Colorado Department of Transportation 12:18 Wednesday, May 17, 2023 1 2023 Cost Data PROJECTS BID FROM 01/01/23 THROUGH 03/31/23 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20230105 Straight Stripe Painting, Inc. 2 $2,089,265.00 107.41 MTCER500-221 REGION 5 5 R 20230112 Kilgore Companies, LLC dba Elam Construc 2 $9,490,148.53 94.56 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST T 3 U 20230112 CASTLE ROCK CONST. CO. OF COLO, LLC 5 $1,853,073.44 115.82 STR2871-040 US 287 MP 0.0 TO MP 122 VARIOU 2 P 20230112 OLDCASTLE SW GROUP, INC. 2 $14,126,484.41 106.27 STA172A-022 SH 172 IGNACIO TO ELMORE'S COR 5 R 20230119 CC ENTRPRS TRAFFIC CONTROL SPECIALISTS 2 $1,636,786.00 109.12 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & C 2 R 20230126 BRANNAN SAND AND GRAVEL, LLC 5 $2,330,855.24 98.45 STA066A-008 SH 66 @ WCR 7 4 R 20230126 COULSON EXCAVATING COMPANY 6 $1,223,303.25 101.94 FSA0853-123 US 85 AND WCR 66 LEFT TURN ACC 4 P 20230126 ABCO CONTRACTING, INC. 3 $1,850,028.00 123.34 NHPPR100-383 I70 OVER WASHINGTON ST 1 U 20230202 Lumin8 Transportation Tech. 3 $558,097.50 117.53 C0342-066 US 034A (MP 113-150) 4 P 20230207 RLW/SEMA, A Joint Venture 1 $3,507,949.39 107.82 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5) 4 U 20230216 MCATEE CONSTRUCTION CO. 1 $12,796,063.70 116.33 STA1381-011 SH 138 STERLING NORTH PART 2 4 R 20230216 KSK, LLC 1 $715,000.00 116.02 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP IM 3 M 20230216 AMERICAN WEST CONSTRUCTION, LLC 2 $2,095,832.00 104.61 C1601-084 US 160 SECTION3 PRIORITY CULVE 5 M 20230216 Meridian Engineering Co. 4 $3,896,461.00 130.03 C133A-052 SH 133 ROCKFALL N OF MCCLURE P 3 M 20230216 AMERICAN WEST CONSTRUCTION, LLC 3 $6,596,527.00 119.84 C0703-498 EISENHOWER JOHNSON MEMORIAL TU 1 M 20230216 Bixby Electric, Inc. 1 $1,634,083.00 125.39 C 1601-086 MAPLE & CHESTNUT SIGNALS AT IN 5 U 20230216 KSK, LLC 4 $2,475,000.00 68.75 C0881-036 R1 CURB RAMPS-SH88B & US285D 1 U Colorado Department of Transportation 12:18 Wednesday, May 17, 2023 2 2023 Cost Data PROJECTS BID FROM 01/01/23 THROUGH 03/31/23 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20230216 OLDCASTLE SW GROUP, INC. 2 $545,861.50 112.11 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 3 U 20230302 Native Sun Materials Inc 1 $2,021,561.69 67.39 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 6 2 M 20230302 Scodeller Construction, Inc. 1 $1,194,545.00 133.83 STRR300-265 MOUNTAIN RE FY23 CRACK SEALS 3 M 20230302 ABCO CONTRACTING, INC. 3 $4,128,231.00 97.81 NHPP0253-290 I25 @ 58TH AND 62ND 1 U 20230309 OLDCASTLE SW GROUP, INC. 2 $5,695,695.99 98.20 STR194A-002 SH194A SUR. TREAT.& DRAI IMP M 2 P 20230316 ENGINEERING AND CONSTRUCTION 2 $23,979,880.00 111.51 FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL TU 1 M 20230316 ROADSAFE TRAFFIC SYSTEMS, INC 2 $2,546,291.82 87.23 MTCER300-276 I-70 MM 116-207, US 6F MM 208. 3 M 20230330 COULSON EXCAVATING COMPANY 2 $6,035,626.55 77.36 STA257A-008 SH 257 WINDSOR RESURFACING 4 R 20230330 HARRISON WESTERN CONSTRUCTION CORP. 2 $2,924,208.00 115.30 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 1 R 20230331 STRUCTURES, INC. 3 $837,006.00 100.00 ER0703-524 STRUCTURE F-13-P, EB I-70 EXIT 1 M ======= ================ ====== TOTALS 67 $118,783,865.01 104.02 Colorado Department of Transportation 12:18 Wednesday, May 17, 2023 1 2023 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/23 THROUGH 03/31/23) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ BRIDGE REPAIR 230302 NHPP0253-290 U I25 @ 58TH AND 62ND E-17-OX 191.5000 239.0000 45768.5 $1,524,362 $33.31 E-17-OW 168.5000 245.0000 41282.5 $1,446,538 $35.04 WEIGHTED AVERAGE COST: NEW STRUCTURES 87051.0 $2,970,900 $34.13 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 1 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00000 Clear and Grub LUMP SUM =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1.00 20000.00 21924.61 29219.22 STA066A-008 SH 66 @ WCR 7 01/26/23 1.00 20000.00 30160.00 10850.00 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 1.00 6422.61 6872.20 6872.20 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 1.00 10000.00 183534.59 338000.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 1.00 20000.00 22500.00 20000.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 1.00 30000.00 15924.69 15924.69 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 1.00 10000.00 10425.00 11500.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 1.00 8000.00 29150.00 8300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 15552.83 41686.19 55083.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 15552.83 41686.19 55083.26 =============== 201-00001 Clear and Grub Acre =================================================== C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 4.00 35000.00 9043.75 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 35000.00 9043.75 10000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 35000.00 9043.75 10000.00 =============== 201-00005 Rem of Debris LUMP SUM =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1.00 1500.00 9467.34 9154.68 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 1.00 15600.00 20841.43 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 8550.00 16291.79 10077.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 8550.00 16291.79 10077.34 =============== 202-00001 Rem Structure Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1.00 1500.00 5335.76 5041.52 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 4.00 8250.00 14026.79 5800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 6900.00 12288.59 5648.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 6900.00 12288.59 5648.30 =============== 202-00003 Rem of Structure (Spec) LUMP SUM =============================================== STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 1.00 5000.00 3880.00 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 3880.00 3500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 3880.00 3500.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 2 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00010 Rem Tree Each =================================================== SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 1.00 1000.00 1306.80 1306.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 1306.80 1306.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 1306.80 1306.80 =============== 202-00014 Brush Clearing Hour =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 20.00 250.00 354.92 317.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 250.00 354.92 317.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 250.00 354.92 317.84 =============== 202-00019 Rem Inlet Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1.00 1000.00 3693.56 5027.12 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 1.00 1400.00 10953.07 6500.00 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 1.00 1583.43 1694.27 1694.27 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 1.00 2000.00 2342.72 1500.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 1.00 2000.00 2800.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 1596.69 4960.80 3444.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1596.69 4960.80 3444.28 =============== 202-00020 Rem CBC Each =================================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 2.00 2000.00 6600.00 6600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2000.00 6600.00 6600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2000.00 6600.00 6600.00 =============== 202-00026 Rem S and D Pave Sq Yard ================================================ STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 171.00 20.00 36.50 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 171.00 20.00 36.50 28.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 171.00 20.00 36.50 28.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 3 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00035 Rem Pipe Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 223.00 25.00 59.29 70.88 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 55.00 50.00 43.17 38.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 120.00 20.00 165.70 260.00 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 58.00 67.88 72.63 72.63 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 58.00 60.00 77.10 58.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 222.00 60.00 60.00 60.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 20.00 200.00 307.72 150.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 8.00 150.00 78.50 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 764.00 47.99 88.00 96.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 764.00 47.99 88.00 96.59 =============== 202-00037 Rem of End Section Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1.00 500.00 1606.47 2496.93 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 4.00 500.00 434.00 150.00 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 2.00 294.20 314.79 314.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 441.20 509.23 532.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 441.20 509.23 532.36 =============== 202-00090 Rem Delineator Each =================================================== FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 38.00 20.00 28.33 21.00 STA066A-008 SH 66 @ WCR 7 01/26/23 63.00 25.00 52.59 28.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 18.00 20.00 66.18 10.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 75.00 10.00 17.82 17.82 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 13.00 18.11 45.07 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 207.00 17.78 41.05 21.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 207.00 17.78 41.05 21.90 =============== 202-00190 Rem of Conc Median Cover Matl Sq Yard ================================================ C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 14.00 60.00 72.00 72.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 60.00 72.00 72.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 60.00 72.00 72.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 4 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00200 Rem Sidewalk Sq Yard ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1,088.00 18.00 22.85 27.79 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 282.00 50.00 47.00 47.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 3,238.00 70.00 28.50 19.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 240.00 50.00 17.88 15.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,848.00 56.18 27.73 22.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,848.00 56.18 27.73 22.43 =============== 202-00201 Rem Curb Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 48.00 15.00 60.83 92.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48.00 15.00 60.83 92.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48.00 15.00 60.83 92.85 =============== 202-00202 Rem Gutter Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 94.00 25.00 54.95 82.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 94.00 25.00 54.95 82.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 94.00 25.00 54.95 82.39 =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 2,553.00 30.00 19.23 27.55 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 488.00 20.00 32.00 32.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 4,003.00 9.00 17.20 16.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 430.00 25.00 9.38 11.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,474.00 17.81 17.68 20.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,474.00 17.81 17.68 20.73 =============== 202-00206 Rem Conc Curb Ramp Sq Yard ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 151.00 40.00 49.27 75.93 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 5 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00206 Rem Conc Curb Ramp Sq Yard ================================================ C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 45.00 55.00 126.00 126.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 10.00 40.00 34.75 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 206.00 43.28 57.88 85.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 206.00 43.28 57.88 85.61 =============== 202-00207 Rem of Brick Pavers Sq Yard ================================================ STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 82.00 30.00 38.00 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 82.00 30.00 38.00 38.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 82.00 30.00 38.00 38.00 =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 14.00 50.00 212.10 309.19 STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 4,140.00 30.00 81.62 72.27 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 87.00 20.00 27.83 32.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 180.00 20.00 155.79 138.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 99.00 25.00 450.00 450.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 36.00 35.00 54.00 54.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 245.00 25.00 36.50 22.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 278.00 50.00 181.06 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,079.00 30.32 85.41 80.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,079.00 30.32 85.41 80.34 =============== 202-00215 Rem Conc Pvmt (Planing) Sq Yard ================================================ NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 320.00 30.00 76.71 76.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 320.00 30.00 76.71 76.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 320.00 30.00 76.71 76.00 =============== 202-00217 Rem Conc Pvmt (Planing) (Spec) Sq Yard ================================================ NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 1,321.00 50.00 49.05 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,321.00 50.00 49.05 54.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,321.00 50.00 49.05 54.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 6 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1,395.00 15.00 38.09 21.38 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 1,638.00 8.00 24.85 33.70 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 1,416.00 25.00 20.33 7.00 STA066A-008 SH 66 @ WCR 7 01/26/23 253.00 20.00 36.72 18.00 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 3,500.00 5.45 5.83 5.83 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 803.00 25.00 21.97 17.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 6,280.00 3.00 30.00 30.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 20.00 100.00 205.63 270.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 147.00 30.00 41.00 41.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 356.00 40.00 12.50 10.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 890.00 100.00 31.65 14.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 507.00 20.00 6.72 6.72 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 166.00 37.00 40.00 30.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 35,025.00 12.00 5.18 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 52,396.00 12.95 11.53 9.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52,396.00 12.95 11.53 9.84 =============== 202-00226 Rem of Asph Mat (Special) Sq Yard ================================================ STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 29.00 60.00 95.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29.00 60.00 95.00 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 60.00 95.00 30.00 =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 50,265.00 4.00 3.84 4.53 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 342,490.00 3.00 2.08 2.35 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 284.00 20.00 22.25 12.50 STA066A-008 SH 66 @ WCR 7 01/26/23 6,130.00 6.00 6.15 3.25 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 57,151.00 6.00 2.92 3.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 163,894.00 2.50 1.40 1.40 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 20.00 30.00 200.63 175.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 135.00 25.00 45.00 45.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 1,559.00 10.00 8.61 8.61 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 4,269.00 7.00 12.00 8.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 87,359.00 4.00 3.05 3.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 713,556.00 3.39 2.57 2.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 713,556.00 3.39 2.57 2.50 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 7 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00246 Rem Asphalt Mat (Planing)(Special) Sq Yard ================================================ STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 1,194.00 12.00 13.75 12.00 ER0703-524 STRUCTURE F-13-P, EB I-70 EXI 03/31/23 1,375.00 50.00 59.45 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,569.00 32.34 42.69 32.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,569.00 32.34 42.69 32.34 =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 89,014.00 3.00 0.90 0.60 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 1,600.00 10.00 6.83 6.50 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 388.00 3.00 14.07 4.00 STA066A-008 SH 66 @ WCR 7 01/26/23 15,654.00 2.50 0.81 0.80 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 496.00 10.00 7.17 6.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 192.00 3.50 3.50 3.50 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 878.00 1.00 11.25 3.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 1,667.00 1.00 2.47 3.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 1,000.00 2.00 5.05 5.05 MTCER300-276 I-70 MM 116-207, US 6F MM 208 03/16/23 1,227,689.00 0.50 0.42 0.38 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 23,000.00 2.50 1.08 0.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,361,578.00 0.74 0.52 0.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,361,578.00 0.74 0.52 0.43 =============== 202-00425 Rem Bridge Railing Lin Foot =============================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 50.00 150.00 17.80 13.60 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 78.00 60.00 15.00 15.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 140.00 40.00 51.38 66.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 268.00 66.34 37.85 41.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 268.00 66.34 37.85 41.38 =============== 202-00426 Rem Bridge Railing (Spec) Lin Foot =============================================== NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 72.00 20.00 239.71 224.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 72.00 20.00 239.71 224.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72.00 20.00 239.71 224.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 8 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00450 Rem Port Present Str (1) Sq Yard ================================================ NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 461.00 145.00 383.91 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 461.00 145.00 383.91 170.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 461.00 145.00 383.91 170.00 =============== 202-00453 Rem Port Present Str (2) Sq Yard ================================================ NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 69.00 550.00 357.14 170.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 461.00 360.00 537.64 265.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 12.00 300.00 1300.00 1100.00 ER0703-524 STRUCTURE F-13-P, EB I-70 EXI 03/31/23 138.00 561.00 1281.38 561.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 680.00 419.01 680.07 330.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 680.00 419.01 680.07 330.17 =============== 202-00460 Rem Port Present Str (3) Sq Yard ================================================ NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 34.00 1200.00 570.74 510.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 93.00 510.00 1256.35 465.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 4.00 500.00 2625.00 2050.00 ER0703-524 STRUCTURE F-13-P, EB I-70 EXI 03/31/23 28.00 892.00 2032.36 892.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 159.00 724.57 1269.46 589.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 159.00 724.57 1269.46 589.69 =============== 202-00502 Rem Port Present Str Cubic Yard ============================================= NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 5.00 2000.00 1310.78 1300.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 3.00 2500.00 1343.60 720.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 2187.50 1320.15 1082.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 2187.50 1320.15 1082.50 =============== 202-00503 Rem Port Present Str Sq Yard ================================================ NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 11.00 1500.00 896.26 890.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 1500.00 896.26 890.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 1500.00 896.26 890.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 9 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00504 Rem Exp Device Lin Foot =============================================== NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 302.00 300.00 590.83 261.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 780.00 220.00 271.70 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,082.00 242.33 360.77 206.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,082.00 242.33 360.77 206.21 =============== 202-00505 Rem Port of Present Structure Sq Foot ================================================ C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 728.00 200.00 106.50 24.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 29.00 250.00 646.24 300.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 202.00 150.00 380.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 959.00 190.98 165.36 90.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 959.00 190.98 165.36 90.48 =============== 202-00700 Rem Light Standard Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 1.00 505.92 541.33 541.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 505.92 541.33 541.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 505.92 541.33 541.33 =============== 202-00705 Rem Light Standard Foundation Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 1.00 804.49 860.80 860.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 804.49 860.80 860.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 804.49 860.80 860.80 =============== 202-00810 Rem Ground Sign Each =================================================== STA066A-008 SH 66 @ WCR 7 01/26/23 12.00 170.00 166.72 148.30 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 2.00 93.29 99.82 99.82 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 93.00 165.00 160.00 160.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 10 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00810 Rem Ground Sign Each =================================================== SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 12.00 150.00 237.60 237.60 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 41.00 125.00 160.00 150.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 75.00 80.00 82.50 105.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 19.00 155.00 140.27 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 254.00 131.66 134.46 137.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 254.00 131.66 134.46 137.30 =============== 202-00821 Rem Sign Panel Each =================================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 2.00 60.00 108.95 87.90 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 9.00 100.00 207.90 207.90 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 26.00 71.00 116.50 83.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 37.00 77.46 128.69 113.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37.00 77.46 128.69 113.65 =============== 202-00827 Rem of Pull Box Each =================================================== C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 8.00 200.00 170.00 170.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 1.00 1100.00 250.00 250.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 51.00 750.00 482.50 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 682.50 469.67 111.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 682.50 469.67 111.83 =============== 202-00828 Rem Traf Sig Equipment LUMP SUM =============================================== STA066A-008 SH 66 @ WCR 7 01/26/23 1.00 24000.00 26341.47 26750.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 1.00 15000.00 35100.00 35100.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 1.00 8500.00 12500.00 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 15625.00 25211.93 27987.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 15625.00 25211.93 27987.50 =============== 202-00858 Rem Pedestal Pole Each =================================================== C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 4.00 1000.00 683.75 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 1000.00 683.75 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1000.00 683.75 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 11 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00860 Rem Ped Push Button Each =================================================== C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 45.00 350.00 249.25 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 45.00 350.00 249.25 42.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 350.00 249.25 42.00 =============== 202-00895 Rem of Impact Attenuator Each =================================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 1.00 4000.00 3350.00 2700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 4000.00 3350.00 2700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 4000.00 3350.00 2700.00 =============== 202-01000 Rem Fence Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 343.00 10.00 3.04 1.97 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 185.00 10.00 10.57 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 528.00 10.00 5.67 2.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 528.00 10.00 5.67 2.68 =============== 202-01030 Rem of Road Closure Gate Each =================================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 1.00 10000.00 5000.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 5000.00 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 5000.00 5000.00 =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 5,275.00 4.00 4.77 4.84 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 1,921.00 10.00 9.25 8.50 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 545.00 30.00 9.25 8.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 5,028.00 6.00 6.15 6.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 1,861.00 5.00 4.40 4.40 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 12 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 850.00 4.00 12.95 12.95 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 1,315.00 6.40 9.50 5.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 641.00 8.00 11.38 10.50 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 3,914.00 5.37 6.15 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21,350.00 6.28 6.57 6.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21,350.00 6.28 6.57 6.38 =============== 202-01140 Rem Gdrail Ty 4 Lin Foot =============================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 600.00 15.00 21.68 31.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 600.00 15.00 21.68 31.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 600.00 15.00 21.68 31.10 =============== 202-01170 Rem Gdrail Ty 7 Lin Foot =============================================== C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 2,278.00 20.00 35.16 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,278.00 20.00 35.16 44.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,278.00 20.00 35.16 44.00 =============== 202-01300 Rem End Anchorage Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 28.00 300.00 475.92 483.83 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 12.00 600.00 738.50 677.00 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 94.00 350.00 562.50 600.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 2.00 500.00 104.54 104.54 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 14.00 370.00 640.00 780.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 6.00 350.00 517.50 475.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 4.00 505.00 489.63 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 160.00 367.50 560.95 586.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 160.00 367.50 560.95 586.56 =============== 202-04001 Plug Culvert Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 1.00 2395.73 2563.43 2563.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2395.73 2563.43 2563.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2395.73 2563.43 2563.43 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 13 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04002 Clean Culvert Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 2.00 500.00 4870.05 3190.10 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 17.00 4000.00 2136.91 1400.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 7.00 4000.00 7435.50 4300.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 1.00 5000.00 5450.00 4400.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 2.00 2429.43 3661.41 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29.00 3684.79 3441.40 2506.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 3684.79 3441.40 2506.21 =============== 202-04005 Clean Valve Box Each =================================================== C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 7.00 175.00 342.50 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 175.00 342.50 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 175.00 342.50 200.00 =============== 202-04007 Plug Culvert Cubic Yard ============================================= STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 140.00 400.00 303.43 274.85 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 51.00 60.00 538.01 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 191.00 309.21 366.06 348.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 191.00 309.21 366.06 348.32 =============== 202-04010 Clean Inlet Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 12.00 300.00 1045.02 1276.04 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 10.00 1350.00 1126.16 1500.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 4.00 350.00 783.75 200.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 4.00 700.00 1168.53 1055.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 710.00 1041.80 1177.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 710.00 1041.80 1177.75 =============== 202-04050 Clean Exp Joint Lin Foot =============================================== NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 89.00 20.00 107.70 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 89.00 20.00 107.70 70.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 89.00 20.00 107.70 70.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 14 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-05100 Sandblasting Reinf Steel Sq Yard ================================================ C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 30.00 40.00 249.62 78.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 40.00 249.62 78.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 40.00 249.62 78.00 =============== 202-06520 Rem of Existing Wall Panels LUMP SUM =============================================== NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 1.00 20000.00 31450.00 12900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 20000.00 31450.00 12900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 20000.00 31450.00 12900.00 =============== 203-00000 Uncl Excav Cubic Yard ============================================= NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 910.00 40.00 38.30 40.60 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 24,128.00 20.00 44.23 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25,038.00 20.73 44.12 26.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25,038.00 20.73 44.12 26.53 =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 726.00 40.00 96.83 102.65 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 3,855.00 20.00 24.50 20.50 STA066A-008 SH 66 @ WCR 7 01/26/23 192.00 100.00 79.86 95.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 538.00 40.00 73.54 130.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 289.00 60.00 53.00 25.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 277.00 50.00 17.79 17.79 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 9,321.00 40.00 17.38 20.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15,198.00 36.25 27.05 29.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,198.00 36.25 27.05 29.43 =============== 203-00050 Unsuitable Material Cubic Yard ============================================= STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 138.00 50.00 132.40 154.47 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 15 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00050 Unsuitable Material Cubic Yard ============================================= C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 500.00 170.00 66.50 45.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 50.00 100.00 162.18 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 688.00 140.84 87.56 75.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 688.00 140.84 87.56 75.68 =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 246.00 50.00 99.10 98.60 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 7,114.00 14.83 15.87 15.87 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 9,582.00 40.00 37.00 37.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 205.00 100.00 112.97 63.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 740.00 50.00 26.19 26.19 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 3.00 40.00 500.00 500.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 27.00 61.00 456.18 320.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17,917.00 31.27 33.13 29.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,917.00 31.27 33.13 29.81 =============== 203-00066 Emb Matl (CIP) (R40) Cubic Yard ============================================= FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 2,809.00 30.00 41.25 42.00 STA066A-008 SH 66 @ WCR 7 01/26/23 201.00 75.00 104.45 102.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,010.00 33.00 44.81 46.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,010.00 33.00 44.81 46.01 =============== 203-00100 Muck Excav Cubic Yard ============================================= C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 15.00 100.00 269.37 170.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 1,275.00 50.00 45.50 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,290.00 50.58 48.10 48.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,290.00 50.58 48.10 48.43 =============== 203-00400 Rock Excav Cubic Yard ============================================= C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 100.00 300.00 147.63 110.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 16 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00400 Rock Excav Cubic Yard ============================================= C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 5.00 300.00 414.34 370.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 6,346.00 90.00 45.99 45.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,451.00 93.42 52.55 47.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,451.00 93.42 52.55 47.23 =============== 203-01100 Proof Rolling Hour =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 10.00 131.45 140.65 140.65 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 50.00 100.00 140.00 140.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 20.00 150.00 134.40 134.40 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 20.00 120.00 116.00 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 117.15 131.12 138.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 117.15 131.12 138.95 =============== 203-01500 Blading Hour =================================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 20.00 300.00 140.00 160.00 STA066A-008 SH 66 @ WCR 7 01/26/23 20.00 160.00 251.82 180.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 200.00 150.00 155.00 155.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 40.00 170.00 171.06 145.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 30.00 150.00 70.00 120.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 80.00 150.00 137.50 135.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 10.00 150.00 165.00 150.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 18.00 233.16 305.95 360.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 418.00 163.15 167.10 157.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 418.00 163.15 167.10 157.85 =============== 203-01510 Backhoe Hour =================================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 10.00 400.00 122.50 125.00 STA066A-008 SH 66 @ WCR 7 01/26/23 20.00 150.00 221.49 155.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 6.00 123.01 170.12 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.00 214.95 201.82 158.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 214.95 201.82 158.33 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 17 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01582 Truck (Dump) Hour =================================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 10.00 200.00 155.00 160.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 100.00 150.00 156.44 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 110.00 154.55 156.37 160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 110.00 154.55 156.37 160.00 =============== 203-01590 Front End Loader (Rubber) Hour =================================================== C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 50.00 175.00 165.31 155.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 20.00 150.00 148.75 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70.00 167.86 160.58 116.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70.00 167.86 160.58 116.43 =============== 203-01594 Combination Loader Hour =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 20.00 150.00 154.61 159.21 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 8.00 150.00 143.33 130.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 80.00 160.00 165.00 165.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 20.00 150.00 143.94 150.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 60.00 250.00 105.56 105.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 188.00 186.17 143.10 142.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 188.00 186.17 143.10 142.33 =============== 203-01597 Potholing Hour =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 60.00 400.00 437.68 425.35 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 25.00 500.00 325.00 450.00 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 40.00 350.00 300.00 250.00 STA066A-008 SH 66 @ WCR 7 01/26/23 70.00 300.00 364.37 320.00 C0342-066 US 034A (MP 113-150) 02/02/23 8.00 500.00 340.67 237.00 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 40.00 299.90 320.89 320.89 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 20.00 400.00 250.00 250.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 50.00 500.00 382.00 160.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 80.00 350.00 280.06 390.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 40.00 300.00 650.00 650.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 18 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 15.00 500.00 50.00 50.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 10.00 450.00 245.00 290.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 100.00 225.00 283.75 20.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 20.00 250.00 433.62 433.62 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 15.00 250.00 327.73 250.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 10.00 314.00 435.07 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 603.00 343.09 339.76 295.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 603.00 343.09 339.76 295.48 =============== 203-02300 Rock Scaler Hour =================================================== C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 120.00 180.00 450.87 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 180.00 450.87 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 180.00 450.87 300.00 =============== 203-02315 Mechanized Scaling Hour =================================================== C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 40.00 500.00 555.04 520.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 500.00 555.04 520.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 500.00 555.04 520.00 =============== 203-02330 Laborer Hour =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 40.00 75.00 59.26 63.51 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 20.00 30.00 65.00 55.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 20.00 80.00 67.22 75.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 20.00 50.00 20.00 20.00 STRR300-265 MOUNTAIN RE FY23 CRACK SEALS 03/02/23 40.00 70.00 50.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 140.00 64.29 56.50 53.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 140.00 64.29 56.50 53.86 =============== 206-00000 Str Excav Cubic Yard ============================================= STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 642.00 50.00 88.80 96.20 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 19 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00000 Str Excav Cubic Yard ============================================= FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 48.00 70.00 36.83 38.00 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 16.00 65.37 69.95 69.95 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 24.00 150.00 170.00 170.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 343.00 100.00 127.72 61.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 7.00 100.00 21.77 21.77 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 40.00 70.00 431.42 310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,120.00 69.56 105.70 91.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,120.00 69.56 105.70 91.30 =============== 206-00065 Str Bkfl (Flow-Fill) Cubic Yard ============================================= STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 87.00 275.00 266.21 284.41 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 7.00 260.00 398.33 290.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 5.00 1000.00 2122.31 1780.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 99.00 310.56 410.75 360.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 99.00 310.56 410.75 360.34 =============== 206-00066 Str Bkfl (FF Ash) Cubic Yard ============================================= NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 50.00 75.00 494.74 670.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 75.00 494.74 670.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 75.00 494.74 670.00 =============== 206-00100 Str Bkfl (CL 1) Cubic Yard ============================================= STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 56.00 150.00 223.90 272.79 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 21.00 90.00 97.67 75.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 20.00 60.00 259.75 234.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 162.00 80.00 104.17 180.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 313.00 75.00 236.50 81.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 3.00 300.00 500.00 750.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 17.00 90.00 829.50 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 592.00 85.06 195.06 140.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 592.00 85.06 195.06 140.87 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 20 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00200 Str Bkfl (CL 2) Cubic Yard ============================================= NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 241.00 75.67 80.97 80.97 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 11.00 300.00 260.00 260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 252.00 85.46 88.78 88.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 252.00 85.46 88.78 88.78 =============== 206-00510 Filter Matl (CL A) Cubic Yard ============================================= STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 91.00 100.00 225.05 316.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 91.00 100.00 225.05 316.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 91.00 100.00 225.05 316.09 =============== 206-01781 Shoring (A 1) LUMP SUM =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1.00 15000.00 90707.47 67374.94 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 1.00 60000.00 80835.76 80000.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 1.00 15000.00 20661.88 6100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 30000.00 66463.71 51158.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 30000.00 66463.71 51158.31 =============== 206-01782 Shoring (A 2) LUMP SUM =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1.00 10000.00 90707.47 67374.94 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 1.00 50000.00 53563.34 60000.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 1.00 10000.00 12351.36 6100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 23333.33 52401.10 44491.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 23333.33 52401.10 44491.65 =============== 206-01783 Shoring (A 3) LUMP SUM =============================================== C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 1.00 10000.00 13201.36 7800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 13201.36 7800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 13201.36 7800.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 21 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00310 Stockpile Wetland Topsoil Cubic Yard ============================================= STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 153.00 25.00 53.80 17.59 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 72.00 30.00 72.19 21.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 1,007.00 17.00 69.00 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,232.00 18.75 67.30 60.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,232.00 18.75 67.30 60.63 =============== 207-00700 Topsoil (Onsite) Cubic Yard ============================================= STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 720.00 30.00 58.11 13.22 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 546.00 16.00 28.00 28.00 STA066A-008 SH 66 @ WCR 7 01/26/23 298.00 35.00 34.17 38.90 C0342-066 US 034A (MP 113-150) 02/02/23 81.00 35.00 88.67 76.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 208.00 30.00 23.50 20.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 12,664.00 4.50 4.00 4.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 3,250.00 20.00 24.50 25.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 672.00 30.00 37.64 20.25 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 135.00 35.00 54.00 40.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 221.00 50.00 9.84 9.84 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 138.00 26.00 93.00 98.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 242.00 30.00 21.13 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19,175.00 11.40 20.80 11.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,175.00 11.40 20.80 11.35 =============== 207-00702 Topsoil (Offsite) Cubic Yard ============================================= NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 116.00 150.00 256.55 97.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 116.00 150.00 256.55 97.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 116.00 150.00 256.55 97.00 =============== 207-00703 Topsoil (Wetlnd) Cubic Yard ============================================= STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 153.00 50.00 35.22 11.24 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 72.00 50.00 85.61 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 225.00 50.00 51.34 14.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 225.00 50.00 51.34 14.36 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 22 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00704 Sub Soil Prep Sq Yard ================================================ NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 812.00 2.00 3.13 3.25 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 1,113.00 1.00 2.38 2.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,925.00 1.42 2.82 2.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,925.00 1.42 2.82 2.75 =============== 208-00002 Erosion Log Type 1 (12 In) Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1,595.00 9.00 5.49 5.58 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 100.00 10.00 6.18 6.35 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 180.00 6.00 7.33 7.00 STA066A-008 SH 66 @ WCR 7 01/26/23 490.00 15.00 7.39 7.50 C0342-066 US 034A (MP 113-150) 02/02/23 300.00 7.00 14.57 16.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 6,300.00 6.00 6.50 6.50 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 1,200.00 10.00 7.48 9.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 1,160.00 10.00 6.61 6.25 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 160.00 10.00 12.50 10.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 7,401.00 5.10 6.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18,886.00 6.70 6.68 6.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,886.00 6.70 6.68 6.19 =============== 208-00008 Erosion Log Type 2 (12 In) Lin Foot =============================================== C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 762.00 8.00 8.23 10.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 400.00 7.00 9.88 9.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,162.00 7.66 8.48 9.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,162.00 7.66 8.48 9.96 =============== 208-00011 Erosion Bales (Weed Free) Each =================================================== SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 20.00 50.00 59.01 59.01 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 3.00 28.00 103.75 107.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 23.00 47.13 69.33 65.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 47.13 69.33 65.33 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 23 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00013 Erosion Log Type 1 (20 In) Lin Foot =============================================== NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 100.00 12.00 22.16 16.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 100.00 15.00 9.28 9.28 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 308.00 7.70 9.75 8.50 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 250.00 33.70 10.36 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 758.00 17.81 12.38 9.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 758.00 17.81 12.38 9.59 =============== 208-00020 Silt Fence Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 37.00 7.00 4.13 4.20 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 2,040.00 2.50 3.25 3.25 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 100.00 10.00 4.19 4.20 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 2,900.00 5.00 2.29 2.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,077.00 4.11 2.76 2.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,077.00 4.11 2.76 2.73 =============== 208-00021 Silt Fence (Reinf) Lin Foot =============================================== STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 2,726.00 3.30 4.18 4.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,726.00 3.30 4.18 4.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,726.00 3.30 4.18 4.35 =============== 208-00022 Erosion Log (Type 3)(9 In) Lin Foot =============================================== SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 100.00 8.00 14.50 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 8.00 14.50 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 8.00 14.50 14.00 =============== 208-00023 Erosion Log (Type 3)(12 In) Lin Foot =============================================== STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 200.00 5.00 7.15 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 200.00 5.00 7.15 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 5.00 7.15 8.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 24 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00033 Sediment Trap Each =================================================== STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 1.00 4300.00 5100.00 3200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 4300.00 5100.00 3200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 4300.00 5100.00 3200.00 =============== 208-00035 Aggregate Bag Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 914.00 8.00 12.53 12.76 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 150.00 14.00 10.75 12.50 STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 100.00 20.00 20.09 23.20 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 100.00 10.00 24.75 22.00 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 200.00 10.00 9.33 8.00 STA066A-008 SH 66 @ WCR 7 01/26/23 200.00 25.00 11.56 8.50 C0342-066 US 034A (MP 113-150) 02/02/23 40.00 35.00 15.83 14.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 285.00 15.00 11.03 11.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 500.00 12.00 11.00 11.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 200.00 12.00 15.76 35.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 100.00 15.00 19.00 19.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 100.00 10.00 10.00 15.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 300.00 8.00 17.82 13.00 FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 1,450.00 25.00 14.28 20.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 4,350.00 8.00 7.63 7.25 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 1,000.00 15.00 6.98 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,989.00 12.46 10.63 10.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,989.00 12.46 10.63 10.80 =============== 208-00045 Conc Washout Str Each =================================================== C0342-066 US 034A (MP 113-150) 02/02/23 1.00 3000.00 3342.67 3774.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 2.00 5000.00 3618.34 3300.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 1.00 4000.00 5579.49 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 4250.00 4158.15 3718.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 4250.00 4158.15 3718.50 =============== 208-00046 Pre-fab Conc Washout Str (Type 1) Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 17.00 2000.00 272.77 277.54 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 25 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00046 Pre-fab Conc Washout Str (Type 1) Each =================================================== STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 2.00 500.00 6559.52 4060.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 1.00 2200.00 3688.52 2700.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 1.00 3000.00 4984.47 5000.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 1.00 2500.00 1700.00 400.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 2.00 2500.00 3744.08 3210.00 FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 2.00 5000.00 28625.00 10000.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 2.00 3148.49 3093.01 4300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28.00 2285.61 3825.24 1998.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 2285.61 3825.24 1998.51 =============== 208-00052 Storm Drain Inlet Protection (Type II) Lin Foot =============================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 100.00 100.00 75.65 86.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 100.00 75.65 86.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 100.00 75.65 86.30 =============== 208-00053 Storm Drain Inlet Protect (Ty I)(84 In) Each =================================================== NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 3.00 200.00 613.18 305.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 200.00 613.18 305.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 200.00 613.18 305.00 =============== 208-00054 Storm Drain Inlet Protection (Type II) Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 4.00 250.00 212.43 215.86 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 17.00 300.00 245.03 340.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 8.00 250.00 300.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29.00 279.31 247.70 311.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 279.31 247.70 311.84 =============== 208-00055 Rigid Inlet Prot Device Each =================================================== C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 55.00 900.00 307.02 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 55.00 900.00 307.02 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55.00 900.00 307.02 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 26 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00056 Storm Drain Inlet Protection (Type III) Each =================================================== NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 13.00 250.00 386.50 330.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 1.00 213.00 203.17 92.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 247.36 377.56 313.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 247.36 377.56 313.00 =============== 208-00058 Storm Drain Inlet Protect (Ty I)(204 In) Each =================================================== STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 2.00 400.00 237.50 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 400.00 237.50 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 400.00 237.50 180.00 =============== 208-00070 Vehicle Tracking Pad Each =================================================== STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 2.00 3500.00 3250.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3500.00 3250.00 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3500.00 3250.00 1500.00 =============== 208-00075 Pre-fab Vehicle Track Pad Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 5.00 6500.00 4026.98 4093.96 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 4.00 5000.00 3903.50 2800.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 1.00 5250.00 8042.00 4600.00 STA066A-008 SH 66 @ WCR 7 01/26/23 2.00 5000.00 2969.03 2500.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 8.00 3000.00 2500.00 2500.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 4.00 5000.00 7746.25 18000.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 1.00 5000.00 10617.44 3800.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 1.00 5000.00 23600.00 23600.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 1.00 5000.00 1750.00 2000.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 1.00 3000.00 6788.80 5750.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 4.00 6000.00 7560.00 7560.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 1.00 3000.00 5087.50 2600.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 2.00 4300.00 3909.77 4350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 35.00 4724.29 5128.83 5998.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 4724.29 5128.83 5998.85 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 27 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00082 Construction Mat Sq Foot ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1,200.00 15.00 24.35 14.09 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 475.00 50.00 26.28 27.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 1,000.00 15.00 18.75 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,675.00 21.21 22.60 20.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,675.00 21.21 22.60 20.46 =============== 208-00090 Erosion Control (Curb Ramp) Each =================================================== STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 27.00 300.00 500.00 500.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 198.00 700.00 515.00 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 225.00 652.00 514.51 764.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 225.00 652.00 514.51 764.00 =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 10.00 60.00 61.72 62.74 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 20.00 100.00 55.75 60.00 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 40.00 75.00 56.92 47.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 20.00 75.00 86.62 105.00 STA066A-008 SH 66 @ WCR 7 01/26/23 32.00 120.00 106.45 115.00 C0342-066 US 034A (MP 113-150) 02/02/23 2.00 105.00 85.00 55.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 16.00 85.00 64.00 59.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 200.00 60.00 95.00 95.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 80.00 70.00 78.31 140.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 10.00 80.00 111.45 75.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 10.00 75.00 90.00 90.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 20.00 75.00 25.00 40.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 50.00 70.00 72.13 123.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 80.00 75.00 43.20 43.20 STRR300-265 MOUNTAIN RE FY23 CRACK SEALS 03/02/23 40.00 75.00 75.00 75.00 FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 5.00 110.00 149.00 223.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 80.00 50.00 45.31 54.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 12.00 87.00 86.47 81.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 727.00 70.50 73.23 85.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 727.00 70.50 73.23 85.56 =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 8.00 130.00 145.67 90.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 28 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 20.00 150.00 163.55 190.00 STA066A-008 SH 66 @ WCR 7 01/26/23 16.00 300.00 201.29 200.00 C0342-066 US 034A (MP 113-150) 02/02/23 2.00 250.00 146.33 64.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 16.00 180.00 136.67 160.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 80.00 120.00 135.00 135.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 80.00 160.00 177.19 240.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 10.00 200.00 187.88 150.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 10.00 225.00 200.00 200.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 20.00 175.00 105.00 200.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 80.00 125.00 108.00 108.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 40.00 120.00 114.50 121.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 12.00 138.82 266.99 360.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 394.00 149.33 158.49 166.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 394.00 149.33 158.49 166.77 =============== 208-00106 Sweeping (Sediment Removal) Hour =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 10.00 160.00 148.73 173.45 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 20.00 250.00 190.00 180.00 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 45.00 160.00 120.00 40.00 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 80.00 150.00 150.00 100.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 40.00 170.00 218.65 225.00 STA066A-008 SH 66 @ WCR 7 01/26/23 32.00 250.00 218.90 205.00 C0342-066 US 034A (MP 113-150) 02/02/23 2.00 200.00 159.67 29.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 4.00 200.00 180.00 170.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 160.00 140.00 215.00 215.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 40.00 190.00 169.25 130.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 20.00 75.00 100.00 100.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 40.00 175.00 67.50 100.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 75.00 125.00 175.25 245.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 160.00 250.00 64.07 64.07 FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 5.00 180.00 212.50 250.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 176.00 130.00 127.50 125.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 60.00 178.00 225.61 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 969.00 169.39 158.19 148.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 969.00 169.39 158.19 148.51 =============== 208-00107 Rem Trash Hour =================================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 80.00 150.00 100.75 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 29 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00107 Rem Trash Hour =================================================== FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 16.00 70.00 163.67 64.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 20.00 110.00 127.09 113.00 STA066A-008 SH 66 @ WCR 7 01/26/23 8.00 250.00 104.45 115.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 8.00 150.00 64.00 59.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 40.00 100.00 125.00 125.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 5.00 125.00 116.25 100.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 10.00 100.00 33.00 46.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 30.00 100.00 110.25 155.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 80.00 100.00 81.00 81.00 FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 5.00 200.00 95.00 105.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 30.00 50.00 53.50 70.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 10.00 124.60 152.28 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 342.00 113.72 106.62 111.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 342.00 113.72 106.62 111.67 =============== 208-00146 Pre-fab Conc Washout Str (Type 2) Each =================================================== FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 2.00 1200.00 1692.00 600.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 5.00 1500.00 2100.00 2100.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 2.00 500.00 350.00 350.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 2.00 2000.00 3025.00 1550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 1354.55 1895.83 1409.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 1354.55 1895.83 1409.09 =============== 208-00200 Erosion Control Management LUMP SUM =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1.00 50000.00 8652.34 8804.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 50000.00 8652.34 8804.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 50000.00 8652.34 8804.68 =============== 208-00207 Erosion Control Management Day ==================================================== SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 20.00 250.00 362.50 350.00 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 18.00 700.00 367.67 420.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 10.00 250.00 443.87 450.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 30.00 300.00 193.33 130.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 30 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00207 Erosion Control Management Day ==================================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 20.00 750.00 415.00 415.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 16.00 350.00 903.94 700.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 50.00 500.00 1041.16 1041.16 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 22.00 320.00 295.00 450.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 10.00 244.66 476.89 420.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 196.00 429.52 484.23 554.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 196.00 429.52 484.23 554.17 =============== 208-00400 Water Control LUMP SUM =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1.00 50000.00 75972.62 32945.24 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 1.00 7000.00 12192.24 4500.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 1.00 55000.00 77000.00 80000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 22166.67 33623.59 21824.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 22166.67 33623.59 21824.21 =============== 210-00011 Res Mailbox Str (Ty 1) Each =================================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 4.00 335.00 575.00 575.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 335.00 575.00 575.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 335.00 575.00 575.00 =============== 210-00012 Res Mailbox Str (Ty 2) Each =================================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 2.00 400.00 575.00 575.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 400.00 575.00 575.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 400.00 575.00 575.00 =============== 210-00013 Res Mailbox Str (Ty 3) Each =================================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 1.00 550.00 575.00 575.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 550.00 575.00 575.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 550.00 575.00 575.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 31 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00065 Res Monument (Ty 3A) Each =================================================== C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 4.00 800.00 787.50 100.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 6.00 1000.00 1065.00 1150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 920.00 906.43 730.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 920.00 906.43 730.00 =============== 210-00075 Reset Pre-Fab Veh Tracking Pad Each =================================================== NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 2.00 1400.00 863.26 570.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1400.00 863.26 570.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1400.00 863.26 570.00 =============== 210-00090 Res Delineator Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 4.00 45.00 13.61 13.82 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 15.00 35.00 119.25 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19.00 37.11 106.82 42.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 37.11 106.82 42.38 =============== 210-00810 Res Ground Sign Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 31.00 350.00 392.38 398.76 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 9.00 400.00 406.17 630.00 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 1.00 336.66 360.23 360.23 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 10.00 700.00 834.88 42.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 1.00 420.00 330.00 330.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 3.00 550.00 817.08 1300.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 2.00 500.00 320.29 350.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 1.00 450.00 200.00 200.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 2.00 600.00 625.00 450.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 27.00 450.00 408.75 500.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 1.00 500.00 772.20 772.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 88.00 444.96 470.15 444.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 88.00 444.96 470.15 444.48 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 32 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00815 Res Sign Panel Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 22.00 150.00 261.42 265.84 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 2.00 300.00 150.00 150.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 10.00 170.00 287.50 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 34.00 164.71 265.95 261.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 164.71 265.95 261.72 =============== 210-00858 Res Pedestal Pole Each =================================================== STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 1.00 1200.00 12000.00 12000.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 9.00 750.00 2475.00 2380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 795.00 2732.43 3342.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 795.00 2732.43 3342.00 =============== 210-00859 Mod Ped Push Button Each =================================================== STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 2.00 700.00 1500.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 700.00 1500.00 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 700.00 1500.00 1500.00 =============== 210-00860 Res Ped Push Button Each =================================================== STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 9.00 500.00 500.00 500.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 17.00 1400.00 649.00 166.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26.00 1088.46 631.58 281.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 1088.46 631.58 281.62 =============== 210-01000 Res Fence Lin Foot =============================================== C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 40.00 20.00 47.50 20.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 40.00 80.00 145.82 245.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 80.00 50.00 89.64 132.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 50.00 89.64 132.50 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 33 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01011 Res Gate Each =================================================== STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 1.00 820.00 3137.50 5475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 820.00 3137.50 5475.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 820.00 3137.50 5475.00 =============== 210-01130 Res Gdrail Ty 3 Lin Foot =============================================== C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 25.00 40.00 132.75 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 40.00 132.75 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 40.00 132.75 275.00 =============== 210-01180 Reset Guardrail (Special) Lin Foot =============================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 31.00 100.00 112.50 112.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 31.00 100.00 112.50 112.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31.00 100.00 112.50 112.50 =============== 210-02510 Relay Sprinkler System LUMP SUM =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1.00 250.00 2646.53 4263.05 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 1.00 2000.00 51875.00 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 833.33 27260.76 11175.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 833.33 27260.76 11175.37 =============== 210-02804 Grinding: Sidwlk and/or Curb Ramp Repair Lin Foot =============================================== STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 89.00 45.00 55.00 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 89.00 45.00 55.00 55.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 89.00 45.00 55.00 55.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 34 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04010 Adj Manhole Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 5.00 1100.00 1813.43 1496.85 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 100.00 1300.00 1605.00 1110.00 STA066A-008 SH 66 @ WCR 7 01/26/23 1.00 1000.00 2126.52 1718.67 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 2.00 1595.29 1706.96 1706.96 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 2.00 2000.00 500.00 500.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 5.00 1500.00 801.25 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 115.00 1314.70 1548.98 1103.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 115.00 1314.70 1548.98 1103.19 =============== 210-04020 Modify Inlet Each =================================================== C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 5.00 3500.00 8262.50 750.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 1.00 3200.00 7177.90 3600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 3450.00 8121.03 1225.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 3450.00 8121.03 1225.00 =============== 210-04050 Adj Valve Box Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 2.00 1200.00 1779.06 1478.11 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 104.00 500.00 522.00 544.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 2.00 900.00 500.00 500.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 7.00 700.00 576.25 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 115.00 531.30 548.87 556.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 115.00 531.30 548.87 556.80 =============== 211-00100 Drilling Hole Lin Foot =============================================== FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 14,700.00 350.00 348.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14,700.00 350.00 348.00 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,700.00 350.00 348.00 300.00 =============== 211-00116 2 In Drilled Hole Lin Foot =============================================== FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 2,205.00 350.00 1084.80 825.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,205.00 350.00 1084.80 825.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,205.00 350.00 1084.80 825.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 35 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 211-00224 3 In Core Drilled Hole Lin Foot =============================================== FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 1,838.00 1000.00 408.50 425.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,838.00 1000.00 408.50 425.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,838.00 1000.00 408.50 425.00 =============== 211-01115 Rock Reinf (No.10) Lin Foot =============================================== C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 360.00 140.00 239.08 260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 360.00 140.00 239.08 260.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 360.00 140.00 239.08 260.00 =============== 211-02210 Pre Grouting Ton ==================================================== FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 421.00 3000.00 6967.06 2175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 421.00 3000.00 6967.06 2175.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 421.00 3000.00 6967.06 2175.00 =============== 211-02232 Grout Conn (Pre-Grout) Each =================================================== FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 2,205.00 3500.00 4801.50 3995.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,205.00 3500.00 4801.50 3995.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,205.00 3500.00 4801.50 3995.00 =============== 211-02277 Cement Grout (Voids) Cubic Yard ============================================= STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 5.00 1200.00 1851.30 1882.59 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 23.00 1000.00 1880.47 2100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28.00 1035.71 1875.26 2061.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 1035.71 1875.26 2061.18 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 36 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 211-03005 Dewatering LUMP SUM =============================================== C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 1.00 7000.00 9499.06 7100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 7000.00 9499.06 7100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 7000.00 9499.06 7100.00 =============== 212-00006 Seeding (Native) Acre =================================================== SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 0.78 5000.00 10100.00 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.78 5000.00 10100.00 2200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.78 5000.00 10100.00 2200.00 =============== 212-00700 Organic Fertilizer Pound ================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 261.00 3.00 1.58 1.60 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 75.00 50.00 1.55 2.35 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 420.00 1.50 2.00 1.75 STA066A-008 SH 66 @ WCR 7 01/26/23 150.00 10.00 7.02 5.75 C0342-066 US 034A (MP 113-150) 02/02/23 30.00 10.00 20.67 16.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 117.00 3.00 3.63 4.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 1,200.00 0.50 1.92 2.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 345.00 2.00 1.73 2.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 3.30 500.00 26.00 26.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 50.00 3.00 15.00 10.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 90.00 2.00 2.96 2.96 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 400.00 1.90 4.00 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,141.30 3.61 2.76 2.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,141.30 3.61 2.76 2.76 =============== 212-00701 Compost (Mech App) Cubic Yard ============================================= FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 84.00 45.00 65.24 68.00 STA066A-008 SH 66 @ WCR 7 01/26/23 25.00 70.00 66.38 77.79 C0342-066 US 034A (MP 113-150) 02/02/23 7.00 65.00 159.33 218.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 54.00 100.00 81.92 84.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 39.00 60.00 117.83 145.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 37 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00701 Compost (Mech App) Cubic Yard ============================================= STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 52.00 52.00 115.00 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 261.00 62.95 82.22 100.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 261.00 62.95 82.22 100.13 =============== 212-00702 Bio Soil Amd (Hyd App) Pound ================================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 875.00 1.50 2.05 2.35 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 11,900.00 1.80 2.29 2.50 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 590.00 2.00 11.50 3.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 1,050.00 2.00 2.70 2.70 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 1,050.00 3.00 1.65 1.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15,465.00 1.89 2.46 2.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,465.00 1.89 2.46 2.45 =============== 212-00703 Humate Pound ================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 130.50 3.50 2.84 2.87 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 50.00 50.00 1.23 1.70 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 105.00 7.00 3.53 2.50 STA066A-008 SH 66 @ WCR 7 01/26/23 50.00 7.00 10.43 12.91 C0342-066 US 034A (MP 113-150) 02/02/23 15.00 10.00 47.00 58.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 59.00 4.00 5.11 5.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 3,555.00 2.50 2.40 2.40 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 680.00 0.70 2.22 2.50 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 172.00 5.00 2.80 3.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 1.65 200.00 52.00 52.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 35.00 2.00 15.00 10.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 60.00 2.00 2.84 2.84 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 160.00 1.90 6.00 8.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 45.00 3.00 2.45 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,118.15 3.05 3.21 2.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,118.15 3.05 3.21 2.99 =============== 212-00704 Mycorrhizae Pound ================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 17.40 36.00 23.57 23.93 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 38 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00704 Mycorrhizae Pound ================================================== FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 14.00 22.00 41.17 35.00 STA066A-008 SH 66 @ WCR 7 01/26/23 8.00 50.00 73.06 86.37 C0342-066 US 034A (MP 113-150) 02/02/23 2.00 25.00 265.00 280.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 8.00 50.00 69.24 75.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 190.00 25.00 22.00 22.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 23.00 30.00 31.05 31.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 0.66 200.00 130.00 130.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 16.00 22.00 45.00 60.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 6.00 30.00 47.08 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 285.06 27.67 38.66 31.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 285.06 27.67 38.66 31.47 =============== 212-00705 Elemental Sulfur Pound ================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 52.20 4.00 3.97 4.04 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 69.00 8.75 6.07 6.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 0.66 100.00 130.00 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 121.86 7.21 5.50 5.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 121.86 7.21 5.50 5.83 =============== 212-00706 Seed (Native) Drill Acre =================================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 23.70 2300.00 1275.00 1275.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 0.60 2000.00 2156.25 3900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.30 2292.59 1356.03 1339.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.30 2292.59 1356.03 1339.81 =============== 212-00707 Seed (Native) Hyd) Acre =================================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 0.30 3000.00 4565.00 5880.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 3.40 4000.00 2912.19 4100.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 0.35 2000.00 5173.40 5173.40 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 0.30 2000.00 3350.00 4200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.35 3632.18 3047.22 4316.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.35 3632.18 3047.22 4316.02 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 39 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00708 Seed (Native) Brdcst Acre =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 0.87 3000.00 956.99 972.98 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 0.70 4000.00 2170.83 2600.00 STA066A-008 SH 66 @ WCR 7 01/26/23 0.37 3500.00 5800.04 5160.32 C0342-066 US 034A (MP 113-150) 02/02/23 0.10 3500.00 9420.00 13120.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 0.40 4000.00 4321.10 4800.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 1.15 2000.00 1078.57 1100.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 0.01 5000.00 14000.00 14000.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 0.20 5000.00 8250.00 6500.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 0.80 3100.00 4875.00 4750.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 0.14 3635.00 9275.50 11900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.74 3163.66 3303.50 3373.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.74 3163.66 3303.50 3373.30 =============== 212-00711 Seeding (Wetland) Broadcast Acre =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 0.17 3000.00 2999.87 3049.74 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 0.12 25000.00 2517.42 2500.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 0.02 10000.00 10400.00 16000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.31 11967.74 3290.54 3672.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.31 11967.74 3290.54 3672.44 =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 0.14 5500.00 18357.93 24600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.14 5500.00 18357.93 24600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.14 5500.00 18357.93 24600.00 =============== 213-00003 Mulching (Weed Free) Acre =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1.04 1100.00 1717.50 1744.99 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 0.78 3000.00 4250.00 4500.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 1.15 2500.00 4987.35 5000.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 0.01 4000.00 13000.00 13000.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 0.80 2000.00 3137.50 4275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.78 2116.64 3554.00 3871.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.78 2116.64 3554.00 3871.41 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 40 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00004 Mulching (Weed Free Straw) Acre =================================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 23.70 950.00 905.00 905.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 0.60 3200.00 2150.00 3700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.30 1005.56 1019.48 974.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.30 1005.56 1019.48 974.01 =============== 213-00012 Spray-on Mulch Blanket Acre =================================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 0.30 10000.00 7745.00 9990.00 C0342-066 US 034A (MP 113-150) 02/02/23 0.10 4000.00 14041.67 16255.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 3.40 7000.00 6486.67 7800.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 1.15 5500.00 7584.66 7600.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 0.20 10000.00 12400.00 9800.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 0.25 15000.00 6232.72 6232.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.40 7273.15 6936.45 8037.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.40 7273.15 6936.45 8037.16 =============== 213-00013 Spray-on Mulch Blanket Pound ================================================== SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 150.00 16.00 3.88 3.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 150.00 16.00 3.88 3.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 16.00 3.88 3.88 =============== 213-00061 Mulch Tackifier Pound ================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 150.00 7.00 7.01 7.12 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 4,740.00 4.00 3.85 3.85 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 120.00 10.00 5.38 8.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 2.80 20.00 31.00 31.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 28.00 10.00 44.40 71.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,040.80 4.27 4.57 4.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,040.80 4.27 4.57 4.43 =============== 213-00067 Rock Mulch (Weed Free) Sq Foot ================================================ STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 29.00 20.00 5.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29.00 20.00 5.00 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 20.00 5.00 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 41 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00070 Landscape Weed Barr Fabric Sq Yard ================================================ NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 1,850.00 2.66 2.85 2.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,850.00 2.66 2.85 2.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,850.00 2.66 2.85 2.85 =============== 213-00150 Bonded Fiber Matrix Acre =================================================== STA066A-008 SH 66 @ WCR 7 01/26/23 0.20 5000.00 9733.68 7463.25 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 15.00 3800.00 3900.00 3900.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 1.00 3500.00 4700.00 4200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.20 3796.30 4312.98 3962.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.20 3796.30 4312.98 3962.51 =============== 214-00506 Evergreen Tree (6 Ft)(B-B) Each =================================================== SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 5.00 1000.00 994.06 994.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 1000.00 994.06 994.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1000.00 994.06 994.06 =============== 214-01010 Brush Layer Cutting Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 170.00 15.00 9.98 10.16 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 415.00 20.00 16.34 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 585.00 18.55 14.49 14.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 585.00 18.55 14.49 14.30 =============== 216-00021 Soil Reten Blanket (Cl 1) Sq Yard ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1,247.00 5.00 3.92 3.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,247.00 5.00 3.92 3.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,247.00 5.00 3.92 3.99 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 42 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00101 Soil Reten Blanket (S-C)(PhotoD Cl 1) Sq Yard ================================================ C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 1,888.00 5.00 3.73 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,888.00 5.00 3.73 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,888.00 5.00 3.73 4.00 =============== 216-00201 Soil Reten Blanket (S-C)(BioD Cl 1) Sq Yard ================================================ SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 1,000.00 4.00 9.00 8.00 STA066A-008 SH 66 @ WCR 7 01/26/23 1,790.00 3.50 4.09 4.14 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 5,184.00 3.30 3.68 3.35 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 1,460.00 3.00 3.08 3.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,434.00 3.37 4.20 3.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,434.00 3.37 4.20 3.98 =============== 216-00211 Soil Reten Blanket (Exc)(BioD Cl 1) Sq Yard ================================================ FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 3,388.00 3.00 4.14 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,388.00 3.00 4.14 3.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,388.00 3.00 4.14 3.50 =============== 217-00020 Herbicide Treatment Hour =================================================== FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 16.00 250.00 157.33 95.00 STA066A-008 SH 66 @ WCR 7 01/26/23 24.00 130.00 159.96 106.77 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 4.00 250.00 204.82 240.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 10.00 200.00 650.00 650.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 8.00 200.00 70.00 100.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 24.00 110.00 171.25 20.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 40.00 200.00 142.56 142.56 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 10.00 200.00 212.50 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 136.00 179.12 172.61 143.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 136.00 179.12 172.61 143.93 =============== 240-00000 Wildlife Biologist Hour =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 20.00 150.00 150.56 153.12 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 43 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 240-00000 Wildlife Biologist Hour =================================================== NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 40.00 125.00 112.03 106.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 40.00 130.00 205.06 320.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 20.00 140.00 171.43 150.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 20.00 200.00 160.00 160.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 80.00 125.00 93.03 104.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 16.00 140.00 368.73 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 236.00 136.61 147.95 183.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 236.00 136.61 147.95 183.99 =============== 240-00010 Rem of Nests Hour =================================================== NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 40.00 100.00 197.01 205.00 STA066A-008 SH 66 @ WCR 7 01/26/23 10.00 150.00 131.85 100.84 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 20.00 150.00 135.00 135.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 80.00 80.00 265.19 175.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 10.00 150.00 154.44 154.44 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 20.00 50.00 135.00 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 180.00 96.67 215.67 163.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 180.00 96.67 215.67 163.07 =============== 240-00020 Netting Sq Yard ================================================ STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 200.00 10.00 11.00 11.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 300.00 10.00 16.75 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 500.00 10.00 15.31 15.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 500.00 10.00 15.31 15.80 =============== 240-00100 Prairie Dog Mgmt LUMP SUM =============================================== SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 1.00 10000.00 13068.00 13068.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 13068.00 13068.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 13068.00 13068.00 =============== 250-00010 Envir Health/Safety Mngmt LUMP SUM =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1.00 10000.00 9243.42 5316.84 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 44 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00010 Envir Health/Safety Mngmt LUMP SUM =============================================== FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 1.00 1500000.00 2510000.00 2000000.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 1.00 10000.00 56374.41 39700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 506666.67 858539.28 681672.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 506666.67 858539.28 681672.28 =============== 250-00050 Monitoring Technician Hour =================================================== FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 200.00 150.00 205.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 200.00 150.00 205.00 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 150.00 205.00 300.00 =============== 250-00110 Health and Safety Officer Hour =================================================== FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 100.00 200.00 535.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 200.00 535.00 250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 200.00 535.00 250.00 =============== 250-10005 Custom Fire Extinguisher Cab Each =================================================== C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 68.00 180.00 1524.00 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 68.00 180.00 1524.00 1400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 68.00 180.00 1524.00 1400.00 =============== 250-10021 Fire Preempt Unit + Timer Each =================================================== C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 4.00 7500.00 5200.00 5200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 7500.00 5200.00 5200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 7500.00 5200.00 5200.00 =============== 304-01000 ABC (CL 1) Ton ==================================================== NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 363.00 40.00 46.00 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 363.00 40.00 46.00 34.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 363.00 40.00 46.00 34.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 45 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-03005 ABC (CL 3) Cubic Yard ============================================= NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 819.00 50.00 109.00 126.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 819.00 50.00 109.00 126.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 819.00 50.00 109.00 126.00 =============== 304-06000 ABC (CL 6) Ton ==================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 2,684.00 50.00 98.27 87.54 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 120.00 300.00 67.50 65.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 51.00 130.00 229.04 120.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 284.00 50.00 49.50 38.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 209.00 45.00 67.50 35.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 50.00 85.00 126.68 100.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 937.00 50.00 36.28 36.28 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 50.00 32.00 285.25 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,385.00 57.73 88.32 71.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,385.00 57.73 88.32 71.72 =============== 304-06007 ABC (CL 6) Cubic Yard ============================================= NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 273.00 70.00 142.00 190.00 STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 138.00 90.00 324.66 250.61 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 1,137.00 55.00 63.75 59.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 32.00 100.00 205.38 170.00 STA066A-008 SH 66 @ WCR 7 01/26/23 53.00 125.00 172.94 130.00 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 3,342.00 51.00 54.57 54.57 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 7,784.00 95.00 104.00 104.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 300.00 90.00 72.00 72.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 6,062.00 50.00 53.88 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19,121.00 70.28 77.22 79.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,121.00 70.28 77.22 79.12 =============== 304-06008 ABC (CL 6) (Spec) Cubic Yard ============================================= FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 298.00 95.00 71.17 70.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 46 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06008 ABC (CL 6) (Spec) Cubic Yard ============================================= STA066A-008 SH 66 @ WCR 7 01/26/23 301.00 95.00 118.68 96.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 1,354.00 50.00 56.33 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,953.00 63.80 76.39 63.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,953.00 63.80 76.39 63.61 =============== 304-07000 ABC (CL 7) Ton ==================================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 389.34 50.00 83.05 87.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 389.34 50.00 83.05 87.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 389.34 50.00 83.05 87.10 =============== 304-08000 ABC (Shoulder Material) Ton ==================================================== SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 333.00 50.00 39.57 39.57 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 5,068.93 31.00 44.75 41.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,401.93 32.17 44.59 41.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,401.93 32.17 44.59 41.38 =============== 304-08002 ABC (Shoulder Material) Cubic Yard ============================================= NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 43.00 229.98 246.08 246.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 43.00 229.98 246.08 246.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43.00 229.98 246.08 246.08 =============== 304-09014 ABC (Spec) Ton ==================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 5,356.00 35.00 44.96 59.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,356.00 35.00 44.96 59.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,356.00 35.00 44.96 59.51 =============== 306-01000 Reconditioning Sq Yard ================================================ NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 83.00 12.05 12.89 12.89 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 47 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 306-01000 Reconditioning Sq Yard ================================================ STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 35,277.00 2.00 1.88 2.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 35,360.00 2.02 1.89 2.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35,360.00 2.02 1.89 2.47 =============== 310-00608 Full Depth Reclam. of HMA Pvmt (0-8 in.) Sq Yard ================================================ NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 6,190.00 3.30 3.53 3.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,190.00 3.30 3.53 3.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,190.00 3.30 3.53 3.53 =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 158.00 350.00 381.20 548.40 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 540.54 300.00 298.50 297.00 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 20.00 500.00 337.50 275.00 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 69.00 300.00 299.33 190.00 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 34.00 255.62 273.52 273.52 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 93.00 500.00 350.76 390.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 500.00 200.00 400.00 400.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 50.00 500.00 578.44 1150.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 50.00 300.00 200.00 200.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 10.00 350.00 262.50 265.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 105.00 250.00 332.64 332.64 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 95.62 280.00 252.50 185.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 105.00 250.00 166.00 155.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 60.00 309.51 1016.31 930.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,890.16 288.18 353.54 373.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,890.16 288.18 353.54 373.62 =============== 403-00721 HMA (Patching) (Asph) Sq Yard ================================================ C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 170.00 100.00 205.29 120.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 467.00 60.00 163.75 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 637.00 70.68 170.15 105.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 637.00 70.68 170.15 105.34 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 48 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-33841 HMA (Gr S) (100) (PG 64-22) Ton ==================================================== STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 17,985.00 105.00 90.83 83.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17,985.00 105.00 90.83 83.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,985.00 105.00 90.83 83.00 =============== 403-34721 HMA (Gr SX) (75) (PG 58-28) Ton ==================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 36,995.00 120.00 118.10 116.69 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 6,939.00 150.00 154.45 160.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 1,950.00 200.00 178.20 178.20 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 23,155.74 150.00 131.50 133.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 69,039.74 135.34 128.54 128.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 69,039.74 135.34 128.54 128.25 =============== 403-34741 HMA (Gr SX) (75) (PG 64-22) Ton ==================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 4,321.00 99.18 106.12 106.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,321.00 99.18 106.12 106.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,321.00 99.18 106.12 106.12 =============== 403-34751 HMA (Gr SX) (75) (PG 64-28) Ton ==================================================== FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 1,843.00 125.00 121.17 96.00 STA066A-008 SH 66 @ WCR 7 01/26/23 4,449.00 140.00 124.46 99.75 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 1,838.00 115.71 123.81 123.81 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 53,035.00 120.00 139.00 139.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 61,165.00 121.48 132.78 134.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 61,165.00 121.48 132.78 134.39 =============== 403-34801 HMA (Gr SX) (100) Ton ==================================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 40,125.29 95.00 88.70 82.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40,125.29 95.00 88.70 82.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40,125.29 95.00 88.70 82.40 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 49 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34871 HMA (Gr SX) (100) (PG 76-28) Ton ==================================================== NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 303.00 150.00 257.50 230.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 17,116.00 140.00 100.63 92.00 ER0703-524 STRUCTURE F-13-P, EB I-70 EXI 03/31/23 227.00 204.00 373.81 204.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17,646.00 141.00 108.54 95.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,646.00 141.00 108.54 95.81 =============== 403-36721 HMA (Gr ST)(75)(PG 58-28) Ton ==================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 26,481.00 120.00 126.55 126.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26,481.00 120.00 126.55 126.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26,481.00 120.00 126.55 126.09 =============== 408-01000 Hot Joint-Crack Sealant Ton ==================================================== STRR300-265 MOUNTAIN RE FY23 CRACK SEALS 03/02/23 135.00 3500.00 5055.00 5055.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 135.00 3500.00 5055.00 5055.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 135.00 3500.00 5055.00 5055.00 =============== 408-01100 Joint Sealant Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 324.00 30.00 9.88 9.75 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 488.00 40.00 17.72 5.50 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 270.00 35.00 46.88 36.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,082.00 35.76 22.64 14.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,082.00 35.76 22.64 14.51 =============== 409-01015 CC Matl (Ty I) Sq Yard ================================================ SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 3,705.00 10.00 2.97 2.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,705.00 10.00 2.97 2.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,705.00 10.00 2.97 2.97 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 50 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 409-03060 Furn CC Matl Ton ==================================================== STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 150.00 100.00 88.50 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 150.00 100.00 88.50 105.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 100.00 88.50 105.00 =============== 411-03345 Asph Cem (PG 76-28) Ton ==================================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 2,408.32 600.00 716.00 882.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,408.32 600.00 716.00 882.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,408.32 600.00 716.00 882.00 =============== 411-10216 Emul Asph (CRS-2P) Gallon ================================================= SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 1,912.00 5.00 17.82 17.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,912.00 5.00 17.82 17.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,912.00 5.00 17.82 17.82 =============== 411-10255 Emul Asph (SS) Gallon ================================================= STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 43,875.00 4.00 5.44 5.57 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 18,795.00 3.00 4.25 4.50 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 6,172.00 4.00 3.95 4.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 54.00 10.00 3.50 2.50 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 610.00 5.00 24.95 24.95 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 10,884.00 3.60 4.00 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 80,390.00 3.72 4.88 5.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80,390.00 3.72 4.88 5.13 =============== 412-00190 Conc Pvmt (Patching) Sq Yard ================================================ STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 4,140.00 200.00 267.28 204.94 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 51 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-00190 Conc Pvmt (Patching) Sq Yard ================================================ C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 594.00 140.00 184.75 124.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 278.00 493.00 561.72 435.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,012.00 209.14 269.35 208.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,012.00 209.14 269.35 208.11 =============== 412-00600 Conc Pvmt (6 In) Sq Yard ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 408.00 150.00 122.92 144.83 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 36.00 200.00 149.00 149.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 444.00 154.05 124.02 145.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 444.00 154.05 124.02 145.17 =============== 412-00801 Conc Pvmt (8 In) (Spec) Sq Yard ================================================ NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 1,514.00 137.55 147.18 147.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,514.00 137.55 147.18 147.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,514.00 137.55 147.18 147.18 =============== 412-01250 Conc Pvmt (12-1/2 In) Sq Yard ================================================ NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 180.00 300.00 403.49 332.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 180.00 300.00 403.49 332.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 180.00 300.00 403.49 332.00 =============== 412-05100 Poly Slab Jacking Pound ================================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 113.00 10.00 66.35 51.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 113.00 10.00 66.35 51.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 113.00 10.00 66.35 51.70 =============== 420-00000 Geomembrane Sq Yard ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 96.00 50.00 20.94 22.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 96.00 50.00 20.94 22.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 96.00 50.00 20.94 22.17 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 52 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00102 Geotextile (Er Cont) (CL 1) Sq Yard ================================================ NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 153.00 13.89 14.86 14.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 153.00 13.89 14.86 14.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 153.00 13.89 14.86 14.86 =============== 420-00112 Geotextile (Drain) (CL 1) Sq Yard ================================================ SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 26.00 20.00 10.98 10.98 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 99.00 6.60 11.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 125.00 9.39 11.00 10.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 125.00 9.39 11.00 10.20 =============== 420-00113 Geotextile (Drain) (CL 2) Sq Yard ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 490.00 5.00 8.05 12.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 490.00 5.00 8.05 12.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 490.00 5.00 8.05 12.20 =============== 420-00114 Geotextile (Drain) (CL 3) Sq Yard ================================================ NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 72.00 21.59 13.98 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 72.00 21.59 13.98 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72.00 21.59 13.98 12.00 =============== 420-00133 Geotextile (Separator) (CL 2) Sq Yard ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 685.00 8.00 6.59 9.23 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 8,758.00 4.00 3.50 3.50 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 192.00 10.00 5.59 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,635.00 4.40 3.98 3.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,635.00 4.40 3.98 3.94 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 53 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00300 Geotextile (Reinforcement) Sq Yard ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 933.00 10.00 4.78 5.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 933.00 10.00 4.78 5.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 933.00 10.00 4.78 5.06 =============== 502-00460 Pile Tip Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 8.00 209.91 224.60 224.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 209.91 224.60 224.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 209.91 224.60 224.60 =============== 502-11489 Steel Pile (HP 14x89) Lin Foot =============================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 220.00 196.88 211.84 211.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 220.00 196.88 211.84 211.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 220.00 196.88 211.84 211.84 =============== 503-00018 Drilled Shaft (18 In) Lin Foot =============================================== STA066A-008 SH 66 @ WCR 7 01/26/23 5.00 700.00 401.80 431.63 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 5.00 400.00 1500.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 550.00 715.57 1215.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 550.00 715.57 1215.82 =============== 503-00036 Drilled Shaft (36 In) Lin Foot =============================================== STA066A-008 SH 66 @ WCR 7 01/26/23 114.00 750.00 891.55 924.75 C0342-066 US 034A (MP 113-150) 02/02/23 18.00 650.00 782.33 767.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 132.00 736.36 882.10 903.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 132.00 736.36 882.10 903.24 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 54 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00042 Drilled Shaft (42 In) Lin Foot =============================================== C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 17.00 900.00 1620.00 1620.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 900.00 1620.00 1620.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 900.00 1620.00 1620.00 =============== 503-00048 Drilled Shaft (48 In) Lin Foot =============================================== STA066A-008 SH 66 @ WCR 7 01/26/23 21.00 1200.00 932.44 939.22 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 63.00 1000.00 1980.00 1980.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 84.00 1050.00 1325.28 1719.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 84.00 1050.00 1325.28 1719.81 =============== 504-03411 Retaining Wall (Boulder) Sq Foot ================================================ SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 882.00 100.00 59.40 59.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 882.00 100.00 59.40 59.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 882.00 100.00 59.40 59.40 =============== 504-06300 Ground Nail Lin Foot =============================================== C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 360.00 500.00 237.39 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 360.00 500.00 237.39 240.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 360.00 500.00 237.39 240.00 =============== 504-06406 Soil Nail Lin Foot =============================================== NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 4,101.00 61.23 101.08 108.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,101.00 61.23 101.08 108.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,101.00 61.23 101.08 108.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 55 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 504-06410 Verification Testing Each =================================================== NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 10.00 2400.00 4498.47 7300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 2400.00 4498.47 7300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 2400.00 4498.47 7300.00 =============== 506-00020 Place Riprap Cubic Yard ============================================= STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 36.00 35.00 98.39 83.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.00 35.00 98.39 83.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 35.00 98.39 83.78 =============== 506-00206 Riprap (6 In) Cubic Yard ============================================= NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 463.00 168.88 180.70 180.70 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 4.00 400.00 342.52 300.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 12.40 170.00 285.00 270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 479.40 170.84 189.76 184.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 479.40 170.84 189.76 184.01 =============== 506-00209 Riprap (9 In) Cubic Yard ============================================= NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 77.00 188.31 201.49 201.49 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 37.00 250.00 300.00 300.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 31.40 190.00 278.50 247.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 36.00 205.11 236.75 84.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 181.40 204.52 245.78 206.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 181.40 204.52 245.78 206.14 =============== 506-00212 Riprap (12 In) Cubic Yard ============================================= STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 108.00 125.00 326.96 372.92 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 56 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00212 Riprap (12 In) Cubic Yard ============================================= STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 8.00 235.00 325.00 325.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 89.00 230.00 302.54 310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 205.00 174.88 316.11 343.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 205.00 174.88 316.11 343.73 =============== 506-00218 Riprap (18 In) Cubic Yard ============================================= STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 59.00 275.00 316.84 367.68 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 27.00 275.00 440.00 440.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 88.00 275.00 341.73 320.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 7.00 200.00 241.06 241.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 181.00 272.10 338.72 350.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 181.00 272.10 338.72 350.39 =============== 506-01020 Geogrid Reinforce Sq Yard ================================================ NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 3,276.00 6.00 4.30 4.60 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 8,758.00 4.00 2.75 2.75 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 950.00 8.00 4.40 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,984.00 4.80 3.52 3.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,984.00 4.80 3.52 3.31 =============== 507-00000 Conc S and D Pave Cubic Yard ============================================= C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 48.00 900.00 1294.15 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48.00 900.00 1294.15 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48.00 900.00 1294.15 1800.00 =============== 507-00400 Asphalt S and D Pave (Asph) Ton ==================================================== NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 4.00 553.17 1282.63 360.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 553.17 1282.63 360.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 553.17 1282.63 360.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 57 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 509-00000 Str Steel Pound ================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 26,700.00 1.54 1.65 1.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26,700.00 1.54 1.65 1.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26,700.00 1.54 1.65 1.65 =============== 515-00120 Waterproofing (Membrane) Sq Yard ================================================ STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 234.00 25.00 37.45 29.00 ER0703-524 STRUCTURE F-13-P, EB I-70 EXI 03/31/23 1,375.00 27.00 37.78 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,609.00 26.71 37.75 27.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,609.00 26.71 37.75 27.29 =============== 515-00400 Concrete Sealer Sq Yard ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 123.00 20.00 18.63 18.95 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 170.00 100.00 21.47 28.75 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 165.00 30.00 33.50 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 458.00 53.30 25.04 25.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 458.00 53.30 25.04 25.13 =============== 518-01001 Br Expan Joint (Asphaultic Plug) Lin Foot =============================================== STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 30.00 300.00 331.00 260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 300.00 331.00 260.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 300.00 331.00 260.00 =============== 518-01004 Br Expan Device (0-4 In) Lin Foot =============================================== NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 301.00 375.00 713.87 445.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 780.00 300.00 475.60 370.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,081.00 320.88 541.95 390.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,081.00 320.88 541.95 390.88 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 58 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 518-01250 Br Expan Cover Plate Lin Foot =============================================== NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 32.00 500.00 599.69 470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32.00 500.00 599.69 470.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 500.00 599.69 470.00 =============== 518-03000 Saw and Seal Br Joint Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 97.00 44.00 43.48 42.76 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 438.00 25.00 35.95 25.90 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 391.00 30.00 37.85 40.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 4,691.00 30.00 14.00 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,617.00 29.85 17.25 18.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,617.00 29.85 17.25 18.90 =============== 519-03035 Place Thin Bond Overlay (Poly Conc) Sq Yard ================================================ NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 320.00 60.00 290.01 187.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 11,173.00 40.00 53.76 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,493.00 40.56 60.34 51.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,493.00 40.56 60.34 51.87 =============== 519-03055 Furnish Thin Bond Overlay (Poly Conc) Cubic Foot ============================================= NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 240.00 135.00 284.52 180.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 10,336.00 135.00 138.52 119.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,576.00 135.00 141.83 121.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,576.00 135.00 141.83 121.12 =============== 521-00000 Slurry Cut-Off Wall Sq Foot ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1,680.00 25.00 37.41 35.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,680.00 25.00 37.41 35.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,680.00 25.00 37.41 35.32 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 59 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-01000 Conc CL B Cubic Yard ============================================= NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 4.00 1036.84 1109.42 1109.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 1036.84 1109.42 1109.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1036.84 1109.42 1109.42 =============== 601-01050 Conc CL B (Wall) Cubic Yard ============================================= C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 1.00 5000.00 2315.00 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 2315.00 3000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 2315.00 3000.00 =============== 601-03000 Conc CL D Cubic Yard ============================================= STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 28.00 1000.00 1207.63 1225.25 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 45.00 987.05 1056.14 1056.14 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 8.00 2000.00 3104.84 4200.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 45.00 1800.00 2301.36 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 126.00 1344.58 1845.54 1987.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 126.00 1344.58 1845.54 1987.57 =============== 601-03050 Conc CL D (Wall) Cubic Yard ============================================= STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 11.10 900.00 6000.00 6000.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 49.00 1000.00 2486.03 1850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.10 981.53 2843.55 2616.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.10 981.53 2843.55 2616.47 =============== 601-03056 Conc CL DF Cubic Yard ============================================= STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 17.00 750.00 1911.88 1943.75 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 10.00 1000.00 4370.05 2300.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 60 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03056 Conc CL DF Cubic Yard ============================================= C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 120.00 892.23 1758.50 2000.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 29.00 1800.00 1702.33 1700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 176.00 1034.19 1925.11 1962.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 176.00 1034.19 1925.11 1962.18 =============== 601-03057 Conc CL DR Cubic Yard ============================================= NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 49.00 2500.00 3360.67 2825.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 128.00 2500.00 3171.48 2000.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 2.00 3000.00 6700.00 5250.00 ER0703-524 STRUCTURE F-13-P, EB I-70 EXI 03/31/23 22.00 3163.00 6828.78 3163.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 201.00 2577.54 3642.87 2360.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 201.00 2577.54 3642.87 2360.75 =============== 601-06102 Concrete (Patching) Cubic Foot ============================================= NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 22.00 2200.00 697.99 415.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 59.00 250.00 952.50 745.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 81.00 779.63 861.21 655.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 81.00 779.63 861.21 655.37 =============== 601-06150 Conc (Patching) Sq Foot ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 10.00 200.00 373.08 489.15 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 728.00 150.00 187.91 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 738.00 150.68 189.59 223.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 738.00 150.68 189.59 223.65 =============== 601-40000 Masonry Veneer Sq Foot ================================================ C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 538.00 18.00 137.44 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 538.00 18.00 137.44 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 538.00 18.00 137.44 90.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 61 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-40002 Masonry Veneer (Brick) Sq Foot ================================================ C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 950.00 50.00 95.15 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 950.00 50.00 95.15 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 950.00 50.00 95.15 100.00 =============== 601-40300 Struct Conc Coating Sq Yard ================================================ C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 792.00 20.00 35.98 42.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 648.00 20.49 18.13 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,440.00 20.22 29.68 24.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,440.00 20.22 29.68 24.45 =============== 601-40301 Struct Conc Coating Sq Foot ================================================ C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 8,110.00 1.00 6.22 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,110.00 1.00 6.22 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,110.00 1.00 6.22 15.00 =============== 601-40400 Struct Conc Stain Sq Yard ================================================ NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 104.00 18.10 19.37 19.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 104.00 18.10 19.37 19.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 104.00 18.10 19.37 19.37 =============== 601-51005 Galvanic Anodes Each =================================================== STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 78.00 35.00 67.25 52.50 ER0703-524 STRUCTURE F-13-P, EB I-70 EXI 03/31/23 825.00 35.00 37.77 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 903.00 35.00 39.52 36.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 903.00 35.00 39.52 36.51 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 62 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 602-00000 Reinf Steel Pound ================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 280.00 2.56 2.74 2.74 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 2,667.00 3.00 4.82 6.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 2,090.00 2.00 8.00 8.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 138.00 4.00 12.25 9.50 ER0703-524 STRUCTURE F-13-P, EB I-70 EXI 03/31/23 963.00 4.00 8.20 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,138.00 2.82 6.14 6.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,138.00 2.82 6.14 6.30 =============== 602-00020 Reinf Steel (Epoxy) Pound ================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 3,297.00 4.00 1.58 1.60 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 6,135.00 3.00 3.21 4.00 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 2,890.00 1.83 1.96 1.96 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 6,940.00 2.00 5.91 8.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 2,588.00 5.00 4.67 2.50 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 8,273.00 1.50 4.03 5.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 1,590.00 2.50 2.89 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 31,713.00 2.53 4.05 4.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31,713.00 2.53 4.05 4.53 =============== 602-00060 Reinf Steel Splice Each =================================================== C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 201.00 180.00 105.93 96.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 201.00 180.00 105.93 96.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 201.00 180.00 105.93 96.00 =============== 602-00210 Welded Wire Fabric Sq Yard ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 246.00 20.00 27.47 27.93 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 340.00 50.00 34.24 52.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 586.00 37.41 31.40 42.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 586.00 37.41 31.40 42.04 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 63 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-00010 Culvert Lining Sq Foot ================================================ C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 4,293.00 47.46 35.43 25.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,293.00 47.46 35.43 25.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,293.00 47.46 35.43 25.72 =============== 603-01185 18 In RCP (CIP) Lin Foot =============================================== NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 120.00 150.00 363.19 265.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 56.00 160.00 232.53 320.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 8.00 250.00 312.50 400.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 53.00 130.00 296.50 263.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 237.00 151.27 317.30 282.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 237.00 151.27 317.30 282.11 =============== 603-01245 24 In RCP (CIP) Lin Foot =============================================== FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 73.00 175.00 246.00 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 73.00 175.00 246.00 210.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 73.00 175.00 246.00 210.00 =============== 603-01305 30 In RCP (CIP) Lin Foot =============================================== STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 72.00 200.00 369.50 339.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 72.00 200.00 369.50 339.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72.00 200.00 369.50 339.00 =============== 603-01365 36 In RCP (CIP) Lin Foot =============================================== STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 201.00 240.00 411.00 372.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 201.00 240.00 411.00 372.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 201.00 240.00 411.00 372.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 64 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01420 42 In RCP Lin Foot =============================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 133.00 400.00 400.00 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 133.00 400.00 400.00 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 133.00 400.00 400.00 400.00 =============== 603-01480 48 In RCP Lin Foot =============================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 130.00 450.00 450.00 450.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 292.00 600.00 970.43 910.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 422.00 553.79 875.67 768.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 422.00 553.79 875.67 768.29 =============== 603-02245 30x19 In RCP (CIP) Lin Foot =============================================== FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 130.00 200.00 295.67 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 130.00 200.00 295.67 240.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 130.00 200.00 295.67 240.00 =============== 603-05018 18 In RCES Each =================================================== STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 2.00 1800.00 3369.00 2738.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1800.00 3369.00 2738.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1800.00 3369.00 2738.00 =============== 603-05024 24 In RCES Each =================================================== FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 1.00 1900.00 1767.67 1275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1900.00 1767.67 1275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1900.00 1767.67 1275.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 65 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05030 30 In RCES Each =================================================== STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 4.00 2000.00 3802.00 3504.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 2000.00 3802.00 3504.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 2000.00 3802.00 3504.00 =============== 603-05036 36 In RCES Each =================================================== STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 8.00 2500.00 4221.00 3942.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 2500.00 4221.00 3942.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 2500.00 4221.00 3942.00 =============== 603-05042 42 In RCES Each =================================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 4.00 3500.00 4500.00 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 3500.00 4500.00 4500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 3500.00 4500.00 4500.00 =============== 603-05048 48 In RCES Each =================================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 4.00 4000.00 4800.00 4800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 4000.00 4800.00 4800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 4000.00 4800.00 4800.00 =============== 603-05124 30x19 In RCES Each =================================================== FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 2.00 3200.00 2280.17 1350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3200.00 2280.17 1350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3200.00 2280.17 1350.00 =============== 603-15021 21 In Equiv CSPA Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 7.00 150.00 458.08 377.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 150.00 458.08 377.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 150.00 458.08 377.16 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 66 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-15030 30 In Equiv CSPA Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 180.00 100.00 545.57 465.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 180.00 100.00 545.57 465.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 180.00 100.00 545.57 465.14 =============== 603-15060 60 In Equiv CSPA Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 104.00 300.00 958.42 796.84 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 100.00 500.00 971.00 790.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 204.00 398.04 964.58 793.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 204.00 398.04 964.58 793.49 =============== 603-30024 24 In SES Each =================================================== C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 1.00 3500.00 1750.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3500.00 1750.00 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3500.00 1750.00 2000.00 =============== 603-31330 30 In Equiv Arch SES Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1.00 1000.00 2837.25 2624.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 2837.25 2624.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 2837.25 2624.49 =============== 603-33042 42 In Pipe Safety End Treat Each =================================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 4.00 1500.00 1600.00 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 1500.00 1600.00 1600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1500.00 1600.00 1600.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 67 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-33048 48 In Pipe Safety End Treat Each =================================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 4.00 1700.00 1700.00 1700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 1700.00 1700.00 1700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1700.00 1700.00 1700.00 =============== 603-50015 15 In Plastic Pipe Lin Foot =============================================== NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 30.00 239.60 185.91 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 239.60 185.91 17.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 239.60 185.91 17.00 =============== 603-70804 8x4 Ft CBC (Precast) Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 108.00 1100.00 2691.06 2882.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 108.00 1100.00 2691.06 2882.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 108.00 1100.00 2691.06 2882.12 =============== 604-00305 Inlet Ty C (5 Ft) Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 1.00 6307.29 6748.81 6748.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 6307.29 6748.81 6748.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 6307.29 6748.81 6748.81 =============== 604-00310 Inlet Ty C (10 Ft) Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 2.00 6897.07 7379.88 7379.88 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 1.00 6000.00 10202.24 13000.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 1.00 5600.00 9050.00 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 6348.54 9066.64 8939.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 6348.54 9066.64 8939.94 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 68 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-00505 Inlet Ty D (5 Ft) Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 2.00 15000.00 12042.54 8955.07 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 1.00 6000.00 8796.17 8000.00 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 1.00 7554.25 8083.07 8083.07 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 1.00 9000.00 7712.50 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 10510.85 9325.35 9198.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 10510.85 9325.35 9198.64 =============== 604-13005 Inlet Ty 13 (5 Ft) Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1.00 15000.00 8860.11 8370.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 15000.00 8860.11 8370.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 8860.11 8370.22 =============== 604-16050 Inlet Ty 16 (S) (Spec) Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 2.00 11634.85 12449.31 12449.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 11634.85 12449.31 12449.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 11634.85 12449.31 12449.31 =============== 604-19105 Inlet Ty R L5 (5 Ft) Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 2.00 8195.83 8769.55 8769.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 8195.83 8769.55 8769.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 8195.83 8769.55 8769.55 =============== 604-19110 Inlet Ty R L5 (10 Ft) Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 1.00 15240.30 16307.14 16307.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 15240.30 16307.14 16307.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15240.30 16307.14 16307.14 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 69 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-26005 Vane Grate Inlet (D) (5 Ft) Each =================================================== NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 1.00 8000.00 14254.43 21000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 8000.00 14254.43 21000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 8000.00 14254.43 21000.00 =============== 604-30005 MH Slab Base (5 Ft) Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 1.00 6878.87 7360.40 7360.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 6878.87 7360.40 7360.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 6878.87 7360.40 7360.40 =============== 604-30010 MH Slab Base (10 Ft) Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 2.00 10530.75 11267.92 11267.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 10530.75 11267.92 11267.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 10530.75 11267.92 11267.92 =============== 604-30015 MH Slab Base (15 Ft) Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 2.00 16017.80 17139.08 17139.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 16017.80 17139.08 17139.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 16017.80 17139.08 17139.08 =============== 604-30020 MH Slab Base (20 Ft) Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 1.00 17835.98 19084.53 19084.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 17835.98 19084.53 19084.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 17835.98 19084.53 19084.53 =============== 604-50200 MH R and C Each =================================================== STA066A-008 SH 66 @ WCR 7 01/26/23 1.00 750.00 3587.44 415.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 750.00 3587.44 415.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 750.00 3587.44 415.24 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 70 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-83108 8 In PPS (PVC) Lin Foot =============================================== C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 50.00 50.00 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 50.00 100.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 50.00 100.00 100.00 =============== 605-00061 6 In PP Underdrain (Special) Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 420.00 30.00 97.71 50.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 420.00 30.00 97.71 50.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 420.00 30.00 97.71 50.42 =============== 606-00302 Gdrail Ty 3 (31 In MGS) Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 5,275.00 55.00 38.06 38.71 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 1,677.00 50.00 56.30 49.60 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 545.00 80.00 70.00 85.00 C0342-066 US 034A (MP 113-150) 02/02/23 150.00 50.00 59.33 68.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 4,599.00 50.00 52.84 54.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 1,438.00 36.00 35.00 35.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 875.00 40.00 50.67 50.67 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 1,138.00 40.00 57.00 59.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 787.50 35.00 39.50 37.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 4,414.00 40.70 49.79 59.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20,898.50 47.59 48.57 49.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,898.50 47.59 48.57 49.94 =============== 606-00305 Gdrail Ty 3 (Spec) Lin Foot =============================================== C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 84.00 80.60 183.66 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 84.00 80.60 183.66 190.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 84.00 80.60 183.66 190.00 =============== 606-00710 Gdrail Ty 7 (Sty CA) Lin Foot =============================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 40.00 400.00 403.50 387.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 71 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00710 Gdrail Ty 7 (Sty CA) Lin Foot =============================================== C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 2,160.00 220.00 196.10 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,200.00 223.27 198.01 193.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,200.00 223.27 198.01 193.58 =============== 606-00910 Guardrail Type 9 (Style CA) Lin Foot =============================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 276.00 307.54 329.08 329.08 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 2,223.00 170.00 228.40 240.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 220.00 200.00 370.50 361.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,719.00 186.39 240.63 258.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,719.00 186.39 240.63 258.83 =============== 606-00915 Guardrail Type 9 (Style CG) Lin Foot =============================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 328.00 331.95 355.19 355.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 328.00 331.95 355.19 355.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 328.00 331.95 355.19 355.19 =============== 606-01340 End Anchor Ty 3D Each =================================================== C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 9.00 2000.00 1552.18 1600.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 1.00 1600.00 2577.00 3154.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 2.00 1543.96 3151.56 3100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 1890.66 1808.16 1979.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 1890.66 1808.16 1979.50 =============== 606-01370 Transition Ty 3G Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 4.00 3500.00 4161.10 4232.20 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 1.00 7000.00 5795.00 5290.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 9.00 5000.00 5192.97 5300.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 6.00 3600.00 3900.00 3900.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 72 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01370 Transition Ty 3G Each =================================================== STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 4.00 3500.00 4651.00 4802.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 4.00 1500.00 4450.00 3800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28.00 3842.86 4767.75 4561.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 3842.86 4767.75 4561.67 =============== 606-01371 Transition Ty 3G (Spec) Each =================================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 7.00 5000.00 6690.00 6080.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 5000.00 6690.00 6080.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 5000.00 6690.00 6080.00 =============== 606-01372 Transition Type GR9-GR3 Each =================================================== STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 4.00 5000.00 8325.50 8651.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 5000.00 8325.50 8651.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 5000.00 8325.50 8651.00 =============== 606-01380 Transition Ty 3H Each =================================================== C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 6.00 2000.00 2244.50 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 2000.00 2244.50 2300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 2000.00 2244.50 2300.00 =============== 606-01385 Transition Ty 3J Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 4.00 2500.00 1616.45 1642.90 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 3.00 2000.00 2290.55 2300.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 1.00 1800.00 3750.00 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 2225.00 2160.35 2121.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 2225.00 2160.35 2121.45 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 73 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01390 End Anchor Ty 3K Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 4.00 2500.00 2472.43 2514.86 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 6.00 2000.00 3308.57 3400.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 1.00 2000.00 2775.00 2250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 2181.82 3031.56 2973.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 2181.82 3031.56 2973.59 =============== 606-01400 Transition Type BR10M-GR3 Each =================================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 4.00 5000.00 10000.00 10000.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 4.00 4000.00 8200.00 9000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 4500.00 8800.00 9500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 4500.00 8800.00 9500.00 =============== 606-01460 Median Terminal Each =================================================== C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 14.00 12000.00 13949.92 14000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 12000.00 13949.92 14000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 12000.00 13949.92 14000.00 =============== 606-02003 End Anchor (Nonflared) Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 26.00 4500.00 3598.99 3657.98 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 11.00 5000.00 6800.00 4500.00 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 71.00 5000.00 5500.00 5500.00 C0342-066 US 034A (MP 113-150) 02/02/23 2.00 5000.00 4707.33 5522.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 10.00 3800.00 3650.00 3650.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 2.00 5000.00 4747.25 4747.25 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 13.00 3700.00 6905.00 5210.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 3.00 3800.00 4350.00 4200.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 2.00 4905.00 4722.93 5300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 140.00 4673.64 5246.32 4879.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 140.00 4673.64 5246.32 4879.11 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 74 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-02005 End Anchor (Flared) Each =================================================== SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 23.00 6500.00 6225.00 7250.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 3.00 6000.00 7526.70 7700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26.00 6442.31 6438.01 7301.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 6442.31 6438.01 7301.92 =============== 606-10305 Brdg Rail Ty 3 (Spec) Lin Foot =============================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 50.00 50.00 210.50 171.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 50.00 210.50 171.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 50.00 210.50 171.00 =============== 606-10700 Brdg Rail Ty 7 Lin Foot =============================================== NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 72.00 200.00 977.63 786.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 72.00 200.00 977.63 786.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72.00 200.00 977.63 786.00 =============== 606-11037 Brdg Rail Ty 10R MASH Lin Foot =============================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 78.00 225.00 230.00 230.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 140.00 300.00 340.00 270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 218.00 273.17 316.03 255.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 218.00 273.17 316.03 255.69 =============== 607-00005 End Post Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 21.00 750.00 596.06 606.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21.00 750.00 596.06 606.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 750.00 596.06 606.12 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 75 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-00010 Corner and Line Br Post Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 16.00 10.00 855.92 869.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 10.00 855.92 869.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 10.00 855.92 869.83 =============== 607-01000 Fence BW MP Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 400.00 10.00 4.72 4.79 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 185.00 20.00 29.13 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 585.00 13.16 12.44 11.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 585.00 13.16 12.44 11.18 =============== 607-11525 Fence (Plastic) Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 495.00 5.00 3.71 3.77 STA066A-008 SH 66 @ WCR 7 01/26/23 100.00 5.00 8.78 17.80 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 148.00 14.00 6.24 7.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 400.00 7.00 5.53 7.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 330.00 10.00 4.89 4.30 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 300.00 7.00 0.50 0.50 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 500.00 5.00 6.51 0.05 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 530.00 6.00 3.63 4.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,803.00 6.75 5.28 4.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,803.00 6.75 5.28 4.04 =============== 607-11560 Debris Barrier Sq Foot ================================================ C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 368.00 170.00 459.21 790.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 368.00 170.00 459.21 790.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 368.00 170.00 459.21 790.00 =============== 607-21300 Fence Barrier MP Lin Foot =============================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 800.00 30.00 13.75 20.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 800.00 30.00 13.75 20.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 800.00 30.00 13.75 20.50 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 76 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-53143 Fence CL (Spec) (42 In) Lin Foot =============================================== NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 204.00 80.00 139.17 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 204.00 80.00 139.17 135.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 204.00 80.00 139.17 135.00 =============== 607-55040 Mesh Anchor Each =================================================== C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 26.00 1300.00 2006.14 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26.00 1300.00 2006.14 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 1300.00 2006.14 2000.00 =============== 607-55050 Mesh Anchor (Spec) Each =================================================== C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 13.00 2200.00 4483.36 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 2200.00 4483.36 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 2200.00 4483.36 5000.00 =============== 607-55100 Wire Mesh (Draped) Sq Foot ================================================ C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 15,100.00 4.00 7.11 9.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15,100.00 4.00 7.11 9.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,100.00 4.00 7.11 9.40 =============== 607-55104 Wire Mesh (Special) Sq Foot ================================================ C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 21,700.00 10.00 9.42 11.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21,700.00 10.00 9.42 11.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21,700.00 10.00 9.42 11.60 =============== 607-55110 Safety Rail (Cable) Lin Foot =============================================== C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 87.00 100.00 136.80 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 87.00 100.00 136.80 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 87.00 100.00 136.80 140.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 77 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-60120 20 Ft Gate Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 3.00 900.00 1156.98 1173.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 900.00 1156.98 1173.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 900.00 1156.98 1173.96 =============== 607-60620 Road Closure Gate Each =================================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 1.00 30000.00 45000.00 45000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 30000.00 45000.00 45000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 30000.00 45000.00 45000.00 =============== 608-00000 Conc Sidewalk Sq Yard ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1,572.00 48.00 108.52 117.14 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 86.00 150.00 128.00 128.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 1,269.00 125.00 92.00 82.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,927.00 84.38 98.63 102.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,927.00 84.38 98.63 102.22 =============== 608-00006 Conc Sidewalk (6 In) Sq Yard ================================================ NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 33.00 150.00 118.50 125.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 240.00 80.00 82.75 77.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 273.00 88.46 87.07 82.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 273.00 88.46 87.07 82.80 =============== 608-00010 Conc Curb Ramp Sq Yard ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 970.00 50.00 103.33 110.56 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 45.00 500.00 630.00 630.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 330.00 300.00 315.00 315.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 78 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00010 Conc Curb Ramp Sq Yard ================================================ C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 3,034.00 300.00 183.75 182.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 10.00 200.00 175.00 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,389.00 246.57 177.34 180.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,389.00 246.57 177.34 180.82 =============== 608-00015 Detectable Warnings Sq Foot ================================================ STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 146.00 75.00 135.00 135.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 16.00 95.00 155.50 94.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 30.00 50.00 70.70 71.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 192.00 72.76 125.57 121.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 192.00 72.76 125.57 121.58 =============== 608-00050 Brick Pavers Sq Foot ================================================ STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 64.00 75.00 85.00 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 64.00 75.00 85.00 85.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 64.00 75.00 85.00 85.00 =============== 609-20000 Curb Ty 2 B (Spec) Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 120.00 80.00 53.69 69.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 80.00 53.69 69.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 80.00 53.69 69.48 =============== 609-20010 Curb Ty 2 B Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 139.00 60.00 51.53 65.25 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 41.00 45.00 51.00 51.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 199.00 55.00 63.88 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 379.00 55.75 60.32 47.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 379.00 55.75 60.32 47.83 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 79 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-20011 Curb Ty 2 M Lin Foot =============================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 414.00 39.70 42.48 42.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 414.00 39.70 42.48 42.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 414.00 39.70 42.48 42.48 =============== 609-21010 C and G Ty 2 I-B Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 70.00 50.00 69.83 96.56 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 244.00 50.00 58.75 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 314.00 50.00 60.14 53.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 314.00 50.00 60.14 53.39 =============== 609-21011 C and G Ty 2 I-M Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 234.00 40.00 51.62 60.13 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 587.00 34.49 36.90 36.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 821.00 36.06 43.43 43.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 821.00 36.06 43.43 43.52 =============== 609-21020 C and G Ty 2 II-B Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 2,811.00 40.00 47.08 51.06 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 335.00 50.00 59.84 77.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 80.00 45.00 55.00 55.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 1,419.00 50.00 57.00 45.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 430.00 45.00 38.90 37.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,075.00 43.96 51.82 49.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,075.00 43.96 51.82 49.99 =============== 609-21021 C and G Ty 2 II-M Lin Foot =============================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 1,173.00 41.63 44.54 44.54 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 80 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-21021 C and G Ty 2 II-M Lin Foot =============================================== C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 20.00 50.00 108.50 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,193.00 41.77 48.62 44.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,193.00 41.77 48.62 44.55 =============== 609-21900 C and G Ty 2 (Spec) Lin Foot =============================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 711.00 40.03 42.83 42.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 711.00 40.03 42.83 42.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 711.00 40.03 42.83 42.83 =============== 609-23000 Gutter (Special) Lin Foot =============================================== C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 105.00 60.00 89.41 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 105.00 60.00 89.41 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 105.00 60.00 89.41 120.00 =============== 609-24000 Gutter Ty 2 (Spec) Lin Foot =============================================== C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 128.00 65.00 74.62 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 128.00 65.00 74.62 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 128.00 65.00 74.62 100.00 =============== 609-24002 Gutter Ty 2 (2 Ft) Lin Foot =============================================== C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 83.00 40.00 92.74 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 83.00 40.00 92.74 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 83.00 40.00 92.74 120.00 =============== 609-24004 Gutter Ty 2 (4 Ft) Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 50.00 45.00 125.97 163.83 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 81 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-24004 Gutter Ty 2 (4 Ft) Lin Foot =============================================== STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 145.00 50.00 48.13 51.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 195.00 48.72 68.08 80.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 195.00 48.72 68.08 80.12 =============== 609-24008 Gutter Ty 2 (8 Ft) Lin Foot =============================================== C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 7.00 120.00 269.50 305.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 120.00 269.50 305.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 120.00 269.50 305.00 =============== 609-60011 Curb Ty 6 M Lin Foot =============================================== NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 4,414.00 14.00 39.81 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,414.00 14.00 39.81 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,414.00 14.00 39.81 30.00 =============== 610-00020 Median Cover (Pattern Conc) Sq Foot ================================================ NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 1,827.00 20.72 22.17 22.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,827.00 20.72 22.17 22.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,827.00 20.72 22.17 22.17 =============== 610-00026 Median Cover (6 In Pattern Conc) Sq Foot ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 241.00 20.00 37.10 38.89 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 130.00 60.00 150.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 371.00 34.02 61.08 77.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 371.00 34.02 61.08 77.82 =============== 610-00030 Median Cover Matl (Conc) Sq Foot ================================================ STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 17.00 25.00 145.00 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 25.00 145.00 145.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 25.00 145.00 145.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 82 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 610-00035 Median Cover Matl (Conc)(Spec) Sq Foot ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 246.00 30.00 30.76 38.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 246.00 30.00 30.76 38.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 246.00 30.00 30.76 38.52 =============== 610-00055 Median Cover Matl (Stone) Sq Foot ================================================ NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 2,463.00 6.03 6.45 6.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,463.00 6.03 6.45 6.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,463.00 6.03 6.45 6.45 =============== 612-00001 Delin (Ty I) Each =================================================== SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 23.00 50.00 50.00 25.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 20.00 55.00 76.00 120.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 1.00 25.00 41.25 32.50 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 20.00 25.00 114.75 50.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 121.00 25.00 56.25 77.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 11.00 36.63 65.35 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 196.00 31.65 69.26 70.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 196.00 31.65 69.26 70.68 =============== 612-00002 Delin (Ty II) Each =================================================== C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 15.00 60.00 85.75 135.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 2.00 30.00 42.50 35.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 5.00 25.00 124.25 50.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 16.00 30.00 62.00 82.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 1.00 40.84 76.65 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 39.00 41.18 84.21 94.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39.00 41.18 84.21 94.59 =============== 612-00003 Delin (Ty III) Each =================================================== SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 15.00 35.00 58.00 26.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 83 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00003 Delin (Ty III) Each =================================================== C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 10.00 70.00 97.75 155.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 18.00 50.00 87.61 48.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 2.00 35.00 42.50 35.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 5.00 35.00 142.50 50.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 17.00 30.00 65.00 87.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 1.00 45.08 116.69 79.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 68.00 43.02 85.95 68.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 68.00 43.02 85.95 68.85 =============== 612-00041 Delin (Flex) (Ty I) Each =================================================== SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 70.00 100.00 80.78 80.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70.00 100.00 80.78 80.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70.00 100.00 80.78 80.78 =============== 612-00043 Delin (Flex) (Ty III) Each =================================================== SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 10.00 100.00 87.91 87.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 100.00 87.91 87.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 100.00 87.91 87.91 =============== 612-00081 Delin (PM) (Ty I) Each =================================================== SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 68.00 50.00 82.50 65.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 36.00 65.00 29.00 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 104.00 55.19 71.30 52.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 104.00 55.19 71.30 52.54 =============== 612-00083 Delin (PM)(Ty III) Each =================================================== SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 76.00 65.00 95.00 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 76.00 65.00 95.00 70.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 76.00 65.00 95.00 70.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 84 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00101 Delin (Drv Conc Inst) (Ty I) Each =================================================== STA066A-008 SH 66 @ WCR 7 01/26/23 21.00 30.00 91.77 87.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21.00 30.00 91.77 87.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 30.00 91.77 87.79 =============== 612-00102 Delin (Drv Conc Inst) (Ty II) Each =================================================== FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 31.00 200.00 111.50 94.00 STA066A-008 SH 66 @ WCR 7 01/26/23 37.00 30.00 114.36 116.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 68.00 107.50 112.92 106.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 68.00 107.50 112.92 106.12 =============== 612-00103 Delin (Drv Conc Inst) (Ty III) Each =================================================== FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 4.00 250.00 117.50 104.00 STA066A-008 SH 66 @ WCR 7 01/26/23 5.00 30.00 126.00 130.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 127.78 121.83 118.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 127.78 121.83 118.72 =============== 612-00111 Delin (Drv)(Ty I) Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 42.00 31.85 34.08 34.08 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 256.00 75.00 87.00 87.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 298.00 68.92 79.54 79.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 298.00 68.92 79.54 79.54 =============== 612-00112 Delin (Drv)(Ty II) Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 24.00 35.20 37.66 37.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 35.20 37.66 37.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 35.20 37.66 37.66 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 85 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00113 Delin (Drv)(Ty III) Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 4.00 38.55 41.25 41.25 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 7.00 75.00 92.00 92.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 61.75 73.55 73.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 61.75 73.55 73.55 =============== 612-00270 Loc Mark (Util)(Flat Slat) Each =================================================== C0342-066 US 034A (MP 113-150) 02/02/23 4.00 200.00 169.67 149.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 200.00 169.67 149.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 200.00 169.67 149.00 =============== 613-00050 1/2 In Elec Cond Lin Foot =============================================== C0342-066 US 034A (MP 113-150) 02/02/23 30.00 25.00 32.67 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 25.00 32.67 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 25.00 32.67 18.00 =============== 613-00100 1 In Elec Cond Lin Foot =============================================== C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 150.00 20.00 18.00 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 150.00 20.00 18.00 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 20.00 18.00 18.00 =============== 613-00200 2 In Elec Cond Lin Foot =============================================== C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 135.00 30.00 29.00 29.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 50.00 40.00 250.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 185.00 32.70 123.04 102.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 185.00 32.70 123.04 102.24 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 86 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00206 2 In Elec Cond (Bored) Lin Foot =============================================== STA066A-008 SH 66 @ WCR 7 01/26/23 1,244.00 25.00 25.08 25.32 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 50.00 30.00 175.00 175.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 615.00 30.00 40.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,909.00 26.74 27.50 33.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,909.00 26.74 27.50 33.97 =============== 613-00300 3 In Elec Cond Lin Foot =============================================== C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 220.00 32.00 38.00 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 220.00 32.00 38.00 38.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 220.00 32.00 38.00 38.00 =============== 613-00306 3 In Elec Cond (Bored) Lin Foot =============================================== STA066A-008 SH 66 @ WCR 7 01/26/23 1,520.00 30.00 25.94 26.52 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 550.00 48.73 52.14 52.14 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 965.00 35.00 47.00 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,035.00 34.98 29.75 37.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,035.00 34.98 29.75 37.67 =============== 613-01200 2 In Elec Cond (P) Lin Foot =============================================== STA066A-008 SH 66 @ WCR 7 01/26/23 423.00 30.00 33.79 36.17 C0342-066 US 034A (MP 113-150) 02/02/23 1,040.00 30.00 28.00 25.00 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 3,425.00 34.21 36.60 36.60 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 90.00 35.00 68.00 68.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,978.00 32.99 33.18 34.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,978.00 32.99 33.18 34.71 =============== 613-01300 3 In Elec Cond (P) Lin Foot =============================================== STA066A-008 SH 66 @ WCR 7 01/26/23 483.00 40.00 39.36 43.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 483.00 40.00 39.36 43.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 483.00 40.00 39.36 43.40 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 87 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-02200 Furn 2 In Elec Cond Lin Foot =============================================== C0342-066 US 034A (MP 113-150) 02/02/23 60.00 30.00 20.67 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 30.00 20.67 17.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 30.00 20.67 17.00 =============== 613-04100 Elect System Mods LUMP SUM =============================================== C0342-066 US 034A (MP 113-150) 02/02/23 1.00 5000.00 8824.00 2131.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 8824.00 2131.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 8824.00 2131.00 =============== 613-07001 Type One Pull Box Each =================================================== C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 14.00 1000.00 1513.00 852.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 1000.00 1513.00 852.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 1000.00 1513.00 852.00 =============== 613-07002 Type Two Pull Box Each =================================================== C0342-066 US 034A (MP 113-150) 02/02/23 4.00 1500.00 2136.00 1758.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 3.00 2200.00 3900.00 3900.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 2.00 1700.00 3500.00 3500.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 9.00 1250.00 1847.50 990.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 1513.89 2091.36 1924.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 1513.89 2091.36 1924.56 =============== 613-07003 Type Three Pull Box Each =================================================== STA066A-008 SH 66 @ WCR 7 01/26/23 7.00 2500.00 2140.45 2307.66 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 10.00 1500.00 2161.75 1297.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 1911.76 2151.81 1713.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 1911.76 2151.81 1713.15 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 88 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07004 Type Four Pull Box Each =================================================== STA066A-008 SH 66 @ WCR 7 01/26/23 2.00 2800.00 3078.51 3344.55 C0342-066 US 034A (MP 113-150) 02/02/23 3.00 2000.00 3509.33 3628.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 15.00 1800.00 3081.25 2325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 1930.00 3129.67 2622.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 1930.00 3129.67 2622.41 =============== 613-07005 Type Five Pull Box Each =================================================== STA066A-008 SH 66 @ WCR 7 01/26/23 2.00 3500.00 3908.97 4381.43 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 3.00 2800.00 4898.50 3214.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 3080.00 4448.72 3680.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 3080.00 4448.72 3680.97 =============== 613-07023 Pull Box (24"x36"x24") Each =================================================== C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 1.00 2000.00 3770.00 3770.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2000.00 3770.00 3770.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 3770.00 3770.00 =============== 613-07060 Pull Box (18"x30"x18") Deep Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1.00 1300.00 2058.29 3293.57 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 8.00 2000.00 2730.00 2730.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 1922.22 2595.66 2792.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 1922.22 2595.66 2792.62 =============== 613-10000 Wiring LUMP SUM =============================================== STA066A-008 SH 66 @ WCR 7 01/26/23 1.00 40000.00 69763.85 48000.00 C0342-066 US 034A (MP 113-150) 02/02/23 1.00 30000.00 27773.00 20819.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 89 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-10000 Wiring LUMP SUM =============================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 1.00 65351.54 69926.27 69926.27 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 1.00 15000.00 11000.00 11000.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 1.00 20000.00 57000.00 57000.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 1.00 10000.00 10400.00 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 28621.65 46276.04 39820.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 28621.65 46276.04 39820.75 =============== 613-13006 Lumin (LED) (6,000 Lumens) Each =================================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 1.00 1000.00 3000.00 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 3000.00 3000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 3000.00 3000.00 =============== 613-13008 Lumin (LED) (8,000 Lumens) Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 1.00 1362.25 1457.61 1457.61 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 4.00 1000.00 1160.00 1160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 1072.45 1219.52 1219.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1072.45 1219.52 1219.52 =============== 613-13010 Lumin(LED)(10,000 Lumens) Each =================================================== STA066A-008 SH 66 @ WCR 7 01/26/23 8.00 1200.00 1693.25 1675.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 1200.00 1693.25 1675.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 1200.00 1693.25 1675.89 =============== 613-13014 Lumin (LED) (14,000 Lumens) Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 6.00 4098.14 4385.02 4385.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 4098.14 4385.02 4385.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 4098.14 4385.02 4385.02 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 90 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-20000 Inst Light Std + Lumin Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 6.00 761.99 815.33 815.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 761.99 815.33 815.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 761.99 815.33 815.33 =============== 613-32300 Light Std Steel (30 Ft) Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 6.00 2898.66 3101.58 3101.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 2898.66 3101.58 3101.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 2898.66 3101.58 3101.58 =============== 613-34400 Light Std Metal (40 Ft) Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 1.00 5131.75 5490.98 5490.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5131.75 5490.98 5490.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5131.75 5490.98 5490.98 =============== 613-40010 Light Std Foundation Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 13.00 4109.55 4397.22 4397.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 4109.55 4397.22 4397.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 4109.55 4397.22 4397.22 =============== 613-40020 Transformer Base Alum Each =================================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 1.00 1200.00 1300.00 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1200.00 1300.00 1300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1200.00 1300.00 1300.00 =============== 613-50100 Lighting Ctrl Center Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 1.00 10803.63 11559.91 11559.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10803.63 11559.91 11559.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10803.63 11559.91 11559.91 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 91 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-80130 Service Meter Cabinet Each =================================================== C0342-066 US 034A (MP 113-150) 02/02/23 2.00 7000.00 9122.00 8757.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 7000.00 9122.00 8757.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 7000.00 9122.00 8757.00 =============== 613-80274 Struct Mount Disc Switch Each =================================================== C0342-066 US 034A (MP 113-150) 02/02/23 3.00 2500.00 1736.67 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 2500.00 1736.67 550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2500.00 1736.67 550.00 =============== 614-00011 Sign Panel (CL I) Sq Foot ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 18.00 25.00 24.08 24.46 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 52.00 25.00 34.50 29.00 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 193.00 38.68 41.39 41.39 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 183.00 30.00 43.00 43.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 4.00 30.00 35.50 41.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 162.13 23.00 39.50 44.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 296.00 25.00 29.50 26.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 35.00 50.00 62.57 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 943.13 29.37 36.58 37.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 943.13 29.37 36.58 37.37 =============== 614-00012 Sign Panel (CL II) Sq Foot ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 36.00 25.00 43.93 44.66 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 176.00 44.48 47.59 47.59 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 1,001.00 35.00 45.00 45.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 227.00 40.00 54.00 54.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 9.00 35.00 48.00 46.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 240.00 40.00 27.32 27.32 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 415.00 28.00 43.63 49.25 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 416.00 28.00 42.50 47.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 53.00 35.59 63.84 56.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,573.00 34.17 44.15 45.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,573.00 34.17 44.15 45.56 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 92 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00013 Sign Panel (CL III) Sq Foot ================================================ NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 190.00 51.15 54.73 54.73 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 89.00 43.96 83.61 79.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 279.00 48.86 68.70 62.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 279.00 48.86 68.70 62.47 =============== 614-00025 Inst Sign Panel (CL I) Sq Foot ================================================ STA066A-008 SH 66 @ WCR 7 01/26/23 200.00 35.00 29.18 71.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 200.00 35.00 29.18 71.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 35.00 29.18 71.18 =============== 614-00027 Inst Sign Panel (CL II) Sq Foot ================================================ STA066A-008 SH 66 @ WCR 7 01/26/23 129.00 45.00 32.61 71.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 129.00 45.00 32.61 71.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 129.00 45.00 32.61 71.18 =============== 614-00216 Steel Signpost (2x2 In T) Lin Foot =============================================== STA066A-008 SH 66 @ WCR 7 01/26/23 21.00 25.00 35.68 28.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21.00 25.00 35.68 28.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 25.00 35.68 28.47 =============== 614-00615 Steel Signpost (W 6x15) Lin Foot =============================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 30.00 97.98 104.84 104.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 97.98 104.84 104.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 97.98 104.84 104.84 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 93 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00818 Steel Signpost (W 8x18) Lin Foot =============================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 43.00 118.61 126.91 126.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 43.00 118.61 126.91 126.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43.00 118.61 126.91 126.91 =============== 614-01502 Steel Sign Supp (2-In Rd)(Po&Sock) Lin Foot =============================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 425.00 15.00 10.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 425.00 15.00 10.00 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 425.00 15.00 10.00 10.00 =============== 614-01503 Steel Sign Supp (2-In Rd)(Po&Sock) Each =================================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 4.00 300.00 494.00 388.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 14.00 29.00 678.50 657.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 34.00 250.00 108.00 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 52.00 194.35 291.29 227.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 194.35 291.29 227.00 =============== 614-01512 Steel Sign Support (2-In Rd)(Post) Lin Foot =============================================== STA066A-008 SH 66 @ WCR 7 01/26/23 12.00 30.00 38.47 32.03 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 41.00 15.99 17.11 17.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 53.00 19.16 29.80 20.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 53.00 19.16 29.80 20.49 =============== 614-01522 Steel Sign Supp (2-In Rd)(Sock) Each =================================================== STA066A-008 SH 66 @ WCR 7 01/26/23 2.00 250.00 186.09 189.82 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 4.00 484.02 517.90 517.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 406.01 280.89 408.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 406.01 280.89 408.54 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 94 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01572 Steel Sign Supp (2-1/2 Rd NP40)(Po&Silp) Lin Foot =============================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 770.00 40.00 11.00 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 770.00 40.00 11.00 11.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 770.00 40.00 11.00 11.00 =============== 614-01573 Steel Sign Supp (2-1/2 Rd NP40)(Po&Slip) Each =================================================== SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 17.00 1000.00 470.45 470.45 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 28.00 450.00 835.50 821.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 38.00 60.00 387.50 305.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 83.00 384.10 565.34 512.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 83.00 384.10 565.34 512.96 =============== 614-01575 Steel Sign Supp (2-1/2 In Rd NP40)(Po) Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 84.00 20.00 15.68 15.95 STA066A-008 SH 66 @ WCR 7 01/26/23 124.00 35.00 27.64 23.73 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 226.00 52.60 56.28 56.28 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 10.00 30.00 45.50 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 444.00 41.01 32.30 39.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 444.00 41.01 32.30 39.22 =============== 614-01578 Steel Sign Supp (2-1/2 In Rd NP40)(Slip) Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 7.00 20.00 392.38 398.76 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 9.00 200.00 427.67 315.00 STA066A-008 SH 66 @ WCR 7 01/26/23 10.00 450.00 299.21 282.36 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 21.00 594.09 635.68 635.68 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 2.00 300.00 776.64 420.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 1.00 500.00 611.00 522.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 400.32 422.24 463.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 400.32 422.24 463.22 =============== 614-01583 Stl Sign Supp (2-1/2 In Rd 80)(Po&Slip) Each =================================================== NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 16.00 615.00 946.31 790.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 615.00 946.31 790.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 615.00 946.31 790.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 95 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01585 Steel Sign Supp (2-1/2 In Rd 80)(Post) Lin Foot =============================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 22.00 63.12 67.54 67.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 63.12 67.54 67.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 63.12 67.54 67.54 =============== 614-01588 Steel Sign Supp (2-1/2 In Rd 80)(Slip) Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 2.00 783.86 838.74 838.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 783.86 838.74 838.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 783.86 838.74 838.74 =============== 614-03001 Conc Footing (Ty 1) Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 2.00 1438.17 1538.84 1538.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1438.17 1538.84 1538.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1438.17 1538.84 1538.84 =============== 614-03003 Conc Footing (Ty 3) Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 2.00 1645.74 1760.94 1760.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1645.74 1760.94 1760.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1645.74 1760.94 1760.94 =============== 614-10160 Sig Head B-Plates Each =================================================== C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 19.00 300.00 178.00 178.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19.00 300.00 178.00 178.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 300.00 178.00 178.00 =============== 614-70150 Ped Sig Face (16) (Countdown) Each =================================================== C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 10.00 900.00 720.00 720.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 96 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70150 Ped Sig Face (16) (Countdown) Each =================================================== NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 1.00 875.00 918.00 986.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 897.73 753.00 744.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 897.73 753.00 744.18 =============== 614-70200 Access Ped Sig Each =================================================== C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 34.00 2200.00 2603.75 1590.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 34.00 2200.00 2603.75 1590.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 2200.00 2603.75 1590.00 =============== 614-70336 Traf Sig Face (12-12-12) Each =================================================== STA066A-008 SH 66 @ WCR 7 01/26/23 35.00 850.00 1231.36 1350.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 18.00 900.00 1000.00 1000.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 1.00 1100.00 1575.00 1700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 54.00 871.30 1213.52 1239.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54.00 871.30 1213.52 1239.81 =============== 614-70448 Traf Sig Face (12-12-12-12) Each =================================================== C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 12.00 1000.00 1160.00 1160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 1000.00 1160.00 1160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 1000.00 1160.00 1160.00 =============== 614-72832 Comm Cabinet (Type 2) Each =================================================== C0342-066 US 034A (MP 113-150) 02/02/23 2.00 15000.00 21003.33 22010.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 15000.00 21003.33 22010.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 15000.00 21003.33 22010.00 =============== 614-72835 Custom Phone Cab Blank Cover Each =================================================== C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 20.00 50.00 2135.33 2400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 50.00 2135.33 2400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 50.00 2135.33 2400.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 97 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72854 Traf Ctrl Cabinet Each =================================================== C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 2.00 10000.00 31400.00 31400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 10000.00 31400.00 31400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 10000.00 31400.00 31400.00 =============== 614-72855 Traf Sig Ctrl Cabinet Each =================================================== STA066A-008 SH 66 @ WCR 7 01/26/23 2.00 40000.00 49878.06 53175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 40000.00 49878.06 53175.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 40000.00 49878.06 53175.00 =============== 614-72860 Ped Push Button Each =================================================== NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 1.00 650.00 540.00 580.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 650.00 540.00 580.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 650.00 540.00 580.00 =============== 614-72863 Ped Push Button Post Assem Each =================================================== C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 2.00 1500.00 5200.00 5200.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 2.00 3000.00 3800.00 4100.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 41.00 2200.00 3002.50 2925.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 45.00 2204.44 3047.12 3078.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 2204.44 3047.12 3078.33 =============== 614-72864 Fire Preempt Unit Each =================================================== STA066A-008 SH 66 @ WCR 7 01/26/23 2.00 10000.00 17523.33 19750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 10000.00 17523.33 19750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 10000.00 17523.33 19750.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 98 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72885 Detect (Spec) Each =================================================== C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 12.00 12000.00 11100.00 11100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 12000.00 11100.00 11100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 12000.00 11100.00 11100.00 =============== 614-72886 Intersection Detect Sys (Camera) Each =================================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 10.00 12000.00 15420.00 14840.00 STA066A-008 SH 66 @ WCR 7 01/26/23 8.00 12000.00 16703.11 17735.49 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 3.00 12000.00 14750.00 16000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21.00 12000.00 16136.74 16108.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 12000.00 16136.74 16108.76 =============== 614-75840 Inst Traf Sig Ctrler Each =================================================== C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 2.00 7000.00 160.00 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 7000.00 160.00 160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 7000.00 160.00 160.00 =============== 614-79336 Furn Traf Sig Face (12-12-12) Each =================================================== STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 1.00 750.00 2000.00 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 750.00 2000.00 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 750.00 2000.00 1800.00 =============== 614-80000 Flash Beacon Each =================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 2.00 841.58 900.49 900.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 841.58 900.49 900.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 841.58 900.49 900.49 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 99 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-80390 Rumble Strip (Grinding)(Asphalt)(Sin) Lin Foot =============================================== SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 3,124.00 1.00 9.08 9.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,124.00 1.00 9.08 9.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,124.00 1.00 9.08 9.08 =============== 614-80391 Rumble Strip (Grind)(Asphalt) Lin Foot =============================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 95,718.00 0.20 0.15 0.15 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 15,280.00 0.60 1.05 0.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 110,998.00 0.26 0.37 0.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 110,998.00 0.26 0.37 0.17 =============== 614-81020 Sig-Light Pole Steel (2) Each =================================================== C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 2.00 52500.00 55150.00 55150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 52500.00 55150.00 55150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 52500.00 55150.00 55150.00 =============== 614-81135 Sig-Light Pole Steel (1-35 Ft) Each =================================================== STA066A-008 SH 66 @ WCR 7 01/26/23 1.00 20000.00 25724.87 27238.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 20000.00 25724.87 27238.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 20000.00 25724.87 27238.63 =============== 614-81145 Sig-Light Pole Steel (1-45 Ft) Each =================================================== STA066A-008 SH 66 @ WCR 7 01/26/23 1.00 25000.00 29272.82 31290.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 25000.00 29272.82 31290.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 29272.82 31290.90 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 100 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81155 Sig-Light Pole Steel (1-55 Ft) Each =================================================== STA066A-008 SH 66 @ WCR 7 01/26/23 4.00 35000.00 32040.56 33728.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 35000.00 32040.56 33728.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 35000.00 32040.56 33728.78 =============== 614-81250 Sig-Light Pole Steel (2-50 Ft) Each =================================================== C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 1.00 50000.00 50400.00 50400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 50000.00 50400.00 50400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 50000.00 50400.00 50400.00 =============== 614-81260 Sig-Light Pole Steel (2-60 Ft) Each =================================================== C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 1.00 55000.00 57000.00 57000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 55000.00 57000.00 57000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 55000.00 57000.00 57000.00 =============== 614-81550 Sig-Light Pole Steel (2-50&60 Ft) Each =================================================== STA066A-008 SH 66 @ WCR 7 01/26/23 1.00 40000.00 67587.58 72376.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 40000.00 67587.58 72376.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 40000.00 67587.58 72376.71 =============== 614-84000 Traf Sig Ped Pole Steel Each =================================================== STA066A-008 SH 66 @ WCR 7 01/26/23 1.00 3000.00 4161.83 4393.49 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 1.00 4000.00 4825.00 5200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3500.00 4351.31 4796.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3500.00 4351.31 4796.75 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 101 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-85001 Impact Atten Each =================================================== C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 1.00 41571.43 49356.54 50000.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 6.00 40000.00 41250.00 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 40224.49 42150.73 12285.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 40224.49 42150.73 12285.71 =============== 614-86105 Telemetry (Field) Each =================================================== C0342-066 US 034A (MP 113-150) 02/02/23 3.00 5000.00 7382.33 4268.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 2.00 3000.00 2260.00 2260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 4200.00 6451.00 3464.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 4200.00 6451.00 3464.80 =============== 614-86741 Weather Monitor System Each =================================================== C0342-066 US 034A (MP 113-150) 02/02/23 1.00 60000.00 84424.33 84512.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 60000.00 84424.33 84512.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 60000.00 84424.33 84512.00 =============== 614-86752 Fold-Over Tower (ITS) Each =================================================== C0342-066 US 034A (MP 113-150) 02/02/23 1.00 35000.00 46653.00 40399.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 35000.00 46653.00 40399.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 35000.00 46653.00 40399.00 =============== 614-86757 Anti-icing Syst Each =================================================== C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 2.00 551000.00 776912.90 671000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 551000.00 776912.90 671000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 551000.00 776912.90 671000.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 102 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87100 Auto Traf Rec Sta Each =================================================== STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 1.00 35000.00 30600.00 28000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 35000.00 30600.00 28000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 35000.00 30600.00 28000.00 =============== 614-87320 CCTV Each =================================================== C0342-066 US 034A (MP 113-150) 02/02/23 3.00 6000.00 7460.33 9281.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 6000.00 7460.33 9281.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 6000.00 7460.33 9281.00 =============== 614-87333 CCTV Camera (Traf Surveil) Each =================================================== C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 2.00 9000.00 10200.00 10200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 9000.00 10200.00 10200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 9000.00 10200.00 10200.00 =============== 614-87364 CCTV Pole w Low Dev (50 Ft) Each =================================================== C0342-066 US 034A (MP 113-150) 02/02/23 1.00 30000.00 35586.00 17758.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 30000.00 35586.00 17758.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 30000.00 35586.00 17758.00 =============== 614-87690 Ethernet Switch Each =================================================== STA066A-008 SH 66 @ WCR 7 01/26/23 2.00 7000.00 3803.81 4180.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 7000.00 3803.81 4180.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 7000.00 3803.81 4180.08 =============== 614-87702 Ethernet Radio (Pair) Each =================================================== STA066A-008 SH 66 @ WCR 7 01/26/23 2.00 2000.00 2804.59 2941.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2000.00 2804.59 2941.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2000.00 2804.59 2941.85 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 103 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 615-00030 Emb Prot Ty 3 Each =================================================== NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 2.00 3600.00 11888.24 22450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3600.00 11888.24 22450.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3600.00 11888.24 22450.00 =============== 615-00050 Emb Prot Ty 5 Each =================================================== STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 1.00 700.00 2650.00 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 700.00 2650.00 2300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 700.00 2650.00 2300.00 =============== 615-00150 Emb Prot (Spec) Each =================================================== STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 1.00 2500.00 5950.00 3700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2500.00 5950.00 3700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2500.00 5950.00 3700.00 =============== 619-30320 4 In Galv Pipe Lin Foot =============================================== STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 5.00 400.00 517.50 610.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 400.00 517.50 610.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 400.00 517.50 610.00 =============== 620-00001 Field Office (CL 1) Each =================================================== C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 1.00 40000.00 90000.00 90000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 40000.00 90000.00 90000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 40000.00 90000.00 90000.00 =============== 620-00002 Field Office (CL 2) Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1.00 55000.00 42925.81 51041.62 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 104 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00002 Field Office (CL 2) Each =================================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 1.00 40000.00 29485.00 16970.00 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 1.00 35000.00 29916.67 31500.00 STA066A-008 SH 66 @ WCR 7 01/26/23 1.00 30000.00 41857.00 27500.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 1.00 30000.00 65000.00 65000.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 1.00 45000.00 35000.00 35000.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 1.00 34000.00 48200.55 54000.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 1.00 35000.00 47817.00 47817.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 1.00 36500.00 52000.00 46000.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 1.00 25000.00 26250.00 37000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 36550.00 39301.01 41182.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 36550.00 39301.01 41182.86 =============== 620-00012 Field Lab (CL 2) Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1.00 55000.00 32028.83 30837.65 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 1.00 40000.00 28335.00 15570.00 STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 1.00 25000.00 33871.38 25044.40 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 1.00 30000.00 23583.33 16500.00 STA066A-008 SH 66 @ WCR 7 01/26/23 1.00 30000.00 31878.56 23950.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 1.00 45000.00 29043.79 49000.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 1.00 35000.00 80000.00 80000.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 1.00 32000.00 41993.80 44000.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 1.00 30000.00 28526.85 28526.85 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 1.00 28200.00 49500.00 45000.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 1.00 20000.00 21750.00 29400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 33654.55 32972.41 35257.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 33654.55 32972.41 35257.17 =============== 620-00020 Sanitary Facility Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 2.00 5000.00 7485.21 12760.41 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 1.00 4000.00 4740.00 6980.00 STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 1.00 2000.00 3197.73 1693.60 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 1.00 10000.00 5250.00 3500.00 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 1.00 3500.00 2370.00 6500.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 1.00 1500.00 5759.87 3200.00 STA066A-008 SH 66 @ WCR 7 01/26/23 3.00 3000.00 3401.44 3090.00 C0342-066 US 034A (MP 113-150) 02/02/23 1.00 3500.00 1527.67 713.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 1.00 10000.00 13000.00 13000.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 1.00 3000.00 4750.00 11000.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 105 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00020 Sanitary Facility Each =================================================== C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 1.00 4000.00 7011.63 2400.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 2.00 5000.00 1800.00 1800.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 1.00 5000.00 5000.00 5000.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 1.00 3000.00 2000.00 500.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 2.00 2500.00 3647.68 3500.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 2.00 3500.00 8019.00 8019.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 1.00 3200.00 7000.00 5000.00 FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 2.00 9000.00 22500.00 10000.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 2.00 3000.00 4850.00 7500.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 2.00 5000.00 2007.10 2250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29.00 4403.45 5148.50 5531.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 4403.45 5148.50 5531.57 =============== 621-00425 Detour LUMP SUM =============================================== C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 1.00 50000.00 55712.27 27000.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 1.00 150000.00 35640.00 35640.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 100000.00 49021.51 31320.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 100000.00 49021.51 31320.00 =============== 621-00450 Detour Pvmt Sq Yard ================================================ NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 780.00 70.00 84.92 3.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 1,004.00 80.00 54.25 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,784.00 75.63 70.75 29.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,784.00 75.63 70.75 29.45 =============== 624-20025 24 In Drainage Pipe (CL 0) (CIP) Lin Foot =============================================== C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 120.00 100.00 437.19 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 100.00 437.19 700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 100.00 437.19 700.00 =============== 624-29016 15 In Drainage Pipe (CL 9) (CIP) Lin Foot =============================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 7.00 312.53 334.41 334.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 312.53 334.41 334.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 312.53 334.41 334.41 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 106 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 624-29019 18 In Drainage Pipe (CL 9) (CIP) Lin Foot =============================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 237.00 119.14 127.48 127.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 237.00 119.14 127.48 127.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 237.00 119.14 127.48 127.48 =============== 624-29025 24 In Drainage Pipe (CL 9) (CIP) Lin Foot =============================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 166.00 139.10 148.84 148.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 166.00 139.10 148.84 148.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 166.00 139.10 148.84 148.84 =============== 624-29061 60 In Drainage Pipe (CL 9) (CIP) Lin Foot =============================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 837.00 385.64 412.63 412.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 837.00 385.64 412.63 412.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 837.00 385.64 412.63 412.63 =============== 625-00000 Const Surveying LUMP SUM =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1.00 75000.00 156212.72 154745.44 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 1.00 20000.00 31866.67 12500.00 STA066A-008 SH 66 @ WCR 7 01/26/23 1.00 30000.00 31051.00 27250.00 C0342-066 US 034A (MP 113-150) 02/02/23 1.00 20000.00 13669.67 16009.00 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 1.00 51843.63 55472.77 55472.77 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 1.00 45000.00 66105.07 36000.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 1.00 120000.00 165000.00 165000.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 1.00 60000.00 21241.43 22000.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 1.00 30000.00 19000.00 19000.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 1.00 15000.00 12520.00 12520.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 1.00 15000.00 14136.00 20000.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 1.00 30000.00 23522.40 23522.40 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 1.00 100000.00 50500.00 60000.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 1.00 40000.00 71900.00 77000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 46560.26 46539.83 50072.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 46560.26 46539.83 50072.83 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 107 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 625-00001 Const Surveying (Hour) Hour =================================================== NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 60.00 250.00 217.83 215.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 92.00 250.00 242.88 300.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 10.00 180.00 179.00 179.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 40.00 225.00 296.25 175.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 10.00 215.36 1791.44 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 212.00 240.35 289.44 245.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 212.00 240.35 289.44 245.47 =============== 626-00000 Mobilization LUMP SUM =============================================== MTCER500-221 REGION 5 01/05/23 1.00 65000.00 132500.00 90000.00 STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1.00 1500000.00 1012819.64 750639.27 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 1.00 1000000.00 1062500.00 960000.00 STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 1.00 298110.00 405648.20 183241.00 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 1.00 368925.00 613775.00 560000.00 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 1.00 86512.00 147075.83 192500.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 1.00 256041.00 303400.53 242000.00 STA066A-008 SH 66 @ WCR 7 01/26/23 1.00 182020.00 412362.00 218875.00 C0342-066 US 034A (MP 113-150) 02/02/23 1.00 39590.00 89785.33 54356.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 1.00 500000.00 823940.22 657000.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 1.00 755937.90 890000.00 890000.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 1.00 220000.00 651781.75 389258.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 1.00 270000.00 388425.95 195000.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 1.00 200000.00 163000.00 163000.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 1.00 80000.00 247650.00 247650.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 1.00 50000.00 124616.00 93000.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 1.00 805965.00 232020.50 258312.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 1.00 506433.50 310382.50 280000.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 1.00 783603.00 210344.67 210344.67 STRR300-265 MOUNTAIN RE FY23 CRACK SEALS 03/02/23 1.00 120000.00 200000.00 200000.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 1.00 846348.08 795780.00 667560.00 MTCER300-276 I-70 MM 116-207, US 6F MM 208 03/16/23 1.00 50000.00 42500.00 50000.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 1.00 562770.50 330000.00 350000.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 1.00 828243.26 623350.00 246700.00 ER0703-524 STRUCTURE F-13-P, EB I-70 EXI 03/31/23 1.00 250500.00 283511.20 250500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 425039.97 404754.72 335997.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 425039.97 404754.72 335997.44 =============== 626-00007 Mobilization Each =================================================== FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 1.00 3000000.00 4887500.00 5000000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3000000.00 4887500.00 5000000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000000.00 4887500.00 5000000.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 108 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00100 Mobilization (w/o Autopay) LUMP SUM =============================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 1.00 179036.81 204795.55 204795.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 179036.81 204795.55 204795.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 179036.81 204795.55 204795.55 =============== 626-01113 Public Info Manage (Tier III) Day ==================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 280.00 80.00 54.40 55.30 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 108.00 250.00 88.80 77.60 STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 126.00 120.00 76.03 80.04 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 200.00 100.00 109.93 95.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 212.00 70.00 58.88 65.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 72.00 100.00 92.00 65.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 196.00 90.00 302.50 90.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 80.00 120.00 92.02 98.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 133.00 87.00 75.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,407.00 103.32 117.97 76.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,407.00 103.32 117.97 76.42 =============== 626-01114 Public Info Manage (Tier IV) Day ==================================================== MTCER500-221 REGION 5 01/05/23 95.00 85.00 100.00 85.00 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 120.00 150.00 90.00 95.00 STA066A-008 SH 66 @ WCR 7 01/26/23 117.00 70.00 73.12 72.00 C0342-066 US 034A (MP 113-150) 02/02/23 52.00 85.00 108.00 121.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 241.00 180.00 91.77 41.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 80.00 75.00 146.00 146.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 55.00 80.00 99.00 99.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 150.00 100.00 77.22 77.22 STRR300-265 MOUNTAIN RE FY23 CRACK SEALS 03/02/23 100.00 100.00 65.00 65.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 84.00 100.00 109.11 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,094.00 115.05 89.75 82.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,094.00 115.05 89.75 82.45 =============== 627-00001 Pvmt Mkg Paint Gallon ================================================= STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 10.00 150.00 248.97 290.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 109 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00001 Pvmt Mkg Paint Gallon ================================================= STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 2,168.00 51.00 64.00 77.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,178.00 51.45 66.11 77.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,178.00 51.45 66.11 77.98 =============== 627-00008 Mod Epoxy Pvmt Mkg Gallon ================================================= NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 914.00 160.00 146.00 140.00 STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 10.00 300.00 518.32 667.00 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 30.00 250.00 432.83 410.00 STA066A-008 SH 66 @ WCR 7 01/26/23 171.00 160.00 192.37 175.00 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 87.00 203.18 217.40 217.40 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 115.00 200.00 251.75 220.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 775.00 150.00 230.00 230.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 8.00 350.00 262.50 300.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 20.00 200.00 517.67 670.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 69.00 200.00 267.30 267.30 MTCER300-276 I-70 MM 116-207, US 6F MM 208 03/16/23 22,553.00 100.00 89.00 90.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 556.00 90.00 162.50 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25,308.00 105.38 100.39 100.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25,308.00 105.38 100.39 100.41 =============== 627-00009 Mod Epoxy (Inlaid) Gallon ================================================= SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 48.00 300.00 552.42 552.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48.00 300.00 552.42 552.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48.00 300.00 552.42 552.42 =============== 627-00011 Pvmt Mkg Paint (Waterborne) Gallon ================================================= STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 1,977.00 60.00 80.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,977.00 60.00 80.00 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,977.00 60.00 80.00 80.00 =============== 627-00013 Pvmt Mkg Paint (High Build) Gallon ================================================= MTCER500-221 REGION 5 01/05/23 45,300.00 40.00 41.53 42.30 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 110 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00013 Pvmt Mkg Paint (High Build) Gallon ================================================= STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 10,522.00 40.00 51.04 51.89 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 1,459.00 170.00 115.20 88.40 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 100.00 130.00 169.67 162.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 4.00 250.00 2238.33 125.00 STA066A-008 SH 66 @ WCR 7 01/26/23 433.00 70.00 54.13 50.42 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 5.00 190.00 565.75 1200.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 4.00 1000.00 507.76 260.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 10.00 70.00 892.50 475.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 26.00 125.00 97.08 115.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 10.00 100.00 178.20 178.20 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 1,008.00 52.00 51.00 49.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 340.00 50.00 110.00 90.00 ER0703-524 STRUCTURE F-13-P, EB I-70 EXI 03/31/23 10.00 207.00 216.14 207.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 59,231.00 44.01 47.10 46.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 59,231.00 44.01 47.10 46.06 =============== 627-00014 Pvmt Mkg Paint (Low Temp) Gallon ================================================= C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 6.00 150.00 352.05 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 150.00 352.05 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 150.00 352.05 120.00 =============== 627-01001 Preform Plastic Pvmt Mkg (Ty I) Sq Foot ================================================ NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 75.00 15.00 31.35 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 75.00 15.00 31.35 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75.00 15.00 31.35 40.00 =============== 627-01010 Preform Plastic Pvmt Mkg (TY I)(Inlaid) Sq Foot ================================================ NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 45.00 33.48 35.82 35.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 45.00 33.48 35.82 35.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 33.48 35.82 35.82 =============== 627-01011 Preform Plastic Pvmt Mkg (Contr)(Inlaid) Sq Foot ================================================ NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 75.00 20.00 31.35 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 75.00 20.00 31.35 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75.00 20.00 31.35 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 111 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-02001 Preform Plastic Pvmt Mkg (Ty II) Sq Foot ================================================ NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 320.00 25.00 52.47 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 320.00 25.00 52.47 31.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 320.00 25.00 52.47 31.00 =============== 627-02010 Preform Plastic Pvmt Mkg (Ty II)(Inlaid) Sq Foot ================================================ NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 67.00 23.00 36.23 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 67.00 23.00 36.23 45.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 67.00 23.00 36.23 45.00 =============== 627-30405 Preform Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 3,514.00 30.00 19.90 20.20 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 156.00 30.00 47.93 28.00 STA066A-008 SH 66 @ WCR 7 01/26/23 835.00 30.00 26.04 26.10 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 63.00 26.81 28.69 28.69 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 410.00 20.00 33.00 33.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 1,554.00 22.00 21.00 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,532.00 27.44 23.05 22.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,532.00 27.44 23.05 22.45 =============== 627-30407 Preform Thermoplastic Pvmt Mkg (WS)(Sp) Sq Foot ================================================ NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 1,621.00 30.00 18.15 17.30 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 30.00 25.00 19.50 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,651.00 29.91 18.17 17.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,651.00 29.91 18.17 17.37 =============== 627-30410 Preform Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 4,756.00 30.00 17.79 18.08 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 112 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30410 Preform Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ STA066A-008 SH 66 @ WCR 7 01/26/23 304.00 20.00 19.79 18.98 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 904.00 14.00 43.00 43.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 1,850.00 17.00 30.13 18.50 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 2,354.00 20.00 15.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,168.00 23.60 22.11 19.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,168.00 23.60 22.11 19.69 =============== 627-30411 Preform Thermoplastic Pvmt Mkg (XS)(Sp) Sq Foot ================================================ NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 11,003.00 20.00 14.10 13.20 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 173.00 20.00 16.00 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,176.00 20.00 14.11 13.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,176.00 20.00 14.11 13.24 =============== 629-01002 Survey Monument (Ty 2) Each =================================================== STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 1.00 670.00 750.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 670.00 750.00 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 670.00 750.00 500.00 =============== 629-01005 Survey Monument (Ty 5) Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1.00 700.00 1961.89 3721.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 700.00 1961.89 3721.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 700.00 1961.89 3721.78 =============== 629-01006 Survey Monument (Ty 6) Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 3.00 700.00 717.38 1254.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 700.00 717.38 1254.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 700.00 717.38 1254.77 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 113 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 629-01031 Survey Monument (Ty 3A) Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 11.00 1400.00 267.64 340.28 STA066A-008 SH 66 @ WCR 7 01/26/23 1.00 1000.00 1983.01 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 1366.67 585.30 411.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 1366.67 585.30 411.92 =============== 629-01050 Monument Box Each =================================================== STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 1.00 1400.00 750.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1400.00 750.00 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1400.00 750.00 500.00 =============== 629-01065 Survey Monument (Ty 5S) Each =================================================== STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 5.00 1000.00 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 1000.00 100.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1000.00 100.00 100.00 =============== 629-01110 Locate Monuments Hour =================================================== C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 80.00 190.00 265.00 175.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 1.00 170.00 345.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 81.00 189.75 265.50 179.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 81.00 189.75 265.50 179.01 =============== 630-00000 Flagging Hour =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 6,000.00 35.00 40.79 41.47 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 8,100.00 45.00 35.60 36.20 STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 250.00 50.00 53.74 48.55 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 700.00 30.00 42.50 35.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 114 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00000 Flagging Hour =================================================== FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 2,000.00 40.00 48.00 46.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 252.00 50.00 43.47 48.00 STA066A-008 SH 66 @ WCR 7 01/26/23 1,500.00 45.00 50.23 50.00 C0342-066 US 034A (MP 113-150) 02/02/23 8.00 75.00 46.33 48.00 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 600.00 42.24 45.20 45.20 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 700.00 45.00 45.14 47.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 5,000.00 45.00 49.00 49.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 2,500.00 45.00 50.30 59.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 1,200.00 45.00 37.56 37.25 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 1,600.00 40.00 46.00 46.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 1,800.00 45.00 2.00 2.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 200.00 45.00 36.50 41.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 3,000.00 33.00 41.75 2.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 1,500.00 35.00 59.40 59.40 STRR300-265 MOUNTAIN RE FY23 CRACK SEALS 03/02/23 2,800.00 45.00 45.00 45.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 3,000.00 30.00 38.50 41.00 FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 1,200.00 45.00 45.25 50.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 4,000.00 40.00 43.75 41.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 875.00 35.90 59.07 63.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48,785.00 40.67 43.30 40.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48,785.00 40.67 43.30 40.26 =============== 630-00001 Pilot Car Operation Hour =================================================== STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 1,500.00 110.00 135.00 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,500.00 110.00 135.00 135.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,500.00 110.00 135.00 135.00 =============== 630-00003 Uniformed Traf Ctrl Hour =================================================== NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 580.00 130.00 190.67 150.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 100.00 100.00 237.60 237.60 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 16.00 150.00 162.50 155.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 100.00 138.00 195.71 215.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 796.00 127.64 192.98 169.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 796.00 127.64 192.98 169.27 =============== 630-00006 Uniformed Traf Ctrl (Vehicle) Hour =================================================== NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 580.00 160.00 129.00 75.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 115 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00006 Uniformed Traf Ctrl (Vehicle) Hour =================================================== SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 100.00 100.00 237.60 237.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 680.00 151.18 134.90 98.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 680.00 151.18 134.90 98.91 =============== 630-00007 Traf Ctrl Inspection Day ==================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 90.00 130.00 261.42 265.84 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 22.00 500.00 607.00 414.00 STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 32.00 250.00 710.40 580.00 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 44.00 450.00 325.00 200.00 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 26.00 250.00 174.33 153.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 50.00 250.00 685.20 438.00 STA066A-008 SH 66 @ WCR 7 01/26/23 42.00 350.00 226.00 200.00 C0342-066 US 034A (MP 113-150) 02/02/23 12.00 350.00 349.67 452.00 NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 90.00 100.56 107.60 107.60 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 30.00 400.00 537.22 560.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 60.00 400.00 775.00 775.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 70.00 400.00 541.88 650.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 78.00 400.00 408.41 410.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 12.00 500.00 496.00 496.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 13.00 400.00 800.00 800.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 15.00 400.00 400.00 300.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 56.00 300.00 667.50 750.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 28.00 250.00 357.10 470.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 50.00 500.00 950.40 950.40 STRR300-265 MOUNTAIN RE FY23 CRACK SEALS 03/02/23 38.00 400.00 400.00 400.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 34.00 250.00 570.00 550.00 FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 5.00 600.00 731.00 900.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 40.00 300.00 167.50 160.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 60.00 88.00 448.09 400.00 ER0703-524 STRUCTURE F-13-P, EB I-70 EXI 03/31/23 8.00 592.00 706.60 592.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,005.00 305.84 459.36 445.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,005.00 305.84 459.36 445.40 =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 185.00 1000.00 1974.21 2658.42 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 72.00 1500.00 1967.50 1500.00 STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 80.00 1500.00 1545.80 1392.00 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 105.00 2000.00 2025.00 1550.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 116 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 53.00 1300.00 1002.57 1220.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 120.00 1300.00 2060.36 1625.00 STA066A-008 SH 66 @ WCR 7 01/26/23 97.00 1300.00 1345.95 1260.00 C0342-066 US 034A (MP 113-150) 02/02/23 30.00 1300.00 1671.33 1959.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 70.00 1500.00 1657.16 1700.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 130.00 1500.00 1930.00 1930.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 136.00 1200.00 2002.50 1950.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 155.00 1600.00 1311.50 1300.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 50.00 1200.00 1770.00 1770.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 27.00 1800.00 2000.00 2000.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 38.00 1200.00 1300.00 1100.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 140.00 1400.00 1550.00 3000.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 98.00 750.00 1704.11 1600.00 STRR300-265 MOUNTAIN RE FY23 CRACK SEALS 03/02/23 76.00 1200.00 1400.00 1400.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 85.00 990.00 1400.00 1300.00 FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 10.00 2500.00 1215.00 800.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 98.00 1600.00 1612.50 1525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,855.00 1350.43 1649.00 1771.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,855.00 1350.43 1649.00 1771.76 =============== 630-00015 Uniformed Traf Ctrl Coordination Hour =================================================== NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 10.00 25.00 55.81 38.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 520.00 30.00 47.87 50.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 100.00 70.00 65.83 43.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 8.00 100.00 35.75 21.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 638.00 37.07 50.72 48.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 638.00 37.07 50.72 48.36 =============== 630-00017 Traffic Control Management (Special) Day ==================================================== NHPP0253-296 I-25 @ LCR 16 (MP 253.8-254.5 02/07/23 30.00 402.25 430.41 430.41 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 110.00 1300.00 1057.32 1057.32 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 150.00 1161.00 2493.02 2450.00 ER0703-524 STRUCTURE F-13-P, EB I-70 EXI 03/31/23 30.00 7427.00 6250.93 7427.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 320.00 1725.09 2716.43 2248.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 320.00 1725.09 2716.43 2248.52 =============== 630-80001 Flash Beacon (Port) Each =================================================== NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 14.00 1200.00 1468.01 1825.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 117 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80001 Flash Beacon (Port) Each =================================================== C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 20.00 1000.00 1729.89 1800.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 20.00 900.00 1351.33 2200.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 8.00 1000.00 53.46 53.46 FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 4.00 1500.00 630.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 66.00 1042.42 1415.72 1606.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66.00 1042.42 1415.72 1606.33 =============== 630-80002 Flash Beacon (Solar) Each =================================================== FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 4.00 900.00 741.67 1550.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 2.00 1800.00 1625.00 1625.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 3.00 900.00 1500.00 1000.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 2.00 1025.83 1805.13 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 1086.51 1035.29 1768.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 1086.51 1035.29 1768.18 =============== 630-80335 Barricade (3 M-A) (Temp) Each =================================================== FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 8.00 160.00 108.00 210.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 3.00 400.00 384.13 378.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 8.00 200.00 5.00 5.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 8.00 225.00 215.00 10.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 13.00 200.00 222.00 460.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 4.00 160.00 475.00 450.00 FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 3.00 400.00 30.00 10.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 8.00 200.00 140.00 135.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 4.00 104.00 377.83 480.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 59.00 209.08 192.31 232.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 59.00 209.08 192.31 232.95 =============== 630-80336 Barricade (3 M-B) (Temp) Each =================================================== STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 4.00 400.00 397.13 598.56 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 2.00 600.00 185.00 350.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 2.00 500.00 59.40 59.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 475.00 338.52 401.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 475.00 338.52 401.63 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 118 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80337 Barricade (3 M-C) (Temp) Each =================================================== C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 3.00 500.00 537.72 540.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 500.00 537.72 540.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 500.00 537.72 540.00 =============== 630-80340 Pedestrian Barricade (ADA) Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 250.00 150.00 10.47 10.63 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 200.00 40.00 63.00 63.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 600.00 40.00 60.00 60.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 600.00 37.00 50.00 70.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 12.00 50.00 73.50 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,662.00 55.54 47.15 56.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,662.00 55.54 47.15 56.62 =============== 630-80341 Const Traf Sign (A) Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 22.00 40.00 33.47 34.03 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 57.00 80.00 91.45 87.90 STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 20.00 60.00 90.98 62.55 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 23.00 60.00 110.00 70.00 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 38.00 55.00 105.83 102.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 38.00 75.00 112.47 102.00 STA066A-008 SH 66 @ WCR 7 01/26/23 4.00 80.00 162.29 193.38 C0342-066 US 034A (MP 113-150) 02/02/23 10.00 70.00 54.33 75.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 18.00 70.00 97.99 100.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 32.00 120.00 76.00 76.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 32.00 50.00 81.21 120.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 36.00 80.00 45.42 45.50 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 102.00 15.00 38.00 38.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 84.00 60.00 5.00 5.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 22.00 75.00 30.00 40.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 98.00 75.00 45.00 2.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 48.00 75.00 105.33 110.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 2.00 60.00 44.55 44.55 STRR300-265 MOUNTAIN RE FY23 CRACK SEALS 03/02/23 112.00 80.00 90.00 90.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 24.00 54.00 56.50 56.00 FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 6.00 100.00 27.50 10.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 151.00 60.00 56.00 53.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 119 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80341 Const Traf Sign (A) Each =================================================== NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 48.00 60.00 216.46 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,027.00 63.92 76.98 61.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,027.00 63.92 76.98 61.92 =============== 630-80342 Const Traf Sign (B) Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 80.00 42.00 36.61 37.22 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 147.00 90.00 102.60 98.20 STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 90.00 75.00 97.03 78.57 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 39.00 70.00 122.50 80.00 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 44.00 80.00 237.67 155.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 56.00 100.00 135.73 120.00 STA066A-008 SH 66 @ WCR 7 01/26/23 42.00 130.00 329.12 447.27 C0342-066 US 034A (MP 113-150) 02/02/23 20.00 80.00 71.67 90.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 49.00 130.00 114.60 120.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 130.00 125.00 85.00 85.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 96.00 60.00 90.12 140.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 50.00 80.00 69.16 69.25 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 40.00 20.00 51.00 51.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 24.00 70.00 5.00 5.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 10.00 80.00 35.00 50.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 33.00 100.00 74.75 2.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 75.00 100.00 113.67 135.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 14.00 90.00 59.40 59.40 STRR300-265 MOUNTAIN RE FY23 CRACK SEALS 03/02/23 16.00 90.00 95.00 95.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 36.00 78.00 77.00 75.00 FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 36.00 150.00 42.50 10.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 6.00 75.00 56.50 54.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 34.00 105.83 355.14 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,167.00 88.83 124.75 109.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,167.00 88.83 124.75 109.47 =============== 630-80343 Const Traf Sign (C) Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 1.00 40.00 41.87 42.53 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 8.00 80.00 132.50 90.00 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 8.00 110.00 241.17 155.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 14.00 200.00 172.27 136.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 44.00 140.00 132.21 140.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 16.00 200.00 117.00 145.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 120 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80343 Const Traf Sign (C) Each =================================================== SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 4.00 120.00 178.20 178.20 FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 15.00 200.00 62.50 35.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 28.00 110.62 401.91 480.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 138.00 147.08 183.01 196.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 138.00 147.08 183.01 196.12 =============== 630-80344 Const Traf Sign (Spec) Sq Foot ================================================ NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 48.00 25.00 38.10 36.20 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 64.00 30.00 32.50 30.00 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 85.00 60.00 12.71 16.25 STRR300-265 MOUNTAIN RE FY23 CRACK SEALS 03/02/23 128.00 35.00 40.00 40.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 64.00 26.00 57.50 60.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 36.00 28.16 75.13 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 425.00 36.18 30.31 36.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 425.00 36.18 30.31 36.33 =============== 630-80348 Const Info Sign Each =================================================== SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 4.00 250.00 172.26 172.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 250.00 172.26 172.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 250.00 172.26 172.26 =============== 630-80350 Vert Panel Each =================================================== STA066A-008 SH 66 @ WCR 7 01/26/23 25.00 75.00 32.62 33.22 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 50.00 50.00 62.00 62.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 40.00 25.00 40.00 20.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 20.00 40.00 54.67 61.00 STRR300-265 MOUNTAIN RE FY23 CRACK SEALS 03/02/23 50.00 20.00 30.00 30.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 60.00 40.00 17.00 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 245.00 39.08 35.46 34.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 245.00 39.08 35.46 34.33 =============== 630-80355 Port Mesg Panel Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 5.00 3500.00 12550.21 12760.41 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 121 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80355 Port Mesg Panel Each =================================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 2.00 12000.00 15040.00 10080.00 STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 4.00 3500.00 7443.55 6960.00 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 4.00 6000.00 3648.83 4700.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 2.00 7500.00 14551.67 10375.00 STA066A-008 SH 66 @ WCR 7 01/26/23 4.00 10000.00 7138.76 5800.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 2.00 10000.00 8377.82 8700.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 2.00 15000.00 11500.00 11500.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 2.00 10000.00 10288.76 11000.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 2.00 10000.00 8168.14 8200.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 4.00 5000.00 4649.00 4649.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 3.00 8000.00 7000.00 7000.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 3.00 5000.00 6500.00 4500.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 4.00 8000.00 11250.00 10000.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 5.00 3500.00 8325.00 14675.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 4.00 7500.00 8910.00 8910.00 STRR300-265 MOUNTAIN RE FY23 CRACK SEALS 03/02/23 4.00 8000.00 7500.00 7500.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 4.00 6000.00 8575.00 5150.00 FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 2.00 15000.00 1137.50 1500.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 8.00 6000.00 8275.00 8000.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 4.00 6507.70 15263.12 19500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 74.00 7067.98 8422.95 8798.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 74.00 7067.98 8422.95 8798.15 =============== 630-80357 Flash Arrow Panel (B Ty) Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 4.00 1800.00 5754.26 5848.52 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 4.00 2000.00 3500.00 2000.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 4.00 250.00 320.00 320.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 3.00 1300.00 200.00 200.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 4.00 1500.00 325.00 400.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 6.00 1600.00 3900.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 1428.00 3129.35 1442.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 1428.00 3129.35 1442.96 =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 1.00 5000.00 6420.00 2840.00 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 4.00 1700.00 949.00 1550.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 3.00 2500.00 4494.67 3280.00 C0342-066 US 034A (MP 113-150) 02/02/23 1.00 3000.00 535.67 904.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 122 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 3.00 3000.00 2769.69 2900.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 4.00 250.00 320.00 320.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 5.00 2000.00 1808.33 3365.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 2.00 1700.00 2225.00 2350.00 FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 1.00 3500.00 350.00 450.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 3.00 1354.00 2702.80 3550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27.00 1972.67 2010.56 2310.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 1972.67 2010.56 2310.70 =============== 630-80360 Drum Channel Dev Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 200.00 30.00 33.47 34.03 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 100.00 50.00 32.50 31.00 STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 200.00 50.00 70.75 66.41 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 100.00 40.00 55.00 20.00 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 200.00 36.00 21.83 26.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 110.00 38.00 84.20 79.00 STA066A-008 SH 66 @ WCR 7 01/26/23 60.00 70.00 42.86 36.78 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 204.00 50.00 75.16 78.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 300.00 40.00 50.00 50.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 50.00 30.00 68.62 90.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 25.00 50.00 34.26 34.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 193.00 50.00 38.00 38.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 40.00 50.00 40.00 20.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 200.00 45.00 38.00 20.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 220.00 40.00 53.23 67.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 30.00 30.00 29.70 29.70 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 150.00 36.00 42.00 42.00 FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 100.00 50.00 15.00 5.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 150.00 40.00 28.13 27.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 100.00 72.00 100.35 118.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,732.00 43.73 48.44 46.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,732.00 43.73 48.44 46.84 =============== 630-80363 Drum Channel Dev (Light) (F) Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 40.00 50.00 43.93 44.66 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 40.00 70.00 38.10 36.20 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 20.00 45.00 72.50 25.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 8.00 35.00 125.49 112.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 123 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80363 Drum Channel Dev (Light) (F) Each =================================================== C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 4.00 55.00 106.61 110.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 20.00 35.00 86.04 130.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 25.00 60.00 62.24 62.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 40.00 38.00 61.75 5.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 25.00 40.00 99.93 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 222.00 49.19 68.43 57.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 222.00 49.19 68.43 57.64 =============== 630-80364 Drum Channel Dev (Light) (SB) Each =================================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 25.00 70.00 38.10 36.20 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 32.00 50.00 106.94 110.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 20.00 35.00 86.04 130.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 25.00 70.00 62.24 62.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 150.00 40.00 60.50 59.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 252.00 46.83 69.99 69.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 252.00 46.83 69.99 69.15 =============== 630-80370 Barrier (Temp) Lin Foot =============================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 500.00 100.00 124.57 98.14 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 120.00 50.00 69.33 55.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 220.00 40.00 109.35 150.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 280.00 75.00 201.50 290.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 100.00 150.00 391.60 370.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 600.00 40.00 60.00 35.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 350.00 47.86 48.97 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,170.00 65.23 117.31 107.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,170.00 65.23 117.31 107.59 =============== 630-80372 Conc Barrier (Temp) (Furnish & Install) Lin Foot =============================================== NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 175.00 45.00 162.40 152.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 40.00 40.00 68.38 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 215.00 44.07 149.97 140.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 215.00 44.07 149.97 140.47 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 124 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80380 Traffic Cone Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 700.00 10.00 12.53 12.76 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 610.00 10.00 15.25 15.50 STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 100.00 15.00 5.01 1.43 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 100.00 25.00 25.00 15.00 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 50.00 10.00 11.08 10.50 STA066A-008 SH 66 @ WCR 7 01/26/23 50.00 20.00 18.34 18.98 C0342-066 US 034A (MP 113-150) 02/02/23 50.00 25.00 13.00 15.00 C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 200.00 12.00 28.72 30.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 400.00 15.00 11.00 11.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 150.00 10.00 29.53 35.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 100.00 10.00 1.16 1.15 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 300.00 10.00 1.00 1.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 150.00 10.00 2.00 2.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 40.00 10.00 15.00 10.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 400.00 11.00 19.88 2.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 50.00 20.00 12.87 18.00 STRR300-265 MOUNTAIN RE FY23 CRACK SEALS 03/02/23 400.00 10.00 12.00 12.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 350.00 10.00 1.50 1.00 FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 150.00 10.00 5.50 4.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 100.00 15.00 14.25 13.50 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 200.00 20.96 28.27 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,650.00 11.99 14.88 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,650.00 11.99 14.88 12.00 =============== 630-80393 Stackable Vertical Panels Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 100.00 35.00 25.11 25.52 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 24.00 40.00 20.00 26.00 C0342-066 US 034A (MP 113-150) 02/02/23 20.00 30.00 46.67 68.00 STM C440-013 R3 EAGLE RESIDENCY ADA RAMP I 02/16/23 120.00 30.00 20.00 20.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 40.00 27.00 85.00 60.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 80.00 50.00 52.67 55.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 50.00 35.92 76.85 71.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 434.00 35.80 45.92 39.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 434.00 35.80 45.92 39.83 =============== 630-80430 Rumble Strip (Port) Each =================================================== SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 12.00 500.00 1425.00 1200.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 125 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80430 Rumble Strip (Port) Each =================================================== C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 4.00 1500.00 3198.20 3200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 750.00 1868.30 1700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 750.00 1868.30 1700.00 =============== 630-80440 Port Rumble Strips (Temp) Each =================================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 12.00 1500.00 1425.00 1450.00 STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 36.00 1200.00 2316.00 3244.72 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 12.00 100.00 999.00 999.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 1040.00 2143.84 2436.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 1040.00 2143.84 2436.63 =============== 630-80511 Mobile Pvmt Marking Zone LUMP SUM =============================================== MTCER500-221 REGION 5 01/05/23 1.00 60000.00 112500.00 75000.00 NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 1.00 15000.00 15170.00 10340.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 37500.00 63835.00 42670.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 37500.00 63835.00 42670.00 =============== 630-80520 Mobile Pvmt Mkg Zone Day ==================================================== STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 4.00 3000.00 3396.83 2900.00 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 4.00 1600.00 2616.67 2000.00 STA1381-011 SH 138 STERLING NORTH PART 2 02/16/23 3.00 3000.00 4350.00 4350.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 2.00 1000.00 2970.00 2970.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 2261.54 3055.64 2968.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 2261.54 3055.64 2968.46 =============== 630-85010 Impact Atten (Temp) Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 2.00 8500.00 366.09 372.18 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 4.00 6000.00 4128.33 4500.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 126 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85010 Impact Atten (Temp) Each =================================================== C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 2.00 9000.00 12070.54 14000.00 C133A-052 SH 133 ROCKFALL N OF MCCLURE 02/16/23 2.00 2500.00 7608.41 14000.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 2.00 10000.00 1406.12 1400.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 2.00 4000.00 13200.00 13200.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 1.00 10000.00 5250.00 5500.00 STA257A-008 SH 257 WINDSOR RESURFACING 03/30/23 2.00 7000.00 4925.00 4000.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 1.00 4258.95 12519.68 8500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 6681.05 5733.91 6996.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 6681.05 5733.91 6996.91 =============== 630-85011 Imp Atten (Temp) Day ==================================================== SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 140.00 300.00 125.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 140.00 300.00 125.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 140.00 300.00 125.00 50.00 =============== 630-85020 Mobile Attenuator Each =================================================== SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 2.00 30000.00 45000.00 45000.00 FSA0853-123 US 85 AND WCR 66 LEFT TURN AC 01/26/23 1.00 30000.00 47781.67 36500.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 1.00 25000.00 89372.00 109000.00 C0342-066 US 034A (MP 113-150) 02/02/23 1.00 20000.00 35252.67 36158.00 STR194A-002 SH194A SUR. TREAT.& DRAI IMP 03/09/23 2.00 25700.00 27500.00 27000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 26628.57 47528.20 46522.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 26628.57 47528.20 46522.57 =============== 630-85040 Impact Atten (T-M-A) (Temp) Each =================================================== NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 2.00 13000.00 44719.59 10600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 13000.00 44719.59 10600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 13000.00 44719.59 10600.00 =============== 630-85041 Mobile Attenuator Day ==================================================== STA066A-008 SH 66 @ WCR 7 01/26/23 15.00 600.00 1171.19 880.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 127 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85041 Mobile Attenuator Day ==================================================== C0703-498 EISENHOWER JOHNSON MEMORIAL T 02/16/23 65.00 900.00 1120.59 1200.00 NHPP0701-256 I-70B/31.5 RD MESA COUNTY 02/16/23 10.00 1000.00 725.00 850.00 C0881-036 R1 CURB RAMPS-SH88B & US285D 02/16/23 50.00 600.00 1337.50 800.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 80.00 250.00 867.33 1160.00 SHE067A-044 SH 67F M.P. 56.5-57.6 AND SH 03/02/23 40.00 1000.00 1092.96 1092.96 FBR 0703-520 EISENHOWER-JOHNSON MEMORIAL T 03/16/23 10.00 1500.00 1050.00 1000.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 150.00 598.72 825.66 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 420.00 648.35 1017.37 1074.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 420.00 648.35 1017.37 1074.33 =============== 630-86810 Traffic Signal (Temp) Each =================================================== STA172A-022 SH 172 IGNACIO TO ELMORE'S CO 01/12/23 2.00 10000.00 33473.88 34027.75 STR2871-040 US 287 MP 0.0 TO MP 122 VARIO 01/12/23 2.00 25000.00 30576.07 43500.00 C1601-084 US 160 SECTION3 PRIORITY CULV 02/16/23 1.00 40000.00 19292.99 3600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 22000.00 29890.14 31731.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 22000.00 29890.14 31731.10 =============== 630-88001 Work Zone Intrusion Alarm System Day ==================================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 72.00 120.00 102.50 155.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 72.00 120.00 102.50 155.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72.00 120.00 102.50 155.00 =============== 632-00000 Night Work Lighting LUMP SUM =============================================== NHPP0701-250 I-70B: DDI TO 24 RD, MAIN ST 01/12/23 1.00 100000.00 78755.00 57510.00 SFTYR200-277 REGION 2 WIDE, VARIOUS HWY & 01/19/23 1.00 30000.00 65000.00 10000.00 NHPPR100-383 I70 OVER WASHINGTON ST 01/26/23 1.00 20000.00 150013.58 36000.00 C 1601-086 MAPLE & CHESTNUT SIGNALS AT I 02/16/23 1.00 30000.00 3870.00 3870.00 NHPP0253-290 I25 @ 58TH AND 62ND 03/02/23 1.00 20000.00 126839.15 38000.00 NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 1.00 16670.93 31565.23 30600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 36111.82 91159.13 29330.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 36111.82 91159.13 29330.00 COLORADO DEPARTMENT OF TRANSPORTATION 12:26 Wednesday, May 17, 2023 128 ITEM UNIT COSTS BY PROJECTS -- 2023 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 641-10010 Initial Shotcrete Facing Sq Foot ================================================ NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 6,546.00 30.00 28.96 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,546.00 30.00 28.96 32.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,546.00 30.00 28.96 32.00 =============== 641-10070 Shotcrete Sculpting Sq Yard ================================================ NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 491.00 340.12 113.10 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 491.00 340.12 113.10 165.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 491.00 340.12 113.10 165.00 =============== 641-11003 Shotcrete (CL D) Cubic Yard ============================================= NHPP R100-376 VARIOUS LOCATIONS IN REGION 1 03/30/23 131.00 590.08 1116.84 980.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 131.00 590.08 1116.84 980.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 131.00 590.08 1116.84 980.00