Colorado Department of Transportation 2025 Cost Data Projects Bid From 01/01/25 Through 03/31/25 Bid Letting Contractor/ Project Number Location Dist Terrain Bids Awarded Bid Index 20250109 BRANNAN SAND AND GRAVEL, LLC NHPP2873-206 US287:RESURFACING I-70 TO 92ND 6 U 3 $12,912,912.00 96.97 20250116 STRUCTURES, INC. 2670252-499 I-25:MOBILITY HUB (LONE TREE) 1 R 6 $16,509,889.28 142.33 20250116 Lobato Construction, LLC STRR200-288 CO 9B, US 24A, US 24G, CO 67C, 2 M 7 $1,798,366.30 62.01 20250130 STURGEON ELECTRIC COMPANY, INC STM0132-025 CO13 MM 90.2, US40Z MM 0.65, M 3 U 3 $1,280,705.00 83.07 20250130 KSK, LLC NHPP0702-428 I-70 THROUGH GLENWOOD CANYON I 3 M 5 $6,295,000.00 83.20 20250206 Native Sun Materials Inc BRR100-400 VAR LOCATIONS R1 I25, I225 & I 1 U 4 $2,684,443.68 76.70 20250206 OLDCASTLE SW GROUP, INC. NHPP0403-069 US 40 MP 215.90 - 219.88 IN GR 3 M 2 $5,792,196.70 91.19 20250213 Adiona Transportation Solutions SHE0881-032 LLC FEDERAL BLVD SIGNALS 41st and 1 U 6 $934,434.00 84.95 20250220 ASPHALT SPECIALTIES NHPP0072-033 CO., INC. CO7 28TH ST TO CHERRYVALE RD ( 4 U 4 $8,058,760.55 87.60 20250227 RDZ Build BR0761-249 I-76 4 U 6 $3,259,684.20 101.57 20250228 Myers & Sons STR141A-056 Construction, LLC SH 141 MP 85.5 K-01-B BRIDGE 5 R 4 $2,088,196.75 87.92 20250306 STREAMLINE MARKINGS, INC MTCER500-233 REGION 5 5 R 6 $1,834,021.50 71.81 20250313 ROADSAFE TRAFFIC SYSTEMS, INC 2 $993,522.30 90.32 MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 2 R 20250320 OLDCASTLE SW GROUP, INC. 3 $7,290,197.96 96.69 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVER 6 R 20250327 TRICON 2, LLC 3 $247,000.00 98.80 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 6 P Totals 64 $71,979,330.22 97.13 Bridge Cost Per Square Foot (01/01/25 Through 03/31/25) Project Number/ Terr/ Total Total Cost Per Date Let Project Location Bridge ID Length Width Square Ft Cost Square Foot BRIDGE REPAIR 250206 BRR100-400 VAR LOCATIONS R1 I25, I225 & I U 0300 213.0000 39.0000 8307.0 $107,074 $12.89 0301 346.5000 173.0000 59944.5 $695,165 $11.60 0302 543.5000 67.0000 36414.5 $495,348 $13.60 250228 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE R 0300 103.0000 28.0000 2884.0 $82,342 $28.55 Weighted Average Cost: New Structures 107550.0 $1,379,929 $12.83 PEDESTRIAN OR BIKEWAY BRIDGE 250116 2670252-499 R I-25:MOBILITY HUB (LONE TREE) 0302 286.0000 14.0000 4004.0 $6,317,408 $1,577.77 Weighted Average Cost: New Structures 4004.0 $6,317,408 $1,577.77 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid 201-00000 Clear and Grub Lump Sum NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 1.00 20000.00 6317.76 12000.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 10000.00 53833.33 53000.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 1.00 25000.00 7271.67 4300.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 1.00 10000.00 96000.00 70000.00 BR0761-249 I-76 02/27/25 1.00 10000.00 33955.67 25000.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 1.00 20000.00 36038.61 17500.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 1.00 40636.01 12585.63 5100.00 Weighted Average for the First Quarter 7.00 19376.57 34867.17 26700.00 Weighted Average for the Year 7.00 19376.57 34867.17 26700.00 202-00001 Rem Structure Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 3302.51 1600.19 2810.15 Weighted Average for the First Quarter 1.00 3302.51 1600.19 2810.15 Weighted Average for the Year 1.00 3302.51 1600.19 2810.15 202-00010 Rem Tree Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 26.00 702.59 361.67 318.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 6.00 1500.00 2037.50 3300.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 1.00 250.00 2121.33 648.00 Weighted Average for the First Quarter 33.00 833.86 537.92 870.18 Weighted Average for the Year 33.00 833.86 537.92 870.18 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 202-00019 Rem Inlet Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 2.00 1581.90 1012.23 625.40 Weighted Average for the First Quarter 2.00 1581.90 1012.23 625.40 Weighted Average for the Year 2.00 1581.90 1012.23 625.40 202-00021 Rem Manhole Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 983.06 1021.71 375.24 Weighted Average for the First Quarter 1.00 983.06 1021.71 375.24 Weighted Average for the Year 1.00 983.06 1021.71 375.24 BR0761-249 202-00023 Rem Emb I-76 Prot Ty 3 02/27/25 Each 2.00 1000.00 1567.00 750.00 Weighted Average for the First Quarter 2.00 1000.00 1567.00 750.00 Weighted Average for the Year 2.00 1000.00 1567.00 750.00 202-00026 Rem S and D Pave Sq Yard 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 59.00 60.07 31.13 31.80 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 359.00 13.88 45.42 15.79 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 418.00 20.40 42.60 18.05 Weighted Average for the Year 418.00 20.40 42.60 18.05 202-00027 Rem Riprap Sq Yard 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 114.00 35.95 43.15 24.38 Weighted Average for the First Quarter 114.00 35.95 43.15 24.38 Weighted Average for the Year 114.00 35.95 43.15 24.38 202-00035 Rem Pipe Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 144.00 46.01 54.61 82.68 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 129.00 53.70 38.87 29.99 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 13.00 115.00 164.00 225.00 Weighted Average for the First Quarter 286.00 52.61 50.86 65.38 Weighted Average for the Year 286.00 52.61 50.86 65.38 202-00037 Rem of End Section Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 3.00 430.36 432.53 250.16 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 1.00 650.00 1230.00 2000.00 Weighted Average for the First Quarter 4.00 485.27 512.27 687.62 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the Year 4.00 485.27 512.27 687.62 202-00039 Rem of Bollard Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 2.00 700.00 642.16 1115.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 18.00 150.00 400.07 350.00 Weighted Average for the First Quarter 20.00 205.00 418.69 426.50 Weighted Average for the Year 20.00 205.00 418.69 426.50 2670252-499 202-00055 Rem of FO Cable I-25:MOBILITY HUB (LONE TREE) 01/16/25 Lin Foot 125.00 2.17 3.78 5.30 Weighted Average for the First Quarter 125.00 2.17 3.78 5.30 2670252-499 202-00060 Weighted Average for the Year Rem Trav Time Indicator I-25:MOBILITY HUB (LONE TREE) 01/16/25 125.00 Each 1.00 2.17 488.56 3.78 845.59 5.30 292.56 Weighted Average for the First Quarter 1.00 488.56 845.59 292.56 Weighted Average for the Year 1.00 488.56 845.59 292.56 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid 202-00090 Rem Delineator Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 52.00 40.00 13.89 14.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 82.00 20.00 16.53 17.00 BR0761-249 I-76 02/27/25 22.00 20.00 37.55 100.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 100.00 14.72 20.39 10.20 Weighted Average for the First Quarter 256.00 22.00 20.37 20.87 Weighted Average for the Year 256.00 22.00 20.37 20.87 202-00155 Rem Wall Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 361.00 32.50 42.02 27.13 Weighted Average for the First Quarter 361.00 32.50 42.02 27.13 Weighted Average for the Year 361.00 32.50 42.02 27.13 202-00190 Rem of Conc Median Cover Matl Sq Yard NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 14.00 72.00 38.40 38.85 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 9.00 35.00 60.40 54.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 604.00 25.00 20.28 20.35 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 14.00 64.60 40.58 45.95 Weighted Average for the First Quarter 641.00 27.03 21.76 21.79 Weighted Average for the Year 641.00 27.03 21.76 21.79 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 202-00195 Rem of Median Cover Sq Yard NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 226.00 25.57 33.00 40.80 Weighted Average for the First Quarter 226.00 25.57 33.00 40.80 Weighted Average for the Year 226.00 25.57 33.00 40.80 202-00200 Rem Sidewalk Sq Yard NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 1,578.00 25.00 34.91 35.32 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 24.00 34.29 33.46 37.52 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 22.00 50.00 92.75 110.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 128.00 40.00 45.60 54.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 809.00 35.00 20.87 22.70 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 5.00 91.75 35.59 51.00 Weighted Average for the First Quarter 2,566.00 29.33 31.16 32.96 Weighted Average for the Year 2,566.00 29.33 31.16 32.96 202-00201 Rem Curb Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 500.00 12.90 13.96 14.13 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 2.00 8.00 116.33 140.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 104.00 25.00 10.73 12.50 Weighted Average for the First Quarter 606.00 14.96 13.58 14.27 Weighted Average for the Year 606.00 14.96 13.58 14.27 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid 202-00203 Rem Curb and Gutter Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 3,331.00 16.00 15.13 15.30 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1,080.00 11.25 11.98 13.14 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 18.00 25.00 106.42 150.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 125.00 28.45 19.92 22.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 3,552.00 15.00 10.95 10.65 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 465.00 18.77 17.88 13.25 Weighted Average for the First Quarter 8,571.00 15.34 13.08 13.37 Weighted Average for the Year 8,571.00 15.34 13.08 13.37 202-00206 Rem Conc Curb Ramp Sq Yard STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 15.00 50.00 97.75 130.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 107.00 35.00 45.69 54.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 1,829.00 45.00 20.30 20.45 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 17.00 73.17 33.30 45.90 Weighted Average for the First Quarter 1,968.00 44.74 22.84 23.33 Weighted Average for the Year 1,968.00 44.74 22.84 23.33 202-00207 Rem of Brick Pavers Sq Yard NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 3.00 48.00 50.94 50.00 Weighted Average for the First Quarter 3.00 48.00 50.94 50.00 Weighted Average for the Year 3.00 48.00 50.94 50.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 202-00210 Rem Conc Pavement Sq Yard NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 377.00 50.00 38.40 38.85 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1,248.00 23.60 45.21 43.25 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 22.00 50.00 59.84 60.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 245.00 53.00 25.22 25.00 BR0761-249 I-76 02/27/25 348.00 42.95 84.32 60.00 Weighted Average for the First Quarter 2,240.00 34.52 49.97 43.28 Weighted Average for the Year 2,240.00 34.52 49.97 43.28 202-00220 Rem Asphalt Mat Sq Yard NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 202.00 45.00 37.39 35.32 STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 281.00 130.00 55.01 35.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 45.00 80.00 45.38 65.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 475.00 25.00 22.00 30.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 24,598.00 12.00 7.47 7.50 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 4,756.00 6.59 16.90 15.90 Weighted Average for the First Quarter 30,357.00 12.77 9.75 9.69 Weighted Average for the Year 30,357.00 12.77 9.75 9.69 202-00240 Rem Asphalt Mat (Planing) Sq Yard NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 250,763.00 3.00 3.29 2.42 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 689.00 15.00 22.50 20.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 173.00 12.00 34.93 30.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 202-00240 Rem Asphalt Mat (Planing) Sq Yard NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 83,156.00 3.50 4.74 4.20 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 430.00 50.00 22.84 20.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 168,060.00 2.10 3.58 3.91 Weighted Average for the First Quarter 503,271.00 2.84 3.74 3.26 Weighted Average for the Year 503,271.00 2.84 3.74 3.26 202-00246 Rem Asphalt Mat (Planing)(Special) Sq Yard NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 1,568.00 18.00 17.10 21.40 BR0761-249 I-76 02/27/25 5,778.00 20.61 24.20 19.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 275.00 46.00 30.40 10.00 Weighted Average for the First Quarter 7,621.00 20.99 23.54 19.17 Weighted Average for the Year 7,621.00 20.99 23.54 19.17 202-00250 Rem Pavement Marking Sq Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1,387.00 2.99 6.31 5.30 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 2,400.00 2.50 4.24 4.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 44,637.00 1.00 0.74 0.55 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 785.00 2.50 5.60 5.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 44,566.00 1.00 0.79 0.60 BR0761-249 I-76 02/27/25 14,386.00 1.94 2.00 1.20 MTCER500-233 REGION 5 03/06/25 8,397.00 2.75 7.13 3.50 MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 5,406.00 2.86 6.38 2.75 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 596.00 3.91 6.94 7.90 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 122,560.00 1.39 2.13 1.13 Weighted Average for the Year 122,560.00 1.39 2.13 1.13 202-00425 Rem Bridge Railing Lin Foot NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 1,180.00 150.00 115.94 75.00 BR0761-249 I-76 02/27/25 760.00 25.00 55.06 110.00 Weighted Average for the First Quarter 1,940.00 101.03 89.40 88.71 Weighted Average for the Year 1,940.00 101.03 89.40 88.71 202-00453 Rem Port Present Str (2) Sq Yard NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 78.00 500.00 674.95 670.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 324.00 400.00 388.30 393.62 BR0761-249 I-76 02/27/25 308.00 395.65 400.92 350.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 14.00 380.00 638.64 200.00 Weighted Average for the First Quarter 724.00 408.54 418.70 401.10 Weighted Average for the Year 724.00 408.54 418.70 401.10 202-00460 Rem Port Present Str (3) Sq Yard NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 16.00 1200.00 1338.64 1330.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 33.00 1500.00 572.14 515.31 BR0761-249 I-76 02/27/25 66.00 741.96 1087.90 600.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 3.00 2500.00 1858.92 350.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 118.00 1060.76 1008.32 668.94 Weighted Average for the Year 118.00 1060.76 1008.32 668.94 202-00502 Rem Port Present Str Cubic Yard STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 1.00 7000.00 4012.34 5000.00 Weighted Average for the First Quarter 1.00 7000.00 4012.34 5000.00 Weighted Average for the Year 1.00 7000.00 4012.34 5000.00 202-00504 Rem Exp Device Lin Foot NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 856.00 600.00 1185.89 445.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 609.00 500.00 397.89 366.26 BR0761-249 I-76 02/27/25 760.00 238.63 206.26 135.00 Weighted Average for the First Quarter 2,225.00 449.20 619.49 317.56 Weighted Average for the Year 2,225.00 449.20 619.49 317.56 202-00505 Rem Port of Present Structure Sq Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 26.00 700.00 213.28 212.00 BR0761-249 I-76 02/27/25 1,661.00 163.90 135.36 115.00 Weighted Average for the First Quarter 1,687.00 172.16 135.97 116.49 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the Year 1,687.00 172.16 135.97 116.49 202-00705 Rem Light Standard Foundation Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 5.00 718.12 1909.38 906.30 Weighted Average for the First Quarter 5.00 718.12 1909.38 906.30 Weighted Average for the Year 5.00 718.12 1909.38 906.30 202-00750 Rem Luminaire Each STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 1.00 250.00 317.50 325.00 Weighted Average for the First Quarter 1.00 250.00 317.50 325.00 Weighted Average for the Year 1.00 250.00 317.50 325.00 202-00810 Rem Ground Sign Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 96.00 100.00 290.57 295.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 251.91 228.26 126.55 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 12.00 200.00 254.00 250.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 1.00 250.00 313.67 577.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 4.00 200.00 257.30 285.00 Weighted Average for the First Quarter 114.00 116.68 285.73 290.91 Weighted Average for the Year 114.00 116.68 285.73 290.91 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid 202-00821 Rem Sign Panel Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 8.00 150.00 173.41 176.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 5.00 100.00 154.84 170.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 8.00 150.01 94.04 155.00 Weighted Average for the First Quarter 21.00 138.10 139.93 166.57 Weighted Average for the Year 21.00 138.10 139.93 166.57 202-00827 Rem of Pull Box Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 8.00 247.62 421.76 292.56 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 10.00 1000.00 447.50 350.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 69.00 250.00 560.63 580.00 Weighted Average for the First Quarter 87.00 335.99 532.21 527.13 Weighted Average for the Year 87.00 335.99 532.21 527.13 202-00828 Rem Traf Sig Equipment Lump Sum NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 1.00 30000.00 57839.82 45600.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 1.00 30000.00 24200.00 29000.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 1.00 50000.00 12140.83 10507.00 Weighted Average for the First Quarter 3.00 36666.67 26580.37 28369.00 Weighted Average for the Year 3.00 36666.67 26580.37 28369.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 202-00831 Rem Traf Sig Head Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 37.00 120.00 198.27 275.00 Weighted Average for the First Quarter 37.00 120.00 198.27 275.00 Weighted Average for the Year 37.00 120.00 198.27 275.00 202-00858 Rem Pedestal Pole Each NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 3.00 2300.00 1133.66 580.00 Weighted Average for the First Quarter 3.00 2300.00 1133.66 580.00 Weighted Average for the Year 3.00 2300.00 1133.66 580.00 202-00860 Rem Ped Push Button Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 13.00 150.00 89.97 110.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 42.00 130.00 241.00 115.00 Weighted Average for the First Quarter 55.00 134.73 212.54 113.82 Weighted Average for the Year 55.00 134.73 212.54 113.82 202-00887 Rem Radar Detect Sys Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 330.00 862.26 292.56 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 1.00 330.00 862.26 292.56 Weighted Average for the Year 1.00 330.00 862.26 292.56 202-01000 Rem Fence Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 22.00 25.00 111.20 88.30 STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 300.00 50.00 9.96 10.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1,725.00 2.37 3.83 2.23 Weighted Average for the First Quarter 2,047.00 9.59 5.42 4.29 Weighted Average for the Year 2,047.00 9.59 5.42 4.29 202-01030 Rem of Road Closure Gate Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 2041.00 892.50 1272.00 Weighted Average for the First Quarter 1.00 2041.00 892.50 1272.00 Weighted Average for the Year 1.00 2041.00 892.50 1272.00 202-01130 Rem Gdrail Ty 3 Lin Foot NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 3,334.00 10.00 5.38 5.75 BR0761-249 I-76 02/27/25 1,430.00 11.00 17.13 20.00 Weighted Average for the First Quarter 4,764.00 10.30 11.99 10.03 Weighted Average for the Year 4,764.00 10.30 11.99 10.03 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 202-01170 Rem Gdrail Ty 7 Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 139.00 75.05 79.27 81.38 Weighted Average for the First Quarter 139.00 75.05 79.27 81.38 Weighted Average for the Year 139.00 75.05 79.27 81.38 202-01300 Rem End Anchorage Each NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 6.00 800.00 489.50 690.00 Weighted Average for the First Quarter 6.00 800.00 489.50 690.00 Weighted Average for the Year 6.00 800.00 489.50 690.00 202-04002 Clean Culvert Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 8.00 2205.28 3079.38 3526.25 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 2.00 6500.00 2542.50 2500.00 Weighted Average for the First Quarter 10.00 3064.22 3038.08 3321.00 Weighted Average for the Year 10.00 3064.22 3038.08 3321.00 202-04005 Clean Valve Box Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 50.00 100.00 517.13 420.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 202-04005 Clean Valve Box Each SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 5.00 180.00 820.70 577.00 Weighted Average for the First Quarter 55.00 107.27 567.72 434.27 Weighted Average for the Year 55.00 107.27 567.72 434.27 202-04010 Clean Inlet Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 127.00 300.00 1133.13 1170.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 5.00 1351.08 1606.33 1380.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 10.00 1607.32 1585.37 3575.00 Weighted Average for the First Quarter 142.00 429.07 1186.56 1346.76 Weighted Average for the Year 142.00 429.07 1186.56 1346.76 202-04050 Clean Exp Joint Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 166.00 30.00 112.36 99.00 Weighted Average for the First Quarter 166.00 30.00 112.36 99.00 Weighted Average for the Year 166.00 30.00 112.36 99.00 202-05030 Sawing Asphalt Mat (10 In) Lin Foot STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 352.00 20.00 14.96 15.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 352.00 20.00 14.96 15.00 Weighted Average for the Year 352.00 20.00 14.96 15.00 203-00000 Uncl Excav Cubic Yard NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 5,318.00 85.00 49.32 49.65 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 20.00 184.17 203.13 105.00 Weighted Average for the First Quarter 5,338.00 85.37 49.75 49.86 Weighted Average for the Year 5,338.00 85.37 49.75 49.86 203-00010 Uncl Excav (CIP) Cubic Yard NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 2,320.00 25.00 50.16 74.00 STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 640.00 80.00 85.86 75.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 10,309.00 18.00 28.87 31.19 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 8,502.00 45.00 49.00 52.00 Weighted Average for the First Quarter 21,771.00 31.11 37.13 45.17 Weighted Average for the Year 21,771.00 31.11 37.13 45.17 203-00050 Unsuitable Material Cubic Yard NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 109.00 115.00 157.14 190.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 20.00 120.00 160.60 169.60 Weighted Average for the First Quarter 129.00 115.78 158.07 186.84 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the Year 129.00 115.78 158.07 186.84 BR0761-249 203-00060 Emb Matl (CIP) I-76 02/27/25 Cubic Yard 1,296.00 50.00 69.38 50.00 Weighted Average for the First Quarter 1,296.00 50.00 69.38 50.00 203-00062 Weighted Average for Emb Matl (CIP) (Spec) the Year 1,296.00 Cubic Yard 50.00 69.38 50.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 4,206.00 35.00 34.53 32.20 Weighted Average for the First Quarter 4,206.00 35.00 34.53 32.20 Weighted Average for the Year 4,206.00 35.00 34.53 32.20 203-01100 Proof Rolling Hour NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 40.00 135.00 246.00 115.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 8.00 150.00 199.25 300.00 Weighted Average for the First Quarter 48.00 137.50 232.64 145.83 Weighted Average for the Year 48.00 137.50 232.64 145.83 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 203-01500 Blading Hour 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 10.00 186.57 185.47 190.80 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 20.00 270.00 231.25 250.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 80.00 200.00 271.59 150.00 Weighted Average for the First Quarter 110.00 211.51 244.49 171.89 Weighted Average for the Year 110.00 211.51 244.49 171.89 203-01550 Dozing Hour 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 10.00 193.63 195.13 190.80 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 80.00 200.00 312.49 150.00 Weighted Average for the First Quarter 90.00 199.29 280.48 154.53 Weighted Average for the Year 90.00 199.29 280.48 154.53 203-01565 Hydraulic Excavator Hour STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 15.00 230.00 200.84 200.00 Weighted Average for the First Quarter 15.00 230.00 200.84 200.00 Weighted Average for the Year 15.00 230.00 200.84 200.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 203-01580 Truck Hour NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 80.00 200.00 167.56 100.00 Weighted Average for the First Quarter 80.00 200.00 167.56 100.00 Weighted Average for the Year 80.00 200.00 167.56 100.00 203-01594 Combination Loader Hour 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 20.00 132.87 156.93 169.60 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 40.00 115.00 196.03 20.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 80.00 150.00 415.15 120.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 15.00 230.00 151.87 120.00 Weighted Average for the First Quarter 155.00 146.50 247.36 100.59 Weighted Average for the Year 155.00 146.50 247.36 100.59 203-01597 Potholing Hour NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 100.00 298.14 448.12 420.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 20.00 327.19 290.70 286.20 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 20.00 400.00 477.83 700.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 10.00 300.00 383.25 575.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 10.00 600.00 407.50 490.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 69.00 250.00 392.50 309.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 40.00 350.00 381.54 225.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 16.00 350.00 382.58 375.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 80.00 309.73 375.07 360.00 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 40.00 400.00 326.33 334.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 405.00 323.42 389.26 372.48 Weighted Average for the Year 405.00 323.42 389.26 372.48 203-01620 Sweeping Hour MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 75.00 129.17 222.50 325.00 Weighted Average for the First Quarter 75.00 129.17 222.50 325.00 Weighted Average for the Year 75.00 129.17 222.50 325.00 203-01622 Sweeping (With Pickup Broom) Hour NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 40.00 200.00 193.61 195.00 Weighted Average for the First Quarter 40.00 200.00 193.61 195.00 Weighted Average for the Year 40.00 200.00 193.61 195.00 203-02330 Laborer Hour NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 40.00 85.00 54.94 20.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 80.00 100.00 67.50 40.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 15.00 65.00 59.62 45.00 Weighted Average for the First Quarter 135.00 91.67 60.39 34.63 Weighted Average for the Year 135.00 91.67 60.39 34.63 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 206-00000 Str Excav Cubic Yard 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1,252.00 33.33 38.15 33.92 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 87.00 106.66 134.55 85.61 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 2,658.00 35.00 52.26 50.00 Weighted Average for the First Quarter 3,997.00 36.04 48.08 45.74 Weighted Average for the Year 3,997.00 36.04 48.08 45.74 206-00065 Str Bkfl (Flow-Fill) Cubic Yard STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 22.00 680.00 1364.36 750.00 Weighted Average for the First Quarter 22.00 680.00 1364.36 750.00 Weighted Average for the Year 22.00 680.00 1364.36 750.00 206-00100 Str Bkfl (CL 1) Cubic Yard 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 281.00 76.51 61.26 58.30 Weighted Average for the First Quarter 281.00 76.51 61.26 58.30 Weighted Average for the Year 281.00 76.51 61.26 58.30 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 206-00200 Str Bkfl (CL 2) Cubic Yard 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 826.00 22.60 40.31 14.84 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 274.00 33.21 256.97 78.84 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 597.00 100.00 45.48 35.00 Weighted Average for the First Quarter 1,697.00 51.54 69.90 32.27 Weighted Average for the Year 1,697.00 51.54 69.90 32.27 206-00520 Filter Matl (CL B) Cubic Yard NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 6.00 100.00 1858.33 175.00 Weighted Average for the First Quarter 6.00 100.00 1858.33 175.00 Weighted Average for the Year 6.00 100.00 1858.33 175.00 207-00205 Topsoil Cubic Yard 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 2,200.00 50.00 37.30 31.80 Weighted Average for the First Quarter 2,200.00 50.00 37.30 31.80 Weighted Average for the Year 2,200.00 50.00 37.30 31.80 207-00210 Stockpile Topsoil Cubic Yard STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 161.00 30.00 15.80 15.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 161.00 30.00 15.80 15.00 Weighted Average for the Year 161.00 30.00 15.80 15.00 207-00305 Wetland Topsoil Cubic Yard 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 25.00 50.00 53.82 42.40 Weighted Average for the First Quarter 25.00 50.00 53.82 42.40 Weighted Average for the Year 25.00 50.00 53.82 42.40 207-00310 Stockpile Wetland Topsoil Cubic Yard STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 8.00 30.00 87.01 50.00 Weighted Average for the First Quarter 8.00 30.00 87.01 50.00 Weighted Average for the Year 8.00 30.00 87.01 50.00 207-00700 Topsoil (Onsite) Cubic Yard NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 850.00 20.00 30.85 64.75 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 34.00 120.00 89.75 120.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 3,692.00 30.00 25.00 21.00 BR0761-249 I-76 02/27/25 1,372.00 25.04 20.34 42.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 161.00 50.00 20.86 15.00 Weighted Average for the First Quarter 6,109.00 28.52 23.97 32.20 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the Year 6,109.00 28.52 23.97 32.20 STR141A-056 207-00703 Topsoil (Wetlnd) SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 Cubic Yard 8.00 500.00 90.62 50.00 Weighted Average for the First Quarter 8.00 500.00 90.62 50.00 Weighted Average for the Year 8.00 500.00 90.62 50.00 208-00002 Erosion Log Type 1 (12 In) Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 575.00 7.35 7.28 8.20 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 600.00 5.97 6.34 8.44 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 2,000.00 10.00 5.91 5.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 44.00 8.00 21.01 24.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 570.00 10.00 11.17 6.50 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 200.00 8.32 12.00 10.70 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 200.00 6.00 8.92 8.75 Weighted Average for the First Quarter 4,189.00 8.77 7.85 6.79 Weighted Average for the Year 4,189.00 8.77 7.85 6.79 208-00009 Erosion Log Type 2 (18 In) Lin Foot STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 3,000.00 13.43 14.05 13.00 Weighted Average for the First Quarter 3,000.00 13.43 14.05 13.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the Year 3,000.00 13.43 14.05 13.00 208-00013 Erosion Log Type 1 (20 In) Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 4,300.00 8.00 9.29 11.19 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 250.00 20.00 8.50 7.50 Weighted Average for the First Quarter 4,550.00 8.66 9.27 10.99 Weighted Average for the Year 4,550.00 8.66 9.27 10.99 208-00020 Silt Fence Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 1,260.00 1.96 3.06 3.35 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 400.00 1.99 3.22 3.11 Weighted Average for the First Quarter 1,660.00 1.96 3.12 3.29 Weighted Average for the Year 1,660.00 1.96 3.12 3.29 208-00021 Silt Fence (Reinf) Lin Foot STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 205.00 5.00 10.09 6.50 Weighted Average for the First Quarter 205.00 5.00 10.09 6.50 Weighted Average for the Year 205.00 5.00 10.09 6.50 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 208-00023 Erosion Log Type 3 (12 In) Lin Foot BR0761-249 I-76 02/27/25 1,800.00 8.11 8.10 6.00 Weighted Average for the First Quarter 1,800.00 8.11 8.10 6.00 Weighted Average for the Year 1,800.00 8.11 8.10 6.00 208-00033 Sediment Trap Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 4985.74 2833.42 895.49 Weighted Average for the First Quarter 1.00 4985.74 2833.42 895.49 Weighted Average for the Year 1.00 4985.74 2833.42 895.49 208-00035 Aggregate Bag Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 84.00 14.13 11.81 12.50 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1,750.00 9.20 9.83 12.97 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 200.00 15.00 18.06 20.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 160.00 25.00 12.41 9.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 50.00 15.26 20.29 25.30 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 102.00 10.00 15.66 22.00 BR0761-249 I-76 02/27/25 2,000.00 10.69 10.38 15.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 300.00 12.25 13.95 12.40 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 300.00 11.00 12.83 12.50 Weighted Average for the First Quarter 4,946.00 11.01 10.89 14.19 Weighted Average for the Year 4,946.00 11.01 10.89 14.19 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 208-00045 Conc Washout Str Each NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 1.00 1800.00 3333.33 7500.00 Weighted Average for the First Quarter 1.00 1800.00 3333.33 7500.00 Weighted Average for the Year 1.00 1800.00 3333.33 7500.00 208-00046 Pre-fab Conc Washout Str (Type 1) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 4.00 1805.77 2597.85 2095.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 2.00 5000.00 4153.89 4102.86 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 1.00 6000.00 13456.06 7500.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 1.00 5000.00 2835.08 3000.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 3.00 2500.00 3588.73 2875.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 1.00 4000.00 6630.50 6100.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 2.00 1500.00 2908.08 3058.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 2.00 3000.00 5994.07 1700.00 BR0761-249 I-76 02/27/25 6.00 995.89 2283.85 3000.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 2.00 2299.14 2921.64 2570.00 Weighted Average for the First Quarter 24.00 2470.70 3664.17 3102.78 Weighted Average for the Year 24.00 2470.70 3664.17 3102.78 208-00051 Storm Drain Inlet Protection (Type I) Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 500.00 10.75 43.79 184.60 Weighted Average for the First Quarter 500.00 10.75 43.79 184.60 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid 208-00053 Weighted Average Storm Drain Inlet for the Year Protect (Ty I)(84 In) 500.00 Each 10.75 43.79 184.60 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 1.00 300.00 367.35 500.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 5.00 207.41 343.67 305.00 Weighted Average for the First Quarter 6.00 222.84 347.62 337.50 Weighted Average for the Year 6.00 222.84 347.62 337.50 208-00054 Storm Drain Inlet Protection (Type II) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 32.00 243.56 288.27 335.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 2.00 310.00 331.59 450.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 5.00 273.84 346.65 316.25 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 5.00 277.35 460.60 405.00 Weighted Average for the First Quarter 44.00 253.86 317.56 346.05 Weighted Average for the Year 44.00 253.86 317.56 346.05 208-00055 Rigid Inlet Prot Device Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 22.00 420.48 327.02 305.00 Weighted Average for the First Quarter 22.00 420.48 327.02 305.00 Weighted Average for the Year 22.00 420.48 327.02 305.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 208-00056 Storm Drain Inlet Protection (Type III) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 12.00 265.04 196.11 294.68 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 1.00 320.00 446.27 600.00 Weighted Average for the First Quarter 13.00 269.27 206.12 318.17 Weighted Average for the Year 13.00 269.27 206.12 318.17 208-00070 Vehicle Tracking Pad Each NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 2.00 2500.00 3906.50 5000.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 2.00 3000.00 3974.96 599.00 Weighted Average for the First Quarter 4.00 2750.00 3957.84 2799.50 Weighted Average for the Year 4.00 2750.00 3957.84 2799.50 208-00075 Pre-fab Vehicle Track Pad Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 2.00 3678.07 3852.62 4800.00 STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 42.00 1000.00 1078.86 1500.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 3.00 5000.00 8918.41 4855.45 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 1.00 4000.00 13154.23 800.00 BR0761-249 I-76 02/27/25 2.00 3983.52 6854.29 4500.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 1.00 5000.00 10843.22 25000.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 2.00 3727.79 4806.14 4375.00 Weighted Average for the First Quarter 53.00 1675.07 2025.53 2466.35 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the Year 53.00 1675.07 2025.53 2466.35 208-00082 Construction Mat Sq Foot STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 4,000.00 25.00 20.42 30.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 800.00 25.00 13.00 22.00 Weighted Average for the First Quarter 4,800.00 25.00 20.02 28.67 Weighted Average for the Year 4,800.00 25.00 20.02 28.67 208-00090 Erosion Control (Curb Ramp) Each NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 95.00 600.00 899.22 2100.00 Weighted Average for the First Quarter 95.00 600.00 899.22 2100.00 Weighted Average for the Year 95.00 600.00 899.22 2100.00 208-00103 Removal and Disposal of Sediment (Labor) Hour NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 40.00 78.84 83.52 82.40 STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 60.00 60.58 72.98 100.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 100.00 65.99 67.32 49.71 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 100.00 75.00 55.89 5.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 8.00 80.00 269.50 350.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 50.00 72.61 85.38 189.75 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 40.00 75.00 132.00 53.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 24.00 70.00 101.50 145.00 BR0761-249 I-76 02/27/25 80.00 69.65 67.57 115.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 208-00103 Removal and Disposal of Sediment (Labor) Hour STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 20.00 150.00 88.30 45.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 80.00 77.73 84.65 75.25 Weighted Average for the First Quarter 602.00 74.13 75.33 81.02 Weighted Average for the Year 602.00 74.13 75.33 81.02 208-00105 Removal and Disposal of Sediment (Equip) Hour NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 40.00 154.81 149.71 163.30 STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 60.00 151.37 144.45 175.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 25.00 134.51 128.02 105.14 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 80.00 100.00 118.52 5.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 50.00 146.10 137.45 189.75 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 40.00 150.00 311.00 120.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 16.00 150.00 140.00 73.00 BR0761-249 I-76 02/27/25 24.00 148.61 137.69 150.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 20.00 150.00 135.16 100.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 40.00 155.86 182.65 163.90 Weighted Average for the First Quarter 395.00 139.60 145.64 120.69 Weighted Average for the Year 395.00 139.60 145.64 120.69 208-00106 Sweeping (Sediment Removal) Hour NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 40.00 148.41 239.35 187.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 100.00 147.33 192.02 114.09 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 80.00 115.00 226.27 20.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 10.00 250.00 247.92 300.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 208-00106 Sweeping (Sediment Removal) Hour BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 40.00 148.41 211.97 189.75 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 40.00 200.00 193.00 120.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 16.00 150.00 205.33 216.00 BR0761-249 I-76 02/27/25 104.00 147.42 191.05 105.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 100.00 205.92 234.87 209.20 Weighted Average for the First Quarter 530.00 159.68 207.73 134.29 Weighted Average for the Year 530.00 159.68 207.73 134.29 208-00107 Rem Trash Hour NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 20.00 144.11 128.63 94.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 50.00 99.92 93.00 65.99 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 5.00 200.00 74.03 40.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 4.00 90.00 149.83 200.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 20.00 123.27 98.48 189.75 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 40.00 100.00 87.00 53.00 BR0761-249 I-76 02/27/25 10.00 107.99 83.82 110.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 10.00 146.09 109.89 97.00 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 40.00 160.00 132.92 143.75 Weighted Average for the First Quarter 199.00 123.84 102.19 100.07 Weighted Average for the Year 199.00 123.84 102.19 100.07 208-00146 Pre-fab Conc Washout Str (Type 2) Each STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 2.00 100.00 3025.34 5000.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 2.00 100.00 3025.34 5000.00 Weighted Average for the Year 2.00 100.00 3025.34 5000.00 208-00207 Erosion Control Management Day NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 200.00 330.59 385.31 388.50 STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 60.00 350.04 258.61 150.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 210.00 304.76 145.73 316.49 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 50.00 400.00 840.00 150.00 BR0761-249 I-76 02/27/25 26.00 400.00 419.30 385.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 40.00 454.05 485.88 450.50 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 10.00 350.00 553.33 750.00 Weighted Average for the First Quarter 596.00 340.91 278.38 329.18 Weighted Average for the Year 596.00 340.91 278.38 329.18 208-00400 Water Control Lump Sum STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 1.00 50000.00 76301.59 45000.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 50000.00 40003.68 11022.08 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 1.00 75000.00 152471.24 98000.00 Weighted Average for the First Quarter 3.00 58333.33 81412.83 51340.69 Weighted Average for the Year 3.00 58333.33 81412.83 51340.69 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid NHPP2873-206 210-00065 Res Monument (Ty 3A) US287:RESURFACING I-70 TO 92N 01/09/25 Each 21.00 700.00 1010.33 465.00 Weighted Average for the First Quarter 21.00 700.00 1010.33 465.00 Weighted Average for the Year 21.00 700.00 1010.33 465.00 210-00479 Res Radio Com Antenna Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 1.00 900.00 1063.88 1250.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 1.00 2000.00 1494.17 1900.00 Weighted Average for the First Quarter 2.00 1450.00 1279.02 1575.00 Weighted Average for the Year 2.00 1450.00 1279.02 1575.00 210-00810 Res Ground Sign Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 7.00 423.51 744.79 873.76 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 12.00 500.00 647.50 675.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 2.00 500.00 576.67 1031.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 17.00 700.00 467.87 505.00 Weighted Average for the First Quarter 38.00 575.38 586.00 654.30 Weighted Average for the Year 38.00 575.38 586.00 654.30 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 210-00815 Res Sign Panel Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 20.00 130.00 306.04 210.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 4.00 250.00 212.41 225.00 Weighted Average for the First Quarter 24.00 150.00 286.33 212.50 Weighted Average for the Year 24.00 150.00 286.33 212.50 210-00827 Res Pull Box Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 20.00 1095.19 1078.26 1750.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 1539.76 1494.10 1229.60 Weighted Average for the First Quarter 21.00 1116.36 1116.06 1725.22 Weighted Average for the Year 21.00 1116.36 1116.06 1725.22 210-00848 Res Traf Sig Control+Cab Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 2546.16 11197.27 9073.60 Weighted Average for the First Quarter 1.00 2546.16 11197.27 9073.60 Weighted Average for the Year 1.00 2546.16 11197.27 9073.60 210-00858 Res Pedestal Pole Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 1196.44 2220.72 1754.30 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 1.00 1196.44 2220.72 1754.30 Weighted Average for the Year 1.00 1196.44 2220.72 1754.30 210-00860 Res Ped Push Button Each NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 1.00 600.00 455.61 375.00 Weighted Average for the First Quarter 1.00 600.00 455.61 375.00 Weighted Average for the Year 1.00 600.00 455.61 375.00 210-00866 Res Fire Preempt Unit+Timer Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 6.00 600.00 1251.42 1470.00 Weighted Average for the First Quarter 6.00 600.00 1251.42 1470.00 Weighted Average for the Year 6.00 600.00 1251.42 1470.00 210-00882 Res Detector Each SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 4.00 2000.00 955.50 763.00 Weighted Average for the First Quarter 4.00 2000.00 955.50 763.00 Weighted Average for the Year 4.00 2000.00 955.50 763.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 210-00892 Port Pan-Tilt-Zoom Cam (Reset) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 4.00 1500.00 1251.42 1470.00 Weighted Average for the First Quarter 4.00 1500.00 1251.42 1470.00 210-01000 Weighted Res Fence Average for the Year 4.00 Lin Foot 1500.00 1251.42 1470.00 STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 300.00 50.00 26.62 30.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 100.00 50.00 31.99 35.00 Weighted Average for the First Quarter 400.00 50.00 27.48 31.25 Weighted Average for the Year 400.00 50.00 27.48 31.25 210-02900 Relay Riprap Cubic Yard STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 385.00 100.00 114.48 200.00 Weighted Average for the First Quarter 385.00 100.00 114.48 200.00 Weighted Average for the Year 385.00 100.00 114.48 200.00 210-04010 Adj Manhole Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 72.00 1200.00 1013.82 695.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 4.00 1200.00 1598.47 900.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 76.00 1200.00 1054.14 705.79 Weighted Average for the Year 76.00 1200.00 1054.14 705.79 210-04020 Modify Inlet Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 2.00 4650.24 5271.32 6572.93 Weighted Average for the First Quarter 2.00 4650.24 5271.32 6572.93 Weighted Average for the Year 2.00 4650.24 5271.32 6572.93 210-04050 Adj Valve Box Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 100.00 550.00 484.30 375.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 1.00 500.00 1235.50 1774.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 2.00 600.00 1070.12 475.00 Weighted Average for the First Quarter 103.00 550.49 513.58 390.52 Weighted Average for the Year 103.00 550.49 513.58 390.52 211-00136 4 In Drilled Hole Lin Foot BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 69.00 200.00 113.85 109.25 Weighted Average for the First Quarter 69.00 200.00 113.85 109.25 Weighted Average for the Year 69.00 200.00 113.85 109.25 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 211-00150 Patch Exist Drill Hole Each BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 69.00 200.00 102.86 109.25 Weighted Average for the First Quarter 69.00 200.00 102.86 109.25 Weighted Average for the Year 69.00 200.00 102.86 109.25 212-00006 Seeding (Native) Acre NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 0.01 120000.00 118583.33 93750.00 Weighted Average for the First Quarter 0.01 120000.00 118583.33 93750.00 Weighted Average for the Year 0.01 120000.00 118583.33 93750.00 212-00032 Soil Conditioning Acre NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 0.01 140000.00 128916.67 93750.00 Weighted Average for the First Quarter 0.01 140000.00 128916.67 93750.00 Weighted Average for the Year 0.01 140000.00 128916.67 93750.00 212-00050 Sod Sq Foot STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 825.00 3.00 13.52 18.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 170.00 5.50 16.17 14.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 995.00 3.43 14.29 17.32 Weighted Average for the Year 995.00 3.43 14.29 17.32 212-00100 Tree Retention and Protection Lump Sum SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 1.00 5000.00 4625.50 2233.00 Weighted Average for the First Quarter 1.00 5000.00 4625.50 2233.00 Weighted Average for the Year 1.00 5000.00 4625.50 2233.00 212-00700 Organic Fertilizer Pound NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 200.00 1.43 3.14 3.70 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 435.00 2.03 1.09 0.59 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 12.00 8.00 59.23 80.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 1,420.00 2.00 1.05 1.00 BR0761-249 I-76 02/27/25 660.00 2.29 1.51 3.00 Weighted Average for the First Quarter 2,727.00 2.06 1.57 1.96 Weighted Average for the Year 2,727.00 2.06 1.57 1.96 212-00701 Compost (Mech App) Cubic Yard NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 131.00 56.74 78.93 89.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 283.00 51.00 64.13 64.77 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 414.00 52.82 66.91 72.44 Weighted Average for the Year 414.00 52.82 66.91 72.44 212-00702 Bio Soil Amd (Hyd App) Pound 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 15,225.00 2.00 1.07 1.05 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 140.00 4.00 21.24 7.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 310.00 3.00 3.27 3.80 BR0761-249 I-76 02/27/25 7,700.00 1.45 1.53 2.15 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 1,050.00 10.00 2.43 2.00 Weighted Average for the First Quarter 24,425.00 2.19 1.33 1.51 Weighted Average for the Year 24,425.00 2.19 1.33 1.51 212-00703 Humate Pound NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 151.00 2.35 2.71 2.70 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 870.00 1.91 1.44 0.59 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 6.00 15.00 68.66 95.00 Weighted Average for the First Quarter 1,027.00 2.05 1.75 1.45 Weighted Average for the Year 1,027.00 2.05 1.75 1.45 212-00704 Mycorrhizae Pound NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 11.00 17.80 30.82 30.50 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 39.00 14.24 12.61 12.88 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 212-00704 Mycorrhizae Pound STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 1.60 50.00 346.39 500.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 950.00 10.00 19.00 22.50 BR0761-249 I-76 02/27/25 44.00 38.73 21.06 18.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 18.00 10.00 59.54 45.00 Weighted Average for the First Quarter 1,063.60 11.48 20.57 23.14 Weighted Average for the Year 1,063.60 11.48 20.57 23.14 212-00706 Seed (Native) Drill Acre NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 0.75 2508.99 2687.33 3375.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 4.00 1576.12 599.53 498.20 Weighted Average for the First Quarter 4.75 1723.42 778.49 952.43 Weighted Average for the Year 4.75 1723.42 778.49 952.43 212-00707 Seed (Native) Hyd) Acre 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 0.10 5000.00 5483.92 5803.50 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 4.72 3000.00 1082.50 1500.00 BR0761-249 I-76 02/27/25 2.20 2000.00 2598.38 3500.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 0.30 2500.00 5614.23 5000.00 Weighted Average for the First Quarter 7.32 2706.28 2231.78 2303.33 Weighted Average for the Year 7.32 2706.28 2231.78 2303.33 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 212-00708 Seed (Native) Brdcst Acre NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 0.25 4698.23 4650.44 4330.00 STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 10.50 3000.00 2778.18 2200.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 0.25 5000.00 1636.90 943.40 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 0.02 15000.00 48005.32 73000.00 Weighted Average for the First Quarter 11.02 3105.68 2809.92 2348.31 Weighted Average for the Year 11.02 3105.68 2809.92 2348.31 212-00710 Seeding (Wetland) Hydraulic Acre STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 0.02 2500.00 19514.20 9000.00 Weighted Average for the First Quarter 0.02 2500.00 19514.20 9000.00 Weighted Average for the Year 0.02 2500.00 19514.20 9000.00 212-01200 Landscape Restoration Lump Sum NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 1.00 58182.22 10688.50 8950.00 Weighted Average for the First Quarter 1.00 58182.22 10688.50 8950.00 Weighted Average for the Year 1.00 58182.22 10688.50 8950.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 213-00002 Mulching (Weed Free Hay) Acre 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 3.00 1468.28 1324.18 1203.10 Weighted Average for the First Quarter 3.00 1468.28 1324.18 1203.10 Weighted Average for the Year 3.00 1468.28 1324.18 1203.10 213-00003 Mulching (Weed Free) Acre NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 0.75 2387.26 2951.29 3765.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 0.32 500.00 5697.23 4150.00 Weighted Average for the First Quarter 1.07 1829.06 3937.01 3878.87 Weighted Average for the Year 1.07 1829.06 3937.01 3878.87 213-00005 Mulching (Decorative) Cubic Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 4,323.00 6.03 10.34 10.81 Weighted Average for the First Quarter 4,323.00 6.03 10.34 10.81 2670252-499 213-00008 Weighted Average for the Year Mulching (Wood Chip) I-25:MOBILITY HUB (LONE TREE) 01/16/25 4,323.00 Cubic Foot 243.00 6.03 3.51 10.34 6.87 10.81 5.51 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 243.00 3.51 6.87 5.51 Weighted Average for the Year 243.00 3.51 6.87 5.51 213-00012 Spray-on Mulch Blanket Acre 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 0.10 10000.00 6134.25 5856.50 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 0.02 15000.00 510183.11 700000.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 4.72 4700.00 6790.00 5580.00 BR0761-249 I-76 02/27/25 3.20 6331.43 4558.79 3800.00 Weighted Average for the First Quarter 8.04 5440.87 6345.32 6602.39 Weighted Average for the Year 8.04 5440.87 6345.32 6602.39 213-00061 Mulch Tackifier Pound NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 150.00 6.70 5.34 5.10 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 3,280.00 5.00 3.05 2.81 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 63.00 3.00 19.92 15.00 Weighted Average for the First Quarter 3,493.00 5.04 3.31 3.13 Weighted Average for the Year 3,493.00 5.04 3.31 3.13 213-00150 Bonded Fiber Matrix Acre 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 0.10 7394.61 6305.08 5856.50 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 2.00 4600.00 6400.00 4800.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 2.10 4733.08 6387.62 4850.31 Weighted Average for the Year 2.10 4733.08 6387.62 4850.31 213-00462 Landscape Border (3/16x5-1/2 In) Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 600.00 7.34 11.32 13.25 Weighted Average for the First Quarter 600.00 7.34 11.32 13.25 Weighted Average for the Year 600.00 7.34 11.32 13.25 214-00000 Landscape Maintenance Lump Sum 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 10000.00 27586.10 27729.60 Weighted Average for the First Quarter 1.00 10000.00 27586.10 27729.60 Weighted Average for the Year 1.00 10000.00 27586.10 27729.60 214-00008 Extended Landscape Preservation Lump Sum NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 1.00 17000.00 57585.70 89000.00 Weighted Average for the First Quarter 1.00 17000.00 57585.70 89000.00 Weighted Average for the Year 1.00 17000.00 57585.70 89000.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 214-00220 Deciduous Tree (2 In C) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 23.00 790.02 862.98 810.90 Weighted Average for the First Quarter 23.00 790.02 862.98 810.90 Weighted Average for the Year 23.00 790.02 862.98 810.90 214-00506 Evergreen Tree (6 Ft)(B-B) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 3.00 774.94 841.17 795.00 Weighted Average for the First Quarter 3.00 774.94 841.17 795.00 Weighted Average for the Year 3.00 774.94 841.17 795.00 214-01013 Live Willow Stakes Each STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 73.00 25.00 30.32 22.00 Weighted Average for the First Quarter 73.00 25.00 30.32 22.00 Weighted Average for the Year 73.00 25.00 30.32 22.00 216-00201 Soil Reten Blanket (S-C)(BioD Cl 1) Sq Yard NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 1,210.00 5.09 4.52 5.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 5,400.00 3.75 3.08 2.54 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 970.00 5.00 4.18 4.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 7,580.00 4.13 3.28 3.12 Weighted Average for the Year 7,580.00 4.13 3.28 3.12 216-00301 Turf Reinf Mat (Cl 1) Sq Yard 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 146.00 9.05 8.50 7.74 Weighted Average for the First Quarter 146.00 9.05 8.50 7.74 Weighted Average for the Year 146.00 9.05 8.50 7.74 217-00020 Herbicide Treatment Hour 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 16.00 206.98 339.75 344.50 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 8.00 300.00 185.34 200.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 10.00 216.60 352.51 255.00 Weighted Average for the First Quarter 34.00 231.70 317.60 284.18 Weighted Average for the Year 34.00 231.70 317.60 284.18 240-00000 Wildlife Biologist Hour NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 40.00 143.90 206.41 215.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 8.00 160.72 174.98 174.90 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 20.00 200.00 233.59 120.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 40.00 140.83 224.08 189.75 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 40.00 200.00 142.00 150.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 240-00000 Wildlife Biologist Hour STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 20.00 250.00 302.16 273.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 120.00 117.61 177.74 155.00 Weighted Average for the First Quarter 288.00 152.04 202.42 173.78 Weighted Average for the Year 288.00 152.04 202.42 173.78 240-00010 Rem of Nests Hour NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 40.00 156.28 268.95 215.00 STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 200.00 172.66 123.12 185.00 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 20.00 200.00 254.28 120.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 40.00 174.29 218.08 189.75 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 40.00 200.00 117.00 100.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 10.00 250.00 295.33 273.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 80.00 77.79 175.71 155.00 Weighted Average for the First Quarter 430.00 159.25 153.42 173.77 Weighted Average for the Year 430.00 159.25 153.42 173.77 240-00020 Netting Sq Yard NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 500.00 10.00 14.00 15.00 Weighted Average for the First Quarter 500.00 10.00 14.00 15.00 Weighted Average for the Year 500.00 10.00 14.00 15.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 250-00010 Envir Health/Safety Mngmt Lump Sum 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 10000.00 5395.83 2544.00 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 1.00 2000.00 4666.67 2200.00 Weighted Average for the First Quarter 2.00 6000.00 5152.78 2372.00 Weighted Average for the Year 2.00 6000.00 5152.78 2372.00 250-00050 Monitoring Technician Hour NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 8.00 150.00 150.67 139.00 Weighted Average for the First Quarter 8.00 150.00 150.67 139.00 Weighted Average for the Year 8.00 150.00 150.67 139.00 250-00110 Health and Safety Officer Hour NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 3.00 200.00 195.67 184.00 Weighted Average for the First Quarter 3.00 200.00 195.67 184.00 Weighted Average for the Year 3.00 200.00 195.67 184.00 250-00204 Materials Management Plan Lump Sum 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 2000.00 4152.67 1855.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 1.00 2000.00 4152.67 1855.00 Weighted Average for the Year 1.00 2000.00 4152.67 1855.00 304-01005 ABC (CL 1) Cubic Yard NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 3,866.00 90.00 65.00 52.00 Weighted Average for the First Quarter 3,866.00 90.00 65.00 52.00 Weighted Average for the Year 3,866.00 90.00 65.00 52.00 304-03005 ABC (CL 3) Cubic Yard NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 39.00 140.00 176.75 220.00 Weighted Average for the First Quarter 39.00 140.00 176.75 220.00 Weighted Average for the Year 39.00 140.00 176.75 220.00 304-06000 ABC (CL 6) Ton NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 807.00 65.00 93.14 115.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 44.00 75.00 111.69 65.00 Weighted Average for the First Quarter 851.00 65.52 94.96 112.41 Weighted Average for the Year 851.00 65.52 94.96 112.41 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid 304-06007 ABC (CL 6) Cubic Yard STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 233.00 170.00 189.14 135.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1,081.00 80.00 80.13 66.78 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 2,963.00 120.00 85.50 87.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 4,615.00 90.00 79.69 101.50 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 771.00 80.93 116.46 71.45 Weighted Average for the First Quarter 9,663.00 99.29 88.33 91.58 Weighted Average for the Year 9,663.00 99.29 88.33 91.58 304-09000 ABC (Spec) Cubic Yard STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 4.00 250.00 575.83 50.00 Weighted Average for the First Quarter 4.00 250.00 575.83 50.00 Weighted Average for the Year 4.00 250.00 575.83 50.00 306-01000 Reconditioning Sq Yard NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 24,256.00 3.00 3.14 4.50 Weighted Average for the First Quarter 24,256.00 3.00 3.14 4.50 Weighted Average for the Year 24,256.00 3.00 3.14 4.50 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 310-00608 Full Depth Reclam. of HMA Pvmt (0-8 in.) Sq Yard NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 7,492.00 6.00 7.13 7.25 Weighted Average for the First Quarter 7,492.00 6.00 7.13 7.25 Weighted Average for the Year 7,492.00 6.00 7.13 7.25 403-00720 HMA (Patching) (Asph) Ton NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 400.00 300.00 274.36 190.00 STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 153.64 400.00 630.11 300.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 9.00 800.00 808.62 900.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 72.00 300.00 311.17 270.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 157.00 400.00 442.41 320.00 BR0761-249 I-76 02/27/25 253.00 300.00 318.85 315.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 88.00 400.00 616.85 537.50 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 100.00 314.72 342.60 375.00 Weighted Average for the First Quarter 1,232.64 337.19 405.77 295.60 Weighted Average for the Year 1,232.64 337.19 405.77 295.60 403-00721 HMA (Patching) (Asph) Sq Yard 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 12.00 297.97 448.50 371.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 828.00 160.00 53.50 40.00 Weighted Average for the First Quarter 840.00 161.97 69.96 44.73 Weighted Average for the Year 840.00 161.97 69.96 44.73 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 403-09221 SMA (Fibers)(Asph) Ton NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 28,926.00 150.13 138.92 134.90 Weighted Average for the First Quarter 28,926.00 150.13 138.92 134.90 Weighted Average for the Year 28,926.00 150.13 138.92 134.90 403-33841 HMA (Gr S) (100) (PG 64-22) Ton NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 1,869.00 134.40 219.49 244.50 Weighted Average for the First Quarter 1,869.00 134.40 219.49 244.50 Weighted Average for the Year 1,869.00 134.40 219.49 244.50 403-34701 HMA (Gr SX) (75) Ton NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 11,568.00 130.00 126.00 135.00 Weighted Average for the First Quarter 11,568.00 130.00 126.00 135.00 Weighted Average for the Year 11,568.00 130.00 126.00 135.00 403-34851 HMA (Gr SX) (100) (PG 64-28) Ton NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 6,462.00 140.00 120.66 121.50 BR0761-249 I-76 02/27/25 1,162.00 221.08 181.31 120.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 7,624.00 152.36 133.54 121.27 Weighted Average for the Year 7,624.00 152.36 133.54 121.27 403-34871 HMA (Gr SX) (100) (PG 76-28) Ton NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 38,248.00 120.00 106.55 84.60 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 15,416.00 130.00 123.99 127.00 Weighted Average for the First Quarter 53,664.00 122.87 112.64 96.78 Weighted Average for the Year 53,664.00 122.87 112.64 96.78 408-01100 Joint Sealant Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 514.00 25.00 43.09 53.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 340.00 14.43 25.35 15.90 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 160.00 36.00 25.65 28.30 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 96.00 50.00 75.38 100.00 Weighted Average for the First Quarter 1,110.00 25.51 35.50 42.14 Weighted Average for the Year 1,110.00 25.51 35.50 42.14 411-03352 Asph Cem (PG 58-28) Ton NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 650.00 650.00 435.00 400.00 Weighted Average for the First Quarter 650.00 650.00 435.00 400.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the Year 650.00 650.00 435.00 400.00 411-10255 Emul Asph (SS) Gallon NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 12,546.00 4.00 4.55 5.30 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 7,313.00 5.00 4.30 5.50 MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 1,092.00 9.45 8.75 16.50 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 7,710.00 6.05 4.80 4.10 Weighted Average for the First Quarter 28,661.00 5.01 4.70 5.45 Weighted Average for the Year 28,661.00 5.01 4.70 5.45 412-00190 Conc Pvmt (Patching) Sq Yard NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 317.00 350.00 87.27 88.30 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 224.00 283.18 173.58 114.48 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 211.00 250.00 101.69 115.00 Weighted Average for the First Quarter 752.00 302.04 128.10 103.59 Weighted Average for the Year 752.00 302.04 128.10 103.59 412-00800 Conc Pvmt (8 In) Sq Yard 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 57.00 130.07 115.15 86.92 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 22.00 200.00 140.60 117.00 Weighted Average for the First Quarter 79.00 149.54 122.24 95.30 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the Year 79.00 149.54 122.24 95.30 412-00805 Conc Pvmt (8 In) (Fast Track) Sq Yard NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 78.00 150.00 126.16 135.00 Weighted Average for the First Quarter 78.00 150.00 126.16 135.00 Weighted Average for the Year 78.00 150.00 126.16 135.00 412-01050 Conc Pvmt (10-1/2 In) Sq Yard 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 3,961.00 120.00 143.47 137.80 Weighted Average for the First Quarter 3,961.00 120.00 143.47 137.80 Weighted Average for the Year 3,961.00 120.00 143.47 137.80 412-05100 Poly Slab Jacking Pound BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 1,000.00 20.00 19.89 18.09 Weighted Average for the First Quarter 1,000.00 20.00 19.89 18.09 Weighted Average for the Year 1,000.00 20.00 19.89 18.09 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 420-00102 Geotextile (Er Cont) (CL 1) Sq Yard STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 1,125.00 5.00 12.53 15.00 Weighted Average for the First Quarter 1,125.00 5.00 12.53 15.00 Weighted Average for the Year 1,125.00 5.00 12.53 15.00 420-00112 Geotextile (Drain) (CL 1) Sq Yard 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 66.00 13.25 11.16 10.60 Weighted Average for the First Quarter 66.00 13.25 11.16 10.60 Weighted Average for the Year 66.00 13.25 11.16 10.60 503-00018 Drilled Shaft (18 In) Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 35.00 350.00 430.94 264.90 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 128.00 309.10 178.22 121.30 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 45.00 500.00 491.67 400.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 6.00 350.00 432.28 605.00 Weighted Average for the First Quarter 214.00 357.08 252.93 216.95 Weighted Average for the Year 214.00 357.08 252.93 216.95 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 503-00024 Drilled Shaft (24 In) Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 24.00 450.00 608.89 661.70 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1,549.00 300.00 200.20 132.19 Weighted Average for the First Quarter 1,573.00 302.29 203.34 140.27 Weighted Average for the Year 1,573.00 302.29 203.34 140.27 503-00036 Drilled Shaft (36 In) Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 91.00 800.00 994.95 929.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 313.00 320.00 394.47 430.80 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 38.00 900.00 898.33 900.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 76.00 750.00 868.74 961.00 Weighted Average for the First Quarter 518.00 509.96 555.31 630.53 Weighted Average for the Year 518.00 509.96 555.31 630.53 503-00042 Drilled Shaft (42 In) Lin Foot STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 19.00 1000.00 1007.50 900.00 Weighted Average for the First Quarter 19.00 1000.00 1007.50 900.00 Weighted Average for the Year 19.00 1000.00 1007.50 900.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 503-00048 Drilled Shaft (48 In) Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 126.00 750.00 1043.83 950.00 Weighted Average for the First Quarter 126.00 750.00 1043.83 950.00 Weighted Average for the Year 126.00 750.00 1043.83 950.00 503-00054 Drilled Shaft (54 In) Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 84.00 850.00 1130.46 1050.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 444.00 600.00 671.88 458.26 Weighted Average for the First Quarter 528.00 639.77 711.51 552.40 Weighted Average for the Year 528.00 639.77 711.51 552.40 503-00310 CSL Testing Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 13.00 2549.10 4297.60 3360.59 Weighted Average for the First Quarter 13.00 2549.10 4297.60 3360.59 Weighted Average for the Year 13.00 2549.10 4297.60 3360.59 503-01100 M Pile (10 In) Lin Foot STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 305.00 800.00 772.98 550.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 305.00 800.00 772.98 550.00 Weighted Average for the Year 305.00 800.00 772.98 550.00 503-02000 Verification Test Pile Each STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 1.00 15000.00 14248.64 15000.00 Weighted Average for the First Quarter 1.00 15000.00 14248.64 15000.00 Weighted Average for the Year 1.00 15000.00 14248.64 15000.00 504-06406 Soil Nail Lin Foot STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 3,785.00 65.00 92.16 65.00 Weighted Average for the First Quarter 3,785.00 65.00 92.16 65.00 Weighted Average for the Year 3,785.00 65.00 92.16 65.00 504-06410 Verification Testing Each STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 2.00 4500.00 10688.39 10000.00 Weighted Average for the First Quarter 2.00 4500.00 10688.39 10000.00 Weighted Average for the Year 2.00 4500.00 10688.39 10000.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 504-08150 Soldier Pile Wall Sq Foot NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 210.00 200.00 608.00 465.00 Weighted Average for the First Quarter 210.00 200.00 608.00 465.00 Weighted Average for the Year 210.00 200.00 608.00 465.00 506-00209 Riprap (9 In) Cubic Yard 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 28.00 203.62 224.93 169.60 BR0761-249 I-76 02/27/25 84.00 207.30 224.00 210.00 Weighted Average for the First Quarter 112.00 206.38 224.23 199.90 Weighted Average for the Year 112.00 206.38 224.23 199.90 506-00212 Riprap (12 In) Cubic Yard BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 22.00 200.00 354.49 214.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 16.00 200.00 344.00 475.00 Weighted Average for the First Quarter 38.00 200.00 351.69 323.89 Weighted Average for the Year 38.00 200.00 351.69 323.89 506-00226 Riprap (24 In) Ton STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 1,628.00 166.16 111.34 140.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 1,628.00 166.16 111.34 140.00 Weighted Average for the Year 1,628.00 166.16 111.34 140.00 506-01020 Geogrid Reinforce Sq Yard NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 78.00 8.00 11.75 13.00 Weighted Average for the First Quarter 78.00 8.00 11.75 13.00 Weighted Average for the Year 78.00 8.00 11.75 13.00 507-00100 Conc S and D Pave (Reinf) Cubic Yard 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 11.00 1347.50 1088.86 760.17 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 45.00 1415.95 1539.58 1288.00 Weighted Average for the First Quarter 56.00 1402.50 1418.65 1184.32 Weighted Average for the Year 56.00 1402.50 1418.65 1184.32 509-00000 Str Steel Pound 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 327,913.00 2.80 16.26 13.22 Weighted Average for the First Quarter 327,913.00 2.80 16.26 13.22 Weighted Average for the Year 327,913.00 2.80 16.26 13.22 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 509-00003 Str Steel (Install Only) Pound STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 594,813.00 2.71 2.67 1.10 Weighted Average for the First Quarter 594,813.00 2.71 2.67 1.10 Weighted Average for the Year 594,813.00 2.71 2.67 1.10 509-08121 Temp Bridge Deck Lin Foot NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 66.00 1200.00 1676.58 820.00 Weighted Average for the First Quarter 66.00 1200.00 1676.58 820.00 Weighted Average for the Year 66.00 1200.00 1676.58 820.00 512-00101 Bearing Device (Type I) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 16.00 1133.09 6544.99 5469.94 Weighted Average for the First Quarter 16.00 1133.09 6544.99 5469.94 Weighted Average for the Year 16.00 1133.09 6544.99 5469.94 513-00600 Bridge Drain Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 4.00 4523.78 14909.93 17304.59 Weighted Average for the First Quarter 4.00 4523.78 14909.93 17304.59 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the Year 4.00 4523.78 14909.93 17304.59 513-00690 Bridge Drain (Spec) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 4.00 3798.07 12938.57 15399.44 Weighted Average for the First Quarter 4.00 3798.07 12938.57 15399.44 Weighted Average for the Year 4.00 3798.07 12938.57 15399.44 514-00048 Ped Railing (48 In) Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1,311.00 20.00 366.04 273.24 Weighted Average for the First Quarter 1,311.00 20.00 366.04 273.24 Weighted Average for the Year 1,311.00 20.00 366.04 273.24 514-00100 Hand Rail Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 585.00 90.00 111.18 158.10 Weighted Average for the First Quarter 585.00 90.00 111.18 158.10 Weighted Average for the Year 585.00 90.00 111.18 158.10 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 515-00120 Waterproofing (Membrane) Sq Yard NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 1,568.00 30.00 27.94 28.25 BR0761-249 I-76 02/27/25 5,778.00 28.26 25.13 28.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 275.00 35.00 69.19 45.00 Weighted Average for the First Quarter 7,621.00 28.86 26.66 28.66 Weighted Average for the Year 7,621.00 28.86 26.66 28.66 515-00400 Concrete Sealer Sq Yard 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1,091.00 21.43 14.82 14.65 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 11,208.00 12.00 11.99 10.63 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 175.00 23.00 52.33 25.00 Weighted Average for the First Quarter 12,474.00 12.98 12.89 11.18 Weighted Average for the Year 12,474.00 12.98 12.89 11.18 518-01001 Br Expan Joint (Asphaultic Plug) Lin Foot BR0761-249 I-76 02/27/25 624.00 293.88 294.69 320.00 Weighted Average for the First Quarter 624.00 293.88 294.69 320.00 Weighted Average for the Year 624.00 293.88 294.69 320.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 518-01004 Br Expan Device (0-4 In) Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 64.00 407.21 469.80 374.77 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 272.00 600.00 836.69 475.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 609.00 1000.00 685.92 630.32 BR0761-249 I-76 02/27/25 120.00 405.98 846.80 380.00 Weighted Average for the First Quarter 1,065.00 795.29 734.47 547.09 Weighted Average for the Year 1,065.00 795.29 734.47 547.09 518-01006 Br Expan Device (0-6 In) Lin Foot NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 173.00 3000.00 3607.03 3400.00 Weighted Average for the First Quarter 173.00 3000.00 3607.03 3400.00 Weighted Average for the Year 173.00 3000.00 3607.03 3400.00 518-01009 Br Expan Device (0-9 In) Lin Foot NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 245.00 4000.00 4721.87 5020.00 Weighted Average for the First Quarter 245.00 4000.00 4721.87 5020.00 Weighted Average for the Year 245.00 4000.00 4721.87 5020.00 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid NHPP0702-428 518-01012 Br Expan Device (0-12 I-70 THROUGH GLENWOOD In) CANYON 01/30/25 Lin Foot 166.00 6000.00 5733.16 5800.00 Weighted Average for the First Quarter 166.00 6000.00 5733.16 5800.00 Weighted Average for the Year 166.00 6000.00 5733.16 5800.00 518-01250 Br Expan Cover Plate Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 139.00 475.86 581.23 545.39 Weighted Average for the First Quarter 139.00 475.86 581.23 545.39 Weighted Average for the Year 139.00 475.86 581.23 545.39 518-02030 Polyester Conc End Dam Cubic Foot NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 3,856.00 200.00 231.78 152.50 Weighted Average for the First Quarter 3,856.00 200.00 231.78 152.50 Weighted Average for the Year 3,856.00 200.00 231.78 152.50 518-03000 Saw and Seal Br Joint Lin Foot BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 609.00 500.00 33.14 26.45 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 48.00 50.00 93.46 30.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 657.00 467.12 37.55 26.71 Weighted Average for the Year 657.00 467.12 37.55 26.71 601-01000 Conc CL B Cubic Yard 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 2654.86 2267.45 1204.67 Weighted Average for the First Quarter 1.00 2654.86 2267.45 1204.67 Weighted Average for the Year 1.00 2654.86 2267.45 1204.67 601-03000 Conc CL D Cubic Yard STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 53.20 2000.00 1897.23 2100.00 Weighted Average for the First Quarter 53.20 2000.00 1897.23 2100.00 Weighted Average for the Year 53.20 2000.00 1897.23 2100.00 2670252-499 601-03040 Conc CL D (Bridge) I-25:MOBILITY HUB (LONE TREE) 01/16/25 Cubic Yard 922.00 1500.00 1451.72 1180.31 Weighted Average for the First Quarter 922.00 1500.00 1451.72 1180.31 Weighted Average for the Year 922.00 1500.00 1451.72 1180.31 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 601-03057 Conc CL DR Cubic Yard NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 12.00 7000.00 4597.48 4570.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 125.00 3000.00 2613.86 1822.75 BR0761-249 I-76 02/27/25 46.00 1439.71 3191.59 3000.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 1.90 3500.00 5146.26 3500.00 Weighted Average for the First Quarter 184.90 2876.56 2919.02 2311.16 Weighted Average for the Year 184.90 2876.56 2919.02 2311.16 601-06102 Concrete (Patching) Cubic Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 4.00 1500.00 1846.00 1830.00 BR0761-249 I-76 02/27/25 488.00 141.95 431.13 250.00 Weighted Average for the First Quarter 492.00 152.99 436.90 262.85 Weighted Average for the Year 492.00 152.99 436.90 262.85 601-06150 Conc (Patching) Sq Foot STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 2.00 500.00 1608.14 2400.00 Weighted Average for the First Quarter 2.00 500.00 1608.14 2400.00 Weighted Average for the Year 2.00 500.00 1608.14 2400.00 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid 2670252-499 601-40300 Struct Conc Coating I-25:MOBILITY HUB (LONE TREE) 01/16/25 Sq Yard 230.00 23.92 25.31 48.53 Weighted Average for the First Quarter 230.00 23.92 25.31 48.53 Weighted Average for the Year 230.00 23.92 25.31 48.53 601-40302 Struct Conc Coating (Anti-Graf) Sq Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 16,737.00 2.54 1.94 2.06 Weighted Average for the First Quarter 16,737.00 2.54 1.94 2.06 Weighted Average for the Year 16,737.00 2.54 1.94 2.06 601-40400 Struct Conc Stain Sq Yard 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1,865.00 18.81 18.31 21.18 Weighted Average for the First Quarter 1,865.00 18.81 18.31 21.18 Weighted Average for the Year 1,865.00 18.81 18.31 21.18 601-51005 Galvanic Anodes Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 473.00 35.00 47.74 48.25 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 1,782.00 27.00 40.60 65.78 BR0761-249 I-76 02/27/25 1,870.00 26.33 37.73 40.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 601-51005 Galvanic Anodes Each STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 83.00 35.00 88.68 35.00 Weighted Average for the First Quarter 4,208.00 27.76 40.29 51.75 Weighted Average for the Year 4,208.00 27.76 40.29 51.75 602-00000 Reinf Steel Pound NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 550.00 5.00 5.83 5.90 BR0761-249 I-76 02/27/25 2,382.00 3.22 5.79 6.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 96.00 5.00 7.99 7.00 Weighted Average for the First Quarter 3,028.00 3.60 5.85 6.01 Weighted Average for the Year 3,028.00 3.60 5.85 6.01 602-00020 Reinf Steel (Epoxy) Pound 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 191,756.00 3.00 1.62 1.98 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 38,560.00 2.50 4.51 4.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 8,254.00 5.00 3.21 3.12 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 10,739.00 10.00 4.67 5.00 Weighted Average for the First Quarter 249,309.00 3.29 2.14 2.46 Weighted Average for the Year 249,309.00 3.29 2.14 2.46 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 603-01180 18 In RCP Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 125.00 120.00 233.25 259.00 Weighted Average for the First Quarter 125.00 120.00 233.25 259.00 Weighted Average for the Year 125.00 120.00 233.25 259.00 603-01185 18 In RCP (CIP) Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 256.00 182.13 160.96 154.76 Weighted Average for the First Quarter 256.00 182.13 160.96 154.76 Weighted Average for the Year 256.00 182.13 160.96 154.76 603-01245 24 In RCP (CIP) Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 93.00 229.42 275.34 354.04 Weighted Average for the First Quarter 93.00 229.42 275.34 354.04 Weighted Average for the Year 93.00 229.42 275.34 354.04 603-01305 30 In RCP (CIP) Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 156.00 217.36 227.57 201.40 Weighted Average for the First Quarter 156.00 217.36 227.57 201.40 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the Year 156.00 217.36 227.57 201.40 603-05018 18 In RCES Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 5.00 1200.00 2917.85 3650.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 3.00 1820.40 2285.87 1435.24 Weighted Average for the First Quarter 8.00 1432.65 2573.13 2819.47 Weighted Average for the Year 8.00 1432.65 2573.13 2819.47 603-10240 24 In CSP Lin Foot NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 75.00 300.00 140.50 155.00 Weighted Average for the First Quarter 75.00 300.00 140.50 155.00 Weighted Average for the Year 75.00 300.00 140.50 155.00 603-10360 36 In CSP Lin Foot NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 13.00 400.00 441.00 750.00 Weighted Average for the First Quarter 13.00 400.00 441.00 750.00 Weighted Average for the Year 13.00 400.00 441.00 750.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 603-32024 Place 24 In SES Each NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 4.00 1000.00 991.50 770.00 Weighted Average for the First Quarter 4.00 1000.00 991.50 770.00 Weighted Average for the Year 4.00 1000.00 991.50 770.00 604-00305 Inlet Ty C (5 Ft) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 3.00 6015.36 9152.92 13540.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 4.00 4730.43 6729.42 5326.50 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 2.00 10000.00 7002.00 7800.00 Weighted Average for the First Quarter 9.00 6329.75 7348.39 8614.00 Weighted Average for the Year 9.00 6329.75 7348.39 8614.00 604-00550 Inlet Ty D (Spec) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 7639.82 14278.95 7573.70 Weighted Average for the First Quarter 1.00 7639.82 14278.95 7573.70 Weighted Average for the Year 1.00 7639.82 14278.95 7573.70 604-16010 Inlet Ty 16 (10 Ft) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 7801.38 12331.81 8070.84 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 1.00 7801.38 12331.81 8070.84 Weighted Average for the Year 1.00 7801.38 12331.81 8070.84 604-19105 Inlet Ty R L5 (5 Ft) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 6.00 7967.26 8913.03 8253.16 Weighted Average for the First Quarter 6.00 7967.26 8913.03 8253.16 Weighted Average for the Year 6.00 7967.26 8913.03 8253.16 604-19110 Inlet Ty R L5 (10 Ft) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 5.00 5683.25 10847.41 9159.46 Weighted Average for the First Quarter 5.00 5683.25 10847.41 9159.46 Weighted Average for the Year 5.00 5683.25 10847.41 9159.46 604-19205 Inlet Ty R L10 (5 Ft) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 5.00 5512.59 12975.33 11111.98 Weighted Average for the First Quarter 5.00 5512.59 12975.33 11111.98 Weighted Average for the Year 5.00 5512.59 12975.33 11111.98 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 604-19210 Inlet Ty R L10 (10 Ft) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 2.00 6711.17 16235.59 14513.52 Weighted Average for the First Quarter 2.00 6711.17 16235.59 14513.52 Weighted Average for the Year 2.00 6711.17 16235.59 14513.52 604-19310 Inlet Ty R L15 (10 Ft) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 8131.27 21629.10 18224.58 Weighted Average for the First Quarter 1.00 8131.27 21629.10 18224.58 Weighted Average for the Year 1.00 8131.27 21629.10 18224.58 604-25005 Vane Grate Inlet (5 Ft) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 2.00 4027.37 7929.62 5577.72 Weighted Average for the First Quarter 2.00 4027.37 7929.62 5577.72 Weighted Average for the Year 2.00 4027.37 7929.62 5577.72 604-25010 Vane Grate Inlet (10 Ft) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 2.00 4946.69 9690.45 6937.70 Weighted Average for the First Quarter 2.00 4946.69 9690.45 6937.70 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the Year 2.00 4946.69 9690.45 6937.70 604-30005 MH Slab Base (5 Ft) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 2.00 5081.41 8681.51 10389.06 Weighted Average for the First Quarter 2.00 5081.41 8681.51 10389.06 Weighted Average for the Year 2.00 5081.41 8681.51 10389.06 604-30010 MH Slab Base (10 Ft) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 3.00 6805.46 10548.18 10389.06 Weighted Average for the First Quarter 3.00 6805.46 10548.18 10389.06 Weighted Average for the Year 3.00 6805.46 10548.18 10389.06 604-39000 MH Spec Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 2.00 35000.00 13519.00 12614.00 Weighted Average for the First Quarter 2.00 35000.00 13519.00 12614.00 Weighted Average for the Year 2.00 35000.00 13519.00 12614.00 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid 2670252-499 605-82100 Pipe Edge Drain I-25:MOBILITY HUB (LONE TREE) 01/16/25 Lin Foot 1,595.00 13.08 37.33 34.98 Weighted Average for the First Quarter 1,595.00 13.08 37.33 34.98 Weighted Average for the Year 1,595.00 13.08 37.33 34.98 605-84000 Subsurface Drain Outlet Lin Foot STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 165.00 80.00 50.09 90.00 Weighted Average for the First Quarter 165.00 80.00 50.09 90.00 Weighted Average for the Year 165.00 80.00 50.09 90.00 606-00301 Gdrail Ty 3 (6-3) Lin Foot NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 3,334.00 55.00 36.03 36.25 Weighted Average for the First Quarter 3,334.00 55.00 36.03 36.25 Weighted Average for the Year 3,334.00 55.00 36.03 36.25 606-00302 Gdrail Ty 3 (31 In MGS) Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 140.00 65.75 46.07 42.40 BR0761-249 I-76 02/27/25 1,500.00 50.00 52.23 60.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 1,640.00 51.34 51.71 58.50 Weighted Average for the Year 1,640.00 51.34 51.71 58.50 606-00910 Guardrail Type 9 (Style CA) Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 494.00 65.80 150.01 141.05 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 1,511.00 250.00 169.12 200.00 Weighted Average for the First Quarter 2,005.00 204.62 159.65 185.48 Weighted Average for the Year 2,005.00 204.62 159.65 185.48 606-00944 Guardrail Type 9 (Style CGD) (Special) Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 139.00 500.00 400.21 450.28 Weighted Average for the First Quarter 139.00 500.00 400.21 450.28 Weighted Average for the Year 139.00 500.00 400.21 450.28 606-01340 End Anchor Ty 3D Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 2009.36 2339.00 2014.00 Weighted Average for the First Quarter 1.00 2009.36 2339.00 2014.00 Weighted Average for the Year 1.00 2009.36 2339.00 2014.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 606-01370 Transition Ty 3G Each BR0761-249 I-76 02/27/25 8.00 4000.00 6627.87 4200.00 Weighted Average for the First Quarter 8.00 4000.00 6627.87 4200.00 Weighted Average for the Year 8.00 4000.00 6627.87 4200.00 606-01390 End Anchor Ty 3K Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 1214.03 3266.33 2968.00 Weighted Average for the First Quarter 1.00 1214.03 3266.33 2968.00 Weighted Average for the Year 1.00 1214.03 3266.33 2968.00 606-01400 Transition Type BR10M-GR3 Each BR0761-249 I-76 02/27/25 4.00 7000.00 10989.00 8000.00 Weighted Average for the First Quarter 4.00 7000.00 10989.00 8000.00 Weighted Average for the Year 4.00 7000.00 10989.00 8000.00 606-02003 End Anchor (Nonflared) Each NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 1.00 5000.00 1950.13 38.25 BR0761-249 I-76 02/27/25 8.00 5000.00 5167.89 4000.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 9.00 5000.00 5039.18 3559.81 Weighted Average for the Year 9.00 5000.00 5039.18 3559.81 606-02005 End Anchor (Flared) Each NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 5.00 6000.00 4095.50 4350.00 Weighted Average for the First Quarter 5.00 6000.00 4095.50 4350.00 Weighted Average for the Year 5.00 6000.00 4095.50 4350.00 606-10810 Bridge Rail Type 8R MASH Lin Foot NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 1,180.00 300.00 643.61 510.00 Weighted Average for the First Quarter 1,180.00 300.00 643.61 510.00 Weighted Average for the Year 1,180.00 300.00 643.61 510.00 606-11037 Brdg Rail Ty 10R MASH Lin Foot BR0761-249 I-76 02/27/25 760.00 250.00 329.55 350.00 Weighted Average for the First Quarter 760.00 250.00 329.55 350.00 Weighted Average for the Year 760.00 250.00 329.55 350.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 607-01100 Fence BW TWP Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 11.00 12.00 300.57 182.50 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 871.00 7.16 14.57 5.62 Weighted Average for the First Quarter 882.00 7.22 16.36 7.83 Weighted Average for the Year 882.00 7.22 16.36 7.83 607-11525 Fence (Plastic) Lin Foot STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 1,142.00 2.95 5.76 5.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 3,700.00 2.95 3.41 2.01 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 180.00 15.00 8.98 10.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 150.00 5.00 13.83 23.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 100.00 10.00 4.81 2.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 100.00 6.05 5.78 5.05 Weighted Average for the First Quarter 5,372.00 3.60 4.24 3.56 Weighted Average for the Year 5,372.00 3.60 4.24 3.56 607-11530 Fence (Spec) Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 911.00 100.00 345.28 265.69 Weighted Average for the First Quarter 911.00 100.00 345.28 265.69 Weighted Average for the Year 911.00 100.00 345.28 265.69 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 607-53172 Fence CL (72 In) Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 463.00 22.56 42.36 38.16 Weighted Average for the First Quarter 463.00 22.56 42.36 38.16 Weighted Average for the Year 463.00 22.56 42.36 38.16 608-00000 Conc Sidewalk Sq Yard NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 3,155.00 75.00 103.57 104.80 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 118.00 125.00 119.71 106.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 728.00 120.00 92.45 80.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 20.00 163.21 102.90 97.95 Weighted Average for the First Quarter 4,021.00 85.05 101.98 100.31 Weighted Average for the Year 4,021.00 85.05 101.98 100.31 608-00006 Conc Sidewalk (6 In) Sq Yard 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 2,641.00 85.00 81.00 71.02 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 20.00 200.00 322.17 350.00 Weighted Average for the First Quarter 2,661.00 85.86 81.91 73.12 Weighted Average for the Year 2,661.00 85.86 81.91 73.12 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid 608-00010 Conc Curb Ramp Sq Yard NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 1,614.00 205.00 151.28 153.06 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 40.00 217.92 194.55 137.80 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 34.00 350.00 411.33 450.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 190.00 280.00 211.17 173.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 1,804.00 180.00 140.82 145.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 42.00 261.03 174.14 163.25 Weighted Average for the First Quarter 3,724.00 198.81 153.66 152.83 Weighted Average for the Year 3,724.00 198.81 153.66 152.83 608-00015 Detectable Warnings Sq Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 64.00 95.00 116.37 117.75 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 50.00 87.32 85.08 107.15 Weighted Average for the First Quarter 114.00 91.63 102.65 113.10 Weighted Average for the Year 114.00 91.63 102.65 113.10 608-00350 Conc Sidewalk (C) Sq Yard 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 110.00 87.86 105.47 84.80 Weighted Average for the First Quarter 110.00 87.86 105.47 84.80 Weighted Average for the Year 110.00 87.86 105.47 84.80 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 609-20000 Curb Ty 2 B (Spec) Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 241.00 100.00 50.03 50.60 Weighted Average for the First Quarter 241.00 100.00 50.03 50.60 Weighted Average for the Year 241.00 100.00 50.03 50.60 609-20010 Curb Ty 2 B Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 500.00 48.42 46.55 47.10 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 46.00 50.00 54.89 58.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 415.00 50.00 31.93 28.50 Weighted Average for the First Quarter 961.00 49.18 40.16 39.59 Weighted Average for the Year 961.00 49.18 40.16 39.59 609-21010 C and G Ty 2 I-B Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 388.00 36.71 35.44 28.62 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 2,671.00 50.00 32.55 24.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 438.00 45.62 46.66 58.15 Weighted Average for the First Quarter 3,497.00 47.98 34.31 28.79 Weighted Average for the Year 3,497.00 47.98 34.31 28.79 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid 609-21020 C and G Ty 2 II-B Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 884.00 47.00 52.37 53.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 833.00 41.16 40.66 29.68 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 37.00 45.00 184.21 180.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 56.00 45.00 60.14 64.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 949.00 60.00 37.27 30.50 Weighted Average for the First Quarter 2,759.00 49.64 44.08 40.15 Weighted Average for the Year 2,759.00 49.64 44.08 40.15 609-21021 C and G Ty 2 II-M Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 289.00 35.00 55.85 56.50 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1,842.00 31.91 43.02 37.10 Weighted Average for the First Quarter 2,131.00 32.33 43.95 39.73 Weighted Average for the Year 2,131.00 32.33 43.95 39.73 609-24004 Gutter Ty 2 (4 Ft) Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 91.00 66.38 52.36 29.68 Weighted Average for the First Quarter 91.00 66.38 52.36 29.68 Weighted Average for the Year 91.00 66.38 52.36 29.68 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 609-60011 Curb Ty 6 M Lin Foot NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 3,574.00 35.00 13.38 15.00 Weighted Average for the First Quarter 3,574.00 35.00 13.38 15.00 Weighted Average for the Year 3,574.00 35.00 13.38 15.00 610-00020 Median Cover (Pattern Conc) Sq Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 828.00 30.00 25.60 25.90 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 91.00 20.00 51.49 53.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 1,097.00 22.50 20.37 25.50 Weighted Average for the First Quarter 2,016.00 25.47 23.92 26.91 Weighted Average for the Year 2,016.00 25.47 23.92 26.91 610-00024 Median Cover (4 In Pattern Conc) Sq Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 2,849.00 20.00 14.60 10.60 Weighted Average for the First Quarter 2,849.00 20.00 14.60 10.60 Weighted Average for the Year 2,849.00 20.00 14.60 10.60 610-00026 Median Cover (6 In Pattern Conc) Sq Foot NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 7,645.00 20.00 20.75 16.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 7,645.00 20.00 20.75 16.00 Weighted Average for the Year 7,645.00 20.00 20.75 16.00 610-00030 Median Cover Matl (Conc) Sq Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 863.00 20.00 23.28 23.55 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 80.00 20.00 25.74 29.00 Weighted Average for the First Quarter 943.00 20.00 23.66 24.01 Weighted Average for the Year 943.00 20.00 23.66 24.01 612-00001 Delin (Ty I) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 230.00 32.00 37.19 37.75 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 28.00 50.00 35.50 37.00 BR0761-249 I-76 02/27/25 52.00 40.00 62.17 120.00 Weighted Average for the First Quarter 310.00 34.97 44.47 51.48 Weighted Average for the Year 310.00 34.97 44.47 51.48 612-00002 Delin (Ty II) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 260.00 30.00 40.66 41.25 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 30.00 31.17 43.17 67.00 Weighted Average for the First Quarter 290.00 30.12 41.13 43.91 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the Year 290.00 30.12 41.13 43.91 612-00003 Delin (Ty III) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 2.00 40.00 44.14 44.75 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 5.00 60.00 35.50 37.00 BR0761-249 I-76 02/27/25 16.00 40.00 63.82 120.00 Weighted Average for the First Quarter 23.00 44.35 60.23 95.41 Weighted Average for the Year 23.00 44.35 60.23 95.41 612-00021 Delin (Ty I) (Barrier) Each NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 9.00 95.00 114.00 120.00 Weighted Average for the First Quarter 9.00 95.00 114.00 120.00 Weighted Average for the Year 9.00 95.00 114.00 120.00 612-00041 Delin (Flex) (Ty I) Each NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 81.00 110.00 121.98 125.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 50.00 109.96 84.27 86.70 Weighted Average for the First Quarter 131.00 109.99 110.05 110.38 Weighted Average for the Year 131.00 109.99 110.05 110.38 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 612-00042 Delin (Flex) (Ty II) Each NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 50.00 129.77 85.01 86.70 Weighted Average for the First Quarter 50.00 129.77 85.01 86.70 Weighted Average for the Year 50.00 129.77 85.01 86.70 612-00043 Delin (Flex) (Ty III) Each NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 50.00 115.82 86.67 86.70 Weighted Average for the First Quarter 50.00 115.82 86.67 86.70 Weighted Average for the Year 50.00 115.82 86.67 86.70 612-00260 Loc Mark (Fib Opt)(Dome) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 10.00 235.04 227.37 110.24 Weighted Average for the First Quarter 10.00 235.04 227.37 110.24 Weighted Average for the Year 10.00 235.04 227.37 110.24 613-00102 1 In Elec Cond (GRC) (Special) Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 340.00 48.88 38.29 39.22 Weighted Average for the First Quarter 340.00 48.88 38.29 39.22 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the Year 340.00 48.88 38.29 39.22 613-00200 2 In Elec Cond Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1,038.00 19.87 28.46 24.38 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 706.00 38.00 40.85 35.00 Weighted Average for the First Quarter 1,744.00 27.21 32.32 28.68 Weighted Average for the Year 1,744.00 27.21 32.32 28.68 613-00206 2 In Elec Cond (Bored) Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 1,293.00 30.00 36.09 30.60 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1,415.00 26.44 38.92 36.04 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 500.00 30.00 29.48 22.00 Weighted Average for the First Quarter 3,208.00 28.43 36.37 31.66 Weighted Average for the Year 3,208.00 28.43 36.37 31.66 613-00210 2 In Elec Conduit (Spec) Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 126.00 50.00 35.09 39.22 Weighted Average for the First Quarter 126.00 50.00 35.09 39.22 Weighted Average for the Year 126.00 50.00 35.09 39.22 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid 613-00306 3 In Elec Cond (Bored) Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 2,736.00 40.00 37.66 35.30 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 900.00 36.16 57.68 54.06 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 2,450.00 40.00 43.97 36.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 750.00 25.00 32.36 25.00 Weighted Average for the First Quarter 6,836.00 37.85 42.79 36.89 Weighted Average for the Year 6,836.00 37.85 42.79 36.89 613-01200 2 In Elec Cond (P) Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 1,190.00 20.00 33.04 30.60 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 7,180.00 12.00 22.95 12.72 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 300.00 30.00 24.15 27.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 10.00 50.00 23.55 24.00 Weighted Average for the First Quarter 8,680.00 13.76 23.73 15.68 Weighted Average for the Year 8,680.00 13.76 23.73 15.68 613-01300 3 In Elec Cond (P) Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 260.00 25.00 34.61 35.30 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1,400.00 15.51 30.65 26.50 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 310.00 40.00 27.62 28.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 475.00 15.00 29.05 29.00 Weighted Average for the First Quarter 2,445.00 19.53 30.32 28.11 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the Year 2,445.00 19.53 30.32 28.11 613-03500 Elec Cond (P) (Mult) (Spec) Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 638.00 68.79 51.47 36.04 Weighted Average for the First Quarter 638.00 68.79 51.47 36.04 Weighted Average for the Year 638.00 68.79 51.47 36.04 613-07000 Pull Box (Spec) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 8.00 1592.68 2487.00 1272.00 Weighted Average for the First Quarter 8.00 1592.68 2487.00 1272.00 Weighted Average for the Year 8.00 1592.68 2487.00 1272.00 613-07001 Type One Pull Box Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 13.00 979.95 1339.60 1388.60 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 13.00 1500.00 1738.15 1800.00 Weighted Average for the First Quarter 26.00 1239.98 1499.02 1594.30 Weighted Average for the Year 26.00 1239.98 1499.02 1594.30 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid 613-07002 Type Two Pull Box Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 4.00 1500.00 1805.66 2137.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 17.00 1520.05 1654.10 1600.60 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 37.00 2000.00 2078.26 2200.00 Weighted Average for the First Quarter 58.00 1824.84 1900.65 2019.97 Weighted Average for the Year 58.00 1824.84 1900.65 2019.97 613-07003 Type Three Pull Box Each SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 5.00 1100.00 1708.49 2053.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 16.00 2500.00 2629.35 2650.00 Weighted Average for the First Quarter 21.00 2166.67 2335.46 2507.86 Weighted Average for the Year 21.00 2166.67 2335.46 2507.86 613-07004 Type Four Pull Box Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 16.00 2000.00 3344.95 3696.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 9.00 1949.84 2961.05 2761.30 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 6.00 3500.00 2278.52 3000.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 2.00 2000.00 2379.56 2948.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 3.00 3000.00 3741.47 3750.00 Weighted Average for the First Quarter 36.00 2320.79 3020.28 3309.27 Weighted Average for the Year 36.00 2320.79 3020.28 3309.27 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 613-07005 Type Five Pull Box Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 4.00 2500.00 4284.43 4904.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 4.00 3621.89 3977.27 3508.60 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 2.00 4500.00 3148.65 3800.00 Weighted Average for the First Quarter 10.00 3348.76 3946.65 4125.04 Weighted Average for the Year 10.00 3348.76 3946.65 4125.04 613-10000 Wiring Lump Sum NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 1.00 56362.03 119518.22 105000.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 80000.00 130472.26 112360.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 1.00 50000.00 56351.01 76600.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 1.00 70000.00 31184.47 25177.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 1.00 20000.00 14942.05 30600.00 Weighted Average for the First Quarter 5.00 55272.41 73446.39 69947.40 Weighted Average for the Year 5.00 55272.41 73446.39 69947.40 613-13000 Luminaire (LED) (Spec) Each STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 3.00 1500.00 1036.88 960.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 4.00 1100.00 1326.33 1377.00 Weighted Average for the First Quarter 7.00 1271.43 1247.39 1198.29 Weighted Average for the Year 7.00 1271.43 1247.39 1198.29 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 613-13002 Lumin (LED) (2,000 Lumens) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 8.00 400.00 737.47 932.80 Weighted Average for the First Quarter 8.00 400.00 737.47 932.80 Weighted Average for the Year 8.00 400.00 737.47 932.80 613-13004 Lumin (LED) (4,000 Lumens) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 5.00 578.17 1948.57 1791.40 Weighted Average for the First Quarter 5.00 578.17 1948.57 1791.40 Weighted Average for the Year 5.00 578.17 1948.57 1791.40 613-13008 Lumin (LED) (8,000 Lumens) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 12.00 1095.66 2922.25 1828.50 Weighted Average for the First Quarter 12.00 1095.66 2922.25 1828.50 Weighted Average for the Year 12.00 1095.66 2922.25 1828.50 613-13014 Lumin (LED) (14,000 Lumens) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 15.00 40.00 1432.52 1328.00 Weighted Average for the First Quarter 15.00 40.00 1432.52 1328.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the Year 15.00 40.00 1432.52 1328.00 613-16000 Luminaire (Spec) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 2.00 1000.00 2105.66 1520.00 Weighted Average for the First Quarter 2.00 1000.00 2105.66 1520.00 Weighted Average for the Year 2.00 1000.00 2105.66 1520.00 613-30005 Light Std + Lumin (Pedest) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 28.00 2500.00 6681.33 5618.00 Weighted Average for the First Quarter 28.00 2500.00 6681.33 5618.00 Weighted Average for the Year 28.00 2500.00 6681.33 5618.00 613-30120 Light Std Alum (12 Ft) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 17.00 1500.00 4285.55 3927.30 Weighted Average for the First Quarter 17.00 1500.00 4285.55 3927.30 Weighted Average for the Year 17.00 1500.00 4285.55 3927.30 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 613-33300 Light Std Timber (30 Ft) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 2.00 3500.00 5017.75 3175.00 Weighted Average for the First Quarter 2.00 3500.00 5017.75 3175.00 Weighted Average for the Year 2.00 3500.00 5017.75 3175.00 613-34350 Light Std Metal (35 Ft) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 2.00 4000.00 5487.11 6342.00 Weighted Average for the First Quarter 2.00 4000.00 5487.11 6342.00 Weighted Average for the Year 2.00 4000.00 5487.11 6342.00 613-40000 Conc Foundation Pad Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 2.00 3000.00 3106.86 2285.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 3.00 3640.28 3356.92 4054.50 Weighted Average for the First Quarter 5.00 3384.17 3294.40 3346.70 Weighted Average for the Year 5.00 3384.17 3294.40 3346.70 613-40010 Light Std Foundation Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 2.00 2000.00 3754.44 5210.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 38.00 2615.25 3041.83 3233.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 40.00 2584.48 3060.11 3331.85 Weighted Average for the Year 40.00 2584.48 3060.11 3331.85 613-50106 Light Cont Center (Spec) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 2.00 9217.35 12961.63 13069.80 Weighted Average for the First Quarter 2.00 9217.35 12961.63 13069.80 Weighted Average for the Year 2.00 9217.35 12961.63 13069.80 613-50109 Meter Power Pedestal Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 2.00 12000.00 12119.20 9860.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 10792.53 11531.13 11161.80 Weighted Average for the First Quarter 3.00 11597.51 11825.17 10293.93 Weighted Average for the Year 3.00 11597.51 11825.17 10293.93 613-50150 Secondary Serv Pedestal Each STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 2.00 15000.00 12735.32 13200.00 Weighted Average for the First Quarter 2.00 15000.00 12735.32 13200.00 Weighted Average for the Year 2.00 15000.00 12735.32 13200.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 613-60700 Troubleshooting Hour 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 20.00 223.57 367.62 365.70 Weighted Average for the First Quarter 20.00 223.57 367.62 365.70 Weighted Average for the Year 20.00 223.57 367.62 365.70 613-80130 Service Meter Cabinet Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 5.00 7000.00 11395.85 9860.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 2.00 10000.00 10042.83 10562.00 Weighted Average for the First Quarter 7.00 7857.14 10794.51 10060.57 Weighted Average for the Year 7.00 7857.14 10794.51 10060.57 614-00011 Sign Panel (CL I) Sq Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 688.00 30.00 27.87 28.25 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 177.00 26.16 29.45 31.21 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 30.00 30.00 57.56 82.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 49.00 40.00 34.17 31.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 665.00 40.00 27.78 27.50 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 11.00 33.73 61.30 25.00 Weighted Average for the First Quarter 1,620.00 34.01 29.01 29.32 Weighted Average for the Year 1,620.00 34.01 29.01 29.32 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid 614-00012 Sign Panel (CL II) Sq Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 95.00 33.09 39.90 48.42 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 12.00 45.00 75.60 90.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 80.00 35.00 40.88 42.75 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 51.00 50.00 44.25 47.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 117.00 34.44 46.11 35.70 Weighted Average for the First Quarter 355.00 36.80 43.38 44.15 Weighted Average for the Year 355.00 36.80 43.38 44.15 614-00026 Inst Sign Panel (CL I) Each STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 7.00 500.00 182.40 280.00 Weighted Average for the First Quarter 7.00 500.00 182.40 280.00 SHE0881-032 614-00029 Weighted Average for the Year Inst Sign Panel (CL II) FEDERAL BLVD SIGNALS 41st and 02/13/25 7.00 Each 4.00 500.00 120.00 182.40 270.00 280.00 495.00 Weighted Average for the First Quarter 4.00 120.00 270.00 495.00 Weighted Average for the Year 4.00 120.00 270.00 495.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 614-00037 Sign Panel (Spec) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 3.00 14110.47 5111.06 12109.35 Weighted Average for the First Quarter 3.00 14110.47 5111.06 12109.35 Weighted Average for the Year 3.00 14110.47 5111.06 12109.35 614-00040 Signpost (Spec) Lin Foot NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 770.00 700.00 23.31 24.00 Weighted Average for the First Quarter 770.00 700.00 23.31 24.00 Weighted Average for the Year 770.00 700.00 23.31 24.00 614-00216 Steel Signpost (2x2 In T) Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 60.00 19.93 23.67 40.78 Weighted Average for the First Quarter 60.00 19.93 23.67 40.78 Weighted Average for the Year 60.00 19.93 23.67 40.78 614-01503 Steel Sign Supp (2-In Rd)(Po&Sock) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 75.00 400.00 435.03 440.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 7.00 478.92 395.40 381.41 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 2.00 450.00 539.81 428.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 84.00 407.77 433.57 434.83 Weighted Average for the Year 84.00 407.77 433.57 434.83 614-01573 Steel Sign Supp (2-1/2 Rd NP40)(Po&Slip) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 21.00 500.00 603.62 689.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 6.00 591.27 608.80 596.78 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 6.00 650.00 819.33 680.00 Weighted Average for the First Quarter 33.00 543.87 662.52 670.60 Weighted Average for the Year 33.00 614-01575 Steel Sign Supp (2-1/2 In Rd NP40)(Po) Lin Foot 543.87 662.52 670.60 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 88.00 25.00 32.38 33.75 Weighted Average for the First Quarter 88.00 25.00 32.38 33.75 NHPP0403-069 614-01578 Weighted Average for the Year Steel Sign Supp (2-1/2 In Rd NP40)(Slip) US 40 MP 215.90 - 219.88 IN G 02/06/25 88.00 Each 7.00 25.00 350.00 32.38 297.00 33.75 310.00 Weighted Average for the First Quarter 7.00 350.00 297.00 310.00 Weighted Average for the Year 7.00 350.00 297.00 310.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 614-01583 Stl Sign Supp (2-1/2 In Rd 80)(Po&Slip) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 10.00 702.60 683.99 655.92 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 11.00 642.66 804.71 730.00 Weighted Average for the First Quarter 21.00 671.20 726.82 694.72 Weighted Average for the Year 21.00 671.20 726.82 694.72 614-10142 Public Info Display Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 4.00 20000.00 25171.77 32605.60 Weighted Average for the First Quarter 4.00 20000.00 25171.77 32605.60 Weighted Average for the Year 4.00 20000.00 25171.77 32605.60 614-70024 1310nm SFP Optic Module Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 4.00 522.15 482.27 593.60 Weighted Average for the First Quarter 4.00 522.15 482.27 593.60 Weighted Average for the Year 4.00 522.15 482.27 593.60 614-70028 CWDM SFP Optic Module Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 4.00 990.21 1249.60 1494.60 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 4.00 990.21 1249.60 1494.60 Weighted Average for the Year 4.00 990.21 1249.60 1494.60 614-70032 Optical Filter Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 4.00 685.82 605.52 832.10 Weighted Average for the First Quarter 4.00 685.82 605.52 832.10 Weighted Average for the Year 4.00 685.82 605.52 832.10 614-70150 Ped Sig Face (16) (Countdown) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 41.00 700.00 1060.50 1000.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 14.00 900.00 837.26 1100.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 10.00 700.00 683.51 680.00 Weighted Average for the First Quarter 65.00 743.08 918.29 972.31 Weighted Average for the Year 65.00 743.08 918.29 972.31 614-70200 Access Ped Sig Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 58.00 1500.00 2051.32 2225.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 4.00 2308.88 2809.32 3570.00 Weighted Average for the First Quarter 62.00 1552.19 2100.22 2311.77 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the Year 62.00 1552.19 2100.22 2311.77 614-70336 Traf Sig Face (12-12-12) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 96.00 850.00 1512.68 1420.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 2.00 949.73 1495.23 1526.40 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 15.00 1300.00 1153.57 1600.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 18.00 900.00 1202.81 1259.00 Weighted Average for the First Quarter 131.00 909.92 1402.67 1420.11 Weighted Average for the Year 131.00 909.92 1402.67 1420.11 614-70448 Traf Sig Face (12-12-12-12) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 26.00 1200.00 1797.30 1600.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 4.00 1100.00 1423.16 1509.00 Weighted Average for the First Quarter 30.00 1186.67 1709.27 1587.87 Weighted Average for the Year 30.00 1186.67 1709.27 1587.87 614-72830 Communications Cabinet Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 3.00 12878.46 25232.33 21094.00 Weighted Average for the First Quarter 3.00 12878.46 25232.33 21094.00 Weighted Average for the Year 3.00 12878.46 25232.33 21094.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 614-72836 Conflict Monitor Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 5.00 1000.00 1694.08 1850.00 Weighted Average for the First Quarter 5.00 1000.00 1694.08 1850.00 Weighted Average for the Year 5.00 1000.00 1694.08 1850.00 614-72855 Traf Sig Ctrl Cabinet Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 5.00 25000.00 33281.34 33600.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 2.00 62000.00 46042.63 50500.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 2.00 30000.00 46266.29 52079.00 Weighted Average for the First Quarter 9.00 34333.33 40323.37 41462.00 Weighted Average for the Year 9.00 34333.33 40323.37 41462.00 614-72860 Ped Push Button Each STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 14.00 800.00 740.95 950.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 11.00 850.00 1726.17 1842.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 44.00 1000.00 1022.75 525.00 Weighted Average for the First Quarter 69.00 935.51 1144.54 821.19 Weighted Average for the Year 69.00 935.51 1144.54 821.19 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 614-72863 Ped Push Button Post Assem Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 32.00 2000.00 1748.81 1820.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 4.00 2000.00 2161.38 3200.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 4.00 2000.00 1688.12 1440.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 44.00 3500.00 2447.01 2850.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 4.00 3000.00 4926.98 3570.00 Weighted Average for the First Quarter 88.00 2795.45 2262.92 2460.00 Weighted Average for the Year 88.00 2795.45 2262.92 2460.00 614-72866 Fire Preempt Unit + Timer Each SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 1.00 3200.00 6027.91 5902.00 Weighted Average for the First Quarter 1.00 3200.00 6027.91 5902.00 Weighted Average for the Year 1.00 3200.00 6027.91 5902.00 614-72884 Detect (Micro Wave) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 21.00 8000.00 12434.18 12975.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 2.00 8805.06 12064.93 11299.60 Weighted Average for the First Quarter 23.00 8070.01 12375.10 12829.31 Weighted Average for the Year 23.00 8070.01 12375.10 12829.31 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 614-72886 Intersection Detect Sys (Camera) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 18.00 12000.00 13005.25 12975.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 2.00 25000.00 33580.79 25000.00 Weighted Average for the First Quarter 20.00 13300.00 15062.80 14177.50 Weighted Average for the Year 20.00 13300.00 15062.80 14177.50 614-72887 Detect (Microwave Veh) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 26.00 15000.00 12829.01 13360.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 20000.00 19109.93 17659.60 Weighted Average for the First Quarter 27.00 15185.19 13277.65 13519.24 Weighted Average for the Year 27.00 15185.19 13277.65 13519.24 614-72894 Emergency Telephone Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 3.00 4387.84 10768.13 5278.80 Weighted Average for the First Quarter 3.00 4387.84 10768.13 5278.80 Weighted Average for the Year 3.00 4387.84 10768.13 5278.80 614-72895 Vehicle Detect Sys (Single Camera) Each SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 4.00 10000.00 9363.67 12152.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 4.00 10000.00 9363.67 12152.00 Weighted Average for the Year 4.00 10000.00 9363.67 12152.00 614-80385 Rumble Strip Lin Foot NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 32,086.00 0.43 0.53 0.41 Weighted Average for the First Quarter 32,086.00 0.43 0.53 0.41 Weighted Average for the Year 32,086.00 0.43 0.53 0.41 614-80390 Rumble Strip (Grinding)(Asphalt)(Sin) Lin Foot MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 245,604.00 0.50 1.03 0.70 Weighted Average for the First Quarter 245,604.00 0.50 1.03 0.70 Weighted Average for the Year 245,604.00 0.50 1.03 0.70 614-80391 Rumble Strip (Grind)(Asphalt) Lin Foot NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 19,508.00 0.50 0.84 1.00 Weighted Average for the First Quarter 19,508.00 0.50 0.84 1.00 Weighted Average for the Year 19,508.00 0.50 0.84 1.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 614-81020 Sig-Light Pole Steel (2) Each STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 1.00 65000.00 40381.72 38500.00 Weighted Average for the First Quarter 1.00 65000.00 40381.72 38500.00 Weighted Average for the Year 1.00 65000.00 40381.72 38500.00 614-81120 Sig-Light Pole Steel (1-20 Ft) Each SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 2.00 22000.00 19895.63 20336.00 Weighted Average for the First Quarter 2.00 22000.00 19895.63 20336.00 Weighted Average for the Year 2.00 22000.00 19895.63 20336.00 614-81130 Sig-Light Pole Steel (1-30 Ft) Each STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 1.00 28000.00 22329.92 21500.00 Weighted Average for the First Quarter 1.00 28000.00 22329.92 21500.00 Weighted Average for the Year 1.00 28000.00 22329.92 21500.00 614-81135 Sig-Light Pole Steel (1-35 Ft) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 2.00 20000.00 23942.55 25000.00 Weighted Average for the First Quarter 2.00 20000.00 23942.55 25000.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the Year 2.00 20000.00 23942.55 25000.00 614-81140 Sig-Light Pole Steel (1-40 Ft) Each SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 2.00 22000.00 22137.66 21417.00 Weighted Average for the First Quarter 2.00 22000.00 22137.66 21417.00 Weighted Average for the Year 2.00 22000.00 22137.66 21417.00 614-81145 Sig-Light Pole Steel (1-45 Ft) Each SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 2.00 28000.00 25081.08 24661.00 Weighted Average for the First Quarter 2.00 28000.00 25081.08 24661.00 Weighted Average for the Year 2.00 28000.00 25081.08 24661.00 614-81150 Sig-Light Pole Steel (1-50 Ft) Each STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 1.00 35000.00 25420.27 25000.00 Weighted Average for the First Quarter 1.00 35000.00 25420.27 25000.00 Weighted Average for the Year 1.00 35000.00 25420.27 25000.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 614-81155 Sig-Light Pole Steel (1-55 Ft) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 5.00 25000.00 30854.25 33400.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 45000.00 32367.33 24804.00 Weighted Average for the First Quarter 6.00 28333.33 31286.56 31967.33 Weighted Average for the Year 6.00 28333.33 31286.56 31967.33 614-81160 Sig-Light Pole Steel (1-60 Ft) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 3.00 40000.00 35571.19 37500.00 Weighted Average for the First Quarter 3.00 40000.00 35571.19 37500.00 Weighted Average for the Year 3.00 40000.00 35571.19 37500.00 614-81165 Sig-Light Pole Steel (1-65 Ft) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 1.00 45000.00 41435.84 45500.00 Weighted Average for the First Quarter 1.00 45000.00 41435.84 45500.00 Weighted Average for the Year 1.00 45000.00 41435.84 45500.00 614-81170 Sig-Light Pole Steel (1-70 Ft) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 2.00 30000.00 44772.57 49000.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 2.00 30000.00 44772.57 49000.00 Weighted Average for the Year 2.00 30000.00 44772.57 49000.00 NHPP2873-206 614-81175 Sig-Light Pole Steel (1-75 Ft) US287:RESURFACING I-70 TO 92N 01/09/25 Each 2.00 35000.00 45258.19 50000.00 Weighted Average for the First Quarter 2.00 35000.00 45258.19 50000.00 Weighted Average for the Year 2.00 35000.00 45258.19 50000.00 614-84000 Traf Sig Ped Pole Steel Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 8.00 2000.00 3524.62 4100.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 9.00 4500.00 3372.01 3700.00 Weighted Average for the First Quarter 17.00 3323.53 3443.83 3888.24 Weighted Average for the Year 17.00 3323.53 3443.83 3888.24 614-84100 Traf Sig Ped Pole Alum Each SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 1.00 2000.00 2195.66 2901.00 Weighted Average for the First Quarter 1.00 2000.00 2195.66 2901.00 Weighted Average for the Year 1.00 2000.00 2195.66 2901.00 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid 2670252-499 614-85003 Impact Atten (LM) I-25:MOBILITY HUB (LONE TREE) 01/16/25 Each 1.00 38985.56 37231.48 28388.89 Weighted Average for the First Quarter 1.00 38985.56 37231.48 28388.89 Weighted Average for the Year 1.00 38985.56 37231.48 28388.89 614-86248 Traf Ctrler (Type 2070LC) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 5.00 7000.00 8237.85 7650.00 Weighted Average for the First Quarter 5.00 7000.00 8237.85 7650.00 Weighted Average for the Year 5.00 7000.00 8237.85 7650.00 614-86800 Uninterrupted Power Supply Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 5.00 20000.00 9064.83 8235.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 3.00 11467.00 15976.87 14861.20 Weighted Average for the First Quarter 8.00 16800.12 12835.03 10719.83 Weighted Average for the Year 8.00 16800.12 12835.03 10719.83 614-87010 Fiber Optic Cable (S Mode) (12 Fiber) Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 800.00 10.00 11.17 12.95 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 2,330.00 5.89 7.85 8.48 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 3,130.00 6.94 8.33 9.62 Weighted Average for the Year 3,130.00 6.94 8.33 9.62 614-87012 Fiber Optic Term Panel (12 Fiber) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 4.00 2000.00 1379.23 1625.00 Weighted Average for the First Quarter 4.00 2000.00 1379.23 1625.00 Weighted Average for the Year 4.00 2000.00 1379.23 1625.00 614-87015 Buffer Tube Fan Out Kit Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 3.00 317.58 406.78 594.66 Weighted Average for the First Quarter 3.00 317.58 406.78 594.66 Weighted Average for the Year 3.00 317.58 406.78 594.66 614-87024 Fiber Optic Term Panel (24 Fiber) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 3.00 1843.37 1187.52 1115.12 Weighted Average for the First Quarter 3.00 1843.37 1187.52 1115.12 Weighted Average for the Year 3.00 1843.37 1187.52 1115.12 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid 614-87320 CCTV Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 11.00 6617.91 6981.17 4187.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 2.00 6000.00 6524.43 5682.00 Weighted Average for the First Quarter 13.00 6522.85 6910.90 4417.00 Weighted Average for the Year 13.00 6522.85 6910.90 4417.00 614-87333 CCTV Camera (Traf Surveil) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 1.00 4000.00 8762.39 5900.00 Weighted Average for the First Quarter 1.00 4000.00 8762.39 5900.00 Weighted Average for the Year 1.00 4000.00 8762.39 5900.00 614-87350 Test Fiber Optic Cable Lump Sum NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 1.00 15000.00 5901.25 6625.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 20000.00 7802.63 5225.80 Weighted Average for the First Quarter 2.00 17500.00 7168.84 5925.40 Weighted Average for the Year 2.00 17500.00 7168.84 5925.40 614-87512 Splice FO Cable (12 S) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 4.00 850.00 1204.23 1100.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 4.00 850.00 1204.23 1100.00 Weighted Average for the Year 4.00 850.00 1204.23 1100.00 614-87690 Ethernet Switch Each SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 2.00 6000.00 5521.17 5890.00 Weighted Average for the First Quarter 2.00 6000.00 5521.17 5890.00 Weighted Average for the Year 2.00 6000.00 5521.17 5890.00 614-87692 Ethernet Switch Type II Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 5.00 7000.00 12277.70 14550.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 3.00 10759.34 13726.83 9911.00 Weighted Average for the First Quarter 8.00 8409.75 13068.14 12810.38 Weighted Average for the Year 8.00 8409.75 13068.14 12810.38 615-00050 Emb Prot Ty 5 Each NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 8.00 2500.00 2034.00 2000.00 Weighted Average for the First Quarter 8.00 2500.00 2034.00 2000.00 Weighted Average for the Year 8.00 2500.00 2034.00 2000.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 618-00000 Prestress Steel Bar Pound 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 15,165.00 4.00 23.30 36.63 Weighted Average for the First Quarter 15,165.00 4.00 23.30 36.63 Weighted Average for the Year 15,165.00 4.00 23.30 36.63 618-01992 Prestress Conc Box (Depth Less Than 32") Sq Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 4,047.00 85.00 92.93 106.57 Weighted Average for the First Quarter 4,047.00 85.00 92.93 106.57 Weighted Average for the Year 4,047.00 85.00 92.93 106.57 619-30800 10 In Galv Pipe Lin Foot BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 4.00 120.00 727.65 592.25 Weighted Average for the First Quarter 4.00 120.00 727.65 592.25 Weighted Average for the Year 4.00 120.00 727.65 592.25 620-00001 Field Office (CL 1) Each STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 1.00 50000.00 65372.73 22000.00 Weighted Average for the First Quarter 1.00 50000.00 65372.73 22000.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the Year 1.00 50000.00 65372.73 22000.00 620-00002 Field Office (CL 2) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 75000.00 101997.01 64552.08 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 1.00 50000.00 53318.72 75000.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 1.00 35000.00 58046.74 60000.00 BR0761-249 I-76 02/27/25 1.00 11954.12 68854.67 50000.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 1.00 21666.63 63446.44 19700.00 Weighted Average for the First Quarter 5.00 38724.15 74013.04 53850.42 Weighted Average for the Year 5.00 38724.15 74013.04 53850.42 620-00005 Field Office (Spec) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 1.00 250000.00 97546.61 135900.00 Weighted Average for the First Quarter 1.00 250000.00 97546.61 135900.00 Weighted Average for the Year 1.00 250000.00 97546.61 135900.00 620-00012 Field Lab (CL 2) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 1.00 120000.00 59047.65 79000.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 85000.00 64798.51 44991.04 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 1.00 50000.00 48600.05 65000.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 1.00 35000.00 48012.54 32000.00 BR0761-249 I-76 02/27/25 1.00 10000.00 52118.86 50000.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 620-00012 Field Lab (CL 2) Each NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 1.00 16766.07 56301.48 20450.00 Weighted Average for the First Quarter 6.00 52794.35 55700.08 48573.51 Weighted Average for the Year 6.00 52794.35 55700.08 48573.51 620-00020 Sanitary Facility Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 2.00 6000.00 10033.53 10500.00 STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 1.00 3407.62 6596.11 15000.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 2.00 4076.45 6420.71 2224.25 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 2.00 5000.00 9688.14 7500.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 1.00 4000.00 3115.18 1500.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 2.00 2648.74 3624.59 1897.50 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 1.00 5000.00 12750.00 10000.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 1.00 3000.00 2772.50 1902.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 2.00 3000.00 4399.09 2500.00 BR0761-249 I-76 02/27/25 1.00 2244.46 5502.33 8000.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 1.00 6000.00 5270.23 4000.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 1.00 4390.72 4937.71 3950.00 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 1.00 4000.00 1341.67 625.00 Weighted Average for the First Quarter 18.00 4082.96 6011.62 5234.47 Weighted Average for the Year 18.00 4082.96 6011.62 5234.47 621-00450 Detour Pvmt Sq Yard NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 2,256.00 100.00 97.80 100.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 916.00 130.00 167.51 175.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 3,172.00 108.66 114.89 121.66 Weighted Average for the Year 3,172.00 108.66 114.89 121.66 621-00650 Ped Stair Str Lump Sum 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 65000.00 158428.42 105570.50 Weighted Average for the First Quarter 1.00 65000.00 158428.42 105570.50 Weighted Average for the Year 1.00 65000.00 158428.42 105570.50 622-00010 Bicycle Rack Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 6.00 1157.03 1128.28 932.67 Weighted Average for the First Quarter 6.00 1157.03 1128.28 932.67 Weighted Average for the Year 6.00 1157.03 1128.28 932.67 622-00100 Shade Shelter Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 2.00 25000.00 77998.40 43890.42 Weighted Average for the First Quarter 2.00 25000.00 77998.40 43890.42 Weighted Average for the Year 2.00 25000.00 77998.40 43890.42 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid 2670252-499 622-00250 Bench I-25:MOBILITY HUB (LONE TREE) 01/16/25 Each 2.00 640.23 3356.45 2418.68 Weighted Average for the First Quarter 2.00 640.23 3356.45 2418.68 Weighted Average for the Year 2.00 640.23 3356.45 2418.68 622-00252 Precast Concrete Bench Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 4.00 2500.00 5033.72 7752.33 Weighted Average for the First Quarter 4.00 2500.00 5033.72 7752.33 Weighted Average for the Year 4.00 2500.00 5033.72 7752.33 622-00270 Bollard Each NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 17.00 1000.00 759.41 730.00 Weighted Average for the First Quarter 17.00 1000.00 759.41 730.00 Weighted Average for the Year 17.00 1000.00 759.41 730.00 622-00350 Trash Receptacle Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 4.00 1845.03 2829.83 3075.98 Weighted Average for the First Quarter 4.00 1845.03 2829.83 3075.98 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the Year 4.00 1845.03 2829.83 3075.98 622-00827 Glazing Panel Sq Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 5,555.00 55.00 144.43 108.56 Weighted Average for the First Quarter 5,555.00 55.00 144.43 108.56 Weighted Average for the Year 5,555.00 55.00 144.43 108.56 622-00836 Metal Roofing Sq Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 4,532.00 16.00 35.34 27.06 Weighted Average for the First Quarter 4,532.00 16.00 35.34 27.06 Weighted Average for the Year 4,532.00 16.00 35.34 27.06 622-00851 Dog Waste Station Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 3.00 300.00 1474.23 1345.40 Weighted Average for the First Quarter 3.00 300.00 1474.23 1345.40 Weighted Average for the Year 3.00 300.00 1474.23 1345.40 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 624-27019 18 In Drainage Pipe (CL 7) (CIP) Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1,219.00 95.00 134.61 109.18 Weighted Average for the First Quarter 1,219.00 95.00 134.61 109.18 2670252-499 624-27025 Weighted Average for the Year 24 In Drainage Pipe (CL 7) (CIP) I-25:MOBILITY HUB (LONE TREE) 01/16/25 1,219.00 Lin Foot 90.00 95.00 105.00 134.61 171.37 109.18 127.20 Weighted Average for the First Quarter 90.00 105.00 171.37 127.20 Weighted Average for the Year 90.00 105.00 171.37 127.20 624-27031 30 In Drainage Pipe (CL 7) (CIP) Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 263.00 112.00 213.53 180.20 Weighted Average for the First Quarter 263.00 112.00 213.53 180.20 Weighted Average for the Year 263.00 112.00 213.53 180.20 625-00000 Const Surveying Lump Sum NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 1.00 15000.00 82053.86 90000.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 50000.00 191210.98 187265.85 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 1.00 150000.00 32961.93 46000.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 625-00000 Const Surveying Lump Sum NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 1.00 150000.00 141823.01 160000.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 1.00 30000.00 18280.50 14653.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 1.00 20000.00 132284.32 195000.00 BR0761-249 I-76 02/27/25 1.00 15000.00 54466.67 120000.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 1.00 35000.00 40620.66 25000.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 1.00 10000.00 38885.31 48500.00 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 1.00 7000.00 4716.67 5550.00 Weighted Average for the First Quarter 10.00 48200.00 75871.70 89196.89 Weighted Average for the Year 10.00 48200.00 75871.70 89196.89 625-00001 Const Surveying (Hour) Hour NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 40.00 200.00 218.69 210.00 Weighted Average for the First Quarter 40.00 200.00 218.69 210.00 Weighted Average for the Year 40.00 200.00 218.69 210.00 626-00000 Mobilization Lump Sum NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 1.00 1214139.23 1097207.31 1269983.85 STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 1.00 204072.43 276921.17 175000.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 1.00 1556140.84 1403560.14 1279275.84 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 1.00 1200000.00 871893.67 202850.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 1.00 225000.00 263236.14 123000.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 1.00 327147.09 334346.28 142352.41 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 1.00 850000.00 1121500.00 865000.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 1.00 113723.25 120205.24 50387.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 626-00000 Mobilization Lump Sum NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 1.00 918270.00 1090866.54 625000.00 BR0761-249 I-76 02/27/25 1.00 299775.65 317425.87 200000.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 1.00 330000.00 249571.76 207000.00 MTCER500-233 REGION 5 03/06/25 1.00 250000.00 120908.33 27500.00 MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 1.00 219664.10 112500.00 115000.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 1.00 813312.98 574382.36 390500.00 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 1.00 62810.00 70500.00 23500.00 Weighted Average for the First Quarter 15.00 572270.37 519587.97 379756.61 Weighted Average for the Year 15.00 572270.37 519587.97 379756.61 626-01103 Public Info Services (Tier III) Lump Sum NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 1.00 50000.00 22271.24 20600.00 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 1.00 22000.00 36404.94 45000.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 1.00 90.00 3138.25 4500.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 1.00 15000.00 15851.00 21000.00 Weighted Average for the First Quarter 4.00 21772.50 22304.24 22775.00 Weighted Average for the Year 4.00 21772.50 22304.24 22775.00 626-01104 Public Info Services (Tier IV) Lump Sum STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 1.00 15000.00 11319.39 12500.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 1.00 10000.00 27049.16 10000.00 MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 1.00 5000.00 5500.00 6000.00 Weighted Average for the First Quarter 3.00 10000.00 15264.03 9500.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the Year 3.00 10000.00 15264.03 9500.00 626-01113 Public Info Manage (Tier III) Day 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 250.00 88.69 105.68 90.10 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 142.00 80.23 91.49 151.80 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 150.00 81.48 96.60 117.50 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 10.00 83.00 477.33 487.00 Weighted Average for the First Quarter 552.00 84.45 105.29 120.61 Weighted Average for the Year 552.00 84.45 105.29 120.61 626-01114 Public Info Manage (Tier IV) Day SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 60.00 80.00 100.05 59.00 Weighted Average for the First Quarter 60.00 80.00 100.05 59.00 Weighted Average for the Year 60.00 80.00 100.05 59.00 627-00008 Mod Epoxy Pvmt Mkg Gallon NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 390.00 200.00 161.03 147.15 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 30.00 257.78 422.50 318.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 5.00 1000.00 810.90 320.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 28.00 475.00 697.05 879.18 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 248.00 200.00 175.50 150.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 276.00 145.00 190.02 165.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 627-00008 Mod Epoxy Pvmt Mkg Gallon BR0761-249 I-76 02/27/25 90.00 466.80 228.11 117.00 MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 3,767.00 120.00 112.50 115.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 808.00 205.09 182.97 168.35 Weighted Average for the First Quarter 5,642.00 151.26 152.18 133.93 Weighted Average for the Year 5,642.00 151.26 152.18 133.93 627-00013 Pvmt Mkg Paint (High Build) Gallon 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 27.00 145.72 151.75 79.50 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 30.00 120.00 421.35 5.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 447.00 50.00 159.00 195.00 BR0761-249 I-76 02/27/25 68.00 144.60 129.08 118.00 MTCER500-233 REGION 5 03/06/25 39,054.00 48.00 41.50 40.00 MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 1,817.00 60.00 57.50 65.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 1,705.00 53.46 88.45 86.70 Weighted Average for the First Quarter 43,148.00 49.01 43.60 44.63 Weighted Average for the Year 43,148.00 49.01 43.60 44.63 627-00016 Pvmt Mkg Paint (High Build)(Temporary) Gallon NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 451.00 115.00 99.27 88.30 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 91.00 175.00 235.80 309.93 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 516.00 75.00 89.81 75.00 MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 763.00 80.00 77.50 65.00 Weighted Average for the First Quarter 1,821.00 92.00 98.69 85.84 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the Year 1,821.00 92.00 98.69 85.84 627-01010 Preform Plastic Pvmt Mkg (TY I)(Inlaid) Sq Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 6,091.00 25.00 21.18 18.85 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 1,017.00 24.00 38.01 40.48 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 7,579.00 19.15 25.01 22.20 Weighted Average for the First Quarter 14,687.00 21.91 24.63 22.08 Weighted Average for the Year 14,687.00 21.91 24.63 22.08 627-01011 Preform Plastic Pvmt Mkg (Contr)(Inlaid) Sq Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 100.00 27.02 59.10 63.60 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 350.00 24.00 40.83 40.48 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 596.00 30.15 24.68 22.20 Weighted Average for the First Quarter 1,046.00 27.79 36.10 32.27 Weighted Average for the Year 1,046.00 27.79 36.10 32.27 NHPP085A-020 627-02010 Preform Plastic Pvmt Mkg (Ty II)(Inlaid) US85:I-76 TO 124TH AVENUE OVE 03/20/25 Sq Foot 54.00 37.22 27.41 25.00 Weighted Average for the First Quarter 54.00 37.22 27.41 25.00 Weighted Average for the Year 54.00 37.22 27.41 25.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 627-30405 Preform Thermoplastic Pvmt Mkg (WS) Sq Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 1,941.00 23.00 19.55 18.85 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 82.00 26.29 39.57 42.40 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 264.00 40.00 32.75 36.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 1,634.00 21.00 20.94 19.00 MTCER500-233 REGION 5 03/06/25 4,629.00 16.00 19.53 16.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 1,323.00 24.15 25.42 23.20 Weighted Average for the First Quarter 9,873.00 20.02 20.63 18.78 Weighted Average for the Year 9,873.00 20.02 20.63 18.78 627-30407 Preform Thermoplastic Pvmt Mkg (WS)(Sp) Sq Foot STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 65.00 30.00 25.39 26.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 4,632.00 25.00 24.91 25.00 Weighted Average for the First Quarter 4,697.00 25.07 24.91 25.01 Weighted Average for the Year 4,697.00 25.07 24.91 25.01 627-30410 Preform Thermoplastic Pvmt Mkg (XS) Sq Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 20,922.00 15.00 14.10 14.15 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 276.00 18.85 22.20 21.20 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 1,492.00 20.00 18.99 20.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 14,441.00 16.00 15.07 14.00 MTCER500-233 REGION 5 03/06/25 3,768.00 17.00 17.17 18.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 17,017.00 13.37 15.77 15.30 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 57,916.00 15.05 15.41 14.89 Weighted Average for the Year 57,916.00 15.05 15.41 14.89 627-30411 Preform Thermoplastic Pvmt Mkg (XS)(Sp) Sq Foot STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 1,864.00 15.00 21.41 19.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 9,609.00 16.00 18.70 18.50 Weighted Average for the First Quarter 11,473.00 15.84 19.04 18.58 Weighted Average for the Year 11,473.00 15.84 19.04 18.58 629-01050 Monument Box Each NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 8.00 2500.00 919.38 1685.00 Weighted Average for the First Quarter 8.00 2500.00 919.38 1685.00 Weighted Average for the Year 8.00 2500.00 919.38 1685.00 629-01110 Locate Monuments Hour NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 8.00 258.27 864.77 2050.00 Weighted Average for the First Quarter 8.00 258.27 864.77 2050.00 Weighted Average for the Year 8.00 258.27 864.77 2050.00 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid 630-00000 Flagging Hour NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 6,500.00 45.00 48.79 53.00 STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 4,000.00 40.00 43.66 41.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 600.00 30.37 49.31 50.88 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 3,900.00 50.00 25.90 5.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 2,000.00 50.00 43.00 50.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 40.00 80.00 60.68 94.88 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 3,000.00 50.00 51.00 53.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 40.00 45.00 38.52 34.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 4,000.00 50.00 189.83 52.60 BR0761-249 I-76 02/27/25 300.00 50.00 48.03 55.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 600.00 60.00 51.28 33.00 MTCER500-233 REGION 5 03/06/25 528.00 50.00 27.83 20.00 MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 100.00 45.31 31.00 12.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 1,200.00 41.83 49.83 45.40 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 160.00 53.00 56.33 55.00 Weighted Average for the First Quarter 26,968.00 46.77 63.15 42.44 Weighted Average for the Year 26,968.00 46.77 63.15 42.44 630-00001 Pilot Car Operation Hour MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 20.00 42.81 150.00 100.00 Weighted Average for the First Quarter 20.00 42.81 150.00 100.00 Weighted Average for the Year 20.00 42.81 150.00 100.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 630-00003 Uniformed Traf Ctrl Hour NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 1,200.00 200.00 121.42 175.00 STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 200.00 200.00 185.20 160.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 130.00 145.20 162.22 164.30 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 1,322.00 150.00 144.39 151.80 MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 160.00 187.01 150.00 150.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 600.00 140.25 123.19 102.00 Weighted Average for the First Quarter 3,612.00 169.23 140.75 152.06 Weighted Average for the Year 3,612.00 169.23 140.75 152.06 630-00004 Traf Ctrl Vehicle Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 2.00 3000.00 20515.60 12950.00 Weighted Average for the First Quarter 2.00 3000.00 20515.60 12950.00 Weighted Average for the Year 2.00 3000.00 20515.60 12950.00 630-00006 Uniformed Traf Ctrl (Vehicle) Hour 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 130.00 56.33 53.37 47.70 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 1,322.00 30.00 62.26 151.80 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 600.00 30.89 75.27 102.00 Weighted Average for the First Quarter 2,052.00 31.93 64.36 130.64 Weighted Average for the Year 2,052.00 31.93 64.36 130.64 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 630-00007 Traf Ctrl Inspection Day NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 80.00 250.00 409.41 325.00 STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 58.00 500.00 250.16 250.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 90.00 300.00 356.83 371.00 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 75.00 750.00 678.88 900.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 24.00 150.00 495.66 750.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 64.00 500.00 311.31 316.25 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 50.00 450.00 381.00 375.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 8.00 250.00 250.26 108.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 67.00 300.00 813.11 550.00 BR0761-249 I-76 02/27/25 64.00 300.00 514.83 380.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 37.00 500.00 586.37 600.00 MTCER500-233 REGION 5 03/06/25 28.00 150.00 358.33 250.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 55.00 600.00 221.89 219.40 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 2.00 400.00 190.33 178.00 Weighted Average for the First Quarter 702.00 410.47 444.88 430.25 Weighted Average for the Year 702.00 410.47 444.88 430.25 630-00012 Traf Ctrl Mgmt Day NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 155.00 1600.00 1727.88 1650.00 STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 116.00 1750.00 1450.28 1300.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 180.00 950.00 1334.49 1191.91 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 188.00 2500.00 2142.87 3000.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 60.00 2000.00 1522.25 1400.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 128.00 2000.00 1681.04 1644.50 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 138.00 2000.00 1618.00 1600.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 40.00 1800.00 1280.86 1188.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 140.00 1600.00 1359.47 1840.00 BR0761-249 I-76 02/27/25 125.00 1600.00 1156.60 450.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 630-00012 Traf Ctrl Mgmt Day STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 80.00 1800.00 1589.54 1200.00 MTCER500-233 REGION 5 03/06/25 66.00 1200.00 650.00 200.00 MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 10.00 1200.00 337.50 175.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 70.00 1600.00 1648.87 1377.50 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 10.00 1700.00 1143.33 1200.00 Weighted Average for the First Quarter 1,506.00 1729.22 1488.36 1514.70 Weighted Average for the Year 1,506.00 1729.22 1488.36 1514.70 630-00015 Uniformed Traf Ctrl Coordination Hour NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 60.00 60.00 31.23 47.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 10.00 30.98 58.33 151.80 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 100.00 22.00 42.53 27.00 MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 16.00 48.72 85.00 20.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 25.00 40.35 40.09 45.90 Weighted Average for the First Quarter 211.00 37.43 42.29 40.31 Weighted Average for the Year 211.00 37.43 42.29 40.31 630-80001 Flash Beacon (Port) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 20.00 893.71 1522.17 1802.00 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 4.00 1600.00 1492.61 2000.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 4.00 1600.00 971.67 1650.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 15.00 1000.00 1125.19 695.75 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 2.00 2200.00 647.50 675.00 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 10.00 800.00 478.33 445.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 55.00 1055.90 1254.57 1215.93 Weighted Average for the Year 55.00 1055.90 1254.57 1215.93 630-80002 Flash Beacon (Solar) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 10.00 2000.00 975.19 825.00 BR0761-249 I-76 02/27/25 2.00 670.20 1351.67 415.00 Weighted Average for the First Quarter 12.00 1778.37 1082.76 756.67 Weighted Average for the Year 12.00 1778.37 1082.76 756.67 630-80305 Flagging Station Light Each MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 2.00 919.18 300.00 500.00 Weighted Average for the First Quarter 2.00 919.18 300.00 500.00 Weighted Average for the Year 2.00 919.18 300.00 500.00 630-80335 Barricade (3 M-A) (Temp) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 12.00 250.00 175.03 175.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 16.00 173.97 377.67 371.00 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 4.00 200.00 236.08 500.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 25.00 114.02 305.12 398.48 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 6.00 150.00 197.83 54.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 12.00 160.00 137.82 89.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 630-80335 Barricade (3 M-A) (Temp) Each BR0761-249 I-76 02/27/25 6.00 121.81 288.50 138.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 6.00 120.23 192.27 155.00 Weighted Average for the First Quarter 87.00 157.54 270.19 266.07 Weighted Average for the Year 87.00 157.54 270.19 266.07 630-80336 Barricade (3 M-B) (Temp) Each STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 4.00 500.00 85.67 12.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 3.00 200.00 320.50 315.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 2.00 500.00 561.71 397.00 MTCER500-233 REGION 5 03/06/25 4.00 300.00 252.83 50.00 Weighted Average for the First Quarter 13.00 369.23 270.25 152.85 Weighted Average for the Year 13.00 369.23 270.25 152.85 630-80338 Barricade (3 M-D) (Temp) Each NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 15.00 518.00 240.00 225.00 Weighted Average for the First Quarter 15.00 518.00 240.00 225.00 Weighted Average for the Year 15.00 518.00 240.00 225.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 630-80340 Pedestrian Barricade (ADA) Lin Foot NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 100.00 42.99 23.56 59.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 100.00 100.00 28.33 37.00 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 20.00 100.00 48.00 45.00 Weighted Average for the First Quarter 220.00 74.09 27.95 47.73 Weighted Average for the Year 220.00 74.09 27.95 47.73 630-80341 Const Traf Sign (A) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 122.00 70.00 37.12 53.00 STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 28.00 130.00 72.02 75.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 111.00 49.40 107.78 100.70 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 30.00 100.00 46.23 5.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 87.00 140.00 33.74 2.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 10.00 47.64 73.72 94.88 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 14.00 85.00 84.00 80.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 16.00 65.00 59.27 27.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 281.00 65.00 57.54 61.50 BR0761-249 I-76 02/27/25 20.00 150.00 91.67 75.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 28.00 60.00 90.15 82.00 MTCER500-233 REGION 5 03/06/25 64.00 50.00 51.14 10.00 MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 16.00 49.66 3.00 5.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 63.00 49.73 75.41 40.80 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 35.00 96.00 45.33 42.00 Weighted Average for the First Quarter 925.00 74.58 64.81 52.33 Weighted Average for the Year 925.00 74.58 64.81 52.33 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid 630-80342 Const Traf Sign (B) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 118.00 85.00 52.73 76.50 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 107.00 66.01 161.60 116.60 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 106.00 110.00 46.23 5.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 22.00 150.00 33.74 2.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 56.00 63.59 139.22 94.88 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 80.00 120.00 101.70 100.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 16.00 75.00 82.83 38.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 74.00 80.00 2121.50 61.50 BR0761-249 I-76 02/27/25 78.00 80.00 140.43 315.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 10.00 70.00 96.93 88.00 MTCER500-233 REGION 5 03/06/25 8.00 60.00 90.63 10.00 MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 24.00 61.65 3.00 5.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 74.00 64.73 78.81 51.00 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 30.00 98.00 45.33 42.00 Weighted Average for the First Quarter 803.00 85.88 282.64 88.71 Weighted Average for the Year 803.00 85.88 282.64 88.71 630-80343 Const Traf Sign (C) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 10.00 76.93 191.87 127.20 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 6.00 73.52 175.88 107.53 MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 8.00 77.14 3.00 5.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 6.00 73.50 89.03 81.65 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 2.00 100.00 45.33 42.00 Weighted Average for the First Quarter 32.00 77.14 142.38 79.10 Weighted Average for the Year 32.00 77.14 142.38 79.10 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid 630-80344 Const Traf Sign (Spec) Sq Foot BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 300.00 80.00 25.55 28.46 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 40.00 30.00 31.64 30.00 Weighted Average for the First Quarter 340.00 74.12 26.27 28.64 Weighted Average for the Year 340.00 74.12 26.27 28.64 630-80348 Const Info Sign Each STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 4.00 118.28 86.02 75.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 2.00 500.00 127.00 125.00 Weighted Average for the First Quarter 6.00 245.52 91.14 91.67 Weighted Average for the Year 6.00 245.52 91.14 91.67 630-80350 Vert Panel Each STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 20.00 31.33 59.27 75.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 200.00 30.86 55.25 53.00 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 220.00 60.00 46.63 50.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 50.00 70.00 26.94 22.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 6.00 35.12 33.91 44.28 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 50.00 40.00 41.49 38.00 BR0761-249 I-76 02/27/25 30.00 70.00 65.75 42.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 15.00 60.00 270.04 44.00 MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 75.00 45.38 3.00 5.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 100.00 34.74 38.06 40.80 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid Weighted Average for the First Quarter 766.00 46.46 50.80 42.74 Weighted Average for the Year 766.00 46.46 50.80 42.74 630-80355 Port Mesg Panel Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 8.00 6000.00 6546.91 9420.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 4.00 5191.79 12713.33 13780.00 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 2.00 10000.00 7917.28 20000.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 4.00 150.00 5576.67 6500.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 4.00 5200.09 8645.00 13915.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 2.00 8000.00 13175.00 14000.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 2.00 6000.00 3453.93 1620.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 8.00 6000.00 8510.10 7500.00 BR0761-249 I-76 02/27/25 3.00 12000.00 8761.67 4000.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 2.00 10000.00 8015.40 4000.00 MTCER500-233 REGION 5 03/06/25 2.00 6000.00 5958.33 1000.00 MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 2.00 5105.07 1000.00 1000.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 4.00 5172.24 8948.34 7140.00 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 2.00 9600.00 2900.00 2500.00 Weighted Average for the First Quarter 49.00 6209.52 7913.62 8182.45 Weighted Average for the Year 49.00 6209.52 7913.62 8182.45 630-80356 Flash Arrow Panel (A Ty) Each SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 2.00 2000.00 1811.80 864.00 Weighted Average for the First Quarter 2.00 2000.00 1811.80 864.00 Weighted Average for the Year 2.00 2000.00 1811.80 864.00 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 630-80357 Flash Arrow Panel (B Ty) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 4.00 2000.00 2211.53 2060.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 2.00 1700.00 2508.00 2600.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 5.00 2500.00 2256.12 2800.00 MTCER500-233 REGION 5 03/06/25 2.00 5000.00 1016.83 1.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 2.00 1059.06 2684.93 1840.00 Weighted Average for the First Quarter 15.00 2401.21 2053.93 2074.80 Weighted Average for the Year 15.00 2401.21 2053.93 2074.80 630-80358 Flash Arrow Panel (C Ty) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 6.00 1240.26 2538.67 1272.00 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 2.00 3500.00 4460.37 10000.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 4.00 1189.59 2043.75 2530.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 2.00 2000.00 2848.00 2800.00 BR0761-249 I-76 02/27/25 2.00 1143.89 4313.33 1650.00 MTCER500-233 REGION 5 03/06/25 2.00 3000.00 1058.33 100.00 MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 2.00 1148.60 550.00 1000.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 4.00 1172.47 2684.93 1840.00 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 1.00 2700.00 312.67 278.00 Weighted Average for the First Quarter 25.00 1646.99 2567.93 2259.60 Weighted Average for the Year 25.00 1646.99 2567.93 2259.60 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid 630-80360 Drum Channel Dev Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 150.00 50.00 29.34 53.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 75.00 27.01 60.05 58.30 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 100.00 100.00 41.63 25.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 50.00 50.00 27.27 23.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 250.00 36.93 44.76 44.28 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 200.00 35.00 45.75 45.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 100.00 35.00 45.33 38.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 300.00 46.00 35.60 22.50 BR0761-249 I-76 02/27/25 50.00 33.94 74.92 45.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 10.00 35.00 58.21 50.00 MTCER500-233 REGION 5 03/06/25 58.00 30.00 22.31 1.00 MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 40.00 29.80 3.00 5.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 70.00 27.62 46.65 40.80 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 10.00 45.00 24.33 23.00 Weighted Average for the First Quarter 1,463.00 43.01 41.93 36.01 Weighted Average for the Year 1,463.00 43.01 41.93 36.01 630-80363 Drum Channel Dev (Light) (F) Each NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 50.00 120.00 41.63 25.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 50.00 40.21 54.88 56.93 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 20.00 45.00 61.00 60.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 50.00 75.00 35.47 24.65 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 4.00 100.00 98.60 115.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 10.00 35.41 60.48 45.90 Weighted Average for the First Quarter 184.00 72.90 46.62 40.48 Weighted Average for the Year 184.00 72.90 46.62 40.48 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 630-80364 Drum Channel Dev (Light) (SB) Each NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 50.00 120.00 41.63 25.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 20.00 45.00 61.00 60.00 MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 20.00 37.36 3.00 5.00 Weighted Average for the First Quarter 90.00 84.97 39.29 28.33 Weighted Average for the Year 90.00 84.97 39.29 28.33 630-80367 Port Traf Speed Monitor Each NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 2.00 9000.00 3333.26 10000.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 2.00 4000.00 5894.50 3000.00 Weighted Average for the First Quarter 4.00 6500.00 4065.04 6500.00 Weighted Average for the Year 4.00 6500.00 4065.04 6500.00 630-80370 Barrier (Temp) Lin Foot 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 3,520.00 45.00 61.42 49.52 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 1,000.00 100.00 230.06 60.00 BR0761-249 I-76 02/27/25 2,000.00 42.06 59.62 60.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 150.00 200.00 150.89 70.00 Weighted Average for the First Quarter 6,670.00 55.85 84.02 54.69 Weighted Average for the Year 6,670.00 55.85 84.02 54.69 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid 630-80380 Traffic Cone Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 400.00 15.00 15.22 17.65 STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 40.00 9.47 10.91 10.00 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 60.00 8.61 19.07 15.90 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 200.00 20.00 18.11 2.00 STM0132-025 CO13 MM 90.2, US40Z MM 0.65, 01/30/25 100.00 20.00 9.33 2.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 300.00 9.10 19.68 18.98 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 500.00 15.00 15.25 15.00 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 100.00 12.00 14.11 11.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 250.00 15.00 2252.80 11.50 BR0761-249 I-76 02/27/25 50.00 15.00 25.43 15.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 30.00 15.00 23.70 13.00 MTCER500-233 REGION 5 03/06/25 44.00 12.00 13.46 1.00 MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 350.00 8.69 5.00 5.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 633.00 9.40 25.48 15.30 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 50.00 18.00 8.83 8.00 Weighted Average for the First Quarter 3,107.00 12.78 232.96 12.62 Weighted Average for the Year 3,107.00 12.78 232.96 12.62 630-80393 Stackable Vertical Panels Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 200.00 40.00 27.37 49.45 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 12.00 45.00 48.25 50.00 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 20.00 18.00 16.33 15.00 Weighted Average for the First Quarter 232.00 38.36 27.14 46.51 Weighted Average for the Year 232.00 38.36 27.14 46.51 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 630-80440 Port Rumble Strips (Temp) Each STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 6.00 1700.00 1650.38 800.00 Weighted Average for the First Quarter 6.00 1700.00 1650.38 800.00 Weighted Average for the Year 6.00 1700.00 1650.38 800.00 630-80511 Mobile Pvmt Marking Zone Lump Sum NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 1.00 15000.00 6894.50 5000.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 1.00 7500.00 19266.04 8500.00 MTCER500-233 REGION 5 03/06/25 1.00 80000.00 66666.67 35000.00 Weighted Average for the First Quarter 3.00 34166.67 40904.43 16166.67 Weighted Average for the Year 3.00 34166.67 40904.43 16166.67 630-80520 Mobile Pvmt Mkg Zone Day MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 30.00 308.01 175.00 150.00 Weighted Average for the First Quarter 30.00 308.01 175.00 150.00 Weighted Average for the Year 30.00 308.01 175.00 150.00 630-85010 Impact Atten (Temp) Each 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 4.00 4765.33 10218.38 9510.28 Item Number/ Item Description/ Unit/ Project Number Project Location Date Let Quantity Engr. Est. Average Bid Awarded Bid 630-85010 Impact Atten (Temp) Each NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 4.00 10000.00 10007.00 10000.00 BR0761-249 I-76 02/27/25 2.00 24698.36 12950.00 25000.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 2.00 10000.00 7146.63 4000.00 Weighted Average for the First Quarter 12.00 10704.84 10280.53 11336.76 Weighted Average for the Year 12.00 10704.84 10280.53 11336.76 630-85020 Mobile Attenuator Each STRR200-288 CO 9B, US 24A, US 24G, CO 67C 01/16/25 1.00 65000.00 59162.50 65000.00 NHPP0403-069 US 40 MP 215.90 - 219.88 IN G 02/06/25 2.00 25000.00 45750.00 25000.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 2.00 26765.49 59409.74 21430.00 Weighted Average for the First Quarter 5.00 33706.20 56093.88 31572.00 Weighted Average for the Year 5.00 33706.20 56093.88 31572.00 630-85040 Impact Atten (T-M-A) (Temp) Each NHPP2873-206 US287:RESURFACING I-70 TO 92N 01/09/25 2.00 30000.00 112652.19 136875.00 BR0761-249 I-76 02/27/25 2.00 16665.05 31416.67 25000.00 MTCER500-233 REGION 5 03/06/25 2.00 14219.72 8166.67 2000.00 Weighted Average for the First Quarter 6.00 20294.92 38363.77 54625.00 Weighted Average for the Year 6.00 20294.92 38363.77 54625.00 Project Number Item Number/ Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid 630-85041 Mobile Attenuator Day 2670252-499 I-25:MOBILITY HUB (LONE TREE) 01/16/25 30.00 2000.00 1114.50 1007.00 NHPP0702-428 I-70 THROUGH GLENWOOD CANYON 01/30/25 500.00 875.00 346.60 300.00 BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 168.00 1100.00 676.41 917.13 SHE0881-032 FEDERAL BLVD SIGNALS 41st and 02/13/25 50.00 1200.00 708.13 378.00 MTCER200-296 REGION 2 VARIOUS HIGHWAYS AND 03/13/25 10.00 1200.00 150.00 100.00 Weighted Average for the First Quarter 758.00 995.12 473.07 467.27 Weighted Average for the Year 758.00 995.12 473.07 467.27 630-86810 Traffic Signal (Temp) Each NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 4.00 35000.00 48312.08 23000.00 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 1.00 30000.00 37433.43 25000.00 Weighted Average for the First Quarter 5.00 34000.00 46136.35 23400.00 Weighted Average for the Year 5.00 34000.00 46136.35 23400.00 632-00000 Night Work Lighting Lump Sum BRR100-400 VAR LOCATIONS R1 I25, I225 & 02/06/25 1.00 100000.00 67584.69 31625.00 NHPP0072-033 CO7 28TH ST TO CHERRYVALE RD 02/20/25 1.00 50000.00 109552.76 65000.00 MTCER500-233 REGION 5 03/06/25 1.00 15000.00 7016.67 100.00 NHPP085A-020 US85:I-76 TO 124TH AVENUE OVE 03/20/25 1.00 50000.00 36100.89 25500.00 NHPP2706-054 I-270/SAND CREEK DRIVE REPAIR 03/27/25 1.00 20000.00 14167.67 29503.00 Weighted Average for the First Quarter 5.00 47000.00 45072.77 30345.60 Item Number/ Project Number Item Description/ Project Location Date Let Unit/ Quantity Engr. Est. Average Bid Awarded Bid 641-10010 Weighted Average for the Year Initial Shotcrete Facing 5.00 Sq Foot 47000.00 45072.77 30345.60 STR141A-056 SH 141 MP 85.5 K-01-B BRIDGE 02/28/25 2,059.00 30.00 67.71 46.00 Weighted Average for the First Quarter 2,059.00 30.00 67.71 46.00 STR141A-056 641-11003 Weighted Average for Shotcrete (CL D) SH 141 MP 85.5 K-01-B the Year BRIDGE 02/28/25 2,059.00 Cubic Yard 50.80 30.00 1000.00 67.71 2512.16 46.00 1900.00 Weighted Average for the First Quarter 50.80 1000.00 2512.16 1900.00 Weighted Average for the Year 50.80 1000.00 2512.16 1900.00