Colorado Department of Transporation 15:10 Monday, January 8, 2007 1 2006 Cost Data PROJECTS BID FROM 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20060105 ROCKY MOUNTAIN ENTERPRISES, INC. 9 $174,645.00 75.97 SHE 0091-025 SH 9 VMS IN BRECKENRIDGE 1 M 20060105 DKS ENTERPRISES INC. 5 $425,058.20 98.02 SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38. 3 M 20060105 APC SOUTHERN CONSTRUCTION COMPANY, LLC 5 $6,249,303.40 108.25 NH 5502-052 US 550 N OF DURANGO PH II 5 R 20060105 SCHMIDT CONSTRUCTION COMPANY 5 $1,259,439.92 89.96 STA 105A-013 SH 105, SOUTH OF SEDALIA 1 R 20060105 SIMON CONTRACTORS 5 $2,380,980.05 97.71 IM 0705-076 I-70, GENOA EAST AND WEST 1 R 20060105 INTEGRATED ELECTRIC, INC. 7 $141,591.12 69.97 STA 0361-081 SH 36 VMS IN BOULDER COUNTY 4 R 20060106 G.A. WESTERN CONSTRUCTION CO. 3 $53,000.00 103.92 C 0702-258 I70 - ROCKFALL IN GLENWOOD CAN 3 M 20060112 APC SOUTHERN CONSTRUCTION COMPANY, LLC 4 $4,354,793.50 98.48 NH 1602-096 US 160, MP 117 TO MP 131.5 5 M 20060112 COULSON EXCAVATING COMPANY 2 $2,577,365.95 104.16 NH 0341-064 US 34: ESTES PARK TO ROCKY MTN 4 M 20060112 AMERICAN CIVIL CONSTRUCTORS, INC. 5 $2,567,642.00 65.99 IM 0704-206 I-70, BRIGHTON BLVD - COLO. BL 6 U 20060112 INTERMOUNTAIN SLURRY SEAL, INC. 2 $1,585,500.00 100.92 NH 0342-042 US 34 AND US 36 CHIPSEALS - EA 4 P 20060112 NEIL'S EXCAVATION & GENERAL CONTRACTING 5 $320,971.17 105.30 MTCE 05-044 R5 - INLAID PAVEMENT MARKING 5 M 20060112 KOLBE STRIPING INC. 3 $1,597,589.00 92.19 MTCE 05-045 R5 - REGION WIDE EPOXY STRIPIN 5 M 20060112 DKS ENTERPRISES INC. 8 $155,210.50 88.51 MTCE 02-025 R2 - FY 06 SNOW GATES 2 P 20060119 LAFARGE WEST, INC 3 $5,798,560.50 106.80 STA 3852-010 US 385 IN YUMA COUNTY 4 P 20060119 TRICON 2, LLC 3 $2,040,422.08 100.41 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 2 U 20060126 SIMON CONTRACTORS 4 $4,552,264.00 106.71 STA 0343-025 US 34, WRAY WEST 4 P Colorado Department of Transporation 15:10 Monday, January 8, 2007 2 2006 Cost Data PROJECTS BID FROM 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20060126 ASPHALT PAVING CO. 3 $4,062,848.89 109.96 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 1 M 20060126 AGGREGATE INDUSTRIES - WCR, INC. 9 $2,467,100.00 88.88 STA 052A-024 SH 52, PROSPECT VALLEY WEST 4 R 20060126 DKS ENTERPRISES INC. 4 $152,041.00 80.87 MTCE 05-043 US 24 & MAIN ST IN BUENA VISTA 5 M 20060126 ADARAND CONSTRUCTORS, INC. 4 $650,042.70 91.18 MTCE 05-046 REGION 5, MAINTENANCE SECTION 5 M 20060126 AMERICAN CIVIL CONSTRUCTORS, INC. 5 $148,500.00 103.45 MTCE 06-064 I-270 OVER SH224, STR. E-17-QP 6 U 20060202 LAWRENCE CONSTRUCTION CO. 5 $8,048,977.95 88.78 NH 2854-106 US 285, FOXTON RD - RICHMOND H 1 M 20060202 TECHNOLOGY CONSTRUCTORS, INC. 8 $1,692,903.89 77.60 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP ME 1 M 20060202 CRUZ CONSTRUCTION, INC. 4 $355,920.50 110.50 SHE 0504-049 US 50, EAST OF LA JUNTA 2 R 20060202 A-1 CHIPSEAL COMPANY 4 $674,674.00 90.12 STA 1131-005 SH 113 IN LOGAN COUNTY 4 P 20060209 UNITED COMPANIES OF MESA COUNTY < 3 BIDDERS & LOW BID > 10% OVER ENG EST STA 062A-011 SH 62 & CR 5 (AMELIA ST) 5 R 20060209 ELAM CONSTRUCTION, INC. < 3 BIDDERS & LOW BID > 10% OVER ENG EST IM 0701-179 I-70, GLENWOOD SPRINGS 3 M 20060209 ROCKY MOUNTAIN MATERIALS & ASPHALT, INC. 3 $5,198,924.79 117.64 IM 0252-382 I 25, SH 83 TO FOUNTAIN 2 P 20060209 INTERFACE COMMUNICATIONS, COMPANY 6 $355,247.78 80.11 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLAY 1 M 20060209 ROCKY MOUNTAIN ENTERPRISES, INC. 3 $192,872.00 100.30 MTCE 05-047 MONTE VISTA SIGNAL REPLACEMEN 5 U 20060216 AMERICAN CIVIL CONSTRUCTORS, INC. < 3 BIDDERS & LOW BID > 10% OVER ENG EST STA 0091-022 SH 9, HOOSIER PASS NORTH 1 M 20060216 FOUR CORNERS MATERIALS 3 $2,132,316.90 96.43 STA 172A-015 SH 172, NM STATE LINE TO S. OF 5 R 20060216 AMERICAN CIVIL CONSTRUCTORS, INC. 3 $3,819,931.00 96.28 IM 0702-257 I70 - EISENHOWER TUNNEL 1 M Colorado Department of Transporation 15:10 Monday, January 8, 2007 3 2006 Cost Data PROJECTS BID FROM 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20060216 K.E.C.I. COLORADO, INC. < 3 BIDDERS & LOW BID > 10% OVER ENG EST NH 0821-076 SH82 OVERLAY - ASPEN 3 M 20060216 FOUR CORNERS MATERIALS 1 $913,989.30 98.19 MTCE 05-048 US550 - MP 49.85 TO MP 56.00 5 M 20060302 BRANNAN SAND AND GRAVEL, LLC 4 $3,176,939.60 79.78 IM 0253-187 I-25, 84TH TO 120TH AVENUE 6 R 20060302 BRANNAN SAND AND GRAVEL, LLC 4 $1,817,381.45 104.11 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 6 U 20060302 BRANNAN SAND AND GRAVEL, LLC 6 $3,260,892.51 94.82 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUIE 6 P 20060302 FLATIRON CONSTRUCTORS, INC. 7 $6,601,236.02 92.02 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 6 U 20060302 KIEWIT WESTERN CO < 3 BIDDERS & LOW BID > 10% OVER ENG EST IM 0702-252 I-70, WOLCOTT EAST 3 M 20060302 KIEWIT WESTERN CO < 3 BIDDERS & LOW BID > 10% OVER ENG EST IM 0702-252 I-70, WOLCOTT EAST 3 M 20060302 SCHMIDT CONSTRUCTION COMPANY 4 $1,395,084.77 128.17 SHE 0243-071 US 24 PEYTON INTERSECTION 2 P 20060302 LAFARGE WEST, INC ALL BIDS REJECTED - CDOT OPTION NH 1604-009 SH 160, WALSH EAST & WEST 2 P 20060302 POWER ELECTRIC COMPANY 5 $80,122.17 75.92 SHE 2854-111 US 285 & C470 SIGNING 6 M 20060309 FLATIRON CONSTRUCTORS, INC. 6 $986,717.70 81.00 BR 069A-019 SH 69, ROSITA CREEK 2 R 20060309 K.E.C.I. COLORADO, INC. < 3 BIDDERS & LOW BID > 10% OVER ENG EST C 0501-049 US50 AT 29 RD & SUNDANCE DR. 3 U 20060309 ZAK DIRT, INC. 5 $285,111.25 81.85 SHE R400-183 R4 FY06 SAFETY PROJECTS 4 M 20060309 LAFARGE WEST, INC 5 $4,933,605.85 95.04 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NORT 2 R 20060309 STURGEON ELECTRIC COMPANY, INC 7 $443,623.75 96.13 SHE M910-004 US 50 AND SH 550 IN MONTROSE 3 U 20060309 CRUZ CONSTRUCTION, INC. 3 $392,973.00 102.66 SHE 0911-004 SH 91 & SH 67 GUARDRAIL 1 M Colorado Department of Transporation 15:10 Monday, January 8, 2007 4 2006 Cost Data PROJECTS BID FROM 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20060309 UNITED RENTALS HIGHWAY TECHNOLOGIES 3 $738,917.75 94.24 MTCE 01-054 R1 FY 06 STRIPING WEST 1 M 20060309 INTERMOUNTAIN SLURRY SEAL, INC. 4 $1,036,575.00 85.57 MTCE 05-049 US 491B CHIP SEAL, MP 45.4 - 5 M 20060316 KIEWIT WESTERN CO 3 $2,530,719.40 103.29 STA 0091-022 SH 9, HOOSIER PASS NORTH 1 M 20060316 DKS ENTERPRISES INC. 4 $122,972.00 92.17 AQC R600-241 SH 287 (FEDERAL BLVD), 52ND AV 6 U 20060316 TLM CONSTRUCTORS, INC. 1 $596,446.00 108.74 BR 012A-041 ON SH12, 5 MILES NORTH OF STON 2 M 20060316 ELAM CONSTRUCTION, INC. 2 $5,542,648.70 99.33 IM 0701-179 I-70, GLENWOOD SPRINGS 3 M 20060316 POWER ELECTRIC COMPANY 4 $220,384.18 63.59 MTCE 06-065 I25 - HOV / HOT LANES 6 U 20060323 NEW DESIGN CONSTRUCTION CO. 5 $3,921,892.86 97.51 SHO M145-006 SH 121 & 128 INTERSECTION IMPR 6 U 20060323 BRANNAN SAND AND GRAVEL, LLC 3 $1,721,275.30 96.11 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 6 U 20060323 KIEWIT WESTERN CO ALL BIDS REJECTED - CDOT OPTION IM 0702-252 I 70, WOLCOTT EAST ALT. A 3 M 20060323 KIEWIT WESTERN CO 1 $4,083,618.20 104.20 IM 0702-252 I-70 WOLCOTT EAST ALT. B 3 M 20060323 W.L. CONTRACTORS, INC. 4 $916,060.80 72.61 R600-247 SIGNALS - SH 121 & SH 391 6 U 20060323 K.E.C.I. COLORADO, INC. 4 $753,599.00 92.88 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 ( 1 R 20060323 K.E.C.I. COLORADO, INC. 2 $2,250,763.00 104.10 NH 0821-076 SH82 OVERLAY - ASPEN 3 M 20060323 ASPHALT PAVING CO. 4 $1,204,160.88 85.60 NH 093A-005 SH 93, BOULDER CANAL TO SH 128 6 R 20060323 CRUZ CONSTRUCTION, INC. 1 $249,400.90 100.07 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 2 M 20060323 W.L. CONTRACTORS, INC. 5 $106,620.00 124.18 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 4 P Colorado Department of Transporation 15:10 Monday, January 8, 2007 5 2006 Cost Data PROJECTS BID FROM 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20060323 INTEGRATED ELECTRIC, INC. 3 $97,243.28 98.34 STA 0853-063 SH 14 & 1ST AVE. IN AULT 4 R 20060323 ASPHALT PAVING CO. 6 $871,333.63 92.31 NH 1211-066 SH 121: WATERTON RD TO C470 6 R 20060323 K.E.C.I. COLORADO, INC. CONTRACT REJ - NO REASON GIVEN MTCE 02-024 CAŅON CITY CURB RAMPS 2 U 20060323 W.L. CONTRACTORS, INC. 5 $89,662.00 77.43 MTCE 06-066 SH 121, SIGNAL CABINET REPLACE 6 U 20060330 UNITED COMPANIES OF MESA COUNTY < 3 BIDDERS & LOW BID > 10% OVER ENG EST STA 062A-011 SH 62 & CR 5 (AMELIA ST) 5 R 20060330 ARROW ELECTRIC SERVICE, INC. 3 $203,119.10 72.15 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTER 2 R 20060330 NEW DESIGN CONSTRUCTION CO. 4 $818,472.25 98.50 NH R200-140 I-25, SH 47, 50, 115 CRACK REP 2 R 20060330 MOUNTAIN CONSTRUCTORS, INC. 4 $219,773.00 104.64 SHE 2873-143 US 287 AT CR 54G, N. OF FT. CO 4 R 20060406 UNITED COMPANIES OF MESA COUNTY LOW BID IS GREATER THAN 15% OVER ENG EST STA 0131-044 SH 13, S OF MEEKER - ALT. A 3 M 20060406 UNITED COMPANIES OF MESA COUNTY LOW BID IS GREATER THAN 15% OVER ENG EST STA 0131-044 SH 13, S. OF MEEKER - ALT B 3 M 20060406 HALLMARK, INC. 4 $361,992.00 98.95 STA 157A-009 SH 157 IN BOULDER COUNTY 4 R 20060406 SCHMIDT CONSTRUCTION COMPANY 3 $2,790,697.45 90.49 IM 0252-381 I-25, GREENLAND TO LARKSPUR 1 R 20060406 INTERFACE COMMUNICATIONS, COMPANY 5 $396,235.00 92.15 STA 0831-100 PARKER RD AT LONG AVE. SIGNALS 1 R 20060406 APC SOUTHERN CONSTRUCTION COMPANY, LLC 5 $5,730,737.98 86.11 IM 0251-172 I-25, N. OF BUTTE CREEK RD 2 R 20060413 PAVETEC, INC. 3 $582,110.20 110.88 MTCE 01-056 I-70 EB, MP 206.0 TO MP 210.0 1 R 20060413 UNITED RENTALS HIGHWAY TECHNOLOGIES 2 $148,562.60 63.48 MTCE 04-065 R4 I-25 FRONTAGE RD EPOXY 4 R 20060420 AGGREGATE INDUSTRIES - WCR, INC. 4 $1,098,540.40 104.78 STA 053A-001 BROADWAY: 58TH TO SH 224 6 R Colorado Department of Transporation 15:10 Monday, January 8, 2007 6 2006 Cost Data PROJECTS BID FROM 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20060420 KIEWIT WESTERN CO 3 $11,405,683.50 115.99 STA 145A-037 SH 145 KEYSTONE HILL 5 M 20060420 WESTERN ENGINEERING COMPANY, INC.DBA 5 $3,174,436.50 93.59 STA 0142-046 SH 14, EAST OF BRIGGSDALE 4 P 20060420 ASPHALT PAVING CO. 4 $1,726,368.40 100.93 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMITE 6 R 20060420 AGGREGATE INDUSTRIES - WCR, INC. 6 $869,775.80 102.41 NH 088A-023 BELLVIEW AVE. - BROADWAY TO UN 6 U 20060420 ARROW ELECTRIC SERVICE, INC. 3 $181,907.30 94.43 MTCE 02-029 US50 / PURCELL AND ELIZABETH S 2 P 20060420 ASPHALT PAVING CO. 4 $830,598.70 90.31 MTCE 06-067 C 470 OVERLAY, MP 4.21 TO 7.62 6 R 20060427 AGGREGATE INDUSTRIES - WCR, INC. < 3 BIDDERS & LOW BID > 10% OVER ENG EST STA 0072-016 SH 7, LYONS TO RAYMOND 4 M 20060427 INTEGRATED ELECTRIC, INC. 5 $73,752.81 82.79 SHE 052A-026 SH 52/ US 287 DILEMMA ZONE PRO 4 P 20060504 G.A. WESTERN CONSTRUCTION CO. < 3 BIDDERS & LOW BID > 10% OVER ENG EST BR 149A-022 EXISTING BRIDGE STRUCTURE L-07 3 M 20060504 UNITED RENTALS HIGHWAY TECHNOLOGIES 2 $1,355,395.98 76.66 MTCE 03-032 REGION WIDE, VARIOUS LOCATIONS 3 M 20060504 LAFARGE WEST, INC 1 $166,188.65 78.73 MTCE 04-066 US 85 MP 299.68 TO MP 301.00 4 R 20060511 TLM CONSTRUCTORS, INC. < 3 BIDDERS & LOW BID > 10% OVER ENG EST BR 0505-040 US 50/287 BRIDGE REPAIR - ARKA 2 P 20060511 UNITED RENTALS HIGHWAY TECHNOLOGIES 3 $1,944,605.34 94.57 MTCE 02-030 FY 07 REGION 2 STRIPING 2 P 20060518 INTERSTATE HIGHWAY CONSTRUCTION 3 $17,483,249.34 105.90 NH 2871-030 SH 287, JUNCTION OF SH 116 NOR 2 P 20060518 TRICON 2, LLC 2 $1,283,480.13 99.10 BR 0132-016 EXISTING TIMBER BRIDGE (STR. N 3 M 20060518 AGGREGATE INDUSTRIES - WCR, INC. 3 $4,055,794.53 99.43 STA 0072-016 SH 7, LYONS TO RAYMOND 4 M 20060518 UNITED RENTALS HIGHWAY TECHNOLOGIES 3 $139,877.00 67.11 MTCE 03-033 REGION 3 VARIOUS HIGHWAYS, GU 3 M Colorado Department of Transporation 15:10 Monday, January 8, 2007 7 2006 Cost Data PROJECTS BID FROM 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20060525 A-1 CHIPSEAL COMPANY 2 $548,670.08 102.90 NH 0341-067 ON US 34 IN LARIMER COUNTY. 4 20060525 STURGEON ELECTRIC COMPANY, INC 4 $443,642.80 86.60 MTCE 01-057 VARIOUS, REGION 1 1 M 20060601 KOLBE STRIPING INC. 3 $1,320,161.00 84.21 MTCE 01-059 REGION WIDE 1 P 20060601 G.A. WESTERN CONSTRUCTION CO. 2 $952,059.00 102.92 MTCE 03-034 REGION 3 VARIOUS HIGHWAYS, BR 3 M 20060608 LAFARGE WEST, INC CONTRACT REJ - NO REASON GIVEN NH 1604-009 SH 160, WALSH EAST & WEST 2 P 20060608 LAFARGE WEST, INC 4 $5,877,051.15 100.81 NH 1604-009 SH 160, WALSH EAST & WEST - AL 2 P 20060608 MOUNTAIN CONSTRUCTORS, INC. 5 $285,800.00 107.40 SHE 0342-045 ON US 34 IN WELD COUNTY. 4 R 20060608 SCHMIDT CONSTRUCTION COMPANY 2 $456,066.97 119.97 C 0831-103 PINELLO ROUNDABOUT - ACADEMY B 2 U 20060608 DKS ENTERPRISES INC. 3 $426,600.00 115.27 MTCE 02-031 REGION 2 - FY07/08 LIGHTING 2 R 20060615 LAWSON CONSTRUCTION CO. 2 $12,054,086.36 107.02 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 4 R 20060615 ASPHALT PAVING CO. 3 $4,123,078.14 126.22 NH 0062-021 6TH AVE COLFAX TO SIMMS 6 R 20060615 W.L. CONTRACTORS, INC. 5 $362,927.25 90.08 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 6 L 20060615 KOLBE STRIPING INC. 4 $403,304.15 86.14 MTCE 01-058 REGION WIDE 1 R 20060615 UNITED RENTALS HIGHWAY TECHNOLOGIES 3 $1,306,938.40 95.07 MTCE 04-069 FY07 R4 EPOXY EAST 4 R 20060615 KOLBE STRIPING INC. 3 $648,960.00 90.88 MTCE 04-070 FY07 R4 EPOXY WEST 4 R 20060622 A & S CONSTRUCTION CO. & AFFILIATED CO. 3 $5,167,146.92 92.15 STA 0131-044 SH 13, S. OF MEEKER - ALT B 3 M 20060622 A & S CONSTRUCTION CO. & AFFILIATED CO. CONTRACT REJ - NO REASON GIVEN STA 0131-044 SH 13, S. OF MEEKER - ALT B 3 M Colorado Department of Transporation 15:10 Monday, January 8, 2007 8 2006 Cost Data PROJECTS BID FROM 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20060622 TLM CONSTRUCTORS, INC. 3 $1,286,055.50 118.14 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWLE 2 R 20060622 G.A. WESTERN CONSTRUCTION CO. 1 $1,373,363.18 96.66 BR 149A-022 EXISTING BRIDGE STRUCTURE L-07 3 M 20060622 ASPHALT SPECIALTIES CO., INC. 3 $498,765.43 109.86 CC R600-281 CHATFIELD STATE PARK MAIN ROAD 6 R 20060622 UNITED RENTALS HIGHWAY TECHNOLOGIES 3 $177,504.00 94.87 MTCE 04-067 FY 07 REGION 4 STERLING SIGNS 4 U 20060622 ROCKY MOUNTAIN ENTERPRISES, INC. 4 $622,195.00 88.11 MTCE 04-068 FY 07 REGION 4 STENCIL MARKING 4 R 20060622 INTERMOUNTAIN SLURRY SEAL, INC. 2 $1,077,844.00 95.37 MTCE 05-050 US 160CHIP SEAL, MP 69.7 - 81 5 M 20060629 MCATEE CONSTRUCTION CO. WITHDRAWN 3 STA 0343-026 ON US 34 IN YUMA COUNTY 4 P 20060629 ROCKY MOUNTAIN ENTERPRISES, INC. 2 $233,720.00 103.69 MTCE 06-070 R6 - SIGN POST REPLACEMENT 6 U 20060706 UNITED RENTALS HIGHWAY TECHNOLOGIES 2 $1,066,950.00 82.69 MTCE 06-069 VARIOUS LOCATIONS WITHIN REGIO 6 U 20060713 INTERSTATE HIGHWAY CONSTRUCTION 4 $18,926,154.14 109.02 C 0252-367 I-25, 5TH STREET TO FOUNDERS/M 1 R 20060713 TLM CONSTRUCTORS, INC. 6 $2,875,949.04 127.19 BR 3852-009 US 385 WRAY BRIDGE REPLACEMEN 4 P 20060713 ROCKY MOUNTAIN ENTERPRISES, INC. 3 $504,725.36 100.93 MTCE 03-035 REGION WIDE VARIOUS LOCATIONS 3 M 20060713 JALISCO INTERNATIONAL, INC. 2 $576,905.00 112.41 MTCE 06-068 REGION 6- C-470, I-70, US 287 6 U 20060720 SEMA CONSTRUCTION, INC. CONTRACT REJ - NO REASON GIVEN STU R200-097 POWERS BLVD/ WOODMAN INTERCHA 2 U 20060720 K.E.C.I. COLORADO, INC. < 3 BIDDERS & LOW BID > 10% OVER ENG EST NH 2854-102 US 285 CORRIDOR IN JEFFERSON C 1 M 20060720 ASPHALT SPECIALTIES CO., INC. 4 $1,148,761.70 98.79 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DECA 6 U 20060720 CRUZ CONSTRUCTION, INC. 4 $1,077,385.97 117.52 STU 4701-107 C-470: WADSWORTH BLVD TO BROAD 6 R Colorado Department of Transporation 15:10 Monday, January 8, 2007 9 2006 Cost Data PROJECTS BID FROM 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20060720 TLM CONSTRUCTORS, INC. 2 $232,132.50 81.07 BR R400-203 FY 06 BRIDGE MAINTENANCE 4 P 20060720 G.A. WESTERN CONSTRUCTION CO. 1 $609,472.00 86.15 MTCE 03-036 REGION 3 I-70 STRUCTURE H-03- 3 M 20060720 LPZ INDUSTRIES, INC. 5 $105,840.00 85.89 MTCE 04-071 FY07 R4 US 287 PHASE 1 4 R 20060727 AMES CONSTRUCTION, INC. 5 $5,117,945.00 92.39 BR 2854-105 US 285 WEST OF SH 470 AND EAST 6 M 20060727 KIEWIT WESTERN CO CONTRACT REJ - NO REASON GIVEN STA 0405-031 US40 HUGO EAST 1 P 20060727 NEW DESIGN CONSTRUCTION CO. 2 $1,711,875.71 102.82 STA 0881-019 AT THE INTERSECTION OF ARAPAHO 6 20060727 TECHNOLOGY CONSTRUCTORS, INC. 2 $293,462.00 123.70 SHE 0403-050 ON US 40 THROUGH WINTER PARK 3 M 20060801 SEMA CONSTRUCTION, INC. 7 $7,669,001.10 66.40 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 2 M 20060803 FLATIRON CONSTRUCTORS, INC. 5 $35,949,933.08 89.60 IM 0253-160 ON I-25 IN WELD COUNTY 4 P 20060803 KELLEY TRUCKING INC. 4 $7,779,386.18 85.94 IM 0703-273 HOGBACK PARK N RIDE PHASE II 1 M 20060803 WILLIAMS CONSTRUCTION CONTRACTORS 3 $1,528,696.84 98.27 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 5 R 20060803 HAMON CONTRACTORS, INC. 7 $17,618,378.14 98.12 STU M040-011 WADSWORTH BYPASS (SH 121) FROM 6 R 20060803 NEW DESIGN CONSTRUCTION CO. 5 $1,031,180.75 97.86 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN TE 6 U 20060803 WILLIAMS CONSTRUCTION CONTRACTORS 4 $640,299.71 56.92 C 5502-057 US 550 CULVERT REPAIRS 5 M 20060803 DKS ENTERPRISES INC. 2 $630,440.00 106.49 MTCE 06-071 I-25, SH 85 TO I-70 6 U 20060810 EDWARD KRAEMER & SONS INC. 4 $14,731,461.60 113.81 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RAM 6 R 20060810 ABCO CONTRACTING, INC. 3 $1,068,319.30 96.30 C R600-283 VARIOUS 6 R Colorado Department of Transporation 15:10 Monday, January 8, 2007 10 2006 Cost Data PROJECTS BID FROM 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20060810 W.L. CONTRACTORS, INC. 5 $872,681.50 89.34 MTCE 01-053 VARIOUS LOCATIONS ON I-70 FROM 1 M 20060817 K.E.C.I. COLORADO, INC. 2 $1,513,637.25 103.36 C 0501-049 US50 AT 29 RD IN MESA COUNTY 3 U 20060824 SEMA CONSTRUCTION, INC. CONTRACT REJ - NO REASON GIVEN NH 1602-111 US 160 ABOUT 4 MILES WEST SOUT 5 M 20060824 SEMA CONSTRUCTION, INC. CONTRACT REJ - NO REASON GIVEN NH 1602-111 US 160 ABOUT 4 MILES WEST SOUT 5 M 20060824 A & S CONSTRUCTION CO. & AFFILIATED CO. 3 $703,241.80 108.93 STA 0405-031 US40 HUGO EAST 1 P 20060831 HAMON CONTRACTORS, INC. 5 $4,291,121.42 103.09 BR 0361-052 N ST VRAIN Cr (LYONS) 4 M 20060831 ZAK DIRT, INC. 8 $1,865,079.02 87.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COUN 4 P 20060831 TRICON 2, LLC 2 $1,582,889.62 78.82 BR 064A-008 STRUCTURE NO. D-04-L IS LOCATE 3 M 20060831 HI-TECH ROCKFALL CONSTRUCTION, INC. 3 $866,980.00 79.07 NH 0061-078 US 6 MP 260.00 TO 270.5 1 M 20060831 DKS ENTERPRISES INC. 4 $325,535.50 80.98 MTCE 01-060 I-70 WEST 1 M 20060914 WESTERN STATES RECLAMATION, INC. 2 $223,802.70 72.32 NH 2854-102 US 285 CORRIDOR IN JEFFERSON C 1 M 20060914 COLORADO BORING. CO. 5 $593,870.90 68.38 AQC 1211-064 SH 121/WADSWORTH BOULEVARD FRO 6 U 20060914 W.L. CONTRACTORS, INC. 5 $442,891.65 81.59 STU R400-204 ALONG I-25 IN REGION 4. 4 R 20060921 LAWRENCE CONSTRUCTION CO. 3 $36,907,794.90 99.77 IM 0251-166 ON I-25 NB FROM COMMERCIAL STR 2 U 20060921 ROCK & COMPANY 3 $822,321.00 64.48 IM 0703-301 ON GEORGETOWN HILL ABOVE THE T 1 M 20060921 NEW DESIGN CONSTRUCTION CO. 5 $1,241,692.15 103.19 MTCE 04-072 I-25 SLAB REPLACEMENT MILEPOST 4 U 20060928 STRUCTURES, INC. 6 $851,122.71 56.13 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 5 M Colorado Department of Transporation 15:10 Monday, January 8, 2007 11 2006 Cost Data PROJECTS BID FROM 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20060928 ALERT TRAFFIC CONTROL, INC. 5 $264,592.00 83.67 MTCE 04-074 R4 US 287 SIGNS PHASE 2 4 R 20061005 STURGEON ELECTRIC COMPANY, INC 1 $1,088,555.26 117.15 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNTY 1 M 20061005 COLORADO BORING. CO. 4 $286,049.50 114.59 STA R600-279 SH 121 (WADSWORTH) FROM KEN CA 6 U 20061012 UNITED RENTALS HIGHWAY TECHNOLOGIES 5 $171,327.50 93.63 MTCE 06-074 SH 6 AT MP 280.996 6 U 20061019 K.E.C.I. COLORADO, INC. 1 $466,700.50 78.32 NH 0503-063 US 50 AND CR 107 IN SALIDA 5 M 20061019 KIEWIT WESTERN CO 3 $159,443.50 124.31 MTCE 03-041 REGION 3 SH 82 STRUCTURE H-09 3 M 20061020 KIEWIT WESTERN CO 4 $436,932.50 97.36 MTCE 02-032 SH115 2 20061026 FRONT RANGE STRIPING 3 $449,931.50 81.72 MTCE 04-075 FY07 REGION 4 SIGNS NE PHASE I 4 R 20061026 UNITED RENTALS HIGHWAY TECHNOLOGIES 1 $565,185.00 123.00 MTCE 04-076 FY07 R4 SIGNS NE PHASE 2 4 R 20061102 JALISCO INTERNATIONAL, INC. IRREGULAR BID IM 0703-291 I70 / SH58, RAMP A, B, C, D, E 6 R 20061102 AMES CONSTRUCTION, INC. 5 $25,711,000.00 94.35 IM 0703-291 I70 / SH58, RAMP A, B, C, D, E 6 R 20061102 THE TRUESDELL CORPORATION 6 $357,488.00 99.64 MTCE 03-039 REGION 3 I-70 #F-06-Y (EB) AN 3 M 20061109 JALISCO INTERNATIONAL, INC. 8 $1,967,361.92 91.22 IM 0252-384 I-25 OVER BROADWAY 6 U 20061116 APC SOUTHERN CONSTRUCTION COMPANY, LLC 5 $4,363,308.99 101.35 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 3 R 20061116 BRANNAN SAND AND GRAVEL, LLC 7 $2,657,491.25 82.50 IM 076A-007 I-76 FROM US85 TO BURLINGTON C 6 R 20061116 AMERICAN WEST CONSTRUCTION, LLC 3 $709,850.00 88.05 C 0251-173 I 25, CULVERTS, TRINIDAD & PUE 2 R 20061116 STRUCTURES, INC. 4 $1,352,699.58 77.80 BR 109A-018 SH 109 LA JUNTA, SH50, MANZIN 2 P Colorado Department of Transporation 15:10 Monday, January 8, 2007 12 2006 Cost Data PROJECTS BID FROM 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20061116 TIERDAEL CONSTRUCTION CO. 11 $1,139,639.95 77.12 HB 0853-064 US 85C-LATHAM CANAL CONST 4 R 20061116 KIEWIT WESTERN CO LOW BID IS GREATER THAN 15% OVER ENG EST HB 149A-023 SH 149 BETWEEN SOUTH FORK AND 5 M 20061116 LPZ INDUSTRIES, INC. 4 $139,052.00 63.32 MTCE 03-038 REGION WIDE VARIOUS LOCATIONS 3 M 20061129 KIEWIT WESTERN CO 2 $107,710.00 87.57 C 0252-389 BRONCO ARCH BRIDGE OVER THE SO 6 U 20061130 SCOTT CONTRACTING INC. 5 $1,419,027.30 98.76 STA 0091-026 STATE HIGHWAY NO 9 1 M 20061130 AMERICAN CIVIL CONSTRUCTORS, INC. 3 $1,047,081.00 109.89 BR 092A-019 EXISTING STRUCTURE J-06-A IS L 3 M 20061130 UNITED COMPANIES OF MESA COUNTY 4 $2,923,453.45 86.60 HB 0701-180 INTERSTATE 70, UTAH/COLORADO B 3 M 20061130 ZAK DIRT, INC. 7 $380,390.50 76.33 BR 0021-034 SH 2 OVER FULTON CANAL 6 U 20061130 W.L. CONTRACTORS, INC. 7 $202,702.00 84.40 IM R600-292 70TH AVE AT I-25/BLAKE AND 20T 6 P 20061130 ADARAND CONSTRUCTORS, INC. 5 $297,646.10 79.51 SHE 0503-067 US 50, WEST OF CANON CITY 2 M 20061130 HALLMARK, INC. 5 $151,985.00 78.45 MTCE 06-077 I-76 #E-17-GL & #E-17-GM; SH30 6 U 20061207 R.E. MONKS CONSTRUCTION COMPANY LLC 5 $18,936,708.95 96.47 STU R200-097 POWERS BLVD / WOODMAN RD - COL 2 U 20061207 AMERICAN WEST CONSTRUCTION, LLC 17 $134,327.00 62.08 MTCE 06-075 I-25 @ CLEAR CREEK, E-17-PA & 6 U 20061228 ASPHALT SPECIALTIES CO., INC. 7 $3,058,631.50 91.94 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 6 R 20061228 BRANNAN SAND AND GRAVEL, LLC 7 $1,497,256.15 86.29 MTCE 06-072 C470 BOWLES TO KIPLING 6 U 20061228 INTEGRATED ELECTRIC, INC. 6 $256,124.00 90.54 MTCE 04-077 FY07 R4 BEACON REPLACEMENT 4 R ======= ================ ====== TOTALS 720 $462,914,870.47 96.37 Colorado Department of Transporation 15:10 Monday, January 8, 2007 1 2006 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/06 THROUGH 12/31/06) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ BRIDGE REPAIR 060112 NH 1602-096 M US 160, MP 117 TO MP 131.5 P-07-A 165.0000 32.0000 5280.0 $66,820 $12.66 P-07-B 96.0000 32.0000 3072.0 $43,484 $14.15 060406 STA 157A-009 R SH 157 IN BOULDER COUNTY D-16-CW 367.4200 35.0000 12859.7 $112,460 $8.75 E-16-HX 184.5900 40.0000 7383.6 $78,262 $10.60 E-16-HY 184.5900 42.0000 7752.8 $55,770 $7.19 060720 MTCE 03-036 M REGION 3 I-70 STRUCTURE H-03- H-03-AY 1127.0000 60.0000 67620.0 $350,526 $5.18 H-03-AY 1127.0000 60.0000 67620.0 $258,946 $3.83 061019 MTCE 03-041 M REGION 3 SH 82 STRUCTURE H-09 0.0000 0.0000 0.0 $47,441 0.0000 0.0000 0.0 $112,003 061102 MTCE 03-039 M REGION 3 I-70 #F-06-Y (EB) AN 0.0000 0.0000 0.0 $111,811 0.0000 0.0000 0.0 $245,677 061116 BR 109A-018 P SH 109 LA JUNTA, SH50, MANZIN M-22-AY 1448.0000 30.0000 43440.0 $481,234 $11.08 L-21-CX 173.0000 38.0000 6574.0 $500,374 $76.11 L-26-H 570.0000 28.0000 15960.0 $114,174 $7.15 061129 C 0252-389 U BRONCO ARCH BRIDGE OVER THE SO F-16-DP 1120.6320 111.0000 124390.2 $107,570 $0.86 WEIGHTED AVERAGE COST: NEW STRUCTURES 361952.2 $2,686,552 $7.42 BRIDGE WIDENING 060316 BR 012A-041 M ON SH12, 5 MILES NORTH OF STON P-16-B 33.0000 30.0000 990.0 $171,549 $173.28 P-17-H 47.5000 30.0000 1425.0 $99,845 $70.07 WEIGHTED AVERAGE COST: NEW STRUCTURES 2415.0 $271,394 $112.38 CONCRETE SLAB AND GIRDER 060302 IM 0253-187 R I-25, 84TH TO 120TH AVENUE E-17-FI 38.0000 123.0000 4674.0 $55,652 $11.91 Colorado Department of Transporation 15:10 Monday, January 8, 2007 2 2006 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/06 THROUGH 12/31/06) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ E-17-FJ 50.0000 126.0000 6300.0 $54,724 $8.69 060622 BR 149A-022 M EXISTING BRIDGE STRUCTURE L-07 L-07-B 103.4400 32.0000 3310.1 $807,509 $243.95 060713 BR 3852-009 P US 385 WRAY BRIDGE REPLACEMEN D-28-R 108.2500 66.2500 7171.6 $1,026,228 $143.10 060831 BR 0361-052 M N ST VRAIN Cr (LYONS) STR D-15-BA 88.5800 50.7500 4495.4 $682,835 $151.90 061207 STU R200-097 U POWERS BLVD / WOODMAN RD - COL 222.5000 68.0000 15130.0 $1,200,220 $79.33 WEIGHTED AVERAGE COST: NEW STRUCTURES 41081.1 $3,827,169 $93.16 PRECAST SEGMENTAL BOX GIRDER 060921 IM 0251-166 U ON I-25 NB FROM COMMERCIAL STR P-18-BM 384.0000 27.0000 10368.0 $1,300,000 $125.39 P-18-BK 453.0000 40.0000 18120.0 $2,250,000 $124.17 P-18-BY 2072.0000 52.0000 107744.0 $12,225,000 $113.46 936.0000 40.0000 37440.0 $1,140,291 $30.46 061102 IM 0703-291 R I70 / SH58, RAMP A, B, C, D, E E-16-RS 2112.0000 38.0000 80256.0 $9,040,231 $112.64 WEIGHTED AVERAGE COST: NEW STRUCTURES 253928.0 $25,955,522 $102.22 PRESTRES GIRDER (BOX SECTION) 060202 NH 2854-106 M US 285, FOXTON RD - RICHMOND H G-15-I 215.0000 37.0000 7955.0 $1,303,651 $163.88 060302 IM R600-224 U I-25 & SPEER INTERCHANGE MOD. F-16-IR 124.3900 28.0000 3482.9 $362,509 $104.08 060803 IM 0253-160 P ON I-25 IN WELD COUNTY 127.3300 67.0000 8531.1 $886,104 $103.87 127.3300 67.0000 8531.1 $1,259,551 $147.64 060803 STU M040-011 R WADSWORTH BYPASS (SH 121) FROM E-16-WM 135.0000 20.0000 2700.0 $423,089 $156.70 E-16-WM 0.0000 35.0000 0.0 $389,379 E-16-WN 136.0000 20.0000 2720.0 $728,587 $267.86 0.0000 0.0000 0.0 $58,867 Colorado Department of Transporation 15:10 Monday, January 8, 2007 3 2006 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/06 THROUGH 12/31/06) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ 060831 BR 0361-052 M N ST VRAIN Cr (LYONS) STR D-15-BB 93.2700 91.7500 8557.5 $945,579 $110.50 060921 IM 0251-166 U ON I-25 NB FROM COMMERCIAL STR P-18-BI 144.0000 40.0000 5760.0 $1,072,268 $186.16 WEIGHTED AVERAGE COST: NEW STRUCTURES 48237.7 $7,429,583 $154.02 PRESTRES GIRDER (I-SECTION G-72) 061102 IM 0703-291 R I70 / SH58, RAMP A, B, C, D, E E-16-JJ 350.0000 30.0000 10500.0 $172,293 $16.41 E-16-JM 185.0000 24.0000 4440.0 $539,929 $121.61 WEIGHTED AVERAGE COST: NEW STRUCTURES 14940.0 $712,222 $47.67 MAJOR STRUCTURE CBC OR PIPES 060309 BR 069A-019 R SH 69, ROSITA CREEK L-15-E 63.3333 43.3333 2744.4 $322,397 $117.47 060518 NH 2871-030 P SH 287, JUNCTION OF SH 116 NOR TBD 33.3000 48.0000 1598.4 $259,962 $162.64 N-26-S 51.5000 50.0000 2575.0 $249,791 $97.01 061130 BR 0021-034 U SH 2 OVER FULTON CANAL E-17-ABQ 0.0000 0.0000 0.0 $139,753 WEIGHTED AVERAGE COST: NEW STRUCTURES 6917.8 $971,903 $140.49 TIMBER BRIDGE (GLUELAM) 060105 STA 105A-013 R SH 105, SOUTH OF SEDALIA G-17-AL 94.0000 25.0000 2350.0 $37,963 $16.15 WEIGHTED AVERAGE COST: NEW STRUCTURES 2350.0 $37,963 $16.15 MISCELLANEOUS 060302 NH 0021-025 U SH2 - HAMPDEN AVE. TO BUCHTEL F-17-CG 30.0000 76.0000 2280.0 $37,246 $16.34 060420 STA 053A-001 R BROADWAY: 58TH TO SH 224 E-17-IR 178.0000 49.0000 8722.0 $52,375 $6.00 Colorado Department of Transporation 15:10 Monday, January 8, 2007 4 2006 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/06 THROUGH 12/31/06) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ 061102 IM 0703-291 R I70 / SH58, RAMP A, B, C, D, E E-16-AJ 0.0001 1.0000 0.0 $133,937 1339374400.00 E-16-AK 0.0001 1.0000 0.0 $327,035 3270351400.00 E-16-JL 0.0001 1.0000 0.0 $151,506 1515059200.00 E-16-AM 0.0001 1.0000 0.0 $57,875 $578747000.00 E-16-AN 0.0001 1.0000 0.0 $235,295 2352954500.00 E-16-AO 0.0001 1.0000 0.0 $202,716 2027163000.00 E-16-AP 0.0001 1.0000 0.0 $546,666 5466656000.00 WEIGHTED AVERAGE COST: NEW STRUCTURES 11002.0 $1,744,652 $158.58 Colorado Department of Transporation 15:10 Monday, January 8, 2007 1 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 201-00000 Clearing and Grubbing 22 Lump Sum 1,081,864.12 49,175.64 201-00001 Clearing and Grubbing 46 Acre 152,898.00 3,323.87 201-00005 Removal of Debris 1 Lump Sum 1,070,000.00 1,070,000.00 202-00000 Removal of Structures and Obstructions 8 Lump Sum 250,247.47 31,280.93 202-00001 Removal of Structure 220 Each 208,413.62 947.33 202-00002 Removal of Structure (Special) 1 Each 700.00 700.00 202-00003 Removal of Structure (Special) 2 Lump Sum 139,271.47 69,635.74 202-00008 Tree Trimming 50 Hour 5,250.00 105.00 202-00009 Tree Trimming 4 Lump Sum 3,992.00 998.00 202-00010 Removal of Tree 710 Each 152,929.40 215.39 202-00014 Brush Clearing 16 Hour 3,680.00 230.00 202-00015 Removal of Headwall 14 Each 27,524.28 1,966.02 202-00019 Removal of Inlet 66 Each 65,891.70 998.36 202-00020 Removal of Concrete Box Culvert 3 Each 35,850.34 11,950.11 202-00023 Removal of Embankment Protector Type 3 2 Each 3,000.00 1,500.00 202-00024 Removal of Embankment Protector Type 5 1 Each 452.96 452.96 202-00025 Removal of Ditch Lining 3,667 Lin Foot 16,501.50 4.50 202-00026 Removal of Slope and Ditch Paving 156 Sq Yard 3,239.25 20.76 202-00027 Removal of Riprap 727 Sq Yard 8,051.00 11.07 202-00033 Removal of Pipe 120 Each 175,684.24 1,464.04 202-00035 Removal of Pipe 27,271 Lin Foot 474,414.22 17.40 202-00037 Removal of End Section 98 Each 35,451.84 361.75 202-00080 Removal of Guard Post 6 Each 2,340.00 390.00 202-00090 Removal of Delineator 4,794 Each 46,987.44 9.80 202-00150 Removal of Wall 4 Each 20,000.00 5,000.00 202-00155 Removal of Wall 50 Lin Foot 1,000.00 20.00 202-00170 Grinding And Texturing Concrete Pavement 401 Sq Yard 1,203.00 3.00 202-00175 Removal of Concrete 1 Lump Sum 850.00 850.00 202-00190 Removal of Concrete Median Cover Material 9,892 Sq Yard 140,094.15 14.16 202-00195 Removal of Median Cover 21,207 Sq Yard 42,209.03 1.99 202-00200 Removal of Sidewalk 9,289 Sq Yard 120,623.92 12.99 202-00201 Removal of Curb 5,879 Lin Foot 73,951.41 12.58 202-00202 Removal of Gutter 2,337 Lin Foot 15,128.30 6.47 202-00203 Removal of Curb and Gutter 80,415 Lin Foot 451,520.46 5.61 202-00204 Removal of Curb, Gutter and Sidewalk 477 Lin Foot 7,156.50 15.00 202-00205 Removal of Wheel Stop 22 Each 330.00 15.00 202-00206 Removal of Concrete Curb Ramp 894 Sq Yard 32,258.60 36.08 202-00207 Removal of Brick Pavers 3,990 Sq Yard 36,930.00 9.26 Colorado Department of Transporation 15:10 Monday, January 8, 2007 2 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 202-00210 Removal of Concrete Pavement 288,602 Sq Yard 1,671,778.15 5.79 202-00220 Removal of Asphalt Mat 463,834 Sq Yard 1,686,086.14 3.64 202-00226 Removal of Asphalt Mat (Special) 4,273 Sq Yard 17,092.00 4.00 202-00240 Removal of Asphalt Mat (Planing) 4,024,031 Sq Yard 7,469,153.02 1.86 202-00246 Removal of Asphalt Mat (Planing) (Special) 21,359 Sq Yard 323,423.72 15.14 202-00250 Removal of Pavement Marking 1,587,001 Sq Foot 823,933.39 0.52 202-00400 Removal of Bridge 16 Each 1,155,835.31 72,239.71 202-00425 Removal of Bridge Railing 8,794 Lin Foot 87,293.41 9.93 202-00450 Removal of Portions of Present Structure (Class 1) 340 Sq Yard 28,200.00 82.94 202-00453 Removal of Portions of Present Structure (Class 2) 3,395 Sq Yard 557,109.41 164.10 202-00454 Removal of Portions of Present Structure (Class 2A) 220 Sq Yard 26,400.00 120.00 202-00460 Removal of Portions of Present Structure (Class 3) 334 Sq Yard 72,762.32 217.85 202-00462 Removal of Portions of Present Structure (Class 3A) 2 Sq Yard 720.00 360.00 202-00495 Removal of Portions of Present Structure 10 Lump Sum 319,690.70 31,969.07 202-00500 Removal of Portions of Present Structure 4 Each 47,100.00 11,775.00 202-00502 Removal of Portions of Present Structure 155 Cubic Yard 303,790.00 1,959.94 202-00503 Removal of Portions of Present Structure 768 Sq Yard 263,558.45 343.18 202-00504 Removal of Expansion Device 4,651 Lin Foot 327,974.70 70.52 202-00520 Removal of Expansion Joint Material 542 Lin Foot 7,019.50 12.95 202-00610 Removal of Railroad Track 34 Lin Foot 2,788.00 82.00 202-00620 Removal of Railroad Crossover 1 Each 4,100.00 4,100.00 202-00700 Removal of Light Standard 95 Each 30,668.37 322.82 202-00710 Removal of Power Pole 1 Each 375.00 375.00 202-00725 Removal of Existing Lighting System 3 Lump Sum 16,237.35 5,412.45 202-00750 Removal of Luminaire 378 Each 32,275.90 85.39 202-00805 Removal of Overhead Sign Structure 8 Each 46,694.91 5,836.86 202-00806 Removal of Walkway 2,384 Lin Foot 65,624.68 27.53 202-00810 Removal of Ground Sign 4,933 Each 248,647.57 50.40 202-00815 Removal of Sign (Special) 1 Each 568.93 568.93 202-00821 Removal of Sign Panel 4,749 Each 165,478.10 34.84 202-00825 Removal of Flashing Beacon 133 Each 30,253.34 227.47 202-00827 Removal of Pull Box 2 Each 190.00 95.00 202-00828 Removal of Traffic Signal Equipment 13 Lump Sum 45,826.33 3,525.10 202-00831 Removal of Traffic Signal Head 6 Each 328.56 54.76 202-00840 Removal of Traffic Signal Pole 6 Each 9,105.70 1,517.62 202-00848 Removal of Traffic Signal Controller and Cabinet 32 Each 16,691.00 521.59 202-00895 Removal of Impact Attenuator 12 Each 19,800.00 1,650.00 202-00900 Removal of Concrete Footing 65 Each 14,300.00 220.00 Colorado Department of Transporation 15:10 Monday, January 8, 2007 3 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 202-01000 Removal of Fence 204,083 Lin Foot 131,767.40 0.65 202-01030 Removal of Road Closure Gate 15 Each 7,215.77 481.05 202-01130 Removal of Guardrail Type 3 94,515 Lin Foot 216,609.95 2.29 202-01140 Removal of Guardrail Type 4 15,717 Lin Foot 269,892.85 17.17 202-01170 Removal of Guardrail Type 7 454 Lin Foot 7,060.00 15.55 202-01300 Removal of End Anchorage 495 Each 150,107.43 303.25 202-04001 Plug Culvert 20 Each 31,933.52 1,596.68 202-04002 Clean Culvert 96 Each 257,011.88 2,677.21 202-04005 Clean Valve Box 226 Each 14,002.98 61.96 202-04100 Abandon Well 28 Each 31,700.00 1,132.14 202-04300 Removal of Underground Storage Tank 3 Each 18,855.00 6,285.00 202-05010 Sawing Concrete (10 Inch) 1,141 Lin Foot 5,944.61 5.21 202-05019 Sawing Concrete (Special) 1,424 Lin Foot 3,841.92 2.70 202-05026 Sawing Asphalt Material (6 Inch) 1,815 Lin Foot 12,652.48 6.97 202-05030 Sawing Asphalt Material (10 Inch) 1,200 Lin Foot 2,400.00 2.00 202-05100 Sandblasting Reinforcing Steel 379 Sq Yard 25,916.00 68.38 202-05150 Sandblasting 129,419 Sq Foot 77,340.92 0.60 202-05300 Removal and Disposal of Paint 1 Lump Sum 5,000.00 5,000.00 202-06000 Removal of Detour 4 Lump Sum 174,838.29 43,709.57 202-07000 Obliterate Old Road 3 Lump Sum 39,481.31 13,160.44 203-00000 Unclassified Excavation 42,712 Cubic Yard 395,664.56 9.26 203-00010 Unclassified Excavation (Complete In Place) 1,436,147 Cubic Yard 8,780,147.23 6.11 203-00040 Unclassified Excavation (Special) 2,213 Cubic Yard 15,491.00 7.00 203-00060 Embankment Material (Complete In Place) 1,166,499 Cubic Yard 9,547,406.55 8.18 203-00061 Embankment Material (Complete In Place) 725 Ton 23,200.00 32.00 203-00062 Embankment Material (Complete In Place) (Special) 545,431 Cubic Yard 5,172,482.09 9.48 203-00100 Muck Excavation 94,847 Cubic Yard 839,776.50 8.85 203-00210 Borrow (Complete In Place) 53,691 Cubic Yard 402,682.50 7.50 203-00400 Rock Excavation 1,327 Cubic Yard 49,674.02 37.43 203-00705 Access Pit 14 Each 30,800.00 2,200.00 203-00910 Contaminated Soil Excavation and Disposal (Off-Site) 3,600 Cubic Yard 50,400.00 14.00 203-01100 Proof Rolling 1,593 Hour 189,885.40 119.20 203-01140 Rolling 262 Hour 33,113.44 126.39 203-01200 Roadway Insulation Material (2 Inch) 2,400 Sq Foot 14,400.00 6.00 203-01500 Blading 5,076 Hour 672,225.30 132.43 203-01510 Backhoe 1,979 Hour 280,592.94 141.79 203-01550 Dozing 1,162 Hour 153,461.66 132.07 203-01555 Dozing (Landscaping) 444 Hour 67,765.20 152.62 Colorado Department of Transporation 15:10 Monday, January 8, 2007 4 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 203-01565 Hydraulic Excavator 8 Hour 1,248.88 156.11 203-01582 Truck (Dump) 960 Hour 121,256.00 126.31 203-01590 Front End Loader (Rubber Tire) 226 Hour 38,662.12 171.07 203-01594 Combination Loader 1,160 Hour 132,039.10 113.83 203-01597 Potholing 2,896 Hour 507,280.70 175.17 203-01620 Sweeping 200 Hour 26,000.00 130.00 203-01622 Sweeping (With Pickup Broom) 75 Hour 9,375.00 125.00 203-02300 Rock Scaler 420 Hour 48,360.00 115.14 203-02330 Laborer 820 Hour 47,390.80 57.79 206-00000 Structure Excavation 138,811 Cubic Yard 2,392,527.67 17.24 206-00050 Structure Backfill (Special) 20,442 Cubic Yard 962,078.00 47.06 206-00065 Structure Backfill (Flow-Fill) 2,654 Cubic Yard 280,659.89 105.75 206-00066 Structure Backfill (Flowable Fly Ash) 32 Cubic Yard 6,400.00 200.00 206-00100 Structure Backfill (Class 1) 233,332 Cubic Yard 4,082,559.16 17.50 206-00200 Structure Backfill (Class 2) 4,880 Cubic Yard 88,323.52 18.10 206-00360 Mechanical Reinforcement of Soil 149,897 Cubic Yard 3,243,804.35 21.64 206-00510 Filter Material (Class A) 722 Cubic Yard 50,792.00 70.35 206-01010 Bed Course Material 15 Ton 750.00 50.00 206-01600 Temporary Excavation Support 1 Lump Sum 62,415.94 62,415.94 206-01750 Shoring 2 Lump Sum 98,398.72 49,199.36 206-01781 Shoring (Area 1) 14 Lump Sum 537,135.00 38,366.79 206-01782 Shoring (Area 2) 7 Lump Sum 265,420.25 37,917.18 206-01783 Shoring (Area 3) 2 Lump Sum 114,000.00 57,000.00 206-01784 Shoring (Area 4) 1 Lump Sum 30,000.00 30,000.00 207-00205 Topsoil 186,915 Cubic Yard 1,459,375.79 7.81 207-00210 Stockpile Topsoil 9,534 Cubic Yard 23,772.30 2.49 207-00305 Wetland Topsoil 1,906 Cubic Yard 35,290.50 18.52 207-00310 Stockpile Wetland Topsoil 127 Cubic Yard 5,135.00 40.43 207-00405 Topsoil (Special) 52,505 Cubic Yard 331,069.75 6.31 207-01110 Planter Soil Mix 200 Cubic Yard 6,200.00 31.00 208-00002 Erosion Log (12 Inch) 47,557 Lin Foot 285,143.57 6.00 208-00003 Erosion Log (18 Inch) 1,540 Lin Foot 13,476.00 8.75 208-00004 Silt Berm 680 Lin Foot 6,460.00 9.50 208-00005 Erosion Log 32,904 Lin Foot 162,594.47 4.94 208-00007 Erosion Log (8 Inch) 3,140 Lin Foot 13,700.00 4.36 208-00010 Erosion Bales 135 Each 2,010.21 14.89 208-00011 Erosion Bales (Weed Free) 11,640 Each 232,295.41 19.96 208-00020 Silt Fence 182,033 Lin Foot 395,742.80 2.17 Colorado Department of Transporation 15:10 Monday, January 8, 2007 5 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 208-00030 Sediment Basin 7 Each 15,825.00 2,260.71 208-00033 Sediment Trap 63 Each 7,125.93 113.11 208-00040 Check Dam 164 Each 105,610.75 643.97 208-00045 Concrete Washout Structure 272 Each 294,826.27 1,083.92 208-00050 Storm Drain Inlet Protection 631 Each 132,938.52 210.68 208-00051 Storm Drain Inlet Protection 848 Lin Foot 20,928.20 24.68 208-00055 Rigid Inlet Protection Device 48 Each 36,200.00 754.17 208-00060 Temporary Slope Drain 1,700 Lin Foot 29,646.00 17.44 208-00070 Stabilized Construction Entrance 139 Each 219,723.15 1,580.74 208-00100 Sediment Removal and Disposal 29 Lump Sum 151,805.48 5,234.67 208-00110 Sediment Removal and Disposal 895 Cubic Yard 38,285.00 42.78 208-00200 Erosion Control Supervisor 55 Lump Sum 576,195.94 10,476.29 208-00205 Erosion Control Supervisor 2,581 Hour 218,156.50 84.52 208-00300 Temporary Berms 6,064 Lin Foot 18,993.00 3.13 209-00000 Water 250 M Gallon 950.00 3.80 209-00100 Water (Landscaping) 1,903 M Gallon 69,097.93 36.31 209-00200 Time-Released Water Product 1,296 Each 4,752.00 3.67 209-00600 Dust Palliative (Magnesium Chloride) 16,878 Gallon 16,966.60 1.01 210-00001 Reset Structure 13 Each 15,149.77 1,165.37 210-00010 Reset Mailbox Structure 12 Each 2,557.76 213.15 210-00011 Reset Mailbox Structure (Type 1) 133 Each 29,516.57 221.93 210-00012 Reset Mailbox Structure (Type 2) 15 Each 3,552.88 236.86 210-00013 Reset Mailbox Structure (Type 3) 30 Each 10,559.62 351.99 210-00015 Reset End Section 3 Each 5,475.00 1,825.00 210-00050 Reset Fire Hydrant 17 Each 69,027.00 4,060.41 210-00065 Reset Monument (Type 3A) 10 Each 7,900.00 790.00 210-00090 Reset Delineator 157 Each 2,699.40 17.19 210-00425 Reset Bridge Railing 50 Lin Foot 2,500.00 50.00 210-00500 Rebuild Portions of Present Structure 31 Each 110,900.00 3,577.42 210-00510 Rebuild Portions of Present Structure 2 Lump Sum 74,159.96 37,079.98 210-00750 Reset Light Standard 78 Each 78,327.12 1,004.19 210-00760 Reset Luminaire 12 Each 3,914.86 326.24 210-00809 Reset Blankout Sign (Fiber Optic) 2 Each 6,345.57 3,172.79 210-00810 Reset Ground Sign 389 Each 98,056.70 252.07 210-00815 Reset Sign Panel 766 Each 25,258.42 32.97 210-00820 Reset Variable Message Sign 2 Each 9,079.30 4,539.65 210-00825 Reset Flashing Beacon 7 Each 8,748.50 1,249.79 210-00831 Reset Traffic Signal Head 105 Each 54,109.76 515.33 Colorado Department of Transporation 15:10 Monday, January 8, 2007 6 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 210-00840 Reset Traffic Signal Pole 7 Each 37,809.09 5,401.30 210-00845 Reset Traffic Signal Controller 1 Each 1,850.00 1,850.00 210-00848 Reset Traffic Signal Controller and Cabinet 3 Each 11,180.00 3,726.67 210-00855 Reset Traffic Signal Controller Cabinet 1 Each 800.00 800.00 210-00860 Reset Pedestrian Push Button 3 Each 463.00 154.33 210-00865 Reset Pedestrian Signal Head 9 Each 425.00 47.22 210-00866 Reset Fire Preemption Unit and Timer 16 Each 5,191.00 324.44 210-00870 Reset Coordination Unit 6 Each 2,500.00 416.67 210-00890 Reset Intersection Detection System (Camera) 10 Each 13,500.00 1,350.00 210-01000 Reset Fence 860 Lin Foot 11,165.00 12.98 210-01011 Reset Gate 12 Each 4,568.48 380.71 210-01050 Reset Chain Link Fence 309 Lin Foot 3,994.50 12.93 210-01130 Reset Guardrail Type 3 18,047 Lin Foot 175,517.73 9.73 210-01136 Reset Guardrail Type 3 (Double) 2,125 Lin Foot 38,675.00 18.20 210-01140 Reset Guardrail Type 4 1,030 Lin Foot 3,605.00 3.50 210-01170 Reset Guardrail Type 7 1,000 Lin Foot 23,000.00 23.00 210-01180 Reset Guardrail (Special) 17,386 Lin Foot 117,355.50 6.75 210-01200 Reset End Anchorage 28 Each 10,692.20 381.86 210-01700 Reset Sprinkler Head 14 Each 810.00 57.86 210-01710 Reset Valve 1 Each 700.00 700.00 210-01720 Reset Air Vent 1 Each 1,850.00 1,850.00 210-02510 Relay Sprinkler System 1 Lump Sum 25,000.00 25,000.00 210-02900 Relay Riprap 3 Cubic Yard 186.05 62.02 210-03100 Replace Concrete Pavement 708 Sq Yard 63,720.00 90.00 210-04000 Adjust Structure 5 Each 8,443.25 1,688.65 210-04010 Adjust Manhole 435 Each 230,720.33 530.39 210-04015 Modify Manhole 64 Each 61,845.63 966.34 210-04016 Modify Manhole (Special) 3 Each 4,800.00 1,600.00 210-04020 Modify Inlet 21 Each 40,285.40 1,918.35 210-04025 Modify Structure 6 Each 12,500.00 2,083.33 210-04030 Modify Guardrail 11,701 Lin Foot 114,629.88 9.80 210-04050 Adjust Valve Box 623 Each 168,297.20 270.14 210-04051 Adjust Valve Box (Special) 19 Each 7,600.00 400.00 210-04060 Adjust Water Meter 1 Each 589.75 589.75 210-04200 Adjust Guardrail 82,841 Lin Foot 194,990.46 2.35 211-00212 1-1/2 Inch Core Drilled Hole 324 Lin Foot 4,212.00 13.00 211-01123 Rock Reinforcement (Permanent A) 600 Lin Foot 50,400.00 84.00 211-02230 Grouting Connection 16 Each 1,600.00 100.00 Colorado Department of Transporation 15:10 Monday, January 8, 2007 7 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 211-02270 Cement Grout 13,500 Cubic Foot 119,475.00 8.85 211-03005 Dewatering 1 Lump Sum 20,000.00 20,000.00 212-00006 Seeding (Native) 707 Acre 406,489.98 574.95 212-00007 Seeding (Native) (Hydraulic) 44 Acre 25,300.00 575.00 212-00028 Seeding (Wetlands) 1 Acre 1,742.50 1,742.50 212-00032 Soil Conditioning 368 Acre 735,898.80 1,999.73 212-00040 Soil Preparation (Lawn) 1 Acre 1,701.00 1,701.00 212-00047 Soil Preparation (Special) 25 Acre 82,565.67 3,302.63 212-00048 Soil Preparation (Special) 888 Cubic Yard 10,656.00 12.00 212-00050 Sod 40,609 Sq Foot 34,926.65 0.86 213-00000 Mulching 25 Acre 18,563.00 742.52 213-00002 Mulching (Weed Free Hay) 547 Acre 217,932.91 398.41 213-00003 Mulching (Weed Free) 234 Acre 113,982.37 487.10 213-00004 Mulching (Weed Free Straw) 94 Acre 52,450.32 557.98 213-00005 Mulching (Decorative) 7,072 Cubic Foot 16,310.20 2.31 213-00006 Mulching (Weed Free) 7 Ton 2,388.67 341.24 213-00008 Mulching (Wood Chip) 14,834 Cubic Foot 35,835.83 2.42 213-00011 Mulching (Hydraulic) 3 Acre 3,980.00 1,326.67 213-00061 Mulch Tackifier 171,472 Pound 313,157.12 1.83 213-00065 Inorganic Mulch 3,116 Cubic Yard 159,579.02 51.21 213-00100 Soil Binder 123 Acre 52,938.16 430.39 213-00300 Concrete Landscape Border 281 Lin Foot 2,810.00 10.00 213-00440 Metal Landscape Border (1/8x4 Inch) 3,160 Lin Foot 7,148.75 2.26 213-00460 Metal Landscape Border (3/16x4 Inch) 1,233 Lin Foot 5,560.83 4.51 213-00500 Tree Grate 6 Each 6,000.00 1,000.00 213-00700 Landscape Boulder 188 Each 40,962.44 217.89 214-00000 Landscape Maintenance 6 Lump Sum 210,628.77 35,104.80 214-00205 Deciduous Tree (5 Gallon Container) 25 Each 1,000.00 40.00 214-00215 Deciduous Tree (1.5 Inch Caliper) 54 Each 14,134.88 261.76 214-00220 Deciduous Tree (2 Inch Caliper) 62 Each 27,668.00 446.26 214-00222 Deciduous Tree (2 Inch Caliper) (Furnish Only) 9 Each 2,700.00 300.00 214-00225 Deciduous Tree (2.5 Inch Caliper) 37 Each 20,260.00 547.57 214-00230 Deciduous Tree (3 Inch Caliper) 103 Each 57,718.50 560.37 214-00280 Deciduous Tree (8 Foot) 11 Each 3,300.00 300.00 214-00310 Deciduous Shrub (1 Gallon Container) 18 Each 828.00 46.00 214-00350 Deciduous Shrub (5 Gallon Container) 3,921 Each 173,468.34 44.24 214-00450 Evergreen Tree (5 Gallon Container) 25 Each 1,500.00 60.00 214-00504 Evergreen Tree (4 Foot) (Ball and Burlap) 90 Each 31,356.00 348.40 Colorado Department of Transporation 15:10 Monday, January 8, 2007 8 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 214-00506 Evergreen Tree (6 Foot) (Ball and Burlap) 90 Each 37,601.45 417.79 214-00507 Evergreen Tree (6 Foot) (Ball and Burlap) (Furnish On 9 Each 2,700.00 300.00 214-00508 Evergreen Tree (8 Foot) (Ball and Burlap) 46 Each 30,141.49 655.25 214-00650 Evergreen Shrub (5 Gallon Container) 555 Each 23,979.50 43.21 214-00805 Ground Cover Vines (2.25 Inch Pots) 318 Each 4,770.00 15.00 214-00850 Ground Cover Vines (5 Gallon Container) 118 Each 4,838.00 41.00 214-00908 Perennials (1 Quart Container) 5,538 Each 42,088.80 7.60 214-00910 Perennials (1 Gallon Container) 893 Each 16,074.00 18.00 214-00950 Perennials (5 Gallon Container) 16 Each 662.40 41.40 214-01010 Brush Layer Cutting 2,060 Each 10,386.25 5.04 214-01015 Willow Cuttings 20 Each 460.00 23.00 214-01025 Dormant Log Cutting 40 Each 1,200.00 30.00 214-01030 Wattle 300 Each 4,500.00 15.00 215-00000 Transplant Shrub 30 Each 19,278.00 642.60 215-00010 Transplant Tree 12 Each 3,036.00 253.00 215-00060 Transplant Tree (3 to 6 Inch) 3 Each 1,310.10 436.70 215-00100 Transplant Tree (Over 6 Inch) 7 Each 4,206.25 600.89 215-00600 Transplant Plug 175 Each 1,602.50 9.16 216-00015 Soil Retention Blanket (Excelsior) 40,784 Sq Yard 73,383.20 1.80 216-00021 Soil Retention Blanket (Class 1) 96,978 Sq Yard 119,513.10 1.23 216-00022 Soil Retention Blanket (Class 2) 5,290 Sq Yard 27,402.20 5.18 216-00023 Soil Retention Blanket (Class 3) 14,148 Sq Yard 124,463.74 8.80 216-00035 Soil Retention Blanket (Plastic) 7,032 Sq Yard 59,883.47 8.52 216-00037 Soil Retention Blanket (Coconut) 46,366 Sq Yard 93,388.45 2.01 216-00039 Soil Retention Blanket (Straw) 13,886 Sq Yard 20,829.80 1.50 216-00041 Soil Retention Blanket (Straw/Coconut) 183,288 Sq Yard 311,339.24 1.70 217-00000 Herbicide Treatment 40,172 Sq Yard 7,230.96 0.18 217-00010 Pre-Emergent Herbicide 17,803 Sq Yard 2,492.42 0.14 217-00020 Herbicide Treatment 424 Hour 44,910.08 105.92 250-00010 Environmental Health and Safety Management 15 Lump Sum 73,719.38 4,914.63 250-00050 Monitoring Technician 1,034 Hour 64,724.20 62.60 250-00100 Environmental Health and Safety 5 Lump Sum 21,563.09 4,312.62 250-00110 Health and Safety Officer 686 Hour 74,182.40 108.14 250-00120 Material Sampling and Delivery 153 Each 20,415.70 133.44 250-00200 Material Handling (Stockpile) 1,156 Cubic Yard 17,919.00 15.50 250-00210 Solid Waste Disposal 1,217 Cubic Yard 58,076.98 47.72 250-00220 Hazardous Waste Disposal 1,050 Cubic Yard 49,247.00 46.90 250-00230 Trap and Treat BOS-200, gypsum dry weight 4,500 Pound 20,025.00 4.45 Colorado Department of Transporation 15:10 Monday, January 8, 2007 9 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 250-00240 Subsurface Bioenhancement Injection 140 Each 40,180.00 287.00 250-00300 Water Treatment System 1 Each 24,000.00 24,000.00 250-00310 Water Treatment 15 M Gallon 10,020.00 668.00 304-01005 Aggregate Base Course (Class 1) 23 Cubic Yard 2,300.00 100.00 304-03000 Aggregate Base Course (Class 3) 66,118 Ton 1,026,482.12 15.53 304-04000 Aggregate Base Course (Class 4) 61 Ton 2,172.82 35.62 304-05000 Aggregate Base Course (Class 5) 11,334 Ton 215,346.00 19.00 304-06000 Aggregate Base Course (Class 6) 111,824 Ton 2,512,669.73 22.47 304-06004 Aggregate Base Course (Class 6) 2,575 Sq Yard 13,261.25 5.15 304-06007 Aggregate Base Course (Class 6) 136,822 Cubic Yard 3,125,901.73 22.85 304-06008 Aggregate Base Course (Class 6) (Special) 8,207 Cubic Yard 86,530.15 10.54 304-06009 Aggregate Base Course (Class 6) (Special) 8,708 Ton 209,691.00 24.08 304-07000 Aggregate Base Course (Class 7) 9,985 Ton 212,691.28 21.30 304-07009 Aggregate Base Course (Class 7) (Special) 19,605 Ton 121,179.50 6.18 304-09000 Aggregate Base Course (Special) 16,068 Cubic Yard 425,489.70 26.48 304-09014 Aggregate Base Course (Special) 33,441 Ton 574,326.49 17.17 304-09020 Permeable Aggregate Base Course 13 Ton 260.00 20.00 306-01000 Reconditioning 52,522 Sq Yard 82,522.00 1.57 307-00000 Hydrated Lime 190 Ton 18,952.50 99.75 310-00400 Process Asphalt Mat For Base Course 74,517 Sq Yard 186,292.50 2.50 310-00500 Full Depth Reclamation of Hot Mix Asph. Pavement 93,402 Sq Yard 317,566.80 3.40 310-00608 Full Depth Reclamation of Hot Mix Asphalt Pavement (0 169,873 Sq Yard 605,693.25 3.57 310-00610 Full Depth Reclamation of Hot Mix Asphalt Pavement (8 92,599 Sq Yard 244,545.70 2.64 310-00611 Full Depth Reclamation of Hot Mix Asphalt Pavement up 677,459 Sq Yard 1,268,554.45 1.87 310-00612 Full Depth Reclamation of Hot Mix Asphalt Pavement ov 121,089 Square Yd 33,886.25 0.28 310-00614 Full Depth Reclamation Of Hot Mix Asphalt Pavement (1 62,109 Sq Yard 162,891.40 2.62 403-00720 Hot Bituminous Pavement (Patching) (Asphalt) 22,927 Ton 2,977,713.30 129.88 403-00721 Hot Bituminous Pavement (Patching) (Asphalt) 4,849 Sq Yard 152,907.22 31.53 403-00800 Emergency Pothole Repair 110 Ton 16,601.50 150.92 403-09210 Stone Matrix Asphalt 113,785 Ton 6,939,531.05 60.99 403-09221 Stone Matrix Asphalt (Fibers)(Asphalt) 152,681 Ton 9,487,654.47 62.14 403-09500 Furnish Hot Bituminous Pavement 16,171 Ton 766,881.30 47.42 403-33721 Hot Bituminous Pavement (Grading S) (75) (PG 58-28) 30,212 Ton 1,444,480.82 47.81 403-33731 Hot Bituminous Pavement (Grading S) (75) (PG 58-34) 61,051 Ton 3,318,445.50 54.36 403-33741 Hot Bituminous Pavement (Grading S) (75) (PG 64-22) 212,327 Ton 11,553,690.35 54.41 403-33751 Hot Bituminous Pavement (Grading S) (75) (PG 64-28) 83,668 Ton 4,468,681.00 53.41 403-33841 Hot Bituminous Pavement (Grading S) (100) (PG 64-22) 193,245 Ton 10,892,488.96 56.37 403-33851 Hot Bituminous Pavement (Grading S) (100) (PG 64-28) 29,126 Ton 1,976,898.78 67.87 Colorado Department of Transporation 15:10 Monday, January 8, 2007 10 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 403-33871 Hot Bituminous Pavement (Grading S) (100) (PG 76-28) 25,060 Ton 1,543,617.14 61.60 403-34641 Hot Bituminous Pavement (Grading SX) (50) (PG 64-22) 19,107 Ton 1,509,258.00 78.99 403-34701 Hot Bituminous Pavement (Grading SX) (75) 124,908 Ton 5,610,866.37 44.92 403-34721 Hot Bituminous Pavement (Grading SX) (75) (PG 58-28) 43,074 Ton 2,505,655.70 58.17 403-34741 Hot Bituminous Pavement (Grading SX) (75) (PG 64-22) 39,003 Ton 2,101,999.50 53.89 403-34751 Hot Bituminous Pavement (Grading SX) (75) (PG 64-28) 3,519 Ton 218,178.00 62.00 403-34771 Hot Bituminous Pavement (Grading SX) (75) (PG 76-28) 298 Ton 21,754.00 73.00 403-34801 Hot Bituminous Pavement (Grading SX) (100) 83,664 Ton 3,398,795.74 40.62 403-34821 Hot Bituminous Pavement (Grading SX) (100) (PG 58-28) 25,072 Ton 1,344,057.27 53.61 403-34841 Hot Bituminous Pavement (Grading SX) (100) (PG 64-22) 214,078 Ton 9,930,546.96 46.39 403-34851 Hot Bituminous Pavement (Grading SX) (100) (PG 64-28) 78,405 Ton 3,878,307.49 49.47 403-34871 Hot Bituminous Pavement (Grading SX) (100) (PG 76-28) 89,694 Ton 5,336,784.58 59.50 403-35701 Hot Bituminous Pavement (Grading S-Fines) (75) 10,496 Ton 317,504.00 30.25 403-36400 Hot Bituminous Pavement (Grading SX) (75) 59,531 Ton 2,290,639.05 38.48 405-00100 Heating and Remixing Treatment 611,805 Sq Yard 2,248,004.05 3.67 405-00101 Heating and Remixing Treatment (Special) 122,214 Sq Yard 806,612.40 6.60 406-09500 Cold Bituminous Pavement (Recycle) 55,533 Sq Yard 155,492.40 2.80 408-01000 Hot Poured Joint and Crack Sealant 3 Ton 10,207.61 3,402.54 409-02010 Cover Coat Material (Type II) 7,592 Ton 383,396.00 50.50 409-02015 Cover Coat Material (Type II) 385,283 Sq Yard 577,924.50 1.50 409-02030 Cover Coat Material (Type I) Special 503,034 Sq Yard 571,299.68 1.14 409-02055 Cover Coat Material (Type II)(Special) 708,466 Sq Yard 788,956.40 1.11 409-09000 Micro-Surfacing Seal Coat 253 Ton 131,190.62 518.54 411-03342 Asphalt Cement Performance Grade (PG 64-28) 4,100 Ton 1,724,931.00 420.71 411-03345 Asphalt Cement Performance Grade (PG 76-28) 6,725 Ton 3,015,590.00 448.41 411-03352 Asphalt Cement Performance Grade (PG 58-28) 5,473 Ton 1,953,647.72 356.96 411-03354 Asphalt Cement Performance Grade (PG 64-22) 400 Ton 174,250.00 435.63 411-03355 Asphalt Cement Performance Grade (PG 58-34) 4,792 Ton 1,779,191.30 371.28 411-10253 Emulsified Asphalt (CSS-1H) 21,077 Gallon 27,915.00 1.32 411-10254 Emulsified Asphalt (CSS-1H) (Modified) 13,858 Gallon 36,030.80 2.60 411-10255 Emulsified Asphalt (Slow-Setting) 548,028 Gallon 1,144,059.28 2.09 411-10261 Emulsified Asphalt (Rapid-Setting-2P)(Polymerized) 698,767 Gallon 702,220.40 1.00 411-10275 Emulsified Asphalt (HFMS-2P) (High Float) (Polymerize 514,863 Gallon 414,217.88 0.80 411-10300 Emulsified Asphalt (Prime Coat) 43,975 Gallon 103,281.34 2.35 411-90010 Asphalt Rejuvenating Agent 42,835 Gallon 84,860.10 1.98 411-90040 Recycling Agent 45,400 Gallon 54,480.00 1.20 412-00000 Furnish Concrete Pavement 51,585 Cubic Yard 4,487,895.00 87.00 412-00050 Place Concrete Pavement 188,708 Sq Yard 1,849,338.40 9.80 Colorado Department of Transporation 15:10 Monday, January 8, 2007 11 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 412-00400 Concrete Pavement (4 Inch) 41 Sq Yard 4,100.00 100.00 412-00600 Concrete Pavement (6 Inch) 10,566 Sq Yard 504,709.35 47.77 412-00605 Concrete Pavement (6 Inch) (Fast Track) 111 Sq Yard 7,133.04 64.26 412-00800 Concrete Pavement (8 Inch) 11,804 Sq Yard 583,983.00 49.47 412-00805 Concrete Pavement (8 Inch) (Fast Track) 2,078 Sq Yard 139,226.00 67.00 412-00950 Concrete Pavement (9-1/2 Inch) 12,737 Sq Yard 416,647.00 32.71 412-00975 Concrete Pavement (9-3/4 Inch) 700 Sq Yard 108,500.00 155.00 412-01000 Concrete Pavement (10 Inch) 20,544 Sq Yard 1,277,440.00 62.18 412-01050 Concrete Pavement (10-1/2 Inch) 6,040 Sq Yard 256,803.90 42.52 412-01060 Concrete Pavement (10-1/2 Inch) (Fast Track) 356 Sq Yard 42,008.00 118.00 412-01100 Concrete Pavement (11 Inch) 27,648 Sq Yard 1,482,082.05 53.61 412-01120 Concrete Pavement (11 Inch) (Fast Track) 2,704 Sq Yard 225,577.58 83.42 412-01150 Concrete Pavement (11-1/2 Inch) 4,978 Sq Yard 303,658.00 61.00 412-01200 Concrete Pavement (12 Inch) 312,107 Sq Yard 11,478,155.77 36.78 412-01250 Concrete Pavement (12-1/2 Inch) 178,788 Sq Yard 6,568,671.12 36.74 412-01300 Concrete Pavement (13 Inch) 273,371 Sq Yard 10,037,673.80 36.72 412-01325 Concrete Pavement (13 Inch)(Fast Track) 3,041 Sq Yard 243,280.00 80.00 412-01350 Concrete Pavement (13-1/2 Inch) 9,200 Sq Yard 660,100.00 71.75 412-05000 Partial Depth Repair of Concrete Pavement 73 Sq Foot 5,402.00 74.00 412-14000 Sawing and Sealing Concrete Pavement Joints 300,767 Lin Foot 451,150.50 1.50 412-15000 Routing and Sealing Concrete Pavement Cracks 4,629 Lin Foot 19,131.75 4.13 412-15050 Cross Stitching 600 Each 22,800.00 38.00 420-00000 Geomembrane 1,240 Sq Yard 25,110.00 20.25 420-00100 Geotextile (Erosion Control) (Class A) 16,877 Sq Yard 48,343.19 2.86 420-00101 Geotextile (Erosion Control) (Class B) 2,851 Sq Yard 9,356.80 3.28 420-00110 Geotextile (Drainage) (Class A) 67,832 Sq Yard 119,870.59 1.77 420-00111 Geotextile (Drainage) (Class B) 2,980 Sq Yard 13,735.00 4.61 420-00130 Geotextile (Separator) (Class A) 24,361 Sq Yard 42,847.68 1.76 420-00131 Geotextile (Separator) (Class B) 64 Sq Yard 854.00 13.34 420-00200 Geotextile (Weed Barrier) 16,624 Sq Yard 35,022.33 2.11 420-00500 Geotextile (Paving) 961 Sq Yard 12,925.45 13.45 420-00510 Geotextile (Crack Reduction) (High Density) 33 Sq Yard 1,009.50 30.59 501-00000 Steel Sheet Piling (Type I) 3,000 Sq Foot 51,810.00 17.27 502-00000 Treated Timber Piling 600 Lin Foot 31,800.00 53.00 502-00100 Drilling Hole to Facilitate Pile Driving 1,029 Lin Foot 81,291.00 79.00 502-00460 Pile Tip 70 Each 6,000.00 85.71 502-11274 Steel Piling (HP 12x74) 4,922 Lin Foot 241,003.00 48.96 502-11489 Steel Piling (HP 14x89) 892 Lin Foot 71,360.00 80.00 Colorado Department of Transporation 15:10 Monday, January 8, 2007 12 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 503-00018 Drilled Caisson (18 Inch) 232 Lin Foot 38,143.00 164.41 503-00024 Drilled Caisson (24 Inch) 635 Lin Foot 65,958.12 103.87 503-00030 Drilled Caisson (30 Inch) 798 Lin Foot 175,926.00 220.46 503-00036 Drilled Caisson (36 Inch) 2,783 Lin Foot 566,847.53 203.68 503-00042 Drilled Caisson (42 Inch) 427 Lin Foot 110,877.14 259.67 503-00048 Drilled Caisson (48 Inch) 5,430 Lin Foot 1,273,945.31 234.61 503-00054 Drilled Caisson (54 Inch) 564 Lin Foot 181,806.28 322.35 503-00200 Caisson (Special) 10,597 Lin Foot 4,556,710.00 430.00 503-01070 Micropile (7 Inch) 17,050 Lin Foot 1,636,800.00 96.00 503-02000 Verification Test Pile 3 Each 43,950.00 14,650.00 504-04410 Block Facing 149,599 Sq Foot 1,484,423.09 9.92 504-04420 Precast Panel Facing 111,201 Sq Foot 2,176,464.96 19.57 504-04440 Facing (Special) 36,709 Sq Foot 513,926.00 14.00 504-06315 Ground Nail (15 Foot) 522 Each 336,690.00 645.00 504-06320 Ground Nail (20 Foot) 360 Each 306,000.00 850.00 504-06325 Ground Nail (25 Foot) 123 Each 130,995.00 1,065.00 504-06330 Ground Nail (30 Foot) 157 Each 200,175.00 1,275.00 504-06335 Ground Nail (35 Foot) 741 Each 1,104,090.00 1,490.00 504-08050 Stone Landscape Wall 2,701 Sq Foot 128,044.00 47.41 504-08255 Masonry Landscape Wall (Dry Stack) 61 Sq Foot 1,945.90 31.90 506-00000 Riprap 110 Cubic Yard 5,830.00 53.00 506-00010 Riprap (Special) 269 Cubic Yard 16,258.04 60.44 506-00030 Grouted Riprap 107 Cubic Yard 15,260.28 142.62 506-00206 Riprap (6 Inch) 93 Cubic Yard 11,624.50 124.99 506-00209 Riprap (9 Inch) 2,321 Cubic Yard 169,723.75 73.13 506-00212 Riprap (12 Inch) 2,671 Cubic Yard 222,947.64 83.47 506-00218 Riprap (18 Inch) 3,599 Cubic Yard 251,182.01 69.79 506-00224 Riprap (24 Inch) 58,018 Cubic Yard 2,228,389.00 38.41 507-00000 Concrete Slope and Ditch Paving 253 Cubic Yard 113,725.04 449.51 507-00100 Concrete Slope and Ditch Paving (Reinforced) 1,793 Cubic Yard 497,489.20 277.46 507-00200 Dry Rubble Slope and Ditch Paving 189 Cubic Yard 27,662.31 146.36 507-00300 Grouted Rubble Slope and Ditch Paving 32 Cubic Yard 4,000.00 125.00 507-00350 Grouted Riprap Slope and Ditch Paving 44 Cubic Yard 19,470.00 442.50 507-00400 Bituminous Slope and Ditch Paving (Asphalt) 129 Ton 22,590.81 175.12 507-00700 Slope and Ditch Paving (Special) 41 Cubic Yard 40,132.86 978.85 508-00100 Treated Timber 2 M Ft Bd Me 11,200.00 5,600.00 508-00520 Insulation Material (2 Inch) 960 Sq Foot 2,016.00 2.10 508-90000 Paint Existing Structure 1 Lump Sum 4,147.00 4,147.00 Colorado Department of Transporation 15:10 Monday, January 8, 2007 13 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 509-00000 Structural Steel 64,517 Pound 192,450.20 2.98 509-00001 Structural Steel (Galvanized) 33,231 Pound 116,191.10 3.50 509-00010 Structural Steel (Special) 1,300 Pound 93,150.00 71.65 509-08010 Alter and Erect Structural Steel 1 Lump Sum 94,700.00 94,700.00 509-08100 Provide Temporary Support 5 Lump Sum 1,594,600.76 318,920.15 509-08120 Temporary Bridge Deck 4,489 Sq Foot 179,560.00 40.00 509-90000 Paint Existing Structure(S) 2 Lump Sum 30,548.56 15,274.28 509-90002 Paint Existing Structure (Special) 60 Gallon 19,445.25 324.09 510-20100 Structural Plate Arch (Special) 110 Lin Foot 158,046.41 1,436.79 512-00101 Bearing Device (Type I) 81 Each 32,231.00 397.91 512-00102 Bearing Device (Type II) 22 Each 50,132.00 2,278.73 512-00103 Bearing Device (Type III) 40 Each 349,600.00 8,740.00 512-00118 Bearing Device (Special) 36 Each 36,000.00 1,000.00 513-00690 Bridge Drain (Special) 55 Each 369,600.00 6,720.00 514-00000 Pipe Railing 330 Lin Foot 18,150.00 55.00 514-00100 Hand Rail 15 Lin Foot 600.00 40.00 514-00200 Pedestrian Railing (Steel) 2,477 Lin Foot 210,754.50 85.08 514-00201 Pedestrian Railing (Steel)(Special) 2,618 Lin Foot 620,466.00 237.00 514-00300 Traffic Railing (Steel) 50 Lin Foot 5,000.00 100.00 515-00120 Waterproofing (Membrane) 42,605 Sq Yard 432,864.45 10.16 515-00400 Concrete Sealer 24,987 Sq Yard 138,611.71 5.55 515-00410 Concrete Sealer (Calcium Nitrite) 421 Sq Yard 24,908.20 59.16 517-00000 Waterproofing (Asphalt) 1,580 Sq Yard 44,808.80 28.36 517-00100 Waterproofing (Railroad) 281 Sq Yard 28,395.05 101.05 518-00000 Bridge Compression Joint Sealer 179 Lin Foot 16,856.00 94.17 518-00100 Waterstop 127 Lin Foot 6,622.70 52.15 518-00106 Waterstop (6 Inch) 215 Lin Foot 4,042.00 18.80 518-01002 Bridge Expansion Device (0-2 Inch) 2,968 Lin Foot 332,306.14 111.96 518-01004 Bridge Expansion Device (0-4 Inch) 2,559 Lin Foot 466,889.85 182.45 518-01006 Bridge Expansion Device (0-6 Inch) 160 Lin Foot 156,560.00 978.50 518-01009 Bridge Expansion Device (0-9 Inch) 62 Lin Foot 74,400.00 1,200.00 518-01012 Bridge Expansion Device (0-12 Inch) 72 Lin Foot 115,200.00 1,600.00 518-01015 Bridge Expansion Device (0-15 Inch) 65 Lin Foot 128,980.00 1,984.31 518-01250 Bridge Expansion Cover Plate 12 Lin Foot 8,400.00 700.00 518-02010 Elastomeric Concrete End Dam 78 Cubic Foot 36,270.00 465.00 518-02100 Polymer Mortar End Dam 723 Cubic Foot 264,517.92 365.86 518-03000 Sawing and Sealing Bridge Joint 791 Lin Foot 18,254.88 23.08 518-03100 Rapid Cure Silicone Joint Seal 2,291 Lin Foot 80,380.38 35.09 Colorado Department of Transporation 15:10 Monday, January 8, 2007 14 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 519-01000 Epoxy Resin (Injection) 300 Lin Foot 18,000.00 60.00 601-01000 Concrete Class B 759 Cubic Yard 382,013.16 503.31 601-01025 Concrete Class B (Miscellaneous) 146 Cubic Yard 117,722.36 806.32 601-01040 Concrete Class B (Bridge) 86 Cubic Yard 81,872.00 952.00 601-01050 Concrete Class B (Wall) 1,045 Cubic Yard 392,872.30 375.95 601-03000 Concrete Class D 1,513 Cubic Yard 596,012.95 393.93 601-03020 Concrete Class D (Miscellaneous) 18 Cubic Yard 6,584.32 365.80 601-03025 Concrete Class D (Miscellaneous) (Colored) 5 Cubic Yard 3,000.00 600.00 601-03027 Concrete Class D (Special) 652 Cubic Yard 306,762.83 470.50 601-03030 Concrete Class D (Box Culvert) 4,089 Cubic Yard 1,530,682.81 374.34 601-03040 Concrete Class D (Bridge) 16,413 Cubic Yard 7,089,402.48 431.94 601-03041 Concrete Class D (Bridge) (Special) 677 Cubic Yard 477,723.40 705.65 601-03050 Concrete Class D (Wall) 4,997 Cubic Yard 1,936,169.93 387.47 601-03540 Concrete Class DT (Deck Topping) 8 Cubic Yard 4,800.00 600.00 601-04000 Concrete Class E 892 Cubic Yard 765,336.00 858.00 601-05035 Concrete Class S35 52 Cubic Yard 63,960.00 1,230.00 601-05045 Concrete Class S40 533 Cubic Yard 61,295.00 115.00 601-05050 Concrete Class S50 139 Cubic Yard 83,400.00 600.00 601-05540 Concrete Class HT (Deck Topping) 165 Cubic Yard 69,930.30 423.82 601-06020 Concrete (Patching) (Polymer) 25 Cubic Yard 203,891.81 8,155.67 601-06100 Concrete (Patching) 102 Cubic Yard 196,511.46 1,926.58 601-06150 Concrete (Patching) 1,292 Sq Foot 79,070.00 61.20 601-40000 Masonry Veneer 275 Sq Foot 3,753.75 13.65 601-40005 Cut Stone Veneer 4,586 Sq Foot 178,854.00 39.00 601-40250 Bridge Deck Finish (Sawed Grooves) 12,111 Sq Yard 35,973.66 2.97 601-40300 Structural Concrete Coating 43,999 Sq Yard 226,371.40 5.14 601-40301 Structural Concrete Coating 60,713 Sq Foot 20,066.67 0.33 601-40302 Structural Concrete Coating (Anti-Graffiti) 90,141 Sq Foot 119,332.81 1.32 601-40400 Structural Concrete Stain 40,540 Sq Yard 214,781.75 5.30 601-40600 Concrete Tinting 88 Sq Yard 1,320.00 15.00 602-00000 Reinforcing Steel 1,296,094 Pound 1,282,696.13 0.99 602-00020 Reinforcing Steel (Epoxy Coated) 4,132,417 Pound 3,704,410.85 0.90 603-00000 Culvert Lining 208 Lin Foot 38,480.00 185.00 603-00001 Annular Space Grouting 344 Cubic Yard 256,725.00 746.29 603-00010 Culvert Lining 4,429 Sq Foot 155,015.00 35.00 603-00037 Culvert Lining (36 Inch) (Install Only)(Jacked) 207 Lin Foot 37,558.08 181.44 603-00048 Culvert Lining (48 Inch) 288 Lin Foot 93,600.00 325.00 603-00060 Culvert Lining (60 Inch) 618 Lin Foot 256,470.00 415.00 Colorado Department of Transporation 15:10 Monday, January 8, 2007 15 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 603-01125 12 Inch Reinforced Concrete Pipe (Complete In Place) 47 Lin Foot 4,671.50 99.39 603-01155 15 Inch Reinforced Concrete Pipe (Complete In Place) 1,413 Lin Foot 80,840.36 57.21 603-01180 18 Inch Reinforced Concrete Pipe 3,304 Lin Foot 257,170.76 77.84 603-01185 18 Inch Reinforced Concrete Pipe (Complete In Place) 16,504 Lin Foot 816,482.08 49.47 603-01240 24 Inch Reinforced Concrete Pipe 7,610 Lin Foot 672,894.60 88.42 603-01245 24 Inch Reinforced Concrete Pipe (Complete In Place) 12,555 Lin Foot 684,301.21 54.50 603-01300 30 Inch Reinforced Concrete Pipe 2,370 Lin Foot 343,688.20 145.02 603-01305 30 Inch Reinforced Concrete Pipe (Complete In Place) 6,982 Lin Foot 470,845.78 67.44 603-01360 36 Inch Reinforced Concrete Pipe 3,396 Lin Foot 389,220.64 114.61 603-01365 36 Inch Reinforced Concrete Pipe (Complete In Place) 4,481 Lin Foot 331,291.48 73.93 603-01420 42 Inch Reinforced Concrete Pipe 315 Lin Foot 99,945.00 317.29 603-01425 42 Inch Reinforced Concrete Pipe (Complete In Place) 1,780 Lin Foot 163,389.55 91.79 603-01480 48 Inch Reinforced Concrete Pipe 638 Lin Foot 219,684.32 344.33 603-01485 48 Inch Reinforced Concrete Pipe (Complete In Place) 2,071 Lin Foot 224,439.75 108.37 603-01540 54 Inch Reinforced Concrete Pipe 1,740 Lin Foot 361,500.00 207.76 603-01545 54 Inch Reinforced Concrete Pipe (Complete In Place) 556 Lin Foot 81,426.20 146.45 603-01600 60 Inch Reinforced Concrete Pipe 122 Lin Foot 34,165.10 280.04 603-01605 60 Inch Reinforced Concrete Pipe (Complete In Place) 750 Lin Foot 138,750.00 185.00 603-01660 66 Inch Reinforced Concrete Pipe 333 Lin Foot 108,225.00 325.00 603-01665 66 Inch Reinforced Concrete Pipe (Complete In Place) 213 Lin Foot 40,576.50 190.50 603-01725 72 Inch Reinforced Concrete Pipe (Complete In Place) 239 Lin Foot 57,983.79 242.61 603-01840 84 Inch Reinforced Concrete Pipe 96 Lin Foot 48,243.84 502.54 603-02185 23x14 Inch Reinforced Concrete Pipe (Complete In Plac 293 Lin Foot 23,015.29 78.55 603-02240 30x19 Inch Reinforced Concrete Pipe Elliptical 51 Lin Foot 7,140.00 140.00 603-02245 30x19 Inch Reinforced Concrete Pipe Elliptical 80 Lin Foot 11,347.20 141.84 603-02305 38x24 Inch Reinforced Concrete Pipe Elliptical 111 Lin Foot 11,044.50 99.50 603-02365 45x29 Inch Reinforced Concrete Pipe Elliptical 64 Lin Foot 8,607.36 134.49 603-02420 53x34 Inch Reinforced Concrete Pipe Elliptical 120 Lin Foot 27,600.00 230.00 603-02425 53x34 Inch Reinforced Concrete Pipe Elliptical 1,079 Lin Foot 147,013.75 136.25 603-02485 60x38 Inch Reinforced Concrete Pipe Elliptical (CIP) 900 Lin Foot 165,600.00 184.00 603-02600 76x48 Inch Reinforced Concrete Pipe Elliptical 288 Lin Foot 102,934.08 357.41 603-02720 91x58 Inch Reinforced Concrete Pipe Elliptical 96 Lin Foot 50,041.92 521.27 603-02840 106x68 Inch Reinforced Concrete Pipe Elliptical 96 Lin Foot 71,302.08 742.73 603-03360 36 Inch Reinforced Concrete Pipe Special 198 Lin Foot 99,000.00 500.00 603-03541 54 Inch Reinforced Concrete Pipe (Special) (Install O 68 Lin Foot 7,257.64 106.73 603-03661 66 Inch Reinforced Concrete Pipe (Special) (Install O 64 Lin Foot 6,830.72 106.73 603-03721 72 Inch RCP (Special) (Install Only) 72 Lin Foot 7,684.56 106.73 603-05015 15 Inch Reinforced Concrete End Section 6 Each 3,328.05 554.68 Colorado Department of Transporation 15:10 Monday, January 8, 2007 16 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 603-05018 18 Inch Reinforced Concrete End Section 42 Each 30,930.62 736.44 603-05024 24 Inch Reinforced Concrete End Section 65 Each 55,252.41 850.04 603-05030 30 Inch Reinforced Concrete End Section 20 Each 18,498.37 924.92 603-05036 36 Inch Reinforced Concrete End Section 30 Each 35,938.92 1,197.96 603-05042 42 Inch Reinforced Concrete End Section 3 Each 4,160.17 1,386.72 603-05048 48 Inch Reinforced Concrete End Section 15 Each 32,103.62 2,140.24 603-05054 54 Inch Reinforced Concrete End Section 6 Each 12,057.48 2,009.58 603-05055 54 Inch Reinforced Concrete End Section (Install Only 1 Each 1,814.40 1,814.40 603-05060 60 Inch Reinforced Concrete End Section 3 Each 6,600.00 2,200.00 603-05066 66 Inch Reinforced Concrete End Section 2 Each 4,015.04 2,007.52 603-05067 66 Inch Reinforced Concrete End Section (Install Only 1 Each 1,814.40 1,814.40 603-05072 72 Inch Reinforced Concrete End Section 1 Each 2,078.89 2,078.89 603-05073 72 Inch Reinforced Concrete End Section (Install Only 1 Each 1,814.40 1,814.40 603-05084 84 Inch Reinforced Concrete End Section 2 Each 15,490.46 7,745.23 603-05118 23x14 Inch Reinforced Concrete End Section Elliptical 1 Each 944.82 944.82 603-05148 60x38 Inch Reinforced Concrete End Section Elliptical 8 Each 9,778.00 1,222.25 603-05160 76x48 Inch Reinforced Concrete End Section Elliptical 6 Each 17,873.58 2,978.93 603-05172 91x58 Inch Reinforced Concrete End Section Elliptical 2 Each 26,214.64 13,107.32 603-07180 18 Inch Reinforced Concrete Pipe (Jacked) 320 Lin Foot 267,081.60 834.63 603-07360 36 Inch Reinforced Concrete Pipe (Jacked) 234 Lin Foot 202,916.42 867.16 603-07420 42 Inch Reinforced Concrete Pipe (Jacked) 270 Lin Foot 137,970.00 511.00 603-10120 12 Inch Corrugated Steel Pipe 142 Lin Foot 5,370.00 37.82 603-10150 15 Inch Corrugated Steel Pipe 1,990 Lin Foot 71,418.00 35.89 603-10180 18 Inch Corrugated Steel Pipe 1,740 Lin Foot 93,970.50 54.01 603-10240 24 Inch Corrugated Steel Pipe 3,421 Lin Foot 226,720.24 66.27 603-10300 30 Inch Corrugated Steel Pipe 276 Lin Foot 27,400.00 99.28 603-10360 36 Inch Corrugated Steel Pipe 2,507 Lin Foot 209,396.60 83.52 603-10420 42 Inch Corrugated Steel Pipe 225 Lin Foot 21,600.00 96.00 603-10480 48 Inch Corrugated Steel Pipe 800 Lin Foot 107,201.02 134.00 603-10600 60 Inch Corrugated Steel Pipe 134 Lin Foot 17,728.20 132.30 603-10720 72 Inch Corrugated Steel Pipe 18 Lin Foot 2,700.00 150.00 603-10840 84 Inch Corrugated Steel Pipe 329 Lin Foot 86,808.15 263.85 603-15024 24 Inch Equivalent Corrugated Steel Pipe Arch 15 Lin Foot 4,500.00 300.00 603-15060 60 Inch Equivalent Corrugated Steel Pipe Arch 8 Lin Foot 1,080.00 135.00 603-30012 12 Inch Steel End Section 2 Each 300.00 150.00 603-30015 15 Inch Steel End Section 2 Each 440.00 220.00 603-30018 18 Inch Steel End Section 36 Each 13,734.58 381.52 603-30024 24 Inch Steel End Section 66 Each 28,227.26 427.69 Colorado Department of Transporation 15:10 Monday, January 8, 2007 17 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 603-30030 30 Inch Steel End Section 16 Each 8,800.00 550.00 603-30036 36 Inch Steel End Section 26 Each 19,732.32 758.94 603-30048 48 Inch Steel End Section 7 Each 10,047.78 1,435.40 603-30060 60 Inch Steel End Section 2 Each 3,748.50 1,874.25 603-30072 72 Inch Steel End Section 1 Each 3,500.00 3,500.00 603-30084 84 Inch Steel End Section 2 Each 6,615.00 3,307.50 603-31324 24 Inch Equivalent Arch Steel End Section 3 Each 2,748.00 916.00 603-33024 24 Inch Pipe Safety End Treatment 30 Each 71,494.50 2,383.15 603-33030 30 Inch Pipe Safety End Treatment 8 Each 23,831.44 2,978.93 603-33048 48 Inch Pipe Safety End Treatment 5 Each 20,852.50 4,170.50 603-33060 60 Inch Pipe Safety End Treatment 2 Each 10,724.18 5,362.09 603-50004 4 Inch Plastic Pipe 760 Lin Foot 13,362.32 17.58 603-50006 6 Inch Plastic Pipe 10 Lin Foot 528.00 52.80 603-50008 8 Inch Plastic Pipe 68 Lin Foot 1,566.00 23.03 603-50012 12 Inch Plastic Pipe 1,107 Lin Foot 65,869.91 59.50 603-50015 15 Inch Plastic Pipe 520 Lin Foot 42,415.00 81.57 603-50018 18 Inch Plastic Pipe 863 Lin Foot 83,096.34 96.29 603-50024 24 Inch Plastic Pipe 100 Lin Foot 10,365.00 103.65 603-50043 42 Inch Plastic Pipe (Install Only) 80 Lin Foot 8,538.40 106.73 603-50048 48 Inch Plastic Pipe 135 Lin Foot 23,226.75 172.05 603-61120 12 Inch Flexible Pipe 100 Lin Foot 1,200.00 12.00 603-70404 4X4 Foot Concrete Box Culvert (Precast) 190 Lin Foot 38,900.60 204.74 603-70502 5x2 Foot Concrete Box Culvert (Precast) 496 Lin Foot 94,175.52 189.87 603-70803 8x3 Foot Concrete Box Culvert (Precast) 206 Lin Foot 79,388.28 385.38 603-70806 8x6 Foot Concrete Box Culvert (Precast) 254 Lin Foot 146,050.00 575.00 603-71812 18x12 Foot Concrete Box Culvert (Precast) 78 Lin Foot 178,620.00 2,290.00 603-83024 24 Inch Sewer Pipe 650 Lin Foot 83,200.00 128.00 604-00305 Inlet Type C (5 Foot) 120 Each 316,893.59 2,640.78 604-00310 Inlet Type C (10 Foot) 28 Each 77,867.43 2,780.98 604-00315 Inlet Type C (15 Foot) 3 Each 13,394.81 4,464.94 604-00320 Inlet Type C (20 Foot) 2 Each 9,625.00 4,812.50 604-00350 Inlet Type C (Special) 19 Each 118,286.47 6,225.60 604-00505 Inlet Type D (5 Foot) 19 Each 86,803.95 4,568.63 604-00510 Inlet Type D (10 Foot) 20 Each 190,390.67 9,519.53 604-00515 Inlet Type D (15 Foot) 3 Each 19,541.05 6,513.68 604-00550 Inlet Type D (Special) 6 Each 63,690.15 10,615.03 604-13005 Inlet Type 13 (5 Foot) 6 Each 18,749.73 3,124.96 604-13010 Inlet Type 13 (10 Foot) 1 Each 4,316.28 4,316.28 Colorado Department of Transporation 15:10 Monday, January 8, 2007 18 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 604-13505 Inlet Type 13 (Double) (5 Foot) 1 Each 4,333.35 4,333.35 604-16005 Inlet Type 16 (5 Foot) 3 Each 10,200.00 3,400.00 604-16010 Inlet Type 16 (10 Foot) 1 Each 4,979.20 4,979.20 604-16050 Inlet Type 16 (Single) (Special) 2 Each 4,800.00 2,400.00 604-16510 Inlet Type 16 (Double) (10 Foot) 1 Each 6,572.30 6,572.30 604-19105 Inlet Type R L 5 (5 Foot) 31 Each 117,620.14 3,794.20 604-19110 Inlet Type R L 5 (10 Foot) 19 Each 83,464.83 4,392.89 604-19115 Inlet Type R L 5 (15 Foot) 2 Each 12,087.00 6,043.50 604-19205 Inlet Type R L 10 (5 Foot) 15 Each 76,038.95 5,069.26 604-19210 Inlet Type R L 10 (10 Foot) 18 Each 110,288.01 6,127.11 604-19215 Inlet Type R L 10 (15 Foot) 3 Each 27,708.50 9,236.17 604-19220 Inlet Type R L 10 (20 Foot) 1 Each 9,998.85 9,998.85 604-19305 Inlet Type R L 15 (5 Foot) 5 Each 36,628.69 7,325.74 604-19310 Inlet Type R L 15 (10 Foot) 8 Each 61,038.00 7,629.75 604-19315 Inlet Type R L 15 (15 Foot) 2 Each 21,293.50 10,646.75 604-19410 Inlet Type R Special (10 Foot) 3 Each 69,900.00 23,300.00 604-19415 Inlet Type R Special (15 Foot) 4 Each 107,200.00 26,800.00 604-19600 Inlet (Sand Filter) 13 Each 260,000.00 20,000.00 604-20000 Outlet Structure 5 Each 36,818.00 7,363.60 604-25000 Vane Grate Inlet Special 6 Each 16,400.00 2,733.33 604-25005 Vane Grate Inlet (5 Foot) 26 Each 72,154.16 2,775.16 604-25006 Vane Grate Inlet Special (5 Foot) 4 Each 22,319.54 5,579.89 604-25010 Vane Grate Inlet (10 Foot) 6 Each 20,347.86 3,391.31 604-25011 Vane Grate Inlet Special (10 Foot) 5 Each 83,999.41 16,799.88 604-26005 Vane Grate Inlet (Double) (5 Foot) 40 Each 157,384.78 3,934.62 604-26010 Vane Grate Inlet (Double) (10 Foot) 8 Each 41,019.04 5,127.38 604-26015 Vane Grate Inlet (Double) (15 Foot) 3 Each 19,701.22 6,567.07 604-26016 Vane Grate Inlet Special (Double) (15 Foot) 1 Each 6,790.48 6,790.48 604-26020 Vane Grate Inlet (Double) (20 Foot) 1 Each 12,649.28 12,649.28 604-30000 Manhole Slab Base (Special) 1 Each 2,600.00 2,600.00 604-30005 Manhole Slab Base (5 Foot) 37 Each 85,315.76 2,305.83 604-30010 Manhole Slab Base (10 Foot) 50 Each 174,396.06 3,487.92 604-30015 Manhole Slab Base (15 Foot) 26 Each 143,535.82 5,520.61 604-30020 Manhole Slab Base (20 Foot) 6 Each 43,534.60 7,255.77 604-31000 Manhole Box Base (Special) 2 Each 12,600.00 6,300.00 604-31005 Manhole Box Base (5 Foot) 1 Each 8,900.00 8,900.00 604-31010 Manhole Box Base (10 Foot) 10 Each 75,082.12 7,508.21 604-31015 Manhole Box Base (15 Foot) 4 Each 37,082.40 9,270.60 Colorado Department of Transporation 15:10 Monday, January 8, 2007 19 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 604-31020 Manhole Box Base (20 Foot) 2 Each 17,957.40 8,978.70 604-32015 Manhole T-Base (15 Foot) 1 Each 2,600.00 2,600.00 604-39005 Manhole Special (5 Foot) 3 Each 10,200.00 3,400.00 604-39010 Manhole Special (10 Foot) 3 Each 23,032.99 7,677.66 604-39015 Manhole Special (15 Foot) 3 Each 16,135.00 5,378.33 604-39020 Manhole Special (20 Foot) 1 Each 9,200.00 9,200.00 604-39050 Manhole (Traffic Management System) 9 Each 117,000.00 13,000.00 604-84000 Plastic Sliplining 518 Lin Foot 99,974.00 193.00 605-00004 4 Inch Non-Perforated Pipe Underdrain 1,954 Lin Foot 20,472.08 10.48 605-00020 2 Inch Perforated Pipe Underdrain 1,700 Lin Foot 63,206.00 37.18 605-00040 4 Inch Perforated Pipe Underdrain 4,608 Lin Foot 216,290.10 46.94 605-00041 4 Inch Perforated Pipe Underdrain (Special) 2,931 Lin Foot 65,800.95 22.45 605-00060 6 Inch Perforated Pipe Underdrain 7,279 Lin Foot 84,058.73 11.55 605-00080 8 Inch Perforated Pipe Underdrain 3,460 Lin Foot 51,035.00 14.75 605-00120 12 Inch Perforated Pipe Underdrain 191 Lin Foot 12,052.10 63.10 605-01020 2 Inch Horizontal Drain 1,449 Lin Foot 65,996.00 45.55 605-01030 3 Inch Horizontal Drain 537 Lin Foot 2,148.00 4.00 605-82100 Pipe Edge Drain 1,072 Lin Foot 41,927.43 39.11 605-83000 Geocomposite Drain 1,429 Sq Yard 18,587.13 13.01 605-83001 Geocomposite Drain without Pipe 54 Sq Yard 729.00 13.50 605-83560 6 Inch Pipe Underdrain 938 Lin Foot 31,470.46 33.55 605-84000 Subsurface Drain Outlet 2,796 Lin Foot 41,968.25 15.01 605-84100 Subsurface Drain Outlet Structure 8 Each 6,230.00 778.75 605-85000 Surface Sand Filter 28,580 Sq Foot 135,755.00 4.75 606-00301 Guardrail Type 3 (6-3 Post Spacing) 167,775 Lin Foot 2,657,096.88 15.84 606-00305 Guardrail Type 3 (Special) 25 Lin Foot 1,050.00 42.00 606-00310 Guardrail Type 3A 4,000 Lin Foot 52,000.00 13.00 606-00350 Guardrail Type 3 (Double) (6-3 Post Spacing) 587 Lin Foot 15,497.35 26.40 606-00700 Guardrail Type 7 450 Lin Foot 48,282.44 107.29 606-00705 Guardrail Type 7 (Special) 75 Lin Foot 29,625.00 395.00 606-00710 Guardrail Type 7 (Style CA) 15,011 Lin Foot 622,034.62 41.44 606-00716 Guardrail Type 7 (Style CA) (Special) 835 Lin Foot 45,457.40 54.44 606-00720 Guardrail Type 7 (Style CC) 7,933 Lin Foot 391,041.50 49.29 606-00721 Guardrail Type 7 (Style CC) (Special) 667 Lin Foot 26,780.05 40.15 606-00725 Guardrail Type 7 (Style CC)(Concrete Glare Screen) 365 Lin Foot 42,705.00 117.00 606-00730 Guardrail Type 7 (Style CD) 2,651 Lin Foot 102,764.06 38.76 606-00740 Guardrail Type 7 (Style CE) 15,146 Lin Foot 804,216.86 53.10 606-00741 Guardrail Type 7 (Style CE) (Special) 828 Lin Foot 92,749.67 112.02 Colorado Department of Transporation 15:10 Monday, January 8, 2007 20 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 606-00800 Guardrail Type 7 (F-Shape Concrete Barrier) 1,620 Lin Foot 116,640.00 72.00 606-00900 Guardrail (Special) 20 Lin Foot 10,000.00 500.00 606-01320 End Anchorage Type 3B 5 Each 3,300.00 660.00 606-01340 End Anchorage Type 3D 135 Each 90,873.75 673.14 606-01370 Transition Type 3G 202 Each 218,299.21 1,080.69 606-01371 Transition Type 3G (Special) 2 Each 1,840.00 920.00 606-01380 Transition Type 3H 66 Each 45,094.22 683.25 606-01385 Transition Type 3J 20 Each 18,504.30 925.22 606-01390 End Anchorage Type 3K 15 Each 15,820.18 1,054.68 606-01395 Transition Type 3L 30 Each 20,604.00 686.80 606-01460 Median Terminal 37 Each 153,197.27 4,140.47 606-02003 End Anchorage (Nonflared) 160 Each 348,213.59 2,176.33 606-02005 End Anchorage (Flared) 545 Each 951,921.53 1,746.65 606-10200 Bridge Rail (Special) 30 Lin Foot 2,740.50 91.35 606-10300 Bridge Rail Type 3 294 Lin Foot 32,612.00 110.93 606-10305 Bridge Rail Type 3 (Special) 421 Lin Foot 20,208.00 48.00 606-10700 Bridge Rail Type 7 14,000 Lin Foot 743,090.27 53.08 606-10705 Bridge Rail Type 7 (Special) 4,447 Lin Foot 435,759.40 97.99 606-11000 Bridge Rail Type 10 167 Lin Foot 17,326.00 103.75 606-11005 Bridge Rail Type 10 (Special) 162 Lin Foot 18,630.00 115.00 606-11010 Bridge Rail Type 10R 9,059 Lin Foot 1,059,331.82 116.94 606-11020 Bridge Rail Type 10H 94 Lin Foot 11,280.00 120.00 606-11030 Bridge Rail Type 10M 2,392 Lin Foot 378,116.14 158.08 606-11032 Bridge Rail Type 10M (Special) 1,041 Lin Foot 190,361.60 182.86 606-20000 Wire Rope Safety Fence 1,281 Lin Foot 63,857.85 49.85 606-20010 Tensioned Cable Barrier 56,587 Lin Foot 949,292.64 16.78 606-21000 Wire Rope End Anchorage 18 Each 55,418.00 3,078.78 606-21010 End Anchorage (Tensioned Cable Barrier) 48 Each 147,800.00 3,079.17 607-00000 Line Post 130 Each 7,281.25 56.01 607-00005 End Post 182 Each 30,262.98 166.28 607-00010 Corner and Line Brace Post 397 Each 66,663.63 167.92 607-01000 Fence Barbed Wire with Metal Posts 138,832 Lin Foot 165,347.25 1.19 607-01050 Fence Wire With Metal Posts 13,901 Lin Foot 20,851.50 1.50 607-01100 Fence Barbed Wire With Treated Wooden Posts 17,637 Lin Foot 57,726.75 3.27 607-11200 Fence Combination Wire With Metal Posts 4,664 Lin Foot 12,046.21 2.58 607-11300 Fence Combination Wire With Treated Wooden Posts 17,936 Lin Foot 56,319.04 3.14 607-11400 Fence Picket 220 Lin Foot 20,875.80 94.89 607-11455 Fence Wood 126 Lin Foot 2,822.40 22.40 Colorado Department of Transporation 15:10 Monday, January 8, 2007 21 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 607-11525 Fence (Plastic) 36,868 Lin Foot 116,413.30 3.16 607-11575 Rock Fall Fence 1,190 Lin Foot 648,130.00 544.65 607-11580 Fence (Temporary) 21,723 Lin Foot 59,465.20 2.74 607-11581 Fence (Temporary) (Special) 1,176 Lin Foot 55,238.00 46.97 607-15000 Fence Concrete (Sound Barrier) 2,064 Sq Foot 185,739.36 89.99 607-21300 Fence Barrier With Metal Posts 242 Lin Foot 1,315.71 5.44 607-52900 Line Post (Chain Link) 697 Each 32,214.00 46.22 607-52905 End Post (Chain Link) 14 Each 2,452.56 175.18 607-52910 Corner and Line Brace Post (Chain Link) 19 Each 3,230.06 170.00 607-53137 Fence Chain Link (Special) (36 Inch) 5,102 Lin Foot 120,822.95 23.68 607-53143 Fence Chain Link (Special) (42 Inch) 315 Lin Foot 8,820.00 28.00 607-53148 Fence Chain Link (48 Inch) 1,272 Lin Foot 12,720.00 10.00 607-53160 Fence Chain Link (60 Inch) 878 Lin Foot 23,867.46 27.18 607-53161 Fence Chain Link (Special) (60 Inch) 278 Lin Foot 10,530.92 37.88 607-53172 Fence Chain Link (72 Inch) 9,042 Lin Foot 125,460.37 13.88 607-55030 Mesh Post 12 Each 58,080.00 4,840.00 607-55031 Mesh Post (Special) 10 Each 45,000.00 4,500.00 607-55040 Mesh Anchor 66 Each 36,080.00 546.67 607-55050 Mesh Anchor (Special) 45 Each 68,895.00 1,531.00 607-55060 Mesh Pin 50 Each 3,500.00 70.00 607-55100 Wire Mesh 165,000 Sq Foot 309,600.00 1.88 607-55101 Cable Net 3,000 Sq Foot 34,500.00 11.50 607-56001 Fence (Animal Protection) 900 Lin Foot 4,950.00 5.50 607-60116 16 Foot Gate 8 Each 3,129.94 391.24 607-60203 3 Ft Gate Single (Chain Link) 1 Each 724.50 724.50 607-60212 12 Foot Gate Single (Chain Link) 4 Each 2,306.50 576.63 607-60220 20 Foot Gate Single (Chain Link) 1 Each 620.00 620.00 607-60270 20 Foot Gate Double (Chain Link) 1 Each 1,200.00 1,200.00 607-60290 40 Foot Gate Double (Chain Link) 1 Each 2,280.00 2,280.00 607-60316 16 Foot Gate Twin 2 Each 474.00 237.00 607-60620 Road Closure Gate 23 Each 168,760.00 7,337.39 607-60630 HOV Gate 10 Each 105,078.00 10,507.80 608-00000 Concrete Sidewalk 6,443 Sq Yard 328,661.04 51.01 608-00005 Concrete Sidewalk (Special) 120 Sq Yard 7,800.00 65.00 608-00006 Concrete Sidewalk (6 Inch) 14,059 Sq Yard 479,292.63 34.09 608-00010 Concrete Curb Ramp 3,448 Sq Yard 591,563.71 171.57 608-00012 Curb Ramp (Special) 18 Sq Yard 1,890.00 105.00 608-00015 Truncated Domes 316 Sq Foot 15,603.70 49.38 Colorado Department of Transporation 15:10 Monday, January 8, 2007 22 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 608-00020 Concrete Bikeway 1,682 Sq Yard 58,870.00 35.00 608-00026 Concrete Bikeway (6 Inch) 1,627 Sq Yard 70,618.02 43.40 608-00070 Interlocking Pavers 5,980 Sq Foot 53,820.00 9.00 608-00350 Concrete Sidewalk (Colored) 52 Sq Yard 2,860.00 55.00 608-01600 Aggregate Walkway 2,480 Sq Yard 16,248.40 6.55 608-10010 Sidewalk Drain 4 Each 6,724.12 1,681.03 609-20010 Curb Type 2 (Section B) 1,281 Lin Foot 27,084.50 21.14 609-21010 Curb and Gutter Type 2 (Section I-B) 35,252 Lin Foot 408,603.37 11.59 609-21011 Curb and Gutter Type 2 (Section I-M) 5,968 Lin Foot 83,347.90 13.97 609-21020 Curb and Gutter Type 2 (Section II-B) 48,656 Lin Foot 772,223.11 15.87 609-21021 Curb and Gutter Type 2 (Section II-M) 4,839 Lin Foot 66,965.70 13.84 609-21022 Curb and Gutter Type 2 (Section II-B) (Colored) 415 Lin Foot 7,055.00 17.00 609-21023 Curb and Gutter Type 2 (Section II-B) (Special) 3,429 Lin Foot 64,297.50 18.75 609-21900 Curb and Gutter Type 2 Special 54 Lin Foot 10,800.00 200.00 609-22021 Curb, Gutter and Sidewalk Type 2 (Section MS) 286 Lin Foot 9,031.88 31.58 609-22022 Curb, Gutter and Sidewalk Type 2 (Section II-B) 65 Lin Foot 8,458.05 130.12 609-24000 Gutter Type 2 Special 338 Lin Foot 16,691.88 49.38 609-24002 Gutter Type 2 (2 Foot) 1,119 Lin Foot 18,417.50 16.46 609-24004 Gutter Type 2 (4 Foot) 196 Lin Foot 5,159.00 26.32 609-24006 Gutter Type 2 (6 Foot) 107 Lin Foot 3,713.00 34.70 609-24008 Gutter Type 2 (8 Foot) 95 Lin Foot 4,548.00 47.87 609-24010 Gutter Type 2 (10 Foot) 247 Lin Foot 24,990.00 101.17 609-31010 Curb and Gutter Type 2 (Section I-B) (Fast Track) 340 Lin Foot 9,520.00 28.00 609-40011 Curb Type 4 (Section M) 300 Lin Foot 2,610.00 8.70 609-40021 Curb Type 4 (Section B) (Epoxy) 172 Lin Foot 3,914.72 22.76 609-40130 Curb (Median) (Special) 310 Lin Foot 5,580.00 18.00 609-60011 Curb Type 6 (Section M) 16,175 Lin Foot 152,886.59 9.45 610-00010 Median Cover Material (Decorative) 6,100 Sq Foot 57,950.00 9.50 610-00020 Median Cover Material (Patterned Concrete) 66,947 Sq Foot 541,429.67 8.09 610-00024 Median Cover Material (4 Inch Patterned Concrete) 23,265 Sq Foot 109,223.15 4.69 610-00026 Median Cover Material (6 Inch Patterned Concrete) 6,655 Sq Foot 59,895.00 9.00 610-00030 Median Cover Material (Concrete) 12,030 Sq Foot 63,368.11 5.27 610-00040 Median Cover Material (Bituminous) 2,002 Ton 214,714.50 107.25 610-00060 Median Cover Material (Brick Pavers) 3,004 Sq Foot 47,853.72 15.93 610-00100 Median Edging (Patterned Concrete) 4,916 Lin Foot 113,978.78 23.19 611-00030 30 Foot Cattle Guard 1 Each 7,500.00 7,500.00 612-00001 Delineator (Type I) 7,819 Each 133,972.38 17.13 612-00002 Delineator (Type II) 1,769 Each 34,414.42 19.45 Colorado Department of Transporation 15:10 Monday, January 8, 2007 23 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 612-00003 Delineator (Type III) 1,611 Each 34,156.64 21.20 612-00010 Delineator (Special) 2 Each 42,440.00 21,220.00 612-00021 Delineator (Type I) (Barrier) 6 Each 43.02 7.17 612-00022 Delineator (Type II) (Barrier) 176 Each 2,148.07 12.20 612-00031 Delineator (Type I) (Extra Height) 1 Each 79.30 79.30 612-00033 Delineator (Type III) (Extra Height) 1 Each 82.00 82.00 612-00041 Delineator (Flexible) (Type I) 1,597 Each 48,696.59 30.49 612-00042 Delineator (Flexible) (Type II) 233 Each 6,521.60 27.99 612-00043 Delineator (Flexible) (Type III) 238 Each 7,490.20 31.47 612-00046 Delineator (Flexible) (Special) (Type I) 26 Each 1,872.00 72.00 612-00050 Reflector (Type-3) 138 Each 966.00 7.00 612-00260 Location Marker (Fiber Optic)(Dome) 30 Each 6,324.12 210.80 612-00270 Location Marker (Utility)(Flat Slat) 10 Each 1,189.76 118.98 612-00300 Steel Guard Post 1 Each 1,310.00 1,310.00 612-01060 Reflector Strip (6 Inch) 370 Each 14,060.00 38.00 612-15000 Install Marker 10 Each 2,640.00 264.00 613-00001 Directional Boring Conduit 3,035 Lin Foot 85,860.00 28.29 613-00075 3/4 Inch Electrical Conduit 1,064 Lin Foot 13,482.00 12.67 613-00100 1 Inch Electrical Conduit 1,686 Lin Foot 11,761.45 6.98 613-00126 1-1/4 Inch Electrical Conduit (Jacked) 35 Lin Foot 770.00 22.00 613-00200 2 Inch Electrical Conduit 46,242 Lin Foot 480,004.68 10.38 613-00201 2 Inch Electrical Conduit (Jacked) 4,616 Lin Foot 63,960.32 13.86 613-00206 2 Inch Electrical Conduit (Bored) 105,635 Lin Foot 773,582.95 7.32 613-00300 3 Inch Electrical Conduit 12,233 Lin Foot 168,908.60 13.81 613-00301 3 Inch Electrical Conduit (Jacked) 7,406 Lin Foot 121,455.74 16.40 613-00306 3 Inch Electrical Conduit (Bored) 3,506 Lin Foot 35,449.40 10.11 613-00400 4 Inch Electrical Conduit 867 Lin Foot 12,598.08 14.53 613-00401 4 Inch Electrical Conduit (Jacked) 380 Lin Foot 5,654.40 14.88 613-00402 4 Inch Electrical Conduit (Install Only) 2,200 Lin Foot 36,520.00 16.60 613-00700 Inspection Trip 48 Each 28,800.00 600.00 613-01100 1 Inch Electrical Conduit (Plastic) 10,130 Lin Foot 42,340.00 4.18 613-01150 1-1/2 Inch Electrical Conduit (Plastic) 2,120 Lin Foot 31,700.00 14.95 613-01200 2 Inch Electrical Conduit (Plastic) 122,476 Lin Foot 1,023,994.28 8.36 613-01250 2-1/2 Inch Electrical Conduit (Plastic) 680 Lin Foot 9,575.00 14.08 613-01300 3 Inch Electrical Conduit (Plastic) 47,171 Lin Foot 543,268.41 11.52 613-01301 3 Inch Electrical Conduit (Plastic) (Special) 503 Lin Foot 15,090.00 30.00 613-01400 4 Inch Electrical Conduit (Plastic) 11,450 Lin Foot 173,892.67 15.19 613-03501 HID Fixtures (Type M1 Tunnel Luminare) 29 Each 35,426.98 1,221.62 Colorado Department of Transporation 15:10 Monday, January 8, 2007 24 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 613-03503 HID Fixtures (Type M3 Tunnel Luminare) 227 Each 296,847.90 1,307.70 613-04200 2 Inch Electrical Conduit (Liquidtight Flexible Metal 10 Lin Foot 335.20 33.52 613-04250 2-1/2 Inch Electrical Conduit (Liquidtight Flexible M 130 Lin Foot 3,185.00 24.50 613-05000 Direct-Burial Cable 2,640 Lin Foot 26,400.00 10.00 613-05200 Heat Trace Cable 2,917 Lin Foot 20,419.00 7.00 613-06000 Meter Pole 12 Each 21,088.00 1,757.33 613-07000 Pull Box (Special) 136 Each 54,029.36 397.27 613-07010 Pull Box (Surface Mounted) 3 Each 1,350.00 450.00 613-07017 Pull Box (16"x14"x6") 31 Each 14,464.73 466.60 613-07023 Pull Box (24"x36"x24") 52 Each 45,764.89 880.09 613-07026 Pull Box (16"x24"x12") 38 Each 24,521.51 645.30 613-07029 Pull Box (24"x24"x12") 10 Each 7,468.16 746.82 613-07033 Pull Box (24"x20"x12") 2 Each 760.00 380.00 613-07034 Pull Box (24"x36"x18") 119 Each 94,069.50 790.50 613-07036 Pull Box (36"x24"x8") 2 Each 4,582.82 2,291.41 613-07038 Pull Box (36"x48"x18") 35 Each 35,835.00 1,023.86 613-07040 Pull Box (30"x48"x24") 27 Each 27,314.00 1,011.63 613-07050 Pull Box (13"x24"x18") Deep 13 Each 5,125.77 394.29 613-07060 Pull Box (18"x30"x18") Deep 1 Each 650.00 650.00 613-08110 Electric Vault (7'x9'x7.5') Deep 1 Each 8,737.09 8,737.09 613-10000 Wiring 46 Lump Sum 752,974.19 16,369.00 613-12000 Luminaire Fluorescent (Tunnel) 50 Each 41,500.00 830.00 613-15000 Floodlight 30 Each 25,080.00 836.00 613-15050 Spot Light 8 Each 7,344.00 918.00 613-15100 Recessed Light 101 Each 77,265.00 765.00 613-15200 Recessed Light (Special) 4 Each 1,800.00 450.00 613-15750 HID Luminaire Mounting Support System 1 Lump Sum 134,784.55 134,784.55 613-16000 Luminaire (Special) 148 Each 265,141.93 1,791.50 613-16010 Light Standard and Luminaire (Decorative) 2 Each 15,020.00 7,510.00 613-16020 Luminaire (Special) Induction (165 Watt) 21 Each 19,782.00 942.00 613-16025 Luminaire (Special) (LED) (Step Light) 135 Each 12,150.00 90.00 613-20100 Light Standard (Install Only) 75 Each 60,762.25 810.16 613-20200 Luminaire (Install Only) 1 Each 163.00 163.00 613-30005 Light Standard and Luminaire (Pedestrian) 27 Each 94,690.46 3,507.05 613-30302 Light Standard Aluminum (30 Foot) (2-Arm) 15 Each 33,750.00 2,250.00 613-30350 Light Standard Aluminum (35 Foot) 117 Each 187,200.00 1,600.00 613-32300 Light Standard Steel (30 Foot) 11 Each 34,375.00 3,125.00 613-32350 Light Standard Steel (35 Foot) 31 Each 97,650.00 3,150.00 Colorado Department of Transporation 15:10 Monday, January 8, 2007 25 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 613-32400 Light Standard Steel (40 Foot) 20 Each 60,773.87 3,038.69 613-34250 Light Standard Metal (25 Foot) 32 Each 101,181.60 3,161.93 613-34300 Light Standard Metal (30 Foot) 10 Each 26,368.70 2,636.87 613-34350 Light Standard Metal (35 Foot) 34 Each 93,290.05 2,743.83 613-34400 Light Standard Metal (40 Foot) 33 Each 98,913.42 2,997.38 613-34401 Light Standard Metal (40 Foot) (Special) 4 Each 12,216.00 3,054.00 613-34402 Light Standard Metal (40 Foot) (2 Arm) 4 Each 12,933.64 3,233.41 613-35100 Light Standard Steel High Mast (100 Foot) 1 Each 27,000.00 27,000.00 613-35120 Light Standard Steel High Mast (120 Foot) 8 Each 244,000.00 30,500.00 613-35140 Light Standard Steel High Mast (140 Foot) 2 Each 70,000.00 35,000.00 613-40000 Concrete Foundation Pad 143 Each 85,345.71 596.82 613-40010 Light Standard Foundation 187 Each 158,669.16 848.50 613-40012 Light Standard Foundation Special 15 Each 18,371.50 1,224.77 613-40020 Transformer Base Aluminum 10 Each 7,693.50 769.35 613-40030 Transformer Base Aluminum (Install Only) 65 Each 16,545.00 254.54 613-45048 High Mast Foundation (Drilled Caisson) (48 Inch) 305 Lin Foot 131,150.00 430.00 613-50000 Lowering Device 11 Each 66,000.00 6,000.00 613-50010 Photoelectric Cell 1,301 Each 47,500.00 36.51 613-50050 Portable Power Unit 2 Each 6,400.00 3,200.00 613-50060 Portable Power Generator 13 Each 45,500.00 3,500.00 613-50100 Lighting Control Center 18 Each 92,972.22 5,165.12 613-50125 Control Center Box 2 Each 3,050.00 1,525.00 613-50150 Secondary Service Pedestal 14 Each 11,015.00 786.79 613-50200 Lighting System 20 Each 10,200.00 510.00 613-50225 Interior Lighting (Concrete Box Girder) 11 Each 9,130.00 830.00 613-50300 Tunnel Lighting System 2 Lump Sum 30,500.00 15,250.00 613-50325 Tunnel Lighting Control System 2 Lump Sum 62,980.24 31,490.12 613-50400 Light Standard Timber (Temporary) 61 Each 107,570.00 1,763.44 613-50410 Light Standard (Temporary) 4 Each 18,400.00 4,600.00 613-60000 Lamps 1,450 Each 91,200.00 62.90 613-60500 Underground Repair 80 Each 64,000.00 800.00 613-70150 Luminaire High Pressure Sodium (150 Watt) 4 Each 1,800.00 450.00 613-70250 Luminaire High Pressure Sodium (250 Watt) 108 Each 82,295.88 762.00 613-70251 Luminaire High Pressure Sodium (250 Watt) (Install On 11 Each 1,650.00 150.00 613-70255 Fuses 300 Each 16,115.00 53.72 613-70260 Fuse Holder 250 Each 29,392.50 117.57 613-70400 Luminaire High Pressure Sodium (400 Watt) 443 Each 185,699.06 419.19 613-70401 Luminaire High Pressure Sodium (400 Watt) (Install On 28 Each 5,417.80 193.49 Colorado Department of Transporation 15:10 Monday, January 8, 2007 26 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 613-70403 Luminaire High Pressure Sodium (400 Watt) (Special) 8 Each 6,886.86 860.86 613-71000 Luminaire High Pressure Sodium (1000 Watt) 40 Each 34,400.00 860.00 613-72150 Luminaire High Pressure Sodium (Wall Type) (150 Watt) 22 Each 7,920.00 360.00 613-74000 Light Mast Arm 4 Each 600.00 150.00 613-75250 Luminaire Metal Halide (250 Watt) 57 Each 48,955.29 858.86 613-80010 Ballast Unit 10 Each 3,350.00 335.00 613-80022 Circuit Breaker (225A, 3 Pole) 2 Each 10,579.90 5,289.95 613-81022 Panelboard (225A, 277/480V, 3 Phase) 2 Each 2,774.82 1,387.41 614-00011 Sign Panel (Class I) 11,869 Sq Foot 191,243.30 16.11 614-00012 Sign Panel (Class II) 26,957 Sq Foot 491,990.78 18.25 614-00013 Sign Panel (Class III) 27,230 Sq Foot 595,913.60 21.88 614-00025 Sign Panel (Class I) (Install Only) 18,698 Sq Foot 97,692.85 5.22 614-00027 Sign Panel (Class II) (Install Only) 16,077 Sq Foot 94,866.89 5.90 614-00028 Sign Panel (Class III) (Install Only) 4,707 Sq Foot 41,195.12 8.75 614-00035 Sign Panel (Special) 1,070 Sq Foot 80,250.00 75.00 614-00040 Sign Post (Special) 73 Lin Foot 5,399.08 73.96 614-00044 Timber Sign Post 4x4 Inch 203 Lin Foot 2,233.00 11.00 614-00200 Steel Sign Post (U-2) 378 Lin Foot 2,155.10 5.70 614-00214 Steel Sign Post (1.75x1.75 Inch Tubing) 20 Lin Foot 110.00 5.50 614-00216 Steel Sign Post (2x2 Inch Tubing) 261 Lin Foot 2,935.50 11.25 614-00218 Steel Sign Post (2.25x2.25 Inch Tubing) 104 Lin Foot 1,366.80 13.14 614-00220 Steel Sign Post (2.5x2.5 Inch Tubing) 544 Lin Foot 12,986.10 23.87 614-00357 Steel Sign Post (S 3x5.7) 56 Lin Foot 2,808.00 50.14 614-00477 Steel Sign Post (S 4x7.7) 65 Lin Foot 1,765.00 27.15 614-00612 Steel Sign Post (W 6x12) 172 Lin Foot 6,160.00 35.81 614-00615 Steel Sign Post (W 6x15) 362 Lin Foot 13,670.08 37.76 614-00818 Steel Sign Post (W 8x18) 318 Lin Foot 14,767.13 46.44 614-00821 Steel Sign Post (W 8x21) 120 Lin Foot 5,521.12 46.01 614-01022 Steel Sign Post (W 10x22) 137 Lin Foot 7,453.55 54.41 614-01026 Steel Sign Post (W 10x26) 79 Lin Foot 4,243.79 53.72 614-01226 Steel Sign Post (W 12x26) 94 Lin Foot 4,750.00 50.53 614-01502 Steel Sign Support (2-Inch Round)(Post & Socket) 5,339 Lin Foot 69,269.86 12.97 614-01503 Steel Sign Support (2-Inch Round)(Post and Socket) 108 Each 19,782.34 183.17 614-01512 Steel Sign Support (2-Inch Round)(Post) 12,282 Lin Foot 157,484.23 12.82 614-01513 Steel Sign Support (2-Inch Round)(Post)(Install Only) 2,126 Lin Foot 9,567.00 4.50 614-01522 Steel Sign Support (2-Inch Round)(Socket) 1,131 Each 66,865.48 59.12 614-01523 Steel Sign Support (2-Inch Round)(Socket)(Install Onl 155 Each 4,340.00 28.00 614-01575 Steel Sign Support (2-1/2 Inch Round NP-40)(Post) 9,133 Lin Foot 131,084.60 14.35 Colorado Department of Transporation 15:10 Monday, January 8, 2007 27 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-01578 Steel Sign Support (2-1/2 Inch Round NP-40)(Slipbase) 852 Each 131,640.00 154.51 614-01582 Steel Sign Support (2-1/2 Inch Round)(Post and Slipba 1,522 Lin Foot 54,075.74 35.53 614-01583 Steel Sign Support (2-1/2 Inch Round)(Post & Slipbase 261 Each 111,873.86 428.64 614-01585 Steel Sign Support (2-1/2 Inch Round Sch 80)(Post) 22,027 Lin Foot 522,282.95 23.71 614-01586 Steel Sign Support (2-1/2 In Rd Sch 80)(Post)(Install 2,892 Lin Foot 27,474.00 9.50 614-01588 Steel Sign Support (2-1/2 Inch Round Sch 80)(Slipbase 1,918 Each 319,687.04 166.68 614-01589 Steel Sign Supp (2-1/2 In Rd Sch 80)(Slip)(Install On 161 Each 10,465.00 65.00 614-03001 Concrete Footing (Type 1) 12 Each 11,600.00 966.67 614-03002 Concrete Footing (Type 2) 18 Each 23,618.02 1,312.11 614-03003 Concrete Footing (Type 3) 10 Each 13,830.63 1,383.06 614-03004 Concrete Footing (Type 4) 2 Each 4,040.42 2,020.21 614-03005 Concrete Footing (Type 5) 28 Each 51,949.20 1,855.33 614-03006 Concrete Footing (Type 6) 6 Each 10,596.16 1,766.03 614-03007 Concrete Footing (Type 7) 6 Each 12,200.00 2,033.33 614-03100 Concrete Footing (Traffic Signal Pole) 4 Each 12,400.00 3,100.00 614-07000 Mask Sign Legend 6 Each 3,413.58 568.93 614-07105 Modification of Sign Legend 8 Each 31,137.86 3,892.23 614-07125 Modification of Steel Sign Post 2 Each 1,000.00 500.00 614-10015 Overpass Mounted Sign Bracket 1 Each 3,251.76 3,251.76 614-10100 Sign Bridge Structure (Install Only) 1 Each 8,500.00 8,500.00 614-10120 Variable Message Sign 1 Each 132,000.00 132,000.00 614-10123 Variable Message Sign (Install Only) 5 Each 72,916.98 14,583.40 614-10125 Variable Message Sign (Ground Mounted) 5 Each 562,492.00 112,498.40 614-10128 Blankout Sign (Fiber Optic) 10 Each 121,300.00 12,130.00 614-10135 LED Variable Message Sign System 1 Each 114,400.00 114,400.00 614-10146 Variable Message Sign (LED) (Ground Mounted) 2 Each 195,100.00 97,550.00 614-10147 Variable Message Sign LED (Overhead) 5 Each 570,551.00 114,110.20 614-10151 12 Inch LED (Ball) (Green) 25 Each 3,502.28 140.09 614-10153 12 Inch LED (Ball) (Yellow) 33 Each 3,053.00 92.52 614-10156 12 Inch LED (Arrow) (Green) 2 Each 280.00 140.00 614-10158 12 Inch LED (Arrow) (Yellow) 2 Each 180.00 90.00 614-10160 Signal Head Backplates 30 Each 3,205.00 106.83 614-10163 8 Inch LED (Ball) (Green) 16 Each 2,032.80 127.05 614-10165 8 Inch LED (Ball) (Yellow) 16 Each 1,366.88 85.43 614-21275 VMS Support (Ground Mounted) (12.75 Inch Diameter) 2 Each 14,494.00 7,247.00 614-21400 VMS Support (Ground Mounted) (14 Inch Diameter) 1 Each 17,300.00 17,300.00 614-30110 Butterfly Structure 3 Each 89,687.98 29,895.99 614-30205 VMS Butterfly Support (Roadside) 2 Each 68,000.00 34,000.00 Colorado Department of Transporation 15:10 Monday, January 8, 2007 28 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-31400 Monotube Overhead Sign Cantilever (14 Inch Diameter) 1 Each 25,000.00 25,000.00 614-31800 Monotube Overhead Sign Cantilever (18 Inch Diameter) 6 Each 174,500.00 29,083.33 614-32000 Monotube Overhead Sign Cantilever (20 Inch Diameter) 2 Each 54,316.09 27,158.05 614-32400 Monotube Overhead Sign Cantilever (24 Inch Diameter) 19 Each 642,349.74 33,807.88 614-32900 Monotube Overhead Sign Cantilever (Install Only) 1 Each 8,200.00 8,200.00 614-41600 Monotube Overhead Sign Bridge (16 Inch Diameter) 3 Each 127,113.07 42,371.02 614-41800 Monotube Overhead Sign Bridge (18 Inch Diameter) 1 Each 50,000.00 50,000.00 614-42000 Monotube Overhead Sign Bridge (20 Inch Diameter) 1 Each 43,239.02 43,239.02 614-42400 Monotube Overhead Sign Bridge (24 Inch Diameter) 4 Each 255,000.00 63,750.00 614-70116 Pedestrian Signal Face (16-16) 2 Each 960.00 480.00 614-70117 Pedestrian Signal Face (16) 67 Each 27,300.48 407.47 614-70150 Pedestrian Signal Face (16) (Countdown) 26 Each 14,732.32 566.63 614-70216 Traffic Signal Face (8-8) 12 Each 6,240.00 520.00 614-70328 Traffic Signal Face (12-8-8) 12 Each 7,260.00 605.00 614-70336 Traffic Signal Face (12-12-12) 270 Each 178,991.95 662.93 614-70337 Traffic Signal Face (12-12-12) (Install Only) 3 Each 840.00 280.00 614-70560 Traffic Signal Face (12-12-12-12-12) 59 Each 50,920.94 863.07 614-72830 Communications Cabinet 14 Each 15,400.00 1,100.00 614-72855 Traffic Signal Controller Cabinet 2 Each 29,515.00 14,757.50 614-72860 Pedestrian Push Button 63 Each 9,626.76 152.81 614-72866 Fire Preemption Unit and Timer 4 Each 26,157.00 6,539.25 614-72871 Loop Detector Wire (Prefab) Special 6,252 Lin Foot 71,272.30 11.40 614-72875 Loop Detector Wire 94,880 Lin Foot 220,896.13 2.33 614-72876 Traffic Signal Vehicle Detector Amplifier (Loop Type) 36 Each 39,818.00 1,106.06 614-72878 Traffic Signal Vehicle Detector Amplifier (Loop Type) 32 Each 24,522.20 766.32 614-72882 Traffic Signal Vehicle Detector (Micro Type) 2 Each 800.00 400.00 614-72884 Traffic Signal Vehicle Detector (Micro Wave Type) 3 Each 21,000.00 7,000.00 614-72886 Intersection Detection System (Camera) 20 Each 143,400.32 7,170.02 614-72887 Microwave Vehicle Radar Detector 4 Each 18,260.00 4,565.00 614-72889 Traffic Signal Vehicle Detector (Micro Type) (Non-Inv 93 Each 68,170.20 733.01 614-72890 Span Wire Cable 1,830 Lin Foot 16,256.00 8.88 614-72893 Signal Cable 15,137 Lin Foot 90,822.00 6.00 614-72895 Vehicle Detection System (Single Camera) 1 Each 5,400.00 5,400.00 614-72896 Intersection Detection System (Camera)(Install Only) 7 Each 5,655.00 807.86 614-73005 Piezo Electric Tube, Class 2 2 Each 2,400.00 1,200.00 614-75216 Pedestrian Signal Face (16) (Install Only) 24 Each 4,640.00 193.33 614-75332 Pedestrian Signal Face (16-16) (Install Only) 2 Each 500.00 250.00 614-75336 Traffic Signal Face (12-12-12) (Install Only) 28 Each 6,870.01 245.36 Colorado Department of Transporation 15:10 Monday, January 8, 2007 29 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-75560 Traffic Signal Face (12-12-12-12-12) (Install Only) 20 Each 5,320.00 266.00 614-75840 Traffic Signal Controller (Install Only) 1 Each 2,055.67 2,055.67 614-75841 Traffic Signal Controller (Type 170) (Install Only) 3 Each 4,750.00 1,583.33 614-75848 Traffic Signal Controller and Cabinet (Install Only) 20 Each 9,600.00 480.00 614-75860 Pedestrian Push Button (Install Only) 26 Each 5,680.00 218.46 614-75866 Fire Preemption Unit and Timer (Install Only) 5 Each 1,410.00 282.00 614-75877 Loop Detector Wire Prefabricated (Special) (Install O 2,200 Lin Foot 7,810.00 3.55 614-80000 Flashing Beacon 129 Each 226,663.82 1,757.08 614-80001 Flashing Beacon (Solar Powered) 5 Each 24,650.00 4,930.00 614-80002 Flashing Beacon (Install Only) 25 Each 13,275.00 531.00 614-80313 Barricade (Type 3 F-C) 4 Each 3,745.44 936.36 614-80385 Rumble Strip 535,504 Lin Foot 114,289.36 0.21 614-80387 Rumble Strip (Grinding) 851,688 Lin Foot 362,122.56 0.43 614-80391 Rumble Strip (Grinding)(Asphalt) 152,862 Lin Foot 39,333.44 0.26 614-81000 Traffic Signal-Light Pole Steel 1 Each 8,100.00 8,100.00 614-81010 Traffic Signal-Light Pole Steel (1 Mast Arm) 4 Each 105,807.96 26,451.99 614-81011 Traffic Signal-Light Pole Steel (1 Mast Arm) (Install 3 Each 10,250.00 3,416.67 614-81012 Traffic Signal-Light Pole Steel (2 Mast Arm) (Install 3 Each 15,840.00 5,280.00 614-81020 Traffic Signal-Light Pole Steel (2 Mast Arm) 1 Each 24,000.00 24,000.00 614-81130 Traffic Signal-Light Pole Steel (1-30 Foot Mast Arm) 1 Each 18,000.00 18,000.00 614-81135 Traffic Signal-Light Pole Steel (1-35 Foot Mast Arm) 7 Each 115,417.00 16,488.14 614-81140 Traffic Signal-Light Pole Steel (1-40 Foot Mast Arm) 5 Each 91,755.00 18,351.00 614-81145 Traffic Signal-Light Pole Steel (1-45 Foot Mast Arm) 5 Each 78,160.52 15,632.10 614-81150 Traffic Signal-Light Pole Steel (1-50 Foot Mast Arm) 5 Each 90,248.55 18,049.71 614-81155 Traffic Signal-Light Pole Steel (1-55 Foot Mast Arm) 7 Each 125,080.90 17,868.70 614-81160 Traffic Signal Light Pole Steel (1-60 Mast Arm Foot) 5 Each 145,497.93 29,099.59 614-81165 Traffic Signal-Light Pole Steel (1-65 Foot Mast Arm) 5 Each 141,337.60 28,267.52 614-81175 Traffic Signal-Light Pole Steel (1-75 Foot Mast Arm) 4 Each 118,037.25 29,509.31 614-81240 Traffic Signal-Light Pole Steel (2-40 Foot Mast Arm) 1 Each 20,800.00 20,800.00 614-81301 Traffic Signal-Light Pole (1 Mast Arm) (Install Only) 14 Each 33,000.00 2,357.14 614-82010 Traffic Signal Pole Steel (1 Mast Arm) 5 Each 102,608.00 20,521.60 614-84000 Traffic Signal Pedestal Pole Steel 18 Each 23,425.54 1,301.42 614-84100 Traffic Signal Pedestal Pole Aluminum 13 Each 19,120.00 1,470.77 614-85001 Impact Attenuator 3 Each 20,100.00 6,700.00 614-85005 Impact Attenuator (Sand Filled Plastic Barrel) 18 Each 86,535.00 4,807.50 614-85045 Truck with Mounted Attenuator and Flashing Arrow Pane 1 Each 42,500.00 42,500.00 614-85115 Impact Attenuator (Quadguard) 16 Each 436,023.38 27,251.46 614-85125 Impact Attenuator (Quadguard) (Tapered) 2 Each 74,942.07 37,471.04 Colorado Department of Transporation 15:10 Monday, January 8, 2007 30 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-85312 Traffic Signal Span Wire Pole (12 Inch) 8 Each 46,890.17 5,861.27 614-85316 Traffic Signal Span Wire Pole (16 Inch) 4 Each 37,200.00 9,300.00 614-85362 Traffic Signal-Light Span Wire Pole (12 Inch) 10 Each 56,824.78 5,682.48 614-85520 Paint Traffic Signal Pole 4 Each 1,251.52 312.88 614-86000 Traffic Signal Controller (Master) 1 Each 3,000.00 3,000.00 614-86002 Spread Spectrum Radio 7 Each 16,400.00 2,342.86 614-86105 Telemetry (Field) 12 Each 20,675.00 1,722.92 614-86106 Telemetry (Field)(Install Only) 1 Each 71.30 71.30 614-86238 Traffic Signal Controller (Solid State) (Full-Actuate 2 Each 14,700.00 7,350.00 614-86240 Traffic Signal Controller (Type 170) 1 Each 16,584.35 16,584.35 614-86245 Controller (Type 170E) 16 Each 153,950.00 9,621.88 614-86246 Controller (Type 170E-HC11) 10 Each 137,185.97 13,718.60 614-86247 Controller (Type 170E-HC11 W/W70SM Firmware) 1 Each 2,700.00 2,700.00 614-86600 Traffic Signal Controller (Master) (Install Only) 1 Each 2,950.00 2,950.00 614-86705 Traffic Signal Equipment (Install Only) 160 Hour 18,592.00 116.20 614-86710 Traffic Signal Equipment 1 Lump Sum 2,040.00 2,040.00 614-86735 Weather Sensor 2 Lump Sum 27,800.00 13,900.00 614-86756 Anti-Icing System 1 Lump Sum 325,700.00 325,700.00 614-86800 Uninterrupted Power Supply 3 Each 14,090.96 4,696.99 614-86920 Modification of Traffic Signal Controller Cabinet 4 Each 4,746.00 1,186.50 614-87010 Fiber Optic Cable (Single Mode) (12 Fiber) 7,335 Lin Foot 15,271.15 2.08 614-87020 Optical Transceiver 77 Each 202,936.16 2,635.53 614-87028 Video Optical Transceiver 26 Each 68,200.00 2,623.08 614-87320 Closed Circuit Television 13 Each 57,000.00 4,384.62 614-87325 Closed Circuit Television Pole 9 Each 49,605.00 5,511.67 614-87350 Test Fiber Optic Cable 5 Lump Sum 37,850.00 7,570.00 614-87401 Fiber Optic Cable (Special) 6,092 Lin Foot 12,166.50 2.00 614-87406 Fiber Optic Cable (Single Mode) (6 Strands) 11,665 Lin Foot 42,766.00 3.67 614-87424 Fiber Optic Cable (Single Mode) (24 Strands) 6,000 Lin Foot 19,800.00 3.30 614-87448 Fiber Optic Cable (Single Mode) (48 Strands) 21,250 Lin Foot 49,612.50 2.33 614-87496 Fiber Optic Cable (Single Mode) (96 Strands) 93,745 Lin Foot 155,168.50 1.66 614-87497 Fiber Optic Cable (Multi Mode) (96 Stands) 10,000 Lin Foot 13,500.00 1.35 615-00030 Embankment Protector Type 3 24 Each 25,182.78 1,049.28 615-00050 Embankment Protector Type 5 20 Each 16,498.83 824.94 615-00150 Embankment Protector (Special) 25 Each 20,982.76 839.31 615-21809 18 Inch Slide Headgate (9 Foot Frame) 1 Each 2,300.00 2,300.00 615-22409 24 Inch Slide Headgate (9 Foot Frame) 1 Each 3,500.00 3,500.00 615-22499 24 Inch Slide Headgate Special 1 Each 3,500.00 3,500.00 Colorado Department of Transporation 15:10 Monday, January 8, 2007 31 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 615-23609 36 Inch Slide Headgate (9 Foot Frame) 1 Each 5,600.00 5,600.00 615-34809 48x48 Inch Slide Headgate (9 Foot Frame) 1 Each 9,500.00 9,500.00 615-50000 Parshall Measuring Flume 1 Each 10,000.00 10,000.00 616-00150 15 Inch Concrete Siphon Pipe 23 Lin Foot 977.50 42.50 616-00240 24 Inch Concrete Siphon Pipe 3,658 Lin Foot 174,669.50 47.75 616-00300 30 Inch Concrete Siphon Pipe 1,101 Lin Foot 63,582.75 57.75 616-00420 42 Inch Concrete Siphon Pipe 2,396 Lin Foot 221,031.00 92.25 616-30024 24 Inch Trash Guard 5 Each 4,950.00 990.00 616-30030 30 Inch Trash Guard 2 Each 1,682.00 841.00 616-30042 42 Inch Trash Guard 2 Each 2,316.50 1,158.25 616-30499 Trash Guard Special 3 Each 2,960.50 986.83 617-00012 12 Inch Culvert Pipe 445 Lin Foot 19,972.17 44.88 617-03000 Detour Culvert Pipe 1 Lump Sum 2,538.00 2,538.00 617-03010 Detour Culvert Pipe 1,100 Lin Foot 144,315.00 131.20 618-00000 Prestressing Steel Bar 36,261 Pound 59,076.42 1.63 618-00002 Prestressing Steel Wire or Strand 48,857 M Kip Foot 1,477,569.64 30.24 618-00142 Prestressed Concrete I (BT42) 2,335 Lin Foot 322,748.00 138.22 618-00154 Prestressed Concrete I (BT54) 1,066 Lin Foot 219,520.00 205.93 618-00510 Prestressed Concrete I (Special) 524 Lin Foot 110,040.00 210.00 618-01992 Prestressed Concrete Box (Depth Less Than 32 Inches) 13,968 Sq Foot 536,408.00 38.40 618-01994 Prestressed Concrete Box (Depth 32" Through 48") 18,959 Sq Foot 859,829.00 45.35 618-06032 Prestressed Concrete Slab (Depth Less Than 6 Inches) 64,974 Sq Foot 620,992.00 9.56 618-06036 Prestressed Concrete Slab (Depth Greater Than 13 Inch 8,031 Sq Foot 362,302.00 45.11 618-10000 Precast Concrete U Girder (Pre-Tensioned) 2,538 Lin Foot 1,261,502.78 497.05 618-10384 Precast Concrete U Girder (U84)(Curved) 7,028 Lin Foot 6,065,794.00 863.09 618-10396 Precast Concrete U Girder (U96)(Curved) 1,519 Lin Foot 1,371,657.00 903.00 619-00005 Water Line 1 Lump Sum 33,000.00 33,000.00 619-00007 Connect To Existing Waterline 2 Each 2,800.00 1,400.00 619-00013 3 Inch Cured-In-Place-Pipe Waterline 440 Lin Foot 33,000.00 75.00 619-00018 8 Inch Cured-In-Place-Pipe Waterline 2,917 Lin Foot 437,550.00 150.00 619-06080 8 Inch Ductile Iron Pipe 40 Lin Foot 6,059.20 151.48 619-10180 18 Inch Welded Steel Pipe 463 Lin Foot 65,283.00 141.00 619-10207 20 Inch Welded Steel Pipe (Jacked) 300 Lin Foot 102,408.00 341.36 619-10241 24 Inch Welded Steel Pipe (Install Only) 450 Each 47,587.50 105.75 619-10247 24 Inch Welded Steel Pipe (Jacked) 150 Lin Foot 76,806.00 512.04 619-40120 1-1/2 Inch Copper Pipe 50 Lin Foot 1,083.50 21.67 619-50080 1 Inch Plastic Pipe 18,327 Lin Foot 22,419.67 1.22 619-50100 1-1/4 Inch Plastic Pipe 1,060 Lin Foot 2,241.50 2.11 Colorado Department of Transporation 15:10 Monday, January 8, 2007 32 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 619-50120 1-1/2 Inch Plastic Pipe 900 Lin Foot 2,142.00 2.38 619-50160 2 Inch Plastic Pipe 2,547 Lin Foot 8,107.44 3.18 619-50320 4 Inch Plastic Pipe 1,173 Lin Foot 34,240.00 29.19 619-50480 6 Inch Plastic Pipe 14 Lin Foot 3,032.54 216.61 619-50640 8 Inch Plastic Pipe 705 Lin Foot 79,821.65 113.22 619-50960 12 Inch Plastic Pipe 83 Lin Foot 11,411.67 137.49 619-72024 3 Inch Pressure Reducing Valve 2 Each 8,000.00 4,000.00 619-72048 6 Inch Pressure Reducing Valve 2 Each 12,000.00 6,000.00 619-75032 4 Inch Gate Valve 1 Each 700.00 700.00 619-75048 6 Inch Gate Valve 1 Each 710.00 710.00 619-75064 8 Inch Gate Valve 9 Each 25,200.00 2,800.00 619-78048 6 Inch Fire Hydrant 1 Each 6,000.00 6,000.00 620-00001 Field Office (Class 1) 11 Each 130,148.70 11,831.70 620-00002 Field Office (Class 2) 60 Each 1,073,900.82 17,898.35 620-00005 Field Office (Special) 5 Each 283,643.50 56,728.70 620-00011 Field Laboratory (Class 1) 11 Each 137,778.59 12,525.33 620-00012 Field Laboratory (Class 2) 70 Each 1,171,751.11 16,739.30 620-00014 Field Laboratory (Special) 1 Each 10,000.00 10,000.00 620-00015 Field Laboratory (State Furnished) 2 Each 12,600.00 6,300.00 620-00020 Sanitary Facility 134 Each 195,651.72 1,460.09 621-00425 Detour 4 Lump Sum 1,195,000.00 298,750.00 621-00450 Detour Pavement 184,787 Sq Yard 6,312,808.31 34.16 621-00650 Pedestrian Stair Structure 1 Lump Sum 20,000.00 20,000.00 622-00150 Planter Box 4 Each 6,000.00 1,500.00 622-00250 Bench 9 Each 12,000.00 1,333.33 622-00270 Bollard 6 Each 3,000.00 500.00 622-00350 Trash Receptacle 7 Each 8,603.60 1,229.09 622-00715 Monitoring Wells 100 Lin Foot 2,550.00 25.50 622-04035 Water Storage Facility 1 Lump Sum 12,500.00 12,500.00 622-11100 Storage Building 1 Each 6,500.00 6,500.00 622-20100 Precast Colored Concrete Cap 835 Lin Foot 33,750.64 40.42 622-20200 Skate Board Protection 32 Each 1,695.68 52.99 623-00156 Irrigation Bubbler 164 Each 2,048.00 12.49 623-00162 Drip Emitter Tubing 175 Lin Foot 238.00 1.36 623-00205 4 Inch Pop-Up Spray Sprinkler 432 Each 6,912.00 16.00 623-00206 6 Inch Pop-Up Spray Sprinkler 290 Each 7,540.00 26.00 623-00212 12 Inch Pop-Up Spray Sprinkler 294 Each 13,083.00 44.50 623-00332 4 Inch Pop-Up Rotary Sprinkler 109 Each 4,422.00 40.57 Colorado Department of Transporation 15:10 Monday, January 8, 2007 33 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 623-01708 1 Inch Backflow Preventer 1 Each 1,212.00 1,212.00 623-01712 1-1/2 Inch Backflow Preventer 2 Each 3,500.00 1,750.00 623-03008 1 Inch Manual Control Valve 1 Each 162.00 162.00 623-03108 1 Inch Automatic Control Valve 71 Each 11,181.00 157.48 623-03112 1-1/2 Inch Automatic Control Valve 19 Each 4,636.00 244.00 623-04000 Control Wire 24 Volt 54,750 Lin Foot 19,845.00 0.36 623-04002 Power Source Wire 50 Lin Foot 1,150.00 23.00 623-04008 1 Inch Quick-Coupler Valve 21 Each 2,366.00 112.67 623-05012 1-1/2 Inch Gate Valve 2 Each 106.00 53.00 623-05016 2 Inch Gate Valve 6 Each 683.00 113.83 623-06900 Valve Box 52 Each 4,472.00 86.00 623-07012 1-1/2 Inch Water Meter 2 Each 3,000.00 1,500.00 623-07600 1-1/2 Inch Flow Sensor 2 Each 332.00 166.00 623-07601 1 Inch Flow Sensor 4 Each 758.00 189.50 623-08106 6 Station Automatic Controller 1 Each 481.00 481.00 623-08112 12 Station Automatic Controller 4 Each 17,073.00 4,268.25 623-08116 16 Station Automatic Controller 1 Each 797.00 797.00 623-08136 36 Station Automatic Controller 1 Each 30,400.00 30,400.00 623-08308 8 Station Automatic Controller (Install Only) 5 Each 2,570.00 514.00 623-09100 Submersible Pump (w/Valving and Controls) 1 Each 6,500.00 6,500.00 623-09900 Sprinkler System 5 Lump Sum 159,282.66 31,856.53 624-14015 15 Inch Culvert Pipe (CR 4) 230 Lin Foot 21,850.00 95.00 624-14018 18 Inch Culvert Pipe (CR 4) 41 Lin Foot 3,895.00 95.00 624-14024 24 Inch Culvert Pipe (CR 4) 1,289 Lin Foot 231,760.00 179.80 624-14030 30 Inch Culvert Pipe (CR 4) 80 Lin Foot 11,260.00 140.75 625-00000 Construction Surveying 83 Lump Sum 4,026,643.15 48,513.77 625-00001 Construction Surveying (Hourly) 1,309 Hour 177,194.72 135.37 626-00000 Mobilization 173 Lump Sum 31,932,356.44 184,580.10 626-00001 Mobilization (With Autopay) 1 Lump Sum 133,418.80 133,418.80 626-01000 Public Information Services 54 Lump Sum 396,193.76 7,336.92 627-00001 Pavement Marking Paint 20,477 Gallon 764,166.38 37.32 627-00002 Thermoplastic Pavement Marking 17,332 Sq Foot 73,176.56 4.22 627-00003 Thermoplastic Pavement Marking (Inlaid) 15,825 Sq Foot 124,667.45 7.88 627-00004 Epoxy Pavement Marking 87 Sq Foot 1,218.00 14.00 627-00005 Epoxy Pavement Marking 209,879 Gallon 9,996,251.05 47.63 627-00007 Epoxy Pavement Marking (Special) 191 Gallon 72,460.00 379.37 627-00011 Pavement Marking Paint (Waterborne) 7,734 Gallon 252,756.25 32.68 627-00012 Pavement Marking Paint (Low VOC Solvent Base) 21,202 Gallon 753,368.23 35.53 Colorado Department of Transporation 15:10 Monday, January 8, 2007 34 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 627-00025 4 Inch Pavement Marking Tape (Removable) 1,900 Lin Foot 4,728.00 2.49 627-00029 24 Inch Pavement Marking Tape (Removable) 679 Lin Foot 16,659.75 24.54 627-00030 Raised Pavement Marker (Temporary) 10,100 Each 15,800.00 1.56 627-00032 Raised Flexible Pavement Marker (Temporary) 3,000 Each 3,000.00 1.00 627-00060 Preformed Plastic Pavement Marking (60 Mils) 384 Sq Foot 3,648.00 9.50 627-00070 Preformed Thermoplastic Pavement Marking 186 Sq Foot 2,946.38 15.84 627-01001 Preformed Plastic Pavement Marking (Type I) 78,697 Sq Foot 819,265.13 10.41 627-01003 Preformed Plastic Pavement Marking (Type A) (Inlaid) 15,334 Sq Foot 186,651.00 12.17 627-01010 Preformed Plastic Pavement Marking (Type I)(Inlaid) 83,487 Sq Foot 820,103.47 9.82 627-02001 Preformed Plastic Pavement Marking (Type II) 93,635 Sq Foot 828,584.94 8.85 627-02010 Preformed Plastic Pavement Marking (Type II) (Inlaid) 117,770 Sq Foot 1,147,626.95 9.74 627-03001 Preformed Plastic Pavement Marking (Type III) 269 Sq Foot 2,421.00 9.00 627-03003 Preformed Plastic Pavement Marking (Type C) (Inlaid) 185 Sq Foot 3,977.50 21.50 627-03010 Preformed Plastic Pavement Marking (Type III) (Inlaid 25 Sq Foot 800.00 32.00 627-30105 Pavement Marking Paint (Word-Symbol) 256 Sq Foot 1,559.04 6.09 627-30205 Thermoplastic Pavement Marking (Word-Symbol) 62 Sq Foot 952.94 15.37 627-30210 Thermoplastic Pavement Marking (Xwalk-Stopline) 849 Sq Foot 8,481.96 9.99 627-30324 Preformed Plastic Pavement Marking (Word-Symbol) (Typ 3,825 Sq Foot 76,179.78 19.92 627-30326 Preformed Plastic Pavement Marking (Word - Symbol) (T 1,068 Sq Foot 17,787.00 16.65 627-30327 Preformed Plastic Pavement Marking (Word-Symbol) (Typ 4,579 Sq Foot 71,747.84 15.67 627-30329 Preformed Plastic Pavement Marking (Xwalk-Stop Line) 19,711 Sq Foot 200,028.31 10.15 627-30331 Preformed Plastic Pavement Marking (Xwalk - Stop Line 3,032 Sq Foot 34,306.80 11.31 627-30332 Preformed Plastic Pavement Marking (Xwalk-Stop Line) 38,631 Sq Foot 402,569.68 10.42 627-30405 Preformed Thermoplastic Pavement Marking (Word-Symbol 33,267 Sq Foot 404,137.37 12.15 627-30407 Preformed Thermoplastic Pavement Marking (Word-Symbol 675 Sq Foot 13,500.00 20.00 627-30410 Preformed Thermoplastic Pavement Marking (Xwalk-Stop 44,715 Sq Foot 390,519.06 8.73 627-30411 Preformed Thermoplastic Pavement Marking (Xwalk-Stop 6,587 Sq Foot 85,631.00 13.00 628-50000 Design Services 1,000 Hour 77,000.00 77.00 629-01001 Survey Monument (Type 1) 90 Each 27,356.00 303.96 629-01002 Survey Monument (Type 2) 57 Each 23,515.65 412.56 629-01003 Survey Monument (Type 3) 3 Each 1,215.00 405.00 629-01005 Survey Monument (Type 5) 5 Each 1,985.00 397.00 629-01031 Survey Monument (Type 3A) 30 Each 18,437.50 614.58 629-01050 Monument Box 2 Each 650.00 325.00 629-01110 Locate Monuments 82 Hour 12,023.96 146.63 629-01210 Adjust Monument Box 10 Each 3,295.40 329.54 630-00000 Flagging 315,485 Hour 6,666,721.38 21.13 630-00001 Pilot Car Operation 12,090 Hour 443,972.00 36.72 Colorado Department of Transporation 15:10 Monday, January 8, 2007 35 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 630-00003 Uniformed Traffic Control 4,933 Hour 365,184.14 74.03 630-00004 Traffic Control Vehicle 24 Each 117,829.83 4,909.58 630-00007 Traffic Control Inspection 7,455 Day 758,301.33 101.72 630-00009 Traffic Control Vehicle (Truck) 4 Each 121,405.00 30,351.25 630-00011 Courtesy Vehicle 30 Day 27,000.00 900.00 630-00012 Traffic Control Management 14,360 Day 6,800,544.65 473.58 630-00013 Traffic Control Management includes Flagging 210 Day 112,905.50 537.65 630-00015 Uniformed Traffic Control Coordination 5,270 Hour 135,878.50 25.78 630-00020 Traffic Control Vehicle 1 Day 205.00 205.00 630-00025 Traffic Control Vehicle 325 Hour 6,025.00 18.54 630-10005 Traffic Control 3 Lump Sum 44,750.00 14,916.67 630-80001 Flashing Beacon (Portable) 157 Each 132,891.82 846.44 630-80002 Flashing Beacon (Solar) 67 Each 37,048.44 552.96 630-80305 Flagging Station Light 4 Each 4,045.06 1,011.27 630-80333 Barricade (Type 3 F-C) (Temporary) 2 Each 3,960.00 1,980.00 630-80335 Barricade (Type 3 M-A) (Temporary) 399 Each 71,336.11 178.79 630-80336 Barricade (Type 3 M-B) (Temporary) 149 Each 36,399.04 244.29 630-80337 Barricade (Type 3 M-C) (Temporary) 113 Each 51,313.08 454.10 630-80338 Barricade (Type 3 M-D) (Temporary) 4 Each 997.20 249.30 630-80341 Construction Traffic Sign (Panel Size A) 4,756 Each 301,046.77 63.30 630-80342 Construction Traffic Sign (Panel Size B) 7,564 Each 582,170.78 76.97 630-80343 Construction Traffic Sign (Panel Size C) 1,458 Each 116,784.48 80.10 630-80344 Construction Traffic Sign (Special) 14,175 Sq Foot 256,991.78 18.13 630-80348 Construction Information Sign 4 Each 2,275.72 568.93 630-80350 Vertical Panel 470 Each 8,625.00 18.35 630-80354 Vertical Panel (With Light) (Steady Burn) 450 Each 10,450.00 23.22 630-80355 Portable Message Sign Panel 210 Each 1,534,822.81 7,308.68 630-80356 Advance Warning Flashing or Sequencing Arrow Panel (A 11 Each 10,515.66 955.97 630-80357 Advance Warning Flashing or Sequencing Arrow Panel (B 26 Each 19,121.25 735.43 630-80358 Advance Warning Flashing or Sequencing Arrow Panel (C 250 Each 293,426.44 1,173.71 630-80359 Portable Message Sign Panel 2,627 Day 273,624.51 104.16 630-80360 Drum Channelizing Device 16,701 Each 566,350.12 33.91 630-80363 Drum Channelizing Device (With Light) (Flashing) 601 Each 29,509.88 49.10 630-80364 Drum Channelizing Device (With Light) (Steady Burn) 778 Each 31,135.82 40.02 630-80365 Portable Message Sign Panel (State Furnished) 3 Each 4,243.50 1,414.50 630-80367 Portable Traffic Speed Monitor 4 Each 27,200.00 6,800.00 630-80368 Portable Traffic Speed Monitor 70 Day 7,700.00 110.00 630-80370 Concrete Barrier (Temporary) 200,660 Lin Foot 5,138,685.15 25.61 Colorado Department of Transporation 15:10 Monday, January 8, 2007 36 2006 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/06 THROUGH 12/31/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 630-80375 Concrete Barrier (Temporary) (Install Only) 1,120 Lin Foot 32,776.20 29.26 630-80376 Guardrail Type 7 (Temporary) 19,695 Lin Foot 271,695.00 13.80 630-80377 Portable Water Filled Barrier (Temporary) 1,500 Lin Foot 48,000.00 32.00 630-80378 Glare Screen (Temporary) 12,750 Lin Foot 175,185.00 13.74 630-80380 Traffic Cone 40,340 Each 371,626.16 9.21 630-80384 Tubular Marker 98 Each 3,714.00 37.90 630-80390 Channelizing Device (Special) 1,240 Each 44,130.00 35.59 630-80391 Channelizing Device (Fixed) 625 Each 42,090.00 67.34 630-80430 Rumble Strip (Portable) 4 Each 408.00 102.00 630-80510 Mobile Pavement Marking Zone 19 Lump Sum 54,955.00 2,892.37 630-80520 Mobile Pavement Marking Zone 280 Day 94,066.25 335.95 630-80560 Mobile Profilograph Operation Zone 2 Lump Sum 2,687.50 1,343.75 630-85006 Impact Attenuator (Sand Filled Plastic Barrel) (Tempo 18 Each 63,060.00 3,503.33 630-85010 Impact Attenuator (Temporary) 95 Each 439,201.36 4,623.17 630-85040 Impact Attenuator (Truck Mounted Attenuator) (Tempora 67 Each 1,112,150.09 16,599.26 630-85041 Impact Attenuator (Truck Mounted Attenuator) 70 Day 27,120.00 387.43 630-85115 Impact Attenuator (Quadguard) (Temporary) 8 Each 188,773.47 23,596.68 630-86800 Traffic Signal (Temporary) 7 Lump Sum 112,400.00 16,057.14 630-86810 Traffic Signal (Temporary) 10 Each 208,200.00 20,820.00 630-86820 Traffic Signal (Temporary)(State Furnished) 2 Each 108.00 54.00 631-10000 Alternate Bridge Design and Construction 4 Lump Sum 16,340,291.35 4,085,072.84 641-10050 Shotcrete Class 1 3 Sq Yard 2,550.00 850.00 660-00000 Special Systems 1 Lump Sum 74,744.00 74,744.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 1 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00000 Clear and Grub LUMP SUM =============================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 1.00 20000.00 7476.00 2835.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1.00 250000.00 238742.65 127713.24 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 1.00 10000.00 24843.61 15000.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 24500.00 61161.64 66000.00 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 1.00 6700.00 8062.50 17000.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 1.00 3000.00 3000.00 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 52366.67 63107.45 38591.37 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 1.00 150000.00 147338.67 150000.00 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 1.00 30000.00 27250.00 15000.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 1.00 100000.00 113375.00 55125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 93333.33 104580.13 73375.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 100000.00 98018.75 75000.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1.00 10000.00 58846.88 61000.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 1.00 20000.00 34649.33 33948.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 150000.00 113814.92 28626.00 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 1.00 15000.00 29123.64 16494.55 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 1.00 40000.00 18500.67 29001.33 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 50000.00 64746.00 127000.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 1.00 30000.00 18155.00 6310.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 25000.00 105206.67 145000.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 1.00 15000.00 18336.89 8100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 45500.00 58936.13 53047.99 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.00 9500.00 14542.20 2711.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1.00 70000.00 106202.94 57000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 39750.00 60372.57 29855.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 53747.62 64736.78 49612.58 =============== 201-00001 Clear and Grub Acre =================================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 5.79 2000.00 6605.00 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.79 2000.00 6605.00 2200.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 2 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00001 Clear and Grub Acre =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 3.60 5000.00 28282.92 3100.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 3.00 2000.00 37815.20 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.60 3636.36 31357.85 6236.36 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 33.00 3000.00 2191.56 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 33.00 3000.00 2191.56 3000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.39 2964.97 7438.18 3368.54 =============== 201-00005 Rem of Debris LUMP SUM =============================================== ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 1.00 600000.00 706914.16 1070000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 600000.00 706914.16 1070000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 600000.00 706914.16 1070000.00 =============== 202-00000 Rem Str and Obstructions LUMP SUM =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 20000.00 29316.16 15000.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 1.00 1200.00 1320.26 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 10600.00 17651.20 8400.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 1.00 3500.00 6240.97 5422.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3500.00 6240.97 5422.91 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 50000.00 99028.21 26631.75 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 3 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00000 Rem Str and Obstructions LUMP SUM =============================================== IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 30000.00 10709.02 9308.81 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 55000.00 82751.67 105000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 45000.00 65519.34 46980.19 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 10000.00 45713.23 86000.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.00 5000.00 2156.80 1084.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 7500.00 23935.02 43542.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 21837.50 33949.18 31280.93 =============== 202-00001 Rem Structure Each =================================================== STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 3.00 900.00 8566.67 12500.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 2.00 1000.00 604.58 293.89 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 15.00 800.00 934.99 300.00 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 2.00 750.00 1455.51 1303.94 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 2.00 750.00 3040.00 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 820.83 1572.99 2258.15 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 1.00 1000.00 332.12 250.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 6.00 250.00 424.02 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 357.14 410.89 185.71 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 50.00 500.00 874.97 1014.89 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 70.00 2500.00 563.20 640.50 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 3.00 1500.00 656.74 866.47 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 1.00 25000.00 12695.00 3780.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 25.00 1000.00 932.78 90.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 15.00 1100.00 418.09 423.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 164.00 1652.44 779.68 674.13 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 1.00 3000.00 1500.00 1500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 4 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00001 Rem Structure Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 5.00 1000.00 1940.91 3000.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 6.00 1000.00 1367.80 800.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 13.00 1100.00 1426.19 1620.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.00 1132.00 1499.14 1694.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 220.00 1461.36 964.45 947.33 =============== 202-00002 Rem of Structure (Spec) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 1500.00 1192.95 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1500.00 1192.95 700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1500.00 1192.95 700.00 =============== 202-00003 Rem of Structure (Spec) LUMP SUM =============================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 30000.00 52141.87 39271.47 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 100000.00 212967.90 100000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 65000.00 154485.71 69635.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 65000.00 154485.71 69635.74 =============== 202-00008 Tree Trimming Hour =================================================== NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 50.00 50.00 116.01 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 50.00 116.01 105.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 50.00 116.01 105.00 =============== 202-00009 Tree Trimming LUMP SUM =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 2000.00 4389.50 100.00 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 1.00 2000.00 1209.36 285.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2000.00 2799.43 192.50 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 1.00 2000.00 2965.00 2160.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 5 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00009 Tree Trimming LUMP SUM =============================================== STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 1.00 2500.00 2582.33 1447.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2250.00 2821.50 1803.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 2125.00 2807.45 998.00 =============== 202-00010 Rem Tree Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 87.00 220.00 245.94 100.00 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 9.00 500.00 442.50 700.00 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 1.00 1000.00 1899.43 600.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 8.00 250.00 617.00 475.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 6.00 1200.00 446.75 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 111.00 304.86 299.45 215.32 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 1.00 600.00 1400.67 1702.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 600.00 1400.67 1702.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 16.00 400.00 525.00 550.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 94.00 200.00 412.38 121.25 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 90.00 200.00 281.24 163.96 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 233.00 300.00 257.20 85.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 10.00 300.00 776.58 760.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 443.00 262.08 301.00 140.77 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 136.00 450.00 305.29 400.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 12.00 375.00 367.54 400.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 3.00 750.00 492.90 164.50 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 3.00 600.00 660.04 425.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 154.00 452.92 327.08 395.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 709.00 310.71 306.93 210.06 =============== 202-00014 Brush Clearing Hour =================================================== SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 16.00 400.00 230.00 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 400.00 230.00 230.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 400.00 230.00 230.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 6 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00015 Rem Headwall Each =================================================== IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 1.00 1000.00 1533.33 1100.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 7.00 650.00 858.27 2268.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 693.75 911.56 2122.29 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 2.00 1500.00 3366.93 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1500.00 3366.93 2500.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 2.00 1200.00 899.18 1962.47 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 1.00 1300.00 4675.00 1350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1233.33 1654.34 1758.31 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.00 2500.00 954.20 271.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2500.00 954.20 271.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 1053.57 1290.77 1966.02 =============== 202-00019 Rem Inlet Each =================================================== NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 3.00 1000.00 1467.25 769.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 2.00 700.00 735.83 1134.17 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 1.00 1500.00 887.37 881.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 14.00 700.00 622.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 785.00 756.04 622.82 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 1.00 1500.00 1933.47 2000.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 1.00 700.00 1763.41 2000.00 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 1.00 800.00 841.69 1083.37 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 7 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00019 Rem Inlet Each =================================================== IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 13.00 800.00 1330.09 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 837.50 1403.42 1130.21 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 3.00 1500.00 587.50 275.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 8.00 1500.00 593.84 700.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 2.00 1100.00 2750.00 1000.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 1000.00 834.14 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 1407.14 731.70 655.36 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 500.00 723.01 560.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 9.00 1000.00 2632.00 2760.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 6.00 1200.00 960.90 129.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 1043.75 1886.03 1636.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66.00 992.42 1145.30 998.36 =============== 202-00020 Rem CBC Each =================================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 35000.00 25919.64 22682.25 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 5000.00 4316.46 6668.09 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 20000.00 20122.12 6500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 20000.00 17982.43 11950.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 20000.00 17982.43 11950.11 =============== 202-00023 Rem Emb Prot Ty 3 Each =================================================== STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 2.00 1500.00 1240.80 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1500.00 1240.80 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1500.00 1240.80 1500.00 =============== 202-00024 Rem Emb Prot Ty 5 Each =================================================== NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 1.00 300.00 839.45 452.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 300.00 839.45 452.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 300.00 839.45 452.96 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 8 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00025 Rem Ditch Lining Lin Foot =============================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 3,667.00 5.00 6.24 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,667.00 5.00 6.24 4.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,667.00 5.00 6.24 4.50 =============== 202-00026 Rem S and D Pave Sq Yard ================================================ NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 100.00 13.00 13.46 9.32 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 12.00 20.00 45.79 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 112.00 13.75 16.93 19.03 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 35.00 30.00 32.17 26.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 35.00 30.00 32.17 26.50 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 9.00 25.00 110.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 25.00 110.00 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 156.00 18.04 21.72 20.76 =============== 202-00027 Rem Riprap Sq Yard ================================================ SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 4.00 25.00 89.18 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 25.00 89.18 90.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 67.00 30.00 37.10 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 67.00 30.00 37.10 35.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 404.00 15.00 10.13 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 404.00 15.00 10.13 4.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 9 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00027 Rem Riprap Sq Yard ================================================ STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 252.00 14.00 11.77 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 252.00 14.00 11.77 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 727.00 16.09 12.23 11.07 =============== 202-00033 Rem Pipe Each =================================================== STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 19.00 2000.00 647.00 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19.00 2000.00 647.00 600.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 50.00 700.00 2075.76 2377.28 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 16.00 1500.00 1248.48 350.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 22.00 700.00 1157.67 1163.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 88.00 845.45 1724.68 1705.11 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 4.00 1100.00 2875.00 1000.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 2.00 900.00 1271.63 1000.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 7.00 2100.00 5211.44 1176.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 1607.69 3395.25 1094.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 1110.83 1763.96 1464.04 =============== 202-00035 Rem Pipe Lin Foot =============================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 10.00 30.00 65.50 105.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 698.00 20.00 15.22 11.62 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 4.00 100.00 165.53 110.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 885.00 20.00 19.12 17.00 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 207.00 12.00 33.75 42.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1,015.00 12.00 13.70 13.75 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 10 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00035 Rem Pipe Lin Foot =============================================== NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 100.00 20.00 36.24 19.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,919.00 16.79 18.06 16.88 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 409.00 60.00 60.77 75.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 10.00 70.00 58.15 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 419.00 60.24 60.68 74.50 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 2,633.00 11.00 15.78 14.13 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 240.00 20.00 30.28 18.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 28.00 100.00 55.00 35.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 42.00 20.00 31.69 20.06 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 8,970.00 15.00 15.31 11.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1,206.00 15.00 11.00 9.34 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 379.00 50.00 86.01 34.02 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 3,345.00 20.00 14.36 11.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 135.00 30.00 36.34 62.67 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 251.00 20.00 24.76 13.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 316.00 31.00 26.52 17.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17,545.00 16.80 16.69 12.55 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1,027.00 15.00 25.50 20.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 354.00 20.00 27.85 20.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 2.00 125.00 329.50 150.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 490.00 30.00 41.10 39.50 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 4,515.00 10.00 28.45 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,388.00 12.93 28.95 27.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27,271.00 16.56 20.15 17.40 =============== 202-00037 Rem of End Section Each =================================================== IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 1.00 200.00 550.00 550.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 16.00 225.00 198.18 337.89 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 11 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00037 Rem of End Section Each =================================================== IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 13.00 500.00 414.73 500.00 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 4.00 250.00 301.25 545.00 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 1.00 500.00 480.00 480.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 35.00 337.14 280.42 431.89 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 1.00 2500.00 1106.50 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2500.00 1106.50 2000.00 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 1.00 250.00 399.30 400.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 33.00 200.00 237.62 147.75 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 7.00 500.00 259.16 337.13 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 4.00 300.00 203.10 175.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 3.00 200.00 350.00 200.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 1.00 450.00 245.00 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 49.00 257.14 243.13 187.26 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 4.00 400.00 254.11 210.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 2.00 350.00 884.00 920.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 3.00 350.00 374.00 160.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 4.00 300.00 572.54 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 350.00 481.63 704.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 98.00 320.92 294.52 361.75 =============== 202-00080 Rem Guard Post Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2.00 100.00 139.32 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 100.00 139.32 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 100.00 139.32 90.00 =============== 202-00090 Rem Delineator Each =================================================== SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 01/05/06 28.00 8.00 17.58 20.20 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 12 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00090 Rem Delineator Each =================================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 112.00 9.00 12.74 5.80 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 404.00 12.00 9.48 23.80 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 50.00 7.00 7.03 5.10 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 409.00 6.00 10.28 10.85 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 200.00 8.00 14.33 4.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 53.00 10.00 9.68 10.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 260.00 7.00 8.69 8.71 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 150.00 6.00 8.22 5.44 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 50.00 7.00 11.71 18.00 SHE 0911-004 SH 91 & SH 67 GUARDRAIL 03/09/06 20.00 15.00 9.85 18.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 11.00 8.50 15.45 9.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 220.00 10.00 6.72 5.25 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 4.00 13.00 18.00 18.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 115.00 10.00 8.33 7.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 57.00 5.00 16.75 15.00 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 10.00 6.00 10.59 10.85 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 9.00 12.00 25.00 25.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 29.00 15.00 8.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,191.00 8.57 9.95 11.32 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 38.00 6.50 8.22 7.40 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 16.00 25.00 35.60 15.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 20.00 6.00 6.69 5.75 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 326.00 6.00 6.12 4.17 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 8.00 12.00 14.63 17.25 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 282.00 7.00 8.00 12.50 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 9.00 10.00 26.62 23.24 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 5.00 15.00 49.40 25.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 351.00 4.00 3.96 4.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 150.00 7.00 7.53 5.25 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 5.00 30.00 30.00 30.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 10.00 15.00 14.33 25.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 90.00 8.00 7.69 6.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,310.00 6.44 6.91 6.97 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 275.00 7.00 10.88 15.91 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1.00 15.00 112.50 170.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 82.00 7.00 12.12 26.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 18.00 5.00 10.64 6.92 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 241.00 9.00 6.05 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 13 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00090 Rem Delineator Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2.00 10.00 43.75 8.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 12.00 12.00 12.50 15.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 8.00 20.00 14.50 12.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 24.00 5.00 20.77 5.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 50.00 9.75 8.56 5.69 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 12.00 20.00 11.76 5.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 725.00 8.20 9.84 12.10 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 358.00 12.00 6.88 5.50 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 16.00 15.00 18.07 6.35 SHE 0503-067 US 50, WEST OF CANON CITY 11/30/06 20.00 20.00 10.42 16.60 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 8.00 20.00 20.85 25.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 162.00 11.00 8.88 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 564.00 12.20 8.27 7.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,790.00 8.36 9.00 9.80 =============== 202-00155 Rem Wall Lin Foot =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 50.00 150.00 61.13 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 150.00 61.13 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 150.00 61.13 20.00 =============== 202-00175 Rem Concrete LUMP SUM =============================================== STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 1.00 7000.00 725.00 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 7000.00 725.00 850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 7000.00 725.00 850.00 =============== 202-00190 Rem of Conc Median Cover Matl Sq Yard ================================================ NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 6,045.00 6.00 12.20 19.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,045.00 6.00 12.20 19.99 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 14 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00190 Rem of Conc Median Cover Matl Sq Yard ================================================ STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 8.00 25.00 84.50 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 25.00 84.50 25.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1,313.00 16.00 7.60 6.20 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 1,234.00 15.00 6.83 3.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1,198.00 15.00 4.93 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,745.00 15.35 6.02 4.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,798.00 9.59 9.26 14.17 =============== 202-00195 Rem of Median Cover Sq Yard ================================================ IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 385.00 11.00 12.94 13.81 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 295.00 12.00 11.75 7.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 382.00 11.00 23.03 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,062.00 11.28 15.95 16.30 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 11.00 25.00 52.65 16.77 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 103.00 10.00 16.20 23.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 114.00 11.45 23.88 22.75 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 18.00 19.25 19.61 4.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 19.25 19.61 4.83 IM 0252-384 I-25 OVER BROADWAY 11/09/06 1,000.00 10.00 10.83 7.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 15 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00195 Rem of Median Cover Sq Yard ================================================ STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 18,828.00 4.00 2.56 0.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19,828.00 4.30 3.20 1.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21,022.00 4.71 3.80 1.91 =============== 202-00200 Rem Sidewalk Sq Yard ================================================ IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 663.00 7.50 5.69 9.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 14.00 10.00 27.70 30.78 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 366.00 12.00 23.03 23.53 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 160.00 18.50 37.46 7.60 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1,367.20 12.00 7.41 5.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 297.00 20.00 23.30 27.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 522.00 13.00 6.75 11.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 1,105.00 35.00 41.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,494.20 17.86 14.62 15.57 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 56.00 20.00 35.37 17.36 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 425.00 12.00 21.61 14.60 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 332.00 12.00 19.42 26.50 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 64.00 16.00 41.36 20.00 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 101.00 15.00 131.05 62.10 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 12.00 55.00 59.13 62.40 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 54.00 14.00 14.58 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,044.00 13.56 28.96 23.98 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 79.00 18.00 13.50 5.64 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 338.00 25.00 25.21 18.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 138.00 28.00 7.50 4.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 681.00 12.00 6.43 6.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 156.00 10.00 12.45 8.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1,371.00 6.25 8.43 3.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,763.00 11.59 9.92 6.13 IM 0252-384 I-25 OVER BROADWAY 11/09/06 335.00 10.00 11.81 7.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 16 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00200 Rem Sidewalk Sq Yard ================================================ STA 0091-026 STATE HIGHWAY NO 9 11/30/06 653.00 20.00 11.24 9.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 988.00 16.61 11.50 8.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,289.20 15.38 14.31 12.99 =============== 202-00201 Rem Curb Lin Foot =============================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 31.00 20.00 21.18 10.90 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 28.00 50.00 22.43 29.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 685.00 4.00 55.77 66.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 15.00 20.00 21.20 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 759.00 6.67 49.62 61.67 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 172.00 5.00 28.40 19.00 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 44.00 10.00 36.25 5.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 1,293.00 5.00 11.33 7.50 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 120.00 8.00 8.14 10.40 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 2,525.00 1.25 2.60 1.40 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 278.00 6.00 8.42 8.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,432.00 3.06 7.62 4.61 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 89.00 5.00 7.65 8.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 167.00 6.00 5.15 2.50 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 71.00 8.00 19.59 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 327.00 6.16 8.32 11.70 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 361.00 4.50 5.74 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 361.00 4.50 5.74 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,879.00 3.78 12.84 12.58 =============== 202-00202 Rem Gutter Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1,780.00 6.00 4.46 6.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 17 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00202 Rem Gutter Lin Foot =============================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 33.00 20.00 17.50 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,813.00 6.25 4.63 6.04 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 67.00 10.00 37.13 22.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 217.50 10.00 7.19 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 284.50 10.00 11.67 8.24 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 239.00 18.00 10.28 7.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 239.00 18.00 10.28 7.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,336.50 7.91 5.87 6.47 =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 40.00 12.00 8.00 6.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 27.00 18.00 11.57 6.70 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 5,188.00 5.00 4.43 5.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 602.00 5.00 10.66 10.89 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 1,459.00 8.00 13.44 10.15 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 279.00 8.00 12.87 9.75 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 797.30 8.00 5.95 5.25 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 10,965.00 6.00 6.57 5.20 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 422.00 10.00 9.11 9.75 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 1,566.00 5.00 4.80 4.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 2,371.00 16.00 15.50 12.00 NH R200-140 I-25, SH 47, 50, 115 CRACK RE 03/30/06 340.00 7.00 12.38 12.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24,056.30 7.00 6.84 6.43 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 1,180.00 9.00 16.35 7.10 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 616.00 8.00 9.81 8.20 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 812.00 6.00 8.56 10.25 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 144.00 12.00 19.87 14.45 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 48.00 15.00 19.97 19.90 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 18 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 669.00 7.00 10.62 11.24 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 713.00 4.00 4.09 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,182.00 7.27 11.56 8.41 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 743.00 7.50 5.41 3.27 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 498.00 10.00 17.93 12.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 2,443.00 9.00 5.50 5.00 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 10,516.00 6.00 8.32 9.20 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 381.00 12.50 6.18 8.25 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 2,314.00 6.00 5.80 1.74 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 6,969.00 6.00 3.84 3.50 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1,915.00 5.00 4.51 3.50 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 2,718.00 6.25 5.06 3.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 28,497.00 6.41 6.09 5.77 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 150.00 23.00 20.00 20.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 972.00 10.00 4.34 4.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 1,085.00 5.00 7.25 4.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1,805.00 12.00 7.55 3.75 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 19,602.00 3.00 3.69 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 23,614.00 4.20 4.28 4.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80,349.30 5.98 5.95 5.61 =============== 202-00204 Rem C, G and Sidewalk Lin Foot =============================================== STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 20.00 20.00 52.93 19.79 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 75.00 20.00 46.28 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 95.00 20.00 47.20 23.90 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 120.00 10.00 29.37 25.00 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 12.00 25.00 62.70 68.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 132.00 11.36 30.95 28.92 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 19 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00204 Rem C, G and Sidewalk Lin Foot =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 241.00 10.00 8.19 3.50 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 9.00 25.00 57.50 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 250.00 10.54 8.71 4.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 477.00 12.65 20.30 15.00 =============== 202-00205 Rem Wheel Stop Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 22.00 100.00 66.03 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 22.00 100.00 66.03 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 100.00 66.03 15.00 =============== 202-00206 Rem Conc Curb Ramp Sq Yard ================================================ IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 20.00 20.00 25.37 26.47 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 70.00 40.00 44.08 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 90.00 35.56 41.46 19.88 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 134.00 18.00 49.66 137.20 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 20.00 20.00 50.13 45.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 154.00 18.26 49.71 125.28 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 165.00 50.00 24.46 18.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 154.70 20.00 10.33 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 319.70 35.48 15.68 15.10 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 10.00 80.00 35.00 35.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 20 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00206 Rem Conc Curb Ramp Sq Yard ================================================ IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 20.00 40.00 36.86 30.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 300.00 46.00 22.04 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 330.00 46.67 22.76 19.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 893.70 36.65 25.57 36.10 =============== 202-00207 Rem of Brick Pavers Sq Yard ================================================ STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 30.00 100.00 17.58 10.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 3,960.00 8.50 33.42 9.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,990.00 9.19 33.14 9.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,990.00 9.19 33.14 9.26 =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 32.00 30.00 104.05 80.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 8,671.00 9.60 5.28 2.85 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 6,933.00 35.00 12.42 12.00 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 287.00 14.00 31.58 32.32 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 9,200.00 6.00 29.87 26.09 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 570.00 45.00 47.50 35.00 NH R200-140 I-25, SH 47, 50, 115 CRACK RE 03/30/06 708.00 32.00 63.00 79.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26,401.00 16.45 21.72 16.50 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 21.00 14.00 69.52 53.59 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 30.00 20.00 39.38 30.60 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 25.00 30.00 29.32 41.50 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 3,739.00 20.00 9.67 16.27 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 247.00 15.00 19.83 20.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 9,248.00 10.00 8.76 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,310.00 12.97 9.83 12.12 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 76,171.00 3.75 7.83 6.12 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 21 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 138.00 35.00 15.75 11.50 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 455.00 20.00 27.50 35.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 158,338.00 3.50 3.42 2.29 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 341.00 15.00 13.98 13.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 26.00 80.00 30.12 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 235,469.00 3.66 4.72 3.62 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 5,671.00 13.00 7.83 5.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 3,676.00 12.00 13.22 12.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 64.00 20.00 16.36 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,411.00 12.66 10.61 7.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 284,591.00 5.58 6.51 5.35 =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 185.00 20.00 15.24 23.70 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 3,260.00 6.00 3.68 3.50 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 28,169.00 2.60 2.13 2.20 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 180.00 15.00 11.10 7.51 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 5,545.00 6.00 8.74 16.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 46.00 45.00 25.80 13.00 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 35.00 40.00 68.23 54.59 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 12,862.00 3.30 4.09 4.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 692.00 10.00 12.09 7.39 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 2,668.00 6.00 7.36 7.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 2,526.00 6.50 3.31 1.80 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 242.00 15.00 13.45 15.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 15,758.10 3.00 7.80 5.25 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 2,856.00 10.00 6.09 4.98 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 160.00 10.00 20.59 9.35 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 54.00 60.00 33.24 31.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 1,025.00 20.00 7.89 17.00 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 29.00 30.00 69.23 62.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 95.00 25.00 58.50 43.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 468.00 12.00 11.38 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 76,855.10 4.31 5.52 4.97 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 405.00 6.00 19.50 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 22 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 200.00 12.00 30.96 43.25 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 61.00 20.00 29.83 9.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 800.00 12.00 8.03 2.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 24,680.00 3.50 3.75 4.55 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 470.00 15.00 3.61 4.22 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 3,741.00 5.50 6.03 4.06 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 218.00 15.00 45.40 25.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 4,666.00 2.25 4.14 3.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 1,175.00 20.00 21.00 21.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 1,545.00 6.00 5.30 7.50 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 799.00 4.50 8.83 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 38,760.00 4.64 5.41 5.23 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 60,509.00 3.40 2.86 2.37 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 6,366.00 5.50 7.05 9.00 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 1,455.00 5.00 14.38 10.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 459.00 12.00 17.00 14.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 5,889.00 4.00 5.83 3.90 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 37,781.00 3.00 1.70 1.10 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 675.00 20.00 17.70 3.10 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1,000.00 6.00 5.63 7.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 27,453.00 3.50 3.18 3.48 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 21,103.40 4.00 4.85 6.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 13,689.00 4.00 4.30 4.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 1,063.00 13.00 21.50 13.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 16,241.00 3.50 2.70 1.80 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 3,642.00 12.00 3.73 2.95 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 5,236.00 5.00 4.00 5.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 30,701.00 3.50 3.26 2.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 233,262.40 3.83 3.35 3.13 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 31,594.00 4.00 3.82 3.50 IM 0252-384 I-25 OVER BROADWAY 11/09/06 1,305.00 7.00 9.54 10.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 1,537.00 3.50 12.56 6.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 4,007.00 8.00 7.38 5.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 1,115.00 7.00 7.53 3.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 1,419.00 12.00 5.11 5.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 71,406.00 3.00 2.75 2.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 112,383.00 3.67 3.70 3.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 461,260.50 3.94 3.89 3.61 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 23 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00226 Rem of Asph Mat (Special) Sq Yard ================================================ IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 4,273.00 5.00 4.56 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,273.00 5.00 4.56 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,273.00 5.00 4.56 4.00 =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 205,806.00 1.25 1.75 1.10 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 256.00 10.00 15.26 15.60 IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 135,211.00 1.25 1.61 1.07 IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 21,036.00 6.00 4.99 3.50 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 3,618.00 8.00 5.58 3.80 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 5,231.00 4.00 2.77 2.50 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 14,678.00 4.00 3.32 1.80 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 4,118.00 10.00 9.17 7.50 STA 0343-025 US 34, WRAY WEST 01/26/06 2,531.00 4.00 5.69 3.50 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 5,578.00 4.00 4.98 6.05 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 326,245.00 1.46 3.07 2.50 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 49,253.00 3.50 4.92 4.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 1,488.00 4.00 6.90 5.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2,126.00 10.00 4.59 5.70 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 348,359.00 1.50 1.83 1.49 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 92,581.00 2.50 2.72 1.93 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 827.00 5.00 12.53 9.50 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 1,796.00 9.00 4.79 3.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 257,921.00 1.10 1.68 1.55 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 824.00 12.00 15.00 15.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 212,489.00 3.00 2.40 2.30 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 17,107.00 1.50 2.33 3.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 74,302.00 1.50 2.88 1.85 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 54,393.00 1.50 1.81 0.90 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 5,191.00 2.00 3.31 1.50 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 62,446.00 2.50 2.95 2.30 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 252,140.00 2.00 2.00 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,157,551.00 1.86 2.27 1.91 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 574,080.00 2.70 1.47 1.35 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 79,023.00 2.00 2.10 2.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 99,174.00 1.20 1.79 0.90 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 24 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 44,905.00 2.00 1.68 1.55 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 49,044.00 1.50 2.58 2.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 3,098.00 4.00 6.65 8.81 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 3,626.00 6.00 4.16 3.31 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 10,470.00 3.00 2.82 2.45 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 8,028.00 3.00 2.65 2.50 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 231,559.00 1.50 1.58 1.69 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 129.00 55.00 55.00 55.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 8,693.00 3.50 3.38 6.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 500.00 10.00 11.03 1.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,112,329.00 2.22 1.67 1.55 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 3,378.00 3.50 4.23 5.11 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 44,219.00 1.40 3.19 2.30 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 3,004.00 6.00 3.79 3.10 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 5,487.00 4.00 4.68 3.04 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 281,978.00 2.50 1.69 1.76 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 16,210.00 3.00 1.78 1.47 C R600-283 VARIOUS 08/10/06 5,067.00 5.00 5.88 4.65 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 5,060.00 5.00 6.63 4.25 STA 0405-031 US40 HUGO EAST 08/24/06 46,464.00 2.90 5.17 4.50 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 2,356.00 4.00 4.69 3.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 762.00 10.00 9.04 8.13 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 4,225.00 8.00 5.21 6.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 418,210.00 2.64 2.29 2.29 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 800.00 17.00 10.00 10.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 19,420.00 3.00 2.15 2.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 17,546.00 3.00 4.62 3.30 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 158,571.00 1.40 1.94 1.45 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 4,560.00 5.00 5.19 3.75 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 4,906.00 6.00 6.51 1.75 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 332.00 12.00 11.59 15.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 143.00 55.00 20.37 25.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 8,055.00 2.50 2.49 1.90 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 103,225.00 1.70 2.11 1.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 317,558.00 1.91 2.23 1.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,005,648.00 2.04 2.09 1.83 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 25 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00246 Rem Asphalt Mat (Planing)(Special) Sq Yard ================================================ STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 12,505.00 3.00 13.52 20.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 945.00 6.00 11.19 16.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 912.00 8.00 4.22 4.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14,362.00 3.51 12.57 18.78 C R600-283 VARIOUS 08/10/06 6,390.00 8.00 8.44 7.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 607.00 13.00 15.25 14.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,997.00 8.43 9.03 7.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21,359.00 5.13 11.44 15.14 =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 900.00 2.00 2.82 1.60 IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 500.00 4.00 2.62 2.50 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 9,535.00 1.15 2.15 2.05 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 5,000.00 2.00 1.20 1.14 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 3,660.00 1.50 2.35 1.80 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2,055.00 2.25 1.71 1.70 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 2,934.00 1.65 2.50 3.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 1,500.00 2.50 3.01 3.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 900.00 1.90 3.15 2.30 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 200.00 3.00 4.54 3.72 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 200.00 4.00 2.22 2.05 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 636.00 5.00 2.38 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28,020.00 1.78 2.08 2.00 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 1,333.00 4.00 2.31 2.04 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 2,500.00 2.00 2.06 2.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 14,684.00 1.75 1.71 1.40 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 82.00 5.00 3.14 2.30 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 20,104.00 1.50 1.20 1.29 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 500.00 5.00 7.65 6.30 NH 0341-067 ON US 34 IN LARIMER COUNTY. 05/25/06 37.50 5.00 4.00 3.00 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 706.00 2.50 3.46 3.91 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 26 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 78,000.00 0.50 0.75 0.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 117,946.50 0.93 1.12 1.07 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 46,775.00 0.75 1.49 0.86 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 1,100.00 2.10 3.10 2.50 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 200.00 2.50 3.85 2.10 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1,500.00 2.00 1.78 1.75 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 20,367.00 1.50 1.04 1.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 13,792.00 1.00 1.32 1.25 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 3,500.00 2.00 1.55 1.56 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1,000.00 3.00 2.13 2.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 6,500.00 2.00 2.40 3.00 C R600-283 VARIOUS 08/10/06 3,000.00 2.00 2.11 1.95 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 2,500.00 2.50 2.09 1.60 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 550.00 5.00 5.56 2.11 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 13,669.00 1.00 1.41 1.25 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1,000.00 2.20 2.43 2.28 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 600.00 9.00 3.15 5.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 116,053.00 1.25 1.51 1.24 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 1,065.00 11.00 2.00 2.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 46,551.00 1.25 1.32 1.30 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 2,930.00 3.00 2.40 2.35 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 26,295.00 1.00 1.09 1.55 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 2,200.00 1.60 2.27 2.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 79,041.00 1.37 1.37 1.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 341,060.50 1.21 1.43 1.30 =============== 202-00400 Rem Bridge Each =================================================== BR 069A-019 SH 69, ROSITA CREEK 03/09/06 1.00 15500.00 33000.00 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 15500.00 33000.00 15000.00 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 1.00 15000.00 41886.08 28222.15 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 27 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00400 Rem Bridge Each =================================================== BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 1.00 40000.00 41014.58 27000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 27500.00 41363.18 27611.08 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 1.00 25000.00 48321.83 50000.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 2.00 75000.00 61541.48 36000.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 1.00 40000.00 46806.58 34613.16 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 2.00 12500.00 54979.81 50000.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 3.00 268333.33 235879.67 240000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 116111.11 99234.43 108512.57 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 2.00 30000.00 38064.03 29500.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 1.00 20000.00 20340.00 20000.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 1.00 15000.00 43965.33 30000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 23750.00 34740.15 27250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 75656.25 64852.18 72239.71 =============== 202-00425 Rem Bridge Railing Lin Foot =============================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 184.00 30.00 12.03 12.15 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 523.00 11.00 10.53 10.10 STA 0343-025 US 34, WRAY WEST 01/26/06 544.00 11.00 10.14 8.25 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 202.00 11.50 9.61 5.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 1,836.00 8.00 17.00 9.19 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 84.00 30.00 24.09 19.96 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 763.00 10.00 15.08 8.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,136.00 10.74 14.19 9.23 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 172.00 11.50 11.16 9.90 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 250.00 20.00 10.54 8.25 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 1,437.00 10.00 8.50 8.34 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 155.00 13.00 39.31 31.62 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 360.00 9.00 7.30 6.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 28 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00425 Rem Bridge Railing Lin Foot =============================================== NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 30.00 25.00 64.58 59.85 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 219.00 20.00 18.00 18.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 300.00 10.00 8.17 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,923.00 11.88 10.58 10.70 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 697.00 10.00 12.50 14.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 1,011.00 12.00 6.09 5.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,708.00 11.18 9.05 9.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,767.00 11.21 11.97 9.68 =============== 202-00450 Rem Port Present Str (1) Sq Yard ================================================ IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 120.00 35.00 133.33 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 35.00 133.33 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 35.00 133.33 125.00 =============== 202-00453 Rem Port Present Str (2) Sq Yard ================================================ IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 20.00 150.00 253.33 160.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 139.60 150.00 268.38 173.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 159.60 150.00 266.92 171.82 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 300.00 200.00 183.01 185.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 92.00 150.00 186.10 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 392.00 188.27 183.73 182.65 C R600-283 VARIOUS 08/10/06 1,917.00 175.00 167.67 150.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 91.00 68.00 202.27 159.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,008.00 170.15 169.23 150.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,559.60 171.67 179.36 156.71 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 29 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00460 Rem Port Present Str (3) Sq Yard ================================================ IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 14.00 750.00 520.55 317.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 750.00 520.55 317.18 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 30.00 650.00 486.89 375.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 4.00 750.00 450.66 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 34.00 661.76 482.63 356.76 C R600-283 VARIOUS 08/10/06 96.00 375.00 262.00 350.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 5.00 125.00 617.51 305.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 101.00 362.62 279.60 347.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 149.00 467.28 362.64 346.97 =============== 202-00462 Rem Port Present Str (3A) Sq Yard ================================================ IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 2.00 410.00 653.33 360.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 410.00 653.33 360.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 410.00 653.33 360.00 =============== 202-00495 Rem Port Present Str LUMP SUM =============================================== NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 1.00 8000.00 26756.26 27018.78 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 1.00 2500.00 6925.00 3150.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 1.00 7000.00 7812.50 7500.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 1.00 30000.00 29750.00 29750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 11875.00 15511.88 16854.70 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 1.00 50000.00 30644.95 22115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 50000.00 30644.95 22115.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 30 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00495 Rem Port Present Str LUMP SUM =============================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 30000.00 66932.85 16000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 30000.00 66932.85 16000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 21250.00 32078.70 17588.96 =============== 202-00500 Rem Port Present Str Each =================================================== BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 2.00 5000.00 18900.00 18900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5000.00 18900.00 18900.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 1.00 4300.00 4300.00 4300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 4300.00 4300.00 4300.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 1000.00 7620.66 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1000.00 7620.66 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 3825.00 10025.41 11775.00 =============== 202-00502 Rem Port Present Str Cubic Yard ============================================= IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 5.00 1200.00 3479.26 4200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 1200.00 3479.26 4200.00 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 28.00 1200.00 1453.75 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28.00 1200.00 1453.75 1500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 31 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00502 Rem Port Present Str Cubic Yard ============================================= IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 54.00 300.00 282.78 84.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 54.00 300.00 282.78 84.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 87.00 641.38 801.35 776.28 =============== 202-00503 Rem Port Present Str Sq Yard ================================================ IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 232.00 1600.00 1165.15 750.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 33.00 250.00 221.98 85.00 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 10.00 300.00 426.61 510.24 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 87.00 180.00 232.56 285.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 362.00 1099.75 815.16 571.04 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 334.00 200.00 119.50 119.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 334.00 200.00 119.50 119.50 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2.00 300.00 496.94 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 300.00 496.94 65.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 698.00 666.92 708.20 353.52 =============== 202-00504 Rem Exp Device Lin Foot =============================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 599.00 30.00 49.35 135.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 414.00 50.00 104.56 56.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,013.00 38.17 65.54 102.71 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 136.00 105.00 79.80 79.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 32 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00504 Rem Exp Device Lin Foot =============================================== STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 373.00 100.00 53.00 25.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 250.00 130.00 166.69 160.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 49.00 100.00 187.02 115.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 333.00 80.00 94.02 87.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,141.00 101.33 98.61 83.02 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 85.00 35.00 79.85 85.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 85.00 35.00 79.85 85.55 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 68.00 120.00 92.50 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 68.00 120.00 92.50 85.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,307.00 71.71 82.56 91.82 =============== 202-00520 Rem of Exp Joint Matl Lin Foot =============================================== STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 32.00 25.00 34.50 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 25.00 34.50 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 25.00 34.50 5.00 =============== 202-00610 Rem of RR Track Lin Foot =============================================== STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 34.00 30.00 95.33 82.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 34.00 30.00 95.33 82.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 30.00 95.33 82.00 =============== 202-00620 Rem of RR Crossover Each =================================================== STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 1.00 2500.00 6190.32 4100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2500.00 6190.32 4100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2500.00 6190.32 4100.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 33 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00700 Rem Light Standard Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 2.00 400.00 336.88 438.38 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 4.00 200.00 486.89 485.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 1.00 400.00 391.67 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 285.71 443.34 423.82 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 3.00 500.00 248.43 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 500.00 248.43 300.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 16.00 150.00 212.27 213.07 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 16.00 200.00 245.92 215.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 2.00 450.00 470.60 400.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 18.00 305.00 388.75 346.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 52.00 230.58 283.13 266.95 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 31.00 250.00 420.97 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 31.00 250.00 420.97 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93.00 249.89 345.02 324.18 =============== 202-00710 Rem Power Pole Each =================================================== STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 1.00 600.00 409.86 375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 600.00 409.86 375.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 600.00 409.86 375.00 =============== 202-00725 Rem Ex Lighting Sys LUMP SUM =============================================== STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 1.00 5000.00 550.79 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5000.00 550.79 525.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 34 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00725 Rem Ex Lighting Sys LUMP SUM =============================================== IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 1.00 6800.00 15532.35 15532.35 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 1.00 25000.00 227.11 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 15900.00 2140.27 7856.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 12266.67 1345.53 5412.45 =============== 202-00750 Rem Luminaire Each =================================================== STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 2.00 200.00 156.63 53.88 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 2.00 200.00 208.26 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 200.00 188.90 47.94 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 20.00 380.00 71.71 70.82 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 4.00 70.00 472.35 863.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 18.00 75.00 221.71 173.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 42.00 219.76 176.34 190.11 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 213.00 72.00 59.97 59.97 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 50.00 137.67 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 215.00 71.80 63.46 60.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 261.00 97.57 112.80 81.08 =============== 202-00805 Rem Overhead Sign Str Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 3.00 6000.00 3113.11 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 6000.00 3113.11 3000.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 4000.00 4289.60 4000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 35 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00805 Rem Overhead Sign Str Each =================================================== C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 3.00 3000.00 4832.47 10000.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 3300.00 3564.97 3694.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 3260.00 4506.63 7538.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 4287.50 3792.87 5836.86 =============== 202-00806 Rem Walkway Lin Foot =============================================== IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 84.00 12.00 29.11 28.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 84.00 12.00 29.11 28.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 84.00 12.00 29.11 28.27 =============== 202-00810 Rem Ground Sign Each =================================================== NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 3.00 70.00 71.00 100.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 12.00 40.00 56.27 30.80 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 19.00 60.00 87.00 110.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 10.00 60.00 59.57 55.13 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 71.00 40.00 38.33 39.67 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 20.00 140.00 103.43 100.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 3.00 100.00 124.22 108.86 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 33.00 60.00 80.15 79.07 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 25.00 40.00 55.49 54.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 19.00 60.00 58.07 36.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 2.00 100.00 90.00 90.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 34.00 60.00 49.60 81.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 6.00 100.00 55.14 21.91 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 2.00 100.00 70.83 30.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 6.00 75.00 52.18 26.56 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 4.00 100.00 90.88 51.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 4.00 85.00 38.00 23.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 1.00 70.00 61.75 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 274.00 61.28 61.62 61.31 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 15.00 50.00 89.93 80.63 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 11.00 55.00 111.67 45.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 23.00 55.00 39.07 23.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 36 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00810 Rem Ground Sign Each =================================================== NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 2.00 100.00 35.59 25.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 56.00 70.00 68.99 67.71 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 6.00 50.00 128.75 57.50 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 6.00 80.00 71.63 82.90 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 13.00 65.00 84.72 19.44 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 4.00 75.00 69.40 55.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 8.00 60.00 75.67 26.25 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 2.00 70.00 102.00 102.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 12.00 30.00 117.67 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 158.00 61.04 74.75 56.99 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 41.00 50.00 139.68 120.22 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 15.00 100.00 83.04 100.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 2.00 35.00 46.00 70.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 10.00 70.00 100.59 100.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 2.00 50.00 111.92 235.75 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 4.00 50.00 115.55 150.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 79.00 80.00 42.55 90.75 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 44.00 65.00 60.83 26.58 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 27.00 100.00 45.51 20.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 26.00 55.00 90.54 100.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 15.00 70.00 47.50 70.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 14.00 50.00 67.64 50.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 6.00 50.00 188.34 76.67 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 20.00 40.00 52.51 35.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 39.00 55.00 120.78 85.34 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 344.00 66.64 73.48 76.62 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 2.00 150.00 75.00 75.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 34.00 100.00 275.22 320.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 7.00 55.00 51.30 28.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 8.00 70.00 84.12 95.60 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 38.00 60.00 73.86 93.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 5.00 60.00 54.02 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 94.00 76.86 141.44 167.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 870.00 65.04 77.94 78.10 =============== 202-00815 Rem of Sign (Special) Each =================================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 730.00 626.31 568.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 730.00 626.31 568.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 730.00 626.31 568.93 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 37 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00821 Rem Sign Panel Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 10.00 500.00 51.98 51.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 13.00 80.00 93.61 54.43 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 19.00 100.00 37.49 30.91 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 9.00 45.00 99.28 90.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 22.00 70.00 34.00 27.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 14.00 60.00 106.65 10.95 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 2.00 80.00 120.21 15.00 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 3.00 100.00 92.42 71.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 92.00 121.58 62.07 39.19 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 5.00 45.00 118.33 18.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 13.00 50.00 23.07 11.55 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 11.00 100.00 35.97 10.50 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 6.00 10.00 34.83 45.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 35.00 58.14 40.58 17.96 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 75.00 119.43 127.23 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 29.00 60.00 68.21 30.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 1.00 50.00 212.80 88.41 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 4.00 50.00 24.74 15.95 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 9.00 120.00 109.21 10.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 27.00 50.00 149.37 260.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 30.00 60.93 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 72.00 62.85 98.39 115.06 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 7.00 100.00 319.82 320.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 6.00 16.00 74.97 14.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 28.00 50.00 36.33 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 41.00 53.56 78.62 85.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 240.00 83.09 74.67 66.75 =============== 202-00825 Rem Flashing Beacon Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 2.00 330.00 273.53 444.67 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 38 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00825 Rem Flashing Beacon Each =================================================== SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 1.00 400.00 159.75 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 353.33 241.02 329.78 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 250.00 215.16 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 250.00 215.16 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 312.00 230.25 277.87 =============== 202-00828 Rem Traf Sig Equipment LUMP SUM =============================================== SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 1.00 3700.00 4597.43 7550.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 6500.00 982.00 810.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 1.00 30000.00 12313.75 8230.00 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 1.00 6000.00 1991.47 2863.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 11550.00 4859.02 4863.36 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 5000.00 948.35 757.91 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1.00 6000.00 2252.50 2255.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 5000.00 2779.13 2750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 5333.33 2134.80 1920.97 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 1.00 8000.00 3500.00 3500.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 10000.00 1658.43 1000.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 1.00 5000.00 1743.69 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 7666.67 1846.00 1916.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 8520.00 3201.59 3096.63 =============== 202-00831 Rem Traf Sig Head Each =================================================== NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 6.00 100.00 64.59 54.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 100.00 64.59 54.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 100.00 64.59 54.76 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 39 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00840 Rem Traf Sig Pole Each =================================================== STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 2.00 750.00 780.74 1218.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 750.00 780.74 1218.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 2.00 1800.00 671.21 634.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1800.00 671.21 634.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1275.00 732.06 926.43 =============== 202-00848 Rem Traf Sig Control+Cab Each =================================================== SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 2.00 500.00 661.43 495.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 500.00 661.43 495.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 500.00 661.43 495.00 =============== 202-00895 Rem of Impact Attenuator Each =================================================== SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 6.00 1400.00 2000.00 1500.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 6.00 800.00 1412.13 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 1100.00 1608.09 1650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 1100.00 1608.09 1650.00 =============== 202-00900 Rem Conc Footing Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 46.00 500.00 307.40 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 46.00 500.00 307.40 145.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 3.00 300.00 248.43 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 300.00 248.43 300.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 40 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00900 Rem Conc Footing Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 13.00 250.00 823.01 300.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 2.00 2500.00 2478.90 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 550.00 1043.80 282.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 64.00 502.34 443.57 184.38 =============== 202-01000 Rem Fence Lin Foot =============================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 237.00 5.00 5.09 4.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 1,639.00 1.00 2.07 1.20 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 1,300.00 1.50 1.68 1.50 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 6,238.00 0.80 0.92 0.92 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 609.00 3.00 1.32 1.05 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1,580.00 1.00 3.16 3.00 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 3,843.00 0.60 1.00 1.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 1,429.00 1.00 1.08 0.35 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 933.70 2.00 2.64 0.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17,808.70 1.05 1.51 1.17 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 89,098.00 0.30 0.26 0.27 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 1,500.00 1.50 3.89 1.79 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 6,452.00 0.50 0.34 0.40 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 30,013.00 0.60 0.63 0.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 127,063.00 0.40 0.38 0.38 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 4,225.00 1.00 1.36 1.15 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 295.00 1.00 2.06 1.25 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 231.00 2.00 5.00 5.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 5,000.00 1.00 1.80 1.20 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 26,674.00 1.50 0.48 0.30 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 4,210.00 1.00 0.62 0.42 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 598.00 1.00 5.77 5.85 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 30.00 2.50 7.72 13.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 41 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01000 Rem Fence Lin Foot =============================================== BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 342.00 5.00 4.00 3.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1,304.00 0.85 2.36 1.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 650.00 5.00 3.22 3.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 43,559.00 1.40 1.01 0.70 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 5,109.00 3.00 3.55 3.50 IM 0252-384 I-25 OVER BROADWAY 11/09/06 2,000.00 1.50 1.92 4.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 44.00 14.00 11.16 12.80 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 7,499.00 0.60 0.65 0.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14,652.00 1.60 1.87 2.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 203,082.70 0.76 0.84 0.65 =============== 202-01030 Rem of Road Closure Gate Each =================================================== STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 1.00 600.00 276.27 153.80 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 1.00 450.00 554.16 135.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 525.00 484.69 144.63 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 2.00 565.00 504.32 608.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 565.00 504.32 608.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 545.00 492.54 376.69 =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 3,135.00 2.75 5.64 7.05 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 1,037.50 3.00 4.38 4.15 STA 0343-025 US 34, WRAY WEST 01/26/06 1,250.00 4.00 2.35 2.05 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1,651.00 2.50 3.25 3.55 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 1,401.00 5.00 3.12 2.65 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 4,535.00 3.00 2.02 2.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 528.00 5.00 2.57 2.45 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 1,652.00 3.00 2.50 2.17 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 42 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 450.00 6.30 5.64 6.35 SHE 0911-004 SH 91 & SH 67 GUARDRAIL 03/09/06 150.00 5.00 2.70 2.25 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 320.00 5.50 4.29 8.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 4,192.00 3.00 2.41 2.25 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 233.00 5.00 3.00 3.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 1,100.00 3.00 3.50 4.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 360.00 5.00 5.30 4.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 204.10 6.00 5.08 4.40 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 5,431.00 2.50 3.00 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27,629.60 3.19 3.25 3.31 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 1,930.00 3.00 4.15 3.75 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 2,370.00 3.00 3.38 2.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 2,510.00 4.00 2.39 2.08 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 781.00 4.00 2.98 2.90 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 3,455.00 2.30 2.03 2.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 287.50 2.50 2.62 3.15 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 365.00 6.00 8.71 6.25 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 450.00 5.75 5.42 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12,148.50 3.25 3.21 2.62 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 31,179.00 2.00 1.45 0.88 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 132.00 5.00 19.53 25.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 3,362.00 4.00 2.85 3.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 554.00 4.00 3.73 3.18 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 4,105.00 3.50 2.43 1.75 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 579.00 4.00 2.29 2.32 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1,099.50 3.00 6.68 3.10 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 639.00 3.50 2.42 3.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 125.00 12.00 7.04 7.07 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 124.00 4.00 8.96 8.50 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1,390.00 6.50 3.60 2.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 43,288.50 2.59 2.11 1.44 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 75.00 10.00 5.10 5.10 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 4,957.00 3.00 2.04 2.20 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 43 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 1,721.25 4.25 3.23 3.20 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 1,653.00 4.00 2.41 3.50 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 212.00 4.00 3.58 2.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,618.25 3.53 2.45 2.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 91,684.85 2.94 2.60 2.28 =============== 202-01140 Rem Gdrail Ty 4 Lin Foot =============================================== IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 1,271.00 9.00 16.83 25.50 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1,142.00 11.00 10.04 7.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 1,750.00 11.00 12.50 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,163.00 10.39 12.29 16.01 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 779.00 7.50 11.60 5.15 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1,500.00 10.00 13.67 13.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 7,818.00 12.00 15.04 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,097.00 11.36 14.54 17.81 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1,292.00 12.00 10.82 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,292.00 12.00 10.82 17.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,552.00 11.15 13.62 17.26 =============== 202-01170 Rem Gdrail Ty 7 Lin Foot =============================================== IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 430.00 10.00 11.33 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 430.00 10.00 11.33 10.00 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 24.00 25.00 95.00 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 24.00 25.00 95.00 115.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 454.00 10.79 14.33 15.55 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 44 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01300 Rem End Anchorage Each =================================================== NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 2.00 175.00 211.70 226.80 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 18.00 170.00 168.33 165.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 4.00 180.00 164.56 156.81 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 3.00 250.00 207.49 265.00 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 6.00 160.00 131.50 100.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 2.00 250.00 216.11 140.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 34.00 235.00 147.07 150.00 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 12.00 250.00 344.91 298.96 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 2.00 250.00 283.75 398.00 SHE 0911-004 SH 91 & SH 67 GUARDRAIL 03/09/06 2.00 200.00 140.95 150.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 8.00 200.00 153.96 100.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 54.00 70.00 129.31 122.55 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 4.00 160.00 185.00 185.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 22.00 185.00 360.00 320.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 2.00 400.00 410.00 300.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 7.00 300.00 247.00 195.00 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 1.00 300.00 180.00 180.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 8.00 170.00 200.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 191.00 172.15 186.79 180.38 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 17.00 150.00 157.60 153.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 5.00 160.00 172.61 125.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 4.00 300.00 431.12 765.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 26.00 250.00 130.37 125.10 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 2.00 200.00 134.00 2.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 32.00 140.00 130.75 125.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 4.00 175.00 145.17 160.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 14.00 200.00 1935.31 5145.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 4.00 250.00 124.00 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 108.00 189.17 344.93 803.45 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 52.00 140.00 85.20 113.30 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1.00 200.00 134.84 135.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 17.00 200.00 296.45 290.50 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 4.00 180.00 189.95 194.79 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 6.00 150.00 227.37 185.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1.00 180.00 216.41 250.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 2.00 400.00 1470.00 1740.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 83.00 162.41 172.88 199.81 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 45 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01300 Rem End Anchorage Each =================================================== IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 3.00 250.00 187.57 187.57 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 12.00 200.00 127.70 100.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 27.00 180.00 188.20 166.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 11.00 210.00 126.70 113.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 8.00 200.00 114.75 110.00 SHE 0503-067 US 50, WEST OF CANON CITY 11/30/06 2.00 220.00 152.47 106.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1.00 250.00 161.66 111.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 2.00 300.00 200.11 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 66.00 200.15 155.34 136.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 448.00 178.57 211.95 327.68 =============== 202-04001 Plug Culvert Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 3.00 1200.00 944.64 1020.21 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 7.00 600.00 845.61 300.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 2.00 700.00 2333.33 1500.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 1.00 800.00 602.50 375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 769.23 973.17 656.59 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 1.00 3000.00 3049.10 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3000.00 3049.10 5000.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2.00 1000.00 2189.15 408.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 600.00 16023.02 13500.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 1100.00 2918.96 1681.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 925.00 6153.53 3999.47 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 600.00 1383.66 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 600.00 1383.66 1200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 895.00 1959.64 1596.68 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 46 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04002 Clean Culvert Each =================================================== NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 3.00 600.00 1791.00 864.00 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 10.00 1000.00 381.50 500.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 6.00 1000.00 1308.67 350.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 7.00 1000.00 4975.00 4925.00 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 2.00 1000.00 1131.56 2160.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 2.00 1000.00 7333.33 6400.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 2.00 1000.00 3678.00 1895.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 2.00 750.00 835.02 1000.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 2.00 1000.00 1260.15 2190.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.00 952.78 2058.46 1984.94 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 1.00 750.00 1458.02 1525.00 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 2.00 2000.00 2459.33 3178.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 2.00 500.00 1856.67 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 1150.00 1924.67 2016.20 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 30.00 2000.00 2004.15 2700.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 1.00 5000.00 1196.46 589.38 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 8.00 1000.00 3068.15 5685.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 39.00 1871.79 2101.68 3258.28 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 5.00 1500.00 1134.42 1000.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 8.00 1500.00 8690.00 3450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 1500.00 5784.01 2507.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93.00 1425.27 2584.76 2593.68 =============== 202-04005 Clean Valve Box Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 300.00 278.37 475.00 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 62.00 150.00 69.92 56.69 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 47 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04005 Clean Valve Box Each =================================================== NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 20.00 160.00 70.39 54.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 83.00 154.22 74.64 61.26 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 17.00 160.00 166.85 54.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 30.00 175.00 126.06 30.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 35.00 150.00 151.15 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 82.00 161.22 146.27 47.78 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 55.00 60.00 106.25 60.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 3.00 100.00 355.00 400.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2.00 130.00 284.34 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 64.33 122.86 77.50 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 200.00 574.12 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 200.00 574.12 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 226.00 133.10 119.09 61.96 =============== 202-04100 Abandon Well Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 9.00 375.00 358.29 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 375.00 358.29 1200.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 19.00 1500.00 1527.70 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19.00 1500.00 1527.70 1100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 1138.39 1061.41 1132.14 =============== 202-04300 Rem Underground Storage Tank Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 3.00 10000.00 9257.55 6285.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 10000.00 9257.55 6285.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 10000.00 9257.55 6285.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 48 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-05010 Sawing Concrete (10 In) Lin Foot =============================================== STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 1,141.00 4.00 5.29 5.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,141.00 4.00 5.29 5.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,141.00 4.00 5.29 5.21 =============== 202-05019 Sawing Concrete (Spec) Lin Foot =============================================== STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 1,024.00 6.00 5.64 2.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,024.00 6.00 5.64 2.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,024.00 6.00 5.64 2.58 =============== 202-05026 Sawing Asphalt Mat (6 In) Lin Foot =============================================== BR 069A-019 SH 69, ROSITA CREEK 03/09/06 1,643.00 3.75 3.11 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,643.00 3.75 3.11 6.00 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 60.00 10.00 13.25 11.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 10.00 13.25 11.50 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 112.00 10.00 14.40 18.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 112.00 10.00 14.40 18.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,815.00 4.34 3.47 6.97 =============== 202-05030 Sawing Asphalt Mat (10 In) Lin Foot =============================================== SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 1,200.00 3.00 2.73 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,200.00 3.00 2.73 2.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,200.00 3.00 2.73 2.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 49 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-05100 Sandblasting Reinf Steel Sq Yard ================================================ IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 232.00 100.00 82.22 75.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 22.00 60.00 58.33 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 254.00 96.54 80.94 69.80 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 65.00 40.00 44.00 25.00 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 6.00 50.00 328.75 157.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 71.00 40.85 56.56 36.20 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 54.00 40.00 80.13 104.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 54.00 40.00 80.13 104.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 379.00 78.05 77.06 68.38 =============== 202-05150 Sandblasting Sq Foot ================================================ BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 443.00 75.00 30.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 443.00 75.00 30.00 30.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1,000.00 1.30 1.63 1.65 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 74,282.00 0.75 0.55 0.50 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 2,000.00 0.60 1.10 1.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 77,282.00 0.75 0.58 0.54 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 5,000.00 1.00 0.64 0.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,000.00 1.00 0.64 0.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 82,725.00 1.17 0.62 0.70 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 50 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-06000 Rem Detour LUMP SUM =============================================== BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 1.00 10000.00 64348.48 56596.96 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 1.00 20000.00 39687.81 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 15000.00 52018.14 38298.48 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 1.00 30000.00 63710.67 77421.33 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 1.00 50000.00 28556.22 20820.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 40000.00 37344.83 49120.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 27500.00 42235.94 43709.57 =============== 202-07000 Oblit Old Road LUMP SUM =============================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1.00 42000.00 16625.86 8888.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 42000.00 16625.86 8888.31 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 1.00 20000.00 31904.07 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 20000.00 31904.07 25000.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.00 15000.00 9058.60 5593.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 15000.00 9058.60 5593.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 25666.67 19990.42 13160.44 =============== 203-00000 Uncl Excav Cubic Yard ============================================= NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 189.00 12.00 38.28 20.40 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 526.00 10.00 29.57 30.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 287.00 10.00 25.50 14.98 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 51 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00000 Uncl Excav Cubic Yard ============================================= BR 069A-019 SH 69, ROSITA CREEK 03/09/06 680.00 11.00 11.97 14.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 159.00 65.00 98.00 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,841.00 15.32 23.81 23.35 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 2,800.00 13.00 14.83 15.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 33.00 50.00 50.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,833.00 13.43 15.13 15.06 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 38,038.00 7.00 11.05 8.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 38,038.00 7.00 11.05 8.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42,712.00 7.79 12.17 9.26 =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 2,026.00 20.00 42.50 42.50 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 52.00 250.00 108.98 82.68 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 28,532.00 10.00 9.54 7.40 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 14,910.00 9.00 21.39 14.85 SHE 0911-004 SH 91 & SH 67 GUARDRAIL 03/09/06 329.00 25.00 93.75 75.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 301.00 50.00 34.33 35.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 22,560.00 10.00 12.10 6.00 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 1,982.00 18.00 36.63 26.80 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 465.30 20.00 28.03 23.45 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 1,145.00 23.00 13.83 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 72,302.30 10.97 13.63 10.64 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 2,033.00 35.00 76.15 120.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 640.00 20.00 26.38 24.55 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 30.00 50.00 120.18 110.00 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 600.00 23.00 25.98 16.95 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 985.19 25.00 37.36 17.55 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 113,127.00 11.50 10.87 7.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 117,415.19 12.14 12.44 9.56 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 52 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 213,210.00 4.00 5.38 6.50 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 1,012.00 22.00 17.99 16.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 429,323.00 7.00 8.70 5.51 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 115,578.00 9.00 9.89 9.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 4,424.00 29.00 36.00 27.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 3,726.00 35.00 11.25 20.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 220.00 30.00 28.72 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 767,493.00 6.76 8.25 6.53 IM 0252-384 I-25 OVER BROADWAY 11/09/06 4,400.00 15.00 15.57 8.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 4,280.00 18.80 21.04 12.20 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 461,458.00 4.00 5.02 3.50 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 8,799.00 20.00 20.22 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 478,937.00 4.53 5.70 3.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,436,147.49 6.67 7.85 6.11 =============== 203-00040 Uncl Excav (Spec) Cubic Yard ============================================= CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 2,213.00 6.00 15.33 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,213.00 6.00 15.33 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,213.00 6.00 15.33 7.00 =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 2,222.00 15.00 24.63 43.60 SHE 0091-025 SH 9 VMS IN BRECKENRIDGE 01/05/06 15.00 250.00 189.84 125.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 593.00 50.00 26.25 12.00 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 50.00 60.00 30.00 10.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 37,942.00 7.90 15.90 10.70 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 2,707.00 9.00 22.50 28.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 2,466.00 20.00 19.89 8.50 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 156,159.00 13.00 12.39 10.28 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 53 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 7,396.00 12.00 15.17 7.85 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 1,265.00 12.00 24.78 20.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 6,583.00 15.00 24.50 15.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 3,396.00 22.00 16.30 14.50 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 2,364.00 22.00 14.49 6.45 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 531.00 45.00 37.75 35.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 4,044.00 15.00 24.43 17.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 940.00 27.00 53.13 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 228,673.00 12.74 14.07 11.27 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 5,280.00 10.00 13.08 15.70 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 4.00 80.00 86.97 27.09 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 36,267.00 12.00 13.12 10.51 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 9,350.00 16.00 22.13 15.25 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 426.00 30.00 49.33 59.00 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 282.00 30.00 66.20 36.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 304.00 25.00 20.00 20.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 911.00 25.00 21.93 22.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 2,139.00 8.00 23.00 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 54,963.00 12.86 15.41 12.82 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 4,986.00 11.00 22.19 13.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 35,211.00 10.50 9.25 6.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 623.00 20.00 56.64 26.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 106,651.00 11.50 9.75 3.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 4,294.00 50.00 35.23 10.69 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 428,906.00 7.00 6.51 5.87 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 37,757.00 12.00 16.07 15.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 20,844.00 9.00 12.52 16.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 55,927.00 8.00 7.96 7.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 2,899.00 25.00 24.62 21.24 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 12,406.00 8.00 17.44 23.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 2,268.00 35.00 30.42 17.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 712,772.00 8.73 8.67 6.81 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 160,707.00 10.00 7.43 8.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 54 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 2,824.00 25.00 20.13 9.90 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 45.00 40.00 38.87 20.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 1,015.00 25.00 40.12 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 164,591.00 10.36 8.03 8.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,160,999.00 9.94 9.74 8.16 =============== 203-00061 Emb Matl (CIP) Ton ==================================================== SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 725.00 25.00 32.00 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 725.00 25.00 32.00 32.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 725.00 25.00 32.00 32.00 =============== 203-00062 Emb Matl (CIP) (Spec) Cubic Yard ============================================= NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 22,729.00 17.00 17.24 17.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 22,729.00 17.00 17.24 17.62 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 395,891.00 11.00 11.91 8.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 395,891.00 11.00 11.91 8.21 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 126,811.00 11.00 12.66 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 126,811.00 11.00 12.66 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 545,431.00 11.25 12.23 9.48 =============== 203-00100 Muck Excav Cubic Yard ============================================= STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 1,000.00 9.50 9.90 12.70 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 1,250.00 14.00 20.27 4.75 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 55 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00100 Muck Excav Cubic Yard ============================================= IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 250.00 12.00 35.97 41.80 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 1,000.00 11.50 26.69 21.05 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 500.00 60.00 39.00 45.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 4,000.00 7.00 19.37 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,000.00 12.44 21.13 19.08 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 20.00 25.00 82.35 96.75 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 250.00 70.00 72.68 100.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 275.00 15.00 12.26 10.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 5,000.00 20.00 17.34 11.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,545.00 22.02 19.72 15.30 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 33,100.00 6.00 6.01 4.87 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 100.00 15.00 37.50 30.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 26,649.00 8.00 9.15 5.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 20,903.00 10.00 13.36 14.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 500.00 24.00 41.00 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 81,252.00 7.81 9.73 7.40 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 50.00 100.00 55.28 24.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 100.00 55.28 24.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 94,847.00 9.08 11.12 8.85 =============== 203-00210 Borrow (CIP) Cubic Yard ============================================= IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 53,691.00 12.00 10.97 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 53,691.00 12.00 10.97 7.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 53,691.00 12.00 10.97 7.50 =============== 203-00400 Rock Excav Cubic Yard ============================================= NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 670.00 65.00 59.33 48.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 670.00 65.00 59.33 48.64 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 56 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00400 Rock Excav Cubic Yard ============================================= BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 657.00 45.08 36.96 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 657.00 45.08 36.96 26.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,327.00 55.14 48.26 37.43 =============== 203-00705 Access Pit Each =================================================== IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 14.00 3500.00 1900.00 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 3500.00 1900.00 2200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 3500.00 1900.00 2200.00 =============== 203-00910 Contam Soil Excav & Disposal (Off-Site) Cubic Yard ============================================= STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 3,600.00 31.00 30.62 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,600.00 31.00 30.62 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,600.00 31.00 30.62 14.00 =============== 203-01100 Proof Rolling Hour =================================================== STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 70.00 95.00 138.33 115.00 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 10.00 110.00 130.29 159.50 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 25.00 100.00 83.51 120.00 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 20.00 105.00 96.50 78.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 4.00 100.00 116.82 85.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 25.00 150.00 143.33 90.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 50.00 100.00 110.00 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 204.00 105.39 115.05 111.74 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 40.00 165.00 147.10 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 57 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01100 Proof Rolling Hour =================================================== NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 10.00 110.00 127.48 167.45 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 4.00 110.00 105.67 102.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 20.00 85.00 115.35 120.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 5.00 100.00 140.00 120.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 100.00 90.00 105.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 179.00 108.04 117.91 145.71 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 100.00 110.00 112.32 111.29 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 10.00 120.00 158.00 170.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 30.00 120.00 142.50 140.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 30.00 105.00 117.75 91.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 10.00 100.00 112.15 96.44 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 40.00 120.00 107.20 125.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 500.00 100.00 112.83 112.50 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 50.00 95.00 119.02 60.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 50.00 100.00 85.59 61.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 40.00 100.00 122.36 110.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 50.00 120.00 173.98 195.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 910.00 103.85 115.57 112.33 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 200.00 120.00 97.08 147.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 20.00 100.00 100.74 113.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 40.00 130.00 110.44 82.20 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 40.00 160.00 131.55 96.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 300.00 125.33 103.48 129.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,593.00 108.56 113.05 119.20 =============== 203-01140 Rolling Hour =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 30.00 115.00 103.76 100.80 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 40.00 115.00 137.75 101.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 100.00 100.00 130.00 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 170.00 106.18 123.42 118.02 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 50.00 140.00 140.28 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 140.00 140.28 175.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 58 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01140 Rolling Hour =================================================== STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 20.00 170.00 128.81 96.44 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 12.00 150.00 88.86 111.72 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 10.00 110.00 130.50 103.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 42.00 150.00 122.86 102.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 262.00 119.66 126.90 126.39 =============== 203-01200 Roadway Insulation Mat (2 In) Sq Foot ================================================ STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 2,400.00 4.00 4.33 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,400.00 4.00 4.33 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,400.00 4.00 4.33 6.00 =============== 203-01500 Blading Hour =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 30.00 135.00 109.88 134.40 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 50.00 150.00 128.30 136.50 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 50.00 135.00 141.25 135.00 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 30.00 110.00 107.50 120.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 70.00 120.00 118.33 115.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 50.00 100.00 130.17 85.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 40.00 150.00 135.00 135.00 STA 0343-025 US 34, WRAY WEST 01/26/06 200.00 110.00 108.25 86.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 20.00 160.00 152.94 126.70 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 140.00 120.00 151.33 225.50 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 100.00 110.00 141.79 175.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 20.00 125.00 110.67 100.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 40.00 125.00 111.52 105.00 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 25.00 125.00 117.62 104.14 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 20.00 128.00 114.25 104.00 SHE 2854-111 US 285 & C470 SIGNING 03/02/06 24.00 125.00 108.71 95.54 SHE 0911-004 SH 91 & SH 67 GUARDRAIL 03/09/06 20.00 115.00 230.57 200.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 50.00 120.00 118.33 70.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 60.00 115.00 119.79 85.95 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 40.00 140.00 151.67 180.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 25.00 125.00 133.00 105.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 12.00 120.00 135.30 139.89 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 59 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01500 Blading Hour =================================================== NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 200.00 125.00 145.50 100.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 80.00 120.00 136.28 123.55 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 20.00 150.00 123.00 140.00 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 30.00 120.00 140.00 140.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 100.00 85.00 140.00 140.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 10.00 140.00 131.50 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,556.00 119.96 132.15 126.79 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 100.00 100.00 87.80 119.00 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 8.00 150.00 126.67 100.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 100.00 150.00 217.79 300.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 300.00 100.00 97.11 90.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 40.00 120.00 126.80 140.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 175.00 120.00 130.82 167.45 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 20.00 110.00 221.88 143.75 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 100.00 120.00 113.33 120.00 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 10.00 125.00 178.20 115.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 75.00 100.00 101.63 95.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 500.00 100.00 137.58 130.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 40.00 125.00 126.14 135.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 20.00 145.00 145.00 145.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 50.00 110.00 103.33 100.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 32.00 120.00 131.67 120.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 100.00 100.00 120.00 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,670.00 109.10 120.51 133.47 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 100.00 120.00 113.37 112.47 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 100.00 100.00 136.29 85.00 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 150.00 120.00 158.35 148.50 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 21.00 140.00 180.00 180.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 50.00 100.00 159.50 155.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 200.00 140.00 138.27 130.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 30.00 135.00 152.03 106.09 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 200.00 110.00 161.78 203.25 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 40.00 130.00 120.56 95.75 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 50.00 125.00 153.42 90.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 180.00 120.00 92.87 71.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 30.00 150.00 121.49 110.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 32.00 150.00 119.90 119.79 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 20.00 120.00 129.16 85.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 60 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01500 Blading Hour =================================================== STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 5.00 140.00 181.40 250.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 40.00 160.00 180.00 200.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 150.00 170.00 180.17 152.51 IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 20.00 150.00 249.33 148.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 10.00 200.00 141.22 124.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,428.00 129.09 142.23 132.81 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 10.00 200.00 165.00 165.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 150.00 120.00 126.52 153.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 40.00 100.00 137.40 150.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 40.00 110.00 144.00 173.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 10.00 120.00 222.70 130.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 50.00 120.00 129.40 165.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 40.00 110.00 128.00 100.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 40.00 180.00 156.50 112.50 SHE 0503-067 US 50, WEST OF CANON CITY 11/30/06 6.00 150.00 178.25 137.50 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 20.00 145.00 138.67 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 406.00 125.62 136.81 146.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,060.00 119.40 132.88 132.30 =============== 203-01510 Backhoe Hour =================================================== STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 20.00 120.00 123.33 150.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 40.00 125.00 94.56 85.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 20.00 115.00 137.50 145.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 25.00 125.00 115.00 105.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 20.00 130.00 122.50 70.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 50.00 115.00 120.00 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 175.00 121.00 108.66 110.43 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 100.00 110.00 97.80 92.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 12.00 165.00 226.12 325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 112.00 115.89 106.42 116.96 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 20.00 150.00 118.30 110.68 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 61 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01510 Backhoe Hour =================================================== ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 1,200.00 180.00 172.86 150.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 30.00 130.00 163.29 154.87 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 180.00 100.00 109.10 76.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 12.00 150.00 131.89 163.77 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 10.00 120.00 106.25 92.50 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 150.00 105.00 205.31 187.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,602.00 162.08 168.89 144.58 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 50.00 130.00 150.48 195.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 40.00 120.00 119.87 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 90.00 125.56 133.30 183.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,979.00 154.17 161.09 141.79 =============== 203-01550 Dozing Hour =================================================== STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 70.00 120.00 168.33 150.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 60.00 180.00 175.69 164.47 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 20.00 135.00 183.50 119.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 25.00 150.00 150.00 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 175.00 146.57 169.91 148.56 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 100.00 150.00 129.19 123.77 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 40.00 130.00 159.70 150.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 500.00 140.00 165.23 130.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 40.00 130.00 184.63 167.50 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 50.00 150.00 151.06 125.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 180.00 125.00 112.10 92.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 12.00 180.00 121.53 123.05 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 20.00 150.00 130.23 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 942.00 138.60 154.46 124.06 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 20.00 130.00 209.00 230.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 62 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01550 Dozing Hour =================================================== HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 25.00 150.00 140.73 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 45.00 141.11 158.93 235.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,162.00 139.90 156.38 132.07 =============== 203-01555 Dozing (Landscaping) Hour =================================================== BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 24.00 150.00 151.44 150.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 50.00 125.00 160.97 170.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 200.00 120.00 150.63 167.50 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 20.00 125.00 146.44 100.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 294.00 123.64 152.24 161.96 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 50.00 100.00 129.61 163.00 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 100.00 150.00 150.33 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 150.00 133.33 140.91 134.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 444.00 126.91 149.16 152.62 =============== 203-01565 Hydraulic Excavator Hour =================================================== C 5502-057 US 550 CULVERT REPAIRS 08/03/06 8.00 200.00 236.53 156.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 200.00 236.53 156.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 200.00 236.53 156.11 =============== 203-01582 Truck (Dump) Hour =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 84.00 105.00 96.80 84.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 20.00 110.00 81.00 87.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 20.00 100.00 100.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 124.00 105.00 95.79 85.45 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 800.00 100.00 109.99 130.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 63 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01582 Truck (Dump) Hour =================================================== NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 16.00 90.00 133.33 110.00 IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 20.00 120.00 180.00 245.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 836.00 100.29 110.93 132.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 960.00 100.90 109.71 126.31 =============== 203-01590 Front End Loader (Rubber) Hour =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 40.00 135.00 119.12 145.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 135.00 119.12 145.60 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 50.00 125.00 226.12 325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 125.00 226.12 325.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 100.00 125.00 117.58 117.82 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 24.00 200.00 187.67 135.69 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 12.00 230.00 119.57 129.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 136.00 147.50 130.61 121.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 226.00 140.31 144.44 171.07 =============== 203-01594 Combination Loader Hour =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 30.00 100.00 101.28 134.40 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 10.00 100.00 108.75 135.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 40.00 85.00 115.00 130.00 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 10.00 100.00 120.50 214.50 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 40.00 100.00 123.33 100.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 30.00 115.00 100.44 95.20 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 20.00 130.00 122.00 122.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 80.00 110.00 118.33 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 260.00 104.81 112.70 124.70 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 100.00 100.00 72.80 108.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 64 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01594 Combination Loader Hour =================================================== BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 30.00 100.00 100.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 130.00 100.00 76.95 103.85 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 200.00 130.00 106.57 91.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 30.00 125.00 137.22 111.67 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 180.00 150.00 92.14 72.00 NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 120.00 120.00 203.33 200.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 20.00 105.00 95.75 90.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 10.00 140.00 130.00 120.00 IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 20.00 200.00 199.33 148.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 580.00 135.60 118.26 111.16 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 10.00 210.00 135.00 135.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 100.00 100.00 104.94 135.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 40.00 140.00 117.98 89.90 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 40.00 160.00 132.17 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 190.00 126.84 114.12 113.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,160.00 123.28 111.83 113.83 =============== 203-01597 Potholing Hour =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 20.00 225.00 221.60 168.00 SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 01/05/06 50.00 180.00 200.80 160.00 SHE 0091-025 SH 9 VMS IN BRECKENRIDGE 01/05/06 20.00 200.00 154.75 210.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 40.00 225.00 183.75 135.00 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 8.00 160.00 167.00 150.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 70.00 150.00 211.67 165.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 50.00 250.00 228.59 249.97 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 40.00 130.00 181.16 159.50 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 40.00 180.00 105.70 25.34 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 8.00 200.00 199.00 265.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 168.00 175.00 180.17 100.00 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 20.00 175.00 205.52 187.09 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 20.00 180.00 220.25 211.00 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 30.00 180.00 178.13 125.00 SHE 0911-004 SH 91 & SH 67 GUARDRAIL 03/09/06 10.00 200.00 166.95 118.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 65 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== AQC R600-241 SH 287 (FEDERAL BLVD), 52ND A 03/16/06 20.00 150.00 124.99 135.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 70.00 200.00 234.00 250.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 10.00 175.00 197.40 273.81 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 100.00 150.00 143.75 120.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 20.00 160.00 186.57 208.43 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 6.00 200.00 151.86 136.57 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 6.00 200.00 171.78 80.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 10.00 150.00 136.00 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 836.00 178.86 182.38 152.06 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 40.00 160.00 149.62 75.60 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 20.00 350.00 286.38 400.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 20.00 175.00 195.79 135.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 40.00 175.00 155.53 150.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 40.00 175.00 178.01 115.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 50.00 150.00 184.23 217.70 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 10.00 150.00 264.20 135.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 40.00 120.00 103.25 115.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 20.00 200.00 218.37 189.00 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 15.00 200.00 142.00 95.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 20.00 250.00 180.00 140.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 10.00 130.00 258.67 250.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 10.00 180.00 138.33 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 335.00 178.51 172.84 158.70 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 100.00 140.00 189.18 235.23 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 30.00 160.00 204.04 175.00 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 40.00 180.00 167.50 200.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 20.00 200.00 175.00 150.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 100.00 200.00 222.28 175.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 40.00 250.00 213.72 180.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 16.00 300.00 249.89 149.68 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 10.00 200.00 215.00 140.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 200.00 200.00 198.51 175.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 10.00 150.00 471.20 1244.80 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 12.00 250.00 309.40 162.58 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 50.00 125.00 224.11 190.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 170.00 200.00 160.86 92.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 30.00 200.00 262.50 175.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 16.00 170.00 218.19 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 66 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 10.00 210.00 260.00 300.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 40.00 180.00 204.12 190.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 15.00 200.00 163.11 128.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 100.00 115.00 257.63 327.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,009.00 182.43 206.01 194.02 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 24.00 250.00 125.00 125.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 200.00 150.00 194.72 202.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 200.00 200.00 196.08 190.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 10.00 220.00 252.57 275.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 40.00 200.00 288.20 191.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 50.00 150.00 184.57 150.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 10.00 165.00 182.22 150.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 100.00 220.00 240.62 205.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 24.00 200.00 172.67 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 658.00 185.64 204.51 190.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,838.00 181.66 195.15 176.60 =============== 203-01620 Sweeping Hour =================================================== BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 100.00 120.00 114.76 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 120.00 114.76 85.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 120.00 114.76 85.00 =============== 203-01622 Sweeping (With Pickup Broom) Hour =================================================== NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 50.00 100.00 137.50 125.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 25.00 30.00 130.21 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 75.00 76.67 134.10 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75.00 76.67 134.10 125.00 =============== 203-02300 Rock Scaler Hour =================================================== NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 360.00 150.00 187.33 107.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 67 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-02300 Rock Scaler Hour =================================================== IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 60.00 300.00 238.00 164.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 420.00 171.43 194.57 115.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 420.00 171.43 194.57 115.14 =============== 203-02330 Laborer Hour =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 80.00 40.00 41.32 33.60 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 80.00 35.00 37.00 26.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 40.00 50.00 56.50 35.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 40.00 40.00 45.00 40.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 40.00 40.00 42.33 55.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 40.00 40.00 41.00 30.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 50.00 40.00 50.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 370.00 40.00 42.80 36.94 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 20.00 40.00 58.66 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 40.00 58.66 35.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 50.00 40.00 47.48 44.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 10.00 40.00 43.67 41.00 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 40.00 50.00 47.21 45.82 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 50.00 200.00 42.02 30.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 180.00 40.00 56.62 126.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 330.00 65.45 50.47 86.74 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 100.00 40.00 35.59 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 40.00 35.59 44.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 820.00 50.24 45.62 57.79 =============== 206-00000 Str Excav Cubic Yard ============================================= STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 306.00 22.00 24.23 19.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 68 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00000 Str Excav Cubic Yard ============================================= IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 23.00 50.00 56.67 75.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 4,003.00 20.00 20.24 16.21 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 6,018.00 15.00 11.32 10.03 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 14,117.00 10.00 7.55 3.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 926.00 16.50 12.82 6.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 133.00 30.00 36.50 24.50 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 145.00 25.00 29.00 29.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 1,063.00 40.00 27.67 15.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 2,867.40 9.00 9.04 8.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29,601.40 13.87 10.63 7.70 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 14,444.00 30.00 70.56 95.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 2,667.00 15.00 20.75 8.86 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 263.00 25.00 18.98 14.95 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 80.00 15.00 15.66 15.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 2,091.00 32.00 36.00 36.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 620.00 20.00 23.22 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20,165.00 27.79 59.81 73.48 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 4,947.00 8.00 8.71 7.54 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 1,542.00 9.00 12.95 14.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 10,871.00 15.00 10.71 9.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 2.90 210.00 91.80 20.39 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 7,531.00 7.00 9.04 10.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 2,574.00 9.00 7.80 2.61 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 372.00 75.00 53.06 27.22 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 3,985.00 20.00 11.78 7.50 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1,255.00 9.00 18.25 8.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 485.00 20.00 18.51 18.01 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 4,953.00 7.50 10.02 7.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 29,064.00 11.00 9.74 6.72 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 340.00 30.00 25.33 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 67,921.90 11.61 10.55 7.87 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 12.00 50.00 100.00 100.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 6,773.00 10.00 9.51 6.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 69 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00000 Str Excav Cubic Yard ============================================= HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 1,160.00 20.00 16.61 9.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 670.00 15.00 20.37 15.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 496.00 20.00 61.76 50.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 11,262.00 7.00 7.58 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20,373.00 9.34 10.53 6.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 138,061.30 14.12 14.91 17.25 =============== 206-00050 Str Bkfl (Spec) Cubic Yard ============================================= STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 20,434.00 35.00 47.20 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20,434.00 35.00 47.20 47.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 8.00 120.00 356.27 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 120.00 356.27 210.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,442.00 35.03 47.40 47.06 =============== 206-00065 Str Bkfl (Flow-Fill) Cubic Yard ============================================= NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 10.00 125.00 141.52 136.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 125.00 141.52 136.06 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 808.00 95.00 107.18 157.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 808.00 95.00 107.18 157.54 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 148.00 80.00 114.40 157.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1,500.00 70.00 78.56 72.50 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 110.00 94.00 135.22 80.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 51.00 130.00 134.41 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,809.00 73.97 87.93 81.77 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 70 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00065 Str Bkfl (Flow-Fill) Cubic Yard ============================================= NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 10.00 200.00 200.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 200.00 200.00 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,637.00 81.08 92.16 105.64 =============== 206-00066 Str Bkfl (FF Ash) Cubic Yard ============================================= SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 32.00 100.00 137.60 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32.00 100.00 137.60 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 100.00 137.60 200.00 =============== 206-00100 Str Bkfl (CL 1) Cubic Yard ============================================= NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 6,520.00 21.00 21.63 17.17 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 9,918.00 18.00 15.08 11.88 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 28,413.50 20.00 18.23 8.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 287.00 20.00 34.62 35.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 141.00 30.00 56.70 24.50 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 126.00 40.00 70.00 70.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1,075.00 25.00 26.35 20.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 46,480.50 19.91 18.12 10.78 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 23.00 60.00 146.20 168.00 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 4.00 50.00 197.75 100.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 275.00 30.00 55.73 69.94 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 406.00 40.00 32.38 28.75 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 366.00 75.00 77.00 77.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 420.00 28.00 38.43 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,494.00 43.69 49.75 53.65 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 1,024.00 19.00 48.46 41.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 71 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00100 Str Bkfl (CL 1) Cubic Yard ============================================= BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 19,852.00 18.00 16.15 16.50 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 5,631.00 19.00 22.13 21.75 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 14,643.00 10.50 11.73 12.03 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 6,142.00 22.00 18.55 17.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 2,028.00 25.00 30.89 28.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 598.00 80.00 64.41 58.82 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 4,924.00 20.00 27.39 23.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 74,448.00 15.00 27.30 22.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 129,290.00 16.14 22.56 20.75 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 37,628.00 14.00 13.02 13.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 720.00 30.00 31.17 21.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 300.00 45.00 35.10 30.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 857.00 65.00 66.04 65.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 15,712.00 18.00 19.69 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 55,217.00 16.31 16.06 14.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 232,481.50 17.11 19.69 17.43 =============== 206-00200 Str Bkfl (CL 2) Cubic Yard ============================================= STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 320.00 26.00 43.57 40.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 81.00 3.00 35.17 22.85 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 40.00 25.00 27.39 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 441.00 21.68 38.75 37.76 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 125.00 12.00 20.95 20.50 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 901.00 25.00 12.50 12.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,026.00 23.42 15.52 13.47 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 10.00 21.00 73.47 46.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 103.00 30.00 41.46 21.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 180.00 12.00 27.06 31.25 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 72 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00200 Str Bkfl (CL 2) Cubic Yard ============================================= C 5502-057 US 550 CULVERT REPAIRS 08/03/06 424.00 90.00 77.75 42.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1,081.00 25.00 9.88 8.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 173.00 12.00 26.34 13.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 352.00 25.00 33.74 17.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,323.00 35.09 30.44 18.53 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 11.00 50.00 45.00 45.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 759.00 15.00 18.67 10.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 320.00 28.00 18.08 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,090.00 19.17 18.43 13.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,880.00 27.87 25.87 18.10 =============== 206-00360 Mechanical Reinforcement of Soil Cubic Yard ============================================= NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 3,409.00 20.00 23.05 25.46 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 6,282.00 25.00 15.38 12.76 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 17,534.50 20.00 18.77 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27,225.50 21.15 18.26 19.01 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 17,590.00 15.00 22.37 15.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 366.00 30.00 25.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17,956.00 15.31 22.39 15.20 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 899.00 25.00 31.26 20.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 11,847.00 26.00 18.03 15.50 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 3,095.00 28.00 17.75 32.75 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 8,388.00 18.00 15.10 14.03 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 4,392.00 35.00 21.54 16.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1,416.00 25.00 17.63 20.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 4,058.00 36.00 22.39 22.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 42,923.00 15.00 23.19 29.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 77,018.00 20.09 20.80 24.39 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 73 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00360 Mechanical Reinforcement of Soil Cubic Yard ============================================= IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 17,664.00 18.00 19.58 17.50 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 10,033.00 27.00 26.15 26.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 27,697.00 21.26 21.96 20.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 149,896.50 19.93 20.45 21.64 =============== 206-00510 Filter Matl (CL A) Cubic Yard ============================================= SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 22.00 60.00 54.40 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 60.00 54.40 31.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 16.00 30.00 66.51 80.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 529.00 60.00 53.65 80.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 155.00 35.00 55.42 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 700.00 53.78 54.53 71.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 722.00 53.97 54.52 70.35 =============== 206-01010 Bed Course Matl Ton ==================================================== NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 15.00 50.00 50.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 50.00 50.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 50.00 50.00 50.00 =============== 206-01600 Temp Excav Support LUMP SUM =============================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1.00 50000.00 58157.19 62415.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 50000.00 58157.19 62415.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 50000.00 58157.19 62415.94 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 74 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01750 Shoring LUMP SUM =============================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1.00 180000.00 129564.74 89872.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 180000.00 129564.74 89872.72 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 1.00 30000.00 11976.56 8526.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 30000.00 11976.56 8526.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 105000.00 65425.73 49199.36 =============== 206-01781 Shoring (A 1) LUMP SUM =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 10000.00 15477.36 2700.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 25000.00 25940.00 22700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 17500.00 19836.80 12700.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 1.00 5000.00 3050.00 3050.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 1.00 20000.00 12945.07 9000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 12500.00 10471.30 6025.00 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 1.00 22260.00 27431.02 18000.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1.00 50000.00 48220.93 86000.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 15000.00 55214.40 55685.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 120000.00 69079.04 75000.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 33000.00 40471.13 10000.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 14000.00 75101.67 105000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 42376.67 51386.35 58280.83 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 10000.00 37581.45 65000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 75 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01781 Shoring (A 1) LUMP SUM =============================================== HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 1.00 20000.00 45258.73 11000.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 1.00 5000.00 29722.22 30000.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1.00 55000.00 67720.10 44000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 22500.00 46396.69 37500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 28875.71 42062.31 38366.79 =============== 206-01782 Shoring (A 2) LUMP SUM =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 10000.00 35554.35 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 35554.35 20000.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 1.00 5000.00 3050.00 3050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5000.00 3050.00 3050.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1.00 40000.00 50483.82 65000.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 15000.00 45551.45 2370.25 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 300000.00 94287.18 75000.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 47000.00 93929.83 85000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 100500.00 73174.36 56842.56 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 25000.00 19691.99 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 25000.00 19691.99 15000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 63142.86 56006.47 37917.18 =============== 206-01783 Shoring (A 3) LUMP SUM =============================================== BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1.00 40000.00 62905.69 39000.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 120000.00 55650.47 75000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 80000.00 58673.48 57000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 80000.00 58673.48 57000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 76 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01784 Shoring (A 4) LUMP SUM =============================================== BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1.00 35000.00 62736.53 30000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 35000.00 62736.53 30000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 35000.00 62736.53 30000.00 =============== 207-00205 Topsoil Cubic Yard ============================================= STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 2,332.00 9.00 13.12 16.35 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 425.00 12.00 34.51 25.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 4,762.00 15.00 21.68 13.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 17.00 40.00 67.12 32.66 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 2,415.00 15.00 12.92 12.18 SHE 2854-111 US 285 & C470 SIGNING 03/02/06 50.00 50.00 130.24 68.22 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 465.00 26.00 28.50 8.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 288.00 28.00 26.98 17.90 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 3,226.00 18.00 13.80 16.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 280.00 15.00 28.48 27.23 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 100.00 40.00 24.33 25.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 90.00 30.00 33.25 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14,450.00 15.64 19.23 14.98 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 1,196.00 12.00 14.60 18.50 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 566.00 30.00 71.31 70.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 405.00 15.00 27.13 28.80 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 27.00 40.00 76.32 30.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 28,199.00 8.00 7.98 3.29 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 410.00 30.00 13.53 8.05 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 102.00 28.00 50.60 61.19 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 159.00 30.00 41.40 14.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 12,260.00 10.00 10.14 7.25 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 1,556.80 20.00 39.03 23.65 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 126.00 75.00 77.00 77.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 512.00 25.00 24.45 20.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 3,076.00 5.00 18.67 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 48,594.80 9.78 11.80 7.12 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 55.00 8.00 41.44 25.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 77 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00205 Topsoil Cubic Yard ============================================= STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 3,918.00 11.00 28.30 24.20 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 810.00 30.00 25.00 26.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 2,400.00 13.00 13.90 12.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 500.00 55.00 45.08 38.23 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 63,548.00 7.00 4.15 4.50 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 8,361.00 9.00 3.43 3.68 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 2,208.00 15.00 12.14 15.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 799.00 25.00 19.76 19.52 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 290.00 17.00 24.65 18.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 545.00 50.00 41.25 32.50 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 740.00 23.00 27.78 15.33 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 97.00 20.00 34.69 9.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 84,271.00 8.91 6.20 6.71 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 9,400.00 12.00 10.41 8.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 690.00 25.00 28.20 21.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 225.00 30.00 41.40 34.50 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 150.00 75.00 57.87 15.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 27,624.00 7.00 7.95 7.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 1,198.00 30.00 19.30 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 39,287.00 9.61 9.86 8.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 186,602.80 9.80 9.32 7.81 =============== 207-00210 Stockpile Topsoil Cubic Yard ============================================= IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 8,361.00 2.00 2.10 1.30 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1,173.00 4.00 9.92 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,534.00 2.25 3.27 2.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,534.00 2.25 3.27 2.49 =============== 207-00305 Wetland Topsoil Cubic Yard ============================================= SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 1,614.00 13.00 14.49 13.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,614.00 13.00 14.49 13.75 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 74.00 40.00 73.55 75.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 78 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00305 Wetland Topsoil Cubic Yard ============================================= BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 30.00 20.00 18.00 23.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 135.00 17.00 38.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 239.00 24.50 47.74 48.70 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 23.00 20.00 47.29 36.00 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 30.00 50.00 72.75 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 53.00 36.98 59.13 27.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,906.00 15.11 19.13 18.52 =============== 207-00310 Stockpile Wetland Topsoil Cubic Yard ============================================= STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 74.00 45.00 65.21 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 74.00 45.00 65.21 50.00 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 23.00 20.00 57.38 35.00 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 30.00 55.00 50.25 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 53.00 39.81 54.06 27.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 127.00 42.83 59.22 40.43 =============== 207-00405 Topsoil (Spec) Cubic Yard ============================================= IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 49,699.00 10.00 5.16 5.25 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2,806.00 20.00 16.96 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 52,505.00 10.53 6.03 6.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52,505.00 10.53 6.03 6.31 =============== 207-01110 Planter Soil Mix Cubic Yard ============================================= IM 0252-384 I-25 OVER BROADWAY 11/09/06 200.00 40.00 36.99 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 40.00 36.99 31.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 40.00 36.99 31.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 79 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00002 Erosion Log (12 In) Lin Foot =============================================== NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 300.00 8.00 7.06 6.75 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 225.00 6.00 6.20 8.60 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 164.00 25.00 6.33 5.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1,236.00 6.00 7.29 5.04 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 2,814.00 7.00 5.55 4.95 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 100.00 12.00 11.00 6.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 500.00 7.50 5.32 5.25 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 20.00 8.00 12.66 7.80 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 200.00 6.00 14.00 14.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 910.00 7.00 6.67 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,469.00 7.36 6.11 5.65 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 100.00 8.00 19.89 8.60 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 700.00 10.00 23.91 30.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 1,000.00 5.00 8.05 6.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 872.00 7.00 7.87 6.77 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 1,330.00 6.00 7.00 5.50 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 100.00 7.50 14.16 20.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 1,000.00 5.00 5.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,102.00 6.40 9.26 9.42 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 3,117.00 5.50 4.66 4.63 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 960.00 6.00 5.62 7.50 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 10.00 8.10 285.75 533.50 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 1,050.00 6.50 6.75 6.50 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 500.00 6.00 8.25 12.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 22,152.00 8.00 4.17 4.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 210.00 8.00 7.00 8.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 890.00 6.00 6.43 4.50 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 2,498.00 9.00 8.56 11.11 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 795.00 7.00 8.19 8.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 100.00 5.00 9.14 6.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 24.00 12.00 7.30 4.60 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1,380.00 6.00 12.73 13.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 33,686.00 7.54 5.01 5.55 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 920.00 7.50 7.66 6.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 80 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00002 Erosion Log (12 In) Lin Foot =============================================== HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 680.00 6.00 7.06 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,600.00 6.86 7.29 6.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 46,857.00 7.37 5.69 6.02 =============== 208-00003 Erosion Log (18 In) Lin Foot =============================================== STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 400.00 15.00 12.40 5.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 400.00 15.00 12.40 5.19 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1,140.00 6.00 9.02 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,140.00 6.00 9.02 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,540.00 8.34 9.61 8.75 =============== 208-00004 Silt Berm Lin Foot =============================================== STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 680.00 5.75 10.30 9.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 680.00 5.75 10.30 9.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 680.00 5.75 10.30 9.50 =============== 208-00005 Erosion Log Lin Foot =============================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 240.00 8.00 7.48 6.30 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 100.00 10.00 8.98 10.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 168.00 6.00 11.59 11.00 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 1,000.00 5.00 5.46 4.89 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 320.00 6.00 5.55 7.25 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 500.00 5.00 6.55 5.50 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 1,000.00 5.00 4.84 3.25 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 1,396.00 5.00 5.04 4.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,724.00 5.36 5.59 5.08 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 100.00 12.00 7.37 7.80 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 81 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00005 Erosion Log Lin Foot =============================================== BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 3,300.00 5.00 4.44 4.89 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 30.00 10.00 12.75 10.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 2,000.00 4.50 4.58 5.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 1,000.00 6.00 6.29 4.60 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 20.00 4.21 42.10 79.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 1,000.00 6.00 6.00 6.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 8,100.00 5.00 3.77 3.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15,550.00 5.12 4.37 4.26 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 100.00 5.00 7.05 9.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 500.00 7.00 2.47 2.99 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 600.00 20.00 12.51 5.04 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2,000.00 5.00 5.56 6.00 AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR 09/14/06 10.00 5.00 106.84 210.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 230.00 8.00 8.51 6.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,440.00 8.11 6.56 6.09 STA R600-279 SH 121 (WADSWORTH) FROM KEN C 10/05/06 150.00 7.00 6.87 15.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 375.00 6.00 4.39 2.50 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 500.00 6.00 7.50 5.50 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 20.00 25.00 36.00 25.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 250.00 8.00 7.15 8.15 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 1,600.00 6.00 6.97 8.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 5,295.00 6.00 4.45 4.75 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 1,000.00 6.00 4.97 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,190.00 6.11 5.07 5.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32,904.00 5.74 5.19 4.94 =============== 208-00007 Erosion Log (8 In) Lin Foot =============================================== IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 300.00 7.00 8.34 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 300.00 7.00 8.34 7.50 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 2,500.00 5.00 6.12 3.90 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 82 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00007 Erosion Log (8 In) Lin Foot =============================================== C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 340.00 6.00 5.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,840.00 5.12 6.08 4.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,140.00 5.30 6.25 4.36 =============== 208-00010 Erosion Bales Each =================================================== SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 6.00 25.00 33.67 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 25.00 33.67 25.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 64.00 25.00 34.55 17.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 64.00 25.00 34.55 17.64 IM 0252-384 I-25 OVER BROADWAY 11/09/06 65.00 15.00 23.07 11.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 65.00 15.00 23.07 11.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 135.00 20.19 26.35 14.89 =============== 208-00011 Erosion Bales (Weed Free) Each =================================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 30.00 30.00 16.23 15.75 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 27.00 16.00 104.28 18.50 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 36.00 40.00 16.67 14.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 903.00 16.00 17.85 13.74 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 153.00 10.00 22.33 20.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 25.00 15.00 18.36 17.42 SHE 2854-111 US 285 & C470 SIGNING 03/02/06 6.00 25.00 38.40 42.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 100.00 13.00 24.30 19.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 55.00 15.00 21.92 22.30 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 45.00 15.00 16.88 18.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 84.00 18.00 19.50 16.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 200.00 15.00 13.90 12.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 41.00 16.00 14.00 10.00 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 15.00 17.00 24.00 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,720.00 15.99 20.80 15.16 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 83 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00011 Erosion Bales (Weed Free) Each =================================================== STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 18.00 20.00 21.04 18.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 322.00 15.00 12.70 12.51 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 46.00 15.00 24.19 33.38 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 33.00 18.00 41.00 20.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 252.00 15.00 12.74 13.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 100.00 25.00 14.94 13.25 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 35.00 18.00 17.54 20.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 20.00 15.00 30.67 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 826.00 16.57 16.54 15.07 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 805.00 14.00 12.86 11.44 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 18.00 18.00 30.05 25.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 100.00 15.00 18.97 25.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 1,000.00 20.00 17.96 16.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 3,710.00 11.00 13.22 12.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1,500.00 13.00 15.93 13.71 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 500.00 15.00 15.30 15.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 678.00 15.00 13.92 15.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 18.00 16.00 19.50 23.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 84.00 12.00 21.15 17.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 12.00 25.00 18.50 12.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 480.00 14.00 67.68 159.03 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 10.00 20.00 26.77 21.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,915.00 13.41 16.56 21.25 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 12.00 15.00 51.25 65.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 28.00 20.00 34.56 54.80 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 100.00 25.00 13.81 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 140.00 23.14 19.11 25.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,601.00 14.14 17.23 19.96 =============== 208-00020 Silt Fence Lin Foot =============================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 3,000.00 2.50 1.70 1.60 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 84 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00020 Silt Fence Lin Foot =============================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 300.00 2.00 2.00 1.85 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 100.00 4.50 6.76 10.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 3,330.00 1.20 1.70 2.10 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 100.00 6.00 4.00 5.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 3,951.00 2.50 2.98 2.29 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 853.00 2.00 2.84 1.50 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 7,275.00 1.50 1.21 1.25 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 5,728.00 2.00 2.10 2.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 2,144.00 1.50 2.28 1.63 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 4,000.00 2.00 1.69 1.36 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 9,084.00 1.20 1.88 1.35 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 3,000.00 2.00 1.91 2.50 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 200.00 2.75 4.41 3.35 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 250.00 5.00 2.90 2.50 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 1,200.00 2.00 2.00 2.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 14,600.00 2.10 2.60 3.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 7,276.00 2.00 1.77 1.65 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 100.00 3.00 5.39 2.96 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 100.00 2.25 7.75 2.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 1,500.00 2.00 1.56 1.06 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 350.00 10.00 2.11 2.25 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 1,550.00 2.50 2.00 2.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 755.00 2.00 1.95 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70,746.00 1.94 2.03 1.98 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 120.00 5.00 4.13 5.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 3,671.00 8.00 6.63 10.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 500.00 2.00 2.22 2.60 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 560.00 2.00 1.37 1.31 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 1,200.00 2.00 1.92 2.55 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 470.00 3.00 3.09 4.17 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 2,150.00 1.50 1.30 1.30 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 1,000.00 6.00 2.78 2.45 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 200.00 3.50 3.35 3.35 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 300.00 2.50 2.69 3.50 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 2,130.00 4.00 2.25 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12,301.00 4.48 3.56 4.61 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 4,090.00 2.00 1.44 1.09 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 600.00 3.00 2.45 2.25 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 85 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00020 Silt Fence Lin Foot =============================================== STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 2,300.00 1.60 2.09 1.98 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 3,800.00 2.00 2.72 3.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 12,000.00 1.10 2.15 1.90 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 650.00 3.00 3.22 2.16 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2,670.00 2.50 1.68 1.25 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 5,000.00 2.70 1.19 1.12 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 1,200.00 15.00 7.26 2.52 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 12,000.00 2.00 1.86 2.25 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 5,173.00 2.00 1.79 2.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 975.00 2.00 2.70 2.50 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 18,745.00 1.60 2.57 2.70 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 1,000.00 3.00 3.17 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 70,203.00 2.05 2.16 2.14 STA R600-279 SH 121 (WADSWORTH) FROM KEN C 10/05/06 50.00 2.00 6.40 2.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 10,303.00 2.00 1.91 2.50 IM 0252-384 I-25 OVER BROADWAY 11/09/06 270.00 2.00 3.35 1.25 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 6,900.00 3.20 1.38 1.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 927.00 2.75 3.42 1.60 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 300.00 3.50 1.83 1.50 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 200.00 3.50 5.66 3.25 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 5,333.00 2.00 1.45 1.20 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 500.00 4.00 1.86 1.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24,783.00 2.43 1.73 1.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 178,033.00 2.23 2.10 2.19 =============== 208-00030 Sediment Basin Each =================================================== IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 1.00 3000.00 4524.40 825.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3000.00 4524.40 825.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 6.00 3000.00 3317.10 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 3000.00 3317.10 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 3000.00 3618.93 2260.71 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 86 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00033 Sediment Trap Each =================================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 63.00 1000.00 349.37 113.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 63.00 1000.00 349.37 113.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 63.00 1000.00 349.37 113.11 =============== 208-00040 Check Dam Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 2.00 500.00 440.40 268.98 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 14.00 250.00 641.37 61.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 70.00 600.00 246.00 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 86.00 540.70 343.93 117.93 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 25.00 1000.00 4937.50 2940.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 25.00 1000.00 4937.50 2940.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 9.00 500.00 241.05 83.20 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 16.00 160.00 364.55 600.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 14.00 600.00 552.12 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 39.00 396.41 429.67 444.84 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 14.00 2500.00 1764.60 330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 2500.00 1764.60 330.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 164.00 743.66 928.44 643.97 =============== 208-00045 Conc Washout Str Each =================================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 2.00 1000.00 1647.38 875.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 87 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00045 Conc Washout Str Each =================================================== NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 1.00 1000.00 1682.50 4480.00 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 1.00 1000.00 1300.00 2000.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 1.00 600.00 2000.00 2000.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 3.00 1700.00 1698.29 2861.46 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 2.00 500.00 1445.21 600.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 2.00 1000.00 1783.33 1000.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 4.00 1100.00 1404.95 2100.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 2.00 1200.00 976.57 1306.29 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 10.00 900.00 548.43 793.70 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 4.00 900.00 1383.33 600.00 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 1.00 900.00 2000.00 4000.00 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 1.00 1000.00 985.86 1775.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 1.00 1500.00 1015.21 1450.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 1.00 1000.00 647.94 900.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 2.00 800.00 400.00 400.00 AQC R600-241 SH 287 (FEDERAL BLVD), 52ND A 03/16/06 1.00 500.00 552.63 100.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 2.00 1000.00 1336.67 1800.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 6.00 900.00 988.00 650.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 6.00 900.00 757.14 821.42 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 2.00 600.00 736.25 815.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 4.00 1250.00 387.00 63.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 1.00 1000.00 662.74 106.26 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 1.00 800.00 862.50 1000.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 1.00 1500.00 2150.00 1500.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 1.00 800.00 749.50 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 63.00 979.37 1074.56 1106.44 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 1.00 1000.00 962.00 1260.00 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 1.00 1000.00 1346.40 587.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 1.00 3000.00 3783.60 5500.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 10.00 900.00 430.14 130.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 5.00 750.00 559.76 575.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 2.00 900.00 564.25 600.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 4.00 800.00 2453.82 2711.45 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 2.00 1200.00 1712.50 1725.00 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 1.00 1200.00 1507.20 800.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 1.00 1000.00 783.25 600.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 4.00 1200.00 1668.99 3000.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 3.00 1000.00 1378.47 1575.00 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 1.00 909.00 658.00 155.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 1.00 2000.00 2200.00 2200.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 1.00 1500.00 1833.33 1500.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 1.00 500.00 805.00 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 39.00 1027.15 1037.36 1266.61 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 88 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00045 Conc Washout Str Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 4.00 800.00 1185.70 1626.81 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 1.00 1500.00 1279.03 1200.00 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 6.00 800.00 416.25 100.00 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 4.00 50.00 594.85 525.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 8.00 600.00 825.00 1300.00 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 1.00 2000.00 1200.00 900.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 10.00 700.00 805.78 1500.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 2.00 1000.00 1331.93 560.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 1.00 1500.00 947.67 943.00 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 10.00 50.00 924.00 905.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 10.00 800.00 1860.05 1716.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 5.00 800.00 1107.12 1013.99 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 3.00 2000.00 2115.00 1260.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 10.00 900.00 1394.97 400.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 4.00 500.00 1736.18 2000.00 C R600-283 VARIOUS 08/10/06 4.00 600.00 622.00 760.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 2.00 1000.00 750.00 1000.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 1.00 1000.00 1339.63 1000.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 2.00 1200.00 1051.58 1500.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 2.00 1500.00 1293.56 1050.00 AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR . 2.00 200.00 503.53 . NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 1.00 2000.00 920.00 340.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 2.00 850.00 4127.09 2375.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 95.00 751.58 1204.39 1097.43 STA R600-279 SH 121 (WADSWORTH) FROM KEN C 10/05/06 2.00 100.00 514.98 150.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 27.00 800.00 1152.77 1500.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 2.00 500.00 1775.69 1050.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 1.00 1000.00 2860.00 3500.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 1.00 550.00 916.43 820.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 1.00 1100.00 1058.36 850.00 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 4.00 1200.00 1077.00 800.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 1.00 1300.00 2290.00 500.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.00 1800.00 1432.00 1510.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 2.00 1000.00 1026.14 550.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 1.00 1500.00 1500.00 1300.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1.00 1800.00 2733.97 1000.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 2.00 600.00 722.54 560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 46.00 866.30 1223.46 1256.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 243.00 876.58 1153.46 1157.53 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 89 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00050 Storm Drain Inlet Protection Each =================================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 30.00 500.00 258.05 150.00 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 2.00 1200.00 578.79 83.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 18.00 285.00 266.99 260.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 8.00 250.00 261.64 326.57 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 31.00 200.00 140.60 164.41 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 36.00 200.00 197.20 184.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 20.00 200.00 275.32 355.95 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 14.00 250.00 216.75 152.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 159.00 285.72 230.60 207.08 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 20.00 200.00 165.20 68.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 27.00 300.00 189.59 175.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 8.00 200.00 178.14 175.00 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 4.00 175.00 227.33 167.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 9.00 300.00 405.23 210.00 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 2.00 110.00 212.95 260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 70.00 247.43 203.65 150.90 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 5.00 160.00 272.50 220.00 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 19.00 120.00 206.81 275.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 14.00 150.00 287.98 400.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 50.00 130.00 348.88 120.00 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 32.00 200.00 215.60 165.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 75.00 200.00 261.93 275.00 C R600-283 VARIOUS 08/10/06 4.00 250.00 191.67 185.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 2.00 250.00 225.00 250.00 AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR 09/14/06 30.00 120.00 179.14 165.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 25.00 175.00 396.39 125.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 256.00 166.23 274.10 207.61 STA R600-279 SH 121 (WADSWORTH) FROM KEN C 10/05/06 20.00 110.00 176.28 120.00 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 4.00 250.00 275.00 275.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 33.00 300.00 260.33 400.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 3.00 150.00 356.84 275.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 90 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00050 Storm Drain Inlet Protection Each =================================================== IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 18.00 210.00 140.21 150.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 24.00 160.00 166.07 215.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 2.00 200.00 287.39 370.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 104.00 207.40 203.26 251.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 589.00 215.41 244.07 208.43 =============== 208-00051 Storm Drain Inlet Protection (Type 1) Lin Foot =============================================== STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 15.00 10.00 53.46 17.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 164.00 14.00 10.75 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 179.00 13.66 15.13 15.17 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 14.00 18.00 21.13 11.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.00 18.00 21.13 11.90 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 80.00 15.00 9.55 3.09 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 150.00 15.00 57.42 22.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 246.00 15.00 76.08 18.50 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 90.00 15.00 15.79 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 566.00 15.00 53.99 16.85 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 89.00 15.00 52.86 95.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 89.00 15.00 52.86 95.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 848.00 14.77 45.49 24.68 =============== 208-00055 Rigid Inlet Prot Device Each =================================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 2.00 500.00 853.89 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 91 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00055 Rigid Inlet Prot Device Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 8.00 500.00 555.69 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 500.00 600.88 820.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 18.00 600.00 1739.41 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 600.00 1739.41 1000.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 20.00 450.00 454.98 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 450.00 454.98 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48.00 516.67 884.01 754.17 =============== 208-00060 Temporary Slope Drain Lin Foot =============================================== ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 1,000.00 25.00 20.18 20.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 700.00 20.00 24.26 13.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,700.00 22.94 21.12 17.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,700.00 22.94 21.12 17.44 =============== 208-00070 Stabilized Construction Entrance Each =================================================== NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 1.00 1200.00 975.00 1500.00 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 1.00 700.00 1500.00 1000.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 1.00 1400.00 2076.11 500.00 STA 0343-025 US 34, WRAY WEST 01/26/06 1.00 700.00 1850.25 1400.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 3.00 1900.00 1798.49 2513.45 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 2.00 1400.00 1840.98 1800.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 7.00 1250.00 1499.83 2000.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 1.00 1200.00 1054.45 1137.78 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 1.00 1250.00 1675.14 600.85 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 1.00 1400.00 2975.00 3600.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 2.00 1000.00 1783.33 850.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 3.00 1100.00 700.00 700.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 3.00 1200.00 1505.00 1500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 92 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00070 Stabilized Construction Entrance Each =================================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 4.00 1500.00 1179.00 820.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 1.00 1100.00 1526.48 1809.44 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 2.00 1250.00 1122.50 540.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 34.00 1282.35 1573.74 1451.42 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 1.00 1000.00 1300.00 600.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 1.00 1500.00 1205.14 500.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 5.00 1500.00 2184.58 3253.74 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 1.00 1200.00 2667.80 1750.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 1.00 1500.00 2037.50 1250.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 2.00 1200.00 2799.86 3000.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 3.00 1600.00 993.06 525.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 1.00 1250.00 2083.33 3000.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 5.00 1500.00 1676.67 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 1432.50 1836.83 2047.19 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 4.00 1500.00 1503.46 2711.35 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 1.00 1500.00 1939.40 1500.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 3.00 1500.00 1550.00 900.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 9.00 1500.00 1114.53 1500.00 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 1.00 1500.00 1076.00 600.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 10.00 1500.00 1469.45 520.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 5.00 1200.00 1516.48 3965.18 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 6.00 1500.00 1657.61 1200.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 18.00 1500.00 1416.05 1000.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 2.00 1750.00 1410.50 1000.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 1500.00 1525.24 1150.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 1.00 2000.00 1540.00 1080.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 3.00 1700.00 2522.53 3312.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 64.00 1501.56 1468.98 1461.55 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 10.00 1500.00 1372.31 2200.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 2.00 1500.00 1637.70 1600.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 1.00 1500.00 1233.82 1420.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.00 1800.00 1772.40 1912.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 3.00 1500.00 1350.57 900.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 93 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00070 Stabilized Construction Entrance Each =================================================== NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 2.00 1600.00 1324.78 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19.00 1526.32 1403.09 1770.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 137.00 1440.51 1520.40 1587.32 =============== 208-00100 Sediment Removal and Disposal LUMP SUM =============================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 1.00 8000.00 2962.00 5622.00 IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 1.00 3500.00 2805.95 4000.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 1.00 4500.00 3166.67 5000.00 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 1.00 4000.00 5127.94 3000.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 4000.00 10586.84 10000.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 1.00 2000.00 2080.28 1271.12 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 1.00 3000.00 5217.13 3968.51 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 1.00 3500.00 3660.00 2600.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 10000.00 15250.00 12100.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 1.00 2500.00 937.50 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 4500.00 5659.20 4906.16 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 1.00 5000.00 21567.20 5500.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 1.00 3000.00 1232.69 585.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 1.00 5000.00 6648.60 10845.81 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 1.00 2500.00 2289.00 1500.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 1.00 3500.00 3990.77 3000.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 1.00 3600.00 3000.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 3766.67 5475.91 3821.80 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 4000.00 18026.89 8134.05 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 1.00 1500.00 2670.96 4766.30 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1.00 6000.00 5000.00 5000.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 1.00 15000.00 19950.40 5200.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 1.00 4000.00 2581.17 4243.50 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 4500.00 11191.50 3700.99 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 10000.00 17937.46 6000.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 3000.00 6511.94 3500.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 3200.00 41293.40 28432.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 5688.89 14537.33 7664.12 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 94 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00100 Sediment Removal and Disposal LUMP SUM =============================================== IM 0252-384 I-25 OVER BROADWAY 11/09/06 1.00 5000.00 4479.52 4800.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.00 3500.00 4077.20 3186.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 1.00 5000.00 2036.71 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 4500.00 3523.96 2778.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 4725.00 7963.12 5332.34 =============== 208-00110 Sediment Removal and Disposal Cubic Yard ============================================= IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 700.00 6.00 183.58 46.50 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 15.00 65.00 50.50 49.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 715.00 7.24 182.45 46.55 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 80.00 25.00 44.72 50.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 100.00 40.00 43.48 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 180.00 33.33 44.03 27.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 895.00 12.49 154.33 42.78 =============== 208-00200 Erosion Control Supervisor LUMP SUM =============================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 1.00 5000.00 14040.00 11200.00 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 1.00 10000.00 3344.00 2100.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 1.00 2000.00 7800.00 11200.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 1.00 4000.00 3833.33 4500.00 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 1.00 4000.00 2733.33 3200.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 1.00 3000.00 3451.78 5000.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 1.00 7000.00 6000.00 6000.00 STA 0343-025 US 34, WRAY WEST 01/26/06 1.00 5000.00 3675.00 2500.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1.00 11000.00 8562.71 18350.54 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 1.00 8000.00 8451.18 6600.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 1.00 3000.00 7232.70 10000.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 1.00 7000.00 10466.67 10000.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 1.00 2000.00 4933.33 1000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 95 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00200 Erosion Control Supervisor LUMP SUM =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 5000.00 12350.64 2000.00 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 1.00 4000.00 3962.50 1750.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 1.00 6000.00 3425.60 3900.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 1.00 5000.00 2500.00 2500.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 1.00 7000.00 8141.67 4500.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 8000.00 16126.00 30030.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 1.00 2000.00 2335.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 5400.00 7083.16 6891.53 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 1.00 2500.00 2533.33 1100.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 1.00 6000.00 41908.57 10000.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 1.00 3000.00 3191.00 3500.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 1.00 8000.00 13793.33 25000.00 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 1.00 4000.00 3875.00 5750.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 1.00 5500.00 3725.00 2200.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 1.00 10000.00 13500.00 17000.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 1.00 10000.00 3133.33 1900.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 1.00 10000.00 18733.33 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 6555.56 10925.38 7938.89 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 5000.00 11639.00 15000.00 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 1.00 5000.00 4683.54 4000.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1.00 5000.00 12250.00 20500.00 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 1.00 4000.00 3000.00 5000.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1.00 15000.00 13951.24 7000.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 1.00 10000.00 21064.01 3200.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 1.00 5000.00 3571.67 4715.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 6000.00 24380.00 25000.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 5000.00 17459.57 10438.28 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 1.00 20000.00 11010.00 5040.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 500.00 13595.54 25000.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1.00 8000.00 12071.83 5000.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 1.00 4000.00 4250.00 3500.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 1.00 5000.00 3674.50 1000.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 1.00 10000.00 8500.00 12000.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 4300.00 9180.91 20000.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 1.00 3000.00 1625.00 1750.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 1.00 8000.00 3108.33 1650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 6822.22 10705.28 9432.96 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 96 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00200 Erosion Control Supervisor LUMP SUM =============================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 8000.00 14875.82 15000.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 1.00 5000.00 6575.60 2400.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 1.00 5200.00 8590.00 17250.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 1.00 3750.00 5481.17 4500.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 1.00 4500.00 6525.00 1000.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.00 6000.00 5026.40 3832.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1.00 22000.00 41187.85 150000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 7778.57 11334.84 27711.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54.00 6375.00 9510.83 10612.14 =============== 208-00205 Erosion Control Supervisor Hour =================================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 80.00 60.00 51.73 75.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 104.00 80.00 73.28 83.10 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 20.00 100.00 91.93 107.72 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 120.00 75.00 86.69 98.66 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 70.00 80.00 63.45 42.00 AQC R600-241 SH 287 (FEDERAL BLVD), 52ND A 03/16/06 20.00 100.00 70.59 60.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 80.00 75.00 69.76 76.67 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 112.00 90.00 77.13 92.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 40.00 75.00 72.25 73.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 40.00 75.00 78.42 74.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 686.00 78.43 73.32 80.33 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 20.00 100.00 102.04 110.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 50.00 75.00 93.61 105.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 45.00 75.00 90.44 115.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 160.00 80.00 131.92 85.00 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 32.00 130.00 93.55 75.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 50.00 60.00 195.00 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 357.00 81.47 118.54 93.49 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 80.00 80.00 94.25 80.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 97 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00205 Erosion Control Supervisor Hour =================================================== STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 120.00 50.00 84.89 102.00 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 100.00 100.00 82.35 125.00 C R600-283 VARIOUS 08/10/06 100.00 80.00 37.33 61.00 AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR 09/14/06 124.00 80.00 63.24 30.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 375.00 80.00 105.77 85.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 899.00 78.22 84.15 81.14 STA R600-279 SH 121 (WADSWORTH) FROM KEN C 10/05/06 40.00 60.00 83.65 60.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 112.00 85.00 84.57 105.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 80.00 100.00 64.71 20.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 190.00 75.00 100.57 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 422.00 80.97 88.10 82.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,364.00 79.26 86.26 82.99 =============== 208-00300 Temporary Berms Lin Foot =============================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 352.00 5.00 7.35 9.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 352.00 5.00 7.35 9.50 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 3,000.00 1.50 3.77 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,000.00 1.50 3.77 3.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 172.00 8.00 9.88 17.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2,500.00 5.00 3.96 1.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,672.00 5.19 4.24 2.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,024.00 3.34 4.28 3.05 =============== 209-00000 Water M Gallon =============================================== NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 250.00 30.00 13.60 3.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 250.00 30.00 13.60 3.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 30.00 13.60 3.80 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 98 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 209-00100 Water (Landscaping) M Gallon =============================================== IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1,903.00 45.00 32.13 36.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,903.00 45.00 32.13 36.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,903.00 45.00 32.13 36.31 =============== 209-00200 Time-Released Water Product Each =================================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 96.00 10.00 16.30 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 96.00 10.00 16.30 12.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1,200.00 6.00 8.95 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,200.00 6.00 8.95 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,296.00 6.30 9.49 3.67 =============== 209-00600 Dust Palliative (Mg Cl) Gallon ================================================= STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 16,778.00 0.85 0.75 0.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,778.00 0.85 0.75 0.70 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 100.00 25.00 28.11 52.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 25.00 28.11 52.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,878.00 0.99 0.86 1.01 =============== 210-00001 Res Structure Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1.00 1000.00 384.87 468.33 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 5000.00 3568.56 5000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 99 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00001 Res Structure Each =================================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 1000.00 2935.00 6600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 2333.33 2445.84 4022.78 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 1000.00 850.63 650.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 8.00 600.00 294.48 166.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 644.44 420.06 220.16 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 2500.00 2160.37 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2500.00 2160.37 1100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 1176.92 1234.02 1165.37 =============== 210-00010 Res Mailbox Str Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 6.00 275.00 282.76 164.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 275.00 282.76 164.81 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 2.00 250.00 436.50 349.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 250.00 436.50 349.50 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 4.00 170.00 256.87 217.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 170.00 256.87 217.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 235.83 292.53 213.15 =============== 210-00011 Res Mailbox Str (Ty 1) Each =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 11.00 200.00 339.00 420.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 100 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00011 Res Mailbox Str (Ty 1) Each =================================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 1.00 300.00 175.32 117.60 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 9.00 200.00 383.00 432.00 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 17.00 160.00 205.50 175.00 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 22.00 200.00 219.00 200.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 17.00 250.00 144.94 135.50 STA 0343-025 US 34, WRAY WEST 01/26/06 19.00 200.00 149.94 133.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 1.00 200.00 246.67 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 97.00 202.78 208.36 216.82 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 2.00 200.00 239.45 208.36 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 15.00 200.00 228.75 166.25 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 1.00 350.00 338.75 325.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 2.00 350.00 190.35 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 222.50 233.24 176.77 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 12.00 150.00 308.99 300.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 3.00 350.00 280.00 350.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 225.00 297.22 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 192.19 305.71 309.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 133.00 204.47 223.33 221.93 =============== 210-00012 Res Mailbox Str (Ty 2) Each =================================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 1.00 450.00 275.00 137.00 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 1.00 260.00 277.33 300.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 6.00 300.00 228.33 177.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 313.75 234.47 187.75 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 2.00 250.00 280.98 260.44 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 2.00 300.00 344.17 277.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 275.00 312.57 268.97 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 101 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00012 Res Mailbox Str (Ty 2) Each =================================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 3.00 250.00 332.24 325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 250.00 332.24 325.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 290.67 261.48 236.86 =============== 210-00013 Res Mailbox Str (Ty 3) Each =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 5.00 260.00 464.00 420.00 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 1.00 600.00 467.80 210.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 1.00 260.00 458.00 432.00 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 6.00 375.00 268.50 300.00 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 1.00 360.00 319.00 350.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 2.00 350.00 354.08 317.10 STA 0343-025 US 34, WRAY WEST 01/26/06 2.00 260.00 320.78 310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 332.78 385.19 341.46 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 2.00 400.00 412.24 416.71 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 6.00 375.00 433.33 330.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 1.00 600.00 576.25 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 405.56 449.23 373.71 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 3.00 300.00 359.49 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 300.00 359.49 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 351.33 397.12 351.99 =============== 210-00015 Res End Section Each =================================================== STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 2.00 1200.00 3250.33 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1200.00 3250.33 2500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 102 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00015 Res End Section Each =================================================== IM 0252-384 I-25 OVER BROADWAY 11/09/06 1.00 400.00 593.34 475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 400.00 593.34 475.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 933.33 1732.05 1825.00 =============== 210-00050 Res Fire Hydrant Each =================================================== IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 13.00 2900.00 4700.00 4000.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 2300.00 3778.16 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 2857.14 4559.72 4071.43 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2.00 3500.00 1999.56 4756.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 3500.00 1999.56 4756.50 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.00 4500.00 4612.80 2514.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 4500.00 4612.80 2514.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 3029.41 4144.37 4060.41 =============== 210-00065 Res Monument (Ty 3A) Each =================================================== NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 10.00 625.00 701.19 790.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 625.00 701.19 790.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 625.00 701.19 790.00 =============== 210-00090 Res Delineator Each =================================================== IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 5.00 100.00 25.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 100.00 25.00 25.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 103 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00090 Res Delineator Each =================================================== STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 150.00 18.00 14.64 16.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 150.00 18.00 14.64 16.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 155.00 20.65 14.72 16.53 =============== 210-00425 Res Bridge Railing Lin Foot =============================================== C 0702-258 I70 - ROCKFALL IN GLENWOOD CA 01/06/06 50.00 20.00 116.67 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 20.00 116.67 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 20.00 116.67 50.00 =============== 210-00500 Reb Port Present Str Each =================================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 10.00 15000.00 8019.65 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 15000.00 8019.65 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 15000.00 8019.65 5000.00 =============== 210-00750 Res Light Standard Each =================================================== IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 7.00 600.00 1202.07 1320.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 1.00 2000.00 1149.00 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 775.00 1198.53 1317.50 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 2.00 3500.00 3500.00 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 3500.00 3500.00 3500.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1.00 1000.00 2815.69 2800.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 104 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00750 Res Light Standard Each =================================================== IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 3.00 1500.00 2323.64 1904.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 1375.00 2468.36 2128.41 IM 0252-384 I-25 OVER BROADWAY 11/09/06 1.00 1500.00 7693.75 4500.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 33.00 1000.00 1149.97 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 34.00 1014.71 1452.57 1102.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48.00 1108.33 1476.86 1324.03 =============== 210-00760 Res Luminaire Each =================================================== BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 1.00 800.00 285.93 400.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 3.00 500.00 202.91 211.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 575.00 230.58 258.72 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 6.00 400.00 335.88 330.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 2.00 500.00 424.03 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 425.00 363.93 360.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 475.00 325.21 326.24 =============== 210-00809 Res Blank Sign (Fib Opt) Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 2.00 2600.00 2503.96 3172.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2600.00 2503.96 3172.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2600.00 2503.96 3172.79 =============== 210-00810 Res Ground Sign Each =================================================== STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 1.00 175.00 1404.60 161.19 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 105 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00810 Res Ground Sign Each =================================================== STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 4.00 155.00 270.68 282.05 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 38.00 185.00 95.67 110.25 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 13.00 250.00 206.14 262.68 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 11.00 200.00 145.83 165.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 15.00 160.00 425.97 500.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 3.00 150.00 225.82 163.29 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 1.00 100.00 195.02 170.08 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 1.00 250.00 450.37 489.21 SHE 0911-004 SH 91 & SH 67 GUARDRAIL 03/09/06 6.00 200.00 87.60 98.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 1.00 200.00 248.03 200.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 5.00 220.00 230.00 250.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 12.00 200.00 129.20 160.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 12.00 400.00 197.50 200.00 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 4.00 250.00 100.00 100.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 3.00 500.00 168.25 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 130.00 220.58 185.47 204.58 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 5.00 180.00 309.00 305.00 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 2.00 250.00 185.25 161.25 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 3.00 200.00 223.00 225.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 30.00 105.00 284.71 300.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 17.00 260.00 264.00 264.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 1.00 350.00 192.98 150.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 2.00 200.00 205.33 140.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 18.00 250.00 152.09 121.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 78.00 190.00 234.30 238.76 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 1.00 220.00 262.51 350.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 8.00 300.00 217.50 330.00 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 2.00 250.00 505.00 760.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 12.00 199.00 146.74 265.22 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 3.00 160.00 313.99 300.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 45.00 150.00 286.75 318.98 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 4.00 200.00 168.24 90.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 6.00 250.00 225.00 250.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 24.00 200.00 247.92 275.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 3.00 300.00 195.00 84.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 3.00 150.00 370.83 375.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 111.00 190.88 254.21 295.36 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 106 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00810 Res Ground Sign Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 225.00 741.99 1100.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 14.00 260.00 312.10 420.50 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 1.00 250.00 593.52 600.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 4.00 280.00 205.82 210.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 34.00 110.00 163.09 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 55.00 167.27 216.95 327.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 374.00 197.55 213.81 256.77 =============== 210-00815 Res Sign Panel Each =================================================== NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 9.00 85.00 45.50 65.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 1.00 85.00 135.90 110.25 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 2.00 120.00 39.97 40.86 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 10.00 450.00 46.12 50.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 1.00 150.00 116.66 81.64 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 125.00 274.90 53.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 1.00 150.00 80.21 82.14 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 10.00 120.00 82.89 10.85 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 5.00 80.00 54.93 21.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 190.38 67.28 42.71 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 3.00 150.00 43.19 28.80 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 1.00 120.00 144.76 139.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 142.50 57.70 56.48 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 22.00 90.00 196.98 149.43 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 46.00 50.00 37.99 15.95 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 80.00 58.58 25.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 5.00 50.00 397.07 70.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 4.00 125.00 135.13 105.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 78.00 65.51 109.96 61.76 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 107 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00815 Res Sign Panel Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 75.00 459.42 600.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 1.00 80.00 137.34 28.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 7.00 85.00 88.48 57.40 IM R600-292 70TH AVE AT I-25/BLAKE AND 20 11/30/06 3.00 150.00 472.69 125.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 8.00 150.00 90.08 26.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 2.00 50.00 55.72 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22.00 113.64 169.39 77.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 144.00 109.69 107.51 58.67 =============== 210-00820 Res Var Mesg Sign Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 3500.00 8587.83 2579.30 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 1500.00 6624.04 6500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2500.00 7496.83 4539.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2500.00 7496.83 4539.65 =============== 210-00825 Res Flashing Beacon Each =================================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 2.00 1500.00 618.20 461.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1500.00 618.20 461.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 2.00 2000.00 1477.75 2593.25 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2.00 800.00 1042.88 720.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 1800.00 1270.11 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 1480.00 1221.23 1565.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 1485.71 1026.70 1249.79 =============== 210-00831 Res Traf Sig Head Each =================================================== BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 3.00 350.00 315.93 350.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 108 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00831 Res Traf Sig Head Each =================================================== IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 19.00 400.00 364.76 529.04 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 21.00 400.00 344.40 128.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 43.00 396.51 348.69 320.69 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 10.00 350.00 497.14 600.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 52.00 350.00 581.99 660.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 62.00 350.00 568.30 650.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 105.00 369.05 472.25 515.33 =============== 210-00840 Res Traf Sig Pole Each =================================================== BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 1.00 2500.00 3893.92 3000.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 2500.00 2439.77 3809.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2500.00 3312.26 3404.55 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 5.00 2800.00 5867.61 6200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 2800.00 5867.61 6200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 2714.29 5137.51 5401.30 =============== 210-00845 Res Traf Sig Cntrlr Each =================================================== NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 1.00 1000.00 2166.85 1850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1000.00 2166.85 1850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 2166.85 1850.00 =============== 210-00848 Res Traf Sig Control+Cab Each =================================================== STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 1.00 2500.00 2573.41 2680.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2500.00 2573.41 2680.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 109 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00848 Res Traf Sig Control+Cab Each =================================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 2.00 2500.00 3726.80 4250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2500.00 3726.80 4250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2500.00 3342.33 3726.67 =============== 210-00855 Res Traf Sig Control Cab Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 1400.00 1785.58 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1400.00 1785.58 800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1400.00 1785.58 800.00 =============== 210-00860 Res Ped Push Button Each =================================================== BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 2.00 260.00 106.86 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 260.00 106.86 200.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 1.00 250.00 99.67 63.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 250.00 99.67 63.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 256.67 104.21 154.33 =============== 210-00865 Res Ped Sig Head Each =================================================== STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 8.00 270.00 201.40 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 270.00 201.40 40.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 1.00 40.00 129.44 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 40.00 129.44 105.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 244.44 190.68 47.22 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 110 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00866 Res Fire Preempt Unit+Timer Each =================================================== SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 2.00 850.00 1117.14 465.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 800.00 299.20 281.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 12.00 750.00 538.00 265.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 766.67 641.19 292.73 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 300.00 728.62 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 300.00 728.62 800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 737.50 647.27 324.44 =============== 210-00870 Res Coordination Unit Each =================================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 500.00 430.00 400.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 4.00 400.00 427.50 375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 420.00 428.10 380.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 1.00 400.00 562.72 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 400.00 562.72 600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 416.67 461.75 416.67 =============== 210-00890 Res Int Detect Sys (Camera) Each =================================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 10.00 1100.00 1229.35 1350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 1100.00 1229.35 1350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 1100.00 1229.35 1350.00 =============== 210-01000 Res Fence Lin Foot =============================================== STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 50.00 45.00 59.67 60.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 111 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01000 Res Fence Lin Foot =============================================== STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 200.00 10.00 10.93 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 250.00 17.00 18.62 34.40 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 150.00 15.00 3.50 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 150.00 15.00 3.50 3.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 430.00 10.00 2.82 3.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 30.00 50.00 20.89 27.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 460.00 12.61 4.63 4.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 860.00 14.30 8.19 12.98 =============== 210-01011 Res Gate Each =================================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 2.00 600.00 687.39 1000.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1.00 500.00 409.28 522.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 566.67 594.68 840.80 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 6.00 250.00 243.50 220.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 250.00 243.50 220.50 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 1.00 700.00 861.03 383.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 700.00 861.03 383.09 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 400.00 96.38 100.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 112 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01011 Res Gate Each =================================================== IM 0252-384 I-25 OVER BROADWAY 11/09/06 1.00 400.00 661.13 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 400.00 443.92 170.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 391.67 441.98 380.71 =============== 210-01050 Res C L Fence Lin Foot =============================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 100.00 25.00 15.14 18.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 209.00 12.00 11.85 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 309.00 16.21 12.91 12.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 309.00 16.21 12.91 12.93 =============== 210-01130 Res Gdrail Ty 3 Lin Foot =============================================== IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 9,175.00 7.50 11.22 10.65 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 4,013.00 8.00 8.29 8.25 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 486.00 15.00 11.60 8.50 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 150.00 15.00 25.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13,824.00 7.99 10.11 10.03 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 250.00 15.00 17.34 33.60 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 287.50 10.00 9.84 9.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 537.50 12.33 14.60 20.58 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1,834.00 8.00 6.96 5.40 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 213.00 22.00 6.94 6.75 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 138.00 15.00 6.95 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,185.00 9.81 6.96 5.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,546.50 8.37 9.76 9.78 =============== 210-01136 Res Gdrail Ty 3 (Dbl) Lin Foot =============================================== IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 2,125.00 10.00 18.40 18.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,125.00 10.00 18.40 18.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,125.00 10.00 18.40 18.20 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 113 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01140 Res Gdrail Ty 4 Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1,030.00 12.00 6.55 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,030.00 12.00 6.55 3.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,030.00 12.00 6.55 3.50 =============== 210-01170 Res Gdrail Ty 7 Lin Foot =============================================== IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 1,000.00 14.00 46.00 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,000.00 14.00 46.00 23.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,000.00 14.00 46.00 23.00 =============== 210-01180 Reset Guardrail (Special) Lin Foot =============================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 17,386.00 15.00 6.94 6.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17,386.00 15.00 6.94 6.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,386.00 15.00 6.94 6.75 =============== 210-01200 Res End Anchorage Each =================================================== NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 2.00 500.00 996.90 777.60 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 5.00 500.00 351.67 355.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 500.00 576.10 475.74 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 12.00 175.00 162.83 163.50 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 4.00 400.00 806.03 830.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 231.25 279.78 330.13 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 2.00 350.00 264.25 360.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 114 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01200 Res End Anchorage Each =================================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2.00 500.00 518.71 504.50 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1.00 450.00 476.16 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 430.00 418.44 416.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 333.93 390.63 381.86 =============== 210-01700 Res Sprinkler Head Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 10.00 60.00 61.23 60.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 4.00 100.00 182.50 52.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 71.43 88.18 57.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 71.43 88.18 57.86 =============== 210-01710 Res Valve Each =================================================== STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1.00 100.00 2000.00 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 100.00 2000.00 700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 100.00 2000.00 700.00 =============== 210-01720 Res Air Vent Each =================================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1.00 1500.00 1537.40 1850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1500.00 1537.40 1850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1500.00 1537.40 1850.00 =============== 210-02510 Relay Sprinkler System LUMP SUM =============================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 10000.00 10831.09 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 10831.09 25000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 10831.09 25000.00 =============== 210-02900 Relay Riprap Cubic Yard ============================================= IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 3.20 27.00 191.38 58.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.20 27.00 191.38 58.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.20 27.00 191.38 58.14 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 115 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-03100 Replace Conc Pvmt Sq Yard ================================================ NH R200-140 I-25, SH 47, 50, 115 CRACK RE 03/30/06 708.00 125.00 133.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 708.00 125.00 133.00 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 708.00 125.00 133.00 90.00 =============== 210-04000 Adj Structure Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 2.00 1850.00 1554.93 2403.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1850.00 1554.93 2403.63 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1.00 2000.00 1156.60 1036.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2000.00 1156.60 1036.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 2500.00 1104.55 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2500.00 1104.55 1300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 2140.00 1300.88 1688.65 =============== 210-04010 Adj Manhole Each =================================================== NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 5.00 550.00 460.00 500.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 1.00 500.00 1233.33 1500.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 45.00 1000.00 1350.00 750.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 450.00 609.37 430.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 2.00 350.00 517.48 354.92 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 84.00 300.00 419.44 390.75 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 500.00 497.60 508.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 18.00 300.00 553.47 590.41 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 2.00 700.00 618.75 660.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 39.00 700.00 1015.00 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 198.00 551.52 708.67 602.36 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 116 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04010 Adj Manhole Each =================================================== NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 28.00 300.00 537.74 495.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 54.00 350.00 435.00 430.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 26.00 300.00 564.07 575.00 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 5.00 650.00 575.00 550.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 1.00 225.00 220.00 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 114.00 338.38 502.05 482.46 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 74.00 350.00 408.75 340.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1.00 500.00 700.00 400.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 3.00 500.00 555.99 600.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 5.00 600.00 769.54 408.63 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 2.00 400.00 460.00 350.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2.00 500.00 619.18 565.25 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2.00 300.00 654.24 500.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 3.00 400.00 800.00 400.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 10.00 450.00 689.54 600.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 3.00 1866.67 722.94 593.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 105.00 424.76 487.14 392.52 IM 0252-384 I-25 OVER BROADWAY 11/09/06 7.00 350.00 606.32 465.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 6.00 600.00 859.40 697.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 4.00 500.00 1656.11 1400.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1.00 900.00 1263.05 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 497.22 834.22 846.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 435.00 462.82 598.17 530.39 =============== 210-04015 Modify Manhole Each =================================================== IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 45.00 2500.00 1733.33 800.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 6.00 1300.00 3585.59 1150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 51.00 2358.82 2172.85 841.18 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 117 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04015 Modify Manhole Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 8.00 1500.00 1733.59 1500.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 1630.00 2499.21 1187.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 1514.44 1772.52 1465.29 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 1200.00 1742.28 1600.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 2.00 1500.00 1629.44 1800.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.00 1500.00 1763.60 558.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1425.00 1676.94 1439.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 64.00 2181.72 2033.49 966.34 =============== 210-04016 Modify Manhole (Spec) Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2.00 4500.00 2818.47 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 4500.00 2818.47 1300.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 2400.00 2443.97 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2400.00 2443.97 2200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 3800.00 2719.92 1600.00 =============== 210-04020 Modify Inlet Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 5.00 1500.00 1183.36 640.00 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 1.00 200.00 1131.57 360.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 4.00 2000.00 2655.54 3066.62 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 1.00 1500.00 1678.75 2405.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 1563.64 1515.87 1657.41 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 1500.00 2147.85 1200.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 118 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04020 Modify Inlet Each =================================================== NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 1.00 2000.00 1405.00 810.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 2.00 2450.00 2504.99 771.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 2100.00 2191.66 888.48 IM 0252-384 I-25 OVER BROADWAY 11/09/06 5.00 1400.00 2590.06 3000.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 1.00 1500.00 2622.50 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 1416.67 2593.01 3083.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 1623.81 2007.59 1918.35 =============== 210-04025 Modify Structure Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 5000.00 2928.18 7000.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 5.00 3000.00 1079.57 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 3333.33 1284.97 2083.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 3333.33 1284.97 2083.33 =============== 210-04030 Modify Guardrail Lin Foot =============================================== IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 75.00 5.50 70.00 40.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 3,138.00 7.00 21.00 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,213.00 6.96 23.24 21.44 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 6,212.50 8.00 4.69 3.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,212.50 8.00 4.69 3.15 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 2,275.00 18.00 11.95 11.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,275.00 18.00 11.95 11.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,700.50 9.66 7.83 9.80 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 119 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04050 Adj Valve Box Each =================================================== NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 3.00 150.00 385.00 350.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 21.00 500.00 430.00 350.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2.00 200.00 290.55 270.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 12.00 200.00 242.48 179.90 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 138.00 200.00 222.38 201.53 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 40.00 200.00 203.84 241.53 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 2.00 300.00 435.00 550.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 46.00 450.00 750.00 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 264.00 267.61 293.25 310.12 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 46.00 200.00 236.83 290.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 60.00 200.00 214.20 155.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 70.00 200.00 253.06 300.00 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 12.00 450.00 406.67 450.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 1.00 250.00 247.00 247.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 189.00 216.14 245.35 260.78 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 110.00 200.00 178.75 180.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 2.00 300.00 340.00 300.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 8.00 350.00 351.44 204.32 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 5.00 350.00 266.57 402.50 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2.00 200.00 289.79 225.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 3.00 250.00 350.00 250.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 7.00 250.00 339.60 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 137.00 219.34 206.48 198.34 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 250.00 303.19 500.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 29.00 300.00 317.60 223.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 3.00 250.00 617.22 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 33.00 293.94 334.11 302.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 623.00 242.78 259.83 270.14 =============== 210-04051 Adj Valve Box (Spec) Each =================================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 19.00 500.00 857.46 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19.00 500.00 857.46 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 500.00 857.46 400.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 120 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04060 Adj Water Meter Each =================================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 750.00 582.08 589.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 750.00 582.08 589.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 750.00 582.08 589.75 =============== 210-04200 Adj Gdrail Lin Foot =============================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 13,150.00 2.50 4.68 4.20 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 702.00 5.00 3.93 3.80 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 19,200.00 5.00 2.68 2.05 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 1,889.00 4.00 4.00 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 34,941.00 4.01 3.76 3.00 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 303.00 7.00 14.17 14.25 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 3,216.00 4.00 1.97 1.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,519.00 4.26 3.02 2.96 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 1,458.00 7.00 6.86 7.07 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 40.00 15.00 32.69 33.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,498.00 7.21 7.77 7.77 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 27,940.00 3.00 1.63 1.50 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 3,413.00 4.00 1.59 1.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 31,353.00 3.11 1.63 1.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 71,311.00 3.69 2.70 2.44 =============== 211-00212 1-1/2 In Core Drilled Hole Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 324.00 25.00 42.18 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 324.00 25.00 42.18 13.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 324.00 25.00 42.18 13.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 121 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 211-01123 Rock Reinf (Perm A) Lin Foot =============================================== NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 600.00 45.00 118.00 84.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 600.00 45.00 118.00 84.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 600.00 45.00 118.00 84.00 =============== 211-02230 Grout Conn Each =================================================== STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 16.00 150.00 173.44 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 150.00 173.44 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 150.00 173.44 100.00 =============== 211-02270 Cement Grout Cubic Foot ============================================= STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 13,500.00 10.00 8.78 8.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,500.00 10.00 8.78 8.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,500.00 10.00 8.78 8.85 =============== 211-03005 Dewatering LUMP SUM =============================================== BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 150000.00 71456.53 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 150000.00 71456.53 20000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 150000.00 71456.53 20000.00 =============== 212-00006 Seeding (Native) Acre =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 1.00 1000.00 1235.00 1260.00 SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 01/05/06 4.00 700.00 993.40 743.00 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 4.30 700.00 657.00 735.00 SHE 0091-025 SH 9 VMS IN BRECKENRIDGE 01/05/06 0.20 7000.00 5918.91 1200.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 0.50 1000.00 2540.00 2160.00 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 0.40 1000.00 1630.00 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 122 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00006 Seeding (Native) Acre =================================================== STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 4.50 700.00 563.67 441.00 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 0.70 600.00 1193.33 1400.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 3.00 500.00 765.00 2055.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 4.00 1000.00 693.33 650.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 17.00 650.00 699.55 493.74 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 3.00 1500.00 527.33 528.00 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 0.68 1600.00 2065.00 2500.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 0.60 1600.00 2605.22 2000.00 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 0.20 4000.00 2658.17 1166.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 17.00 1200.00 1213.33 840.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 0.60 1500.00 2371.67 450.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 8.30 400.00 1005.62 900.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 0.50 1000.00 1296.57 1306.28 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 4.50 700.00 571.25 630.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 0.54 2000.00 972.92 750.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 1.00 850.00 1652.20 2000.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 0.50 1000.00 956.40 550.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 0.50 2000.00 1500.00 1500.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 9.00 900.00 1216.67 1800.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 12.12 550.00 560.10 430.50 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 0.40 2500.00 2164.00 3300.00 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 0.90 1300.00 1200.00 1200.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 0.20 2000.00 2541.67 2500.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 0.40 2500.00 2162.50 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.54 861.49 901.89 879.34 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 0.90 1100.00 1443.00 735.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 0.10 4000.00 3710.00 3000.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 0.25 2000.00 5815.57 6800.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 0.05 5000.00 7051.73 6920.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 50.00 350.00 342.57 336.45 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 3.00 550.00 393.73 387.45 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 0.12 3000.00 3896.17 5788.50 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 0.19 2500.00 5133.53 7467.06 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 0.50 1200.00 4550.40 1500.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 16.00 650.00 421.75 310.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 110.00 400.00 334.45 330.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 5.82 1000.00 620.89 695.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 0.15 3000.00 3000.00 3000.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 3.00 500.00 600.88 650.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 5.70 600.00 3733.33 2500.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 25.00 350.00 1027.33 882.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 220.78 439.65 603.46 488.54 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 123 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00006 Seeding (Native) Acre =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 45.00 400.00 386.08 268.31 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 2.50 650.00 1552.88 2200.00 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 8.45 450.00 774.79 797.50 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 2.00 600.00 1123.35 1316.70 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 0.80 2000.00 1750.00 1100.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1.50 400.00 1495.88 1730.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 0.90 1450.00 2016.62 2549.87 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 111.40 600.00 316.70 348.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 17.00 450.00 423.95 549.79 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 2.00 3000.00 2706.41 2725.63 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 5.12 650.00 1022.08 1190.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 37.00 550.00 338.34 332.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 1.70 3000.00 1775.00 3000.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 8.50 500.00 464.46 400.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 3.78 1500.00 1051.06 902.11 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 2.00 700.00 1236.28 1330.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 0.60 1500.00 2056.40 2742.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 2.50 2500.00 3710.00 620.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 21.00 844.29 1164.34 1318.30 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 1.00 1200.00 3840.15 4752.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 274.75 636.22 517.81 563.64 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 40.00 600.00 350.41 400.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 1.10 600.00 1462.29 3750.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 0.67 2000.00 1865.00 1725.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 0.50 1500.00 1560.43 1100.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 0.40 1500.00 2170.00 2832.00 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 0.90 1200.00 1718.67 1400.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 1.00 2000.00 1251.25 550.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.15 1500.00 1582.20 2001.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 0.05 5000.00 12893.86 10200.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 0.18 2000.00 6594.44 13000.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 51.00 400.00 356.14 316.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 4.70 750.00 954.42 1020.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 101.65 557.70 485.80 500.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 697.72 595.04 592.38 576.11 =============== 212-00007 Seeding (Native) (Hydraulic) Acre =================================================== STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 2.00 1600.00 1898.67 890.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1600.00 1898.67 890.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 124 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00007 Seeding (Native) (Hydraulic) Acre =================================================== ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 42.00 800.00 754.87 560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 42.00 800.00 754.87 560.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44.00 836.36 777.74 575.00 =============== 212-00028 Seeding (Wetlands) Acre =================================================== SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 1.00 2000.00 1503.75 1135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2000.00 1503.75 1135.00 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 0.10 1000.00 987.50 575.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 0.25 2000.00 2101.75 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.35 1714.29 1867.17 1735.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.35 1925.93 1573.50 1290.74 =============== 212-00032 Soil Conditioning Acre =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 1.00 700.00 3508.00 4725.00 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 4.30 1500.00 4148.00 4640.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 4.00 4000.00 1666.67 1500.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 17.00 1000.00 988.25 1086.24 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 0.20 7000.00 4868.67 2199.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 17.00 1100.00 1116.67 1300.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 0.60 1500.00 743.33 1400.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 0.50 3000.00 3477.68 2600.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 0.50 5500.00 2200.00 2200.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 9.00 1500.00 1833.33 2100.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 0.40 1000.00 4545.00 4290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 54.50 1455.05 1632.81 1753.01 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 0.25 3000.00 6879.32 6800.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 125 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00032 Soil Conditioning Acre =================================================== IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 85.00 800.00 1608.12 1600.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 5.82 2500.00 1226.88 240.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 25.00 1500.00 1520.92 1212.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 116.07 1040.76 1578.03 1459.59 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 45.00 1300.00 2345.66 1929.14 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 8.45 1000.00 2725.00 3025.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 2.00 3000.00 1016.65 1653.30 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 0.80 3000.00 3585.00 1170.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 42.00 2200.00 803.95 1100.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 2000.00 3889.00 1556.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 5.12 3000.00 3107.25 1750.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 19.00 1500.00 3013.06 3000.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 8.50 2000.00 2435.50 1650.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 0.60 3000.00 5709.40 10307.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 13.00 1300.00 4213.48 4460.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 145.47 1713.82 1979.69 2120.89 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 40.00 3000.00 2650.98 3000.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 1.60 2000.00 3143.20 6900.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 0.50 2000.00 2848.00 1100.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 0.40 2800.00 7147.82 10207.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.15 3000.00 3038.20 2871.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 0.05 2000.00 16582.14 10200.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 4.70 3500.00 3695.04 3600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 48.40 3002.48 2913.70 3231.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 364.44 1631.90 2023.32 2002.75 =============== 212-00040 Soil Preparation (Lawn) Acre =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 0.81 1000.00 3391.79 2100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.81 1000.00 3391.79 2100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.81 1000.00 3391.79 2100.00 =============== 212-00047 Soil Preparation (Spec) Acre =================================================== IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 3.00 2500.00 1084.38 908.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 126 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00047 Soil Preparation (Spec) Acre =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 8.30 2000.00 2874.20 4000.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 0.50 3000.00 1294.39 707.56 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 6.06 1500.00 3038.80 3334.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.86 1942.33 2514.69 3162.48 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 3.00 3700.00 4213.48 4460.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 3700.00 4213.48 4460.45 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 0.67 2000.00 1985.00 5750.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 1.00 2000.00 2527.50 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.67 2000.00 2280.24 2516.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.53 2180.65 2618.45 3287.42 =============== 212-00048 Soil Preparation (Spec) Cubic Yard ============================================= STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 888.00 100.00 38.52 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 888.00 100.00 38.52 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 888.00 100.00 38.52 12.00 =============== 212-00050 Sod Sq Foot ================================================ IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 5,064.00 1.00 1.28 0.60 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 100.00 4.50 14.79 17.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,164.00 1.07 1.54 0.93 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 35,445.00 0.60 0.73 0.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 35,445.00 0.60 0.73 0.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40,609.00 0.66 0.83 0.86 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 127 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00000 Mulching Acre =================================================== STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 25.00 1200.00 546.23 738.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 25.00 1200.00 546.23 738.68 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 0.06 350.00 29865.21 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.06 350.00 29865.21 1600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.06 1197.96 709.50 740.74 =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 01/05/06 4.00 600.00 993.60 743.00 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 4.30 400.00 660.40 682.00 SHE 0091-025 SH 9 VMS IN BRECKENRIDGE 01/05/06 0.20 7000.00 5973.91 1200.00 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 0.40 1000.00 1853.50 2000.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 4.50 600.00 694.02 282.05 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 0.70 550.00 1000.00 1400.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 3.00 550.00 569.44 665.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 4.00 1000.00 741.67 525.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 14.00 400.00 508.32 406.61 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 3.00 500.00 604.53 412.00 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 0.68 1600.00 2068.75 2500.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 0.60 1600.00 2305.22 1700.00 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 0.20 3500.00 2171.67 1166.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 17.00 900.00 941.67 1100.00 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 5.50 700.00 509.00 540.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 2.00 950.00 1118.40 900.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 0.50 1000.00 814.20 550.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 9.00 1000.00 920.00 1200.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 0.40 1500.00 2378.50 3850.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 0.20 2000.00 2541.67 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 74.18 755.63 789.27 805.55 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 0.90 1100.00 1548.60 893.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 0.10 3000.00 3310.00 1000.00 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 0.12 3000.00 3635.33 4006.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 128 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 0.16 2000.00 6555.23 9910.45 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 0.50 1200.00 4478.00 1500.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 150.00 400.00 232.31 230.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 3.00 700.00 642.98 700.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 3.00 500.00 638.33 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 157.78 419.38 320.22 264.10 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 60.00 400.00 294.96 255.83 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 2.50 650.00 1204.46 1800.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 3.00 700.00 1510.55 2091.10 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1.50 400.00 1199.24 650.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 171.40 400.00 337.92 320.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 55.00 550.00 339.80 337.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 10.00 600.00 448.56 400.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 2.00 700.00 662.12 652.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 0.60 1500.00 1673.00 2675.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 1.00 900.00 680.00 560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 307.00 444.09 361.09 351.63 IM 0252-384 I-25 OVER BROADWAY 11/09/06 1.10 900.00 1195.22 1370.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 0.67 2000.00 1877.00 1725.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 0.40 1500.00 1973.09 1770.00 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 0.90 1200.00 1661.33 1350.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 1.00 2000.00 1477.50 750.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.15 1500.00 1553.80 1309.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.22 1481.80 1545.43 1310.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 544.18 489.35 434.64 397.33 =============== 213-00003 Mulching (Weed Free) Acre =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 8.30 400.00 921.39 800.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 0.50 1000.00 1221.57 1306.28 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 0.54 2000.00 917.92 750.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 12.12 550.00 504.40 462.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 0.40 2500.00 2320.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21.86 574.84 742.62 644.90 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 129 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00003 Mulching (Weed Free) Acre =================================================== STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 0.25 2000.00 3783.67 4500.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 0.05 5000.00 4785.75 4575.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 75.00 250.00 236.39 232.93 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 3.00 600.00 945.08 990.15 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 16.00 650.00 405.00 275.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 5.82 600.00 633.94 690.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.12 351.50 322.12 301.74 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 8.45 400.00 762.73 715.00 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 0.80 2000.00 1640.00 880.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 4.10 1000.00 1637.64 2100.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 20.00 630.00 846.74 893.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 33.35 650.07 1016.99 996.11 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 40.00 600.00 416.60 400.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 0.50 1500.00 1415.57 1100.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 0.05 3000.00 11642.71 5500.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 32.00 300.00 443.54 520.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 4.70 650.00 592.28 530.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 77.25 486.15 460.75 465.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 232.58 460.03 524.20 487.93 =============== 213-00004 Mulching (Weed Free Straw) Acre =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 1.00 1000.00 1452.00 1260.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 0.50 1000.00 3290.00 2160.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 0.60 1500.00 1594.67 475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.10 1142.86 1898.91 1250.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 0.10 2500.00 7000.00 7000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.10 2500.00 7000.00 7000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 130 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00004 Mulching (Weed Free Straw) Acre =================================================== ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 52.00 900.00 362.63 270.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 0.90 1600.00 2933.29 2549.87 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 26.00 600.00 346.00 389.00 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 2.00 5000.00 3156.41 2725.63 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.02 800.00 1639.07 2100.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 1.70 1500.00 1350.00 1500.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 3.78 1800.00 1271.06 1842.11 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 1.00 1500.00 2244.45 2350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 88.40 967.31 478.36 519.29 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 0.18 2000.00 6927.78 14000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.18 2000.00 6927.78 14000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90.78 975.10 510.84 570.06 =============== 213-00005 Mulching (Decorative) Cubic Foot ============================================= IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1,680.00 5.00 1.99 2.55 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 4,612.00 2.00 2.96 2.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,292.00 2.80 2.58 2.29 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 780.00 3.00 3.22 2.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 780.00 3.00 3.22 2.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,072.00 2.82 2.68 2.31 =============== 213-00006 Mulching (Weed Free) Ton ==================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 6.60 500.00 338.98 361.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.60 500.00 338.98 361.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.60 500.00 338.98 361.92 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 131 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00008 Mulching (Wood Chip) Cubic Foot ============================================= IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1,247.00 3.50 1.57 1.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,247.00 3.50 1.57 1.65 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 9,007.00 2.00 2.22 2.24 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 4,580.00 2.00 3.01 2.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,587.00 2.00 2.73 2.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,834.00 2.13 2.55 2.42 =============== 213-00011 Mulching (Hydraulic) Acre =================================================== STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 2.00 1500.00 2111.67 1140.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 1.00 720.00 1591.67 1700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1240.00 1938.33 1326.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1240.00 1938.33 1326.67 =============== 213-00061 Mulch Tackifier Pound ================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 100.00 10.00 8.13 7.90 SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 01/05/06 800.00 3.00 2.75 1.55 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 860.00 2.00 1.98 2.05 SHE 0091-025 SH 9 VMS IN BRECKENRIDGE 01/05/06 40.00 18.00 12.07 5.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 100.00 10.00 10.95 10.80 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 80.00 4.50 10.65 15.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 900.00 2.00 1.98 1.45 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 140.00 2.25 3.87 4.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 600.00 2.00 2.51 2.35 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 800.00 4.00 2.38 1.90 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 2,800.00 2.00 2.34 2.90 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 588.00 3.00 2.49 2.00 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 68.00 9.00 8.25 7.50 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 120.00 2.50 4.13 5.00 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 40.00 10.00 9.54 4.24 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 3,400.00 2.25 2.27 2.20 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2,490.00 2.00 3.29 2.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 132 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00061 Mulch Tackifier Pound ================================================== IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 180.00 2.50 2.97 2.99 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 1,344.00 2.30 1.83 1.80 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 324.00 4.00 2.38 1.50 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 400.00 2.00 3.82 3.35 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 100.00 2.50 5.28 3.15 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 1,800.00 2.00 2.77 2.50 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 2,424.00 2.00 2.00 1.70 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 80.00 5.00 4.40 4.50 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 90.00 9.00 5.20 5.20 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 40.00 8.00 12.50 12.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20,708.00 2.46 2.70 2.37 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 180.00 4.00 4.06 3.20 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 200.00 1.00 5.53 0.75 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 20.00 10.00 6.90 6.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 50.00 8.00 6.43 5.75 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 10.00 5.00 8.33 5.85 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 15,000.00 1.80 1.58 1.55 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 300.00 4.00 3.38 3.75 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 24.00 10.00 13.27 6.80 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 25.00 8.00 26.69 33.38 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 100.00 6.00 5.35 6.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 3,203.00 3.50 1.85 1.75 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 30,000.00 2.00 1.58 1.60 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 100.00 3.00 5.22 5.50 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 20.00 6.00 45.00 45.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 600.00 2.00 2.54 3.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 800.00 6.00 2.93 2.50 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 5,000.00 1.40 1.94 1.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 55,632.00 2.08 1.77 1.66 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 12,000.00 1.90 1.50 1.23 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 500.00 4.00 2.65 2.00 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 1,690.00 1.60 2.32 2.04 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 600.00 3.00 2.40 0.99 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 80.00 8.00 4.75 3.50 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 300.00 1.50 1.33 2.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 10,400.00 2.30 1.49 1.50 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 180.00 10.00 4.63 2.89 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 26,080.00 2.00 1.56 1.75 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 133 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00061 Mulch Tackifier Pound ================================================== IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 3,450.00 2.00 1.33 2.07 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 200.00 15.00 4.94 2.77 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 820.00 2.00 1.83 0.91 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 10,180.00 2.00 1.61 1.60 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 255.00 5.00 3.63 5.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 2,000.00 2.50 2.36 1.65 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 378.00 4.00 5.71 8.42 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 400.00 3.00 3.97 3.85 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 120.00 4.00 8.38 22.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 200.00 3.50 3.23 4.45 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 3,907.00 2.20 2.56 2.67 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 200.00 5.00 5.35 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 73,940.00 2.16 1.70 1.78 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 12,400.00 2.00 1.50 1.50 IM 0252-384 I-25 OVER BROADWAY 11/09/06 220.00 2.00 3.62 4.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 134.00 4.00 6.14 5.70 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 50.00 2.00 4.07 1.65 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 80.00 5.00 5.94 3.60 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 180.00 4.00 6.05 7.50 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 224.00 4.00 5.88 2.50 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 186.00 3.50 5.96 6.80 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 10.00 5.00 22.19 11.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 18.00 12.00 16.37 25.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 6,000.00 1.50 1.75 1.90 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 940.00 2.50 1.96 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20,442.00 1.96 1.83 1.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 170,722.00 2.15 1.87 1.82 =============== 213-00065 Inorg Mulch Cubic Yard ============================================= IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 454.00 75.00 73.13 77.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 454.00 75.00 73.13 77.38 IM 0252-384 I-25 OVER BROADWAY 11/09/06 2,662.00 20.00 32.83 46.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,662.00 20.00 32.83 46.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,116.00 28.01 35.25 51.21 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 134 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00100 Soil Binder Acre =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 8.30 400.00 1065.89 700.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 3.00 450.00 668.50 472.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.30 413.27 984.35 639.60 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1.00 600.00 2365.00 3080.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 40.00 400.00 353.64 240.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 18.00 450.00 375.75 375.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 13.00 400.00 765.61 790.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 72.00 415.28 422.91 412.65 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 40.00 500.00 518.88 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 500.00 518.88 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 123.30 442.58 525.68 429.34 =============== 213-00300 Conc Landscape Border Lin Foot =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 281.00 15.00 12.79 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 281.00 15.00 12.79 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 281.00 15.00 12.79 10.00 =============== 213-00440 Landscape Border (1/8x4 In) Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 25.00 10.00 6.09 3.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 10.00 6.09 3.80 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 3,135.00 2.50 2.86 2.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,135.00 2.50 2.86 2.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,160.00 2.56 2.89 2.26 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 135 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00460 Landscape Border (3/16x4 In) Lin Foot =============================================== STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1,233.00 8.00 4.76 4.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,233.00 8.00 4.76 4.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,233.00 8.00 4.76 4.51 =============== 213-00500 Tree Grate Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 6.00 1000.00 1191.62 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 1000.00 1191.62 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1000.00 1191.62 1000.00 =============== 213-00700 Landscape Boulder Each =================================================== IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 28.00 200.00 228.93 220.73 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 10.00 660.00 975.00 150.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 150.00 200.00 223.29 221.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 188.00 224.47 250.21 217.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 188.00 224.47 250.21 217.89 =============== 214-00000 Landscape Maintenance LUMP SUM =============================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1.00 8000.00 9942.13 11036.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 8000.00 9942.13 11036.65 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 10000.00 40693.33 10373.33 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 20000.00 77894.16 114291.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 1.00 35000.00 36025.00 37050.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 16000.00 27583.60 27877.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 20250.00 53927.08 47398.03 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 10000.00 14011.19 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 10000.00 14011.19 10000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 16500.00 37792.30 35104.79 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 136 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00205 Deciduous Tree (5 Gal) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 25.00 75.00 98.80 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.00 75.00 98.80 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 75.00 98.80 40.00 =============== 214-00215 Deciduous Tree (1.5 In C) Each =================================================== IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 2.00 500.00 387.52 303.00 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 9.00 240.00 305.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 287.27 330.39 300.55 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 11.00 310.00 432.50 190.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 32.00 300.00 289.03 273.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 43.00 302.56 315.78 251.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54.00 299.44 320.25 261.76 =============== 214-00220 Deciduous Tree (2 In C) Each =================================================== STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 19.00 350.00 451.00 517.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 43.00 400.00 424.77 415.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 62.00 384.68 427.71 446.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 62.00 384.68 427.71 446.26 =============== 214-00222 Furn Decid Tree (2 In C) Each =================================================== BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 9.00 500.00 381.03 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 500.00 381.03 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 500.00 381.03 300.00 =============== 214-00225 Deciduous Tree (2.5 In C) Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 36.00 500.00 572.50 540.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 36.00 500.00 572.50 540.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 137 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00225 Deciduous Tree (2.5 In C) Each =================================================== IM 0252-384 I-25 OVER BROADWAY 11/09/06 1.00 450.00 602.36 820.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 450.00 602.36 820.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37.00 498.65 573.42 547.57 =============== 214-00230 Deciduous Tree (3 In C) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 65.00 500.00 510.98 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 65.00 500.00 510.98 500.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 10.00 500.00 830.23 815.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 15.00 500.00 467.97 477.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 500.00 638.44 612.74 IM 0252-384 I-25 OVER BROADWAY 11/09/06 10.00 700.00 753.33 660.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 3.00 500.00 903.21 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 653.85 784.50 761.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 103.00 519.42 570.98 560.37 =============== 214-00280 Deciduous Tree (8 Ft) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 11.00 500.00 321.83 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 500.00 321.83 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 500.00 321.83 300.00 =============== 214-00310 Deciduous Shrub (1 Gal) Each =================================================== SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 18.00 25.00 38.75 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 25.00 38.75 46.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 25.00 38.75 46.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 138 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00350 Deciduous Shrub (5 Gal) Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 102.00 30.00 65.03 87.13 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 10.00 50.00 74.31 35.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 82.00 30.00 33.74 27.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 194.00 31.03 50.24 59.20 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 55.00 25.00 69.10 68.20 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 431.00 40.00 46.43 103.73 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 385.00 30.00 41.32 44.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 10.00 40.00 36.29 21.10 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 762.00 60.00 56.50 23.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1,879.00 37.00 37.90 38.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,522.00 41.40 42.64 44.25 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 205.00 40.00 30.60 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 205.00 40.00 30.60 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,921.00 40.81 42.39 44.24 =============== 214-00450 Evergreen Tree (5 Gal) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 25.00 90.00 65.58 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.00 90.00 65.58 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 90.00 65.58 60.00 =============== 214-00504 Evergreen Tree (4 Ft)(B-B) Each =================================================== IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 45.00 250.00 254.33 466.80 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 45.00 260.00 390.00 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 90.00 255.00 299.55 348.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90.00 255.00 299.55 348.40 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 139 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00506 Evergreen Tree (6 Ft)(B-B) Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 34.00 350.00 367.45 418.23 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 11.00 300.00 356.29 361.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 45.00 337.78 363.97 404.24 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 20.00 450.00 385.88 570.53 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 25.00 370.00 497.50 320.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 45.00 405.56 428.81 431.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90.00 371.67 386.33 417.79 =============== 214-00507 Furn Evergreen Tree (6 Ft)(B-B) Each =================================================== BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 9.00 500.00 372.61 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 500.00 372.61 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 500.00 372.61 300.00 =============== 214-00508 Evergreen Tree (8 Ft)(B-B) Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 12.00 500.00 474.13 557.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 500.00 474.13 557.64 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 34.00 300.00 569.85 689.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 34.00 300.00 569.85 689.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 46.00 352.17 524.98 655.25 =============== 214-00650 Evergreen Shrub (5 Gal) Each =================================================== STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 97.00 100.00 65.25 60.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 140 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00650 Evergreen Shrub (5 Gal) Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 150.00 35.00 86.69 34.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 247.00 60.53 83.35 44.71 IM 0252-384 I-25 OVER BROADWAY 11/09/06 308.00 50.00 61.02 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 308.00 50.00 61.02 42.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 555.00 54.68 68.51 43.21 =============== 214-00805 Gr Cover Vines (2.25 In Pot) Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 318.00 15.00 11.66 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 318.00 15.00 11.66 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 318.00 15.00 11.66 15.00 =============== 214-00850 Gr Cover Vines (5 Gal) Each =================================================== IM 0252-384 I-25 OVER BROADWAY 11/09/06 118.00 25.00 60.89 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 118.00 25.00 60.89 41.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 118.00 25.00 60.89 41.00 =============== 214-00908 Perennials (1 Qt) Each =================================================== IM 0252-384 I-25 OVER BROADWAY 11/09/06 5,538.00 3.00 15.79 7.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,538.00 3.00 15.79 7.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,538.00 3.00 15.79 7.60 =============== 214-00910 Perennials (1 Gal) Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 893.00 12.00 15.94 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 893.00 12.00 15.94 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 893.00 12.00 15.94 18.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 141 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00950 Perennials (5 Gal) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 16.00 50.00 37.95 41.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 50.00 37.95 41.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 50.00 37.95 41.40 =============== 214-01010 Brush Layer Cutting Each =================================================== IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 15.00 18.00 6.75 3.25 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 90.00 10.00 13.83 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 105.00 11.14 12.82 17.61 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 200.00 3.00 10.83 3.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 200.00 3.00 10.83 3.65 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 75.00 20.00 7.91 9.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 1,000.00 3.50 4.53 3.10 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 300.00 5.00 23.58 6.30 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 50.00 25.00 3.94 3.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,425.00 5.44 7.25 4.09 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 330.00 5.00 5.07 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 330.00 5.00 5.07 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,060.00 5.42 7.28 5.04 =============== 214-01015 Willow Cuttings Each =================================================== BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 20.00 12.00 21.50 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 12.00 21.50 23.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 12.00 21.50 23.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 142 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-01025 Dormant Log Cutting Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 40.00 120.00 48.10 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 120.00 48.10 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 120.00 48.10 30.00 =============== 214-01030 Wattle Each =================================================== ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 300.00 100.00 59.61 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 300.00 100.00 59.61 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 300.00 100.00 59.61 15.00 =============== 215-00000 Transplant Shrub Each =================================================== C 5502-057 US 550 CULVERT REPAIRS 08/03/06 30.00 40.00 251.90 642.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 40.00 251.90 642.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 40.00 251.90 642.60 =============== 215-00010 Transplant Tree Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 12.00 500.00 771.55 253.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 500.00 771.55 253.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 500.00 771.55 253.00 =============== 215-00060 Transplant Tree (3-6 In) Each =================================================== STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 3.00 400.00 568.35 436.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 400.00 568.35 436.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 400.00 568.35 436.70 =============== 215-00100 Transplant Tree (6+ In) Each =================================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 3.00 700.00 877.75 708.75 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 143 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 215-00100 Transplant Tree (6+ In) Each =================================================== STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 4.00 2000.00 537.50 520.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 1442.86 702.14 600.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 1442.86 702.14 600.89 =============== 215-00600 Transplant Plug Each =================================================== STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 25.00 9.00 38.33 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 9.00 38.33 45.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 50.00 5.00 101.24 2.55 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 100.00 4.00 7.13 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 150.00 4.33 38.50 3.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 175.00 5.00 38.48 9.16 =============== 216-00015 Soil Reten Blanket (Excel) Sq Yard ================================================ IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 8,179.00 2.00 1.44 2.10 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 735.00 3.00 2.15 2.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,914.00 2.08 1.48 2.12 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 170.00 3.00 6.10 7.19 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 3,850.00 3.00 1.94 2.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,020.00 3.00 2.06 2.53 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 450.00 3.00 4.75 2.50 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 25,000.00 3.00 1.61 1.50 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 2,400.00 3.50 3.45 2.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 27,850.00 3.04 1.70 1.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40,784.00 2.83 1.66 1.80 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 144 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00021 Soil Reten Blanket (Cl 1) Sq Yard ================================================ IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 9,510.00 4.70 2.00 1.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,510.00 4.70 2.00 1.99 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 87,468.00 1.20 1.20 1.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 87,468.00 1.20 1.20 1.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 96,978.00 1.54 1.25 1.23 =============== 216-00022 Soil Reten Blanket (Cl 2) Sq Yard ================================================ NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 5,290.00 2.00 5.31 5.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,290.00 2.00 5.31 5.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,290.00 2.00 5.31 5.18 =============== 216-00023 Soil Reten Blanket (Cl 3) Sq Yard ================================================ IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 10,486.00 2.20 8.80 9.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,486.00 2.20 8.80 9.39 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 3,662.00 6.00 5.34 7.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,662.00 6.00 5.34 7.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,148.00 3.18 7.52 8.80 =============== 216-00035 Soil Reten Blanket (Plastic) Sq Yard ================================================ NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 2,890.00 13.00 8.98 8.07 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 115.00 6.00 10.28 13.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,005.00 12.73 9.03 8.27 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 145 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00035 Soil Reten Blanket (Plastic) Sq Yard ================================================ C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 334.00 10.00 12.15 10.24 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1,000.00 10.00 10.20 6.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 2,293.00 8.00 13.60 9.34 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 400.00 11.00 9.75 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,027.00 8.96 12.25 8.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,032.00 10.57 10.71 8.52 =============== 216-00037 Soil Reten Blanket (Coconut) Sq Yard ================================================ BR 069A-019 SH 69, ROSITA CREEK 03/09/06 2,321.00 3.00 2.27 2.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 14,621.00 2.00 1.99 1.95 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 50.00 5.00 6.09 8.70 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 4,356.00 1.80 2.40 2.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21,348.00 2.07 2.06 2.06 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 6,438.00 1.25 2.02 2.20 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 17,495.00 1.50 1.80 1.52 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 1,005.00 3.50 6.71 8.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 24,938.00 1.52 1.91 1.97 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 80.00 8.00 3.00 1.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 80.00 8.00 3.00 1.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 46,366.00 1.78 1.97 2.01 =============== 216-00039 Soil Reten Blanket (Straw) Sq Yard ================================================ BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 1,400.00 1.75 2.64 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,400.00 1.75 2.64 3.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 146 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00039 Soil Reten Blanket (Straw) Sq Yard ================================================ IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 12,024.00 2.00 1.35 1.20 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 17.00 6.00 20.56 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12,041.00 2.01 1.37 1.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,441.00 1.98 1.46 1.46 =============== 216-00041 Soil Reten Blanket (S/C) Sq Yard ================================================ IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 80.00 20.00 7.17 1.50 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 52,396.00 1.30 1.64 1.92 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 2,119.00 2.00 1.65 1.45 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 2,904.00 1.25 2.46 2.50 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 248.00 2.60 1.92 2.18 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 800.00 2.00 3.19 3.35 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 2,500.00 2.50 3.00 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 61,047.00 1.41 1.71 1.99 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 180.00 3.00 5.84 6.68 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 715.00 2.25 4.80 3.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 300.00 2.30 2.26 2.25 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 9,061.00 2.50 1.07 1.10 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 230.00 3.00 5.50 5.50 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 8,230.00 1.50 2.05 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18,716.00 2.06 1.94 1.69 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 19,350.00 2.00 1.57 1.47 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 265.00 5.00 3.33 2.50 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 272.00 1.50 3.65 3.85 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1,150.00 3.00 2.84 2.17 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 20,025.00 2.00 1.47 1.25 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 21,721.00 1.50 1.42 1.71 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 30,480.00 1.50 1.37 1.35 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 2,820.00 2.00 1.76 1.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 147 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00041 Soil Reten Blanket (S/C) Sq Yard ================================================ NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 2,719.00 3.00 4.80 1.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 98,802.00 1.78 1.52 1.46 IM 0252-384 I-25 OVER BROADWAY 11/09/06 2,600.00 1.50 2.50 1.15 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 20.00 2.00 8.55 2.65 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 640.00 3.00 3.51 5.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1,258.00 2.00 3.21 3.55 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 75.00 4.00 6.95 5.50 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 130.00 6.00 9.15 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,723.00 2.00 2.99 2.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 183,288.00 1.69 1.68 1.70 =============== 217-00000 Herbicide Treatment Sq Yard ================================================ IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 40,172.00 0.10 0.35 0.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40,172.00 0.10 0.35 0.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40,172.00 0.10 0.35 0.18 =============== 217-00010 Pre-Emergent Herbicide Sq Yard ================================================ IM 0252-384 I-25 OVER BROADWAY 11/09/06 17,803.00 0.50 0.26 0.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17,803.00 0.50 0.26 0.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,803.00 0.50 0.26 0.14 =============== 217-00020 Herbicide Treatment Hour =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 20.00 100.00 97.76 52.28 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 10.00 300.00 129.45 99.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 1.20 200.00 168.02 87.08 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 4.00 200.00 198.75 183.75 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 4.00 175.00 132.38 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 39.20 171.94 122.42 90.18 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 148 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 217-00020 Herbicide Treatment Hour =================================================== NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 2.00 160.00 453.29 560.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 26.00 120.00 148.67 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28.00 122.86 170.43 132.86 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 60.00 100.00 88.55 83.20 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 2.00 150.00 102.50 55.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 100.00 100.00 105.74 100.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 20.00 100.00 326.24 331.95 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 100.00 170.00 135.63 56.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 282.00 125.18 125.73 97.27 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 60.00 125.00 164.45 134.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 5.00 150.00 187.80 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 65.00 126.92 166.89 144.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 414.20 129.72 135.26 106.47 =============== 250-00010 Envir Health/Safety Mngmt LUMP SUM =============================================== NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 1.00 4000.00 2939.25 3057.00 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 1.00 17000.00 3022.45 3124.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 10500.00 2994.72 3090.50 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 1.00 5000.00 4560.00 4560.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 1.00 3000.00 3613.33 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 4000.00 3850.00 4280.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 3500.00 11800.00 10000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 149 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00010 Envir Health/Safety Mngmt LUMP SUM =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 1650.00 20767.83 5200.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 19000.00 15880.15 16840.46 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 1.00 5000.00 3721.30 3070.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 7287.50 13063.95 8777.62 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 1.00 4500.00 3332.92 3332.92 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 1.00 4000.00 4000.00 4000.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 1.00 5000.00 3454.50 2400.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 1.00 6000.00 4646.30 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 4875.00 3762.14 3683.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 6470.83 7491.75 5382.03 =============== 250-00050 Monitoring Technician Hour =================================================== NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 8.00 90.00 129.00 96.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 90.00 129.00 96.00 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 20.00 85.00 192.00 84.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 40.00 80.00 78.00 78.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 81.67 135.00 80.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 40.00 125.00 73.20 60.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 370.00 45.00 56.67 37.50 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 20.00 85.00 151.58 103.16 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 140.00 110.00 119.10 126.30 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 24.00 100.00 88.22 81.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 594.00 69.28 67.83 63.91 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 20.00 90.00 100.00 100.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 150 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00050 Monitoring Technician Hour =================================================== IM 0252-384 I-25 OVER BROADWAY 11/09/06 200.00 75.00 54.22 39.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 40.00 80.00 81.30 60.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 40.00 65.00 68.34 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 300.00 75.33 57.82 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 962.00 72.11 65.61 60.84 =============== 250-00100 Environmental Health and Safety LUMP SUM =============================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 1.00 2000.00 2701.00 2415.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2000.00 2701.00 2415.00 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 1.00 3400.00 5650.00 6300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3400.00 5650.00 6300.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 1.00 4000.00 6567.24 6134.48 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 4300.00 5637.87 3413.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 4150.00 6009.62 4774.05 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1.00 4000.00 3168.17 3300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 4000.00 3168.17 3300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 3540.00 4158.47 4312.62 =============== 250-00110 Health and Safety Officer Hour =================================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 20.00 150.00 110.10 99.50 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 6.00 150.00 170.75 173.00 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 40.00 150.00 131.97 127.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 66.00 150.00 129.14 122.85 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 151 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00110 Health and Safety Officer Hour =================================================== BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 20.00 135.00 197.25 94.50 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 20.00 120.00 114.00 114.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 127.50 169.50 104.25 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 40.00 170.00 89.00 75.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 24.00 75.00 92.05 60.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 20.00 150.00 189.21 168.42 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 140.00 110.00 167.07 176.20 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 24.00 150.00 139.69 127.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 248.00 123.39 134.89 143.24 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 16.00 120.00 155.00 155.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 200.00 120.00 80.46 66.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 20.00 130.00 120.37 85.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 40.00 80.00 94.24 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 276.00 114.93 83.84 76.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 630.00 122.73 106.18 109.50 =============== 250-00120 Material Sampling and Delivery Each =================================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 6.00 400.00 173.00 147.00 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 10.00 600.00 99.58 102.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 525.00 119.60 118.88 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 1.00 520.00 762.50 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 520.00 762.50 525.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 74.00 23.00 52.61 50.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 152 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00120 Material Sampling and Delivery Each =================================================== BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 1.00 520.00 1410.53 821.05 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 15.00 265.00 248.50 210.51 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 4.00 200.00 149.63 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 94.00 74.44 76.14 86.58 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 8.00 125.00 215.00 215.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 5.00 160.00 171.01 70.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 5.00 150.00 499.59 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 141.67 254.83 420.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 129.00 143.16 98.93 140.59 =============== 250-00200 Material Handling (Stockpile) Cubic Yard ============================================= IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 2.00 50.00 290.57 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 50.00 290.57 110.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1,000.00 17.00 34.21 10.64 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 5.00 100.00 186.09 151.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,005.00 17.41 35.72 11.34 IM 0252-384 I-25 OVER BROADWAY 11/09/06 75.00 40.00 45.10 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 75.00 40.00 45.10 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,082.00 19.04 38.38 13.51 =============== 250-00210 Solid Waste Disposal Cubic Yard ============================================= STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 1.00 150.00 212.78 52.50 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 1.00 150.00 385.21 120.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 153 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00210 Solid Waste Disposal Cubic Yard ============================================= STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 1.00 100.00 1919.83 439.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 133.33 619.06 203.99 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1,000.00 22.50 50.10 48.30 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 5.00 110.00 199.43 216.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,005.00 22.94 51.58 49.13 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 35.00 50.00 75.00 75.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 100.00 60.00 59.56 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 135.00 57.41 60.21 39.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,143.00 27.30 55.78 48.40 =============== 250-00220 Hazardous Waste Disposal Cubic Yard ============================================= STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 1.00 500.00 265.80 231.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 1.00 55.00 691.50 216.00 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 1.00 500.00 320.84 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 351.67 391.86 185.67 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1,000.00 175.00 55.15 45.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,000.00 175.00 55.15 45.46 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 5.00 150.00 260.00 260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 150.00 260.00 260.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,008.00 175.40 57.39 46.94 =============== 250-00230 Trap and Treat BOS-200 Pound ================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 4,500.00 4.00 6.88 4.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,500.00 4.00 6.88 4.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,500.00 4.00 6.88 4.45 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 154 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00240 Subsurface Bioenhancement Inj Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 140.00 250.00 343.65 287.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 140.00 250.00 343.65 287.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 140.00 250.00 343.65 287.00 =============== 250-00300 Water Treatment System Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 7000.00 24277.38 24000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 7000.00 24277.38 24000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 7000.00 24277.38 24000.00 =============== 250-00310 Water Treatment M Gallon =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 15.00 5000.00 798.98 668.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 5000.00 798.98 668.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 5000.00 798.98 668.00 =============== 304-01005 ABC (CL 1) Cubic Yard ============================================= BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 23.00 40.00 81.61 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23.00 40.00 81.61 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 40.00 81.61 100.00 =============== 304-03000 ABC (CL 3) Ton ==================================================== BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 2,542.00 20.00 18.06 13.11 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 55,583.00 13.00 13.78 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 58,125.00 13.31 13.91 14.92 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 6,482.00 20.00 20.00 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 155 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-03000 ABC (CL 3) Ton ==================================================== BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 975.00 45.00 29.77 19.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,457.00 23.27 21.28 19.94 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 536.00 25.00 19.49 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 536.00 25.00 19.49 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66,118.00 14.52 14.57 15.53 =============== 304-04000 ABC (CL 4) Ton ==================================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 61.00 78.00 49.21 35.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 61.00 78.00 49.21 35.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 61.00 78.00 49.21 35.62 =============== 304-05000 ABC (CL 5) Ton ==================================================== ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 11,334.00 30.00 21.08 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,334.00 30.00 21.08 19.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,334.00 30.00 21.08 19.00 =============== 304-06000 ABC (CL 6) Ton ==================================================== IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 2,876.00 20.00 26.00 25.00 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 3,205.00 31.00 22.16 28.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 41.00 27.00 30.28 30.00 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 62.00 100.00 89.20 42.40 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 644.00 20.00 18.72 16.00 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 555.00 23.00 23.55 24.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 4,073.00 23.00 27.00 21.00 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 500.00 30.00 25.73 14.90 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 223.00 60.00 62.50 55.00 NH R200-140 I-25, SH 47, 50, 115 CRACK RE 03/30/06 300.00 33.00 36.50 22.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 12.00 40.00 263.33 39.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 156 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06000 ABC (CL 6) Ton ==================================================== SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 578.00 30.00 24.00 22.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13,069.00 25.99 24.86 24.06 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 3,525.00 25.00 47.10 65.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 500.00 17.00 18.88 13.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 890.00 25.00 21.81 18.75 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 2,674.00 30.00 22.63 14.26 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 255.00 20.00 23.13 16.40 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 1,177.00 25.00 27.41 19.81 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 8,330.00 22.00 20.84 17.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 22,283.00 20.00 17.58 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 39,634.00 21.76 21.63 20.59 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 3,698.00 17.00 40.08 35.00 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 35.00 50.00 85.00 110.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 1,789.00 27.00 34.60 17.81 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 134.00 100.00 86.12 24.48 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1,219.00 25.00 19.22 12.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 2,386.00 25.00 29.00 30.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 3,705.00 55.00 33.95 22.90 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 140.00 30.00 41.66 50.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 34,223.00 16.00 20.96 21.87 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 1,363.00 50.00 25.22 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48,692.00 21.36 25.50 22.96 IM 0252-384 I-25 OVER BROADWAY 11/09/06 3,648.00 16.00 19.88 17.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 3,754.00 25.00 27.05 25.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1,637.00 25.00 34.14 47.70 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 778.00 22.00 23.21 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,817.00 21.42 24.10 25.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 111,212.00 22.05 24.09 22.48 =============== 304-06004 ABC (CL 6) Sq Yard ================================================ HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 2,575.00 7.00 8.91 5.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,575.00 7.00 8.91 5.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,575.00 7.00 8.91 5.15 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 157 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06007 ABC (CL 6) Cubic Yard ============================================= NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 182.00 30.00 51.28 11.40 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 301.00 30.00 30.50 30.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 7.00 40.00 79.45 68.35 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 3,778.00 25.00 30.87 16.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 232.00 30.00 44.41 20.64 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 2,200.00 20.00 45.28 32.70 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 2,411.00 28.00 33.48 40.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 177.00 50.00 52.17 50.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 3,446.50 26.00 27.45 19.75 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 819.00 32.00 33.71 29.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13,553.50 26.00 33.55 25.54 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 20.00 60.00 58.77 24.67 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 49.00 50.00 88.00 75.00 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 95.00 35.00 93.00 64.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 1,548.00 46.00 48.00 44.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 1,995.20 30.00 35.54 25.40 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 193.00 115.00 131.00 131.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 679.00 28.00 40.27 35.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 940.00 27.00 45.17 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,519.20 37.08 45.11 39.93 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1,146.00 35.00 30.50 25.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 4,750.00 23.00 29.51 23.50 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 182.00 30.00 41.45 55.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 82,307.00 18.00 19.94 20.25 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1,085.00 45.00 23.19 20.27 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 5,102.30 32.00 25.87 27.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 3,980.00 24.00 25.66 24.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 3,136.00 24.00 28.54 33.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 2,175.00 40.00 36.96 32.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 103,863.30 20.28 21.67 21.63 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 8,922.00 22.00 19.88 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 158 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06007 ABC (CL 6) Cubic Yard ============================================= BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 254.00 40.00 34.74 25.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 531.00 75.00 52.33 45.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 4,179.00 25.00 25.45 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13,886.00 25.26 23.00 22.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 136,822.00 22.03 23.86 22.85 =============== 304-06008 ABC (CL 6) (Spec) Cubic Yard ============================================= NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 2,444.00 22.00 10.75 15.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 4,200.00 36.00 18.39 4.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 713.00 30.00 28.31 22.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,357.00 30.77 18.35 9.40 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 200.00 20.00 27.34 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 20.00 27.34 12.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 650.00 40.00 31.04 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 650.00 40.00 31.04 23.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,207.00 31.24 19.70 10.54 =============== 304-06009 ABC (CL 6) (Spec) Ton ==================================================== STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 5,085.00 20.00 22.27 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,085.00 20.00 22.27 22.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 3,623.00 25.00 23.80 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,623.00 25.00 23.80 27.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,708.00 22.08 23.10 24.08 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 159 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-07000 ABC (CL 7) Ton ==================================================== STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 7,730.00 30.00 18.67 20.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 110.00 35.00 34.52 20.60 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 2,023.00 22.00 23.00 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,863.00 28.41 19.35 20.62 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 69.00 160.00 104.00 104.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 69.00 160.00 104.00 104.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 53.00 100.00 59.67 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 53.00 100.00 59.67 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,985.00 29.70 19.82 21.30 =============== 304-07009 ABC (CL 7) (Spec) Ton ==================================================== STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 10,284.00 15.00 15.50 5.50 STA 0343-025 US 34, WRAY WEST 01/26/06 6,046.00 15.00 7.13 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16,330.00 15.00 11.82 5.31 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 3,275.00 14.00 8.27 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,275.00 14.00 8.27 10.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,605.00 14.83 11.00 6.18 =============== 304-09000 ABC (Spec) Cubic Yard ============================================= IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 1,454.00 18.00 46.67 55.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 1,709.00 30.00 25.32 15.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,163.00 24.48 32.53 33.82 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 160 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-09000 ABC (Spec) Cubic Yard ============================================= IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 1,000.00 12.00 23.93 38.10 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 9,500.00 20.00 25.03 26.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10,500.00 19.24 24.93 27.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,663.00 20.45 27.14 28.77 =============== 304-09014 ABC (Spec) Ton ==================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 10,415.00 10.00 8.68 15.05 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 21,195.00 13.00 18.90 18.10 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 1,127.00 17.00 21.54 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32,737.00 12.18 15.22 17.16 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 704.00 34.00 29.27 17.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 704.00 34.00 29.27 17.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33,441.00 12.64 15.43 17.17 =============== 304-09020 ABC (Permeable) Ton ==================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 13.00 14.00 95.38 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 14.00 95.38 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 14.00 95.38 20.00 =============== 306-01000 Reconditioning Sq Yard ================================================ IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 32,522.00 5.00 2.00 1.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 20,000.00 1.00 1.60 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 52,522.00 3.48 1.85 1.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52,522.00 3.48 1.85 1.57 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 161 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 307-00000 Hydrated Lime Ton ==================================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 190.00 150.00 149.87 99.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 190.00 150.00 149.87 99.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 190.00 150.00 149.87 99.75 =============== 310-00400 Process Asphalt Mat For Base Course Sq Yard ================================================ IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 74,517.00 1.50 2.36 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 74,517.00 1.50 2.36 2.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 74,517.00 1.50 2.36 2.50 =============== 310-00500 Full Depth Reclam. of Hot Mix Asph. Pvmt Sq Yard ================================================ NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 93,402.00 1.60 2.89 3.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 93,402.00 1.60 2.89 3.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93,402.00 1.60 2.89 3.40 =============== 310-00608 Full Depth Reclam. of HMA Pvmt (0-8 in.) Sq Yard ================================================ STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 48,800.00 4.00 4.33 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48,800.00 4.00 4.33 4.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 79,769.00 2.75 2.96 2.65 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 33,220.00 3.50 3.93 5.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 112,989.00 2.97 3.33 3.43 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 8,084.00 1.50 5.82 2.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,084.00 1.50 5.82 2.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 169,873.00 3.20 3.89 3.57 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 162 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 310-00610 Full Depth Reclam. of HMA Pvmt (8-12 in) Sq Yard ================================================ STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 14,000.00 5.00 5.67 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14,000.00 5.00 5.67 5.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 74,908.00 1.85 3.11 2.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 3,691.00 4.50 5.32 6.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 78,599.00 1.97 3.17 2.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 92,599.00 2.43 3.41 2.64 =============== 310-00611 Full Depth Reclam Hot Mix Asph Pmt < 12" Sq Yard ================================================ STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 325,731.00 1.80 2.02 1.80 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 70,093.00 2.70 2.76 2.30 STA 0343-025 US 34, WRAY WEST 01/26/06 281,635.00 1.80 1.96 1.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 677,459.00 1.89 2.17 1.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 677,459.00 1.89 2.17 1.87 =============== 310-00612 Reclam Hot Mix Asph Pmt per Inch depth Square Yd - Inch ======================================= STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 36,140.00 0.40 0.39 0.35 STA 0343-025 US 34, WRAY WEST 01/26/06 84,949.00 0.40 0.38 0.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 121,089.00 0.40 0.38 0.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 121,089.00 0.40 0.38 0.28 =============== 310-00614 Full Depth Reclam of HMA Pvmt (12-16 in) Sq Yard ================================================ STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 320.00 10.00 8.00 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 320.00 10.00 8.00 7.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 61,789.00 2.10 3.65 2.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 61,789.00 2.10 3.65 2.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 62,109.00 2.14 3.66 2.62 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 163 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 155.00 130.00 139.00 105.00 SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 01/05/06 32.00 200.00 627.60 416.00 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 97.00 120.00 104.30 78.50 IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 300.00 120.00 101.07 60.35 IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 100.00 200.00 176.55 140.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 100.00 135.00 179.25 122.00 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 100.00 150.00 105.00 110.00 NH 0342-042 US 34 AND US 36 CHIPSEALS - E 01/12/06 1,000.00 110.00 95.00 105.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 100.00 110.00 119.23 107.70 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 100.00 100.00 117.24 85.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 60.00 150.00 170.00 150.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 187.00 125.00 126.18 154.88 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 230.00 150.00 116.10 110.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 100.00 125.00 149.71 125.00 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 36.00 250.00 181.71 163.24 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 500.00 150.00 173.33 210.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 200.00 100.00 134.00 120.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 100.00 150.00 115.34 103.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 1,000.00 100.00 114.44 89.75 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 1,000.00 90.00 126.29 109.17 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 300.00 100.00 112.78 99.88 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 100.00 110.00 146.63 145.00 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 11.00 200.00 276.49 230.00 SHE 0911-004 SH 91 & SH 67 GUARDRAIL 03/09/06 590.00 150.00 201.73 179.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 200.00 120.00 103.83 82.15 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 75.00 140.00 180.00 180.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 20.00 200.00 195.00 190.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 500.00 140.00 140.00 150.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 100.00 120.00 118.75 99.75 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 500.00 100.00 123.86 106.59 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 200.00 110.00 109.23 78.90 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 42.00 150.00 186.75 160.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 200.00 130.00 128.00 143.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 20.00 250.00 270.00 290.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 9.00 240.00 293.50 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,364.00 120.24 131.76 122.16 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 500.00 110.00 97.41 86.50 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 100.00 150.00 116.58 106.75 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 15.00 200.00 208.05 161.25 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 57.00 120.00 176.25 150.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 150.00 250.00 334.00 295.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 164 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 200.00 110.00 95.73 65.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 465.00 100.00 129.01 105.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 200.00 120.00 89.95 85.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 200.00 100.00 138.05 100.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 600.00 115.00 149.89 153.68 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 64.00 150.00 148.33 150.00 NH 0341-067 ON US 34 IN LARIMER COUNTY. 05/25/06 30.00 130.00 200.00 200.00 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 184.00 130.00 118.80 110.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 250.00 110.00 84.63 90.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 200.00 150.00 190.75 190.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 220.00 100.00 125.20 130.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 10.00 270.00 375.00 375.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 518.00 115.00 116.00 100.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 170.00 180.00 188.33 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,133.00 123.07 128.95 122.47 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 468.00 110.00 195.22 199.88 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 50.00 125.00 245.46 285.00 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 200.00 150.00 151.00 165.00 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 1,757.00 105.00 129.46 97.75 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 100.00 250.00 146.50 143.00 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 90.00 200.00 404.00 408.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 50.00 250.00 201.64 170.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 300.00 250.00 174.48 180.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 50.00 150.00 338.41 265.22 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 3,000.00 100.00 102.37 95.75 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 25.00 270.00 133.51 124.79 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 116.00 470.00 398.40 453.60 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 500.00 110.00 105.21 111.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 42.00 250.00 183.84 200.00 C R600-283 VARIOUS 08/10/06 100.00 150.00 136.83 107.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 18.00 250.00 342.50 435.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 100.00 130.00 104.06 105.00 NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 20.00 280.00 420.00 300.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 67.00 250.00 144.32 125.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 65.00 150.00 187.38 205.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 52.20 220.00 453.13 604.39 IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 20.00 350.00 571.67 415.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,190.20 127.96 133.06 131.12 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 63.00 220.00 128.96 128.96 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 165 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 5.00 595.00 500.00 500.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 600.00 160.00 118.21 101.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 25.00 200.00 157.18 130.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 100.00 200.00 133.01 108.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 50.00 140.00 149.31 170.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 50.00 270.00 253.70 203.50 SHE 0503-067 US 50, WEST OF CANON CITY 11/30/06 394.00 160.00 212.36 187.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 50.00 150.00 124.14 110.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 10.00 300.00 420.00 695.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 404.00 160.00 164.02 158.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 250.00 120.00 117.01 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,001.00 163.18 151.16 141.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21,688.20 127.30 134.05 126.95 =============== 403-00721 HMA (Patching) (Asph) Sq Yard ================================================ SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 2,342.00 25.00 39.16 36.00 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 1,850.00 38.00 28.00 28.00 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 10.00 130.00 194.54 206.63 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 29.00 100.00 130.97 126.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,231.00 31.45 38.93 33.52 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 156.00 100.00 50.32 26.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 156.00 100.00 50.32 26.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,387.00 33.88 39.79 33.27 =============== 403-00800 Emerg Pothole Rep Ton ==================================================== NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 50.00 160.00 285.25 130.98 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 50.00 150.00 184.02 117.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 155.00 224.51 124.02 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 10.00 100.00 536.18 420.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 100.00 536.18 420.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 110.00 150.00 252.85 150.92 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 166 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-09210 SMA Ton ==================================================== IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 27,944.00 60.00 74.03 67.10 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 9,471.00 85.00 72.80 68.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 18,636.00 50.00 56.50 48.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 27,712.00 58.00 60.00 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 83,763.00 59.94 67.95 60.60 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 19,957.00 70.00 65.13 62.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19,957.00 70.00 65.13 62.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 103,720.00 61.88 67.24 61.05 =============== 403-09221 SMA (Fibers)(Asph) Ton ==================================================== IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 38,167.60 60.00 61.82 46.84 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 15,275.00 63.00 60.38 52.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 53,442.60 60.86 61.28 48.40 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 28,571.00 62.00 79.42 73.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28,571.00 62.00 79.42 73.50 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1,273.00 92.00 123.93 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,273.00 92.00 123.93 125.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 10,332.00 90.00 78.51 78.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 25,020.00 75.00 72.65 63.90 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 16,886.00 71.00 72.58 62.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 52,238.00 76.67 73.51 66.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 135,524.60 67.49 70.34 61.22 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 167 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-09500 Furnish HMA Ton ==================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 4,406.00 42.00 55.65 47.25 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 6,032.00 50.00 59.60 52.40 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 1,835.00 45.00 56.50 43.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,273.00 46.38 57.63 49.15 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 3,898.00 45.00 46.10 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,898.00 45.00 46.10 42.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,171.00 46.05 54.38 47.42 =============== 403-33721 HMA (Gr S) (75) (PG 58-28) Ton ==================================================== STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 23,139.00 43.00 51.73 40.38 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 378.00 135.00 84.73 75.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 461.00 115.00 112.00 112.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 23,978.00 45.83 52.15 42.30 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 6,234.00 90.00 82.77 69.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,234.00 90.00 82.77 69.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30,212.00 54.95 57.41 47.81 =============== 403-33731 HMA (Gr S) (75) (PG 58-34) Ton ==================================================== NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 26,535.00 50.00 45.95 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26,535.00 50.00 45.95 45.00 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 34,153.00 61.00 61.17 61.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 34,153.00 61.00 61.17 61.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 168 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-33731 HMA (Gr S) (75) (PG 58-34) Ton ==================================================== BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 106.00 110.00 156.39 175.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 257.00 100.00 92.59 87.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 363.00 102.92 113.71 113.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 61,051.00 56.47 56.68 54.36 =============== 403-33741 HMA (Gr S) (75) (PG 64-22) Ton ==================================================== STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 38,722.00 44.00 53.42 50.00 STA 0343-025 US 34, WRAY WEST 01/26/06 31,613.00 44.00 54.34 50.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 1,578.00 58.00 80.25 78.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 349.00 75.00 78.50 94.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 72,262.00 44.46 55.02 50.82 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 914.00 75.00 71.20 75.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 58,559.00 54.00 60.58 56.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 59,473.00 54.32 60.78 56.69 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 1,333.00 85.00 110.81 125.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 68,443.00 63.00 55.50 54.25 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 6,559.00 76.00 58.74 54.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 3,517.00 76.00 69.84 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 79,852.00 65.01 57.55 55.88 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 201.00 100.00 109.98 96.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 539.00 100.00 62.94 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 740.00 100.00 80.32 63.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 212,327.00 55.14 57.84 54.41 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 169 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-33751 HMA (Gr S) (75) (PG 64-28) Ton ==================================================== STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 37,644.00 47.00 59.15 55.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 13,548.00 48.00 56.36 44.10 STA 0343-025 US 34, WRAY WEST 01/26/06 32,476.00 47.00 58.30 55.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 83,668.00 47.16 57.91 53.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 83,668.00 47.16 57.91 53.41 =============== 403-33841 HMA (Gr S) (100) (PG 64-22) Ton ==================================================== STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 10,766.00 43.40 44.30 38.90 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 10,588.00 52.00 40.33 39.00 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 21,472.00 50.00 44.05 35.29 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 8,545.00 47.00 56.36 59.95 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 4,609.80 55.00 52.62 48.85 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 2,814.00 60.00 59.94 37.50 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 579.00 75.00 59.33 43.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 59,373.80 49.83 45.94 41.39 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 32,187.00 51.00 47.32 47.50 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 581.00 70.00 55.95 45.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 1,126.00 55.00 55.53 55.40 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 2,029.00 56.00 76.95 74.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 35,923.00 51.72 48.64 49.20 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 3,283.00 70.00 77.22 84.43 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 3,750.00 70.00 87.44 91.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 12,742.00 73.00 58.79 49.46 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 8,567.20 65.00 57.95 55.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 12,241.00 73.00 104.53 114.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40,583.20 70.79 72.01 76.94 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 4,272.00 80.00 53.21 54.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 170 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-33841 HMA (Gr S) (100) (PG 64-22) Ton ==================================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 47,697.00 69.00 63.95 63.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 4,728.00 60.00 54.98 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 56,697.00 69.08 62.16 61.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 192,577.00 60.27 56.22 56.23 =============== 403-33851 HMA (Gr S) (100) (PG 64-28) Ton ==================================================== STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 5,383.00 47.90 50.97 45.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,383.00 47.90 50.97 45.90 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 15,221.00 56.00 54.08 51.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 1,818.00 60.00 88.20 81.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17,039.00 56.43 56.36 54.20 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 6,704.00 80.00 108.42 120.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,704.00 80.00 108.42 120.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29,126.00 60.28 64.51 67.87 =============== 403-33871 HMA (Gr S) (100) (PG 76-28) Ton ==================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 76.00 100.00 50.89 46.00 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 15,276.00 48.00 65.49 53.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15,352.00 48.26 65.37 53.28 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 382.00 80.00 131.76 140.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 9,326.00 80.00 72.02 72.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,708.00 80.00 74.93 74.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25,060.00 60.55 69.08 61.60 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 171 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34641 HMA (Gr SX) (50) (PG 64-22) Ton ==================================================== IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 17,925.00 53.00 78.13 78.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17,925.00 53.00 78.13 78.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 1,182.00 80.00 78.79 94.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,182.00 80.00 78.79 94.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,107.00 54.67 78.22 78.99 =============== 403-34701 HMA (Gr SX) (75) Ton ==================================================== NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 36,039.00 39.00 33.50 30.50 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 4,172.00 60.00 62.80 66.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 18,291.00 35.00 34.00 31.70 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 12,611.00 50.00 51.90 54.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 7,213.00 70.00 71.50 73.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 1,967.00 65.00 69.00 69.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 80,293.00 44.33 39.93 41.07 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 5,152.00 75.00 82.28 71.00 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 1,351.00 60.00 87.38 78.75 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 411.00 170.00 157.00 157.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 17,866.00 44.00 39.27 37.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24,780.00 53.41 50.95 48.55 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 5,398.00 80.00 90.65 85.46 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 718.00 174.20 119.34 73.68 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 1,260.00 150.00 80.87 55.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,376.00 101.13 89.35 79.25 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 517.00 100.00 130.11 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 517.00 100.00 130.11 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 112,966.00 50.28 45.91 45.59 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 172 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34721 HMA (Gr SX) (75) (PG 58-28) Ton ==================================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 12,245.00 51.00 49.24 42.50 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 6,835.00 45.00 64.08 59.25 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 3,475.00 75.00 64.59 62.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22,555.00 52.88 55.91 50.60 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 8,493.00 110.00 78.57 66.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,493.00 110.00 78.57 66.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 2,210.00 79.00 109.10 104.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,210.00 79.00 109.10 104.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33,258.00 69.20 66.66 58.12 =============== 403-34741 HMA (Gr SX) (75) (PG 64-22) Ton ==================================================== STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 16,389.00 55.00 56.00 48.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 20,611.00 57.00 61.48 57.50 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 2,003.00 76.00 68.33 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 39,003.00 57.14 59.82 53.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39,003.00 57.14 59.82 53.89 =============== 403-34751 HMA (Gr SX) (75) (PG 64-28) Ton ==================================================== STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 3,519.00 60.00 60.14 62.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,519.00 60.00 60.14 62.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,519.00 60.00 60.14 62.00 =============== 403-34771 HMA (Gr SX) (75) (PG 76-28) Ton ==================================================== BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 298.00 125.00 83.73 73.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 298.00 125.00 83.73 73.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 298.00 125.00 83.73 73.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 173 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34801 HMA (Gr SX) (100) Ton ==================================================== IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 25,449.00 41.00 46.25 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25,449.00 41.00 46.25 41.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 2,576.00 115.00 110.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,576.00 115.00 110.00 110.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 26,073.00 45.00 44.44 38.48 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 29,380.00 45.00 38.69 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 55,453.00 45.00 41.71 37.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 83,478.00 45.94 43.63 40.58 =============== 403-34821 HMA (Gr SX) (100) (PG 58-28) Ton ==================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 25,072.00 44.00 50.74 53.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25,072.00 44.00 50.74 53.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25,072.00 44.00 50.74 53.61 =============== 403-34841 HMA (Gr SX) (100) (PG 64-22) Ton ==================================================== IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 39,330.00 45.00 56.22 48.50 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 23,589.00 42.00 50.76 38.35 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 879.90 75.00 62.86 51.15 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 35,287.00 48.00 48.85 43.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 99,085.90 45.62 52.50 44.43 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 87,076.00 45.00 48.30 45.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 174 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34841 HMA (Gr SX) (100) (PG 64-22) Ton ==================================================== IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 20,264.00 50.00 50.93 49.75 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 2,965.00 53.00 85.25 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 110,305.00 46.13 49.05 46.95 STA 0405-031 US40 HUGO EAST 08/24/06 4,025.00 90.00 75.00 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,025.00 90.00 75.00 65.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 213,415.90 46.72 50.98 46.12 =============== 403-34851 HMA (Gr SX) (100) (PG 64-28) Ton ==================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 8,193.00 50.00 53.19 56.47 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 35,887.00 47.00 51.27 46.35 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 34,325.00 52.00 54.23 51.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 78,405.00 49.50 53.10 49.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 78,405.00 49.50 53.10 49.47 =============== 403-34871 HMA (Gr SX) (100) (PG 76-28) Ton ==================================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 3,976.00 75.00 77.45 77.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2,042.00 75.00 49.18 46.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 3,272.80 56.00 58.50 54.50 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 9,599.00 63.00 56.02 50.95 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 7,505.00 60.00 51.16 45.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 8,162.00 60.00 56.17 45.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 34,556.80 63.07 57.48 51.34 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 11,617.00 60.00 60.88 53.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 5,746.00 55.00 54.00 50.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 6,853.00 60.00 65.00 50.00 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 1,062.00 64.00 104.35 88.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 25,278.00 59.03 61.80 53.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 175 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34871 HMA (Gr SX) (100) (PG 76-28) Ton ==================================================== NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 6,690.00 70.00 73.05 70.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 877.00 95.00 81.28 77.55 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 558.00 90.00 116.98 120.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2,438.50 75.00 74.68 63.40 C R600-283 VARIOUS 08/10/06 1,282.00 90.00 124.07 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,845.50 75.99 79.96 75.88 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 18,013.00 78.00 74.61 73.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18,013.00 78.00 74.61 73.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 89,693.30 66.63 65.23 59.50 =============== 403-35701 HMA (Gr S-Fines) (75) Ton ==================================================== STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 10,496.00 33.00 34.05 30.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,496.00 33.00 34.05 30.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,496.00 33.00 34.05 30.25 =============== 403-36400 HMA (Gr SX) (75) Ton ==================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 59,443.00 34.00 41.25 38.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 59,443.00 34.00 41.25 38.35 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 88.00 200.00 125.00 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 88.00 200.00 125.00 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 59,531.00 34.25 41.27 38.48 =============== 405-00100 Heating and Remixing Treatment Sq Yard ================================================ NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 176,248.00 3.50 3.96 3.65 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 176 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 405-00100 Heating and Remixing Treatment Sq Yard ================================================ NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 240,652.00 3.50 3.59 3.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 416,900.00 3.50 3.76 3.59 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 194,905.00 4.00 4.40 3.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 194,905.00 4.00 4.40 3.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 611,805.00 3.66 3.98 3.67 =============== 405-00101 Heating and Remixing Treatment (Special) Sq Yard ================================================ IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 122,214.00 6.50 6.30 6.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 122,214.00 6.50 6.30 6.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 122,214.00 6.50 6.30 6.60 =============== 406-09500 Cold Bitum Pvmt (Recycle) Sq Yard ================================================ STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 55,533.00 2.00 3.21 2.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 55,533.00 2.00 3.21 2.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55,533.00 2.00 3.21 2.80 =============== 408-01000 Hot Joint-Crack Sealant Ton ==================================================== NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 3.00 7500.00 3137.96 2815.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 7500.00 3137.96 2815.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 7500.00 3137.96 2815.87 =============== 409-02030 CC Matl (Type I) Special Sq Yard ================================================ NH 0342-042 US 34 AND US 36 CHIPSEALS - E 01/12/06 300,902.00 0.80 1.08 1.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 300,902.00 0.80 1.08 1.20 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 177 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 409-02030 CC Matl (Type I) Special Sq Yard ================================================ NH 0341-067 ON US 34 IN LARIMER COUNTY. 05/25/06 202,132.00 1.10 1.17 1.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 202,132.00 1.10 1.17 1.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 503,034.00 0.92 1.12 1.14 =============== 409-02055 CC Matl (Ty II)(Special) Sq Yard ================================================ NH 0342-042 US 34 AND US 36 CHIPSEALS - E 01/12/06 402,452.00 1.00 1.09 1.20 STA 1131-005 SH 113 IN LOGAN COUNTY 02/02/06 306,014.00 1.00 1.00 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 708,466.00 1.00 1.03 1.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 708,466.00 1.00 1.03 1.11 =============== 409-09000 Micro-Surfacing Seal Coat Ton ==================================================== NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 253.00 180.00 450.99 518.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 253.00 180.00 450.99 518.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 253.00 180.00 450.99 518.54 =============== 411-03342 Asph Cem (PG 64-28) Ton ==================================================== IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 616.00 360.00 431.67 530.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 1,098.00 320.00 380.00 365.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 1,472.00 340.00 357.50 365.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 447.00 380.00 400.00 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,633.00 342.27 385.25 397.28 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 467.00 480.00 667.67 603.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 467.00 480.00 667.67 603.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,100.00 357.96 423.36 420.71 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 178 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-03345 Asph Cem (PG 76-28) Ton ==================================================== IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 1,420.00 380.00 365.00 370.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 2,023.00 360.00 355.00 355.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,443.00 368.25 360.84 361.19 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 152.00 500.00 632.50 715.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 152.00 500.00 632.50 715.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 1,513.00 550.00 539.00 565.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 1,617.00 575.00 531.25 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,130.00 562.92 535.43 531.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,725.00 461.83 492.75 448.41 =============== 411-03352 Asph Cem (PG 58-28) Ton ==================================================== NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 2,364.00 235.00 278.25 297.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 250.00 250.00 326.67 390.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 631.00 280.00 316.67 300.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 757.00 320.00 343.33 280.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 134.00 320.00 255.00 255.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,136.00 261.08 295.74 298.61 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 292.00 325.00 337.80 305.00 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 29.00 350.00 333.75 367.50 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 25.00 450.00 930.00 930.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 553.00 300.00 521.67 470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 899.00 313.90 459.88 425.89 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 354.00 460.00 655.40 766.19 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 179 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-03352 Asph Cem (PG 58-28) Ton ==================================================== BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 44.00 600.00 618.42 736.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 398.00 475.48 652.57 762.95 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 8.00 600.00 410.00 410.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 32.00 600.00 676.85 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 600.00 656.33 802.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,473.00 287.83 343.50 356.96 =============== 411-03354 Asph Cem (PG 64-22) Ton ==================================================== HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 285.00 400.00 428.80 450.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 115.00 475.00 416.25 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 400.00 421.56 425.74 435.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 400.00 421.56 425.74 435.63 =============== 411-03355 Asph Cem (PG 58-34) Ton ==================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 3,861.00 340.00 353.86 359.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,861.00 340.00 353.86 359.30 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 54.00 350.00 588.75 577.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 54.00 350.00 588.75 577.50 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 101.00 600.00 724.00 729.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 101.00 600.00 724.00 729.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,016.00 346.67 366.33 371.53 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 180 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-10253 Emul Asph (CSS-1H) Gallon ================================================= IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 3,713.00 2.50 2.83 2.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 12,500.00 1.70 1.68 1.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16,213.00 1.88 1.95 1.42 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 4,864.00 1.50 1.79 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,864.00 1.50 1.79 1.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21,077.00 1.79 1.90 1.32 =============== 411-10254 Emul Asph (CSS-1H) (Mod) Gallon ================================================= IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 13,858.00 2.50 2.20 2.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13,858.00 2.50 2.20 2.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,858.00 2.50 2.20 2.60 =============== 411-10255 Emul Asph (SS) Gallon ================================================= NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 22,699.00 1.75 2.22 3.15 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 12,838.00 1.50 1.31 0.80 IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 12,844.00 1.40 1.57 1.25 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 19,136.00 1.75 2.04 3.25 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 12,234.00 1.15 1.37 2.10 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 8,918.00 1.20 1.09 1.14 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 729.00 1.50 1.37 1.10 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 52,120.00 1.00 1.25 1.75 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 7,995.00 2.25 2.70 2.90 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 6,995.00 1.75 1.99 1.90 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 17,519.00 2.00 1.74 1.84 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 4,629.00 1.50 2.16 2.10 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 33,770.00 1.50 1.32 1.53 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 6,377.00 1.25 1.73 1.40 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 503.00 4.30 4.24 4.50 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 29,530.00 1.20 1.86 2.10 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 250.00 3.00 4.00 4.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 21,865.00 2.00 1.35 1.70 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 181 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-10255 Emul Asph (SS) Gallon ================================================= SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 2,245.10 2.00 2.67 2.85 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 3,715.00 2.00 1.45 1.54 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 4,188.00 2.00 1.56 1.55 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 5,432.00 2.00 1.50 2.11 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 1,541.00 2.00 1.64 1.80 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 6,557.00 2.25 2.75 2.50 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 13,417.00 1.00 1.00 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 308,046.10 1.51 1.65 1.92 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 28,704.00 2.50 1.66 3.25 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 17,109.00 1.50 1.35 1.50 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 884.00 2.50 9.79 8.50 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 5,259.00 1.50 1.70 2.25 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 2,441.00 2.00 1.75 1.15 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 2,492.00 1.50 2.00 1.00 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 303.00 1.60 6.75 10.50 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 34,618.00 1.50 2.05 1.75 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 12,271.00 1.25 2.48 3.15 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 1,060.00 1.50 2.54 3.50 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 779.00 1.10 2.67 3.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 3,356.00 2.00 2.08 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 109,276.00 1.77 1.91 2.37 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1,028.00 2.00 2.24 2.48 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1,330.00 1.25 3.09 3.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 3,860.00 1.25 2.68 3.60 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 2,561.00 2.00 3.41 4.72 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 5,555.00 2.70 1.98 1.61 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 3,195.70 3.00 3.10 3.00 C R600-283 VARIOUS 08/10/06 259.00 4.00 4.85 1.05 STA 0405-031 US40 HUGO EAST 08/24/06 2,324.00 2.00 2.07 2.20 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 202.00 18.00 8.82 12.63 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 11,457.00 3.00 3.52 4.55 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 152.00 18.00 3.60 4.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 31,923.70 2.65 2.91 3.50 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 40.00 10.00 10.00 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 182 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-10255 Emul Asph (SS) Gallon ================================================= IM 0252-384 I-25 OVER BROADWAY 11/09/06 15.00 1.50 6.36 4.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 15,282.00 2.00 2.08 3.40 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 7,929.00 2.10 1.93 2.70 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 12,830.00 2.50 2.33 1.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 769.00 4.00 3.02 1.35 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 80.00 2.00 1.64 1.10 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 28,628.00 1.50 1.32 1.30 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 4,014.00 1.50 2.13 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 69,587.00 1.90 1.80 1.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 518,832.80 1.68 1.80 2.12 =============== 411-10261 Emul Asph (RS-2P) Gallon ================================================= NH 0342-042 US 34 AND US 36 CHIPSEALS - E 01/12/06 393,879.00 1.30 0.92 0.70 STA 1131-005 SH 113 IN LOGAN COUNTY 02/02/06 183,609.00 1.30 1.25 1.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 577,488.00 1.30 1.08 0.86 NH 0341-067 ON US 34 IN LARIMER COUNTY. 05/25/06 121,279.00 1.00 1.95 1.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 121,279.00 1.00 1.95 1.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 698,767.00 1.25 1.20 1.00 =============== 411-10300 Emul Asph (Prime Coat) Gallon ================================================= NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 29,824.00 1.50 1.34 1.37 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 3,098.00 2.00 3.06 2.20 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 1,579.00 2.00 2.73 2.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 34,501.00 1.57 1.62 1.52 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 5,302.00 4.00 3.54 3.30 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 540.00 2.50 7.75 10.50 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 391.00 8.00 16.80 16.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,233.00 4.12 4.10 4.77 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 183 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-10300 Emul Asph (Prime Coat) Gallon ================================================= SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 23.00 10.00 18.50 12.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 1,872.00 4.00 4.63 5.89 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 634.00 11.00 7.53 6.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,529.00 5.81 5.86 6.16 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 167.00 14.00 7.19 4.20 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 545.00 12.00 8.26 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 712.00 12.47 7.90 7.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43,975.00 2.35 2.09 2.35 =============== 411-90010 Asph Rejuvenating Agent Gallon ================================================= NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 10,575.00 2.40 1.74 1.60 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 14,454.00 2.50 2.31 2.05 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 6,112.00 2.50 2.13 2.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 31,141.00 2.47 2.05 1.94 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 11,694.00 2.50 2.07 2.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11,694.00 2.50 2.07 2.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42,835.00 2.48 2.06 1.98 =============== 411-90040 Recycling Agent Gallon ================================================= STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 45,400.00 2.00 1.32 1.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 45,400.00 2.00 1.32 1.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45,400.00 2.00 1.32 1.20 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 184 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-00000 Furn Conc Pvmt Cubic Yard ============================================= IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 51,585.00 105.00 86.00 87.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 51,585.00 105.00 86.00 87.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 51,585.00 105.00 86.00 87.00 =============== 412-00050 Pl Conc Pvmt Sq Yard ================================================ IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 188,708.00 4.70 8.63 9.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 188,708.00 4.70 8.63 9.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 188,708.00 4.70 8.63 9.80 =============== 412-00400 Conc Pvmt (4 In) Sq Yard ================================================ STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 41.00 100.00 70.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 41.00 100.00 70.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 41.00 100.00 70.00 100.00 =============== 412-00600 Conc Pvmt (6 In) Sq Yard ================================================ STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 141.00 60.00 55.25 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 141.00 60.00 55.25 60.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 30.00 50.00 77.81 77.30 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 30.00 100.00 74.27 46.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 6,563.00 37.00 46.79 50.46 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 257.00 55.00 57.34 54.68 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 247.00 65.00 69.08 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,127.00 38.94 48.39 51.21 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 60.00 80.00 142.20 168.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 185 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-00600 Conc Pvmt (6 In) Sq Yard ================================================ IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1,192.00 40.00 37.24 27.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 136.00 50.00 57.11 52.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 89.00 62.00 80.53 53.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,477.00 43.87 44.27 36.63 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 27.00 70.00 50.00 50.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 617.00 60.00 66.64 52.30 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1,177.00 35.00 35.15 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,821.00 43.99 45.99 42.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,566.00 40.78 47.16 47.77 =============== 412-00605 Conc Pvmt (6 In) (Fast Track) Sq Yard ================================================ NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 99.00 60.00 65.02 58.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 99.00 60.00 65.02 58.96 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 12.00 80.00 115.24 108.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 80.00 115.24 108.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 111.00 62.16 71.62 64.26 =============== 412-00800 Conc Pvmt (8 In) Sq Yard ================================================ NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 3,260.00 65.00 62.24 62.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 35.00 185.00 192.50 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,295.00 66.27 63.62 63.31 IM 0252-384 I-25 OVER BROADWAY 11/09/06 8,385.00 64.00 52.40 44.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 124.00 100.00 83.56 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,509.00 64.52 52.68 44.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,804.00 65.01 53.65 49.47 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 186 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-00805 Conc Pvmt (8 In) (Fast Track) Sq Yard ================================================ IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 2,078.00 75.00 78.32 67.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,078.00 75.00 78.32 67.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,078.00 75.00 78.32 67.00 =============== 412-00950 Conc Pvmt (9-1/2 In) Sq Yard ================================================ C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 12,650.00 45.00 32.98 32.18 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 87.00 70.00 85.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12,737.00 45.17 33.43 32.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,737.00 45.17 33.43 32.71 =============== 412-00975 Conc Pvmt (9-3/4 In) Sq Yard ================================================ NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 700.00 155.00 162.50 155.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 700.00 155.00 162.50 155.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 700.00 155.00 162.50 155.00 =============== 412-01000 Conc Pvmt (10 In) Sq Yard ================================================ IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 38.00 75.00 64.52 43.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 38.00 75.00 64.52 43.50 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 8,979.00 55.00 80.38 70.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 149.00 60.00 92.50 85.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 7,342.00 40.00 62.76 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16,470.00 48.36 71.24 63.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 4,036.00 60.00 62.82 59.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,036.00 60.00 62.82 59.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,544.00 50.69 69.36 62.18 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 187 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-01050 Conc Pvmt (10-1/2 In) Sq Yard ================================================ SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 2,173.70 45.00 58.70 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,173.70 45.00 58.70 47.00 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 3,866.00 65.00 72.56 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,866.00 65.00 72.56 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,039.70 57.80 67.57 42.52 =============== 412-01060 Conc Pvmt (10-1/2 In) (Fast Track) Sq Yard ================================================ SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 356.00 70.00 117.80 118.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 356.00 70.00 117.80 118.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 356.00 70.00 117.80 118.00 =============== 412-01100 Conc Pvmt (11 In) Sq Yard ================================================ SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 10,541.40 50.00 58.55 45.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,541.40 50.00 58.55 45.75 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 94.20 50.00 82.06 100.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 3,145.00 60.00 71.35 79.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,239.20 59.71 71.88 79.61 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 13,868.00 46.00 55.18 53.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13,868.00 46.00 55.18 53.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27,648.60 49.13 58.13 53.60 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 188 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-01120 Conc Pvmt (11 In) (Fast Track) Sq Yard ================================================ NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 111.00 125.00 94.20 99.78 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 400.00 90.00 78.40 77.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 511.00 97.60 81.27 81.95 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 504.00 125.00 123.01 116.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 504.00 125.00 123.01 116.50 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 1,689.00 100.00 87.77 74.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,689.00 100.00 87.77 74.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,704.00 104.21 90.16 83.42 =============== 412-01150 Conc Pvmt (11-1/2 In) Sq Yard ================================================ IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 4,978.00 46.00 55.96 61.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,978.00 46.00 55.96 61.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,978.00 46.00 55.96 61.00 =============== 412-01200 Conc Pvmt (12 In) Sq Yard ================================================ STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 22.00 100.00 131.99 127.93 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 284,742.00 34.50 37.81 35.49 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 11,594.00 40.00 41.52 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 296,358.00 34.72 37.92 35.83 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 284.00 70.00 43.28 40.13 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 281.00 91.00 124.00 128.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 565.00 80.44 77.67 83.84 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 189 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-01200 Conc Pvmt (12 In) Sq Yard ================================================ IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 15,184.00 45.00 56.66 53.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15,184.00 45.00 56.66 53.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 312,107.00 35.30 39.49 36.78 =============== 412-01250 Conc Pvmt (12-1/2 In) Sq Yard ================================================ C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 178,788.00 35.00 38.60 36.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 178,788.00 35.00 38.60 36.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 178,788.00 35.00 38.60 36.74 =============== 412-01300 Conc Pvmt (13 In) Sq Yard ================================================ IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 263,411.00 36.00 37.16 35.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 263,411.00 36.00 37.16 35.80 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 9,960.00 45.00 60.69 61.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,960.00 45.00 60.69 61.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 273,371.00 36.33 38.02 36.72 =============== 412-01325 Conc Pvmt (13 In)(Fast Track) Sq Yard ================================================ IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 3,041.00 70.00 82.38 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,041.00 70.00 82.38 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,041.00 70.00 82.38 80.00 =============== 412-01350 Conc Pvmt (13-1/2 In) Sq Yard ================================================ IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 9,200.00 45.00 74.43 71.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,200.00 45.00 74.43 71.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,200.00 45.00 74.43 71.75 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 190 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-05000 Partial Depth Repair of Conc Pvmt Sq Foot ================================================ NH R200-140 I-25, SH 47, 50, 115 CRACK RE 03/30/06 73.00 70.00 95.75 74.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 73.00 70.00 95.75 74.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 73.00 70.00 95.75 74.00 =============== 412-14000 Sawing and Sealing Joints Lin Foot =============================================== NH R200-140 I-25, SH 47, 50, 115 CRACK RE 03/30/06 300,767.00 1.40 1.53 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 300,767.00 1.40 1.53 1.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 300,767.00 1.40 1.53 1.50 =============== 412-15000 Routing and Sealing Cracks Lin Foot =============================================== IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 3,400.00 5.00 5.26 3.91 NH R200-140 I-25, SH 47, 50, 115 CRACK RE 03/30/06 1,229.00 6.00 6.19 4.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,629.00 5.27 5.44 4.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,629.00 5.27 5.44 4.13 =============== 412-15050 Cross Stitching Each =================================================== NH R200-140 I-25, SH 47, 50, 115 CRACK RE 03/30/06 600.00 35.00 52.00 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 600.00 35.00 52.00 38.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 600.00 35.00 52.00 38.00 =============== 420-00000 Geomembrane Sq Yard ================================================ IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1,240.00 7.00 21.25 20.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,240.00 7.00 21.25 20.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,240.00 7.00 21.25 20.25 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 191 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00100 Geotextile (Er Cont) (CL A) Sq Yard ================================================ STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 20.00 15.00 18.24 26.25 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 3,984.00 3.00 2.85 2.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,004.00 3.06 2.93 2.72 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 1,600.00 3.00 3.42 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,600.00 3.00 3.42 4.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 8,682.00 2.70 2.27 2.26 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 485.00 3.00 5.28 10.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 140.00 15.00 7.03 4.05 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1,420.00 7.75 5.35 3.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,727.00 3.54 2.82 2.74 IM 0252-384 I-25 OVER BROADWAY 11/09/06 166.00 3.20 5.46 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 166.00 3.20 5.46 5.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,497.00 3.37 2.94 2.88 =============== 420-00101 Geotextile (Er Cont) (CL B) Sq Yard ================================================ SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 102.00 5.00 8.50 11.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 102.00 5.00 8.50 11.25 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 130.00 7.00 2.94 2.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 130.00 7.00 2.94 2.88 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1,185.00 5.00 2.38 2.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 192 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00101 Geotextile (Er Cont) (CL B) Sq Yard ================================================ STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 105.00 4.00 5.70 3.50 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 531.00 5.00 3.63 2.50 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 383.00 7.75 3.60 2.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,204.00 5.43 3.03 2.33 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 415.00 15.00 3.96 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 415.00 15.00 3.96 6.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,851.00 6.88 3.43 3.28 =============== 420-00110 Geotextile (Drain) (CL A) Sq Yard ================================================ NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 32.00 14.00 11.60 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32.00 14.00 11.60 15.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 312.00 5.00 10.03 8.35 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 98.00 5.00 4.50 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 410.00 5.00 9.50 7.43 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 62,900.00 3.00 1.82 1.40 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 6.00 20.00 20.30 5.89 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1,922.00 10.99 4.05 8.25 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 33.00 15.00 18.00 25.75 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 198.00 20.00 10.40 3.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 65,059.00 3.30 1.89 1.62 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 1,781.00 10.00 3.59 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,781.00 10.00 3.59 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 67,282.00 3.49 1.95 1.75 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 193 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00111 Geotextile (Drain) (CL B) Sq Yard ================================================ HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 50.00 10.00 8.09 11.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 2,930.00 4.00 3.17 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,980.00 4.10 3.35 4.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,980.00 4.10 3.35 4.61 =============== 420-00130 Geotextile (Separator) (CL A) Sq Yard ================================================ STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 1,000.00 1.90 2.30 2.40 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 3,710.00 2.00 2.34 2.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 2,856.00 2.00 2.41 2.03 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 745.00 6.00 9.00 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,311.00 2.35 2.56 2.24 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 550.00 2.00 3.80 5.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 15,000.00 2.00 1.37 1.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15,550.00 2.00 1.51 1.24 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 500.00 10.00 7.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 500.00 10.00 7.00 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24,361.00 2.28 2.08 1.76 =============== 420-00131 Geotextile (Separator) (CL B) Sq Yard ================================================ BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 23.00 10.00 27.13 30.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 41.00 0.60 8.70 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 64.00 3.98 14.68 13.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 64.00 3.98 14.68 13.34 =============== 420-00200 Geotextile (Weed Barrier) Sq Yard ================================================ IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1,536.00 2.00 1.91 1.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 194 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00200 Geotextile (Weed Barrier) Sq Yard ================================================ STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 1,025.00 1.50 2.03 1.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,561.00 1.80 1.94 1.46 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 2,000.00 1.50 2.12 2.04 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 8,361.00 1.50 2.23 2.33 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1,040.00 1.50 2.35 2.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,401.00 1.50 2.23 2.25 IM 0252-384 I-25 OVER BROADWAY 11/09/06 2,662.00 3.00 2.21 2.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,662.00 3.00 2.21 2.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,624.00 1.79 2.17 2.11 =============== 420-00500 Geotextile (Paving) Sq Yard ================================================ NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 961.00 5.50 12.86 13.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 961.00 5.50 12.86 13.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 961.00 5.50 12.86 13.45 =============== 420-00510 Geotextile (Cr Reduc) (H D) Sq Yard ================================================ STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 3.00 30.00 223.80 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 30.00 223.80 230.00 C R600-283 VARIOUS 08/10/06 30.00 7.00 13.61 10.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 7.00 13.61 10.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.00 9.09 38.34 30.59 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 195 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 501-00000 Steel Sheet Pile (Ty I) Sq Foot ================================================ IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 3,000.00 12.00 19.12 17.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,000.00 12.00 19.12 17.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,000.00 12.00 19.12 17.27 =============== 502-00000 Tr Tim Piling Lin Foot =============================================== NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 600.00 50.00 54.50 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 600.00 50.00 54.50 53.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 600.00 50.00 54.50 53.00 =============== 502-00100 Drill Hole Fac Pile Driving Lin Foot =============================================== BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1,029.00 20.00 64.21 79.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,029.00 20.00 64.21 79.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,029.00 20.00 64.21 79.00 =============== 502-00460 Pile Tip Each =================================================== NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 20.00 95.00 99.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 95.00 99.00 100.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 50.00 150.00 120.95 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 150.00 120.95 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70.00 134.29 115.63 85.71 =============== 502-11274 Steel Pile (HP 12x74) Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 713.00 35.00 45.67 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 713.00 35.00 45.67 46.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 196 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 502-11274 Steel Pile (HP 12x74) Lin Foot =============================================== BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1,945.00 45.00 41.52 42.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1,066.00 40.00 55.70 53.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,011.00 43.23 46.54 46.07 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1,198.00 45.00 51.72 58.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,198.00 45.00 51.72 58.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,922.00 42.47 47.56 48.96 =============== 502-11489 Steel Pile (HP 14x89) Lin Foot =============================================== BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 892.00 45.00 69.33 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 892.00 45.00 69.33 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 892.00 45.00 69.33 80.00 =============== 503-00018 Drilled Caisson (18 In) Lin Foot =============================================== IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 160.00 80.00 163.27 194.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 160.00 80.00 163.27 194.95 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 20.00 150.00 140.39 137.55 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 48.00 120.00 90.00 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 68.00 128.82 112.90 93.40 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 4.00 100.00 345.54 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 100.00 345.54 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 232.00 94.66 158.03 164.41 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 197 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00024 Drilled Caisson (24 In) Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 134.00 120.00 97.78 93.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 134.00 120.00 97.78 93.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 192.00 95.00 135.37 153.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 192.00 95.00 135.37 153.11 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 232.00 100.00 101.97 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 232.00 100.00 101.97 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 558.00 103.08 107.69 106.20 =============== 503-00030 Drilled Caisson (30 In) Lin Foot =============================================== STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 48.00 120.00 268.50 287.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 750.00 125.00 219.07 216.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 798.00 124.70 221.09 220.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 798.00 124.70 221.09 220.46 =============== 503-00036 Drilled Caisson (36 In) Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 253.00 150.00 143.06 150.00 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 144.00 300.00 278.05 295.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 36.00 200.00 72.30 69.50 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 209.00 200.00 206.25 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 642.00 202.73 189.48 150.34 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 18.00 200.00 217.90 193.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18.00 200.00 217.90 193.51 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 198 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00036 Drilled Caisson (36 In) Lin Foot =============================================== BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 203.00 250.00 266.63 240.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 95.00 190.00 199.28 312.13 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 73.00 300.00 315.00 275.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 68.00 220.00 222.25 200.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1,087.00 300.00 246.97 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,526.00 282.94 247.27 237.26 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 30.00 500.00 600.00 600.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 336.00 200.00 158.62 140.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 19.00 200.00 180.67 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 385.00 223.38 167.39 176.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,571.00 253.41 219.83 206.13 =============== 503-00042 Drilled Caisson (42 In) Lin Foot =============================================== SHE 2854-111 US 285 & C470 SIGNING 03/02/06 30.00 300.00 236.67 247.33 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 34.00 250.00 156.79 200.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 17.00 220.00 243.00 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 81.00 262.22 207.19 191.30 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 48.00 250.00 363.83 410.83 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 56.00 300.00 206.61 125.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 17.00 220.00 246.05 386.20 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 19.00 250.00 315.55 325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 140.00 266.36 273.41 281.86 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 34.00 600.00 650.00 650.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 91.00 200.00 243.07 182.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 199 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00042 Drilled Caisson (42 In) Lin Foot =============================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 17.00 250.00 284.58 180.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 34.00 200.00 260.19 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 176.00 282.10 269.47 285.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 397.00 272.49 258.46 264.93 =============== 503-00048 Drilled Caisson (48 In) Lin Foot =============================================== STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 64.00 380.00 330.83 369.96 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 42.00 300.00 342.06 260.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 21.00 350.00 161.30 156.50 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 21.00 260.00 336.75 311.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 63.00 370.00 361.67 290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 211.00 346.16 323.53 297.09 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 63.00 300.00 303.42 231.09 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 32.00 400.00 411.20 288.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 95.00 333.68 339.72 250.26 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 178.00 300.00 370.29 365.65 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 62.00 350.00 279.11 230.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 670.00 300.00 217.66 170.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1,889.00 300.00 254.82 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,799.00 301.11 248.45 237.76 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1,860.00 300.00 247.13 207.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 31.50 130.00 532.90 530.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 367.00 290.00 261.47 245.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,258.50 296.00 254.99 217.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,363.50 301.31 256.14 231.86 =============== 503-00054 Drilled Caisson (54 In) Lin Foot =============================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 21.00 400.00 349.25 341.25 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 200 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00054 Drilled Caisson (54 In) Lin Foot =============================================== R600-247 SIGNALS - SH 121 & SH 391 03/23/06 63.00 330.00 401.00 360.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 84.00 347.50 385.78 355.31 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 128.00 400.00 270.87 240.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 47.00 430.00 391.83 686.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 175.00 408.06 287.32 359.91 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 211.00 400.00 273.22 265.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 211.00 400.00 273.22 265.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 470.00 393.62 295.60 316.48 =============== 503-00200 Caisson (Special) Lin Foot =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 10,597.00 425.00 400.54 430.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,597.00 425.00 400.54 430.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,597.00 425.00 400.54 430.00 =============== 503-01070 M Pile (7 In) Lin Foot =============================================== STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 17,050.00 87.00 100.65 96.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17,050.00 87.00 100.65 96.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,050.00 87.00 100.65 96.00 =============== 503-02000 Verification Test Pile Each =================================================== STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 3.00 20000.00 19255.33 14650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 20000.00 19255.33 14650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 20000.00 19255.33 14650.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 201 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 504-04410 Block Facing Sq Foot ================================================ NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 10,309.00 13.00 12.31 11.82 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 11,756.00 13.00 12.67 11.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22,065.00 13.00 12.54 11.42 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 27,549.00 13.00 10.96 10.50 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 11,110.00 13.00 7.68 7.50 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 24,673.00 12.00 11.84 12.26 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 2,836.00 20.00 9.73 15.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1,187.00 20.00 11.31 11.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 67,355.00 13.05 10.61 10.87 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 36,785.00 12.00 9.67 9.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 23,394.00 13.00 10.95 7.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60,179.00 12.39 10.17 8.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 149,599.00 12.78 10.81 9.92 =============== 504-04420 Precast Panel Facing Sq Foot ================================================ IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 26,147.00 20.00 15.02 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26,147.00 20.00 15.02 22.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 17,259.00 38.00 32.25 29.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1,766.00 45.00 29.23 25.06 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 66,029.00 13.00 20.83 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 85,054.00 18.74 25.27 18.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 111,201.00 19.03 21.60 19.57 =============== 504-04440 Facing (Special) Sq Foot ================================================ STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 36,709.00 18.00 13.38 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36,709.00 18.00 13.38 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36,709.00 18.00 13.38 14.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 202 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 504-06315 Ground Nail (15 Foot) Each =================================================== STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 522.00 800.00 870.88 645.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 522.00 800.00 870.88 645.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 522.00 800.00 870.88 645.00 =============== 504-06320 Ground Nail (20 Foot) Each =================================================== STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 360.00 1000.00 1091.01 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 360.00 1000.00 1091.01 850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 360.00 1000.00 1091.01 850.00 =============== 504-06325 Ground Nail (25 Foot) Each =================================================== STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 123.00 1200.00 1341.59 1065.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 123.00 1200.00 1341.59 1065.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 123.00 1200.00 1341.59 1065.00 =============== 504-06330 Ground Nail (30 Foot) Each =================================================== STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 157.00 1400.00 1578.64 1275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 157.00 1400.00 1578.64 1275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 157.00 1400.00 1578.64 1275.00 =============== 504-06335 Ground Nail (35 Foot) Each =================================================== STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 741.00 1600.00 1826.62 1490.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 741.00 1600.00 1826.62 1490.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 741.00 1600.00 1826.62 1490.00 =============== 504-08050 Stone Landscape Wall Sq Foot ================================================ IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2,063.00 38.00 35.54 48.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 203 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 504-08050 Stone Landscape Wall Sq Foot ================================================ BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 50.00 20.00 110.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,113.00 37.57 35.79 49.47 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 588.00 45.00 40.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 588.00 45.00 40.00 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,701.00 39.19 36.11 47.41 =============== 504-08255 Masonry Landscape Wall (Dry Stack) Sq Foot ================================================ STA 0091-026 STATE HIGHWAY NO 9 11/30/06 61.00 35.00 51.38 31.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 61.00 35.00 51.38 31.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 61.00 35.00 51.38 31.90 =============== 506-00000 Riprap Cubic Yard ============================================= BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 110.00 65.00 98.81 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 110.00 65.00 98.81 53.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 110.00 65.00 98.81 53.00 =============== 506-00010 Riprap (Special) Cubic Yard ============================================= C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 41.00 100.00 122.72 125.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 41.00 100.00 122.72 125.44 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 228.00 61.00 90.57 48.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 228.00 61.00 90.57 48.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 269.00 66.94 92.73 60.44 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 204 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00030 Grouted Riprap Cubic Yard ============================================= BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 5.00 850.00 240.00 300.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 90.00 115.00 138.36 100.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 12.00 14.20 536.56 396.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 107.00 138.04 169.31 142.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 107.00 138.04 169.31 142.62 =============== 506-00206 Riprap (6 In) Cubic Yard ============================================= BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 10.00 50.00 111.49 155.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 8.00 100.00 121.95 60.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 37.00 90.00 84.50 76.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 55.00 84.18 98.67 88.37 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 38.00 70.00 112.85 178.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 38.00 70.00 112.85 178.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93.00 78.39 105.56 124.99 =============== 506-00209 Riprap (9 In) Cubic Yard ============================================= STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 1.00 180.00 204.80 89.00 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 10.00 130.00 78.80 150.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 66.50 80.00 96.52 106.58 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 71.70 110.00 118.90 90.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 93.00 90.00 53.48 48.00 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 18.00 120.00 108.25 134.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 69.00 100.00 92.00 72.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 329.20 97.56 82.05 81.94 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 4.00 250.00 251.67 255.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 250.00 251.67 255.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 205 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00209 Riprap (9 In) Cubic Yard ============================================= C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 28.00 125.00 95.71 98.32 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1,154.00 100.00 52.34 57.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 65.00 75.00 68.03 39.13 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 247.00 150.00 82.84 57.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 20.00 150.00 141.00 82.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 366.00 45.00 99.74 135.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,880.00 95.90 63.79 72.49 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 87.00 85.00 86.88 50.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 20.00 95.00 97.35 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 107.00 86.87 90.40 50.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,320.20 95.99 68.49 73.15 =============== 506-00212 Riprap (12 In) Cubic Yard ============================================= NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 140.00 85.00 114.80 104.99 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 43.00 200.00 104.07 55.00 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 48.00 105.00 93.63 111.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 75.00 120.00 116.67 85.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 44.00 100.00 85.60 78.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 350.00 111.26 106.61 92.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 89.00 125.00 278.36 500.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 51.00 65.00 138.38 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 140.00 103.14 227.37 359.75 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 307.00 90.00 61.03 50.12 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 121.00 85.00 63.34 60.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 206 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00212 Riprap (12 In) Cubic Yard ============================================= STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 2.90 600.00 223.58 70.73 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 297.00 45.00 55.23 40.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1,043.00 85.00 63.40 46.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 291.00 50.00 97.63 153.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,061.90 75.77 64.54 61.83 IM 0252-384 I-25 OVER BROADWAY 11/09/06 75.00 70.00 90.32 125.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 44.00 170.00 109.75 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 119.00 106.97 96.91 108.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,670.90 83.24 77.48 83.47 =============== 506-00218 Riprap (18 In) Cubic Yard ============================================= STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 13.00 200.00 141.80 89.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 57.00 90.00 96.90 97.50 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 46.00 45.00 68.05 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 116.00 84.48 87.42 78.50 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 103.00 135.00 276.41 500.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 22.00 135.00 131.67 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 125.00 135.00 250.94 431.36 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 2,218.00 55.00 50.31 45.23 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 122.00 350.00 201.87 82.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,340.00 70.38 58.21 47.17 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 402.00 100.00 50.01 50.00 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 100.00 105.00 126.00 123.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 207 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00218 Riprap (18 In) Cubic Yard ============================================= HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 7.00 200.00 414.75 200.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 134.00 85.00 109.46 76.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 643.00 98.74 74.22 68.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,224.00 79.05 68.65 67.44 =============== 506-00224 Riprap (24 In) Cubic Yard ============================================= BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 50.00 80.00 58.00 58.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 80.00 58.00 58.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1,070.00 65.00 63.60 54.90 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 53,300.00 80.00 46.76 37.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 648.00 120.00 75.88 72.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 556.00 95.00 66.15 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 55,574.00 80.33 47.29 37.88 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 50.00 100.00 97.78 85.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 400.00 50.00 48.21 59.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 450.00 55.56 51.66 61.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56,074.00 80.13 47.31 38.09 =============== 507-00000 Conc S and D Pave Cubic Yard ============================================= IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 76.00 450.00 393.95 345.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 76.00 450.00 393.95 345.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 72.00 450.00 407.14 722.57 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 44.20 333.03 419.39 350.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 208 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 507-00000 Conc S and D Pave Cubic Yard ============================================= STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 25.00 25.00 443.05 300.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 1.00 750.00 1214.13 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 142.20 341.03 429.46 537.24 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 34.00 300.00 483.44 300.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 1.30 1000.00 787.00 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35.30 325.78 492.45 314.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 253.50 371.58 423.85 448.62 =============== 507-00100 Conc S and D Pave (Reinf) Cubic Yard ============================================= NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 3.30 500.00 1421.00 2484.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 16.30 600.00 716.67 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19.60 583.16 866.38 875.62 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 2.10 750.00 1206.72 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.10 750.00 1206.72 1200.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1,263.00 300.00 244.62 249.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 132.00 500.00 409.76 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,395.00 318.92 257.37 258.56 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 109.00 350.00 448.16 300.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 268.00 400.00 367.81 315.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 377.00 385.54 391.04 310.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,793.70 336.32 290.99 277.35 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 209 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 507-00200 Dry Rubble S and D Pave Cubic Yard ============================================= IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 10.00 100.00 365.58 167.33 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 179.00 45.00 105.06 145.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 189.00 47.91 123.12 146.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 189.00 47.91 123.12 146.36 =============== 507-00300 Gr Rubble S and D Pave Cubic Yard ============================================= BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 32.00 100.00 204.86 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 32.00 100.00 204.86 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 100.00 204.86 125.00 =============== 507-00350 Gr Riprap S and D Pave Cubic Yard ============================================= STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 14.00 250.00 629.68 705.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.00 250.00 629.68 705.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 30.00 200.00 385.00 320.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 200.00 385.00 320.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44.00 215.91 485.75 442.50 =============== 507-00400 Bitum S and D Pave (Asph) Ton ==================================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 2.00 300.00 367.00 465.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 2.50 400.00 412.60 371.99 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 2.00 400.00 202.28 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.50 369.23 333.85 332.30 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 42.00 150.00 175.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 42.00 150.00 175.00 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 210 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 507-00400 Bitum S and D Pave (Asph) Ton ==================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 18.00 120.00 198.97 199.88 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 22.00 120.00 268.25 236.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 120.00 225.25 220.02 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 41.00 400.00 160.38 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 41.00 400.00 160.38 130.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 129.50 230.89 191.67 174.45 =============== 507-00700 S and D Pave (Spec) Cubic Yard ============================================= NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 29.00 500.00 642.81 488.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29.00 500.00 642.81 488.03 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 12.00 545.00 1108.33 2164.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 545.00 1108.33 2164.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 41.00 513.17 735.40 978.85 =============== 508-00100 Tr Timber M Ft Bd Measure ======================================== NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 2.24 4800.00 4947.50 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.24 4800.00 4947.50 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.24 4800.00 4947.50 5000.00 =============== 508-00520 Insulation Material (2 In) Sq Foot ================================================ STA 0091-026 STATE HIGHWAY NO 9 11/30/06 960.00 3.00 4.42 2.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 960.00 3.00 4.42 2.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 960.00 3.00 4.42 2.10 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 211 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 508-90000 Paint Existing Structure LUMP SUM =============================================== BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 1.00 1500.00 2421.29 4147.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1500.00 2421.29 4147.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1500.00 2421.29 4147.00 =============== 509-00000 Str Steel Pound ================================================== BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 212.00 20.00 21.30 12.60 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 46,231.00 1.80 1.88 1.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 46,443.00 1.88 2.06 1.93 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 38.00 10.00 19.64 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 38.00 10.00 19.64 24.00 C 0252-389 BRONCO ARCH BRIDGE OVER THE S 11/29/06 9,500.00 10.00 7.73 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,500.00 10.00 7.73 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55,981.00 3.27 3.75 2.63 =============== 509-00001 Str Steel (Galv) Pound ================================================== BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 1,095.00 7.00 4.30 4.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,095.00 7.00 4.30 4.30 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 4,788.00 3.00 5.34 1.25 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 18,795.00 3.25 3.25 4.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 7,689.00 6.00 4.05 3.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 31,272.00 3.89 4.17 3.43 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 212 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 509-00001 Str Steel (Galv) Pound ================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 574.00 6.50 5.53 5.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 290.00 9.00 5.60 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 864.00 7.34 5.56 4.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33,231.00 4.08 4.24 3.50 =============== 509-00010 Str Steel (Spec) Pound ================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 600.00 5.00 142.75 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 600.00 5.00 142.75 115.00 C 0252-389 BRONCO ARCH BRIDGE OVER THE S 11/29/06 700.00 10.00 38.93 34.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 700.00 10.00 38.93 34.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,300.00 7.69 116.80 71.65 =============== 509-08100 Provide Temporary Support LUMP SUM =============================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 1.00 500000.00 388000.00 300000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 500000.00 388000.00 300000.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1.00 300000.00 725842.31 600000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 300000.00 725842.31 600000.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 500000.00 950493.56 650000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 500000.00 950493.56 650000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 433333.33 685416.93 516666.67 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 213 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 509-08120 Temporary Bridge Deck Sq Foot ================================================ IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 4,489.00 175.00 50.60 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,489.00 175.00 50.60 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,489.00 175.00 50.60 40.00 =============== 509-90000 Paint Existing Str(S) LUMP SUM =============================================== NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 1.00 25000.00 25482.85 27548.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 25000.00 25482.85 27548.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 25482.85 27548.56 =============== 509-90002 Paint Existing Structure (Special) Gallon ================================================= STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 5.00 300.00 1885.55 776.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 300.00 1885.55 776.65 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 20.00 1000.00 194.98 369.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 1000.00 194.98 369.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 34.00 800.00 349.00 123.00 C 0252-389 BRONCO ARCH BRIDGE OVER THE S 11/29/06 1.00 300.00 7000.00 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35.00 785.71 384.38 233.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 816.67 383.96 324.09 =============== 510-20100 Str PA(Spec) Lin Foot =============================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 110.00 2450.00 1548.76 1436.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 110.00 2450.00 1548.76 1436.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 110.00 2450.00 1548.76 1436.79 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 214 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 512-00101 Bearing Device (Type I) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 14.00 800.00 1289.58 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 800.00 1289.58 900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 800.00 1289.58 900.00 =============== 512-00102 Bearing Device (Type II) Each =================================================== BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 2.00 5000.00 4283.00 5066.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 5000.00 4283.00 5066.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5000.00 4283.00 5066.00 =============== 512-00103 Bearing Device (Type III) Each =================================================== C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 28.00 8000.00 8472.69 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 28.00 8000.00 8472.69 10000.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 12.00 8000.00 7057.06 5800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 8000.00 7057.06 5800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 8000.00 7978.87 8740.00 =============== 512-00118 Bearing Device (Spec) Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 36.00 1500.00 543.44 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 36.00 1500.00 543.44 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 1500.00 543.44 1000.00 =============== 513-00690 Bridge Drain (Spec) Each =================================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 26.00 6000.00 6238.28 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26.00 6000.00 6238.28 4000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 215 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 513-00690 Bridge Drain (Spec) Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 1500.00 9449.96 8000.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 17.00 4500.00 10286.01 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 4333.33 10207.98 9888.89 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 9.00 9000.00 8387.34 8000.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 2.00 3500.00 5600.12 7800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 8000.00 7880.57 7963.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55.00 5854.55 7730.79 6720.00 =============== 514-00000 Pipe Railing Lin Foot =============================================== STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 330.00 100.00 71.75 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 330.00 100.00 71.75 55.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 330.00 100.00 71.75 55.00 =============== 514-00100 Hand Rail Lin Foot =============================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 15.00 250.00 118.22 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 250.00 118.22 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 250.00 118.22 40.00 =============== 514-00200 Pedestrian Railing (Steel) Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1,677.00 150.00 107.21 108.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,677.00 150.00 107.21 108.50 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 800.00 150.00 28.20 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 800.00 150.00 28.20 36.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,477.00 150.00 87.13 85.08 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 216 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 514-00201 Ped Railing (Steel) (Spec) Lin Foot =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2,618.00 120.00 332.53 237.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,618.00 120.00 332.53 237.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,618.00 120.00 332.53 237.00 =============== 514-00300 Traffic Railing (Steel) Lin Foot =============================================== C 0702-258 I70 - ROCKFALL IN GLENWOOD CA 01/06/06 50.00 150.00 213.33 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 150.00 213.33 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 150.00 213.33 100.00 =============== 515-00120 Waterproofing (Membrane) Sq Yard ================================================ IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 496.00 15.00 19.62 30.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 302.00 10.00 11.72 11.15 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 944.00 15.00 10.46 10.31 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 2,852.00 7.50 11.49 11.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 451.00 15.00 11.31 7.50 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 1,496.00 10.00 10.13 8.43 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 147.00 26.00 24.00 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,688.00 10.70 11.82 11.79 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 373.00 22.00 23.40 21.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 945.00 12.00 9.46 8.70 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 912.00 12.00 10.23 12.15 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 87.00 25.00 45.32 42.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 361.00 20.00 18.00 18.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 190.00 25.00 23.85 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,868.00 15.56 14.18 13.99 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 863.00 10.00 16.48 14.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 217 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 515-00120 Waterproofing (Membrane) Sq Yard ================================================ BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 2,269.00 10.00 8.75 9.50 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2,350.00 9.50 8.96 8.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 521.00 12.00 11.00 10.38 C R600-283 VARIOUS 08/10/06 6,390.00 10.00 10.20 7.30 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1,556.00 10.00 9.11 8.25 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1,475.00 10.00 10.25 9.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15,424.00 9.99 10.14 8.54 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 10,700.00 9.00 9.26 9.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 1,757.00 10.00 11.93 10.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 118.00 25.00 29.91 24.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 3,936.00 9.00 9.23 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16,511.00 9.22 9.70 9.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 41,491.00 10.18 10.42 9.99 =============== 515-00400 Concrete Sealer Sq Yard ================================================ NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 688.00 8.00 7.95 4.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 688.00 8.00 7.95 4.86 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 4,056.00 7.00 15.19 7.68 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 153.00 15.00 21.13 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,209.00 7.29 15.34 7.59 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 754.00 8.00 5.64 5.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 8,047.00 5.00 5.21 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,801.00 5.26 5.27 5.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 9,329.00 5.00 4.82 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,329.00 5.00 4.82 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23,027.00 5.61 6.41 5.47 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 218 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 515-00410 Concrete Sealer (Calcium Nitrite) Sq Yard ================================================ NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 191.00 60.00 62.55 70.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 191.00 60.00 62.55 70.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 191.00 60.00 62.55 70.20 =============== 517-00000 Waterproofing (Asphalt) Sq Yard ================================================ STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1,580.00 6.00 25.90 28.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,580.00 6.00 25.90 28.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,580.00 6.00 25.90 28.36 =============== 517-00100 Waterproofing (Railroad) Sq Yard ================================================ STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 281.00 100.00 100.92 101.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 281.00 100.00 100.92 101.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 281.00 100.00 100.92 101.05 =============== 518-00000 Brdg Compress Joint Sealer Lin Foot =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 72.00 116.00 175.04 120.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 38.00 45.00 77.50 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 110.00 91.47 162.26 113.09 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 69.00 100.00 108.57 64.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 69.00 100.00 108.57 64.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 179.00 94.76 142.23 94.17 =============== 518-00100 Waterstop Lin Foot =============================================== BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 45.00 20.00 62.63 105.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 45.00 20.00 62.63 105.26 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 219 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 518-00100 Waterstop Lin Foot =============================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 82.00 25.00 20.05 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 82.00 25.00 20.05 23.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 127.00 23.23 27.72 52.15 =============== 518-00106 Waterstop (6 In) Lin Foot =============================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 31.00 9.00 18.34 24.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 7.00 30.00 43.30 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 38.00 12.87 24.33 22.53 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 177.00 20.00 22.13 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 177.00 20.00 22.13 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 215.00 18.74 22.74 18.80 =============== 518-01002 Br Expan Device (0-2 In) Lin Foot =============================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 78.00 120.00 126.99 184.94 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 414.00 120.00 147.66 125.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 60.00 125.00 131.88 150.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 552.00 120.54 141.04 136.23 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 136.00 120.00 131.20 121.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 136.00 120.00 131.20 121.00 BR R400-203 FY 06 BRIDGE MAINTENANCE 07/20/06 1,467.50 120.00 152.70 98.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 220 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 518-01002 Br Expan Device (0-2 In) Lin Foot =============================================== BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 67.00 150.00 136.90 125.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 85.00 125.00 182.45 217.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,619.50 121.50 153.35 105.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,307.50 121.19 147.02 113.68 =============== 518-01004 Br Expan Device (0-4 In) Lin Foot =============================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 129.00 200.00 269.42 215.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 128.00 150.00 158.33 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 257.00 175.10 204.82 187.61 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 418.00 200.00 289.00 300.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 508.00 165.00 136.98 128.20 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 64.00 210.00 205.00 205.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 990.00 182.69 216.29 205.70 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 365.00 185.00 149.67 120.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 256.00 135.00 145.05 163.75 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 86.00 165.00 223.94 257.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 707.00 164.46 153.61 152.61 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 60.00 200.00 177.28 113.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 272.00 150.00 160.00 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 332.00 159.04 163.12 176.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,286.00 172.76 184.05 182.95 =============== 518-01006 Br Expan Device (0-6 In) Lin Foot =============================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 72.00 1200.00 880.13 830.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 72.00 1200.00 880.13 830.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72.00 1200.00 880.13 830.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 221 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 518-01009 Br Expan Device (0-9 In) Lin Foot =============================================== C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 62.00 1000.00 1244.32 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 62.00 1000.00 1244.32 1200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 62.00 1000.00 1244.32 1200.00 =============== 518-01012 Br Expan Device (0-12 In) Lin Foot =============================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 72.00 3000.00 1907.38 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 72.00 3000.00 1907.38 1600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72.00 3000.00 1907.38 1600.00 =============== 518-01015 Br Expan Device (0-15 In) Lin Foot =============================================== C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 31.00 1900.00 2281.80 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 31.00 1900.00 2281.80 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31.00 1900.00 2281.80 2000.00 =============== 518-01250 Br Expan Cover Plate Lin Foot =============================================== SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 12.00 100.00 607.00 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 100.00 607.00 700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 100.00 607.00 700.00 =============== 518-02010 Elastomeric Conc End Dam Cubic Foot ============================================= IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 78.00 400.00 431.56 465.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 78.00 400.00 431.56 465.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 78.00 400.00 431.56 465.00 =============== 518-02100 Polymer Mortar End Dam Cubic Foot ============================================= HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 20.00 500.00 619.00 475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 500.00 619.00 475.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 500.00 619.00 475.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 222 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 518-03000 Saw and Seal Br Joint Lin Foot =============================================== IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 169.00 9.00 8.88 6.30 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 98.00 12.00 16.28 17.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 267.00 10.10 11.23 10.47 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 296.00 27.30 30.61 39.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 296.00 27.30 30.61 39.83 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 228.00 12.50 16.02 16.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 228.00 12.50 16.02 16.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 791.00 17.23 18.17 23.08 =============== 518-03100 Rapid Cure Silicone Jt Seal Lin Foot =============================================== BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 223.00 65.00 33.32 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 223.00 65.00 33.32 25.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 70.00 50.00 57.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 70.00 50.00 57.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 293.00 61.42 37.42 30.97 =============== 519-01000 Epoxy Resin (Injection) Lin Foot =============================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 300.00 60.00 51.23 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 300.00 60.00 51.23 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 300.00 60.00 51.23 60.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 223 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-01000 Conc CL B Cubic Yard ============================================= NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 39.00 750.00 537.43 286.15 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 87.00 350.00 483.20 558.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 126.00 473.81 496.35 473.85 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 3.80 2000.00 1839.55 518.65 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 302.00 300.99 664.44 461.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 145.00 250.00 355.18 342.20 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 19.00 1500.00 2703.50 1764.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 108.00 500.00 895.05 600.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 10.00 1800.00 770.40 915.79 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 11.50 600.00 281.90 150.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 30.00 550.00 750.73 721.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 629.30 411.01 713.21 511.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 755.30 421.49 668.56 504.90 =============== 601-01025 Conc CL B (Misc) Cubic Yard ============================================= STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 7.60 1000.00 1080.72 1653.60 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 33.00 550.00 806.67 1300.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 8.50 1000.00 363.33 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 49.10 697.56 801.18 1153.92 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 9.00 950.00 1308.33 1275.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 87.00 600.00 630.03 570.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 96.00 632.81 669.67 636.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 145.10 654.72 703.89 811.32 =============== 601-01040 Conc CL B (Bridge) Cubic Yard ============================================= IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 86.00 450.00 549.70 952.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 86.00 450.00 549.70 952.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 86.00 450.00 549.70 952.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 224 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-01050 Conc CL B (Wall) Cubic Yard ============================================= NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 37.60 800.00 807.90 643.51 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 33.10 800.00 410.78 406.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70.70 800.00 575.66 532.32 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 161.10 400.00 265.10 366.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 35.80 400.00 1081.73 680.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 58.00 600.00 311.37 190.50 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 611.00 400.00 623.81 350.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 8.00 500.00 538.82 500.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 2.00 2000.00 3000.00 2000.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 0.40 2500.00 2755.00 3010.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 876.30 418.76 578.53 362.22 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 98.00 450.00 371.50 386.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 98.00 450.00 371.50 386.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,045.00 447.48 562.97 375.95 =============== 601-03000 Conc CL D Cubic Yard ============================================= NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 67.00 700.00 488.69 547.46 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 10.20 650.00 2177.33 1500.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 379.00 400.00 368.07 432.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 456.20 449.65 399.80 472.84 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 496.00 440.00 328.36 357.45 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 427.00 400.00 160.20 280.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 7.00 400.00 716.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 930.00 421.33 247.57 322.96 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 114.00 500.00 521.02 650.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 225 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03000 Conc CL D Cubic Yard ============================================= IM 0252-384 I-25 OVER BROADWAY 11/09/06 13.00 800.00 503.29 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 127.00 530.71 518.28 629.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,513.20 439.05 329.17 393.88 =============== 601-03020 Conc CL D (Misc) Cubic Yard ============================================= NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 8.00 800.00 666.21 403.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 800.00 666.21 403.04 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 9.60 500.00 892.95 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.60 500.00 892.95 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.60 636.36 808.35 374.11 =============== 601-03025 Conc CL D (Misc) (C) Cubic Yard ============================================= STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 5.00 800.00 1287.25 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 800.00 1287.25 600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 800.00 1287.25 600.00 =============== 601-03027 Conc CL D (Spec) Cubic Yard ============================================= IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 501.00 500.00 631.01 510.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 501.00 500.00 631.01 510.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 501.00 500.00 631.01 510.32 =============== 601-03030 Conc CL D (Box) Cubic Yard ============================================= STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 55.00 400.00 975.67 950.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 226 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03030 Conc CL D (Box) Cubic Yard ============================================= BR 069A-019 SH 69, ROSITA CREEK 03/09/06 486.00 500.00 391.45 375.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 77.00 790.00 807.60 810.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 618.00 527.23 465.49 480.37 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 781.00 400.00 355.42 333.76 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 435.00 420.00 344.38 288.75 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 235.00 380.00 472.12 430.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,451.00 402.76 373.97 335.85 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 275.00 400.00 395.47 316.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 299.00 600.00 582.50 440.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 574.00 504.18 452.16 380.59 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 915.00 450.00 359.87 300.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 170.00 380.00 411.71 325.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 201.00 550.00 643.89 680.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 160.00 560.00 452.60 385.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,446.00 467.84 384.14 365.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,089.00 458.82 401.23 374.34 =============== 601-03040 Conc CL D (Bridge) Cubic Yard ============================================= NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 678.00 800.00 723.99 523.93 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 26.00 700.00 1612.53 2805.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 237.00 450.00 422.12 343.00 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 3.00 950.00 1045.63 1360.63 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 69.00 900.00 875.00 875.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,013.00 722.80 643.88 566.54 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 11.00 1200.00 1226.00 1210.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 227 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03040 Conc CL D (Bridge) Cubic Yard ============================================= NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 481.00 450.00 288.64 323.17 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 15.00 1000.00 1343.75 787.50 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 227.00 800.00 778.00 778.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 734.00 580.72 399.35 486.61 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 533.90 500.00 563.84 450.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1,102.70 400.00 371.50 375.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 880.00 400.00 344.28 220.75 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 930.00 400.00 549.22 450.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 3,530.00 400.00 512.04 450.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 848.50 400.00 454.20 450.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 435.00 450.00 502.69 558.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,260.10 409.10 477.36 421.26 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 4,514.00 500.00 432.37 406.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1,648.00 460.00 414.12 425.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,162.00 489.30 427.49 411.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,169.10 467.11 466.90 429.45 =============== 601-03041 Conc CL D (Bridge) (Spec) Cubic Yard ============================================= IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 130.00 2500.00 1676.00 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 130.00 2500.00 1676.00 1100.00 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 35.00 1600.00 1921.25 1250.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 90.00 650.00 517.12 490.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 125.00 916.00 910.28 702.80 C R600-283 VARIOUS 08/10/06 283.40 600.00 555.33 575.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 228 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03041 Conc CL D (Bridge) (Spec) Cubic Yard ============================================= BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 103.10 550.00 514.95 250.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 11.00 700.00 1420.80 1649.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 397.50 589.80 560.87 520.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 652.50 1032.87 913.81 670.84 =============== 601-03050 Conc CL D (Wall) Cubic Yard ============================================= IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 55.00 400.00 870.67 750.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 178.00 500.00 487.00 435.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 233.00 476.39 602.85 509.36 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 517.90 500.00 716.73 500.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 70.00 600.00 600.00 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 587.90 511.91 711.70 511.91 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 241.00 400.00 364.64 369.75 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1,288.30 450.00 507.68 350.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 79.00 525.00 595.00 440.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 38.40 600.00 730.33 750.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1,531.00 460.00 375.26 354.78 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 72.00 600.00 628.78 431.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,249.70 457.92 464.61 362.43 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 716.00 400.00 323.99 270.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 151.00 550.00 658.70 695.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 867.00 426.12 361.59 344.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,937.60 459.64 471.80 383.93 =============== 601-03540 Conc CL DT (Deck Topping) Cubic Yard ============================================= IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 8.00 500.00 933.33 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 500.00 933.33 600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 500.00 933.33 600.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 229 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-05045 Conc CL S40 Cubic Yard ============================================= IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 533.00 700.00 511.74 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 533.00 700.00 511.74 115.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 533.00 700.00 511.74 115.00 =============== 601-05050 Conc CL S50 Cubic Yard ============================================= C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 139.00 600.00 1117.07 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 139.00 600.00 1117.07 600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 139.00 600.00 1117.07 600.00 =============== 601-05540 Conc CL HT (Deck Topping) Cubic Yard ============================================= NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 165.00 1100.00 629.61 423.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 165.00 1100.00 629.61 423.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 165.00 1100.00 629.61 423.82 =============== 601-06100 Conc (Patching) Cubic Yard ============================================= IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 11.00 1000.00 958.33 400.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 17.00 800.00 2466.35 2915.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28.00 878.57 1973.63 1927.20 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 5.00 2000.00 1752.47 600.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 17.00 3000.00 2967.86 2750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 22.00 2772.73 2625.50 2261.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 1712.00 2242.71 2074.23 =============== 601-06150 Conc (Patching) Sq Foot ================================================ C 0702-258 I70 - ROCKFALL IN GLENWOOD CA 01/06/06 100.00 200.00 286.67 160.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 230 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-06150 Conc (Patching) Sq Foot ================================================ NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 40.00 85.00 77.75 81.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 27.00 130.00 207.37 200.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 285.00 50.00 40.52 27.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 42.00 70.00 122.20 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 494.00 89.27 80.75 73.96 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 118.00 85.00 92.60 90.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 50.00 50.00 119.30 71.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 168.00 74.58 99.36 84.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 662.00 85.54 84.91 76.62 =============== 601-40000 Masonry Veneer Sq Foot ================================================ IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 275.00 27.30 15.22 13.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 275.00 27.30 15.22 13.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 275.00 27.30 15.22 13.65 =============== 601-40005 Cut Stone Veneer Sq Foot ================================================ STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 4,586.00 25.00 42.94 39.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,586.00 25.00 42.94 39.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,586.00 25.00 42.94 39.00 =============== 601-40250 Bridge Deck Finish (Saw Grv) Sq Yard ================================================ NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 4,056.00 5.00 3.52 3.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,056.00 5.00 3.52 3.11 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 8,055.00 6.00 3.16 2.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,055.00 6.00 3.16 2.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,111.00 5.67 3.26 2.97 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 231 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-40300 Struct Conc Coating Sq Yard ================================================ NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 499.00 8.00 10.94 14.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 499.00 8.00 10.94 14.20 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 950.00 8.00 5.73 0.90 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 20,970.00 6.00 7.89 6.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21,920.00 6.09 7.78 6.07 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 21,580.00 6.00 5.92 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21,580.00 6.00 5.92 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43,999.00 6.07 6.81 5.14 =============== 601-40301 Struct Conc Coating Sq Foot ================================================ IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 40,301.00 1.00 0.75 0.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40,301.00 1.00 0.75 0.27 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 20,412.00 2.00 1.45 0.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20,412.00 2.00 1.45 0.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60,713.00 1.34 0.98 0.33 =============== 601-40302 Struct Conc Coating (Anti-Graf) Sq Foot ================================================ IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 40,301.00 1.25 1.06 0.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40,301.00 1.25 1.06 0.31 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 11,110.00 1.00 2.23 1.25 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 232 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-40302 Struct Conc Coating (Anti-Graf) Sq Foot ================================================ STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 38,730.00 2.00 1.97 2.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 49,840.00 1.78 2.02 2.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90,141.00 1.54 1.57 1.32 =============== 601-40400 Struct Conc Stain Sq Yard ================================================ BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 2,011.00 5.00 7.43 5.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2,036.00 5.00 8.83 0.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,047.00 5.00 8.25 2.86 IM 0252-384 I-25 OVER BROADWAY 11/09/06 28,752.00 5.00 8.74 5.25 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 7,741.00 11.00 6.44 6.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 36,493.00 6.27 8.40 5.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40,540.00 6.15 8.39 5.30 =============== 601-40600 Concrete Tinting Sq Yard ================================================ IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 88.00 20.00 13.33 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 88.00 20.00 13.33 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 88.00 20.00 13.33 15.00 =============== 602-00000 Reinf Steel Pound ================================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 25,046.00 5.00 10.95 7.50 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 4,064.00 1.00 1.39 1.80 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 750.00 3.00 2.75 3.25 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 52,998.00 0.90 0.77 0.75 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 330.00 3.00 2.43 2.40 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 21,950.00 1.00 0.68 0.70 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 1,000.00 2.50 1.41 1.33 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 1,287.00 1.50 1.23 1.20 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 10,520.00 0.90 0.97 0.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 117,945.00 1.83 2.85 2.22 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 233 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 602-00000 Reinf Steel Pound ================================================== STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 1,781.00 3.00 2.00 2.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 33,584.00 1.00 2.35 2.40 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 190,688.00 0.70 1.04 0.91 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 71,641.00 0.70 0.98 0.95 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 13,626.00 1.75 1.80 1.80 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 38,810.00 1.00 0.75 0.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 350,130.00 0.81 1.15 1.10 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 85,980.00 0.90 0.74 0.83 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 13,841.00 1.00 0.92 1.25 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 5,159.00 1.00 1.96 2.75 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 652.00 5.00 2.16 2.48 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 81,964.00 0.80 0.74 0.62 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 48,790.00 0.85 0.80 0.65 C R600-283 VARIOUS 08/10/06 2,000.00 4.00 2.53 2.10 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 79,076.00 1.20 0.98 1.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 28,390.00 0.80 0.84 0.67 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 11.00 4.00 3.20 3.40 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 31,542.00 1.00 0.86 0.74 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 4,423.00 2.00 1.74 1.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 381,828.00 0.98 0.84 0.83 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 152,471.00 0.82 0.69 0.64 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 227,510.00 0.90 0.78 0.65 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 600.00 2.00 13.73 19.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 41,935.00 1.25 1.14 1.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 23,675.00 1.00 0.72 0.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 446,191.00 0.91 0.78 0.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,296,094.00 0.99 1.04 0.99 =============== 602-00020 Reinf Steel (Epoxy) Pound ================================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 302.00 5.00 6.16 6.30 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 234 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 602-00020 Reinf Steel (Epoxy) Pound ================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 172,490.00 1.00 0.88 0.91 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 931.00 1.50 5.06 2.75 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 3,847.00 1.00 5.12 3.30 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 121,250.00 1.00 0.80 0.80 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 238.00 3.00 2.86 3.40 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 109,750.00 1.00 1.02 0.80 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 11,376.00 1.50 2.25 1.95 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 11,050.00 1.70 2.00 2.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 600.00 6.00 6.50 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 431,834.00 1.04 0.96 0.94 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 950.00 2.00 5.00 5.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 1,000.00 2.50 2.57 2.30 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 500.00 3.00 3.01 2.95 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 27,600.00 1.00 1.17 1.01 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 2,220.00 3.00 1.63 1.26 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 1,000.00 2.50 2.98 2.75 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 38,863.00 1.10 1.10 1.10 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 14,535.00 1.50 0.94 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 86,668.00 1.24 1.29 1.14 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 14,772.00 1.10 0.96 1.29 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 95,811.00 1.10 1.02 1.10 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 172,907.00 1.00 0.91 0.82 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 5,620.00 1.25 1.74 1.20 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 173,781.00 0.85 0.87 0.72 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 7,142.00 2.00 2.02 2.48 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 1,174.00 5.00 7.04 3.15 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 327,532.00 0.90 0.84 0.75 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 941,184.00 0.90 0.86 1.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 3,871.00 1.10 1.88 1.10 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 115,030.00 0.95 1.08 0.80 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 278,297.00 0.95 0.96 0.87 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 1,699.00 3.00 2.39 1.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,138,820.00 0.93 0.90 0.91 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 985,472.00 0.90 0.81 0.75 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 235 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 602-00020 Reinf Steel (Epoxy) Pound ================================================== BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 36,000.00 1.00 1.14 0.90 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 373,020.00 1.00 0.76 0.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,394,492.00 0.93 0.81 0.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,051,814.00 0.95 0.88 0.88 =============== 603-00000 Culvert Lining Lin Foot =============================================== C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 208.00 225.00 244.00 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 208.00 225.00 244.00 185.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 208.00 225.00 244.00 185.00 =============== 603-00001 Annular Space Grouting Cubic Yard ============================================= C 5502-057 US 550 CULVERT REPAIRS 08/03/06 29.00 990.00 2837.50 3150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29.00 990.00 2837.50 3150.00 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 315.00 600.00 587.33 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 315.00 600.00 587.33 525.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 344.00 632.88 833.35 746.29 =============== 603-00010 Culvert Lining Sq Foot ================================================ HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 4,429.00 18.00 41.25 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,429.00 18.00 41.25 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,429.00 18.00 41.25 35.00 =============== 603-00037 Inst Culvert Lining (36 In)(J) Lin Foot =============================================== C 5502-057 US 550 CULVERT REPAIRS 08/03/06 207.00 880.00 445.36 181.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 207.00 880.00 445.36 181.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 207.00 880.00 445.36 181.44 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 236 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-00048 Culvert Lining (48 In) Lin Foot =============================================== C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 288.00 450.00 352.67 325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 288.00 450.00 352.67 325.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 288.00 450.00 352.67 325.00 =============== 603-00060 Culvert Lining (60 In) Lin Foot =============================================== C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 618.00 450.00 526.33 415.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 618.00 450.00 526.33 415.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 618.00 450.00 526.33 415.00 =============== 603-01125 12 In RCP (CIP) Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 23.00 60.00 80.07 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 23.00 60.00 80.07 52.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 6.00 50.00 114.61 159.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 50.00 114.61 159.25 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 18.00 150.00 156.85 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 150.00 156.85 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 47.00 93.19 108.35 99.39 =============== 603-01155 15 In RCP (CIP) Lin Foot =============================================== STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 12.00 80.00 83.50 82.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 500.00 50.00 58.68 41.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 237 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01155 15 In RCP (CIP) Lin Foot =============================================== C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 369.00 60.00 54.63 37.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 349.00 65.00 99.21 102.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,230.00 57.55 64.81 57.69 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 183.00 60.00 52.57 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 183.00 60.00 52.57 54.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,413.00 57.87 63.20 57.21 =============== 603-01180 18 In RCP Lin Foot =============================================== NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 108.00 80.00 95.52 98.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 108.00 80.00 95.52 98.57 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1,853.00 60.00 48.88 53.91 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 130.00 140.00 138.96 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,983.00 65.24 56.14 59.55 IM 0252-384 I-25 OVER BROADWAY 11/09/06 200.00 120.00 84.47 85.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1,013.00 65.00 75.39 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,213.00 74.07 77.57 105.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,304.00 68.97 66.48 77.84 =============== 603-01185 18 In RCP (CIP) Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2,442.00 56.00 57.49 60.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 28.00 70.00 89.07 95.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1,254.00 50.00 47.70 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,724.00 54.08 55.06 52.52 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 238 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01185 18 In RCP (CIP) Lin Foot =============================================== C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 210.00 80.00 125.28 120.56 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 80.00 35.00 88.33 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 290.00 67.59 111.84 114.89 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 5,218.00 50.00 45.31 42.22 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 110.00 100.00 68.50 62.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2,347.00 50.00 57.33 40.25 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1,567.00 60.00 59.54 49.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 292.00 60.00 69.62 70.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1,213.00 55.00 89.76 67.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,747.00 52.81 55.44 46.57 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1,743.00 70.00 47.62 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,743.00 70.00 47.62 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,504.00 55.17 54.95 49.47 =============== 603-01240 24 In RCP Lin Foot =============================================== STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 514.00 80.00 98.13 107.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 514.00 80.00 98.13 107.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 8.00 160.00 405.06 350.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 1,425.00 60.00 83.87 92.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,433.00 60.56 85.66 93.80 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 735.00 100.00 73.44 67.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 239 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01240 24 In RCP Lin Foot =============================================== IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 2,080.00 65.00 56.96 54.92 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1,345.00 55.00 108.46 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,160.00 67.95 78.69 76.48 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1,503.00 75.00 85.44 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,503.00 75.00 85.44 110.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,610.00 68.76 82.39 88.42 =============== 603-01245 24 In RCP (CIP) Lin Foot =============================================== IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 80.00 70.00 111.26 92.00 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 98.00 60.00 101.75 125.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 39.00 75.00 114.12 98.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 252.00 60.00 61.80 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 469.00 62.95 79.88 74.14 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 16.00 60.00 306.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 60.00 306.00 100.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 3,556.00 60.00 55.01 54.53 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2,905.00 55.00 59.36 41.75 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 241.00 60.00 68.84 61.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 674.00 60.00 116.32 97.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,376.00 58.03 61.50 53.68 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 3,203.00 55.00 53.47 50.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 8.00 100.00 338.13 730.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1,483.00 60.00 99.40 58.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,694.00 56.66 68.65 53.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,555.00 57.70 65.38 54.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 240 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01300 30 In RCP Lin Foot =============================================== STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 241.00 220.00 415.47 575.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 364.00 85.00 96.85 112.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 605.00 138.78 223.77 296.77 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1,765.00 80.00 82.14 93.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,765.00 80.00 82.14 93.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,370.00 95.00 106.30 145.02 =============== 603-01305 30 In RCP (CIP) Lin Foot =============================================== SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 234.00 70.00 129.94 145.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 569.00 70.00 75.60 64.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 803.00 70.00 89.05 87.60 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1,000.00 95.00 70.42 64.96 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2,926.00 65.00 70.63 57.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 229.00 70.00 101.83 106.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 166.00 100.00 122.41 118.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,321.00 73.55 74.25 63.79 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1,858.00 70.00 122.84 67.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,858.00 70.00 122.84 67.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,982.00 72.20 89.26 67.44 =============== 603-01360 36 In RCP Lin Foot =============================================== STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 38.00 100.00 302.06 187.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 38.00 100.00 302.06 187.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 241 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01360 36 In RCP Lin Foot =============================================== STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 72.00 290.00 2298.34 675.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 72.00 290.00 2298.34 675.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 762.00 125.00 103.18 89.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 828.00 110.00 92.60 93.38 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 494.00 200.00 107.55 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,084.00 136.82 101.57 93.35 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 30.00 175.00 245.80 179.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1,172.00 90.00 111.31 114.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,202.00 92.12 114.67 115.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,396.00 123.83 136.82 114.61 =============== 603-01365 36 In RCP (CIP) Lin Foot =============================================== IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 8.00 110.00 122.25 103.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 110.00 122.25 103.50 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 337.00 105.00 88.02 80.08 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 3,486.00 75.00 82.22 67.50 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 223.00 100.00 117.20 99.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 236.00 100.00 168.86 130.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,282.00 80.04 88.10 73.61 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 191.00 100.00 91.03 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 191.00 100.00 91.03 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,481.00 80.95 88.27 73.93 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 242 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01420 42 In RCP Lin Foot =============================================== STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 81.00 310.00 473.28 685.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 81.00 310.00 473.28 685.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 234.00 140.00 152.90 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 234.00 140.00 152.90 190.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 315.00 183.71 208.00 317.29 =============== 603-01425 42 In RCP (CIP) Lin Foot =============================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 167.00 130.00 115.79 95.65 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1,592.00 100.00 124.71 90.25 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 21.00 150.00 182.31 178.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,780.00 103.40 125.00 91.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,780.00 103.40 125.00 91.79 =============== 603-01480 48 In RCP Lin Foot =============================================== STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 180.00 315.00 492.15 700.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 272.00 150.00 242.15 196.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 452.00 215.71 341.71 397.13 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 16.00 350.00 263.41 386.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 350.00 263.41 386.37 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 170.00 160.00 181.45 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 170.00 160.00 181.45 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 638.00 204.23 279.49 344.33 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 243 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01485 48 In RCP (CIP) Lin Foot =============================================== IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 24.00 245.00 141.82 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 245.00 141.82 125.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 179.00 135.00 126.38 113.50 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 471.00 140.00 146.11 100.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 650.00 138.62 141.51 104.26 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1,397.00 150.00 122.48 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,397.00 150.00 122.48 110.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,071.00 147.53 128.39 108.37 =============== 603-01540 54 In RCP Lin Foot =============================================== STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 72.00 390.00 532.60 735.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 72.00 390.00 532.60 735.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1,668.00 230.00 184.74 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,668.00 230.00 184.74 185.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,740.00 236.62 193.52 207.76 =============== 603-01545 54 In RCP (CIP) Lin Foot =============================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 556.00 140.00 163.61 146.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 556.00 140.00 163.61 146.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 556.00 140.00 163.61 146.45 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 244 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01600 60 In RCP Lin Foot =============================================== IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 8.00 270.00 246.98 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 270.00 246.98 250.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 114.00 270.00 295.13 282.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 114.00 270.00 295.13 282.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 122.00 270.00 291.98 280.04 =============== 603-01605 60 In RCP (CIP) Lin Foot =============================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 750.00 225.00 202.08 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 750.00 225.00 202.08 185.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 750.00 225.00 202.08 185.00 =============== 603-01660 66 In RCP Lin Foot =============================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 333.00 230.00 276.27 325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 333.00 230.00 276.27 325.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 333.00 230.00 276.27 325.00 =============== 603-01665 66 In RCP (CIP) Lin Foot =============================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 213.00 185.00 240.63 190.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 213.00 185.00 240.63 190.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 213.00 185.00 240.63 190.50 =============== 603-01725 72 In RCP (CIP) Lin Foot =============================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 239.00 200.00 263.90 242.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 239.00 200.00 263.90 242.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 239.00 200.00 263.90 242.61 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 245 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01840 84 In RCP Lin Foot =============================================== NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 96.00 390.00 584.60 502.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 96.00 390.00 584.60 502.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 96.00 390.00 584.60 502.54 =============== 603-02185 23x14 In RCP (CIP) Lin Foot =============================================== STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 184.00 68.00 62.33 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 184.00 68.00 62.33 47.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 109.00 65.00 133.60 131.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 109.00 65.00 133.60 131.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 293.00 66.88 88.85 78.55 =============== 603-02240 30x19 In RCP Lin Foot =============================================== BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 51.00 100.00 166.21 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 51.00 100.00 166.21 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 51.00 100.00 166.21 140.00 =============== 603-02245 30x19 In RCP (CIP) Lin Foot =============================================== C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 80.00 90.00 145.92 141.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 80.00 90.00 145.92 141.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 90.00 145.92 141.84 =============== 603-02305 38x24 In RCP (CIP) Lin Foot =============================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 111.00 120.00 107.24 99.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 111.00 120.00 107.24 99.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 111.00 120.00 107.24 99.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 246 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-02365 45x29 In RCP (CIP) Lin Foot =============================================== NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 64.00 150.00 148.75 134.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 64.00 150.00 148.75 134.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 64.00 150.00 148.75 134.49 =============== 603-02420 53x34 In RCP Lin Foot =============================================== STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 120.00 100.00 203.67 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 100.00 203.67 230.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 100.00 203.67 230.00 =============== 603-02425 53x34 In RCP (CIP) Lin Foot =============================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1,079.00 140.00 148.23 136.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,079.00 140.00 148.23 136.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,079.00 140.00 148.23 136.25 =============== 603-02485 60x30 In. RCP (CIP) Lin Foot =============================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 900.00 150.00 200.76 184.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 900.00 150.00 200.76 184.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 900.00 150.00 200.76 184.00 =============== 603-02600 76x48 In RCP Lin Foot =============================================== NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 288.00 350.00 418.80 357.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 288.00 350.00 418.80 357.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 288.00 350.00 418.80 357.41 =============== 603-02720 91x58 In RCP Lin Foot =============================================== NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 96.00 450.00 569.84 521.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 96.00 450.00 569.84 521.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 96.00 450.00 569.84 521.27 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 247 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-02840 106x68 In RCP Lin Foot =============================================== NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 96.00 500.00 833.24 742.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 96.00 500.00 833.24 742.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 96.00 500.00 833.24 742.73 =============== 603-03360 36 In RCP Spec Lin Foot =============================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 198.00 300.00 190.94 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 198.00 300.00 190.94 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 198.00 300.00 190.94 500.00 =============== 603-03541 Inst 54 In RCP (Spec) Lin Foot =============================================== C 5502-057 US 550 CULVERT REPAIRS 08/03/06 68.00 500.00 757.93 106.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 68.00 500.00 757.93 106.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 68.00 500.00 757.93 106.73 =============== 603-03661 Inst 66 In RCP (Spec) Lin Foot =============================================== C 5502-057 US 550 CULVERT REPAIRS 08/03/06 64.00 530.00 851.68 106.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 64.00 530.00 851.68 106.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 64.00 530.00 851.68 106.73 =============== 603-03721 Inst 72 In RCP (Spec) Lin Foot =============================================== C 5502-057 US 550 CULVERT REPAIRS 08/03/06 72.00 550.00 951.68 106.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 72.00 550.00 951.68 106.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72.00 550.00 951.68 106.73 =============== 603-05015 15 In RCES Each =================================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 600.00 740.28 530.75 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 248 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05015 15 In RCES Each =================================================== C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 2.00 700.00 688.24 450.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 580.00 854.77 837.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 645.00 735.72 567.01 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 450.00 944.09 530.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 450.00 944.09 530.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 580.00 815.87 554.68 =============== 603-05018 18 In RCES Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 7.00 500.00 791.04 645.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 1.00 600.00 899.22 1000.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 5.00 600.00 620.00 470.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 3.00 600.00 1255.07 1095.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 556.25 796.05 696.92 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 2.00 500.00 791.67 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 500.00 791.67 700.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 3.00 800.00 647.16 642.62 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 8.00 550.00 862.12 636.50 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 2.00 800.00 738.44 500.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 5.00 680.00 1011.34 1202.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 655.56 844.38 779.44 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 5.00 500.00 1154.89 630.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1.00 1000.00 936.47 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 583.33 1118.48 725.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42.00 600.00 862.74 736.44 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 249 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05024 24 In RCES Each =================================================== IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 6.00 600.00 674.90 665.00 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 1.00 800.00 949.75 1114.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 3.00 600.00 992.72 1200.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 1.00 700.00 1242.75 1400.00 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 1.00 800.00 920.00 920.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 641.67 874.50 918.67 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 2.00 900.00 905.32 714.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 900.00 905.32 714.95 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 6.00 950.00 749.42 726.19 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 2.00 1000.00 1002.23 700.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 26.00 800.00 993.96 742.25 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 9.00 700.00 852.87 1047.71 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 1400.00 990.87 800.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 2.00 750.00 1174.75 1465.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 46.00 819.57 947.53 830.77 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 800.00 1274.81 740.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 1.00 750.00 8139.53 1200.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.00 1000.00 1278.60 603.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1.00 1200.00 1050.02 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 910.00 3013.63 916.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65.00 796.15 1130.97 850.04 =============== 603-05030 30 In RCES Each =================================================== SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 4.00 850.00 1148.25 1423.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 1000.00 928.60 813.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 880.00 1095.95 1301.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 250 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05030 30 In RCES Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 3.00 1100.00 835.89 858.04 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 9.00 900.00 1035.45 796.25 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 1000.00 917.78 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 953.85 985.16 810.80 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 2.00 1100.00 1435.30 726.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1100.00 1435.30 726.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 950.00 1057.03 924.92 =============== 603-05036 36 In RCES Each =================================================== STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 2.00 850.00 1255.00 1025.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 1.00 1500.00 1397.18 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1066.67 1275.31 1183.33 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 3.00 1200.00 1074.29 1123.14 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 4.00 1200.00 1188.01 820.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 3.00 1250.00 1208.84 1009.75 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 4.00 1200.00 1319.26 1633.80 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 1200.00 1202.53 1000.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 6.00 1500.00 1175.38 1100.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 3.00 1500.00 4413.45 1928.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 24.00 1318.75 1420.86 1233.29 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 3.00 1250.00 1585.36 930.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 1250.00 1585.36 930.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 1286.67 1417.25 1197.96 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 251 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05042 42 In RCES Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 2000.00 1377.54 1402.67 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2.00 1800.00 1865.39 1378.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1866.67 1726.01 1386.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1866.67 1726.01 1386.72 =============== 603-05048 48 In RCES Each =================================================== IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 3.00 1600.00 1572.09 1610.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1600.00 1572.09 1610.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 6.00 1800.00 3370.18 2850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 1800.00 3370.18 2850.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 2.00 1800.00 1344.79 1315.65 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2.00 710.99 2203.54 1538.50 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 1700.00 1924.14 3065.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 1344.40 1840.47 1754.72 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 2000.00 2474.88 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2000.00 2474.88 1400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 1621.47 2364.38 2140.24 =============== 603-05054 54 In RCES Each =================================================== STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 1.00 2300.00 4922.25 3300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2300.00 4922.25 3300.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 252 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05054 54 In RCES Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 4.00 4300.00 1314.22 1539.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 4300.00 1314.22 1539.37 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1.00 2500.00 2216.38 2600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2500.00 2216.38 2600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 3666.67 1953.17 2009.58 =============== 603-05055 Inst 54 In RCES Each =================================================== C 5502-057 US 550 CULVERT REPAIRS 08/03/06 1.00 3000.00 2728.60 1814.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3000.00 2728.60 1814.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 2728.60 1814.40 =============== 603-05060 60 In RCES Each =================================================== IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 3.00 1700.00 1959.97 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1700.00 1959.97 2200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1700.00 1959.97 2200.00 =============== 603-05066 66 In RCES Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 2.00 4800.00 2066.63 2007.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 4800.00 2066.63 2007.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4800.00 2066.63 2007.52 =============== 603-05067 Inst 66 In RCES Each =================================================== C 5502-057 US 550 CULVERT REPAIRS 08/03/06 1.00 3500.00 3478.60 1814.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3500.00 3478.60 1814.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3500.00 3478.60 1814.40 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 253 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05072 72 In RCES Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 5000.00 2199.35 2078.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5000.00 2199.35 2078.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 2199.35 2078.89 =============== 603-05073 Inst 72 In RCES Each =================================================== C 5502-057 US 550 CULVERT REPAIRS 08/03/06 1.00 4000.00 9953.60 1814.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 4000.00 9953.60 1814.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 4000.00 9953.60 1814.40 =============== 603-05084 84 In RCES Each =================================================== NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 2.00 4500.00 6278.41 7745.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 4500.00 6278.41 7745.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4500.00 6278.41 7745.23 =============== 603-05118 23x14 In RCES Each =================================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 820.00 944.61 944.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 820.00 944.61 944.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 820.00 944.61 944.82 =============== 603-05148 60x38 In RCES Each =================================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 8.00 3000.00 2077.53 1222.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 3000.00 2077.53 1222.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 3000.00 2077.53 1222.25 =============== 603-05160 76x48 In RCES Each =================================================== NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 6.00 2800.00 2541.31 2978.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 2800.00 2541.31 2978.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 2800.00 2541.31 2978.93 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 254 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05172 91x58 In RCES Each =================================================== NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 2.00 4500.00 6682.44 13107.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 4500.00 6682.44 13107.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4500.00 6682.44 13107.32 =============== 603-07180 18 In RCP (Jacked) Lin Foot =============================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 70.00 570.00 678.96 386.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 70.00 570.00 678.96 386.88 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 250.00 2000.00 896.38 960.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 250.00 2000.00 896.38 960.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 320.00 1687.19 865.11 834.63 =============== 603-07360 36 In RCP (Jacked) Lin Foot =============================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 30.00 300.99 1700.78 1266.75 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 118.00 100.00 941.74 900.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 86.00 1150.00 1044.24 682.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 234.00 511.67 1055.44 867.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 234.00 511.67 1055.44 867.16 =============== 603-07420 42 In RCP (Jacked) Lin Foot =============================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 270.00 300.00 818.54 511.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 270.00 300.00 818.54 511.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 270.00 300.00 818.54 511.00 =============== 603-10120 12 In CSP Lin Foot =============================================== NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 6.00 60.00 103.50 100.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 255 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-10120 12 In CSP Lin Foot =============================================== BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 16.00 53.00 30.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 54.91 61.50 49.09 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 120.00 45.99 50.23 35.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 120.00 45.99 50.23 35.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 142.00 47.37 50.73 37.82 =============== 603-10150 15 In CSP Lin Foot =============================================== NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 90.00 140.00 57.64 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 90.00 140.00 57.64 50.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1,900.00 45.00 54.41 35.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,900.00 45.00 54.41 35.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,990.00 49.30 54.51 35.89 =============== 603-10180 18 In CSP Lin Foot =============================================== STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 13.00 80.00 134.43 72.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 687.00 60.00 53.05 53.27 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 34.00 45.00 58.25 57.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 734.00 59.66 55.83 53.77 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 450.00 55.00 45.29 45.88 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 200.00 125.00 79.97 41.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 650.00 76.54 55.96 44.66 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 284.00 40.00 82.73 75.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 256 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-10180 18 In CSP Lin Foot =============================================== NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 72.00 65.00 79.00 58.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 356.00 45.06 82.38 71.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,740.00 62.98 61.63 54.01 =============== 603-10240 24 In CSP Lin Foot =============================================== NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 115.00 60.00 75.54 80.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 15.00 100.00 163.18 125.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 8.00 80.00 220.00 60.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1,269.00 70.00 59.90 62.52 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 109.00 80.00 105.63 99.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,516.00 70.31 65.67 67.07 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 10.00 90.00 99.79 100.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 420.00 80.00 51.05 53.41 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 719.00 130.00 88.78 57.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,149.00 111.38 75.23 56.27 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 30.00 160.00 161.49 130.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 14.00 100.00 109.53 78.58 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 310.00 75.00 57.69 35.75 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 394.00 50.00 100.01 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 748.00 65.71 86.15 79.44 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 8.00 100.00 143.25 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 100.00 143.25 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,421.00 83.17 73.48 66.27 =============== 603-10300 30 In CSP Lin Foot =============================================== NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 176.00 90.00 101.75 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 176.00 90.00 101.75 95.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 257 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-10300 30 In CSP Lin Foot =============================================== BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 80.00 90.00 77.38 86.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 20.00 170.00 158.60 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 106.00 95.72 106.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 276.00 95.80 98.93 99.28 =============== 603-10360 36 In CSP Lin Foot =============================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 217.00 92.00 89.03 87.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 217.00 92.00 89.03 87.13 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 76.00 70.00 187.99 125.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 46.00 100.00 122.75 120.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 573.00 140.00 102.26 83.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 695.00 129.70 118.18 90.69 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 90.00 95.00 99.08 180.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 1,495.00 180.00 115.13 74.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 10.00 150.00 124.29 62.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,595.00 175.02 114.37 79.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,507.00 155.27 113.06 83.52 =============== 603-10420 42 In CSP Lin Foot =============================================== ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 225.00 190.00 138.57 96.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 225.00 190.00 138.57 96.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 225.00 190.00 138.57 96.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 258 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-10480 48 In CSP Lin Foot =============================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 80.00 135.00 115.21 111.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 80.00 135.00 115.21 111.07 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 77.00 280.00 432.80 450.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 26.00 130.00 145.25 140.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 122.00 180.00 165.52 156.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 225.00 208.44 250.59 255.07 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 70.00 110.00 128.06 190.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 425.00 80.00 90.79 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 495.00 84.24 98.17 82.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 800.00 124.25 133.46 134.00 =============== 603-10600 60 In CSP Lin Foot =============================================== STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 134.00 200.00 170.77 132.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 134.00 200.00 170.77 132.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 134.00 200.00 170.77 132.30 =============== 603-10720 72 In CSP Lin Foot =============================================== STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 18.00 250.00 176.67 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 250.00 176.67 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 250.00 176.67 150.00 =============== 603-10840 84 In CSP Lin Foot =============================================== STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 113.00 215.00 232.52 242.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 113.00 215.00 232.52 242.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 113.00 215.00 232.52 242.55 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 259 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-15024 24 In Equiv CSPA Lin Foot =============================================== IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 15.00 100.00 217.03 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 100.00 217.03 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 100.00 217.03 300.00 =============== 603-15060 60 In Equiv CSPA Lin Foot =============================================== STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 8.00 350.00 290.89 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 350.00 290.89 135.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 350.00 290.89 135.00 =============== 603-30012 12 In SES Each =================================================== NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 2.00 200.00 350.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 200.00 350.00 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 200.00 350.00 150.00 =============== 603-30015 15 In SES Each =================================================== NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 2.00 250.00 405.00 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 250.00 405.00 220.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 250.00 405.00 220.00 =============== 603-30018 18 In SES Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 19.00 350.00 314.60 433.98 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 2.00 400.00 417.50 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21.00 354.76 322.59 440.27 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 10.00 500.00 188.84 231.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 500.00 188.84 231.53 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 260 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-30018 18 In SES Each =================================================== BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 4.00 325.00 384.46 120.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 500.00 782.89 1693.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 360.00 436.43 434.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 395.83 313.65 381.52 =============== 603-30024 24 In SES Each =================================================== NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 3.00 350.00 579.00 216.00 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 13.00 400.00 475.00 300.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 2.00 450.00 750.00 850.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 23.00 400.00 382.25 517.24 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 1.00 1000.00 689.38 500.00 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 2.00 360.00 523.75 745.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 44.00 410.68 442.64 457.60 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 1.00 500.00 689.41 350.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 16.00 500.00 260.42 336.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17.00 500.00 300.89 337.07 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 2.00 220.00 415.44 496.32 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 500.00 536.20 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 313.33 470.33 387.55 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 2.00 500.00 951.25 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 500.00 951.25 600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66.00 431.97 429.93 427.69 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 261 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-30030 30 In SES Each =================================================== NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 14.00 500.00 542.50 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.00 500.00 542.50 500.00 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 2.00 600.00 565.13 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 600.00 565.13 900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 512.50 546.49 550.00 =============== 603-30036 36 In SES Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 6.00 800.00 704.41 949.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 800.00 704.41 949.05 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 2.00 650.00 1035.50 500.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 4.00 650.00 693.75 675.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 12.00 650.00 637.17 661.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18.00 650.00 716.02 646.56 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 2.00 700.00 675.73 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 700.00 675.73 1200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 688.46 708.02 758.94 =============== 603-30048 48 In SES Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1.00 1500.00 1250.46 1481.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 1250.46 1481.28 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 262 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-30048 48 In SES Each =================================================== NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 2.00 1400.00 1412.50 1350.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 2.00 1300.00 1289.42 1433.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 1350.00 1359.75 1391.63 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 2.00 1000.00 852.77 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1000.00 852.77 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 1271.43 1145.87 1435.40 =============== 603-30060 60 In SES Each =================================================== STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 2.00 1700.00 1791.42 1874.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1700.00 1791.42 1874.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1700.00 1791.42 1874.25 =============== 603-30072 72 In SES Each =================================================== STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 1.00 1800.00 2700.00 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1800.00 2700.00 3500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1800.00 2700.00 3500.00 =============== 603-30084 84 In SES Each =================================================== STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 2.00 3500.00 3035.83 3307.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 3500.00 3035.83 3307.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3500.00 3035.83 3307.50 =============== 603-31324 24 In Equiv Arch SES Each =================================================== IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 3.00 1100.00 1006.05 916.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 1100.00 1006.05 916.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1100.00 1006.05 916.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 263 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-33024 24 In Pipe Safety End Treat Each =================================================== NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 30.00 1200.00 2122.72 2383.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 1200.00 2122.72 2383.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 1200.00 2122.72 2383.15 =============== 603-33030 30 In Pipe Safety End Treat Each =================================================== NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 8.00 2000.00 2607.98 2978.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 2000.00 2607.98 2978.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 2000.00 2607.98 2978.93 =============== 603-33048 48 In Pipe Safety End Treat Each =================================================== NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 5.00 2500.00 4821.83 4170.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 2500.00 4821.83 4170.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 2500.00 4821.83 4170.50 =============== 603-33060 60 In Pipe Safety End Treat Each =================================================== NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 2.00 5000.00 5724.03 5362.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 5000.00 5724.03 5362.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5000.00 5724.03 5362.09 =============== 603-50004 4 In Plastic Pipe Lin Foot =============================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 760.00 30.00 29.92 17.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 760.00 30.00 29.92 17.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 760.00 30.00 29.92 17.58 =============== 603-50006 6 In Plastic Pipe Lin Foot =============================================== STA 0091-026 STATE HIGHWAY NO 9 11/30/06 10.00 165.00 66.56 52.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 165.00 66.56 52.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 165.00 66.56 52.80 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 264 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-50008 8 In Plastic Pipe Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 46.00 75.00 55.72 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 46.00 75.00 55.72 13.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 22.00 15.00 39.87 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22.00 15.00 39.87 44.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 68.00 55.59 50.12 23.03 =============== 603-50012 12 In Plastic Pipe Lin Foot =============================================== BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 440.00 30.00 54.37 44.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 667.00 45.00 104.91 69.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,107.00 39.04 78.44 59.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,107.00 39.04 78.44 59.50 =============== 603-50015 15 In Plastic Pipe Lin Foot =============================================== BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 435.00 60.00 80.66 85.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 85.00 50.00 77.33 64.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 520.00 58.37 80.31 81.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 520.00 58.37 80.31 81.57 =============== 603-50018 18 In Plastic Pipe Lin Foot =============================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 30.00 75.00 75.82 80.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 75.00 75.82 80.12 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 833.00 75.00 157.29 96.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 833.00 75.00 157.29 96.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 863.00 75.00 152.68 96.29 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 265 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-50024 24 In Plastic Pipe Lin Foot =============================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 100.00 80.00 87.88 103.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 80.00 87.88 103.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 80.00 87.88 103.65 =============== 603-50043 Inst 42 In Plastic Pipe Lin Foot =============================================== C 5502-057 US 550 CULVERT REPAIRS 08/03/06 80.00 251.00 639.18 106.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 80.00 251.00 639.18 106.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 251.00 639.18 106.73 =============== 603-50048 48 In Plastic Pipe Lin Foot =============================================== BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 135.00 200.00 131.03 172.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 135.00 200.00 131.03 172.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 135.00 200.00 131.03 172.05 =============== 603-61120 12 In Flexible Pipe Lin Foot =============================================== C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 100.00 200.00 31.81 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 200.00 31.81 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 200.00 31.81 12.00 =============== 603-70404 4X4 Ft CBC (Precast) Lin Foot =============================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 190.00 310.00 261.81 204.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 190.00 310.00 261.81 204.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 190.00 310.00 261.81 204.74 =============== 603-70502 5x2 Ft CBC (Precast) Lin Foot =============================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 496.00 300.00 237.22 189.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 496.00 300.00 237.22 189.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 496.00 300.00 237.22 189.87 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 266 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-70803 8x3 Ft CBC (Precast) Lin Foot =============================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 206.00 480.00 432.97 385.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 206.00 480.00 432.97 385.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 206.00 480.00 432.97 385.38 =============== 603-70806 8x6 Ft CBC (Precast) Lin Foot =============================================== STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 254.00 550.00 529.67 575.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 254.00 550.00 529.67 575.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 254.00 550.00 529.67 575.00 =============== 603-71812 18x12 Ft CBC (Precast) Lin Foot =============================================== BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 78.00 4000.00 2465.48 2290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 78.00 4000.00 2465.48 2290.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 78.00 4000.00 2465.48 2290.00 =============== 603-83024 24 In Sewer Pipe Lin Foot =============================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 650.00 90.00 121.56 128.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 650.00 90.00 121.56 128.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 650.00 90.00 121.56 128.00 =============== 604-00305 Inlet Ty C (5 Ft) Each =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 1.00 3000.00 7850.00 5250.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 3.00 3500.00 5435.00 3240.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 6.00 3000.00 3063.12 1432.60 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 5.00 2200.00 2268.33 1850.00 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 1.00 3500.00 4277.50 4800.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 1.00 3500.00 3403.26 2800.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 267 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-00305 Inlet Ty C (5 Ft) Each =================================================== STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 8.00 2000.00 4166.67 4000.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 4.00 2300.00 2625.00 1900.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 3.00 2500.00 3683.25 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32.00 2568.75 3446.13 2875.49 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 4.00 3500.00 5590.03 8000.00 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 3.00 3750.00 3999.24 2498.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 3607.14 5059.77 5642.21 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 8.00 2500.00 2552.98 2634.90 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 6.00 3000.00 2095.12 2300.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 41.00 2000.00 2656.91 2281.25 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 3000.00 2827.00 4410.74 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 3.00 2300.00 2657.40 2300.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 4.00 2000.00 1868.33 4.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 1.00 4000.00 4300.00 4000.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 3.00 3000.00 2862.35 2175.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 6.00 3000.00 2565.02 2420.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 73.00 2313.70 2577.05 2257.30 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 4.00 2100.00 2944.48 2300.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 4.00 2800.00 2542.46 2850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 2450.00 2743.47 2575.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 2466.25 2903.87 2640.78 =============== 604-00310 Inlet Ty C (10 Ft) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 2500.00 3247.49 2590.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2500.00 3247.49 2590.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 12.00 2850.00 3016.70 2976.75 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 268 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-00310 Inlet Ty C (10 Ft) Each =================================================== IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 4000.00 3583.92 5152.43 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2.00 2600.00 3315.53 2700.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 2.00 3000.00 2544.34 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17.00 2905.88 3047.79 2722.20 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 5.00 2300.00 3125.26 2700.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 5.00 3300.00 3281.95 3100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 2800.00 3203.61 2900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 2853.57 3112.05 2780.98 =============== 604-00315 Inlet Ty C (15 Ft) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 4000.00 4040.62 3330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 4000.00 4040.62 3330.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 5000.00 5338.94 6064.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5000.00 5338.94 6064.81 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1.00 4200.00 4678.58 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 4200.00 4678.58 4000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 4400.00 4512.93 4464.94 =============== 604-00320 Inlet Ty C (20 Ft) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 5000.00 5478.52 4625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 5478.52 4625.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1.00 5000.00 5657.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 5657.00 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5000.00 5552.88 4812.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 269 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-00350 Inlet Ty C (Spec) Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1.00 6000.00 5529.13 3824.67 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 2.00 7000.00 5402.07 3800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 6666.67 5432.32 3808.22 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 2.00 4000.00 6523.98 8562.15 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 13000.00 10474.50 11297.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 7000.00 7601.39 9473.93 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 5000.00 4888.25 5200.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.00 4500.00 5428.00 3390.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 11.00 6700.00 5119.99 6350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 6400.00 5125.86 6033.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 6536.84 5472.94 6225.60 =============== 604-00505 Inlet Ty D (5 Ft) Each =================================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 4000.00 3357.40 2487.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 4000.00 3357.40 2487.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 1.00 5500.00 7443.61 10500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5500.00 7443.61 10500.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 3500.00 3481.03 3553.12 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 9.00 3000.00 3362.22 4111.25 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 2.00 3500.00 4276.30 5471.93 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 4.00 3500.00 3089.73 2992.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 3218.75 3427.70 3966.68 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 270 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-00505 Inlet Ty D (5 Ft) Each =================================================== HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 1.00 5000.00 9830.00 10350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 9830.00 10350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 3473.68 3960.72 4568.63 =============== 604-00510 Inlet Ty D (10 Ft) Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 2.00 4000.00 4499.24 4438.46 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 5.00 4200.00 6240.52 9871.75 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 4500.00 4272.93 4200.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1.00 5000.00 4131.60 2240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 4277.78 5419.18 7186.19 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 4500.00 3976.62 3400.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 9.00 6000.00 11967.00 12535.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 1.00 6000.00 14411.00 9500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 5863.64 11408.19 11428.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 5150.00 8719.24 9519.53 =============== 604-00515 Inlet Ty D (15 Ft) Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 7000.00 5974.13 5813.02 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 6000.00 7260.35 6672.13 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 6000.00 6769.30 7055.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 6333.33 6658.71 6513.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 6333.33 6658.71 6513.68 =============== 604-00550 Inlet Ty D (Spec) Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 9000.00 12113.79 11590.15 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 271 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-00550 Inlet Ty D (Spec) Each =================================================== BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 2.00 8000.00 5870.52 7300.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 6000.00 7141.17 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 7750.00 7483.26 7422.54 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 2.00 15000.00 11603.11 17000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 15000.00 11603.11 17000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 10166.67 9131.20 10615.03 =============== 604-13005 Inlet Ty 13 (5 Ft) Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1.00 4000.00 3737.17 3633.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 4000.00 3737.17 3633.83 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 4000.00 2630.92 2591.17 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 2800.00 3029.57 4196.01 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 3.00 3500.00 2817.75 2776.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 3460.00 2823.63 3023.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 3550.00 3031.25 3124.95 =============== 604-13010 Inlet Ty 13 (10 Ft) Each =================================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 4500.00 4176.76 4316.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 4500.00 4176.76 4316.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 4500.00 4176.76 4316.28 =============== 604-13505 Inlet Ty 13 (D) (5 Ft) Each =================================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 5000.00 3803.45 4333.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5000.00 3803.45 4333.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 3803.45 4333.35 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 272 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-16005 Inlet Ty 16 (5 Ft) Each =================================================== IM 0252-384 I-25 OVER BROADWAY 11/09/06 3.00 4500.00 3200.52 3400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 4500.00 3200.52 3400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 4500.00 3200.52 3400.00 =============== 604-16010 Inlet Ty 16 (10 Ft) Each =================================================== IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 5000.00 3665.61 4979.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5000.00 3665.61 4979.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 3665.61 4979.20 =============== 604-16050 Inlet Ty 16 (S) (Spec) Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2.00 1000.00 3423.50 2400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1000.00 3423.50 2400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1000.00 3423.50 2400.00 =============== 604-16510 Inlet Ty 16 (D) (10 Ft) Each =================================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 6000.00 6041.43 6572.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 6000.00 6041.43 6572.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 6000.00 6041.43 6572.30 =============== 604-19105 Inlet Ty R L5 (5 Ft) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 4.00 2800.00 3008.06 2370.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 2800.00 3008.06 2370.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1.00 3500.00 3893.00 4286.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 273 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-19105 Inlet Ty R L5 (5 Ft) Each =================================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 4.00 6000.00 3285.86 3212.25 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 3.00 3500.00 3377.91 4789.37 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 3000.00 3232.79 2500.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 4000.00 4225.12 3250.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 4200.00 3639.68 3742.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 4472.73 3443.11 3726.83 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 13.00 3500.00 4823.00 4115.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 3.00 4500.00 3977.08 4550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 3687.50 4664.39 4196.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31.00 3851.61 3987.83 3794.20 =============== 604-19110 Inlet Ty R L5 (10 Ft) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 3.00 4000.00 4015.53 3165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 4000.00 4015.53 3165.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 11.00 5000.00 4387.28 4278.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 2.00 4500.00 4791.39 5982.30 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 5000.00 5225.16 4200.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 4900.00 4991.08 5859.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 4926.67 4517.33 4605.46 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.00 4500.00 5935.60 4888.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 4500.00 5935.60 4888.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 4757.89 4481.80 4392.89 =============== 604-19115 Inlet Ty R L5 (15 Ft) Each =================================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2.00 6000.00 6031.40 6043.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 6000.00 6031.40 6043.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 6000.00 6031.40 6043.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 274 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-19205 Inlet Ty R L10 (5 Ft) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 3500.00 4474.44 3450.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 2.00 4200.00 4192.00 2800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 3966.67 4308.30 3016.67 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 2.00 3500.00 5468.00 6136.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 3500.00 5020.89 4718.50 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 3.00 5500.00 4861.93 6514.45 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 3.00 4000.00 4919.24 3900.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 2.00 5800.00 5730.52 6439.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 4600.00 5062.64 5555.72 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.00 4500.00 7439.20 5876.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 4500.00 7439.20 5876.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 4466.67 5049.20 5069.26 =============== 604-19210 Inlet Ty R L10 (10 Ft) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 4500.00 5185.95 5030.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 2.00 5500.00 5183.00 3900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 5166.67 5184.21 4276.67 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 5100.00 7020.28 6853.50 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 2.00 6000.00 6164.88 7676.26 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 6.00 5000.00 6132.65 4600.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 8700.00 7418.00 10401.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 5580.00 6280.10 6020.80 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 5.00 6500.00 7080.54 7450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 6500.00 7080.54 7450.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 5766.67 6293.91 6127.11 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 275 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-19215 Inlet Ty R L10 (15 Ft) Each =================================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 7000.00 8570.57 7708.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 7000.00 8570.57 7708.50 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 2.00 10500.00 9205.79 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 10500.00 9205.79 10000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 9333.33 8994.05 9236.17 =============== 604-19220 Inlet Ty R L10 (20 Ft) Each =================================================== IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 9000.00 9373.28 9998.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 9000.00 9373.28 9998.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 9000.00 9373.28 9998.85 =============== 604-19305 Inlet Ty R L15 (5 Ft) Each =================================================== C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 1.00 7000.00 8176.79 5853.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 7000.00 8176.79 5853.57 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 2.00 6500.00 6560.00 7520.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 8500.00 7320.37 8535.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 7166.67 6885.87 7858.37 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1.00 8500.00 6997.33 7200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 8500.00 6997.33 7200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 7400.00 7110.10 7325.74 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 276 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-19310 Inlet Ty R L15 (10 Ft) Each =================================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 7500.00 7501.60 4888.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 7500.00 7501.60 4888.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 4.00 9500.00 9500.03 7100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 9500.00 9500.03 7100.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 3.00 9000.00 8459.72 9250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 9000.00 8459.72 9250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 9062.50 8860.11 7629.75 =============== 604-19315 Inlet Ty R L15 (15 Ft) Each =================================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 9200.00 10781.34 9793.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 9200.00 10781.34 9793.50 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1.00 12000.00 11125.84 11500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 12000.00 11125.84 11500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 10600.00 10953.59 10646.75 =============== 604-19410 Inlet Ty R Spec (10 Ft) Each =================================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 3.00 18000.00 13471.15 23300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 18000.00 13471.15 23300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 18000.00 13471.15 23300.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 277 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-19415 Inlet Ty R Spec (15 Ft) Each =================================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 4.00 18000.00 14581.63 26800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 18000.00 14581.63 26800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 18000.00 14581.63 26800.00 =============== 604-19600 Inlet (Sand Filter) Each =================================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 13.00 13000.00 15421.55 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 13000.00 15421.55 20000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 13000.00 15421.55 20000.00 =============== 604-20000 Outlet Structure Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2.00 12000.00 5354.36 4800.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 2.00 6400.00 11241.80 11259.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 9200.00 7807.46 8029.50 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 7500.00 6054.76 4700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 7500.00 6054.76 4700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 8860.00 7505.27 7363.60 =============== 604-25000 Vane Grate Inlet Spec Each =================================================== BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 2.00 5000.00 3598.91 3200.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 4.00 5000.00 3930.78 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 5000.00 3806.33 2733.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 5000.00 3806.33 2733.33 =============== 604-25005 Vane Grate Inlet (5 Ft) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 3.00 3250.00 3433.92 2150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 3250.00 3433.92 2150.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 278 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-25005 Vane Grate Inlet (5 Ft) Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 18.00 2000.00 3368.16 2960.62 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 4.00 3000.00 3987.05 2400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 22.00 2181.82 3541.45 2858.69 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.00 3500.00 6242.60 2813.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 3500.00 6242.60 2813.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 2355.77 3630.71 2775.16 =============== 604-25006 Vane Grate Inlet Spec (5 Ft) Each =================================================== STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 1.00 6000.00 8304.13 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 6000.00 8304.13 10000.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 4000.00 4107.14 3411.54 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2.00 5500.00 4116.97 4454.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 5000.00 4114.16 4106.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 5250.00 4853.57 5579.89 =============== 604-25010 Vane Grate Inlet (10 Ft) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 3.00 4000.00 4243.66 2950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 4000.00 4243.66 2950.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 2.00 3000.00 4039.63 3548.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 279 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-25010 Vane Grate Inlet (10 Ft) Each =================================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 4200.00 4304.95 4400.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 3400.00 4111.99 3832.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 3700.00 4198.40 3391.31 =============== 604-25011 Vane Grate Inlet Spec (10 Ft) Each =================================================== STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 4.00 7000.00 16219.60 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 7000.00 16219.60 20000.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 5000.00 4722.85 3999.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5000.00 4722.85 3999.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 6600.00 13345.41 16799.88 =============== 604-26005 Vane Grate Inlet (D) (5 Ft) Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 31.00 3500.00 4829.92 3770.18 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1.00 5000.00 4697.93 2755.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 2.00 5900.00 4943.03 4477.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 34.00 3685.29 4831.04 3781.91 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 6.00 5000.00 4788.96 4800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 5000.00 4788.96 4800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 3882.50 4823.35 3934.62 =============== 604-26010 Vane Grate Inlet (D) (10 Ft) Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 6.00 4800.00 5545.96 4769.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 4800.00 5545.96 4769.84 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 280 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-26010 Vane Grate Inlet (D) (10 Ft) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 4000.00 6258.58 6200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 4000.00 6258.58 6200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 4600.00 5755.56 5127.38 =============== 604-26015 Vane Grate Inlet (D) (15 Ft) Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 5200.00 6842.39 6296.05 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 7500.00 7777.06 6505.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 6350.00 7242.96 6400.61 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 6000.00 7615.94 6900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 6000.00 7615.94 6900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 6233.33 7398.37 6567.07 =============== 604-26016 Vane Grate Inlet Special (D) (15 Ft) Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 7500.00 7660.75 6790.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 7500.00 7660.75 6790.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 7500.00 7660.75 6790.48 =============== 604-26020 Vane Grate Inlet (D) (20 Ft.) Each =================================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 8500.00 10675.43 12649.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 8500.00 10675.43 12649.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 8500.00 10675.43 12649.28 =============== 604-30000 MH Slab Base (Spec) Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 7000.00 4717.46 2600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 7000.00 4717.46 2600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 7000.00 4717.46 2600.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 281 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-30005 MH Slab Base (5 Ft) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 5.00 2400.00 2126.48 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 2400.00 2126.48 1500.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 7.00 2100.00 2383.48 1738.93 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1.00 3000.00 2280.37 1700.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 5.00 2500.00 2968.35 4452.25 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 3.00 2000.00 2788.00 1800.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 6500.00 3102.87 1800.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 5.00 2000.00 3509.13 2779.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 22.00 2395.45 2818.66 2601.40 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 5.00 2000.00 2427.03 2100.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 5.00 2500.00 4643.40 2017.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 2250.00 3535.22 2058.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37.00 2356.76 2881.71 2305.83 =============== 604-30010 MH Slab Base (10 Ft) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 7.00 2700.00 2964.82 2000.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 2.00 4750.00 3266.00 2800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 3155.56 3015.87 2177.78 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 1.00 6000.00 8139.57 10000.00 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 1.00 3500.00 8319.25 7138.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 4750.00 8211.44 8569.25 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 2.00 2900.00 2781.80 1815.21 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 282 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-30010 MH Slab Base (10 Ft) Each =================================================== BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1.00 3500.00 2429.16 2600.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 8.00 3500.00 3535.59 4667.75 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 2.00 2500.00 3776.59 3573.61 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 4.00 3000.00 3583.19 2200.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 6500.00 3236.29 2250.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 3.00 4000.00 5274.66 5032.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21.00 3466.67 3592.42 3660.36 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 16.00 3500.00 3610.17 3040.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 1.00 3500.00 4922.65 3800.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1.00 3500.00 5557.68 8350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 3500.00 3827.78 3377.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 3474.00 3634.60 3487.92 =============== 604-30015 MH Slab Base (15 Ft) Each =================================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 4500.00 4569.60 2798.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 4500.00 4569.60 2798.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 2.00 4800.00 4970.73 7197.41 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 4.00 4500.00 4375.72 5334.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 3.00 4500.00 5085.03 3100.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 10.00 4500.00 7099.27 5930.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19.00 4531.58 5658.79 5491.46 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 4.00 4500.00 6319.62 5700.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 2.00 6500.00 6103.55 6800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 5166.67 6247.60 6066.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 4676.92 5765.96 5520.61 =============== 604-30020 MH Slab Base (20 Ft) Each =================================================== IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 2.00 7500.00 4535.53 3726.10 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 283 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-30020 MH Slab Base (20 Ft) Each =================================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 2.00 5150.00 8684.23 6541.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 6325.00 6313.54 5133.65 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 8000.00 13198.50 11500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 8000.00 13198.50 11500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 6883.33 9182.28 7255.77 =============== 604-31000 MH Box Base (Spec) Each =================================================== BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 2.00 10000.00 6034.07 6300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 10000.00 6034.07 6300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 10000.00 6034.07 6300.00 =============== 604-31005 MH Box Base (5 Ft) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 5000.00 7010.62 8900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 7010.62 8900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 7010.62 8900.00 =============== 604-31010 MH Box Base (10 Ft) Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 4.00 5000.00 9264.26 8895.53 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 5.00 5000.00 5380.85 6500.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 4200.00 7198.91 7000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 4920.00 6940.45 7508.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 4920.00 6940.45 7508.21 =============== 604-31015 MH Box Base (15 Ft) Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 4.00 5800.00 10092.28 9270.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 5800.00 10092.28 9270.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 5800.00 10092.28 9270.60 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 284 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-31020 MH Box Base (20 Ft) Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 6400.00 10522.23 9657.40 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 5500.00 8796.03 8300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 5950.00 9423.74 8978.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5950.00 9423.74 8978.70 =============== 604-32015 MH T-Base (15 Ft) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 5000.00 3948.73 2600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 3948.73 2600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 3948.73 2600.00 =============== 604-39005 MH Spec (5 Ft) Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 3.00 5000.00 6411.69 3400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 5000.00 6411.69 3400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 5000.00 6411.69 3400.00 =============== 604-39010 MH Spec (10 Ft) Each =================================================== IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 1.00 25000.00 18533.33 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 25000.00 18533.33 15000.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 2500.00 6780.33 5782.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2500.00 6780.33 5782.99 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.00 4000.00 4390.00 2250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 4000.00 4390.00 2250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 10500.00 8899.18 7677.66 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 285 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-39015 MH Spec (15 Ft) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 5000.00 6758.76 6600.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.00 4500.00 5267.00 2935.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 4833.33 6261.51 5378.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 4833.33 6261.51 5378.33 =============== 604-39020 MH Spec (20 Ft) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 6000.00 8758.26 9200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 6000.00 8758.26 9200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 6000.00 8758.26 9200.00 =============== 604-39050 MH (TMS) Each =================================================== C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 9.00 4500.00 11108.79 13000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 4500.00 11108.79 13000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 4500.00 11108.79 13000.00 =============== 604-84000 Plastic Sliplining Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 518.00 60.00 131.01 193.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 518.00 60.00 131.01 193.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 518.00 60.00 131.01 193.00 =============== 605-00004 4 In Underdrain Lin Foot =============================================== IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 202.00 5.00 5.96 3.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 202.00 5.00 5.96 3.69 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 1,058.00 10.00 18.36 8.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,058.00 10.00 18.36 8.15 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 286 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 605-00004 4 In Underdrain Lin Foot =============================================== NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 694.00 10.00 15.76 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 694.00 10.00 15.76 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,954.00 9.48 14.97 10.48 =============== 605-00020 2 Inch PP Underdrain Lin Foot =============================================== IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1,700.00 35.00 39.10 37.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,700.00 35.00 39.10 37.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,700.00 35.00 39.10 37.18 =============== 605-00040 4 In PP Underdrain Lin Foot =============================================== IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 880.00 3.00 4.15 2.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 880.00 3.00 4.15 2.12 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 130.00 20.00 23.16 26.49 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 3,093.00 12.00 40.90 65.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,223.00 12.32 40.18 64.02 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 505.00 66.00 26.22 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 505.00 66.00 26.22 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,608.00 16.42 25.21 46.94 =============== 605-00041 4 In PP Underdrain (Special) Lin Foot =============================================== STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 2,931.00 27.00 28.15 22.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,931.00 27.00 28.15 22.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,931.00 27.00 28.15 22.45 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 287 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 605-00060 6 In PP Underdrain Lin Foot =============================================== STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 3,733.00 8.00 15.76 9.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,733.00 8.00 15.76 9.50 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 664.00 80.00 18.83 15.58 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1,441.00 25.00 24.27 16.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 300.00 60.00 14.57 12.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 361.00 60.00 80.84 10.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,766.00 46.57 26.61 14.75 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 780.00 20.00 18.59 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 780.00 20.00 18.59 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,279.00 23.94 21.54 11.55 =============== 605-00080 8 In PP Underdrain Lin Foot =============================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 3,460.00 40.00 24.31 14.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,460.00 40.00 24.31 14.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,460.00 40.00 24.31 14.75 =============== 605-00120 12 In PP Underdrain Lin Foot =============================================== STA 0091-026 STATE HIGHWAY NO 9 11/30/06 191.00 65.00 103.22 63.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 191.00 65.00 103.22 63.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 191.00 65.00 103.22 63.10 =============== 605-01020 2 In Hor Drain Lin Foot =============================================== STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 1,400.00 30.00 43.41 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,400.00 30.00 43.41 47.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 288 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 605-01020 2 In Hor Drain Lin Foot =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 49.00 35.00 21.12 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 49.00 35.00 21.12 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,449.00 30.17 41.73 45.55 =============== 605-01030 3 In Hor Drain Lin Foot =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 537.00 50.00 22.36 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 537.00 50.00 22.36 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 537.00 50.00 22.36 4.00 =============== 605-82100 Pipe Edge Drain Lin Foot =============================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 275.00 35.00 24.31 7.55 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 797.00 18.00 36.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,072.00 22.36 31.73 39.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,072.00 22.36 31.73 39.11 =============== 605-83000 Geocomp Drain Sq Yard ================================================ IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 147.00 20.00 13.33 13.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 147.00 20.00 13.33 13.79 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 392.00 19.00 20.19 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 392.00 19.00 20.19 15.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 890.00 10.00 11.21 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 890.00 10.00 11.21 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,429.00 13.50 12.73 13.01 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 289 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 605-83001 Geocomp Drain (w/o Pipe) Sq Yard ================================================ IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 54.00 20.00 17.60 13.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 54.00 20.00 17.60 13.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54.00 20.00 17.60 13.50 =============== 605-83560 6 In Pipe Underdrain Lin Foot =============================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 890.00 45.00 36.11 34.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 890.00 45.00 36.11 34.55 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 48.00 50.00 26.01 15.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48.00 50.00 26.01 15.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 938.00 45.26 35.79 33.55 =============== 605-84000 Subsurface Drain Outlet Lin Foot =============================================== STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 850.00 12.50 16.63 12.90 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 60.00 80.00 39.07 34.34 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 60.00 15.00 36.67 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 970.00 16.83 20.04 17.14 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 722.00 6.00 12.43 9.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 722.00 6.00 12.43 9.50 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 500.00 14.00 27.54 12.42 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 554.00 25.00 21.64 20.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 50.00 40.00 39.29 23.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,104.00 20.70 24.04 16.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,796.00 15.56 20.72 15.01 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 290 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 605-84100 Subsurface Drain Outlet Str Each =================================================== STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 6.00 200.00 464.67 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 200.00 464.67 900.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 2.00 500.00 4550.38 415.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 500.00 4550.38 415.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 275.00 1923.85 778.75 =============== 605-85000 Surface Sand Filter Sq Foot ================================================ STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 28,580.00 4.50 5.07 4.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 28,580.00 4.50 5.07 4.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28,580.00 4.50 5.07 4.75 =============== 606-00301 Gdrail Ty 3 (6-3) Lin Foot =============================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 1,675.00 25.00 17.58 16.38 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 2,988.00 20.00 15.65 14.70 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 775.00 25.00 21.00 19.50 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 1,137.50 18.00 15.50 15.00 STA 0343-025 US 34, WRAY WEST 01/26/06 1,663.00 15.00 15.48 14.90 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 4,326.00 20.00 17.47 17.86 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 2,801.00 20.00 17.51 17.27 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 7,875.00 18.00 16.01 14.53 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 8,800.00 17.00 14.93 15.50 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 875.00 21.00 17.77 16.59 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 3,137.50 18.00 20.10 19.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 25.00 20.00 22.90 22.00 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 1,862.50 16.00 17.78 16.20 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 287.50 17.00 19.40 20.83 SHE 0911-004 SH 91 & SH 67 GUARDRAIL 03/09/06 9,600.00 17.00 14.71 15.87 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 1,300.00 17.00 14.89 14.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 5,500.00 16.00 17.14 17.70 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 2,825.00 17.00 17.13 15.50 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 253.00 17.00 18.00 18.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 291 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00301 Gdrail Ty 3 (6-3) Lin Foot =============================================== IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 2,815.00 16.00 15.25 15.50 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 1,525.00 18.00 19.67 19.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 887.50 20.00 16.43 15.65 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 1,825.00 17.00 17.40 18.00 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 3,090.00 17.50 17.25 17.25 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 412.50 25.00 18.75 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 68,261.00 17.90 16.60 16.30 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 2,675.00 16.00 16.69 14.70 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 45.00 35.00 148.67 156.36 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 3,450.00 18.00 24.01 20.15 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 100.00 25.00 25.01 22.75 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 4,200.00 17.00 16.20 15.90 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 774.00 18.00 17.50 18.00 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 162.50 25.00 36.12 40.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 6,767.00 17.00 16.24 16.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 287.50 20.00 22.13 26.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 975.00 18.00 21.07 21.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 1,100.00 18.00 23.09 19.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20,536.00 17.36 18.65 17.68 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 7,479.00 16.00 16.01 16.22 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 147.00 20.00 19.01 20.00 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 75.00 30.00 33.00 33.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 3,347.00 16.00 17.36 17.50 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 575.00 20.00 21.13 22.40 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 6,137.50 17.00 14.69 14.50 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 756.00 19.00 16.20 16.64 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 801.00 20.00 17.22 16.10 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 125.00 40.00 24.84 24.68 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 28.00 30.00 60.32 55.50 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1,104.00 17.00 17.76 21.28 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 100.00 20.00 23.43 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20,674.50 16.99 16.22 16.58 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 1,417.00 18.00 18.29 18.29 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 292 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00301 Gdrail Ty 3 (6-3) Lin Foot =============================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 8,494.00 17.00 13.95 14.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 3,230.00 18.50 14.70 14.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 425.00 17.00 20.91 20.00 SHE 0503-067 US 50, WEST OF CANON CITY 11/30/06 8,000.00 22.00 19.09 16.25 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 52.00 25.00 39.77 30.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 250.00 27.00 20.37 25.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 6,862.50 15.00 13.87 14.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 1,239.00 16.00 16.71 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29,969.50 18.14 15.86 15.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 139,441.00 17.74 16.61 16.28 =============== 606-00305 Gdrail Ty 3 (Spec) Lin Foot =============================================== BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 25.00 50.00 57.75 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.00 50.00 57.75 42.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 50.00 57.75 42.00 =============== 606-00310 Gdrail Ty 3A Lin Foot =============================================== ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 4,000.00 20.00 13.79 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,000.00 20.00 13.79 13.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,000.00 20.00 13.79 13.00 =============== 606-00350 Gdrail Ty 3 (D) (6-3) Lin Foot =============================================== IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 575.00 16.00 25.28 25.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 575.00 16.00 25.28 25.85 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 12.00 160.00 52.93 52.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 160.00 52.93 52.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 587.00 18.94 25.85 26.40 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 293 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00700 Gdrail Ty 7 Lin Foot =============================================== C 0702-258 I70 - ROCKFALL IN GLENWOOD CA 01/06/06 30.00 250.00 833.33 300.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 20.00 71.00 76.67 70.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 400.00 70.00 60.14 94.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 450.00 82.04 92.97 107.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 450.00 82.04 92.97 107.29 =============== 606-00705 Gdrail Ty 7 (Spec) Lin Foot =============================================== SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 75.00 250.00 372.50 395.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 75.00 250.00 372.50 395.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75.00 250.00 372.50 395.00 =============== 606-00710 Gdrail Ty 7 (Sty CA) Lin Foot =============================================== IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 550.00 50.00 96.67 95.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 3,832.00 40.00 52.29 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,382.00 41.26 54.86 45.15 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 64.00 100.00 115.36 113.99 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 664.00 75.00 49.38 58.03 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 454.00 40.00 56.57 46.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 314.00 60.00 65.27 53.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,496.00 62.30 57.30 55.89 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 9,103.00 38.00 54.13 37.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 30.00 75.00 100.29 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,133.00 38.12 54.35 37.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,011.00 41.45 54.74 41.44 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 294 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00716 Gdrial Ty 7 (Sty CA) (Spec) Lin Foot =============================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 835.00 55.00 71.81 54.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 835.00 55.00 71.81 54.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 835.00 55.00 71.81 54.44 =============== 606-00720 Gdrail Ty 7 (Sty CC) Lin Foot =============================================== BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1,853.00 45.00 58.03 46.50 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 5,203.00 40.00 48.57 50.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 877.00 100.00 84.46 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,933.00 47.80 54.07 49.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,933.00 47.80 54.07 49.29 =============== 606-00721 Gdrail Ty 7 (Sty CC)(Spec) Lin Foot =============================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 667.00 70.00 41.06 40.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 667.00 70.00 41.06 40.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 667.00 70.00 41.06 40.15 =============== 606-00725 Gdrail Ty 7 (Sty CC)(Conc Glare Screen) Lin Foot =============================================== NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 365.00 150.00 203.51 117.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 365.00 150.00 203.51 117.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 365.00 150.00 203.51 117.00 =============== 606-00730 Gdrail Ty 7 (Sty CD) Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 481.00 37.00 55.66 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 481.00 37.00 55.66 37.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1,872.20 38.00 80.90 37.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 295 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00730 Gdrail Ty 7 (Sty CD) Lin Foot =============================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 298.00 50.00 63.56 52.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,170.20 39.65 79.79 39.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,651.20 39.17 75.11 38.76 =============== 606-00740 Gdrail Ty 7 (Sty CE) Lin Foot =============================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 25.00 125.00 112.40 84.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 125.00 112.40 84.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 13,658.00 50.00 49.23 50.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,658.00 50.00 49.23 50.67 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1,298.00 100.00 71.40 67.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,298.00 100.00 71.40 67.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,981.00 54.46 51.71 52.14 =============== 606-00741 Gdrail Ty 7 (Sty CE) (Spec) Lin Foot =============================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 335.00 220.00 204.30 162.68 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 493.00 125.00 104.53 77.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 828.00 163.44 151.95 112.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 828.00 163.44 151.95 112.02 =============== 606-00800 Gdrail Ty 7 (F-Sh Conc Barrier) Lin Foot =============================================== IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 1,620.00 55.00 63.50 72.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,620.00 55.00 63.50 72.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,620.00 55.00 63.50 72.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 296 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00900 Gdrail (Spec) Lin Foot =============================================== C 0702-258 I70 - ROCKFALL IN GLENWOOD CA 01/06/06 20.00 500.00 933.33 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 500.00 933.33 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 500.00 933.33 500.00 =============== 606-01320 End Anchor Ty 3B Each =================================================== NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 4.00 1250.00 785.01 375.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 1.00 600.00 1800.00 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 1120.00 844.72 660.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1120.00 844.72 660.00 =============== 606-01340 End Anchor Ty 3D Each =================================================== IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 5.00 1000.00 683.33 670.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 8.00 700.00 705.35 773.74 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 3.00 700.00 848.47 636.00 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 6.00 650.00 710.63 560.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 7.00 600.00 832.52 1100.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 4.00 525.00 616.34 593.00 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 3.00 600.00 677.23 649.55 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 17.00 600.00 598.80 400.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 2.00 700.00 755.00 760.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 2.00 700.00 658.00 580.00 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 3.00 800.00 625.00 625.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 1.00 700.00 750.00 750.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 1.00 1000.00 695.00 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 62.00 674.19 681.28 640.06 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 2.00 800.00 808.40 657.00 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 1.00 1000.00 1610.20 1118.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 2.00 700.00 857.33 860.00 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 1.00 600.00 1214.00 915.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 766.67 1037.99 844.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 297 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01340 End Anchor Ty 3D Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 19.00 650.00 663.04 726.15 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 9.00 700.00 553.63 524.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 2.00 800.00 580.61 593.67 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 2.00 650.00 627.06 588.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 4.00 1000.00 664.25 636.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 36.00 709.72 623.74 650.64 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 8.00 600.00 641.31 670.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 4.00 650.00 1233.43 875.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 12.00 650.00 608.91 610.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 5.00 650.00 763.29 760.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29.00 636.21 757.29 688.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 133.00 679.70 703.65 662.81 =============== 606-01370 Transition Ty 3G Each =================================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 4.00 1100.00 1119.26 1016.30 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 8.00 1800.00 1217.85 1247.40 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 1.00 1500.00 983.33 1050.00 STA 0343-025 US 34, WRAY WEST 01/26/06 12.00 1100.00 1087.50 950.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 6.00 1100.00 1027.53 1081.63 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 2.00 1200.00 1051.00 1100.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 8.00 1000.00 1106.60 1200.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 8.00 850.00 1044.82 1016.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 4.00 1200.00 980.83 900.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 4.00 1200.00 1028.48 1100.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 6.00 1200.00 1150.00 1150.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 1.00 1050.00 1100.00 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 64.00 1174.22 1076.99 1076.75 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 4.00 1100.00 1262.00 1100.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 2.00 1100.00 1241.22 1188.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 298 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01370 Transition Ty 3G Each =================================================== NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 20.00 1200.00 781.00 766.24 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 34.00 1000.00 1080.88 1050.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 2.00 900.00 1071.36 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 62.00 1070.97 1023.31 967.75 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 3.00 1200.00 985.75 927.00 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 4.00 1050.00 1562.07 1700.00 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 6.00 1500.00 1450.00 1400.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 4.00 1000.00 1150.36 1200.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 4.00 1200.00 1024.14 991.25 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 4.00 1100.00 1015.43 952.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 5.00 1200.00 1217.72 1114.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 6.00 1200.00 1116.34 1248.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 36.00 1200.00 1204.03 1211.45 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 9.00 1200.00 1050.80 1100.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 17.00 1100.00 1123.60 1075.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 2.00 1100.00 1320.33 1461.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 4.00 1250.00 1300.25 1150.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 5.00 1000.00 975.26 985.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 1.00 1200.00 1177.25 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 38.00 1128.95 1125.93 1097.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 1138.25 1097.27 1071.24 =============== 606-01371 Transition Ty 3G (Spec) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 2000.00 936.49 920.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2000.00 936.49 920.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2000.00 936.49 920.00 =============== 606-01380 Transition Ty 3H Each =================================================== IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 1.00 800.00 625.00 650.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 299 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01380 Transition Ty 3H Each =================================================== IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 4.00 600.00 756.57 810.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 4.00 550.00 574.89 550.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 4.00 700.00 649.06 700.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 2.00 750.00 1000.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 646.67 646.64 726.00 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 2.00 750.00 735.00 665.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 2.00 700.00 736.44 740.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 725.00 735.64 702.50 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 6.00 700.00 747.44 746.75 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 4.00 600.00 692.67 700.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 4.00 700.00 606.93 586.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1.00 600.00 639.27 600.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 5.00 800.00 688.44 729.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 700.00 684.51 693.56 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 6.00 550.00 624.45 655.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 13.00 800.00 665.14 630.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 1.00 850.00 647.94 802.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 5.00 600.00 555.75 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.00 702.00 638.74 626.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 64.00 689.84 657.49 675.67 =============== 606-01385 Transition Ty 3J Each =================================================== NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 2.00 850.00 597.00 528.00 STA 0343-025 US 34, WRAY WEST 01/26/06 1.00 800.00 561.25 555.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 3.00 1200.00 1299.57 1431.87 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 4.00 700.00 749.73 460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 890.00 910.55 774.66 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 300 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01385 Transition Ty 3J Each =================================================== STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 1.00 1100.00 1955.20 1591.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 2.00 750.00 638.50 625.49 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 2.00 700.00 942.93 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 800.00 1133.21 968.40 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 2.00 800.00 1284.20 1500.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 700.00 763.54 693.35 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 1000.00 1110.45 591.35 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 1.00 600.00 1238.13 1631.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 780.00 1153.39 1183.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 840.00 1033.71 925.22 =============== 606-01390 End Anchor Ty 3K Each =================================================== NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 2.00 1000.00 1124.05 1096.20 STA 0343-025 US 34, WRAY WEST 01/26/06 1.00 1000.00 997.59 945.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 2.00 950.00 1117.87 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 980.00 1093.89 1107.48 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 1.00 1200.00 1885.36 1329.78 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 2.00 900.00 1047.03 1026.85 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 2.00 1000.00 1082.71 1150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 1000.00 1306.19 1136.70 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 1.00 1000.00 1081.07 1300.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 2.00 900.00 1043.88 955.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 1200.00 749.77 343.30 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 1.00 1300.00 1078.59 1046.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 1060.00 1025.84 919.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 1013.33 1125.69 1054.68 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 301 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01395 Transition Ty 3L Each =================================================== STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 6.00 470.00 816.00 850.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 20.00 650.00 644.00 680.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26.00 608.46 670.24 719.23 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 4.00 850.00 539.33 476.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 850.00 539.33 476.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 640.67 648.11 686.80 =============== 606-01460 Median Terminal Each =================================================== IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 6.00 4000.00 4021.78 3970.70 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 4.00 3800.00 4310.60 4400.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 4.00 4000.00 3700.00 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 3942.86 4071.82 4101.73 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 6.00 3800.00 4316.60 3883.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 3800.00 4316.60 3883.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 4500.00 3931.69 4024.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 4500.00 3931.69 4024.07 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 4000.00 3797.72 3800.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 3.00 4000.00 4091.40 4057.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 8.00 5000.00 4425.21 4610.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 1.00 3400.00 4284.60 4400.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 2.00 4000.00 3674.47 3700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 4462.50 4225.83 4278.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37.00 4159.46 4185.55 4140.47 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 302 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-02003 End Anchor (Nonflared) Each =================================================== NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 4.00 2200.00 2036.90 2127.60 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 5.00 3500.00 1956.67 1920.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 14.00 2000.00 1951.31 2054.53 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 12.00 1900.00 1906.50 1625.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 8.00 1900.00 1898.02 2300.00 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 3.00 2500.00 2159.56 1973.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 8.00 1900.00 1969.71 1970.00 SHE 0911-004 SH 91 & SH 67 GUARDRAIL 03/09/06 2.00 3000.00 1747.60 1700.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 17.00 1900.00 2225.40 3200.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 6.00 2000.00 2178.16 1900.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 4.00 2000.00 2100.00 2100.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 8.00 1700.00 2200.00 2500.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 1.00 2000.00 2200.00 2000.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 2.00 2300.00 2020.00 1900.00 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 4.00 2100.00 1850.00 1850.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 1.00 2200.00 2280.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 99.00 2061.62 2045.68 2219.73 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 1.00 2200.00 1962.28 1600.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 2.00 2100.00 2224.74 2115.00 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 6.00 2100.00 2111.67 2235.00 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 1.00 2200.00 2818.00 2700.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 2.00 2200.00 2497.95 2800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 2133.33 2269.31 2295.00 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 3.00 2100.00 2204.54 2300.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 16.00 2500.00 1946.51 1900.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 2.00 2000.00 2144.64 2010.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 2.00 2600.00 2143.42 2196.84 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 2000.00 2141.42 1950.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 4.00 2100.00 2024.43 2152.28 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 3.00 2500.00 2269.85 2178.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 31.00 2367.74 2029.82 2026.03 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 1.00 2100.00 2278.44 2340.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 303 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-02003 End Anchor (Nonflared) Each =================================================== SHE 0503-067 US 50, WEST OF CANON CITY 11/30/06 14.00 2200.00 1909.85 2116.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 3.00 2400.00 2170.44 2050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 2227.78 2003.25 2117.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 160.00 2145.00 2048.16 2176.33 =============== 606-02005 End Anchor (Flared) Each =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 40.00 1600.00 2328.60 1393.00 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 18.00 1400.00 1513.38 1386.90 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 2.00 1600.00 1571.70 1576.80 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 7.00 3200.00 1538.33 1490.00 STA 0343-025 US 34, WRAY WEST 01/26/06 11.00 1650.00 1666.25 1465.00 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 3.00 1800.00 1593.13 1400.00 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 1.00 2000.00 1629.67 1458.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 34.00 1400.00 2255.33 3400.00 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 3.00 2000.00 1826.15 1788.91 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 2.00 1500.00 2153.25 3978.00 SHE 0911-004 SH 91 & SH 67 GUARDRAIL 03/09/06 12.00 1800.00 1214.38 1400.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 4.00 1750.00 1497.50 1400.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 2.00 1600.00 1594.78 1400.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 10.00 1400.00 1950.00 2300.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 7.00 1500.00 1733.33 1700.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 1500.00 1509.20 1396.00 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 2.00 1600.00 2061.71 3850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 159.00 1622.33 1927.62 1975.85 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 4.00 1350.00 1698.00 1460.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 4.00 1800.00 1944.08 1840.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 20.00 1600.00 1592.91 1563.74 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 34.00 1750.00 1608.25 1900.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 2.00 1500.00 1608.12 1600.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 14.00 2000.00 2116.95 2470.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 12.00 1800.00 1948.13 1714.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 90.00 1741.11 1735.16 1860.31 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 15.00 1500.00 1561.63 1545.01 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 304 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-02005 End Anchor (Flared) Each =================================================== SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 6.00 2000.00 3600.00 5200.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 1.00 2400.00 2205.29 2115.86 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 17.00 1600.00 1380.25 1349.50 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 1800.00 1414.33 1439.83 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 3.00 1500.00 1589.68 1500.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 2.00 1600.00 1663.68 1525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 45.00 1635.56 1624.76 1964.94 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 1.00 1700.00 2385.68 2385.68 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 9.00 1500.00 1481.50 1500.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 24.00 2000.00 2350.00 1600.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 11.00 2500.00 1922.70 2645.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 8.00 2000.00 1993.75 1575.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 4.00 2500.00 1929.07 2400.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 12.00 1500.00 1438.22 1450.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 3.00 1500.00 1658.72 1650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 72.00 1933.33 1921.67 1776.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 366.00 1714.34 1849.00 1906.94 =============== 606-10200 Brdg Rail (Spec) Lin Foot =============================================== NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 30.00 180.00 98.57 91.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 180.00 98.57 91.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 180.00 98.57 91.35 =============== 606-10300 Brdg Rail Ty 3 Lin Foot =============================================== STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 50.00 75.00 191.00 150.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 196.00 85.00 95.40 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 246.00 82.97 108.09 118.13 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 48.00 100.00 88.32 74.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48.00 100.00 88.32 74.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 294.00 85.75 104.08 110.93 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 305 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-10305 Brdg Rail Ty 3 (Spec) Lin Foot =============================================== NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 421.00 75.00 62.71 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 421.00 75.00 62.71 48.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 421.00 75.00 62.71 48.00 =============== 606-10700 Brdg Rail Ty 7 Lin Foot =============================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 542.00 80.00 85.72 70.59 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1,507.00 55.00 68.44 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,049.00 61.61 71.97 59.12 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 227.00 73.00 85.59 81.34 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1,011.00 65.00 78.19 68.50 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 4,609.00 60.00 57.64 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,847.00 61.37 62.93 57.57 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 6,011.00 60.00 59.51 46.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 93.00 100.00 131.57 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,104.00 60.61 61.04 46.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,000.00 61.07 63.84 53.08 =============== 606-10705 Brdg Rail Ty 7 (Spec) Lin Foot =============================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 219.00 150.00 89.36 67.82 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 115.00 105.00 210.00 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 334.00 134.51 100.83 116.77 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 4,086.00 80.00 103.99 95.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,086.00 80.00 103.99 95.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,420.00 84.12 103.71 97.37 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 306 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-11000 Brdg Rail Ty 10 Lin Foot =============================================== BR 069A-019 SH 69, ROSITA CREEK 03/09/06 137.00 270.00 106.45 98.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 137.00 270.00 106.45 98.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 30.00 80.00 150.41 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 80.00 150.41 130.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 167.00 235.87 115.40 103.75 =============== 606-11005 Brdg Rail Ty 10 (Spec) Lin Foot =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 162.00 90.00 143.49 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 162.00 90.00 143.49 115.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 162.00 90.00 143.49 115.00 =============== 606-11010 Brdg Rail Ty 10R Lin Foot =============================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 184.00 140.00 167.80 166.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 523.00 170.00 92.63 89.50 STA 0343-025 US 34, WRAY WEST 01/26/06 544.00 120.00 170.44 175.00 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 186.00 135.00 231.00 230.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 1,836.00 80.00 102.84 91.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1,036.00 100.00 96.57 92.00 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 58.00 150.00 287.18 354.22 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 676.00 115.00 94.50 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,043.00 107.47 114.05 111.54 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 344.00 110.00 103.80 95.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 250.00 125.00 125.43 120.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 1,334.00 130.00 118.35 118.84 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 360.00 240.00 251.50 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,288.00 143.75 139.64 136.02 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 307 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-11010 Brdg Rail Ty 10R Lin Foot =============================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 717.00 100.00 131.78 132.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 1,011.00 125.00 93.50 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,728.00 114.63 111.49 107.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,059.00 118.00 119.02 116.94 =============== 606-11020 Brdg Rail Ty 10H Lin Foot =============================================== BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 94.00 150.00 120.00 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 94.00 150.00 120.00 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 94.00 150.00 120.00 120.00 =============== 606-11030 Brdg Rail Ty 10M Lin Foot =============================================== BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 143.00 110.00 154.64 170.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 520.00 110.00 130.28 111.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 80.00 100.00 145.50 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 743.00 108.92 137.60 122.79 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 230.00 100.00 138.99 130.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1,072.00 140.00 149.53 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,302.00 132.93 147.67 179.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,045.00 124.21 143.83 158.83 =============== 606-11032 Brdg Rail Ty 10M (Spec) Lin Foot =============================================== BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 159.00 125.00 177.70 155.40 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 19.00 340.00 366.00 350.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 241.00 230.00 248.00 248.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 419.00 195.14 226.92 217.49 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 308 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-11032 Brdg Rail Ty 10M (Spec) Lin Foot =============================================== BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 143.00 120.00 205.40 225.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 479.00 100.00 188.78 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 622.00 104.60 193.16 159.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,041.00 141.04 198.67 182.86 =============== 606-20000 Wire Rope Safety Fence Lin Foot =============================================== IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 1,281.00 20.00 49.28 49.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,281.00 20.00 49.28 49.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,281.00 20.00 49.28 49.85 =============== 606-20010 Tensioned Cable Barrier Lin Foot =============================================== IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 23,937.00 16.00 13.33 14.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 8,976.00 20.00 20.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32,913.00 17.09 14.07 15.64 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 23,674.00 17.00 19.87 18.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23,674.00 17.00 19.87 18.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56,587.00 17.05 17.20 16.78 =============== 606-21000 Wire Rope End Anchorage Each =================================================== IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 4.00 2700.00 3966.67 4100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 2700.00 3966.67 4100.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 14.00 2500.00 2906.34 2787.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 2500.00 2906.34 2787.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 2544.44 3061.51 3078.78 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 309 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-21010 End Anchor (Tens Cab Bar) Each =================================================== IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 20.00 2200.00 2780.00 2900.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 10.00 2500.00 2500.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 2300.00 2740.00 2766.67 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 18.00 2700.00 3068.63 3600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 2700.00 3068.63 3600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48.00 2450.00 2906.63 3079.17 =============== 607-00000 Line Post Each =================================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 75.00 50.00 55.55 45.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 75.00 50.00 55.55 45.75 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 55.00 30.00 84.71 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 55.00 30.00 84.71 70.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 130.00 41.54 67.89 56.01 =============== 607-00005 End Post Each =================================================== STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 12.00 130.00 210.67 225.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 13.00 160.00 155.71 150.57 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 8.00 130.00 155.75 223.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 8.00 180.00 130.71 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 41.00 149.27 160.02 175.64 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 29.00 130.00 106.41 104.24 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 310 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-00005 End Post Each =================================================== BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 4.00 200.00 197.65 195.30 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 8.00 130.00 106.25 100.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 49.00 150.00 170.10 175.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 90.00 144.00 143.22 146.59 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 10.00 200.00 144.26 157.52 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 10.00 130.00 246.25 210.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 2.00 170.00 147.72 149.14 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 4.00 165.00 161.84 173.68 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 6.00 160.00 185.33 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 32.00 164.38 199.00 168.38 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 5.00 200.00 379.20 446.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 12.00 130.00 125.33 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 150.59 200.00 219.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 180.00 149.44 167.03 163.96 =============== 607-00010 Corner and Line Br Post Each =================================================== STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 4.00 155.00 255.03 205.10 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 12.00 150.00 252.67 250.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 63.00 180.00 179.13 171.63 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 7.00 190.00 206.75 247.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 7.00 230.00 126.54 95.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 4.00 150.00 334.65 383.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 97.00 178.35 190.68 191.34 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 139.00 125.00 116.89 114.67 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 22.00 200.00 212.88 225.75 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 8.00 125.00 106.25 100.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 28.00 175.00 204.12 197.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 197.00 140.48 136.32 138.23 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 311 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-00010 Corner and Line Br Post Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 2.00 220.00 181.44 183.77 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 20.00 150.00 273.07 230.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 7.00 250.00 178.76 182.05 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 3.00 275.00 265.70 281.40 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 8.00 250.00 266.07 302.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 200.38 256.75 237.55 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 3.00 250.00 420.00 510.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 60.00 160.00 158.21 164.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 63.00 164.29 170.67 180.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 397.00 159.55 176.41 167.92 =============== 607-01000 Fence BW MP Lin Foot =============================================== STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 1,200.00 1.20 3.37 2.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 7,498.00 2.00 1.47 1.89 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 609.00 3.00 3.10 2.15 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 3,411.00 1.30 1.95 1.45 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 1,255.00 2.25 2.06 1.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13,973.00 1.83 1.85 1.79 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 89,098.00 0.90 1.01 0.99 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 6,452.00 1.40 1.20 1.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 95,550.00 0.93 1.03 1.01 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 3,206.00 1.40 1.39 1.16 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 5,000.00 1.30 3.20 1.50 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 20,453.00 1.20 1.57 1.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 312 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-01000 Fence BW MP Lin Foot =============================================== BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 650.00 2.00 6.62 3.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29,309.00 1.26 2.06 1.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 138,832.00 1.09 1.44 1.19 =============== 607-01050 Fence Wire MP Lin Foot =============================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 13,901.00 1.50 1.49 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13,901.00 1.50 1.49 1.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,901.00 1.50 1.49 1.50 =============== 607-01100 Fence BW TWP Lin Foot =============================================== STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 1,634.00 2.25 2.27 1.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,634.00 2.25 2.27 1.80 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 1,650.00 4.00 3.84 3.68 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 11,759.00 2.50 3.33 3.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,409.00 2.68 3.38 3.35 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 510.00 10.00 9.61 10.21 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1,084.00 2.00 1.76 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,594.00 4.56 3.00 4.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,637.00 2.82 3.22 3.35 =============== 607-11200 Fence CW MP Lin Foot =============================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2,560.00 3.00 2.92 2.75 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 2,073.00 3.00 2.31 2.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,633.00 3.00 2.68 2.56 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 313 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-11200 Fence CW MP Lin Foot =============================================== STA 0091-026 STATE HIGHWAY NO 9 11/30/06 31.00 6.00 9.27 6.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 31.00 6.00 9.27 6.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,664.00 3.02 2.73 2.58 =============== 607-11300 Fence CW TWP Lin Foot =============================================== STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 17,936.00 3.40 3.66 3.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17,936.00 3.40 3.66 3.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,936.00 3.40 3.66 3.14 =============== 607-11400 Fence Picket Lin Foot =============================================== BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 220.00 12.00 179.84 94.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 220.00 12.00 179.84 94.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 220.00 12.00 179.84 94.89 =============== 607-11455 Fence Wood Lin Foot =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 126.00 30.00 23.57 22.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 126.00 30.00 23.57 22.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 126.00 30.00 23.57 22.40 =============== 607-11525 Fence (Plastic) Lin Foot =============================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 600.00 4.00 8.60 10.50 STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 150.00 4.00 3.80 4.81 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 400.00 4.00 6.35 4.40 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 100.00 3.00 9.33 15.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 314 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-11525 Fence (Plastic) Lin Foot =============================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1,200.00 3.00 3.51 2.86 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 2,000.00 2.00 2.51 2.31 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 200.00 5.00 12.00 3.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2,801.00 4.00 2.89 2.80 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 3,280.00 2.50 2.44 1.75 SHE 2854-111 US 285 & C470 SIGNING 03/02/06 100.00 5.00 4.99 5.66 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 200.00 4.00 5.01 6.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 920.00 3.00 4.33 5.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 400.00 5.00 5.29 2.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 1,000.00 3.75 3.50 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13,351.00 3.20 3.40 3.27 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 400.00 3.00 9.59 10.00 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 150.00 5.00 4.23 4.46 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 200.00 6.00 4.36 3.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 100.00 5.00 5.71 6.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 400.00 4.00 4.00 4.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 600.00 5.50 3.04 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,850.00 4.62 5.17 4.69 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 4,290.00 2.50 2.16 1.58 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 300.00 5.00 4.73 5.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 500.00 3.00 5.50 5.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1,000.00 4.00 3.24 4.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 1,000.00 6.00 3.62 4.70 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 300.00 8.00 6.91 4.72 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 500.00 3.50 3.29 1.50 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1,000.00 3.50 2.79 2.79 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 1,200.00 21.00 8.80 5.21 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 3,884.00 2.00 2.51 2.50 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 300.00 5.00 4.68 3.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 200.00 4.00 2.55 1.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14,474.00 4.60 3.37 2.87 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 3,523.00 3.50 2.47 3.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 770.00 5.00 2.99 1.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 315 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-11525 Fence (Plastic) Lin Foot =============================================== STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1,700.00 3.00 5.32 3.80 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 1,000.00 4.00 3.17 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,993.00 3.62 3.29 3.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36,668.00 3.90 3.42 3.14 =============== 607-11575 Rock Fall Fence Lin Foot =============================================== NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 560.00 585.00 277.67 263.00 IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 630.00 1290.00 1038.33 795.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,190.00 958.24 680.37 544.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,190.00 958.24 680.37 544.65 =============== 607-11580 Fence (Temp) Lin Foot =============================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 300.00 5.00 7.09 4.95 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 1,800.00 2.00 4.28 2.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 787.00 6.00 9.92 9.60 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 1,316.00 2.80 1.77 1.75 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 10,500.00 3.50 2.24 1.68 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 500.00 4.00 5.86 6.38 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 300.00 5.00 2.50 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15,503.00 3.47 3.12 2.35 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 200.00 5.00 6.95 5.85 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 1,000.00 2.00 1.06 1.04 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 300.00 3.50 3.89 3.50 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 200.00 4.00 10.00 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,700.00 2.85 3.69 2.39 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 500.00 6.00 5.47 3.35 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1,880.00 5.00 4.59 4.50 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 200.00 5.00 4.00 3.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 316 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-11580 Fence (Temp) Lin Foot =============================================== BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 1,540.00 5.00 3.03 3.05 NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 100.00 5.00 10.50 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,220.00 5.12 4.58 3.94 IM R600-292 70TH AVE AT I-25/BLAKE AND 20 11/30/06 300.00 20.00 4.61 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 300.00 20.00 4.61 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21,723.00 3.97 3.40 2.74 =============== 607-11581 Fence (Temp) (Spec) Lin Foot =============================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 121.00 15.00 26.94 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 121.00 15.00 26.94 40.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 300.00 10.00 13.95 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 300.00 10.00 13.95 18.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 755.00 125.00 62.67 59.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 755.00 125.00 62.67 59.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,176.00 84.35 53.03 46.97 =============== 607-15000 Fence Conc (Sound) Sq Foot ================================================ STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 2,064.00 25.00 70.00 89.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,064.00 25.00 70.00 89.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,064.00 25.00 70.00 89.99 =============== 607-21300 Fence Barrier MP Lin Foot =============================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 242.00 6.00 5.99 5.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 242.00 6.00 5.99 5.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 242.00 6.00 5.99 5.44 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 317 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-52900 Line Post (CL) Each =================================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 38.00 60.00 44.90 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 38.00 60.00 44.90 50.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 659.00 50.00 46.91 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 659.00 50.00 46.91 46.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 697.00 50.55 46.80 46.22 =============== 607-52905 End Post (CL) Each =================================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 4.00 100.00 106.67 130.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 2.00 300.00 374.25 372.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 166.67 183.12 210.67 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 2.00 350.00 175.82 236.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 350.00 175.82 236.28 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 4.00 200.00 95.51 94.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 2.00 250.00 172.95 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 216.67 121.32 119.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 214.29 154.15 175.18 =============== 607-52910 Corner and Line Br Post (CL) Each =================================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 1.00 150.00 135.16 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 150.00 135.16 165.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 318 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-52910 Corner and Line Br Post (CL) Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 2.00 250.00 215.88 262.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 250.00 215.88 262.53 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 12.00 150.00 133.22 135.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 4.00 240.00 229.93 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 172.50 157.40 158.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 179.47 161.23 170.00 =============== 607-53137 Fence CL (Spec) (36 In) Lin Foot =============================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 492.00 35.00 22.09 24.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 492.00 35.00 22.09 24.44 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 2,970.00 25.00 23.78 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,970.00 25.00 23.78 22.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1,640.00 20.00 26.77 26.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,640.00 20.00 26.77 26.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,102.00 24.36 24.68 23.68 =============== 607-53143 Fence CL (Spec) (42 In) Lin Foot =============================================== BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 315.00 40.00 22.61 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 315.00 40.00 22.61 28.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 315.00 40.00 22.61 28.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 319 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-53148 Fence CL (48 In) Lin Foot =============================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1,272.00 10.00 9.94 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,272.00 10.00 9.94 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,272.00 10.00 9.94 10.00 =============== 607-53160 Fence CL (60 In) Lin Foot =============================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 878.00 15.00 18.24 27.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 878.00 15.00 18.24 27.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 878.00 15.00 18.24 27.18 =============== 607-53161 Fence CL (Spec) (60 In) Lin Foot =============================================== NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 58.00 30.00 77.41 86.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 58.00 30.00 77.41 86.74 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 220.00 35.00 23.71 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 220.00 35.00 23.71 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 278.00 33.96 33.06 37.88 =============== 607-53172 Fence CL (72 In) Lin Foot =============================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 319.00 20.00 16.71 19.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 21.00 40.00 21.76 32.79 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 720.30 10.00 8.15 7.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,060.30 13.60 10.99 11.63 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 930.00 11.00 12.97 16.57 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 320 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-53172 Fence CL (72 In) Lin Foot =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 126.00 10.00 7.00 6.55 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 4,200.00 12.60 17.17 17.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,256.00 12.25 15.74 17.09 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1,970.00 10.00 5.26 5.50 IM 0252-384 I-25 OVER BROADWAY 11/09/06 756.00 15.00 17.68 16.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,726.00 11.39 9.98 8.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,042.30 12.15 12.70 13.87 =============== 607-55030 Mesh Post Each =================================================== NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 10.00 2800.00 5483.33 4500.00 IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 2.00 8500.00 7013.33 6540.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 3750.00 5738.33 4840.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 3750.00 5738.33 4840.00 =============== 607-55031 Mesh Post (Spec) Each =================================================== NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 10.00 3000.00 5716.67 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 3000.00 5716.67 4500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 3000.00 5716.67 4500.00 =============== 607-55040 Mesh Anchor Each =================================================== NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 55.00 460.00 583.33 590.00 IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 11.00 500.00 600.00 330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 66.00 466.67 586.11 546.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66.00 466.67 586.11 546.67 =============== 607-55050 Mesh Anchor (Spec) Each =================================================== NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 45.00 1500.00 1017.00 1531.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 45.00 1500.00 1017.00 1531.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 1500.00 1017.00 1531.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 321 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-55060 Mesh Pin Each =================================================== NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 50.00 50.00 126.67 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 50.00 126.67 70.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 50.00 126.67 70.00 =============== 607-55100 Wire Mesh Sq Foot ================================================ NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 114,000.00 3.00 2.62 2.00 IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 51,000.00 2.20 2.00 1.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 165,000.00 2.75 2.43 1.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 165,000.00 2.75 2.43 1.88 =============== 607-55101 Cable Net Sq Foot ================================================ IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 3,000.00 19.00 20.83 11.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,000.00 19.00 20.83 11.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,000.00 19.00 20.83 11.50 =============== 607-56001 Fence (Animal Protect) Lin Foot =============================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 900.00 8.00 7.50 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 900.00 8.00 7.50 5.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 900.00 8.00 7.50 5.50 =============== 607-60116 16 Ft Gate Each =================================================== BR 069A-019 SH 69, ROSITA CREEK 03/09/06 1.00 300.00 454.38 375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 300.00 454.38 375.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 4.00 400.00 241.13 194.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 322 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-60116 16 Ft Gate Each =================================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 2.00 1300.00 751.16 719.47 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 1.00 1000.00 1165.00 540.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 742.86 509.99 393.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 687.50 501.21 391.24 =============== 607-60203 3 Ft Gate S (CL) Each =================================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 350.00 602.90 724.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 350.00 602.90 724.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 350.00 602.90 724.50 =============== 607-60212 12 Ft Gate S (CL) Each =================================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 400.00 851.30 976.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 400.00 851.30 976.50 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 600.00 401.52 400.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 1.00 650.00 1024.22 530.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 616.67 678.28 443.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 562.50 715.89 576.63 =============== 607-60220 20 Ft Gate S (CL) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 3000.00 627.16 620.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 3000.00 627.16 620.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 627.16 620.00 =============== 607-60290 40 Ft Gate D (CL) Each =================================================== STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 1.00 2500.00 1922.50 2280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2500.00 1922.50 2280.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2500.00 1922.50 2280.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 323 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-60316 16 Ft Gate Twin Each =================================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2.00 300.00 336.67 237.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 300.00 336.67 237.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 300.00 336.67 237.00 =============== 607-60620 Road Closure Gate Each =================================================== STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 1.00 11800.00 11572.22 10600.00 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 1.00 10000.00 14439.70 10300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 10900.00 12454.52 10450.00 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 2.00 12000.00 13182.54 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 12000.00 13182.54 12000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 11450.00 12803.97 11225.00 =============== 608-00000 Conc Sidewalk Sq Yard ================================================ IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 71.00 40.00 47.81 49.23 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 366.00 35.00 50.41 41.95 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 136.00 50.00 51.90 48.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 941.00 50.00 35.36 37.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 395.00 82.00 86.50 83.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,909.00 53.37 46.31 48.71 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 57.00 50.00 66.91 64.55 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 86.00 50.00 58.95 57.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 470.00 40.00 47.67 38.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 72.00 40.00 86.13 70.00 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 5.00 180.00 167.17 181.50 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 54.00 60.00 70.08 63.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 744.00 44.31 57.95 48.11 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 324 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00000 Conc Sidewalk Sq Yard ================================================ BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 134.00 40.00 56.83 75.00 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 338.00 50.00 56.58 45.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 21.00 65.00 62.50 65.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 91.00 75.00 51.46 35.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1,264.00 42.00 47.53 53.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,848.00 45.20 50.96 52.79 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1,942.00 33.00 44.54 52.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,942.00 33.00 44.54 52.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,443.00 43.84 48.21 51.01 =============== 608-00005 Conc Sidewalk (Spec) Sq Yard ================================================ STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 120.00 100.00 52.48 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 120.00 100.00 52.48 65.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 100.00 52.48 65.00 =============== 608-00006 Conc Sidewalk (6 In) Sq Yard ================================================ IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 3,390.00 32.00 45.79 32.40 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 64.00 45.00 76.39 52.50 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 2,381.60 30.00 33.22 32.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,835.60 31.33 42.02 32.66 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 77.00 53.00 62.52 48.81 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 571.00 45.00 44.50 39.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1,598.00 34.00 39.71 37.82 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 4,732.30 32.00 42.57 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,978.30 33.75 42.33 34.77 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 325 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00006 Conc Sidewalk (6 In) Sq Yard ================================================ IM 0252-384 I-25 OVER BROADWAY 11/09/06 1,245.00 40.00 40.99 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,245.00 40.00 40.99 37.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,058.90 33.30 42.05 34.09 =============== 608-00010 Conc Curb Ramp Sq Yard ================================================ IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 92.00 125.00 103.86 80.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 48.00 125.00 124.75 133.00 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 106.00 100.00 135.72 132.66 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 98.00 130.00 118.30 96.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 145.20 100.00 103.45 82.25 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 191.00 125.00 121.68 135.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 20.00 200.00 134.50 106.00 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 11.00 120.00 328.65 539.96 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 36.00 90.00 133.28 150.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 676.00 350.00 399.00 378.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,423.20 227.93 193.40 241.66 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 30.00 100.00 170.99 138.94 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 339.00 110.00 147.26 145.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 200.00 125.00 133.28 137.20 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 94.00 100.00 195.97 165.00 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 37.00 200.00 178.17 204.50 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 22.00 240.00 236.75 225.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 5.00 200.00 419.67 390.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 727.00 121.55 158.69 152.32 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 16.00 125.00 122.21 54.23 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 165.00 100.00 147.24 120.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 46.00 150.00 102.50 125.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 108.00 140.00 101.81 70.24 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 138.00 100.00 113.63 85.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 326 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00010 Conc Curb Ramp Sq Yard ================================================ C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 20.00 150.00 150.00 150.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 51.00 120.00 123.82 125.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 149.00 130.00 127.64 97.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 693.00 119.49 122.73 100.57 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 13.00 250.00 250.00 250.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 36.00 200.00 102.37 116.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 95.00 110.00 118.86 120.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 128.00 135.00 125.94 99.70 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 33.00 125.00 136.57 170.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 300.00 185.00 127.45 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 605.00 161.66 125.14 111.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,448.20 172.08 154.72 171.56 =============== 608-00012 Curb Ramp (Spec) Sq Yard ================================================ STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 18.00 50.00 121.43 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 50.00 121.43 105.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 50.00 121.43 105.00 =============== 608-00015 Truncated Domes Sq Foot ================================================ NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 49.00 50.00 58.25 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 49.00 50.00 58.25 85.00 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 27.00 60.00 62.70 68.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 27.00 60.00 62.70 68.10 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 240.00 80.00 32.44 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 240.00 80.00 32.44 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 316.00 73.64 35.12 49.38 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 327 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00020 Conc Bikeway Sq Yard ================================================ STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1,682.00 35.00 36.35 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,682.00 35.00 36.35 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,682.00 35.00 36.35 35.00 =============== 608-00026 Conc Bikeway (6 In) Sq Yard ================================================ SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 197.40 35.00 35.00 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 197.40 35.00 35.00 33.00 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 454.00 30.00 51.52 50.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 110.00 35.00 48.60 35.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 298.00 50.00 56.20 53.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 862.00 37.55 52.23 49.33 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 568.00 30.00 41.28 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 568.00 30.00 41.28 38.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,627.40 34.61 46.13 43.39 =============== 608-00070 Interlock Pavers Sq Foot ================================================ STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 5,980.00 18.00 13.89 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,980.00 18.00 13.89 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,980.00 18.00 13.89 9.00 =============== 608-00350 Conc Sidewalk (C) Sq Yard ================================================ STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 52.00 80.00 93.32 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 52.00 80.00 93.32 55.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 80.00 93.32 55.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 328 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-01600 Aggregate Walkway Sq Yard ================================================ SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 120.00 10.00 18.30 23.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 10.00 18.30 23.50 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 2,360.00 5.00 5.09 5.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,360.00 5.00 5.09 5.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,480.00 5.24 5.87 6.55 =============== 608-10010 Sidewalk Drain Each =================================================== NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 3.00 2000.00 1486.86 1672.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 2000.00 1486.86 1672.44 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 1250.00 1435.60 1706.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1250.00 1435.60 1706.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1812.50 1476.61 1681.03 =============== 609-20010 Curb Ty 2 B Lin Foot =============================================== SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 590.00 16.00 22.29 24.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 590.00 16.00 22.29 24.15 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 111.00 30.00 18.21 26.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 20.00 25.00 27.50 25.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 150.00 16.00 24.09 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 281.00 22.17 22.35 23.79 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 329 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-20010 Curb Ty 2 B Lin Foot =============================================== IM 0252-384 I-25 OVER BROADWAY 11/09/06 410.00 24.15 23.07 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 410.00 24.15 23.07 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,281.00 19.96 22.65 21.14 =============== 609-21010 C and G Ty 2 I-B Lin Foot =============================================== STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 2,866.00 11.50 7.47 6.90 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 596.00 13.00 16.66 10.70 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 162.00 20.00 25.20 27.30 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 210.00 12.00 14.80 13.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 10,965.00 12.00 14.03 10.94 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 340.00 18.00 16.38 10.50 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 65.00 28.00 29.00 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15,204.00 12.23 13.37 10.43 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 1,138.00 13.00 25.06 21.29 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 1,173.00 12.00 12.84 11.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,311.00 12.49 21.49 16.41 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 783.00 12.00 16.00 12.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1,378.00 20.00 11.41 9.62 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 4,000.40 12.00 11.86 9.50 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 472.00 20.00 21.00 20.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 569.00 18.00 22.86 13.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1,159.00 21.00 23.41 14.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,361.40 15.43 13.84 11.24 IM 0252-384 I-25 OVER BROADWAY 11/09/06 2,710.00 11.00 13.54 13.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 330 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-21010 C and G Ty 2 I-B Lin Foot =============================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 6,510.00 8.00 9.57 12.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 90.00 11.50 33.15 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,310.00 8.91 11.41 12.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35,186.40 12.13 13.23 11.54 =============== 609-21011 C and G Ty 2 I-M Lin Foot =============================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 3,724.40 12.00 12.30 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,724.40 12.00 12.30 11.00 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 15.00 30.00 25.94 39.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 30.00 25.94 39.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 2,013.00 9.00 10.95 12.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,013.00 9.00 10.95 12.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,752.40 11.00 11.86 11.60 =============== 609-21020 C and G Ty 2 II-B Lin Foot =============================================== NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 40.00 14.00 23.00 25.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 27.00 70.00 16.87 14.60 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2,568.00 13.00 14.93 13.40 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 251.00 22.00 28.15 31.11 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 1,459.00 18.00 20.95 19.28 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 279.00 30.00 22.34 13.50 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 135.00 20.00 16.10 13.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 8.00 25.00 29.92 21.36 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 229.00 25.00 19.16 12.15 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 1,566.00 15.00 18.76 19.00 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 82.00 20.00 60.24 90.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 2,273.00 26.00 28.00 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,917.00 18.93 19.22 19.79 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 331 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-21020 C and G Ty 2 II-B Lin Foot =============================================== STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 100.00 27.00 32.77 30.64 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 616.00 19.00 30.46 30.50 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 1,151.00 18.00 19.74 16.15 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 264.00 18.00 35.90 29.00 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 1,006.00 17.00 14.71 14.42 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 266.00 27.00 33.00 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,403.00 18.85 24.85 20.82 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 149.00 25.00 63.74 18.44 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 162.00 25.00 30.27 32.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 2,375.00 20.00 16.50 13.00 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 115.00 30.00 23.97 25.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 5,463.00 14.00 15.68 14.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 7,398.00 16.00 13.17 11.94 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 3,259.40 18.00 13.98 15.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 225.00 25.00 25.00 25.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 2,715.00 15.00 18.91 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21,861.40 16.40 15.55 13.43 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 160.00 80.00 30.00 30.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1,868.00 15.00 16.13 17.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 1,735.00 16.00 16.20 18.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 4,380.00 16.50 19.30 17.10 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 6,332.00 10.00 12.15 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14,475.00 14.11 15.43 15.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48,656.40 16.35 16.64 15.87 =============== 609-21021 C and G Ty 2 II-M Lin Foot =============================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 2,808.90 15.00 15.40 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,808.90 15.00 15.40 13.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 332 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-21021 C and G Ty 2 II-M Lin Foot =============================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 2,030.00 11.00 13.28 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,030.00 11.00 13.28 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,838.90 13.32 14.51 13.84 =============== 609-21022 C and G Ty 2 II-B (C) Lin Foot =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 415.00 10.00 21.82 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 415.00 10.00 21.82 17.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 415.00 10.00 21.82 17.00 =============== 609-21023 C and G Ty 2 II-B (Spec) Lin Foot =============================================== NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 498.00 45.00 39.78 32.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 2,931.00 20.00 23.83 16.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,429.00 23.63 26.78 18.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,429.00 23.63 26.78 18.75 =============== 609-21900 C and G Ty 2 Special Lin Foot =============================================== STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 54.00 180.00 146.67 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 54.00 180.00 146.67 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54.00 180.00 146.67 200.00 =============== 609-22021 CGS Ty 2 MS Lin Foot =============================================== C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 286.00 25.00 34.29 31.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 286.00 25.00 34.29 31.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 286.00 25.00 34.29 31.58 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 333 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-22022 CGS Ty 2 II-B Lin Foot =============================================== STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 35.00 40.00 155.74 76.23 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 30.00 40.00 140.31 193.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 65.00 40.00 146.66 130.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65.00 40.00 146.66 130.12 =============== 609-24000 Gutter Ty 2 Special Lin Foot =============================================== NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 132.00 70.00 103.20 104.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 132.00 70.00 103.20 104.59 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 200.00 35.00 40.84 10.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 35.00 40.84 10.53 IM 0252-384 I-25 OVER BROADWAY 11/09/06 6.00 60.00 369.80 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 60.00 369.80 130.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 338.00 49.11 79.62 49.38 =============== 609-24002 Gutter Ty 2 (2 Ft) Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 330.00 25.00 15.32 10.35 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 278.00 20.00 14.70 15.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 608.00 22.71 15.09 12.70 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 405.00 19.00 25.08 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 405.00 19.00 25.08 23.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 334 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-24002 Gutter Ty 2 (2 Ft) Lin Foot =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 106.00 12.00 12.38 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 106.00 12.00 12.38 13.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,119.00 20.35 17.43 16.46 =============== 609-24004 Gutter Ty 2 (4 Ft) Lin Foot =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 47.00 35.00 27.86 31.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 53.00 35.00 28.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 35.00 27.89 30.47 IM 0252-384 I-25 OVER BROADWAY 11/09/06 96.00 35.00 35.03 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 96.00 35.00 35.03 22.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 196.00 35.00 32.45 26.32 =============== 609-24006 Gutter Ty 2 (6 Ft) Lin Foot =============================================== C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 20.00 38.00 37.50 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 38.00 37.50 35.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 55.00 65.00 56.90 35.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 32.00 40.00 43.56 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 87.00 55.80 51.99 34.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 107.00 52.48 50.77 34.70 =============== 609-24008 Gutter Ty 2 (8 Ft) Lin Foot =============================================== STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 34.00 55.00 61.00 62.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 335 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-24008 Gutter Ty 2 (8 Ft) Lin Foot =============================================== C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 61.00 40.00 45.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 95.00 45.37 50.73 47.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 95.00 45.37 50.73 47.87 =============== 609-24010 Gutter Ty 2 (10 Ft) Lin Foot =============================================== NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 67.00 80.00 76.56 60.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 135.00 55.00 71.00 62.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 45.00 160.00 240.00 280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 247.00 80.91 97.59 101.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 247.00 80.91 97.59 101.17 =============== 609-31010 C and G Ty 2 I-B (Fast Track) Lin Foot =============================================== NH R200-140 I-25, SH 47, 50, 115 CRACK RE 03/30/06 340.00 18.00 40.75 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 340.00 18.00 40.75 28.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 340.00 18.00 40.75 28.00 =============== 609-40011 Curb Ty 4 M Lin Foot =============================================== IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 300.00 12.00 9.93 8.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 300.00 12.00 9.93 8.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 300.00 12.00 9.93 8.70 =============== 609-40021 Curb Ty 4 B (Epoxy) Lin Foot =============================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 172.00 18.00 21.59 22.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 172.00 18.00 21.59 22.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 172.00 18.00 21.59 22.76 =============== 609-40130 Curb Median Special Lin Foot =============================================== IM 0252-384 I-25 OVER BROADWAY 11/09/06 310.00 12.00 35.41 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 310.00 12.00 35.41 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 310.00 12.00 35.41 18.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 336 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-60011 Curb Ty 6 M Lin Foot =============================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 475.00 10.00 10.51 6.30 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 1,223.00 6.00 6.00 5.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 1,400.00 10.00 8.17 6.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 175.00 30.00 10.09 7.44 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 190.00 8.50 15.57 11.85 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 45.00 13.00 20.06 10.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 30.00 30.00 20.00 20.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 129.00 8.00 24.63 12.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,667.00 9.67 10.25 6.48 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 1,644.00 7.00 18.15 17.00 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 2,905.00 6.00 7.58 5.95 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 550.00 10.00 3.66 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,099.00 6.75 10.82 9.30 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 2,093.00 5.30 9.62 5.59 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 88.00 12.00 22.00 14.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 2,101.00 5.00 11.60 12.50 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 100.00 5.99 14.36 8.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 62.00 12.00 17.50 15.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 265.00 18.00 13.84 15.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,709.00 6.11 11.14 9.58 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 20.00 15.00 47.13 21.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 2,680.00 6.00 8.77 13.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,700.00 6.07 9.06 13.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,175.00 7.11 10.43 9.45 =============== 610-00010 Median Cover Matl (Dec) Sq Foot ================================================ STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 6,100.00 5.00 9.46 9.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,100.00 5.00 9.46 9.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,100.00 5.00 9.46 9.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 337 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 610-00020 Median Cover (Pattern Conc) Sq Foot ================================================ SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 9,379.60 8.00 6.94 7.75 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 3,341.00 7.00 8.50 6.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,720.60 7.74 7.29 7.49 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 18,587.00 6.50 7.34 8.06 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 19,753.60 7.50 8.15 9.50 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 2,557.00 11.00 10.43 10.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40,897.60 7.26 7.96 8.90 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 11,373.00 6.20 6.66 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11,373.00 6.20 6.66 5.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 64,991.20 7.17 7.62 8.03 =============== 610-00024 Median Cover (4 In Pattern Conc) Sq Foot ================================================ STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 15,231.00 5.50 4.95 3.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15,231.00 5.50 4.95 3.35 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 85.00 8.00 21.26 14.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 85.00 8.00 21.26 14.78 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 2,392.00 12.00 7.00 7.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 4,257.00 8.00 9.50 7.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 1,300.00 9.00 7.63 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,949.00 9.37 8.18 7.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23,265.00 6.83 6.14 4.69 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 338 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 610-00026 Median Cover (6 In Pattern Conc) Sq Foot ================================================ IM 0252-384 I-25 OVER BROADWAY 11/09/06 6,655.00 7.00 9.03 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,655.00 7.00 9.03 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,655.00 7.00 9.03 9.00 =============== 610-00030 Median Cover Matl (Conc) Sq Foot ================================================ IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 1,409.00 6.00 6.22 4.53 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 280.00 10.00 9.55 9.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,689.00 6.66 6.98 5.40 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 4,954.00 5.00 5.06 4.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,954.00 5.00 5.06 4.11 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 30.00 10.00 21.10 23.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1,252.00 4.50 8.81 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,282.00 4.63 9.10 5.91 IM 0252-384 I-25 OVER BROADWAY 11/09/06 3,685.00 5.00 6.15 6.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 420.00 6.00 7.55 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,105.00 5.10 6.28 6.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,030.00 5.23 6.48 5.27 =============== 610-00040 Median Cover Matl (Bitum) Ton ==================================================== NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 2,002.00 75.00 94.53 107.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,002.00 75.00 94.53 107.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,002.00 75.00 94.53 107.25 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 339 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 610-00060 Median Cover Matl (Brick) Sq Foot ================================================ IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 3,004.00 12.50 16.64 15.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,004.00 12.50 16.64 15.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,004.00 12.50 16.64 15.93 =============== 610-00100 Median Edging (Pattern Conc) Lin Foot =============================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 214.00 25.00 34.42 16.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 214.00 25.00 34.42 16.27 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 4,702.00 22.00 24.11 23.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,702.00 22.00 24.11 23.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,916.00 22.13 24.39 23.19 =============== 611-00030 30 Ft Cattle Gd Each =================================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 15000.00 17219.94 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 15000.00 17219.94 7500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 17219.94 7500.00 =============== 612-00001 Delin (Ty I) Each =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 65.00 20.00 22.00 21.00 SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 01/05/06 28.00 18.00 35.98 27.20 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 380.00 20.00 19.43 22.70 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 502.00 18.00 16.15 19.70 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 27.00 16.00 18.13 15.40 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 592.00 18.00 13.77 12.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 420.00 15.00 17.17 18.50 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 212.00 20.00 13.80 14.01 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 16.00 17.00 18.90 18.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 340 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00001 Delin (Ty I) Each =================================================== IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 330.00 15.00 20.50 20.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 231.00 17.00 20.27 18.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 200.00 20.00 18.43 18.51 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 150.00 16.00 13.25 12.61 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 42.00 15.00 20.96 31.35 SHE 2854-111 US 285 & C470 SIGNING 03/02/06 20.00 20.00 32.68 35.40 SHE 0911-004 SH 91 & SH 67 GUARDRAIL 03/09/06 20.00 20.00 17.45 20.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 29.00 17.00 20.08 15.50 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 876.00 16.00 18.04 16.70 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 271.00 18.00 14.76 12.50 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 6.00 20.00 27.00 27.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 42.00 18.00 28.51 18.05 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 10.00 18.00 14.98 9.75 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 24.00 16.00 45.75 39.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 3.00 16.00 14.32 10.63 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 5.00 25.00 19.23 17.00 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 3.00 20.00 30.00 30.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 7.00 25.00 18.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,511.00 17.35 17.66 17.45 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 34.00 16.00 23.60 24.00 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 60.00 17.00 23.57 29.00 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 4.00 20.00 23.86 18.28 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 14.00 20.00 23.46 16.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 6.00 20.00 47.46 90.50 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 10.00 18.00 13.48 11.50 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 280.00 17.00 18.19 17.71 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 8.00 22.00 17.88 15.75 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 40.00 18.00 17.83 23.50 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 27.00 17.00 21.66 22.32 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 351.00 17.00 17.06 17.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 186.00 15.00 20.47 14.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 6.00 20.00 36.00 36.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 10.00 25.00 18.88 30.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 96.00 18.00 21.45 17.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,132.00 16.96 19.08 18.46 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 114.00 16.00 17.48 18.52 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 11.00 18.00 29.33 22.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 3.00 18.00 14.75 16.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 341 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00001 Delin (Ty I) Each =================================================== BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 20.00 20.00 18.68 38.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 100.00 18.00 19.77 16.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 32.00 16.00 18.64 25.93 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 602.00 18.00 13.12 12.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 41.00 20.00 14.85 14.89 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 26.00 17.00 17.00 17.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 14.00 20.00 19.81 17.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 8.00 25.00 20.06 22.11 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 16.00 15.00 19.79 16.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 170.00 10.00 16.64 15.93 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 6.00 21.00 21.55 16.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,163.00 16.71 15.49 14.91 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 100.00 15.00 19.52 21.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 61.00 18.00 13.76 10.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 20.00 18.00 25.25 18.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 332.00 18.00 18.25 16.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 2.00 18.00 30.08 60.40 SHE 0503-067 US 50, WEST OF CANON CITY 11/30/06 15.00 24.00 18.27 10.10 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 6.00 16.00 24.46 28.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 6.00 22.00 27.22 25.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 266.00 18.00 17.64 15.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 150.00 16.50 16.51 18.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 958.00 17.56 17.88 16.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,764.00 17.22 17.48 17.09 =============== 612-00002 Delin (Ty II) Each =================================================== NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 27.00 20.00 20.45 23.80 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 50.00 23.00 17.53 20.35 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 26.00 18.00 20.65 17.95 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 13.00 19.00 14.95 12.50 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 20.00 20.00 19.33 20.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 31.00 21.00 15.87 16.34 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 12.00 18.00 21.62 19.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 50.00 21.00 19.77 19.59 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 25.00 18.00 15.29 14.46 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 67.00 16.00 21.94 29.75 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 112.00 17.00 19.24 18.20 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 27.00 20.00 33.02 19.10 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 342 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00002 Delin (Ty II) Each =================================================== NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 10.00 18.00 16.03 10.85 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 24.00 18.00 15.43 11.69 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 10.00 30.00 21.00 18.00 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 3.00 23.00 30.00 30.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 32.00 25.00 19.00 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 539.00 19.42 19.67 19.75 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 20.00 20.00 28.27 39.00 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 5.00 45.00 24.97 19.35 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 25.00 23.00 24.72 17.50 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 10.00 20.00 13.76 11.50 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 70.00 18.00 19.22 18.76 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 12.00 20.00 19.33 24.00 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 50.00 18.00 24.36 23.72 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 116.00 16.00 21.59 15.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 125.00 18.00 14.98 11.45 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 46.00 18.00 23.84 19.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 479.00 18.23 19.99 17.25 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 64.00 18.00 18.53 19.61 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 6.00 20.00 31.00 23.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 15.00 25.00 20.31 42.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 14.00 17.00 20.04 27.11 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 46.00 18.00 14.54 14.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 32.00 22.00 16.38 17.01 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 52.00 19.00 18.50 19.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 43.00 22.00 20.83 18.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 31.00 17.00 21.07 17.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 80.00 11.00 18.07 18.21 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 6.00 22.00 23.17 17.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 389.00 17.71 18.95 19.13 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 200.00 18.00 23.24 26.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 7.00 18.00 15.02 11.20 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 32.00 18.00 21.25 20.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 78.00 20.00 18.69 16.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 343 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00002 Delin (Ty II) Each =================================================== NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 45.00 18.00 17.48 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 362.00 18.43 20.98 22.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,769.00 18.52 19.91 19.45 =============== 612-00003 Delin (Ty III) Each =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 20.00 25.00 23.30 21.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 17.00 25.00 21.96 24.85 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 84.00 23.00 18.60 20.40 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 2.00 20.00 25.18 21.55 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 16.00 20.00 16.05 12.75 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 12.00 25.00 23.33 25.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 43.00 22.00 18.77 19.85 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 24.00 19.00 24.27 25.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 29.00 19.00 22.65 20.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 10.00 23.00 21.30 20.68 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 15.00 20.00 17.33 16.31 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 9.00 17.00 35.39 76.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 4.00 19.00 28.62 16.50 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 139.00 18.00 20.44 19.70 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 14.00 20.00 16.05 14.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 2.00 24.00 28.00 28.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 3.00 22.00 45.85 20.25 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 10.00 18.00 16.78 12.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 7.00 35.00 22.75 19.00 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 3.00 28.00 30.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 463.00 20.81 20.78 21.02 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 4.00 22.50 25.80 26.00 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 40.00 22.00 32.00 45.10 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 1.00 25.00 25.77 19.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 2.00 30.00 62.97 95.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 50.00 19.00 20.25 19.80 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 6.00 22.00 20.50 21.00 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 264.00 20.00 21.17 25.50 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 5.00 19.00 27.95 27.90 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 50.00 18.00 18.13 18.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 420.00 17.00 22.70 16.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 2.00 18.00 25.43 26.25 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 2.00 22.00 42.00 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 846.00 18.48 22.28 21.11 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 344 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00003 Delin (Ty III) Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 28.00 20.00 19.60 20.70 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 9.00 25.00 30.24 24.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 60.00 25.00 22.82 18.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 1.00 16.50 31.04 27.11 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 7.00 22.00 16.36 16.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 8.00 25.00 17.91 19.14 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 8.00 24.00 22.15 19.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 4.00 30.00 23.69 27.37 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 16.00 20.00 21.23 18.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 10.00 12.00 19.49 20.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 151.00 22.57 22.13 19.35 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 40.00 18.00 26.70 26.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 4.00 21.00 16.22 12.30 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 2.00 20.00 28.76 20.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 4.00 20.00 23.13 22.00 SHE 0503-067 US 50, WEST OF CANON CITY 11/30/06 5.00 25.00 30.29 24.60 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 4.00 22.00 29.64 40.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 2.00 25.00 30.63 30.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 10.00 22.00 19.74 17.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 25.00 16.50 19.29 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 96.00 18.95 23.51 23.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,556.00 19.60 21.87 21.08 =============== 612-00021 Delin (Ty I) (Barrier) Each =================================================== STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 6.00 12.00 9.06 7.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 12.00 9.06 7.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 12.00 9.06 7.17 =============== 612-00022 Delin (Ty II) (Barrier) Each =================================================== STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 4.00 12.00 10.00 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 12.00 10.00 8.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 345 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00022 Delin (Ty II) (Barrier) Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 67.00 15.00 17.99 18.56 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 105.00 16.00 16.06 8.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 172.00 15.61 16.71 12.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 176.00 15.53 16.61 12.20 =============== 612-00041 Delin (Flex) (Ty I) Each =================================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 75.00 30.00 36.62 30.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 104.00 27.00 26.55 34.20 STA 0343-025 US 34, WRAY WEST 01/26/06 476.00 18.00 28.94 32.00 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 31.00 25.00 32.56 28.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 43.00 23.00 31.22 30.60 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 6.00 40.00 50.57 36.29 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 140.00 25.00 27.81 26.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 387.00 20.00 33.33 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,262.00 21.29 30.19 31.27 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 120.00 25.00 29.68 21.00 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 6.00 40.00 67.80 45.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 205.00 16.00 34.96 30.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 331.00 19.70 33.20 27.29 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 4.00 55.00 52.50 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 55.00 52.50 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,597.00 21.05 30.76 30.49 =============== 612-00042 Delin (Flex) (Ty II) Each =================================================== STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 18.00 30.00 28.31 35.20 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 346 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00042 Delin (Flex) (Ty II) Each =================================================== STA 0343-025 US 34, WRAY WEST 01/26/06 118.00 19.00 26.69 29.00 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 47.00 26.00 33.74 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 183.00 21.88 29.57 29.35 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 50.00 30.00 31.17 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 30.00 31.17 23.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 233.00 23.62 29.89 27.99 =============== 612-00043 Delin (Flex) (Ty III) Each =================================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 37.00 45.00 40.36 32.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 24.00 32.00 29.88 36.20 STA 0343-025 US 34, WRAY WEST 01/26/06 74.00 20.00 28.14 30.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2.00 35.00 36.37 35.70 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 24.00 32.00 28.99 27.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 56.00 22.00 37.67 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 217.00 27.57 32.60 31.78 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 18.00 32.00 32.86 25.00 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 2.00 50.00 69.00 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 33.80 36.47 27.20 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 1.00 60.00 55.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 60.00 55.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 238.00 28.23 32.99 31.47 =============== 612-00046 Delin (Flex) (Spec) (Ty I) Each =================================================== SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 26.00 35.00 82.40 72.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26.00 35.00 82.40 72.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 35.00 82.40 72.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 347 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00050 Reflector (Type-3) Each =================================================== HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 138.00 25.00 7.75 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 138.00 25.00 7.75 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 138.00 25.00 7.75 7.00 =============== 612-00260 Loc Mark (Fib Opt)(Dome) Each =================================================== STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 2.00 50.00 271.51 309.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 50.00 271.51 309.56 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 3.00 325.00 326.14 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 325.00 326.14 235.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 25.00 50.00 180.23 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 50.00 180.23 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 77.50 207.10 210.80 =============== 612-00270 Loc Mark (Util)(Flat Slat) Each =================================================== STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 2.00 54.00 227.93 324.04 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 6.00 60.00 118.13 22.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 58.50 148.88 97.72 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 2.00 325.00 145.45 204.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 325.00 145.45 204.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 111.80 148.30 118.98 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 348 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-01060 Reflector Strip (6 In) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 370.00 10.00 25.68 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 370.00 10.00 25.68 38.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 370.00 10.00 25.68 38.00 =============== 612-15000 Inst Marker Each =================================================== IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 10.00 150.00 220.84 264.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 150.00 220.84 264.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 150.00 220.84 264.00 =============== 613-00001 Direct Bor Cond Lin Foot =============================================== SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 01/05/06 1,435.00 45.00 48.80 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,435.00 45.00 48.80 44.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,435.00 45.00 48.80 44.00 =============== 613-00075 3/4 In Elec Cond Lin Foot =============================================== IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 70.00 10.00 43.00 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70.00 10.00 43.00 55.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 760.00 14.00 5.13 5.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 174.00 15.00 21.49 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 934.00 14.19 7.67 9.28 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 60.00 20.00 19.13 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60.00 20.00 19.13 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,064.00 14.24 9.84 12.67 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 349 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00100 1 In Elec Cond Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 205.00 12.00 17.44 9.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 205.00 12.00 17.44 9.40 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1,000.00 10.00 4.52 3.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 361.00 10.00 15.75 15.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,361.00 10.00 6.02 6.25 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 120.00 11.00 11.05 11.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 120.00 11.00 11.05 11.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,686.00 10.31 7.78 6.98 =============== 613-00126 1-1/4 In Elec Cond (Jacked) Lin Foot =============================================== BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 35.00 25.00 20.53 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 35.00 25.00 20.53 22.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 25.00 20.53 22.00 =============== 613-00200 2 In Elec Cond Lin Foot =============================================== STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 30.00 14.00 22.03 21.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 3,247.00 8.00 8.87 9.50 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 900.00 16.00 12.95 16.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,177.00 9.77 9.87 11.09 SHE 052A-026 SH 52/ US 287 DILEMMA ZONE PR 04/27/06 150.00 13.00 22.73 57.14 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 60.00 21.00 24.80 23.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 210.00 15.29 23.13 47.41 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 350 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00200 2 In Elec Cond Lin Foot =============================================== BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 284.00 12.00 16.32 18.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 520.00 12.00 11.66 12.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 3,020.00 10.00 5.07 3.25 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 9,377.00 6.00 6.17 4.50 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 246.00 12.50 7.08 6.50 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 8,228.00 8.00 10.31 16.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21,675.00 7.61 7.43 9.42 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 1,776.00 14.00 28.21 28.21 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 9,500.00 10.00 6.85 6.50 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 500.00 11.00 24.32 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11,776.00 10.65 8.73 10.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37,838.00 8.84 8.33 10.16 =============== 613-00201 2 In Elec Cond (Jacked) Lin Foot =============================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 200.00 20.00 19.98 18.89 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2,286.00 10.00 13.91 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,486.00 10.80 14.27 10.71 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 315.00 16.00 25.65 28.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 400.00 15.00 15.92 21.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 330.00 25.00 11.86 9.50 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 355.00 19.00 17.95 6.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,400.00 18.60 17.28 16.27 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 370.00 16.00 13.62 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 370.00 16.00 13.62 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,256.00 13.82 15.05 12.83 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 351 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00206 2 In Elec Cond (Bored) Lin Foot =============================================== SHE 2854-111 US 285 & C470 SIGNING 03/02/06 650.00 15.00 13.92 12.60 AQC R600-241 SH 287 (FEDERAL BLVD), 52ND A 03/16/06 2,000.00 20.00 22.14 17.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 12,675.00 8.00 7.56 7.35 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 5,644.00 11.00 9.03 7.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20,969.00 10.17 9.31 8.53 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 100.00 25.00 27.06 25.20 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 1,020.00 15.00 11.20 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,120.00 15.89 12.08 7.71 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 500.00 10.00 20.43 26.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 300.00 15.00 20.68 12.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 11,000.00 8.00 9.25 9.00 AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR 09/14/06 48,430.00 10.00 8.75 5.93 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 936.00 17.00 18.57 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 61,166.00 9.77 9.16 6.85 STA R600-279 SH 121 (WADSWORTH) FROM KEN C 10/05/06 21,070.00 6.50 8.84 6.50 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 160.00 25.00 44.87 43.60 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 700.00 8.00 11.64 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21,930.00 6.68 9.44 6.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 105,185.00 9.27 9.27 7.22 =============== 613-00300 3 In Elec Cond Lin Foot =============================================== SHE 0091-025 SH 9 VMS IN BRECKENRIDGE 01/05/06 1,000.00 15.00 15.61 11.00 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 480.00 40.00 16.49 11.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 4,879.00 10.00 11.04 16.40 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 2,025.00 10.00 16.08 14.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 65.00 15.00 30.50 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,449.00 12.33 13.29 14.88 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 352 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00300 3 In Elec Cond Lin Foot =============================================== BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 284.00 13.00 27.56 32.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 150.00 14.00 41.78 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 434.00 13.35 31.26 32.35 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2,850.00 18.00 9.00 8.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,850.00 18.00 9.00 8.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,733.00 13.75 13.04 13.91 =============== 613-00301 3 In Elec Cond (Jacked) Lin Foot =============================================== IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 820.00 41.00 30.84 33.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 628.00 12.00 17.99 10.70 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 60.00 25.00 32.75 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,508.00 28.29 25.83 23.71 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 1,670.00 15.00 7.95 5.44 SHE 052A-026 SH 52/ US 287 DILEMMA ZONE PR 04/27/06 257.00 20.00 23.12 28.62 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 71.00 22.00 43.80 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,998.00 15.89 11.17 8.97 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 210.00 20.00 30.09 33.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 660.00 30.00 12.26 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 870.00 27.59 15.69 15.55 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1,130.00 18.00 17.75 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,130.00 18.00 17.75 17.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,506.00 21.57 18.09 15.70 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 353 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00306 3 In Elec Cond (Bored) Lin Foot =============================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 910.00 15.00 10.40 10.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 2,596.00 15.00 10.39 10.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,506.00 15.00 10.39 10.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,506.00 15.00 10.39 10.11 =============== 613-00400 4 In Elec Cond Lin Foot =============================================== BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 737.00 16.00 6.74 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 737.00 16.00 6.74 7.50 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 130.00 40.00 54.39 54.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 130.00 40.00 54.39 54.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 867.00 19.60 8.37 14.53 =============== 613-00401 4 In Elec Cond (Jacked) Lin Foot =============================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 380.00 30.00 32.63 14.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 380.00 30.00 32.63 14.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 380.00 30.00 32.63 14.88 =============== 613-00402 Inst 4 In Elec Cond Lin Foot =============================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1,260.00 7.99 21.98 26.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 940.00 25.00 5.11 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,200.00 15.26 13.36 16.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,200.00 15.26 13.36 16.60 =============== 613-01100 1 In Elec Cond (P) Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 200.00 20.00 15.71 9.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 200.00 20.00 15.71 9.70 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 354 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-01100 1 In Elec Cond (P) Lin Foot =============================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 425.00 10.00 6.55 7.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 7,500.00 8.00 4.08 3.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 430.00 9.00 10.67 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,355.00 8.15 4.37 3.67 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1,575.00 12.00 5.87 6.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,575.00 12.00 5.87 6.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,130.00 8.99 4.79 4.18 =============== 613-01150 1-1/2 In Elec Cond (P) Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2,000.00 4.00 9.53 15.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,000.00 4.00 9.53 15.25 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 120.00 20.00 9.93 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 120.00 20.00 9.93 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,120.00 4.91 9.54 14.95 =============== 613-01200 2 In Elec Cond (P) Lin Foot =============================================== SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 01/05/06 11,950.00 10.00 11.67 12.00 STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 1,150.00 12.00 8.78 4.42 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 5,600.00 9.00 4.45 4.10 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 7,360.00 6.00 6.49 6.19 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 700.00 12.00 12.88 4.07 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 8,400.00 6.00 8.21 9.25 AQC R600-241 SH 287 (FEDERAL BLVD), 52ND A 03/16/06 40.00 10.00 17.38 20.50 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 630.00 10.00 10.04 9.45 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 355 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-01200 2 In Elec Cond (P) Lin Foot =============================================== NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 1,200.00 9.00 11.15 11.90 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 5,000.00 9.00 7.99 7.50 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 900.00 8.00 12.84 12.25 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 10.00 15.00 16.38 28.15 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 20.00 15.00 23.35 6.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 1,050.00 11.50 32.50 12.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 44,010.00 8.38 9.20 8.65 SHE 052A-026 SH 52/ US 287 DILEMMA ZONE PR 04/27/06 3,868.00 7.50 8.13 4.13 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 260.00 12.00 18.25 14.50 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 757.00 18.00 12.00 11.00 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 200.00 6.50 15.05 15.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 120.00 15.00 14.40 14.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,205.00 9.39 9.24 6.30 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 4,010.00 5.00 6.90 6.60 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 330.00 12.00 16.41 18.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 200.00 15.00 10.13 10.25 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1,397.00 10.00 7.05 7.50 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 10,706.00 9.00 6.65 5.29 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 6,255.00 8.50 6.77 6.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 14,585.00 9.00 6.50 5.50 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 5,250.00 12.00 9.75 8.50 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 270.00 15.00 6.05 4.00 AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR 09/14/06 150.00 10.00 14.29 22.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 2,494.00 13.00 12.67 12.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 7,760.00 8.00 9.61 6.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 53,407.00 9.08 7.58 6.58 STA R600-279 SH 121 (WADSWORTH) FROM KEN C 10/05/06 150.00 12.00 17.77 22.00 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 2,050.00 16.00 26.18 26.18 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 1,100.00 25.00 15.50 15.50 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 965.00 20.00 8.04 8.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 1,150.00 12.00 5.74 5.50 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1,480.00 16.00 9.27 9.25 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 450.00 9.00 9.11 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7,345.00 16.74 9.70 14.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 109,967.00 9.33 8.50 7.92 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 356 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-01250 2-1/2 In Elec Cond (P) Lin Foot =============================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 250.00 17.00 12.09 12.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 250.00 17.00 12.09 12.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 17.00 12.09 12.50 =============== 613-01300 3 In Elec Cond (P) Lin Foot =============================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 700.00 8.00 8.85 8.23 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 6,140.00 10.00 8.71 8.80 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 700.00 14.00 19.37 6.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 300.00 20.00 14.39 18.30 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 265.00 14.00 12.21 11.55 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 50.00 12.00 13.20 15.20 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 20.00 20.00 14.55 21.64 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 20.00 20.00 29.98 9.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 845.00 30.00 34.00 25.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 1,040.00 12.50 31.70 14.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,080.00 12.53 11.45 10.88 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 400.00 14.00 5.65 3.96 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 171.00 15.00 17.40 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 571.00 14.30 9.17 6.37 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 220.00 15.00 13.21 13.44 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 60.00 15.00 18.79 22.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 425.00 15.00 11.00 11.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 874.00 6.00 16.52 18.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1,069.00 14.00 11.89 8.46 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 1,720.00 13.00 13.50 13.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 270.00 16.00 7.83 6.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 2,610.00 12.00 19.62 14.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,248.00 12.25 15.22 13.31 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 80.00 40.00 20.00 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 357 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-01300 3 In Elec Cond (P) Lin Foot =============================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 7,390.00 12.00 8.65 8.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 3,650.00 19.00 11.43 11.50 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 250.00 12.00 13.56 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11,370.00 14.44 9.71 9.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29,269.00 13.24 11.35 10.80 =============== 613-01301 3 In Elec Cond (P) (Spec) Lin Foot =============================================== SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 01/05/06 503.00 20.00 106.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 503.00 20.00 106.00 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 503.00 20.00 106.00 30.00 =============== 613-01400 4 In Elec Cond (P) Lin Foot =============================================== BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 287.00 26.00 26.00 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 287.00 26.00 26.00 26.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 940.00 5.00 11.48 10.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 856.00 14.70 16.86 16.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,796.00 9.62 12.99 13.13 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 9,367.00 17.00 15.33 15.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,367.00 17.00 15.33 15.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,450.00 16.07 15.01 15.19 =============== 613-03501 HID Fixtures (Ty M1 Tunnel Luminare) Each =================================================== IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 29.00 1350.00 1221.62 1221.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29.00 1350.00 1221.62 1221.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 1350.00 1221.62 1221.62 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 358 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-03503 HID Fixtures (Ty M3 Tunnel Luminare) Each =================================================== IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 227.00 1400.00 1307.70 1307.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 227.00 1400.00 1307.70 1307.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 227.00 1400.00 1307.70 1307.70 =============== 613-04200 2 In Elec cond (Liquidtight Flx Met) Lin Foot =============================================== IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 10.00 40.00 33.52 33.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 40.00 33.52 33.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 40.00 33.52 33.52 =============== 613-05000 Dir Burial Cable Lin Foot =============================================== IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 2,640.00 12.00 6.94 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,640.00 12.00 6.94 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,640.00 12.00 6.94 10.00 =============== 613-05200 Heat Trace Cable Lin Foot =============================================== IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 2,917.00 25.00 11.83 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,917.00 25.00 11.83 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,917.00 25.00 11.83 7.00 =============== 613-06000 Meter Pole Each =================================================== NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 1.00 500.00 2427.80 1720.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 500.00 2427.80 1720.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 1500.00 2880.73 3430.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1500.00 2880.73 3430.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1000.00 2692.01 2575.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 359 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07000 Pull Box (Spec) Each =================================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 5.00 500.00 145.12 138.60 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 9.00 400.00 247.19 236.57 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 36.00 300.00 381.50 131.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 338.00 332.85 150.76 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 7.00 330.00 306.08 290.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 9.00 250.00 434.09 405.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 285.00 368.92 354.69 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 18.00 400.00 277.11 317.42 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 19.00 347.37 801.42 1226.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 37.00 372.97 508.78 784.22 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 250.00 564.38 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 250.00 564.38 600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 104.00 341.44 399.96 411.82 =============== 613-07010 Pull Box (Surf Mtd) Each =================================================== NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 1.00 800.00 534.64 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 800.00 534.64 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 800.00 534.64 150.00 =============== 613-07017 Pull Box (16"x14"x6") Each =================================================== C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 1.00 500.00 285.56 451.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 500.00 285.56 451.12 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 360 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07017 Pull Box (16"x14"x6") Each =================================================== IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 29.00 600.00 469.43 469.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29.00 600.00 469.43 469.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 596.67 457.57 468.82 =============== 613-07023 Pull Box (24"x36"x24") Each =================================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 10.00 650.00 658.20 626.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 7.00 720.00 815.50 622.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 678.82 714.67 624.35 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 1.00 850.00 800.51 877.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 850.00 800.51 877.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 900.00 1188.72 1163.89 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 9.00 750.00 826.15 740.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 18.00 650.00 1084.74 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 28.00 691.07 970.53 986.57 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 2.00 750.00 1364.69 1325.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 4.00 660.00 931.72 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 690.00 1076.04 1108.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 690.00 908.50 880.09 =============== 613-07026 Pull Box (16"x24"x12") Each =================================================== SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 4.00 500.00 360.25 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 500.00 360.25 400.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 361 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07026 Pull Box (16"x24"x12") Each =================================================== STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 19.00 600.00 563.42 391.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 9.00 395.00 858.46 1421.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 28.00 534.11 628.72 722.20 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 6.00 500.00 436.21 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 500.00 436.21 450.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38.00 525.13 568.77 645.30 =============== 613-07029 Pull Box (24"x24"x12") Each =================================================== IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 10.00 950.00 746.82 746.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 950.00 746.82 746.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 950.00 746.82 746.82 =============== 613-07033 Pull Box (24"x20"x12") Each =================================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 2.00 700.00 392.14 380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 700.00 392.14 380.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 700.00 392.14 380.00 =============== 613-07034 Pull Box (24"x36"x18") Each =================================================== IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 10.00 900.00 549.05 440.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 5.00 600.00 774.97 758.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 4.00 650.00 633.60 608.00 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 2.00 700.00 707.53 510.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 5.00 650.00 683.33 445.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26.00 740.38 630.57 533.35 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 362 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07034 Pull Box (24"x36"x18") Each =================================================== AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR 09/14/06 46.00 700.00 709.22 875.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 46.00 700.00 709.22 875.00 STA R600-279 SH 121 (WADSWORTH) FROM KEN C 10/05/06 10.00 700.00 937.72 875.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 700.00 937.72 875.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 82.00 712.80 701.54 766.67 =============== 613-07036 Pull Box (36"x24"x8") Each =================================================== IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 2.00 1500.00 2291.41 2291.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1500.00 2291.41 2291.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1500.00 2291.41 2291.41 =============== 613-07038 Pull Box (36"x48"x18") Each =================================================== NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 2.00 1250.00 947.80 660.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 1.00 1000.00 796.67 590.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1166.67 906.58 636.67 AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR 09/14/06 24.00 850.00 976.54 1150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 24.00 850.00 976.54 1150.00 STA R600-279 SH 121 (WADSWORTH) FROM KEN C 10/05/06 5.00 700.00 1295.28 950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 700.00 1295.28 950.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 856.25 1013.66 1070.63 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 363 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07040 Pull Box (30"x48"x24") Each =================================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 6.00 880.00 895.00 870.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 5.00 1250.00 964.50 822.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 1048.18 922.80 848.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 1048.18 922.80 848.18 =============== 613-07050 Pull Box (13"x24"x18") Deep Each =================================================== STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 9.00 400.00 599.20 405.53 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 4.00 500.00 534.79 369.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 430.77 581.43 394.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 430.77 581.43 394.29 =============== 613-07060 Pull Box (18"x30"x18") Deep Each =================================================== NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 1.00 2000.00 650.00 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2000.00 650.00 650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 650.00 650.00 =============== 613-08110 Elec Vault (7'x9'x7.5') Deep Each =================================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 8200.00 9070.36 8737.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 8200.00 9070.36 8737.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 8200.00 9070.36 8737.09 =============== 613-10000 Wiring LUMP SUM =============================================== SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 01/05/06 1.00 40000.00 21696.40 9075.00 SHE 0091-025 SH 9 VMS IN BRECKENRIDGE 01/05/06 1.00 10000.00 4197.69 3875.00 STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 1.00 5000.00 4921.79 1162.51 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1.00 14000.00 13429.69 11672.47 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 364 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-10000 Wiring LUMP SUM =============================================== IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 1.00 11000.00 6531.81 1650.00 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 1.00 6500.00 7020.17 7042.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 1.00 3000.00 7366.67 4000.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 22000.00 30957.47 60600.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 20000.00 3361.00 3130.00 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 1.00 4000.00 5018.29 2100.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 1.00 22000.00 22305.25 17671.00 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 1.00 4000.00 3463.33 3864.98 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 1.00 3500.00 4563.29 1670.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 1.00 2000.00 5166.67 4300.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 1.00 2000.00 1580.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 11266.67 9771.35 8887.53 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 1.00 10000.00 8806.24 4218.22 SHE 052A-026 SH 52/ US 287 DILEMMA ZONE PR 04/27/06 1.00 12000.00 17536.12 10565.58 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 1.00 700.00 6409.19 3818.37 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 1.00 4000.00 3950.00 4200.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 1.00 5000.00 1902.09 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 6340.00 8846.54 4960.43 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 10000.00 19041.98 10450.43 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 1.00 8000.00 5358.25 7500.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1.00 5000.00 4715.00 4730.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1.00 5000.00 2512.85 3000.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 20000.00 6345.05 6650.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 24000.00 13156.78 1587.12 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 10000.00 37691.56 61330.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1.00 40000.00 19787.73 22000.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 1.00 10000.00 15000.00 10000.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 1.00 4000.00 4948.38 4100.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 1.00 5000.00 8025.20 7450.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 45000.00 94050.91 66982.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 15500.00 17264.03 17148.36 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 1.00 52000.00 113379.77 113379.77 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 1.00 10000.00 6000.00 6000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 365 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-10000 Wiring LUMP SUM =============================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 20000.00 63438.11 78000.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1.00 150000.00 121695.24 60000.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 1.00 4000.00 4718.12 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 47200.00 56740.70 51975.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37.00 16829.73 17297.34 16858.79 =============== 613-12000 Luminaire Fl (Tunnel) Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 50.00 1500.00 881.13 830.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 1500.00 881.13 830.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 1500.00 881.13 830.00 =============== 613-15000 Floodlight Each =================================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 6.00 5000.00 627.71 400.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 24.00 2500.00 929.86 945.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 3000.00 884.08 836.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 3000.00 884.08 836.00 =============== 613-15050 Spot Light Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 8.00 500.00 913.37 918.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 500.00 913.37 918.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 500.00 913.37 918.00 =============== 613-15100 Recessed Light Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 101.00 500.00 730.33 765.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 101.00 500.00 730.33 765.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 101.00 500.00 730.33 765.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 366 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-15200 Recessed Light (Spec) Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 4.00 700.00 497.75 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 700.00 497.75 450.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 700.00 497.75 450.00 =============== 613-15750 HID Luminaire Mounting Support System LUMP SUM =============================================== IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 1.00 57000.00 134784.55 134784.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 57000.00 134784.55 134784.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 57000.00 134784.55 134784.55 =============== 613-16000 Luminaire (Spec) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2.00 1250.00 1945.64 1600.00 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 10.00 1000.00 1397.64 1320.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 1041.67 1501.32 1367.38 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 4.00 1500.00 1498.92 1263.19 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 132.00 1235.61 1339.68 1846.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 136.00 1243.38 1345.86 1828.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 148.00 1227.03 1369.53 1791.50 =============== 613-16010 Light Std + Lumin (Dec) Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2.00 3700.00 6431.92 7510.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 3700.00 6431.92 7510.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3700.00 6431.92 7510.00 =============== 613-16020 Luminaire (Spec) Ind (165 Watt) Each =================================================== STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 21.00 1200.00 978.85 942.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21.00 1200.00 978.85 942.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 1200.00 978.85 942.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 367 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-16025 Luminaire (Spec) (LED) (Step Light) Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 135.00 1200.00 143.82 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 135.00 1200.00 143.82 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 135.00 1200.00 143.82 90.00 =============== 613-20100 Inst Light Std Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 10.00 350.00 380.89 280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 350.00 380.89 280.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 350.00 380.89 280.00 =============== 613-20200 Inst Lumin Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 350.00 331.86 163.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 350.00 331.86 163.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 350.00 331.86 163.00 =============== 613-30005 Light Std + Lumin (Pedest) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 13.00 3000.00 3216.76 2800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 3000.00 3216.76 2800.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 12.00 3500.00 4001.76 4240.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 2.00 3600.00 3095.74 3705.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 3514.29 3941.36 4163.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 3266.67 3577.06 3507.05 =============== 613-30302 Light Std Alum (30 Ft) (2) Each =================================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 15.00 2400.00 2402.65 2250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 2400.00 2402.65 2250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 2400.00 2402.65 2250.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 368 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-30350 Light Std Alum (35 Ft) Each =================================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 117.00 2200.00 1747.88 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 117.00 2200.00 1747.88 1600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 117.00 2200.00 1747.88 1600.00 =============== 613-32350 Light Std Steel (35 Ft) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 31.00 1200.00 3671.28 3150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 31.00 1200.00 3671.28 3150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31.00 1200.00 3671.28 3150.00 =============== 613-32400 Light Std Steel (40 Ft) Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 10.00 3000.00 2855.82 2993.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 3000.00 2855.82 2993.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 3000.00 2855.82 2993.09 =============== 613-34250 Light Std Metal (25 Ft) Each =================================================== SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 2.00 3000.00 3787.50 4400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3000.00 3787.50 4400.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 22.00 3300.00 2917.55 2645.20 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 8.00 4000.00 3279.80 4273.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 3486.67 2995.18 3079.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 3456.25 3048.00 3161.93 =============== 613-34300 Light Std Metal (30 Ft) Each =================================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 10.00 1800.00 2086.62 2636.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 1800.00 2086.62 2636.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 1800.00 2086.62 2636.87 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 369 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-34350 Light Std Metal (35 Ft) Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 17.00 2800.00 2691.75 2637.98 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 17.00 1800.00 2351.56 2849.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 34.00 2300.00 2545.95 2743.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 2300.00 2545.95 2743.83 =============== 613-34400 Light Std Metal (40 Ft) Each =================================================== C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 2.00 2700.00 3358.36 5316.71 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 3.00 2500.00 3112.36 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 2580.00 3210.76 3926.68 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 16.00 2000.00 3640.23 3500.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 12.00 2600.00 2412.67 1940.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 28.00 2257.14 3212.01 2831.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.00 2306.06 3211.94 2997.38 =============== 613-34401 Light Std Metal (40 Ft) (Spec) Each =================================================== STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 4.00 2600.00 3309.85 3054.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 2600.00 3309.85 3054.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 2600.00 3309.85 3054.00 =============== 613-34402 Light Std Metal (40 Ft) (2) Each =================================================== IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 4.00 3500.00 3233.41 3233.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 3500.00 3233.41 3233.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 3500.00 3233.41 3233.41 =============== 613-35100 Light Std Steel Hi Mast (100 Ft) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 22000.00 26728.32 27000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 22000.00 26728.32 27000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 22000.00 26728.32 27000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 370 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-35120 Light Std Steel Hi Mast (120 Ft) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 8.00 22000.00 30392.80 30500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 22000.00 30392.80 30500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 22000.00 30392.80 30500.00 =============== 613-35140 Light Std Steel Hi Mast (140 Ft) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 25000.00 34728.73 35000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 25000.00 34728.73 35000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 25000.00 34728.73 35000.00 =============== 613-40000 Conc Foundation Pad Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 10.00 700.00 710.81 602.05 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 3.00 600.00 841.63 610.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 676.92 749.50 603.89 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 3.00 750.00 967.07 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 750.00 967.07 800.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 600.00 1652.55 2645.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 600.00 1652.55 2645.20 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 126.00 700.00 654.55 575.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 126.00 700.00 654.55 575.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 143.00 698.25 672.28 596.82 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 371 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-40010 Light Std Foundation Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 54.00 750.00 735.25 790.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 3.00 1000.00 786.50 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 57.00 763.16 736.83 785.26 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 2.00 900.00 967.70 1535.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 900.00 967.70 1535.40 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 17.00 780.00 747.41 913.14 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 22.00 750.00 944.17 740.66 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 30.00 500.00 839.69 890.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 11.00 850.00 926.55 822.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 29.00 750.00 770.29 742.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 109.00 695.96 842.95 817.46 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 4.00 900.00 2571.37 2571.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 900.00 2571.37 2571.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 172.00 725.35 805.45 855.93 =============== 613-40012 Light Std Foundation Spec Each =================================================== STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 5.00 1200.00 1375.84 1520.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 10.00 825.00 1015.72 1077.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 950.00 1179.41 1224.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 950.00 1179.41 1224.77 =============== 613-45048 Foundation (48 In Caisson) Lin Foot =============================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 305.00 250.00 399.22 430.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 305.00 250.00 399.22 430.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 305.00 250.00 399.22 430.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 372 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-50000 Lowering Device Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 11.00 5000.00 5900.46 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 5000.00 5900.46 6000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 5000.00 5900.46 6000.00 =============== 613-50010 Photoel Cell Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 200.00 307.98 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 200.00 307.98 250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 200.00 307.98 250.00 =============== 613-50050 Port Power Unit Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 3000.00 3094.77 3200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 3000.00 3094.77 3200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3000.00 3094.77 3200.00 =============== 613-50060 Port Power Generator Each =================================================== BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 13.00 8000.00 5312.32 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 8000.00 5312.32 3500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 8000.00 5312.32 3500.00 =============== 613-50100 Lighting Ctrl Center Each =================================================== IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 5000.00 5209.88 6877.52 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 4500.00 10695.67 11440.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 5.00 4600.00 6421.31 6790.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 4642.86 7385.73 7467.46 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 11.00 7000.00 3590.24 3700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 7000.00 3590.24 3700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 6083.33 4808.54 5165.12 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 373 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-50125 Ctrl Center Box Each =================================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2.00 3000.00 1520.33 1525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 3000.00 1520.33 1525.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3000.00 1520.33 1525.00 =============== 613-50150 Secondary Serv Pedestal Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 3.00 2000.00 718.00 1105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 2000.00 718.00 1105.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 11.00 3000.00 647.20 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 3000.00 647.20 700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 2785.71 666.76 786.79 =============== 613-50225 Interior Lighting (Conc Box) Each =================================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 11.00 1600.00 855.89 830.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 1600.00 855.89 830.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 1600.00 855.89 830.00 =============== 613-50300 Tunnel Lighting System LUMP SUM =============================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1.00 5000.00 12273.31 15250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 12273.31 15250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 12273.31 15250.00 =============== 613-50325 Tunnel Lighting Control System LUMP SUM =============================================== IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 1.00 10000.00 31490.12 31490.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 10000.00 31490.12 31490.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 31490.12 31490.12 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 374 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-50400 Light Std Timber (Temp) Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 19.00 2000.00 1975.03 1430.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 6.00 3000.00 4703.72 4400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 2240.00 2477.24 2142.80 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 36.00 2500.00 1597.38 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 36.00 2500.00 1597.38 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 61.00 2393.44 2015.51 1763.44 =============== 613-50410 Light Std (Temp) Each =================================================== IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 4.00 3500.00 4964.45 4600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 3500.00 4964.45 4600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 3500.00 4964.45 4600.00 =============== 613-70150 Lumin HPS (150 W) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 4.00 500.00 661.52 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 500.00 661.52 450.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 500.00 661.52 450.00 =============== 613-70250 Lumin HPS (250 W) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 34.00 1100.00 531.53 630.00 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 6.00 380.00 518.57 735.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 4.00 500.00 434.65 383.25 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 1.00 500.00 510.15 500.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 14.00 400.00 420.75 361.00 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 2.00 600.00 541.37 387.10 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 3.00 530.00 711.78 706.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 2.00 500.00 513.75 480.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 66.00 781.36 515.72 557.11 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 375 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-70250 Lumin HPS (250 W) Each =================================================== IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 3.00 500.00 416.45 420.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 500.00 416.45 420.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 2.00 600.00 403.50 407.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 4.00 550.00 389.36 317.42 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 16.00 475.00 412.53 458.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 13.00 500.00 2497.30 2550.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 3.00 500.00 439.44 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 38.00 500.00 934.87 1151.62 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 500.00 499.96 505.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 500.00 499.96 505.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 108.00 671.94 658.00 762.00 =============== 613-70251 Inst Lumin HPS (250 W) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 11.00 475.00 137.71 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 475.00 137.71 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 475.00 137.71 150.00 =============== 613-70400 Lumin HPS (400 W) Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 10.00 450.00 415.79 426.93 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 3.00 600.00 466.67 405.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 484.62 423.55 421.87 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 4.00 500.00 437.77 338.87 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 376 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-70400 Lumin HPS (400 W) Each =================================================== C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 2.00 525.00 455.28 660.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 508.33 440.69 446.10 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 5.00 450.00 450.00 400.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 4.00 420.00 543.78 377.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 436.67 501.15 389.92 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 8.00 600.00 446.85 446.85 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 4.00 800.00 450.00 450.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 166.00 400.00 368.15 390.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 178.00 417.98 369.28 393.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 206.00 425.63 377.54 397.01 =============== 613-70403 Lumin HPS (400 W) (Spec) Each =================================================== IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 8.00 600.00 860.86 860.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 600.00 860.86 860.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 600.00 860.86 860.86 =============== 613-71000 Lumin HPS (1000 W) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 40.00 1000.00 796.31 860.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 1000.00 796.31 860.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 1000.00 796.31 860.00 =============== 613-72150 Lumin HPS (WT) (150 W) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 2000.00 1021.90 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2000.00 1021.90 1300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2000.00 1021.90 1300.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 377 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-74000 Light Mast Arm Each =================================================== NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 4.00 300.00 150.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 300.00 150.00 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 300.00 150.00 150.00 =============== 613-75250 Lumin Metal Halide (250 W) Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 21.00 500.00 1270.47 1242.89 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 36.00 1200.00 943.96 634.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 57.00 942.11 1064.26 858.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 57.00 942.11 1064.26 858.86 =============== 613-80022 Circuit Breaker (225A, 3 Pole) Each =================================================== IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 2.00 10000.00 5289.95 5289.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 10000.00 5289.95 5289.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 10000.00 5289.95 5289.95 =============== 613-81022 Panelboard (225A, 277/480V, 3 Ph) Each =================================================== IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 2.00 3500.00 1387.41 1387.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 3500.00 1387.41 1387.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3500.00 1387.41 1387.41 =============== 614-00011 Sign Panel (CL I) Sq Foot ================================================ NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 33.00 15.00 14.98 15.25 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 14.00 28.00 19.13 16.40 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 12.50 20.00 17.38 14.60 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 378.00 16.00 14.64 15.18 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 30.00 32.00 19.94 14.30 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 378 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00011 Sign Panel (CL I) Sq Foot ================================================ IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 94.00 18.00 18.72 18.50 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 51.00 18.00 19.71 19.84 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 72.00 18.00 15.08 14.46 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 101.00 17.00 21.81 26.35 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 115.00 18.00 28.88 32.65 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 3.00 25.00 18.97 17.50 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 21.00 20.00 18.20 15.50 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 30.00 20.00 15.42 14.50 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 19.00 20.00 15.00 15.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 107.00 15.00 16.17 18.60 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 47.00 18.00 16.18 10.84 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 288.00 18.00 26.16 19.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 57.00 17.00 15.26 10.52 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 12.50 30.00 15.25 15.00 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 30.00 25.00 28.00 28.00 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 22.00 22.00 28.61 21.82 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 24.00 20.00 27.13 22.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 35.75 22.00 18.75 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,596.75 18.03 19.64 18.61 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 76.00 15.00 21.61 18.81 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 20.00 13.00 14.48 13.50 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 139.00 15.00 13.54 11.40 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 18.00 18.00 15.84 12.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 52.00 22.00 18.52 17.71 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 73.00 18.00 19.23 22.70 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 66.60 18.00 20.76 26.51 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 28.50 20.00 20.60 22.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 20.00 18.00 15.43 11.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 9.00 20.00 13.00 13.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 52.00 15.00 20.67 16.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 27.00 15.00 15.50 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 581.10 16.80 17.78 17.33 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 69.00 17.00 19.28 19.52 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 140.33 18.00 19.99 18.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 104.00 18.00 14.80 17.60 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 40.00 20.00 16.35 32.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 190.50 20.00 24.87 26.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 220.00 17.00 14.54 14.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 379 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00011 Sign Panel (CL I) Sq Foot ================================================ IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 187.00 15.00 16.94 17.01 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 90.00 20.00 15.92 11.93 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 65.00 21.00 18.46 16.60 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 115.00 16.00 15.00 15.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 90.82 20.00 19.13 16.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 77.00 20.00 16.04 15.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 36.25 21.00 26.27 22.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 199.00 15.00 18.07 18.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,623.90 17.76 18.69 17.92 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 15.00 40.00 20.00 20.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 266.00 18.00 16.57 17.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 69.00 18.00 22.63 19.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 41.00 18.00 15.80 10.80 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 43.75 17.00 31.48 60.40 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 40.00 30.00 18.16 16.50 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 35.00 18.00 17.65 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 509.75 19.50 19.04 20.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,311.50 17.94 19.01 18.43 =============== 614-00012 Sign Panel (CL II) Sq Foot ================================================ NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 18.00 15.00 17.88 18.95 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 30.00 25.00 24.18 21.55 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 108.00 22.00 18.80 18.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 98.00 22.00 20.93 20.80 STA 0343-025 US 34, WRAY WEST 01/26/06 64.00 30.00 21.23 20.40 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 298.00 18.00 17.10 17.51 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 200.00 35.00 23.43 16.50 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 32.00 19.00 20.18 16.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 255.00 20.00 20.78 20.50 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 303.00 22.00 27.94 29.94 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 467.00 20.00 18.35 17.83 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 222.50 18.00 31.23 35.00 SHE 2854-111 US 285 & C470 SIGNING 03/02/06 94.00 25.00 21.03 18.17 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 160.00 30.00 22.61 22.05 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 393.25 24.00 18.55 17.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 69.00 20.00 25.33 25.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 280.00 20.00 21.45 29.25 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 240.00 20.00 22.91 14.24 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 380 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00012 Sign Panel (CL II) Sq Foot ================================================ NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 49.00 18.00 19.51 14.60 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 18.00 25.00 22.15 18.00 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 25.00 26.00 38.38 25.14 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 72.00 20.00 19.27 21.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,495.75 22.13 21.41 21.23 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 39.00 20.00 30.31 29.56 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 73.00 17.00 18.30 17.50 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 98.00 20.00 19.44 15.45 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 410.00 25.00 22.31 21.88 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 18.00 20.00 24.05 23.10 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 157.20 22.00 25.05 32.09 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 44.00 21.00 23.20 25.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 229.00 20.00 21.85 14.70 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 36.00 21.00 30.92 30.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 54.00 15.00 28.29 22.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,158.20 21.69 23.10 21.72 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 218.00 18.00 21.90 22.11 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 113.25 21.00 21.31 21.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 61.00 18.00 17.90 19.80 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 18.00 20.00 20.07 21.22 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 42.00 20.00 38.00 36.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 898.00 25.00 16.36 16.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 139.00 20.00 19.04 19.14 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 25.00 20.00 20.27 14.84 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 88.00 21.00 20.39 17.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 162.25 18.00 17.00 17.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 203.00 23.00 21.90 18.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 18.00 28.00 26.79 31.58 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 83.50 18.00 17.92 17.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 437.00 17.00 19.49 20.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,506.00 21.23 19.13 18.57 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 421.00 20.00 20.10 20.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 280.00 18.00 18.48 14.85 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 381 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00012 Sign Panel (CL II) Sq Foot ================================================ STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 573.00 22.00 19.64 18.50 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 234.00 20.00 20.66 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,508.00 20.39 19.68 18.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,667.95 21.51 20.58 20.05 =============== 614-00013 Sign Panel (CL III) Sq Foot ================================================ NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 16.00 21.00 20.60 22.30 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 108.00 25.00 22.50 20.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 282.00 20.00 20.00 21.01 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 940.00 22.00 25.99 26.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 50.00 25.00 37.89 40.82 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 328.00 22.00 20.52 19.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,724.00 21.94 24.26 24.03 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 45.00 28.00 25.48 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 45.00 28.00 25.48 25.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 2,288.00 20.00 19.36 18.56 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 45.50 26.00 24.71 26.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 60.00 35.00 23.35 42.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 376.00 18.00 28.60 20.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 764.00 25.00 22.07 21.27 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 2,165.00 21.00 24.25 23.50 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1,029.00 20.00 21.63 23.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,727.50 20.95 22.30 21.61 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 12.00 45.00 25.00 25.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2,845.00 22.00 24.70 26.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1,198.00 26.00 22.88 22.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 48.00 24.00 27.32 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,103.00 23.26 24.21 24.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,599.50 21.86 23.35 22.99 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 382 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00025 Inst Sign Panel (CL I) Sq Foot ================================================ SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 15.00 10.00 17.61 18.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 10.00 17.61 18.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 10.00 17.61 18.25 =============== 614-00027 Inst Sign Panel (CL II) Sq Foot ================================================ SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 60.00 10.00 16.60 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 10.00 16.60 22.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 32.00 22.00 7.30 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 32.00 22.00 7.30 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 92.00 14.17 14.04 17.48 =============== 614-00035 Sign Panel (Spec) Sq Foot ================================================ STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1,070.00 170.00 76.02 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,070.00 170.00 76.02 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,070.00 170.00 76.02 75.00 =============== 614-00040 Sign Post (Spec) Lin Foot =============================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 73.00 50.00 79.99 73.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 73.00 50.00 79.99 73.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 73.00 50.00 79.99 73.96 =============== 614-00044 Timber Sign Post (4x4 In) Lin Foot =============================================== CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 203.00 16.00 13.33 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 203.00 16.00 13.33 11.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 203.00 16.00 13.33 11.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 383 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00200 Steel Sign Post (U-2) Lin Foot =============================================== IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 80.00 10.00 5.01 3.26 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 16.00 12.50 10.81 10.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 18.00 10.00 34.00 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 114.00 10.35 6.83 9.06 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 28.00 10.00 5.13 2.20 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 60.00 10.00 7.23 2.15 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 10.00 10.00 4.00 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 98.00 10.00 6.34 2.35 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 15.50 10.00 5.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.50 10.00 5.00 5.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 9.00 15.00 10.73 9.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 72.00 3.50 8.24 2.10 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 36.00 8.00 7.56 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 117.00 5.77 8.16 4.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 344.50 8.68 7.33 5.30 =============== 614-00214 Steel Sign Post (1.75x1.75 In T) Lin Foot =============================================== NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 20.00 30.00 10.32 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 30.00 10.32 5.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 30.00 10.32 5.50 =============== 614-00216 Steel Sign Post (2x2 In T) Lin Foot =============================================== IM 0252-384 I-25 OVER BROADWAY 11/09/06 130.00 15.00 15.39 12.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 384 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00216 Steel Sign Post (2x2 In T) Lin Foot =============================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 131.00 15.00 12.50 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 261.00 15.00 14.27 11.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 261.00 15.00 14.27 11.25 =============== 614-00218 Steel Sign Post (2.25x2.25 In T) Lin Foot =============================================== STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 74.00 12.00 10.10 13.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 74.00 12.00 10.10 13.20 IM 0252-384 I-25 OVER BROADWAY 11/09/06 30.00 12.00 18.11 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30.00 12.00 18.11 13.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 104.00 12.00 15.05 13.14 =============== 614-00220 Steel Sign Post (2.5x2.5 In T) Lin Foot =============================================== NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 10.00 18.00 32.50 17.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 18.00 32.50 17.01 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 534.00 35.00 32.08 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 534.00 35.00 32.08 24.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 544.00 34.69 32.08 23.87 =============== 614-00357 Steel Sign Post (S 3x5.7) Lin Foot =============================================== SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 40.00 20.00 73.20 59.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 20.00 73.20 59.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 16.00 22.00 27.18 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 22.00 27.18 28.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56.00 20.57 60.05 50.14 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 385 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00477 Steel Sign Post (S 4x7.7) Lin Foot =============================================== C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 45.00 25.00 31.29 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 45.00 25.00 31.29 25.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 20.00 50.00 31.59 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 50.00 31.59 32.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65.00 32.69 31.40 27.15 =============== 614-00615 Steel Sign Post (W 6x15) Lin Foot =============================================== IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 32.00 35.00 46.14 45.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32.00 35.00 46.14 45.93 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 28.00 35.00 33.98 33.34 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28.00 35.00 33.98 33.34 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 166.00 32.00 38.89 36.54 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 26.00 50.00 34.93 37.21 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 30.00 30.00 46.93 47.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 222.00 33.84 39.25 38.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 282.00 34.09 40.03 38.55 =============== 614-00818 Steel Sign Post (W 8x18) Lin Foot =============================================== IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 29.00 55.00 39.24 41.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29.00 55.00 39.24 41.47 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 386 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00818 Steel Sign Post (W 8x18) Lin Foot =============================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 192.00 50.00 44.14 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 192.00 50.00 44.14 42.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 221.00 50.66 43.61 41.93 =============== 614-00821 Steel Sign Post (W 8x21) Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 16.00 45.00 41.56 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 45.00 41.56 41.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 104.00 55.00 44.32 46.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 104.00 55.00 44.32 46.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 53.67 43.73 46.01 =============== 614-01022 Steel Sign Post (W 10x22) Lin Foot =============================================== IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 35.00 45.00 56.46 57.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 35.00 45.00 56.46 57.02 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 38.00 58.00 65.14 65.06 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 27.00 60.00 48.48 48.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 65.00 58.83 58.22 58.35 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 37.00 60.00 46.14 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 37.00 60.00 46.14 45.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 137.00 55.61 54.24 54.41 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 387 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01026 Steel Sign Post (W 10x26) Lin Foot =============================================== IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 39.00 55.00 62.25 60.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 39.00 55.00 62.25 60.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39.00 55.00 62.25 60.61 =============== 614-01226 Steel Sign Post (W 12x26) Lin Foot =============================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 44.00 60.00 50.85 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 44.00 60.00 50.85 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44.00 60.00 50.85 50.00 =============== 614-01502 Steel Sign Supp (2-In Rd)(Po&Sock) Lin Foot =============================================== BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 26.00 25.00 61.00 61.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26.00 25.00 61.00 61.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 147.00 15.00 20.25 19.80 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 117.00 28.00 18.15 29.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 264.00 20.76 19.52 24.01 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 114.00 20.00 19.70 17.94 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 80.00 27.00 30.38 13.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 62.00 20.00 23.50 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 256.00 22.19 25.40 14.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 546.00 21.63 23.95 21.53 =============== 614-01503 Steel Sign Supp (2-In Rd)(Po&Sock) Each =================================================== STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 1.00 300.00 203.17 179.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 388 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01503 Steel Sign Supp (2-In Rd)(Po&Sock) Each =================================================== SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 11.00 140.00 236.75 270.00 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 5.00 195.00 180.00 180.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 4.00 180.00 190.75 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21.00 168.33 220.27 240.45 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 2.00 70.00 108.50 113.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 70.00 108.50 113.01 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 39.00 200.00 176.68 200.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 40.00 115.99 128.25 125.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 6.00 200.00 246.49 284.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 85.00 160.47 159.51 170.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 108.00 160.32 166.28 183.17 =============== 614-01512 Steel Sign Supp (2-In Rd)(Post) Lin Foot =============================================== NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 84.00 15.00 12.08 16.80 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 248.00 15.00 13.37 9.45 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 502.00 12.00 7.86 7.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 68.50 13.00 12.52 12.25 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 90.00 12.00 10.30 8.50 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 22.00 30.00 13.55 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,014.50 13.44 10.70 8.91 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 33.00 13.00 13.39 13.44 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 230.00 15.00 17.50 16.50 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 22.00 15.00 17.10 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 285.00 14.77 16.75 16.03 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 65.00 15.00 18.18 14.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 389 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01512 Steel Sign Supp (2-In Rd)(Post) Lin Foot =============================================== IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 352.00 15.00 13.09 12.76 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 187.00 14.00 53.00 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 604.00 14.69 27.47 11.73 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 20.00 20.00 35.00 35.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 181.00 12.00 22.44 25.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 201.00 12.80 22.71 26.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,104.50 13.92 16.65 12.33 =============== 614-01522 Steel Sign Supp (2-In Rd)(Sock) Each =================================================== NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 7.00 35.00 45.60 38.70 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 2.00 50.00 40.70 39.90 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 43.00 65.00 46.07 58.37 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 9.00 55.00 65.02 48.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 10.00 80.00 102.96 93.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 71.00 62.46 55.18 59.55 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 3.00 72.00 82.25 53.75 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 23.00 75.00 110.42 111.25 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 2.00 60.00 162.60 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28.00 73.61 111.47 104.29 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 5.00 41.00 85.44 90.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 7.00 50.00 55.84 82.51 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 51.00 60.00 109.94 79.74 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 13.00 45.00 76.03 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 76.00 55.26 97.20 79.86 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 2.00 100.00 75.00 75.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 390 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01522 Steel Sign Supp (2-In Rd)(Sock) Each =================================================== STA 0091-026 STATE HIGHWAY NO 9 11/30/06 17.00 80.00 81.92 94.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19.00 82.11 81.76 92.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 194.00 63.18 80.45 77.19 =============== 614-01582 Steel Sign Supp (2-1/2 In Rd)(Po&Slip) Lin Foot =============================================== SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 22.00 35.00 33.41 28.00 SHE 2854-111 US 285 & C470 SIGNING 03/02/06 60.00 30.00 46.02 43.12 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 12.00 50.00 45.67 66.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 94.00 33.72 43.38 42.50 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 246.00 30.00 37.86 33.45 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 458.00 32.00 32.95 32.29 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 176.00 40.00 21.94 34.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 880.00 33.04 33.30 33.13 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 262.00 38.00 64.97 33.37 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 220.00 29.00 67.89 38.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 40.00 60.00 46.32 52.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 522.00 35.89 66.23 36.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,496.00 34.08 49.80 35.00 =============== 614-01583 Stl Sign Supp(2-1/2 In Rd 80)(Po&Slip) Each =================================================== STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 4.00 600.00 364.48 338.45 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 3.00 400.00 548.57 544.28 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 30.00 350.00 477.50 442.67 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 12.00 330.00 292.02 275.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 38.00 450.00 359.50 477.50 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 9.00 400.00 360.13 349.38 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 2.00 350.00 393.38 350.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 7.00 400.00 421.66 340.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 105.00 402.48 401.72 418.44 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 391 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01583 Stl Sign Supp(2-1/2 In Rd 80)(Po&Slip) Each =================================================== NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 7.00 400.00 504.67 362.25 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 6.00 300.00 430.76 347.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 353.85 470.56 355.35 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 2.00 400.00 443.00 506.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 11.00 350.00 518.78 1000.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 65.00 450.00 409.98 400.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 23.00 450.00 339.06 367.50 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 38.00 450.00 468.42 398.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 139.00 441.37 412.04 443.15 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 4.00 450.00 380.96 430.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 450.00 380.96 430.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 261.00 421.49 408.81 428.64 =============== 614-01585 Steel Sign Supp (2-1/2 In Rd 80 )(Po) Lin Foot =============================================== NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 110.00 35.00 29.63 25.65 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 144.00 30.00 28.95 24.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 344.00 30.00 26.12 21.20 STA 0343-025 US 34, WRAY WEST 01/26/06 56.00 30.00 23.43 20.70 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 658.00 22.00 17.77 19.85 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 42.00 35.00 32.57 27.50 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 178.00 28.00 34.10 32.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 51.00 30.00 30.67 35.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 24.00 25.00 32.50 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,607.00 26.90 24.35 23.22 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 22.00 35.00 29.51 29.56 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 392 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01585 Steel Sign Supp (2-1/2 In Rd 80 )(Po) Lin Foot =============================================== STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 100.50 18.00 26.22 23.00 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 50.00 30.00 41.00 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 172.50 23.65 32.35 27.03 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 57.00 30.00 33.29 40.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 24.00 25.00 29.82 29.47 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 262.00 23.00 27.15 26.58 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 92.00 30.00 30.83 30.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 317.75 24.00 24.50 24.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 67.00 35.00 18.75 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 819.75 25.70 26.84 26.28 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 439.00 22.00 25.21 30.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 70.00 30.00 36.64 64.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 509.00 23.10 26.78 34.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,108.25 25.78 25.60 26.12 =============== 614-01588 Steel Sign Supp (2-1/2 In Rd 80)(Slip) Each =================================================== NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 10.00 130.00 146.80 151.85 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 12.00 170.00 141.67 110.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 8.00 180.00 122.31 39.50 STA 0343-025 US 34, WRAY WEST 01/26/06 4.00 170.00 110.25 88.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 58.00 140.00 112.79 145.93 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 14.00 400.00 149.87 132.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 15.00 150.00 40.53 40.00 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 21.00 150.00 420.50 420.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 16.00 160.00 176.35 160.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 4.00 170.00 160.00 150.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 31.00 200.00 128.20 106.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 6.00 150.00 189.16 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 199.00 175.48 147.23 154.90 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 2.00 200.00 197.45 161.25 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 393 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01588 Steel Sign Supp (2-1/2 In Rd 80)(Slip) Each =================================================== STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 10.00 155.00 161.70 145.00 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 4.00 170.00 293.20 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 164.38 211.49 173.28 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 5.00 180.00 176.49 230.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 7.00 180.00 166.20 188.60 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 36.00 140.00 153.87 159.49 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 32.00 150.00 147.50 150.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 6.00 185.00 182.67 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 86.00 152.44 158.69 163.51 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 32.00 150.00 221.76 221.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 3.00 175.00 304.60 503.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 33.00 106.00 186.05 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 68.00 129.75 204.50 203.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 369.00 161.20 164.51 166.72 =============== 614-03002 Conc Footing (Ty 2) Each =================================================== IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 2.00 750.00 1196.66 1256.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 750.00 1196.66 1256.71 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 2.00 900.00 1115.46 1093.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 900.00 1115.46 1093.88 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 6.00 1400.00 860.42 786.17 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 2.00 1300.00 1638.47 1913.88 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 2.00 1400.00 2314.34 3186.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 1380.00 1253.79 1491.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 1221.43 1226.72 1401.29 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 394 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-03003 Conc Footing (Ty 3) Each =================================================== IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 3.00 1500.00 1767.55 2020.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1500.00 1767.55 2020.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1500.00 1767.55 2020.21 =============== 614-03004 Conc Footing (Ty 4) Each =================================================== IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 2.00 1600.00 1792.55 2020.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1600.00 1792.55 2020.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1600.00 1792.55 2020.21 =============== 614-03005 Conc Footing (Ty 5) Each =================================================== IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 2.00 1200.00 1737.29 1643.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1200.00 1737.29 1643.72 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 2.00 1600.00 1316.70 1213.31 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 6.00 1800.00 2084.80 2339.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 1750.00 1892.77 2057.72 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 1800.00 1723.51 1700.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 16.00 2500.00 1613.58 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 2422.22 1625.80 1788.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 2142.86 1699.54 1855.33 =============== 614-03006 Conc Footing (Ty 6) Each =================================================== IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 2.00 1500.00 1872.18 1698.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1500.00 1872.18 1698.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1500.00 1872.18 1698.08 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 395 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-03007 Conc Footing (Ty 7) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 1800.00 2309.97 2100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1800.00 2309.97 2100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1800.00 2309.97 2100.00 =============== 614-03100 Conc Footing (Sig Pole) Each =================================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 4.00 5500.00 3407.78 3100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 5500.00 3407.78 3100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 5500.00 3407.78 3100.00 =============== 614-07000 Mask Sign Legend Each =================================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 6.00 500.00 459.64 568.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 500.00 459.64 568.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 500.00 459.64 568.93 =============== 614-07105 Mod Sign Legend Each =================================================== C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 6.00 500.00 3168.35 5000.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 2.00 550.00 692.98 568.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 512.50 2673.28 3892.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 512.50 2673.28 3892.23 =============== 614-07125 Mod Steel Sign Post Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2.00 500.00 852.94 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 500.00 852.94 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 500.00 852.94 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 396 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-10015 Overpass Mtd Sign Bracket Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1.00 12000.00 10027.95 3251.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 12000.00 10027.95 3251.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 12000.00 10027.95 3251.76 =============== 614-10120 Var Mesg Sign Each =================================================== C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1.00 130000.00 140943.25 132000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 130000.00 140943.25 132000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 130000.00 140943.25 132000.00 =============== 614-10123 Inst Var Mesg Sign Each =================================================== STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 2.00 8500.00 6047.86 2617.49 SHE 2854-111 US 285 & C470 SIGNING 03/02/06 1.00 5000.00 4415.40 5302.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 7333.33 5618.26 3512.33 IM R600-292 70TH AVE AT I-25/BLAKE AND 20 11/30/06 2.00 30000.00 25311.03 31190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 30000.00 25311.03 31190.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 16400.00 13972.77 14583.40 =============== 614-10125 Var Mesg Sign (Grnd Mtd) Each =================================================== SHE 0091-025 SH 9 VMS IN BRECKENRIDGE 01/05/06 1.00 140000.00 137011.45 120000.00 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 2.00 125000.00 120650.08 119246.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 130000.00 127662.10 119497.33 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 2.00 110000.00 106717.97 102000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 110000.00 106717.97 102000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 122000.00 119284.45 112498.40 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 397 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-10135 LED VMS System Each =================================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 130000.00 119015.04 114400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 130000.00 119015.04 114400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 130000.00 119015.04 114400.00 =============== 614-10146 VMS (LED) (Ground Mounted) Each =================================================== NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 1.00 130000.00 108147.96 105600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 130000.00 108147.96 105600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 130000.00 108147.96 105600.00 =============== 614-10147 VMS LED (Overhead) Each =================================================== NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 1.00 120000.00 130308.60 125206.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 120000.00 130308.60 125206.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 1.00 130000.00 123967.29 121885.00 IM R600-292 70TH AVE AT I-25/BLAKE AND 20 11/30/06 1.00 120000.00 134200.95 110260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 125000.00 129084.12 116072.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 123333.33 129406.35 119117.00 =============== 614-10151 12 In LED (Ball) (Green) Each =================================================== NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 12.00 160.00 155.40 140.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 160.00 155.40 140.19 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 13.00 160.00 139.49 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 160.00 139.49 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 160.00 146.00 140.09 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 398 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-10153 12 In LED (Ball) (Yellow) Each =================================================== NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 20.00 110.00 101.97 90.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 110.00 101.97 90.90 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 13.00 110.00 95.82 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 110.00 95.82 95.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.00 110.00 99.11 92.52 =============== 614-10156 12 In LED (Arr) (Green) Each =================================================== STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 2.00 150.00 137.66 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 150.00 137.66 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 150.00 137.66 140.00 =============== 614-10158 12 In LED (Arr) (Yellow) Each =================================================== STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 2.00 110.00 89.44 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 110.00 89.44 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 110.00 89.44 90.00 =============== 614-10160 Sig Head B-Plates Each =================================================== NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 11.00 160.00 257.13 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 160.00 257.13 110.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 19.00 125.00 120.86 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19.00 125.00 120.86 105.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 137.83 151.45 106.83 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 399 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-10163 8 In LED (Ball) (Green) Each =================================================== NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 16.00 120.00 137.98 127.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 120.00 137.98 127.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 120.00 137.98 127.05 =============== 614-10165 8 In LED (Ball) (Yellow) Each =================================================== NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 16.00 100.00 92.48 85.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 100.00 92.48 85.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 100.00 92.48 85.43 =============== 614-21275 VMS Support (Grnd Mtd) (12.75 In) Each =================================================== SHE 2854-111 US 285 & C470 SIGNING 03/02/06 2.00 15000.00 11345.40 7247.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 15000.00 11345.40 7247.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 15000.00 11345.40 7247.00 =============== 614-21400 VMS Support (Grnd Mtd) (14 In) Each =================================================== NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 1.00 15000.00 24129.49 17300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 15000.00 24129.49 17300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 24129.49 17300.00 =============== 614-30110 Btrfly Str Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 2.00 40000.00 30686.00 27743.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 40000.00 30686.00 27743.99 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 30000.00 24400.58 34200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 30000.00 24400.58 34200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 36666.67 28268.53 29895.99 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 400 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-30205 VMS Butterfly Support (Roadside) Each =================================================== NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 2.00 15000.00 30371.68 34000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 15000.00 30371.68 34000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 15000.00 30371.68 34000.00 =============== 614-31400 Monotube Overhead Sign Cant (14 In Dia) Each =================================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1.00 30000.00 27070.68 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 30000.00 27070.68 25000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 30000.00 27070.68 25000.00 =============== 614-31800 Monotube Overhead Sign Cant (18 In Dia) Each =================================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 3.00 20000.00 27655.73 30500.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1.00 20000.00 35961.56 27000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 20000.00 29404.33 29625.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 2.00 35000.00 26846.74 28000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 35000.00 26846.74 28000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 25000.00 28522.40 29083.33 =============== 614-32000 Monotube Overhead Sign Cant (20 In Dia) Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 25000.00 28304.02 26316.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25000.00 28304.02 26316.09 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 25000.00 26246.88 28000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 25000.00 26246.88 28000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 25000.00 27161.17 27158.05 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 401 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-32400 Monotube Overhead Sign Cant (24 In Dia) Each =================================================== STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 2.00 28000.00 31338.71 30494.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 28000.00 31338.71 30494.99 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 1.00 30000.00 36454.60 32660.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 30000.00 36454.60 32660.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 2.00 30000.00 33531.85 31627.38 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 30000.00 40973.14 41500.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 3.00 30000.00 51352.55 40000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 30000.00 43574.04 37459.13 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 3.00 30000.00 30766.43 32400.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 1.00 30000.00 39016.57 38485.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 4.00 40000.00 34419.13 32000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 35000.00 33880.83 32960.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 32117.65 36434.43 34240.57 =============== 614-32900 Inst Monotube Overhead Sign Cant Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 2000.00 10344.58 8200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2000.00 10344.58 8200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 10344.58 8200.00 =============== 614-41600 Monotube Overhead Sign Brdg (16 In Dia) Each =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 2.00 30000.00 45410.96 43643.83 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 402 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-41600 Monotube Overhead Sign Brdg (16 In Dia) Each =================================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 45000.00 39045.14 39825.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 35000.00 43674.82 42371.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 35000.00 43674.82 42371.02 =============== 614-41800 Monotube Overhead Sign Brdg (18 In Dia) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 40000.00 48632.13 50000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 40000.00 48632.13 50000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 40000.00 48632.13 50000.00 =============== 614-42000 Monotube Overhead Sign Brdg (20 In Dia) Each =================================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 55000.00 43249.01 43239.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 55000.00 43249.01 43239.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 55000.00 43249.01 43239.02 =============== 614-42400 Monotube Overhead Sign Brdg (24 In Dia) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 60000.00 46673.64 51000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 60000.00 46673.64 51000.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 3.00 50000.00 66578.48 68000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 50000.00 66578.48 68000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 52500.00 60245.12 63750.00 =============== 614-70116 Ped Sig Face (16-16) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2.00 850.00 465.06 480.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 850.00 465.06 480.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 850.00 465.06 480.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 403 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70117 Ped Sig Face (16) Each =================================================== SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 8.00 550.00 527.83 510.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 6.00 500.00 404.00 350.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 32.00 500.00 496.25 327.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 46.00 508.70 491.58 361.83 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 4.00 400.00 475.60 362.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 400.00 475.60 362.52 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 700.00 476.65 527.60 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 8.00 370.00 568.71 634.85 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 8.00 480.00 487.50 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17.00 441.18 536.64 541.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 67.00 485.07 498.66 407.47 =============== 614-70150 Ped Sig Face (16) (Countdown) Each =================================================== SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 8.00 500.00 655.73 640.00 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 8.00 500.00 529.68 444.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 500.00 617.92 542.02 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 8.00 500.00 602.50 605.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 500.00 602.50 605.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 550.00 590.46 610.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 550.00 590.46 610.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 503.85 613.00 566.63 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 404 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70216 Traf Sig Face (8-8) Each =================================================== IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 6.00 500.00 444.10 440.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 6.00 500.00 480.64 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 500.00 461.15 520.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 500.00 461.15 520.00 =============== 614-70328 Traf Sig Face (12-8-8) Each =================================================== IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 6.00 650.00 571.69 550.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 6.00 700.00 575.68 660.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 675.00 573.55 605.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 675.00 573.55 605.00 =============== 614-70336 Traf Sig Face (12-12-12) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 15.00 880.00 712.30 660.00 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 29.00 800.00 663.60 745.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 25.00 800.00 575.20 546.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 6.00 750.00 711.60 664.80 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 48.00 800.00 797.25 683.00 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 12.00 700.00 728.18 691.53 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 12.00 730.00 672.17 626.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 7.00 750.00 751.67 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 154.00 790.32 696.86 658.53 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 17.00 700.00 851.22 648.12 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 10.00 750.00 819.00 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 27.00 718.52 839.29 667.33 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 800.00 708.06 745.73 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 2.00 810.00 840.99 850.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 405 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70336 Traf Sig Face (12-12-12) Each =================================================== STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 18.00 600.00 653.90 657.80 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 7.00 650.00 683.92 740.66 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 27.00 750.00 835.00 670.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 7.00 700.00 636.34 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 62.00 692.26 717.57 673.56 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 12.00 1000.00 685.00 685.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 750.00 883.06 930.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 4.00 660.00 773.48 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 905.29 762.06 738.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 260.00 767.00 719.95 668.24 =============== 614-70337 Traf Sig Face (12-12-12) (Inst Only) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 3.00 150.00 177.97 280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 150.00 177.97 280.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 150.00 177.97 280.00 =============== 614-70560 Traf Sig Face (12-12-12-12-12) Each =================================================== R600-247 SIGNALS - SH 121 & SH 391 03/23/06 40.00 1000.00 1026.50 816.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 1.00 1200.00 980.00 785.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 41.00 1004.88 1025.64 815.24 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 2.00 1500.00 1045.57 818.86 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 4.00 1150.00 1212.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 1266.67 1156.52 939.62 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 900.00 931.43 918.22 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 406 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70560 Traf Sig Face (12-12-12-12-12) Each =================================================== C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 2.00 800.00 900.00 700.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 2.00 1100.00 1079.13 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 940.00 1024.66 863.64 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 4.00 1500.00 950.00 950.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 1200.00 1249.28 1320.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 1.00 800.00 1026.09 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 1314.29 1117.88 1077.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 59.00 1062.71 1050.18 863.07 =============== 614-72855 Traf Sig Ctrl Cabinet Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 8500.00 11367.11 9825.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 8500.00 11367.11 9825.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1.00 10000.00 19345.00 19690.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 19345.00 19690.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 9250.00 13139.98 14757.50 =============== 614-72860 Ped Push Button Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2.00 160.00 176.13 225.00 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 16.00 120.00 143.62 185.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 2.00 120.00 149.63 150.00 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 8.00 120.00 172.50 177.50 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 8.00 120.00 151.84 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.00 122.22 151.32 159.17 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 200.00 161.39 177.56 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 407 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72860 Ped Push Button Each =================================================== STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 8.00 150.00 174.95 174.90 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 8.00 115.00 112.50 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17.00 136.47 145.69 142.16 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 8.00 200.00 110.00 110.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 180.00 241.98 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 196.00 183.32 148.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 63.00 137.78 152.80 152.81 =============== 614-72866 Fire Preempt Unit + Timer Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 3000.00 5251.35 6400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3000.00 5251.35 6400.00 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 1.00 3000.00 5696.00 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3000.00 5696.00 10000.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1.00 3000.00 4253.50 4257.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 1.00 7000.00 5680.38 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 5000.00 5395.00 4878.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 4000.00 5417.70 6539.25 =============== 614-72871 Loop Detect Wire (Prefab) Spec Lin Foot =============================================== IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 1,600.00 10.00 15.43 15.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 2,478.00 6.00 4.92 4.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,078.00 7.57 7.86 8.68 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 408 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72871 Loop Detect Wire (Prefab) Spec Lin Foot =============================================== STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 1,050.00 20.00 17.58 20.75 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 584.00 12.00 13.13 10.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,634.00 17.14 16.38 17.00 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 540.00 23.00 15.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 540.00 23.00 15.00 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,252.00 11.40 9.70 11.40 =============== 614-72875 Loop Detect Wire Lin Foot =============================================== STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 280.00 3.00 4.27 3.90 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 3,550.00 4.00 2.51 2.20 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 7,100.00 2.50 3.10 2.55 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 9,748.00 4.00 2.11 2.07 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 6,192.00 2.50 2.54 2.55 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 708.00 4.00 2.14 2.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 6,018.00 2.75 2.18 2.19 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 24,400.00 3.00 2.38 1.80 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 2,480.00 3.00 4.50 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60,476.00 3.10 2.54 2.21 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 1,125.00 3.00 2.52 2.20 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 4,248.00 3.00 2.57 2.85 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 1,125.00 4.00 2.65 2.35 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 1,760.00 2.20 2.95 3.25 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 3,432.00 3.00 2.83 2.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11,690.00 2.98 2.70 2.73 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 205.00 4.00 6.39 7.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 409 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72875 Loop Detect Wire Lin Foot =============================================== NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 8,944.00 2.55 2.10 2.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 3,000.00 3.00 2.52 2.53 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 3,450.00 2.80 2.71 3.17 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 2,115.00 2.50 3.50 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17,714.00 2.69 2.46 2.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 89,880.00 3.00 2.55 2.32 =============== 614-72876 Detect Amp (Loop) (2) Each =================================================== SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 01/05/06 26.00 800.00 724.80 1318.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26.00 800.00 724.80 1318.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 10.00 650.00 477.50 555.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 650.00 477.50 555.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 758.33 691.83 1106.06 =============== 614-72878 Detect Amp (Loop) (4) Each =================================================== IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 12.00 1000.00 944.26 880.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 12.00 850.00 802.09 630.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 4.00 1000.00 642.11 620.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28.00 935.71 854.34 735.79 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 4.00 1000.00 1018.66 980.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 1000.00 1018.66 980.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 943.75 866.51 766.32 =============== 614-72882 Detect (Micro) Each =================================================== STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 2.00 650.00 976.17 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 650.00 976.17 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 650.00 976.17 400.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 410 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72884 Detect (Micro Wave) Each =================================================== C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 3.00 800.00 7583.36 7000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 800.00 7583.36 7000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 800.00 7583.36 7000.00 =============== 614-72886 Intersection Detect Sys (Camera) Each =================================================== NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 4.00 6000.00 5325.85 5810.20 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 7500.00 13927.12 17400.00 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 8.00 6000.00 5282.14 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 6115.38 6139.38 6203.14 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 1.00 22000.00 21732.90 19509.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 22000.00 21732.90 19509.52 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 1.00 6500.00 15908.63 16000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 6500.00 15908.63 16000.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 3.00 10000.00 5724.96 5800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 10000.00 5724.96 5800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 7666.67 7653.58 7419.46 =============== 614-72889 Detect (Micro) (Non-Invasive) Each =================================================== SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 01/05/06 52.00 750.00 698.00 846.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 6.00 650.00 636.85 614.25 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 1.00 1300.00 862.49 975.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 411 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72889 Detect (Micro) (Non-Invasive) Each =================================================== R600-247 SIGNALS - SH 121 & SH 391 03/23/06 20.00 710.00 628.75 580.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 79.00 739.24 680.04 762.69 SHE 052A-026 SH 52/ US 287 DILEMMA ZONE PR 04/27/06 14.00 800.00 1083.11 565.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.00 800.00 1083.11 565.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93.00 748.39 743.59 733.01 =============== 614-72890 Span Wire Cable Lin Foot =============================================== NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 150.00 10.00 3.20 2.19 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 250.00 10.00 10.17 10.50 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 280.00 10.00 8.16 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 680.00 10.00 7.88 9.28 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 105.00 5.00 23.89 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 105.00 5.00 23.89 30.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1,045.00 8.00 6.91 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,045.00 8.00 6.91 6.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,830.00 8.57 8.47 8.88 =============== 614-72893 Signal Cable Lin Foot =============================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 15,137.00 6.00 5.21 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15,137.00 6.00 5.21 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,137.00 6.00 5.21 6.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 412 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72895 Vehicle Detect Sys (Single Camera) Each =================================================== C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 1.00 6000.00 5450.00 5400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 6000.00 5450.00 5400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 6000.00 5450.00 5400.00 =============== 614-72896 Inst Intersect Detect Sys (Camera) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 600.00 558.26 675.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 2.00 870.00 790.00 890.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 780.00 665.22 818.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 780.00 665.22 818.33 =============== 614-73005 Piezo Elec Tube, CL 2 Each =================================================== STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 2.00 1750.00 1339.00 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1750.00 1339.00 1200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1750.00 1339.00 1200.00 =============== 614-75332 Inst Ped Sig Face (16-16) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2.00 750.00 157.71 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 750.00 157.71 250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 750.00 157.71 250.00 =============== 614-75336 Inst Traf Sig Face (12-12-12) Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 6.00 180.00 186.80 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 180.00 186.80 190.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 180.00 186.80 190.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 413 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-75840 Inst Traf Sig Ctrler Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1.00 2000.00 1616.33 2055.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2000.00 1616.33 2055.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 1616.33 2055.67 =============== 614-75860 Inst Ped Push Button Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2.00 60.00 82.42 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 60.00 82.42 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 60.00 82.42 140.00 =============== 614-75866 Inst Fire Preempt Unit + Timer Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 1300.00 684.41 350.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 4.00 225.00 338.75 265.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 440.00 443.95 282.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 440.00 443.95 282.00 =============== 614-80000 Flash Beacon Each =================================================== IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 5.00 1500.00 1846.51 1650.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 5.00 2000.00 2137.59 1900.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 6.00 3000.00 2223.75 2150.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 1.00 1900.00 1900.00 1790.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 1.00 2000.00 2562.50 2400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 2188.89 2056.57 1935.56 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 1.00 2000.00 3352.94 1908.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2000.00 3352.94 1908.82 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 2000.00 1964.24 1900.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 414 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-80000 Flash Beacon Each =================================================== IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 4.00 2200.00 3195.46 3200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 2133.33 2871.45 2766.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 2168.00 2293.67 2133.95 =============== 614-80001 Flash Beacon (Solar Pwred) Each =================================================== STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 1.00 8000.00 4842.22 3450.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 4.00 8500.00 5826.36 5300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 8400.00 5520.94 4930.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 8400.00 5520.94 4930.00 =============== 614-80313 Barricade (Ty 3 F-C) Each =================================================== IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 2.00 1400.00 843.00 765.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1400.00 843.00 765.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 1500.00 1675.08 850.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 3000.00 1696.48 1365.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2250.00 1683.10 1107.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1825.00 1216.38 936.36 =============== 614-80385 Rumble Strip Lin Foot =============================================== IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 81,236.00 0.20 0.16 0.13 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 147,208.00 0.13 0.21 0.20 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 3,024.00 0.80 2.54 3.35 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 91,608.00 0.25 0.15 0.10 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 13,780.00 0.50 0.57 0.50 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 16,684.00 0.65 0.57 0.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 353,540.00 0.22 0.22 0.22 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 178,584.00 0.20 0.12 0.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 178,584.00 0.20 0.12 0.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 532,124.00 0.21 0.19 0.20 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 415 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-80387 Rumble Strip (Grind) Lin Foot =============================================== IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 86,986.00 0.25 0.42 0.16 STA 0343-025 US 34, WRAY WEST 01/26/06 97,152.00 0.18 0.13 0.15 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 1,000.00 0.70 5.06 5.22 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 59,624.00 0.20 0.18 0.15 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 113,212.00 0.14 0.10 0.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 357,974.00 0.19 0.24 0.15 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 41,310.00 0.30 0.25 0.30 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 47,955.00 0.35 0.20 0.22 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 74,080.00 0.15 0.11 0.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 163,345.00 0.25 0.19 0.19 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 78,875.00 0.20 0.94 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 78,875.00 0.20 0.94 3.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 135,394.00 0.15 0.16 0.15 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 105,600.00 0.15 0.15 0.12 SHE 0503-067 US 50, WEST OF CANON CITY 11/30/06 10,500.00 1.50 0.87 0.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 251,494.00 0.21 0.19 0.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 851,688.00 0.21 0.30 0.43 =============== 614-80391 Rumble Strip (Grind)(Asphalt) Lin Foot =============================================== NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 8,600.00 0.40 0.99 1.05 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 55,000.00 0.25 0.17 0.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 63,600.00 0.27 0.25 0.25 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 73,862.00 0.20 0.15 0.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 73,862.00 0.20 0.15 0.12 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 416 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-80391 Rumble Strip (Grind)(Asphalt) Lin Foot =============================================== IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 2,760.00 1.00 2.50 2.40 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 12,640.00 0.70 0.57 0.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15,400.00 0.75 1.02 0.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 152,862.00 0.29 0.31 0.26 =============== 614-81000 Sig-Light Pole Steel Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 11500.00 6748.76 8100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 11500.00 6748.76 8100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 11500.00 6748.76 8100.00 =============== 614-81010 Sig-Light Pole Steel (1) Each =================================================== IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 4.00 19500.00 24075.50 26451.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 19500.00 24075.50 26451.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 19500.00 24075.50 26451.99 =============== 614-81011 Inst Sig-Light Pole Steel (1) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 3000.00 1762.28 2750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3000.00 1762.28 2750.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 2.00 4000.00 3625.00 3750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 4000.00 3625.00 3750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 3666.67 2439.63 3416.67 =============== 614-81012 Inst Sig-Light Pole Steel (2) Each =================================================== C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 3.00 6000.00 4640.00 5280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 6000.00 4640.00 5280.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 6000.00 4640.00 5280.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 417 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81020 Sig-Light Pole Steel (2) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 45000.00 23804.54 24000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 45000.00 23804.54 24000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 45000.00 23804.54 24000.00 =============== 614-81130 Sig-Light Pole Steel (1-30 Ft) Each =================================================== NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 1.00 20000.00 18000.00 18000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 20000.00 18000.00 18000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 20000.00 18000.00 18000.00 =============== 614-81135 Sig-Light Pole Steel (1-35 Ft) Each =================================================== SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 3.00 19000.00 22512.08 16595.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 2.00 18000.00 14306.50 13521.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 18600.00 20248.47 15365.40 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 1.00 1900.00 21243.75 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1900.00 21243.75 20000.00 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 1.00 25000.00 18590.00 18590.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 25000.00 18590.00 18590.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 17128.57 20414.36 16488.14 =============== 614-81140 Sig-Light Pole Steel (1-40 Ft) Each =================================================== SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 3.00 21000.00 23810.23 16585.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 21000.00 23810.23 16585.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 418 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81140 Sig-Light Pole Steel (1-40 Ft) Each =================================================== STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 2.00 20500.00 22961.25 21000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 20500.00 22961.25 21000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 20800.00 23443.11 18351.00 =============== 614-81145 Sig-Light Pole Steel (1-45 Ft) Each =================================================== R600-247 SIGNALS - SH 121 & SH 391 03/23/06 4.00 21000.00 15773.25 15283.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 21000.00 15773.25 15283.00 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 1.00 22000.00 18495.30 17028.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 22000.00 18495.30 17028.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 21200.00 16421.36 15632.10 =============== 614-81150 Sig-Light Pole Steel (1-50 Ft) Each =================================================== SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 1.00 21000.00 24417.49 18975.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 20000.00 18082.11 17525.55 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 1.00 24000.00 16080.75 15298.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 21666.67 20353.50 17266.18 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 2.00 30000.00 19225.00 19225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 30000.00 19225.00 19225.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 25000.00 20228.11 18049.71 =============== 614-81155 Sig-Light Pole Steel (1-55 Ft) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 23000.00 18026.82 17200.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 419 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81155 Sig-Light Pole Steel (1-55 Ft) Each =================================================== SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 1.00 24000.00 24497.37 19145.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 21000.00 18325.58 17742.90 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 3.00 26000.00 16155.25 15331.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 24333.33 18811.62 16680.15 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 1.00 20000.00 24096.97 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 20000.00 24096.97 25000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 23714.29 19785.24 17868.70 =============== 614-81160 Sig-Light Pole Steel (1-60 Ft) Each =================================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 24000.00 32451.57 31307.85 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 2.00 35000.00 27459.00 26952.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 31333.33 29728.35 28403.95 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 1.00 30000.00 28616.22 27319.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 30000.00 28616.22 27319.08 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1.00 30000.00 32483.50 32967.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 30000.00 32483.50 32967.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 30800.00 29725.55 29099.59 =============== 614-81165 Sig-Light Pole Steel (1-65 Ft) Each =================================================== R600-247 SIGNALS - SH 121 & SH 391 03/23/06 1.00 28000.00 25741.75 25947.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 1.00 35800.00 28415.33 27096.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 31900.00 26887.57 26521.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 420 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81165 Sig-Light Pole Steel (1-65 Ft) Each =================================================== STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 2.00 35000.00 29059.16 27465.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 35000.00 29059.16 27465.80 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1.00 26000.00 33181.50 33363.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 26000.00 33181.50 33363.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 31960.00 28693.03 28267.52 =============== 614-81175 Sig-Light Pole Steel (1-75 Ft) Each =================================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 30000.00 33877.25 32786.25 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 3.00 30000.00 27916.75 28417.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 30000.00 29669.84 29509.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 30000.00 29669.84 29509.31 =============== 614-81240 Sig-Light Pole Steel (2-40 Ft) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 25000.00 22360.49 20800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 25000.00 22360.49 20800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 22360.49 20800.00 =============== 614-82010 Sig Pole Steel (1) Each =================================================== R600-247 SIGNALS - SH 121 & SH 391 03/23/06 2.00 15000.00 14081.75 13207.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 15000.00 14081.75 13207.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 2.00 16000.00 29223.50 29447.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 16000.00 29223.50 29447.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 421 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-82010 Sig Pole Steel (1) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 20000.00 17268.76 17300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 20000.00 17268.76 17300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 16400.00 18581.87 20521.60 =============== 614-84000 Traf Sig Ped Pole Steel Each =================================================== SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 2.00 1100.00 1548.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1100.00 1548.00 2000.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 1500.00 1200.22 1207.38 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 4.00 1300.00 1367.89 1904.54 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 10.00 900.00 1040.00 880.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 1046.67 1187.18 1175.04 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 2500.00 1702.37 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2500.00 1702.37 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 1133.33 1299.62 1301.42 =============== 614-84100 Traf Sig Ped Pole Alum Each =================================================== IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 6.00 1200.00 1292.78 1320.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 7.00 1100.00 1184.47 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 1146.15 1238.07 1470.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 1146.15 1238.07 1470.77 =============== 614-85005 Impact Atten (Sand Fill) Each =================================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 18.00 3500.00 4802.50 4807.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 3500.00 4802.50 4807.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 3500.00 4802.50 4807.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 422 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-85045 Truck w/Mtd Atten & Flash Arrow Panel Each =================================================== C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 1.00 45000.00 31250.00 42500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 45000.00 31250.00 42500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 45000.00 31250.00 42500.00 =============== 614-85115 Impact Atten (Quadguard) Each =================================================== IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 4.00 25000.00 32466.67 34400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 25000.00 32466.67 34400.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 35000.00 35028.75 36050.01 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 1.00 30000.00 28500.00 27000.00 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 2.00 30000.00 25100.00 19700.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2.00 30000.00 16593.06 15000.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1.00 30000.00 46981.54 30000.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 20000.00 15257.62 9000.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 30000.00 28490.79 27973.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 29444.44 24526.30 22158.15 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 3.00 30000.00 34167.52 33000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 30000.00 34167.52 33000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 28437.50 28003.15 27251.46 =============== 614-85125 Impact Atten (Quadguard) (Taper) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 30000.00 34015.31 30000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 30000.00 34015.31 30000.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 30000.00 36239.02 44942.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 30000.00 36239.02 44942.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 30000.00 34682.43 37471.04 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 423 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-85312 Span Wire Pole (12 In) Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 4.00 6000.00 5325.46 5686.29 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 2.00 3000.00 4939.50 4672.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 5000.00 5196.81 5348.36 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 2.00 6000.00 6871.37 7400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 6000.00 6871.37 7400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 5250.00 5615.45 5861.27 =============== 614-85316 Span Wire Pole (16 In) Each =================================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 4.00 6500.00 9152.72 9300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 6500.00 9152.72 9300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 6500.00 9152.72 9300.00 =============== 614-85362 Sig-Light Span Wire Pole (12 In) Each =================================================== STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 2.00 4600.00 5582.46 4212.39 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 4.00 4600.00 7354.60 6050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 4600.00 6945.65 5437.46 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 2.00 5000.00 7124.00 5600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 5000.00 7124.00 5600.00 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 2.00 3500.00 5975.46 6500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 3500.00 5975.46 6500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 4460.00 6740.26 5682.48 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 424 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-85520 Paint Traf Sig Pole Each =================================================== STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 4.00 300.00 540.96 312.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 300.00 540.96 312.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 300.00 540.96 312.88 =============== 614-86000 Traf Sig Ctrler (M) Each =================================================== C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 1.00 3500.00 2250.00 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3500.00 2250.00 3000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3500.00 2250.00 3000.00 =============== 614-86002 Spread Spectrum Radio Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 4.00 2600.00 2469.98 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 2600.00 2469.98 2300.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 3.00 3000.00 2433.61 2400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 3000.00 2433.61 2400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 2771.43 2459.07 2342.86 =============== 614-86105 Telemetry (Field) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 4000.00 1853.43 1300.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 1.00 5000.00 5365.00 5460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 4500.00 2906.90 3380.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 1.00 3200.00 2632.75 2500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 425 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86105 Telemetry (Field) Each =================================================== AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR 09/14/06 6.00 5000.00 2560.76 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 4742.86 2575.91 1642.86 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 2.00 3000.00 926.09 580.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 3000.00 926.09 580.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 4381.82 2256.76 1765.45 =============== 614-86106 Telemetry (Field)(Install Only) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 1000.00 646.12 71.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 646.12 71.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 646.12 71.30 =============== 614-86238 Ctrler (S-S) (F-A) (8) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 3500.00 4646.80 2600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3500.00 4646.80 2600.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 20000.00 12026.63 12100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 20000.00 12026.63 12100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 11750.00 7721.73 7350.00 =============== 614-86240 Ctrler (Ty 170) Each =================================================== STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 1.00 20000.00 20452.47 16584.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 20000.00 20452.47 16584.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 20000.00 20452.47 16584.35 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 426 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86245 Ctrler (Ty 170E) Each =================================================== IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 3.00 9000.00 7770.76 7150.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 3.00 11000.00 7661.02 8000.00 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 2.00 12000.00 16978.79 14000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 10500.00 9916.65 9181.25 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 5.00 8000.00 7451.90 7700.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 2.00 15000.00 15000.00 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 10000.00 8709.91 9785.71 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 1.00 15000.00 12000.00 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 15000.00 12000.00 12000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 10562.50 9596.67 9621.88 =============== 614-86246 Ctrler (Ty 170E-HC11) Each =================================================== STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 1.00 18000.00 4900.91 1674.39 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 18000.00 18012.13 17380.65 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 4.00 20000.00 18029.50 16518.00 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 1.00 17000.00 11734.50 10513.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 19000.00 14452.99 13662.93 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 1.00 12000.00 11730.00 11500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 12000.00 11730.00 11500.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 17000.00 19608.86 19045.43 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 1.00 13000.00 12168.75 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 15000.00 14648.79 15022.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 17500.00 14218.29 13718.60 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 427 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86247 Ctrler (Ty 170E-HC11 W/W70SM Firmware) Each =================================================== NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 1.00 4000.00 2977.50 2700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 4000.00 2977.50 2700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 4000.00 2977.50 2700.00 =============== 614-86600 Inst Traf Sig Ctrler (M) Each =================================================== SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 1.00 1600.00 1846.00 2950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1600.00 1846.00 2950.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1600.00 1846.00 2950.00 =============== 614-86735 Weather Sensor LUMP SUM =============================================== NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 1.00 16000.00 15500.00 13000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 16000.00 15500.00 13000.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 1.00 3000.00 16050.00 14800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 3000.00 16050.00 14800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 9500.00 15866.67 13900.00 =============== 614-86756 Anti-Icing Syst LUMP SUM =============================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 150000.00 346395.36 325700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 150000.00 346395.36 325700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 150000.00 346395.36 325700.00 =============== 614-86800 Uninterrupted Power Supply Each =================================================== STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 1.00 4800.00 5092.99 4840.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 4800.00 5092.99 4840.96 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 428 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86800 Uninterrupted Power Supply Each =================================================== SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 1.00 4900.00 5131.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 4900.00 5131.00 5000.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 1.00 5250.00 4646.13 4250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5250.00 4646.13 4250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 4983.33 4881.44 4696.99 =============== 614-86920 Mod Traf Sig Ctrler Cab Each =================================================== NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 1.00 1600.00 1991.31 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1600.00 1991.31 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1600.00 1991.31 1800.00 =============== 614-87010 Fiber Optic Cable (S Mode) (12 Fiber) Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 400.00 10.00 4.72 4.00 AQC R600-241 SH 287 (FEDERAL BLVD), 52ND A 03/16/06 1,265.00 5.00 3.39 2.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,665.00 6.20 3.86 2.71 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 455.00 4.20 3.52 4.23 AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR 09/14/06 2,640.00 3.00 1.76 0.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,095.00 3.18 1.97 1.30 STA R600-279 SH 121 (WADSWORTH) FROM KEN C 10/05/06 1,475.00 1.50 2.21 1.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 429 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87010 Fiber Optic Cable (S Mode) (12 Fiber) Lin Foot =============================================== IM R600-292 70TH AVE AT I-25/BLAKE AND 20 11/30/06 600.00 9.00 7.26 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,075.00 3.67 4.31 2.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,835.00 4.06 3.14 1.91 =============== 614-87020 Optic Transceiver Each =================================================== IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 3.00 2000.00 1556.71 1430.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2.00 3000.00 2370.34 1260.00 AQC R600-241 SH 287 (FEDERAL BLVD), 52ND A 03/16/06 9.00 3300.00 1783.81 1820.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 2978.57 1821.12 1656.43 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 1.00 3000.00 4661.80 4530.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3000.00 4661.80 4530.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 5000.00 2135.29 2116.16 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 12.00 3000.00 3748.35 3800.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 3.00 2200.00 1550.00 1900.00 AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR 09/14/06 28.00 2000.00 1996.32 2610.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 44.00 2354.55 2410.34 2874.91 STA R600-279 SH 121 (WADSWORTH) FROM KEN C 10/05/06 12.00 2300.00 1983.19 2610.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 2300.00 1983.19 2610.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 71.00 2477.46 2247.73 2613.19 =============== 614-87028 Video Optic Transceiver Each =================================================== C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 6.00 5000.00 3230.86 3700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 5000.00 3230.86 3700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 5000.00 3230.86 3700.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 430 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87320 CCTV Each =================================================== C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 3.00 6500.00 6609.54 9000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 6500.00 6609.54 9000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 6500.00 6609.54 9000.00 =============== 614-87325 CCTV Pole Each =================================================== C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 3.00 15000.00 10917.67 10535.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 15000.00 10917.67 10535.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 15000.00 10917.67 10535.00 =============== 614-87350 Test Fiber Optic Cable LUMP SUM =============================================== AQC R600-241 SH 287 (FEDERAL BLVD), 52ND A 03/16/06 1.00 5000.00 2532.98 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 2532.98 550.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1.00 6500.00 6391.43 8800.00 AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR 09/14/06 1.00 6000.00 5274.47 13000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 6250.00 5770.89 10900.00 STA R600-279 SH 121 (WADSWORTH) FROM KEN C 10/05/06 1.00 3500.00 4337.98 13000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 3500.00 4337.98 13000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 5250.00 4671.87 8837.50 =============== 614-87401 Fiber Optic Cable (Spec) Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 5,742.00 2.00 2.65 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,742.00 2.00 2.65 2.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,742.00 2.00 2.65 2.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 431 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87406 Fiber Optic Cable (S Mode) (6 S) Lin Foot =============================================== IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 5,150.00 2.00 3.38 3.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,150.00 2.00 3.38 3.30 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 460.00 6.00 5.98 3.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 460.00 6.00 5.98 3.10 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 500.00 4.50 6.13 4.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 500.00 4.50 6.13 4.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,110.00 2.51 3.57 3.36 =============== 614-87424 Fiber Optic Cable (S Mode) (24 S) Lin Foot =============================================== C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 6,000.00 4.00 2.73 3.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,000.00 4.00 2.73 3.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,000.00 4.00 2.73 3.30 =============== 614-87448 Fiber Optic Cable (S Mode) (48 S) Lin Foot =============================================== AQC R600-241 SH 287 (FEDERAL BLVD), 52ND A 03/16/06 18,250.00 2.00 2.15 2.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18,250.00 2.00 2.15 2.25 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 3,000.00 8.00 2.52 2.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,000.00 8.00 2.52 2.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21,250.00 2.85 2.20 2.33 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 432 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87496 Fiber Optic Cable (S Mode) (96 S) Lin Foot =============================================== C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 9,000.00 5.00 3.98 5.00 AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR 09/14/06 58,430.00 2.00 2.10 1.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 67,430.00 2.40 2.31 1.79 STA R600-279 SH 121 (WADSWORTH) FROM KEN C 10/05/06 26,315.00 1.40 2.12 1.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 26,315.00 1.40 2.12 1.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93,745.00 2.12 2.26 1.66 =============== 615-00030 Emb Prot Ty 3 Each =================================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 1.00 1100.00 1974.20 1116.00 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 2.00 1600.00 2250.00 1000.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 5.00 1100.00 825.57 188.86 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 1.00 1500.00 800.00 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 1255.56 1151.72 540.03 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 2.00 1500.00 1833.21 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1500.00 1833.21 1500.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 9.00 1500.00 1539.43 1200.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2.00 1000.99 1219.13 1761.25 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1.00 1000.00 1186.05 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 1375.17 1461.19 1235.21 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 1200.00 1771.21 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1200.00 1771.21 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 1333.42 1385.53 1049.28 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 433 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 615-00050 Emb Prot Ty 5 Each =================================================== IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 2.00 2500.00 1566.67 1200.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 1.00 1800.00 1007.90 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 2266.67 1312.68 1100.00 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 6.00 750.00 1075.00 675.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 750.00 1075.00 675.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 1200.00 2225.08 1552.33 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 2.00 1000.00 1251.63 203.25 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1.00 1000.00 2116.39 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 1050.00 1864.37 802.21 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 1200.00 1791.81 300.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 6.00 700.00 1422.12 940.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 771.43 1474.94 848.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 1045.00 1418.22 824.94 =============== 615-00150 Emb Prot (Spec) Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 4.00 2000.00 1347.58 972.90 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 2.00 6000.00 2634.13 1900.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 1.00 3000.00 1403.73 991.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 3285.71 1879.71 1240.39 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 2.00 3000.00 1370.34 1350.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 16.00 1000.00 559.98 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18.00 1222.22 722.05 683.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 1800.00 1293.55 839.31 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 434 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 615-21809 18 In Sl Hdgate (9 Ft) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 400.00 2943.89 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 400.00 2943.89 2300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 400.00 2943.89 2300.00 =============== 615-22409 24 In Sl Hdgate (9 Ft) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 600.00 4221.50 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 600.00 4221.50 3500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 600.00 4221.50 3500.00 =============== 615-22499 24 In Sl Hdgate Spec Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 800.00 4311.32 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 800.00 4311.32 3500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 800.00 4311.32 3500.00 =============== 615-23609 36 In Sl Hdgate (9 Ft) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 1000.00 6923.65 5600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1000.00 6923.65 5600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 6923.65 5600.00 =============== 615-34809 48x48 In Sl Hdgate (9 Ft) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 1200.00 9740.84 9500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1200.00 9740.84 9500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1200.00 9740.84 9500.00 =============== 615-50000 Parshall Flume Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 9500.00 26003.76 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 9500.00 26003.76 10000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 9500.00 26003.76 10000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 435 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 616-00150 15 In Conc Siphon Pipe Lin Foot =============================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 23.00 40.00 105.37 42.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23.00 40.00 105.37 42.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 40.00 105.37 42.50 =============== 616-00240 24 In Conc Siphon Pipe Lin Foot =============================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 3,658.00 100.00 60.29 47.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,658.00 100.00 60.29 47.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,658.00 100.00 60.29 47.75 =============== 616-00300 30 In Conc Siphon Pipe Lin Foot =============================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1,101.00 100.00 80.83 57.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,101.00 100.00 80.83 57.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,101.00 100.00 80.83 57.75 =============== 616-00420 42 In Conc Siphon Pipe Lin Foot =============================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2,396.00 112.00 100.13 92.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,396.00 112.00 100.13 92.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,396.00 112.00 100.13 92.25 =============== 616-30024 24 In Trash Guard Each =================================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 5.00 1500.00 795.51 990.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 1500.00 795.51 990.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1500.00 795.51 990.00 =============== 616-30030 30 In Trash Guard Each =================================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2.00 2250.99 937.78 841.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2250.99 937.78 841.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2250.99 937.78 841.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 436 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 616-30042 42 In Trash Guard Each =================================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2.00 3000.00 1225.29 1158.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 3000.00 1225.29 1158.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3000.00 1225.29 1158.25 =============== 616-30499 Trash Guard Spec Each =================================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2.00 2500.00 4230.66 1105.25 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 2000.00 1754.00 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 2333.33 3405.11 986.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2333.33 3405.11 986.83 =============== 617-00012 12 In Culvert Pipe Lin Foot =============================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 30.00 50.00 41.46 35.80 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 165.00 60.00 38.54 41.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 195.00 58.46 38.99 40.78 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 220.00 40.00 44.65 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 220.00 40.00 44.65 50.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 30.00 40.00 46.26 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30.00 40.00 46.26 34.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 445.00 48.09 41.28 44.88 =============== 617-03000 Detour Culvert Pipe LUMP SUM =============================================== BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 1.00 30000.00 9469.89 2538.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 30000.00 9469.89 2538.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 30000.00 9469.89 2538.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 437 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 617-03010 Detour Culvert Pipe Lin Foot =============================================== BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 220.00 85.00 86.13 131.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 220.00 85.00 86.13 131.25 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 480.00 110.00 682.66 73.25 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 400.00 45.00 130.44 200.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 880.00 80.45 544.61 131.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,100.00 81.36 489.19 131.20 =============== 618-00000 Prestress Steel Bar Pound ================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 36,261.00 2.00 1.50 1.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36,261.00 2.00 1.50 1.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36,261.00 2.00 1.50 1.63 =============== 618-00002 Prestress Steel Strand M Kip Foot ============================================= NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1,293.00 75.00 70.29 102.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,293.00 75.00 70.29 102.45 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 18,074.00 50.00 35.42 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18,074.00 50.00 35.42 32.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 29,490.00 40.00 28.01 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29,490.00 40.00 28.01 26.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48,857.00 44.63 31.59 30.24 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 438 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 618-00142 Prestress Conc I (BT42) Lin Foot =============================================== BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1,038.00 165.00 163.06 136.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1,297.00 170.00 174.77 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,335.00 167.78 170.51 138.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,335.00 167.78 170.51 138.22 =============== 618-00154 Prestress Conc I (BT54) Lin Foot =============================================== BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 434.00 185.00 217.55 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 434.00 185.00 217.55 200.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 632.00 180.00 206.80 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 632.00 180.00 206.80 210.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,066.00 182.04 211.18 205.93 =============== 618-00510 Prestress Conc I (Spec) Lin Foot =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 524.00 190.00 262.47 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 524.00 190.00 262.47 210.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 524.00 190.00 262.47 210.00 =============== 618-01992 Prestress Conc Box (Depth Less Than 32") Sq Foot ================================================ BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 5,941.00 50.00 50.82 43.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 8,027.00 45.00 39.10 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,968.00 47.13 44.08 38.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,968.00 47.13 44.08 38.40 =============== 618-01994 Prestress Conc Box (Depth 32" Thru 48") Sq Foot ================================================ IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2,937.00 40.00 60.20 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,937.00 40.00 60.20 50.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 439 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 618-01994 Prestress Conc Box (Depth 32" Thru 48") Sq Foot ================================================ IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 16,022.00 50.00 44.91 44.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16,022.00 50.00 44.91 44.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,959.00 48.45 48.03 45.35 =============== 618-06032 Prestress Conc Slab (Depth Less Than 6") Sq Foot ================================================ C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 44,734.00 10.00 8.72 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 44,734.00 10.00 8.72 8.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 20,240.00 9.00 11.22 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20,240.00 9.00 11.22 13.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 64,974.00 9.69 9.62 9.56 =============== 618-06036 Prestress Conc Slab (Depth Gr Than 13") Sq Foot ================================================ BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 1,250.00 45.00 62.00 62.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,250.00 45.00 62.00 62.00 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 6,781.00 38.00 42.55 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,781.00 38.00 42.55 42.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,031.00 39.09 43.13 45.11 =============== 618-10000 Precast Conc U Girder (Pre-Ten) Lin Foot =============================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 421.00 1000.00 785.73 740.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 421.00 1000.00 785.73 740.65 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 440 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 618-10000 Precast Conc U Girder (Pre-Ten) Lin Foot =============================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 357.00 750.00 621.87 589.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 357.00 750.00 621.87 589.61 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1,760.00 400.00 376.70 420.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,760.00 400.00 376.70 420.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,538.00 548.76 470.52 497.05 =============== 618-10384 Precast Concrete U Girder (U84)(Curved) Lin Foot =============================================== C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 4,452.00 600.00 875.71 880.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,452.00 600.00 875.71 880.50 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2,576.00 800.00 898.51 833.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,576.00 800.00 898.51 833.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,028.00 673.31 885.28 863.09 =============== 618-10396 Precast Concrete U Girder (U96)(Curved) Lin Foot =============================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1,519.00 950.00 1026.56 903.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,519.00 950.00 1026.56 903.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,519.00 950.00 1026.56 903.00 =============== 619-00005 Water Line LUMP SUM =============================================== IM 0252-384 I-25 OVER BROADWAY 11/09/06 1.00 70000.00 46549.28 33000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 70000.00 46549.28 33000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 70000.00 46549.28 33000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 441 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-00007 Connect To Existing Waterline Each =================================================== IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 2.00 2500.00 4966.67 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2500.00 4966.67 1400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2500.00 4966.67 1400.00 =============== 619-00013 3 In CIPP Waterline Lin Foot =============================================== IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 440.00 65.00 180.00 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 440.00 65.00 180.00 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 440.00 65.00 180.00 75.00 =============== 619-00018 8 In CIPP Waterline Lin Foot =============================================== IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 2,917.00 65.00 143.33 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,917.00 65.00 143.33 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,917.00 65.00 143.33 150.00 =============== 619-06080 8 In Duct Iron Pipe Lin Foot =============================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 40.00 55.00 185.83 151.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 55.00 185.83 151.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 55.00 185.83 151.48 =============== 619-10180 18 In Weld Steel Pipe Lin Foot =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 463.00 100.00 168.36 141.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 463.00 100.00 168.36 141.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 463.00 100.00 168.36 141.00 =============== 619-10207 20 In Weld Steel Pipe (J) Lin Foot =============================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 300.00 550.00 761.79 341.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 300.00 550.00 761.79 341.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 300.00 550.00 761.79 341.36 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 442 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-10241 24 In Weld Steel Pipe (IO) Each =================================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 450.00 1000.99 94.51 105.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 450.00 1000.99 94.51 105.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 450.00 1000.99 94.51 105.75 =============== 619-10247 24 In Weld Steel Pipe (J) Lin Foot =============================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 150.00 600.00 870.68 512.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 150.00 600.00 870.68 512.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 600.00 870.68 512.04 =============== 619-40120 1-1/2 In Copper Pipe Lin Foot =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 50.00 30.00 29.18 21.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 30.00 29.18 21.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 30.00 29.18 21.67 =============== 619-50080 1 In Plastic Pipe Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 6,100.00 2.10 2.53 1.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,100.00 2.10 2.53 1.25 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 12,227.00 2.00 2.41 1.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12,227.00 2.00 2.41 1.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,327.00 2.03 2.45 1.22 =============== 619-50100 1-1/4 In Plastic Pipe Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 250.00 3.00 3.05 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 250.00 3.00 3.05 2.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 443 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-50100 1-1/4 In Plastic Pipe Lin Foot =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 810.00 2.50 3.09 2.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 810.00 2.50 3.09 2.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,060.00 2.62 3.08 2.11 =============== 619-50120 1-1/2 In Plastic Pipe Lin Foot =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 900.00 2.00 2.91 2.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 900.00 2.00 2.91 2.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 900.00 2.00 2.91 2.38 =============== 619-50160 2 In Plastic Pipe Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1,650.00 3.00 3.51 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,650.00 3.00 3.51 3.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 897.00 10.00 4.14 3.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 897.00 10.00 4.14 3.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,547.00 5.47 3.73 3.18 =============== 619-50320 4 In Plastic Pipe Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 200.00 12.50 9.45 6.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 765.00 16.00 26.70 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 965.00 15.27 22.08 13.93 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 208.00 22.00 34.84 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 208.00 22.00 34.84 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,173.00 16.47 24.20 29.19 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 444 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-50480 6 In Plastic Pipe Lin Foot =============================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 14.00 25.00 271.87 216.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 25.00 271.87 216.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 25.00 271.87 216.61 =============== 619-50640 8 In Plastic Pipe Lin Foot =============================================== C 5502-057 US 550 CULVERT REPAIRS 08/03/06 70.00 35.00 50.87 60.48 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 190.00 40.00 111.03 125.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 445.00 25.00 102.50 116.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 705.00 30.04 101.44 113.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 705.00 30.04 101.44 113.22 =============== 619-50960 12 In Plastic Pipe Lin Foot =============================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 83.00 44.00 164.16 137.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 83.00 44.00 164.16 137.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 83.00 44.00 164.16 137.49 =============== 619-72024 3 In Press Reducing Valve Each =================================================== IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 2.00 7000.00 5666.67 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 7000.00 5666.67 4000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 7000.00 5666.67 4000.00 =============== 619-72048 6 In Press Reducing Valve Each =================================================== IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 2.00 11000.00 8650.00 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 11000.00 8650.00 6000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 11000.00 8650.00 6000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 445 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-75032 4 In Gate Valve Each =================================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 800.00 1001.00 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 800.00 1001.00 700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 800.00 1001.00 700.00 =============== 619-75048 6 In Gate Valve Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 1100.00 928.67 710.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1100.00 928.67 710.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1100.00 928.67 710.00 =============== 619-75064 8 In Gate Valve Each =================================================== IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 8.00 1500.00 3133.33 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 1500.00 3133.33 3000.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 1000.00 1444.03 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1000.00 1444.03 1200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 1444.44 2751.88 2800.00 =============== 619-78048 6 In Fire Hydrant Each =================================================== STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 1.00 5000.00 4295.00 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 4295.00 6000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 4295.00 6000.00 =============== 620-00001 Field Office (CL 1) Each =================================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 1.00 11000.00 11624.40 4672.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 446 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00001 Field Office (CL 1) Each =================================================== STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 1.00 9000.00 12700.00 12300.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 1.00 12000.00 5413.33 3000.00 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 1.00 10000.00 18615.56 11962.23 SHE 2854-111 US 285 & C470 SIGNING 03/02/06 1.00 8000.00 8313.80 3099.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 1.00 12000.00 13500.00 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 10333.33 11613.33 7838.87 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 1.00 12000.00 8480.67 3942.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 1.00 15000.00 27100.00 27100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 13500.00 13135.50 15521.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 1.00 15000.00 16046.11 11610.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 15000.00 16046.11 11610.00 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 1.00 9000.00 26963.47 26963.47 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 1.00 15000.00 23066.67 13500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 12000.00 24040.87 20231.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 11636.36 13902.09 11831.70 =============== 620-00002 Field Office (CL 2) Each =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 1.00 12000.00 17508.00 19040.00 IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 1.00 12000.00 9420.00 8300.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 1.00 15000.00 15135.00 19040.00 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 1.00 12000.00 9237.00 7500.00 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 1.00 15000.00 14900.00 12000.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 1.00 16000.00 11762.78 8500.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 1.00 20000.00 19000.00 22000.00 STA 0343-025 US 34, WRAY WEST 01/26/06 1.00 14000.00 12175.00 7700.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1.00 38000.00 32474.69 22513.39 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 1.00 16000.00 20818.77 28000.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 1.00 25000.00 25619.93 11979.72 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 447 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00002 Field Office (CL 2) Each =================================================== IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 1.00 12000.00 14894.54 13567.24 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 1.00 15000.00 16750.00 12000.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 1.00 17000.00 13675.00 8000.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 1.00 17000.00 14285.00 7450.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 1.00 12000.00 14666.67 15000.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 41000.00 35400.00 30000.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 1.00 12000.00 22299.76 16899.27 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 1.00 10000.00 17380.14 16000.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 1.00 15000.00 16612.25 11544.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 1.00 15000.00 18335.18 10785.29 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 1.00 10000.00 11236.25 9500.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 1.00 18000.00 23750.00 17500.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 1.00 13000.00 20000.00 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 16750.00 17533.96 14784.12 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 1.00 15000.00 14224.00 15120.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 1.00 25000.00 36778.67 20000.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 1.00 15000.00 11751.26 6000.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 1.00 15000.00 14213.55 19300.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 1.00 19000.00 19697.02 20091.07 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 1.00 18000.00 22187.50 14375.00 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 1.00 12000.00 23850.00 10050.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 1.00 15000.00 11862.50 10000.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 1.00 15000.00 15805.40 11000.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 1.00 9000.00 27696.37 34000.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 1.00 15000.00 13059.26 18000.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 1.00 14000.00 14333.33 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 15583.33 17910.26 16078.01 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 18000.00 36351.37 28995.99 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 1.00 16000.00 25426.82 20000.00 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 1.00 15000.00 17000.00 18000.00 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 1.00 13000.00 14092.50 9800.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1.00 40000.00 42162.49 35000.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 1.00 35000.00 28364.09 27000.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 15000.00 43635.10 29076.65 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 40000.00 84323.86 50000.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 1.00 15000.00 12422.50 8000.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 1.00 30000.00 22500.00 20000.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 15000.00 19418.62 25000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 448 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00002 Field Office (CL 2) Each =================================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 3.00 20000.00 72129.00 22000.00 IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 1.00 18000.00 17051.67 10700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 22000.00 37327.85 23171.51 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 1.00 15000.00 18140.00 20700.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 1.00 18000.00 24815.71 15215.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 1.00 14000.00 14674.30 18000.00 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 1.00 16000.00 12163.33 14000.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 1.00 15000.00 15540.00 10000.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.00 20000.00 18570.00 12250.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 1.00 15000.00 15553.57 12000.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 1.00 15000.00 30591.02 60000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 16000.00 19190.60 20270.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 59.00 17745.76 23145.68 17923.60 =============== 620-00005 Field Office (Spec) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 30000.00 31697.58 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 30000.00 31697.58 25000.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 50000.00 118928.70 75643.50 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1.00 50000.00 90137.53 60000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 50000.00 106132.63 67821.75 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 85000.00 133359.63 93000.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 1.00 40000.00 51283.30 30000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 62500.00 82851.12 61500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 51000.00 77729.01 56728.70 =============== 620-00011 Field Lab (CL 1) Each =================================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 1.00 10000.00 10262.40 4042.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 449 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00011 Field Lab (CL 1) Each =================================================== IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 1.00 15000.00 12273.44 8000.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 1.00 18000.00 14518.47 18000.00 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 1.00 10000.00 15906.07 10624.27 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 1.00 6000.00 14000.00 9200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 11800.00 13028.30 9973.25 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 1.00 10000.00 8762.67 4588.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 10000.00 8762.67 4588.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1.00 8000.00 24843.66 19687.32 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 1.00 20000.00 21508.13 15400.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 1.00 20000.00 17953.33 18860.00 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 1.00 10000.00 16950.00 16300.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 1.00 15000.00 14957.28 13077.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 14600.00 18634.69 16664.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 12909.09 15351.30 12525.33 =============== 620-00012 Field Lab (CL 2) Each =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 1.00 12000.00 16608.00 19040.00 IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 1.00 10000.00 9940.00 7400.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 1.00 15000.00 14060.00 19040.00 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 1.00 12000.00 9237.00 7500.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 1.00 13000.00 12466.67 10700.00 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 1.00 13000.00 15666.67 10000.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 1.00 14000.00 9696.67 8500.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 1.00 15000.00 18166.67 17500.00 STA 0343-025 US 34, WRAY WEST 01/26/06 1.00 13000.00 13175.00 7700.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1.00 25000.00 21959.96 21368.81 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 1.00 12000.00 27333.33 17000.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 1.00 15000.00 11066.67 7000.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 1.00 25000.00 17577.81 8311.23 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 1.00 12000.00 13817.24 8403.42 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 1.00 14000.00 14216.67 6000.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 1.00 14000.00 13895.00 5500.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 1.00 15000.00 15000.00 15000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 450 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00012 Field Lab (CL 2) Each =================================================== IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 1.00 13000.00 17000.00 14000.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 1.00 20000.00 15000.00 18000.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 35000.00 26060.00 15100.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 1.00 12000.00 14147.79 11943.38 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 1.00 10000.00 10413.54 8500.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 1.00 11000.00 10318.75 8500.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 1.00 18000.00 17000.00 18000.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 1.00 13000.00 22000.00 22000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 15240.00 14999.85 12480.27 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 1.00 13000.00 12552.00 15120.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 1.00 25000.00 22204.67 25000.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 1.00 13000.00 8994.64 5000.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 1.00 7500.00 13316.33 13750.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 1.00 13000.00 9354.78 9000.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 1.00 10000.00 19910.09 8800.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 1.00 15000.00 18533.39 22100.17 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 1.00 12000.00 19637.50 14375.00 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 1.00 12000.00 23636.67 9410.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 1.00 12500.00 11137.50 10000.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 1.00 15000.00 13996.82 14000.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 1.00 9000.00 22265.28 30000.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 1.00 15000.00 26150.00 26150.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 1.00 12000.00 14945.93 20000.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 1.00 15000.00 17500.00 15000.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 1.00 14000.00 16333.33 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 13312.50 15964.90 15794.07 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 15000.00 28215.57 17818.76 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 1.00 14000.00 23925.53 15000.00 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 1.00 12000.00 13500.00 14000.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1.00 40000.00 22279.38 20968.81 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 50000.00 40070.60 39453.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 13000.00 33378.25 25375.99 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 1.00 20000.00 23687.50 15750.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 35000.00 43182.43 45000.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1.00 35000.00 46845.48 40000.00 STA 0405-031 US40 HUGO EAST 08/24/06 1.00 10000.00 20666.67 10000.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 1.00 15000.00 12908.75 8000.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 1.00 30000.00 23000.00 24000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 451 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00012 Field Lab (CL 2) Each =================================================== BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 15000.00 17593.48 20000.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 2.00 20000.00 41919.00 17000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 22933.33 28221.47 21957.77 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 1.00 14000.00 18000.00 18000.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 60000.00 47925.18 27868.06 IM 0252-384 I-25 OVER BROADWAY 11/09/06 1.00 12000.00 20197.50 40000.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 1.00 15000.00 18650.00 17250.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 1.00 15000.00 15118.57 11355.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 1.00 12000.00 16998.78 15000.00 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 1.00 14000.00 9176.67 10000.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 1.00 15000.00 13950.00 10000.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.00 25000.00 16172.00 15560.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 1.00 15000.00 14700.00 6500.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 1.00 15000.00 23433.33 14200.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1.00 22000.00 31155.65 35000.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 1.00 15000.00 20949.80 40000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 19153.85 20353.37 20056.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 69.00 17202.90 19592.40 16736.40 =============== 620-00014 Field Lab (Spec) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 30000.00 17137.23 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 30000.00 17137.23 10000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 30000.00 17137.23 10000.00 =============== 620-00015 Field Lab (State Furn) Each =================================================== IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 1.00 5000.00 6220.00 5100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 6220.00 5100.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 1.00 4400.00 6637.50 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 4400.00 6637.50 7500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4700.00 6405.56 6300.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 452 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00020 Sanitary Facility Each =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 2.00 1000.00 2200.00 4400.00 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 1.00 1200.00 724.00 525.00 IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 2.00 2000.00 989.00 250.00 IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 2.00 800.00 1168.95 1000.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 1.00 1000.00 2370.00 4480.00 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 1.00 1000.00 1504.00 2000.00 NH 0342-042 US 34 AND US 36 CHIPSEALS - E 01/12/06 2.00 1500.00 350.00 500.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 1.00 1000.00 1300.00 1400.00 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 1.00 1200.00 2033.33 4000.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 2.00 1500.00 975.33 880.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 1.00 1500.00 1733.33 2500.00 STA 0343-025 US 34, WRAY WEST 01/26/06 1.00 1200.00 1362.50 600.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1.00 4000.00 3807.50 4120.50 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 1.00 1600.00 1203.64 720.00 STA 1131-005 SH 113 IN LOGAN COUNTY 02/02/06 1.00 1500.00 287.50 250.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 2.00 1000.00 1068.23 1000.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 1.00 1000.00 1520.00 400.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2.00 3000.00 2676.51 1700.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 1.00 2500.00 1223.57 544.28 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 2.00 1000.00 580.46 425.20 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 1.00 1200.00 2172.13 1032.76 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 1.00 1200.00 1300.00 1100.00 SHE 2854-111 US 285 & C470 SIGNING 03/02/06 1.00 800.00 673.60 168.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 1.00 1200.00 1312.50 375.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 1.00 1200.00 2572.00 1500.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 1.00 1000.00 394.32 500.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 3.00 1200.00 600.00 600.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 1.00 1000.00 1750.00 2300.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 2.00 500.00 2400.00 1200.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 2.00 4000.00 1780.00 1600.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 1.00 1200.00 1393.81 821.42 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 1.00 1000.00 2426.76 4900.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 1.00 1500.00 1034.50 578.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 1.00 1500.00 3015.41 1275.11 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 1.00 1000.00 744.50 400.00 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 2.00 1200.00 1800.00 1800.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 1.00 2000.00 1900.00 1800.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 1.00 1000.00 800.00 800.00 NH R200-140 I-25, SH 47, 50, 115 CRACK RE 03/30/06 2.00 1000.00 463.50 344.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 1.00 900.00 338.75 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 54.00 1425.93 1473.65 1325.71 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 1.00 1150.00 2788.00 4240.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 453 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00020 Sanitary Facility Each =================================================== IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 1.00 1500.00 641.67 575.00 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 2.00 1600.00 275.00 300.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 1.00 2000.00 4533.60 2500.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 1.00 1400.00 1483.56 1000.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 1.00 750.00 704.64 275.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 1.00 1400.00 1038.53 450.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 1.00 1000.00 899.84 1175.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 1.00 1400.00 2003.04 2009.11 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 1.00 1000.00 1335.00 2070.00 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 2.00 1500.00 2053.33 1160.00 NH 0341-067 ON US 34 IN LARIMER COUNTY. 05/25/06 1.00 1000.00 200.50 1.00 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 1.00 950.00 638.34 976.68 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 1.00 500.00 576.00 200.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 1.00 1500.00 2675.00 3750.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 1.00 2000.00 1918.69 800.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 1.00 900.00 1476.36 2100.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 1.00 1200.00 1500.00 1500.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 1.00 1200.00 2685.19 1500.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 1.00 1000.00 966.67 1500.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 1.00 1200.00 2966.67 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23.00 1271.74 1523.82 1414.86 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 1200.00 2791.91 4967.65 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 1.00 1400.00 1863.82 2000.00 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 1.00 1400.00 950.00 800.00 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 1.00 1000.00 1160.00 730.00 BR R400-203 FY 06 BRIDGE MAINTENANCE 07/20/06 1.00 1500.00 580.00 300.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 2.00 1500.00 2342.77 685.54 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 1.00 1200.00 660.00 720.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1.00 4000.00 2068.48 2000.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 2.00 2000.00 2694.78 1200.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 1.00 500.00 1226.25 1178.75 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 1.00 1000.00 1170.00 1100.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2.00 1500.00 2535.20 3376.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 2.00 1400.00 2387.51 2167.53 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 2.00 3000.00 1722.50 1890.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2.00 4000.00 3024.46 4000.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1.00 4000.00 2974.12 3500.00 C R600-283 VARIOUS 08/10/06 2.00 1200.00 754.47 785.00 STA 0405-031 US40 HUGO EAST 08/24/06 2.00 800.00 1500.00 1500.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 1.00 1400.00 2208.30 1000.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 2.00 4000.00 3000.00 2000.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 1500.00 1713.28 1500.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 1.00 1500.00 757.50 1015.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 454 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00020 Sanitary Facility Each =================================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 3.00 1100.00 4981.56 2844.67 IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 1.00 1500.00 1450.00 850.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 1.00 2000.00 1345.22 1238.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 36.00 1866.67 2213.98 1851.15 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 1.00 1500.00 1406.79 1406.79 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 1.00 2000.00 1000.00 1000.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 3000.00 2284.12 3000.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 1.00 1000.00 2530.00 3450.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 1.00 1500.00 1785.43 708.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 1.00 1500.00 1243.61 850.00 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 2.00 1400.00 774.33 425.00 C 0252-389 BRONCO ARCH BRIDGE OVER THE S 11/29/06 1.00 500.00 570.00 140.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 1.00 1000.00 2265.00 500.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.00 1500.00 1557.40 637.00 SHE 0503-067 US 50, WEST OF CANON CITY 11/30/06 1.00 1500.00 701.31 175.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 1.00 1500.00 1091.86 425.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 1.00 1500.00 1676.67 1530.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 2.00 3000.00 2925.54 1200.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 1.00 1200.00 1825.33 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 1722.22 1725.25 1253.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 131.00 1560.69 1727.15 1475.91 =============== 621-00425 Detour LUMP SUM =============================================== BR 069A-019 SH 69, ROSITA CREEK 03/09/06 1.00 174000.00 217829.28 115000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 174000.00 217829.28 115000.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 1.00 200000.00 331778.98 310000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 200000.00 331778.98 310000.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 1.00 50000.00 245313.89 220000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 50000.00 245313.89 220000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 455 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 621-00425 Detour LUMP SUM =============================================== STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1.00 500000.00 613222.14 550000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 500000.00 613222.14 550000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 231000.00 337410.50 298750.00 =============== 621-00450 Detour Pvmt Sq Yard ================================================ NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1,831.00 25.00 24.01 20.47 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1,294.00 20.00 26.55 24.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 700.00 28.00 38.90 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,825.00 23.86 27.47 24.14 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 1,000.00 50.00 57.03 60.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 5,778.00 23.00 39.51 34.32 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 6,309.00 25.00 35.44 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,087.00 26.03 39.55 36.13 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 89,214.00 25.00 32.31 35.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 32,850.00 32.00 34.60 38.75 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 19,081.90 30.00 29.22 28.50 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 780.00 28.00 51.63 54.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 454.00 25.00 47.36 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 142,379.90 27.30 32.43 35.07 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 24,968.00 30.00 28.82 29.50 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 527.00 30.00 56.09 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25,495.00 30.00 30.03 29.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 184,786.90 27.51 32.21 34.16 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 456 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 621-00650 Ped Stair Str LUMP SUM =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 25000.00 27592.05 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25000.00 27592.05 20000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 27592.05 20000.00 =============== 622-00150 Planter Box Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 4.00 150.00 2044.24 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 150.00 2044.24 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 150.00 2044.24 1500.00 =============== 622-00250 Bench Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 5.00 3200.00 1152.03 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 3200.00 1152.03 1200.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 4.00 8000.00 1992.32 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 8000.00 1992.32 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 5333.33 1525.49 1333.33 =============== 622-00270 Bollard Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 6.00 500.00 648.68 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 500.00 648.68 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 500.00 648.68 500.00 =============== 622-00350 Trash Receptacle Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2.00 600.00 1075.60 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 600.00 1075.60 1300.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 457 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 622-00350 Trash Receptacle Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 3.00 750.00 1088.58 1400.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 2.00 1000.00 653.93 901.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 850.00 991.99 1200.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 778.57 1020.54 1229.09 =============== 622-00715 Monitor Wells Lin Foot =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 100.00 50.00 42.38 25.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 50.00 42.38 25.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 50.00 42.38 25.50 =============== 622-04035 Water Storage Facility LUMP SUM =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 25000.00 31631.71 12500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25000.00 31631.71 12500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 31631.71 12500.00 =============== 622-11100 Storage Bldg Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 5200.00 7500.88 6500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5200.00 7500.88 6500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5200.00 7500.88 6500.00 =============== 622-20100 Prec Col Conc Cap Lin Foot =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 702.00 2.50 45.89 42.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 133.00 230.00 88.36 32.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 835.00 38.74 49.08 40.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 835.00 38.74 49.08 40.42 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 458 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 622-20200 Skate Bd Prot Each =================================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 32.00 230.00 127.66 52.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 32.00 230.00 127.66 52.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 230.00 127.66 52.99 =============== 623-00156 Irrig Bubbler Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 152.00 10.00 10.22 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 152.00 10.00 10.22 7.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 12.00 8.00 77.86 82.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 8.00 77.86 82.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 164.00 9.85 15.17 12.49 =============== 623-00162 Drip Emit Tubing Lin Foot =============================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 175.00 3.00 2.26 1.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 175.00 3.00 2.26 1.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 175.00 3.00 2.26 1.36 =============== 623-00205 4 In Pop-Up Spray Spr Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 432.00 12.50 17.44 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 432.00 12.50 17.44 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 432.00 12.50 17.44 16.00 =============== 623-00206 6 In Pop-Up Spray Spr Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 290.00 13.00 28.30 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 290.00 13.00 28.30 26.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 290.00 13.00 28.30 26.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 459 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 623-00212 12 In Pop-Up Spray Spr Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 294.00 26.00 43.20 44.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 294.00 26.00 43.20 44.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 294.00 26.00 43.20 44.50 =============== 623-00332 4 In Pop-Up Rotary Spr Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 52.00 50.00 29.11 39.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 52.00 50.00 29.11 39.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 57.00 40.00 37.96 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 57.00 40.00 37.96 42.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 109.00 44.77 33.74 40.57 =============== 623-01708 1 Inch Backflow Preventer Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 1000.00 1189.56 1212.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 1189.56 1212.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 1189.56 1212.00 =============== 623-01712 1-1/2 In Backflow Preventer Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2.00 2200.00 2112.25 1750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2200.00 2112.25 1750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2200.00 2112.25 1750.00 =============== 623-03008 1 In Manual Ctrl Valve Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 350.00 103.60 162.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 350.00 103.60 162.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 350.00 103.60 162.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 460 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 623-03108 1 In Auto Ctrl Valve Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 41.00 120.00 176.76 141.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 41.00 120.00 176.76 141.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 30.00 150.00 213.64 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 150.00 213.64 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 71.00 132.68 192.34 157.48 =============== 623-03112 1-1/2 In Auto Ctrl Val Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 19.00 100.00 281.21 244.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19.00 100.00 281.21 244.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 100.00 281.21 244.00 =============== 623-04000 Ctrl Wire 24 Volt Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 40,000.00 0.20 0.18 0.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40,000.00 0.20 0.18 0.12 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 14,750.00 0.10 0.74 1.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14,750.00 0.10 0.74 1.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54,750.00 0.17 0.33 0.36 =============== 623-04002 Power Source Wire Lin Foot =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 50.00 15.00 24.06 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 15.00 24.06 23.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 15.00 24.06 23.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 461 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 623-04008 1 In Quick-Coupler Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 7.00 125.00 161.04 162.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 125.00 161.04 162.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 14.00 162.00 94.36 88.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 162.00 94.36 88.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 149.67 116.59 112.67 =============== 623-05012 1-1/2 In Gate Valve Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2.00 50.00 98.22 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 50.00 98.22 53.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 50.00 98.22 53.00 =============== 623-05016 2 In Gate Valve Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 75.00 260.76 278.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 75.00 260.76 278.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 5.00 150.00 181.10 81.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 150.00 181.10 81.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 137.50 194.38 113.83 =============== 623-06900 Valve Box Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 52.00 100.00 63.20 86.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 52.00 100.00 63.20 86.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 100.00 63.20 86.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 462 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 623-07012 1-1/2 In Water Meter Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2.00 1500.00 2839.80 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1500.00 2839.80 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1500.00 2839.80 1500.00 =============== 623-07600 1-1/2 In Flow Sensor Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2.00 560.00 463.50 166.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 560.00 463.50 166.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 560.00 463.50 166.00 =============== 623-07601 1 In Flow Sensor Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 500.00 342.92 293.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 500.00 342.92 293.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 3.00 300.00 298.52 155.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 300.00 298.52 155.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 350.00 309.62 189.50 =============== 623-08106 6 Station Auto Ctrler Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 3000.00 837.73 481.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3000.00 837.73 481.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 837.73 481.00 =============== 623-08112 12 Station Auto Ctrler Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 3000.00 9369.62 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3000.00 9369.62 15000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 463 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 623-08112 12 Station Auto Ctrler Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 3.00 3000.00 1065.55 691.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 3000.00 1065.55 691.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 3000.00 3141.57 4268.25 =============== 623-08116 16 Station Auto Ctrler Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 3000.00 1561.28 797.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3000.00 1561.28 797.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 1561.28 797.00 =============== 623-08136 36 Station Auto Ctrler Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 5000.00 18434.28 30400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 18434.28 30400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 18434.28 30400.00 =============== 623-08308 Inst 8 Station Auto Ctrler Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 5.00 1500.00 800.81 514.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 1500.00 800.81 514.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1500.00 800.81 514.00 =============== 623-09100 Submersible Pump (w/Val & Ctrl) Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 1600.00 8319.46 6500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1600.00 8319.46 6500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1600.00 8319.46 6500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 464 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 623-09900 Sprinkler System LUMP SUM =============================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 80000.00 82025.75 32325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 80000.00 82025.75 32325.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1.00 12000.00 14896.93 24293.86 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 22250.00 24796.74 25831.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 18833.33 22321.79 25319.22 IM 0252-384 I-25 OVER BROADWAY 11/09/06 1.00 20000.00 59593.34 51000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 20000.00 59593.34 51000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 31300.00 53456.58 31856.53 =============== 624-14015 15 In Culvert Pipe (CR 4) Lin Foot =============================================== C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 230.00 100.00 100.00 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 230.00 100.00 100.00 95.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 230.00 100.00 100.00 95.00 =============== 624-14018 18 In Culvert Pipe (CR 4) Lin Foot =============================================== C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 41.00 100.00 122.50 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 41.00 100.00 122.50 95.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 41.00 100.00 122.50 95.00 =============== 624-14024 24 In Culvert Pipe (CR 4) Lin Foot =============================================== STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 1,276.00 100.00 131.00 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,276.00 100.00 131.00 180.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 465 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 624-14024 24 In Culvert Pipe (CR 4) Lin Foot =============================================== C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 13.00 160.00 260.00 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 160.00 260.00 160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,289.00 100.61 131.87 179.80 =============== 624-14030 30 In Culvert Pipe (CR 4) Lin Foot =============================================== STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 59.00 110.00 162.33 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 59.00 110.00 162.33 125.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 21.00 185.00 167.50 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21.00 185.00 167.50 185.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 129.69 163.32 140.75 =============== 625-00000 Const Surveying LUMP SUM =============================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 1.00 20000.00 25505.00 21525.00 SHE 0091-025 SH 9 VMS IN BRECKENRIDGE 01/05/06 1.00 3000.00 1444.86 1200.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 1.00 20000.00 24435.00 30240.00 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 1.00 60000.00 71336.50 75000.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 1.00 40000.00 36616.67 27850.00 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 1.00 45000.00 35333.33 25000.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 1.00 35000.00 58602.78 47775.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 1.00 25000.00 15566.67 21700.00 STA 0343-025 US 34, WRAY WEST 01/26/06 1.00 35000.00 21319.75 17400.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1.00 110000.00 139480.22 107751.12 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 1.00 50000.00 23021.53 27600.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 1.00 20000.00 12922.64 15000.00 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 1.00 4000.00 2850.67 1378.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 1.00 32000.00 60000.00 50000.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 100000.00 84370.80 60000.00 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 1.00 33000.00 22000.00 25000.00 SHE 2854-111 US 285 & C470 SIGNING 03/02/06 1.00 2000.00 1801.20 1056.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 466 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 625-00000 Const Surveying LUMP SUM =============================================== SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 1.00 4000.00 5976.00 5850.00 SHE 0911-004 SH 91 & SH 67 GUARDRAIL 03/09/06 1.00 2000.00 5926.85 1000.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 1.00 24000.00 20230.83 10000.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 1.00 15000.00 14456.00 10500.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 1.00 7500.00 13276.80 8000.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 1.00 18000.00 9000.00 9000.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 1.00 100000.00 83333.33 40000.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 80000.00 66044.00 57120.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 1.00 8000.00 12144.40 8433.20 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 1.00 12000.00 11600.00 10900.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 1.00 5000.00 13037.00 3608.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 1.00 5000.00 9316.50 13425.83 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 1.00 10000.00 10973.75 6800.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 1.00 40000.00 60500.00 54000.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 1.00 4000.00 3226.67 1980.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 1.00 5000.00 4817.50 4400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 33.00 29500.00 29424.66 24257.34 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 1.00 12000.00 10040.00 10000.00 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 1.00 5000.00 8385.00 3225.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 1.00 135000.00 244736.67 127325.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 1.00 30000.00 24295.00 12000.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 1.00 5000.00 8837.20 5500.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 1.00 10000.00 5357.08 5850.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 1.00 120000.00 191514.50 225000.00 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 1.00 15000.00 27875.00 15750.00 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 1.00 35000.00 27786.67 40860.00 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 1.00 5000.00 14714.54 20929.08 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 1.00 5000.00 7030.00 5850.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 1.00 20000.00 20493.75 18000.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 1.00 35000.00 122500.00 120000.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 1.00 25000.00 25060.00 25060.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 1.00 36000.00 19443.86 15000.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 1.00 9000.00 22100.00 9000.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 1.00 85000.00 103666.67 100000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17.00 34529.41 43749.16 44667.59 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 100000.00 187129.50 180000.00 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 1.00 40000.00 37299.41 30000.00 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 1.00 30000.00 8250.00 10000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 467 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 625-00000 Const Surveying LUMP SUM =============================================== STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 1.00 7500.00 11189.08 18210.50 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1.00 12000.00 27750.00 27500.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1.00 80000.00 51655.29 57000.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 1.00 60000.00 79136.52 52500.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 1.00 30000.00 54861.67 89585.00 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 1.00 10000.00 10150.00 2750.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 300000.00 295960.00 200000.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 100000.00 103548.56 166945.50 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 1.00 30000.00 24305.00 34020.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 150000.00 133350.40 230000.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1.00 80000.00 153609.65 150000.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 1.00 35000.00 41500.00 35000.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 1.00 25000.00 33756.25 17000.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 1.00 28000.00 23336.84 18673.68 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 30000.00 45494.58 85400.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 1.00 5000.00 3775.40 3120.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 420000.00 535457.06 527971.19 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 1.00 25000.00 18491.20 10325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21.00 76071.43 84585.64 92666.71 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 1.00 5000.00 3048.05 3048.05 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 1.00 15000.00 10000.00 10000.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 231000.00 194349.91 280000.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 1.00 10000.00 23317.41 14000.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 1.00 20000.00 5262.86 4350.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 1.00 15000.00 11036.67 6513.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.00 30000.00 40000.00 40800.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 1.00 15000.00 4266.57 3000.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 1.00 25000.00 20190.00 18000.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1.00 200000.00 200179.29 130000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 56600.00 49451.18 50971.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 81.00 45975.31 49556.61 49574.73 =============== 625-00001 Const Surveying (Hour) Hour =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 20.00 150.00 150.50 115.50 STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 6.00 130.00 354.02 80.62 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 40.00 150.00 153.67 137.35 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 20.00 130.00 151.70 148.50 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 40.00 150.00 156.67 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 468 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 625-00001 Const Surveying (Hour) Hour =================================================== IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 75.00 130.00 153.47 108.86 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 40.00 170.00 146.67 140.00 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 8.00 140.00 171.13 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 249.00 144.78 161.01 128.76 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 40.00 140.00 142.92 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 140.00 142.92 135.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 50.00 140.00 163.00 175.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 500.00 180.00 149.84 120.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 250.00 140.00 162.36 151.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 800.00 165.00 153.07 133.27 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 80.00 150.00 134.61 152.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 100.00 150.00 133.10 130.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 40.00 160.00 160.80 199.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 220.00 151.82 137.49 150.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,309.00 158.17 151.05 135.37 =============== 626-00000 Mobilization LUMP SUM =============================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 1.00 250000.00 601600.00 400000.00 SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 01/05/06 1.00 40000.00 47061.60 20000.00 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 1.00 110000.00 109651.20 86356.00 SHE 0091-025 SH 9 VMS IN BRECKENRIDGE 01/05/06 1.00 25000.00 17531.90 18000.00 STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 1.00 15000.00 7621.94 2394.61 IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 1.00 160000.00 199486.60 70250.00 C 0702-258 I70 - ROCKFALL IN GLENWOOD CA 01/06/06 1.00 5000.00 17666.67 10500.00 IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 1.00 300000.00 255751.70 202750.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 1.00 275000.00 332418.50 259674.00 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 1.00 40000.00 242652.50 165000.00 NH 0342-042 US 34 AND US 36 CHIPSEALS - E 01/12/06 1.00 70000.00 156797.95 164595.90 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 469 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00000 Mobilization LUMP SUM =============================================== STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 1.00 100000.00 196250.00 212750.00 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 1.00 270000.00 266723.33 135170.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 1.00 140000.00 182630.41 240017.73 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 1.00 350000.00 372000.00 286000.00 STA 0343-025 US 34, WRAY WEST 01/26/06 1.00 210000.00 175000.00 95000.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1.00 550000.00 650741.22 467495.14 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 1.00 150000.00 165739.10 172000.00 STA 1131-005 SH 113 IN LOGAN COUNTY 02/02/06 1.00 50000.00 70145.80 44334.20 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 1.00 17000.00 33875.75 32500.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 1.00 250000.00 402870.88 540000.00 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 1.00 45000.00 22020.67 34161.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 1.00 300000.00 416333.33 239000.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 1.00 175000.00 180333.33 81000.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 450000.00 612308.62 580000.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 1.00 250000.00 187172.84 31550.00 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 1.00 85000.00 121597.87 28697.22 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 1.00 230000.00 258595.93 110834.57 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 1.00 75000.00 90550.00 69700.00 SHE 2854-111 US 285 & C470 SIGNING 03/02/06 1.00 10000.00 14883.60 16818.00 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 1.00 10000.00 35399.86 10100.00 SHE 0911-004 SH 91 & SH 67 GUARDRAIL 03/09/06 1.00 30000.00 30286.67 36600.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 1.00 90000.00 102077.33 92000.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 1.00 350000.00 278120.00 176000.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 1.00 30000.00 21371.86 17681.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 1.00 60000.00 55000.00 55000.00 AQC R600-241 SH 287 (FEDERAL BLVD), 52ND A 03/16/06 1.00 5000.00 5218.23 4000.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 1.00 400000.00 467500.00 428000.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 1.00 200000.00 272000.00 148000.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 300000.00 357360.00 525000.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 1.00 100000.00 80054.70 32164.09 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 1.00 78000.00 85348.83 75000.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 1.00 60000.00 42686.75 3247.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 1.00 50000.00 93486.12 28595.83 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 1.00 50000.00 61080.08 21785.30 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 1.00 20000.00 43000.00 43000.00 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 1.00 14000.00 10576.46 12579.39 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 1.00 10000.00 17491.31 13220.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 1.00 225000.00 249320.35 263640.70 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 1.00 265000.00 308000.00 308000.00 NH R200-140 I-25, SH 47, 50, 115 CRACK RE 03/30/06 1.00 150000.00 98000.00 108000.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 1.00 20000.00 18666.67 5000.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 1.00 14000.00 27925.19 16000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 53.00 142037.74 169303.42 136587.96 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 1.00 350000.00 398116.40 182000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 470 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00000 Mobilization LUMP SUM =============================================== IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 1.00 200000.00 155766.67 43300.00 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 1.00 20000.00 56044.44 56913.98 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 1.00 25000.00 35565.63 39000.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 1.00 1000000.00 863813.33 878000.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 1.00 170000.00 233178.40 175000.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 1.00 64000.00 127980.76 165000.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 1.00 50000.00 81127.51 111900.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 1.00 65000.00 80397.66 112986.00 SHE 052A-026 SH 52/ US 287 DILEMMA ZONE PR 04/27/06 1.00 10000.00 7166.84 2834.20 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 1.00 850000.00 1234884.74 1204654.21 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 1.00 175000.00 246786.00 150000.00 NH 0341-067 ON US 34 IN LARIMER COUNTY. 05/25/06 1.00 50000.00 57000.00 45000.00 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 1.00 20000.00 32950.51 23901.01 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 1.00 12500.00 23760.00 27500.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 1.00 280000.00 371313.25 250023.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 1.00 500000.00 658395.00 550000.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 1.00 185000.00 272759.12 390000.00 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 1.00 30000.00 23976.00 23130.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 1.00 140000.00 167900.00 167900.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 1.00 70000.00 121413.16 77000.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 1.00 30000.00 24454.48 34695.43 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 1.00 480000.00 650266.67 611000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23.00 207673.91 229308.05 231379.91 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 1.00 1000000.00 1347174.50 750000.00 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 1.00 100000.00 259612.12 200000.00 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 1.00 100000.00 120000.00 90000.00 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 1.00 60000.00 78742.50 60000.00 BR R400-203 FY 06 BRIDGE MAINTENANCE 07/20/06 1.00 30000.00 13400.00 9000.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1.00 135000.00 141050.00 132100.00 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 1.00 25000.00 62666.50 57000.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1.00 450000.00 390713.96 385000.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 1.00 500000.00 628436.81 730000.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 1.00 175000.00 170200.00 188600.00 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 1.00 90000.00 108640.00 84800.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 3000000.00 3165185.20 3044000.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 540000.00 700770.13 432036.63 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 1.00 125000.00 108721.74 78886.96 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 1100000.00 1433230.71 1585000.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1.00 700000.00 879272.61 990000.00 C R600-283 VARIOUS 08/10/06 1.00 100000.00 117666.67 153000.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 1.00 70000.00 182750.00 150000.00 STA 0405-031 US40 HUGO EAST 08/24/06 1.00 45000.00 96000.00 140000.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 1.00 150000.00 149766.25 114700.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 471 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00000 Mobilization LUMP SUM =============================================== BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 1.00 250000.00 182591.93 217183.86 NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 1.00 60000.00 86333.33 84000.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 325000.00 367299.16 425000.00 AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR 09/14/06 1.00 15000.00 24101.52 38000.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 1.00 50000.00 44021.82 22850.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 1.00 27000.00 45775.00 16550.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 3700000.00 3712333.33 3500000.00 IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 1.00 95000.00 77766.33 31900.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 1.00 150000.00 166076.05 78943.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29.00 454034.48 556439.25 475467.26 STA R600-279 SH 121 (WADSWORTH) FROM KEN C 10/05/06 1.00 10000.00 13018.30 26820.00 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 1.00 45500.00 31326.87 31326.87 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 1.00 80000.00 65000.00 65000.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 990000.00 1724352.91 1385000.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 1.00 150000.00 214341.28 65000.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 1.00 365000.00 442613.80 425000.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 1.00 250000.00 141764.29 40850.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 1.00 100000.00 234991.91 110000.00 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 1.00 45000.00 45534.00 46000.00 C 0252-389 BRONCO ARCH BRIDGE OVER THE S 11/29/06 1.00 5000.00 24000.00 8000.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 1.00 330000.00 282625.00 288500.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.00 90000.00 136436.00 55180.00 IM R600-292 70TH AVE AT I-25/BLAKE AND 20 11/30/06 1.00 15000.00 8548.57 2210.00 SHE 0503-067 US 50, WEST OF CANON CITY 11/30/06 1.00 35000.00 18618.50 15970.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 1.00 50000.00 56193.29 35373.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 1.00 120000.00 178496.22 175000.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1.00 1100000.00 1119065.79 844000.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 1.00 225000.00 192012.60 170000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 222527.78 292152.20 210512.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 123.00 239650.41 288913.50 245029.92 =============== 626-00001 Mobilization (Autopay) LUMP SUM =============================================== BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 1.00 120000.00 122159.40 133418.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 120000.00 122159.40 133418.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 120000.00 122159.40 133418.80 =============== 626-01000 Public Info Services LUMP SUM =============================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 1.00 7500.00 10940.00 11200.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 472 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-01000 Public Info Services LUMP SUM =============================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 1.00 6000.00 24332.41 11000.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 1.00 10000.00 7425.00 11200.00 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 1.00 6000.00 7047.50 10000.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 1.00 5000.00 6873.11 2500.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 1.00 10000.00 5000.00 4000.00 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 1.00 5000.00 5701.71 9600.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 1.00 5000.00 4713.33 500.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 8000.00 10626.70 5000.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 1.00 6000.00 8528.63 1614.53 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 1.00 3000.00 5869.35 1716.08 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 1.00 2500.00 7730.71 3395.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 1.00 3000.00 8730.00 12000.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 1.00 10000.00 7500.00 10000.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 1.00 10000.00 12166.67 1500.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 20000.00 9240.00 6500.00 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 1.00 4000.00 3281.06 3500.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 1.00 6000.00 3678.75 1780.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 1.00 3000.00 4450.44 850.07 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 1.00 12000.00 16000.00 12000.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 1.00 14000.00 1500.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21.00 7428.57 8252.56 5778.84 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 1.00 3000.00 7020.00 5400.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 1.00 10000.00 33392.67 5000.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 1.00 3000.00 3478.85 2700.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 1.00 3000.00 5831.80 5765.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 1.00 5000.00 4876.65 5850.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 1.00 25000.00 6533.33 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 8166.67 8855.22 5785.83 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 1.00 8000.00 5312.18 3000.00 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 1.00 1000.00 5906.83 3500.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1.00 5000.00 8200.00 9900.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1.00 5000.00 6657.49 8000.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 1.00 5000.00 9739.17 21217.50 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 1.00 10000.00 10815.00 6325.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 6000.00 36484.30 40921.50 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 8000.00 26809.17 5436.66 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 1.00 15000.00 12700.00 6300.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 5000.00 17855.75 7000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 473 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-01000 Public Info Services LUMP SUM =============================================== C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1.00 20000.00 10142.76 10000.00 C R600-283 VARIOUS 08/10/06 1.00 5000.00 4749.45 1050.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 1.00 6000.00 3850.00 6200.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 1.00 6000.00 3793.38 1500.00 NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 1.00 7000.00 11500.00 17000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 7466.67 12232.87 9823.38 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 10000.00 54164.62 61000.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 1.00 6000.00 14650.38 4500.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 1.00 5000.00 4680.00 1310.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 1.00 5000.00 5512.04 2900.00 C 0252-389 BRONCO ARCH BRIDGE OVER THE S 11/29/06 1.00 5000.00 1812.50 500.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 1.00 5000.00 6136.60 4183.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 1.00 2500.00 3980.00 1500.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 1.00 5000.00 5156.66 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 5437.50 11147.75 9986.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 7210.00 10024.37 7666.29 =============== 627-00001 Pvmt Mkg Paint Gallon ================================================= NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 4,846.00 30.00 17.46 16.80 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 1,418.00 35.00 45.38 45.50 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 1,984.00 32.00 27.88 40.00 STA 0343-025 US 34, WRAY WEST 01/26/06 1,246.00 32.00 34.81 29.75 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 59.00 250.00 87.05 88.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 1,200.00 45.00 30.93 27.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 596.00 47.00 49.03 50.15 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 15.00 110.00 78.62 69.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 1,762.00 45.00 45.00 45.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 233.00 50.00 55.50 50.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 884.00 36.00 50.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14,243.00 36.48 29.39 32.72 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 148.00 115.00 110.93 105.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 1,106.00 32.00 21.50 18.50 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 540.00 45.00 34.85 33.81 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 474 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00001 Pvmt Mkg Paint Gallon ================================================= BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 65.00 150.00 102.50 105.00 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 35.00 75.00 66.80 64.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 671.00 73.00 48.56 35.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 550.00 35.00 28.93 29.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 2.00 135.00 300.00 300.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 183.00 70.00 76.67 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,300.00 51.64 37.15 35.48 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 133.00 65.00 46.39 34.18 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 28.00 100.00 135.70 37.80 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 34.00 350.00 269.08 263.16 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 30.00 350.00 141.48 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 225.00 150.42 102.07 82.67 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 15.00 300.00 325.00 325.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 1,000.00 45.00 59.00 63.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 600.00 45.00 60.15 70.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 87.00 100.00 127.70 108.50 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 6.50 300.00 681.48 1100.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1,000.00 38.00 36.51 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,708.50 46.21 54.05 59.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,476.50 41.46 35.33 37.32 =============== 627-00002 Thermoplastic Pvmt Mkg Sq Foot ================================================ IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 7,478.00 2.50 5.10 5.19 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 9,439.00 2.65 3.24 3.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16,917.00 2.58 4.19 4.20 IM 0252-384 I-25 OVER BROADWAY 11/09/06 415.00 2.00 6.44 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 415.00 2.00 6.44 5.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,332.00 2.57 4.31 4.22 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 475 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00003 Thermoplastic Pvmt Mkg (Inlaid) Sq Foot ================================================ IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 632.00 25.00 14.00 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 632.00 25.00 14.00 14.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 21.00 22.00 27.82 28.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21.00 22.00 27.82 28.45 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 358.00 12.00 11.50 11.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 358.00 12.00 11.50 11.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,011.00 20.33 12.55 13.41 =============== 627-00004 Epoxy Pvmt Mkg Sq Foot ================================================ NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 87.00 10.00 19.31 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 87.00 10.00 19.31 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 87.00 10.00 19.31 14.00 =============== 627-00005 Epoxy Pvmt Mkg Gallon ================================================= NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 1,616.00 72.00 67.14 65.70 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 275.00 65.00 81.68 60.90 IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 390.00 80.00 69.80 65.20 IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 15.00 250.00 258.79 250.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 870.00 75.00 75.10 75.40 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 325.00 70.00 89.25 89.25 NH 0342-042 US 34 AND US 36 CHIPSEALS - E 01/12/06 1,863.00 60.00 61.75 58.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 102.00 75.00 102.48 97.45 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 992.00 60.00 68.17 75.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 326.00 70.00 101.99 99.75 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 650.00 70.00 65.05 67.15 STA 0343-025 US 34, WRAY WEST 01/26/06 623.00 60.00 75.44 67.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 476 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00005 Epoxy Pvmt Mkg Gallon ================================================= NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 284.00 90.00 73.44 68.68 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 65.00 100.00 99.55 88.00 STA 1131-005 SH 113 IN LOGAN COUNTY 02/02/06 1,339.00 65.00 62.00 55.00 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 28.00 100.00 240.94 236.25 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 400.00 80.00 71.86 71.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 157.00 100.00 121.67 95.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 600.00 78.00 59.53 47.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 63.00 100.00 155.66 150.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 378.00 75.00 85.78 83.12 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 192.00 100.00 96.75 92.98 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 226.00 100.00 104.46 103.28 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 113.00 95.00 102.85 114.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 19.00 250.00 217.69 442.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 512.00 75.00 77.24 75.75 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 15.00 200.00 102.66 91.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 6.00 300.00 500.00 500.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 365.00 100.00 100.00 110.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 200.00 90.00 115.00 100.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 115.00 100.00 82.70 73.50 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 5.00 125.00 235.19 328.57 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 209.00 65.00 76.75 80.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 201.00 70.00 87.64 73.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 43.00 50.00 125.00 110.00 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 15.00 250.00 300.00 300.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 430.00 70.00 75.00 75.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 35.00 230.00 114.67 99.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 9.40 220.00 354.00 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14,071.40 73.46 77.81 73.26 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 1,493.00 65.00 61.58 61.90 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 270.00 60.00 75.48 75.55 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 2.00 100.00 365.40 322.50 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 25.00 100.00 115.75 90.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 51.00 235.00 312.15 285.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 328.00 70.00 86.39 86.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 171.00 100.00 93.78 110.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 125.00 80.00 102.26 110.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 121.00 100.00 133.62 120.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 405.00 75.00 81.55 70.69 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 938.00 65.00 94.17 108.00 NH 0341-067 ON US 34 IN LARIMER COUNTY. 05/25/06 698.00 70.00 69.50 75.00 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 18.00 150.00 150.27 195.53 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 671.00 87.00 81.83 76.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 800.00 70.00 96.97 96.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 477 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00005 Epoxy Pvmt Mkg Gallon ================================================= NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 234.00 100.00 87.33 67.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 27.00 160.00 201.40 220.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 53.00 100.00 95.00 80.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 183.00 95.00 121.67 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,613.00 75.27 83.11 85.46 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 305.00 75.00 75.35 60.88 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 21.00 80.00 216.54 275.00 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 129.00 75.00 107.46 100.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 30.00 120.00 133.75 137.50 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 222.00 75.00 92.26 93.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 400.00 90.00 90.54 86.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 134.00 185.00 136.61 64.83 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 30.00 125.00 132.20 121.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 779.00 75.00 97.67 98.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 166.00 110.00 66.76 67.43 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 354.00 100.00 118.39 110.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 421.00 75.00 133.18 125.00 C R600-283 VARIOUS 08/10/06 16.00 160.00 365.67 321.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 47.00 155.00 177.50 155.00 STA 0405-031 US40 HUGO EAST 08/24/06 193.00 110.00 138.33 100.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 33.00 100.00 185.30 110.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 41.00 200.00 168.96 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,321.00 91.92 107.62 99.17 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 706.00 75.00 79.18 80.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 19.00 70.00 402.06 375.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 525.00 80.00 102.00 109.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 276.00 110.00 141.69 153.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 440.00 80.00 105.63 100.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 60.00 150.00 184.60 223.00 SHE 0503-067 US 50, WEST OF CANON CITY 11/30/06 82.00 150.00 96.59 87.30 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 23.00 150.00 120.29 90.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 1,000.00 55.00 52.30 52.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 228.00 100.00 118.82 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,359.00 78.71 93.53 93.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27,364.40 76.79 85.85 81.78 =============== 627-00007 Epoxy Pvmt Mkg (Spec) Gallon ================================================= IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 74.00 585.00 631.38 761.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 478 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00007 Epoxy Pvmt Mkg (Spec) Gallon ================================================= NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 117.00 135.00 154.00 138.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 191.00 309.35 386.41 379.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 191.00 309.35 386.41 379.37 =============== 627-00011 Pvmt Mkg Paint (Waterborne) Gallon ================================================= NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 650.00 35.00 42.00 42.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 1,353.00 40.00 36.86 36.70 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 11.00 60.00 195.00 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,014.00 38.50 37.87 39.36 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 1,828.00 18.00 27.67 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,828.00 18.00 27.67 34.00 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 101.00 42.00 81.83 100.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 20.00 60.00 69.10 26.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 117.00 50.00 73.96 35.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 45.00 125.00 238.90 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 283.00 59.78 100.04 67.10 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 47.00 80.00 130.49 148.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 47.00 80.00 130.49 148.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,172.00 31.43 42.13 40.12 =============== 627-00012 Pvmt Mkg Paint (Low VOC Solvent Base) Gallon ================================================= STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 825.00 20.00 38.73 30.45 IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 744.00 40.00 42.16 35.90 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 479 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00012 Pvmt Mkg Paint (Low VOC Solvent Base) Gallon ================================================= IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 150.00 150.00 70.93 55.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 132.00 56.00 49.38 46.15 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 1,025.00 40.00 39.63 37.90 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 500.00 30.00 23.43 17.17 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 1,000.00 35.00 46.46 43.50 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 45.00 50.00 58.33 25.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 8.00 100.00 234.20 230.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 1,844.00 35.00 32.67 37.77 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 220.00 50.00 54.51 51.02 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 1,024.00 50.00 15.63 10.87 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 82.00 65.00 56.73 70.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 300.00 30.00 70.00 60.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 500.00 55.00 38.70 31.50 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 370.00 45.00 49.26 58.59 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 836.00 30.00 33.51 51.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 402.00 45.00 28.58 43.73 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 40.00 60.00 101.25 94.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,047.00 39.91 36.01 37.55 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 900.00 55.00 50.93 43.80 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 555.00 45.00 22.61 27.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 520.00 35.00 18.58 17.30 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 270.00 50.00 45.42 53.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 1,288.00 40.00 21.73 21.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 53.00 100.00 33.83 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,586.00 45.45 30.79 29.66 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 600.00 25.00 31.94 25.37 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 258.00 35.00 49.55 46.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 50.00 50.00 27.25 27.50 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 444.00 40.00 34.21 27.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 300.00 50.00 28.06 25.00 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 60.00 55.00 30.70 27.50 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 395.00 40.00 33.34 29.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 200.00 60.00 25.73 25.93 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 50.00 55.00 26.54 25.00 C R600-283 VARIOUS 08/10/06 52.00 100.00 184.73 27.00 STA 0405-031 US40 HUGO EAST 08/24/06 290.00 55.00 55.00 50.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 200.00 52.50 54.30 56.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,899.00 43.05 37.17 32.69 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 480 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00012 Pvmt Mkg Paint (Low VOC Solvent Base) Gallon ================================================= IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 580.00 35.00 159.97 160.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 1,232.00 44.00 20.79 23.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 996.00 40.00 22.73 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,808.00 40.72 43.34 49.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,340.00 41.53 36.98 37.15 =============== 627-00025 4 In Pvmt Mkg Tape (Rem) Lin Foot =============================================== STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 1,500.00 4.00 2.45 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,500.00 4.00 2.45 2.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 400.00 6.00 4.71 4.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 400.00 6.00 4.71 4.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,900.00 4.42 3.10 2.49 =============== 627-00029 24 In Pvmt Mkg Tape (Rem) Lin Foot =============================================== STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 97.00 16.00 16.75 15.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 97.00 16.00 16.75 15.75 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 291.00 20.00 19.68 22.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 291.00 15.00 29.01 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 582.00 17.50 23.92 26.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 679.00 17.29 22.38 24.54 =============== 627-00030 Raised Pvmt Marker (Temp) Each =================================================== NH 0342-042 US 34 AND US 36 CHIPSEALS - E 01/12/06 9,500.00 1.50 1.25 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,500.00 1.50 1.25 1.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 481 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00030 Raised Pvmt Marker (Temp) Each =================================================== IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 600.00 2.00 9.38 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 600.00 2.00 9.38 10.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,100.00 1.53 1.73 1.56 =============== 627-00032 Raised Flex Pvmt Marker (Temp) Each =================================================== STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 3,000.00 1.00 1.33 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,000.00 1.00 1.33 1.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,000.00 1.00 1.33 1.00 =============== 627-00060 Plastic Pvmt Mkg (60 Mils) Sq Foot ================================================ IM 0252-384 I-25 OVER BROADWAY 11/09/06 384.00 15.00 12.16 9.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 384.00 15.00 12.16 9.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 384.00 15.00 12.16 9.50 =============== 627-00070 Preform Thermoplastic Pvmt Mkg Sq Foot ================================================ IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 160.00 15.00 13.00 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 160.00 15.00 13.00 12.00 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 26.25 40.00 32.05 39.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.25 40.00 32.05 39.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 186.25 18.52 14.88 15.82 =============== 627-01001 Preform Plastic Pvmt Mkg (Ty I) Sq Foot ================================================ STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 948.00 10.00 15.45 14.35 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 482 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-01001 Preform Plastic Pvmt Mkg (Ty I) Sq Foot ================================================ IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 437.00 13.00 9.32 9.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 8,095.00 10.00 11.17 10.49 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 2,978.00 11.00 10.90 10.20 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 6,118.00 10.00 11.07 9.78 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 8,830.00 10.00 11.28 11.40 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1,000.00 10.00 11.59 9.45 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 3,696.00 11.00 9.97 9.31 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 142.00 18.00 16.74 11.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 2,077.00 11.00 11.42 9.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 34,321.00 10.33 11.17 10.47 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 9,302.00 9.75 10.59 9.20 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 2,931.00 11.00 10.61 10.50 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 650.00 10.00 12.01 12.70 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 1,240.00 11.00 11.52 10.50 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 9,349.00 11.00 10.32 8.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23,472.00 10.48 10.62 9.43 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 1,700.00 10.00 11.40 11.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 89.00 12.00 11.00 11.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 261.00 12.00 10.64 11.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 703.00 10.00 10.79 10.00 C R600-283 VARIOUS 08/10/06 197.00 12.00 14.28 13.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,950.00 10.37 11.23 10.96 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2,832.00 10.00 10.51 10.50 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 3,520.00 10.50 12.96 13.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 2,209.00 11.00 12.20 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,561.00 10.46 12.11 11.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 69,304.00 10.40 11.17 10.32 =============== 627-01003 Preform Plastic Pvmt Mkg (Ty A) (Inlaid) Sq Foot ================================================ IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 4,500.00 11.00 10.95 9.60 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 483 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-01003 Preform Plastic Pvmt Mkg (Ty A) (Inlaid) Sq Foot ================================================ IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 6,134.00 11.00 13.60 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,634.00 11.00 12.14 12.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,634.00 11.00 12.14 12.14 =============== 627-01010 Preform Plastic Pvmt Mkg (TY I)(Inlaid) Sq Foot ================================================ IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 5,400.00 10.00 11.80 11.40 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 1,956.00 17.00 12.22 12.59 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 1,790.00 15.00 16.83 16.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 4,712.00 11.00 12.00 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13,858.00 11.97 12.69 12.37 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 3,365.00 14.00 13.12 13.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,365.00 14.00 13.12 13.15 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1,026.00 14.00 13.22 13.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,026.00 14.00 13.22 13.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,249.00 12.46 12.81 12.58 =============== 627-02001 Preform Plastic Pvmt Mkg (Ty II) Sq Foot ================================================ NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 10,516.00 12.00 11.96 11.34 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 5,385.00 11.00 10.89 9.86 NH R200-140 I-25, SH 47, 50, 115 CRACK RE 03/30/06 10.00 35.00 34.25 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15,911.00 11.68 11.68 10.84 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 44,317.00 8.50 8.53 8.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 44,317.00 8.50 8.53 8.20 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 484 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-02001 Preform Plastic Pvmt Mkg (Ty II) Sq Foot ================================================ IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 7,824.00 11.00 10.45 9.50 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 583.00 12.00 10.54 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,407.00 11.07 10.45 9.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 68,635.00 9.55 9.66 8.98 =============== 627-02010 Preform Plastic Pvmt Mkg (Ty II)(Inlaid) Sq Foot ================================================ BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 80.00 60.00 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 80.00 60.00 100.00 100.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 5,593.00 11.50 10.94 10.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,593.00 11.50 10.94 10.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,673.00 12.18 11.25 11.42 =============== 627-03001 Preform Plastic Pvmt Mkg (Ty III) Sq Foot ================================================ IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 269.00 10.00 9.32 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 269.00 10.00 9.32 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 269.00 10.00 9.32 9.00 =============== 627-03003 Preform Plastic Pvmt Mkg (Ty C) (Inlaid) Sq Foot ================================================ STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 185.00 70.00 19.54 21.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 185.00 70.00 19.54 21.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 185.00 70.00 19.54 21.50 =============== 627-03010 Preform Plastic Pvmt Mkg(Ty III)(Inlaid) Sq Foot ================================================ SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 25.00 30.00 29.00 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 30.00 29.00 32.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 30.00 29.00 32.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 485 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30105 Pvmt Mkg Paint (WS) Sq Foot ================================================ C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 256.00 17.00 6.79 6.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 256.00 17.00 6.79 6.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 256.00 17.00 6.79 6.09 =============== 627-30205 Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 62.00 17.00 15.96 15.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 62.00 17.00 15.96 15.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 62.00 17.00 15.96 15.37 =============== 627-30210 Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 126.00 12.00 12.54 12.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 126.00 12.00 12.54 12.10 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 387.00 13.00 11.14 9.68 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 288.00 10.00 6.48 6.15 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 48.00 20.00 21.84 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 723.00 12.27 10.29 9.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 849.00 12.23 10.87 9.99 =============== 627-30324 Preform Plastic Pvmt Mkg (WS) (TY I) Sq Foot ================================================ CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 27.00 17.00 20.67 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 27.00 17.00 20.67 17.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 669.00 20.00 16.19 17.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 669.00 20.00 16.19 17.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 696.00 19.88 16.36 17.07 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 486 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30326 Preform Plastic Pvmt Mkg (WS) (Ty II) Sq Foot ================================================ STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 76.00 16.00 19.82 18.45 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 422.00 15.00 15.59 15.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 498.00 15.15 15.89 15.65 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 69.00 27.00 28.19 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 69.00 27.00 28.19 25.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 394.00 17.00 22.17 16.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 394.00 17.00 22.17 16.50 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 107.00 20.00 16.50 16.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 107.00 20.00 16.50 16.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,068.00 17.09 18.18 16.65 =============== 627-30327 Preform Plastic Pvmt Mkg (WS) (Ty III) Sq Foot ================================================ IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 580.00 17.00 16.24 13.95 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 331.00 17.00 18.75 15.75 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 138.00 18.00 15.61 15.33 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 85.00 16.00 17.71 20.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 140.00 18.00 16.38 17.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,274.00 17.15 17.05 15.32 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 423.00 15.00 16.06 15.65 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 406.00 17.00 16.30 16.15 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 132.00 17.00 16.95 17.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 487 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30327 Preform Plastic Pvmt Mkg (WS) (Ty III) Sq Foot ================================================ NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 323.00 16.00 16.72 14.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,284.00 16.09 16.40 15.76 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 708.00 15.00 15.81 15.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 509.00 15.00 16.25 16.50 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 116.00 17.00 17.09 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,333.00 15.17 16.13 15.66 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 147.00 17.00 16.30 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 147.00 17.00 16.30 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,038.00 16.16 16.54 15.60 =============== 627-30329 Preform Plastic Pvmt Mkg (XS) (TY I) Sq Foot ================================================ CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 160.00 8.00 15.42 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 160.00 8.00 15.42 13.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 2,142.00 12.00 11.84 12.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,142.00 12.00 11.84 12.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,302.00 11.72 12.09 12.55 =============== 627-30331 Preform Plastic Pvmt Mkg (XS) (Ty II) Sq Foot ================================================ IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 844.00 12.00 11.47 11.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 844.00 12.00 11.47 11.10 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 48.00 30.00 23.88 22.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 48.00 30.00 23.88 22.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 488 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30331 Preform Plastic Pvmt Mkg (XS) (Ty II) Sq Foot ================================================ STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 920.00 12.00 15.17 10.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 920.00 12.00 15.17 10.02 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 1,220.00 13.00 12.00 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,220.00 13.00 12.00 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,032.00 12.69 12.78 11.31 =============== 627-30332 Preform Plastic Pvmt Mkg (XS) (Ty III) Sq Foot ================================================ IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 707.00 10.00 14.28 15.40 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 1,200.00 10.00 13.29 10.87 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1,584.00 10.00 12.82 10.50 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 8,048.00 11.00 9.97 9.31 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 280.00 10.00 11.54 12.20 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 800.00 13.00 12.11 13.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,619.00 10.83 11.44 10.25 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 10,510.00 10.00 9.66 9.50 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 880.00 13.00 12.30 12.70 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 1,520.00 12.00 11.13 11.75 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 560.00 12.00 12.52 11.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,470.00 10.50 10.15 10.05 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 6,480.00 10.00 11.40 11.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1,860.00 12.00 11.00 11.00 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 652.00 13.00 12.20 11.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2,140.00 10.00 11.84 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,132.00 10.51 11.56 11.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 489 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30332 Preform Plastic Pvmt Mkg (XS) (Ty III) Sq Foot ================================================ NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 690.00 13.00 11.17 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 690.00 13.00 11.17 11.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37,911.00 10.66 11.01 10.41 =============== 627-30405 Preform Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 632.00 16.00 11.55 14.70 NH 0342-042 US 34 AND US 36 CHIPSEALS - E 01/12/06 1,034.00 12.00 17.50 15.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 107.00 14.00 15.33 14.70 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 312.00 15.00 15.20 16.02 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 276.00 16.00 25.01 28.75 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 257.00 15.00 16.63 17.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 84.50 18.00 15.33 18.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 132.00 17.00 17.20 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,834.50 14.37 16.76 16.83 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 240.00 18.00 16.61 16.13 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 214.00 12.00 14.27 15.00 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 59.00 18.00 18.00 18.00 NH 0341-067 ON US 34 IN LARIMER COUNTY. 05/25/06 44.50 20.00 20.00 20.00 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 107.00 17.00 15.40 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 664.50 16.04 15.76 15.37 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 283.00 14.75 16.81 17.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 856.00 15.00 15.70 15.50 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1,608.00 16.00 14.91 15.04 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 321.00 14.00 19.00 13.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 519.50 16.00 16.67 16.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 517.50 16.00 15.99 15.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 268.00 13.00 22.90 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,373.00 15.39 16.33 15.64 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 490 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30405 Preform Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 155.00 17.00 15.69 15.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 155.00 17.00 15.69 15.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,027.00 15.12 16.38 16.04 =============== 627-30407 Preform Thermoplastic Pvmt Mkg (WS)(Sp) Sq Foot ================================================ NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 675.00 20.00 22.50 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 675.00 20.00 22.50 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 675.00 20.00 22.50 20.00 =============== 627-30410 Preform Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 20.00 16.00 12.64 15.75 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 1,170.00 9.00 10.95 11.40 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 97.00 13.00 12.13 11.40 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 760.00 12.00 11.39 11.45 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 144.00 10.00 11.47 11.10 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 72.00 11.00 22.44 35.75 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 40.00 25.00 26.50 23.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 324.00 10.00 17.41 11.00 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 20.00 14.00 40.02 50.06 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 260.00 14.00 13.17 12.50 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 58.00 12.00 13.00 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,965.00 10.90 12.82 12.54 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 390.00 15.00 13.83 13.50 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 149.00 14.00 14.40 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 539.00 14.72 14.05 12.81 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 680.00 12.00 12.97 13.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 491 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30410 Preform Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 360.00 15.00 11.07 10.50 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1,801.00 12.00 9.84 9.85 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 924.00 12.00 15.00 12.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 396.00 12.00 11.93 12.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 714.00 10.00 11.83 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,875.00 11.93 11.60 11.09 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 114.00 13.00 15.20 12.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 108.00 13.00 28.25 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 222.00 13.00 20.83 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,601.00 11.78 12.37 11.72 =============== 627-30411 Preform Thermoplastic Pvmt Mkg (XS)(Sp) Sq Foot ================================================ NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 6,587.00 12.50 14.50 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,587.00 12.50 14.50 13.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,587.00 12.50 14.50 13.00 =============== 628-50000 Design Services Hour =================================================== ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 1,000.00 150.00 126.84 77.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,000.00 150.00 126.84 77.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,000.00 150.00 126.84 77.00 =============== 629-01001 Survey Monument (Ty 1) Each =================================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 15.00 300.00 252.60 210.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 3.00 600.00 311.75 682.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 350.00 260.76 288.67 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 7.00 250.00 415.00 330.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 492 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 629-01001 Survey Monument (Ty 1) Each =================================================== STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 30.00 200.00 210.80 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 37.00 209.46 223.56 305.68 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 35.00 300.00 146.51 310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35.00 300.00 146.51 310.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90.00 272.78 202.48 303.96 =============== 629-01002 Survey Monument (Ty 2) Each =================================================== NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 9.00 250.00 356.56 251.81 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 1.00 600.00 353.95 660.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 13.00 250.00 433.33 400.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 350.00 301.60 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 268.75 384.38 347.34 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 12.00 265.00 277.80 275.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 5.00 300.00 771.34 1000.00 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 1.00 375.00 657.50 315.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 9.00 450.00 380.33 331.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 27.00 337.22 470.79 429.41 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 350.00 435.59 300.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 1.00 1000.00 700.00 1000.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 1.00 1000.00 1473.69 947.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 783.33 672.41 749.12 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 3.00 400.00 631.20 446.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 400.00 631.20 446.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 57.00 335.18 453.55 412.56 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 493 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 629-01003 Survey Monument (Ty 3) Each =================================================== STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1.00 500.00 440.00 440.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 450.00 614.91 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 475.00 576.04 395.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 1.00 500.00 546.91 425.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 500.00 546.91 425.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 483.33 560.02 405.00 =============== 629-01005 Survey Monument (Ty 5) Each =================================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 350.00 455.00 315.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 350.00 455.00 315.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1.00 350.00 475.00 550.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2.00 300.00 210.38 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 316.67 243.46 416.67 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 1.00 350.00 180.81 420.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 350.00 180.81 420.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 330.00 272.09 397.00 =============== 629-01031 Survey Monument (Ty 3A) Each =================================================== STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 13.00 400.00 599.89 600.00 STA 0343-025 US 34, WRAY WEST 01/26/06 6.00 650.00 416.38 305.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 400.00 646.50 367.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 494 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 629-01031 Survey Monument (Ty 3A) Each =================================================== NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 1.00 750.00 734.70 1750.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 1.00 800.00 468.75 160.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 1.00 450.00 950.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 23.00 500.00 577.73 539.46 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 1.00 500.00 621.60 330.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 4.00 650.00 828.67 925.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 620.00 779.37 806.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 2.00 650.00 638.06 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 650.00 638.06 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 530.00 604.67 614.58 =============== 629-01050 Monument Box Each =================================================== STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 2.00 300.00 377.93 325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 300.00 377.93 325.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 300.00 377.93 325.00 =============== 629-01110 Locate Monuments Hour =================================================== NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 20.00 125.00 181.69 226.77 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 8.00 140.00 158.52 98.57 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 4.00 130.00 172.39 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32.00 129.38 175.82 188.25 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 50.00 150.00 128.01 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 150.00 128.01 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 82.00 141.95 143.52 146.63 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 495 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 629-01210 Adjust Monument Box Each =================================================== STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 4.00 350.00 300.00 250.00 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 4.00 250.00 461.59 336.35 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 1.00 400.00 900.00 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 311.11 426.18 305.04 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 1.00 300.00 1004.00 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 300.00 1004.00 550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 310.00 508.73 329.54 =============== 630-00000 Flagging Hour =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 9,900.00 25.00 21.20 21.00 SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 01/05/06 360.00 24.00 28.10 27.00 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 1,000.00 20.00 22.05 20.35 SHE 0091-025 SH 9 VMS IN BRECKENRIDGE 01/05/06 200.00 30.00 25.83 22.00 IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 1,500.00 23.00 23.72 22.60 IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 1,300.00 25.00 24.88 25.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 3,300.00 24.00 22.43 22.70 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 10,000.00 22.00 21.28 21.55 NH 0342-042 US 34 AND US 36 CHIPSEALS - E 01/12/06 1,000.00 22.00 18.50 22.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 1,500.00 21.00 22.03 22.60 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 7,000.00 22.00 21.38 22.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 4,000.00 22.00 22.14 20.50 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 6,000.00 25.00 21.25 22.75 STA 0343-025 US 34, WRAY WEST 01/26/06 4,000.00 22.00 21.06 21.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 15,296.00 22.00 21.88 22.89 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 600.00 22.00 23.48 22.00 STA 1131-005 SH 113 IN LOGAN COUNTY 02/02/06 900.00 22.00 17.75 12.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 1,600.00 22.00 25.57 31.75 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 400.00 25.00 22.25 12.72 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 2,500.00 28.00 27.00 28.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 1,440.00 23.00 22.20 21.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 480.00 25.00 21.97 20.50 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 1,500.00 25.00 24.89 21.77 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 1,600.00 25.00 24.87 27.49 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 2,500.00 25.00 23.05 23.92 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 500.00 22.00 23.51 23.40 SHE 2854-111 US 285 & C470 SIGNING 03/02/06 24.00 25.00 23.93 22.67 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 496 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00000 Flagging Hour =================================================== SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 300.00 24.00 27.92 30.00 SHE 0911-004 SH 91 & SH 67 GUARDRAIL 03/09/06 300.00 30.00 26.87 21.50 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 3,000.00 22.00 19.05 20.25 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 900.00 24.00 24.54 25.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 120.00 22.00 27.00 27.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 2,500.00 23.00 27.00 30.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 2,500.00 30.00 29.33 21.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 2,500.00 23.00 23.20 21.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 1,000.00 25.00 21.72 20.81 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 1,250.00 25.00 22.53 22.75 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 1,000.00 25.00 21.69 22.50 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 400.00 22.00 23.04 22.31 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 1,500.00 22.00 20.54 19.00 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 50.00 24.00 27.72 28.16 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 50.00 24.00 33.20 28.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 2,300.00 23.00 30.50 23.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 1,800.00 23.00 22.00 22.00 NH R200-140 I-25, SH 47, 50, 115 CRACK RE 03/30/06 2,220.00 22.00 22.38 23.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 500.00 25.00 21.94 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 104,590.00 23.34 22.40 22.48 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 300.00 22.00 26.40 29.50 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 2,000.00 25.00 14.63 21.90 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 250.00 23.00 24.37 23.65 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 1,000.00 25.00 21.13 22.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 13,000.00 23.00 17.83 1.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 5,000.00 22.00 21.62 22.50 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 1,600.00 23.00 25.36 26.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 1,600.00 25.00 22.30 21.90 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 900.00 25.00 23.68 25.00 SHE 052A-026 SH 52/ US 287 DILEMMA ZONE PR 04/27/06 240.00 23.00 24.06 27.29 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 27,000.00 21.00 21.25 20.85 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 2,300.00 24.00 27.05 23.10 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 5,000.00 23.00 22.50 22.00 NH 0341-067 ON US 34 IN LARIMER COUNTY. 05/25/06 1,500.00 22.00 16.50 5.00 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 350.00 24.00 25.50 25.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 3,600.00 22.00 23.83 23.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 10,000.00 22.00 21.50 25.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 1,200.00 25.00 23.15 20.00 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 450.00 25.00 25.81 29.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 2,900.00 33.00 25.20 25.20 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 1,110.00 22.00 20.50 22.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 240.00 21.00 23.75 23.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 4,500.00 23.00 25.69 24.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 86,040.00 22.65 21.50 19.04 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 497 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00000 Flagging Hour =================================================== C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 5,000.00 21.00 15.98 15.67 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 600.00 22.00 24.56 24.00 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 900.00 22.00 22.18 20.00 BR R400-203 FY 06 BRIDGE MAINTENANCE 07/20/06 1,000.00 24.00 20.20 18.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 500.00 23.00 23.05 23.10 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 1,100.00 25.00 24.25 24.50 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 1,000.00 25.00 21.62 22.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 1,440.00 25.00 25.21 27.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 2,800.00 28.00 22.06 24.17 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 2,000.00 25.00 23.60 22.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 15,000.00 23.00 21.10 20.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 12,000.00 23.00 19.50 20.00 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 1,700.00 40.00 25.80 25.20 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2,500.00 22.00 21.18 20.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 12,000.00 23.00 19.20 20.00 C R600-283 VARIOUS 08/10/06 250.00 26.00 21.47 20.55 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 2,250.00 24.00 21.00 22.00 STA 0405-031 US40 HUGO EAST 08/24/06 600.00 23.00 25.00 26.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 2,500.00 24.00 24.43 25.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 2,050.00 31.00 25.90 25.79 NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 600.00 28.00 23.67 21.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 5,280.00 22.00 20.59 19.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 250.00 24.00 26.43 30.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 376.00 23.00 24.00 25.00 IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 1,600.00 25.00 26.33 20.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 1,000.00 27.00 24.00 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 76,296.00 23.89 21.10 20.75 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 300.00 33.00 22.27 22.27 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 1,500.00 25.00 22.00 22.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 9,120.00 24.00 21.74 22.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 1,200.00 23.00 24.53 22.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 4,500.00 25.00 27.20 28.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 1,820.00 22.00 23.20 22.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 2,500.00 25.00 19.97 20.00 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 100.00 24.00 20.80 19.00 C 0252-389 BRONCO ARCH BRIDGE OVER THE S 11/29/06 200.00 20.00 25.63 25.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 2,000.00 25.00 28.16 22.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 2,000.00 25.00 27.67 30.60 IM R600-292 70TH AVE AT I-25/BLAKE AND 20 11/30/06 105.00 25.00 22.47 35.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 498 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00000 Flagging Hour =================================================== BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 320.00 22.00 23.01 22.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 2,000.00 27.00 23.74 25.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 4,000.00 21.00 20.26 22.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 1,250.00 25.00 21.50 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 32,915.00 24.13 22.96 23.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 299,841.00 23.37 21.92 21.16 =============== 630-00001 Pilot Car Operation Hour =================================================== NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 590.00 40.00 41.70 36.80 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 1,000.00 35.00 32.23 30.45 NH 0342-042 US 34 AND US 36 CHIPSEALS - E 01/12/06 500.00 35.00 30.00 25.00 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 700.00 33.00 43.60 42.00 STA 0343-025 US 34, WRAY WEST 01/26/06 400.00 33.00 42.13 40.00 STA 1131-005 SH 113 IN LOGAN COUNTY 02/02/06 100.00 40.00 47.25 25.00 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 170.00 40.00 56.00 56.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,460.00 35.61 39.49 35.28 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 450.00 40.00 40.40 39.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 5,640.00 35.00 38.83 38.10 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 600.00 40.00 38.33 39.00 NH 0341-067 ON US 34 IN LARIMER COUNTY. 05/25/06 450.00 35.00 32.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,140.00 35.74 38.67 36.46 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 480.00 40.00 48.16 77.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 480.00 40.00 48.16 77.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 20.00 35.00 50.72 52.00 SHE 0503-067 US 50, WEST OF CANON CITY 11/30/06 270.00 50.00 41.45 30.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 290.00 48.97 42.09 32.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,370.00 36.21 39.90 37.71 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 499 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00003 Uniformed Traf Ctrl Hour =================================================== STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 48.00 70.00 74.79 71.03 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 8.00 60.00 66.96 70.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 1,000.00 65.00 73.45 65.31 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 200.00 70.00 69.75 71.01 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 10.00 70.00 76.81 81.53 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 750.00 60.00 91.25 90.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 36.00 75.00 71.25 72.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,052.00 63.96 79.46 75.25 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 200.00 70.00 78.29 80.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 125.00 80.00 80.77 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 325.00 73.85 78.88 78.08 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 200.00 80.00 68.40 63.00 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 300.00 55.00 74.80 73.50 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 250.00 80.00 64.60 60.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 750.00 70.00 69.30 66.37 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 232.00 80.00 67.64 63.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 64.00 80.00 68.31 70.85 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 200.00 70.00 67.88 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 496.00 75.97 67.85 70.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,623.00 67.74 75.21 73.06 =============== 630-00004 Traf Ctrl Vehicle Each =================================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 2.00 3500.00 7464.90 17600.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 2.00 7500.00 4141.43 3265.72 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 1.00 3300.00 3227.15 4008.60 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 1.00 3000.00 2066.19 1087.12 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 500 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00004 Traf Ctrl Vehicle Each =================================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 3500.00 3785.00 2625.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 1.00 3000.00 2608.55 3285.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 4350.00 4439.91 6592.23 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 1.00 3000.00 3689.93 5400.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 1.00 2500.00 4281.66 3460.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 1.00 4000.00 3464.21 3500.00 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 1.00 7500.00 2663.60 2830.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 4250.00 3473.14 3797.50 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 1.00 3000.00 3395.00 3400.00 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 1.00 3500.00 4890.00 7700.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 2.00 4000.00 4719.18 4500.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 2.00 3500.00 5432.10 5200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 3583.33 4759.85 5083.33 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 3.00 3500.00 3202.45 5200.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 1.00 5000.00 1546.46 1050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 3875.00 2675.54 4162.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 4036.36 4002.26 5230.81 =============== 630-00007 Traf Ctrl Inspection Day ==================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 50.00 125.00 86.85 89.25 SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 01/05/06 30.00 90.00 86.30 55.00 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 30.00 80.00 79.20 32.00 STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 30.00 140.00 60.48 29.60 IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 10.00 100.00 100.32 61.60 IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 29.00 125.00 151.34 165.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 27.00 125.00 75.15 75.60 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 50.00 90.00 76.35 77.70 NH 0342-042 US 34 AND US 36 CHIPSEALS - E 01/12/06 10.00 150.00 75.00 50.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 501 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00007 Traf Ctrl Inspection Day ==================================================== STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 105.00 90.00 51.10 51.30 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 30.00 100.00 111.67 100.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 30.00 160.00 84.97 105.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 36.00 170.00 138.00 110.00 STA 0343-025 US 34, WRAY WEST 01/26/06 40.00 100.00 100.28 86.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 220.00 90.00 73.94 68.68 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 54.00 100.00 88.48 77.00 STA 1131-005 SH 113 IN LOGAN COUNTY 02/02/06 13.00 140.00 88.75 100.00 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 4.00 130.00 76.38 73.50 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 45.00 90.00 70.79 55.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 50.00 180.00 175.00 180.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 20.00 100.00 82.13 70.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 160.00 125.00 72.65 76.50 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 26.00 125.00 82.36 54.43 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 30.00 125.00 101.16 91.62 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 35.00 125.00 93.47 97.84 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 45.00 80.00 85.90 77.00 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 20.00 85.00 150.27 168.50 SHE 0911-004 SH 91 & SH 67 GUARDRAIL 03/09/06 30.00 110.00 82.05 53.50 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 80.00 80.00 131.38 98.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 35.00 65.00 61.94 55.70 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 30.00 90.00 119.20 125.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 28.00 90.00 153.00 153.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 43.00 120.00 122.50 120.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 75.00 200.00 201.67 100.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 165.00 125.00 110.45 131.25 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 34.00 125.00 87.34 87.62 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 35.00 125.00 88.94 110.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 39.00 90.00 52.88 42.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 34.00 120.00 111.25 106.26 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 25.00 130.00 91.25 80.00 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 16.00 80.00 85.00 85.00 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 10.00 140.00 71.36 75.09 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 10.00 140.00 83.00 77.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 64.00 120.00 201.50 125.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 38.00 120.00 120.00 120.00 NH R200-140 I-25, SH 47, 50, 115 CRACK RE 03/30/06 22.00 75.00 58.50 30.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 12.00 90.00 32.33 50.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 17.00 130.00 91.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,071.00 113.42 95.00 89.41 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 30.00 80.00 77.10 73.50 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 35.00 70.00 170.67 219.00 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 24.00 80.00 96.30 107.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 502 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00007 Traf Ctrl Inspection Day ==================================================== STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 19.00 130.00 117.50 100.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 115.00 125.00 157.79 150.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 25.00 100.00 103.97 95.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 60.00 125.00 105.87 92.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 20.00 125.00 88.65 92.25 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 15.00 125.00 99.94 105.00 SHE 052A-026 SH 52/ US 287 DILEMMA ZONE PR 04/27/06 6.00 120.00 105.10 93.02 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 43.00 110.00 159.29 156.37 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 65.00 125.00 152.50 105.00 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 45.00 120.00 88.00 90.00 NH 0341-067 ON US 34 IN LARIMER COUNTY. 05/25/06 10.00 100.00 75.00 50.00 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 18.00 100.00 107.11 94.21 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 8.00 125.00 90.00 70.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 32.00 110.00 114.50 108.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 150.00 120.00 145.00 160.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 50.00 125.00 103.52 80.00 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 18.00 125.00 57.20 50.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 60.00 230.00 102.00 102.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 100.00 85.00 107.19 150.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 8.00 80.00 67.33 45.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 55.00 150.00 103.08 99.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,011.00 120.65 117.01 121.78 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 160.00 110.00 226.50 266.49 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 50.00 100.00 194.72 225.00 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 16.00 100.00 80.00 80.00 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 35.00 55.00 94.24 26.25 BR R400-203 FY 06 BRIDGE MAINTENANCE 07/20/06 15.00 120.00 53.00 50.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 10.00 80.00 110.00 110.00 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 25.00 125.00 124.00 98.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 200.00 120.00 64.86 66.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 120.00 200.00 148.66 110.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 24.00 140.00 104.77 94.30 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 25.00 120.00 88.20 66.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 455.00 120.00 67.56 65.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 332.00 100.00 77.18 73.70 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 32.00 250.00 148.35 113.40 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 300.00 125.00 112.24 150.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 233.00 125.00 62.49 60.00 C R600-283 VARIOUS 08/10/06 20.00 125.00 124.33 108.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 36.00 100.00 52.50 55.00 STA 0405-031 US40 HUGO EAST 08/24/06 15.00 95.00 100.00 80.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 28.00 100.00 109.41 85.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 53.00 125.00 107.90 115.79 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 503 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00007 Traf Ctrl Inspection Day ==================================================== NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 40.00 100.00 106.67 80.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 128.00 80.00 109.18 100.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 25.00 110.00 112.66 86.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 12.00 120.00 155.00 160.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 670.00 130.00 107.91 96.72 IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 20.00 80.00 135.67 112.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 40.00 90.00 101.09 94.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,119.00 120.65 102.44 100.06 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 60.00 180.00 117.23 117.23 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 22.00 150.00 150.00 150.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 250.00 100.00 77.72 68.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 40.00 100.00 84.41 90.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 25.00 125.00 137.80 105.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 30.00 80.00 79.43 55.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 40.00 120.00 79.26 71.00 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 57.00 140.00 173.40 165.00 C 0252-389 BRONCO ARCH BRIDGE OVER THE S 11/29/06 4.00 150.00 112.50 125.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 20.00 125.00 181.25 100.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 35.00 150.00 160.00 223.00 IM R600-292 70TH AVE AT I-25/BLAKE AND 20 11/30/06 2.00 85.00 85.82 60.00 SHE 0503-067 US 50, WEST OF CANON CITY 11/30/06 10.00 120.00 67.59 55.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 64.00 130.00 92.17 80.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 50.00 125.00 147.96 155.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 130.00 260.00 185.64 155.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 75.00 125.00 82.49 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 914.00 141.00 108.21 106.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,115.00 121.16 102.56 100.89 =============== 630-00009 Traf Ctrl Vehicle (Truck) Each =================================================== NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 1.00 14000.00 30463.09 40000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 14000.00 30463.09 40000.00 C R600-283 VARIOUS 08/10/06 1.00 12000.00 7885.00 5405.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 12000.00 7885.00 5405.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 504 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00009 Traf Ctrl Vehicle (Truck) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 2.00 10000.00 14141.06 38000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 10000.00 14141.06 38000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 11500.00 16877.53 30351.25 =============== 630-00011 Courtesy Vehicle Day ==================================================== IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 30.00 600.00 1000.00 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 600.00 1000.00 900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 600.00 1000.00 900.00 =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 110.00 425.00 444.10 430.50 SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 01/05/06 105.00 450.00 446.90 405.00 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 50.00 400.00 445.40 375.00 SHE 0091-025 SH 9 VMS IN BRECKENRIDGE 01/05/06 32.00 500.00 394.13 200.00 STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 30.00 440.00 532.36 651.13 IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 40.00 450.00 490.40 462.00 IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 170.00 450.00 558.15 575.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 100.00 450.00 448.20 442.80 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 85.00 450.00 429.75 409.50 NH 0342-042 US 34 AND US 36 CHIPSEALS - E 01/12/06 35.00 440.00 175.00 150.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 115.00 420.00 393.23 389.70 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 110.00 400.00 445.00 435.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 60.00 420.00 488.86 525.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 84.00 750.00 958.33 975.00 STA 0343-025 US 34, WRAY WEST 01/26/06 90.00 400.00 500.18 540.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 239.00 450.00 434.57 457.83 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 74.00 450.00 429.52 363.00 STA 1131-005 SH 113 IN LOGAN COUNTY 02/02/06 34.00 430.00 368.75 100.00 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 30.00 450.00 468.55 495.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 100.00 400.00 439.64 435.00 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 70.00 400.00 356.02 212.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 100.00 660.00 726.67 900.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 40.00 450.00 455.80 450.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 300.00 450.00 451.74 400.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 505 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 63.00 450.00 537.61 435.43 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 70.00 450.00 507.62 555.48 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 70.00 450.00 528.09 543.56 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 100.00 420.00 488.90 500.00 SHE 2854-111 US 285 & C470 SIGNING 03/02/06 45.00 400.00 254.78 228.89 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 40.00 450.00 561.75 530.00 SHE 0911-004 SH 91 & SH 67 GUARDRAIL 03/09/06 75.00 500.00 485.75 430.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 15.00 450.00 499.33 385.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 75.00 440.00 521.20 550.00 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 55.00 450.00 462.60 450.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 80.00 430.00 490.00 490.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 106.00 550.00 672.50 820.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 75.00 650.00 570.00 400.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 245.00 450.00 500.50 472.50 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 50.00 450.00 529.20 547.61 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 70.00 450.00 502.63 570.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 100.00 500.00 465.50 487.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 100.00 450.00 542.44 584.42 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 50.00 400.00 495.25 450.00 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 25.00 400.00 480.21 505.62 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 25.00 440.00 445.77 540.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 135.00 550.00 679.00 525.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 65.00 550.00 600.00 600.00 NH R200-140 I-25, SH 47, 50, 115 CRACK RE 03/30/06 45.00 420.00 484.75 440.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 45.00 300.00 412.50 490.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,027.00 462.94 486.64 488.51 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 75.00 450.00 520.50 577.50 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 55.00 450.00 415.65 547.00 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 70.00 450.00 454.00 300.00 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 25.00 500.00 537.50 400.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 250.00 450.00 559.94 500.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 50.00 450.00 495.53 460.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 60.00 450.00 570.33 575.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 50.00 450.00 671.65 690.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 50.00 450.00 489.77 485.00 SHE 052A-026 SH 52/ US 287 DILEMMA ZONE PR 04/27/06 15.00 400.00 379.66 533.31 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 341.00 440.00 1160.17 700.00 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 120.00 500.00 583.50 567.00 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 60.00 450.00 488.33 510.00 NH 0341-067 ON US 34 IN LARIMER COUNTY. 05/25/06 25.00 400.00 375.00 50.00 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 20.00 450.00 464.00 430.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 75.00 700.00 803.25 750.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 350.00 450.00 437.50 525.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 506 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 115.00 450.00 554.85 475.00 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 65.00 550.00 455.20 575.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 125.00 650.00 516.00 516.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 50.00 420.00 423.25 450.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 30.00 400.00 498.33 530.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 120.00 600.00 628.60 610.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,196.00 480.55 623.07 550.56 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 300.00 420.00 496.50 727.49 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 130.00 450.00 364.31 425.00 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 45.00 450.00 561.50 420.00 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 75.00 375.00 559.26 682.50 BR R400-203 FY 06 BRIDGE MAINTENANCE 07/20/06 35.00 450.00 691.00 430.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 40.00 550.00 440.00 440.00 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 60.00 575.00 453.50 407.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 300.00 550.00 472.54 493.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 180.00 460.00 539.30 510.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 60.00 600.00 486.39 489.18 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 63.00 550.00 500.80 429.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 395.00 450.00 605.34 500.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 340.00 450.00 394.36 347.45 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 41.00 600.00 524.53 548.10 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 390.00 550.00 453.37 440.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 460.00 450.00 439.46 500.00 C R600-283 VARIOUS 08/10/06 75.00 500.00 520.42 515.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 90.00 500.00 450.00 500.00 STA 0405-031 US40 HUGO EAST 08/24/06 20.00 450.00 498.33 410.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 69.00 450.00 577.79 500.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 115.00 575.00 471.71 468.42 NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 60.00 625.00 466.67 400.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 147.00 450.00 424.28 390.00 AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR 09/14/06 155.00 500.00 441.24 20.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 25.00 450.00 517.26 535.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 27.00 500.00 560.00 620.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 300.00 450.00 469.12 435.35 IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 55.00 550.00 473.33 355.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 95.00 450.00 421.45 362.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,147.00 483.00 479.30 461.95 STA R600-279 SH 121 (WADSWORTH) FROM KEN C 10/05/06 80.00 100.00 371.67 100.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 507 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 105.00 550.00 527.55 527.55 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 60.00 500.00 550.00 550.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 400.00 500.00 486.20 574.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 100.00 500.00 456.28 450.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 60.00 500.00 675.00 685.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 70.00 525.00 462.47 612.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 85.00 420.00 399.95 355.00 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 20.00 550.00 442.33 435.00 C 0252-389 BRONCO ARCH BRIDGE OVER THE S 11/29/06 10.00 200.00 540.63 500.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 50.00 550.00 543.75 500.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 85.00 500.00 606.40 637.00 IM R600-292 70TH AVE AT I-25/BLAKE AND 20 11/30/06 15.00 500.00 450.19 480.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 80.00 500.00 439.14 425.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 100.00 500.00 491.37 515.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 444.00 360.00 383.05 420.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 120.00 500.00 530.71 720.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,884.00 450.39 460.82 500.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,254.00 470.96 496.77 492.53 =============== 630-00013 Traf Ctrl Mgmt with Flagging Day ==================================================== SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 40.00 720.00 440.00 440.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 30.00 600.00 316.67 375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70.00 668.57 354.62 412.14 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 50.00 530.00 514.91 579.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 530.00 514.91 579.81 SHE 0503-067 US 50, WEST OF CANON CITY 11/30/06 30.00 650.00 629.12 687.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30.00 650.00 629.12 687.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 618.67 505.15 523.10 =============== 630-00015 Uniformed Traf Ctrl Coordination Hour =================================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 2,640.00 55.00 14.20 2.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 508 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00015 Uniformed Traf Ctrl Coordination Hour =================================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 300.00 45.00 33.77 57.75 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 250.00 50.00 19.17 21.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,190.00 53.67 16.34 9.22 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 100.00 50.00 15.88 13.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 300.00 55.00 59.88 74.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 400.00 53.75 48.88 59.46 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 50.00 60.00 82.25 82.50 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 500.00 80.00 53.42 30.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 700.00 60.00 51.86 60.00 C R600-283 VARIOUS 08/10/06 130.00 60.00 63.72 75.65 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 100.00 62.00 74.11 85.34 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,480.00 66.89 54.65 53.71 IM 0252-384 I-25 OVER BROADWAY 11/09/06 200.00 60.00 50.32 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 60.00 50.32 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,270.00 57.63 31.03 25.78 =============== 630-00020 Traf Ctrl Vehicle Day ==================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 300.00 1131.33 205.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 300.00 1131.33 205.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 300.00 1131.33 205.00 =============== 630-00025 Traf Ctrl Vehicle Hour =================================================== NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 125.00 20.00 22.93 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 125.00 20.00 22.93 21.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 509 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00025 Traf Ctrl Vehicle Hour =================================================== NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 200.00 20.00 19.58 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 20.00 19.58 17.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 325.00 20.00 20.29 18.54 =============== 630-10005 Traf Ctrl LUMP SUM =============================================== AQC R600-241 SH 287 (FEDERAL BLVD), 52ND A 03/16/06 1.00 5000.00 13409.07 19250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 13409.07 19250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 13409.07 19250.00 =============== 630-80001 Flash Beacon (Port) Each =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 2.00 1000.00 550.00 525.00 IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 12.00 1000.00 1488.74 1600.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 3.00 825.00 540.67 525.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 4.00 1500.00 671.67 110.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 4.00 800.00 1061.63 1030.13 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 4.00 750.00 324.91 110.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 8.00 800.00 1616.67 1900.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2.00 1750.00 1177.10 1530.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 4.00 1300.00 865.50 762.00 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 4.00 1000.00 1012.95 869.69 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 2.00 600.00 726.25 715.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 8.00 750.00 992.00 630.00 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 4.00 800.00 1033.19 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 61.00 953.69 1053.26 994.79 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 4.00 600.00 1623.75 1343.75 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 4.00 700.00 459.50 200.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 4.00 1000.00 1286.44 1190.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 6.00 800.00 532.08 521.25 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 3.00 120.00 383.75 110.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 510 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80001 Flash Beacon (Port) Each =================================================== NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 4.00 1000.00 1146.70 1050.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 2.00 525.00 650.88 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 27.00 718.89 941.88 740.46 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 4.00 1000.00 862.00 209.01 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 6.00 1000.00 591.49 800.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 4.00 900.00 1336.30 2300.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 3.00 1000.00 1131.00 943.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 4.00 1100.00 627.85 600.00 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 4.00 600.00 857.00 1008.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 4.00 800.00 974.90 1000.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 12.00 1500.00 935.35 622.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 2.00 600.00 662.26 548.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 43.00 1065.12 896.34 852.49 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 8.00 800.00 1124.38 840.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 4.00 600.00 816.86 545.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 2.00 1000.00 1131.40 637.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 4.00 1000.00 644.40 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 822.22 917.02 607.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 149.00 927.42 970.00 860.84 =============== 630-80002 Flash Beacon (Solar) Each =================================================== BR 069A-019 SH 69, ROSITA CREEK 03/09/06 6.00 750.00 666.29 550.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 8.00 750.00 223.60 225.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 8.00 700.00 340.00 340.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 731.82 424.41 355.45 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 8.00 700.00 507.00 210.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 8.00 650.00 965.71 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 675.00 638.06 605.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 511 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80002 Flash Beacon (Solar) Each =================================================== STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 3.00 500.00 837.80 525.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 4.00 1500.00 715.79 341.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 1071.43 797.13 420.06 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 8.00 700.00 441.67 375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 700.00 441.67 375.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 53.00 754.72 553.39 442.27 =============== 630-80305 Flagging Station Light Each =================================================== STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 2.00 1300.00 1466.67 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1300.00 1466.67 1500.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 2.00 1500.00 668.88 522.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1500.00 668.88 522.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1400.00 1010.79 1011.27 =============== 630-80333 Barricade (3 F-C) (Temp) Each =================================================== STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 2.00 1500.00 1990.00 1980.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1500.00 1990.00 1980.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1500.00 1990.00 1980.00 =============== 630-80335 Barricade (3 M-A) (Temp) Each =================================================== IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 6.00 175.00 168.33 110.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 512 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80335 Barricade (3 M-A) (Temp) Each =================================================== IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 13.00 350.00 270.00 250.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 4.00 300.00 164.72 108.86 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 4.00 250.00 222.35 163.07 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 8.00 180.00 75.17 49.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 40.00 200.00 246.00 210.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 20.00 300.00 180.43 164.28 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 20.00 250.00 165.64 220.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 2.00 300.00 213.27 212.52 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 2.00 250.00 60.19 62.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 119.00 246.55 201.46 185.09 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 2.00 180.00 133.90 100.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 4.00 150.00 135.90 130.00 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 4.00 500.00 115.75 31.50 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 12.00 150.00 50.37 50.73 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 2.00 300.00 178.05 175.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 4.00 250.00 133.67 105.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 2.00 300.00 180.00 180.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 2.00 300.00 98.67 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 236.25 110.09 84.21 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 10.00 250.00 230.70 180.00 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 6.00 185.00 152.75 110.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 6.00 250.00 222.20 250.00 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 6.00 250.00 180.00 110.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 2.00 200.00 126.32 105.29 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 6.00 700.00 174.38 157.50 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 30.00 200.00 228.71 250.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 12.00 80.00 206.54 208.00 NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 2.00 175.00 250.00 200.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 30.00 150.00 216.35 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 110.00 209.27 214.69 201.56 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 44.00 250.00 132.98 220.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 5.00 250.00 192.41 105.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 8.00 350.00 132.05 120.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 513 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80335 Barricade (3 M-A) (Temp) Each =================================================== C 0252-389 BRONCO ARCH BRIDGE OVER THE S 11/29/06 8.00 100.00 131.25 200.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 2.00 200.00 390.10 318.50 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 20.00 160.00 127.71 105.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 2.00 200.00 118.70 125.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 4.00 200.00 166.94 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 93.00 222.04 142.04 172.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 354.00 227.60 182.58 177.86 =============== 630-80336 Barricade (3 M-B) (Temp) Each =================================================== STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 6.00 250.00 303.42 295.97 IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 20.00 500.00 324.69 400.00 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 6.00 190.00 115.10 130.20 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 2.00 300.00 163.37 205.10 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 14.00 280.00 236.38 228.92 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 3.00 300.00 206.24 205.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 3.00 300.00 90.00 85.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 6.00 300.00 283.33 100.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 5.00 400.00 450.00 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 65.00 350.15 270.07 282.95 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 10.00 320.00 372.46 364.87 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 6.00 400.00 165.75 31.50 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 3.00 350.00 348.75 310.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 4.00 300.00 305.24 300.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 2.00 250.00 185.44 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 25.00 334.00 307.39 257.11 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 3.00 250.00 164.48 157.93 C R600-283 VARIOUS 08/10/06 4.00 400.00 267.92 245.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 8.00 200.00 167.50 175.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 6.00 250.00 141.45 157.89 NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 4.00 250.00 483.33 400.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 2.00 240.00 209.50 150.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 2.00 230.00 180.00 110.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 11.00 590.00 150.22 79.65 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 514 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80336 Barricade (3 M-B) (Temp) Each =================================================== IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 5.00 425.00 356.67 205.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 2.00 200.00 198.32 206.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 47.00 349.04 223.68 175.20 IM 0252-384 I-25 OVER BROADWAY 11/09/06 1.00 250.00 244.26 170.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 8.00 300.00 230.00 200.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 3.00 600.00 430.78 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 370.83 286.83 278.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 149.00 348.76 264.77 244.29 =============== 630-80337 Barricade (3 M-C) (Temp) Each =================================================== STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 4.00 250.00 316.77 410.30 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 6.00 350.00 250.00 128.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 310.00 272.26 240.92 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 4.00 300.00 428.08 290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 300.00 428.08 290.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 2.00 325.00 691.95 783.78 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 2.00 1500.00 275.00 275.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 12.00 280.00 262.12 230.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 65.00 500.00 632.85 600.00 NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 1.00 270.00 683.33 600.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 880.00 177.91 96.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 83.00 489.88 554.83 537.04 IM 0252-384 I-25 OVER BROADWAY 11/09/06 6.00 250.00 331.79 225.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 515 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80337 Barricade (3 M-C) (Temp) Each =================================================== IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 8.00 350.00 250.07 218.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 307.14 287.79 221.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 111.00 443.78 486.27 461.60 =============== 630-80338 Barricade (3 M-D) (Temp) Each =================================================== IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 2.00 500.00 457.86 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 500.00 457.86 450.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 500.00 457.86 450.00 =============== 630-80341 Const Traf Sign (A) Each =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 53.00 55.00 67.20 63.00 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 4.00 70.00 42.19 10.70 SHE 0091-025 SH 9 VMS IN BRECKENRIDGE 01/05/06 2.00 75.00 43.66 50.00 STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 14.00 65.00 38.29 29.60 IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 18.00 50.00 74.20 51.00 IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 65.00 100.00 107.90 130.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 39.00 65.00 76.40 75.60 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 2.00 70.00 45.73 51.45 NH 0342-042 US 34 AND US 36 CHIPSEALS - E 01/12/06 6.00 60.00 75.00 50.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 19.00 55.00 42.67 41.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 18.00 65.00 67.61 42.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 26.00 80.00 65.67 55.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 37.00 60.00 44.82 45.78 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 14.00 50.00 56.74 55.00 STA 1131-005 SH 113 IN LOGAN COUNTY 02/02/06 2.00 65.00 50.00 50.00 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 12.00 60.00 38.24 28.25 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 18.00 60.00 31.65 22.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 6.00 80.00 68.00 64.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 25.00 65.00 54.40 50.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 77.00 70.00 64.61 97.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 46.00 80.00 61.42 32.66 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 12.00 60.00 59.93 68.72 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 28.00 60.00 80.57 92.41 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 43.00 45.00 36.49 17.00 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 104.00 60.00 55.99 54.00 SHE 0911-004 SH 91 & SH 67 GUARDRAIL 03/09/06 2.00 60.00 49.43 20.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 22.00 40.00 21.98 11.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 34.00 40.00 17.74 12.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 516 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80341 Const Traf Sign (A) Each =================================================== SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 36.00 60.00 64.06 65.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 44.00 55.00 49.00 49.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 36.00 70.00 72.50 80.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 2.00 100.00 80.00 30.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 149.00 60.00 66.75 78.75 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 134.00 60.00 51.25 54.76 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 139.00 50.00 52.46 45.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 7.00 60.00 34.63 18.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 18.00 75.00 69.95 79.69 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 4.00 70.00 61.39 50.00 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 2.00 40.00 28.00 28.00 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 8.00 60.00 24.01 25.03 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 4.00 60.00 50.07 65.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 115.00 60.00 80.00 50.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 10.00 60.00 65.00 65.00 NH R200-140 I-25, SH 47, 50, 115 CRACK RE 03/30/06 16.00 45.00 23.25 20.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 1.00 55.00 40.33 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,473.00 61.30 60.05 58.22 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 4.00 60.00 64.17 71.00 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 12.00 60.00 50.95 53.75 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 4.00 80.00 45.00 50.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 41.00 55.00 30.84 15.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 44.00 60.00 48.46 43.20 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 86.00 60.00 48.57 46.10 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 16.00 60.00 70.26 75.00 SHE 052A-026 SH 52/ US 287 DILEMMA ZONE PR 04/27/06 12.00 50.00 61.92 49.61 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 15.00 90.00 137.19 130.31 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 38.00 60.00 56.75 31.50 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 25.00 60.00 78.33 80.00 NH 0341-067 ON US 34 IN LARIMER COUNTY. 05/25/06 13.00 65.00 45.00 75.00 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 35.00 65.00 39.24 43.48 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 12.00 65.00 39.00 35.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 6.00 115.00 104.75 95.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 117.00 65.00 94.07 95.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 78.00 60.00 68.80 63.00 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 10.00 85.00 34.12 40.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 32.00 85.00 48.00 48.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 6.00 50.00 62.11 80.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 17.00 60.00 60.67 55.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 36.00 60.00 67.35 65.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 659.00 63.66 61.31 60.34 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 95.00 55.00 63.51 47.02 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 517 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80341 Const Traf Sign (A) Each =================================================== BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 42.00 60.00 83.91 115.00 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 44.00 60.00 75.15 70.00 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 8.00 55.00 57.45 26.25 BR R400-203 FY 06 BRIDGE MAINTENANCE 07/20/06 8.00 60.00 53.00 50.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 8.00 60.00 55.00 55.00 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 4.00 70.00 36.50 23.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 38.00 60.00 96.79 100.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 58.00 60.00 55.87 85.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 18.00 60.00 67.38 47.15 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 16.00 60.00 69.20 44.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 84.00 70.00 94.93 90.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 19.00 55.00 56.91 52.64 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 22.00 100.00 39.95 37.80 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 149.00 60.00 82.32 75.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 185.00 75.00 86.73 93.00 C R600-283 VARIOUS 08/10/06 32.00 60.00 64.92 70.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 32.00 60.00 37.50 55.00 STA 0405-031 US40 HUGO EAST 08/24/06 4.00 110.00 63.00 29.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 13.00 75.00 38.16 26.32 NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 13.00 50.00 65.00 65.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 142.00 60.00 70.71 65.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 2.00 65.00 27.30 24.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 9.00 55.00 56.00 62.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 121.00 110.00 51.65 73.96 IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 13.00 70.00 70.33 66.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 12.00 55.00 38.03 32.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,191.00 68.63 73.53 72.97 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 18.00 100.00 75.00 75.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 167.00 60.00 76.83 94.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 38.00 60.00 65.88 55.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 36.00 70.00 73.40 46.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 16.00 60.00 95.57 38.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 33.00 75.00 79.37 83.00 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 14.00 60.00 19.13 17.00 C 0252-389 BRONCO ARCH BRIDGE OVER THE S 11/29/06 10.00 120.00 52.50 80.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 24.00 70.00 62.00 50.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 80.00 80.00 68.74 63.70 SHE 0503-067 US 50, WEST OF CANON CITY 11/30/06 4.00 60.00 33.51 11.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 11.00 60.00 70.29 65.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 40.00 60.00 23.74 25.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 118.00 30.00 62.66 105.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 78.00 60.00 54.40 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 687.00 60.69 66.92 70.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,010.00 63.76 65.81 65.09 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 518 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80342 Const Traf Sign (B) Each =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 118.00 75.00 80.50 73.50 SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 01/05/06 84.00 80.00 59.60 55.00 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 43.00 100.00 51.39 10.70 SHE 0091-025 SH 9 VMS IN BRECKENRIDGE 01/05/06 15.00 80.00 47.13 65.00 STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 27.00 75.00 41.86 29.60 IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 56.00 70.00 85.40 51.00 IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 126.00 100.00 107.90 135.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 123.00 70.00 77.65 75.60 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 133.00 80.00 56.23 72.45 NH 0342-042 US 34 AND US 36 CHIPSEALS - E 01/12/06 74.00 70.00 87.50 75.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 18.00 60.00 45.33 41.00 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 89.00 80.00 78.33 85.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 110.00 80.00 89.13 42.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 141.00 90.00 79.00 55.00 STA 0343-025 US 34, WRAY WEST 01/26/06 89.00 80.00 76.64 75.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 94.00 100.00 107.40 103.01 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 44.00 80.00 72.85 60.50 STA 1131-005 SH 113 IN LOGAN COUNTY 02/02/06 32.00 75.00 72.50 75.00 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 42.00 70.00 83.13 52.50 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 48.00 70.00 47.47 33.00 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 38.00 60.00 52.13 53.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 71.00 90.00 97.00 96.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 46.00 75.00 61.33 60.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 50.00 150.00 91.15 132.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 58.00 130.00 60.79 32.66 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 48.00 80.00 86.34 97.35 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 50.00 80.00 109.43 119.58 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 42.00 50.00 44.08 23.00 SHE 2854-111 US 285 & C470 SIGNING 03/02/06 6.00 80.00 53.00 81.00 SHE 0911-004 SH 91 & SH 67 GUARDRAIL 03/09/06 40.00 65.00 90.22 78.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 18.00 45.00 28.13 11.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 102.00 45.00 22.74 16.70 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 18.00 90.00 85.70 80.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 112.00 80.00 87.50 90.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 44.00 110.00 88.33 50.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 98.00 75.00 93.55 78.75 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 92.00 80.00 79.30 71.19 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 61.00 60.00 63.08 45.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 36.00 80.00 53.76 54.50 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 54.00 75.00 77.69 79.69 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 39.00 80.00 80.56 75.00 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 18.00 45.00 35.00 35.00 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 8.00 80.00 35.85 37.55 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 26.00 75.00 54.94 65.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 102.00 80.00 100.00 75.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 115.00 80.00 85.00 85.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 519 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80342 Const Traf Sign (B) Each =================================================== NH R200-140 I-25, SH 47, 50, 115 CRACK RE 03/30/06 56.00 50.00 39.75 27.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 16.00 55.00 45.33 70.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 24.00 70.00 77.38 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,994.00 79.50 75.96 69.42 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 24.00 50.00 53.40 42.00 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 54.00 80.00 74.83 82.00 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 30.00 100.00 91.83 80.63 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 72.00 90.00 75.50 85.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 20.00 65.00 30.84 15.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 95.00 80.00 89.90 100.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 50.00 80.00 75.91 70.20 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 72.00 75.00 68.56 63.40 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 48.00 80.00 97.59 105.00 SHE 052A-026 SH 52/ US 287 DILEMMA ZONE PR 04/27/06 8.00 70.00 93.40 93.02 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 70.00 90.00 159.62 156.37 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 40.00 70.00 61.75 31.50 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 90.00 80.00 109.67 114.00 NH 0341-067 ON US 34 IN LARIMER COUNTY. 05/25/06 24.00 75.00 47.50 75.00 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 15.00 75.00 45.37 50.73 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 28.00 75.00 83.20 75.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 74.00 185.00 187.75 175.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 120.00 75.00 134.77 135.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 68.00 80.00 74.50 63.00 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 38.00 110.00 50.14 54.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 8.00 100.00 60.00 60.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 58.00 60.00 82.19 90.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 2.00 60.00 60.67 55.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 72.00 70.00 88.67 86.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,180.00 85.40 94.59 95.13 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 74.00 65.00 66.19 52.26 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 6.00 75.00 112.27 125.00 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 54.00 80.00 91.35 70.00 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 36.00 75.00 75.64 84.00 BR R400-203 FY 06 BRIDGE MAINTENANCE 07/20/06 70.00 70.00 79.50 75.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 20.00 80.00 55.00 55.00 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 16.00 80.00 54.00 33.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 60.00 70.00 119.41 120.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 42.00 80.00 61.58 85.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 520 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80342 Const Traf Sign (B) Each =================================================== STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 26.00 75.00 91.91 70.73 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 44.00 70.00 101.80 110.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 128.00 80.00 113.62 110.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 67.00 70.00 102.57 105.29 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 66.00 110.00 78.95 100.80 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 106.00 75.00 115.33 100.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 68.00 70.00 130.06 114.00 C R600-283 VARIOUS 08/10/06 34.00 80.00 73.25 70.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 77.00 75.00 42.50 65.00 STA 0405-031 US40 HUGO EAST 08/24/06 41.00 130.00 103.33 100.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 23.00 75.00 92.76 63.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 49.00 95.00 40.66 26.32 NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 40.00 70.00 96.67 100.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 17.00 80.00 108.18 100.00 AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR 09/14/06 11.00 100.00 69.94 10.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 20.00 75.00 40.21 37.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 42.00 75.00 83.50 92.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 59.00 130.00 59.11 85.34 IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 32.00 105.00 98.67 86.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 48.00 60.00 51.83 43.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,376.00 81.09 90.85 84.58 STA R600-279 SH 121 (WADSWORTH) FROM KEN C 10/05/06 11.00 100.00 69.75 20.00 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 56.00 80.00 87.92 87.92 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 54.00 110.00 100.00 100.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 172.00 80.00 125.72 115.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 99.00 80.00 83.40 46.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 84.00 80.00 104.70 104.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 22.00 80.00 111.86 118.00 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 38.00 80.00 34.33 34.00 C 0252-389 BRONCO ARCH BRIDGE OVER THE S 11/29/06 8.00 150.00 70.00 90.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 118.00 80.00 68.50 55.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 4.00 100.00 111.70 76.50 IM R600-292 70TH AVE AT I-25/BLAKE AND 20 11/30/06 20.00 80.00 64.14 108.00 SHE 0503-067 US 50, WEST OF CANON CITY 11/30/06 8.00 80.00 42.78 16.50 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 37.00 70.00 90.21 85.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 8.00 70.00 23.74 25.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 8.00 180.00 143.10 105.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 68.00 70.00 76.09 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 815.00 82.64 93.30 82.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,365.00 81.34 84.81 79.09 =============== 630-80343 Const Traf Sign (C) Each =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 17.00 85.00 80.50 73.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 521 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80343 Const Traf Sign (C) Each =================================================== SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 01/05/06 2.00 90.00 110.90 27.50 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 8.00 110.00 59.19 10.70 SHE 0091-025 SH 9 VMS IN BRECKENRIDGE 01/05/06 6.00 85.00 68.79 65.00 STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 5.00 80.00 45.57 29.60 IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 30.00 100.00 96.20 51.00 IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 8.00 100.00 120.90 140.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 18.00 80.00 78.90 75.60 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 5.00 65.00 55.33 41.00 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 4.00 90.00 108.33 90.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 24.00 85.00 95.32 42.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 42.00 110.00 72.33 55.00 STA 0343-025 US 34, WRAY WEST 01/26/06 4.00 90.00 102.13 85.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 4.00 110.00 112.00 103.01 STA 1131-005 SH 113 IN LOGAN COUNTY 02/02/06 8.00 80.00 96.25 100.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 32.00 80.00 63.30 44.00 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 8.00 65.00 66.25 79.50 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 28.00 100.00 106.67 100.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 8.00 85.00 64.67 70.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 4.00 150.00 90.93 132.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 8.00 160.00 61.55 32.66 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 4.00 80.00 98.84 97.35 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 8.00 80.00 124.43 119.58 SHE 0911-004 SH 91 & SH 67 GUARDRAIL 03/09/06 8.00 80.00 101.33 47.25 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 4.00 50.00 33.63 11.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 48.00 50.00 27.92 22.30 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 90.00 100.00 102.50 95.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 4.00 105.00 96.67 70.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 16.00 80.00 126.75 78.75 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 8.00 80.00 86.88 82.14 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 8.00 70.00 71.08 45.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 14.00 80.00 65.03 54.50 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 8.00 85.00 82.84 79.69 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 12.00 90.00 94.59 100.00 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 4.00 80.00 47.69 50.06 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 24.00 120.00 127.50 125.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 64.00 100.00 120.00 120.00 NH R200-140 I-25, SH 47, 50, 115 CRACK RE 03/30/06 18.00 55.00 33.75 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 615.00 90.16 81.40 74.04 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 22.00 55.00 64.25 47.25 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 24.00 90.00 90.50 93.00 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 20.00 110.00 113.10 107.50 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 8.00 100.00 87.88 100.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 8.00 90.00 99.47 110.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 522 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80343 Const Traf Sign (C) Each =================================================== NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 8.00 80.00 83.37 70.20 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 16.00 75.00 84.27 75.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 4.00 80.00 99.53 105.00 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 18.00 110.00 65.75 31.50 NH 0341-067 ON US 34 IN LARIMER COUNTY. 05/25/06 4.00 85.00 62.50 100.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 25.00 85.00 134.77 135.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 8.00 80.00 78.30 63.00 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 8.00 160.00 61.24 66.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 4.00 90.00 109.98 106.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 177.00 90.25 89.11 85.23 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 27.00 75.00 70.00 57.48 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 8.00 100.00 123.37 150.00 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 8.00 90.00 99.25 70.00 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 12.00 75.00 82.01 94.50 BR R400-203 FY 06 BRIDGE MAINTENANCE 07/20/06 14.00 100.00 116.00 120.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 6.00 90.00 55.00 55.00 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 10.00 120.00 70.00 40.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 8.00 100.00 121.41 130.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 16.00 90.00 66.51 85.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 15.00 90.00 130.84 82.51 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 12.00 90.00 112.80 110.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 24.00 100.00 114.62 110.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 10.00 80.00 102.57 105.29 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 16.00 80.00 119.62 100.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 30.00 100.00 130.56 114.00 C R600-283 VARIOUS 08/10/06 8.00 120.00 81.58 70.00 STA 0405-031 US40 HUGO EAST 08/24/06 8.00 150.00 110.00 100.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 6.00 85.00 106.40 74.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 20.00 120.00 43.10 26.20 NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 4.00 80.00 123.33 100.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 4.00 90.00 108.18 100.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 4.00 100.00 99.75 99.50 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 16.00 120.00 66.24 96.72 IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 22.00 105.00 107.00 86.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 4.00 75.00 60.80 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 312.00 97.48 99.57 88.81 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 8.00 120.00 200.00 200.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 30.00 100.00 129.28 115.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 523 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80343 Const Traf Sign (C) Each =================================================== IM 0252-384 I-25 OVER BROADWAY 11/09/06 27.00 80.00 108.73 135.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 12.00 120.00 87.40 46.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 16.00 110.00 114.41 104.00 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 30.00 90.00 35.90 33.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 18.00 120.00 80.50 65.00 IM R600-292 70TH AVE AT I-25/BLAKE AND 20 11/30/06 2.00 90.00 68.77 100.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 2.00 90.00 104.29 95.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 2.00 200.00 164.18 105.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 8.00 90.00 83.74 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 155.00 101.03 100.15 92.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,259.00 93.33 90.03 81.52 =============== 630-80344 Const Traf Sign (Spec) Sq Foot ================================================ NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 95.00 16.00 18.70 10.50 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 15.75 20.00 18.88 16.35 STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 105.00 16.00 16.72 14.21 IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 200.00 25.00 50.53 19.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 93.00 17.00 13.70 10.80 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 12.00 18.00 18.50 18.50 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 132.00 18.00 15.56 18.90 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 275.00 20.00 18.26 18.31 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 32.00 90.00 12.22 6.60 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 250.00 20.00 22.67 23.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 183.00 20.00 14.95 20.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 272.00 22.00 12.60 10.89 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 200.00 20.00 18.98 22.91 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 232.00 20.00 17.38 15.22 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 15.00 20.00 23.16 33.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 426.00 16.50 16.74 16.70 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 1,623.00 9.00 15.33 22.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 320.00 20.00 20.20 21.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 200.00 20.00 18.62 19.17 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 200.00 20.00 17.30 20.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 320.00 25.00 11.56 9.75 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 60.00 20.00 20.94 21.25 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 100.00 15.00 18.00 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,360.75 17.05 18.04 18.67 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 241.00 20.00 19.63 21.90 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 524 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80344 Const Traf Sign (Spec) Sq Foot ================================================ STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 200.00 150.00 27.37 11.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 200.00 20.00 17.43 16.20 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 112.00 20.00 19.88 20.20 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 120.00 20.00 18.47 17.50 SHE 052A-026 SH 52/ US 287 DILEMMA ZONE PR 04/27/06 64.00 20.00 18.87 17.36 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 81.00 20.00 10.07 10.14 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 685.00 24.00 17.04 17.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 160.00 20.00 19.47 13.65 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 90.00 17.00 14.77 17.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 24.00 18.00 18.00 18.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 189.00 20.00 14.33 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,166.00 33.12 18.36 15.67 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 124.00 18.00 15.02 13.58 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 60.00 18.00 19.23 21.00 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 40.00 16.00 17.93 10.50 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 105.00 20.00 22.00 22.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 516.00 20.00 19.13 22.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 80.00 15.00 20.89 17.68 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 213.00 20.00 18.25 17.00 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 80.00 90.00 23.98 18.90 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 312.00 20.00 18.92 20.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 1,640.00 20.00 18.75 19.00 C R600-283 VARIOUS 08/10/06 165.00 25.00 20.87 21.60 NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 319.00 20.00 20.00 20.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 191.00 17.00 21.84 20.00 AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR 09/14/06 40.00 18.00 13.97 10.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 21.00 18.00 17.41 20.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 792.00 9.50 14.98 15.93 IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 304.00 20.00 25.33 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,002.00 19.30 18.90 18.90 STA R600-279 SH 121 (WADSWORTH) FROM KEN C 10/05/06 40.00 17.00 22.34 20.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 174.00 20.00 17.33 19.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 389.00 18.00 21.18 21.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 64.00 20.00 14.49 11.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 25.00 25.00 21.56 12.80 IM R600-292 70TH AVE AT I-25/BLAKE AND 20 11/30/06 64.00 120.00 12.76 8.00 SHE 0503-067 US 50, WEST OF CANON CITY 11/30/06 40.00 18.00 10.41 4.40 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 331.00 18.00 16.14 13.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 525 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80344 Const Traf Sign (Spec) Sq Foot ================================================ STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 8.00 30.00 23.20 21.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 160.00 20.00 18.39 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,295.00 23.83 18.15 16.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,823.75 21.02 18.39 18.05 =============== 630-80348 Const Info Sign Each =================================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 4.00 400.00 369.64 568.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 400.00 369.64 568.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 400.00 369.64 568.93 =============== 630-80350 Vert Panel Each =================================================== SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 20.00 30.00 33.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 30.00 33.00 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 30.00 33.00 25.00 =============== 630-80355 Port Mesg Panel Each =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 2.00 7500.00 6700.00 5250.00 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 2.00 7000.00 4658.40 2677.00 STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 2.00 6400.00 1515.38 1124.68 IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 2.00 6000.00 4645.00 1025.00 IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 10.00 7500.00 9518.47 14400.00 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 4.00 5000.00 5020.00 6040.00 NH 0342-042 US 34 AND US 36 CHIPSEALS - E 01/12/06 4.00 6500.00 4000.00 3000.00 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 3.00 6400.00 3613.44 3150.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 2.00 9000.00 10573.73 9156.67 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 2.00 3000.00 4238.20 3300.00 STA 1131-005 SH 113 IN LOGAN COUNTY 02/02/06 2.00 6000.00 3250.00 3000.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 2.00 4000.00 5745.55 5500.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 10000.00 9221.72 18000.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 4.00 6000.00 4828.93 3265.71 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 2.00 6500.00 5928.01 5612.04 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 2.00 7500.00 7164.24 7609.83 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 2.00 5000.00 7450.00 8000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 526 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80355 Port Mesg Panel Each =================================================== IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 2.00 5500.00 5635.00 7300.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 2.00 6000.00 5855.00 7500.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 4.00 6000.00 13232.00 14700.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 4.00 6500.00 4912.83 4928.50 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 4.00 6500.00 5045.13 3250.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 2.00 6500.00 5219.80 3187.77 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 2.00 8000.00 4958.00 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 68.00 6441.18 6390.47 6759.89 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 2.00 5000.00 7190.00 6570.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 2.00 10000.00 4534.00 1000.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 2.00 6500.00 6603.75 5100.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 2.00 5000.00 7331.43 7350.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 2.00 6000.00 5310.80 5850.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 2.00 7500.00 13275.38 13031.13 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 2.00 6000.00 9775.00 5250.00 NH 0341-067 ON US 34 IN LARIMER COUNTY. 05/25/06 4.00 4000.00 1900.00 2000.00 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 2.00 4000.00 8428.36 9856.72 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 4.00 7500.00 8239.61 8200.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 3.00 6000.00 7253.49 5250.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 2.00 10000.00 6908.78 6726.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 29.00 6344.83 6885.97 6138.57 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 4.00 6000.00 6613.30 5225.21 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 4.00 6000.00 7758.54 6500.00 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 2.00 5500.00 3543.25 3150.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 1.00 6000.00 3300.00 3300.00 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 2.00 7000.00 3300.00 2100.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 6.00 6000.00 14028.52 14000.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 4.00 6500.00 6425.54 5700.00 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 4.00 6000.00 5640.00 6600.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 4.00 6000.00 13591.76 13000.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 3.00 4000.00 11533.68 12634.71 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 4.00 6000.00 12894.12 12000.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 4.00 5000.00 13475.97 15000.00 C R600-283 VARIOUS 08/10/06 3.00 6000.00 2038.33 540.00 STA 0405-031 US40 HUGO EAST 08/24/06 2.00 6500.00 5166.67 2500.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 3.00 6000.00 4372.25 650.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 3.00 6000.00 5448.78 5000.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 2.00 7000.00 2504.70 2370.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 527 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80355 Port Mesg Panel Each =================================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 5.00 22000.00 15105.37 18092.12 IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 1.00 6000.00 4683.33 3050.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 2.00 7000.00 4526.48 2970.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 63.00 7238.10 8598.12 8247.07 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 2.00 8000.00 7500.00 7500.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 10.00 6000.00 9616.66 15600.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 2.00 6000.00 6908.57 7600.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 2.00 8000.00 4334.09 4130.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 4.00 125.00 4466.29 3800.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 4.00 4000.00 6818.88 13500.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 3.00 6000.00 4401.81 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 27.00 5129.63 6635.51 10376.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 187.00 6505.35 7262.60 7686.72 =============== 630-80356 Flash Arrow Panel (A Ty) Each =================================================== STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 2.00 900.00 701.48 710.33 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 3.00 1500.00 1271.67 1525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 1260.00 1043.59 1199.13 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 2.00 250.00 645.00 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 250.00 645.00 105.00 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 2.00 850.00 1077.50 655.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 2.00 1200.00 1622.63 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 1025.00 1466.88 1077.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 990.91 1091.61 955.97 =============== 630-80357 Flash Arrow Panel (B Ty) Each =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 2.00 1000.00 580.00 525.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 528 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80357 Flash Arrow Panel (B Ty) Each =================================================== NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 4.00 650.00 572.50 540.00 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 3.00 1100.00 720.00 840.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 2.00 800.00 1090.17 820.50 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 2.00 1100.00 1120.03 1030.13 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 2.00 2000.00 861.71 220.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 1.00 750.00 703.33 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 1028.13 789.83 691.95 NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 1.00 700.00 883.33 500.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 1.00 1200.00 560.00 620.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 950.00 754.00 560.00 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 2.00 6000.00 1500.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 6000.00 1500.00 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 1517.50 806.60 759.56 =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 01/05/06 2.00 1500.00 1451.00 1125.00 IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 2.00 1000.00 1204.60 103.00 IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 6.00 1800.00 1553.43 2000.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 3.00 2800.00 2255.00 2165.00 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 2.00 800.00 1071.25 625.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 2.00 800.00 1041.22 550.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 3.00 3000.00 916.67 600.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 4.00 2000.00 984.64 1088.57 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 8.00 1300.00 1246.64 2061.56 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 4.00 1300.00 1932.64 2174.24 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 2.00 850.00 750.25 716.00 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 2.00 1000.00 1284.14 633.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 4.00 600.00 421.90 335.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 6.00 1500.00 975.00 950.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 4.00 1500.00 1970.00 2100.00 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 4.00 1300.00 935.47 821.42 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 4.00 750.00 753.54 550.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 2.00 900.00 1035.50 842.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 529 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 2.00 1100.00 1174.99 1062.59 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 2.00 6000.00 1409.75 750.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 2.00 1400.00 1950.00 2500.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 4.00 2000.00 1600.00 1600.00 NH R200-140 I-25, SH 47, 50, 115 CRACK RE 03/30/06 2.00 900.00 668.50 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 76.00 1551.32 1261.87 1256.28 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 2.00 1100.00 789.00 525.00 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 2.00 800.00 727.00 876.00 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 2.00 1200.00 1411.00 1075.00 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 3.00 1400.00 736.25 750.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 4.00 1300.00 1284.73 1100.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 4.00 1000.00 1070.42 865.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 4.00 1300.00 1168.21 1175.00 SHE 052A-026 SH 52/ US 287 DILEMMA ZONE PR 04/27/06 2.00 1100.00 586.43 620.13 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 4.00 1500.00 3661.08 3700.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 4.00 1500.00 1183.36 840.00 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 3.00 1200.00 692.40 861.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 34.00 1252.94 1155.80 1227.80 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 2.00 1200.00 1168.01 950.00 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 4.00 1200.00 1082.50 540.00 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 2.00 1000.00 940.20 735.00 BR R400-203 FY 06 BRIDGE MAINTENANCE 07/20/06 4.00 900.00 118.50 125.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 2.00 1500.00 822.50 825.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 4.00 2000.00 967.89 1000.00 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 3.00 1500.00 1274.00 880.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 4.00 1500.00 1237.70 1200.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 2.00 1500.00 2051.45 2105.79 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 4.00 1500.00 1892.12 3000.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 4.00 1500.00 1249.71 1250.00 C R600-283 VARIOUS 08/10/06 4.00 1500.00 1170.00 975.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 2.00 600.00 565.00 500.00 AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR 09/14/06 2.00 1500.00 2176.79 3000.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 2.00 2400.00 2605.58 2275.74 IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 1.00 800.00 1371.67 915.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 46.00 1415.22 1334.32 1232.57 STA R600-279 SH 121 (WADSWORTH) FROM KEN C 10/05/06 2.00 1500.00 1475.18 3000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 530 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 2.00 1000.00 937.86 937.86 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 8.00 1500.00 1282.41 1600.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 3.00 1200.00 1071.00 835.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 2.00 1300.00 2945.00 2875.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 4.00 1500.00 1057.59 840.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 2.00 1800.00 1168.64 1000.00 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 2.00 1100.00 493.33 450.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 4.00 1300.00 928.50 500.00 IM R600-292 70TH AVE AT I-25/BLAKE AND 20 11/30/06 1.00 1500.00 577.37 1200.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 4.00 1200.00 1051.07 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 34.00 1367.65 1187.11 1282.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 190.00 1432.11 1243.26 1250.06 =============== 630-80359 Port Mesg Panel Day ==================================================== IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 210.00 120.00 115.83 97.50 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 20.00 100.00 116.58 110.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 63.00 350.00 220.00 250.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 300.00 120.00 95.00 90.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 56.00 100.00 150.00 180.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 190.00 110.00 110.00 110.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 40.00 150.00 200.00 200.00 NH R200-140 I-25, SH 47, 50, 115 CRACK RE 03/30/06 50.00 250.00 167.00 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 929.00 140.20 126.58 118.84 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 60.00 80.00 91.83 80.63 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 44.00 180.00 121.88 120.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 20.00 120.00 143.18 145.00 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 210.00 75.00 86.67 85.00 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 18.00 250.00 162.25 179.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 180.00 100.00 102.00 102.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 532.00 100.32 101.66 98.59 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 60.00 120.00 117.50 100.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 160.00 200.00 85.13 105.26 NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 290.00 90.00 78.33 55.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 531 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80359 Port Mesg Panel Day ==================================================== IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 12.00 120.00 168.33 155.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 522.00 127.85 88.44 77.88 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 194.00 100.00 117.23 117.23 IM 0252-384 I-25 OVER BROADWAY 11/09/06 7.00 150.00 284.09 150.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 85.00 110.00 219.60 173.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 70.00 110.00 121.50 120.00 IM R600-292 70TH AVE AT I-25/BLAKE AND 20 11/30/06 15.00 300.00 145.90 50.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 200.00 110.00 59.85 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 571.00 112.08 130.86 106.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,554.00 123.09 114.16 103.43 =============== 630-80360 Drum Channel Dev Each =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 300.00 40.00 23.45 26.25 SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 01/05/06 100.00 45.00 34.70 27.50 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 100.00 50.00 35.67 10.70 SHE 0091-025 SH 9 VMS IN BRECKENRIDGE 01/05/06 10.00 25.00 42.69 65.00 IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 150.00 50.00 33.40 31.00 IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 50.00 50.00 61.45 65.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 400.00 40.00 12.23 11.90 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 100.00 45.00 17.35 14.70 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 190.00 33.00 43.53 25.60 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 50.00 40.00 29.89 42.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 120.00 80.00 58.33 55.00 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 300.00 45.00 44.01 40.06 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 275.00 70.00 40.68 37.00 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 20.00 38.00 33.75 28.30 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 100.00 38.00 48.63 45.00 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 20.00 55.00 44.35 68.90 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 270.00 55.00 50.00 50.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 150.00 35.00 27.33 25.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 90.00 60.00 38.16 41.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 100.00 50.00 41.35 32.66 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 50.00 40.00 53.63 43.52 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 1,000.00 40.00 29.46 21.74 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 250.00 35.00 28.64 13.00 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 50.00 45.00 43.36 25.50 SHE 0911-004 SH 91 & SH 67 GUARDRAIL 03/09/06 50.00 35.00 64.40 26.25 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 300.00 40.00 21.29 22.30 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 532 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80360 Drum Channel Dev Each =================================================== SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 50.00 50.00 46.98 42.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 100.00 45.00 56.00 47.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 300.00 40.00 43.33 40.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 500.00 60.00 37.65 26.25 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 200.00 40.00 38.21 38.33 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 200.00 40.00 36.35 30.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 200.00 39.00 27.44 25.25 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 100.00 45.00 39.22 37.19 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 100.00 50.00 44.73 50.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 20.00 45.00 49.00 70.00 IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 75.00 45.00 70.00 70.00 NH R200-140 I-25, SH 47, 50, 115 CRACK RE 03/30/06 100.00 38.00 37.50 25.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 60.00 40.00 36.38 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,600.00 45.24 34.48 30.23 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 200.00 38.00 42.00 42.00 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 50.00 40.00 39.15 36.15 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 40.00 30.00 49.58 48.38 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 140.00 50.00 37.25 30.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 300.00 40.00 31.50 17.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 150.00 40.00 31.28 25.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 100.00 40.00 48.53 43.50 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 100.00 50.00 39.98 34.60 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 50.00 40.00 26.61 23.50 SHE 052A-026 SH 52/ US 287 DILEMMA ZONE PR 04/27/06 10.00 40.00 32.12 18.60 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 400.00 40.00 47.81 46.92 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 50.00 45.00 43.75 31.50 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 50.00 40.00 27.67 28.00 C 0831-103 PINELLO ROUNDABOUT - ACADEMY 06/08/06 50.00 40.00 38.12 36.23 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 60.00 40.00 20.40 15.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 50.00 60.00 54.25 50.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 300.00 45.00 46.29 46.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 250.00 40.00 22.87 10.50 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 100.00 65.00 30.83 34.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 20.00 55.00 24.00 24.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 50.00 50.00 49.86 70.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 40.00 45.00 40.33 55.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 100.00 45.00 46.03 44.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,660.00 43.14 37.94 34.49 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 50.00 40.00 35.96 31.35 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 533 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80360 Drum Channel Dev Each =================================================== BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 100.00 50.00 57.04 55.00 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 100.00 40.00 33.05 22.00 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 100.00 50.00 35.34 21.00 BR R400-203 FY 06 BRIDGE MAINTENANCE 07/20/06 100.00 50.00 11.60 12.00 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 200.00 45.00 27.25 27.50 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 400.00 40.00 48.79 50.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 400.00 50.00 31.61 34.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 50.00 55.00 39.23 17.68 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 450.00 45.00 34.66 44.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 400.00 50.00 47.26 45.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 300.00 40.00 40.91 42.12 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 30.00 50.00 38.45 37.80 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 200.00 45.00 45.43 40.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 200.00 50.00 48.49 47.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 100.00 30.00 21.00 22.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 100.00 25.00 32.54 20.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 80.00 50.00 25.66 26.32 NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 150.00 40.00 38.00 20.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 150.00 40.00 43.67 40.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 60.00 45.00 30.50 27.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 220.00 54.00 40.50 45.51 IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 50.00 40.00 40.33 31.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 50.00 30.00 30.46 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,040.00 44.82 39.48 37.47 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 100.00 50.00 55.00 55.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 400.00 45.00 49.32 50.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 25.00 45.00 53.32 47.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 100.00 45.00 62.90 57.50 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 250.00 45.00 34.11 28.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 151.00 50.00 33.09 35.00 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 50.00 40.00 22.80 23.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 50.00 45.00 25.50 22.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 255.00 40.00 42.64 38.20 IM R600-292 70TH AVE AT I-25/BLAKE AND 20 11/30/06 10.00 45.00 25.23 54.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 50.00 45.00 27.39 21.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 20.00 55.00 23.74 25.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 360.00 35.00 40.88 52.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 250.00 45.00 31.74 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,071.00 43.23 39.25 40.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,371.00 44.49 37.08 34.26 =============== 630-80363 Drum Channel Dev (Light) (F) Each =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 20.00 45.00 25.40 21.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 534 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80363 Drum Channel Dev (Light) (F) Each =================================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 6.00 80.00 43.19 10.70 IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 20.00 60.00 47.80 51.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 20.00 45.00 23.90 21.60 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 60.00 60.00 62.33 65.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 30.00 90.00 61.67 55.00 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 20.00 80.00 49.23 44.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 10.00 80.00 59.67 64.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 10.00 45.00 35.67 30.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 20.00 45.00 45.41 33.40 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 4.00 75.00 57.38 47.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 40.00 45.00 67.00 67.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 25.00 55.00 64.00 53.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 10.00 45.00 53.33 60.00 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 6.00 75.00 61.11 70.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 20.00 60.00 57.50 80.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 8.00 50.00 41.13 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 329.00 59.29 49.55 51.80 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 6.00 45.00 41.33 39.40 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 10.00 65.00 51.13 50.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 10.00 45.00 34.84 22.00 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 4.00 55.00 46.25 31.50 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 4.00 45.00 35.60 25.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 24.00 50.00 76.81 76.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 10.00 60.00 89.37 87.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 68.00 52.50 58.16 57.02 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 10.00 60.00 63.75 57.48 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 4.00 30.00 52.00 59.00 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 10.00 101.00 45.60 50.40 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 10.00 40.00 25.00 30.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 15.00 35.00 44.88 20.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 24.00 70.00 28.16 26.32 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 30.00 64.00 50.96 56.89 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 10.00 35.00 47.13 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 113.00 58.45 45.64 42.42 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 10.00 80.00 60.00 60.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 535 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80363 Drum Channel Dev (Light) (F) Each =================================================== HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 10.00 65.00 63.90 57.50 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 9.00 60.00 53.61 60.00 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 10.00 65.00 30.25 25.00 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 20.00 50.00 42.81 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 59.00 61.69 48.10 44.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 569.00 58.56 49.32 49.77 =============== 630-80364 Drum Channel Dev (Light) (SB) Each =================================================== STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 6.00 70.00 72.00 70.00 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 20.00 90.00 50.76 44.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 20.00 45.00 44.00 45.00 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 100.00 60.00 36.78 11.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 20.00 45.00 50.80 39.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 20.00 60.00 71.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 186.00 60.32 42.99 32.69 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 10.00 45.00 40.84 40.00 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 16.00 55.00 48.75 31.50 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 20.00 60.00 105.67 102.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 46.00 55.00 74.80 64.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 10.00 50.00 63.75 57.48 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 20.00 65.00 60.00 65.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 5.00 65.00 46.19 23.58 C R600-283 VARIOUS 08/10/06 100.00 75.00 62.42 59.00 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 50.00 40.00 27.50 35.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 16.00 65.00 30.66 26.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 201.00 63.01 53.32 50.07 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 10.00 60.00 68.90 57.50 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 130.00 50.00 61.12 44.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 140.00 50.71 61.68 45.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 573.00 58.49 52.62 44.43 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 536 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80365 Port Mesg Panel (State Furn) Each =================================================== STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 3.00 1000.00 654.83 1414.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1000.00 654.83 1414.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1000.00 654.83 1414.50 =============== 630-80367 Port Traf Speed Monitor Each =================================================== IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 2.00 5000.00 4628.53 4600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 5000.00 4628.53 4600.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2.00 4000.00 9392.76 9000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 4000.00 9392.76 9000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 4500.00 8031.55 6800.00 =============== 630-80368 Port Traf Speed Monitor Day ==================================================== IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 70.00 300.00 95.67 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70.00 300.00 95.67 110.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70.00 300.00 95.67 110.00 =============== 630-80370 Conc Barrier (Temp) Lin Foot =============================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 150.00 30.00 36.00 31.10 IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 1,500.00 20.00 23.87 30.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 6,300.00 20.00 21.07 18.20 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 4,100.00 25.00 23.53 29.66 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 1,000.00 100.00 34.38 33.50 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 4,018.00 15.00 30.91 30.00 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 500.00 30.00 42.56 42.25 BR 069A-019 SH 69, ROSITA CREEK 03/09/06 2,100.00 30.00 31.72 22.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 600.00 30.00 36.66 32.30 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 537 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80370 Conc Barrier (Temp) Lin Foot =============================================== BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 400.00 30.00 33.00 33.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 150.00 50.00 66.67 40.00 SHE 2873-143 US 287 AT CR 54G, N. OF FT. C 03/30/06 310.00 25.00 31.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21,128.00 25.87 28.10 26.35 IM 0251-172 I-25, N. OF BUTTE CREEK RD 04/06/06 1,000.00 30.00 36.20 38.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 4,000.00 55.00 50.90 50.00 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 4,070.00 30.00 27.99 20.28 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 840.00 32.00 28.70 41.40 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 650.00 30.00 40.25 35.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 480.00 30.00 23.85 26.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 3,100.00 20.00 36.10 26.25 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 365.00 40.00 52.45 31.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 200.00 75.00 77.00 77.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 1,300.00 28.00 37.65 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,005.00 35.04 38.31 33.51 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 47,356.00 16.00 21.99 19.61 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 1,130.00 18.00 42.27 45.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 7,450.00 30.00 20.63 15.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 14,000.00 25.00 22.30 24.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 20,800.00 18.00 24.82 19.75 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 2,000.00 30.00 31.24 38.44 C R600-283 VARIOUS 08/10/06 400.00 60.00 80.67 80.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 675.00 70.00 57.86 35.71 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 800.00 30.00 53.66 45.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 16,598.00 22.00 30.00 31.50 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 960.00 70.00 40.45 34.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 112,169.00 20.63 24.43 22.85 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 22,498.00 25.00 27.04 25.00 HB 0853-064 US 85C-LATHAM CANAL CONST 11/16/06 1,330.00 25.00 31.41 34.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 200.00 75.00 52.52 45.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 22,830.00 28.00 28.53 31.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 3,000.00 30.00 49.32 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 49,858.00 26.88 29.77 28.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 199,160.00 23.90 27.12 25.46 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 538 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80375 Inst Conc Barrier (Temp) Lin Foot =============================================== STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 620.00 20.00 19.50 30.51 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 500.00 100.00 69.43 27.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,120.00 55.71 45.37 29.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,120.00 55.71 45.37 29.26 =============== 630-80376 Gdrail Ty 7 (Temp) Lin Foot =============================================== SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 150.00 28.00 28.70 31.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 600.00 30.00 33.47 31.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 475.00 30.00 50.00 35.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 3,000.00 22.00 26.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,225.00 24.25 28.62 23.64 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 4,490.00 25.00 24.80 32.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 9,980.00 22.00 27.52 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14,470.00 22.93 26.32 10.62 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 500.00 25.00 45.25 13.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 100.00 40.00 40.72 44.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 600.00 27.50 44.34 18.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,295.00 23.36 27.27 13.71 =============== 630-80378 Glare Screen (Temp) Lin Foot =============================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 4,250.00 15.00 12.04 10.50 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 8,500.00 15.00 14.79 15.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12,750.00 15.00 13.54 13.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,750.00 15.00 13.54 13.74 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 539 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80380 Traffic Cone Each =================================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 400.00 12.00 6.22 6.30 SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 01/05/06 300.00 10.00 9.40 9.00 STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 250.00 20.00 9.32 5.50 SHE 0091-025 SH 9 VMS IN BRECKENRIDGE 01/05/06 100.00 15.00 15.81 9.00 STA 0361-081 SH 36 VMS IN BOULDER COUNTY 01/05/06 500.00 12.00 6.24 5.92 IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 600.00 12.00 12.06 12.30 IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 500.00 10.00 8.44 6.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 500.00 12.00 6.23 5.40 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 300.00 10.00 7.23 9.45 NH 0342-042 US 34 AND US 36 CHIPSEALS - E 01/12/06 300.00 12.00 7.50 5.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 50.00 12.00 7.03 5.10 STA 3852-010 US 385 IN YUMA COUNTY 01/19/06 300.00 12.00 13.93 12.50 STA 052A-024 SH 52, PROSPECT VALLEY WEST 01/26/06 300.00 12.00 10.48 11.55 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 650.00 15.00 13.33 11.00 STA 0343-025 US 34, WRAY WEST 01/26/06 300.00 12.00 12.23 9.40 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 100.00 11.00 11.69 11.45 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 100.00 15.00 9.15 6.60 STA 1131-005 SH 113 IN LOGAN COUNTY 02/02/06 600.00 12.00 6.25 3.00 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 130.00 12.00 7.63 3.20 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 600.00 12.00 5.75 1.10 SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA 02/09/06 300.00 25.00 13.71 9.54 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 250.00 20.00 13.33 12.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 500.00 10.00 5.13 4.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 100.00 15.00 8.96 10.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 600.00 12.00 9.34 3.27 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 300.00 15.00 18.66 20.62 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 500.00 15.00 11.65 10.87 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 100.00 9.00 13.88 14.30 SHE 2854-111 US 285 & C470 SIGNING 03/02/06 100.00 12.00 8.04 7.20 SHE M910-004 US 50 AND SH 550 IN MONTROSE 03/09/06 150.00 10.00 12.45 9.85 SHE 0911-004 SH 91 & SH 67 GUARDRAIL 03/09/06 100.00 10.00 12.70 2.15 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 600.00 8.00 6.24 1.10 SHE R400-183 R4 FY06 SAFETY PROJECTS 03/09/06 60.00 12.00 11.38 15.00 BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 100.00 10.00 9.00 9.00 IM 0701-179 I-70, GLENWOOD SPRINGS 03/16/06 650.00 12.00 17.00 18.00 STA 0091-022 SH 9, HOOSIER PASS NORTH 03/16/06 200.00 15.00 15.75 12.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 500.00 15.00 11.80 10.50 NH 0021-027 SH 2, MARTIN LUTHER KING BLVD 03/23/06 500.00 15.00 9.70 8.21 NH 093A-005 SH 93, BOULDER CANAL TO SH 12 03/23/06 500.00 12.00 11.81 11.00 R600-247 SIGNALS - SH 121 & SH 391 03/23/06 300.00 15.00 8.25 8.50 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 500.00 12.00 10.73 10.63 STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 03/23/06 200.00 15.00 14.31 14.00 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 100.00 9.00 10.00 10.00 STA 0853-063 SH 14 & 1ST AVE. IN AULT 03/23/06 100.00 12.00 12.84 12.52 STA 0343-028 SH 34, WRAY SIGNAL REBUILD 03/23/06 100.00 12.00 11.58 15.00 NH 0821-076 SH82 OVERLAY - ASPEN 03/23/06 75.00 14.00 17.50 14.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 540 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80380 Traffic Cone Each =================================================== IM 0702-252 I-70 WOLCOTT EAST ALT. B 03/23/06 1,000.00 12.00 12.00 12.00 NH R200-140 I-25, SH 47, 50, 115 CRACK RE 03/30/06 250.00 10.00 7.00 6.00 SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE 03/30/06 50.00 9.00 28.33 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15,665.00 12.69 10.10 8.79 IM 0252-381 I-25, GREENLAND TO LARKSPUR 04/06/06 200.00 13.00 15.25 15.35 STA 0831-100 PARKER RD AT LONG AVE. SIGNAL 04/06/06 300.00 10.00 10.59 11.83 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 200.00 12.00 13.35 12.00 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 150.00 10.00 10.41 10.00 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 300.00 11.00 11.69 12.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 600.00 15.00 11.14 8.65 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 400.00 15.00 10.00 8.10 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 400.00 15.00 9.22 9.50 SHE 052A-026 SH 52/ US 287 DILEMMA ZONE PR 04/27/06 250.00 10.00 6.04 6.20 NH 2871-030 SH 287, JUNCTION OF SH 116 NO 05/18/06 150.00 12.00 11.67 11.46 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 140.00 15.00 10.13 5.25 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 250.00 12.00 11.17 11.00 NH 0341-067 ON US 34 IN LARIMER COUNTY. 05/25/06 400.00 10.00 8.50 5.00 SHE 0342-045 ON US 34 IN WELD COUNTY. 06/08/06 100.00 12.00 6.90 6.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 500.00 10.00 12.54 12.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 300.00 10.00 16.78 17.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 1,000.00 15.00 11.47 10.50 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 350.00 15.00 7.12 9.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 50.00 18.00 12.00 12.00 BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL 06/22/06 100.00 9.00 17.86 12.00 CC R600-281 CHATFIELD STATE PARK MAIN ROA 06/22/06 300.00 10.00 10.67 6.00 STA 0131-044 SH 13, S. OF MEEKER - ALT B 06/22/06 400.00 12.00 11.80 11.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,840.00 12.61 10.72 10.03 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 200.00 10.00 9.46 5.22 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 50.00 12.00 14.31 18.00 NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 500.00 12.00 11.40 11.00 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 500.00 10.00 13.39 5.25 BR R400-203 FY 06 BRIDGE MAINTENANCE 07/20/06 150.00 12.00 1.19 1.25 STA 0881-019 AT THE INTERSECTION OF ARAPAH 07/27/06 100.00 12.00 11.00 11.00 SHE 0403-050 ON US 40 THROUGH WINTER PARK 07/27/06 100.00 12.00 6.50 6.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 200.00 12.00 11.71 15.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 400.00 15.00 9.70 11.00 STA 062A-011 SH 62 & CR 5 (AMELIA ST) 08/03/06 200.00 15.00 9.91 4.72 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 225.00 10.00 10.63 4.40 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 541 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80380 Traffic Cone Each =================================================== IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 500.00 12.00 11.55 10.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 200.00 10.00 5.35 4.21 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 150.00 20.00 10.64 7.56 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 500.00 15.00 11.09 10.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 600.00 12.00 11.04 10.00 C R600-283 VARIOUS 08/10/06 150.00 12.00 10.43 10.80 C 0501-049 US50 AT 29 RD IN MESA COUNTY 08/17/06 100.00 12.00 8.25 11.00 STA 0405-031 US40 HUGO EAST 08/24/06 400.00 15.00 14.33 14.00 STA 060A-010 SH 60 AT 83RD AVE IN WELD COU 08/31/06 200.00 10.00 10.76 10.00 BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT 08/31/06 100.00 15.00 10.13 5.26 NH 0061-078 US 6 MP 260.00 TO 270.5 08/31/06 50.00 15.00 14.67 10.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 50.00 12.00 10.82 10.00 AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR 09/14/06 200.00 10.00 13.39 20.00 STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 60.00 12.00 8.90 12.00 NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 200.00 11.00 11.00 15.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 300.00 12.00 13.55 13.65 IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 300.00 10.00 14.67 9.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 100.00 10.00 10.10 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,785.00 12.31 11.15 9.77 STA R600-279 SH 121 (WADSWORTH) FROM KEN C 10/05/06 150.00 10.00 13.88 20.00 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 400.00 10.00 15.24 15.24 NH 0503-063 US 50 AND CR 107 IN SALIDA 10/19/06 100.00 20.00 15.00 15.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 550.00 10.00 8.12 11.00 IM 0252-384 I-25 OVER BROADWAY 11/09/06 150.00 12.00 12.27 12.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 500.00 12.00 11.35 10.00 C 0251-173 I 25, CULVERTS, TRINIDAD & PU 11/16/06 100.00 12.00 6.70 5.50 C 0252-389 BRONCO ARCH BRIDGE OVER THE S 11/29/06 20.00 20.00 13.75 15.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 100.00 12.00 18.32 19.10 IM R600-292 70TH AVE AT I-25/BLAKE AND 20 11/30/06 100.00 11.00 9.42 12.00 SHE 0503-067 US 50, WEST OF CANON CITY 11/30/06 60.00 12.00 9.41 4.40 BR 0021-034 SH 2 OVER FULTON CANAL 11/30/06 300.00 12.00 6.51 5.25 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 50.00 15.00 6.02 6.50 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 200.00 12.00 6.63 10.50 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 1,000.00 12.00 10.42 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,780.00 11.69 10.08 11.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33,070.00 12.48 10.43 9.59 =============== 630-80384 Tubular Marker Each =================================================== SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 18.00 35.00 55.83 73.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 35.00 55.83 73.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 542 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80384 Tubular Marker Each =================================================== BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 80.00 30.00 32.65 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 80.00 30.00 32.65 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 98.00 30.92 36.19 37.90 =============== 630-80390 Channel Dev (Spec) Each =================================================== IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 240.00 90.00 25.00 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 240.00 90.00 25.00 12.00 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 500.00 12.00 47.90 57.50 HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 500.00 12.00 32.75 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,000.00 12.00 41.17 41.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,240.00 27.10 38.94 35.59 =============== 630-80391 Channel Dev (Fixed) Each =================================================== IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 400.00 31.00 87.49 87.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 400.00 31.00 87.49 87.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 400.00 31.00 87.49 87.00 =============== 630-80430 Rumble Strip (Port) Each =================================================== IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 4.00 500.00 1344.63 102.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 500.00 1344.63 102.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 500.00 1344.63 102.00 =============== 630-80510 Mobile Pvmt Mkg Zone LUMP SUM =============================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 1.00 6000.00 2635.00 1575.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 543 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80510 Mobile Pvmt Mkg Zone LUMP SUM =============================================== IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 1.00 5000.00 2745.00 1025.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 1.00 6000.00 1832.50 1080.00 NH 0341-064 US 34: ESTES PARK TO ROCKY MT 01/12/06 1.00 7500.00 1075.00 1100.00 NH 0342-042 US 34 AND US 36 CHIPSEALS - E 01/12/06 1.00 2800.00 2000.00 2500.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 1.00 3000.00 2448.22 550.00 STA 172A-015 SH 172, NM STATE LINE TO S. O 02/16/06 1.00 5000.00 2400.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 5042.86 2288.53 1475.71 STA 0142-046 SH 14, EAST OF BRIGGSDALE 04/20/06 1.00 3000.00 1024.50 500.00 STA 0072-016 SH 7, LYONS TO RAYMOND 05/18/06 1.00 3500.00 4080.00 4540.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 3250.00 2170.31 2520.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 1.00 5000.00 11649.68 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5000.00 11649.68 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 4680.00 3527.99 1737.00 =============== 630-80520 Mobile Pvmt Mkg Zone Day ==================================================== STA 1131-005 SH 113 IN LOGAN COUNTY 02/02/06 1.00 2800.00 2250.00 1000.00 SHE 0504-049 US 50, EAST OF LA JUNTA 02/02/06 2.00 1000.00 1087.50 1050.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 5.00 500.00 1299.51 1300.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 6.00 750.00 427.62 390.49 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 6.00 750.00 1116.83 1417.33 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 2.00 750.00 1347.37 2174.24 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 5.00 600.00 740.24 478.17 SHE 069A-020 SH 69 AT MP 66.5 & MP 73 03/23/06 0.50 2000.00 2400.00 2400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27.50 792.73 1016.91 1032.23 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 4.00 750.00 536.12 220.00 NH 088A-023 BELLVIEW AVE. - BROADWAY TO U 04/20/06 4.00 750.00 460.55 875.00 NH 0341-067 ON US 34 IN LARIMER COUNTY. 05/25/06 1.00 2000.00 995.00 1000.00 NH 0062-021 6TH AVE COLFAX TO SIMMS 06/15/06 2.00 750.00 991.54 1050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.00 863.64 574.38 680.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 544 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80520 Mobile Pvmt Mkg Zone Day ==================================================== NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC 07/20/06 5.00 500.00 562.50 520.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 3.00 750.00 1329.67 1350.00 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 1.00 1000.00 1642.00 1650.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 5.00 2500.00 1053.92 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 1303.57 1008.06 950.00 IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 12.00 500.00 1579.69 1600.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 2.00 1000.00 1019.63 1100.00 SHE 0503-067 US 50, WEST OF CANON CITY 11/30/06 0.50 2400.00 1984.00 2200.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 2.00 750.00 589.36 530.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.50 648.48 1351.02 1427.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 69.00 873.19 1042.10 1054.00 =============== 630-80560 Mobile Profilograph Oper Zone LUMP SUM =============================================== NH 5502-052 US 550 N OF DURANGO PH II 01/05/06 1.00 8000.00 2827.50 1837.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 8000.00 2827.50 1837.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 8000.00 2827.50 1837.50 =============== 630-85006 Impact Atten (Sand Fill) (Temp) Each =================================================== IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 2.00 5000.00 4155.81 5300.00 NH 1602-096 US 160, MP 117 TO MP 131.5 01/12/06 4.00 2500.00 1195.00 1080.00 IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 2.00 6000.00 4379.12 4580.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 4000.00 3049.64 3010.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 4.00 5000.00 5577.61 6500.00 C 5502-057 US 550 CULVERT REPAIRS 08/03/06 2.00 2000.00 2785.00 1890.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 4000.00 4779.72 4963.33 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 545 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85006 Impact Atten (Sand Fill) (Temp) Each =================================================== HB 0701-180 INTERSTATE 70, UTAH/COLORADO 11/30/06 2.00 4000.00 2685.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 4000.00 2685.00 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 4000.00 3648.66 3616.25 =============== 630-85010 Impact Atten (Temp) Each =================================================== STA 105A-013 SH 105, SOUTH OF SEDALIA 01/05/06 2.00 6000.00 2551.00 3675.00 STA 0851-007 SH 85, MAIN ST. TO ACADEMY 01/19/06 5.00 4500.00 1983.77 2051.30 NH 2854-106 US 285, FOXTON RD - RICHMOND 02/02/06 2.00 5000.00 4482.35 3433.75 IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M 02/02/06 5.00 15000.00 8219.63 5400.00 IM 0252-382 I 25, SH 83 TO FOUNTAIN 02/09/06 2.00 4000.00 1440.33 1100.00 IM 0702-257 I70 - EISENHOWER TUNNEL 02/16/06 2.00 7500.00 5900.00 5000.00 SHE 0243-071 US 24 PEYTON INTERSECTION 03/02/06 2.00 4000.00 2875.00 1400.00 IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR 03/09/06 3.00 2500.00 1427.00 1120.00 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 2.00 7000.00 5122.00 4200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 6880.00 4737.85 3129.36 STA 145A-037 SH 145 KEYSTONE HILL 04/20/06 2.00 3000.00 1339.00 1000.00 IM 0762-043 ON I-76 IN SEDGWICK COUNTY 06/15/06 2.00 5500.00 20849.02 21000.00 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 1.00 6000.00 4711.00 4305.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 4600.00 7665.67 9661.00 C 0252-367 I-25, 5TH STREET TO FOUNDERS/ 07/13/06 7.00 2500.00 4749.43 4702.70 BR 3852-009 US 385 WRAY BRIDGE REPLACEME 07/13/06 2.00 5000.00 4916.71 2000.00 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 2.00 5000.00 8825.00 4800.00 IM 0253-160 ON I-25 IN WELD COUNTY 08/03/06 2.00 10000.00 5388.51 4800.00 IM 0703-273 HOGBACK PARK N RIDE PHASE II 08/03/06 1.00 4000.00 3778.62 5264.46 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 8.00 4500.00 9779.70 6000.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 12.00 7500.00 5540.68 4500.00 C R600-283 VARIOUS 08/10/06 1.00 6000.00 9788.33 7565.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 2.00 4500.00 3758.51 2850.00 BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK 09/28/06 4.00 5000.00 4700.28 5065.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 41.00 5426.83 6549.30 4802.64 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 546 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85010 Impact Atten (Temp) Each =================================================== IM 0703-291 I70 / SH58, RAMP A, B, C, D, 11/02/06 13.00 4500.00 5247.71 5600.00 STA 0091-026 STATE HIGHWAY NO 9 11/30/06 2.00 5000.00 3089.80 2549.00 STU R200-097 POWERS BLVD / WOODMAN RD - CO 12/07/06 6.00 2500.00 3569.64 5200.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 1.00 4300.00 5009.44 4800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22.00 3990.91 4590.67 5177.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93.00 5433.33 5620.11 4702.64 =============== 630-85040 Impact Atten (T-M-A) (Temp) Each =================================================== IM 0705-076 I-70, GENOA EAST AND WEST 01/05/06 2.00 15000.00 15756.00 11280.00 IM 0704-206 I-70, BRIGHTON BLVD - COLO. B 01/12/06 4.00 20000.00 21123.80 25000.00 IM 0703-295 I-70, GEORGETOWN EAST OVERLAY 01/26/06 2.00 12000.00 17166.67 16500.00 IM 0253-187 I-25, 84TH TO 120TH AVENUE 03/02/06 2.00 20000.00 28031.42 26125.69 NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL 03/02/06 2.00 10000.00 26419.30 22677.21 IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI 03/02/06 2.00 10000.00 22093.06 21742.37 SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 2.00 10000.00 27470.00 10000.00 NH 1211-066 SH 121: WATERTON RD TO C470 03/23/06 1.00 12000.00 32060.75 23376.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 14470.59 23135.29 20001.62 STA 157A-009 SH 157 IN BOULDER COUNTY 04/06/06 2.00 11000.00 8968.75 7500.00 NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT 04/20/06 1.00 9000.00 9728.86 3800.00 STA 053A-001 BROADWAY: 58TH TO SH 224 04/20/06 2.00 10000.00 30009.55 28825.00 NH 0062-022 SH6 EB @ WADSWORTH BLVD. 06/15/06 1.00 12000.00 13058.00 13775.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 10500.00 16641.27 15037.50 STU 4701-107 C-470: WADSWORTH BLVD TO BROA 07/20/06 2.00 11500.00 16250.00 9450.00 BR R400-203 FY 06 BRIDGE MAINTENANCE 07/20/06 2.00 10000.00 17250.00 18000.00 BR 2854-105 US 285 WEST OF SH 470 AND EAS 07/27/06 2.00 20000.00 31849.57 30000.00 SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T 08/03/06 1.00 20000.00 18322.00 16175.00 STU M040-011 WADSWORTH BYPASS (SH 121) FRO 08/03/06 1.00 15000.00 24600.26 20000.00 C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA 08/10/06 2.00 10000.00 27767.62 35000.00 C R600-283 VARIOUS 08/10/06 1.00 12000.00 9281.67 8645.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 547 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85040 Impact Atten (T-M-A) (Temp) Each =================================================== NH 2854-102 US 285 CORRIDOR IN JEFFERSON 09/14/06 1.00 15000.00 8400.00 11800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 13750.00 22299.86 20126.67 IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT 10/05/06 2.00 28000.00 11723.25 11723.25 HB 0701-173 ON INTERSTATE 70 FROM CLIFTON 11/16/06 2.00 16000.00 14500.00 13800.00 IM 076A-007 I-76 FROM US85 TO BURLINGTON 11/16/06 2.00 15000.00 20864.29 16200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 19666.67 17713.33 13907.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 41.00 14439.02 21210.65 18419.98 =============== 630-85041 Impact Atten (T-M-A) Day ==================================================== IM 0703-301 ON GEORGETOWN HILL ABOVE THE 09/21/06 30.00 270.00 516.67 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 270.00 516.67 550.00 IM R600-292 70TH AVE AT I-25/BLAKE AND 20 11/30/06 20.00 300.00 271.19 226.00 NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX 12/28/06 10.00 450.00 536.32 460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30.00 350.00 359.56 304.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 310.00 406.69 427.00 =============== 630-85115 Impact Atten (Quadguard) (Temp) Each =================================================== IM R600-224 I-25 & SPEER INTERCHANGE MOD. 03/02/06 1.00 18000.00 24699.30 19400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 18000.00 24699.30 19400.00 IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 7.00 15000.00 12249.07 24196.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 15000.00 12249.07 24196.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 15375.00 15361.63 23596.68 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 548 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-86800 Traffic Signal (Temp) LUMP SUM =============================================== SHO M145-006 SH 121 & 128 INTERSECTION IMP 03/23/06 1.00 30000.00 17380.00 16700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 30000.00 17380.00 16700.00 NH 1604-009 SH 160, WALSH EAST & WEST - A 06/08/06 1.00 7000.00 7837.50 5100.00 BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 06/22/06 1.00 18000.00 13800.00 13800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 14333.33 9825.00 10900.00 BR 0361-052 N ST VRAIN Cr (LYONS) 08/31/06 1.00 30000.00 57714.87 45000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 30000.00 57714.87 45000.00 BR 092A-019 EXISTING STRUCTURE J-06-A IS 11/30/06 1.00 20000.00 9016.67 9000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 20000.00 9016.67 9000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 20428.57 22205.65 16057.14 =============== 630-86810 Traffic Signal (Temp) Each =================================================== BR 012A-041 ON SH12, 5 MILES NORTH OF STO 03/16/06 2.00 35000.00 28500.00 28500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 35000.00 28500.00 28500.00 BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 2.00 30000.00 29000.00 31500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 30000.00 29000.00 31500.00 ER 067A-025 SH 67 NORTH OF WOODLAND PARK 08/01/06 6.00 50000.00 12446.50 14700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 50000.00 12446.50 14700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 43000.00 14494.85 20820.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 549 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 631-10000 Alt Brdg Design and Const LUMP SUM =============================================== IM 0251-166 ON I-25 NB FROM COMMERCIAL ST 09/21/06 1.00 4873111.30 4912741.20 4085072.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 4873111.30 4912741.20 4085072.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 4873111.30 4912741.20 4085072.84 =============== 641-10050 Shotcrete Class 1 Sq Yard ================================================ BR 0132-016 EXISTING TIMBER BRIDGE (STR. 05/18/06 3.00 1000.00 1175.00 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1000.00 1175.00 850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1000.00 1175.00 850.00 =============== 660-00000 Special Syst LUMP SUM =============================================== STU R400-204 ALONG I-25 IN REGION 4. 09/14/06 1.00 160000.00 88271.80 74744.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 160000.00 88271.80 74744.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 160000.00 88271.80 74744.00 =============== 700-70002 F/A ANTICIPATED CMO Force Acct ============================================= STA 172A-015 SH 172, NM STATE LINE TO S. O . 1.00 122445.49 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 122445.49 . . STA 145A-037 SH 145 KEYSTONE HILL . 1.00 110000.00 . . NH 1604-009 SH 160, WALSH EAST & WEST - A . 1.00 1273661.26 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 691830.63 . . IM 0703-273 HOGBACK PARK N RIDE PHASE II . 1.00 420000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 420000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 481526.69 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 550 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70010 F/A Minor Contract Revisions Force Acct ============================================= NH 5502-052 US 550 N OF DURANGO PH II . 1.00 200000.00 . . SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 . 1.00 30000.00 . . STA 105A-013 SH 105, SOUTH OF SEDALIA . 1.00 50000.00 . . SHE 0091-025 SH 9 VMS IN BRECKENRIDGE . 1.00 10000.00 . . STA 0361-081 SH 36 VMS IN BOULDER COUNTY . 1.00 10000.00 . . IM 0705-076 I-70, GENOA EAST AND WEST . 1.00 20000.00 . . C 0702-258 I70 - ROCKFALL IN GLENWOOD CA . 1.00 5000.00 . . IM 0704-206 I-70, BRIGHTON BLVD - COLO. B . 1.00 300000.00 . . NH 1602-096 US 160, MP 117 TO MP 131.5 . 1.00 160000.00 . . NH 0341-064 US 34: ESTES PARK TO ROCKY MT . 1.00 100000.00 . . NH 0342-042 US 34 AND US 36 CHIPSEALS - E . 1.00 30000.00 . . STA 0851-007 SH 85, MAIN ST. TO ACADEMY . 1.00 650000.00 . . STA 3852-010 US 385 IN YUMA COUNTY . 1.00 50000.00 . . STA 052A-024 SH 52, PROSPECT VALLEY WEST . 1.00 75000.00 . . IM 0703-295 I-70, GEORGETOWN EAST OVERLAY . 1.00 150000.00 . . STA 0343-025 US 34, WRAY WEST . 1.00 50000.00 . . NH 2854-106 US 285, FOXTON RD - RICHMOND . 1.00 150000.00 . . IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M . 1.00 25000.00 . . STA 1131-005 SH 113 IN LOGAN COUNTY . 50,000.00 1.00 . . SHE 0504-049 US 50, EAST OF LA JUNTA . 1.00 5000.00 . . IM 0252-382 I 25, SH 83 TO FOUNTAIN . 1.00 250000.00 . . SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA . 1.00 15000.00 . . IM 0702-257 I70 - EISENHOWER TUNNEL . 1.00 150000.00 . . STA 172A-015 SH 172, NM STATE LINE TO S. O . 1.00 70000.00 . . IM R600-224 I-25 & SPEER INTERCHANGE MOD. . 2.00 150000.00 . . IM 0253-187 I-25, 84TH TO 120TH AVENUE . 1.00 200000.00 . . NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL . 1.00 200000.00 . . IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI . 1.00 100000.00 . . SHE 0243-071 US 24 PEYTON INTERSECTION . 1.00 100000.00 . . SHE 2854-111 US 285 & C470 SIGNING . 1.00 5000.00 . . SHE M910-004 US 50 AND SH 550 IN MONTROSE . 1.00 30000.00 . . SHE 0911-004 SH 91 & SH 67 GUARDRAIL . 1.00 5000.00 . . BR 069A-019 SH 69, ROSITA CREEK . 1.00 75000.00 . . IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR . 1.00 150000.00 . . SHE R400-183 R4 FY06 SAFETY PROJECTS . 1.00 20000.00 . . BR 012A-041 ON SH12, 5 MILES NORTH OF STO . 1.00 15835.51 . . AQC R600-241 SH 287 (FEDERAL BLVD), 52ND A . 1.00 9000.00 . . IM 0701-179 I-70, GLENWOOD SPRINGS . 1.00 150000.00 . . STA 0091-022 SH 9, HOOSIER PASS NORTH . 1.00 100000.00 . . SHO M145-006 SH 121 & 128 INTERSECTION IMP . 1.00 300000.00 . . NH 0021-027 SH 2, MARTIN LUTHER KING BLVD . 1.00 75000.00 . . NH 093A-005 SH 93, BOULDER CANAL TO SH 12 . 1.00 113000.00 . . R600-247 SIGNALS - SH 121 & SH 391 . 1.00 62000.00 . . NH 1211-066 SH 121: WATERTON RD TO C470 . 1.00 57000.00 . . STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 . 1.00 30000.00 . . SHE 069A-020 SH 69 AT MP 66.5 & MP 73 . 1.00 10000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 551 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70010 F/A Minor Contract Revisions Force Acct ============================================= STA 0853-063 SH 14 & 1ST AVE. IN AULT . 1.00 5000.00 . . STA 0343-028 SH 34, WRAY SIGNAL REBUILD . 1.00 5000.00 . . NH 0821-076 SH82 OVERLAY - ASPEN . 1.00 100000.00 . . IM 0702-252 I-70 WOLCOTT EAST ALT. B . 1.00 100000.00 . . NH R200-140 I-25, SH 47, 50, 115 CRACK RE . 1.00 75000.00 . . SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE . 1.00 5000.00 . . SHE 2873-143 US 287 AT CR 54G, N. OF FT. C . 1.00 15000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50,053.00 100.23 . . IM 0251-172 I-25, N. OF BUTTE CREEK RD . 1.00 157000.00 . . IM 0252-381 I-25, GREENLAND TO LARKSPUR . 1.00 50000.00 . . STA 0831-100 PARKER RD AT LONG AVE. SIGNAL . 1.00 15000.00 . . STA 157A-009 SH 157 IN BOULDER COUNTY . 1.00 28000.00 . . STA 145A-037 SH 145 KEYSTONE HILL . 1.00 200000.00 . . STA 0142-046 SH 14, EAST OF BRIGGSDALE . 1.00 50000.00 . . NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT . 1.00 50000.00 . . STA 053A-001 BROADWAY: 58TH TO SH 224 . 1.00 150000.00 . . NH 088A-023 BELLVIEW AVE. - BROADWAY TO U . 1.00 100000.00 . . SHE 052A-026 SH 52/ US 287 DILEMMA ZONE PR . 1.00 15000.00 . . NH 2871-030 SH 287, JUNCTION OF SH 116 NO . 1.00 152000.00 . . BR 0132-016 EXISTING TIMBER BRIDGE (STR. . 1.00 20000.00 . . STA 0072-016 SH 7, LYONS TO RAYMOND . 1.00 125000.00 . . NH 0341-067 ON US 34 IN LARIMER COUNTY. . 1.00 15000.00 . . C 0831-103 PINELLO ROUNDABOUT - ACADEMY . 1.00 5000.00 . . SHE 0342-045 ON US 34 IN WELD COUNTY. . 1.00 10000.00 . . NH 1604-009 SH 160, WALSH EAST & WEST - A . 1.00 162174.00 . . IM 0762-043 ON I-76 IN SEDGWICK COUNTY . 1.00 500000.00 . . NH 0062-021 6TH AVE COLFAX TO SIMMS . 1.00 200000.00 . . NH 0062-022 SH6 EB @ WADSWORTH BLVD. . 1.00 10000.00 . . BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 . 1.00 50000.00 . . BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL . 1.00 65000.00 . . CC R600-281 CHATFIELD STATE PARK MAIN ROA . 1.00 20000.00 . . STA 0131-044 SH 13, S. OF MEEKER - ALT B . 1.00 75000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24.00 92673.92 . . C 0252-367 I-25, 5TH STREET TO FOUNDERS/ . 1.00 500000.00 . . BR 3852-009 US 385 WRAY BRIDGE REPLACEME . 1.00 150000.00 . . NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC . 50,000.00 1.00 . . STU 4701-107 C-470: WADSWORTH BLVD TO BROA . 1.00 25000.00 . . BR R400-203 FY 06 BRIDGE MAINTENANCE . 1.00 5000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 552 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70010 F/A Minor Contract Revisions Force Acct ============================================= STA 0881-019 AT THE INTERSECTION OF ARAPAH . 1.00 50000.00 . . SHE 0403-050 ON US 40 THROUGH WINTER PARK . 1.00 5000.00 . . BR 2854-105 US 285 WEST OF SH 470 AND EAS . 1.00 295000.00 . . ER 067A-025 SH 67 NORTH OF WOODLAND PARK . 1.00 1000000.00 . . STA 062A-011 SH 62 & CR 5 (AMELIA ST) . 1.00 40000.00 . . SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T . 1.00 100000.00 . . IM 0253-160 ON I-25 IN WELD COUNTY . 1.00 750000.00 . . IM 0703-273 HOGBACK PARK N RIDE PHASE II . 1.00 100000.00 . . C 5502-057 US 550 CULVERT REPAIRS . 1.00 50000.00 . . STU M040-011 WADSWORTH BYPASS (SH 121) FRO . 1.00 1000000.00 . . C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA . 1.00 600000.00 . . C R600-283 VARIOUS . 1.00 30000.00 . . C 0501-049 US50 AT 29 RD IN MESA COUNTY . 1.00 50000.00 . . STA 0405-031 US40 HUGO EAST . 1.00 18000.00 . . STA 060A-010 SH 60 AT 83RD AVE IN WELD COU . 1.00 75000.00 . . BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT . 1.00 20000.00 . . NH 0061-078 US 6 MP 260.00 TO 270.5 . 1.00 20000.00 . . BR 0361-052 N ST VRAIN Cr (LYONS) . 1.00 100000.00 . . AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR . 1.00 20000.00 . . STU R400-204 ALONG I-25 IN REGION 4. . 1.00 30000.00 . . NH 2854-102 US 285 CORRIDOR IN JEFFERSON . 1.00 25000.00 . . IM 0251-166 ON I-25 NB FROM COMMERCIAL ST . 1.00 750000.00 . . IM 0703-301 ON GEORGETOWN HILL ABOVE THE . 1.00 20000.00 . . BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK . 1.00 100000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50,028.00 119.49 . . STA R600-279 SH 121 (WADSWORTH) FROM KEN C . 1.00 10000.00 . . IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT . 1.00 55000.00 . . NH 0503-063 US 50 AND CR 107 IN SALIDA . 1.00 30000.00 . . IM 0703-291 I70 / SH58, RAMP A, B, C, D, . 1.00 1750000.00 . . IM 0252-384 I-25 OVER BROADWAY . 1.00 100000.00 . . HB 0701-173 ON INTERSTATE 70 FROM CLIFTON . 1.00 100000.00 . . IM 076A-007 I-76 FROM US85 TO BURLINGTON . 1.00 100000.00 . . HB 0853-064 US 85C-LATHAM CANAL CONST . 1.00 100000.00 . . C 0251-173 I 25, CULVERTS, TRINIDAD & PU . 1.00 45000.00 . . C 0252-389 BRONCO ARCH BRIDGE OVER THE S . 1.00 50000.00 . . HB 0701-180 INTERSTATE 70, UTAH/COLORADO . 1.00 150000.00 . . STA 0091-026 STATE HIGHWAY NO 9 . 1.00 25000.00 . . IM R600-292 70TH AVE AT I-25/BLAKE AND 20 . 1.00 10000.00 . . SHE 0503-067 US 50, WEST OF CANON CITY . 1.00 10000.00 . . BR 0021-034 SH 2 OVER FULTON CANAL . 1.00 75000.00 . . BR 092A-019 EXISTING STRUCTURE J-06-A IS . 1.00 50000.00 . . STU R200-097 POWERS BLVD / WOODMAN RD - CO . 1.00 925000.00 . . NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX . 1.00 300000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 215833.33 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100,123.00 170.83 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 553 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70011 F/A Partnering Force Acct ============================================= NH 5502-052 US 550 N OF DURANGO PH II . 1.00 5000.00 . . IM 0252-382 I 25, SH 83 TO FOUNTAIN . 1.00 5000.00 . . IM 0702-257 I70 - EISENHOWER TUNNEL . 1.00 5000.00 . . IM R600-224 I-25 & SPEER INTERCHANGE MOD. . 1.00 1000.00 . . IM 0253-187 I-25, 84TH TO 120TH AVENUE . 1.00 5000.00 . . BR 069A-019 SH 69, ROSITA CREEK . 1.00 5000.00 . . IM 0701-179 I-70, GLENWOOD SPRINGS . 1.00 1500.00 . . STA 0091-022 SH 9, HOOSIER PASS NORTH . 1.00 5000.00 . . NH 0821-076 SH82 OVERLAY - ASPEN . 1.00 1500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 3777.78 . . IM 0251-172 I-25, N. OF BUTTE CREEK RD . 1.00 5000.00 . . STA 145A-037 SH 145 KEYSTONE HILL . 1.00 5000.00 . . NH 2871-030 SH 287, JUNCTION OF SH 116 NO . 1.00 5000.00 . . NH 1604-009 SH 160, WALSH EAST & WEST - A . 1.00 2500.00 . . NH 0062-021 6TH AVE COLFAX TO SIMMS . 1.00 1000.00 . . BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL . 1.00 1000.00 . . STA 0131-044 SH 13, S. OF MEEKER - ALT B . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 3500.00 . . C 0252-367 I-25, 5TH STREET TO FOUNDERS/ . 1.00 5000.00 . . NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC . 5,000.00 1.00 . . STA 0881-019 AT THE INTERSECTION OF ARAPAH . 1.00 5000.00 . . ER 067A-025 SH 67 NORTH OF WOODLAND PARK . 1.00 10000.00 . . STA 062A-011 SH 62 & CR 5 (AMELIA ST) . 1.00 1000.00 . . SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T . 1.00 2000.00 . . IM 0253-160 ON I-25 IN WELD COUNTY . 1.00 10000.00 . . IM 0703-273 HOGBACK PARK N RIDE PHASE II . 1.00 5000.00 . . STU M040-011 WADSWORTH BYPASS (SH 121) FRO . 1.00 10000.00 . . C R600-283 VARIOUS . 1.00 2000.00 . . STA 060A-010 SH 60 AT 83RD AVE IN WELD COU . 1.00 30000.00 . . IM 0251-166 ON I-25 NB FROM COMMERCIAL ST . 1.00 50000.00 . . BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK . 1.00 2000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,012.00 27.33 . . NH 0503-063 US 50 AND CR 107 IN SALIDA . 1.00 2000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 554 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70011 F/A Partnering Force Acct ============================================= IM 0703-291 I70 / SH58, RAMP A, B, C, D, . 1.00 20000.00 . . IM 0252-384 I-25 OVER BROADWAY . 1.00 5000.00 . . HB 0701-173 ON INTERSTATE 70 FROM CLIFTON . 1.00 3000.00 . . IM 076A-007 I-76 FROM US85 TO BURLINGTON . 1.00 5000.00 . . HB 0853-064 US 85C-LATHAM CANAL CONST . 1.00 5000.00 . . C 0251-173 I 25, CULVERTS, TRINIDAD & PU . 1.00 3000.00 . . HB 0701-180 INTERSTATE 70, UTAH/COLORADO . 1.00 1500.00 . . BR 0021-034 SH 2 OVER FULTON CANAL . 1.00 2000.00 . . STU R200-097 POWERS BLVD / WOODMAN RD - CO . 1.00 25000.00 . . NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX . 1.00 1000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 6590.91 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,039.00 53.19 . . =============== 700-70012 F/A Asph Pvmt Incentive Force Acct ============================================= NH 5502-052 US 550 N OF DURANGO PH II . 1.00 84800.00 . . STA 105A-013 SH 105, SOUTH OF SEDALIA . 1.00 41000.00 . . IM 0705-076 I-70, GENOA EAST AND WEST . 1.00 45957.00 . . NH 1602-096 US 160, MP 117 TO MP 131.5 . 1.00 96870.00 . . NH 0341-064 US 34: ESTES PARK TO ROCKY MT . 1.00 56500.00 . . STA 3852-010 US 385 IN YUMA COUNTY . 1.00 28000.00 . . STA 052A-024 SH 52, PROSPECT VALLEY WEST . 1.00 106000.00 . . IM 0703-295 I-70, GEORGETOWN EAST OVERLAY . 2.00 17500.00 . . STA 0343-025 US 34, WRAY WEST . 1.00 190000.00 . . IM 0252-382 I 25, SH 83 TO FOUNTAIN . 1.00 195000.00 . . STA 172A-015 SH 172, NM STATE LINE TO S. O . 1.00 50000.00 . . IM 0253-187 I-25, 84TH TO 120TH AVENUE . 2.00 71700.00 . . NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL . 1.00 50259.00 . . IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI . 1.00 57800.00 . . BR 069A-019 SH 69, ROSITA CREEK . 1.00 1000.00 . . IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR . 1.00 55000.00 . . BR 012A-041 ON SH12, 5 MILES NORTH OF STO . 1.00 131.84 . . STA 0091-022 SH 9, HOOSIER PASS NORTH . 1.00 45000.00 . . SHO M145-006 SH 121 & 128 INTERSECTION IMP . 1.00 25500.00 . . NH 0021-027 SH 2, MARTIN LUTHER KING BLVD . 1.00 20000.00 . . NH 093A-005 SH 93, BOULDER CANAL TO SH 12 . 1.00 37200.00 . . NH 1211-066 SH 121: WATERTON RD TO C470 . 1.00 32000.00 . . STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 . 1.00 2700.00 . . IM 0702-252 I-70 WOLCOTT EAST ALT. B . 1.00 200000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26.00 61504.53 . . IM 0251-172 I-25, N. OF BUTTE CREEK RD . 1.00 47300.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 555 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70012 F/A Asph Pvmt Incentive Force Acct ============================================= IM 0252-381 I-25, GREENLAND TO LARKSPUR . 1.00 117000.00 . . STA 145A-037 SH 145 KEYSTONE HILL . 1.00 2000.00 . . STA 0142-046 SH 14, EAST OF BRIGGSDALE . 1.00 175000.00 . . STA 053A-001 BROADWAY: 58TH TO SH 224 . 1.00 22500.00 . . NH 088A-023 BELLVIEW AVE. - BROADWAY TO U . 1.00 21000.00 . . STA 0072-016 SH 7, LYONS TO RAYMOND . 1.00 183000.00 . . NH 1604-009 SH 160, WALSH EAST & WEST - A . 1.00 77577.00 . . CC R600-281 CHATFIELD STATE PARK MAIN ROA . 1.00 3100.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 72053.00 . . BR 3852-009 US 385 WRAY BRIDGE REPLACEME . 1.00 4900.00 . . NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC . 5,000.00 1.00 . . STA 062A-011 SH 62 & CR 5 (AMELIA ST) . 1.00 28500.00 . . IM 0253-160 ON I-25 IN WELD COUNTY . 1.00 255000.00 . . STU M040-011 WADSWORTH BYPASS (SH 121) FRO . 1.00 35000.00 . . STA 0405-031 US40 HUGO EAST . 1.00 15495.00 . . STA 060A-010 SH 60 AT 83RD AVE IN WELD COU . 1.00 15000.00 . . BR 0361-052 N ST VRAIN Cr (LYONS) . 1.00 9300.00 . . IM 0251-166 ON I-25 NB FROM COMMERCIAL ST . 1.00 60000.00 . . BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK . 1.00 1300.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,009.00 85.74 . . IM 0703-291 I70 / SH58, RAMP A, B, C, D, . 1.00 65000.00 . . IM 076A-007 I-76 FROM US85 TO BURLINGTON . 1.00 112715.00 . . HB 0853-064 US 85C-LATHAM CANAL CONST . 1.00 2500.00 . . NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX . 2.00 47840.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 55179.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,049.00 584.87 . . =============== 700-70013 F/A Conc Pvmt Incentive Force Acct ============================================= SHO M145-006 SH 121 & 128 INTERSECTION IMP . 1.00 43000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 43000.00 . . C 0831-103 PINELLO ROUNDABOUT - ACADEMY . 1.00 1300.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 556 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70013 F/A Conc Pvmt Incentive Force Acct ============================================= IM 0762-043 ON I-76 IN SEDGWICK COUNTY . 1.00 535000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 268150.00 . . C 0252-367 I-25, 5TH STREET TO FOUNDERS/ . 1.00 300000.00 . . BR 3852-009 US 385 WRAY BRIDGE REPLACEME . 1.00 1000.00 . . SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T . 1.00 9000.00 . . IM 0253-160 ON I-25 IN WELD COUNTY . 1.00 706000.00 . . STA 060A-010 SH 60 AT 83RD AVE IN WELD COU . 1.00 15000.00 . . IM 0251-166 ON I-25 NB FROM COMMERCIAL ST . 1.00 2000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 172166.67 . . IM 0703-291 I70 / SH58, RAMP A, B, C, D, . 1.00 125000.00 . . IM 0252-384 I-25 OVER BROADWAY . 1.00 5000.00 . . HB 0853-064 US 85C-LATHAM CANAL CONST . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 45000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 145608.33 . . =============== 700-70014 F/A Incentive Force Acct ============================================= NH 2854-106 US 285, FOXTON RD - RICHMOND . 1.00 18000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 18000.00 . . NH 088A-023 BELLVIEW AVE. - BROADWAY TO U . 1.00 13000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 13000.00 . . STA 060A-010 SH 60 AT 83RD AVE IN WELD COU . 1.00 4500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 4500.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 11833.33 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 557 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70016 F/A Fuel Cost Adjustment Force Acct ============================================= NH 5502-052 US 550 N OF DURANGO PH II . 1.00 35000.00 . . SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 . 1.00 100.00 . . STA 105A-013 SH 105, SOUTH OF SEDALIA . 1.00 7000.00 . . IM 0705-076 I-70, GENOA EAST AND WEST . 1.00 12000.00 . . NH 1602-096 US 160, MP 117 TO MP 131.5 . 1.00 33000.00 . . NH 0341-064 US 34: ESTES PARK TO ROCKY MT . 1.00 13200.00 . . NH 0342-042 US 34 AND US 36 CHIPSEALS - E . 1.00 7950.00 . . STA 0851-007 SH 85, MAIN ST. TO ACADEMY . 1.00 12900.00 . . STA 3852-010 US 385 IN YUMA COUNTY . 1.00 22500.00 . . STA 052A-024 SH 52, PROSPECT VALLEY WEST . 1.00 19500.00 . . IM 0703-295 I-70, GEORGETOWN EAST OVERLAY . 1.00 18300.00 . . STA 0343-025 US 34, WRAY WEST . 1.00 25000.00 . . NH 2854-106 US 285, FOXTON RD - RICHMOND . 1.00 10000.00 . . IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M . 1.00 14250.00 . . SHE 0504-049 US 50, EAST OF LA JUNTA . 1.00 300.00 . . IM 0252-382 I 25, SH 83 TO FOUNTAIN . 1.00 25000.00 . . IM 0702-257 I70 - EISENHOWER TUNNEL . 1.00 18800.00 . . STA 172A-015 SH 172, NM STATE LINE TO S. O . 1.00 11000.00 . . IM R600-224 I-25 & SPEER INTERCHANGE MOD. . 1.00 5000.00 . . IM 0253-187 I-25, 84TH TO 120TH AVENUE . 1.00 21555.00 . . NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL . 1.00 13500.00 . . IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI . 1.00 17700.00 . . SHE 2854-111 US 285 & C470 SIGNING . 1.00 500.00 . . SHE 0911-004 SH 91 & SH 67 GUARDRAIL . 1.00 2000.00 . . BR 069A-019 SH 69, ROSITA CREEK . 1.00 5500.00 . . IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR . 1.00 25000.00 . . BR 012A-041 ON SH12, 5 MILES NORTH OF STO . 1.00 60000.00 . . AQC R600-241 SH 287 (FEDERAL BLVD), 52ND A . 1.00 1000.00 . . IM 0701-179 I-70, GLENWOOD SPRINGS . 1.00 36000.00 . . STA 0091-022 SH 9, HOOSIER PASS NORTH . 1.00 11500.00 . . SHO M145-006 SH 121 & 128 INTERSECTION IMP . 1.00 1000.00 . . NH 0021-027 SH 2, MARTIN LUTHER KING BLVD . 1.00 1000.00 . . NH 093A-005 SH 93, BOULDER CANAL TO SH 12 . 1.00 7100.00 . . NH 1211-066 SH 121: WATERTON RD TO C470 . 1.00 6375.00 . . STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 . 1.00 10000.00 . . SHE 069A-020 SH 69 AT MP 66.5 & MP 73 . 1.00 500.00 . . STA 0853-063 SH 14 & 1ST AVE. IN AULT . 1.00 500.00 . . STA 0343-028 SH 34, WRAY SIGNAL REBUILD . 1.00 500.00 . . NH 0821-076 SH82 OVERLAY - ASPEN . 1.00 14000.00 . . IM 0702-252 I-70 WOLCOTT EAST ALT. B . 1.00 16900.00 . . NH R200-140 I-25, SH 47, 50, 115 CRACK RE . 1.00 13880.00 . . SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE . 1.00 100.00 . . SHE 2873-143 US 287 AT CR 54G, N. OF FT. C . 1.00 120.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 43.00 12954.19 . . IM 0251-172 I-25, N. OF BUTTE CREEK RD . 1.00 34000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 558 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70016 F/A Fuel Cost Adjustment Force Acct ============================================= IM 0252-381 I-25, GREENLAND TO LARKSPUR . 1.00 20000.00 . . STA 0831-100 PARKER RD AT LONG AVE. SIGNAL . 1.00 1500.00 . . STA 157A-009 SH 157 IN BOULDER COUNTY . 1.00 1000.00 . . STA 145A-037 SH 145 KEYSTONE HILL . 1.00 5000.00 . . STA 0142-046 SH 14, EAST OF BRIGGSDALE . 1.00 20000.00 . . NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT . 1.00 11000.00 . . STA 053A-001 BROADWAY: 58TH TO SH 224 . 1.00 7500.00 . . NH 088A-023 BELLVIEW AVE. - BROADWAY TO U . 1.00 6500.00 . . SHE 052A-026 SH 52/ US 287 DILEMMA ZONE PR . 1.00 100.00 . . NH 2871-030 SH 287, JUNCTION OF SH 116 NO . 1.00 80000.00 . . BR 0132-016 EXISTING TIMBER BRIDGE (STR. . 1.00 1000.00 . . STA 0072-016 SH 7, LYONS TO RAYMOND . 1.00 10000.00 . . NH 0341-067 ON US 34 IN LARIMER COUNTY. . 6,100.00 1.00 . . C 0831-103 PINELLO ROUNDABOUT - ACADEMY . 1.00 500.00 . . SHE 0342-045 ON US 34 IN WELD COUNTY. . 1.00 120.00 . . NH 1604-009 SH 160, WALSH EAST & WEST - A . 1.00 31087.00 . . IM 0762-043 ON I-76 IN SEDGWICK COUNTY . 1.00 600000.00 . . NH 0062-021 6TH AVE COLFAX TO SIMMS . 1.00 45000.00 . . BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 . 1.00 7250.00 . . BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL . 1.00 4575.00 . . CC R600-281 CHATFIELD STATE PARK MAIN ROA . 1.00 5500.00 . . STA 0131-044 SH 13, S. OF MEEKER - ALT B . 1.00 20000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,122.00 149.91 . . C 0252-367 I-25, 5TH STREET TO FOUNDERS/ . 1.00 100000.00 . . BR 3852-009 US 385 WRAY BRIDGE REPLACEME . 1.00 20000.00 . . NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC . 10,000.00 1.00 . . STU 4701-107 C-470: WADSWORTH BLVD TO BROA . 1.00 5500.00 . . SHE 0403-050 ON US 40 THROUGH WINTER PARK . 1.00 1750.00 . . BR 2854-105 US 285 WEST OF SH 470 AND EAS . 1.00 5000.00 . . ER 067A-025 SH 67 NORTH OF WOODLAND PARK . 1.00 10000.00 . . STA 062A-011 SH 62 & CR 5 (AMELIA ST) . 1.00 1000.00 . . SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T . 1.00 10000.00 . . IM 0253-160 ON I-25 IN WELD COUNTY . 1.00 440000.00 . . C 5502-057 US 550 CULVERT REPAIRS . 1.00 5000.00 . . STU M040-011 WADSWORTH BYPASS (SH 121) FRO . 1.00 150000.00 . . C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA . 1.00 119000.00 . . C R600-283 VARIOUS . 1.00 10000.00 . . C 0501-049 US50 AT 29 RD IN MESA COUNTY . 1.00 6000.00 . . STA 0405-031 US40 HUGO EAST . 1.00 3350.00 . . STA 060A-010 SH 60 AT 83RD AVE IN WELD COU . 1.00 13300.00 . . BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT . 1.00 6750.00 . . NH 0061-078 US 6 MP 260.00 TO 270.5 . 1.00 1000.00 . . BR 0361-052 N ST VRAIN Cr (LYONS) . 1.00 48000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 559 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70016 F/A Fuel Cost Adjustment Force Acct ============================================= AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR . 1.00 10000.00 . . STU R400-204 ALONG I-25 IN REGION 4. . 1.00 1000.00 . . NH 2854-102 US 285 CORRIDOR IN JEFFERSON . 1.00 2500.00 . . IM 0251-166 ON I-25 NB FROM COMMERCIAL ST . 1.00 50000.00 . . IM 0703-301 ON GEORGETOWN HILL ABOVE THE . 1.00 5.00 . . BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK . 1.00 1000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,025.00 102.76 . . STA R600-279 SH 121 (WADSWORTH) FROM KEN C . 1.00 3000.00 . . IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT . 1.00 10000.00 . . NH 0503-063 US 50 AND CR 107 IN SALIDA . 1.00 7000.00 . . IM 0703-291 I70 / SH58, RAMP A, B, C, D, . 1.00 245000.00 . . IM 0252-384 I-25 OVER BROADWAY . 1.00 5250.00 . . HB 0701-173 ON INTERSTATE 70 FROM CLIFTON . 1.00 21530.00 . . IM 076A-007 I-76 FROM US85 TO BURLINGTON . 1.00 46000.00 . . HB 0853-064 US 85C-LATHAM CANAL CONST . 1.00 10000.00 . . C 0251-173 I 25, CULVERTS, TRINIDAD & PU . 1.00 5000.00 . . C 0252-389 BRONCO ARCH BRIDGE OVER THE S . 1.00 0.00 . . HB 0701-180 INTERSTATE 70, UTAH/COLORADO . 1.00 17000.00 . . STA 0091-026 STATE HIGHWAY NO 9 . 1.00 7500.00 . . IM R600-292 70TH AVE AT I-25/BLAKE AND 20 . 1.00 100.00 . . SHE 0503-067 US 50, WEST OF CANON CITY . 1.00 900.00 . . BR 0021-034 SH 2 OVER FULTON CANAL . 1.00 1000.00 . . BR 092A-019 EXISTING STRUCTURE J-06-A IS . 1.00 5100.00 . . STU R200-097 POWERS BLVD / WOODMAN RD - CO . 1.00 10000.00 . . NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX . 1.00 30000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 23576.67 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,208.00 180.73 . . =============== 700-70018 F/A Road Smooth Incentive Force Acct ============================================= IM 0252-382 I 25, SH 83 TO FOUNTAIN . 1.00 63078.00 . . IM 0702-257 I70 - EISENHOWER TUNNEL . 1.00 8000.00 . . IM 0253-187 I-25, 84TH TO 120TH AVENUE . 1.00 40000.00 . . IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI . 1.00 29276.00 . . SHE 0243-071 US 24 PEYTON INTERSECTION . 1.00 11200.00 . . BR 069A-019 SH 69, ROSITA CREEK . 1.00 5000.00 . . BR 012A-041 ON SH12, 5 MILES NORTH OF STO . 1.00 500.00 . . STA 0091-022 SH 9, HOOSIER PASS NORTH . 1.00 9000.00 . . SHO M145-006 SH 121 & 128 INTERSECTION IMP . 1.00 21000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 20783.78 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 560 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70018 F/A Road Smooth Incentive Force Acct ============================================= NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT . 1.00 28000.00 . . STA 053A-001 BROADWAY: 58TH TO SH 224 . 1.00 7200.00 . . CC R600-281 CHATFIELD STATE PARK MAIN ROA . 1.00 1400.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 12200.00 . . C 0252-367 I-25, 5TH STREET TO FOUNDERS/ . 1.00 150000.00 . . NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC . 20,000.00 1.00 . . STU M040-011 WADSWORTH BYPASS (SH 121) FRO . 1.00 25000.00 . . BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK . 1.00 1600.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20,003.00 9.83 . . IM 076A-007 I-76 FROM US85 TO BURLINGTON . 1.00 32350.00 . . STA 0091-026 STATE HIGHWAY NO 9 . 1.00 7500.00 . . STU R200-097 POWERS BLVD / WOODMAN RD - CO . 1.00 28463.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 22771.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,018.00 24.41 . . =============== 700-70019 F/A Asphalt Cement Cost Adjustment Force Acct ============================================= HB 0701-180 INTERSTATE 70, UTAH/COLORADO . 1.00 50000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 50000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 50000.00 . . =============== 700-70020 F/A On-The-Job Trainee Each =================================================== SHE 0911-004 SH 91 & SH 67 GUARDRAIL . 1.00 600.00 . . NH 093A-005 SH 93, BOULDER CANAL TO SH 12 . 1.00 525.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 562.50 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 561 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70020 F/A On-The-Job Trainee Each =================================================== NH 2871-030 SH 287, JUNCTION OF SH 116 NO . 4.00 200.00 . . BR 0132-016 EXISTING TIMBER BRIDGE (STR. . 1.00 600.00 . . NH 1604-009 SH 160, WALSH EAST & WEST - A . 1.00 1700.00 . . IM 0762-043 ON I-76 IN SEDGWICK COUNTY . 1.00 2000.00 . . NH 0062-022 SH6 EB @ WADSWORTH BLVD. . 1.00 300.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 675.00 . . C 0252-367 I-25, 5TH STREET TO FOUNDERS/ . 1.00 2600.00 . . STA 0405-031 US40 HUGO EAST . 1.00 200.00 . . BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT . 1.00 600.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1133.33 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 763.46 . . =============== 700-70021 F/A On-the-Job Trainee Hour =================================================== STA 0851-007 SH 85, MAIN ST. TO ACADEMY . 640.00 1.25 . . IM 0252-382 I 25, SH 83 TO FOUNTAIN . 1,600.00 1.06 . . IM 0702-257 I70 - EISENHOWER TUNNEL . 320.00 4.38 . . IM R600-224 I-25 & SPEER INTERCHANGE MOD. . 1,280.00 16.00 . . SHE 0243-071 US 24 PEYTON INTERSECTION . 320.00 1.88 . . SHE 2854-111 US 285 & C470 SIGNING . 40.00 100.00 . . BR 069A-019 SH 69, ROSITA CREEK . 320.00 1.88 . . IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR . 1.00 1400.00 . . STA 0091-022 SH 9, HOOSIER PASS NORTH . 320.00 1.88 . . SHO M145-006 SH 121 & 128 INTERSECTION IMP . 1,280.00 4.80 . . NH R200-140 I-25, SH 47, 50, 115 CRACK RE . 320.00 1.88 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,441.00 5.95 . . IM 0251-172 I-25, N. OF BUTTE CREEK RD . 1,600.00 1.06 . . NH 0062-021 6TH AVE COLFAX TO SIMMS . 640.00 1.00 . . BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL . 300.00 2.00 . . CC R600-281 CHATFIELD STATE PARK MAIN ROA . 1.00 300.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 562 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70021 F/A On-the-Job Trainee Hour =================================================== STA 0131-044 SH 13, S. OF MEEKER - ALT B . 640.00 0.80 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,181.00 1.18 . . BR 3852-009 US 385 WRAY BRIDGE REPLACEME . 640.00 1.25 . . BR 2854-105 US 285 WEST OF SH 470 AND EAS . 1,600.00 1.00 . . ER 067A-025 SH 67 NORTH OF WOODLAND PARK . 1,275.00 1.88 . . STU M040-011 WADSWORTH BYPASS (SH 121) FRO . 2,560.00 4.80 . . C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA . 1,920.00 4.80 . . STA 060A-010 SH 60 AT 83RD AVE IN WELD COU . 1.00 800.00 . . IM 0251-166 ON I-25 NB FROM COMMERCIAL ST . 4,000.00 1.50 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,996.00 2.76 . . IM 0703-291 I70 / SH58, RAMP A, B, C, D, . 2,560.00 4.80 . . IM 0252-384 I-25 OVER BROADWAY . 1,600.00 1.50 . . HB 0701-173 ON INTERSTATE 70 FROM CLIFTON . 640.00 1.80 . . IM 076A-007 I-76 FROM US85 TO BURLINGTON . 640.00 4.80 . . C 0251-173 I 25, CULVERTS, TRINIDAD & PU . 50.00 10.00 . . C 0252-389 BRONCO ARCH BRIDGE OVER THE S . 1.00 0.00 . . HB 0701-180 INTERSTATE 70, UTAH/COLORADO . 320.00 1.80 . . STU R200-097 POWERS BLVD / WOODMAN RD - CO . 2,600.00 1.00 . . NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX . 640.00 16.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,051.00 3.63 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30,669.00 3.52 . . =============== 700-70022 F/A OJT Colorado Training Program Force Acct ============================================= NH 5502-052 US 550 N OF DURANGO PH II . 1.00 1400.00 . . SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 . 1.00 300.00 . . STA 105A-013 SH 105, SOUTH OF SEDALIA . 1.00 525.00 . . SHE 0091-025 SH 9 VMS IN BRECKENRIDGE . 1.00 200.00 . . STA 0361-081 SH 36 VMS IN BOULDER COUNTY . 1.00 150.00 . . IM 0705-076 I-70, GENOA EAST AND WEST . 1.00 1000.00 . . IM 0704-206 I-70, BRIGHTON BLVD - COLO. B . 1.00 2100.00 . . NH 1602-096 US 160, MP 117 TO MP 131.5 . 1.00 2100.00 . . NH 0341-064 US 34: ESTES PARK TO ROCKY MT . 1.00 1000.00 . . NH 0342-042 US 34 AND US 36 CHIPSEALS - E . 1.00 525.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 563 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70022 F/A OJT Colorado Training Program Force Acct ============================================= STA 0851-007 SH 85, MAIN ST. TO ACADEMY . 1.00 1000.00 . . STA 3852-010 US 385 IN YUMA COUNTY . 1.00 1000.00 . . STA 052A-024 SH 52, PROSPECT VALLEY WEST . 1.00 1000.00 . . IM 0703-295 I-70, GEORGETOWN EAST OVERLAY . 1.00 22000.00 . . STA 0343-025 US 34, WRAY WEST . 1.00 1000.00 . . NH 2854-106 US 285, FOXTON RD - RICHMOND . 1.00 2100.00 . . IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M . 1.00 525.00 . . STA 1131-005 SH 113 IN LOGAN COUNTY . 3,200.00 1.00 . . SHE 0504-049 US 50, EAST OF LA JUNTA . 1.00 200.00 . . IM 0252-382 I 25, SH 83 TO FOUNTAIN . 1.00 2100.00 . . SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA . 1.00 300.00 . . STA 172A-015 SH 172, NM STATE LINE TO S. O . 1.00 1000.00 . . NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL . 1.00 800.00 . . IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI . 1.00 1000.00 . . SHE 0243-071 US 24 PEYTON INTERSECTION . 1.00 525.00 . . SHE 2854-111 US 285 & C470 SIGNING . 1.00 150.00 . . SHE M910-004 US 50 AND SH 550 IN MONTROSE . 1.00 300.00 . . SHE 0911-004 SH 91 & SH 67 GUARDRAIL . 1.00 200.00 . . BR 069A-019 SH 69, ROSITA CREEK . 1.00 525.00 . . IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR . 1.00 2100.00 . . SHE R400-183 R4 FY06 SAFETY PROJECTS . 1.00 200.00 . . BR 012A-041 ON SH12, 5 MILES NORTH OF STO . 1.00 200.00 . . IM 0701-179 I-70, GLENWOOD SPRINGS . 1.00 2100.00 . . STA 0091-022 SH 9, HOOSIER PASS NORTH . 1.00 1500.00 . . SHO M145-006 SH 121 & 128 INTERSECTION IMP . 1.00 1000.00 . . NH 093A-005 SH 93, BOULDER CANAL TO SH 12 . 1.00 1000.00 . . R600-247 SIGNALS - SH 121 & SH 391 . 1.00 300.00 . . NH 1211-066 SH 121: WATERTON RD TO C470 . 1.00 525.00 . . STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 . 1.00 300.00 . . SHE 069A-020 SH 69 AT MP 66.5 & MP 73 . 1.00 150.00 . . STA 0853-063 SH 14 & 1ST AVE. IN AULT . 1.00 150.00 . . STA 0343-028 SH 34, WRAY SIGNAL REBUILD . 1.00 150.00 . . NH 0821-076 SH82 OVERLAY - ASPEN . 1.00 525.00 . . IM 0702-252 I-70 WOLCOTT EAST ALT. B . 1.00 1000.00 . . NH R200-140 I-25, SH 47, 50, 115 CRACK RE . 1.00 525.00 . . SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE . 1.00 150.00 . . SHE 2873-143 US 287 AT CR 54G, N. OF FT. C . 1.00 150.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,246.00 18.56 . . IM 0251-172 I-25, N. OF BUTTE CREEK RD . 1.00 2100.00 . . IM 0252-381 I-25, GREENLAND TO LARKSPUR . 1.00 1000.00 . . STA 0831-100 PARKER RD AT LONG AVE. SIGNAL . 1.00 200.00 . . STA 157A-009 SH 157 IN BOULDER COUNTY . 1.00 200.00 . . STA 145A-037 SH 145 KEYSTONE HILL . 1.00 6200.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 564 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70022 F/A OJT Colorado Training Program Force Acct ============================================= STA 0142-046 SH 14, EAST OF BRIGGSDALE . 1.00 1000.00 . . NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT . 1.00 525.00 . . STA 053A-001 BROADWAY: 58TH TO SH 224 . 1.00 525.00 . . SHE 052A-026 SH 52/ US 287 DILEMMA ZONE PR . 1.00 150.00 . . NH 2871-030 SH 287, JUNCTION OF SH 116 NO . 1.00 10425.00 . . BR 0132-016 EXISTING TIMBER BRIDGE (STR. . 1.00 300.00 . . STA 0072-016 SH 7, LYONS TO RAYMOND . 1.00 2100.00 . . NH 0341-067 ON US 34 IN LARIMER COUNTY. . 1.00 300.00 . . C 0831-103 PINELLO ROUNDABOUT - ACADEMY . 1.00 200.00 . . SHE 0342-045 ON US 34 IN WELD COUNTY. . 1.00 200.00 . . NH 1604-009 SH 160, WALSH EAST & WEST - A . 1.00 2100.00 . . IM 0762-043 ON I-76 IN SEDGWICK COUNTY . 1.00 5250.00 . . NH 0062-021 6TH AVE COLFAX TO SIMMS . 1.00 2100.00 . . BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 . 1.00 600.00 . . BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL . 1.00 525.00 . . STA 0131-044 SH 13, S. OF MEEKER - ALT B . 1.00 1000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21.00 1761.90 . . C 0252-367 I-25, 5TH STREET TO FOUNDERS/ . 1.00 9000.00 . . BR 3852-009 US 385 WRAY BRIDGE REPLACEME . 1.00 525.00 . . STU 4701-107 C-470: WADSWORTH BLVD TO BROA . 1.00 525.00 . . BR R400-203 FY 06 BRIDGE MAINTENANCE . 1.00 200.00 . . SHE 0403-050 ON US 40 THROUGH WINTER PARK . 1.00 525.00 . . BR 2854-105 US 285 WEST OF SH 470 AND EAS . 1.00 1000.00 . . ER 067A-025 SH 67 NORTH OF WOODLAND PARK . 1.00 5250.00 . . STA 062A-011 SH 62 & CR 5 (AMELIA ST) . 1.00 525.00 . . IM 0253-160 ON I-25 IN WELD COUNTY . 1.00 9000.00 . . IM 0703-273 HOGBACK PARK N RIDE PHASE II . 1.00 2000.00 . . C 5502-057 US 550 CULVERT REPAIRS . 1.00 600.00 . . STU M040-011 WADSWORTH BYPASS (SH 121) FRO . 1.00 9000.00 . . C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA . 1.00 5250.00 . . C R600-283 VARIOUS . 1.00 3100.00 . . C 0501-049 US50 AT 29 RD IN MESA COUNTY . 1.00 525.00 . . STA 0405-031 US40 HUGO EAST . 1.00 300.00 . . STA 060A-010 SH 60 AT 83RD AVE IN WELD COU . 1.00 525.00 . . BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT . 1.00 525.00 . . NH 0061-078 US 6 MP 260.00 TO 270.5 . 1.00 525.00 . . BR 0361-052 N ST VRAIN Cr (LYONS) . 1.00 1000.00 . . NH 2854-102 US 285 CORRIDOR IN JEFFERSON . 1.00 1500.00 . . IM 0251-166 ON I-25 NB FROM COMMERCIAL ST . 1.00 9000.00 . . IM 0703-301 ON GEORGETOWN HILL ABOVE THE . 1.00 525.00 . . BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK . 1.00 525.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 24.00 2560.42 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 565 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70022 F/A OJT Colorado Training Program Force Acct ============================================= IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT . 1.00 525.00 . . NH 0503-063 US 50 AND CR 107 IN SALIDA . 1.00 300.00 . . IM 0252-384 I-25 OVER BROADWAY . 1.00 1000.00 . . HB 0701-173 ON INTERSTATE 70 FROM CLIFTON . 1.00 2100.00 . . IM 076A-007 I-76 FROM US85 TO BURLINGTON . 1.00 1000.00 . . HB 0853-064 US 85C-LATHAM CANAL CONST . 1.00 525.00 . . C 0251-173 I 25, CULVERTS, TRINIDAD & PU . 1.00 300.00 . . C 0252-389 BRONCO ARCH BRIDGE OVER THE S . 100.00 1.00 . . HB 0701-180 INTERSTATE 70, UTAH/COLORADO . 1.00 1000.00 . . STA 0091-026 STATE HIGHWAY NO 9 . 1.00 525.00 . . IM R600-292 70TH AVE AT I-25/BLAKE AND 20 . 1.00 300.00 . . SHE 0503-067 US 50, WEST OF CANON CITY . 1.00 300.00 . . BR 092A-019 EXISTING STRUCTURE J-06-A IS . 1.00 600.00 . . STU R200-097 POWERS BLVD / WOODMAN RD - CO . 1.00 9000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 113.00 155.53 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,404.00 51.78 . . =============== 700-70023 F/A On-The-Job Trainee Force Acct ============================================= NH 5502-052 US 550 N OF DURANGO PH II . 1.00 1700.00 . . STA 105A-013 SH 105, SOUTH OF SEDALIA . 1.00 800.00 . . IM 0705-076 I-70, GENOA EAST AND WEST . 1.00 800.00 . . IM 0704-206 I-70, BRIGHTON BLVD - COLO. B . 1.00 1400.00 . . NH 1602-096 US 160, MP 117 TO MP 131.5 . 1.00 1400.00 . . NH 0341-064 US 34: ESTES PARK TO ROCKY MT . 1.00 800.00 . . NH 0342-042 US 34 AND US 36 CHIPSEALS - E . 1.00 600.00 . . STA 3852-010 US 385 IN YUMA COUNTY . 1.00 800.00 . . STA 052A-024 SH 52, PROSPECT VALLEY WEST . 1.00 600.00 . . IM 0703-295 I-70, GEORGETOWN EAST OVERLAY . 1.00 2100.00 . . STA 0343-025 US 34, WRAY WEST . 1.00 1400.00 . . NH 2854-106 US 285, FOXTON RD - RICHMOND . 1.00 2000.00 . . STA 1131-005 SH 113 IN LOGAN COUNTY . 800.00 1.00 . . STA 172A-015 SH 172, NM STATE LINE TO S. O . 1.00 800.00 . . IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI . 1.00 600.00 . . AQC R600-241 SH 287 (FEDERAL BLVD), 52ND A . 1.00 200.00 . . IM 0701-179 I-70, GLENWOOD SPRINGS . 1.00 1400.00 . . NH 0021-027 SH 2, MARTIN LUTHER KING BLVD . 1.00 600.00 . . STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 . 1.00 200.00 . . NH 0821-076 SH82 OVERLAY - ASPEN . 1.00 600.00 . . IM 0702-252 I-70 WOLCOTT EAST ALT. B . 1.00 800.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 820.00 24.88 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 566 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70023 F/A On-The-Job Trainee Force Acct ============================================= IM 0252-381 I-25, GREENLAND TO LARKSPUR . 1.00 600.00 . . STA 145A-037 SH 145 KEYSTONE HILL . 1.00 1050.00 . . STA 0142-046 SH 14, EAST OF BRIGGSDALE . 1.00 1400.00 . . NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT . 1.00 2000.00 . . NH 088A-023 BELLVIEW AVE. - BROADWAY TO U . 1.00 900.00 . . STA 0072-016 SH 7, LYONS TO RAYMOND . 1.00 1000.00 . . BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 . 1.00 525.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 1067.86 . . SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T . 1.00 525.00 . . IM 0253-160 ON I-25 IN WELD COUNTY . 1.00 4000.00 . . BR 0361-052 N ST VRAIN Cr (LYONS) . 1.00 1400.00 . . AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR . 1.00 250.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 1543.75 . . STA R600-279 SH 121 (WADSWORTH) FROM KEN C . 1.00 200.00 . . HB 0853-064 US 85C-LATHAM CANAL CONST . 1.00 600.00 . . STA 0091-026 STATE HIGHWAY NO 9 . 1.00 5000.00 . . BR 0021-034 SH 2 OVER FULTON CANAL . 1.00 300.00 . . BR 092A-019 EXISTING STRUCTURE J-06-A IS . 1.00 525.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 1325.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 836.00 48.65 . . =============== 700-70025 F/A Quality Incentive Pymt Force Acct ============================================= NH 5502-052 US 550 N OF DURANGO PH II . 1.00 185000.00 . . STA 105A-013 SH 105, SOUTH OF SEDALIA . 1.00 18000.00 . . IM 0705-076 I-70, GENOA EAST AND WEST . 1.00 88050.00 . . NH 1602-096 US 160, MP 117 TO MP 131.5 . 1.00 121700.00 . . STA 0851-007 SH 85, MAIN ST. TO ACADEMY . 1.00 44539.00 . . STA 3852-010 US 385 IN YUMA COUNTY . 1.00 195000.00 . . IM 0703-295 I-70, GEORGETOWN EAST OVERLAY . 1.00 93000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 567 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70025 F/A Quality Incentive Pymt Force Acct ============================================= NH 2854-106 US 285, FOXTON RD - RICHMOND . 1.00 90000.00 . . IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M . 1.00 5000.00 . . IM 0702-257 I70 - EISENHOWER TUNNEL . 1.00 55000.00 . . STA 172A-015 SH 172, NM STATE LINE TO S. O . 1.00 90000.00 . . IM R600-224 I-25 & SPEER INTERCHANGE MOD. . 1.00 15000.00 . . SHE 0243-071 US 24 PEYTON INTERSECTION . 1.00 19300.00 . . IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR . 1.00 165000.00 . . IM 0701-179 I-70, GLENWOOD SPRINGS . 1.00 184564.00 . . NH 0021-027 SH 2, MARTIN LUTHER KING BLVD . 1.00 10000.00 . . NH 093A-005 SH 93, BOULDER CANAL TO SH 12 . 1.00 13000.00 . . STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 . 1.00 11800.00 . . NH 0821-076 SH82 OVERLAY - ASPEN . 1.00 35743.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19.00 75773.47 . . IM 0251-172 I-25, N. OF BUTTE CREEK RD . 1.00 200000.00 . . IM 0252-381 I-25, GREENLAND TO LARKSPUR . 1.00 54000.00 . . STA 145A-037 SH 145 KEYSTONE HILL . 1.00 30000.00 . . NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT . 1.00 30000.00 . . NH 2871-030 SH 287, JUNCTION OF SH 116 NO . 2.00 315500.00 . . BR 0132-016 EXISTING TIMBER BRIDGE (STR. . 1.00 2400.00 . . NH 1604-009 SH 160, WALSH EAST & WEST - A . 1.00 260221.00 . . NH 0062-021 6TH AVE COLFAX TO SIMMS . 1.00 103000.00 . . BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 . 1.00 4100.00 . . BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL . 1.00 10000.00 . . STA 0131-044 SH 13, S. OF MEEKER - ALT B . 1.00 59600.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 115360.08 . . STA 0881-019 AT THE INTERSECTION OF ARAPAH . 1.00 8000.00 . . ER 067A-025 SH 67 NORTH OF WOODLAND PARK . 1.00 98553.00 . . IM 0703-273 HOGBACK PARK N RIDE PHASE II . 1.00 75000.00 . . C 0501-049 US50 AT 29 RD IN MESA COUNTY . 1.00 5000.00 . . STA 0405-031 US40 HUGO EAST . 1.00 15803.00 . . BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT . 1.00 3800.00 . . IM 0251-166 ON I-25 NB FROM COMMERCIAL ST . 2.00 6000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 27269.50 . . IM 0703-291 I70 / SH58, RAMP A, B, C, D, . 1.00 20000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 568 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70025 F/A Quality Incentive Pymt Force Acct ============================================= IM 0252-384 I-25 OVER BROADWAY . 1.00 34500.00 . . HB 0701-173 ON INTERSTATE 70 FROM CLIFTON . 1.00 232090.00 . . HB 0701-180 INTERSTATE 70, UTAH/COLORADO . 1.00 200800.00 . . STA 0091-026 STATE HIGHWAY NO 9 . 1.00 7500.00 . . BR 092A-019 EXISTING STRUCTURE J-06-A IS . 1.00 3550.00 . . STU R200-097 POWERS BLVD / WOODMAN RD - CO . 1.00 205000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 100491.43 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 46.00 81426.37 . . =============== 700-70028 F/A ESB Program Force Acct ============================================= NH 5502-052 US 550 N OF DURANGO PH II . 1.00 7500.00 . . SHE 0821-074 SH82 SIGNALS (MP 4.2 TO MP 38 . 1.00 5000.00 . . STA 105A-013 SH 105, SOUTH OF SEDALIA . 1.00 7500.00 . . SHE 0091-025 SH 9 VMS IN BRECKENRIDGE . 1.00 5000.00 . . STA 0361-081 SH 36 VMS IN BOULDER COUNTY . 1.00 5000.00 . . IM 0705-076 I-70, GENOA EAST AND WEST . 1.00 7500.00 . . IM 0704-206 I-70, BRIGHTON BLVD - COLO. B . 1.00 7500.00 . . NH 1602-096 US 160, MP 117 TO MP 131.5 . 1.00 7500.00 . . NH 0341-064 US 34: ESTES PARK TO ROCKY MT . 1.00 7500.00 . . NH 0342-042 US 34 AND US 36 CHIPSEALS - E . 1.00 7500.00 . . STA 0851-007 SH 85, MAIN ST. TO ACADEMY . 1.00 7500.00 . . STA 3852-010 US 385 IN YUMA COUNTY . 1.00 7500.00 . . STA 052A-024 SH 52, PROSPECT VALLEY WEST . 1.00 7500.00 . . IM 0703-295 I-70, GEORGETOWN EAST OVERLAY . 1.00 7500.00 . . STA 0343-025 US 34, WRAY WEST . 1.00 7500.00 . . NH 2854-106 US 285, FOXTON RD - RICHMOND . 1.00 7500.00 . . IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M . 1.00 7500.00 . . STA 1131-005 SH 113 IN LOGAN COUNTY . 5,000.00 1.00 . . SHE 0504-049 US 50, EAST OF LA JUNTA . 1.00 5000.00 . . IM 0252-382 I 25, SH 83 TO FOUNTAIN . 1.00 7500.00 . . SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA . 1.00 5000.00 . . IM 0702-257 I70 - EISENHOWER TUNNEL . 1.00 7500.00 . . STA 172A-015 SH 172, NM STATE LINE TO S. O . 1.00 7500.00 . . IM R600-224 I-25 & SPEER INTERCHANGE MOD. . 1.00 7500.00 . . IM 0253-187 I-25, 84TH TO 120TH AVENUE . 1.00 7500.00 . . NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL . 1.00 7500.00 . . IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI . 1.00 7500.00 . . SHE 0243-071 US 24 PEYTON INTERSECTION . 1.00 7500.00 . . SHE 2854-111 US 285 & C470 SIGNING . 1.00 5000.00 . . SHE M910-004 US 50 AND SH 550 IN MONTROSE . 1.00 5000.00 . . SHE 0911-004 SH 91 & SH 67 GUARDRAIL . 1.00 5000.00 . . BR 069A-019 SH 69, ROSITA CREEK . 1.00 5000.00 . . IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR . 1.00 7500.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 569 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70028 F/A ESB Program Force Acct ============================================= SHE R400-183 R4 FY06 SAFETY PROJECTS . 1.00 5000.00 . . BR 012A-041 ON SH12, 5 MILES NORTH OF STO . 1.00 5000.00 . . AQC R600-241 SH 287 (FEDERAL BLVD), 52ND A . 1.00 5000.00 . . IM 0701-179 I-70, GLENWOOD SPRINGS . 1.00 7500.00 . . STA 0091-022 SH 9, HOOSIER PASS NORTH . 1.00 7500.00 . . SHO M145-006 SH 121 & 128 INTERSECTION IMP . 1.00 7500.00 . . NH 0021-027 SH 2, MARTIN LUTHER KING BLVD . 1.00 7500.00 . . NH 093A-005 SH 93, BOULDER CANAL TO SH 12 . 1.00 7500.00 . . R600-247 SIGNALS - SH 121 & SH 391 . 1.00 5000.00 . . NH 1211-066 SH 121: WATERTON RD TO C470 . 1.00 7500.00 . . STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 . 1.00 7500.00 . . SHE 069A-020 SH 69 AT MP 66.5 & MP 73 . 1.00 5000.00 . . STA 0853-063 SH 14 & 1ST AVE. IN AULT . 1.00 5000.00 . . STA 0343-028 SH 34, WRAY SIGNAL REBUILD . 1.00 5000.00 . . NH 0821-076 SH82 OVERLAY - ASPEN . 1.00 7500.00 . . IM 0702-252 I-70 WOLCOTT EAST ALT. B . 1.00 7500.00 . . NH R200-140 I-25, SH 47, 50, 115 CRACK RE . 1.00 7500.00 . . SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE . 1.00 5000.00 . . SHE 2873-143 US 287 AT CR 54G, N. OF FT. C . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,051.00 67.81 . . IM 0251-172 I-25, N. OF BUTTE CREEK RD . 1.00 7500.00 . . IM 0252-381 I-25, GREENLAND TO LARKSPUR . 1.00 7500.00 . . STA 0831-100 PARKER RD AT LONG AVE. SIGNAL . 1.00 5000.00 . . STA 157A-009 SH 157 IN BOULDER COUNTY . 1.00 5000.00 . . STA 145A-037 SH 145 KEYSTONE HILL . 1.00 7500.00 . . STA 0142-046 SH 14, EAST OF BRIGGSDALE . 1.00 7500.00 . . NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT . 1.00 7500.00 . . STA 053A-001 BROADWAY: 58TH TO SH 224 . 1.00 7500.00 . . NH 088A-023 BELLVIEW AVE. - BROADWAY TO U . 1.00 7500.00 . . SHE 052A-026 SH 52/ US 287 DILEMMA ZONE PR . 1.00 5000.00 . . NH 2871-030 SH 287, JUNCTION OF SH 116 NO . 1.00 7500.00 . . BR 0132-016 EXISTING TIMBER BRIDGE (STR. . 1.00 5000.00 . . STA 0072-016 SH 7, LYONS TO RAYMOND . 1.00 7500.00 . . NH 0341-067 ON US 34 IN LARIMER COUNTY. . 1.00 5000.00 . . C 0831-103 PINELLO ROUNDABOUT - ACADEMY . 1.00 5000.00 . . SHE 0342-045 ON US 34 IN WELD COUNTY. . 1.00 5000.00 . . NH 1604-009 SH 160, WALSH EAST & WEST - A . 1.00 7500.00 . . IM 0762-043 ON I-76 IN SEDGWICK COUNTY . 1.00 7500.00 . . NH 0062-022 SH6 EB @ WADSWORTH BLVD. . 1.00 5000.00 . . BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 . 1.00 7500.00 . . BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL . 1.00 7500.00 . . STA 0131-044 SH 13, S. OF MEEKER - ALT B . 1.00 7500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 22.00 6590.91 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 570 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70028 F/A ESB Program Force Acct ============================================= C 0252-367 I-25, 5TH STREET TO FOUNDERS/ . 1.00 7500.00 . . BR 3852-009 US 385 WRAY BRIDGE REPLACEME . 1.00 7500.00 . . NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC . 500.00 1.00 . . STU 4701-107 C-470: WADSWORTH BLVD TO BROA . 1.00 7500.00 . . BR R400-203 FY 06 BRIDGE MAINTENANCE . 1.00 5000.00 . . SHE 0403-050 ON US 40 THROUGH WINTER PARK . 1.00 5000.00 . . BR 2854-105 US 285 WEST OF SH 470 AND EAS . 1.00 10000.00 . . ER 067A-025 SH 67 NORTH OF WOODLAND PARK . 1.00 7500.00 . . STA 062A-011 SH 62 & CR 5 (AMELIA ST) . 1.00 7500.00 . . SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T . 1.00 7500.00 . . IM 0253-160 ON I-25 IN WELD COUNTY . 1.00 7500.00 . . IM 0703-273 HOGBACK PARK N RIDE PHASE II . 1.00 7500.00 . . C 5502-057 US 550 CULVERT REPAIRS . 1.00 5000.00 . . STU M040-011 WADSWORTH BYPASS (SH 121) FRO . 1.00 7500.00 . . C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA . 1.00 7500.00 . . C R600-283 VARIOUS . 1.00 7500.00 . . C 0501-049 US50 AT 29 RD IN MESA COUNTY . 1.00 7500.00 . . STA 0405-031 US40 HUGO EAST . 1.00 5000.00 . . STA 060A-010 SH 60 AT 83RD AVE IN WELD COU . 1.00 7500.00 . . BR 064A-008 STRUCTURE NO. D-04-L IS LOCAT . 1.00 5000.00 . . NH 0061-078 US 6 MP 260.00 TO 270.5 . 1.00 7500.00 . . BR 0361-052 N ST VRAIN Cr (LYONS) . 1.00 7500.00 . . AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR . 1.00 5000.00 . . STU R400-204 ALONG I-25 IN REGION 4. . 1.00 300.00 . . NH 2854-102 US 285 CORRIDOR IN JEFFERSON . 1.00 1500.00 . . IM 0251-166 ON I-25 NB FROM COMMERCIAL ST . 1.00 7500.00 . . IM 0703-301 ON GEORGETOWN HILL ABOVE THE . 1.00 7500.00 . . BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK . 1.00 7500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 527.00 336.43 . . STA R600-279 SH 121 (WADSWORTH) FROM KEN C . 1.00 5000.00 . . IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT . 1.00 7500.00 . . NH 0503-063 US 50 AND CR 107 IN SALIDA . 1.00 5000.00 . . IM 0703-291 I70 / SH58, RAMP A, B, C, D, . 1.00 7500.00 . . IM 0252-384 I-25 OVER BROADWAY . 1.00 7500.00 . . HB 0701-173 ON INTERSTATE 70 FROM CLIFTON . 1.00 7500.00 . . IM 076A-007 I-76 FROM US85 TO BURLINGTON . 1.00 7500.00 . . HB 0853-064 US 85C-LATHAM CANAL CONST . 1.00 7500.00 . . C 0251-173 I 25, CULVERTS, TRINIDAD & PU . 1.00 5000.00 . . C 0252-389 BRONCO ARCH BRIDGE OVER THE S . 5,000.00 1.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 571 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70028 F/A ESB Program Force Acct ============================================= HB 0701-180 INTERSTATE 70, UTAH/COLORADO . 1.00 7500.00 . . STA 0091-026 STATE HIGHWAY NO 9 . 1.00 7500.00 . . IM R600-292 70TH AVE AT I-25/BLAKE AND 20 . 1.00 5000.00 . . SHE 0503-067 US 50, WEST OF CANON CITY . 1.00 5000.00 . . BR 0021-034 SH 2 OVER FULTON CANAL . 1.00 5000.00 . . BR 092A-019 EXISTING STRUCTURE J-06-A IS . 1.00 7500.00 . . STU R200-097 POWERS BLVD / WOODMAN RD - CO . 1.00 7500.00 . . NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX . 1.00 7500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,017.00 23.42 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,617.00 73.68 . . =============== 700-70029 F/A ESB Program Retainage Force Acct ============================================= CC R600-281 CHATFIELD STATE PARK MAIN ROA . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 . . =============== 700-70031 F/A INTERIM SURFACE REPAIR Force Acct ============================================= IM 0252-382 I 25, SH 83 TO FOUNTAIN . 1.00 23565.00 . . IM 0702-257 I70 - EISENHOWER TUNNEL . 1.00 25000.00 . . IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR . 1.00 10060.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 19541.67 . . NH 0062-021 6TH AVE COLFAX TO SIMMS . 1.00 12000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 12000.00 . . IM 076A-007 I-76 FROM US85 TO BURLINGTON . 1.00 11000.00 . . NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX . 1.00 7000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 9000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 14770.83 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 572 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70034 F/A Force Acct ============================================= IM 0705-076 I-70, GENOA EAST AND WEST . 1.00 26500.00 . . IM 0252-382 I 25, SH 83 TO FOUNTAIN . 1.00 20000.00 . . STA 172A-015 SH 172, NM STATE LINE TO S. O . 1.00 12500.00 . . SHE 0243-071 US 24 PEYTON INTERSECTION . 1.00 5000.00 . . IM 0701-179 I-70, GLENWOOD SPRINGS . 1.00 11500.00 . . SHO M145-006 SH 121 & 128 INTERSECTION IMP . 1.00 2200.00 . . NH 093A-005 SH 93, BOULDER CANAL TO SH 12 . 1.00 3400.00 . . NH 0821-076 SH82 OVERLAY - ASPEN . 1.00 15000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 12012.50 . . IM 0251-172 I-25, N. OF BUTTE CREEK RD . 1.00 80400.00 . . STA 145A-037 SH 145 KEYSTONE HILL . 1.00 10000.00 . . NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT . 1.00 7500.00 . . STA 053A-001 BROADWAY: 58TH TO SH 224 . 1.00 22500.00 . . IM 0762-043 ON I-76 IN SEDGWICK COUNTY . 1.00 5000.00 . . CC R600-281 CHATFIELD STATE PARK MAIN ROA . 1.00 2000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 21233.33 . . C 0252-367 I-25, 5TH STREET TO FOUNDERS/ . 1.00 250000.00 . . NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC . 2,000.00 1.00 . . STA 0881-019 AT THE INTERSECTION OF ARAPAH . 2.00 2600.00 . . BR 2854-105 US 285 WEST OF SH 470 AND EAS . 1.00 10000.00 . . ER 067A-025 SH 67 NORTH OF WOODLAND PARK . 1.00 4000000.00 . . IM 0703-273 HOGBACK PARK N RIDE PHASE II . 1.00 50000.00 . . C R600-283 VARIOUS . 1.00 3000.00 . . IM 0251-166 ON I-25 NB FROM COMMERCIAL ST . 1.00 50000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,008.00 2176.39 . . IM 0703-291 I70 / SH58, RAMP A, B, C, D, . 2.00 79000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 79000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,024.00 2347.68 . . =============== 700-70035 F/A Force Acct ============================================= STA 0851-007 SH 85, MAIN ST. TO ACADEMY . 1.00 7829.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 573 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70035 F/A Force Acct ============================================= NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL . 1.00 25000.00 . . SHE 0243-071 US 24 PEYTON INTERSECTION . 1.00 5000.00 . . SHO M145-006 SH 121 & 128 INTERSECTION IMP . 1.00 7500.00 . . NH 093A-005 SH 93, BOULDER CANAL TO SH 12 . 1.00 30000.00 . . STA 0853-063 SH 14 & 1ST AVE. IN AULT . 1.00 600.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 12654.83 . . STA 145A-037 SH 145 KEYSTONE HILL . 2.00 7500.00 . . NH 030A-024 SH 30 HAMPDEN/HAVANA: YOSEMIT . 4.00 4625.00 . . NH 088A-023 BELLVIEW AVE. - BROADWAY TO U . 1.00 7000.00 . . NH 2871-030 SH 287, JUNCTION OF SH 116 NO . 1.00 75000.00 . . STA 0072-016 SH 7, LYONS TO RAYMOND . 1.00 5000.00 . . NH 0062-021 6TH AVE COLFAX TO SIMMS . 1.00 75000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 19550.00 . . C 0252-367 I-25, 5TH STREET TO FOUNDERS/ . 1.00 25000.00 . . STA 0881-019 AT THE INTERSECTION OF ARAPAH . 2.00 3312.50 . . BR 2854-105 US 285 WEST OF SH 470 AND EAS . 1.00 15000.00 . . BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK . 1.00 10000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 11325.00 . . IM 0703-291 I70 / SH58, RAMP A, B, C, D, . 1.00 5000.00 . . IM 076A-007 I-76 FROM US85 TO BURLINGTON . 1.00 2000.00 . . NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX . 1.00 33000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 13333.33 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 15335.58 . . =============== 700-70036 F/A Force Acct ============================================= STA 0851-007 SH 85, MAIN ST. TO ACADEMY . 1.00 5000.00 . . SHO M145-006 SH 121 & 128 INTERSECTION IMP . 1.00 22500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 13750.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 13750.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 574 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70037 F/A Contaminated Soil Force Acct ============================================= IM 0251-166 ON I-25 NB FROM COMMERCIAL ST . 1.00 150000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 150000.00 . . STU R200-097 POWERS BLVD / WOODMAN RD - CO . 1.00 69200.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 69200.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 109600.00 . . =============== 700-70040 F/A Railroad Force Acct ============================================= NH 0021-027 SH 2, MARTIN LUTHER KING BLVD . 1.00 100000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 100000.00 . . STA 060A-010 SH 60 AT 83RD AVE IN WELD COU . 1.00 100000.00 . . IM 0251-166 ON I-25 NB FROM COMMERCIAL ST . 1.00 20000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 60000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 73333.33 . . =============== 700-70042 F/A RR Flagging Force Acct ============================================= AQC R600-241 SH 287 (FEDERAL BLVD), 52ND A . 1.00 3000.00 . . NH 0021-027 SH 2, MARTIN LUTHER KING BLVD . 1.00 7000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5000.00 . . STA 053A-001 BROADWAY: 58TH TO SH 224 . 1.00 8000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 8000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 575 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70042 F/A RR Flagging Force Acct ============================================= C 0252-367 I-25, 5TH STREET TO FOUNDERS/ . 1.00 15000.00 . . BR 3852-009 US 385 WRAY BRIDGE REPLACEME . 1.00 15000.00 . . NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC . 10,000.00 1.00 . . C R600-283 VARIOUS . 1.00 20000.00 . . STA 060A-010 SH 60 AT 83RD AVE IN WELD COU . 1.00 8000.00 . . IM 0251-166 ON I-25 NB FROM COMMERCIAL ST . 1.00 75000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,005.00 14.29 . . IM 0252-384 I-25 OVER BROADWAY . 2.00 25000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 25000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,010.00 21.08 . . =============== 700-70060 F/A Adjust Force Acct ============================================= NH 5502-052 US 550 N OF DURANGO PH II . 1.00 10000.00 . . NH 1602-096 US 160, MP 117 TO MP 131.5 . 1.00 2500.00 . . NH 0021-027 SH 2, MARTIN LUTHER KING BLVD . 1.00 1000.00 . . STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 . 1.00 3000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 4125.00 . . CC R600-281 CHATFIELD STATE PARK MAIN ROA . 1.00 1000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 . . STA 062A-011 SH 62 & CR 5 (AMELIA ST) . 1.00 5000.00 . . STU M040-011 WADSWORTH BYPASS (SH 121) FRO . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 5000.00 . . NH 0503-063 US 50 AND CR 107 IN SALIDA . 1.00 25000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 576 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70060 F/A Adjust Force Acct ============================================= IM 0703-291 I70 / SH58, RAMP A, B, C, D, . 1.00 10000.00 . . IM 0252-384 I-25 OVER BROADWAY . 1.00 5000.00 . . STU R200-097 POWERS BLVD / WOODMAN RD - CO . 1.00 18000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 14500.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 7772.73 . . =============== 700-70070 F/A Obtain Force Acct ============================================= IM R600-224 I-25 & SPEER INTERCHANGE MOD. . 1.00 1500.00 . . SHE 2854-111 US 285 & C470 SIGNING . 1.00 500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1000.00 . . STA 060A-010 SH 60 AT 83RD AVE IN WELD COU . 1.00 1500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1500.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1166.67 . . =============== 700-70072 F/A Obtain Power from PSCO Force Acct ============================================= IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 . . STA 0831-100 PARKER RD AT LONG AVE. SIGNAL . 1.00 10000.00 . . NH 0062-022 SH6 EB @ WADSWORTH BLVD. . 1.00 1000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 5500.00 . . STU M040-011 WADSWORTH BYPASS (SH 121) FRO . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 5250.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 577 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70074 F/A Obtain Power from Force Acct ============================================= STA 052A-024 SH 52, PROSPECT VALLEY WEST . 1.00 2000.00 . . IM R600-224 I-25 & SPEER INTERCHANGE MOD. . 2.00 7000.00 . . SHE 2854-111 US 285 & C470 SIGNING . 1.00 500.00 . . SHO M145-006 SH 121 & 128 INTERSECTION IMP . 1.00 5000.00 . . R600-247 SIGNALS - SH 121 & SH 391 . 1.00 3000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 4083.33 . . C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA . 1.00 1000.00 . . IM 0251-166 ON I-25 NB FROM COMMERCIAL ST . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 3000.00 . . IM 0703-291 I70 / SH58, RAMP A, B, C, D, . 1.00 10000.00 . . IM 0252-384 I-25 OVER BROADWAY . 1.00 5000.00 . . NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX . 1.00 1000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 5333.33 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 4227.27 . . =============== 700-70080 F/A Furnish Force Acct ============================================= IM 0704-206 I-70, BRIGHTON BLVD - COLO. B . 1.00 121000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 121000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 121000.00 . . =============== 700-70081 F/A Provide Force Acct ============================================= STU R200-097 POWERS BLVD / WOODMAN RD - CO . 1.00 14000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 14000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 14000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 578 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70082 F/A Furn & Inst Elec Serv Force Acct ============================================= STA 0361-081 SH 36 VMS IN BOULDER COUNTY . 1.00 6000.00 . . NH 2854-106 US 285, FOXTON RD - RICHMOND . 1.00 5000.00 . . SHE M910-004 US 50 AND SH 550 IN MONTROSE . 1.00 4000.00 . . STA 0853-063 SH 14 & 1ST AVE. IN AULT . 1.00 5000.00 . . STA 0343-028 SH 34, WRAY SIGNAL REBUILD . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 5000.00 . . SHE 0342-045 ON US 34 IN WELD COUNTY. . 1.00 3000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3000.00 . . BR 3852-009 US 385 WRAY BRIDGE REPLACEME . 1.00 8000.00 . . IM 0703-273 HOGBACK PARK N RIDE PHASE II . 1.00 10000.00 . . C 0501-049 US50 AT 29 RD IN MESA COUNTY . 1.00 5000.00 . . STA 060A-010 SH 60 AT 83RD AVE IN WELD COU . 1.00 5000.00 . . STU R400-204 ALONG I-25 IN REGION 4. . 1.00 10500.00 . . BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK . 1.00 2000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 6750.00 . . NH 0503-063 US 50 AND CR 107 IN SALIDA . 1.00 4000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 4000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 5576.92 . . =============== 700-70090 F/A Reset Force Acct ============================================= C 5502-057 US 550 CULVERT REPAIRS . 1.00 2500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2500.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2500.00 . . =============== 700-70100 F/A Relocate Force Acct ============================================= SHE 0243-071 US 24 PEYTON INTERSECTION . 1.00 25000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 579 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70100 F/A Relocate Force Acct ============================================= NH 1211-066 SH 121: WATERTON RD TO C470 . 1.00 15000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 20000.00 . . STU R200-097 POWERS BLVD / WOODMAN RD - CO . 1.00 17000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 17000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 19000.00 . . =============== 700-70131 F/A Modify Force Acct ============================================= IM R600-224 I-25 & SPEER INTERCHANGE MOD. . 1.00 10000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 . . =============== 700-70180 F/A Gas Lines Force Acct ============================================= STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 . 1.00 3000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 . . =============== 700-70190 F/A Elec Serv Force Acct ============================================= SHE 0091-025 SH 9 VMS IN BRECKENRIDGE . 1.00 12500.00 . . SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA . 1.00 20000.00 . . SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE . 1.00 8000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 13500.00 . . NH 2871-030 SH 287, JUNCTION OF SH 116 NO . 1.00 2000.00 . . C 0831-103 PINELLO ROUNDABOUT - ACADEMY . 1.00 2500.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 580 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70190 F/A Elec Serv Force Acct ============================================= IM 0762-043 ON I-76 IN SEDGWICK COUNTY . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 3166.67 . . IMD 0703-296 TWIN TUNNELS IN CLEAR CRK CNT . 1.00 60000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 60000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 15714.29 . . =============== 700-70195 F/A Util and Maint of Field Facil Force Acct ============================================= STU R200-097 POWERS BLVD / WOODMAN RD - CO . 1.00 10000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 10000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 . . =============== 700-70200 F/A Power Lines Force Acct ============================================= STU R200-097 POWERS BLVD / WOODMAN RD - CO . 1.00 100000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 100000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 100000.00 . . =============== 700-70210 F/A Lights Force Acct ============================================= SHO M145-006 SH 121 & 128 INTERSECTION IMP . 1.00 50000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 50000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 50000.00 . . =============== 700-70220 F/A Phone Serv Force Acct ============================================= SHE 0091-025 SH 9 VMS IN BRECKENRIDGE . 1.00 6000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 581 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70220 F/A Phone Serv Force Acct ============================================= STA 0361-081 SH 36 VMS IN BOULDER COUNTY . 1.00 3000.00 . . NH 0341-064 US 34: ESTES PARK TO ROCKY MT . 1.00 1000.00 . . STA 0851-007 SH 85, MAIN ST. TO ACADEMY . 1.00 5000.00 . . STA 3852-010 US 385 IN YUMA COUNTY . 1.00 300.00 . . STA 052A-024 SH 52, PROSPECT VALLEY WEST . 1.00 1000.00 . . STA 0343-025 US 34, WRAY WEST . 1.00 300.00 . . SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA . 1.00 10000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 3325.00 . . STA 0142-046 SH 14, EAST OF BRIGGSDALE . 1.00 500.00 . . STA 0072-016 SH 7, LYONS TO RAYMOND . 1.00 300.00 . . IM 0762-043 ON I-76 IN SEDGWICK COUNTY . 1.00 1000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 600.00 . . BR 3852-009 US 385 WRAY BRIDGE REPLACEME . 1.00 1000.00 . . IM 0253-160 ON I-25 IN WELD COUNTY . 1.00 20000.00 . . STA 060A-010 SH 60 AT 83RD AVE IN WELD COU . 1.00 1000.00 . . BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK . 1.00 1000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 5750.00 . . NH 0503-063 US 50 AND CR 107 IN SALIDA . 1.00 800.00 . . HB 0853-064 US 85C-LATHAM CANAL CONST . 1.00 1000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 900.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 3129.41 . . =============== 700-70222 F/A Cell Phone Serv Force Acct ============================================= IM 0704-206 I-70, BRIGHTON BLVD - COLO. B . 1.00 7500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 7500.00 . . STA 0142-046 SH 14, EAST OF BRIGGSDALE . 1.00 4000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 4000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 582 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70222 F/A Cell Phone Serv Force Acct ============================================= C R600-283 VARIOUS . 1.00 2000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 4500.00 . . =============== 700-70230 F/A Communication Lines Force Acct ============================================= IM 0703-291 I70 / SH58, RAMP A, B, C, D, . 1.00 25000.00 . . STU R200-097 POWERS BLVD / WOODMAN RD - CO . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 15000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 15000.00 . . =============== 700-70260 F/A Water Taps Force Acct ============================================= STA 0881-019 AT THE INTERSECTION OF ARAPAH . 1.00 13000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 13000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 13000.00 . . =============== 700-70290 F/A Manhole Force Acct ============================================= IM 0702-257 I70 - EISENHOWER TUNNEL . 1.00 2000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 . . =============== 700-70310 F/A Landscaping Force Acct ============================================= IM R600-224 I-25 & SPEER INTERCHANGE MOD. . 2.00 6500.00 . . NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL . 1.00 5000.00 . . SHO M145-006 SH 121 & 128 INTERSECTION IMP . 1.00 2000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 583 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70310 F/A Landscaping Force Acct ============================================= R600-247 SIGNALS - SH 121 & SH 391 . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 5000.00 . . NH 0062-021 6TH AVE COLFAX TO SIMMS . 1.00 7500.00 . . NH 0062-022 SH6 EB @ WADSWORTH BLVD. . 1.00 900.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 4200.00 . . STA 0881-019 AT THE INTERSECTION OF ARAPAH . 1.00 5000.00 . . IM 0253-160 ON I-25 IN WELD COUNTY . 1.00 20000.00 . . C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA . 1.00 40000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 21666.67 . . IM 0252-384 I-25 OVER BROADWAY . 1.00 30000.00 . . NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 17500.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 11116.67 . . =============== 700-70320 F/A Sprinklers Force Acct ============================================= IM 0253-160 ON I-25 IN WELD COUNTY . 1.00 10000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 . . =============== 700-70380 F/A Erosion Ctrl Force Acct ============================================= NH 5502-052 US 550 N OF DURANGO PH II . 1.00 5000.00 . . STA 105A-013 SH 105, SOUTH OF SEDALIA . 1.00 5000.00 . . SHE 0091-025 SH 9 VMS IN BRECKENRIDGE . 1.00 1000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 584 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70380 F/A Erosion Ctrl Force Acct ============================================= IM 0704-206 I-70, BRIGHTON BLVD - COLO. B . 1.00 3000.00 . . NH 1602-096 US 160, MP 117 TO MP 131.5 . 1.00 1000.00 . . NH 0341-064 US 34: ESTES PARK TO ROCKY MT . 1.00 1000.00 . . STA 0851-007 SH 85, MAIN ST. TO ACADEMY . 1.00 5000.00 . . STA 3852-010 US 385 IN YUMA COUNTY . 1.00 5000.00 . . STA 052A-024 SH 52, PROSPECT VALLEY WEST . 1.00 2000.00 . . IM 0703-295 I-70, GEORGETOWN EAST OVERLAY . 1.00 5000.00 . . STA 0343-025 US 34, WRAY WEST . 1.00 5000.00 . . NH 2854-106 US 285, FOXTON RD - RICHMOND . 1.00 10000.00 . . IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M . 1.00 2000.00 . . IM 0252-382 I 25, SH 83 TO FOUNTAIN . 1.00 10000.00 . . SHE 2854-112 SH 285 IN THE TOWN OF FAIRPLA . 1.00 2000.00 . . IM 0702-257 I70 - EISENHOWER TUNNEL . 1.00 5000.00 . . STA 172A-015 SH 172, NM STATE LINE TO S. O . 1.00 5000.00 . . IM R600-224 I-25 & SPEER INTERCHANGE MOD. . 2.00 11000.00 . . IM 0253-187 I-25, 84TH TO 120TH AVENUE . 1.00 2000.00 . . NH 0021-025 SH2 - HAMPDEN AVE. TO BUCHTEL . 1.00 2000.00 . . IM 076A-006 I-76, BROMLEY LANE TO LOCHBUI . 1.00 5000.00 . . SHE 0243-071 US 24 PEYTON INTERSECTION . 1.00 5000.00 . . SHE 2854-111 US 285 & C470 SIGNING . 1.00 2000.00 . . SHE 0911-004 SH 91 & SH 67 GUARDRAIL . 1.00 2000.00 . . BR 069A-019 SH 69, ROSITA CREEK . 1.00 5000.00 . . IM 0252-378 I-25 OVERLAY, EAGLERIDGE NOR . 1.00 5000.00 . . SHE R400-183 R4 FY06 SAFETY PROJECTS . 1.00 3000.00 . . BR 012A-041 ON SH12, 5 MILES NORTH OF STO . 1.00 2000.00 . . AQC R600-241 SH 287 (FEDERAL BLVD), 52ND A . 1.00 2500.00 . . STA 0091-022 SH 9, HOOSIER PASS NORTH . 1.00 25000.00 . . SHO M145-006 SH 121 & 128 INTERSECTION IMP . 1.00 5000.00 . . NH 0021-027 SH 2, MARTIN LUTHER KING BLVD . 1.00 5000.00 . . NH 093A-005 SH 93, BOULDER CANAL TO SH 12 . 1.00 2500.00 . . R600-247 SIGNALS - SH 121 & SH 391 . 1.00 2000.00 . . NH 1211-066 SH 121: WATERTON RD TO C470 . 1.00 5000.00 . . STA 086A-043 SH 86 @ ELBERT COUNTRY RD 45 . 1.00 5000.00 . . STA 0343-028 SH 34, WRAY SIGNAL REBUILD . 1.00 800.00 . . SHE 2873-143 US 287 AT CR 54G, N. OF FT. C . 1.00 2000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 39.00 4661.54 . . IM 0251-172 I-25, N. OF BUTTE CREEK RD . 1.00 10000.00 . . IM 0252-381 I-25, GREENLAND TO LARKSPUR . 1.00 10000.00 . . STA 0831-100 PARKER RD AT LONG AVE. SIGNAL . 1.00 2000.00 . . STA 145A-037 SH 145 KEYSTONE HILL . 1.00 5000.00 . . STA 0142-046 SH 14, EAST OF BRIGGSDALE . 1.00 5000.00 . . STA 053A-001 BROADWAY: 58TH TO SH 224 . 1.00 5000.00 . . NH 088A-023 BELLVIEW AVE. - BROADWAY TO U . 1.00 2500.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 585 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70380 F/A Erosion Ctrl Force Acct ============================================= SHE 052A-026 SH 52/ US 287 DILEMMA ZONE PR . 1.00 500.00 . . NH 2871-030 SH 287, JUNCTION OF SH 116 NO . 1.00 5000.00 . . STA 0072-016 SH 7, LYONS TO RAYMOND . 1.00 2500.00 . . SHE 0342-045 ON US 34 IN WELD COUNTY. . 1.00 2000.00 . . NH 1604-009 SH 160, WALSH EAST & WEST - A . 1.00 5000.00 . . IM 0762-043 ON I-76 IN SEDGWICK COUNTY . 1.00 25000.00 . . NH 0062-021 6TH AVE COLFAX TO SIMMS . 1.00 5000.00 . . NH 0062-022 SH6 EB @ WADSWORTH BLVD. . 1.00 2000.00 . . BR 149A-022 EXISTING BRIDGE STRUCTURE L-0 . 1.00 5000.00 . . BR 0504-043 SH 50, 1.2 MILES EAST OF FOWL . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17.00 5676.47 . . C 0252-367 I-25, 5TH STREET TO FOUNDERS/ . 1.00 25000.00 . . BR 3852-009 US 385 WRAY BRIDGE REPLACEME . 1.00 15000.00 . . NH 026A-003 ALAMEDA AVE (SH 26B) FROM DEC . 2,500.00 1.00 . . STU 4701-107 C-470: WADSWORTH BLVD TO BROA . 1.00 5000.00 . . BR R400-203 FY 06 BRIDGE MAINTENANCE . 1.00 2000.00 . . BR 2854-105 US 285 WEST OF SH 470 AND EAS . 1.00 10000.00 . . ER 067A-025 SH 67 NORTH OF WOODLAND PARK . 1.00 5000.00 . . STA 062A-011 SH 62 & CR 5 (AMELIA ST) . 1.00 1000.00 . . SHE 0831-104 PARKER ROAD (SH 83) BETWEEN T . 1.00 2000.00 . . IM 0253-160 ON I-25 IN WELD COUNTY . 1.00 100000.00 . . IM 0703-273 HOGBACK PARK N RIDE PHASE II . 1.00 10000.00 . . STU M040-011 WADSWORTH BYPASS (SH 121) FRO . 1.00 5000.00 . . C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA . 1.00 5000.00 . . C R600-283 VARIOUS . 1.00 4000.00 . . STA 060A-010 SH 60 AT 83RD AVE IN WELD COU . 1.00 1000.00 . . NH 0061-078 US 6 MP 260.00 TO 270.5 . 1.00 1000.00 . . BR 0361-052 N ST VRAIN Cr (LYONS) . 1.00 3000.00 . . AQC 1211-064 SH 121/WADSWORTH BOULEVARD FR . 1.00 2000.00 . . STU R400-204 ALONG I-25 IN REGION 4. . 1.00 3000.00 . . NH 2854-102 US 285 CORRIDOR IN JEFFERSON . 1.00 5000.00 . . IM 0251-166 ON I-25 NB FROM COMMERCIAL ST . 1.00 10000.00 . . IM 0703-301 ON GEORGETOWN HILL ABOVE THE . 1.00 1000.00 . . BR 0241-046 3 MILES SOUTH OF CHAFFEE/PARK . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,522.00 88.22 . . STA R600-279 SH 121 (WADSWORTH) FROM KEN C . 1.00 5000.00 . . IM 0703-291 I70 / SH58, RAMP A, B, C, D, . 1.00 10000.00 . . IM 0252-384 I-25 OVER BROADWAY . 1.00 5000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 586 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70380 F/A Erosion Ctrl Force Acct ============================================= IM 076A-007 I-76 FROM US85 TO BURLINGTON . 1.00 2000.00 . . HB 0853-064 US 85C-LATHAM CANAL CONST . 1.00 2000.00 . . C 0251-173 I 25, CULVERTS, TRINIDAD & PU . 1.00 10000.00 . . STA 0091-026 STATE HIGHWAY NO 9 . 1.00 2000.00 . . IM R600-292 70TH AVE AT I-25/BLAKE AND 20 . 1.00 500.00 . . SHE 0503-067 US 50, WEST OF CANON CITY . 1.00 1000.00 . . BR 0021-034 SH 2 OVER FULTON CANAL . 1.00 2500.00 . . BR 092A-019 EXISTING STRUCTURE J-06-A IS . 1.00 5000.00 . . STU R200-097 POWERS BLVD / WOODMAN RD - CO . 1.00 12000.00 . . NH 0062-020 6TH AVENUE: 19TH ST TO COLFAX . 1.00 2500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 4576.92 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,591.00 216.25 . . =============== 700-70390 F/A Wetland Restore & Replace Force Acct ============================================= IM 0703-291 I70 / SH58, RAMP A, B, C, D, . 1.00 2844.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2844.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2844.00 . . =============== 700-70495 F/A Asbestos Abatement Work Force Acct ============================================= IM R600-224 I-25 & SPEER INTERCHANGE MOD. . 1.00 10000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 . . STU M040-011 WADSWORTH BYPASS (SH 121) FRO . 1.00 25000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 17500.00 . . =============== 700-70588 F/A Transport Hazardous Matl Force Acct ============================================= STA 105A-013 SH 105, SOUTH OF SEDALIA . 1.00 3000.00 . . IM 0703-293 IDAHO SPRINGS - EMPIRE RAMP M . 1.00 2000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2500.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2500.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 587 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-70589 F/A Environ Health & Safety Mgmt Force Acct ============================================= IM R600-224 I-25 & SPEER INTERCHANGE MOD. . 1.00 4000.00 . . R600-247 SIGNALS - SH 121 & SH 391 . 1.00 2000.00 . . SHE 0451-008 PUEBLO BLVD AND 24TH ST. INTE . 1.00 1000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 2333.33 . . STU M040-011 WADSWORTH BYPASS (SH 121) FRO . 1.00 20000.00 . . C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA . 1.00 5000.00 . . IM 0251-166 ON I-25 NB FROM COMMERCIAL ST . 1.00 100000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 41666.67 . . IM 0703-291 I70 / SH58, RAMP A, B, C, D, . 1.00 30000.00 . . IM 0252-384 I-25 OVER BROADWAY . 1.00 5000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 17500.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 20875.00 . . =============== 700-70590 F/A Health and Safety Plan Force Acct ============================================= STU R200-097 POWERS BLVD / WOODMAN RD - CO . 1.00 15000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 15000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 . . =============== 700-73351 F/A Force Acct ============================================= IM 0702-257 I70 - EISENHOWER TUNNEL . 1.00 5000.00 . . IM 0701-179 I-70, GLENWOOD SPRINGS . 1.00 6000.00 . . NH 0821-076 SH82 OVERLAY - ASPEN . 1.00 6000.00 . . IM 0702-252 I-70 WOLCOTT EAST ALT. B . 1.00 11900.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 7225.00 . . IM 0252-381 I-25, GREENLAND TO LARKSPUR . 1.00 50000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 50000.00 . . COLORADO DEPARTMENT OF TRANSPORTATION 10:41 Tuesday, January 9, 2007 588 ITEM UNIT COSTS BY PROJECTS -- 2006 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 700-73351 F/A Force Acct ============================================= C 0252-367 I-25, 5TH STREET TO FOUNDERS/ . 1.00 50000.00 . . ER 067A-025 SH 67 NORTH OF WOODLAND PARK . 1.00 50000.00 . . IM 0703-273 HOGBACK PARK N RIDE PHASE II . 1.00 10000.00 . . STU M040-011 WADSWORTH BYPASS (SH 121) FRO . 1.00 40000.00 . . C2706-033 - Alt. 1 Conc. Def. ADAMS COUNTY COLORADO, NEW RA . 1.00 35000.00 . . C R600-283 VARIOUS . 1.00 7500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 32083.33 . . IM 0703-291 I70 / SH58, RAMP A, B, C, D, . 1.00 140000.00 . . HB 0701-173 ON INTERSTATE 70 FROM CLIFTON . 1.00 8500.00 . . HB 0701-180 INTERSTATE 70, UTAH/COLORADO . 1.00 8000.00 . . STU R200-097 POWERS BLVD / WOODMAN RD - CO . 1.00 140000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 74125.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 37860.00 . . =============== 700-73352 F/A Force Acct ============================================= STA 0881-019 AT THE INTERSECTION OF ARAPAH . 1.00 6000.00 . . IM 0253-160 ON I-25 IN WELD COUNTY . 1.00 50000.00 . . IM 0251-166 ON I-25 NB FROM COMMERCIAL ST . 1.00 24500.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 26833.33 . . IM 0703-291 I70 / SH58, RAMP A, B, C, D, . 1.00 30000.00 . . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 30000.00 . . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 27625.00 . .