Part 1 Colorado Department of Transporation 14:34 Wednesday, January 18, 2006 1 2005 Cost Data - Maintenance PROJECTS BID FROM 01/01/05 THROUGH 12/31/05 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 05010603 K.E.C.I. COLORADO, INC. CONTRACT REJ - NO REASON GIVEN MTCE 06-051 I-270 AT SH 2 AND VARIOUS LOCA 6 U 05010605 KOLBE STRIPING INC. 4 $675,847.00 125.33 MTCE 05-036 REGION 5, MAINTENANCE SECTION 5 M 05010606 COLORADO STRIJPE WRIGHT LTD 3 $255,630.00 95.23 MTCE 03-021 R3 REGION-WIDE STENCIL 3 M 05010607 KOLBE STRIPING INC. 3 $1,462,919.25 96.55 MTCE 01-044 R-1 WEST STRIPING 1 R 05010608 TRAFFIC CONTROL WEST, INC. 3 $228,140.00 104.45 MTCE 06-053 R-6 SIGN POST REPLACEMENT 6 U 05012004 UNITED RENTALS HIGHWAY TECHNOLOGIES 2 $636,392.80 109.33 MTCE 02-020 R-2 REGIONWIDE STRIPING 2 R 05012702 COLORADO STRIJPE WRIGHT LTD 2 $726,422.00 104.44 MTCE 03-022 R-3, REGION WIDE STRIPING 3 M 05020310 ASPHALT CONSTRUCTORS INC. 5 $386,281.05 122.79 MTCE 05-037 R-5 SIGN REPLACEMENT - EAST 5 M 05020311 ALERT TRAFFIC CONTROL, INC. 3 $387,637.50 124.83 MTCE 05-039 R-5, SIGN REPLACEMENT - WEST 5 M 05020312 ARROW ELECTRIC SERVICE, INC. 4 $136,651.10 98.94 MTCE 02-021 SH 50 & 96, VARIABLE MESSAGE S 2 P 05021710 KOLBE STRIPING INC. 2 $565,005.00 98.13 MTCE 06-055 R-6 STRIPING PROJECT 6 U 05021712 WARNING LITES & EQUIPMENT, INC. 2 $85,898.00 65.02 MTCE 03-023 GRAND JUNCTION OVERHEAD SIGNS 3 M 05022406 G.A. WESTERN CONSTRUCTION CO. 2 $143,560.50 97.92 MTCE 03-024 I-70 WB MP 128, STR F-08-BH 3 M 05022408 ARROW ELECTRIC SERVICE, INC. 4 $143,840.45 69.09 MTCE 02-019 R-2 VMS UPGRADES 2 R 05031002 UNITED RENTALS HIGHWAY TECHNOLOGIES 1 $762,237.50 112.00 MTCE 05-035R R-5, EPOXY EAST 5 M 05031003 UNITED RENTALS HIGHWAY TECHNOLOGIES 2 $524,042.61 105.17 MTCE 05-038 REGION 5, MAINTENANCE SECTION 5 M 05032404 WATERFORD CORPORATION 3 $42,696.10 84.90 MTCE 06-037 SH 93 - SNOW FENCE, MP 7.6 TO 6 U Colorado Department of Transporation 14:34 Wednesday, January 18, 2006 2 2005 Cost Data - Maintenance PROJECTS BID FROM 01/01/05 THROUGH 12/31/05 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 05033107 CRUZ CONSTRUCTION, INC. 4 $296,146.20 99.59 MTCE 05-040 R-5 GUARDRAIL UPGRADE 5 M 05040707 XKE CONTRACTORS INC 4 $84,192.50 80.02 MTCE 06-051 I-270 AT SH 2 6 U 05040709 K.E.C.I. COLORADO, INC. CONTRACT REJ - NO REASON GIVEN MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 6 U 05041404 K.E.C.I. COLORADO, INC. 5 $16,320.00 79.80 MTCE 06-056 SH 177 AT CHERRY HILLS FIRE ST 6 U 05042106 UNITED COMPANIES OF MESA COUNTY 2 $563,862.24 100.48 MTCE 05-041 US550 - MP 97.0 TO MP 103.57 5 M 05042107 K.E.C.I. COLORADO, INC. 4 $34,082.80 89.17 MTCE 01-050 I-70 WB AT MP 296.3, STR. F-18 1 U 05042802 UNITED RENTALS HIGHWAY TECHNOLOGIES 3 $1,859,404.45 95.21 MTCE 02-022 R-2 STRIPING, FY06 2 R 05051204 LAFARGE WEST, INC 1 $707,402.30 124.73 MTCE 06-059 C-470 VARIOUS LOCATIONS 6 U 05051205 ELECTRICAL EXCELLENCE ENTERPRISES 8 $129,084.98 77.97 MTCE 02-023 LAMAR FIBER OPTIC 2 P 05051206 UNITED RENTALS HIGHWAY TECHNOLOGIES 2 $162,121.90 99.89 MTCE 04-060 FY05 REGION 4 I-25 EPOXY 4 R 05051904 COLORADO STRIJPE WRIGHT LTD 2 $396,795.00 99.12 MTCE 03-026 R-3, REGION WIDE STRIPING 3 M 05051905 DKS ENTERPRISES INC. 3 $211,351.85 87.87 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 6 U 05060201 KOLBE STRIPING INC. 3 $1,655,671.50 91.54 MTCE 01-049 R-1 FY06 STRIPING EAST 1 R 05060203 UNITED RENTALS HIGHWAY TECHNOLOGIES 3 $486,207.50 127.07 MTCE 04-058 R-4 FY 06 STENCIL MARKING NW 4 R 05060903 UNITED RENTALS HIGHWAY TECHNOLOGIES 3 $408,152.00 100.76 MTCE 04-059 FY 06 R4 - SH 56, 60 & 66 SIGN 4 R 05060904 FRONT RANGE STRIPING 3 $278,572.85 111.58 MTCE 01-047 R-1, FY06, STENCIL MARKING 1 R 05063002 STURGEON ELECTRIC COMPANY, INC 5 $424,825.00 79.27 MTCE 01-051 R-1 HIGHWAY LIGHTING, PH 4 1 P Colorado Department of Transporation 14:34 Wednesday, January 18, 2006 3 2005 Cost Data - Maintenance PROJECTS BID FROM 01/01/05 THROUGH 12/31/05 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 05063004 ALERT TRAFFIC CONTROL, INC. 1 $737,605.00 118.78 MTCE 03-028 R-3 REGION WIDE SIGNING 3 M 05070703 JALISCO INTERNATIONAL, INC. 3 $593,940.00 90.93 MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 6 U 05070704 G.A. WESTERN CONSTRUCTION CO. 1 $613,627.00 107.03 MTCE 03-029 R-3, EXPANSION JOINT REPAIRS 3 M 05072101 POWER ELECTRIC COMPANY 4 $509,906.31 84.61 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 1 M 05072102 FLATIRON CONSTRUCTORS, INC. 5 $94,092.00 41.70 MTCE 06-060 SH 58@ WASHINGTON, STR. E-16-F 6 U 05072104 COLORADO SIGNAL COMPANY, INC. CONTRACT REJ - NO REASON GIVEN MTCE 01-045 R-1 REGION-WIDE SIGNING, FY06 1 R 05072805 TRAFFIC CONTROL WEST, INC. 4 $256,620.00 71.35 MTCE 06-061 R6 - SIGN POST REPLACEMENT 6 U 05072806 KOLBE STRIPING INC. 3 $785,904.00 103.00 MTCE 04-062 REGION 4 EPOXY EAST 4 R 05080405 KOLBE STRIPING INC. 3 $1,854,140.00 93.06 MTCE 06-062 REGION 6 STRIPING - FY 06 6 U 05081802 AGGREGATE INDUSTRIES - WCR, INC. 7 $584,583.35 80.19 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 6 U 05082505 UNITED RENTALS HIGHWAY TECHNOLOGIES 3 $986,550.27 117.69 MTCE 01-045 R-1 REGION-WIDE SIGNING, FY06 1 R 05082507 UNITED RENTALS HIGHWAY TECHNOLOGIES 3 $812,612.05 96.82 MTCE 04-064 FY 06 REGION 4 EPOXY WEST 4 R 05082509 TLM CONSTRUCTORS, INC. CONTRACT REJ - NO REASON GIVEN MTCE 04-061 CONCRETE SLABS ON I-25 4 U 05090101 ROCKY MOUNTAIN ENTERPRISES, INC. 3 $471,324.50 98.77 MTCE 04-063 FY06 R4 I-76 EAST SIGNS 4 R 05090102 COLORADO STRIJPE WRIGHT LTD 1 $670,678.50 83.27 MTCE 03-025 R-3 REGION WIDE STENCIL 3 M 05091502 UNITED RENTALS HIGHWAY TECHNOLOGIES 2 $694,717.25 76.66 MTCE 03-030 R-3 REGION WIDE STRIPING 3 M 05092201 TLM CONSTRUCTORS, INC. 4 $105,824.50 105.81 MTCE 01-052 I-70 AT MP 296, STR. F-18-F 1 U Colorado Department of Transporation 14:34 Wednesday, January 18, 2006 4 2005 Cost Data - Maintenance PROJECTS BID FROM 01/01/05 THROUGH 12/31/05 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 05092904 INTERFACE COMMUNICATIONS, COMPANY 5 $292,598.51 88.38 MTCE 06-063 SH 6, I-70 TO KALAMATH ST 6 U 05101302 CONCRETE WORKS OF COLORADO INC. 4 $668,823.97 92.51 MTCE 04-061R I-25 SLAB REPLACEMENT MM 244 - 4 U 05102001 CC ENTRPRS TRAFFIC CONTROL SPECIALISTS 4 $204,801.00 74.68 MTCE 03-031 R-3 FY06 SIGN REPLACEMENT (SHO 3 M 05102702 INTERFACE COMMUNICATIONS, COMPANY 5 $432,362.60 86.73 MTCE 01-046 I-70 & SH6 1 M 05111001 INTEGRATED ELECTRIC, INC. 3 $75,968.15 97.59 MTCE 02-027 LAMAR - RR FIBER OPTIC 2 U 05120101 ELECTRICAL EXCELLENCE ENTERPRISES 6 $504,936.35 74.54 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPTI 2 U ======= ================ ====== TOTALS 174 $26,829,009.24 96.38 Part 2 Colorado Department of Transporation 14:34 Wednesday, January 18, 2006 1 2005 Cost Data - Maintenance BRIDGE COST PER SQUARE FOOT (01/01/05 THROUGH 12/31/05) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ BRIDGE REPAIR 050224 MTCE 03-024 M I-70 WB MP 128, STR F-08-BH F-08-BH 3133.0000 33.5000 104955.5 $143,561 $1.37 WEIGHTED AVERAGE COST: NEW STRUCTURES 104955.5 $143,561 $1.37 Part 3 Colorado Department of Transporation 14:34 Wednesday, January 18, 2006 1 2005 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/05 THROUGH 12/31/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 201-00000 Clearing and Grubbing 1 Lump Sum 1,200.00 1,200.00 202-00010 Removal of Tree 2 Each 1,000.00 500.00 202-00090 Removal of Delineator 15 Each 196.00 13.07 202-00170 Grinding And Texturing Concrete Pavement 1,475 Sq Yard 23,592.18 15.99 202-00190 Removal of Concrete Median Cover Material 96 Sq Yard 1,344.00 14.00 202-00195 Removal of Median Cover 46 Sq Yard 1,973.40 42.90 202-00200 Removal of Sidewalk 350 Sq Yard 6,610.30 18.89 202-00203 Removal of Curb and Gutter 720 Lin Foot 6,369.50 8.85 202-00206 Removal of Concrete Curb Ramp 9 Sq Yard 572.40 63.60 202-00210 Removal of Concrete Pavement 2,511 Sq Yard 120,780.12 48.10 202-00220 Removal of Asphalt Mat 824 Sq Yard 22,593.10 27.42 202-00240 Removal of Asphalt Mat (Planing) 82,645 Sq Yard 285,057.00 3.45 202-00250 Removal of Pavement Marking 2,981,331 Sq Foot 860,477.75 0.29 202-00425 Removal of Bridge Railing 50 Lin Foot 1,750.00 35.00 202-00502 Removal of Portions of Present Structure 12 Cubic Yard 18,880.00 1,573.33 202-00503 Removal of Portions of Present Structure 203 Sq Yard 62,912.92 309.92 202-00504 Removal of Expansion Device 2,344 Lin Foot 188,645.80 80.48 202-00700 Removal of Light Standard 6 Each 1,370.00 228.33 202-00750 Removal of Luminaire 38 Each 4,225.98 111.21 202-00806 Removal of Walkway 550 Lin Foot 5,846.50 10.63 202-00810 Removal of Ground Sign 7,266 Each 232,730.42 32.03 202-00821 Removal of Sign Panel 3,818 Each 84,004.80 22.00 202-00823 Removal of Dynamic Message Sign 3 Each 4,050.00 1,350.00 202-00828 Removal of Traffic Signal Equipment 1 Lump Sum 1,800.00 1,800.00 202-00860 Removal of Pedestrian Push Button 2 Each 54.00 27.00 202-00900 Removal of Concrete Footing 6 Each 1,500.00 250.00 202-01030 Removal of Road Closure Gate 4 Each 748.00 187.00 202-01130 Removal of Guardrail Type 3 10,285 Lin Foot 23,266.00 2.26 202-01300 Removal of End Anchorage 51 Each 6,430.00 126.08 202-04005 Clean Valve Box 8 Each 875.00 109.38 202-05100 Sandblasting Reinforcing Steel 57 Sq Yard 3,491.46 61.25 203-00060 Embankment Material (Complete In Place) 3,900 Cubic Yard 52,086.00 13.36 203-01500 Blading 10 Hour 1,679.00 167.90 203-01597 Potholing 70 Hour 13,649.00 194.99 203-01620 Sweeping 30 Hour 3,750.00 125.00 203-01622 Sweeping (With Pickup Broom) 70 Hour 1,400.00 20.00 207-00205 Topsoil 854 Cubic Yard 8,234.50 9.64 208-00020 Silt Fence 420 Lin Foot 1,890.00 4.50 Colorado Department of Transporation 14:34 Wednesday, January 18, 2006 2 2005 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/05 THROUGH 12/31/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 208-00045 Concrete Washout Structure 18 Each 10,625.00 590.28 208-00050 Storm Drain Inlet Protection 53 Each 5,735.00 108.21 208-00205 Erosion Control Supervisor 144 Hour 9,105.00 63.23 210-00400 Reset Bridge Expansion Device 130 Lin Foot 13,000.00 100.00 210-00500 Rebuild Portions of Present Structure 7 Each 21,000.00 3,000.00 210-00750 Reset Light Standard 11 Each 3,480.00 316.36 210-00810 Reset Ground Sign 16 Each 3,528.00 220.50 210-00815 Reset Sign Panel 1,634 Each 31,489.00 19.27 210-00860 Reset Pedestrian Push Button 3 Each 270.00 90.00 210-00865 Reset Pedestrian Signal Head 3 Each 465.00 155.00 210-01130 Reset Guardrail Type 3 117 Lin Foot 4,329.00 37.00 210-01200 Reset End Anchorage 1 Each 770.00 770.00 210-04010 Adjust Manhole 12 Each 3,360.00 280.00 210-04050 Adjust Valve Box 13 Each 2,900.00 223.08 210-04200 Adjust Guardrail 3,100 Lin Foot 8,339.00 2.69 212-00006 Seeding (Native) 2 Acre 3,964.14 1,982.07 213-00002 Mulching (Weed Free Hay) 2 Acre 2,864.14 1,432.07 213-00061 Mulch Tackifier 220 Pound 605.00 2.75 304-02005 Aggregate Base Course (Class 2) 479 Cubic Yard 16,765.00 35.00 304-06000 Aggregate Base Course (Class 6) 243 Ton 2,527.20 10.40 304-06007 Aggregate Base Course (Class 6) 92 Cubic Yard 3,431.60 37.30 403-00720 Hot Bituminous Pavement (Patching) (Asphalt) 905 Ton 145,396.98 160.66 403-00721 Hot Bituminous Pavement (Patching) (Asphalt) 60 Sq Yard 4,140.00 69.00 403-33841 Hot Bituminous Pavement (Grading S) (100) (PG 64-22) 3,890 Ton 130,315.00 33.50 403-33871 Hot Bituminous Pavement (Grading S) (100) (PG 76-28) 3,890 Ton 162,407.50 41.75 403-34721 Hot Bituminous Pavement (Grading SX) (75) (PG 58-28) 12,438 Ton 540,804.24 43.48 403-34741 Hot Bituminous Pavement (Grading SX) (75) (PG 64-22) 7 Ton 714.00 102.00 403-34751 Hot Bituminous Pavement (Grading SX) (75) (PG 64-28) 78 Ton 12,324.00 158.00 403-34871 Hot Bituminous Pavement (Grading SX) (100) (PG 76-28) 215 Ton 20,210.00 94.00 409-05000 Ultrathin Bonded Wearing Course 50,466 Sq Yard 305,319.30 6.05 411-10255 Emulsified Asphalt (Slow-Setting) 14,655 Gallon 8,363.00 0.57 412-00600 Concrete Pavement (6 Inch) 32 Sq Yard 1,936.00 60.50 412-04000 Concrete Pavement Panel (Precast) 1,162 Sq Foot 32,524.80 27.99 420-00500 Geotextile (Paving) 32,145 Sq Yard 28,930.50 0.90 503-00018 Drilled Caisson (18 Inch) 12 Lin Foot 1,980.00 165.00 503-00036 Drilled Caisson (36 Inch) 136 Lin Foot 21,860.00 160.74 503-00042 Drilled Caisson (42 Inch) 150 Lin Foot 19,719.60 131.46 503-00048 Drilled Caisson (48 Inch) 135 Lin Foot 64,428.00 477.24 Colorado Department of Transporation 14:34 Wednesday, January 18, 2006 3 2005 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/05 THROUGH 12/31/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 503-00054 Drilled Caisson (54 Inch) 44 Lin Foot 47,329.92 1,075.68 513-00600 Bridge Drain 1 Each 6,469.00 6,469.00 514-00200 Pedestrian Railing (Steel) 10 Lin Foot 1,250.00 125.00 515-00400 Concrete Sealer 369 Sq Yard 7,359.92 19.95 515-00410 Concrete Sealer (Calcium Nitrite) 97 Sq Yard 6,380.32 65.78 518-00000 Bridge Compression Joint Sealer 300 Lin Foot 16,500.00 55.00 518-01004 Bridge Expansion Device (0-4 Inch) 549 Lin Foot 89,071.60 162.24 518-01015 Bridge Expansion Device (0-15 Inch) 37 Lin Foot 64,970.00 1,755.95 518-02100 Polymer Mortar End Dam 633 Cubic Foot 261,429.00 413.00 518-03100 Rapid Cure Silicone Joint Seal 1,260 Lin Foot 46,620.00 37.00 601-01050 Concrete Class B (Wall) 1 Cubic Yard 986.00 986.00 601-03040 Concrete Class D (Bridge) 10 Cubic Yard 9,665.00 966.50 601-03041 Concrete Class D (Bridge) (Special) 12 Cubic Yard 28,800.00 2,400.00 601-04000 Concrete Class E 299 Cubic Yard 204,654.03 684.46 601-06100 Concrete (Patching) 89 Cubic Yard 178,000.00 2,000.00 601-06150 Concrete (Patching) 2,133 Sq Foot 38,394.00 18.00 601-06400 Grout (Bridge)(Special) 4 Cubic Foot 3,983.00 995.75 601-10250 Slab Jacking 929 Pound 11,151.36 12.00 601-40301 Structural Concrete Coating 350 Sq Foot 350.00 1.00 602-00020 Reinforcing Steel (Epoxy Coated) 5,365 Pound 14,672.50 2.73 606-00301 Guardrail Type 3 (6-3 Post Spacing) 13,360 Lin Foot 211,163.70 15.81 606-01340 End Anchorage Type 3D 9 Each 11,477.75 1,275.31 606-01370 Transition Type 3G 1 Each 1,198.00 1,198.00 606-01460 Median Terminal 1 Each 4,382.00 4,382.00 606-02003 End Anchorage (Nonflared) 8 Each 16,580.00 2,072.50 606-02005 End Anchorage (Flared) 55 Each 73,187.00 1,330.67 606-10405 Bridge Rail Type 4 (Special) 50 Lin Foot 9,000.00 180.00 607-32000 Fence Picket Snow 12,238 Lin Foot 42,221.10 3.45 607-60620 Road Closure Gate 2 Each 17,284.00 8,642.00 608-00000 Concrete Sidewalk 226 Sq Yard 7,460.00 33.01 608-00006 Concrete Sidewalk (6 Inch) 10 Sq Yard 1,000.00 100.00 608-00010 Concrete Curb Ramp 259 Sq Yard 20,918.00 80.76 608-00015 Truncated Domes 40 Sq Foot 2,280.00 57.00 609-21010 Curb and Gutter Type 2 (Section I-B) 365 Lin Foot 6,679.50 18.30 609-21011 Curb and Gutter Type 2 (Section I-M) 45 Lin Foot 1,147.50 25.50 609-21020 Curb and Gutter Type 2 (Section II-B) 465 Lin Foot 10,717.00 23.05 610-00020 Median Cover Material (Patterned Concrete) 94 Sq Foot 1,410.00 15.00 610-00024 Median Cover Material (4 Inch Patterned Concrete) 415 Sq Foot 3,216.25 7.75 Colorado Department of Transporation 14:34 Wednesday, January 18, 2006 4 2005 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/05 THROUGH 12/31/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 610-00030 Median Cover Material (Concrete) 697 Sq Foot 4,391.10 6.30 610-00060 Median Cover Material (Brick Pavers) 50 Sq Foot 1,275.00 25.50 612-00001 Delineator (Type I) 15 Each 187.50 12.50 612-00002 Delineator (Type II) 10 Each 200.00 20.00 612-00003 Delineator (Type III) 5 Each 84.25 16.85 612-00270 Location Marker (Utility)(Flat Slat) 25 Each 1,000.00 40.00 612-15000 Install Marker 6 Each 126.00 21.00 613-00001 Directional Boring Conduit 27,738 Lin Foot 270,091.65 9.74 613-00200 2 Inch Electrical Conduit 250 Lin Foot 6,445.00 25.78 613-00201 2 Inch Electrical Conduit (Jacked) 5,750 Lin Foot 76,500.00 13.30 613-00301 3 Inch Electrical Conduit (Jacked) 1,600 Lin Foot 25,267.00 15.79 613-00401 4 Inch Electrical Conduit (Jacked) 1,200 Lin Foot 31,754.00 26.46 613-00405 4 Inch Electrical Conduit (Special) 190 Lin Foot 11,903.50 62.65 613-01200 2 Inch Electrical Conduit (Plastic) 9,782 Lin Foot 80,337.00 8.21 613-01300 3 Inch Electrical Conduit (Plastic) 8,020 Lin Foot 67,770.20 8.45 613-01400 4 Inch Electrical Conduit (Plastic) 1,270 Lin Foot 8,420.10 6.63 613-07000 Pull Box (Special) 64 Each 36,780.00 574.69 613-07026 Pull Box (16"x24"x12") 4 Each 1,144.00 286.00 613-07034 Pull Box (24"x36"x18") 42 Each 17,732.00 422.19 613-07038 Pull Box (36"x48"x18") 1 Each 738.00 738.00 613-07199 Pull Box (Install Only) 2 Each 620.00 310.00 613-10000 Wiring 5 Lump Sum 65,582.00 13,116.40 613-32400 Light Standard Steel (40 Foot) 20 Each 48,120.00 2,406.00 613-40010 Light Standard Foundation 20 Each 14,080.00 704.00 613-40020 Transformer Base Aluminum 20 Each 13,300.00 665.00 613-50010 Photoelectric Cell 500 Each 12,000.00 24.00 613-60000 Lamps 500 Each 37,500.00 75.00 613-70255 Fuses 100 Each 2,100.00 21.00 613-70260 Fuse Holder 100 Each 5,000.00 50.00 613-70400 Luminaire High Pressure Sodium (400 Watt) 56 Each 20,934.00 373.82 613-70401 Luminaire High Pressure Sodium (400 Watt) (Install On 2 Each 380.00 190.00 613-72150 Luminaire High Pressure Sodium (Wall Type) (150 Watt) 30 Each 10,650.00 355.00 614-00011 Sign Panel (Class I) 5,340 Sq Foot 66,944.30 12.54 614-00012 Sign Panel (Class II) 18,314 Sq Foot 272,034.38 14.85 614-00013 Sign Panel (Class III) 18,166 Sq Foot 363,217.50 19.99 614-00025 Sign Panel (Class I) (Install Only) 23,386 Sq Foot 89,552.76 3.83 614-00027 Sign Panel (Class II) (Install Only) 22,185 Sq Foot 116,411.51 5.25 614-00028 Sign Panel (Class III) (Install Only) 8,550 Sq Foot 67,704.00 7.92 Colorado Department of Transporation 14:34 Wednesday, January 18, 2006 5 2005 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/05 THROUGH 12/31/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-00200 Steel Sign Post (U-2) 9 Lin Foot 178.50 19.83 614-00612 Steel Sign Post (W 6x12) 89 Lin Foot 2,492.00 28.00 614-00615 Steel Sign Post (W 6x15) 265 Lin Foot 8,824.25 33.30 614-00818 Steel Sign Post (W 8x18) 323 Lin Foot 13,800.00 42.72 614-00821 Steel Sign Post (W 8x21) 38 Lin Foot 1,824.00 48.00 614-01022 Steel Sign Post (W 10x22) 197 Lin Foot 10,244.00 52.00 614-01026 Steel Sign Post (W 10x26) 219 Lin Foot 12,702.00 58.00 614-01226 Steel Sign Post (W 12x26) 140 Lin Foot 8,400.00 60.00 614-01502 Steel Sign Support (2-Inch Round)(Post & Socket) 16,940 Lin Foot 219,607.80 12.96 614-01512 Steel Sign Support (2-Inch Round)(Post) 11,041 Lin Foot 162,045.00 14.68 614-01522 Steel Sign Support (2-Inch Round)(Socket) 1,446 Each 94,477.00 65.34 614-01552 Steel Sign Post (2.5 Inch Round) (Slipbase) 12,566 Lin Foot 268,890.00 21.40 614-01582 Steel Sign Support (2-1/2 Inch Round)(Post and Slipba 8,118 Lin Foot 196,735.50 24.23 614-01583 Steel Sign Support (2-1/2 Inch Round)(Post & Slipbase 2 Each 1,711.44 855.72 614-01585 Steel Sign Support (2-1/2 Inch Round Sch 80)(Post) 34,789 Lin Foot 774,342.00 22.26 614-01588 Steel Sign Support (2-1/2 Inch Round Sch 80)(Slipbase 3,984 Each 522,220.00 131.08 614-03001 Concrete Footing (Type 1) 6 Each 4,800.00 800.00 614-03002 Concrete Footing (Type 2) 16 Each 13,910.92 869.43 614-03003 Concrete Footing (Type 3) 20 Each 20,648.00 1,032.40 614-03004 Concrete Footing (Type 4) 2 Each 2,000.00 1,000.00 614-03005 Concrete Footing (Type 5) 10 Each 11,000.00 1,100.00 614-03006 Concrete Footing (Type 6) 10 Each 15,000.00 1,500.00 614-03007 Concrete Footing (Type 7) 6 Each 9,600.00 1,600.00 614-10030 Paint Overhead Sign Structure 3 Each 35,634.00 11,878.00 614-10123 Variable Message Sign (Install Only) 5 Each 12,815.00 2,563.00 614-10128 Blankout Sign (Fiber Optic) 8 Each 76,832.00 9,604.00 614-10147 Variable Message Sign LED (Overhead) 2 Each 256,167.00 128,083.50 614-10245 Lane Use Control Signal LED (Single Faced) 2 Each 23,906.00 11,953.00 614-10246 Lane Use Control Signal LED (Single Faced) (Install O 4 Each 3,768.00 942.00 614-10355 LUS Mounting Support and Wiring (Single Faced) 2 Each 549.00 274.50 614-21275 VMS Support (Ground Mounted) (12.75 Inch Diameter) 5 Each 85,895.00 17,179.00 614-32400 Monotube Overhead Sign Cantilever (24 Inch Diameter) 4 Each 50,860.00 12,715.00 614-32900 Monotube Overhead Sign Cantilever (Install Only) 2 Each 9,400.00 4,700.00 614-41800 Monotube Overhead Sign Bridge (18 Inch Diameter) 1 Each 50,011.00 50,011.00 614-70117 Pedestrian Signal Face (16) 12 Each 6,682.00 556.83 614-70336 Traffic Signal Face (12-12-12) 15 Each 10,380.00 692.00 614-70337 Traffic Signal Face (12-12-12) (Install Only) 12 Each 2,340.00 195.00 614-72860 Pedestrian Push Button 18 Each 1,846.00 102.56 Colorado Department of Transporation 14:34 Wednesday, January 18, 2006 6 2005 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/05 THROUGH 12/31/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-72861 Pedestrian Push Button (Install Only) 8 Each 400.00 50.00 614-72875 Loop Detector Wire 1,450 Lin Foot 4,843.75 3.34 614-72876 Traffic Signal Vehicle Detector Amplifier (Loop Type) 2 Each 1,664.00 832.00 614-72886 Intersection Detection System (Camera) 2 Each 10,376.00 5,188.00 614-72896 Intersection Detection System (Camera)(Install Only) 2 Each 1,680.00 840.00 614-75216 Pedestrian Signal Face (16) (Install Only) 8 Each 1,440.00 180.00 614-80000 Flashing Beacon 13 Each 25,950.00 1,996.15 614-81120 Traffic Signal-Light Pole Steel (1-20 Foot Mast Arm) 1 Each 16,322.00 16,322.00 614-81130 Traffic Signal-Light Pole Steel (1-30 Foot Mast Arm) 1 Each 17,482.00 17,482.00 614-81135 Traffic Signal-Light Pole Steel (1-35 Foot Mast Arm) 1 Each 18,459.00 18,459.00 614-81140 Traffic Signal-Light Pole Steel (1-40 Foot Mast Arm) 1 Each 19,567.00 19,567.00 614-82011 Traffic Signal Pole Steel (1 Mast Arm) (Install Only) 4 Each 8,400.00 2,100.00 614-84000 Traffic Signal Pedestal Pole Steel 3 Each 3,246.00 1,082.00 614-86106 Telemetry (Field)(Install Only) 1 Each 310.00 310.00 614-86245 Controller (Type 170E) 2 Each 34,210.00 17,105.00 614-86600 Traffic Signal Controller (Master) (Install Only) 1 Each 1,500.00 1,500.00 614-86705 Traffic Signal Equipment (Install Only) 40 Hour 2,800.00 70.00 614-87010 Fiber Optic Cable (Single Mode) (12 Fiber) 10,000 Lin Foot 16,000.00 1.60 614-87350 Test Fiber Optic Cable 3 Lump Sum 9,833.00 3,277.67 614-87401 Fiber Optic Cable (Special) 43,635 Lin Foot 46,865.05 1.07 614-87407 Fiber Optic Cable (Multi Mode) (6 Strands) 100 Lin Foot 1,785.00 17.85 614-87413 Fiber Optic Cable (Multi Mode) (12 Strands) 100 Lin Foot 1,507.00 15.07 614-87524 Splice Fiber Optic Cable (24 Strand) 10 Each 8,850.00 885.00 614-87624 Terminate Fiber Optic Cable (24 Strand) 5 Each 3,500.00 700.00 620-00011 Field Laboratory (Class 1) 1 Each 4,490.00 4,490.00 620-00020 Sanitary Facility 2 Each 580.00 290.00 625-00000 Construction Surveying 2 Lump Sum 3,656.00 1,828.00 625-00001 Construction Surveying (Hourly) 20 Hour 2,200.00 110.00 626-00000 Mobilization 40 Lump Sum 901,647.00 22,541.18 627-00003 Thermoplastic Pavement Marking (Inlaid) 32,266 Sq Foot 282,966.10 8.77 627-00005 Epoxy Pavement Marking 194,098 Gallon 7,759,496.20 39.98 627-00007 Epoxy Pavement Marking (Special) 9,172 Gallon 376,052.00 41.00 627-00011 Pavement Marking Paint (Waterborne) 10 Gallon 3,500.00 350.00 627-00012 Pavement Marking Paint (Low VOC Solvent Base) 185 Gallon 37,650.00 203.51 627-00025 4 Inch Pavement Marking Tape (Removable) 500 Lin Foot 4,475.00 8.95 627-00032 Raised Flexible Pavement Marker (Temporary) 100 Each 1,040.00 10.40 627-01001 Preformed Plastic Pavement Marking (Type I) 41,622 Sq Foot 415,088.90 9.97 627-01003 Preformed Plastic Pavement Marking (Type A) (Inlaid) 128,378 Sq Foot 1,125,040.66 8.76 Colorado Department of Transporation 14:34 Wednesday, January 18, 2006 7 2005 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/05 THROUGH 12/31/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 627-01010 Preformed Plastic Pavement Marking (Type I)(Inlaid) 66,633 Sq Foot 766,330.00 11.50 627-03000 Preformed Plastic Pavement Marking (Type C) 45,506 Sq Foot 387,762.40 8.52 627-03003 Preformed Plastic Pavement Marking (Type C) (Inlaid) 126,097 Sq Foot 1,025,173.15 8.13 627-30210 Thermoplastic Pavement Marking (Xwalk-Stopline) 39,360 Sq Foot 171,216.00 4.35 627-30325 Preformed Plastic Pavement Marking (Type B) (Word-Sym 717 Sq Foot 13,228.65 18.45 627-30326 Preformed Plastic Pavement Marking (Word - Symbol) (T 132 Sq Foot 1,260.60 9.55 627-30330 Preformed Plastic Pavement Marking (Type B) (Xwalk-St 552 Sq Foot 10,184.40 18.45 627-30331 Preformed Plastic Pavement Marking (Xwalk - Stop Line 2,030 Sq Foot 19,492.00 9.60 627-30405 Preformed Thermoplastic Pavement Marking (Word-Symbol 53,086 Sq Foot 519,882.85 9.79 627-30410 Preformed Thermoplastic Pavement Marking (Xwalk-Stop 96,426 Sq Foot 865,548.80 8.98 630-00000 Flagging 10,152 Hour 220,534.80 21.72 630-00001 Pilot Car Operation 120 Hour 4,320.00 36.00 630-00003 Uniformed Traffic Control 1,000 Hour 65,000.00 65.00 630-00004 Traffic Control Vehicle 3 Each 7,025.00 2,341.67 630-00007 Traffic Control Inspection 273 Day 22,996.10 84.23 630-00009 Traffic Control Vehicle (Truck) 2 Each 17,785.00 8,892.50 630-00012 Traffic Control Management 1,791 Day 739,010.00 412.62 630-00013 Traffic Control Management includes Flagging 40 Day 22,800.00 570.00 630-00015 Uniformed Traffic Control Coordination 40 Hour 2,704.00 67.60 630-10005 Traffic Control 1 Lump Sum 39,000.00 39,000.00 630-80001 Flashing Beacon (Portable) 6 Each 1,800.00 300.00 630-80305 Flagging Station Light 1 Each 400.00 400.00 630-80336 Barricade (Type 3 M-B) (Temporary) 6 Each 2,050.00 341.67 630-80341 Construction Traffic Sign (Panel Size A) 143 Each 6,548.00 45.79 630-80342 Construction Traffic Sign (Panel Size B) 840 Each 45,719.90 54.43 630-80343 Construction Traffic Sign (Panel Size C) 156 Each 10,082.59 64.63 630-80344 Construction Traffic Sign (Special) 903 Sq Foot 15,296.60 16.94 630-80351 Vertical Panel (Plastic) 10 Each 70.00 7.00 630-80355 Portable Message Sign Panel 12 Each 102,600.00 8,550.00 630-80357 Advance Warning Flashing or Sequencing Arrow Panel (B 5 Each 2,183.00 436.60 630-80358 Advance Warning Flashing or Sequencing Arrow Panel (C 49 Each 48,671.00 993.29 630-80359 Portable Message Sign Panel 128 Day 15,379.00 120.15 630-80360 Drum Channelizing Device 800 Each 24,975.00 31.22 630-80363 Drum Channelizing Device (With Light) (Flashing) 11 Each 400.00 36.36 630-80364 Drum Channelizing Device (With Light) (Steady Burn) 156 Each 6,850.00 43.91 630-80370 Concrete Barrier (Temporary) 450 Lin Foot 11,265.00 25.03 630-80380 Traffic Cone 4,530 Each 45,006.00 9.94 630-80510 Mobile Pavement Marking Zone 4 Lump Sum 61,000.00 15,250.00 Colorado Department of Transporation 14:34 Wednesday, January 18, 2006 8 2005 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/05 THROUGH 12/31/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 630-80520 Mobile Pavement Marking Zone 361 Day 163,610.00 453.21 630-85006 Impact Attenuator (Sand Filled Plastic Barrel) (Tempo 2 Each 2,260.00 1,130.00 630-85040 Impact Attenuator (Truck Mounted Attenuator) (Tempora 12 Each 129,586.00 10,798.83 Part 4 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 1 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00000 Clear and Grub LUMP SUM =============================================== MTCE 06-051 I-270 AT SH 2 04/07/05 1.00 2500.00 3675.00 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2500.00 3675.00 1200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2500.00 3675.00 1200.00 =============== 202-00010 Rem Tree Each =================================================== MTCE 06-051 I-270 AT SH 2 04/07/05 2.00 270.00 491.50 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 270.00 491.50 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 270.00 491.50 500.00 =============== 202-00090 Rem Delineator Each =================================================== MTCE 02-021 SH 50 & 96, VARIABLE MESSAGE 02/03/05 5.00 12.00 17.80 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 12.00 17.80 10.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 10.00 6.00 11.06 14.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 6.00 11.06 14.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 8.00 12.56 13.07 =============== 202-00170 Grinding And Texturing Conc Pvmt Sq Yard ================================================ MTCE 04-061R I-25 SLAB REPLACEMENT MM 244 10/13/05 1,474.51 13.00 14.75 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,474.51 13.00 14.75 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,474.51 13.00 14.75 16.00 =============== 202-00190 Rem of Conc Median Cover Matl Sq Yard ================================================ MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 96.00 12.00 20.03 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 96.00 12.00 20.03 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 96.00 12.00 20.03 14.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 2 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00195 Rem of Median Cover Sq Yard ================================================ MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 46.00 10.85 186.63 42.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 46.00 10.85 186.63 42.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 46.00 10.85 186.63 42.90 =============== 202-00200 Rem Sidewalk Sq Yard ================================================ MTCE 02-019 R-2 VMS UPGRADES 02/24/05 30.00 15.00 30.87 68.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 15.00 30.87 68.00 MTCE 06-056 SH 177 AT CHERRY HILLS FIRE S 04/14/05 10.00 40.00 104.25 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 40.00 104.25 75.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 222.00 20.00 14.61 12.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 222.00 20.00 14.61 12.65 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 88.00 38.00 17.40 11.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 88.00 38.00 17.40 11.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 350.00 24.67 18.12 18.89 =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 640.00 7.00 9.21 7.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 640.00 7.00 9.21 7.15 MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 25.00 20.00 13.58 15.75 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 3 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 55.00 15.50 18.79 25.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 80.00 16.91 17.82 22.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 720.00 8.10 9.92 8.85 =============== 202-00206 Rem Conc Curb Ramp Sq Yard ================================================ MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 9.00 25.00 37.04 63.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 25.00 37.04 63.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 25.00 37.04 63.60 =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ MTCE 04-061R I-25 SLAB REPLACEMENT MM 244 10/13/05 2,477.81 22.00 56.75 47.00 MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 33.00 35.00 74.33 131.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,510.81 22.17 56.92 48.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,510.81 22.17 56.92 48.10 =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 336.00 15.00 16.97 23.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 336.00 15.00 16.97 23.40 MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 355.00 30.00 40.67 30.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 121.00 10.00 23.66 24.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 476.00 24.92 33.13 28.65 MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 6.00 50.00 67.00 131.00 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 6.00 60.00 46.85 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 55.00 53.57 91.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 824.00 21.31 28.03 27.42 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 4 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ MTCE 03-024 I-70 WB MP 128, STR F-08-BH 02/24/05 34.00 85.00 159.50 192.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 34.00 85.00 159.50 192.00 MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 50,466.00 1.60 4.50 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50,466.00 1.60 4.50 4.50 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 32,145.00 2.50 2.56 1.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 32,145.00 2.50 2.56 1.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 82,645.00 1.98 2.95 3.45 =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ MTCE 03-021 R3 REGION-WIDE STENCIL 01/06/05 21,500.00 0.50 0.87 0.95 MTCE 01-044 R-1 WEST STRIPING 01/06/05 350,000.00 0.30 0.38 0.20 MTCE 03-022 R-3, REGION WIDE STRIPING 01/27/05 494,840.00 0.35 0.40 0.30 MTCE 06-055 R-6 STRIPING PROJECT 02/17/05 150,000.00 0.50 0.55 0.35 MTCE 05-038 REGION 5, MAINTENANCE SECTION 03/10/05 600.00 2.00 2.25 3.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,016,940.00 0.36 0.42 0.29 MTCE 02-022 R-2 STRIPING, FY06 04/28/05 306,043.00 0.40 0.32 0.25 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 15,010.00 2.50 1.71 1.72 MTCE 01-049 R-1 FY06 STRIPING EAST 06/02/05 272,790.00 0.39 0.46 0.35 MTCE 01-047 R-1, FY06, STENCIL MARKING 06/09/05 5,000.00 0.80 3.12 1.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 598,843.00 0.45 0.44 0.35 MTCE 06-062 REGION 6 STRIPING - FY 06 08/04/05 800,000.00 0.60 0.37 0.25 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 5 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ MTCE 04-064 FY 06 REGION 4 EPOXY WEST 08/25/05 10,453.00 1.80 0.65 0.75 MTCE 03-025 R-3 REGION WIDE STENCIL 09/01/05 1,156.00 2.50 2.00 2.00 MTCE 03-030 R-3 REGION WIDE STRIPING 09/15/05 442,341.00 0.50 0.34 0.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,253,950.00 0.58 0.37 0.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,869,733.00 0.47 0.40 0.29 =============== 202-00425 Rem Bridge Railing Lin Foot =============================================== MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 50.00 100.00 50.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 100.00 50.00 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 100.00 50.00 35.00 =============== 202-00502 Rem Port Present Str Cubic Yard ============================================= MTCE 01-050 I-70 WB AT MP 296.3, STR. F-1 04/21/05 2.40 200.00 1325.00 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.40 200.00 1325.00 1200.00 MTCE 01-052 I-70 AT MP 296, STR. F-18-F 09/22/05 10.00 800.00 1627.50 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 800.00 1627.50 1600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.40 683.87 1568.95 1522.58 =============== 202-00503 Rem Port Present Str Sq Yard ================================================ MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 28.00 200.00 1213.54 1040.64 MTCE 06-060 SH 58@ WASHINGTON, STR. E-16- 07/21/05 175.00 200.00 351.69 193.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 203.00 200.00 449.49 309.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 203.00 200.00 449.49 309.92 =============== 202-00504 Rem Exp Device Lin Foot =============================================== MTCE 03-024 I-70 WB MP 128, STR F-08-BH 02/24/05 36.50 550.00 779.00 538.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.50 550.00 779.00 538.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 6 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00504 Rem Exp Device Lin Foot =============================================== MTCE 01-050 I-70 WB AT MP 296.3, STR. F-1 04/21/05 46.80 140.00 80.25 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 46.80 140.00 80.25 41.00 MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 918.00 100.00 360.00 80.00 MTCE 03-029 R-3, EXPANSION JOINT REPAIRS 07/07/05 1,202.00 67.00 75.00 75.00 MTCE 01-052 I-70 AT MP 296, STR. F-18-F 09/22/05 140.00 70.00 38.25 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,260.00 80.59 244.24 73.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,343.30 89.09 245.99 80.50 =============== 202-00700 Rem Light Standard Each =================================================== MTCE 01-051 R-1 HIGHWAY LIGHTING, PH 4 06/30/05 5.00 500.00 461.21 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 500.00 461.21 190.00 MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 1.00 365.00 290.00 420.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 365.00 290.00 420.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 477.50 442.86 228.33 =============== 202-00750 Rem Luminaire Each =================================================== MTCE 06-063 SH 6, I-70 TO KALAMATH ST 09/29/05 38.00 100.00 208.24 111.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 38.00 100.00 208.24 111.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38.00 100.00 208.24 111.21 =============== 202-00806 Rem Walkway Lin Foot =============================================== MTCE 06-063 SH 6, I-70 TO KALAMATH ST 09/29/05 550.00 18.00 21.98 10.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 550.00 18.00 21.98 10.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 550.00 18.00 21.98 10.63 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 7 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00810 Rem Ground Sign Each =================================================== MTCE 06-053 R-6 SIGN POST REPLACEMENT 01/06/05 800.00 20.00 22.00 20.00 MTCE 05-037 R-5 SIGN REPLACEMENT - EAST 02/03/05 750.00 6.00 18.40 15.00 MTCE 05-039 R-5, SIGN REPLACEMENT - WEST 02/03/05 450.00 8.00 21.33 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,000.00 12.05 20.08 16.33 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 3.00 60.00 124.87 119.60 MTCE 04-059 FY 06 R4 - SH 56, 60 & 66 SIG 06/09/05 422.00 26.00 94.33 38.00 MTCE 03-028 R-3 REGION WIDE SIGNING 06/30/05 1,497.00 18.00 16.00 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,922.00 19.82 52.13 20.99 MTCE 06-061 R6 - SIGN POST REPLACEMENT 07/28/05 800.00 20.00 44.00 20.00 MTCE 01-045 R-1 REGION-WIDE SIGNING, FY06 08/25/05 1,850.00 45.00 51.00 68.00 MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 166.00 38.00 41.67 40.00 MTCE 06-063 SH 6, I-70 TO KALAMATH ST 09/29/05 2.00 800.00 401.26 206.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,818.00 38.03 48.46 52.82 MTCE 03-031 R-3 FY06 SIGN REPLACEMENT (SH 10/20/05 519.00 30.00 65.00 20.00 MTCE 01-046 I-70 & SH6 10/27/05 4.00 50.00 297.25 54.00 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 3.00 220.00 107.61 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 526.00 31.24 67.56 20.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,266.00 25.57 40.96 32.03 =============== 202-00821 Rem Sign Panel Each =================================================== MTCE 05-037 R-5 SIGN REPLACEMENT - EAST 02/03/05 50.00 10.00 22.20 17.00 MTCE 05-039 R-5, SIGN REPLACEMENT - WEST 02/03/05 175.00 8.00 19.00 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 225.00 8.44 20.03 10.78 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 1.00 100.00 134.33 63.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 8 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00821 Rem Sign Panel Each =================================================== MTCE 04-059 FY 06 R4 - SH 56, 60 & 66 SIG 06/09/05 547.00 22.00 49.67 25.00 MTCE 03-028 R-3 REGION WIDE SIGNING 06/30/05 1,996.00 9.50 12.00 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,544.00 12.22 29.08 14.82 MTCE 01-045 R-1 REGION-WIDE SIGNING, FY06 08/25/05 96.00 30.00 55.00 50.00 MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 457.00 28.00 35.67 50.00 MTCE 06-063 SH 6, I-70 TO KALAMATH ST 09/29/05 60.00 400.00 266.65 208.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 613.00 64.72 73.88 65.49 MTCE 03-031 R-3 FY06 SIGN REPLACEMENT (SH 10/20/05 430.00 18.00 38.25 8.00 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 6.00 60.00 93.20 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 436.00 18.58 39.38 8.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,818.00 21.16 41.24 22.00 =============== 202-00823 Rem Dynamic Message Sign Each =================================================== MTCE 02-019 R-2 VMS UPGRADES 02/24/05 3.00 3600.00 3173.19 1350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 3600.00 3173.19 1350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 3600.00 3173.19 1350.00 =============== 202-00828 Rem Traf Sig Equipment LUMP SUM =============================================== MTCE 02-019 R-2 VMS UPGRADES 02/24/05 1.00 7000.00 5206.36 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 7000.00 5206.36 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 7000.00 5206.36 1800.00 =============== 202-00860 Rem Ped Push Button Each =================================================== MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 2.00 50.00 84.42 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 50.00 84.42 27.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 50.00 84.42 27.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 9 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00900 Rem Conc Footing Each =================================================== MTCE 02-019 R-2 VMS UPGRADES 02/24/05 6.00 400.00 726.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 400.00 726.00 250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 400.00 726.00 250.00 =============== 202-01030 Rem of Road Closure Gate Each =================================================== MTCE 01-046 I-70 & SH6 10/27/05 4.00 575.00 400.20 187.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 575.00 400.20 187.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 575.00 400.20 187.00 =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== MTCE 05-040 R-5 GUARDRAIL UPGRADE 03/31/05 8,925.00 2.50 2.56 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,925.00 2.50 2.56 2.00 MTCE 06-051 I-270 AT SH 2 04/07/05 560.00 6.00 3.88 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 560.00 6.00 3.88 3.00 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 800.00 5.00 4.89 4.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 800.00 5.00 4.89 4.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,285.00 2.89 2.82 2.26 =============== 202-01300 Rem End Anchorage Each =================================================== MTCE 05-040 R-5 GUARDRAIL UPGRADE 03/31/05 47.00 120.00 134.50 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 47.00 120.00 134.50 110.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 10 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01300 Rem End Anchorage Each =================================================== MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 4.00 200.00 312.95 315.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 200.00 312.95 315.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 51.00 126.27 148.50 126.08 =============== 202-04005 Clean Valve Box Each =================================================== MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 3.00 200.00 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 200.00 100.00 100.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 5.00 200.00 181.23 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 200.00 181.23 115.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 200.00 174.82 109.38 =============== 202-05100 Sandblasting Reinf Steel Sq Yard ================================================ MTCE 01-050 I-70 WB AT MP 296.3, STR. F-1 04/21/05 10.50 65.00 34.25 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.50 65.00 34.25 40.00 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 14.00 15.00 187.08 163.14 MTCE 01-052 I-70 AT MP 296, STR. F-18-F 09/22/05 31.50 35.00 43.25 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 45.50 28.85 87.50 67.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56.00 35.63 77.52 62.35 =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= MTCE 06-051 I-270 AT SH 2 04/07/05 3,570.00 13.50 16.45 13.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 11 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 330.00 40.00 37.57 17.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,900.00 15.74 17.82 13.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,900.00 15.74 17.82 13.36 =============== 203-01500 Blading Hour =================================================== MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 10.00 100.00 186.23 167.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 100.00 186.23 167.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 100.00 186.23 167.90 =============== 203-01597 Potholing Hour =================================================== MTCE 03-023 GRAND JUNCTION OVERHEAD SIGNS 02/17/05 10.00 170.00 180.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 170.00 180.00 200.00 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 20.00 225.00 173.50 140.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 225.00 173.50 140.50 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 10.00 150.00 256.98 522.90 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 20.00 150.00 190.20 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 150.00 205.04 260.97 MTCE 01-046 I-70 & SH6 10/27/05 10.00 200.00 251.02 101.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 200.00 251.02 101.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70.00 181.43 204.74 194.99 =============== 203-01620 Sweeping Hour =================================================== MTCE 03-030 R-3 REGION WIDE STRIPING 09/15/05 30.00 75.00 87.50 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 75.00 87.50 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 75.00 87.50 125.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 12 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01622 Sweeping (With Pickup Broom) Hour =================================================== MTCE 04-064 FY 06 REGION 4 EPOXY WEST 08/25/05 70.00 100.00 68.33 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 70.00 100.00 68.33 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70.00 100.00 68.33 20.00 =============== 207-00205 Topsoil Cubic Yard ============================================= MTCE 02-021 SH 50 & 96, VARIABLE MESSAGE 02/03/05 209.00 18.00 26.66 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 209.00 18.00 26.66 20.00 MTCE 06-051 I-270 AT SH 2 04/07/05 585.00 12.00 22.06 6.50 MTCE 02-023 LAMAR FIBER OPTIC 05/12/05 60.00 8.00 40.89 4.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 645.00 11.63 25.26 6.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 854.00 13.19 25.58 9.64 =============== 208-00020 Silt Fence Lin Foot =============================================== MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 420.00 3.00 2.67 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 420.00 3.00 2.67 4.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 420.00 3.00 2.67 4.50 =============== 208-00045 Conc Washout Str Each =================================================== MTCE 03-024 I-70 WB MP 128, STR F-08-BH 02/24/05 1.00 490.00 886.50 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 490.00 886.50 175.00 MTCE 01-050 I-70 WB AT MP 296.3, STR. F-1 04/21/05 1.00 600.00 964.50 1100.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 13 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00045 Conc Washout Str Each =================================================== MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 1.00 750.00 300.00 300.00 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 1.00 750.00 1136.67 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 700.00 946.00 833.33 MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 6.00 1000.00 671.67 1000.00 MTCE 03-029 R-3, EXPANSION JOINT REPAIRS 07/07/05 2.00 200.00 150.00 150.00 MTCE 06-060 SH 58@ WASHINGTON, STR. E-16- 07/21/05 1.00 1000.00 1143.68 50.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 4.00 750.00 471.36 150.00 MTCE 01-052 I-70 AT MP 296, STR. F-18-F 09/22/05 1.00 1500.00 792.50 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 850.00 604.85 567.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 805.00 653.99 590.28 =============== 208-00050 Storm Drain Inlet Protection Each =================================================== MTCE 03-024 I-70 WB MP 128, STR F-08-BH 02/24/05 1.00 220.00 437.00 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 220.00 437.00 120.00 MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 3.00 250.00 250.00 250.00 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 1.00 300.00 271.67 365.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 262.50 260.83 278.75 MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 24.00 500.00 156.00 100.00 MTCE 03-029 R-3, EXPANSION JOINT REPAIRS 07/07/05 12.00 80.00 45.00 45.00 MTCE 06-060 SH 58@ WASHINGTON, STR. E-16- 07/21/05 4.00 500.00 447.40 50.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 8.00 300.00 310.01 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48.00 361.67 238.01 93.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 53.00 351.51 241.19 108.21 =============== 208-00205 Erosion Control Supervisor Hour =================================================== MTCE 06-051 I-270 AT SH 2 04/07/05 15.00 50.00 61.50 50.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 14 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00205 Erosion Control Supervisor Hour =================================================== MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 5.00 60.00 75.00 75.00 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 48.00 60.00 57.67 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 68.00 57.79 59.18 76.54 MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 48.00 60.00 50.33 25.00 MTCE 06-060 SH 58@ WASHINGTON, STR. E-16- 07/21/05 8.00 60.00 56.98 50.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 20.00 75.00 103.63 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 76.00 63.95 74.18 51.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 144.00 61.04 68.30 63.23 =============== 210-00400 Res Expan Device Lin Foot =============================================== MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 130.00 100.00 400.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 130.00 100.00 400.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 130.00 100.00 400.00 100.00 =============== 210-00500 Reb Port Present Str Each =================================================== MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 7.00 1000.00 2753.33 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 1000.00 2753.33 3000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 1000.00 2753.33 3000.00 =============== 210-00750 Res Light Standard Each =================================================== MTCE 01-051 R-1 HIGHWAY LIGHTING, PH 4 06/30/05 10.00 600.00 588.76 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 600.00 588.76 300.00 MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 1.00 1475.00 618.33 480.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1475.00 618.33 480.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 679.55 590.43 316.36 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 15 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00810 Res Ground Sign Each =================================================== MTCE 06-051 I-270 AT SH 2 04/07/05 3.00 200.00 294.50 300.00 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 3.00 225.00 320.33 126.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 212.50 305.57 213.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 10.00 130.00 303.06 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 130.00 303.06 225.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 160.94 303.64 220.50 =============== 210-00815 Res Sign Panel Each =================================================== MTCE 06-053 R-6 SIGN POST REPLACEMENT 01/06/05 800.00 25.00 22.33 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 800.00 25.00 22.33 15.00 MTCE 04-059 FY 06 R4 - SH 56, 60 & 66 SIG 06/09/05 1.00 145.00 228.33 500.00 MTCE 03-028 R-3 REGION WIDE SIGNING 06/30/05 13.00 50.00 45.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.00 56.79 79.38 77.50 MTCE 06-061 R6 - SIGN POST REPLACEMENT 07/28/05 800.00 22.00 47.00 20.00 MTCE 01-045 R-1 REGION-WIDE SIGNING, FY06 08/25/05 13.00 110.00 165.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 813.00 23.41 48.42 22.08 MTCE 03-031 R-3 FY06 SIGN REPLACEMENT (SH 10/20/05 5.00 50.00 166.25 40.00 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 2.00 150.00 181.25 127.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 78.57 171.88 64.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,634.00 24.71 38.19 19.27 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 16 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00860 Res Ped Push Button Each =================================================== MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 3.00 270.00 179.61 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 270.00 179.61 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 270.00 179.61 90.00 =============== 210-00865 Res Ped Sig Head Each =================================================== MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 3.00 270.00 190.95 155.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 270.00 190.95 155.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 270.00 190.95 155.00 =============== 210-01130 Res Gdrail Ty 3 Lin Foot =============================================== MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 117.00 25.00 22.00 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 117.00 25.00 22.00 37.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 117.00 25.00 22.00 37.00 =============== 210-01200 Res End Anchorage Each =================================================== MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 1.00 2000.00 1185.33 770.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2000.00 1185.33 770.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 1185.33 770.00 =============== 210-04010 Adj Manhole Each =================================================== MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 12.00 325.00 413.94 280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 325.00 413.94 280.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 325.00 413.94 280.00 =============== 210-04050 Adj Valve Box Each =================================================== MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 3.00 200.00 400.00 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 200.00 400.00 400.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 17 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04050 Adj Valve Box Each =================================================== MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 10.00 200.00 222.69 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 200.00 222.69 170.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 200.00 229.97 223.08 =============== 210-04200 Adj Gdrail Lin Foot =============================================== MTCE 05-040 R-5 GUARDRAIL UPGRADE 03/31/05 3,100.00 4.00 2.10 2.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,100.00 4.00 2.10 2.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,100.00 4.00 2.10 2.69 =============== 212-00006 Seeding (Native) Acre =================================================== MTCE 02-021 SH 50 & 96, VARIABLE MESSAGE 02/03/05 0.55 1300.00 3087.19 2550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.55 1300.00 3087.19 2550.00 MTCE 06-051 I-270 AT SH 2 04/07/05 1.10 2000.00 1796.75 2100.00 MTCE 02-023 LAMAR FIBER OPTIC 05/12/05 0.12 1000.00 7913.37 2097.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.22 1901.64 2892.26 2099.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.77 1714.69 2948.99 2239.63 =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== MTCE 02-021 SH 50 & 96, VARIABLE MESSAGE 02/03/05 0.55 900.00 3077.01 2550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.55 900.00 3077.01 2550.00 MTCE 06-051 I-270 AT SH 2 04/07/05 1.10 1000.00 1007.25 1100.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 18 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== MTCE 02-023 LAMAR FIBER OPTIC 05/12/05 0.12 1000.00 7606.75 2097.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.22 1000.00 2189.25 1198.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.77 968.93 2447.59 1618.16 =============== 213-00061 Mulch Tackifier Pound ================================================== MTCE 06-051 I-270 AT SH 2 04/07/05 220.00 2.50 2.40 2.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 220.00 2.50 2.40 2.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 220.00 2.50 2.40 2.75 =============== 304-02005 ABC (CL 2) Cubic Yard ============================================= MTCE 02-021 SH 50 & 96, VARIABLE MESSAGE 02/03/05 479.00 35.00 42.91 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 479.00 35.00 42.91 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 479.00 35.00 42.91 35.00 =============== 304-06000 ABC (CL 6) Ton ==================================================== MTCE 02-023 LAMAR FIBER OPTIC 05/12/05 243.00 30.00 28.69 10.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 243.00 30.00 28.69 10.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 243.00 30.00 28.69 10.40 =============== 304-06007 ABC (CL 6) Cubic Yard ============================================= MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 42.20 135.00 59.33 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 42.20 135.00 59.33 28.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 50.00 75.00 71.38 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 75.00 71.38 45.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 92.20 102.46 68.18 37.22 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 19 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== MTCE 03-024 I-70 WB MP 128, STR F-08-BH 02/24/05 22.00 200.00 257.50 274.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 200.00 257.50 274.00 MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 100.00 120.00 75.00 75.00 MTCE 02-023 LAMAR FIBER OPTIC 05/12/05 10.00 200.00 148.06 125.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 110.00 127.27 107.47 79.62 MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 75.00 100.00 242.67 300.00 MTCE 03-029 R-3, EXPANSION JOINT REPAIRS 07/07/05 10.00 450.00 350.00 350.00 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 10.00 250.00 250.28 388.10 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 234.00 100.00 103.59 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 329.00 115.20 124.30 140.61 MTCE 04-061R I-25 SLAB REPLACEMENT MM 244 10/13/05 441.89 350.00 207.75 190.00 MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 2.00 400.00 348.33 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 443.89 350.23 208.23 190.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 904.89 234.02 163.09 160.68 =============== 403-00721 HMA (Patching) (Asph) Sq Yard ================================================ MTCE 01-046 I-70 & SH6 10/27/05 60.00 150.00 114.83 69.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60.00 150.00 114.83 69.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 150.00 114.83 69.00 =============== 403-33841 HMA (Gr S) (100) (PG 64-22) Ton ==================================================== MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 3,890.00 45.00 38.93 33.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,890.00 45.00 38.93 33.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,890.00 45.00 38.93 33.50 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 20 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-33871 HMA (Gr S) (100) (PG 76-28) Ton ==================================================== MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 3,890.00 50.00 46.16 41.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,890.00 50.00 46.16 41.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,890.00 50.00 46.16 41.75 =============== 403-34721 HMA (Gr SX) (75) (PG 58-28) Ton ==================================================== MTCE 05-041 US550 - MP 97.0 TO MP 103.57 04/21/05 12,438.00 42.00 45.49 43.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12,438.00 42.00 45.49 43.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,438.00 42.00 45.49 43.48 =============== 403-34741 HMA (Gr SX) (75) (PG 64-22) Ton ==================================================== MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 7.00 350.00 186.57 102.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 350.00 186.57 102.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 350.00 186.57 102.00 =============== 403-34751 HMA (Gr SX) (75) (PG 64-28) Ton ==================================================== MTCE 02-021 SH 50 & 96, VARIABLE MESSAGE 02/03/05 78.00 90.00 162.04 158.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 78.00 90.00 162.04 158.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 78.00 90.00 162.04 158.00 =============== 403-34871 HMA (Gr SX) (100) (PG 76-28) Ton ==================================================== MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 215.00 110.00 101.67 94.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 215.00 110.00 101.67 94.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 215.00 110.00 101.67 94.00 =============== 409-05000 Ultrath Bond Wearing Course Sq Yard ================================================ MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 50,466.00 7.00 6.05 6.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50,466.00 7.00 6.05 6.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50,466.00 7.00 6.05 6.05 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 21 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-10255 Emul Asph (SS) Gallon ================================================= MTCE 05-041 US550 - MP 97.0 TO MP 103.57 04/21/05 11,440.00 1.50 1.63 0.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11,440.00 1.50 1.63 0.45 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 3,215.00 2.00 1.39 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,215.00 2.00 1.39 1.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,655.00 1.61 1.51 0.57 =============== 412-00600 Conc Pvmt (6 In) Sq Yard ================================================ MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 32.00 45.00 49.36 60.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 32.00 45.00 49.36 60.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 45.00 49.36 60.50 =============== 412-04000 Conc Pvt Pan (Precast) Sq Foot ================================================ MTCE 04-061R I-25 SLAB REPLACEMENT MM 244 10/13/05 1,161.60 32.00 33.00 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,161.60 32.00 33.00 28.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,161.60 32.00 33.00 28.00 =============== 420-00500 Geotextile (Paving) Sq Yard ================================================ MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 32,145.00 1.20 1.14 0.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 32,145.00 1.20 1.14 0.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32,145.00 1.20 1.14 0.90 =============== 503-00018 Drilled Caisson (18 In) Lin Foot =============================================== MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 12.00 90.00 151.08 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 90.00 151.08 165.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 90.00 151.08 165.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 22 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00036 Drilled Caisson (36 In) Lin Foot =============================================== MTCE 02-019 R-2 VMS UPGRADES 02/24/05 60.00 250.00 273.54 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 250.00 273.54 130.00 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 76.00 300.00 231.32 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 76.00 300.00 231.32 185.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 136.00 277.94 245.88 160.74 =============== 503-00042 Drilled Caisson (42 In) Lin Foot =============================================== MTCE 02-021 SH 50 & 96, VARIABLE MESSAGE 02/03/05 60.00 350.00 312.92 106.66 MTCE 02-019 R-2 VMS UPGRADES 02/24/05 90.00 300.00 373.12 148.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 150.00 320.00 349.04 131.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 320.00 349.04 131.46 =============== 503-00048 Drilled Caisson (48 In) Lin Foot =============================================== MTCE 03-023 GRAND JUNCTION OVERHEAD SIGNS 02/17/05 62.00 300.00 362.50 325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 62.00 300.00 362.50 325.00 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 40.00 340.00 375.00 310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 340.00 375.00 310.00 MTCE 01-046 I-70 & SH6 10/27/05 33.00 500.00 1163.82 966.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 33.00 500.00 1163.82 966.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 135.00 360.74 689.44 477.24 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 23 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00054 Drilled Caisson (54 In) Lin Foot =============================================== MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 44.00 500.00 1195.06 1075.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 44.00 500.00 1195.06 1075.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44.00 500.00 1195.06 1075.68 =============== 513-00600 Bridge Drain Each =================================================== MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 1.00 3000.00 9791.75 6469.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3000.00 9791.75 6469.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 9791.75 6469.00 =============== 514-00200 Pedestrian Railing (Steel) Lin Foot =============================================== MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 10.00 180.00 267.92 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 180.00 267.92 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 180.00 267.92 125.00 =============== 515-00400 Concrete Sealer Sq Yard ================================================ MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 28.00 100.00 149.29 174.39 MTCE 06-060 SH 58@ WASHINGTON, STR. E-16- 07/21/05 289.00 6.50 13.25 5.00 MTCE 01-052 I-70 AT MP 296, STR. F-18-F 09/22/05 51.60 10.00 21.50 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 368.60 14.09 22.86 19.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 368.60 14.09 22.86 19.97 =============== 515-00410 Concrete Sealer (Calcium Nitrite) Sq Yard ================================================ MTCE 01-050 I-70 WB AT MP 296.3, STR. F-1 04/21/05 17.20 70.00 48.00 67.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17.20 70.00 48.00 67.00 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 28.00 110.00 124.90 140.64 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 24 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 515-00410 Concrete Sealer (Calcium Nitrite) Sq Yard ================================================ MTCE 01-052 I-70 AT MP 296, STR. F-18-F 09/22/05 51.60 30.00 47.25 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 79.60 58.14 74.56 65.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 96.80 60.25 69.84 65.91 =============== 518-00000 Brdg Compress Joint Sealer Lin Foot =============================================== MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 300.00 45.00 55.00 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 300.00 45.00 55.00 55.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 300.00 45.00 55.00 55.00 =============== 518-01004 Br Expan Device (0-4 In) Lin Foot =============================================== MTCE 01-050 I-70 WB AT MP 296.3, STR. F-1 04/21/05 46.80 125.00 230.75 187.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 46.80 125.00 230.75 187.00 MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 362.00 230.00 341.67 160.00 MTCE 01-052 I-70 AT MP 296, STR. F-18-F 09/22/05 140.00 200.00 180.50 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 502.00 221.63 286.83 160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 548.80 213.39 281.11 162.30 =============== 518-01015 Br Expan Device (0-15 In) Lin Foot =============================================== MTCE 03-024 I-70 WB MP 128, STR F-08-BH 02/24/05 36.50 1850.00 2260.00 1780.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.50 1850.00 2260.00 1780.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.50 1850.00 2260.00 1780.00 =============== 518-02100 Polymer Mortar End Dam Cubic Foot ============================================= MTCE 03-029 R-3, EXPANSION JOINT REPAIRS 07/07/05 633.00 405.00 413.00 413.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 633.00 405.00 413.00 413.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 633.00 405.00 413.00 413.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 25 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 518-03100 Rapid Cure Silicone Jt Seal Lin Foot =============================================== MTCE 03-029 R-3, EXPANSION JOINT REPAIRS 07/07/05 1,260.00 35.00 37.00 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,260.00 35.00 37.00 37.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,260.00 35.00 37.00 37.00 =============== 601-01050 Conc CL B (Wall) Cubic Yard ============================================= MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 1.00 1300.00 970.13 986.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1300.00 970.13 986.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1300.00 970.13 986.00 =============== 601-03040 Conc CL D (Bridge) Cubic Yard ============================================= MTCE 03-024 I-70 WB MP 128, STR F-08-BH 02/24/05 9.00 925.00 1037.00 935.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 925.00 1037.00 935.00 MTCE 03-029 R-3, EXPANSION JOINT REPAIRS 07/07/05 1.00 2000.00 1250.00 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2000.00 1250.00 1250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 1032.50 1048.21 966.50 =============== 601-03041 Conc CL D (Bridge) (Spec) Cubic Yard ============================================= MTCE 01-050 I-70 WB AT MP 296.3, STR. F-1 04/21/05 2.40 1200.00 2119.75 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.40 1200.00 2119.75 2000.00 MTCE 01-052 I-70 AT MP 296, STR. F-18-F 09/22/05 10.00 2000.00 2232.50 2400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 2000.00 2232.50 2400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.40 1845.16 2210.68 2322.58 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 26 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-04000 Conc CL E Cubic Yard ============================================= MTCE 04-061R I-25 SLAB REPLACEMENT MM 244 10/13/05 298.77 700.00 752.00 685.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 298.77 700.00 752.00 685.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 298.77 700.00 752.00 685.00 =============== 601-06100 Conc (Patching) Cubic Yard ============================================= MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 89.00 2500.00 3723.33 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 89.00 2500.00 3723.33 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 89.00 2500.00 3723.33 2000.00 =============== 601-06150 Conc (Patching) Sq Foot ================================================ MTCE 06-060 SH 58@ WASHINGTON, STR. E-16- 07/21/05 2,133.00 71.00 39.88 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,133.00 71.00 39.88 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,133.00 71.00 39.88 18.00 =============== 601-06400 Grout (Bridge)(Spec) Cubic Foot ============================================= MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 4.00 140.00 1108.94 995.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 140.00 1108.94 995.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 140.00 1108.94 995.75 =============== 601-10250 Slab Jacking Pound ================================================== MTCE 04-061R I-25 SLAB REPLACEMENT MM 244 10/13/05 929.28 11.00 12.50 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 929.28 11.00 12.50 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 929.28 11.00 12.50 12.00 =============== 601-40301 Struct Conc Coating Sq Foot ================================================ MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 350.00 10.00 3.33 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 350.00 10.00 3.33 1.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 350.00 10.00 3.33 1.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 27 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 602-00020 Reinf Steel (Epoxy) Pound ================================================== MTCE 03-024 I-70 WB MP 128, STR F-08-BH 02/24/05 775.00 4.00 4.25 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 775.00 4.00 4.25 3.50 MTCE 01-050 I-70 WB AT MP 296.3, STR. F-1 04/21/05 195.00 3.00 3.75 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 195.00 3.00 3.75 4.00 MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 3,310.00 3.00 2.53 2.50 MTCE 06-060 SH 58@ WASHINGTON, STR. E-16- 07/21/05 500.00 2.50 2.47 2.30 MTCE 01-052 I-70 AT MP 296, STR. F-18-F 09/22/05 585.00 4.00 3.05 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,395.00 3.08 2.60 2.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,365.00 3.21 2.81 2.73 =============== 606-00301 Gdrail Ty 3 (6-3) Lin Foot =============================================== MTCE 02-021 SH 50 & 96, VARIABLE MESSAGE 02/03/05 1,075.00 14.00 19.74 16.50 MTCE 03-023 GRAND JUNCTION OVERHEAD SIGNS 02/17/05 25.00 50.00 45.00 35.00 MTCE 02-019 R-2 VMS UPGRADES 02/24/05 200.00 20.00 27.35 22.89 MTCE 05-040 R-5 GUARDRAIL UPGRADE 03/31/05 11,160.00 12.00 15.26 14.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,460.00 12.38 15.87 15.27 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 800.00 22.00 20.77 20.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 800.00 22.00 20.77 20.76 MTCE 01-046 I-70 & SH6 10/27/05 100.00 25.00 38.86 43.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 25.00 38.86 43.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,360.00 13.05 16.38 15.81 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 28 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01340 End Anchor Ty 3D Each =================================================== MTCE 02-021 SH 50 & 96, VARIABLE MESSAGE 02/03/05 2.00 500.00 721.13 700.00 MTCE 03-023 GRAND JUNCTION OVERHEAD SIGNS 02/17/05 4.00 730.00 1375.00 1900.00 MTCE 02-019 R-2 VMS UPGRADES 02/24/05 1.00 800.00 889.13 771.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 674.29 1016.28 1395.96 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 1.00 700.00 666.75 672.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 700.00 666.75 672.00 MTCE 01-046 I-70 & SH6 10/27/05 1.00 800.00 995.60 1034.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 800.00 995.60 1034.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 691.11 964.50 1275.31 =============== 606-01370 Transition Ty 3G Each =================================================== MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 1.00 1100.00 1189.25 1198.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1100.00 1189.25 1198.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1100.00 1189.25 1198.00 =============== 606-01460 Median Terminal Each =================================================== MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 1.00 4000.00 4347.75 4382.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 4000.00 4347.75 4382.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 4000.00 4347.75 4382.00 =============== 606-02003 End Anchor (Nonflared) Each =================================================== MTCE 02-021 SH 50 & 96, VARIABLE MESSAGE 02/03/05 2.00 1800.00 2311.09 1990.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1800.00 2311.09 1990.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 29 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-02003 End Anchor (Nonflared) Each =================================================== MTCE 06-051 I-270 AT SH 2 04/07/05 6.00 2500.00 2275.00 2100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 2500.00 2275.00 2100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 2325.00 2284.02 2072.50 =============== 606-02005 End Anchor (Flared) Each =================================================== MTCE 05-040 R-5 GUARDRAIL UPGRADE 03/31/05 53.00 1400.00 1384.56 1314.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 53.00 1400.00 1384.56 1314.00 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 1.00 2000.00 1602.75 1614.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2000.00 1602.75 1614.00 MTCE 01-046 I-70 & SH6 10/27/05 1.00 1700.00 1946.00 1931.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1700.00 1946.00 1931.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55.00 1416.36 1401.21 1330.67 =============== 606-10405 Brdg Rail Ty 4 (Spec) Lin Foot =============================================== MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 50.00 250.00 183.33 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 250.00 183.33 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 250.00 183.33 180.00 =============== 607-32000 Fence Picket Snow Lin Foot =============================================== MTCE 06-037 SH 93 - SNOW FENCE, MP 7.6 TO 03/24/05 12,238.00 4.05 4.02 3.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,238.00 4.05 4.02 3.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,238.00 4.05 4.02 3.45 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 30 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-60620 Road Closure Gate Each =================================================== MTCE 01-046 I-70 & SH6 10/27/05 2.00 12000.00 12467.40 8642.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 12000.00 12467.40 8642.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 12000.00 12467.40 8642.00 =============== 608-00000 Conc Sidewalk Sq Yard ================================================ MTCE 02-023 LAMAR FIBER OPTIC 05/12/05 60.00 40.00 67.76 52.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 40.00 67.76 52.50 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 50.00 50.00 39.57 39.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 50.00 39.57 39.80 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 116.00 55.00 95.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 116.00 55.00 95.00 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 226.00 49.91 73.72 33.01 =============== 608-00006 Conc Sidewalk (6 In) Sq Yard ================================================ MTCE 06-056 SH 177 AT CHERRY HILLS FIRE S 04/14/05 10.00 70.00 185.55 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 70.00 185.55 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 70.00 185.55 100.00 =============== 608-00010 Conc Curb Ramp Sq Yard ================================================ MTCE 02-023 LAMAR FIBER OPTIC 05/12/05 110.00 90.00 73.04 28.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 110.00 90.00 73.04 28.60 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 31 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00010 Conc Curb Ramp Sq Yard ================================================ MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 140.00 100.00 112.59 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 140.00 100.00 112.59 120.00 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 9.00 300.00 146.84 108.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 300.00 146.84 108.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 259.00 102.70 95.37 80.76 =============== 608-00015 Truncated Domes Sq Foot ================================================ MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 40.00 48.00 61.05 57.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 48.00 61.05 57.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 48.00 61.05 57.00 =============== 609-21010 C and G Ty 2 I-B Lin Foot =============================================== MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 365.00 12.00 21.33 18.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 365.00 12.00 21.33 18.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 365.00 12.00 21.33 18.30 =============== 609-21011 C and G Ty 2 I-M Lin Foot =============================================== MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 45.00 25.00 43.02 25.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 45.00 25.00 43.02 25.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 25.00 43.02 25.50 =============== 609-21020 C and G Ty 2 II-B Lin Foot =============================================== MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 440.00 16.00 22.38 21.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 440.00 16.00 22.38 21.80 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 32 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-21020 C and G Ty 2 II-B Lin Foot =============================================== MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 25.00 70.00 47.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.00 70.00 47.00 45.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 465.00 18.90 22.96 23.05 =============== 610-00020 Median Cover (Pattern Conc) Sq Foot ================================================ MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 94.00 12.00 22.34 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 94.00 12.00 22.34 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 94.00 12.00 22.34 15.00 =============== 610-00024 Median Cover (4 In Pattern Conc) Sq Foot ================================================ MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 415.00 8.50 9.25 7.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 415.00 8.50 9.25 7.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 415.00 8.50 9.25 7.75 =============== 610-00030 Median Cover Matl (Conc) Sq Foot ================================================ MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 697.00 10.00 8.71 6.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 697.00 10.00 8.71 6.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 697.00 10.00 8.71 6.30 =============== 610-00060 Median Cover Matl (Brick) Sq Foot ================================================ MTCE 02-019 R-2 VMS UPGRADES 02/24/05 50.00 17.00 39.74 25.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 17.00 39.74 25.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 17.00 39.74 25.50 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 33 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00001 Delin (Ty I) Each =================================================== MTCE 02-021 SH 50 & 96, VARIABLE MESSAGE 02/03/05 5.00 20.00 28.47 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 20.00 28.47 15.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 10.00 18.00 20.16 11.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 18.00 20.16 11.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 18.67 22.01 12.50 =============== 612-00002 Delin (Ty II) Each =================================================== MTCE 06-051 I-270 AT SH 2 04/07/05 10.00 25.00 28.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 25.00 28.00 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 25.00 28.00 20.00 =============== 612-00003 Delin (Ty III) Each =================================================== MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 5.00 20.00 25.55 16.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 20.00 25.55 16.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 20.00 25.55 16.85 =============== 612-00270 Loc Mark (Util)(Flat Slat) Each =================================================== MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 25.00 55.00 78.07 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.00 55.00 78.07 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 55.00 78.07 40.00 =============== 612-15000 Inst Marker Each =================================================== MTCE 02-019 R-2 VMS UPGRADES 02/24/05 6.00 400.00 132.71 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 400.00 132.71 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 400.00 132.71 21.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 34 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00001 Direct Bor Cond Lin Foot =============================================== MTCE 02-023 LAMAR FIBER OPTIC 05/12/05 4,900.00 12.00 13.46 9.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,900.00 12.00 13.46 9.15 MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 265.00 15.80 15.75 15.25 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 22,573.00 14.50 12.22 9.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22,838.00 14.52 12.24 9.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27,738.00 14.07 12.51 9.74 =============== 613-00200 2 In Elec Cond Lin Foot =============================================== MTCE 02-023 LAMAR FIBER OPTIC 05/12/05 50.00 11.00 13.17 11.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 11.00 13.17 11.40 MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 100.00 30.00 101.67 30.00 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 100.00 19.00 15.26 28.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 24.50 52.29 29.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 21.80 38.07 25.78 =============== 613-00201 2 In Elec Cond (Jacked) Lin Foot =============================================== MTCE 06-056 SH 177 AT CHERRY HILLS FIRE S 04/14/05 750.00 13.00 20.36 14.00 MTCE 01-051 R-1 HIGHWAY LIGHTING, PH 4 06/30/05 5,000.00 13.00 12.43 13.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,750.00 13.00 13.47 13.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,750.00 13.00 13.47 13.30 =============== 613-00301 3 In Elec Cond (Jacked) Lin Foot =============================================== MTCE 01-051 R-1 HIGHWAY LIGHTING, PH 4 06/30/05 1,500.00 14.00 14.79 15.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,500.00 14.00 14.79 15.90 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 35 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00301 3 In Elec Cond (Jacked) Lin Foot =============================================== MTCE 01-046 I-70 & SH6 10/27/05 100.00 25.00 49.61 14.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 25.00 49.61 14.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,600.00 14.69 16.97 15.79 =============== 613-00401 4 In Elec Cond (Jacked) Lin Foot =============================================== MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 1,000.00 30.00 30.06 28.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,000.00 30.00 30.06 28.82 MTCE 01-046 I-70 & SH6 10/27/05 200.00 30.00 58.57 14.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 30.00 58.57 14.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,200.00 30.00 35.76 26.46 =============== 613-00405 4 In Elec Cond (Spec) Lin Foot =============================================== MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 190.00 77.00 51.57 62.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 190.00 77.00 51.57 62.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 190.00 77.00 51.57 62.65 =============== 613-01200 2 In Elec Cond (P) Lin Foot =============================================== MTCE 02-019 R-2 VMS UPGRADES 02/24/05 10.00 20.00 14.28 18.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 20.00 14.28 18.05 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 1,915.00 13.00 10.40 8.20 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 36 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-01200 2 In Elec Cond (P) Lin Foot =============================================== MTCE 01-051 R-1 HIGHWAY LIGHTING, PH 4 06/30/05 7,500.00 9.00 8.72 8.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9,415.00 9.81 8.94 8.24 MTCE 01-046 I-70 & SH6 10/27/05 100.00 15.00 14.26 6.51 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 257.00 12.00 13.78 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 357.00 12.84 13.89 7.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,782.00 9.93 9.17 8.21 =============== 613-01300 3 In Elec Cond (P) Lin Foot =============================================== MTCE 02-019 R-2 VMS UPGRADES 02/24/05 80.00 15.00 18.42 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 80.00 15.00 18.42 21.00 MTCE 01-051 R-1 HIGHWAY LIGHTING, PH 4 06/30/05 5,000.00 10.00 10.04 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,000.00 10.00 10.04 10.00 MTCE 01-046 I-70 & SH6 10/27/05 2,730.00 12.50 16.05 5.14 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 210.00 18.00 16.68 9.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,940.00 12.89 16.10 5.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,020.00 11.11 12.35 8.45 =============== 613-01400 4 In Elec Cond (P) Lin Foot =============================================== MTCE 01-046 I-70 & SH6 10/27/05 1,270.00 14.50 15.09 6.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,270.00 14.50 15.09 6.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,270.00 14.50 15.09 6.63 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 37 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07000 Pull Box (Spec) Each =================================================== MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 4.00 450.00 473.33 500.00 MTCE 01-051 R-1 HIGHWAY LIGHTING, PH 4 06/30/05 50.00 750.00 677.79 545.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 54.00 727.78 668.42 541.67 MTCE 01-046 I-70 & SH6 10/27/05 10.00 550.00 662.84 753.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 550.00 662.84 753.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 64.00 700.00 667.53 574.69 =============== 613-07026 Pull Box (16"x24"x12") Each =================================================== MTCE 02-019 R-2 VMS UPGRADES 02/24/05 1.00 400.00 520.50 325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 400.00 520.50 325.00 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 3.00 375.00 650.06 273.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 375.00 650.06 273.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 381.25 626.50 286.00 =============== 613-07034 Pull Box (24"x36"x18") Each =================================================== MTCE 02-023 LAMAR FIBER OPTIC 05/12/05 3.00 650.00 746.25 575.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 650.00 746.25 575.00 MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 1.00 750.00 673.33 845.00 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 38.00 550.00 813.13 399.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 39.00 555.13 811.31 410.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42.00 561.90 805.19 422.19 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 38 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07038 Pull Box (36"x48"x18") Each =================================================== MTCE 02-023 LAMAR FIBER OPTIC 05/12/05 1.00 850.00 1011.98 738.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 850.00 1011.98 738.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 850.00 1011.98 738.00 =============== 613-07199 Inst Pull Box Each =================================================== MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 2.00 400.00 241.67 310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 400.00 241.67 310.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 400.00 241.67 310.00 =============== 613-10000 Wiring LUMP SUM =============================================== MTCE 02-019 R-2 VMS UPGRADES 02/24/05 1.00 15000.00 6524.75 3810.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 15000.00 6524.75 3810.00 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 1.00 2200.00 3933.33 3800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2200.00 3933.33 3800.00 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 1.00 10000.00 9034.50 6792.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 9034.50 6792.00 MTCE 01-046 I-70 & SH6 10/27/05 1.00 17000.00 29832.80 31000.00 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 1.00 12000.00 20289.70 20180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 14500.00 24627.47 25590.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 11240.00 15679.05 13116.40 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 39 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-32400 Light Std Steel (40 Ft) Each =================================================== MTCE 01-051 R-1 HIGHWAY LIGHTING, PH 4 06/30/05 20.00 3500.00 3053.38 2406.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 3500.00 3053.38 2406.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 3500.00 3053.38 2406.00 =============== 613-40010 Light Std Foundation Each =================================================== MTCE 01-051 R-1 HIGHWAY LIGHTING, PH 4 06/30/05 20.00 850.00 785.98 704.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 850.00 785.98 704.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 850.00 785.98 704.00 =============== 613-40020 Transformer Base Alum Each =================================================== MTCE 01-051 R-1 HIGHWAY LIGHTING, PH 4 06/30/05 20.00 800.00 846.31 665.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 800.00 846.31 665.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 800.00 846.31 665.00 =============== 613-50010 Photoel Cell Each =================================================== MTCE 01-051 R-1 HIGHWAY LIGHTING, PH 4 06/30/05 500.00 90.00 61.89 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 500.00 90.00 61.89 24.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 500.00 90.00 61.89 24.00 =============== 613-60000 Lmps Each =================================================== MTCE 01-051 R-1 HIGHWAY LIGHTING, PH 4 06/30/05 500.00 95.00 70.09 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 500.00 95.00 70.09 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 500.00 95.00 70.09 75.00 =============== 613-70255 Fus Each =================================================== MTCE 01-051 R-1 HIGHWAY LIGHTING, PH 4 06/30/05 100.00 50.00 45.17 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 50.00 45.17 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 50.00 45.17 21.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 40 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-70260 Fus Holder Each =================================================== MTCE 01-051 R-1 HIGHWAY LIGHTING, PH 4 06/30/05 100.00 100.00 89.28 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 100.00 89.28 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 100.00 89.28 50.00 =============== 613-70400 Lumin HPS (400 W) Each =================================================== MTCE 01-051 R-1 HIGHWAY LIGHTING, PH 4 06/30/05 50.00 400.00 403.77 360.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 400.00 403.77 360.00 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 6.00 700.00 508.45 489.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 700.00 508.45 489.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56.00 432.14 416.95 373.82 =============== 613-70401 Inst Lumin HPS (400 W) Each =================================================== MTCE 02-019 R-2 VMS UPGRADES 02/24/05 2.00 200.00 211.00 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 200.00 211.00 190.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 200.00 211.00 190.00 =============== 613-72150 Lumin HPS (WT) (150 W) Each =================================================== MTCE 01-051 R-1 HIGHWAY LIGHTING, PH 4 06/30/05 30.00 480.00 404.07 355.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 480.00 404.07 355.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 480.00 404.07 355.00 =============== 614-00011 Sign Panel (CL I) Sq Foot ================================================ MTCE 05-037 R-5 SIGN REPLACEMENT - EAST 02/03/05 993.00 10.00 11.80 11.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 41 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00011 Sign Panel (CL I) Sq Foot ================================================ MTCE 05-039 R-5, SIGN REPLACEMENT - WEST 02/03/05 400.00 9.00 12.67 11.00 MTCE 02-019 R-2 VMS UPGRADES 02/24/05 14.00 22.00 25.20 14.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,407.00 9.84 12.09 11.04 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 25.00 22.00 20.43 20.30 MTCE 04-059 FY 06 R4 - SH 56, 60 & 66 SIG 06/09/05 2,173.00 12.00 19.50 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,198.00 12.11 19.51 13.08 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 111.00 18.00 18.11 16.85 MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 1,493.00 15.00 16.17 12.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,604.00 15.21 16.45 12.80 MTCE 01-046 I-70 & SH6 10/27/05 6.00 15.00 38.40 36.00 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 125.00 20.00 24.75 15.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 131.00 19.77 25.28 16.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,340.00 12.63 16.45 12.54 =============== 614-00012 Sign Panel (CL II) Sq Foot ================================================ MTCE 05-037 R-5 SIGN REPLACEMENT - EAST 02/03/05 1,750.00 12.00 15.40 16.00 MTCE 05-039 R-5, SIGN REPLACEMENT - WEST 02/03/05 8,130.00 12.00 15.58 13.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,880.00 12.00 15.53 14.15 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 66.00 25.00 23.00 22.00 MTCE 04-059 FY 06 R4 - SH 56, 60 & 66 SIG 06/09/05 3,506.00 15.00 23.17 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,572.00 15.18 23.16 15.13 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 44.00 30.00 156.93 33.77 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 42 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00012 Sign Panel (CL II) Sq Foot ================================================ MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 4,164.00 16.00 18.33 15.00 MTCE 06-063 SH 6, I-70 TO KALAMATH ST 09/29/05 650.00 25.00 20.83 21.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,858.00 17.33 20.38 16.08 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 4.00 25.00 51.41 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 25.00 51.41 19.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,314.00 14.04 18.21 14.85 =============== 614-00013 Sign Panel (CL III) Sq Foot ================================================ MTCE 05-037 R-5 SIGN REPLACEMENT - EAST 02/03/05 4,425.00 16.00 19.25 19.25 MTCE 05-039 R-5, SIGN REPLACEMENT - WEST 02/03/05 2,030.00 16.00 18.83 20.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,455.00 16.00 19.16 19.64 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 153.00 18.00 20.75 18.25 MTCE 04-059 FY 06 R4 - SH 56, 60 & 66 SIG 06/09/05 2,173.00 20.00 28.33 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,326.00 19.87 27.83 18.02 MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 4,385.00 19.00 21.33 19.00 MTCE 06-063 SH 6, I-70 TO KALAMATH ST 09/29/05 5,000.00 30.00 24.95 22.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,385.00 24.86 23.70 20.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,166.00 21.07 22.35 19.99 =============== 614-00025 Inst Sign Panel (CL I) Sq Foot ================================================ MTCE 03-028 R-3 REGION WIDE SIGNING 06/30/05 13,128.00 3.00 3.00 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,128.00 3.00 3.00 3.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 43 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00025 Inst Sign Panel (CL I) Sq Foot ================================================ MTCE 01-045 R-1 REGION-WIDE SIGNING, FY06 08/25/05 6,464.96 5.00 12.33 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,464.96 5.00 12.33 6.00 MTCE 03-031 R-3 FY06 SIGN REPLACEMENT (SH 10/20/05 3,793.00 4.00 4.88 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,793.00 4.00 4.88 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23,385.96 3.72 7.39 3.83 =============== 614-00027 Inst Sign Panel (CL II) Sq Foot ================================================ MTCE 03-028 R-3 REGION WIDE SIGNING 06/30/05 10,524.00 3.40 4.00 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10,524.00 3.40 4.00 4.00 MTCE 01-045 R-1 REGION-WIDE SIGNING, FY06 08/25/05 9,223.93 6.00 18.33 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,223.93 6.00 18.33 7.00 MTCE 03-031 R-3 FY06 SIGN REPLACEMENT (SH 10/20/05 2,437.00 5.00 6.13 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,437.00 5.00 6.13 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22,184.93 4.66 12.70 5.25 =============== 614-00028 Inst Sign Panel (CL III) Sq Foot ================================================ MTCE 03-023 GRAND JUNCTION OVERHEAD SIGNS 02/17/05 694.00 6.00 7.38 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 694.00 6.00 7.38 7.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 44 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00028 Inst Sign Panel (CL III) Sq Foot ================================================ MTCE 03-028 R-3 REGION WIDE SIGNING 06/30/05 6,550.00 9.00 8.00 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,550.00 9.00 8.00 8.00 MTCE 01-045 R-1 REGION-WIDE SIGNING, FY06 08/25/05 609.75 7.00 32.67 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 609.75 7.00 32.67 8.00 MTCE 03-031 R-3 FY06 SIGN REPLACEMENT (SH 10/20/05 696.00 9.00 9.25 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 696.00 9.00 9.25 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,549.75 8.61 11.80 7.92 =============== 614-00200 Steel Sign Post (U-2) Lin Foot =============================================== MTCE 01-046 I-70 & SH6 10/27/05 8.50 20.00 18.64 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.50 20.00 18.64 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.50 20.00 18.64 21.00 =============== 614-00612 Steel Sign Post (W 6x12) Lin Foot =============================================== MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 89.00 35.00 30.33 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 89.00 35.00 30.33 28.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 89.00 35.00 30.33 28.00 =============== 614-00615 Steel Sign Post (W 6x15) Lin Foot =============================================== MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 190.00 40.00 36.67 32.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 45 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00615 Steel Sign Post (W 6x15) Lin Foot =============================================== MTCE 06-063 SH 6, I-70 TO KALAMATH ST 09/29/05 75.00 32.00 52.32 36.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 265.00 37.74 42.88 33.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 265.00 37.74 42.88 33.30 =============== 614-00818 Steel Sign Post (W 8x18) Lin Foot =============================================== MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 279.00 48.00 44.33 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 279.00 48.00 44.33 40.00 MTCE 01-046 I-70 & SH6 10/27/05 44.00 40.00 55.55 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 44.00 40.00 55.55 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 323.00 46.91 46.67 42.72 =============== 614-00821 Steel Sign Post (W 8x21) Lin Foot =============================================== MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 38.00 55.00 51.67 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 38.00 55.00 51.67 48.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38.00 55.00 51.67 48.00 =============== 614-01022 Steel Sign Post (W 10x22) Lin Foot =============================================== MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 197.00 54.00 54.67 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 197.00 54.00 54.67 52.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 197.00 54.00 54.67 52.00 =============== 614-01026 Steel Sign Post (W 10x26) Lin Foot =============================================== MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 219.00 55.00 60.33 58.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 219.00 55.00 60.33 58.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 219.00 55.00 60.33 58.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 46 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01226 Steel Sign Post (W 12x26) Lin Foot =============================================== MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 140.00 60.00 62.33 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 140.00 60.00 62.33 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 140.00 60.00 62.33 60.00 =============== 614-01502 Steel Sign Supp (2-In Rd)(Po&Sock) Lin Foot =============================================== MTCE 05-037 R-5 SIGN REPLACEMENT - EAST 02/03/05 1,802.00 6.00 9.88 8.40 MTCE 05-039 R-5, SIGN REPLACEMENT - WEST 02/03/05 895.00 8.00 11.00 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,697.00 6.66 10.14 8.27 MTCE 03-028 R-3 REGION WIDE SIGNING 06/30/05 10,061.00 9.00 14.00 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10,061.00 9.00 14.00 14.00 MTCE 03-031 R-3 FY06 SIGN REPLACEMENT (SH 10/20/05 4,182.00 15.00 17.63 13.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,182.00 15.00 17.63 13.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,940.00 10.11 14.40 12.96 =============== 614-01512 Steel Sign Supp (2-In Rd)(Post) Lin Foot =============================================== MTCE 04-059 FY 06 R4 - SH 56, 60 & 66 SIG 06/09/05 1,822.00 13.00 16.67 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,822.00 13.00 16.67 15.00 MTCE 01-045 R-1 REGION-WIDE SIGNING, FY06 08/25/05 8,624.00 12.00 13.67 15.00 MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 595.00 16.00 13.33 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,219.00 12.26 13.65 14.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,041.00 12.38 14.14 14.68 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 47 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01522 Steel Sign Supp (2-In Rd)(Sock) Each =================================================== MTCE 05-037 R-5 SIGN REPLACEMENT - EAST 02/03/05 179.00 38.00 64.80 110.00 MTCE 05-039 R-5, SIGN REPLACEMENT - WEST 02/03/05 80.00 40.00 93.33 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 259.00 38.62 70.83 86.83 MTCE 04-059 FY 06 R4 - SH 56, 60 & 66 SIG 06/09/05 163.00 60.00 64.67 39.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 163.00 60.00 64.67 39.00 MTCE 01-045 R-1 REGION-WIDE SIGNING, FY06 08/25/05 962.00 40.00 70.00 65.00 MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 62.00 50.00 40.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,024.00 40.61 68.18 64.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,446.00 42.44 68.46 65.34 =============== 614-01552 ====================================================== MTCE 05-037 R-5 SIGN REPLACEMENT - EAST 02/03/05 7,206.00 20.00 20.60 15.00 MTCE 05-039 R-5, SIGN REPLACEMENT - WEST 02/03/05 5,360.00 22.00 23.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,566.00 20.85 21.34 21.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,566.00 20.85 21.34 21.40 =============== 614-01582 Steel Sign Supp (2-1/2 In Rd)(Po&Slip) Lin Foot =============================================== MTCE 06-053 R-6 SIGN POST REPLACEMENT 01/06/05 8,000.00 22.00 29.33 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,000.00 22.00 29.33 24.00 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 77.00 50.00 49.67 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 77.00 50.00 49.67 44.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 48 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01582 Steel Sign Supp (2-1/2 In Rd)(Po&Slip) Lin Foot =============================================== MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 30.00 35.00 40.81 26.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 35.00 40.81 26.95 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 11.00 200.00 79.69 49.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 200.00 79.69 49.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,118.00 22.55 29.76 24.23 =============== 614-01583 Steel Sign Supp(2-1/2 In Rd 80)(Po&Slip) Each =================================================== MTCE 06-063 SH 6, I-70 TO KALAMATH ST 09/29/05 2.00 400.00 516.74 855.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 400.00 516.74 855.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 400.00 516.74 855.72 =============== 614-01585 Steel Sign Supp (2-1/2 In Rd 80 )(Po) Lin Foot =============================================== MTCE 04-059 FY 06 R4 - SH 56, 60 & 66 SIG 06/09/05 3,139.00 16.00 29.67 34.00 MTCE 03-028 R-3 REGION WIDE SIGNING 06/30/05 8,784.00 19.50 23.00 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11,923.00 18.58 26.45 25.90 MTCE 06-061 R6 - SIGN POST REPLACEMENT 07/28/05 8,720.00 23.00 22.50 15.00 MTCE 01-045 R-1 REGION-WIDE SIGNING, FY06 08/25/05 11,044.00 20.00 24.33 25.00 MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 1,195.00 35.00 23.33 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20,959.00 22.10 23.39 20.21 MTCE 03-031 R-3 FY06 SIGN REPLACEMENT (SH 10/20/05 1,907.00 25.00 27.00 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,907.00 25.00 27.00 22.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34,789.00 21.05 24.24 22.26 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 49 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01588 Steel Sign Supp (2-1/2 In Rd 80)(Slip) Each =================================================== MTCE 05-037 R-5 SIGN REPLACEMENT - EAST 02/03/05 516.00 70.00 146.00 135.00 MTCE 05-039 R-5, SIGN REPLACEMENT - WEST 02/03/05 420.00 80.00 158.33 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 936.00 74.49 150.05 121.54 MTCE 04-059 FY 06 R4 - SH 56, 60 & 66 SIG 06/09/05 275.00 150.00 180.00 145.00 MTCE 03-028 R-3 REGION WIDE SIGNING 06/30/05 680.00 85.00 110.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 955.00 103.72 148.37 120.08 MTCE 06-061 R6 - SIGN POST REPLACEMENT 07/28/05 800.00 145.00 172.50 110.00 MTCE 01-045 R-1 REGION-WIDE SIGNING, FY06 08/25/05 1,035.00 170.00 183.33 165.00 MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 98.00 160.00 191.67 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,933.00 159.15 178.45 141.22 MTCE 03-031 R-3 FY06 SIGN REPLACEMENT (SH 10/20/05 160.00 160.00 182.50 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 160.00 160.00 182.50 130.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,984.00 126.00 166.39 131.08 =============== 614-03001 Conc Footing (Ty 1) Each =================================================== MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 6.00 500.00 783.33 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 500.00 783.33 800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 500.00 783.33 800.00 =============== 614-03002 Conc Footing (Ty 2) Each =================================================== MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 12.00 700.00 893.33 950.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 50 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-03002 Conc Footing (Ty 2) Each =================================================== MTCE 06-063 SH 6, I-70 TO KALAMATH ST 09/29/05 4.00 700.00 931.55 627.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 700.00 906.98 869.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 700.00 906.98 869.43 =============== 614-03003 Conc Footing (Ty 3) Each =================================================== MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 16.00 850.00 966.67 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 850.00 966.67 1000.00 MTCE 01-046 I-70 & SH6 10/27/05 4.00 1500.00 1470.05 1162.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1500.00 1470.05 1162.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 980.00 1114.72 1032.40 =============== 614-03004 Conc Footing (Ty 4) Each =================================================== MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 2.00 1200.00 1000.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1200.00 1000.00 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1200.00 1000.00 1000.00 =============== 614-03005 Conc Footing (Ty 5) Each =================================================== MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 10.00 1500.00 1166.67 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 1500.00 1166.67 1100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 1500.00 1166.67 1100.00 =============== 614-03006 Conc Footing (Ty 6) Each =================================================== MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 10.00 1200.00 1383.33 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 1200.00 1383.33 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 1200.00 1383.33 1500.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 51 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-03007 Conc Footing (Ty 7) Each =================================================== MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 6.00 1400.00 1616.67 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 1400.00 1616.67 1600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1400.00 1616.67 1600.00 =============== 614-10030 Paint Overhead Sign Str Each =================================================== MTCE 06-063 SH 6, I-70 TO KALAMATH ST 09/29/05 3.00 10000.00 9375.60 11878.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 10000.00 9375.60 11878.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 10000.00 9375.60 11878.00 =============== 614-10123 Inst Var Mesg Sign Each =================================================== MTCE 02-021 SH 50 & 96, VARIABLE MESSAGE 02/03/05 2.00 6000.00 6524.62 2500.00 MTCE 02-019 R-2 VMS UPGRADES 02/24/05 3.00 6000.00 3838.00 2605.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 6000.00 4912.65 2563.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 6000.00 4912.65 2563.00 =============== 614-10128 Blankout Sign (Fib Opt) Each =================================================== MTCE 01-046 I-70 & SH6 10/27/05 8.00 11000.00 10415.63 9604.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 11000.00 10415.63 9604.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 11000.00 10415.63 9604.00 =============== 614-10147 VMS LED (Overhead) Each =================================================== MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 1.00 150000.00 133523.00 129982.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 150000.00 133523.00 129982.00 MTCE 01-046 I-70 & SH6 10/27/05 1.00 130000.00 122122.80 126185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 130000.00 122122.80 126185.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 140000.00 127189.56 128083.50 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 52 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-10245 LUS LED (Single Faced) Each =================================================== MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 2.00 12000.00 12385.75 11953.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 12000.00 12385.75 11953.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 12000.00 12385.75 11953.00 =============== 614-10246 Inst LUS LED (Single Faced) Each =================================================== MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 4.00 500.00 554.00 942.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 500.00 554.00 942.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 500.00 554.00 942.00 =============== 614-10355 LUS Montig Sprt & Wiring(Single Faced) Each =================================================== MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 2.00 30000.00 481.63 274.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 30000.00 481.63 274.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 30000.00 481.63 274.50 =============== 614-21275 VMS Support (Grnd Mtd) (12.75 In) Each =================================================== MTCE 02-021 SH 50 & 96, VARIABLE MESSAGE 02/03/05 2.00 15000.00 15926.52 19247.50 MTCE 02-019 R-2 VMS UPGRADES 02/24/05 3.00 16000.00 16525.00 15800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 15600.00 16285.61 17179.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 15600.00 16285.61 17179.00 =============== 614-32400 Monotube Overhead Sign Cant (24 In Dia) Each =================================================== MTCE 03-023 GRAND JUNCTION OVERHEAD SIGNS 02/17/05 3.00 22000.00 5750.00 6800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 22000.00 5750.00 6800.00 MTCE 01-046 I-70 & SH6 10/27/05 1.00 28000.00 30549.20 30460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 28000.00 30549.20 30460.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 23500.00 17022.36 12715.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 53 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-32900 Inst Monotube Overhead Sign Cant Each =================================================== MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 2.00 3000.00 6400.00 4700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 3000.00 6400.00 4700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3000.00 6400.00 4700.00 =============== 614-41800 Monotube Overhead Sign Brdg (18 In Dia) Each =================================================== MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 1.00 45000.00 53371.75 50011.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 45000.00 53371.75 50011.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 45000.00 53371.75 50011.00 =============== 614-70117 Ped Sig Face (16) Each =================================================== MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 2.00 825.00 762.00 676.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 825.00 762.00 676.00 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 10.00 420.00 637.50 533.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 420.00 637.50 533.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 487.50 648.82 556.83 =============== 614-70336 Traf Sig Face (12-12-12) Each =================================================== MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 15.00 650.00 826.21 692.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 650.00 826.21 692.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 650.00 826.21 692.00 =============== 614-70337 Traf Sig Face (12-12-12) (Inst Only) Each =================================================== MTCE 02-019 R-2 VMS UPGRADES 02/24/05 12.00 130.00 167.75 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 130.00 167.75 195.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 130.00 167.75 195.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 54 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72860 Ped Push Button Each =================================================== MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 2.00 120.00 120.33 131.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 120.00 120.33 131.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 8.00 100.00 151.18 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 100.00 151.18 115.00 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 8.00 100.00 154.52 83.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 100.00 154.52 83.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 102.22 150.95 102.56 =============== 614-72861 Ped Push Button (Inst Only) Each =================================================== MTCE 02-019 R-2 VMS UPGRADES 02/24/05 8.00 70.00 60.25 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 70.00 60.25 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 70.00 60.25 50.00 =============== 614-72875 Loop Detect Wire Lin Foot =============================================== MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 375.00 4.00 4.00 4.00 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 700.00 4.00 3.45 3.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,075.00 4.00 3.53 3.51 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 375.00 4.00 3.28 2.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 375.00 4.00 3.28 2.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,450.00 4.00 3.40 3.34 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 55 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72876 Detect Amp (Loop) (2) Each =================================================== MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 2.00 750.00 737.33 832.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 750.00 737.33 832.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 750.00 737.33 832.00 =============== 614-72886 Intersection Detect Sys (Camera) Each =================================================== MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 2.00 6000.00 5698.25 5188.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 6000.00 5698.25 5188.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 6000.00 5698.25 5188.00 =============== 614-72896 Inst Intersect Detect Sys (Camera) Each =================================================== MTCE 02-019 R-2 VMS UPGRADES 02/24/05 2.00 450.00 846.75 840.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 450.00 846.75 840.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 450.00 846.75 840.00 =============== 614-75216 Inst Ped Sig Face (16) Each =================================================== MTCE 02-019 R-2 VMS UPGRADES 02/24/05 8.00 150.00 113.63 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 150.00 113.63 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 150.00 113.63 180.00 =============== 614-80000 Flash Beacon Each =================================================== MTCE 04-059 FY 06 R4 - SH 56, 60 & 66 SIG 06/09/05 3.00 2000.00 5166.67 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 2000.00 5166.67 6000.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 2.00 2000.00 2826.94 2135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2000.00 2826.94 2135.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 56 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-80000 Flash Beacon Each =================================================== MTCE 01-046 I-70 & SH6 10/27/05 8.00 2500.00 709.33 460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 2500.00 709.33 460.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 2307.69 1816.67 1996.15 =============== 614-81120 Sig-Light Pole Steel (1-20 Ft) Each =================================================== MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 1.00 15750.00 20275.40 16322.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 15750.00 20275.40 16322.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15750.00 20275.40 16322.00 =============== 614-81130 Sig-Light Pole Steel (1-30 Ft) Each =================================================== MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 1.00 19000.00 21019.29 17482.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 19000.00 21019.29 17482.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 19000.00 21019.29 17482.00 =============== 614-81135 Sig-Light Pole Steel (1-35 Ft) Each =================================================== MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 1.00 23800.00 21501.88 18459.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 23800.00 21501.88 18459.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 23800.00 21501.88 18459.00 =============== 614-81140 Sig-Light Pole Steel (1-40 Ft) Each =================================================== MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 1.00 24700.00 23513.36 19567.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 24700.00 23513.36 19567.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 24700.00 23513.36 19567.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 57 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-82011 Inst Sig Pole Steel (1) Each =================================================== MTCE 02-019 R-2 VMS UPGRADES 02/24/05 4.00 3500.00 1942.75 2100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 3500.00 1942.75 2100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 3500.00 1942.75 2100.00 =============== 614-84000 Traf Sig Ped Pole Steel Each =================================================== MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 3.00 1200.00 1041.56 1082.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 1200.00 1041.56 1082.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1200.00 1041.56 1082.00 =============== 614-86106 Telemetry (Field)(Install Only) Each =================================================== MTCE 02-019 R-2 VMS UPGRADES 02/24/05 1.00 600.00 1005.00 310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 600.00 1005.00 310.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 600.00 1005.00 310.00 =============== 614-86245 Ctrler (Ty 170E) Each =================================================== MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 2.00 11750.00 17980.42 17105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 11750.00 17980.42 17105.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 11750.00 17980.42 17105.00 =============== 614-86600 Inst Traf Sig Ctrler (M) Each =================================================== MTCE 02-019 R-2 VMS UPGRADES 02/24/05 1.00 2500.00 1783.75 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2500.00 1783.75 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2500.00 1783.75 1500.00 =============== 614-86705 Inst Traf Sig Equip Hour =================================================== MTCE 01-051 R-1 HIGHWAY LIGHTING, PH 4 06/30/05 40.00 100.00 113.75 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 100.00 113.75 70.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 100.00 113.75 70.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 58 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87010 Fiber Optic Cable (S Mode) (12 Fiber) Lin Foot =============================================== MTCE 01-051 R-1 HIGHWAY LIGHTING, PH 4 06/30/05 10,000.00 2.50 1.58 1.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10,000.00 2.50 1.58 1.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,000.00 2.50 1.58 1.60 =============== 614-87350 Test Fiber Optic Cable LUMP SUM =============================================== MTCE 02-023 LAMAR FIBER OPTIC 05/12/05 1.00 2000.00 2767.41 3589.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2000.00 2767.41 3589.00 MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 1.00 2000.00 2460.00 2580.00 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 1.00 4000.00 5052.33 3664.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 3000.00 4188.22 3122.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2666.67 3519.61 3277.67 =============== 614-87401 Fiber Optic Cable (Spec) Lin Foot =============================================== MTCE 02-023 LAMAR FIBER OPTIC 05/12/05 22,000.00 1.85 2.06 1.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 22,000.00 1.85 2.06 1.28 MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 400.00 2.50 2.98 2.70 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 21,235.00 1.30 1.35 0.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21,635.00 1.32 1.37 0.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43,635.00 1.59 1.77 1.07 =============== 614-87407 Fiber Optic Cable (M Mode) (6 S) Lin Foot =============================================== MTCE 01-046 I-70 & SH6 10/27/05 100.00 9.00 13.50 17.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 9.00 13.50 17.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 9.00 13.50 17.85 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 59 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87413 Fiber Optic Cable (M Mode) (12 S) Lin Foot =============================================== MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 100.00 20.00 15.65 15.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 20.00 15.65 15.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 20.00 15.65 15.07 =============== 614-87524 Splice FO Cable (24 Strand) Each =================================================== MTCE 01-051 R-1 HIGHWAY LIGHTING, PH 4 06/30/05 10.00 500.00 1514.19 885.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 500.00 1514.19 885.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 500.00 1514.19 885.00 =============== 614-87624 Term FO Cable (24 Strand) Each =================================================== MTCE 01-051 R-1 HIGHWAY LIGHTING, PH 4 06/30/05 5.00 1500.00 938.23 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 1500.00 938.23 700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1500.00 938.23 700.00 =============== 620-00011 Field Lab (CL 1) Each =================================================== MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 1.00 4000.00 8861.66 4490.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 4000.00 8861.66 4490.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 4000.00 8861.66 4490.00 =============== 620-00020 Sanitary Facility Each =================================================== MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 1.00 800.00 300.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 800.00 300.00 300.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 1.00 400.00 637.61 280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 400.00 637.61 280.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 600.00 595.41 290.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 60 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 625-00000 Const Surveying LUMP SUM =============================================== MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 1.00 20000.00 4104.00 2384.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 20000.00 4104.00 2384.00 MTCE 01-046 I-70 & SH6 10/27/05 1.00 7000.00 2487.60 1272.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 7000.00 2487.60 1272.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 13500.00 3206.00 1828.00 =============== 625-00001 Const Surveying (Hour) Hour =================================================== MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 20.00 200.00 146.57 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 200.00 146.57 110.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 200.00 146.57 110.00 =============== 626-00000 Mobilization LUMP SUM =============================================== MTCE 05-036 REGION 5, MAINTENANCE SECTION 01/06/05 1.00 10000.00 13056.25 10000.00 MTCE 03-021 R3 REGION-WIDE STENCIL 01/06/05 1.00 20000.00 16400.00 12000.00 MTCE 01-044 R-1 WEST STRIPING 01/06/05 1.00 10000.00 28333.33 10000.00 MTCE 03-022 R-3, REGION WIDE STRIPING 01/27/05 1.00 4000.00 13500.00 2500.00 MTCE 05-037 R-5 SIGN REPLACEMENT - EAST 02/03/05 1.00 10000.00 25100.00 37500.00 MTCE 05-039 R-5, SIGN REPLACEMENT - WEST 02/03/05 1.00 10000.00 17000.00 8000.00 MTCE 02-021 SH 50 & 96, VARIABLE MESSAGE 02/03/05 1.00 15000.00 12018.02 18000.00 MTCE 06-055 R-6 STRIPING PROJECT 02/17/05 1.00 10000.00 10000.00 10000.00 MTCE 03-023 GRAND JUNCTION OVERHEAD SIGNS 02/17/05 1.00 10000.00 12500.00 16000.00 MTCE 02-019 R-2 VMS UPGRADES 02/24/05 1.00 20000.00 14265.00 19000.00 MTCE 05-035R R-5, EPOXY EAST 03/10/05 1.00 10000.00 10000.00 10000.00 MTCE 05-038 REGION 5, MAINTENANCE SECTION 03/10/05 1.00 20000.00 37275.00 39550.00 MTCE 05-040 R-5 GUARDRAIL UPGRADE 03/31/05 1.00 20000.00 19565.00 6200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 13000.00 18022.23 15288.46 MTCE 06-051 I-270 AT SH 2 04/07/05 1.00 15000.00 12107.50 3500.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 61 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00000 Mobilization LUMP SUM =============================================== MTCE 02-022 R-2 STRIPING, FY06 04/28/05 1.00 10000.00 11333.33 1000.00 MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 1.00 36000.00 33550.00 33550.00 MTCE 02-023 LAMAR FIBER OPTIC 05/12/05 1.00 15000.00 11451.40 9526.00 MTCE 04-060 FY05 REGION 4 I-25 EPOXY 05/12/05 1.00 7000.00 13275.00 1550.00 MTCE 01-049 R-1 FY06 STRIPING EAST 06/02/05 1.00 10000.00 70000.00 10000.00 MTCE 04-058 R-4 FY 06 STENCIL MARKING NW 06/02/05 1.00 20000.00 11666.67 15000.00 MTCE 04-059 FY 06 R4 - SH 56, 60 & 66 SIG 06/09/05 1.00 30000.00 24600.00 13800.00 MTCE 01-047 R-1, FY06, STENCIL MARKING 06/09/05 1.00 5000.00 23333.33 5000.00 MTCE 03-028 R-3 REGION WIDE SIGNING 06/30/05 1.00 23000.00 60000.00 60000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 17100.00 22030.36 15292.60 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 1.00 100000.00 47218.00 51596.00 MTCE 04-062 REGION 4 EPOXY EAST 07/28/05 1.00 10000.00 19000.00 5000.00 MTCE 06-062 REGION 6 STRIPING - FY 06 08/04/05 1.00 30000.00 30000.00 50000.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 1.00 50000.00 41932.63 44900.00 MTCE 01-045 R-1 REGION-WIDE SIGNING, FY06 08/25/05 1.00 40000.00 89333.33 68000.00 MTCE 04-064 FY 06 REGION 4 EPOXY WEST 08/25/05 1.00 10000.00 8000.00 10000.00 MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 1.00 28000.00 64000.00 75000.00 MTCE 03-025 R-3 REGION WIDE STENCIL 09/01/05 1.00 20000.00 20000.00 20000.00 MTCE 03-030 R-3 REGION WIDE STRIPING 09/15/05 1.00 40000.00 15000.00 5000.00 MTCE 01-052 I-70 AT MP 296, STR. F-18-F 09/22/05 1.00 5000.00 10733.75 9000.00 MTCE 06-063 SH 6, I-70 TO KALAMATH ST 09/29/05 1.00 15000.00 34964.40 41972.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 31636.36 36346.25 34588.00 MTCE 04-061R I-25 SLAB REPLACEMENT MM 244 10/13/05 1.00 85000.00 99125.00 85000.00 MTCE 03-031 R-3 FY06 SIGN REPLACEMENT (SH 10/20/05 1.00 50000.00 30937.50 12500.00 MTCE 01-046 I-70 & SH6 10/27/05 1.00 45000.00 36099.00 34974.00 MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 1.00 15000.00 15016.33 19449.00 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 1.00 40000.00 19073.67 7580.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 47000.00 39101.64 31900.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39.00 23666.67 27901.55 22862.74 =============== 627-00003 Thermoplastic Pvmt Mkg (Inlaid) Sq Foot ================================================ MTCE 01-044 R-1 WEST STRIPING 01/06/05 3,080.00 13.00 11.83 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,080.00 13.00 11.83 8.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 62 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00003 Thermoplastic Pvmt Mkg (Inlaid) Sq Foot ================================================ MTCE 02-022 R-2 STRIPING, FY06 04/28/05 16,358.00 13.00 8.83 7.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,358.00 13.00 8.83 7.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,438.00 13.00 9.31 7.96 =============== 627-00005 Epoxy Pvmt Mkg Gallon ================================================= MTCE 05-036 REGION 5, MAINTENANCE SECTION 01/06/05 17,073.00 31.00 40.31 39.00 MTCE 01-044 R-1 WEST STRIPING 01/06/05 26,140.00 34.00 37.45 36.00 MTCE 03-022 R-3, REGION WIDE STRIPING 01/27/05 13,500.00 37.00 39.28 41.60 MTCE 06-055 R-6 STRIPING PROJECT 02/17/05 2,000.00 45.00 44.50 40.00 MTCE 05-035R R-5, EPOXY EAST 03/10/05 17,194.00 39.00 43.75 43.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 75,907.00 35.28 39.41 39.53 MTCE 02-022 R-2 STRIPING, FY06 04/28/05 44,993.00 33.00 41.59 35.00 MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 104.00 100.00 140.00 140.00 MTCE 04-060 FY05 REGION 4 I-25 EPOXY 05/12/05 2,769.00 55.00 55.55 55.10 MTCE 03-026 R-3, REGION WIDE STRIPING 05/19/05 8,300.00 47.00 47.24 47.25 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 94.00 100.00 202.67 198.00 MTCE 01-049 R-1 FY06 STRIPING EAST 06/02/05 4,740.00 38.00 51.62 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 61,000.00 36.51 43.74 38.79 MTCE 04-062 REGION 4 EPOXY EAST 07/28/05 18,576.00 40.00 46.18 41.50 MTCE 06-062 REGION 6 STRIPING - FY 06 08/04/05 10,000.00 45.00 50.37 46.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 60.00 125.00 154.64 95.00 MTCE 04-064 FY 06 REGION 4 EPOXY WEST 08/25/05 18,454.00 43.00 44.15 42.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 47,090.00 42.35 46.59 42.90 MTCE 04-061R I-25 SLAB REPLACEMENT MM 244 10/13/05 10.00 500.00 335.75 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 500.00 335.75 450.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 184,007.00 37.52 42.90 40.17 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 63 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00007 Epoxy Pvmt Mkg (Spec) Gallon ================================================= MTCE 03-030 R-3 REGION WIDE STRIPING 09/15/05 9,172.00 48.00 46.88 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,172.00 48.00 46.88 41.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,172.00 48.00 46.88 41.00 =============== 627-00011 Pvmt Mkg Paint (Waterborne) Gallon ================================================= MTCE 04-061R I-25 SLAB REPLACEMENT MM 244 10/13/05 10.00 400.00 221.25 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 400.00 221.25 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 400.00 221.25 350.00 =============== 627-00012 Pvmt Mkg Paint (Low VOC Solvent Base) Gallon ================================================= MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 110.00 40.00 300.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 110.00 40.00 300.00 300.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 75.00 60.00 98.59 62.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 75.00 60.00 98.59 62.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 185.00 48.11 133.48 203.51 =============== 627-00025 4 In Pvmt Mkg Tape (Rem) Lin Foot =============================================== MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 500.00 5.00 9.85 8.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 500.00 5.00 9.85 8.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 500.00 5.00 9.85 8.95 =============== 627-00032 Raised Flex Pvmt Marker (Temp) Each =================================================== MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 100.00 6.00 12.47 10.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 6.00 12.47 10.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 6.00 12.47 10.40 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 64 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-01001 Preform Plastic Pvmt Mkg (Ty I) Sq Foot ================================================ MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 1,000.00 10.00 8.90 8.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,000.00 10.00 8.90 8.90 MTCE 06-062 REGION 6 STRIPING - FY 06 08/04/05 40,000.00 10.00 10.05 10.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 622.00 11.00 10.33 9.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40,622.00 10.02 10.06 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 41,622.00 10.01 10.05 9.97 =============== 627-01003 Preform Plastic Pvmt Mkg (Ty A) (Inlaid) Sq Foot ================================================ MTCE 01-044 R-1 WEST STRIPING 01/06/05 30,020.00 9.00 9.15 8.15 MTCE 05-038 REGION 5, MAINTENANCE SECTION 03/10/05 35,898.00 10.00 10.34 10.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 65,918.00 9.54 9.68 9.25 MTCE 01-049 R-1 FY06 STRIPING EAST 06/02/05 62,460.00 9.00 10.42 8.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 62,460.00 9.00 10.42 8.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 128,378.00 9.28 10.07 8.76 =============== 627-01010 Preform Plastic Pvmt Mkg (TY I)(Inlaid) Sq Foot ================================================ MTCE 06-062 REGION 6 STRIPING - FY 06 08/04/05 50,000.00 11.00 12.42 12.00 MTCE 03-030 R-3 REGION WIDE STRIPING 09/15/05 16,633.00 12.00 10.83 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 66,633.00 11.25 12.13 11.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66,633.00 11.25 12.13 11.50 =============== 627-03000 Preform Plastic Pvmt Mkg (Ty C) Sq Foot ================================================ MTCE 06-055 R-6 STRIPING PROJECT 02/17/05 45,000.00 8.00 10.25 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 45,000.00 8.00 10.25 8.50 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 65 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-03000 Preform Plastic Pvmt Mkg (Ty C) Sq Foot ================================================ MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 506.00 12.00 11.47 10.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 506.00 12.00 11.47 10.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45,506.00 8.04 10.27 8.52 =============== 627-03003 Preform Plastic Pvmt Mkg (Ty C) (Inlaid) Sq Foot ================================================ MTCE 01-044 R-1 WEST STRIPING 01/06/05 21,175.00 9.50 9.92 8.15 MTCE 05-038 REGION 5, MAINTENANCE SECTION 03/10/05 2,222.00 11.00 12.48 13.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 23,397.00 9.64 10.08 8.70 MTCE 01-049 R-1 FY06 STRIPING EAST 06/02/05 102,700.00 9.25 11.07 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 102,700.00 9.25 11.07 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 126,097.00 9.32 10.89 8.13 =============== 627-30210 Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ MTCE 01-047 R-1, FY06, STENCIL MARKING 06/09/05 39,360.00 4.00 4.62 4.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 39,360.00 4.00 4.62 4.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39,360.00 4.00 4.62 4.35 =============== 627-30325 Plastic Pvmt Mkg (Ty B) (WS) Sq Foot ================================================ MTCE 05-038 REGION 5, MAINTENANCE SECTION 03/10/05 717.00 15.00 19.23 18.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 717.00 15.00 19.23 18.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 717.00 15.00 19.23 18.45 =============== 627-30326 Preform Plastic Pvmt Mkg (WS) (Ty II) Sq Foot ================================================ MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 132.00 12.00 12.51 9.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 132.00 12.00 12.51 9.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 132.00 12.00 12.51 9.55 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 66 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30330 Plastic Pvmt Mkg (Ty B) (XS) Sq Foot ================================================ MTCE 05-038 REGION 5, MAINTENANCE SECTION 03/10/05 552.00 14.00 16.73 18.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 552.00 14.00 16.73 18.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 552.00 14.00 16.73 18.45 =============== 627-30331 Preform Plastic Pvmt Mkg (XS) (Ty II) Sq Foot ================================================ MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 310.00 12.00 11.00 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 310.00 12.00 11.00 11.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 1,720.00 12.00 10.07 9.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,720.00 12.00 10.07 9.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,030.00 12.00 10.09 9.60 =============== 627-30405 Preform Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ MTCE 03-021 R3 REGION-WIDE STENCIL 01/06/05 3,120.00 10.00 11.35 9.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,120.00 10.00 11.35 9.75 MTCE 02-022 R-2 STRIPING, FY06 04/28/05 6,628.00 10.00 9.53 7.95 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 382.00 15.00 16.03 15.60 MTCE 04-058 R-4 FY 06 STENCIL MARKING NW 06/02/05 17,254.50 9.00 11.33 10.00 MTCE 01-047 R-1, FY06, STENCIL MARKING 06/09/05 10,403.00 8.00 11.65 8.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 34,667.50 8.96 11.14 9.35 MTCE 03-025 R-3 REGION WIDE STENCIL 09/01/05 9,442.00 12.00 11.60 11.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,442.00 12.00 11.60 11.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 47,229.50 9.63 11.19 9.83 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 67 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30410 Preform Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ MTCE 03-021 R3 REGION-WIDE STENCIL 01/06/05 17,350.00 10.00 10.04 8.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17,350.00 10.00 10.04 8.82 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 880.00 13.00 13.58 12.25 MTCE 04-058 R-4 FY 06 STENCIL MARKING NW 06/02/05 25,925.00 6.00 8.83 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26,805.00 6.23 8.99 8.62 MTCE 03-025 R-3 REGION WIDE STENCIL 09/01/05 51,443.00 11.00 9.10 9.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 51,443.00 11.00 9.10 9.10 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 828.00 10.00 16.66 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 828.00 10.00 16.66 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 96,426.00 9.49 9.51 8.98 =============== 630-00000 Flagging Hour =================================================== MTCE 03-021 R3 REGION-WIDE STENCIL 01/06/05 717.00 22.00 27.33 24.00 MTCE 06-053 R-6 SIGN POST REPLACEMENT 01/06/05 80.00 20.00 19.67 18.00 MTCE 03-022 R-3, REGION WIDE STRIPING 01/27/05 100.00 28.00 30.00 25.00 MTCE 06-055 R-6 STRIPING PROJECT 02/17/05 240.00 25.00 16.00 12.00 MTCE 03-023 GRAND JUNCTION OVERHEAD SIGNS 02/17/05 87.00 30.00 28.00 15.00 MTCE 03-024 I-70 WB MP 128, STR F-08-BH 02/24/05 200.00 27.00 27.00 28.00 MTCE 02-019 R-2 VMS UPGRADES 02/24/05 20.00 26.00 25.75 21.50 MTCE 05-038 REGION 5, MAINTENANCE SECTION 03/10/05 1,000.00 23.00 28.50 21.00 MTCE 05-040 R-5 GUARDRAIL UPGRADE 03/31/05 600.00 30.00 22.49 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,044.00 24.87 25.34 21.14 MTCE 06-051 I-270 AT SH 2 04/07/05 80.00 25.00 19.81 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 68 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00000 Flagging Hour =================================================== MTCE 06-056 SH 177 AT CHERRY HILLS FIRE S 04/14/05 80.00 25.00 31.20 14.00 MTCE 05-041 US550 - MP 97.0 TO MP 103.57 04/21/05 340.00 25.00 18.78 18.25 MTCE 01-050 I-70 WB AT MP 296.3, STR. F-1 04/21/05 20.00 25.00 20.75 20.00 MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 32.00 25.00 28.00 28.00 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 240.00 25.00 22.13 22.40 MTCE 04-058 R-4 FY 06 STENCIL MARKING NW 06/02/05 500.00 21.00 25.00 25.00 MTCE 04-059 FY 06 R4 - SH 56, 60 & 66 SIG 06/09/05 1,000.00 22.50 21.67 16.00 MTCE 03-028 R-3 REGION WIDE SIGNING 06/30/05 400.00 23.00 22.00 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,692.00 23.03 22.63 19.65 MTCE 03-029 R-3, EXPANSION JOINT REPAIRS 07/07/05 750.00 30.00 41.00 41.00 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 500.00 30.00 20.60 19.13 MTCE 06-060 SH 58@ WASHINGTON, STR. E-16- 07/21/05 250.00 25.00 30.53 21.50 MTCE 06-061 R6 - SIGN POST REPLACEMENT 07/28/05 80.00 24.00 20.75 15.00 MTCE 06-062 REGION 6 STRIPING - FY 06 08/04/05 480.00 25.00 15.67 18.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 320.00 25.00 22.06 22.50 MTCE 03-025 R-3 REGION WIDE STENCIL 09/01/05 1,056.00 30.00 18.00 18.00 MTCE 01-052 I-70 AT MP 296, STR. F-18-F 09/22/05 60.00 25.00 19.00 14.00 MTCE 06-063 SH 6, I-70 TO KALAMATH ST 09/29/05 480.00 30.00 21.16 19.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,976.00 28.48 22.49 23.16 MTCE 04-061R I-25 SLAB REPLACEMENT MM 244 10/13/05 100.00 23.00 24.46 32.60 MTCE 03-031 R-3 FY06 SIGN REPLACEMENT (SH 10/20/05 250.00 25.00 23.75 24.00 MTCE 01-046 I-70 & SH6 10/27/05 40.00 25.00 26.64 23.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 390.00 24.49 24.29 26.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,102.00 25.79 23.44 21.73 =============== 630-00001 Pilot Car Operation Hour =================================================== MTCE 05-041 US550 - MP 97.0 TO MP 103.57 04/21/05 120.00 30.00 37.00 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 120.00 30.00 37.00 36.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 30.00 37.00 36.00 =============== 630-00003 Uniformed Traf Ctrl Hour =================================================== MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 1,000.00 55.00 69.67 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,000.00 55.00 69.67 65.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,000.00 55.00 69.67 65.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 69 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00004 Traf Ctrl Vehicle Each =================================================== MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 1.00 1000.00 900.00 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 900.00 900.00 MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 1.00 2000.00 7908.33 5000.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 1.00 1500.00 996.80 1125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1750.00 3070.26 3062.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1500.00 2872.96 2341.67 =============== 630-00007 Traf Ctrl Inspection Day ==================================================== MTCE 03-023 GRAND JUNCTION OVERHEAD SIGNS 02/17/05 22.00 110.00 100.00 50.00 MTCE 03-024 I-70 WB MP 128, STR F-08-BH 02/24/05 8.00 185.00 166.00 166.00 MTCE 05-038 REGION 5, MAINTENANCE SECTION 03/10/05 12.00 100.00 150.00 100.00 MTCE 05-040 R-5 GUARDRAIL UPGRADE 03/31/05 10.00 120.00 133.25 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 52.00 121.15 128.92 87.08 MTCE 06-051 I-270 AT SH 2 04/07/05 4.00 100.00 77.88 95.00 MTCE 05-041 US550 - MP 97.0 TO MP 103.57 04/21/05 2.00 150.00 177.50 275.00 MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 5.00 120.00 90.00 90.00 MTCE 02-023 LAMAR FIBER OPTIC 05/12/05 10.00 90.00 147.25 128.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21.00 104.76 135.10 126.67 MTCE 03-029 R-3, EXPANSION JOINT REPAIRS 07/07/05 45.00 170.00 173.00 173.00 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 30.00 50.00 91.79 84.37 MTCE 06-060 SH 58@ WASHINGTON, STR. E-16- 07/21/05 5.00 125.00 113.90 26.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 8.00 125.00 75.26 115.00 MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 60.00 80.00 70.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 148.00 105.24 90.29 90.99 MTCE 01-046 I-70 & SH6 10/27/05 30.00 80.00 101.67 53.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 70 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00007 Traf Ctrl Inspection Day ==================================================== MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 6.00 130.00 85.00 40.00 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 16.00 90.00 59.00 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 52.00 88.85 85.02 45.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 273.00 105.11 99.11 84.23 =============== 630-00009 Traf Ctrl Vehicle (Truck) Each =================================================== MTCE 03-024 I-70 WB MP 128, STR F-08-BH 02/24/05 1.00 3000.00 3708.00 2785.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3000.00 3708.00 2785.00 MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 1.00 2500.00 15000.00 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2500.00 15000.00 15000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2750.00 7472.00 8892.50 =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== MTCE 03-021 R3 REGION-WIDE STENCIL 01/06/05 31.00 400.00 675.00 550.00 MTCE 06-053 R-6 SIGN POST REPLACEMENT 01/06/05 10.00 300.00 416.67 500.00 MTCE 02-021 SH 50 & 96, VARIABLE MESSAGE 02/03/05 20.00 450.00 425.71 375.00 MTCE 06-055 R-6 STRIPING PROJECT 02/17/05 30.00 300.00 450.00 500.00 MTCE 03-023 GRAND JUNCTION OVERHEAD SIGNS 02/17/05 20.00 475.00 395.00 300.00 MTCE 03-024 I-70 WB MP 128, STR F-08-BH 02/24/05 20.00 415.00 524.50 557.00 MTCE 02-019 R-2 VMS UPGRADES 02/24/05 20.00 450.00 472.12 375.00 MTCE 05-038 REGION 5, MAINTENANCE SECTION 03/10/05 30.00 475.00 600.00 800.00 MTCE 05-040 R-5 GUARDRAIL UPGRADE 03/31/05 20.00 400.00 479.25 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 201.00 410.20 506.61 503.43 MTCE 06-051 I-270 AT SH 2 04/07/05 10.00 400.00 359.06 425.00 MTCE 06-056 SH 177 AT CHERRY HILLS FIRE S 04/14/05 10.00 400.00 317.00 135.00 MTCE 05-041 US550 - MP 97.0 TO MP 103.57 04/21/05 12.00 350.00 412.50 400.00 MTCE 01-050 I-70 WB AT MP 296.3, STR. F-1 04/21/05 10.00 350.00 372.50 375.00 MTCE 02-022 R-2 STRIPING, FY06 04/28/05 30.00 400.00 375.00 250.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 71 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 15.00 400.00 505.00 505.00 MTCE 02-023 LAMAR FIBER OPTIC 05/12/05 25.00 565.00 497.08 654.00 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 30.00 400.00 402.00 448.00 MTCE 04-058 R-4 FY 06 STENCIL MARKING NW 06/02/05 80.00 400.00 516.67 700.00 MTCE 04-059 FY 06 R4 - SH 56, 60 & 66 SIG 06/09/05 150.00 450.00 325.00 150.00 MTCE 03-028 R-3 REGION WIDE SIGNING 06/30/05 190.00 450.00 350.00 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 562.00 435.63 397.96 363.02 MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 100.00 425.00 550.00 600.00 MTCE 03-029 R-3, EXPANSION JOINT REPAIRS 07/07/05 150.00 600.00 550.00 550.00 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 60.00 500.00 415.75 450.00 MTCE 06-060 SH 58@ WASHINGTON, STR. E-16- 07/21/05 15.00 425.00 612.00 410.00 MTCE 06-061 R6 - SIGN POST REPLACEMENT 07/28/05 10.00 500.00 437.50 300.00 MTCE 06-062 REGION 6 STRIPING - FY 06 08/04/05 100.00 450.00 441.67 500.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 20.00 425.00 419.66 370.00 MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 150.00 370.00 183.33 200.00 MTCE 03-025 R-3 REGION WIDE STENCIL 09/01/05 88.00 700.00 550.00 550.00 MTCE 01-052 I-70 AT MP 296, STR. F-18-F 09/22/05 20.00 375.00 415.00 400.00 MTCE 06-063 SH 6, I-70 TO KALAMATH ST 09/29/05 60.00 500.00 345.20 440.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 773.00 494.15 402.03 451.29 MTCE 04-061R I-25 SLAB REPLACEMENT MM 244 10/13/05 140.00 550.00 329.00 230.00 MTCE 03-031 R-3 FY06 SIGN REPLACEMENT (SH 10/20/05 50.00 450.00 475.00 500.00 MTCE 01-046 I-70 & SH6 10/27/05 30.00 500.00 444.60 371.00 MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 15.00 600.00 483.33 575.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 235.00 525.53 385.01 327.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,771.00 470.21 409.23 412.77 =============== 630-00013 Traf Ctrl Mgmt with Flagging Day ==================================================== MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 40.00 600.00 578.36 570.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 600.00 578.36 570.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 600.00 578.36 570.00 =============== 630-00015 Uniformed Traf Ctrl Coordination Hour =================================================== MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 10.00 60.00 84.23 84.40 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 72 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00015 Uniformed Traf Ctrl Coordination Hour =================================================== MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 30.00 55.00 62.72 62.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 56.25 66.16 67.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 56.25 66.16 67.60 =============== 630-10005 Traf Ctrl LUMP SUM =============================================== MTCE 01-045 R-1 REGION-WIDE SIGNING, FY06 08/25/05 1.00 80000.00 56333.33 39000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 80000.00 56333.33 39000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 80000.00 56333.33 39000.00 =============== 630-80001 Flash Beacon (Port) Each =================================================== MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 6.00 200.00 300.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 200.00 300.00 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 200.00 300.00 300.00 =============== 630-80305 Flagging Station Light Each =================================================== MTCE 03-023 GRAND JUNCTION OVERHEAD SIGNS 02/17/05 1.00 1725.00 599.00 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1725.00 599.00 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1725.00 599.00 400.00 =============== 630-80336 Barricade (3 M-B) (Temp) Each =================================================== MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 2.00 450.00 410.33 500.00 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 2.00 300.00 193.75 225.00 MTCE 06-060 SH 58@ WASHINGTON, STR. E-16- 07/21/05 2.00 300.00 391.30 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 350.00 330.21 341.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 350.00 330.21 341.67 =============== 630-80341 Const Traf Sign (A) Each =================================================== MTCE 02-021 SH 50 & 96, VARIABLE MESSAGE 02/03/05 8.00 50.00 79.64 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 73 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80341 Const Traf Sign (A) Each =================================================== MTCE 03-023 GRAND JUNCTION OVERHEAD SIGNS 02/17/05 3.00 38.00 61.00 30.00 MTCE 03-024 I-70 WB MP 128, STR F-08-BH 02/24/05 4.00 60.00 48.00 34.00 MTCE 02-019 R-2 VMS UPGRADES 02/24/05 4.00 60.00 45.84 30.00 MTCE 05-038 REGION 5, MAINTENANCE SECTION 03/10/05 22.00 50.00 77.50 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 41.00 51.07 70.21 41.12 MTCE 06-056 SH 177 AT CHERRY HILLS FIRE S 04/14/05 5.00 70.00 111.50 50.00 MTCE 05-041 US550 - MP 97.0 TO MP 103.57 04/21/05 5.00 65.00 36.00 35.00 MTCE 02-022 R-2 STRIPING, FY06 04/28/05 2.00 30.00 41.67 15.00 MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 16.00 75.00 75.00 75.00 MTCE 02-023 LAMAR FIBER OPTIC 05/12/05 4.00 65.00 75.97 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 68.59 78.97 56.97 MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 6.00 70.00 88.00 100.00 MTCE 03-029 R-3, EXPANSION JOINT REPAIRS 07/07/05 8.00 70.00 57.50 57.50 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 4.00 40.00 56.56 56.25 MTCE 06-060 SH 58@ WASHINGTON, STR. E-16- 07/21/05 4.00 60.00 54.45 52.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 20.00 60.00 46.23 39.00 MTCE 01-052 I-70 AT MP 296, STR. F-18-F 09/22/05 4.00 50.00 53.25 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 46.00 60.43 52.12 52.46 MTCE 04-061R I-25 SLAB REPLACEMENT MM 244 10/13/05 6.00 60.00 98.25 50.00 MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 2.00 50.00 28.67 20.00 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 14.00 45.00 28.35 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22.00 49.55 43.08 27.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 141.00 57.87 58.34 46.30 =============== 630-80342 Const Traf Sign (B) Each =================================================== MTCE 03-021 R3 REGION-WIDE STENCIL 01/06/05 30.00 60.00 82.50 100.00 MTCE 06-053 R-6 SIGN POST REPLACEMENT 01/06/05 8.00 40.00 81.67 100.00 MTCE 03-022 R-3, REGION WIDE STRIPING 01/27/05 12.00 25.00 110.00 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 74 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80342 Const Traf Sign (B) Each =================================================== MTCE 02-021 SH 50 & 96, VARIABLE MESSAGE 02/03/05 10.00 55.00 92.14 30.00 MTCE 06-055 R-6 STRIPING PROJECT 02/17/05 15.00 50.00 12.50 15.00 MTCE 03-023 GRAND JUNCTION OVERHEAD SIGNS 02/17/05 10.00 65.00 72.50 30.00 MTCE 03-024 I-70 WB MP 128, STR F-08-BH 02/24/05 9.00 67.00 56.50 39.00 MTCE 05-038 REGION 5, MAINTENANCE SECTION 03/10/05 51.00 60.00 81.00 50.00 MTCE 06-037 SH 93 - SNOW FENCE, MP 7.6 TO 03/24/05 5.00 145.00 170.00 95.00 MTCE 05-040 R-5 GUARDRAIL UPGRADE 03/31/05 12.00 60.00 40.50 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 162.00 58.51 76.18 53.09 MTCE 06-051 I-270 AT SH 2 04/07/05 10.00 80.00 104.88 100.00 MTCE 06-056 SH 177 AT CHERRY HILLS FIRE S 04/14/05 10.00 75.00 108.95 50.00 MTCE 05-041 US550 - MP 97.0 TO MP 103.57 04/21/05 28.00 70.00 36.00 35.00 MTCE 01-050 I-70 WB AT MP 296.3, STR. F-1 04/21/05 17.00 70.00 56.00 30.00 MTCE 02-022 R-2 STRIPING, FY06 04/28/05 38.00 35.00 71.67 15.00 MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 22.00 120.00 100.00 100.00 MTCE 02-023 LAMAR FIBER OPTIC 05/12/05 16.00 85.00 108.10 77.00 MTCE 03-026 R-3, REGION WIDE STRIPING 05/19/05 12.00 100.00 80.00 10.00 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 21.00 120.00 71.83 35.50 MTCE 04-058 R-4 FY 06 STENCIL MARKING NW 06/02/05 60.00 80.00 68.33 80.00 MTCE 04-059 FY 06 R4 - SH 56, 60 & 66 SIG 06/09/05 28.00 90.00 73.33 50.00 MTCE 03-028 R-3 REGION WIDE SIGNING 06/30/05 25.00 70.00 50.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 287.00 79.51 77.08 53.34 MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 29.00 150.00 130.33 165.00 MTCE 03-029 R-3, EXPANSION JOINT REPAIRS 07/07/05 40.00 80.00 69.00 69.00 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 35.00 50.00 59.57 56.26 MTCE 06-060 SH 58@ WASHINGTON, STR. E-16- 07/21/05 26.00 80.00 100.05 76.00 MTCE 06-061 R6 - SIGN POST REPLACEMENT 07/28/05 8.00 100.00 82.50 90.00 MTCE 06-062 REGION 6 STRIPING - FY 06 08/04/05 15.00 75.00 61.67 100.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 22.00 80.00 79.89 56.15 MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 14.00 90.00 150.00 50.00 MTCE 03-025 R-3 REGION WIDE STENCIL 09/01/05 40.00 80.00 10.00 10.00 MTCE 01-052 I-70 AT MP 296, STR. F-18-F 09/22/05 17.00 60.00 76.50 45.00 MTCE 06-063 SH 6, I-70 TO KALAMATH ST 09/29/05 12.00 75.00 62.20 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 258.00 83.12 82.10 67.71 MTCE 04-061R I-25 SLAB REPLACEMENT MM 244 10/13/05 25.00 120.00 103.75 65.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 75 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80342 Const Traf Sign (B) Each =================================================== MTCE 03-031 R-3 FY06 SIGN REPLACEMENT (SH 10/20/05 25.00 80.00 51.25 45.00 MTCE 01-046 I-70 & SH6 10/27/05 10.00 80.00 61.10 42.40 MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 11.00 65.00 33.00 17.00 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 24.00 60.00 42.17 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 95.00 83.74 60.22 41.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 802.00 76.93 75.75 56.53 =============== 630-80343 Const Traf Sign (C) Each =================================================== MTCE 03-024 I-70 WB MP 128, STR F-08-BH 02/24/05 11.00 72.00 72.00 45.00 MTCE 02-019 R-2 VMS UPGRADES 02/24/05 24.00 90.00 57.09 38.00 MTCE 05-038 REGION 5, MAINTENANCE SECTION 03/10/05 8.00 85.00 84.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 43.00 84.47 62.75 42.02 MTCE 06-051 I-270 AT SH 2 04/07/05 2.00 100.00 114.88 110.00 MTCE 05-041 US550 - MP 97.0 TO MP 103.57 04/21/05 8.00 90.00 36.00 35.00 MTCE 01-050 I-70 WB AT MP 296.3, STR. F-1 04/21/05 13.00 100.00 71.75 40.00 MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 8.00 120.00 110.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 31.00 102.58 72.69 61.29 MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 8.00 150.00 157.67 200.00 MTCE 03-029 R-3, EXPANSION JOINT REPAIRS 07/07/05 6.00 90.00 80.50 80.50 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 13.00 150.00 62.56 56.23 MTCE 06-060 SH 58@ WASHINGTON, STR. E-16- 07/21/05 4.00 80.00 89.65 51.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 4.00 80.00 81.18 56.15 MTCE 01-052 I-70 AT MP 296, STR. F-18-F 09/22/05 13.00 80.00 89.25 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48.00 111.88 89.16 82.45 MTCE 04-061R I-25 SLAB REPLACEMENT MM 244 10/13/05 28.00 120.00 170.00 75.00 MTCE 01-046 I-70 & SH6 10/27/05 6.00 90.00 83.27 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 34.00 114.71 151.68 71.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 156.00 103.09 96.46 64.63 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 76 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80344 Const Traf Sign (Spec) Sq Foot ================================================ MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 72.00 20.00 20.00 20.00 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 80.00 20.00 12.58 5.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 152.00 20.00 14.29 12.50 MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 165.00 25.00 19.33 18.00 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 462.00 20.00 17.47 16.30 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 60.00 20.00 18.89 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 687.00 21.20 18.02 17.03 MTCE 01-046 I-70 & SH6 10/27/05 64.00 26.00 18.70 26.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 64.00 26.00 18.70 26.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 903.00 21.34 17.74 16.94 =============== 630-80351 Vert Panel (Plastic) Each =================================================== MTCE 03-023 GRAND JUNCTION OVERHEAD SIGNS 02/17/05 10.00 75.00 36.00 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 75.00 36.00 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 75.00 36.00 7.00 =============== 630-80355 Port Mesg Panel Each =================================================== MTCE 05-038 REGION 5, MAINTENANCE SECTION 03/10/05 2.00 15000.00 4500.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 15000.00 4500.00 5000.00 MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 2.00 4000.00 5000.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 4000.00 5000.00 5000.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 77 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80355 Port Mesg Panel Each =================================================== MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 2.00 7000.00 11608.33 12000.00 MTCE 03-029 R-3, EXPANSION JOINT REPAIRS 07/07/05 2.00 15000.00 20700.00 20700.00 MTCE 06-060 SH 58@ WASHINGTON, STR. E-16- 07/21/05 2.00 6000.00 2163.00 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 9333.33 7371.11 11266.67 MTCE 04-061R I-25 SLAB REPLACEMENT MM 244 10/13/05 2.00 10000.00 9165.50 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 10000.00 9165.50 7500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 9500.00 7312.63 8550.00 =============== 630-80357 Flash Arrow Panel (B Ty) Each =================================================== MTCE 03-023 GRAND JUNCTION OVERHEAD SIGNS 02/17/05 2.00 1100.00 892.50 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1100.00 892.50 500.00 MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 1.00 800.00 641.67 675.00 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 2.00 800.00 642.83 254.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 800.00 642.60 394.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 920.00 695.21 436.60 =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== MTCE 03-021 R3 REGION-WIDE STENCIL 01/06/05 2.00 1000.00 958.33 750.00 MTCE 06-053 R-6 SIGN POST REPLACEMENT 01/06/05 1.00 500.00 516.67 600.00 MTCE 06-055 R-6 STRIPING PROJECT 02/17/05 2.00 1000.00 600.00 200.00 MTCE 03-024 I-70 WB MP 128, STR F-08-BH 02/24/05 1.00 775.00 1110.50 1114.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 879.17 794.73 602.33 MTCE 06-056 SH 177 AT CHERRY HILLS FIRE S 04/14/05 1.00 1000.00 653.00 750.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 78 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== MTCE 01-050 I-70 WB AT MP 296.3, STR. F-1 04/21/05 1.00 1200.00 527.50 500.00 MTCE 02-022 R-2 STRIPING, FY06 04/28/05 2.00 200.00 466.67 150.00 MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 2.00 1250.00 2500.00 2500.00 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 2.00 1500.00 1192.00 676.00 MTCE 04-058 R-4 FY 06 STENCIL MARKING NW 06/02/05 2.00 1300.00 833.33 1000.00 MTCE 04-059 FY 06 R4 - SH 56, 60 & 66 SIG 06/09/05 2.00 1375.00 1166.67 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 1120.83 923.63 1075.17 MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 4.00 1800.00 3123.33 1000.00 MTCE 03-029 R-3, EXPANSION JOINT REPAIRS 07/07/05 2.00 2500.00 3450.00 3450.00 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 2.00 600.00 1035.38 1012.50 MTCE 06-060 SH 58@ WASHINGTON, STR. E-16- 07/21/05 2.00 1200.00 609.50 310.00 MTCE 06-061 R6 - SIGN POST REPLACEMENT 07/28/05 1.00 800.00 762.50 400.00 MTCE 06-062 REGION 6 STRIPING - FY 06 08/04/05 2.00 600.00 650.00 200.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 2.00 1300.00 949.93 560.00 MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 2.00 1500.00 3000.00 1500.00 MTCE 03-025 R-3 REGION WIDE STENCIL 09/01/05 4.00 1200.00 550.00 550.00 MTCE 01-052 I-70 AT MP 296, STR. F-18-F 09/22/05 2.00 600.00 812.50 800.00 MTCE 06-063 SH 6, I-70 TO KALAMATH ST 09/29/05 2.00 1110.00 1320.00 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 1264.80 1415.56 934.60 MTCE 04-061R I-25 SLAB REPLACEMENT MM 244 10/13/05 2.00 2250.00 3917.50 3500.00 MTCE 01-046 I-70 & SH6 10/27/05 2.00 1000.00 697.20 795.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1625.00 2128.44 2147.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 47.00 1209.47 1325.44 1031.30 =============== 630-80359 Port Mesg Panel Day ==================================================== MTCE 03-024 I-70 WB MP 128, STR F-08-BH 02/24/05 20.00 115.00 111.50 112.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 115.00 111.50 112.00 MTCE 01-050 I-70 WB AT MP 296.3, STR. F-1 04/21/05 10.00 170.00 147.50 125.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 79 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80359 Port Mesg Panel Day ==================================================== MTCE 02-023 LAMAR FIBER OPTIC 05/12/05 25.00 130.00 161.75 155.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 35.00 141.43 159.38 146.43 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 50.00 150.00 100.22 84.38 MTCE 01-052 I-70 AT MP 296, STR. F-18-F 09/22/05 20.00 200.00 155.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 70.00 164.29 115.87 103.13 MTCE 01-046 I-70 & SH6 10/27/05 3.00 200.00 281.80 265.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 200.00 281.80 265.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 128.00 151.17 138.05 120.15 =============== 630-80360 Drum Channel Dev Each =================================================== MTCE 02-021 SH 50 & 96, VARIABLE MESSAGE 02/03/05 40.00 40.00 45.89 35.00 MTCE 03-023 GRAND JUNCTION OVERHEAD SIGNS 02/17/05 25.00 55.00 50.00 50.00 MTCE 03-024 I-70 WB MP 128, STR F-08-BH 02/24/05 50.00 44.00 29.50 28.00 MTCE 05-038 REGION 5, MAINTENANCE SECTION 03/10/05 25.00 20.00 30.00 20.00 MTCE 05-040 R-5 GUARDRAIL UPGRADE 03/31/05 10.00 30.00 24.61 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 150.00 39.83 38.19 31.33 MTCE 01-050 I-70 WB AT MP 296.3, STR. F-1 04/21/05 50.00 40.00 24.13 15.00 MTCE 02-023 LAMAR FIBER OPTIC 05/12/05 100.00 35.00 50.94 62.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 150.00 36.67 45.58 46.33 MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 100.00 65.00 63.67 20.00 MTCE 03-029 R-3, EXPANSION JOINT REPAIRS 07/07/05 100.00 45.00 34.50 34.50 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 150.00 30.00 25.43 22.50 MTCE 06-060 SH 58@ WASHINGTON, STR. E-16- 07/21/05 15.00 40.00 50.35 26.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 80 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80360 Drum Channel Dev Each =================================================== MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 50.00 40.00 39.84 33.70 MTCE 01-052 I-70 AT MP 296, STR. F-18-F 09/22/05 50.00 25.00 36.25 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 465.00 41.61 38.63 26.67 MTCE 01-046 I-70 & SH6 10/27/05 25.00 45.00 46.56 31.80 MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 10.00 45.00 23.67 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35.00 45.00 42.13 26.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 800.00 40.50 40.93 31.22 =============== 630-80363 Drum Channel Dev (Light) (F) Each =================================================== MTCE 03-023 GRAND JUNCTION OVERHEAD SIGNS 02/17/05 6.00 40.00 55.00 50.00 MTCE 05-040 R-5 GUARDRAIL UPGRADE 03/31/05 5.00 35.00 28.80 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 37.73 38.63 36.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 37.73 38.63 36.36 =============== 630-80364 Drum Channel Dev (Light) (SB) Each =================================================== MTCE 03-023 GRAND JUNCTION OVERHEAD SIGNS 02/17/05 6.00 60.00 55.00 50.00 MTCE 03-024 I-70 WB MP 128, STR F-08-BH 02/24/05 50.00 50.00 41.00 39.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 56.00 51.07 42.50 40.18 MTCE 03-029 R-3, EXPANSION JOINT REPAIRS 07/07/05 100.00 55.00 46.00 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 55.00 46.00 46.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 156.00 53.59 44.15 43.91 =============== 630-80370 Conc Barrier (Temp) Lin Foot =============================================== MTCE 03-023 GRAND JUNCTION OVERHEAD SIGNS 02/17/05 120.00 37.00 40.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 37.00 40.00 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 81 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80370 Conc Barrier (Temp) Lin Foot =============================================== MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 330.00 30.00 30.50 30.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 330.00 30.00 30.50 30.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 450.00 31.87 32.35 25.03 =============== 630-80380 Traffic Cone Each =================================================== MTCE 03-021 R3 REGION-WIDE STENCIL 01/06/05 100.00 10.00 10.42 10.00 MTCE 06-053 R-6 SIGN POST REPLACEMENT 01/06/05 100.00 10.00 5.33 3.00 MTCE 06-055 R-6 STRIPING PROJECT 02/17/05 300.00 10.00 5.00 5.00 MTCE 03-023 GRAND JUNCTION OVERHEAD SIGNS 02/17/05 100.00 11.00 12.13 7.00 MTCE 02-019 R-2 VMS UPGRADES 02/24/05 75.00 10.00 10.22 10.00 MTCE 05-038 REGION 5, MAINTENANCE SECTION 03/10/05 100.00 14.00 17.50 20.00 MTCE 05-040 R-5 GUARDRAIL UPGRADE 03/31/05 50.00 10.00 5.39 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 825.00 10.61 8.47 7.88 MTCE 06-051 I-270 AT SH 2 04/07/05 50.00 15.00 19.31 11.50 MTCE 06-056 SH 177 AT CHERRY HILLS FIRE S 04/14/05 100.00 15.00 12.24 1.00 MTCE 05-041 US550 - MP 97.0 TO MP 103.57 04/21/05 200.00 10.00 3.13 3.00 MTCE 02-022 R-2 STRIPING, FY06 04/28/05 100.00 10.00 13.33 20.00 MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 200.00 15.00 10.00 10.00 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 100.00 15.00 10.58 5.75 MTCE 04-058 R-4 FY 06 STENCIL MARKING NW 06/02/05 150.00 12.50 11.67 20.00 MTCE 04-059 FY 06 R4 - SH 56, 60 & 66 SIG 06/09/05 300.00 12.00 10.17 10.00 MTCE 03-028 R-3 REGION WIDE SIGNING 06/30/05 100.00 12.00 10.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,300.00 12.63 10.69 9.88 MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 300.00 15.00 25.33 15.00 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 200.00 10.00 10.65 11.25 MTCE 06-060 SH 58@ WASHINGTON, STR. E-16- 07/21/05 75.00 15.00 18.05 11.00 MTCE 06-061 R6 - SIGN POST REPLACEMENT 07/28/05 100.00 10.00 6.25 5.00 MTCE 06-062 REGION 6 STRIPING - FY 06 08/04/05 300.00 10.00 13.67 12.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 100.00 15.00 11.31 11.25 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 82 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80380 Traffic Cone Each =================================================== MTCE 04-063 FY06 R4 I-76 EAST SIGNS 09/01/05 300.00 10.00 13.33 15.00 MTCE 03-025 R-3 REGION WIDE STENCIL 09/01/05 175.00 12.00 4.00 4.00 MTCE 06-063 SH 6, I-70 TO KALAMATH ST 09/29/05 200.00 15.00 15.30 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,750.00 12.13 14.44 11.54 MTCE 04-061R I-25 SLAB REPLACEMENT MM 244 10/13/05 200.00 18.00 15.70 10.00 MTCE 03-031 R-3 FY06 SIGN REPLACEMENT (SH 10/20/05 25.00 12.00 11.25 10.00 MTCE 01-046 I-70 & SH6 10/27/05 200.00 12.00 9.73 8.48 MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 30.00 12.00 9.00 4.00 MTCE 02-026 CAŅON CITY SIGNAL - FIBER OPT 12/01/05 100.00 10.50 9.25 8.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 555.00 13.89 11.50 8.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,430.00 12.21 12.13 10.05 =============== 630-80510 Mobile Pvmt Mkg Zone LUMP SUM =============================================== MTCE 04-060 FY05 REGION 4 I-25 EPOXY 05/12/05 1.00 3000.00 16500.00 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3000.00 16500.00 8000.00 MTCE 04-062 REGION 4 EPOXY EAST 07/28/05 1.00 10000.00 13416.67 10000.00 MTCE 04-064 FY 06 REGION 4 EPOXY WEST 08/25/05 1.00 10000.00 10000.00 10000.00 MTCE 03-030 R-3 REGION WIDE STRIPING 09/15/05 1.00 3000.00 29000.00 33000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 7666.67 16031.25 17666.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 6500.00 16125.00 15250.00 =============== 630-80520 Mobile Pvmt Mkg Zone Day ==================================================== MTCE 03-022 R-3, REGION WIDE STRIPING 01/27/05 45.00 350.00 260.00 250.00 MTCE 06-055 R-6 STRIPING PROJECT 02/17/05 40.00 500.00 550.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 85.00 420.59 396.47 367.65 MTCE 02-022 R-2 STRIPING, FY06 04/28/05 140.00 300.00 400.00 100.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 83 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80520 Mobile Pvmt Mkg Zone Day ==================================================== MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 4.00 500.00 250.00 250.00 MTCE 03-026 R-3, REGION WIDE STRIPING 05/19/05 18.00 500.00 225.00 250.00 MTCE 06-054 I-76 AT 88TH AVE. INTERCHANGE 05/19/05 20.00 600.00 277.00 281.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 182.00 357.14 372.54 138.02 MTCE 06-062 REGION 6 STRIPING - FY 06 08/04/05 40.00 500.00 916.67 2000.00 MTCE 06-050 SH 224 MP 2.95 TO MP 3.63 08/18/05 4.00 500.00 577.69 560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 44.00 500.00 852.54 1869.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 311.00 394.69 462.17 445.69 =============== 630-85006 Impact Atten (Sand Fill) (Temp) Each =================================================== MTCE 02-027 LAMAR - RR FIBER OPTIC 11/10/05 2.00 3500.00 2810.00 1130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 3500.00 2810.00 1130.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3500.00 2810.00 1130.00 =============== 630-85040 Impact Atten (T-M-A) (Temp) Each =================================================== MTCE 03-024 I-70 WB MP 128, STR F-08-BH 02/24/05 1.00 12000.00 5985.50 6436.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 12000.00 5985.50 6436.00 MTCE 01-050 I-70 WB AT MP 296.3, STR. F-1 04/21/05 1.00 8000.00 4394.75 4600.00 MTCE 06-059 C-470 VARIOUS LOCATIONS 05/12/05 1.00 4000.00 2500.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 6000.00 4015.80 3550.00 MTCE 06-057 R-6 EXPANSION JOINT REPAIRS 07/07/05 2.00 10000.00 23433.33 5000.00 MTCE 03-029 R-3, EXPANSION JOINT REPAIRS 07/07/05 1.00 15000.00 28750.00 28750.00 MTCE 01-048 I-70, EISENHOWER TUNNEL E & W 07/21/05 1.00 10000.00 10760.50 9000.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:45 Wednesday, January 18, 2006 84 ITEM UNIT COSTS BY PROJECTS -- 2005 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85040 Impact Atten (T-M-A) (Temp) Each =================================================== MTCE 01-052 I-70 AT MP 296, STR. F-18-F 09/22/05 1.00 4500.00 7850.00 8500.00 MTCE 06-063 SH 6, I-70 TO KALAMATH ST 09/29/05 2.00 12000.00 12150.00 9900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 10500.00 14611.68 10864.29 MTCE 04-061R I-25 SLAB REPLACEMENT MM 244 10/13/05 2.00 15000.00 25875.00 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 15000.00 25875.00 20000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 10625.00 15108.55 10798.83