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 276.00 28.00 42.02 19.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 276.00 28.00 42.02 19.03 =============== 613-00150 1-1/2 In Elec Cond Lin Foot =============================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 30.00 30.00 46.01 22.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 30.00 46.01 22.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 30.00 46.01 22.02 =============== 613-00200 2 In Elec Cond Lin Foot =============================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 1,070.00 27.00 49.91 24.82 NHPP 0701-230 Midpoint WB Bore 03/02/17 2,560.00 20.00 67.38 100.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 85.00 28.69 19.11 19.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 1,456.00 7.00 7.00 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,171.00 17.93 55.18 56.93 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1,888.00 12.00 16.19 13.79 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 1,733.00 15.00 19.17 18.50 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 338.00 12.00 17.00 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,959.00 13.31 16.75 16.13 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 338 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00200 2 In Elec Cond Lin Foot =============================================== NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1,000.00 15.00 12.50 12.50 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 646.00 15.00 9.60 10.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 10.00 18.50 51.55 24.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 193.00 6.15 6.70 6.70 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1,104.00 15.00 10.68 4.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,953.00 14.43 10.43 8.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,083.00 15.56 21.76 31.71 =============== 613-00206 2 In Elec Cond (Bored) Lin Foot =============================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 610.00 16.50 41.46 31.75 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 690.00 30.00 16.71 17.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 400.00 30.00 22.70 21.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 4,936.00 26.85 15.15 15.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 3,484.00 17.00 17.08 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,120.00 23.17 17.54 16.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 875.00 13.00 30.60 30.60 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 290.00 15.00 15.06 14.89 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 1,325.00 12.50 14.22 13.13 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 994.00 50.00 61.50 22.50 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 525.00 26.00 17.00 17.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 820.00 17.00 28.00 30.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1,245.00 12.00 15.56 15.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 1,855.00 12.00 18.50 18.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 3,100.00 15.00 13.40 9.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 55,160.00 8.50 9.35 7.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 66,189.00 10.00 10.51 9.26 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 940.00 16.00 68.18 47.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 339 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00206 2 In Elec Cond (Bored) Lin Foot =============================================== NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 2,435.00 15.00 30.00 30.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 235.00 50.00 61.50 44.50 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 56,885.00 9.00 8.34 5.69 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 13,540.00 10.50 8.46 5.83 NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 180.00 70.00 76.33 48.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 920.00 15.00 40.20 25.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 2,350.00 13.00 24.01 31.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 77,485.00 9.99 9.69 8.21 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 180.00 35.00 124.07 83.33 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 525.00 20.00 48.16 40.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 8,380.00 8.00 13.49 6.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,085.00 9.23 19.14 9.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 162,879.00 10.77 10.85 9.20 =============== 613-00300 3 In Elec Cond Lin Foot =============================================== STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 130.00 13.09 27.85 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 130.00 13.09 27.85 27.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 2,089.00 20.00 25.83 22.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,089.00 20.00 25.83 22.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,219.00 19.60 25.99 22.76 =============== 613-00306 3 In Elec Cond (Bored) Lin Foot =============================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 800.00 35.00 18.86 19.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2,020.00 40.00 30.10 28.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1,390.00 32.03 22.53 22.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 1,090.00 20.00 22.33 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,300.00 33.04 25.55 24.23 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 340 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00306 3 In Elec Cond (Bored) Lin Foot =============================================== STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 1,380.00 16.00 29.40 29.40 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 580.00 20.00 16.67 16.54 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 1,670.00 15.00 16.96 15.75 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 1,340.00 90.00 70.83 28.50 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2,960.00 28.00 19.50 19.50 STAR400-348 Region 4 Controller and Cabin 05/04/17 105.00 25.00 38.50 50.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1,950.00 25.00 16.08 15.50 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 480.00 25.00 22.50 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10,465.00 31.11 24.91 20.82 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1,900.00 25.00 33.00 33.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 300.00 25.00 19.76 13.65 NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 180.00 80.00 84.33 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,380.00 29.16 33.92 32.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,145.00 31.42 25.83 23.34 =============== 613-00400 4 In Elec Cond Lin Foot =============================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 1,342.00 25.00 141.77 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,342.00 25.00 141.77 195.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,342.00 25.00 141.77 195.00 =============== 613-01100 1 In Elec Cond (P) Lin Foot =============================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 620.00 12.00 19.50 19.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 620.00 12.00 19.50 19.50 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 530.00 20.00 11.80 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 530.00 20.00 11.80 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,150.00 15.69 13.96 16.04 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 341 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-01200 2 In Elec Cond (P) Lin Foot =============================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 130.00 24.00 69.26 13.51 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 1,040.00 21.00 13.48 9.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 700.00 15.00 12.75 12.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 835.00 21.00 19.43 12.06 NHPP 0701-230 Midpoint WB Bore 03/02/17 4,398.00 15.00 22.41 49.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 725.00 12.00 24.11 15.20 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 125.00 17.53 8.87 8.50 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 726.00 12.00 12.50 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,679.00 15.97 19.54 31.84 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2,030.00 15.00 12.79 12.14 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 21.00 11.00 14.39 12.08 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 10,955.00 12.00 8.50 8.50 STAR400-348 Region 4 Controller and Cabin 05/04/17 220.00 15.00 24.38 22.75 NHPPC120-026 US 85: I-76 to 168th 05/04/17 620.00 10.00 8.83 8.50 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 91.00 10.00 16.00 18.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 360.00 15.00 19.80 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14,297.00 12.45 11.89 9.39 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 590.00 14.00 35.00 47.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 2,030.00 10.00 12.50 12.50 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 5,165.00 20.00 19.08 8.25 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 1,070.00 8.00 28.00 26.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 138,570.00 4.50 4.52 2.04 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 68,560.00 7.00 4.31 2.92 NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 1,150.00 25.00 48.50 8.50 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 7,850.00 9.00 9.72 9.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 224,985.00 5.97 5.03 3.08 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 865.00 15.00 37.35 50.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 950.00 22.00 22.25 39.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 500.00 20.00 15.02 16.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 80.00 15.00 26.49 24.48 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 342 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-01200 2 In Elec Cond (P) Lin Foot =============================================== ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 2,310.00 8.00 14.96 9.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,705.00 13.51 21.23 23.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 252,666.00 6.82 5.92 4.75 =============== 613-01201 2 In Elec Cond (P) (Spec) Lin Foot =============================================== ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 1,565.00 30.00 49.30 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,565.00 30.00 49.30 55.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,565.00 30.00 49.30 55.00 =============== 613-01250 2-1/2 In Elec Cond (P) Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 257.00 17.00 13.00 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 257.00 17.00 13.00 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 257.00 17.00 13.00 12.00 =============== 613-01300 3 In Elec Cond (P) Lin Foot =============================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 80.00 23.00 17.81 15.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 150.00 19.00 13.60 12.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 755.00 20.00 28.23 18.20 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 364.00 17.00 13.67 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,349.00 19.26 23.18 15.39 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 65.00 20.00 16.75 16.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 6.00 13.00 16.57 14.70 STAR400-348 Region 4 Controller and Cabin 05/04/17 110.00 15.00 36.23 45.45 NHPPC120-026 US 85: I-76 to 168th 05/04/17 820.00 15.00 9.87 9.50 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 170.00 20.00 18.00 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,171.00 15.99 13.56 14.93 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 343 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-01300 3 In Elec Cond (P) Lin Foot =============================================== NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 315.00 18.00 13.50 13.50 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 420.00 18.00 29.50 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 735.00 18.00 25.14 22.36 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 960.00 24.00 21.67 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 960.00 24.00 21.67 33.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,215.00 19.21 20.35 20.54 =============== 613-01400 4 In Elec Cond (P) Lin Foot =============================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 648.00 17.00 37.33 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 648.00 17.00 37.33 70.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 648.00 17.00 37.33 70.00 =============== 613-03491 Elec Cond (P) (Mult) Lin Foot =============================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 29,595.00 35.00 27.16 19.32 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 2,200.00 18.00 17.13 18.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 31,795.00 33.82 26.15 19.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31,795.00 33.82 26.15 19.23 =============== 613-03492 Elec Cond (P)(Mult)(Bored) Lin Foot =============================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 7,560.00 55.00 51.13 47.27 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 400.00 32.00 51.39 55.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,960.00 53.84 51.15 47.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,960.00 53.84 51.15 47.66 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 344 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-03500 Elec Cond (P) (Mult) (Spec) Lin Foot =============================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 26,265.00 44.97 45.97 46.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26,265.00 44.97 45.97 46.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26,265.00 44.97 45.97 46.98 =============== 613-04010 Conduit LUMP SUM =============================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 1.00 15000.00 11727.50 8455.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 15000.00 11727.50 8455.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 11727.50 8455.00 =============== 613-04100 Elect System Mods LUMP SUM =============================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 1.00 20000.00 25723.75 16447.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 20000.00 25723.75 16447.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 20000.00 25723.75 16447.50 =============== 613-04125 1-1/4 In Elec Cond (Liquidtight Flx Met) Lin Foot =============================================== IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 12.00 15.00 47.83 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 15.00 47.83 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 15.00 47.83 30.00 =============== 613-07000 Pull Box (Spec) Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 18.00 950.00 687.01 529.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 1.00 9000.00 8636.50 8248.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 7.00 650.00 543.00 500.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 28.00 600.00 403.69 400.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 7.00 750.00 1726.67 355.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 61.00 863.93 691.29 573.03 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 345 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07000 Pull Box (Spec) Each =================================================== STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 4.00 600.00 218.00 218.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 8.00 600.00 518.64 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 600.00 475.69 406.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 5.00 800.00 930.83 892.50 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 1.00 2000.00 3519.88 2089.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 1000.00 1475.89 1092.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 79.00 834.18 724.03 587.08 =============== 613-07001 Type One Pull Box Each =================================================== STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 4.00 800.00 861.98 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 800.00 861.98 850.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 1.00 725.00 520.54 488.25 STAR400-348 Region 4 Controller and Cabin 05/04/17 5.00 800.00 697.50 750.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 2.00 700.00 677.50 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 765.63 646.72 654.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 777.08 745.12 719.85 =============== 613-07002 Type Two Pull Box Each =================================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 4.00 1000.00 1072.83 1324.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 1000.00 1072.83 1324.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 1.00 1000.00 692.50 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 692.50 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 346 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07002 Type Two Pull Box Each =================================================== NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 2.00 1000.00 900.00 900.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 2.00 1200.00 1121.67 865.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 9.00 900.00 1089.35 955.00 NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 3.00 1200.00 1499.33 1933.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 33.00 800.00 586.01 620.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 49.00 867.35 752.29 783.35 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 11.00 750.00 983.67 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 750.00 983.67 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65.00 857.69 812.41 933.54 =============== 613-07003 Type Three Pull Box Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 8.00 1000.00 823.18 1150.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 6.00 1000.00 888.00 805.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 1000.00 856.71 943.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 7.00 900.00 607.04 567.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 2.00 1000.00 887.50 750.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 3.00 1000.00 1173.00 950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 941.67 736.53 693.25 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 3.00 800.00 724.90 835.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 800.00 724.90 835.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 955.17 792.69 810.16 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 347 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07004 Type Four Pull Box Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2.00 1200.00 1141.49 1160.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 4.00 1400.00 1264.00 1200.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 4.00 1270.00 2548.29 2822.34 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 4.00 1300.00 1762.00 1200.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 17.00 1000.00 1176.77 1150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 31.00 1138.06 1410.32 1386.65 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 1.00 1200.00 906.25 892.50 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 9.00 1500.00 1085.00 1085.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 8.00 1100.00 1582.50 1500.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 10.00 1200.00 1011.40 975.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 1.00 1200.00 1530.00 1500.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 2.00 1400.00 1610.20 1361.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 31.00 1274.19 1237.78 1181.60 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 12.00 1200.00 1400.00 1400.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 2.00 1200.00 1733.33 1700.00 NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 3.00 1400.00 1739.00 1452.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 5.00 1200.00 1926.33 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 22.00 1227.27 1708.24 1684.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 84.00 1211.67 1410.69 1388.97 =============== 613-07005 Type Five Pull Box Each =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 30.00 2500.00 2990.00 3480.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 1800.00 1542.00 1500.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 1.00 1800.00 2127.50 1520.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1.00 1195.06 1609.83 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 33.00 2418.03 2759.28 3303.64 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 2000.00 1725.00 1725.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 348 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07005 Type Five Pull Box Each =================================================== NHPPC120-026 US 85: I-76 to 168th 05/04/17 2.00 2000.00 1380.26 1330.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 1.00 1500.00 2022.50 2000.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 3.00 1650.00 2024.67 2500.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 22.00 1700.00 1901.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 29.00 1718.97 1885.81 1616.72 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 3.00 1700.00 1870.00 1870.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1700.00 1870.00 1870.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65.00 2073.00 2200.88 2484.85 =============== 613-07011 Pull Box (11"x18"x12") Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 75.00 600.00 650.00 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 75.00 600.00 650.00 650.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 8.00 500.00 660.68 695.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 500.00 660.68 695.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 25.00 650.00 921.79 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.00 650.00 921.79 550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 108.00 604.17 793.34 630.19 =============== 613-07017 Pull Box (16"x14"x6") Each =================================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 9.00 1000.00 838.47 710.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 1000.00 838.47 710.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 1000.00 838.47 710.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 349 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07023 Pull Box (24"x36"x24") Each =================================================== SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 18.00 1300.00 1235.00 940.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 1300.00 1235.00 940.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2.00 1500.00 965.07 893.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 5.00 1200.00 1841.00 2508.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 1285.71 1301.97 2046.57 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 22.00 1600.00 1525.00 1550.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 1.00 1250.00 1716.49 1575.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 97.00 1200.00 1597.87 1392.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 40.00 1250.00 1495.53 1392.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 160.00 1267.81 1562.16 1414.87 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 1.00 1500.00 1491.17 2000.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 1500.00 1148.50 1045.50 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 9.00 1300.00 1790.04 1227.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 14.00 1400.00 1368.86 1350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.00 1372.00 1541.82 1319.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 210.00 1283.57 1531.31 1383.87 =============== 613-07024 Pull Box (24"x24"x8") Each =================================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 70.00 1200.00 2035.28 605.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70.00 1200.00 2035.28 605.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70.00 1200.00 2035.28 605.00 =============== 613-07026 Pull Box (16"x24"x12") Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 10.00 900.00 701.46 851.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 350 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07026 Pull Box (16"x24"x12") Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 900.00 701.46 851.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 20.00 1300.00 900.00 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 1300.00 900.00 900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 1166.67 773.66 890.20 =============== 613-07034 Pull Box (24"x36"x18") Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 1200.00 1197.00 1100.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 3.00 500.00 1517.46 1222.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 780.00 1423.21 1173.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 780.00 1423.21 1173.33 =============== 613-07039 Pull Box (30"x48"x18") Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 4.00 1500.00 1279.97 1130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 1500.00 1279.97 1130.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1500.00 1279.97 1130.00 =============== 613-07040 Pull Box (30"x48"x24") Each =================================================== SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 3.00 1650.00 1653.33 1340.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1650.00 1653.33 1340.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 1.00 2000.00 2195.00 1890.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2000.00 2195.00 1890.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 351 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07040 Pull Box (30"x48"x24") Each =================================================== ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 2.00 1800.00 1910.25 1658.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1800.00 1910.25 1658.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1758.33 1818.53 1537.83 =============== 613-07050 Pull Box (13"x24"x18") Deep Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 29.00 900.00 760.00 760.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 29.00 900.00 760.00 760.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 900.00 760.00 760.00 =============== 613-07060 Pull Box (18"x30"x18") Deep Each =================================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 19.00 1200.00 1268.67 1436.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19.00 1200.00 1268.67 1436.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 1200.00 1268.67 1436.00 =============== 613-07195 Proof Conduit Lin Foot =============================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 39,390.00 1.50 1.40 1.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 39,390.00 1.50 1.40 1.79 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 3,560.00 2.00 1.06 0.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,560.00 2.00 1.06 0.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42,950.00 1.54 1.34 1.71 =============== 613-08000 Inst Vault Each =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 6.00 7500.00 6412.50 5325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 7500.00 6412.50 5325.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 7500.00 6412.50 5325.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 352 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-10000 Wiring LUMP SUM =============================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 1.00 250000.00 270706.92 171413.83 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 1.00 9000.00 7108.29 6615.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 30000.00 12180.00 11000.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 1.00 2000.00 9940.93 7555.56 NHPP 0701-230 Midpoint WB Bore 03/02/17 1.00 275000.00 213605.83 238051.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1.00 30000.00 13217.65 13100.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 1.00 20000.00 20256.00 12268.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 78125.00 46439.23 65714.77 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 1.00 35000.00 11100.00 11100.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 1.00 10000.00 17897.32 3500.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 7500.00 12375.63 8824.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 1.00 25000.00 26786.53 20475.60 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 60000.00 14100.00 14100.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 1.00 40000.00 28292.50 25000.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1.00 17000.00 9334.23 9000.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 1.00 8500.00 8312.50 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 23961.54 18228.45 14146.31 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 1.00 6000.00 17750.00 15500.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1.00 35000.00 36500.00 36500.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 5000.00 27666.67 35000.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 1.00 60000.00 48150.00 36300.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 1.00 17500.00 12826.00 8500.00 NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 1.00 5000.00 6341.00 4483.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 1.00 10000.00 31411.60 20300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 19785.71 22924.41 22369.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 1.00 5000.00 26654.17 25000.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 30000.00 20600.33 26800.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 1.00 15000.00 26656.60 25000.00 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 1.00 32313.60 31680.00 31680.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 20578.40 25779.27 27120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 36166.05 28497.42 29321.56 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 353 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-10010 Wiring (Spec) LUMP SUM =============================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 90000.00 55000.00 55000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 90000.00 55000.00 55000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 90000.00 55000.00 55000.00 =============== 613-10015 Breakaway Wiring System Each =================================================== IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 2.00 1300.00 3053.50 2800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1300.00 3053.50 2800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1300.00 3053.50 2800.00 =============== 613-13000 Luminaire (LED) Each =================================================== STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 4.00 1350.86 864.48 860.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 9.00 1350.00 971.67 1385.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 1350.26 931.78 1223.46 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 8.00 1481.00 1830.00 1830.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 7.00 1100.00 705.05 661.50 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 7.00 2000.00 967.50 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 22.00 1524.91 927.40 1146.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 1460.04 929.29 1175.01 =============== 613-13004 Lumin (Spec)(LED)(130W) Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 5.00 1500.00 893.72 805.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 1500.00 893.72 805.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1500.00 893.72 805.00 =============== 613-13006 Lumin (LED) (8500 Lumens) Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 3.00 2000.00 783.60 692.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 354 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-13006 Lumin (LED) (8500 Lumens) Each =================================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 16.00 1500.00 1556.67 1630.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 8.00 1250.00 622.17 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 27.00 1481.48 1091.31 1220.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 1481.48 1091.31 1220.59 =============== 613-13014 Lumin (LED) (14,000 Lumens) Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 11.00 1200.00 542.50 542.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.00 1200.00 542.50 542.50 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 21.00 560.00 750.00 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21.00 560.00 750.00 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 780.00 678.67 678.67 =============== 613-13016 Lumin (LED) (16,000 Lumens) Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 12.00 1200.00 540.00 540.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 1200.00 540.00 540.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 8.00 600.00 603.67 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 600.00 603.67 1250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 960.00 582.44 824.00 =============== 613-13100 Luminare Mounting Support System LUMP SUM =============================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 1.00 336000.00 228324.00 128000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 336000.00 228324.00 128000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 336000.00 228324.00 128000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 355 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-13103 Lumin (LED) (Tunnel)(265 W) Each =================================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 418.00 2100.00 2789.29 2380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 418.00 2100.00 2789.29 2380.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 418.00 2100.00 2789.29 2380.00 =============== 613-13104 Lumin (LED) (Tunnel)(265 W)(Furn) Each =================================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 10.00 1800.00 2320.29 1990.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 1800.00 2320.29 1990.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 1800.00 2320.29 1990.00 =============== 613-16010 Light Std + Lumin (Dec) Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 25.00 4000.00 4400.00 4400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 25.00 4000.00 4400.00 4400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 4000.00 4400.00 4400.00 =============== 613-20200 Inst Lumin Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 4.00 200.00 211.00 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 200.00 211.00 195.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 66.00 300.00 165.60 238.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 66.00 300.00 165.60 238.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70.00 294.29 168.19 235.54 =============== 613-20300 Furn Lumin Each =================================================== NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 5.00 500.00 525.00 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 500.00 525.00 525.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 500.00 525.00 525.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 356 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-30005 Light Std + Lumin (Pedest) Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 6.00 4000.00 4700.00 4700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 4000.00 4700.00 4700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 4000.00 4700.00 4700.00 =============== 613-32300 Light Std Steel (30 Ft) Each =================================================== ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 7.00 3000.00 3433.98 3200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 3000.00 3433.98 3200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 3000.00 3433.98 3200.00 =============== 613-32350 Light Std Steel (35 Ft) Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 11.00 3000.00 2000.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.00 3000.00 2000.00 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 3000.00 2000.00 2000.00 =============== 613-32352 Light Std Steel (35 Ft) (2) Each =================================================== SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 33.00 3000.00 3092.81 3385.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 33.00 3000.00 3092.81 3385.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.00 3000.00 3092.81 3385.00 =============== 613-32400 Light Std Steel (40 Ft) Each =================================================== NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 9.00 4750.00 2900.00 2900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 4750.00 2900.00 2900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 4750.00 2900.00 2900.00 =============== 613-34350 Light Std Metal (35 Ft) Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 8.00 3000.00 2500.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 3000.00 2500.00 2500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 357 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-34350 Light Std Metal (35 Ft) Each =================================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 8.00 3000.00 2160.33 3680.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 3000.00 2160.33 3680.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 3000.00 2245.25 3090.00 =============== 613-34400 Light Std Metal (40 Ft) Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 5.00 1500.00 3326.73 3281.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 1500.00 3326.73 3281.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1500.00 3326.73 3281.00 =============== 613-40000 Conc Foundation Pad Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 1.00 1100.00 1410.00 970.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 1.00 1600.00 66472.67 2700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1350.00 40447.60 1835.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2.00 1000.00 2400.00 2400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1000.00 2400.00 2400.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 2400.00 1207.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2400.00 1207.00 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1420.00 21065.90 2194.00 =============== 613-40010 Light Std Foundation Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 6.00 1200.00 975.00 880.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 358 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-40010 Light Std Foundation Each =================================================== SHE160A-031 SH 160 Passing Lanes 03/02/17 3.00 1500.00 2556.52 1222.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 1300.00 1677.90 994.07 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 5.00 2000.00 1670.90 1654.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 45.00 1500.00 1400.00 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 1550.00 1554.80 1425.40 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 9.00 1400.00 1325.00 1325.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 33.00 1500.00 1193.30 1270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 42.00 1478.57 1200.11 1281.79 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 8.00 1500.00 1040.33 2000.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 7.00 1250.00 1866.98 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 1383.33 1530.71 1626.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 116.00 1483.19 1410.69 1365.96 =============== 613-40012 Light Std Foundation Spec Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 1800.00 860.00 790.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1800.00 860.00 790.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 31.00 1000.00 1300.00 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 31.00 1000.00 1300.00 1300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.00 1048.48 1192.68 1269.09 =============== 613-50100 Lighting Ctrl Center Each =================================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 1.00 20000.00 211081.58 128780.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 20000.00 211081.58 128780.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 359 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-50100 Lighting Ctrl Center Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 25000.00 3800.00 3800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 25000.00 3800.00 3800.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 10000.00 8883.33 2650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 8883.33 2650.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 14000.00 6007.00 14100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 14000.00 6007.00 14100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 17250.00 68171.58 37332.50 =============== 613-50105 Lighting Ctrl Center (Pedestal Only) Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 10000.00 8658.64 9375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 10000.00 8658.64 9375.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 8658.64 9375.00 =============== 613-50106 Light Cont Center (Spec) Each =================================================== IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 2.00 4000.00 7843.50 5600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 4000.00 7843.50 5600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4000.00 7843.50 5600.00 =============== 613-50130 4-Plex Rcptl (W/Back Box & Cover) Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 10.00 816.50 734.72 619.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 816.50 734.72 619.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 816.50 734.72 619.43 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 360 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-50132 2-Plex Recept. (W/Box & Cover) Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 32.00 522.50 678.93 507.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32.00 522.50 678.93 507.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 522.50 678.93 507.86 =============== 613-50150 Secondary Serv Pedestal Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 3500.00 2766.00 305.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3500.00 2766.00 305.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 5000.00 3800.00 3800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5000.00 3800.00 3800.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 4.00 3200.00 5655.00 5655.00 NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 1.00 4000.00 5814.73 3789.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 3360.00 5723.46 5281.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 3614.29 4438.02 4359.17 =============== 613-50325 Tunnel Lighting Control System LUMP SUM =============================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 1.00 293850.00 146952.50 201935.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 293850.00 146952.50 201935.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 293850.00 146952.50 201935.00 =============== 613-50355 Power Transformer Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 3.00 2800.00 4812.77 2975.53 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 361 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-50355 Power Transformer Each =================================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 1.00 1700.00 15064.58 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 2525.00 8230.04 2781.65 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 10000.00 4463.71 3860.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 10000.00 4463.71 3860.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 4020.00 6077.85 2997.32 =============== 613-80002 Circuit Breaker (20A, 1 Pole) Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 33.00 60.65 130.00 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 33.00 60.65 130.00 145.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.00 60.65 130.00 145.00 =============== 613-80004 Circuit Breaker (40A, 2 Pole) Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 2.00 1047.50 140.00 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1047.50 140.00 145.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1047.50 140.00 145.00 =============== 613-80005 Circuit Breaker (50A, 3 Pole) Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 1.00 1047.50 147.50 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1047.50 147.50 145.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1047.50 147.50 145.00 =============== 613-80007 Circuit Breaker (70A, 2 Pole) Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 2.00 1069.00 160.00 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1069.00 160.00 145.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1069.00 160.00 145.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 362 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-80008 Circuit Breaker (80A, 2 Pole) Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 1.00 181.00 210.00 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 181.00 210.00 145.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 181.00 210.00 145.00 =============== 613-80012 Circuit Breaker (100A, 2 Pole) Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 2.00 288.00 222.50 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 288.00 222.50 145.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 288.00 222.50 145.00 =============== 613-80013 Circuit Breaker (100A, 3 Pole) Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 1.00 288.00 287.50 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 288.00 287.50 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 288.00 287.50 150.00 =============== 613-80130 Service Meter Cabinet Each =================================================== STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 3.00 3800.00 6266.26 6200.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 3.00 3815.79 5671.67 3390.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 3807.90 6011.43 4795.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 2.00 5500.00 4890.00 4890.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 6.00 5500.00 5627.50 6500.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 2.00 5300.00 5094.58 3625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 5460.00 5393.87 5603.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 8.00 6000.00 5875.00 5750.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 363 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-80130 Service Meter Cabinet Each =================================================== NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 2.00 5500.00 3160.00 3160.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 25.00 6000.00 4972.50 4945.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 4.00 5500.00 5377.15 5000.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 3.00 5500.00 2997.47 4600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 42.00 5892.86 4868.45 4993.93 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 3.00 5000.00 5358.17 7500.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 2.00 4250.00 5859.10 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 4700.00 5537.07 5900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 63.00 5530.91 5177.94 5143.57 =============== 613-80274 Struct Mount Disc Switch Each =================================================== IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 2.00 380.00 3345.83 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 380.00 3345.83 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 380.00 3345.83 2500.00 =============== 613-81010 Pnlbrd (100A, 120/208V, 3Ph, 42 Circuit) Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 1.00 2650.00 4406.88 2363.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2650.00 4406.88 2363.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2650.00 4406.88 2363.75 =============== 614-00011 Sign Panel (CL I) Sq Foot ================================================ NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 138.00 22.00 36.48 28.75 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 6.00 25.00 22.03 22.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 33.00 50.00 37.63 37.75 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 792.00 21.00 19.75 20.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 176.00 20.00 18.89 15.00 STM0243-089 Midpoint: Station 1019+50 Cen STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 137.40 25.00 19.44 16.07 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 364 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00011 Sign Panel (CL I) Sq Foot ================================================ NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 148.00 35.00 20.83 16.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 215.69 17.00 17.01 17.34 SHE160A-031 SH 160 Passing Lanes 03/02/17 81.00 22.00 16.15 13.33 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 372.00 20.00 14.82 10.80 BR0252-449 I-25 Woodmen NB 03/02/17 6.00 25.00 55.00 40.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 12.50 20.50 30.36 34.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 43.00 20.00 34.30 25.69 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 107.00 25.00 26.67 29.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 447.00 17.75 20.83 24.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,714.59 21.50 20.02 19.63 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 232.00 25.00 37.70 37.70 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 37.00 30.00 27.19 25.20 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 647.00 22.00 16.16 12.49 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 5.00 20.00 28.60 34.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 100.00 20.00 19.58 15.44 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 6.00 17.00 23.80 39.90 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 375.00 20.00 23.75 23.75 NHPPC120-026 US 85: I-76 to 168th 05/04/17 67.00 25.00 30.09 29.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 74.00 25.00 28.00 25.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 42.00 30.00 30.64 21.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 345.88 20.00 15.00 10.00 ER0361-115 US 36 Bridges 06/22/17 60.00 20.00 17.01 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,990.88 21.97 19.78 19.03 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 13.00 20.00 19.00 20.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 166.00 25.00 22.88 23.75 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 9.00 30.00 31.00 31.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 38.00 25.00 21.00 22.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 26.00 35.00 25.00 18.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1,243.00 26.00 22.00 22.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 298.25 30.00 26.79 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,793.25 26.66 24.23 23.80 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 32.00 25.00 48.33 45.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 365.00 20.00 16.00 23.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 365 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00011 Sign Panel (CL I) Sq Foot ================================================ C133A-042 SH 133 McClure Pass Slip 11/16/17 97.00 25.00 20.96 20.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 20.00 30.00 34.60 35.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 22.00 21.00 19.15 22.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 536.00 21.62 21.44 24.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,034.72 22.96 20.75 20.89 =============== 614-00012 Sign Panel (CL II) Sq Foot ================================================ NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 122.00 25.00 21.11 17.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 2,461.00 25.00 23.63 23.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 1,392.00 25.00 20.52 16.25 STM0243-089 Midpoint: Station 1019+50 Cen IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 18.00 25.00 33.28 25.96 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 36.00 45.00 23.35 14.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 308.00 21.00 21.07 20.40 SHE160A-031 SH 160 Passing Lanes 03/02/17 598.00 22.00 19.80 18.22 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 1,175.00 24.00 18.80 15.20 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 70.50 24.39 32.58 32.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 50.00 22.45 31.33 29.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 838.00 25.00 25.99 28.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,068.50 24.48 21.93 21.02 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 142.00 27.00 38.90 38.90 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 1,955.00 25.00 19.69 17.06 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 62.00 23.00 32.18 37.40 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 495.00 25.00 21.72 18.76 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 36.00 20.00 19.83 22.05 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 355.00 50.00 58.50 67.50 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 25.00 25.00 27.00 27.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 98.00 27.00 36.30 35.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 244.00 23.00 30.50 28.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 657.00 30.00 33.90 27.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 3,513.00 23.00 18.50 12.00 ER0361-115 US 36 Bridges 06/22/17 78.00 22.00 21.68 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,660.00 25.60 23.75 19.31 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 144.00 25.00 20.25 19.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 366 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00012 Sign Panel (CL II) Sq Foot ================================================ NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 241.00 25.00 27.25 28.50 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 18.00 32.00 38.00 38.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 40.00 30.00 24.00 25.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 72.00 21.00 24.17 26.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 2,979.00 35.00 28.00 28.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 72.00 32.00 32.76 39.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,566.00 33.51 26.91 27.87 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 108.00 35.00 37.24 40.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 158.00 22.00 21.49 24.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 266.00 27.28 29.88 30.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,560.50 26.72 23.19 21.80 =============== 614-00013 Sign Panel (CL III) Sq Foot ================================================ STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 66.00 38.50 30.90 33.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 66.00 38.50 30.90 33.70 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 661.00 30.00 29.61 17.54 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 501.00 30.00 32.00 30.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 3,368.00 30.00 32.14 32.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 7,805.00 28.50 18.50 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12,335.00 29.05 26.00 20.39 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 843.00 29.00 54.00 60.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 271.00 38.00 38.00 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,114.00 31.19 51.78 54.65 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 1,157.00 30.00 27.78 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 367 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00013 Sign Panel (CL III) Sq Foot ================================================ IM025A-037 I25 S. Trinidad Resurface and 11/30/17 28.00 30.00 29.23 35.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,185.00 30.00 27.80 30.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,700.00 29.33 27.36 23.83 =============== 614-00025 Inst Sign Panel (CL I) Sq Foot ================================================ MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 1,811.00 9.00 8.89 8.00 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 13,550.00 8.00 8.50 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15,361.00 8.12 8.55 8.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 32.00 9.00 6.50 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 9.00 6.50 6.50 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 3,223.00 8.00 7.57 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,223.00 8.00 7.57 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,616.00 8.10 8.41 8.00 =============== 614-00026 Inst Sign Panel (CL I) Each =================================================== MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 311.00 50.00 210.80 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 311.00 50.00 210.80 195.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 11.00 23.00 332.50 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 23.00 332.50 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 322.00 49.08 212.50 205.42 =============== 614-00027 Inst Sign Panel (CL II) Sq Foot ================================================ MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 3,837.00 10.00 10.00 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 368 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00027 Inst Sign Panel (CL II) Sq Foot ================================================ MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 2,100.00 10.00 10.50 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,937.00 10.00 10.18 10.35 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 8,970.00 10.00 9.87 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,970.00 10.00 9.87 11.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,907.00 10.00 10.01 10.74 =============== 614-00028 Inst Sign Panel (CL III) Sq Foot ================================================ MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 535.00 11.00 12.19 11.00 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 500.00 12.00 13.38 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,035.00 11.48 12.76 13.42 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 686.00 30.00 14.00 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 686.00 30.00 14.00 14.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 797.00 11.00 44.00 50.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 754.00 11.00 13.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,551.00 11.00 25.81 32.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,272.00 15.14 18.66 22.81 =============== 614-00029 Inst Sign Panel (CL II) Each =================================================== STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 4.00 250.00 286.39 310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 250.00 286.39 310.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 3.00 26.00 827.50 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 26.00 827.50 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 154.00 433.96 820.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 369 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00030 Inst Sign Panel (CL III) Each =================================================== NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 1.00 250.00 2403.67 1376.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 250.00 2403.67 1376.00 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 6.00 500.00 775.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 500.00 775.00 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 464.29 1100.73 1053.71 =============== 614-00035 Sign Panel (Spec) Sq Foot ================================================ STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 114.00 40.00 47.10 47.10 NHPPC120-026 US 85: I-76 to 168th 05/04/17 10.00 40.00 36.30 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 124.00 40.00 44.85 46.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 124.00 40.00 44.85 46.12 =============== 614-00037 Sign Panel (Spec) Each =================================================== NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 12.00 33.00 560.00 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 33.00 560.00 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 33.00 560.00 120.00 =============== 614-00200 Steel Sign Post (U-2) Lin Foot =============================================== SHE160A-031 SH 160 Passing Lanes 03/02/17 12.00 200.00 12.78 13.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 200.00 12.78 13.33 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 331.00 11.34 18.00 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 331.00 11.34 18.00 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 343.00 17.94 16.83 17.84 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 370 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00216 Steel Sign Post (2x2 In T) Lin Foot =============================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 144.00 15.00 170.53 12.25 STA0362-035 US 36: Strasburg to Byers 03/23/17 60.00 15.00 34.03 11.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 204.00 15.00 130.39 12.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 204.00 15.00 130.39 12.08 =============== 614-00220 Steel Sign Post (2.5x2.5 In T) Lin Foot =============================================== SHE160A-031 SH 160 Passing Lanes 03/02/17 50.00 20.00 18.30 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 20.00 18.30 20.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 42.00 15.00 24.75 12.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 42.00 15.00 24.75 12.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 92.00 17.72 19.85 16.46 =============== 614-00612 Steel Sign Post (W 6x12) Lin Foot =============================================== NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 28.00 110.00 65.67 58.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 193.00 35.00 31.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 221.00 44.50 35.39 46.65 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 141.30 80.00 48.10 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 141.30 80.00 48.10 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 362.30 58.35 39.19 47.95 =============== 614-00615 Steel Sign Post (W 6x15) Lin Foot =============================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 29.00 65.00 50.00 46.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 29.00 65.00 50.00 46.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 65.00 50.00 46.35 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 371 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00818 Steel Sign Post (W 8x18) Lin Foot =============================================== MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 121.00 65.00 49.50 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 121.00 65.00 49.50 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 121.00 65.00 49.50 35.00 =============== 614-00821 Steel Sign Post (W 8x21) Lin Foot =============================================== MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 101.00 67.00 51.50 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 101.00 67.00 51.50 38.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 101.00 67.00 51.50 38.00 =============== 614-01022 Steel Sign Post (W 10x22) Lin Foot =============================================== MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 281.00 68.00 58.00 43.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 281.00 68.00 58.00 43.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 281.00 68.00 58.00 43.00 =============== 614-01026 Steel Sign Post (W 10x26) Lin Foot =============================================== STA0703-437 I-70: 32ND TO 44TH 06/01/17 56.00 85.00 95.45 100.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 37.00 77.00 59.50 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 93.00 81.82 86.52 78.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93.00 81.82 86.52 78.12 =============== 614-01226 Steel Sign Post (W 12x26) Lin Foot =============================================== STA0703-437 I-70: 32ND TO 44TH 06/01/17 37.00 95.00 101.46 97.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 41.00 80.00 62.50 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 78.00 87.12 87.57 72.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 78.00 87.12 87.57 72.29 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 372 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01502 Steel Sign Supp (2-In Rd)(Po&Sock) Lin Foot =============================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 8.00 30.00 46.05 19.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 30.00 46.05 19.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 30.00 46.05 19.86 =============== 614-01503 Steel Sign Supp (2-In Rd)(Po&Sock) Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 4.00 200.00 186.68 200.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 9.00 187.50 227.60 205.56 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 48.00 200.00 171.26 174.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 61.00 198.16 186.63 180.75 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 92.00 200.00 182.43 187.29 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 19.00 250.00 170.00 170.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 82.00 175.00 136.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 193.00 194.30 165.33 127.26 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 91.00 140.00 210.00 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 91.00 140.00 210.00 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 345.00 180.66 183.24 150.63 =============== 614-01512 Steel Sign Supp (2-In Rd)(Post) Lin Foot =============================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 22.00 25.00 27.76 27.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 1,346.00 16.00 9.46 12.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 1,000.00 12.00 6.10 6.00 STM0243-089 Midpoint: Station 1019+50 Cen STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 178.00 30.00 10.00 9.64 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 205.00 15.00 8.59 11.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 162.00 12.00 12.89 11.22 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 593.00 15.00 8.91 3.15 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 373 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01512 Steel Sign Supp (2-In Rd)(Post) Lin Foot =============================================== MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 850.00 15.00 6.71 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,356.00 15.17 8.28 8.65 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 100.00 35.00 14.00 6.00 ER0361-115 US 36 Bridges 06/22/17 61.00 15.00 12.76 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 161.00 27.42 13.32 8.65 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 24.00 45.00 13.15 20.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 147.00 17.00 13.50 7.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 46.00 15.00 22.00 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 217.00 19.67 15.55 11.83 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 206.00 12.00 6.25 8.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 206.00 12.00 6.25 8.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,940.00 15.64 8.60 8.81 =============== 614-01522 Steel Sign Supp (2-In Rd)(Sock) Each =================================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 2.00 400.00 252.40 270.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 118.00 225.00 127.25 160.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 104.00 125.00 127.34 100.00 STM0243-089 Midpoint: Station 1019+50 Cen STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 17.00 250.00 117.57 85.70 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 30.00 120.00 93.00 68.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 16.00 170.00 94.44 56.10 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 54.00 140.00 116.90 20.50 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 75.00 110.00 101.25 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 416.00 160.41 117.00 102.33 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 9.00 75.00 86.33 54.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 374 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01522 Steel Sign Supp (2-In Rd)(Sock) Each =================================================== ER0361-115 US 36 Bridges 06/22/17 6.00 150.00 167.33 205.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15.00 105.00 132.62 114.40 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 4.00 150.00 106.00 100.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 15.00 120.00 131.00 112.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 13.00 80.00 315.00 345.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 32.00 107.50 206.01 205.16 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 28.00 110.00 74.33 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 28.00 110.00 74.33 110.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 491.00 152.39 119.81 110.72 =============== 614-01572 Steel Sign Supp (2-1/2 Rd NP40)(Po&Silp) Lin Foot =============================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 424.00 40.00 40.61 35.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 424.00 40.00 40.61 35.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 424.00 40.00 40.61 35.31 =============== 614-01573 Steel Sign Supp (2-1/2 Rd NP40)(Po&Slip) Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 2.00 360.00 363.86 360.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 2.00 350.00 388.17 442.50 SHE160A-031 SH 160 Passing Lanes 03/02/17 51.00 368.18 410.13 388.89 BR0252-449 I-25 Woodmen NB 03/02/17 1.00 350.00 556.25 375.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1.00 326.91 379.16 330.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 64.00 370.00 336.18 361.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 121.00 368.22 382.64 374.21 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 140.00 400.00 370.72 312.16 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 375 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01573 Steel Sign Supp (2-1/2 Rd NP40)(Po&Slip) Each =================================================== STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 8.00 345.00 351.70 315.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 17.00 400.00 460.00 460.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 233.00 325.00 282.50 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 398.00 354.99 327.93 244.09 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 7.00 400.00 460.00 420.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 8.00 300.00 495.00 425.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 430.00 500.00 578.00 578.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 677.00 320.00 294.00 290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,122.00 389.34 346.05 402.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,641.00 379.45 348.02 361.75 =============== 614-01575 Steel Sign Supp (2-1/2 In Rd NP40)(Po) Lin Foot =============================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 3,720.00 31.00 14.20 13.50 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 1,148.00 20.00 15.97 15.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 44.50 22.00 17.66 16.32 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 1,027.00 20.00 19.36 8.50 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 270.00 20.00 15.50 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,209.50 26.60 15.61 12.98 ER0361-115 US 36 Bridges 06/22/17 118.00 16.00 16.28 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 118.00 16.00 16.28 15.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 168.00 30.00 15.90 15.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 321.00 17.00 25.75 23.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 489.00 21.47 20.17 20.58 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 258.00 19.00 14.42 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 258.00 19.00 14.42 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,074.50 25.79 15.83 13.91 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 376 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01578 Steel Sign Supp (2-1/2 In Rd NP40)(Slip) Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 332.00 250.00 223.75 210.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 118.00 250.00 226.89 160.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 4.00 225.00 264.84 244.80 SHE160A-031 SH 160 Passing Lanes 03/02/17 11.00 300.00 252.85 222.22 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 91.00 200.00 167.55 136.00 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 770.00 140.00 217.50 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,326.00 183.03 216.22 147.88 ER0361-115 US 36 Bridges 06/22/17 12.00 250.00 302.50 340.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 250.00 302.50 340.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 14.00 350.00 248.00 240.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 30.00 260.00 380.00 385.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 44.00 288.64 308.92 338.86 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 24.00 250.00 185.33 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24.00 250.00 185.33 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,406.00 188.05 219.06 158.09 =============== 614-01582 Steel Sign Supp (2-1/2 In Rd)(Po&Slip) Lin Foot =============================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 51.00 70.00 81.67 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 51.00 70.00 81.67 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 51.00 70.00 81.67 60.00 =============== 614-01583 Stl Sign Supp (2-1/2 In Rd 80)(Po&Slip) Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 7.00 500.00 448.25 450.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 377 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01583 Stl Sign Supp (2-1/2 In Rd 80)(Po&Slip) Each =================================================== SHE160A-031 SH 160 Passing Lanes 03/02/17 3.00 536.76 454.17 427.78 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 3.00 500.00 500.02 410.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 508.48 463.51 435.64 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 11.00 200.00 469.00 469.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 10.00 300.00 563.81 600.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 2.00 450.00 568.26 522.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 4.00 450.01 435.49 420.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 11.00 800.00 862.50 1000.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 40.00 150.00 541.57 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 78.00 291.03 565.79 575.42 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1.00 120.00 420.00 420.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 28.00 202.00 747.50 935.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 9.00 465.00 708.00 708.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 18.00 475.00 366.67 350.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 54.00 350.00 525.11 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 110.00 340.10 539.06 553.38 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 14.00 200.00 541.46 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 200.00 541.46 550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 215.00 323.35 542.52 554.04 =============== 614-01585 Steel Sign Supp (2-1/2 In Rd 80) (Post) Lin Foot =============================================== MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 1,500.00 21.00 19.63 21.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 99.00 25.00 23.53 14.75 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 1,750.00 20.00 23.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,349.00 20.60 21.52 20.29 C133A-042 SH 133 McClure Pass Slip 11/16/17 106.00 35.00 20.40 18.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 378 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01585 Steel Sign Supp (2-1/2 In Rd 80) (Post) Lin Foot =============================================== NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 5.00 30.00 400.42 406.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 111.00 34.77 27.01 35.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,460.00 21.05 21.85 20.78 =============== 614-01588 Steel Sign Supp (2-1/2 In Rd 80)(Slip) Each =================================================== MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 130.00 370.00 405.00 300.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 15.00 350.00 244.00 150.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 7.00 325.00 192.50 136.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 152.00 365.95 374.03 277.64 C133A-042 SH 133 McClure Pass Slip 11/16/17 11.00 350.00 259.50 260.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 5.00 450.00 520.83 312.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 381.25 297.56 276.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 168.00 367.41 363.28 277.53 =============== 614-03001 Conc Footing (Ty 1) Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 2.00 1500.00 1787.95 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1500.00 1787.95 2000.00 NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 2.00 1500.00 2815.00 2650.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 12.00 900.00 950.00 1550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 985.71 1216.43 1707.14 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 12.00 2000.00 1065.00 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 2000.00 1065.00 1250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 1457.14 1197.17 1532.14 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 379 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-03002 Conc Footing (Ty 2) Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2.00 2000.00 1613.06 1379.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2000.00 1613.06 1379.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2000.00 1613.06 1379.33 =============== 614-03003 Conc Footing (Ty 3) Each =================================================== MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 8.00 1350.00 1126.50 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 1350.00 1126.50 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 1350.00 1126.50 500.00 =============== 614-03004 Conc Footing (Ty 4) Each =================================================== MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 6.00 1500.00 1355.50 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 1500.00 1355.50 700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1500.00 1355.50 700.00 =============== 614-03005 Conc Footing (Ty 5) Each =================================================== MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 16.00 1850.00 1865.00 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 1850.00 1865.00 850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 1850.00 1865.00 850.00 =============== 614-03006 Conc Footing (Ty 6) Each =================================================== STA0703-437 I-70: 32ND TO 44TH 06/01/17 3.00 1750.00 3338.33 2400.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 2.00 3000.00 2065.00 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 2250.00 3020.00 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 2250.00 3020.00 1800.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 380 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-03007 Conc Footing (Ty 7) Each =================================================== STA0703-437 I-70: 32ND TO 44TH 06/01/17 2.00 2000.00 3966.21 2600.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 2.00 3000.00 2625.00 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 2500.00 3519.14 1900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 2500.00 3519.14 1900.00 =============== 614-07105 Mod Sign Legend Each =================================================== NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 5.00 200.00 832.50 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 200.00 832.50 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 200.00 832.50 1000.00 =============== 614-10050 Mod Overhead Sign Str Each =================================================== STA0703-437 I-70: 32ND TO 44TH 06/01/17 2.00 2000.00 12819.94 7800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2000.00 12819.94 7800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2000.00 12819.94 7800.00 =============== 614-10116 Dyn Msg Sign Ctrl Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 16.00 12500.00 6385.30 6470.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 12500.00 6385.30 6470.59 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 1.00 15000.00 26017.00 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 15000.00 26017.00 25000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 12647.06 9485.04 7560.56 =============== 614-10120 Var Mesg Sign Each =================================================== ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 7.00 60000.00 62463.48 71450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 60000.00 62463.48 71450.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 60000.00 62463.48 71450.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 381 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-10139 Radar Speed Disp Sgn (LED) Each =================================================== BR0252-449 I-25 Woodmen NB 03/02/17 1.00 10000.00 9875.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 9875.00 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 9875.00 2500.00 =============== 614-10145 VMS LED (Single Faced) Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 33.00 42500.00 34516.28 30132.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 33.00 42500.00 34516.28 30132.55 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 1.00 60000.00 91232.00 90000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 60000.00 91232.00 90000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 43014.71 39242.59 31893.36 =============== 614-10147 VMS LED (Overhead) Each =================================================== ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 1.00 75000.00 69729.83 65000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 75000.00 69729.83 65000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 75000.00 69729.83 65000.00 =============== 614-10151 12 In LED (Ball) (Green) Each =================================================== MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 1,740.00 85.00 93.60 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,740.00 85.00 93.60 51.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,740.00 85.00 93.60 51.00 =============== 614-10152 12 In LED (Ball) (Red) Each =================================================== MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 1,700.00 80.00 93.60 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,700.00 80.00 93.60 51.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,700.00 80.00 93.60 51.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 382 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-10153 12 In LED (Ball) (Yellow) Each =================================================== MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 1,740.00 85.00 93.60 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,740.00 85.00 93.60 51.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,740.00 85.00 93.60 51.00 =============== 614-10154 12 In Heated LED (Ball)(Red) Each =================================================== MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 42.00 120.00 709.00 315.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 42.00 120.00 709.00 315.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42.00 120.00 709.00 315.00 =============== 614-10156 12 In LED (Arr) (Green) Each =================================================== MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 507.00 75.00 104.00 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 507.00 75.00 104.00 52.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 507.00 75.00 104.00 52.00 =============== 614-10157 12 In LED (Arr) (Red) Each =================================================== MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 192.00 70.00 104.00 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 192.00 70.00 104.00 52.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 192.00 70.00 104.00 52.00 =============== 614-10158 12 In LED (Arr) (Yellow) Each =================================================== MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 493.00 75.00 104.00 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 493.00 75.00 104.00 52.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 493.00 75.00 104.00 52.00 =============== 614-10160 Sig Head B-Plates Each =================================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 43.00 150.00 148.67 126.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 43.00 150.00 148.67 126.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43.00 150.00 148.67 126.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 383 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-10240 LUS LED (Double Faced) Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 52.00 12500.00 4298.35 4071.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 52.00 12500.00 4298.35 4071.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 12500.00 4298.35 4071.70 =============== 614-10245 LUS LED (Single Faced) Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 34.00 10000.00 3531.06 3312.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 34.00 10000.00 3531.06 3312.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 10000.00 3531.06 3312.11 =============== 614-30110 Btrfly Str Each =================================================== NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 1.00 30000.00 41395.60 40000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 30000.00 41395.60 40000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 30000.00 41395.60 40000.00 =============== 614-32400 Monotube Overhead Sign Cant (24 In Dia) Each =================================================== MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 16.00 39000.00 31946.50 30000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 39000.00 31946.50 30000.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 8.00 45000.00 46494.33 50000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 45000.00 46494.33 50000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 41000.00 40675.20 36666.67 =============== 614-41800 Monotube Overhead Sign Brdg (18 In Dia) Each =================================================== MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 1.00 57500.00 50859.00 47000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 57500.00 50859.00 47000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 57500.00 50859.00 47000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 384 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-42000 Monotube Overhead Sign Brdg (20 In Dia) Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 90000.00 84504.81 74111.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 1.00 66000.00 54419.50 50000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 78000.00 80206.91 62055.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 78000.00 80206.91 62055.50 =============== 614-42400 Monotube Overhead Sign Brdg (24 In Dia) Each =================================================== NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 1.00 85000.00 97887.00 99600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 85000.00 97887.00 99600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 85000.00 97887.00 99600.00 =============== 614-70024 1310nm SFP Optic Module Each =================================================== STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 8.00 700.00 446.40 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 700.00 446.40 230.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 26.00 400.00 332.50 265.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 162.00 400.00 372.50 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 188.00 400.00 366.97 295.16 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 10.00 750.00 803.49 695.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 750.00 803.49 695.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 206.00 428.64 412.23 312.04 =============== 614-70028 CWDM SFP Optic Module Each =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 16.00 2500.00 3188.31 5021.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 2500.00 3188.31 5021.62 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 385 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70028 CWDM SFP Optic Module Each =================================================== STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 2.00 1200.00 1358.20 722.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1200.00 1358.20 722.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 19.00 2000.00 1195.00 1945.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19.00 2000.00 1195.00 1945.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37.00 2172.97 2012.72 3209.32 =============== 614-70030 Optical Attenuator Each =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 16.00 200.00 732.16 109.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 200.00 732.16 109.31 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 10.00 200.00 186.80 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 200.00 186.80 34.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 26.00 100.00 47.50 75.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 181.00 100.00 80.88 83.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 207.00 100.00 76.68 82.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 8.00 80.00 198.78 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 80.00 198.78 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 241.00 110.12 134.24 81.75 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 386 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70112 Traf Sig Face (12) Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2.00 900.00 669.96 660.00 STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 900.00 669.96 660.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 900.00 669.96 660.00 =============== 614-70150 Ped Sig Face (16) (Countdown) Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 8.00 600.00 716.00 660.00 MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 20.00 550.00 621.00 685.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 8.00 700.00 627.34 620.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 22.00 700.00 536.67 465.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 58.00 634.48 614.43 589.14 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 21.00 750.00 636.00 636.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 46.00 800.00 1472.76 2000.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 8.00 720.00 813.14 773.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2.00 700.00 571.34 523.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 4.00 750.00 583.38 546.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 40.00 650.00 781.67 600.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 8.00 650.00 650.00 650.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 14.00 750.00 544.52 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 143.00 730.14 899.19 1058.18 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 28.00 1000.00 700.00 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 28.00 1000.00 700.00 700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 229.00 738.91 780.31 895.59 =============== 614-70250 Ped Sig Face (16)(Countdown)(LED Repl) Each =================================================== MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 863.00 200.00 243.00 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 863.00 200.00 243.00 130.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 863.00 200.00 243.00 130.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 387 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70336 Traf Sig Face (12-12-12) Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 20.00 900.00 1050.00 970.00 MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 82.00 1060.00 946.40 1075.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 16.00 900.00 752.66 750.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 42.00 900.00 768.33 665.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 160.00 982.00 911.43 921.75 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 22.00 850.00 830.00 830.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 8.00 900.00 975.42 1010.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 1.00 850.00 1106.02 1050.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 10.00 800.00 814.30 739.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 46.00 1000.00 1258.67 1006.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 8.00 750.00 865.00 865.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 19.00 800.00 829.89 800.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 18.00 600.00 855.00 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 132.00 854.17 984.00 863.45 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 48.00 800.00 1075.00 1075.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48.00 800.00 1075.00 1075.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 340.00 906.68 943.56 920.75 =============== 614-70337 Traf Sig Face (12-12-12) (Inst Only) Each =================================================== STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 16.00 1000.00 299.85 278.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 1000.00 299.85 278.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 1000.00 299.85 278.25 =============== 614-70448 Traf Sig Face (12-12-12-12) Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 4.00 1300.00 1119.34 1250.00 STM0243-089 Midpoint: Station 1019+50 Cen COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 388 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70448 Traf Sig Face (12-12-12-12) Each =================================================== SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 8.00 1300.00 976.67 950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 1300.00 1029.23 1010.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 14.00 1250.00 1160.00 1160.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 4.00 1200.00 969.47 882.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 26.00 1300.00 1591.67 1375.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 7.00 800.00 1102.50 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 51.00 1209.80 1314.02 1212.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 63.00 1226.98 1257.66 1178.98 =============== 614-70450 Traf Sig Face (12-12-12-12)(Instal Only) Each =================================================== STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 9.00 1500.00 310.19 288.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 1500.00 310.19 288.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 1500.00 310.19 288.75 =============== 614-70560 Traf Sig Face (12-12-12-12-12) Each =================================================== MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 17.00 1300.00 1293.00 1525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 1300.00 1293.00 1525.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 2.00 1300.00 1379.88 1380.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 10.00 1200.00 1300.00 1300.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 9.00 1300.01 1297.44 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21.00 1252.39 1306.11 1286.19 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 4.00 1400.00 1400.00 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 1400.00 1400.00 1400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42.00 1285.72 1300.43 1393.69 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 389 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72740 Blank Out Sign(LED)(Sing Fac) Each =================================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 4.00 3500.00 4861.67 5185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 3500.00 4861.67 5185.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 3500.00 4861.67 5185.00 =============== 614-72830 Communications Cabinet Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 2.00 17000.00 10016.18 8782.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 17000.00 10016.18 8782.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 17000.00 10016.18 8782.35 =============== 614-72831 Comm Cabinet (Type 1) Each =================================================== IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 1.00 11000.00 12117.42 9500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 11000.00 12117.42 9500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 11000.00 12117.42 9500.00 =============== 614-72832 Comm Cabinet (Type 2) Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 8.00 13500.00 9464.71 8529.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 13500.00 9464.71 8529.41 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 8.00 8500.00 10545.00 11090.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 4.00 11000.00 9240.40 10200.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 2.00 10000.00 11856.08 10200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 9428.57 10329.19 10708.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 10909.09 10113.07 9916.15 =============== 614-72836 Conflict Monitor Each =================================================== CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 109.00 1000.00 1016.68 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 109.00 1000.00 1016.68 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 109.00 1000.00 1016.68 750.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 390 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72854 Traf Ctrl Cabinet Each =================================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 5.00 20000.00 18455.00 19490.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 20000.00 18455.00 19490.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 20000.00 18455.00 19490.00 =============== 614-72855 Traf Sig Ctrl Cabinet Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 26000.00 25160.00 22900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 26000.00 25160.00 22900.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 2.00 18000.00 29200.00 29200.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 25000.00 24940.34 23825.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 18000.00 23000.00 23000.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 16.00 14000.00 16417.50 15000.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 1.00 26000.00 24067.50 26000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21.00 15666.67 19473.04 17677.38 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 3.00 20000.00 17300.00 17300.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 26.00 13000.00 12250.00 12500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29.00 13724.14 12525.45 12996.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 51.00 14764.71 16228.25 15118.14 =============== 614-72860 Ped Push Button Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 8.00 500.00 1360.00 1250.00 MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 300.00 200.00 341.40 360.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 22.00 350.00 335.00 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 330.00 217.27 366.51 370.24 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 28.00 320.00 1530.00 1530.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 391 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72860 Ped Push Button Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2.00 450.00 265.87 198.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 4.00 500.00 1608.62 1496.25 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 8.00 400.00 1300.00 1300.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 12.00 350.00 1349.20 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 54.00 356.67 1210.04 1392.98 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 14.00 850.00 450.00 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 850.00 450.00 450.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 398.00 258.44 423.55 511.81 =============== 614-72863 Ped Push Button Post Assem Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 40.00 1200.00 4213.60 3240.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 7.00 1500.00 1480.24 1410.72 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 4.00 1500.00 1374.00 1260.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 3.00 1820.83 893.16 890.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 13.00 1400.00 913.33 1070.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 67.00 1315.86 2879.88 2404.40 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 4.00 3000.00 1890.42 2240.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 40.00 2500.00 4110.67 3852.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 4.00 1600.00 1700.00 1700.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1.00 900.01 1142.15 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 49.00 2434.69 3841.70 3488.57 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 8.00 2500.00 1165.00 1165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 2500.00 1165.00 1165.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 124.00 1834.38 3207.00 2752.86 =============== 614-72866 Fire Preempt Unit + Timer Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 4000.00 3480.00 3185.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 392 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72866 Fire Preempt Unit + Timer Each =================================================== STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 2.00 4451.08 3446.75 3400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 4225.54 3465.22 3292.50 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 2.00 4250.00 11100.00 11100.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 9.00 3000.00 4670.00 6540.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.00 3227.27 5113.45 7369.09 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 3.00 5500.00 6420.00 6420.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 5500.00 6420.00 6420.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 3827.90 4598.48 6305.00 =============== 614-72868 Bicycle and Ped Traf Count Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 1000.00 3907.00 3585.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 3907.00 3585.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 3907.00 3585.00 =============== 614-72875 Loop Detect Wire Lin Foot =============================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 11,700.00 4.50 6.52 5.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 3,200.00 4.00 5.06 5.50 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1,850.00 5.00 4.38 4.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 17,584.00 4.00 3.04 3.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 4,768.00 4.00 3.68 4.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 39,102.00 4.20 4.22 3.95 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 1,800.00 4.25 5.70 5.70 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 393 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72875 Loop Detect Wire Lin Foot =============================================== STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 1,360.00 5.00 5.25 4.30 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 2,512.00 5.00 6.42 6.10 NHPPC120-026 US 85: I-76 to 168th 05/04/17 3,426.00 4.00 3.11 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9,098.00 4.48 4.69 4.58 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 3,640.00 4.65 4.75 4.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,640.00 4.65 4.75 4.75 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1,650.00 4.50 11.57 10.71 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 1,000.00 5.00 7.55 7.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,650.00 4.69 9.55 9.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54,490.00 4.30 4.60 4.38 =============== 614-72878 Detect Amp (Loop) (4) Each =================================================== STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 5.00 1200.00 1139.75 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 1200.00 1139.75 1100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1200.00 1139.75 1100.00 =============== 614-72885 Detect (Spec) Each =================================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 16.00 10000.00 9931.67 10398.75 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 16.00 7000.00 9290.60 7707.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 8500.00 9531.00 9052.88 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 8.00 7500.00 12900.00 12900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 7500.00 12900.00 12900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 8300.00 9729.18 9822.30 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 394 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72886 Intersection Detect Sys (Camera) Each =================================================== STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 10.00 10000.00 30282.93 29198.80 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 1.00 7046.67 12411.67 24655.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 9731.52 28658.27 28785.73 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 8.00 8000.00 10000.00 10000.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 7500.00 7761.98 7302.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 7944.44 8657.19 9700.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 8927.33 21110.69 20197.25 =============== 614-72887 Detect (Microwave Veh) Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2.00 10000.00 8349.93 8500.00 STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 10000.00 8349.93 8500.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 7.00 5000.00 6352.50 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 5000.00 6352.50 6000.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 1.00 8000.00 8025.00 8050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 8000.00 8025.00 8050.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 6300.00 7105.85 6505.56 =============== 614-72889 Detect (Micro) (Non-Invasive) Each =================================================== STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 28.00 1686.36 837.62 820.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 10.00 1680.91 2215.00 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 38.00 1684.93 1128.61 920.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 395 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72889 Detect (Micro) (Non-Invasive) Each =================================================== NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 9.00 1200.00 1585.00 1585.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 1200.00 1585.00 1585.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 47.00 1592.07 1155.81 1047.34 =============== 614-72895 Vehicle Detect Sys (Single Camera) Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 10000.00 9000.00 9000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 10000.00 9000.00 9000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 9000.00 9000.00 =============== 614-73000 Piezo (Elec) (CL I) (11 Ft) Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 16.00 2500.00 4186.86 3000.00 STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 2500.00 4186.86 3000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 2500.00 4186.86 3000.00 =============== 614-73005 Piezo (Elec)(CL II) Each =================================================== IM025A-037 I25 S. Trinidad Resurface and 11/30/17 6.00 2200.00 3404.33 3213.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 4.00 2500.00 3714.61 3623.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 2320.00 3567.64 3377.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 2320.00 3567.64 3377.03 =============== 614-80000 Flash Beacon Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 10.00 2500.00 2481.71 2700.00 STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 2500.00 2481.71 2700.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 396 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-80000 Flash Beacon Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2.00 2500.00 2290.11 2327.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 2.00 3207.60 1950.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 2853.80 2241.52 1913.50 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 6.00 2000.00 813.33 740.00 NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 2.00 3000.00 1888.00 734.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 2250.00 1082.00 738.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 2473.42 2018.28 1591.88 =============== 614-80001 Flash Beacon (Solar Pwred) Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 2.00 1100.00 3457.21 3500.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 3.00 2775.00 3361.29 3613.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 2105.00 3385.27 3567.80 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 2.00 5000.00 2933.77 2601.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 5000.00 2933.77 2601.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 2932.14 3262.13 3291.66 =============== 614-80003 Rect Rapid Flash Beacon Each =================================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 16.00 10000.00 4827.00 7980.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 10000.00 4827.00 7980.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 10000.00 4827.00 7980.00 =============== 614-80322 Barricade (Ty 3 M-B) Each =================================================== MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 4.00 1000.00 309.96 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 1000.00 309.96 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1000.00 309.96 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 397 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-80385 Rumble Strip Lin Foot =============================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 59,760.00 0.30 0.38 0.40 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 9,415.00 0.50 0.92 1.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 10,185.00 0.20 0.42 0.41 SHE160A-031 SH 160 Passing Lanes 03/02/17 21,901.00 0.20 1.19 0.13 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 23,625.00 0.50 0.30 0.21 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 65,660.00 0.20 0.26 0.14 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 135,084.00 0.08 0.10 0.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 325,630.00 0.20 0.37 0.18 STA006A-057 SH 6 EAST OF STERLING 04/06/17 126,738.00 0.25 0.09 0.08 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 271,500.00 0.12 0.10 0.09 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 17,200.00 0.25 0.52 0.67 NHPPC120-026 US 85: I-76 to 168th 05/04/17 61,248.00 0.75 0.19 0.15 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 85.00 50.00 85.78 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 476,771.00 0.25 0.19 0.12 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 95,300.00 0.25 0.16 0.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 95,300.00 0.25 0.16 0.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 897,701.00 0.23 0.26 0.15 =============== 614-80391 Rumble Strip (Grind)(Asphalt) Lin Foot =============================================== STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 46,776.00 0.50 0.15 0.22 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 61,392.00 0.25 0.09 0.06 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 67,977.00 0.50 0.14 0.06 FSA0361-122 I-70 at Limon, US 40, US 287, 12/21/17 387,476.00 0.12 0.16 0.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 563,621.00 0.21 0.15 0.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 563,621.00 0.21 0.15 0.11 =============== 614-80392 Rumble Strip (Grind)(Conc) Lin Foot =============================================== FSA0361-122 I-70 at Limon, US 40, US 287, 12/21/17 377,945.00 0.38 0.49 0.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 377,945.00 0.38 0.49 0.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 377,945.00 0.38 0.49 0.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 398 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81000 Sig-Light Pole Steel Each =================================================== NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1.00 9500.00 11700.00 11700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 9500.00 11700.00 11700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 9500.00 11700.00 11700.00 =============== 614-81011 Inst Sig-Light Pole Steel (1) Each =================================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 20.00 3360.00 3845.35 4205.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 3360.00 3845.35 4205.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 3360.00 3845.35 4205.80 =============== 614-81020 Sig-Light Pole Steel (2) Each =================================================== STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 1.00 15000.00 31227.50 27000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 15000.00 31227.50 27000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 31227.50 27000.00 =============== 614-81125 Sig-Light Pole Steel (1-25 Ft) Each =================================================== STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 2.00 10000.00 11550.00 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 10000.00 11550.00 11000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 10000.00 11550.00 11000.00 =============== 614-81130 Sig-Light Pole Steel (1-30 Ft) Each =================================================== STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1.00 15000.00 12212.84 12000.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 1.00 17000.00 12179.00 14212.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 16000.00 12198.34 13106.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 2.00 12000.00 16400.00 16400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 12000.00 16400.00 16400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 14000.00 13132.04 14753.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 399 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81135 Sig-Light Pole Steel (1-35 Ft) Each =================================================== STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1.00 15000.00 12281.86 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 15000.00 12281.86 12000.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 2.00 12000.00 11500.00 11500.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 1.00 17400.00 15589.78 14511.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 2.00 12000.00 12500.00 12500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 13080.00 13722.63 12502.20 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1.00 12500.00 16200.00 16200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 12500.00 16200.00 16200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 13271.43 13517.27 12958.71 =============== 614-81140 Sig-Light Pole Steel (1-40 Ft) Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 15000.00 17960.00 16500.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1.00 16000.00 14204.74 14000.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 2.00 19000.00 11771.67 13420.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 17250.00 14483.26 14335.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 2.00 14000.00 11900.00 11900.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 1.00 18000.00 16407.85 15330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 15333.33 15119.89 13043.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 16428.57 14685.83 13781.43 =============== 614-81145 Sig-Light Pole Steel (1-45 Ft) Each =================================================== STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 2.00 16000.00 14000.00 14000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 400 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81145 Sig-Light Pole Steel (1-45 Ft) Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 20000.00 15959.62 15475.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 17000.00 16275.00 16275.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1.00 14500.00 13673.13 13182.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 16700.00 15378.32 14586.40 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 3.00 14000.00 18000.00 18000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 14000.00 18000.00 18000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 15687.50 15752.85 15866.50 =============== 614-81150 Sig-Light Pole Steel (1-50 Ft) Each =================================================== STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1.00 18000.00 15065.63 15000.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 1.00 20000.00 13805.00 13490.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 19000.00 14525.36 14245.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 1.00 19000.00 14300.00 14300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 19000.00 14300.00 14300.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 2.00 17000.00 18200.00 18200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 17000.00 18200.00 18200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 18200.00 15237.75 15838.00 =============== 614-81155 Sig-Light Pole Steel (1-55 Ft) Each =================================================== SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 2.00 19460.66 14008.33 13695.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 19460.66 14008.33 13695.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 1.00 21000.00 15300.00 15300.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 401 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81155 Sig-Light Pole Steel (1-55 Ft) Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2.00 25000.00 17802.44 17444.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2.00 20000.00 16275.00 16275.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 4.00 21000.00 13899.49 13400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 21666.67 16459.03 15148.67 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 2.00 17500.00 18600.00 18600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 17500.00 18600.00 18600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 20686.26 16237.28 15456.00 =============== 614-81160 Sig-Light Pole Steel (1-60 Ft) Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 22000.00 24500.00 22500.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 2.00 25500.00 20486.67 20465.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 24333.33 22310.91 21143.33 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 2.00 24000.00 22936.64 21262.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 24000.00 22936.64 21262.50 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1.00 20000.00 25500.00 25500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 20000.00 25500.00 25500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 23500.00 22740.29 21909.17 =============== 614-81165 Sig-Light Pole Steel (1-65 Ft) Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 24000.00 25645.00 23750.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 2.00 22000.00 23118.33 22740.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 23000.00 24697.50 23245.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 402 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81165 Sig-Light Pole Steel (1-65 Ft) Each =================================================== NHPPC120-026 US 85: I-76 to 168th 05/04/17 3.00 22000.00 20483.55 19750.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 1.00 22000.00 18982.50 17500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 22000.00 20210.63 19187.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 22500.00 22869.52 21216.25 =============== 614-81170 Sig-Light Pole Steel (1-70 Ft) Each =================================================== STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 1.00 31200.00 25609.34 23861.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 31200.00 25609.34 23861.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 31200.00 25609.34 23861.25 =============== 614-81175 Sig-Light Pole Steel (1-75 Ft) Each =================================================== SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 1.00 25000.00 25663.33 24995.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 25000.00 25663.33 24995.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 2.00 30000.00 25965.86 24192.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 30000.00 25965.86 24192.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 28333.33 25896.05 24459.67 =============== 614-82010 Sig Pole Steel (1) Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 15000.00 15000.00 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 15000.00 15000.00 15000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 15000.00 15000.00 =============== 614-84000 Traf Sig Ped Pole Steel Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2.00 1200.00 3185.57 2800.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 403 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-84000 Traf Sig Ped Pole Steel Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 1800.00 1578.00 1850.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 2.00 1108.51 1677.98 1650.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 4.00 1108.51 2335.33 2271.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 1265.11 2149.37 2098.22 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 3000.00 2700.00 2700.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 1.00 1690.00 1852.50 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2345.00 2135.00 2050.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 2.00 2000.00 2675.00 2675.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2000.00 2675.00 2675.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 1524.36 2173.38 2179.54 =============== 614-84100 Traf Sig Ped Pole Alum Each =================================================== STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 19.00 1500.00 1460.00 1460.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 3.00 1500.00 6350.17 2205.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 22.00 1500.00 3617.43 1561.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 1500.00 3617.43 1561.59 =============== 614-85001 Impact Atten Each =================================================== STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 2.00 30000.00 19608.65 17500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 30000.00 19608.65 17500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 30000.00 19608.65 17500.00 =============== 614-85003 Impact Atten (LM) Each =================================================== STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 1.00 25000.00 28891.50 28500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 25000.00 28891.50 28500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 404 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-85003 Impact Atten (LM) Each =================================================== NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 1.00 27000.00 32500.00 35000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 27000.00 32500.00 35000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 26000.00 29922.50 31750.00 =============== 614-85130 Impact Atten (Quadguard II) Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2.00 30000.00 17500.00 17500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 30000.00 17500.00 17500.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 22000.00 31900.00 31900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 22000.00 31900.00 31900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 27333.33 22300.00 22300.00 =============== 614-86005 Telemetry (Master) LUMP SUM =============================================== CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 1.00 17000.00 27050.00 24100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 17000.00 27050.00 24100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 17000.00 27050.00 24100.00 =============== 614-86007 Serial to IP Converter Each =================================================== ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 2.00 1750.00 950.00 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1750.00 950.00 900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1750.00 950.00 900.00 =============== 614-86105 Telemetry (Field) Each =================================================== STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 2.00 1300.00 9910.00 9910.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 405 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86105 Telemetry (Field) Each =================================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 5.00 3500.00 6951.67 5325.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 7.00 2000.00 1710.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.00 2435.71 4775.32 4317.50 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 5.00 3000.00 3657.50 1715.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 5.00 1600.00 1391.00 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 2300.00 2297.60 1257.50 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 8.00 1500.00 2206.50 2000.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 10.00 1500.00 2274.00 1750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 1500.00 2240.94 1861.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42.00 2002.38 2760.31 2536.19 =============== 614-86239 Ctrler (S-S) (F-A) (12) Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 3500.00 3200.00 3200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3500.00 3200.00 3200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3500.00 3200.00 3200.00 =============== 614-86246 Ctrler (Ty 170E-HC11) Each =================================================== STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1.00 32000.00 5362.43 5350.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 3.00 32000.00 26672.00 28281.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 32000.00 20115.21 22548.25 NHPPC120-026 US 85: I-76 to 168th 05/04/17 2.00 18000.00 28389.19 25200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 18000.00 28389.19 25200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 27333.33 22728.04 23432.17 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 406 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86248 Traf Ctrler (Type 2070LC) Each =================================================== STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 2.00 2600.00 3827.50 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2600.00 3827.50 3500.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 3.00 18500.00 4830.00 4830.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 109.00 3500.00 4292.50 4785.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 112.00 3901.79 4299.80 4786.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 114.00 3878.95 4291.40 4763.64 =============== 614-86733 WIM Station (Ty III) LUMP SUM =============================================== IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 85000.00 156443.33 144330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 85000.00 156443.33 144330.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 85000.00 156443.33 144330.00 =============== 614-86741 Weather Monitor System Each =================================================== ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 14.00 40000.00 65094.10 59775.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 40000.00 65094.10 59775.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 40000.00 65094.10 59775.00 =============== 614-86748 Ctrler (Ty 2070) Each =================================================== STAR400-348 Region 4 Controller and Cabin 05/04/17 75.00 4500.00 3842.50 3400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 75.00 4500.00 3842.50 3400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75.00 4500.00 3842.50 3400.00 =============== 614-86752 Fold-Over Tower (ITS) Each =================================================== ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 14.00 5000.00 15725.84 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 5000.00 15725.84 10000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 5000.00 15725.84 10000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 407 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86800 Uninterrupted Power Supply Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 15.00 11000.00 9067.65 8935.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 11000.00 9067.65 8935.29 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 5.00 7000.00 8613.67 11241.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 18.00 8500.00 7250.00 8500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23.00 8173.91 7651.08 9095.87 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 3.00 10000.00 7730.00 7730.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 42.00 9000.00 8315.00 7810.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 45.00 9066.67 8294.83 7804.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 83.00 9168.67 8237.41 8366.80 =============== 614-86920 Mod Traf Sig Ctrler Cab Each =================================================== ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 2.00 2000.00 8512.50 9525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2000.00 8512.50 9525.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2000.00 8512.50 9525.00 =============== 614-87006 Fiber Optic Term Panel (6 Fiber) Each =================================================== CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 32.00 700.00 612.50 395.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 4.00 700.00 607.15 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 36.00 700.00 611.23 484.44 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 1.00 1000.00 1026.67 1000.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 3.00 1000.00 1181.60 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1000.00 1137.33 587.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 730.00 716.45 494.75 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 408 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87010 Fiber Optic Cable (S Mode) (12 Fiber) Lin Foot =============================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 340.00 3.50 10.22 11.43 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 30.00 2.48 20.74 20.50 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 1,000.00 4.00 6.17 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,370.00 3.84 7.35 8.03 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 450.00 10.00 13.00 13.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 600.00 4.00 7.25 7.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 1,130.00 6.00 12.88 19.84 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 2,215.00 3.75 3.47 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,395.00 5.00 6.04 8.40 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 2,615.00 4.50 6.40 3.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 2,285.00 3.00 2.37 1.10 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 600.00 8.00 3.49 1.10 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 1,360.00 6.50 6.40 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,860.00 4.70 4.08 3.59 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 375.00 6.00 20.09 25.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 50.00 3.00 34.54 14.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 425.00 5.65 21.48 23.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,050.00 4.74 5.81 6.33 =============== 614-87011 Fiber Optic Cable (S Mode) (24 Fiber) Lin Foot =============================================== CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 2,760.00 3.75 3.96 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,760.00 3.75 3.96 3.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,760.00 3.75 3.96 3.50 =============== 614-87012 Fiber Optic Term Panel (12 Fiber) Each =================================================== CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 24.00 1800.00 615.00 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 409 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87012 Fiber Optic Term Panel (12 Fiber) Each =================================================== IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 3.00 850.00 1460.21 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 27.00 1694.44 845.51 577.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 1694.44 845.51 577.78 =============== 614-87015 Buffer Tube Fan Out Kit Each =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 2.00 600.00 768.00 536.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 600.00 768.00 536.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 5.00 300.00 176.80 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 300.00 176.80 34.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 10.00 600.00 800.00 1350.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 23.00 3000.00 179.38 280.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 3.00 265.00 885.85 120.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 5.00 3000.00 387.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 41.00 2214.51 464.66 556.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48.00 1947.81 417.92 500.88 =============== 614-87024 Fiber Optic Term Panel (24 Fiber) Each =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 2.00 1250.00 1660.00 2070.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1250.00 1660.00 2070.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 1.00 1690.00 457.50 350.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 5.00 1250.00 905.80 879.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 1323.33 872.59 790.83 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 410 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87024 Fiber Optic Term Panel (24 Fiber) Each =================================================== ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 10.00 1250.00 762.50 525.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 5.00 500.00 1268.67 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 1000.00 979.43 600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 1106.09 976.97 777.61 =============== 614-87100 Auto Traf Rec Sta Each =================================================== NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 1.00 15000.00 31019.00 13507.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 15000.00 31019.00 13507.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 31019.00 13507.00 =============== 614-87144 Fiber Optic Termi Panel (144 Fiber) Each =================================================== ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 2.00 5000.00 4385.00 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 5000.00 4385.00 1400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5000.00 4385.00 1400.00 =============== 614-87310 TMS Building Equip LUMP SUM =============================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 1.00 16500.00 22024.00 19048.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 16500.00 22024.00 19048.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 16500.00 22024.00 19048.00 =============== 614-87316 Traffic Management Sys Bldg UPS Each =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 1.00 30000.00 25485.00 40970.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 30000.00 25485.00 40970.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 30000.00 25485.00 40970.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 411 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87320 CCTV Each =================================================== STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1.00 5606.30 5426.44 5400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5606.30 5426.44 5400.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 2.00 4600.00 4668.78 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 4600.00 4668.78 4500.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 7.00 5500.00 4325.00 4650.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 3.00 5000.00 5585.00 5585.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 4.00 5000.00 4140.10 4200.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 2.00 4500.00 6214.00 4200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 5156.25 4789.29 4656.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 5121.38 4820.23 4679.21 =============== 614-87333 CCTV Camera (Traf Surveil) Each =================================================== STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 1.00 8000.00 4240.00 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 8000.00 4240.00 3500.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 3.00 9000.00 16925.00 8850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 9000.00 16925.00 8850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 8750.00 13753.75 7512.50 =============== 614-87350 Test Fiber Optic Cable LUMP SUM =============================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 1.00 25000.00 13346.50 19193.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1.00 54456.81 223.77 220.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 412 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87350 Test Fiber Optic Cable LUMP SUM =============================================== SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 1.00 98000.00 4575.00 3100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 59152.27 4590.34 7504.33 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 25000.00 2062.37 1764.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 1.00 1300.00 4312.50 2000.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 1.00 7000.00 6470.20 4366.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 11100.00 3459.18 2710.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 1.00 10000.00 9100.00 3200.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1.00 5000.00 4240.00 4240.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 1.00 15000.00 44250.00 38500.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 1.00 10000.00 10399.00 12000.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 1.00 7000.00 6336.00 7000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 9400.00 12559.44 12988.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 1.00 2500.00 6781.39 2950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2500.00 6781.39 2950.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 21688.07 6981.54 8211.08 =============== 614-87364 CCTV Pole w Low Dev (50 Ft) Each =================================================== ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 4.00 23000.00 21950.00 20900.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 4.00 20000.00 21354.05 22000.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 1.00 18000.00 22079.62 26500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 21111.11 21622.31 22011.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 21111.11 21622.31 22011.11 =============== 614-87366 CCTV Pole w Low Dev (60 Ft) Each =================================================== ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 1.00 26000.00 25125.00 21250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 26000.00 25125.00 21250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 26000.00 25125.00 21250.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 413 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87402 Brkaway Taper ITS Pole Steel (40 Ft) Each =================================================== ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 1.00 4500.00 8500.00 7000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 4500.00 8500.00 7000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 4500.00 8500.00 7000.00 =============== 614-87404 Brkaway Taper Pole Steel (50 Ft) Each =================================================== IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 1.00 10000.00 11483.83 6500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 11483.83 6500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 11483.83 6500.00 =============== 614-87424 Fiber Optic Cable (S Mode) (24 S) Lin Foot =============================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 430.00 20.00 20.31 19.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 430.00 20.00 20.31 19.62 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 690.00 10.00 3.24 2.87 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 505.00 3.60 5.50 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,195.00 7.30 3.48 4.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,625.00 10.66 4.91 8.59 =============== 614-87496 Fiber Optic Cable (S Mode) (96 S) Lin Foot =============================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 94,050.00 2.50 3.99 5.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 94,050.00 2.50 3.99 5.79 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 9,985.00 4.00 3.57 1.79 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 414 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87496 Fiber Optic Cable (S Mode) (96 S) Lin Foot =============================================== STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 27,990.00 2.70 2.40 2.34 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 37,975.00 3.04 2.61 2.20 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 200.00 3.00 13.00 13.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 104,425.00 2.50 2.01 1.44 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 42,890.00 2.30 2.19 1.43 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 195.00 5.00 33.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 147,710.00 2.45 2.09 1.48 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 9,390.00 1.50 2.45 1.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,390.00 1.50 2.45 1.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 289,125.00 2.51 2.48 2.99 =============== 614-87501 Splice FO Cable (1 S) Each =================================================== CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 510.00 60.00 149.50 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 510.00 60.00 149.50 95.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 510.00 60.00 149.50 95.00 =============== 614-87512 Splice FO Cable (12 S) Each =================================================== STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 1.00 3000.00 2860.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3000.00 2860.00 250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 2860.00 250.00 =============== 614-87524 Splice FO Cable (24 Strand) Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2.00 1500.00 2647.23 2095.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1500.00 2647.23 2095.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1500.00 2647.23 2095.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 415 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87624 Term FO Cable (24 Strand) Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2.00 1500.00 1601.59 1379.33 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 1.00 1440.00 5597.50 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1480.00 1908.97 1002.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1480.00 1908.97 1002.89 =============== 614-87690 Ethernet Switch Each =================================================== STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1.00 6511.18 5146.77 5100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 6511.18 5146.77 5100.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 2.00 5500.00 3360.00 3360.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 7.00 3500.00 6212.50 8000.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 2.00 5500.00 4354.86 4200.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 2.00 10000.00 5217.50 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 5115.38 5411.31 6393.85 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 2.00 5000.00 5185.00 5185.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 4.00 5000.00 4849.70 6000.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 5.00 4500.00 5070.33 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 4772.73 4957.27 5397.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 5020.45 5144.78 5903.60 =============== 614-87691 Ethernet Switch Type I Each =================================================== IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 2.00 4500.00 6142.58 6500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 4500.00 6142.58 6500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4500.00 6142.58 6500.00 =============== 614-87692 Ethernet Switch Type II Each =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 1.00 3800.00 15081.00 8496.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3800.00 15081.00 8496.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 416 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87692 Ethernet Switch Type II Each =================================================== STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 5.00 3800.00 4777.60 2938.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 3800.00 4777.60 2938.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 11.00 3800.00 4300.00 3600.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 74.00 3500.00 3262.50 3450.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 1.00 5250.00 6894.50 6500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 86.00 3558.72 3516.01 3504.65 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 3.00 6000.00 5832.53 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 6000.00 5832.53 4000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 95.00 3651.05 3926.18 3543.01 =============== 614-87697 Ethernet Agg Switch Type I Each =================================================== NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1.00 5000.00 53800.00 53800.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 5.00 16000.00 8546.25 7750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 14166.67 12660.23 15425.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 14166.67 12660.23 15425.00 =============== 614-87702 Ethernet Radio (Pair) Each =================================================== CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 2.00 15000.00 10497.50 9795.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 15000.00 10497.50 9795.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 15000.00 10497.50 9795.00 =============== 614-87704 Ethernet Radio (Single Client) Each =================================================== STAR400-348 Region 4 Controller and Cabin 05/04/17 73.00 2500.00 2375.00 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 73.00 2500.00 2375.00 3000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 417 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87704 Ethernet Radio (Single Client) Each =================================================== CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 2.00 7500.00 5845.00 5090.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 7500.00 5845.00 5090.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75.00 2633.33 2467.53 3055.73 =============== 615-00030 Emb Prot Ty 3 Each =================================================== STA0362-035 US 36: Strasburg to Byers 03/23/17 2.00 1500.00 2984.69 3200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1500.00 2984.69 3200.00 STA006A-057 SH 6 EAST OF STERLING 04/06/17 5.00 578.00 1203.65 450.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 5.00 3000.00 2105.75 1967.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 1789.00 1744.91 1208.63 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 6.00 750.00 1261.50 1643.17 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 3.00 10500.00 11000.00 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 4000.00 1622.18 4762.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 2709.05 1722.57 2921.20 =============== 615-00050 Emb Prot Ty 5 Each =================================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1.00 1000.00 2995.88 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 2995.88 3500.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 2000.00 1800.00 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2000.00 1800.00 1800.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 418 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 615-00050 Emb Prot Ty 5 Each =================================================== NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1.00 2200.00 3900.00 3900.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 4.00 6250.00 6600.00 6600.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 7.00 2000.00 1207.67 925.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 3433.33 1503.55 3064.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 3157.14 1622.91 3005.36 =============== 615-00150 Emb Prot (Spec) Each =================================================== IM025A-037 I25 S. Trinidad Resurface and 11/30/17 6.00 3200.00 3111.65 334.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 3200.00 3111.65 334.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 3200.00 3111.65 334.95 =============== 615-00152 Erosion Protect (Spec) Lin Foot =============================================== STA0931-032 SH 93 Erosion Correction 02/09/17 30.00 220.00 179.43 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 220.00 179.43 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 220.00 179.43 60.00 =============== 615-80000 Stream Restoration LUMP SUM =============================================== NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1.00 225000.00 228044.32 205000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 225000.00 228044.32 205000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 225000.00 228044.32 205000.00 =============== 616-30048 48 In Trash Guard Each =================================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 2.00 2000.00 2209.22 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2000.00 2209.22 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2000.00 2209.22 5000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 419 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 618-00142 Prestress Conc I (BT42) Lin Foot =============================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1,270.00 250.00 239.73 215.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,270.00 250.00 239.73 215.81 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 854.00 250.00 256.65 248.39 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 280.00 310.00 275.00 275.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 2,606.00 230.00 217.17 205.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,740.00 240.56 228.52 220.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,010.00 242.95 231.61 219.05 =============== 618-00184 Prestress Conc I (BT84) Lin Foot =============================================== ER0361-115 US 36 Bridges 06/22/17 1,227.00 280.00 322.00 270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,227.00 280.00 322.00 270.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,227.00 280.00 322.00 270.00 =============== 618-08900 Ground Anchor Lin Foot =============================================== C133A-042 SH 133 McClure Pass Slip 11/16/17 1,100.00 100.00 124.31 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,100.00 100.00 124.31 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,100.00 100.00 124.31 75.00 =============== 619-00007 Connect To Existing Waterline Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 4.00 3500.00 2650.00 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 3500.00 2650.00 2300.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 7.00 6000.00 6049.33 3688.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 6000.00 6049.33 3688.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 5090.91 4391.12 3183.27 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 420 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-06060 6 In Duct Iron Pipe Lin Foot =============================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 37.00 200.00 273.00 334.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 37.00 200.00 273.00 334.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37.00 200.00 273.00 334.00 =============== 619-06120 12 In Duct Iron Pipe Lin Foot =============================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 286.00 210.00 251.00 298.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 286.00 210.00 251.00 298.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 286.00 210.00 251.00 298.00 =============== 619-06160 16 In Duct Iron Pipe Lin Foot =============================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1,110.00 225.00 211.96 170.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,110.00 225.00 211.96 170.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,110.00 225.00 211.96 170.00 =============== 619-10000 Temp Water Line Lin Foot =============================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1,126.00 30.00 83.21 58.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,126.00 30.00 83.21 58.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,126.00 30.00 83.21 58.00 =============== 619-10240 24 In Weld Steel Pipe Lin Foot =============================================== STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 120.00 300.00 217.00 208.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 120.00 300.00 217.00 208.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 300.00 217.00 208.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 421 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-10300 30 In Weld Steel Pipe Lin Foot =============================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 123.00 300.00 573.90 320.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 123.00 300.00 573.90 320.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 123.00 300.00 573.90 320.00 =============== 619-50060 3/4 In Plastic Pipe Lin Foot =============================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 30.00 100.00 180.00 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 100.00 180.00 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 100.00 180.00 275.00 =============== 619-50080 1 In Plastic Pipe Lin Foot =============================================== NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 80.00 6.00 16.50 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 80.00 6.00 16.50 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 6.00 16.50 21.00 =============== 619-50480 6 In Plastic Pipe Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 26.00 65.00 150.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26.00 65.00 150.00 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 65.00 150.00 80.00 =============== 619-50640 8 In Plastic Pipe Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 15.00 80.00 127.00 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 80.00 127.00 70.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 80.00 127.00 70.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 422 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-50960 12 In Plastic Pipe Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 800.00 100.00 103.80 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 800.00 100.00 103.80 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 800.00 100.00 103.80 60.00 =============== 619-71524 3 In Air and Vacuum Valve Each =================================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 2.00 5500.00 13003.52 7500.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 5500.00 13003.52 7500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5500.00 13003.52 7500.00 =============== 619-75000 Cast Iron Valve Box Each =================================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 7.00 400.00 411.67 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 400.00 411.67 600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 400.00 411.67 600.00 =============== 619-75048 6 In Gate Valve Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 3.00 1400.00 1512.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1400.00 1512.00 2000.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 3.00 2500.00 1852.67 1868.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 2500.00 1852.67 1868.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1950.00 1639.75 1934.00 =============== 619-75064 8 In Gate Valve Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 2000.00 2208.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2000.00 2208.00 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 2208.00 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 423 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-75096 12 In Gate Valve Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 3.00 3000.00 3355.00 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 3000.00 3355.00 3000.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 4.00 3000.00 4297.67 5408.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 3000.00 4297.67 5408.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 3000.00 3773.96 4376.00 =============== 619-76128 16 In Btrfly Valve Each =================================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 2.00 5500.00 6240.63 4000.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 5500.00 6240.63 4000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5500.00 6240.63 4000.00 =============== 619-77300 Corporation Stop Each =================================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 1.00 1500.00 1246.67 660.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1500.00 1246.67 660.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1500.00 1246.67 660.00 =============== 619-78048 6 In Fire Hydrant Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 5000.00 6820.00 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5000.00 6820.00 6000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5000.00 6820.00 6000.00 =============== 619-78049 Inst 6 In Fire Hydrant Each =================================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 3.00 5000.00 4640.67 4652.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 5000.00 4640.67 4652.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 5000.00 4640.67 4652.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 424 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00001 Field Office (CL 1) Each =================================================== IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 1.00 11000.00 13269.57 9104.96 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1.00 28000.00 25700.00 16000.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 1.00 15000.00 18732.64 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 18000.00 18532.36 13368.32 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 1.00 15000.00 17576.65 8629.94 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 1.00 15000.00 27771.96 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 15000.00 23948.72 16814.97 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 1.00 20000.00 22594.31 26241.97 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1.00 10000.00 18500.00 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 15000.00 21826.63 19120.99 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1.00 30000.00 21621.52 18500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 30000.00 21621.52 18500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 18000.00 20970.11 16309.61 =============== 620-00002 Field Office (CL 2) Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 1.00 28000.00 26076.77 21653.54 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 1.00 12000.00 47176.01 40000.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 1.00 15000.00 11704.50 8409.00 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 1.00 25000.00 16784.92 14000.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 1.00 20000.00 34250.00 30000.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2.00 15000.00 22728.29 25000.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1.00 30000.00 23593.55 17500.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1.00 20000.00 29601.28 21003.85 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 1.00 25000.00 32913.33 29840.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 25000.00 32955.00 40000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 425 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00002 Field Office (CL 2) Each =================================================== NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 1.00 10000.00 20370.44 10710.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 1.00 25000.00 21968.71 25000.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 1.00 26000.00 16771.67 14795.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 1.00 30000.00 35850.00 64000.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 1.00 24000.00 27675.00 25000.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1.00 18000.00 26773.49 18500.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 1.00 20000.00 46399.70 52100.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 1.00 17600.00 23034.65 18019.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19.00 21084.21 27494.57 26418.36 STA006A-057 SH 6 EAST OF STERLING 04/06/17 1.00 25000.00 16907.16 20000.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 1.00 30000.00 51344.93 60000.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 1.00 20000.00 27609.87 18329.60 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 25000.00 47047.42 34593.64 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 1.00 21000.00 44625.42 25615.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 28000.00 14500.00 14500.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 1.00 15000.00 11465.00 14000.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1.00 25000.00 55459.44 55000.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 1.00 20000.00 17617.50 20000.00 ER0361-115 US 36 Bridges 06/22/17 1.00 25000.00 38330.00 29000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 23400.00 36529.01 29103.82 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1.00 20000.00 24800.00 30000.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1.00 60000.00 24175.00 24175.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 28000.00 25113.43 31000.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1.00 20000.00 17666.67 11000.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1.00 25000.00 36619.20 24000.00 BRR400-354 Little-T Channel Work and SH SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 1.00 20000.00 36359.60 30000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 28833.33 30754.44 25029.17 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 28000.00 24942.00 29825.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 1.00 20000.00 26240.13 15000.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 1.00 45000.00 81665.80 70000.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 21000.00 24666.67 22000.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 1.00 28000.00 25833.61 19668.07 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 426 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00002 Field Office (CL 2) Each =================================================== NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 1.00 29414.47 23294.28 23294.28 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 1.00 20000.00 39445.00 62385.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 1.00 28000.00 20518.35 30000.00 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 1.00 20000.00 15543.33 7000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 26601.61 31926.49 31019.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44.00 23795.78 31065.16 27812.00 =============== 620-00005 Field Office (Spec) Each =================================================== STE 0702-357 I-70 West Vail Pass Basin 03/23/17 1.00 20000.00 23391.25 21000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 20000.00 23391.25 21000.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 1.00 15000.00 48000.00 48000.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 1.00 15000.00 39811.78 29000.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 1.00 25000.00 56060.71 87900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 18333.33 48959.77 54966.67 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 1682896.12 2500000.00 2500000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1682896.12 2500000.00 2500000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 351579.22 214902.46 537180.00 =============== 620-00011 Field Lab (CL 1) Each =================================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1.00 30000.00 22340.35 17500.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 1.00 11000.00 11830.14 9104.96 SHE160A-031 SH 160 Passing Lanes 03/02/17 1.00 15000.00 20078.10 25000.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1.00 15000.00 20250.00 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 17750.00 18558.08 19151.24 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 1.00 20000.00 21000.00 27000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 20000.00 21000.00 27000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 427 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00011 Field Lab (CL 1) Each =================================================== BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 1.00 20000.00 20898.12 43240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 20000.00 20898.12 43240.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 1.00 20000.00 22750.88 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 20000.00 22750.88 15000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 18714.29 19975.98 23120.71 =============== 620-00012 Field Lab (CL 2) Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 1.00 10000.00 40048.58 30000.00 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 1.00 20000.00 16769.93 15000.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 1.00 17500.00 31200.00 30000.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2.00 15000.00 20744.14 30000.00 STM0243-089 Midpoint: Station 1019+50 Cen STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1.00 18000.00 25984.55 19953.66 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 1.00 25000.00 23783.33 26150.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 25000.00 27460.00 40000.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 1.00 30000.00 17762.00 24000.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 1.00 26000.00 25150.00 25000.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 1.00 10000.00 36166.67 18500.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1.00 18000.00 20769.49 13000.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 1.00 15000.00 17898.10 12000.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 1.00 20000.00 40298.53 45500.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 1.00 13500.00 22552.14 20971.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 18533.33 25309.83 25005.33 STA006A-057 SH 6 EAST OF STERLING 04/06/17 1.00 25000.00 15227.26 18000.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 1.00 15000.00 43000.00 43000.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 1.00 30000.00 49115.37 57000.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 1.00 20000.00 20721.68 16525.35 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 1.00 15000.00 32864.94 27000.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 25000.00 32865.46 19360.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 428 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00012 Field Lab (CL 2) Each =================================================== STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 1.00 20000.00 28765.00 21825.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 22000.00 13000.00 13000.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 1.00 15000.00 12368.75 12000.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1.00 30000.00 40626.43 30000.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 1.00 25000.00 37266.02 37900.00 ER0361-115 US 36 Bridges 06/22/17 1.00 23000.00 27145.00 28000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 22083.33 29716.18 26967.53 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1.00 20000.00 18700.00 15000.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 1.00 10000.00 10375.00 8750.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1.00 50000.00 24300.00 24300.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 26000.00 20585.89 22000.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 1.00 12000.00 17833.33 14500.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1.00 20000.00 16333.33 11000.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 25400.00 60000.00 60000.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1.00 25000.00 24934.63 21000.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 23550.00 21968.57 22068.75 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 26000.00 18683.67 21050.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 1.00 40000.00 61537.20 50000.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 20000.00 22000.00 15000.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 1.00 26000.00 22605.48 15527.42 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 1.00 26000.00 16577.46 25000.00 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 1.00 20000.00 14736.67 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 26333.33 26826.70 21929.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 41.00 21692.68 26246.82 24545.31 =============== 620-00015 Field Lab (State Furn) Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 1.00 7000.00 4574.98 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 7000.00 4574.98 4000.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 1.00 10000.00 8007.09 9021.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 10000.00 8007.09 9021.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 8500.00 6634.25 6510.64 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 429 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00020 Sanitary Facility Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 1.00 4000.00 7800.00 9000.00 NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 1.00 1000.00 1056.25 2000.00 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 2.00 2000.00 6496.64 2500.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 1.00 1200.00 1155.50 1201.00 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 1.00 3000.00 4902.38 4654.80 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 2.00 2000.00 2697.75 5000.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 4.00 2000.00 1886.14 2000.00 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 2.00 2100.00 1417.50 1500.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1.00 3500.00 2150.68 880.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 1.00 3000.00 1589.08 1699.59 STA0931-032 SH 93 Erosion Correction 02/09/17 1.00 1500.00 786.83 325.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1.00 1500.00 8033.22 5250.96 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 1.00 3000.00 2503.33 2210.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 2500.00 2640.00 2500.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 1.00 1400.00 5053.44 3060.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 2.00 2300.00 2153.12 2000.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1.00 3500.00 2608.00 3300.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 1.00 1900.00 5679.00 4130.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 1.00 2000.00 6924.00 29500.00 BR0252-449 I-25 Woodmen NB 03/02/17 2.00 1500.00 737.50 1000.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 4.00 1700.00 4706.67 5000.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 2.00 1500.00 2300.00 1200.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 2.00 2500.00 1583.14 1200.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 2.00 1500.00 3110.00 4000.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 1.00 2500.00 5417.84 8600.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 1.00 3000.00 578.00 600.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1.00 3000.00 1289.80 750.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 1.00 2000.00 2241.67 600.00 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 2.00 1200.00 987.50 500.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 1.00 1225.00 4979.80 4428.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 46.00 2070.11 2761.00 3386.12 STA006A-057 SH 6 EAST OF STERLING 04/06/17 1.00 2000.00 6122.49 9000.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 2.00 1500.00 5000.00 5000.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 1.00 3000.00 3926.43 2600.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 2.00 3000.00 4987.62 2562.86 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 1.00 2000.00 1638.17 1300.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 2.00 1500.00 1855.85 1900.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2.00 2500.00 4699.97 2620.74 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 2.00 1500.00 1581.20 1800.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 5.00 2000.00 858.33 1200.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 430 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00020 Sanitary Facility Each =================================================== NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 2.00 2000.00 1193.75 1750.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 1.00 2200.00 643.69 531.08 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 2000.00 2500.00 2500.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 1.00 1500.00 1885.00 300.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 2.00 2000.00 1274.25 860.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1.00 3000.00 4211.31 1800.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 1.00 2500.00 750.00 1000.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 1.00 1200.00 920.00 100.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 1.00 1000.00 770.00 1500.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 1.00 2500.00 2940.81 2800.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 1.00 2500.00 1368.00 1250.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 1.00 500.00 4500.00 1000.00 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 1.00 2500.00 5000.00 5000.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 1.00 1500.00 1408.00 2500.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 1.00 2000.00 2405.00 5000.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 1.00 2000.00 2000.00 2000.00 ER0361-115 US 36 Bridges 06/22/17 2.00 2000.00 2822.16 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 38.00 1997.37 2546.54 2146.53 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 1.00 2000.00 844.07 1000.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1.00 3000.00 3956.00 1000.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 1.00 1500.00 2350.00 4200.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 1.00 1500.00 2675.00 350.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1.00 3500.00 635.00 635.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 1500.00 5165.17 10000.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 1.00 2000.00 1633.33 350.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 1.00 2500.00 2356.00 3000.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 1.00 2700.00 3729.77 7705.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1.00 2000.00 1183.33 450.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 1.00 1500.00 1222.17 1500.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 1.00 1870.00 5800.00 1600.00 MTCE131A-039 SH 131 MP 0.053-68.721 IN EAG 08/17/17 1.00 1500.00 2973.33 2420.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 3.00 2000.00 712.00 796.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 1.00 3000.00 380.00 500.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 2.00 2250.00 2400.00 2400.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 2.00 2500.00 2214.70 2000.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 1.00 1200.00 706.00 378.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 1.00 1500.00 1031.00 150.00 MTCE R500-193 R5 FY 18 Regionwide MTCE Crac 09/21/17 1.00 7920.00 2298.00 300.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 2.00 700.00 2161.00 625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26.00 2215.00 2192.75 1845.23 STA094A-034 Critical Culvert Project on S 10/05/17 1.00 2400.00 1084.20 1950.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 431 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00020 Sanitary Facility Each =================================================== MTCE0705-084 I-70 CRACK SEAL KANSAS STATE 10/05/17 1.00 2000.00 1492.67 2728.00 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 2.00 2000.00 1625.00 750.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 1.00 2000.00 3369.17 500.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 1.00 5000.00 1475.00 950.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 2.00 2000.00 1692.00 575.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 1.00 1500.00 3431.88 1000.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 1.00 2000.00 3152.50 7500.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1.00 2500.00 1614.98 3500.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 1.00 6000.00 4933.00 2500.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 2.00 1900.00 5266.71 7500.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 1.00 900.00 3001.20 700.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 1.00 1500.00 1033.33 700.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 1.00 1500.00 8218.76 11593.81 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 1.00 1540.00 748.23 748.23 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 1.00 5000.00 4995.33 5843.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 2.00 1700.00 3823.31 2500.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 3.00 1800.00 1083.57 1075.52 BR3852-018 POA SCOUR US 385 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 1.00 2500.00 2242.50 2000.00 FSA0361-122 I-70 at Limon, US 40, US 287, 12/21/17 1.00 2000.00 1775.00 1550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 26.00 2266.92 2731.40 2678.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 136.00 2115.11 2582.85 2598.31 =============== 621-00411 Str Temp Acc Rd (Loc 1) LUMP SUM =============================================== ER0361-115 US 36 Bridges 06/22/17 1.00 50000.00 51263.77 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 50000.00 51263.77 8000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 50000.00 51263.77 8000.00 =============== 621-00425 Detour LUMP SUM =============================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 1.00 58000.00 81946.56 80000.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1.00 50000.00 66117.61 45000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 55333.33 74032.08 62500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 55333.33 74032.08 62500.00 =============== 621-00450 Detour Pvmt Sq Yard ================================================ STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 26.00 75.00 241.50 60.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 432 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 621-00450 Detour Pvmt Sq Yard ================================================ SHE160A-031 SH 160 Passing Lanes 03/02/17 325.00 50.00 78.41 33.33 NHPP 0701-230 Midpoint WB Bore 03/02/17 325.00 100.00 94.10 87.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 2,107.00 45.00 40.36 29.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 538.00 121.00 121.00 121.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,321.00 63.42 54.97 50.25 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 275.00 40.00 98.60 70.44 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 200.00 75.00 39.28 30.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 300.00 80.00 109.80 50.00 ER0361-115 US 36 Bridges 06/22/17 315.00 50.00 65.46 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,090.00 60.32 84.93 58.71 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 8,463.00 45.00 78.54 42.28 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 7,253.00 57.72 85.00 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15,716.00 50.87 78.94 62.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 4,400.00 50.00 19.50 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,400.00 50.00 19.50 37.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24,527.00 52.83 71.80 55.77 =============== 622-00000 Sewage Pumping Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 24.00 350.00 370.00 370.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 24.00 350.00 370.00 370.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 350.00 370.00 370.00 =============== 622-00027 Info Sign Board (Furnish Only) Each =================================================== SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 1.00 2000.00 2266.67 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2000.00 2266.67 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 2266.67 1800.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 433 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 622-00540 Wheel Stop Each =================================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 17.00 1000.00 613.33 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17.00 1000.00 613.33 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 1000.00 613.33 90.00 =============== 622-00825 Mod Building LUMP SUM =============================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 1.00 3000.00 12906.00 10812.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3000.00 12906.00 10812.00 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 1.00 6817.67 19008.77 19008.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 6817.67 19008.77 19008.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4908.84 14940.26 14910.39 =============== 622-00840 Garage Door (Furnish Only) Each =================================================== NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 2.00 97386.30 97971.32 97971.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 97386.30 97971.32 97971.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 97386.30 97971.32 97971.32 =============== 622-00841 Garage Door (Install Only) Each =================================================== NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 2.00 55617.24 44298.75 44298.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 55617.24 44298.75 44298.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 55617.24 44298.75 44298.75 =============== 622-00842 Grge Door - Fire Rated (Furn Only) Each =================================================== NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 2.00 19250.00 23375.00 23375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 19250.00 23375.00 23375.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 19250.00 23375.00 23375.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 434 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 622-00843 Grge Door - Fire Rated (Instl Only) Each =================================================== NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 2.00 8342.49 2129.46 2129.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 8342.49 2129.46 2129.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 8342.49 2129.46 2129.46 =============== 622-00850 Trailer Sani Station Each =================================================== STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 1.00 2000.00 1004.20 886.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2000.00 1004.20 886.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 1004.20 886.00 =============== 622-01000 Leaching Field Sq Yard ================================================ ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 142.00 276.48 440.00 440.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 142.00 276.48 440.00 440.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 142.00 276.48 440.00 440.00 =============== 622-01499 Septic Tank (1500 Gal) Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 28580.00 30000.00 30000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 28580.00 30000.00 30000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 28580.00 30000.00 30000.00 =============== 622-06300 Chlorine Contact Basin Each =================================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1.00 7500.00 8613.44 11000.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 7500.00 8613.44 11000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 7500.00 8613.44 11000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 435 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 622-11170 HVA LUMP SUM =============================================== NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 1.00 4950.00 7512.89 7512.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 4950.00 7512.89 7512.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 4950.00 7512.89 7512.89 =============== 624-20012 12 In Drainage Pipe (CL 0) Lin Foot =============================================== STA006A-057 SH 6 EAST OF STERLING 04/06/17 75.00 25.00 47.18 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 75.00 25.00 47.18 48.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75.00 25.00 47.18 48.00 =============== 624-20300 Detour Drainage Pipe (CL 0) Lin Foot =============================================== BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 322.00 60.00 187.83 12.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 322.00 60.00 187.83 12.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 322.00 60.00 187.83 12.67 =============== 624-22012 12 In Drainage Pipe (CL 2) Lin Foot =============================================== BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 90.00 35.00 58.10 107.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 90.00 35.00 58.10 107.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90.00 35.00 58.10 107.66 =============== 624-27016 15 In Drainage Pipe (CL 7) (CIP) Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 431.00 60.00 83.20 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 431.00 60.00 83.20 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 431.00 60.00 83.20 75.00 =============== 624-27019 18 In Drainage Pipe (CL 7) (CIP) Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2,590.00 70.00 88.20 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,590.00 70.00 88.20 75.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 436 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 624-27019 18 In Drainage Pipe (CL 7) (CIP) Lin Foot =============================================== ER0361-115 US 36 Bridges 06/22/17 165.00 70.00 92.43 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 165.00 70.00 92.43 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,755.00 70.00 88.50 75.00 =============== 624-27025 24 In Drainage Pipe (CL 7) (CIP) Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 220.00 100.00 104.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 220.00 100.00 104.00 80.00 ER0361-115 US 36 Bridges 06/22/17 105.00 100.00 111.18 99.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 105.00 100.00 111.18 99.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 325.00 100.00 106.62 86.14 =============== 624-27031 30 In Drainage Pipe (CL 7) (CIP) Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 33.00 125.00 162.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 33.00 125.00 162.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.00 125.00 162.00 100.00 =============== 624-27037 36 In Drainage Pipe (CL 7) (CIP) Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 295.00 150.00 151.00 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 295.00 150.00 151.00 105.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 295.00 150.00 151.00 105.00 =============== 624-29012 12 In Drainage Pipe (CL 9) Lin Foot =============================================== NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 1,078.00 80.00 43.18 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,078.00 80.00 43.18 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,078.00 80.00 43.18 50.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 437 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 624-30019 18 In Drainage Pipe (CL 10) (CIP) Lin Foot =============================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 554.00 80.00 46.67 59.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 554.00 80.00 46.67 59.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 554.00 80.00 46.67 59.00 =============== 624-30025 24 In Drainage Pipe (CL 10) (CIP) Lin Foot =============================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 71.00 100.00 83.33 87.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 71.00 100.00 83.33 87.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 71.00 100.00 83.33 87.00 =============== 624-30031 30 In Drainage Pipe (CL 10) CIP) Lin Foot =============================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 330.00 120.00 82.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 330.00 120.00 82.00 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 330.00 120.00 82.00 90.00 =============== 624-30037 36 In Drainage Pipe (CL 10) (CIP) Lin Foot =============================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 238.00 140.00 100.33 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 238.00 140.00 100.33 130.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 238.00 140.00 100.33 130.00 =============== 624-62030 30 In Equiv Drain Pipe A (CL 2) Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 30.00 180.00 150.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 180.00 150.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 180.00 150.00 100.00 =============== 624-62036 36 In Equiv Drain Pipe A (CL 2) Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 22.00 210.00 161.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 210.00 161.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 210.00 161.00 100.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 438 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 624-62042 42 In Equiv Drain Pipe A (CL 2) Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 20.00 250.00 235.00 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 250.00 235.00 115.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 250.00 235.00 115.00 =============== 625-00000 Const Surveying LUMP SUM =============================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 1.00 40000.00 122217.95 65000.00 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 1.00 25000.00 16224.94 17000.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 1.00 50000.00 33624.16 27000.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 1.00 40000.00 68250.00 120000.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 1.00 50000.00 83047.57 88000.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1.00 20000.00 32300.72 14500.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 1.00 10000.00 13779.71 8850.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1.00 50000.00 47252.25 36756.74 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 1.00 20000.00 14850.00 6150.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 42000.00 73270.00 150000.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 1.00 25000.00 76284.49 41777.78 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1.00 40000.00 22560.00 21000.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 1.00 120000.00 112840.00 136000.00 BR0252-449 I-25 Woodmen NB 03/02/17 1.00 5000.00 8537.50 6500.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 1.00 12000.00 13316.67 15000.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 1.00 8000.00 32333.33 55000.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1.00 200000.00 38194.49 41000.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 1.00 350000.00 350000.00 350000.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 1.00 40000.00 21686.35 28000.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 1.00 30000.00 30976.02 22900.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 1.00 6000.00 6451.55 4400.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1.00 10000.00 18940.00 10300.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 1.00 10000.00 9481.67 8940.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 1.00 14000.00 34341.76 50184.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 50680.00 45929.53 55177.44 STA006A-057 SH 6 EAST OF STERLING 04/06/17 1.00 65000.00 18271.36 18000.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 1.00 17000.00 50000.00 50000.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 1.00 20000.00 44414.34 36300.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 1.00 40000.00 22916.10 18000.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 20000.00 120436.38 93757.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 439 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 625-00000 Const Surveying LUMP SUM =============================================== STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 1.00 40000.00 132713.32 80540.25 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 1.00 40000.00 39046.67 41600.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 1.00 20000.00 15800.00 20700.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 1.00 5000.00 6527.00 4081.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 36000.00 60000.00 60000.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 1.00 12000.00 19872.50 6000.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1.00 70000.00 66216.77 83758.75 STA0703-437 I-70: 32ND TO 44TH 06/01/17 1.00 42000.00 34444.21 20000.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 1.00 7500.00 14843.00 5000.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 1.00 10000.00 10338.00 7600.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 1.00 20000.00 15900.00 25000.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 1.00 25000.00 12872.50 15000.00 ER0361-115 US 36 Bridges 06/22/17 1.00 185000.00 101248.62 170000.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 1.00 67630.00 67630.00 67630.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19.00 39059.47 55987.61 43314.05 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1.00 45000.00 60800.00 75000.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 1.00 20000.00 5750.00 3500.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1.00 30000.00 24035.00 24035.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 80000.00 40000.00 30000.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 1.00 10000.00 7852.10 5700.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 1.00 50000.00 44371.56 30000.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1.00 10000.00 9750.00 6250.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 1.00 15000.00 23500.00 8000.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1.00 25000.00 11766.67 15000.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 1.00 30000.00 6275.00 5000.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 1314857.62 3004442.30 3004442.30 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1.00 100000.00 79548.47 53000.00 BRR400-354 Little-T Channel Work and SH SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 1.00 20000.00 30966.60 22255.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 134604.43 96635.74 252475.56 STA094A-034 Critical Culvert Project on S 10/05/17 1.00 12000.00 5412.60 3800.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 1.00 20000.00 30531.17 10000.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 1.00 40000.00 15350.00 5700.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 100000.00 41658.67 34975.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 1.00 40000.00 28237.90 12000.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1.00 15000.00 23787.15 12800.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 75000.00 23000.00 20000.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 1.00 11385.71 17500.00 17500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 440 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 625-00000 Const Surveying LUMP SUM =============================================== STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 1.00 80000.00 11251.50 20700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 40477.14 21322.94 15497.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65.00 62145.66 54792.42 84611.86 =============== 625-00001 Const Surveying (Hour) Hour =================================================== STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 80.00 135.00 196.51 157.53 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 10.00 300.00 182.00 300.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 240.00 170.00 168.05 165.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 40.00 186.31 178.33 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 370.00 167.71 174.44 169.20 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 50.00 150.00 150.00 150.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 100.00 210.00 122.50 50.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 80.00 180.00 162.00 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 230.00 186.52 148.92 115.22 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 60.00 225.00 192.00 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 225.00 192.00 130.00 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 60.00 200.00 292.50 250.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 40.00 175.00 221.20 200.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 20.00 175.00 169.38 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 120.00 187.50 232.23 216.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 780.00 180.71 178.78 157.57 =============== 626-00000 Mobilization LUMP SUM =============================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 1.00 600000.00 374000.00 450000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 441 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00000 Mobilization LUMP SUM =============================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 1.00 140000.00 230437.50 130500.00 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 1.00 600000.00 548180.26 339000.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 1.00 200000.00 143868.00 237736.00 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 1.00 511812.00 371500.00 400000.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 1.00 650000.00 597972.17 568916.50 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 1.00 300000.00 535850.00 500000.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 1.00 1417913.00 461178.18 275000.00 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 1.00 25000.00 29812.75 20000.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1.00 350000.00 266776.31 148975.50 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 1.00 61688.00 65982.21 31694.94 STA0931-032 SH 93 Erosion Correction 02/09/17 1.00 25000.00 26334.83 22250.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1.00 650000.00 595000.00 380000.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 1.00 180000.00 165166.67 80000.00 MTCER500-191 R5 FY17 Striping 02/16/17 1.00 10000.00 21375.00 8500.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 700000.00 886350.00 655000.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 1.00 650000.00 578204.96 433671.91 SHE160A-031 SH 160 Passing Lanes 03/02/17 1.00 556778.69 427131.59 225052.73 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1.00 350000.00 259000.00 375500.00 MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 1.00 150000.00 184777.00 120000.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 1.00 355000.00 483002.25 320175.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 1.00 950000.00 724418.70 267300.00 BR0252-449 I-25 Woodmen NB 03/02/17 1.00 348290.00 182413.25 110000.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 1.00 895000.00 879596.87 598790.61 STA2873-183 US 287 Repairs at LCR 17 03/09/17 1.00 45000.00 158333.33 95000.00 MTCER300-239 070A MP 0-75,131-173; 040A, 0 03/09/17 1.00 12000.00 9000.00 5000.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1.00 400000.00 261430.08 260000.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 1.00 240000.00 359951.80 256534.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 1.00 380000.00 308966.72 300000.00 MTCER300-240 MTCE R3 FY 17/18 REGION WIDE 03/23/17 1.00 40000.00 30500.00 14000.00 MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 1.00 12000.00 29166.67 7500.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 1.00 65000.00 77424.60 52000.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1.00 100000.00 98593.00 75000.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 1.00 120000.00 77666.67 73000.00 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 1.00 40000.00 61521.25 91085.00 SW01-932 I-70 MP 146 TO 259 03/30/17 1.00 45000.00 26250.00 12500.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 1.00 784685.99 613279.49 257850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 37.00 378370.54 302303.20 221554.92 STA006A-057 SH 6 EAST OF STERLING 04/06/17 1.00 450000.00 228401.64 245582.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 1.00 280000.00 520000.00 520000.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 1.00 230000.00 395514.31 294900.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 1.00 805432.50 633834.18 581502.54 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 1.00 365000.00 239014.61 299000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 442 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00000 Mobilization LUMP SUM =============================================== STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 1.00 250000.00 349817.53 288000.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 1022413.40 839476.10 750000.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 1.00 443258.27 936021.63 755108.14 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 1.00 400000.00 528000.00 541000.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 1.00 400000.00 396586.75 240000.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 1.00 35000.00 57743.70 33731.11 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 550000.00 600000.00 600000.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 1.00 65000.00 20125.00 10000.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 1.00 100000.00 162030.00 160000.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1.00 650000.00 826963.33 810000.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 1.00 100000.00 167750.00 212000.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 1.00 34238.00 34000.00 13000.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 1.00 25000.00 14127.00 12000.00 MPR200-235 FY 2018 PAVEMENT MARKING PROJ 06/01/17 1.00 281825.00 15833.33 5000.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 1.00 530000.00 404179.25 451600.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 1.00 69175.00 84439.00 63000.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 1.00 150000.00 153833.33 86500.00 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 1.00 60000.00 107000.00 107000.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 1.00 75000.00 68818.00 75000.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 1.00 100000.00 154200.00 100000.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 1.00 110000.00 66964.50 10000.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 1.00 60000.00 41040.43 71012.17 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 1.00 190000.00 170000.00 170000.00 MTCER300-243 R3 FY18 REGION WIDE ROUNDABOU 06/22/17 1.00 10000.00 28833.33 19500.00 ER0361-115 US 36 Bridges 06/22/17 1.00 800000.00 706585.83 656000.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 1.00 103065.00 103065.00 103065.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 31.00 282077.65 353749.60 267209.71 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 1.00 40000.00 60677.14 26000.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1.00 450000.00 389100.00 350000.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 1.00 60000.00 11075.00 12150.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 1.00 45000.00 62000.00 34000.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1.00 300000.00 310000.00 310000.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 250000.00 454043.05 550000.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 1.00 194291.00 77500.00 105000.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 1.00 35000.00 96666.67 125000.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 1.00 115000.00 122659.40 74700.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 1.00 275000.00 359418.60 630000.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1.00 55000.00 95166.67 40000.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 1.00 65000.00 66808.33 55000.00 MTCE0705-085 FY 18 I-70 EPOXY FROM MM 328 08/10/17 1.00 10000.00 13333.33 5000.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 1.00 100000.00 349072.68 163000.00 MTCE131A-039 SH 131 MP 0.053-68.721 IN EAG 08/17/17 1.00 60000.00 113333.33 80000.00 CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 1.00 1.00 35015.28 24500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 443 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00000 Mobilization LUMP SUM =============================================== ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1.00 132078.50 110371.80 101115.40 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 1.00 50000.00 71500.00 93000.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1.00 575000.00 534879.18 250000.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 1.00 25000.00 36947.00 29850.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 1.00 86095.00 82000.00 56000.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 1.00 5000.00 7636.63 2000.00 MTCE R500-193 R5 FY 18 Regionwide MTCE Crac 09/21/17 1.00 96000.00 58990.00 40000.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 1.00 200000.00 271460.00 118000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 24.00 134311.06 203256.02 136429.81 STA094A-034 Critical Culvert Project on S 10/05/17 1.00 78109.00 44628.54 46000.00 MTCE0705-084 I-70 CRACK SEAL KANSAS STATE 10/05/17 1.00 42650.00 49666.67 53000.00 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 1.00 150000.00 142500.00 80000.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 1.00 125000.00 176400.00 20000.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 1.00 65000.00 27750.00 25500.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 300000.00 360000.33 360000.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 1.00 250000.00 180486.33 100000.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 1.00 120000.00 155362.50 151250.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 1.00 850000.00 1196684.20 769000.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 754638.75 415333.33 250000.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 1.00 89305.00 138588.80 80000.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 1.00 35609.00 25428.75 12000.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 1.00 25000.00 74333.00 106500.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 1.00 550000.00 668578.73 384643.65 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 1.00 357577.40 331636.17 331636.17 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 1.00 36701.43 13350.00 13350.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 1.00 400000.00 414464.67 265894.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 1.00 400000.00 484500.00 520000.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 1.00 300000.00 248832.35 174826.47 BR3852-018 POA SCOUR US 385 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 1.00 77639.00 152649.33 187000.00 FSA0361-122 I-70 at Limon, US 40, US 287, 12/21/17 1.00 29475.00 86500.00 63000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21.00 230609.36 270189.02 182134.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 113.00 273211.82 285982.51 208441.22 =============== 626-00100 Mobilization (w/o Autopay) LUMP SUM =============================================== ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 1.00 1158898.12 1158898.12 1158898.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1158898.12 1158898.12 1158898.12 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 444 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00100 Mobilization (w/o Autopay) LUMP SUM =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 33369798.64 12401328.00 12401328.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 33369798.64 12401328.00 12401328.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1.00 130000.00 73922.82 79000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 130000.00 73922.82 79000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 11552898.92 1750470.38 4546408.71 =============== 626-01102 Public Info Services (Tier II) LUMP SUM =============================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 1.00 40000.00 10085.07 8500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 40000.00 10085.07 8500.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 1230059.66 2500000.00 2500000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1230059.66 2500000.00 2500000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 635029.83 632563.80 1254250.00 =============== 626-01103 Public Info Services (Tier III) LUMP SUM =============================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 1.00 70000.00 32020.18 24850.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 1.00 12000.00 15225.00 20000.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 1.00 10000.00 13184.29 10500.00 STM0243-089 Midpoint: Station 1019+50 Cen STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1.00 15000.00 18001.28 21003.85 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 1.00 15000.00 7636.67 5310.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 30000.00 16740.00 20000.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 1.00 7000.00 8654.82 3763.80 SHE160A-031 SH 160 Passing Lanes 03/02/17 1.00 1000.00 11816.74 8038.89 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1.00 40000.00 9074.00 16000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 445 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-01103 Public Info Services (Tier III) LUMP SUM =============================================== MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 1.00 60000.00 23862.00 28000.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 1.00 17000.00 11083.92 14500.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 1.00 25000.00 12988.00 20000.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 1.00 16000.00 16666.67 6000.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1.00 30000.00 9545.87 9000.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 1.00 15000.00 5594.35 4650.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 1.00 20000.00 7890.00 6770.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 23117.65 13522.60 13649.16 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 1.00 20000.00 50000.00 50000.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 1.00 10000.00 17544.84 14000.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 1.00 30000.00 15083.82 10251.46 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 1.00 15000.00 5860.70 2750.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 1.00 20000.00 12823.36 12500.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 7500.00 25363.98 36084.42 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 1.00 3000.00 16770.95 16891.35 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 1.00 17000.00 16641.67 13200.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 1.00 15000.00 13062.50 12000.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 15000.00 15000.00 15000.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1.00 12000.00 13569.97 10000.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 1.00 5000.00 11318.00 11500.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 1.00 10000.00 16218.98 21200.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 1.00 8000.00 8695.00 8200.00 ER0361-115 US 36 Bridges 06/22/17 1.00 15000.00 16218.75 13000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15.00 13500.00 16088.67 16438.48 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1.00 15000.00 18700.00 18700.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 15000.00 17000.00 20000.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 1.00 20000.00 4250.00 6000.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1.00 18000.00 15440.36 17000.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 1.00 4500.00 5254.00 5062.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 14500.00 13190.30 13352.40 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 1.00 30000.00 24875.00 11250.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 25000.00 20467.00 16400.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 446 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-01103 Public Info Services (Tier III) LUMP SUM =============================================== C133A-042 SH 133 McClure Pass Slip 11/16/17 1.00 15000.00 9090.00 7500.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 1.00 50000.00 29035.80 25000.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 20000.00 12666.67 13000.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 1.00 5000.00 6166.67 7500.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 1.00 20000.00 11199.42 7763.71 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 1.00 6375.75 8250.00 8250.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 1.00 20000.00 14714.67 11500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 21263.97 14967.91 12018.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 18682.08 14602.27 14219.77 =============== 626-01104 Public Info Services (Tier IV) LUMP SUM =============================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 1.00 15000.00 26562.50 18125.00 NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 1.00 5000.00 4796.26 4000.00 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 1.00 15000.00 8119.97 8000.00 MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 1.00 10000.00 4576.25 2500.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1.00 30000.00 5938.45 6600.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 1.00 5000.00 3894.71 3540.00 STA0931-032 SH 93 Erosion Correction 02/09/17 1.00 4000.00 3264.17 5335.00 BR0252-449 I-25 Woodmen NB 03/02/17 1.00 7000.00 7025.00 5000.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 1.00 5000.00 4833.33 3000.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 1.00 5000.00 5450.00 5000.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 1.00 10000.00 17116.85 14885.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1.00 15000.00 5296.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 10500.00 6595.24 6540.42 STA006A-057 SH 6 EAST OF STERLING 04/06/17 1.00 5000.00 6628.14 4500.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 1.00 4000.00 3836.15 1308.44 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 1.00 7500.00 12226.25 1600.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 1.00 7500.00 4353.33 2560.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 1.00 3500.00 6487.20 3500.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 1.00 7500.00 6949.40 8017.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 1.00 4000.00 5000.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 5571.43 6909.25 3783.63 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 1.00 5000.00 3351.58 3200.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 447 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-01104 Public Info Services (Tier IV) LUMP SUM =============================================== NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1.00 10000.00 15500.00 5000.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 1.00 10000.00 3187.50 3500.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 1.00 5000.00 3800.00 3000.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 1.00 8000.00 7854.69 7932.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1.00 6000.00 4416.67 5000.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1.00 14000.00 7600.00 10600.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 1.00 1500.00 5666.67 2500.00 MTCE R500-193 R5 FY 18 Regionwide MTCE Crac 09/21/17 1.00 24000.00 5390.00 10500.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 1.00 5000.00 8025.10 7165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 8850.00 6750.52 5839.70 STA094A-034 Critical Culvert Project on S 10/05/17 1.00 5000.00 2985.03 4500.00 MTCE0705-084 I-70 CRACK SEAL KANSAS STATE 10/05/17 1.00 3000.00 6433.33 7000.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 1.00 10000.00 10125.00 5250.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 1.00 5000.00 3975.00 7500.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1.00 5000.00 4299.50 3500.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 1.00 16000.00 6343.73 10000.00 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 1.00 5000.00 5883.33 3000.00 FSA0361-122 I-70 at Limon, US 40, US 287, 12/21/17 1.00 5000.00 5875.00 6250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 6750.00 5134.33 5875.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37.00 8310.81 6381.74 5685.61 =============== 627-00001 Pvmt Mkg Paint Gallon ================================================= NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 1,750.00 25.00 37.71 40.00 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 2,536.00 40.00 35.91 38.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1,720.00 42.00 32.35 29.85 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 3,758.00 50.00 30.20 31.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,764.00 41.51 33.45 34.37 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 356.00 50.00 70.00 70.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 3,395.00 40.00 28.00 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,751.00 40.95 31.99 31.99 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 15.00 100.00 269.17 82.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 100.00 269.17 82.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 448 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00001 Pvmt Mkg Paint Gallon ================================================= C133A-042 SH 133 McClure Pass Slip 11/16/17 12.00 100.00 385.27 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 100.00 385.27 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,542.00 41.47 34.65 33.82 =============== 627-00002 Thermoplastic Pvmt Mkg Sq Foot ================================================ CR100-286 R1 CURB RAMPS-PH 1 10/26/17 1,184.00 30.00 15.25 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,184.00 30.00 15.25 13.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,184.00 30.00 15.25 13.00 =============== 627-00003 Thermoplastic Pvmt Mkg (Inlaid) Sq Foot ================================================ CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 60.00 1.00 31.11 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 1.00 31.11 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 1.00 31.11 30.00 =============== 627-00005 Epoxy Pvmt Mkg Gallon ================================================= NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 450.00 150.00 78.30 73.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 96.00 150.00 114.93 84.50 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 30.00 300.00 181.67 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 576.00 157.81 85.85 80.75 MPR200-235 FY 2018 PAVEMENT MARKING PROJ 06/01/17 7,723.00 65.00 50.92 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,723.00 65.00 50.92 48.00 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 56.00 336.73 302.50 302.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 56.00 336.73 302.50 302.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,355.00 73.22 55.01 51.96 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 449 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00006 Mod Epoxy Pvmt Mkg (On-Call) Gallon ================================================= SW01-932 I-70 MP 146 TO 259 03/30/17 1,200.00 65.00 71.88 58.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,200.00 65.00 71.88 58.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,200.00 65.00 71.88 58.75 =============== 627-00007 Epoxy Pvmt Mkg (Spec) Gallon ================================================= NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 120.00 150.00 300.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 120.00 150.00 300.00 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 150.00 300.00 300.00 =============== 627-00008 Mod Epoxy Pvmt Mkg Gallon ================================================= NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 875.00 110.00 75.72 82.25 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 151.00 200.00 201.73 154.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 931.00 70.00 86.25 81.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 28.00 80.00 158.33 140.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 175.00 66.00 106.96 105.56 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 440.00 75.00 92.54 90.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 77.00 150.00 145.00 120.00 MTCER300-239 070A MP 0-75,131-173; 040A, 0 03/09/17 22,345.00 60.00 60.55 52.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 451.00 170.00 75.77 75.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 395.00 100.00 107.46 100.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 598.00 65.00 103.51 82.44 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 4.00 70.00 641.00 425.00 SW01-932 I-70 MP 146 TO 259 03/30/17 13,322.00 53.00 60.08 55.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 39,792.00 61.62 65.71 56.87 STA006A-057 SH 6 EAST OF STERLING 04/06/17 768.00 86.00 74.14 74.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 130.00 65.00 142.00 142.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 118.00 65.00 93.61 88.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 149.00 80.00 162.34 152.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 187.00 65.00 219.00 198.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 39.00 140.00 519.50 548.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 3.00 300.00 850.00 1300.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 450 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00008 Mod Epoxy Pvmt Mkg Gallon ================================================= NHPPC120-026 US 85: I-76 to 168th 05/04/17 479.00 65.00 96.04 85.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 196.00 65.00 92.37 90.00 MPR200-235 FY 2018 PAVEMENT MARKING PROJ 06/01/17 23,320.00 70.00 58.42 52.50 STA0703-437 I-70: 32ND TO 44TH 06/01/17 110.00 65.00 133.57 100.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 680.00 80.00 78.67 75.00 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 1,205.00 82.00 75.00 75.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 1,692.00 80.00 73.00 73.00 MTCER300-243 R3 FY18 REGION WIDE ROUNDABOU 06/22/17 130.00 350.00 383.33 330.00 ER0361-115 US 36 Bridges 06/22/17 167.00 100.00 176.46 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 29,373.00 73.09 69.97 61.30 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 10.00 150.00 296.64 260.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 101.00 150.00 136.00 152.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 25.00 65.00 125.00 125.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 38.00 165.00 253.02 254.00 MTCE0705-085 FY 18 I-70 EPOXY FROM MM 328 08/10/17 5,168.00 57.00 61.48 54.00 CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 2.00 1.00 527.50 300.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 129.00 95.00 151.50 200.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1,996.00 96.00 105.00 105.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 95.00 120.00 195.55 177.00 BRR400-354 Little-T Channel Work and SH SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 74.00 65.00 160.81 107.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,638.00 70.59 82.66 74.69 C133A-042 SH 133 McClure Pass Slip 11/16/17 6.00 200.00 840.77 100.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 1,489.00 85.00 53.50 60.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 385.00 100.00 102.82 86.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 4.00 500.00 259.00 330.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 699.00 80.00 101.29 101.45 FSA0361-122 I-70 at Limon, US 40, US 287, 12/21/17 2,809.00 60.00 75.00 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,392.00 72.83 78.30 75.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 82,195.00 67.29 69.64 61.31 =============== 627-00009 Mod Epoxy (Inlaid) Gallon ================================================= STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 980.00 125.00 166.21 148.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 451 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00009 Mod Epoxy (Inlaid) Gallon ================================================= STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 8.00 130.00 646.98 885.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 861.00 150.00 117.56 111.92 SHE160A-031 SH 160 Passing Lanes 03/02/17 24.00 120.00 207.27 183.33 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 939.00 90.00 139.05 143.36 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 2,494.00 95.00 123.78 132.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,306.00 108.75 135.21 133.76 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 2,131.00 140.00 137.07 131.22 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 488.00 97.00 204.03 194.25 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 4.00 400.00 1269.75 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,623.00 132.40 157.58 144.58 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 17.00 200.00 763.33 505.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17.00 200.00 763.33 505.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 114.00 120.00 179.67 320.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 546.00 17.50 122.22 111.65 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 711.00 120.00 124.94 124.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,371.00 79.18 127.90 135.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,317.00 111.22 141.15 137.94 =============== 627-00011 Pvmt Mkg Paint (Waterborne) Gallon ================================================= NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 286.00 60.00 73.31 56.50 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 900.00 50.00 88.08 90.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1,326.00 45.00 32.85 30.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 40.00 80.00 63.09 43.50 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 2,754.00 32.00 30.74 30.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 1,084.00 45.00 45.72 36.64 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 11.00 50.00 283.00 260.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 452 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00011 Pvmt Mkg Paint (Waterborne) Gallon ================================================= STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 5,340.00 32.00 51.35 54.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,741.00 36.91 46.63 45.46 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 373.00 45.00 51.00 51.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 265.00 45.00 58.44 55.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 2,045.00 40.00 48.69 43.06 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 719.00 40.00 30.69 28.80 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 400.00 40.00 63.59 61.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 1,464.00 40.00 50.68 47.78 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 39.00 50.00 219.50 230.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 9.00 100.00 222.75 300.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 2,724.00 45.00 30.70 40.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 362.00 45.00 56.45 55.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 505.00 45.00 55.71 48.00 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 723.00 50.00 32.00 32.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 10.00 100.00 339.13 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9,638.00 43.10 47.44 44.42 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 70.00 45.00 41.00 41.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 3,272.00 80.00 50.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,342.00 79.27 49.81 49.81 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 909.00 50.00 25.00 30.00 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 26.00 84.18 126.50 126.50 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 60.00 45.00 86.33 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 995.00 50.59 31.15 34.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25,716.00 45.27 46.34 45.21 =============== 627-00012 Pvmt Mkg Paint (Low VOC Solvent Base) Gallon ================================================= SHE160A-031 SH 160 Passing Lanes 03/02/17 529.00 44.00 36.44 33.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 529.00 44.00 36.44 33.33 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 453 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00012 Pvmt Mkg Paint (Low VOC Solvent Base) Gallon ================================================= CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 3.00 1.00 146.50 142.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1.00 146.50 142.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1,331.00 30.50 61.28 55.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,331.00 30.50 61.28 55.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,863.00 34.29 48.57 49.58 =============== 627-00013 Pvmt Mkg Paint (High Build) Gallon ================================================= NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 920.00 55.00 44.92 37.84 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 1,721.00 45.00 54.59 40.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 220.00 100.00 236.44 350.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 1,197.00 40.00 42.94 37.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 60.00 100.00 150.94 140.00 MTCER500-191 R5 FY17 Striping 02/16/17 71,710.00 24.50 24.69 24.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 1,936.00 43.18 37.87 39.53 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 40.00 100.00 258.00 125.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 3,280.00 27.00 28.22 30.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 115.00 65.00 104.00 37.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 1,186.00 60.00 42.90 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 82,385.00 26.89 26.95 26.53 STA006A-057 SH 6 EAST OF STERLING 04/06/17 1,976.00 40.00 35.91 36.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 21.00 600.00 472.33 42.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 1,297.00 35.00 33.00 30.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 6.00 180.00 1053.80 2150.00 ER0361-115 US 36 Bridges 06/22/17 550.00 40.00 72.63 73.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,850.00 41.59 50.85 42.59 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 10.00 60.00 122.02 105.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 454 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00013 Pvmt Mkg Paint (High Build) Gallon ================================================= NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 2,437.00 100.00 29.69 26.47 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 70.00 45.00 104.50 69.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 24.00 125.00 151.67 190.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 26.00 135.00 142.06 141.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 78.00 29.00 78.50 100.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 30.00 75.00 99.48 86.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,675.00 96.63 36.98 33.27 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 782.00 40.00 26.00 37.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 2,786.00 60.00 49.14 42.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 4.00 200.00 205.00 270.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 1,398.00 45.00 47.25 36.23 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 3,453.00 50.00 29.18 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,423.00 51.62 39.94 34.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 97,333.00 31.53 29.22 28.08 =============== 627-00032 Raised Flex Pvmt Marker (Temp) Each =================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 6,267.00 2.10 1.43 1.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,267.00 2.10 1.43 1.10 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 13,209.00 1.10 1.00 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,209.00 1.10 1.00 1.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 3,600.00 2.00 3.58 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,600.00 2.00 3.58 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23,076.00 1.51 2.01 1.65 =============== 627-00070 Preform Thermoplastic Pvmt Mkg Sq Foot ================================================ STA006A-057 SH 6 EAST OF STERLING 04/06/17 500.00 16.00 13.38 13.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 455 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00070 Preform Thermoplastic Pvmt Mkg Sq Foot ================================================ STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 366.00 18.40 24.50 22.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 246.00 22.00 21.50 14.50 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 364.00 20.00 14.00 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,476.00 18.58 18.45 15.90 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 312.00 20.00 13.38 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 312.00 20.00 13.38 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,788.00 18.83 16.90 15.22 =============== 627-01001 Preform Plastic Pvmt Mkg (Ty I) Sq Foot ================================================ STA0362-035 US 36: Strasburg to Byers 03/23/17 367.00 14.00 22.39 18.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 367.00 14.00 22.39 18.89 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 433.00 15.00 20.33 20.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 17,084.00 10.00 12.61 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17,517.00 10.12 12.80 12.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,884.00 10.20 13.00 12.34 =============== 627-01010 Preform Plastic Pvmt Mkg (TY I)(Inlaid) Sq Foot ================================================ NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 13,976.00 20.00 14.05 12.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 3,410.00 15.00 14.65 14.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 24.00 11.37 20.38 20.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 4,250.00 12.00 11.10 12.75 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 3,290.00 15.00 10.71 9.50 SW01-932 I-70 MP 146 TO 259 03/30/17 38,830.00 9.00 10.35 10.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 63,780.00 12.24 11.82 10.97 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 5,726.00 11.00 17.00 17.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 456 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-01010 Preform Plastic Pvmt Mkg (TY I)(Inlaid) Sq Foot ================================================ STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 6,681.00 11.00 14.34 13.50 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 3,169.00 12.00 14.73 13.80 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 3,289.00 20.00 20.67 20.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 994.00 18.00 15.00 15.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 3,577.00 12.00 13.86 13.50 STA0703-437 I-70: 32ND TO 44TH 06/01/17 5,288.00 12.00 15.42 14.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 40.00 40.00 98.31 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28,764.00 12.73 16.03 15.24 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 4,251.00 11.00 18.85 18.85 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 9,160.00 11.00 13.54 11.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,411.00 11.00 13.99 14.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 32,289.00 11.00 14.16 14.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 5,077.00 10.00 15.40 14.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 37,366.00 10.86 14.27 14.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 143,321.00 11.86 13.59 12.91 =============== 627-02001 Preform Plastic Pvmt Mkg (Ty II) Sq Foot ================================================ NHPPC120-026 US 85: I-76 to 168th 05/04/17 376.00 16.00 14.17 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 376.00 16.00 14.17 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 376.00 16.00 14.17 15.00 =============== 627-02010 Preform Plastic Pvmt Mkg (Ty II)(Inlaid) Sq Foot ================================================ NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 41,031.00 20.00 15.20 12.50 SW01-932 I-70 MP 146 TO 259 03/30/17 939.00 10.00 11.10 10.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 41,970.00 19.78 15.14 12.46 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1,790.00 20.00 15.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,790.00 20.00 15.00 15.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 457 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-02010 Preform Plastic Pvmt Mkg (Ty II)(Inlaid) Sq Foot ================================================ MTCE0705-085 FY 18 I-70 EPOXY FROM MM 328 08/10/17 98,736.00 10.00 9.95 9.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 98,736.00 10.00 9.95 9.70 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 827.00 19.00 15.67 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 827.00 19.00 15.67 26.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 143,323.00 13.04 11.53 10.67 =============== 627-30110 Pvmt Mkg Paint (XS) Sq Foot ================================================ STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 11,480.00 5.00 8.87 7.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,480.00 5.00 8.87 7.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,480.00 5.00 8.87 7.99 =============== 627-30205 Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 2,164.00 18.00 14.23 13.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,164.00 18.00 14.23 13.32 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 140.00 23.86 26.00 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 140.00 23.86 26.00 22.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 851.00 25.00 13.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 851.00 25.00 13.00 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,155.00 20.15 14.25 15.51 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 458 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30210 Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ STAR400-348 Region 4 Controller and Cabin 05/04/17 17.00 30.00 50.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17.00 30.00 50.00 10.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1,190.00 15.00 11.50 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,190.00 15.00 11.50 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,207.00 15.21 11.86 19.86 =============== 627-30310 Plastic Pvmt Mkg (60 Mil) (XS) Sq Foot ================================================ MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 50.00 20.00 14.00 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 20.00 14.00 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 20.00 14.00 14.00 =============== 627-30323 Preform Plastic Pvmt Mkg (WS)(Typ I)(In) Sq Foot ================================================ STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 2,420.00 18.00 24.82 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,420.00 18.00 24.82 23.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,420.00 18.00 24.82 23.00 =============== 627-30324 Preform Plastic Pvmt Mkg (WS) (TY I) Sq Foot ================================================ NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 550.50 25.00 23.10 22.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 2,290.00 17.00 23.61 23.50 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 296.00 19.65 24.67 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,136.50 18.65 23.57 22.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,136.50 18.65 23.57 22.43 =============== 627-30328 Pre Plastic Pvmt Mkg (XWalk)(Typ1)(In) Sq Foot ================================================ STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 3,200.00 20.00 11.42 13.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,200.00 20.00 11.42 13.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,200.00 20.00 11.42 13.30 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 459 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30329 Preform Plastic Pvmt Mkg (XS) (TY I) Sq Foot ================================================ NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1,794.00 15.00 13.68 13.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 10,430.00 12.00 10.71 9.50 STA0362-035 US 36: Strasburg to Byers 03/23/17 772.00 15.00 18.55 14.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,996.00 12.59 11.55 10.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,996.00 12.59 11.55 10.30 =============== 627-30332 Preform Plastic Pvmt Mkg (XS) (Ty III) Sq Foot ================================================ SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 2,736.00 12.00 11.33 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,736.00 12.00 11.33 11.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,736.00 12.00 11.33 11.00 =============== 627-30405 Preform Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 246.00 13.00 22.78 24.00 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 338.00 17.00 21.41 16.50 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 5,406.00 30.00 23.60 20.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 3,038.00 17.00 17.38 16.50 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 210.00 20.00 25.24 18.00 STM0243-089 Midpoint: Station 1019+50 Cen SHE160A-031 SH 160 Passing Lanes 03/02/17 425.00 19.00 21.52 20.00 BR0252-449 I-25 Woodmen NB 03/02/17 116.00 25.00 18.75 10.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 248.00 20.00 23.50 18.50 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 130.00 20.00 20.33 18.00 MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 1,292.00 14.00 18.33 12.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 655.00 21.00 22.73 23.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,104.00 22.91 20.99 18.28 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 403.00 11.00 18.10 18.10 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 419.00 12.00 13.21 12.40 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 418.00 25.00 22.48 18.45 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 1,556.00 18.00 16.84 15.80 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 504.00 15.00 22.22 25.48 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 1,406.00 14.00 20.30 19.43 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 460 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30405 Preform Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 304.00 18.00 23.00 23.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 575.00 11.00 18.00 20.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 147.00 12.00 16.42 16.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 117.00 12.00 22.08 19.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 494.00 24.00 17.50 17.50 ER0361-115 US 36 Bridges 06/22/17 563.00 18.00 20.68 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,906.00 16.23 19.85 18.69 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1,140.00 20.00 14.55 13.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 236.50 17.00 25.50 28.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 650.00 12.00 17.67 17.67 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 54.00 20.00 36.33 37.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 724.00 25.00 15.21 14.00 BRR400-354 Little-T Channel Work and SH SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 854.00 12.00 18.11 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,658.50 17.51 16.17 16.52 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 236.00 12.00 40.85 37.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 236.00 12.00 40.85 37.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22,904.50 19.92 19.77 18.32 =============== 627-30406 Inst Preform Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 2,160.00 6.00 10.75 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,160.00 6.00 10.75 5.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,160.00 6.00 10.75 5.25 =============== 627-30407 Preform Thermoplastic Pvmt Mkg (WS)(Sp) Sq Foot ================================================ NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 1,774.00 35.00 35.67 30.00 MTCER300-240 MTCE R3 FY 17/18 REGION WIDE 03/23/17 19,013.00 12.50 17.15 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20,787.00 14.42 18.73 12.16 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 461 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30407 Preform Thermoplastic Pvmt Mkg (WS)(Sp) Sq Foot ================================================ STAR500-190 R5 Signal Replacement Chaffee 04/27/17 1,125.00 30.00 27.50 27.50 MTCER300-243 R3 FY18 REGION WIDE ROUNDABOU 06/22/17 2,500.00 21.00 24.17 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,625.00 23.79 25.20 23.71 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 120.00 50.00 28.13 25.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 120.00 50.00 28.13 25.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24,532.00 15.98 19.73 13.93 =============== 627-30408 Pre Thermo Pvmt Mkg (Shield) Sq Foot ================================================ NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 596.00 35.00 40.97 34.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 596.00 35.00 40.97 34.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 596.00 35.00 40.97 34.75 =============== 627-30410 Preform Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 23,630.00 9.00 11.25 8.50 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 9,854.00 25.00 15.48 13.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 6,288.00 13.00 10.63 10.50 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 272.00 15.00 18.07 12.75 STM0243-089 Midpoint: Station 1019+50 Cen STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 786.00 22.00 11.69 10.50 MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 3,991.00 10.50 15.70 9.50 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 426.00 18.85 16.13 16.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 45,247.00 13.53 12.49 9.98 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 12,065.00 9.00 13.60 13.60 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 6,546.00 10.00 8.55 8.05 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 462 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30410 Preform Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 47.00 25.00 17.43 12.30 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 14,014.00 9.00 11.72 11.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1,325.00 10.00 15.75 16.71 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 2,524.00 14.00 13.88 13.13 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1,504.00 12.00 13.00 13.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 3,638.00 9.00 10.96 10.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 401.00 10.00 11.29 11.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 210.00 10.00 14.93 12.00 ER0361-115 US 36 Bridges 06/22/17 204.00 12.00 14.30 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 42,478.00 9.64 12.37 11.59 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 54.00 18.00 15.69 17.37 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 4,570.00 10.00 12.96 12.96 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 48.00 20.00 22.50 20.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 48.00 11.00 29.00 35.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 398.00 20.00 17.87 18.00 BRR400-354 Little-T Channel Work and SH SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 984.00 10.00 13.69 13.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,102.00 10.81 14.95 13.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93,827.00 11.59 12.57 10.95 =============== 627-30411 Preform Thermoplastic Pvmt Mkg (XS)(Sp) Sq Foot ================================================ NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 242.00 30.00 17.29 14.50 MTCER300-240 MTCE R3 FY 17/18 REGION WIDE 03/23/17 68,842.00 11.50 11.88 9.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 69,084.00 11.56 11.90 9.62 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 4,682.00 30.00 17.33 17.00 MTCER300-243 R3 FY18 REGION WIDE ROUNDABOU 06/22/17 1,500.00 19.00 21.50 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,182.00 27.33 18.34 17.73 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 572.00 25.00 18.58 16.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 572.00 25.00 18.58 16.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75,838.00 12.95 12.48 10.33 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 463 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30412 Pre Thermo Pvmt Mkg (XS) (Install Only) Sq Foot ================================================ MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 4,250.00 5.00 9.42 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,250.00 5.00 9.42 5.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,250.00 5.00 9.42 5.25 =============== 627-40000 Methyl Methacrylate Pvmt Mkg Gallon ================================================= BR0252-449 I-25 Woodmen NB 03/02/17 34.00 150.00 788.75 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 34.00 150.00 788.75 450.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 150.00 788.75 450.00 =============== 627-40003 Methyl Methacrylate Pvmt Mkg (Inlaid) Sq Foot ================================================ NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 60.00 35.00 32.86 15.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 35.00 32.86 15.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 35.00 32.86 15.81 =============== 627-40010 Methyl Methac Pvmt Mkg (WS) Sq Foot ================================================ NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 865.00 40.00 21.75 15.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 865.00 40.00 21.75 15.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 865.00 40.00 21.75 15.81 =============== 629-01001 Survey Monument (Ty 1) Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 49.00 150.00 146.40 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 49.00 150.00 146.40 180.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 5.00 500.00 1179.50 530.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 500.00 1179.50 530.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54.00 182.41 224.37 212.41 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 464 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 629-01005 Survey Monument (Ty 5) Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 51.00 150.00 191.40 270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 51.00 150.00 191.40 270.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 51.00 150.00 191.40 270.00 =============== 629-01006 Survey Monument (Ty 6) Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 29.00 200.00 349.03 65.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29.00 200.00 349.03 65.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 200.00 349.03 65.50 =============== 629-01011 Survey Monument (Ty 1A) Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 600.00 375.00 375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 600.00 375.00 375.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 600.00 375.00 375.00 =============== 629-01031 Survey Monument (Ty 3A) Each =================================================== ER0361-115 US 36 Bridges 06/22/17 1.00 600.00 882.50 895.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 600.00 882.50 895.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1.00 500.00 981.94 920.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 500.00 981.94 920.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 550.00 946.85 907.50 =============== 629-01065 Survey Monument (Ty 5S) Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 150.00 65.00 274.47 55.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 150.00 65.00 274.47 55.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 65.00 274.47 55.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 465 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 629-01110 Locate Monuments Hour =================================================== STA0362-035 US 36: Strasburg to Byers 03/23/17 6.00 250.00 241.48 286.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 250.00 241.48 286.25 NHPPC120-026 US 85: I-76 to 168th 05/04/17 8.00 100.01 238.92 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 100.01 238.92 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 164.29 240.02 202.68 =============== 629-01210 Adjust Monument Box Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 45.00 2000.00 291.22 247.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 32.00 1500.00 630.75 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 77.00 1792.21 456.46 248.25 STA006A-057 SH 6 EAST OF STERLING 04/06/17 1.00 241.00 709.05 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 241.00 709.05 800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 78.00 1772.32 458.37 255.32 =============== 630-00000 Flagging Hour =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 4,320.00 32.00 32.50 35.00 NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 720.00 26.00 21.49 21.00 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 6,000.00 25.00 31.19 25.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 400.00 22.00 30.72 26.43 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 2,700.00 24.00 26.26 21.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 6,500.00 35.00 22.86 18.50 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 8,000.00 25.00 24.63 23.50 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 7,600.00 25.00 27.10 25.00 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 200.00 25.00 23.50 18.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 3,100.00 30.00 23.12 22.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 466 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00000 Flagging Hour =================================================== IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 60.00 25.00 30.56 24.78 STA0931-032 SH 93 Erosion Correction 02/09/17 480.00 27.00 30.13 30.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 6,000.00 28.00 34.66 26.78 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 3,200.00 30.00 27.00 25.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 9,000.00 30.00 26.60 19.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 9,000.00 19.00 20.91 20.66 SHE160A-031 SH 160 Passing Lanes 03/02/17 2,840.00 26.00 28.75 23.89 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 2,800.00 30.00 27.40 25.00 MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 400.00 29.00 45.00 40.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 1,328.00 27.00 28.95 27.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 5,000.00 25.00 23.81 23.00 BR0252-449 I-25 Woodmen NB 03/02/17 600.00 25.00 30.75 30.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 8,940.00 32.00 22.15 23.24 STA2873-183 US 287 Repairs at LCR 17 03/09/17 100.00 25.00 28.67 26.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1,800.00 25.00 28.26 27.50 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 2,025.00 27.00 28.92 31.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 6,000.00 25.00 37.28 35.03 MTCER300-240 MTCE R3 FY 17/18 REGION WIDE 03/23/17 300.00 28.00 21.33 10.00 MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 80.00 27.00 25.00 10.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 1,000.00 30.00 29.90 38.50 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 1,200.00 24.91 32.00 30.00 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 620.00 28.00 21.63 26.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 3,636.00 28.45 39.85 42.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 105,949.00 27.28 27.34 25.21 STA006A-057 SH 6 EAST OF STERLING 04/06/17 3,000.00 26.00 24.74 24.50 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 2,400.00 25.00 28.90 28.90 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 1,250.00 25.00 27.78 25.20 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 5,760.00 25.00 23.06 22.17 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 900.00 30.00 28.04 25.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 2,000.00 25.00 29.70 29.60 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 5,000.00 25.00 24.78 24.26 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 1,600.00 26.00 24.63 23.31 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 1,000.00 27.00 24.67 26.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 750.00 30.00 23.25 26.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 80.00 26.00 37.35 30.06 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 7,000.00 22.00 23.00 23.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 100.00 30.00 35.50 40.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 1,440.00 25.00 30.44 23.75 NHPPC120-026 US 85: I-76 to 168th 05/04/17 500.00 27.00 24.17 26.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 80.00 60.00 33.50 45.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 45.00 30.00 26.67 30.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 4.00 50.00 42.99 30.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 200.00 25.00 23.39 22.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 467 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00000 Flagging Hour =================================================== STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 500.00 25.00 24.89 25.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 500.00 26.00 34.67 29.00 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 700.00 27.00 28.00 28.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 1,050.00 22.50 26.40 25.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 1,000.00 30.00 31.25 30.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 1,000.00 25.00 20.56 40.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 1,180.00 25.00 30.69 23.45 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 1,080.00 21.00 26.00 26.00 MTCER300-243 R3 FY18 REGION WIDE ROUNDABOU 06/22/17 320.00 25.00 20.33 25.00 ER0361-115 US 36 Bridges 06/22/17 2,400.00 30.00 27.72 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 42,839.00 25.25 25.82 25.57 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 400.00 28.00 26.16 23.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 4,000.00 25.00 23.80 23.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 60.00 25.00 18.50 22.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 150.00 28.00 31.00 32.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 300.00 30.00 23.86 23.86 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 2,300.00 24.00 26.33 25.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 20.00 26.00 20.35 20.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 800.00 28.00 29.67 25.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 40.00 30.00 28.15 35.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 5,000.00 28.00 23.48 27.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 320.00 27.00 39.33 30.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 300.00 27.00 25.27 36.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 400.00 30.00 36.00 30.00 MTCE131A-039 SH 131 MP 0.053-68.721 IN EAG 08/17/17 3,100.00 40.00 19.08 25.25 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 400.00 84.00 30.17 30.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 100.00 28.00 28.00 21.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 151,248.00 25.00 27.00 27.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 400.00 30.00 32.81 40.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 352.00 36.00 32.67 36.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 14.00 28.00 38.33 20.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 40.00 30.00 18.67 1.00 MTCE R500-193 R5 FY 18 Regionwide MTCE Crac 09/21/17 560.00 23.00 25.29 21.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 100.00 30.00 27.93 35.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 170,404.00 25.57 25.82 26.89 STA094A-034 Critical Culvert Project on S 10/05/17 40.00 30.00 26.76 25.00 MTCE0705-084 I-70 CRACK SEAL KANSAS STATE 10/05/17 1,200.00 22.00 30.00 29.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 468 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00000 Flagging Hour =================================================== C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 3,500.00 35.00 33.00 33.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 300.00 25.00 34.17 30.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 1,200.00 30.00 27.25 24.50 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 4,000.00 25.00 17.33 25.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 3,200.00 30.00 28.00 30.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 1,200.00 27.00 36.50 35.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 64.00 25.00 34.34 24.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 150.00 30.00 32.40 33.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 2,628.00 25.00 22.21 21.63 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 40.00 25.00 40.66 40.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 450.00 25.00 24.55 32.20 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 600.00 27.00 28.67 34.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 4,150.00 28.00 25.56 33.79 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 408.00 30.46 29.70 29.70 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 2,500.00 30.00 30.75 31.25 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 4,500.00 32.00 25.50 20.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 2,000.00 28.00 32.80 27.83 BR3852-018 POA SCOUR US 385 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 300.00 30.00 27.37 22.20 FSA0361-122 I-70 at Limon, US 40, US 287, 12/21/17 740.00 27.00 11.75 22.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 33,170.00 28.79 27.17 27.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 352,362.00 26.35 26.63 26.33 =============== 630-00001 Pilot Car Operation Hour =================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 180.00 50.00 38.06 45.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 1,500.00 60.00 37.37 35.70 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 850.00 60.00 36.23 33.60 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 800.00 60.00 61.59 66.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,330.00 59.46 44.22 42.99 STA006A-057 SH 6 EAST OF STERLING 04/06/17 400.00 54.00 56.01 60.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 300.00 55.00 66.67 50.00 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 150.00 50.00 35.00 35.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 300.00 45.00 46.00 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,150.00 51.39 57.61 50.48 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 60.00 50.00 67.45 53.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 469 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00001 Pilot Car Operation Hour =================================================== MTCE131A-039 SH 131 MP 0.053-68.721 IN EAG 08/17/17 640.00 60.00 48.67 66.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 21,000.00 45.00 48.00 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21,700.00 45.46 48.31 48.54 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 300.00 50.00 42.75 30.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 840.00 60.00 56.14 35.00 FSA0361-122 I-70 at Limon, US 40, US 287, 12/21/17 315.00 50.00 14.25 27.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,455.00 55.77 47.96 32.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27,635.00 47.93 47.66 47.10 =============== 630-00003 Uniformed Traf Ctrl Hour =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 2,000.00 70.00 120.79 97.50 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 400.00 70.00 89.02 87.00 STM0243-089 Midpoint: Station 1019+50 Cen STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 200.00 80.00 90.28 83.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 96.00 80.00 130.00 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,696.00 71.10 112.99 95.79 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 400.00 80.00 94.40 94.40 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 160.00 100.00 92.61 86.00 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 180.00 100.00 98.46 100.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 400.00 66.00 110.82 93.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 1,500.00 100.00 96.50 106.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 300.00 75.00 70.00 40.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 250.00 80.00 74.78 75.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 1,000.00 80.00 75.79 20.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 800.00 100.00 98.19 91.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,990.00 89.16 93.34 78.01 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 300.00 1000.00 64.80 64.80 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 500.00 100.00 101.50 88.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 470 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00003 Uniformed Traf Ctrl Hour =================================================== CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 240.00 1.00 102.31 75.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 400.00 100.00 95.77 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,440.00 271.00 95.66 73.22 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 16.00 100.00 188.50 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 100.00 188.50 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,142.00 112.49 99.87 82.42 =============== 630-00004 Traf Ctrl Vehicle Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 2.00 2000.00 7034.37 4300.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1.00 1500.00 3354.93 3300.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 2.00 1500.00 715.00 620.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 1700.00 3744.75 2628.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 1.00 5000.00 20000.00 20000.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 1.00 1500.00 8989.35 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 3250.00 12659.57 15000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 2142.86 5152.35 6162.86 =============== 630-00006 Uniformed Traf Ctrl (Vehicle) Hour =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 400.00 17.00 62.05 67.00 STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 400.00 17.00 62.05 67.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 250.00 15.00 20.47 20.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 800.00 20.00 23.00 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,050.00 18.81 22.52 20.76 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 471 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00006 Uniformed Traf Ctrl (Vehicle) Hour =================================================== CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 500.00 20.00 26.25 18.00 CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 240.00 1.00 26.61 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 740.00 13.84 26.37 18.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,190.00 16.80 31.46 24.62 =============== 630-00007 Traf Ctrl Inspection Day ==================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 72.00 500.00 522.50 375.00 NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 14.00 200.00 107.00 132.00 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 58.00 125.00 167.13 97.50 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 40.00 120.00 98.05 96.10 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 40.00 180.00 192.09 69.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 10.00 250.00 544.30 650.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 40.00 200.00 180.00 145.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 82.00 100.00 254.11 256.00 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 10.00 190.00 98.75 50.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 25.00 200.00 382.32 90.00 STA0931-032 SH 93 Erosion Correction 02/09/17 20.00 175.00 139.81 108.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 50.00 250.00 345.41 214.24 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 93.00 175.00 268.67 246.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 65.00 300.00 259.40 202.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 48.00 100.00 78.18 76.50 SHE160A-031 SH 160 Passing Lanes 03/02/17 78.00 205.00 239.25 88.89 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 65.00 200.00 146.00 195.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 42.00 800.00 202.00 187.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 58.00 200.00 123.80 125.00 BR0252-449 I-25 Woodmen NB 03/02/17 30.00 150.00 55.75 50.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 57.00 200.00 159.28 56.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 23.00 150.00 192.67 170.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 25.00 150.00 106.44 120.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 30.00 250.00 267.24 310.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 142.00 125.00 231.53 379.50 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 15.00 110.00 150.30 385.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 50.00 150.00 170.60 100.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 31.00 150.00 124.33 93.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 78.00 255.00 343.68 361.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,391.00 213.12 221.20 200.42 STA006A-057 SH 6 EAST OF STERLING 04/06/17 30.00 181.00 181.04 180.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 472 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00007 Traf Ctrl Inspection Day ==================================================== STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 40.00 150.00 58.90 58.90 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 32.00 150.00 79.68 101.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 58.00 200.00 256.23 258.70 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 24.00 200.00 137.18 100.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 45.00 150.00 170.09 116.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 220.00 200.00 172.17 66.21 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 140.00 180.00 166.62 262.50 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 70.00 200.00 159.67 218.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 20.00 350.00 336.59 379.78 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 35.00 200.00 175.00 175.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 80.00 150.00 212.50 100.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 52.00 200.00 248.75 225.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 100.00 150.00 158.55 200.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 20.00 150.00 142.50 100.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 18.00 175.00 140.33 120.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 1.00 300.00 233.25 175.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 60.00 150.00 232.50 210.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 68.00 185.00 213.90 250.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 10.00 200.00 283.33 150.00 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 15.00 150.00 150.00 150.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 12.00 110.00 193.40 140.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 30.00 300.00 176.00 165.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 50.00 175.00 364.00 200.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 30.00 200.00 128.40 112.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 14.00 130.00 135.00 135.00 ER0361-115 US 36 Bridges 06/22/17 80.00 200.00 266.67 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,354.00 184.01 188.41 165.42 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 12.00 200.00 302.98 340.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 30.00 120.00 144.00 130.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 10.00 190.00 130.00 210.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 8.00 175.00 272.50 430.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 50.00 175.00 169.61 169.61 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 45.00 250.00 163.33 160.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 21.00 175.00 171.63 165.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 12.00 400.00 330.00 190.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 10.00 250.00 164.46 95.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 100.00 200.00 240.15 203.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 20.00 175.00 320.00 200.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 20.00 290.00 159.43 65.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 94.00 156.20 222.00 300.00 MTCE131A-039 SH 131 MP 0.053-68.721 IN EAG 08/17/17 40.00 250.00 130.00 215.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 73.00 184.93 255.00 450.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 15.00 200.00 212.50 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 473 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00007 Traf Ctrl Inspection Day ==================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 88.00 252.53 420.00 420.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 100.00 175.00 138.65 103.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 10.00 250.00 337.00 441.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 30.00 200.00 126.33 1.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 48.00 200.00 210.30 198.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 836.00 201.65 203.21 233.69 MTCE0705-084 I-70 CRACK SEAL KANSAS STATE 10/05/17 16.00 200.00 270.00 270.00 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 43.00 400.00 250.25 88.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 5.00 185.00 421.17 500.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 35.00 150.00 246.00 92.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 51.00 250.00 111.00 164.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 42.00 250.00 199.75 150.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 25.00 250.00 257.50 150.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 8.00 250.00 269.02 700.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 57.00 185.00 123.45 149.35 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 5.00 250.00 235.36 320.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 12.00 250.00 163.33 175.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 68.00 250.00 375.91 369.55 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 68.00 564.10 550.00 550.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 50.00 200.00 170.42 281.25 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 30.00 300.00 291.97 195.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 50.00 225.00 435.62 200.34 BR3852-018 POA SCOUR US 385 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 47.00 250.00 179.00 100.00 FSA0361-122 I-70 at Limon, US 40, US 287, 12/21/17 16.00 150.00 33.00 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 628.00 274.89 265.76 236.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,209.00 210.69 211.34 201.09 =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 180.00 1350.00 978.75 1062.50 NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 30.00 800.00 733.31 797.00 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 145.00 650.00 862.29 615.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 100.00 1100.00 1465.42 780.84 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 100.00 730.00 1225.30 1400.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 75.00 1400.00 2990.00 1620.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 120.00 775.00 1015.75 1200.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 166.00 900.00 874.16 766.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 474 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 80.00 750.00 415.50 100.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 86.00 800.00 785.30 650.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 5.00 650.00 865.63 820.10 STA0931-032 SH 93 Erosion Correction 02/09/17 30.00 750.00 672.93 506.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 145.00 750.00 1016.05 803.40 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 200.00 850.00 1050.00 700.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 140.00 900.00 1056.60 923.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 120.00 600.00 696.94 688.50 SHE160A-031 SH 160 Passing Lanes 03/02/17 139.00 750.00 1139.93 1333.33 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 140.00 850.00 777.00 550.00 MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 145.00 945.00 1107.00 1325.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 83.00 1200.00 863.08 790.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 132.00 850.00 705.60 690.00 BR0252-449 I-25 Woodmen NB 03/02/17 75.00 625.00 893.75 800.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 135.00 800.00 954.00 812.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 45.00 800.00 1133.33 1100.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 90.00 650.00 711.63 780.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 60.00 920.00 748.25 870.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 185.00 650.00 1178.32 1055.00 MTCER300-240 MTCE R3 FY 17/18 REGION WIDE 03/23/17 110.00 200.00 450.00 100.00 MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 30.00 350.00 750.00 100.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 36.00 750.00 844.10 600.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 30.00 850.00 802.60 675.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 75.00 650.00 1031.67 775.00 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 120.00 300.00 297.50 540.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 101.00 765.00 1203.68 1204.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,453.00 801.29 942.00 846.05 STA006A-057 SH 6 EAST OF STERLING 04/06/17 70.00 725.00 892.19 900.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 85.00 750.00 589.00 589.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 80.00 850.00 692.64 860.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 120.00 800.00 873.71 871.12 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 55.00 900.00 922.12 600.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 70.00 750.00 1131.09 1390.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 300.00 800.00 630.43 524.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 80.00 890.00 613.13 840.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 160.00 1000.00 780.67 647.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 100.00 850.00 1309.50 1275.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 45.00 700.00 534.93 379.78 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 90.00 600.00 1000.00 1000.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 32.00 600.00 1050.00 1000.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 105.00 750.00 870.75 685.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 125.00 700.00 901.17 804.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 475 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 60.00 600.00 800.00 650.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 45.00 650.00 554.67 650.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 7.00 605.00 943.00 720.00 MPR200-235 FY 2018 PAVEMENT MARKING PROJ 06/01/17 5.00 300.00 383.33 50.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 150.00 850.00 572.32 530.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 35.00 750.00 678.60 650.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 20.00 700.00 1366.67 800.00 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 20.00 750.00 800.00 800.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 45.00 1025.00 808.40 1000.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 100.00 900.00 851.75 800.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 130.00 800.00 715.00 875.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 75.00 800.00 1051.40 642.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 30.00 800.00 750.00 750.00 MTCER300-243 R3 FY18 REGION WIDE ROUNDABOU 06/22/17 20.00 850.00 595.00 750.00 ER0361-115 US 36 Bridges 06/22/17 200.00 950.00 757.50 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,459.00 810.29 761.22 779.11 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 20.00 950.00 781.57 575.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 85.00 750.00 659.00 610.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 150.00 850.00 695.00 790.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 24.00 900.00 1124.00 925.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 110.00 700.00 974.67 974.67 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 160.00 750.00 760.00 500.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 105.00 850.00 844.63 890.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 35.00 1100.00 880.95 550.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 250.00 850.00 740.93 930.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 200.00 750.00 744.61 747.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 41.00 750.00 1101.67 775.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 50.00 720.00 944.85 630.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 27.00 495.00 900.00 1200.00 MTCE131A-039 SH 131 MP 0.053-68.721 IN EAG 08/17/17 60.00 750.00 818.33 1155.00 CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 12.00 1.00 977.49 1200.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 33.00 745.76 850.00 800.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 12.00 950.00 1550.00 1500.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 220.00 2727.27 1710.00 1710.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 210.00 700.00 482.77 206.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 25.00 1200.00 664.00 582.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 120.00 600.00 300.00 100.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 12.00 850.00 1110.67 755.00 MTCE R500-193 R5 FY 18 Regionwide MTCE Crac 09/21/17 28.00 1440.00 881.00 722.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 120.00 900.00 630.75 686.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,109.00 989.93 706.08 790.57 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 476 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== STA094A-034 Critical Culvert Project on S 10/05/17 42.00 950.00 485.84 450.00 MTCE0705-084 I-70 CRACK SEAL KANSAS STATE 10/05/17 40.00 725.00 711.00 688.00 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 109.00 1200.00 1085.00 1070.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 100.00 775.00 1140.33 1200.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 70.00 850.00 490.00 480.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 129.00 750.00 592.00 875.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 100.00 750.00 956.88 900.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 40.00 750.00 850.00 900.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 8.00 750.00 805.47 800.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 93.00 750.00 1024.45 973.35 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 110.00 500.00 939.52 700.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 50.00 650.00 620.25 725.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 30.00 750.00 641.67 730.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 90.00 750.00 1111.17 1055.86 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 51.00 795.39 775.50 775.50 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 70.00 900.00 1152.08 1056.25 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 70.00 900.00 935.13 845.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 100.00 900.00 1032.49 1412.40 BR3852-018 POA SCOUR US 385 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 90.00 750.00 459.83 400.00 FSA0361-122 I-70 at Limon, US 40, US 287, 12/21/17 42.00 750.00 50.50 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,434.00 800.05 869.18 862.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,455.00 845.52 822.33 818.50 =============== 630-00015 Uniformed Traf Ctrl Coordination Hour =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 106.00 7.00 46.30 46.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 10.00 12.00 119.33 246.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 16.00 80.00 144.77 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 132.00 16.23 63.77 71.94 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 40.00 50.00 138.50 160.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 25.00 10.00 29.30 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 65.00 34.62 103.65 99.23 MTCE0705-084 I-70 CRACK SEAL KANSAS STATE 10/05/17 10.00 40.00 146.00 138.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 477 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00015 Uniformed Traf Ctrl Coordination Hour =================================================== NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 40.00 40.00 114.00 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 40.00 118.17 111.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 247.00 25.88 89.19 87.15 =============== 630-00016 Traffic Control (Special) LS LUMP SUM =============================================== CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 1.00 10250.00 5000.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 10250.00 5000.00 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10250.00 5000.00 5000.00 =============== 630-00017 Traffic Control Management (Special) Day ==================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 222.00 2700.00 3415.00 3415.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 222.00 2700.00 3415.00 3415.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 222.00 2700.00 3415.00 3415.00 =============== 630-00040 Develop Traf Incident Mgmt Plan LUMP SUM =============================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 1.00 4000.00 15871.37 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 4000.00 15871.37 1100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 4000.00 15871.37 1100.00 =============== 630-00041 Implement Traf Incident Mgmt Plan Month ================================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 3.00 3000.00 3010.20 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 3000.00 3010.20 1100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 3000.00 3010.20 1100.00 =============== 630-80001 Flash Beacon (Port) Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 12.00 575.00 863.75 937.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 478 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80001 Flash Beacon (Port) Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 12.00 1000.00 1087.92 1130.00 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 2.00 650.00 1335.42 1200.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 12.00 1000.00 1274.16 1225.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 8.00 1200.00 784.21 850.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 6.00 775.00 1190.92 1339.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 2.00 1000.00 1853.33 2460.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 4.00 500.00 1417.20 516.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 2.00 750.00 2059.46 1475.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 2.00 1015.00 1374.47 1445.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 62.00 870.65 1139.10 1111.04 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 4.00 900.00 236.00 236.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 6.00 1000.00 343.78 600.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 8.00 800.00 701.72 475.15 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 4.00 1000.00 422.14 250.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 24.00 750.00 617.18 551.73 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 12.00 1000.00 608.75 600.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 4.00 700.00 665.19 700.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 10.00 700.00 297.38 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 72.00 830.56 570.14 490.79 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 6.00 900.00 2343.91 2343.91 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 12.00 800.00 1052.41 1133.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 6.00 800.00 1085.92 880.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 12.00 575.00 646.67 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 36.00 741.67 1028.26 1181.65 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 12.00 750.00 625.00 515.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 4.00 775.00 469.38 791.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 756.25 569.42 584.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 186.00 820.32 811.01 830.23 =============== 630-80002 Flash Beacon (Solar) Each =================================================== NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 8.00 1000.00 1128.00 280.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 479 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80002 Flash Beacon (Solar) Each =================================================== STA2873-183 US 287 Repairs at LCR 17 03/09/17 2.00 700.00 590.00 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 940.00 1057.83 314.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 40.00 725.00 267.60 157.50 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 4.00 400.00 206.67 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 44.00 695.45 264.15 179.55 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 4.00 450.00 1394.40 1600.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 450.00 1394.40 1600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 58.00 720.69 549.71 300.69 =============== 630-80305 Flagging Station Light Each =================================================== STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 2.00 500.00 903.40 2122.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 500.00 903.40 2122.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 500.00 903.40 2122.00 =============== 630-80335 Barricade (3 M-A) (Temp) Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 20.00 140.00 114.33 51.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 4.00 125.00 352.26 482.04 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 2.00 100.00 263.00 369.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 4.00 175.00 275.00 165.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 5.00 250.00 231.27 215.00 BR0252-449 I-25 Woodmen NB 03/02/17 6.00 110.00 91.25 80.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 4.00 100.00 55.91 55.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 16.00 110.00 159.34 291.98 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 2.00 200.00 199.45 315.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 4.00 100.00 88.10 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 67.00 135.37 156.38 173.48 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 480 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80335 Barricade (3 M-A) (Temp) Each =================================================== STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 8.00 100.00 118.00 118.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 18.00 100.00 64.18 70.00 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 3.00 120.00 100.36 50.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 4.00 150.00 189.95 69.70 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 6.00 175.00 168.58 165.52 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 8.00 110.00 116.00 120.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 8.00 100.00 58.75 65.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 6.00 120.00 98.67 100.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 16.00 165.00 283.50 360.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 2.00 165.00 263.40 250.00 ER0361-115 US 36 Bridges 06/22/17 5.00 150.00 182.08 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 84.00 127.74 165.60 149.30 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 6.00 300.00 104.00 100.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 3.00 220.00 115.00 210.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 8.00 110.00 229.44 229.44 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 3.00 150.00 183.33 160.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 3.00 180.00 109.72 50.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 2.00 175.00 134.92 55.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 4.00 181.00 232.50 165.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 20.00 252.53 263.00 263.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 5.00 125.00 481.41 821.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 54.00 205.18 274.73 256.12 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 8.00 100.00 346.00 92.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 4.00 110.00 313.02 125.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 9.00 165.00 139.83 154.50 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 1.00 125.00 213.31 369.55 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 3.00 169.24 165.00 165.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 2.00 200.00 150.42 231.25 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 6.00 230.00 77.00 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 33.00 155.69 184.14 135.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 238.00 151.33 185.89 178.39 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 481 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80336 Barricade (3 M-B) (Temp) Each =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 4.00 270.00 222.63 180.25 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 16.00 175.00 500.36 511.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 3.00 500.00 406.00 155.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 23.00 233.91 454.32 351.60 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 4.00 200.00 380.00 380.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 6.00 100.00 289.38 270.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 6.00 300.00 178.50 165.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 6.00 220.00 161.00 280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 22.00 205.45 214.38 264.09 NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 2.00 500.00 162.33 177.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 500.00 162.33 177.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 12.00 175.00 223.00 330.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 3.00 300.00 150.42 231.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 200.00 208.48 310.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 62.00 224.19 301.07 298.00 =============== 630-80337 Barricade (3 M-C) (Temp) Each =================================================== BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 4.00 50.00 217.09 215.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 50.00 217.09 215.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 1.00 300.00 150.42 231.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 300.00 150.42 231.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 100.00 213.46 218.25 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 482 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80338 Barricade (3 M-D) (Temp) Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 10.00 330.00 503.25 500.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 3.00 350.00 692.22 640.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 4.00 250.00 439.10 260.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 8.00 500.00 378.99 415.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 374.00 461.48 451.20 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 40.00 365.00 79.32 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 365.00 79.32 105.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 2.00 450.00 332.50 615.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 450.00 332.50 615.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 67.00 370.90 215.64 249.40 =============== 630-80341 Const Traf Sign (A) Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 26.00 45.00 12.25 12.50 NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 96.00 60.00 41.13 52.00 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 90.00 45.00 39.70 20.50 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 249.00 45.00 52.54 60.07 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 18.00 35.00 31.89 6.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 68.00 80.00 27.88 21.50 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 156.00 50.00 63.39 80.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 120.00 45.00 64.64 57.00 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 12.00 45.00 20.00 10.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 34.00 50.00 39.24 50.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 20.00 50.00 71.13 64.90 STA0931-032 SH 93 Erosion Correction 02/09/17 8.00 50.00 42.98 90.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 20.00 45.00 81.95 80.34 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 45.00 60.00 75.20 67.60 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 36.00 35.00 55.50 11.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 14.00 20.00 37.37 35.70 SHE160A-031 SH 160 Passing Lanes 03/02/17 30.00 40.00 90.35 12.22 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 6.00 50.00 66.40 65.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 483 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80341 Const Traf Sign (A) Each =================================================== MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 36.00 95.00 15.90 25.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 58.00 45.00 52.25 49.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 188.00 50.00 64.62 61.00 BR0252-449 I-25 Woodmen NB 03/02/17 12.00 45.00 93.75 80.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 7.00 45.00 6.16 7.17 STA2873-183 US 287 Repairs at LCR 17 03/09/17 6.00 45.00 72.33 50.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 19.00 52.00 27.82 27.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 53.00 55.00 66.74 67.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 55.00 57.00 87.57 70.08 MTCER300-240 MTCE R3 FY 17/18 REGION WIDE 03/23/17 21.00 30.00 40.00 10.00 MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 22.00 50.00 25.00 10.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 17.00 50.00 37.80 54.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 2.00 57.00 27.50 20.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 20.00 60.00 17.00 25.00 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 14.00 20.00 6.00 5.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 38.00 61.00 73.50 78.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,616.00 50.63 55.16 50.84 STA006A-057 SH 6 EAST OF STERLING 04/06/17 30.00 56.00 73.42 74.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 42.00 60.00 29.40 29.40 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 76.00 55.00 39.59 50.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 4.00 50.00 24.21 21.12 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 6.00 50.00 59.16 25.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 16.00 50.00 70.20 69.70 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 22.00 55.00 52.39 55.17 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 108.00 55.00 46.22 31.50 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 108.00 40.00 22.00 30.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 52.00 50.00 50.50 52.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 15.00 50.00 36.36 28.09 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 134.00 45.00 43.00 43.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 18.00 50.00 57.50 5.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 14.00 40.00 70.25 27.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 64.00 57.00 67.02 50.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 2.00 60.00 79.45 1.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 6.00 90.00 23.50 5.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 12.00 50.00 50.33 50.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 13.00 40.00 85.80 55.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 45.00 55.00 63.56 59.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 51.00 45.00 65.25 65.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 62.00 40.00 22.00 40.00 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 48.00 45.00 50.00 50.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 32.00 45.00 56.00 55.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 22.00 40.00 36.16 35.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 14.00 50.00 282.50 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 484 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80341 Const Traf Sign (A) Each =================================================== STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 36.00 40.00 76.60 62.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 88.00 52.00 32.00 32.00 MTCER300-243 R3 FY18 REGION WIDE ROUNDABOU 06/22/17 8.00 25.00 11.67 10.00 ER0361-115 US 36 Bridges 06/22/17 55.00 50.00 79.71 91.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,203.00 48.89 53.42 44.90 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 7.00 50.00 99.22 120.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 96.00 45.00 7.30 10.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 12.00 45.00 35.00 60.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 13.00 75.00 49.50 49.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 74.00 50.00 62.80 62.80 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 24.00 45.00 44.00 37.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 8.00 52.00 27.88 27.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 2.00 90.00 111.67 60.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 4.00 55.00 57.90 72.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 68.00 40.00 71.85 77.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 5.00 40.00 75.00 35.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 36.00 21.00 50.67 48.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 6.00 33.00 56.95 70.00 MTCE131A-039 SH 131 MP 0.053-68.721 IN EAG 08/17/17 44.00 45.00 57.67 22.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 26.00 50.38 20.83 50.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 34.00 60.00 72.50 30.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 508.00 70.71 74.00 74.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 270.00 50.00 52.98 11.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 12.00 55.00 165.00 235.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 8.00 60.00 10.00 10.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 10.00 55.00 33.33 15.00 MTCE R500-193 R5 FY 18 Regionwide MTCE Crac 09/21/17 18.00 36.00 31.50 65.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 14.00 55.00 79.20 136.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,299.00 56.59 54.65 51.46 STA094A-034 Critical Culvert Project on S 10/05/17 8.00 75.00 27.62 25.00 MTCE0705-084 I-70 CRACK SEAL KANSAS STATE 10/05/17 22.00 40.00 44.00 44.00 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 24.00 50.00 51.00 25.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 8.00 50.00 64.00 5.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 91.00 55.00 88.50 92.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 126.00 45.00 34.00 50.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 2.00 55.00 80.75 90.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 44.00 45.00 43.75 35.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 485 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80341 Const Traf Sign (A) Each =================================================== NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 2.00 56.00 80.39 35.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 12.00 55.00 111.48 125.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 20.00 45.00 9.07 10.30 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 8.00 45.00 74.68 89.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 12.00 45.00 40.50 40.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 16.00 50.00 81.67 95.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 8.00 45.00 79.49 84.47 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 19.00 75.00 96.25 68.75 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 7.00 45.00 51.14 30.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 64.00 55.00 51.70 61.22 BR3852-018 POA SCOUR US 385 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 54.00 55.00 35.83 25.00 FSA0361-122 I-70 at Limon, US 40, US 287, 12/21/17 69.00 50.00 36.25 22.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 616.00 50.74 50.53 51.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,734.00 51.84 54.04 49.57 =============== 630-80342 Const Traf Sign (B) Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 48.00 60.00 25.00 25.00 NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 29.00 65.00 48.63 52.00 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 188.00 80.00 85.11 30.75 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 10.00 40.00 50.05 60.10 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 80.00 40.00 42.40 6.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 20.00 100.00 62.38 65.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 77.00 60.00 84.38 110.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 200.00 60.00 69.90 62.00 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 22.00 55.00 23.25 10.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 16.00 60.00 46.50 50.00 STA0931-032 SH 93 Erosion Correction 02/09/17 21.00 65.00 51.19 102.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 60.00 65.00 98.82 85.70 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 46.00 70.00 190.67 252.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 103.00 45.00 97.80 21.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 136.00 30.00 37.37 35.70 SHE160A-031 SH 160 Passing Lanes 03/02/17 38.00 90.00 96.60 12.22 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 12.00 65.00 75.40 110.00 MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 72.00 95.00 21.50 20.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 75.00 55.00 57.97 54.20 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 125.00 55.00 85.64 81.00 BR0252-449 I-25 Woodmen NB 03/02/17 20.00 60.00 95.00 80.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 77.00 55.00 5.84 6.72 STA2873-183 US 287 Repairs at LCR 17 03/09/17 61.00 55.00 101.00 90.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 48.00 55.00 54.33 55.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 74.00 65.00 177.62 72.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 486 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80342 Const Traf Sign (B) Each =================================================== STA0362-035 US 36: Strasburg to Byers 03/23/17 38.00 65.00 87.32 75.92 MTCER300-240 MTCE R3 FY 17/18 REGION WIDE 03/23/17 15.00 40.00 40.00 10.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 2.00 60.00 39.40 62.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 38.00 65.00 49.15 40.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 20.00 62.00 32.33 50.00 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 32.00 30.00 8.25 5.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 75.00 66.00 79.26 84.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,878.00 59.90 74.41 54.90 STA006A-057 SH 6 EAST OF STERLING 04/06/17 140.00 62.00 98.42 98.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 54.00 62.00 88.30 88.30 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 17.00 70.00 39.59 50.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 64.00 60.00 34.73 31.68 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 36.00 70.00 67.61 40.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 48.00 55.00 143.51 69.70 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 98.00 65.00 79.35 82.76 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 162.00 62.00 62.37 31.50 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 24.00 50.00 68.00 48.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 28.00 65.00 72.50 75.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 8.00 60.00 41.36 28.09 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 45.00 55.00 59.00 59.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 16.00 60.00 62.50 5.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 22.00 60.00 100.38 32.50 NHPPC120-026 US 85: I-76 to 168th 05/04/17 108.00 62.00 108.63 100.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 52.00 65.00 79.45 1.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 30.00 72.00 34.00 5.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 38.00 70.00 109.00 60.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 13.00 50.00 100.80 85.00 MPR200-235 FY 2018 PAVEMENT MARKING PROJ 06/01/17 12.00 20.00 21.67 5.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 93.00 75.00 238.94 220.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 12.00 65.00 160.25 240.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 104.00 50.00 32.00 60.00 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 90.00 50.00 55.00 55.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 4.00 55.00 58.00 55.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 72.00 50.00 36.16 35.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 26.00 60.00 282.50 10.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 14.00 50.00 114.80 229.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 29.00 52.00 42.00 42.00 MTCER300-243 R3 FY18 REGION WIDE ROUNDABOU 06/22/17 18.00 25.00 11.67 10.00 ER0361-115 US 36 Bridges 06/22/17 21.00 55.00 79.88 92.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,498.00 59.63 86.15 69.96 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 31.00 60.00 36.85 12.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 487 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80342 Const Traf Sign (B) Each =================================================== NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 4.00 55.00 37.80 50.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 24.00 60.00 112.50 215.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 42.00 95.00 60.00 55.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 14.00 70.00 114.99 114.99 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 35.00 55.00 47.33 42.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 52.00 69.00 39.13 38.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 29.00 65.00 136.67 110.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 30.00 70.00 113.28 72.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 12.00 50.00 63.44 39.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 21.00 50.00 87.00 40.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 11.00 32.00 94.24 48.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 36.00 50.60 139.66 92.00 MTCE131A-039 SH 131 MP 0.053-68.721 IN EAG 08/17/17 70.00 50.00 56.33 18.00 CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 22.00 1.00 37.59 50.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 62.00 66.94 24.17 60.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 82.00 70.00 107.50 40.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 129.00 80.81 84.00 84.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 30.00 65.00 136.65 154.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 8.00 65.00 247.67 353.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 20.00 70.00 13.33 10.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 12.00 90.00 99.00 25.00 MTCE R500-193 R5 FY 18 Regionwide MTCE Crac 09/21/17 34.00 36.00 39.00 65.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 14.00 95.00 103.35 211.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 824.00 64.50 77.54 69.05 STA094A-034 Critical Culvert Project on S 10/05/17 16.00 100.00 29.83 25.00 MTCE0705-084 I-70 CRACK SEAL KANSAS STATE 10/05/17 38.00 50.00 54.67 55.00 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 74.00 60.00 53.75 25.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 26.00 60.00 84.83 5.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 33.00 80.00 88.50 92.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 44.00 55.00 37.33 55.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 37.00 65.00 84.61 90.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 86.00 50.00 47.75 40.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 2.00 60.00 91.22 45.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 96.00 95.00 212.00 125.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 35.00 65.00 14.82 15.45 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 20.00 45.00 79.68 89.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 22.00 45.00 48.50 42.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 4.00 60.00 123.33 145.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 60.00 55.00 81.61 95.03 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 62.00 22.56 22.00 22.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 47.00 250.00 152.50 237.50 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 66.00 55.00 54.89 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 488 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80342 Const Traf Sign (B) Each =================================================== ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 52.00 65.00 80.22 76.80 BR3852-018 POA SCOUR US 385 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 7.00 80.00 36.33 25.00 FSA0361-122 I-70 at Limon, US 40, US 287, 12/21/17 16.00 50.00 40.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 843.00 70.85 87.53 68.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,043.00 62.40 80.70 64.07 =============== 630-80343 Const Traf Sign (C) Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 8.00 75.00 36.25 37.50 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 16.00 70.00 71.40 41.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 31.00 70.00 92.50 125.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 16.00 75.00 75.31 67.00 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 24.00 65.00 30.00 10.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 65.00 65.00 94.60 91.05 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 4.00 70.00 190.67 252.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 8.00 55.00 100.85 21.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 4.00 70.00 75.40 110.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 25.00 65.00 63.74 59.50 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 8.00 70.00 116.00 111.50 BR0252-449 I-25 Woodmen NB 03/02/17 24.00 75.00 96.25 80.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 8.00 65.00 58.47 61.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 8.00 75.00 180.00 83.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 24.00 60.00 89.26 81.76 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 10.00 62.00 61.50 50.00 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 8.00 40.00 8.25 5.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 24.00 71.00 85.03 90.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 315.00 66.87 82.90 75.77 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 17.00 75.00 70.89 45.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 8.00 60.00 143.51 69.70 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 8.00 67.00 74.02 57.75 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 8.00 70.00 74.75 64.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2.00 65.00 65.00 65.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 8.00 75.00 77.50 15.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 4.00 70.00 120.50 38.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 13.00 62.00 132.08 1.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 12.00 70.00 237.69 220.00 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 8.00 55.00 60.00 60.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 489 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80343 Const Traf Sign (C) Each =================================================== NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 4.00 40.00 61.00 55.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 6.00 60.00 36.16 35.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 6.00 65.00 282.50 10.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 2.00 65.00 114.80 229.00 ER0361-115 US 36 Bridges 06/22/17 8.00 65.00 85.13 93.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 114.00 65.85 103.40 66.00 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 40.00 65.00 36.49 12.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 4.00 80.00 112.50 215.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 14.00 75.00 132.47 72.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 8.00 66.00 127.53 80.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 26.00 80.00 25.83 65.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 12.00 80.00 132.50 50.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 20.00 80.00 13.33 10.00 MTCE R500-193 R5 FY 18 Regionwide MTCE Crac 09/21/17 8.00 36.00 40.00 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 132.00 71.41 49.43 45.44 STA094A-034 Critical Culvert Project on S 10/05/17 4.00 150.00 29.83 25.00 MTCE0705-084 I-70 CRACK SEAL KANSAS STATE 10/05/17 20.00 60.00 67.00 66.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 12.00 70.00 92.33 5.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 8.00 65.00 41.00 60.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 8.00 55.00 54.75 45.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 14.00 90.00 222.00 125.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 95.00 75.00 14.82 15.45 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 8.00 45.00 86.68 89.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 8.00 45.00 48.50 42.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 48.00 65.00 83.72 105.59 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 28.00 22.56 22.00 22.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 8.00 400.00 154.58 243.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 261.00 75.31 67.85 54.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 822.00 70.14 74.27 62.66 =============== 630-80344 Const Traf Sign (Spec) Sq Foot ================================================ NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 60.00 22.00 25.00 25.00 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 120.00 22.00 17.85 15.25 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 490 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80344 Const Traf Sign (Spec) Sq Foot ================================================ STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 473.00 25.00 19.13 15.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 96.00 30.00 34.01 26.78 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 55.00 25.00 22.33 11.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 77.50 25.00 23.68 23.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 100.00 24.00 15.25 14.25 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 64.00 25.00 14.25 16.80 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 64.00 30.00 9.62 11.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 168.00 35.00 23.78 23.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 170.50 80.00 22.05 19.50 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 100.00 25.00 12.00 13.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 192.00 20.50 28.34 30.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,740.00 30.95 20.95 18.88 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 165.00 25.00 15.92 13.24 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 300.00 23.00 12.47 12.60 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 320.00 5.00 21.00 18.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 216.00 20.00 27.00 27.00 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 32.00 25.00 30.00 30.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 10.00 20.00 155.50 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,043.00 17.21 17.06 19.67 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 52.50 16.00 18.30 20.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 50.00 28.00 27.00 17.00 MTCE131A-039 SH 131 MP 0.053-68.721 IN EAG 08/17/17 32.00 27.00 14.33 22.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1,279.00 1.23 15.00 15.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 40.00 25.00 30.65 52.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,453.50 3.91 19.26 16.42 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 112.00 20.00 15.17 22.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 64.00 25.00 33.20 35.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 64.00 25.00 26.25 21.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 2.00 25.00 57.12 150.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 142.00 96.00 25.34 31.68 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 119.00 22.56 22.00 22.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 286.50 30.00 29.08 31.25 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 491 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80344 Const Traf Sign (Spec) Sq Foot ================================================ STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 64.00 25.00 20.38 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 853.50 37.49 26.24 27.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,090.00 21.51 20.60 19.77 =============== 630-80348 Const Info Sign Each =================================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 2.00 500.00 235.79 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 500.00 235.79 500.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 4.00 150.00 605.00 1000.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 4.00 150.00 36.16 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 150.00 225.78 517.50 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 6.00 380.00 76.33 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 380.00 76.33 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 280.00 180.24 377.50 =============== 630-80350 Vert Panel Each =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 100.00 25.00 27.52 30.03 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 40.00 40.00 27.06 25.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 25.00 45.00 43.33 43.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 30.00 15.00 25.84 25.50 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 50.00 20.00 30.96 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 245.00 27.24 29.49 26.91 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 20.00 30.00 13.85 10.56 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 50.00 25.00 50.50 52.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 492 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80350 Vert Panel Each =================================================== NHPPC120-026 US 85: I-76 to 168th 05/04/17 100.00 45.00 24.38 20.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 12.00 30.00 22.50 12.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 50.00 30.00 39.40 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 232.00 35.39 33.85 29.98 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 25.00 36.00 40.00 40.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 50.00 31.00 41.25 22.00 NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 20.00 30.00 21.00 12.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 100.00 30.00 27.48 60.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 195.00 31.03 30.10 43.15 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 40.00 70.00 17.25 18.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 200.00 30.00 51.48 50.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 30.00 45.00 19.31 12.00 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 200.00 5.64 5.50 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 470.00 24.00 40.20 25.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,142.00 28.21 34.42 29.90 =============== 630-80351 Vert Panel (Plastic) Each =================================================== ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 50.00 40.00 39.18 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 40.00 39.18 36.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 50.00 30.00 17.92 15.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 25.00 45.00 34.52 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 75.00 35.00 22.80 18.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 125.00 37.00 28.87 25.40 =============== 630-80355 Port Mesg Panel Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 8.00 3500.00 5749.75 3580.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 493 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80355 Port Mesg Panel Each =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 3.00 4250.00 3326.33 2402.66 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 2.00 5500.00 7914.42 9000.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 4.00 5000.00 10959.73 12950.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 4.00 4500.00 5167.00 6000.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 8.00 7500.00 5135.57 4600.00 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 2.00 5300.00 3221.25 2000.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 4.00 9000.00 2771.71 4250.00 STA0931-032 SH 93 Erosion Correction 02/09/17 2.00 3000.00 2836.67 3420.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 3.00 4000.00 8560.66 8033.97 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 4.00 5500.00 9360.00 5700.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 6.00 5000.00 6535.15 11111.11 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 2.00 6000.00 4844.00 5000.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 2.00 3600.00 4035.17 3725.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 2.00 4500.00 6012.00 5100.00 BR0252-449 I-25 Woodmen NB 03/02/17 4.00 7500.00 3475.00 3000.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 2.00 5300.00 5602.00 13776.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 4.00 3500.00 3559.33 3300.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 8.00 4000.00 4191.67 3600.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 2.00 6000.00 6607.64 4800.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 4.00 5000.00 7467.47 8760.00 MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 2.00 4000.00 1083.33 100.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 2.00 5000.00 3224.20 4285.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 2.00 5000.00 3337.20 2500.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 6.00 5600.00 6736.49 7227.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 92.00 5160.33 5412.27 5686.71 STA006A-057 SH 6 EAST OF STERLING 04/06/17 4.00 4500.00 3414.73 3500.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 4.00 5000.00 4710.00 4710.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 2.00 5000.00 3667.31 5000.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 3.00 5000.00 5475.52 4751.55 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 2.00 5000.00 2899.48 2000.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 4.00 6000.00 10634.61 11034.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 2.00 5600.00 4151.62 2100.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 6.00 4500.00 5706.25 6000.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 2.00 3600.00 2687.27 561.80 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 3.00 5000.00 4000.00 4000.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 4.00 3500.00 4000.00 300.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 2.00 3500.00 8752.50 8500.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 6.00 5000.00 6664.44 5000.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 4.00 4500.00 3052.50 1000.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 2.00 4500.00 2138.33 1700.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 2.00 5000.00 7118.00 6800.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 2.00 2250.00 1833.33 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 494 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80355 Port Mesg Panel Each =================================================== MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 4.00 4000.00 305.50 500.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 2.00 4000.00 5236.80 7034.00 ER0361-115 US 36 Bridges 06/22/17 8.00 3500.00 6915.83 9200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 68.00 4439.71 6113.48 4726.80 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 2.00 3000.00 1147.07 600.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 2.00 3750.00 3270.00 1540.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 2.00 5000.00 16541.00 16541.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 4.00 2000.00 4600.00 5800.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 2.00 5000.00 16818.98 20397.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 2.00 4000.00 5033.33 5000.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 6.00 5833.33 2350.00 3250.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 8.00 5300.00 2500.00 1500.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 15.00 6000.00 6300.00 6300.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 5.00 5000.00 5562.43 411.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 2.00 4500.00 2754.33 2938.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 2.00 5000.00 2465.00 2725.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 2.00 5000.00 5553.75 4860.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 54.00 5016.67 5925.43 4823.28 MTCE0705-084 I-70 CRACK SEAL KANSAS STATE 10/05/17 2.00 2000.00 3943.33 3850.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 4.00 5000.00 2582.00 3825.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 2.00 5000.00 5685.63 4000.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 8.00 5000.00 16649.80 12000.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 4.00 5000.00 7060.00 6180.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 2.00 4000.00 2533.33 2600.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 2.00 4000.00 4564.69 4223.46 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 4.00 5000.00 5063.33 6250.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 6.00 5700.00 5887.14 5565.00 BR3852-018 POA SCOUR US 385 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 3.00 7500.00 3476.50 1300.00 FSA0361-122 I-70 at Limon, US 40, US 287, 12/21/17 2.00 3000.00 2037.50 1875.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 39.00 4941.03 7505.17 5933.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 253.00 4902.17 6059.39 5275.97 =============== 630-80356 Flash Arrow Panel (A Ty) Each =================================================== MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 2.00 600.00 205.50 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 600.00 205.50 300.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 495 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80356 Flash Arrow Panel (A Ty) Each =================================================== SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 2.00 300.00 1321.82 2341.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 300.00 1321.82 2341.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 450.00 1002.87 1320.68 =============== 630-80357 Flash Arrow Panel (B Ty) Each =================================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 4.00 1000.00 644.35 540.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 4.00 950.00 1010.08 510.00 MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 4.00 2250.00 772.00 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 1400.00 802.12 441.67 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 2.00 2000.00 971.92 1010.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 4.00 1500.00 898.33 300.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 2.00 600.00 780.00 300.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 1.00 1500.00 869.40 1117.00 ER0361-115 US 36 Bridges 06/22/17 4.00 2000.00 1163.33 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 1592.31 1021.52 749.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 2.00 1500.00 565.00 530.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 2.00 1500.00 1131.14 1131.14 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 1000.00 1316.67 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 1400.00 790.82 1064.46 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 3.00 1500.00 982.50 465.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 5.00 1200.00 627.00 930.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 2.00 2000.00 1504.17 2312.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 1450.00 900.93 1067.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 1475.00 900.26 775.73 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 496 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 2.00 1500.00 2018.75 2187.50 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 8.00 2000.00 1997.91 1230.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 2.00 1600.00 1101.75 1000.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 4.00 1200.00 1669.14 1531.00 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 2.00 1600.00 1223.75 500.00 STA0931-032 SH 93 Erosion Correction 02/09/17 2.00 1200.00 1584.39 1920.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 2.00 1500.00 2223.07 1981.71 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 4.00 2000.00 4306.67 4920.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 3500.00 2100.00 1600.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 2.00 2500.00 1587.46 1111.11 NHPP 0701-230 Midpoint WB Bore 03/02/17 2.00 2500.00 1735.50 1615.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 2.00 1500.00 1497.00 1550.00 BR0252-449 I-25 Woodmen NB 03/02/17 4.00 1500.00 912.50 800.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 2.00 1350.00 1066.67 900.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 2.00 1200.00 1000.45 1150.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 6.00 15000.00 1855.40 1755.00 MTCER300-240 MTCE R3 FY 17/18 REGION WIDE 03/23/17 2.00 1200.00 916.67 100.00 MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 2.00 1000.00 366.67 100.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 2.00 1250.00 796.60 750.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 2.00 1500.00 853.33 1115.00 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 2.00 1200.00 737.50 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 58.00 3051.72 1602.32 1501.30 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 2.00 1500.00 1770.00 1770.00 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 1.00 1500.00 920.54 300.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 2.00 1500.00 1456.49 1160.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 4.00 2000.00 2226.80 1986.24 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 4.00 1500.00 626.29 105.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 4.00 1250.00 742.50 720.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 3.00 1500.00 800.00 800.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 2.00 1500.00 800.00 500.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 4.00 1300.00 1137.44 500.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 2.00 1500.00 1835.00 250.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 2.00 1300.00 609.67 600.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 2.00 1500.00 1776.28 1600.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 2.00 1800.00 894.75 825.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 34.00 1511.76 1396.90 863.38 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 1.00 1500.00 4601.84 6500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 497 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 2.00 1500.00 1720.00 2940.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 2.00 1300.00 825.00 800.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 2.00 1300.00 1680.70 830.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 1.00 1200.00 576.25 520.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 4.00 1455.00 850.00 300.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 2.00 1300.00 826.67 625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 1380.00 1952.68 1329.29 MTCE0705-084 I-70 CRACK SEAL KANSAS STATE 10/05/17 2.00 1500.00 1673.33 1650.00 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 2.00 5000.00 2225.00 600.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 2.00 1500.00 3025.83 4000.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 1.00 2000.00 1252.50 2500.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 6.00 1300.00 4477.80 2250.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 2.00 1600.00 3373.33 4120.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 1.00 1000.00 2199.56 3000.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 1.00 1500.00 755.00 950.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 2.00 1500.00 2187.93 2639.66 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 2.00 846.15 825.00 825.00 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 2.00 1500.00 688.67 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 23.00 1704.01 2743.63 2118.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 129.00 2224.13 1791.19 1423.28 =============== 630-80359 Port Mesg Panel Day ==================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 68.00 135.00 48.50 66.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 400.00 80.00 89.67 123.00 MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 390.00 65.00 32.40 25.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 242.00 65.00 69.23 162.40 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 230.00 65.00 41.25 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,330.00 73.09 53.71 84.16 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 50.00 82.00 65.41 58.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 450.00 40.00 25.33 30.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 120.00 220.00 71.81 59.00 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 80.00 100.00 75.00 75.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 140.00 150.00 71.00 50.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 498 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80359 Port Mesg Panel Day ==================================================== NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 300.00 45.00 59.60 55.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 66.00 65.00 65.00 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,206.00 79.01 52.16 47.49 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 192.00 110.00 23.15 20.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 28.00 75.00 248.33 500.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 40.00 80.00 73.80 48.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 60.00 75.00 89.13 92.00 MTCE131A-039 SH 131 MP 0.053-68.721 IN EAG 08/17/17 200.00 120.00 66.67 55.00 CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 30.00 1.00 54.11 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 550.00 99.91 55.23 70.05 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 314.00 150.00 26.25 25.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 55.00 60.00 104.17 140.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 130.00 120.00 91.50 105.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 5.00 50.00 313.96 300.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 5.00 200.00 145.25 150.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 70.00 90.00 76.00 113.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 200.00 65.00 87.38 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 779.00 111.10 77.01 56.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,865.00 86.42 57.80 65.23 =============== 630-80360 Drum Channel Dev Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 20.00 35.00 1.63 1.25 NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 48.00 13.00 11.69 15.00 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 300.00 35.00 50.81 35.75 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 150.00 40.00 32.02 24.03 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 100.00 20.00 13.01 5.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 100.00 70.00 25.91 22.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 150.00 40.00 22.56 35.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 800.00 30.00 19.76 15.50 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 40.00 29.00 22.50 5.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 70.00 25.00 29.53 30.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 25.00 30.00 40.15 88.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 499 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80360 Drum Channel Dev Each =================================================== STA0931-032 SH 93 Erosion Correction 02/09/17 70.00 40.00 32.34 24.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 250.00 25.00 25.06 21.42 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 100.00 35.00 74.07 92.20 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 300.00 25.00 30.60 11.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 100.00 20.00 16.97 15.30 SHE160A-031 SH 160 Passing Lanes 03/02/17 336.00 30.00 22.90 11.11 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 30.00 35.00 36.80 22.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 200.00 30.00 28.95 27.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 200.00 30.00 38.39 36.00 BR0252-449 I-25 Woodmen NB 03/02/17 120.00 30.00 34.50 30.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 100.00 30.00 17.03 7.84 STA2873-183 US 287 Repairs at LCR 17 03/09/17 50.00 25.00 40.33 32.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 60.00 29.00 13.63 16.50 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 100.00 30.00 59.96 15.50 STA0362-035 US 36: Strasburg to Byers 03/23/17 70.00 30.00 31.44 17.52 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 150.00 40.00 7.42 14.50 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 100.00 35.00 17.20 15.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 50.00 27.00 18.67 25.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 100.00 20.50 22.58 24.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,289.00 31.07 27.59 22.86 STA006A-057 SH 6 EAST OF STERLING 04/06/17 50.00 30.00 37.21 38.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 100.00 35.00 11.80 11.80 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 15.00 35.00 12.97 20.10 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 100.00 30.00 10.69 10.56 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 100.00 45.00 30.50 20.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 100.00 30.00 26.57 34.80 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 200.00 35.00 55.94 55.17 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 200.00 35.00 46.22 31.50 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 75.00 30.00 11.00 12.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 40.00 45.00 27.50 30.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 80.00 20.00 18.41 11.24 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 30.00 25.00 5.25 5.25 STAR400-348 Region 4 Controller and Cabin 05/04/17 20.00 50.00 37.50 20.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 25.00 40.00 45.38 32.50 NHPPC120-026 US 85: I-76 to 168th 05/04/17 100.00 35.00 31.47 20.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 200.00 32.00 24.18 1.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 50.00 36.00 15.50 10.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 50.00 40.00 53.67 48.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 123.00 21.00 56.65 55.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 50.00 40.00 89.06 80.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 10.00 35.00 55.10 60.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 50.00 35.00 10.42 20.00 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 20.00 40.00 5.00 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 500 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80360 Drum Channel Dev Each =================================================== NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 70.00 30.00 12.95 15.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 400.00 30.00 5.56 10.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 100.00 30.00 44.60 84.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 48.00 15.00 25.00 25.00 ER0361-115 US 36 Bridges 06/22/17 200.00 30.00 28.08 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,606.00 32.01 35.93 27.18 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 200.00 30.00 46.46 60.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 70.00 20.00 11.15 10.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 60.00 35.00 44.50 79.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 120.00 40.00 18.75 12.50 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 15.00 35.00 43.56 43.56 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 45.00 25.00 11.87 10.60 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 16.00 60.00 50.67 42.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 50.00 35.00 44.80 38.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 50.00 50.00 36.19 29.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 20.00 40.00 53.67 35.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 150.00 62.70 46.04 24.00 MTCE131A-039 SH 131 MP 0.053-68.721 IN EAG 08/17/17 30.00 40.00 16.00 22.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 100.00 35.00 13.33 15.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 200.00 32.00 40.00 25.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 450.00 35.35 37.00 37.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 20.00 25.00 80.13 103.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 40.00 30.00 24.67 18.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 10.00 10.00 5.33 5.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 10.00 35.00 48.00 25.00 MTCE R500-193 R5 FY 18 Regionwide MTCE Crac 09/21/17 50.00 12.00 9.23 22.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 200.00 35.00 19.84 20.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,906.00 35.74 34.79 31.71 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 50.00 35.00 19.33 20.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 200.00 32.00 37.50 35.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 140.00 30.00 11.50 16.50 C133A-042 SH 133 McClure Pass Slip 11/16/17 10.00 35.00 42.11 44.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 20.00 40.00 11.25 10.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 100.00 35.00 62.76 50.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 100.00 35.00 9.07 10.30 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 25.00 25.00 34.52 25.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 60.00 35.00 20.38 15.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 501 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80360 Drum Channel Dev Each =================================================== MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 40.00 28.00 34.33 33.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 500.00 30.00 29.42 21.12 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 100.00 50.00 50.33 62.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 50.00 30.00 24.82 22.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 45.00 35.00 52.30 24.49 BR3852-018 POA SCOUR US 385 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 300.00 30.00 24.17 20.00 FSA0361-122 I-70 at Limon, US 40, US 287, 12/21/17 35.00 25.00 13.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,775.00 32.28 29.91 25.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,576.00 32.35 31.21 26.12 =============== 630-80363 Drum Channel Dev (Light) (F) Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 20.00 35.00 1.63 1.25 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 12.00 50.00 25.89 20.50 STM0243-089 Midpoint: Station 1019+50 Cen STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 20.00 30.00 36.18 26.78 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 8.00 50.00 74.07 92.20 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 40.00 30.00 40.30 42.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 20.00 25.00 35.71 35.70 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 5.00 70.00 61.20 65.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 200.00 35.00 34.73 32.35 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 40.00 40.00 102.30 112.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 10.00 35.00 27.66 7.84 STA2873-183 US 287 Repairs at LCR 17 03/09/17 10.00 35.00 66.00 63.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 150.00 50.00 7.92 17.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 10.00 25.50 22.58 24.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 545.00 39.28 32.26 34.49 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 60.00 45.00 34.69 40.20 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 175.00 50.00 79.18 82.76 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 30.00 45.00 60.67 47.25 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 10.00 40.00 41.67 36.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 10.00 30.00 5.40 5.40 STA0703-437 I-70: 32ND TO 44TH 06/01/17 12.00 50.00 89.07 80.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 10.00 40.00 61.55 60.00 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 5.00 50.00 10.00 10.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 16.00 40.00 53.00 50.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 30.00 35.00 12.95 15.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 200.00 45.00 13.06 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 558.00 45.59 64.01 47.65 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 502 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80363 Drum Channel Dev (Light) (F) Each =================================================== NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 20.00 30.00 39.30 40.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 60.00 45.00 86.28 86.28 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 10.00 60.00 43.32 34.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 20.00 25.00 40.04 38.00 MTCE131A-039 SH 131 MP 0.053-68.721 IN EAG 08/17/17 5.00 50.00 21.67 39.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 10.00 50.00 35.17 20.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 100.00 35.35 105.00 105.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 50.00 45.00 36.40 41.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 275.00 39.76 50.34 72.85 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 8.00 45.00 37.50 35.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 2.00 40.00 59.57 66.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 5.00 50.00 11.25 10.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 300.00 40.00 16.87 20.60 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 20.00 35.00 31.48 26.40 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 10.00 35.00 46.82 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 345.00 39.83 20.13 23.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,723.00 41.51 46.34 42.74 =============== 630-80364 Drum Channel Dev (Light) (SB) Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 20.00 35.00 1.63 1.25 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 52.00 40.00 25.89 20.50 STM0243-089 Midpoint: Station 1019+50 Cen STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 40.00 30.00 40.01 26.78 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 40.00 30.00 40.30 42.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 24.00 40.00 27.83 7.84 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 20.00 25.50 22.58 24.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 196.00 33.93 30.90 23.41 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 16.00 40.00 36.36 28.09 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 10.00 30.00 5.40 5.40 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 503 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80364 Drum Channel Dev (Light) (SB) Each =================================================== MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 5.00 50.00 10.00 10.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 30.00 35.00 12.95 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 61.00 36.72 18.60 16.45 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 50.00 45.00 52.71 60.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 20.00 50.00 36.75 18.50 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 20.00 70.00 43.93 34.00 MTCE131A-039 SH 131 MP 0.053-68.721 IN EAG 08/17/17 5.00 50.00 21.67 39.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 50.00 50.00 105.00 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 145.00 51.03 51.82 65.48 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 20.00 35.00 11.50 16.50 C133A-042 SH 133 McClure Pass Slip 11/16/17 14.00 40.00 60.31 66.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 10.00 50.00 11.25 10.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 5.00 45.00 76.67 80.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 40.00 35.00 31.48 26.40 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 20.00 50.00 51.67 66.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 109.00 40.23 37.87 37.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 511.00 40.46 39.53 38.37 =============== 630-80367 Port Traf Speed Monitor Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 2.00 7000.00 1443.75 1562.50 NHPP 0701-230 Midpoint WB Bore 03/02/17 1.00 5000.00 1442.83 1335.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 6333.33 1443.36 1486.67 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 2.00 1500.00 1333.33 1300.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 1.00 2500.00 894.75 825.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1833.33 1157.90 1141.67 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 2.00 2000.00 1390.17 600.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 504 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80367 Port Traf Speed Monitor Each =================================================== BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 4.00 3000.00 5072.41 5439.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 2.00 160.00 4800.00 4800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 2040.00 4069.85 4069.50 MTCE0705-084 I-70 CRACK SEAL KANSAS STATE 10/05/17 1.00 3000.00 5566.67 5500.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 1.00 6000.00 2021.23 2006.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 4500.00 3350.77 3753.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 3113.75 3531.89 2996.70 =============== 630-80370 Conc Barrier (Temp) Lin Foot =============================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 1,000.00 50.00 32.19 31.50 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1,265.00 60.00 61.39 40.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 1,000.00 35.00 47.33 40.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2,000.00 40.00 55.05 40.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 8,970.00 17.00 41.42 45.14 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 675.00 60.00 73.40 58.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 1,560.00 50.00 66.75 67.75 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 900.00 35.00 33.60 30.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1,100.00 35.00 32.80 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18,470.00 31.50 45.26 44.61 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 200.00 100.00 61.02 31.06 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 3,200.00 40.00 42.56 23.05 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 2,000.00 24.00 27.74 25.58 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 200.00 40.00 56.50 68.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 200.00 45.00 68.20 50.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 1,000.00 45.00 87.25 50.00 ER0361-115 US 36 Bridges 06/22/17 1,820.00 45.00 33.43 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,620.00 39.43 42.24 31.77 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 750.00 60.00 48.90 35.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 505 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80370 Conc Barrier (Temp) Lin Foot =============================================== NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 160.00 50.00 37.50 43.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 400.00 30.00 20.71 20.71 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1,000.00 30.00 46.65 48.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 2,158.00 35.00 27.03 12.70 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 2,380.00 55.00 119.50 99.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,848.00 44.02 41.47 51.47 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 800.00 40.00 28.67 45.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 210.00 40.00 96.54 100.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 500.00 50.00 117.82 90.00 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 325.00 61.53 64.36 64.36 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 500.00 45.00 34.00 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,335.00 46.21 65.47 61.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36,273.00 36.70 44.61 43.94 =============== 630-80371 Reset Concrete Barrier (Temp) Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 6,000.00 8.95 14.00 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,000.00 8.95 14.00 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,000.00 8.95 14.00 14.00 =============== 630-80372 Conc Barrier (Temp) (Furnish & Install) Lin Foot =============================================== ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 1,500.00 50.00 50.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,500.00 50.00 50.00 50.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1,450.00 35.66 50.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,450.00 35.66 50.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,950.00 42.95 50.00 50.00 =============== 630-80373 Concrete Barrier (Temporary)(Remove) Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 23,000.00 9.50 12.00 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23,000.00 9.50 12.00 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23,000.00 9.50 12.00 12.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 506 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80377 Port Water Filled Barrier (Temp) Lin Foot =============================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 2,000.00 50.00 21.53 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,000.00 50.00 21.53 11.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 200.00 15.00 50.33 84.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 500.00 40.00 32.55 32.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 700.00 32.86 42.25 47.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,700.00 45.56 24.74 20.40 =============== 630-80378 Glare Screen (Temp) Lin Foot =============================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 900.00 20.00 19.15 18.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 900.00 20.00 19.15 18.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 900.00 20.00 19.15 18.25 =============== 630-80380 Traffic Cone Each =================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 264.00 12.00 5.59 7.00 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 400.00 9.00 9.08 6.70 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 50.00 10.00 5.60 1.20 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 200.00 10.00 6.76 3.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 350.00 10.00 1.45 1.05 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 200.00 10.00 9.65 15.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 600.00 10.00 10.79 10.25 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 150.00 7.00 4.13 1.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 60.00 10.00 4.14 7.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 25.00 15.00 9.35 14.16 STA0931-032 SH 93 Erosion Correction 02/09/17 200.00 10.00 7.33 6.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 500.00 7.00 14.04 16.07 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 100.00 30.00 11.80 15.40 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 200.00 10.00 9.95 1.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 500.00 5.00 1.02 1.02 SHE160A-031 SH 160 Passing Lanes 03/02/17 300.00 10.00 5.18 1.11 MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 300.00 7.00 5.00 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 507 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80380 Traffic Cone Each =================================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 100.00 7.00 6.01 6.05 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 50.00 8.00 14.56 14.20 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 375.00 10.00 1.39 1.12 STA2873-183 US 287 Repairs at LCR 17 03/09/17 230.00 10.00 13.17 6.50 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 500.00 9.00 6.80 7.20 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 400.00 15.00 15.27 10.50 STA0362-035 US 36: Strasburg to Byers 03/23/17 125.00 10.00 11.64 11.68 MTCER300-240 MTCE R3 FY 17/18 REGION WIDE 03/23/17 100.00 7.00 8.33 5.00 MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 50.00 10.00 8.33 5.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 500.00 12.00 3.42 12.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 50.00 10.00 7.44 7.50 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 150.00 9.00 5.33 8.00 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 250.00 7.00 2.00 1.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 200.00 10.15 11.28 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,479.00 9.71 7.28 6.87 STA006A-057 SH 6 EAST OF STERLING 04/06/17 300.00 9.00 10.45 10.50 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 400.00 10.00 11.80 11.80 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 200.00 10.00 6.95 8.05 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 400.00 8.00 2.69 1.06 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 150.00 40.00 9.69 5.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 400.00 15.00 13.59 11.60 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 500.00 10.00 9.72 8.83 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 200.00 9.00 6.58 5.25 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 40.00 10.00 5.08 2.25 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 250.00 8.00 5.00 5.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 40.00 12.00 6.00 1.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 200.00 6.00 7.56 3.25 NHPPC120-026 US 85: I-76 to 168th 05/04/17 300.00 10.00 6.98 6.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 500.00 10.00 5.75 1.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 50.00 12.00 11.50 10.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 100.00 10.00 10.67 10.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 123.00 6.00 13.83 16.00 MPR200-235 FY 2018 PAVEMENT MARKING PROJ 06/01/17 200.00 8.00 4.17 2.50 STA0703-437 I-70: 32ND TO 44TH 06/01/17 500.00 10.00 13.95 13.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 100.00 8.50 10.95 14.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 600.00 12.00 3.33 4.00 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 350.00 10.00 5.00 5.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 20.00 7.00 12.20 10.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 70.00 7.00 6.48 7.50 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 200.00 10.00 3.06 5.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 100.00 10.00 9.40 14.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 264.00 7.00 6.00 6.00 MTCER300-243 R3 FY18 REGION WIDE ROUNDABOU 06/22/17 80.00 5.00 6.67 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 508 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80380 Traffic Cone Each =================================================== ER0361-115 US 36 Bridges 06/22/17 200.00 9.00 9.75 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,837.00 10.38 8.55 7.02 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 500.00 5.00 2.04 2.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 200.00 10.00 9.00 13.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 100.00 10.00 14.52 14.52 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 20.00 10.00 7.50 5.50 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 40.00 10.00 5.88 6.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 60.00 10.00 13.33 14.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 200.00 10.00 11.17 10.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 100.00 10.00 4.79 3.40 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 50.00 10.00 13.50 3.50 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 100.00 6.60 13.27 6.00 MTCE131A-039 SH 131 MP 0.053-68.721 IN EAG 08/17/17 300.00 10.00 9.08 1.25 CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 700.00 1.00 8.52 12.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 350.00 10.00 4.43 10.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 400.00 12.00 7.00 3.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 100.00 6.06 7.00 7.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 50.00 8.00 12.67 11.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 40.00 8.00 4.67 2.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 100.00 6.00 5.33 5.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 40.00 10.00 10.00 5.00 MTCE R500-193 R5 FY 18 Regionwide MTCE Crac 09/21/17 200.00 3.00 5.60 8.85 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 100.00 10.00 6.04 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,750.00 7.14 6.68 7.38 MTCE0705-084 I-70 CRACK SEAL KANSAS STATE 10/05/17 300.00 5.00 5.83 6.00 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 300.00 15.00 16.75 6.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 200.00 10.00 7.75 2.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 60.00 10.00 10.00 10.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 20.00 10.00 5.50 5.50 C133A-042 SH 133 McClure Pass Slip 11/16/17 40.00 10.00 7.26 8.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 600.00 10.00 1.63 1.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 700.00 10.00 17.22 10.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 500.00 8.50 2.39 1.03 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 150.00 10.00 4.24 5.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 60.00 10.00 7.63 5.50 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 1,000.00 7.00 7.47 15.84 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 200.00 1.13 5.50 5.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 509 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80380 Traffic Cone Each =================================================== NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 200.00 15.00 11.67 13.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 250.00 10.00 10.79 1.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 45.00 15.00 10.25 5.57 BR3852-018 POA SCOUR US 385 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 100.00 10.00 5.67 5.00 FSA0361-122 I-70 at Limon, US 40, US 287, 12/21/17 200.00 5.00 5.50 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,925.00 8.92 8.44 7.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22,991.00 9.32 7.81 7.13 =============== 630-80384 Tubular Marker Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 40.00 45.00 43.70 21.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 500.00 30.00 78.13 76.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 540.00 31.11 75.58 71.93 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 25.00 20.00 41.20 41.20 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 250.00 36.75 29.06 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 275.00 35.23 29.30 8.52 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 100.00 50.00 25.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 50.00 25.00 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 915.00 34.41 56.05 47.19 =============== 630-80390 Channel Dev (Spec) Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 245.00 17.00 30.63 31.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 245.00 17.00 30.63 31.25 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 150.00 20.00 10.50 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 150.00 20.00 10.50 10.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 510 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80390 Channel Dev (Spec) Each =================================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 90.00 20.00 7.67 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 90.00 20.00 7.67 11.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 485.00 18.48 20.50 21.07 =============== 630-80391 Channel Dev (Fixed) Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 600.00 50.00 77.54 77.00 STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 600.00 50.00 77.54 77.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 100.00 70.00 19.05 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 70.00 19.05 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 700.00 52.86 66.29 63.00 =============== 630-80392 Stackable Tubular Marker Each =================================================== NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 50.00 25.00 28.13 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 25.00 28.13 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 25.00 28.13 16.00 =============== 630-80393 Stackable Vertical Panels Each =================================================== BR0252-449 I-25 Woodmen NB 03/02/17 80.00 35.00 22.75 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 80.00 35.00 22.75 20.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 60.00 30.00 13.67 18.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 511 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80393 Stackable Vertical Panels Each =================================================== NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 80.00 20.00 36.25 40.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 50.00 15.00 8.33 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 190.00 21.84 23.55 26.47 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 10.00 25.00 63.50 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 25.00 63.50 12.00 MTCE0705-084 I-70 CRACK SEAL KANSAS STATE 10/05/17 32.00 11.50 17.33 17.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 40.00 30.00 37.50 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 72.00 21.78 26.50 27.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 352.00 24.91 24.46 24.70 =============== 630-80401 Delin (Ty I) (Temp) Each =================================================== STA006A-057 SH 6 EAST OF STERLING 04/06/17 240.00 5.00 19.96 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 240.00 5.00 19.96 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 240.00 5.00 19.96 21.00 =============== 630-80415 Adv Warn Flash or Seq Panel (C Type) Day ==================================================== CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 55.00 1.00 45.17 40.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 20.00 40.00 63.33 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 75.00 11.40 51.58 36.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75.00 11.40 51.58 36.00 =============== 630-80430 Rumble Strip (Port) Each =================================================== BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 4.00 900.00 2043.86 2266.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 900.00 2043.86 2266.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 512 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80430 Rumble Strip (Port) Each =================================================== C133A-042 SH 133 McClure Pass Slip 11/16/17 18.00 850.00 739.02 550.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 36.00 850.00 1010.43 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 54.00 850.00 874.72 516.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 58.00 853.45 1053.53 637.31 =============== 630-80440 Port Rumble Strips (Temp) Each =================================================== C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 18.00 2500.00 2010.00 1600.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 10.00 1000.00 592.00 875.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 28.00 1964.29 1365.45 1341.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 1964.29 1365.45 1341.07 =============== 630-80510 Mobile Pvmt Mkg Zone LUMP SUM =============================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 1.00 5000.00 4406.25 5000.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 1.00 4000.00 8355.57 8200.00 STM0243-089 Midpoint: Station 1019+50 Cen STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1.00 4000.00 1294.52 906.05 MTCER500-191 R5 FY17 Striping 02/16/17 1.00 2500.00 50725.00 6500.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 4000.00 7920.00 9600.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 1.00 5000.00 8603.54 6120.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 1.00 15000.00 2388.00 2464.00 MTCER300-239 070A MP 0-75,131-173; 040A, 0 03/09/17 1.00 10000.00 7500.00 2500.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 1.00 2450.00 5740.78 5963.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 5595.00 11137.09 5250.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 5595.00 11137.09 5250.34 =============== 630-80511 Mobile Pvmt Marking Zone LUMP SUM =============================================== MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 1.00 5000.00 4250.00 4250.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 1.00 5000.00 7000.00 7000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 5000.00 5625.00 5625.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 513 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80511 Mobile Pvmt Marking Zone LUMP SUM =============================================== MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 1.00 4500.00 5822.11 2000.00 MTCE0705-085 FY 18 I-70 EPOXY FROM MM 328 08/10/17 1.00 10000.00 10833.33 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 7250.00 6978.55 2250.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 1.00 5000.00 1825.00 2500.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 1.00 4000.00 5204.70 9523.49 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 1.00 15000.00 2739.44 3500.00 FSA0361-122 I-70 at Limon, US 40, US 287, 12/21/17 1.00 3000.00 5500.00 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 6750.00 3685.42 4755.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 6437.50 5241.75 4346.69 =============== 630-80520 Mobile Pvmt Mkg Zone Day ==================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 12.00 1000.00 1010.08 1500.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 3.00 1100.00 1845.00 2000.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 4.00 2000.00 2755.67 2800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19.00 1226.32 1812.42 1852.63 STA006A-057 SH 6 EAST OF STERLING 04/06/17 2.00 2000.00 2240.64 2200.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 14.00 900.00 1922.21 2716.64 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 2.00 1000.00 1036.44 1130.00 MPR200-235 FY 2018 PAVEMENT MARKING PROJ 06/01/17 157.00 200.00 366.67 150.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 4.00 650.00 616.67 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 179.00 293.85 515.91 395.77 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1.00 3000.00 2000.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3000.00 2000.00 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 199.00 396.48 650.18 542.93 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 514 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85006 Impact Atten (Sand Fill) (Temp) Each =================================================== BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 4.00 4000.00 3722.07 991.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 4000.00 3722.07 991.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 4000.00 3722.07 991.00 =============== 630-85010 Impact Atten (Temp) Each =================================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 8.00 10000.00 2160.89 1500.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 6.00 3500.00 4190.00 2100.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 4.00 5400.00 3221.43 3135.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 4.00 4500.00 6058.00 2100.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 5.00 4500.00 6173.00 5600.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 4.00 5490.00 5490.00 5490.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 31.00 5969.68 3875.69 3080.65 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 4.00 8800.00 4311.62 2100.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 1.00 4000.00 8495.00 7600.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 4.00 3200.00 3544.60 4000.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 4.00 3000.00 2651.25 2500.00 ER0361-115 US 36 Bridges 06/22/17 4.00 5000.00 3390.42 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17.00 4941.18 3748.74 3529.41 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 2.00 4000.00 3250.00 3000.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 5000.00 3943.16 5000.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 21.00 9450.00 5350.00 5350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 24.00 8810.42 4899.27 5139.58 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 8.00 6000.00 1660.33 2460.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 2.00 9000.00 2525.00 2000.00 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 2.00 11659.11 13102.65 13102.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 7443.19 2534.60 4157.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 84.00 6783.67 3756.29 3913.52 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 515 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85011 Imp Atten (Temp) Day ==================================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 300.00 50.00 43.89 1.05 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 160.00 50.00 77.76 67.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP 0701-230 Midpoint WB Bore 03/02/17 94.00 100.00 52.25 49.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 100.00 40.50 68.24 72.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 654.00 55.73 58.39 30.51 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 58.00 100.00 61.21 68.63 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 400.00 250.00 67.07 55.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 458.00 231.00 66.87 56.87 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 120.00 175.00 84.55 75.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 52.00 70.00 129.67 129.67 CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 8.00 1.00 1233.10 1750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 180.00 136.93 115.57 165.24 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 150.00 75.00 42.17 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 150.00 75.00 42.17 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,442.00 123.54 65.96 57.67 =============== 630-85013 Impact Atten (Temp)(Reset) Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 4.00 1400.00 1470.00 1470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 1400.00 1470.00 1470.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1400.00 1470.00 1470.00 =============== 630-85014 Impact Atten(Temp)(Remove) Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 44.00 1400.00 1470.00 1470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 44.00 1400.00 1470.00 1470.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44.00 1400.00 1470.00 1470.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 516 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85020 Mobile Attenuator Each =================================================== STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 3.00 7000.00 22855.44 23566.32 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 2.00 25000.00 38171.75 44000.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1.00 30000.00 15221.46 14500.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1.00 15000.00 10662.00 7250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 16571.43 25057.58 25778.42 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 1.00 10249.00 35853.32 20900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 10249.00 35853.32 20900.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 19000.00 17300.00 17300.00 NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 1.00 8000.00 5429.33 4113.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 13500.00 8397.00 10706.50 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 1.00 20000.00 32999.32 26396.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 20000.00 32999.32 26396.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 15749.91 25193.92 22650.78 =============== 630-85040 Impact Atten (T-M-A) (Temp) Each =================================================== STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 1.00 750.00 7070.00 7070.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 2.00 50000.00 11635.57 15100.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 2.00 20400.00 20267.77 14700.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 2.00 10000.00 33925.00 32000.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 1.00 12000.00 28464.20 51056.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 21693.75 23928.96 22715.75 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 2.00 10000.00 6422.65 6500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 517 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85040 Impact Atten (T-M-A) (Temp) Each =================================================== IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 1.00 10000.00 24233.30 24000.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 2.00 15000.00 22435.60 13000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 12000.00 13839.13 12600.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 10500.00 30350.00 36050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 10500.00 30350.00 36050.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 17432.14 18795.07 20055.43 =============== 630-85041 Mobile Attenuator Day ==================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 360.00 325.00 250.00 250.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 200.00 600.00 355.20 360.39 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 10.00 700.00 436.39 400.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 75.00 1000.00 215.28 110.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 30.00 300.00 496.50 650.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 320.00 40.00 294.26 256.00 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 80.00 350.00 328.75 100.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 100.00 350.00 553.33 600.00 MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 210.00 525.00 333.00 250.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 83.00 400.00 430.96 395.00 BR0252-449 I-25 Woodmen NB 03/02/17 150.00 500.00 440.00 400.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 45.00 375.00 591.67 550.00 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 120.00 150.00 88.75 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,783.00 368.55 328.11 291.70 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 30.00 400.00 379.85 369.56 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 55.00 500.00 384.45 265.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 200.00 300.00 207.89 220.69 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 100.00 500.00 893.75 715.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 90.00 300.00 400.00 400.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 200.00 350.00 517.72 300.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 105.00 350.00 357.50 100.00 MPR200-235 FY 2018 PAVEMENT MARKING PROJ 06/01/17 2.00 500.00 316.67 150.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 120.00 400.00 575.26 530.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 902.00 368.35 373.10 345.57 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 518 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85041 Mobile Attenuator Day ==================================================== ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 50.00 370.00 490.00 580.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 40.00 500.00 535.73 535.73 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 100.00 400.00 510.81 480.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 30.00 600.00 973.25 900.00 CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 24.00 1.00 526.50 600.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 20.00 375.00 575.00 550.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 60.00 300.00 233.33 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 324.00 376.62 490.19 484.04 MTCE0705-084 I-70 CRACK SEAL KANSAS STATE 10/05/17 40.00 250.00 566.67 550.00 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 109.00 350.00 555.00 450.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 55.00 350.00 480.83 250.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 200.00 400.00 530.00 480.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 120.00 500.00 600.88 675.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 5.00 750.00 1112.80 1550.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 5.00 375.00 658.75 600.00 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 50.00 394.87 385.00 385.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 10.00 1800.00 679.17 937.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 594.00 422.17 558.18 507.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,603.00 378.06 387.25 361.06 =============== 630-86800 Traffic Signal (Temp) LUMP SUM =============================================== STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 1.00 60000.00 111490.00 115000.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 1.00 20000.00 38073.53 35000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 40000.00 83958.82 75000.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 1.00 20000.00 29230.00 19950.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 30000.00 31000.00 31000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 25000.00 29525.00 25475.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 32500.00 60630.04 50237.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 519 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-86801 Traffic Signal (Temp) LUMP SUM =============================================== NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1.00 20000.00 19200.00 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 20000.00 19200.00 20000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 20000.00 19200.00 20000.00 =============== 630-86810 Traffic Signal (Temp) Each =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 1.00 18000.00 23672.00 22344.00 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 2.00 15000.00 21657.69 16000.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 2.00 20000.00 22096.40 22500.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1.00 35000.00 28290.00 28000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 20500.00 23390.98 21224.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 1.00 25000.00 13555.00 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 25000.00 13555.00 15000.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 1.00 15000.00 17522.87 22000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 15000.00 17522.87 22000.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 5.00 15000.00 20640.33 45920.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 1.00 10000.00 16190.60 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 14166.67 19703.55 42433.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 17714.29 20759.33 29924.57 =============== 632-00000 Night Work Lighting LUMP SUM =============================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 1.00 22000.00 26125.00 24000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 520 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 632-00000 Night Work Lighting LUMP SUM =============================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 1.00 50000.00 21574.12 24000.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1.00 50000.00 42693.69 33081.07 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 1.00 20000.00 20580.00 37000.00 BR0252-449 I-25 Woodmen NB 03/02/17 1.00 40000.00 38625.00 21000.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1.00 40000.00 29469.56 15000.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 1.00 245000.00 245000.00 245000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 66714.29 39333.26 57011.58 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 1.00 20000.00 60000.00 60000.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 1.00 25000.00 20806.09 17900.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 1.00 20000.00 49258.63 20000.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 1.00 40000.00 51516.75 22000.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 5000.00 27500.00 27500.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1.00 10000.01 27932.32 25000.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 1.00 10000.00 29687.50 35000.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 1.00 25000.00 86304.31 145000.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 1.00 25000.00 11837.50 500.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 1.00 20000.00 8219.00 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 20000.00 39812.78 36290.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1.00 30000.00 11782.68 11782.68 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 739244.56 2750000.00 2750000.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 1.00 40000.00 29414.60 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 269748.19 415550.81 923260.89 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 5000.00 34605.33 43815.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 1.00 35000.00 99319.00 55000.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 1.00 50000.00 29850.65 20703.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 30000.00 57666.48 39839.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 68097.59 81749.76 158751.39 =============== 641-10000 Shotcrete Sq Yard ================================================ NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 260.00 310.00 291.00 300.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 521 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 641-10000 Shotcrete Sq Yard ================================================ NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 997.00 300.00 161.10 142.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,257.00 302.07 187.97 175.08 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 510.00 200.00 143.61 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 510.00 200.00 143.61 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,767.00 272.61 179.28 159.18