Colorado Department of Transportation 14:27 Monday, March 12, 2012 1 2011 Cost Data - Maintenance BRIDGE COST PER SQUARE FOOT (01/01/11 THROUGH 12/31/11) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ BRIDGE REPAIR 110203 MTCE 133A-038 M I-07P SH-133A MM 18.9 I-07-P 290.0000 43.0000 12470.0 $57,155 $4.58 WEIGHTED AVERAGE COST: NEW STRUCTURES 12470.0 $57,155 $4.58 POST TENSIONED BOX GIRDER 111117 MTCE 0702-315 R I-70 MM 125.83 EB STRUCTURE F- F-08-AR 1307.7500 36.5000 47732.9 $134,009 $2.81 WEIGHTED AVERAGE COST: NEW STRUCTURES 47732.9 $134,009 $2.81 Colorado Department of Transportation 14:27 Monday, March 12, 2012 1 2011 Cost Data - Maintenance PROJECTS BID FROM 01/01/11 THROUGH 12/31/11 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20110106 HIGHMARK TRAFFIC SERVICES, INC. 5 $1,169,787.50 106.43 MTCER300-171 REGION 3 FY 11 REGION WIDE EPO 3 M 20110127 ROADSAFE TRAFFIC SYSTEMS, INC 4 $1,597,276.30 108.91 MTCER500-116 REGION 5 VARIOUS HIGHWAYS 5 M 20110203 MUELLER CONSTRUCTION SERVICES 8 $86,866.00 60.01 MTCE 133A-038 I-07P SH-133A MM 18.9 3 M 20110203 ROCKY MOUNTAIN ENTERPRISES, INC. 5 $213,370.00 95.60 MTCER500-118 SH 145, US 160, US 491, US 285 5 M 20110210 KOLBE STRIPING INC. 1 $135,060.00 68.21 MTCE R500-117 R5 VARIOUS HIGHWAYS 5 M 20110217 CC ENTRPRS TRAFFIC CONTROL SPECIALISTS 4 $102,264.00 85.44 MTCER300-172 REGION 3 INTERSTATE 70 CORRIDO 3 M 20110217 ALERT TRAFFIC CONTROL, INC. 4 $304,782.00 121.60 MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 1 R 20110217 HIGHWAY TECHNOLOGIES 5 $312,364.00 111.63 MTCE R100-187 REGION 1 EAST STENCIL PROJECT 1 R 20110217 AMERICAN DIRECTIONAL BORING INC. 6 $707,438.65 116.88 MTCE085A-016 SH85 BETWEEN MP127.65 & MP 136 2 R 20110217 STREAMLINE MARKINGS 3 $646,189.75 95.50 MTCER300-173 REGION 3 FY 11 SH 40 EPOXY STR 3 M 20110310 OLDCASTLE SW GROUP, INC. 5 $977,659.16 84.79 MTCE R500-108 US 550 R5 MP 38.2 TO MP 49.8 5 M 20110602 ROADSAFE TRAFFIC SYSTEMS, INC 2 $347,917.00 123.88 MTCE R300-177 US 50, SH 114,149,347 3 M 20110707 ROADSAFE TRAFFIC SYSTEMS, INC 2 $1,591,680.00 102.93 MTCE R600-398 VARIOUS LOCATIONS IN REGION 6 6 U 20110728 W.L. CONTRACTORS, INC. 2 $689,082.90 108.97 MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PIT 3 M 20110728 HIGHMARK TRAFFIC SERVICES, INC. 5 $398,488.00 96.65 MTCER300-181 SH 50A MM 95.41 - 81.60, SH 13 3 M 20110728 ROADSAFE TRAFFIC SYSTEMS, INC 3 $248,800.00 122.92 MTCE 070-011 INTERSTATE 70A, MM 155 TO MM 1 3 M 20110804 KOLBE STRIPING INC. 2 $753,320.00 99.56 MTCE1602-131 REGION 5 5 U Colorado Department of Transportation 14:27 Monday, March 12, 2012 2 2011 Cost Data - Maintenance PROJECTS BID FROM 01/01/11 THROUGH 12/31/11 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20110825 STURGEON ELECTRIC COMPANY, INC 3 $194,749.00 107.72 MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 6 U 20110915 HIGHWAY TECHNOLOGIES 3 $183,462.00 76.61 MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLEA 1 M 20111117 G.A. WESTERN CONSTRUCTION CO. 5 $150,634.00 60.26 MTCE 0702-315 I-70 MM 125.83 EB STRUCTURE F- 3 R 20111201 MOUNTAIN VALLEY HYDROSEED, LLC 4 $699,566.12 116.83 R200-179 REGION-WIDE 2 U ======= ================ ====== TOTALS 81 $11,510,756.38 101.71 Colorado Department of Transportation 14:27 Monday, March 12, 2012 1 2011 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/11 THROUGH 12/31/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 201-00000 Clearing and Grubbing 1 Lump Sum 5,264.70 5,264.70 202-00037 Removal of End Section 1 Each 233.91 233.91 202-00195 Removal of Median Cover 150 Sq Yard 1,207.50 8.05 202-00200 Removal of Sidewalk 60 Sq Yard 586.80 9.78 202-00203 Removal of Curb and Gutter 36 Lin Foot 564.12 15.67 202-00220 Removal of Asphalt Mat 30 Sq Yard 493.15 16.44 202-00250 Removal of Pavement Marking 725,220 Sq Foot 324,810.00 0.45 202-00251 Removal of Pavement Marking (Asphalt Grooving) 10,100 Sq Foot 15,150.00 1.50 202-00500 Removal of Portions of Present Structure 2 Each 19,032.50 9,516.25 202-00503 Removal of Portions of Present Structure 2 Sq Yard 1,100.00 550.00 202-00504 Removal of Expansion Device 176 Lin Foot 10,048.50 57.09 202-00700 Removal of Light Standard 5 Each 1,375.00 275.00 202-00705 Removal of Light Standard Foundation 5 Each 1,375.00 275.00 202-00750 Removal of Luminaire 15 Each 1,575.00 105.00 202-00805 Removal of Overhead Sign Structure 4 Each 17,669.56 4,417.39 202-00810 Removal of Ground Sign 550 Each 24,118.48 43.85 202-00821 Removal of Sign Panel 2,752 Each 64,297.44 23.36 202-00827 Removal of Pull Box 39 Each 10,047.50 257.63 202-00848 Removal of Traffic Signal Controller and Cabinet 1 Each 1,351.25 1,351.25 202-01130 Removal of Guardrail Type 3 325 Lin Foot 2,528.50 7.78 202-05100 Sandblasting Reinforcing Steel 21 Sq Yard 420.00 20.00 202-05150 Sandblasting 425 Sq Foot 2,122.50 4.99 203-00060 Embankment Material (Complete In Place) 2,000 Cubic Yard 48,280.00 24.14 203-01597 Potholing 50 Hour 7,000.00 140.00 203-01622 Sweeping (With Pickup Broom) 250 Hour 37,500.00 150.00 208-00002 Erosion Log (12 Inch) 435 Lin Foot 2,120.30 4.87 208-00005 Erosion Log 50 Lin Foot 550.00 11.00 208-00011 Erosion Bales (Weed Free) 20 Each 345.00 17.25 208-00020 Silt Fence 500 Lin Foot 625.00 1.25 208-00034 Gravel Bag 1,192 Lin Foot 4,458.00 3.74 208-00045 Concrete Washout Structure 3 Each 2,640.00 880.00 208-00050 Storm Drain Inlet Protection 11 Each 1,678.75 152.61 208-00051 Storm Drain Inlet Protection 10 Lin Foot 300.00 30.00 208-00103 Removal and Disposal of Sediment (Labor) 60 Hour 3,300.00 55.00 210-00425 Reset Bridge Railing 12 Lin Foot 396.00 33.00 210-00750 Reset Light Standard 15 Each 2,122.50 141.50 210-00755 Reset Light Standard Steel High Mast 2 Each 4,950.00 2,475.00 210-00810 Reset Ground Sign 5 Each 1,550.00 310.00 Colorado Department of Transportation 14:27 Monday, March 12, 2012 2 2011 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/11 THROUGH 12/31/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 210-00815 Reset Sign Panel 21 Each 2,210.00 105.24 210-00827 Reset Pull Box 6 Each 1,380.00 230.00 210-00855 Reset Traffic Signal Controller Cabinet 1 Each 5,727.00 5,727.00 212-00006 Seeding (Native) 1 Acre 2,613.86 2,613.86 212-00032 Soil Conditioning 1 Acre 548.00 548.00 213-00002 Mulching (Weed Free Hay) 1 Acre 766.50 766.50 213-00012 Spray-on Mulch Blanket 0 Acre 2,234.78 213-00061 Mulch Tackifier 100 Pound 323.00 3.23 216-00201 Soil Retention Blanket (Straw-Coconut) 500 Sq Yard 845.00 1.69 304-06000 Aggregate Base Course (Class 6) 225 Ton 6,655.50 29.58 403-00720 Hot Bituminous Pavement (Patching) (Asphalt) 65 Ton 11,430.85 175.86 403-32741 Hot Bituminous Pavement (Grading SG) (75) (PG 64-22) 295 Ton 24,995.35 84.73 409-03055 Place Cover Coat Material 462,462 Sq Yard 106,366.26 0.23 411-10216 Emulsified Asphalt (CRS-2P) 237,838 Gallon 487,567.90 2.05 411-10255 Emulsified Asphalt (Slow-Setting) 29,069 Gallon 58,138.00 2.00 503-00042 Drilled Caisson (42 Inch) 66 Lin Foot 22,921.80 347.30 503-00048 Drilled Caisson (48 Inch) 80 Lin Foot 35,885.60 448.57 503-00054 Drilled Caisson (54 Inch) 138 Lin Foot 76,806.66 556.57 515-00410 Concrete Sealer (Calcium Nitrite) 21 Sq Yard 903.00 43.00 518-01004 Bridge Expansion Device (0-4 Inch) 142 Lin Foot 8,490.00 59.79 518-01015 Bridge Expansion Device (0-15 Inch) 34 Lin Foot 106,362.50 3,128.31 518-02010 Elastomeric Concrete End Dam 38 Cubic Foot 19,000.00 500.00 518-02030 Polyester Concrete End Dam 174 Cubic Foot 17,052.00 98.00 601-01000 Concrete Class B 33 Cubic Yard 11,726.55 355.35 601-03000 Concrete Class D 22 Cubic Yard 12,928.30 587.65 601-03040 Concrete Class D (Bridge) 3 Cubic Yard 3,650.00 1,216.67 602-00020 Reinforcing Steel (Epoxy Coated) 700 Pound 2,345.00 3.35 606-00301 Guardrail Type 3 (6-3 Post Spacing) 1,300 Lin Foot 22,958.00 17.66 606-01340 End Anchorage Type 3D 4 Each 3,227.96 806.99 606-02003 End Anchorage (Nonflared) 3 Each 6,210.30 2,070.10 607-52910 Corner and Line Brace Post (Chain Link) 6 Each 690.00 115.00 607-53172 Fence Chain Link (72 Inch) 400 Lin Foot 10,776.00 26.94 607-60274 24 Foot Gate Double (Chain Link) 1 Each 2,694.45 2,694.45 608-00000 Concrete Sidewalk 40 Sq Yard 6,946.00 173.65 610-00030 Median Cover Material (Concrete) 160 Sq Foot 5,520.00 34.50 612-00001 Delineator (Type I) 6 Each 114.60 19.10 612-00003 Delineator (Type III) 6 Each 128.64 21.44 612-00260 Location Marker (Fiber Optic)(Dome) 72 Each 2,566.80 35.65 Colorado Department of Transportation 14:27 Monday, March 12, 2012 3 2011 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/11 THROUGH 12/31/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 613-00150 1-1/2 Inch Electrical Conduit 1,970 Lin Foot 41,370.00 21.00 613-00206 2 Inch Electrical Conduit (Bored) 8,151 Lin Foot 150,793.50 18.50 613-00208 2 Inch Electrical Conduit (Bored) (Install Only) 100 Lin Foot 4,000.00 40.00 613-00306 3 Inch Electrical Conduit (Bored) 3,880 Lin Foot 85,360.00 22.00 613-00700 Inspection Trip 12 Each 34,920.00 2,910.00 613-01200 2 Inch Electrical Conduit (Plastic) 40,605 Lin Foot 274,489.80 6.76 613-01202 2 Inch Electrical Conduit (Plastic) (Install Only) 150 Lin Foot 2,250.00 15.00 613-01300 3 Inch Electrical Conduit (Plastic) 1,090 Lin Foot 8,175.00 7.50 613-04010 Conduit 1 Lump Sum 5,669.50 5,669.50 613-07000 Pull Box (Special) 67 Each 40,535.50 605.01 613-07018 Pull Box (18"x12"x8") 2 Each 851.00 425.50 613-07023 Pull Box (24"x36"x24") 14 Each 26,600.00 1,900.00 613-07026 Pull Box (16"x24"x12") 37 Each 33,670.00 910.00 613-07039 Pull Box (30"x48"x18") 58 Each 56,361.50 971.75 613-07199 Pull Box (Install Only) 10 Each 3,450.00 345.00 613-08100 Electric Vault (6'x5'x6.5') Deep 1 Each 6,785.00 6,785.00 613-10000 Wiring 2 Lump Sum 53,339.75 26,669.88 613-20100 Light Standard (Install Only) 5 Each 1,025.00 205.00 613-20200 Luminaire (Install Only) 15 Each 3,075.00 205.00 613-20215 Luminaire Arm (Install Only) 15 Each 1,575.00 105.00 613-40005 Concrete Foundation Pad (Install Only) 5 Each 3,725.00 745.00 613-50102 Lighting Control Center (Install Only) 2 Each 2,320.00 1,160.00 613-50150 Secondary Service Pedestal 3 Each 12,633.00 4,211.00 613-50155 Secondary Service Pedestal (Install Only) 2 Each 3,400.00 1,700.00 613-60600 Lighting Repair 600 Hour 45,000.00 75.00 613-60700 Troubleshooting 200 Hour 15,000.00 75.00 613-60800 Locate Utilities 100 Hour 5,000.00 50.00 614-00011 Sign Panel (Class I) 893 Sq Foot 15,293.00 17.13 614-00012 Sign Panel (Class II) 3,847 Sq Foot 77,060.60 20.03 614-00013 Sign Panel (Class III) 11,367 Sq Foot 238,396.43 20.97 614-00025 Sign Panel (Class I) (Install Only) 15,091 Sq Foot 64,244.00 4.26 614-00027 Sign Panel (Class II) (Install Only) 11,839 Sq Foot 92,665.00 7.83 614-00028 Sign Panel (Class III) (Install Only) 9,333 Sq Foot 45,730.00 4.90 614-00612 Steel Sign Post (W 6x12) 84 Lin Foot 2,940.00 35.00 614-00615 Steel Sign Post (W 6x15) 92 Lin Foot 3,680.00 40.00 614-00818 Steel Sign Post (W 8x18) 34 Lin Foot 1,700.00 50.00 614-00821 Steel Sign Post (W 8x21) 70 Lin Foot 3,266.32 46.66 614-01026 Steel Sign Post (W 10x26) 32 Lin Foot 1,888.00 59.00 Colorado Department of Transportation 14:27 Monday, March 12, 2012 4 2011 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/11 THROUGH 12/31/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-01512 Steel Sign Support (2-Inch Round)(Post) 1,619 Lin Foot 10,419.00 6.44 614-01522 Steel Sign Support (2-Inch Round)(Socket) 49 Each 5,010.00 102.24 614-01573 Steel Sign Support (2-1/2 Inch Round NP-40)(Post & Sl 2 Each 573.08 286.54 614-01575 Steel Sign Support (2-1/2 Inch Round NP-40)(Post) 5,521 Lin Foot 92,852.00 16.82 614-01578 Steel Sign Support (2-1/2 Inch Round NP-40)(Slipbase) 421 Each 78,970.00 187.58 614-01585 Steel Sign Support (2-1/2 Inch Round Sch 80) (Post) 1,163 Lin Foot 21,979.00 18.90 614-01588 Steel Sign Support (2-1/2 Inch Round Sch 80)(Slipbase 77 Each 18,075.00 234.74 614-03001 Concrete Footing (Type 1) 6 Each 6,300.00 1,050.00 614-03002 Concrete Footing (Type 2) 6 Each 6,900.00 1,150.00 614-03003 Concrete Footing (Type 3) 2 Each 2,560.00 1,280.00 614-03004 Concrete Footing (Type 4) 4 Each 5,195.24 1,298.81 614-03006 Concrete Footing (Type 6) 2 Each 3,600.00 1,800.00 614-10110 LED Warning Sign System (_Signs) 1 Each 5,000.00 5,000.00 614-32400 Monotube Overhead Sign Cantilever (24 Inch Diameter) 4 Each 150,778.40 37,694.60 614-41800 Monotube Overhead Sign Bridge (18 Inch Diameter) 1 Each 53,027.40 53,027.40 614-42400 Monotube Overhead Sign Bridge (24 Inch Diameter) 2 Each 136,650.22 68,325.11 614-70150 Pedestrian Signal Face (16) (Countdown) 32 Each 17,600.00 550.00 614-72860 Pedestrian Push Button 32 Each 3,136.00 98.00 614-72875 Loop Detector Wire 8,244 Lin Foot 39,983.40 4.85 614-72876 Traffic Signal Vehicle Detector Amplifier (Loop Type) 45 Each 8,100.00 180.00 614-72892 Power Feed Wire 110 Lin Foot 440.00 4.00 614-75875 Loop Detector Wire (Install Only) 10,000 Lin Foot 22,500.00 2.25 614-86000 Traffic Signal Controller (Master) 2 Each 48,540.00 24,270.00 614-86920 Modification of Traffic Signal Controller Cabinet 8 Each 18,960.00 2,370.00 614-87010 Fiber Optic Cable (Single Mode) (12 Fiber) 13,033 Lin Foot 26,066.00 2.00 614-87012 Fiber Optic Termination Panel - 12 Fiber 8 Each 5,616.00 702.00 614-87020 Optical Transceiver 8 Each 17,560.00 2,195.00 614-87350 Test Fiber Optic Cable 1 Lump Sum 4,025.00 4,025.00 614-87401 Fiber Optic Cable (Special) 56,150 Lin Foot 32,567.00 0.58 614-87424 Fiber Optic Cable (Single Mode) (24 Strands) 1,500 Lin Foot 870.00 0.58 614-87506 Splice Fiber Optic Cable (6 Strand) 126 Each 27,357.12 217.12 620-00020 Sanitary Facility 5 Each 825.00 165.00 625-00000 Construction Surveying 2 Lump Sum 5,214.10 2,607.05 626-00000 Mobilization 20 Lump Sum 608,667.79 30,433.39 626-01000 Public Information Services 3 Lump Sum 22,685.00 7,561.67 627-00005 Epoxy Pavement Marking 96,394 Gallon 3,877,926.55 40.23 627-00007 Epoxy Pavement Marking (Special) 2,750 Gallon 281,875.00 102.50 627-00011 Pavement Marking Paint (Waterborne) 2,367 Gallon 71,010.00 30.00 Colorado Department of Transportation 14:27 Monday, March 12, 2012 5 2011 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/11 THROUGH 12/31/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 627-00032 Raised Flexible Pavement Marker (Temporary) 1,000 Each 2,500.00 2.50 627-01010 Preformed Plastic Pavement Marking (Type I)(Inlaid) 62,158 Sq Foot 583,412.00 9.39 627-02010 Preformed Plastic Pavement Marking (Type II) (Inlaid) 103,350 Sq Foot 928,490.00 8.98 627-30205 Thermoplastic Pavement Marking (Word-Symbol) 3,520 Sq Foot 45,232.00 12.85 627-30405 Preformed Thermoplastic Pavement Marking (Word-Symbol 13,601 Sq Foot 81,606.00 6.00 627-30410 Preformed Thermoplastic Pavement Marking (Xwalk-Stop 33,612 Sq Foot 168,060.00 5.00 627-40003 Methyl Methacrylate Pavement Marking (Inlaid) 24,097 Sq Foot 282,758.00 11.73 630-00000 Flagging 5,398 Hour 106,366.80 19.70 630-00007 Traffic Control Inspection 52 Day 5,197.44 99.95 630-00012 Traffic Control Management 768 Day 241,444.20 314.38 630-80305 Flagging Station Light 2 Each 800.00 400.00 630-80335 Barricade (Type 3 M-A) (Temporary) 10 Each 1,754.30 175.43 630-80341 Construction Traffic Sign (Panel Size A) 266 Each 6,107.40 22.96 630-80342 Construction Traffic Sign (Panel Size B) 574 Each 14,984.30 26.11 630-80343 Construction Traffic Sign (Panel Size C) 44 Each 930.30 21.14 630-80344 Construction Traffic Sign (Special) 127 Sq Foot 1,888.00 14.87 630-80350 Vertical Panel 170 Each 3,230.00 19.00 630-80355 Portable Message Sign Panel 5 Each 5,002.00 1,000.40 630-80357 Advance Warning Flashing or Sequencing Arrow Panel (B 13 Each 6,006.92 462.07 630-80358 Advance Warning Flashing or Sequencing Arrow Panel (C 14 Each 5,053.00 360.93 630-80359 Portable Message Sign Panel 230 Day 15,858.80 68.95 630-80360 Drum Channelizing Device 315 Each 3,835.50 12.18 630-80380 Traffic Cone 3,530 Each 13,291.50 3.77 630-80510 Mobile Pavement Marking Zone 4 Lump Sum 19,000.00 4,750.00 630-85040 Impact Attenuator (Truck Mounted Attenuator) (Tempora 6 Each 24,334.60 4,055.77 630-85041 Mobile Attenuator 110 Day 21,070.00 191.55 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 1 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00000 Clear and Grub LUMP SUM =============================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 1.00 1500.00 3854.12 5264.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 3160.52 3889.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1500.00 3160.52 3889.85 =============== 202-00037 Rem of End Section Each =================================================== R200-179 REGION-WIDE 12/01/11 1.00 500.00 247.98 233.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 500.00 247.98 233.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 500.00 247.98 233.91 =============== 202-00195 Rem of Median Cover Sq Yard ================================================ MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 150.00 30.00 26.15 8.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 150.00 30.00 26.15 8.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 30.00 26.15 8.05 =============== 202-00200 Rem Sidewalk Sq Yard ================================================ MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 60.00 23.00 26.44 9.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 23.00 26.44 9.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 23.00 26.44 9.78 =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 36.00 10.00 17.54 15.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.00 10.00 17.54 15.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 10.00 17.54 15.67 =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 25.00 8.00 39.89 9.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 8.00 39.89 9.20 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 2 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ R200-179 REGION-WIDE 12/01/11 5.00 60.00 110.91 52.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 60.00 110.91 52.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 16.67 48.25 16.44 =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ MTCER300-171 REGION 3 FY 11 REGION WIDE EP 01/06/11 150,000.00 0.30 0.29 0.25 MTCER500-116 REGION 5 VARIOUS HIGHWAYS 01/27/11 500.00 3.50 4.15 0.50 MTCER300-173 REGION 3 FY 11 SH 40 EPOXY ST 02/17/11 214,000.00 0.30 0.38 0.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 364,500.00 0.30 0.33 0.24 MTCE R600-398 VARIOUS LOCATIONS IN REGION 6 07/07/11 310,000.00 0.40 0.67 0.44 MTCE1602-131 REGION 5 08/04/11 50,720.00 1.00 5.00 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 360,720.00 0.48 1.18 0.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 725,220.00 0.39 0.54 0.45 =============== 202-00251 Rem Pvmt Marking (Asph Grooving) Sq Foot ================================================ MTCE R500-117 R5 VARIOUS HIGHWAYS 02/10/11 10,100.00 1.50 1.50 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,100.00 1.50 1.50 1.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,100.00 1.50 1.50 1.50 =============== 202-00500 Rem Port Present Str Each =================================================== MTCE 133A-038 I-07P SH-133A MM 18.9 02/03/11 2.00 4000.00 5190.91 9516.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 4000.00 5190.91 9516.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4000.00 5190.91 9516.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 3 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00503 Rem Port Present Str Sq Yard ================================================ MTCE 0702-315 I-70 MM 125.83 EB STRUCTURE F 11/17/11 2.00 700.00 4211.00 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 700.00 4211.00 550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 700.00 4211.00 550.00 =============== 202-00504 Rem Exp Device Lin Foot =============================================== MTCE 133A-038 I-07P SH-133A MM 18.9 02/03/11 141.50 100.00 107.75 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 141.50 100.00 107.75 40.00 MTCE 0702-315 I-70 MM 125.83 EB STRUCTURE F 11/17/11 33.50 120.00 537.60 131.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 33.50 120.00 537.60 131.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 175.00 103.83 163.16 57.42 =============== 202-00700 Rem Light Standard Each =================================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 5.00 350.00 308.33 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 350.00 308.33 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 350.00 308.33 275.00 =============== 202-00705 Rem Light Standard Foundation Each =================================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 5.00 150.00 341.67 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 150.00 341.67 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 150.00 341.67 275.00 =============== 202-00750 Rem Luminaire Each =================================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 15.00 80.00 82.00 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 80.00 82.00 105.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 80.00 82.00 105.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 4 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00805 Rem Overhead Sign Str Each =================================================== R200-179 REGION-WIDE 12/01/11 4.00 3000.00 7935.60 4417.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 3000.00 7935.60 4417.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 3000.00 7935.60 4417.39 =============== 202-00810 Rem Ground Sign Each =================================================== MTCER500-118 SH 145, US 160, US 491, US 28 02/03/11 55.00 40.00 144.30 30.00 MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 02/17/11 136.00 25.00 54.25 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 191.00 29.32 41.53 34.92 MTCE R300-177 US 50, SH 114,149,347 06/02/11 330.00 35.00 33.50 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 330.00 35.00 33.50 17.00 MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 28.00 125.00 171.67 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 28.00 125.00 171.67 90.00 R200-179 REGION-WIDE 12/01/11 1.00 50.00 323.87 58.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 50.00 323.87 58.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 550.00 37.64 43.31 30.54 =============== 202-00821 Rem Sign Panel Each =================================================== MTCER500-118 SH 145, US 160, US 491, US 28 02/03/11 25.00 15.00 78.60 15.00 MTCER300-172 REGION 3 INTERSTATE 70 CORRID 02/17/11 320.00 15.00 21.75 22.00 MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 02/17/11 853.00 14.00 30.81 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,198.00 14.29 29.65 41.70 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 5 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00821 Rem Sign Panel Each =================================================== MTCE R300-177 US 50, SH 114,149,347 06/02/11 1,540.00 15.00 17.00 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,540.00 15.00 17.00 9.00 MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 2.00 14.00 135.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 14.00 135.00 40.00 R200-179 REGION-WIDE 12/01/11 12.00 250.00 446.59 24.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 250.00 446.59 24.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,752.00 15.71 27.35 23.34 =============== 202-00827 Rem of Pull Box Each =================================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 11.00 60.00 143.96 172.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 60.00 143.96 172.50 MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 23.00 80.00 335.00 325.00 MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 5.00 60.00 125.00 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 28.00 76.43 186.51 241.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39.00 71.79 177.87 231.22 =============== 202-00848 Rem Traf Sig Control+Cab Each =================================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 1.00 1000.00 787.04 1351.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 787.04 1351.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 787.04 1351.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 6 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== R200-179 REGION-WIDE 12/01/11 325.00 2.75 8.20 7.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 325.00 2.75 8.20 7.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 325.00 2.75 8.20 7.78 =============== 202-05100 Sandblasting Reinf Steel Sq Yard ================================================ MTCE 0702-315 I-70 MM 125.83 EB STRUCTURE F 11/17/11 21.00 6.00 42.20 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21.00 6.00 42.20 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 6.00 42.20 20.00 =============== 202-05150 Sandblasting Sq Foot ================================================ MTCE 133A-038 I-07P SH-133A MM 18.9 02/03/11 424.50 0.50 3.91 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 424.50 0.50 3.91 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 424.50 0.50 3.91 5.00 =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 2,000.00 8.00 17.05 24.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,000.00 8.00 17.47 24.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,000.00 8.00 17.47 24.09 =============== 203-01597 Potholing Hour =================================================== MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 50.00 180.00 282.50 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 180.00 164.21 168.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 180.00 162.43 150.55 =============== 203-01622 Sweeping (With Pickup Broom) Hour =================================================== MTCE1602-131 REGION 5 08/04/11 250.00 150.00 142.50 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 250.00 150.00 142.50 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 150.00 142.50 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 7 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00002 Erosion Log (12 In) Lin Foot =============================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 335.00 6.00 5.28 5.18 MTCE R500-108 US 550 R5 MP 38.2 TO MP 49.8 03/10/11 100.00 5.00 14.43 3.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 435.00 5.77 6.06 4.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 435.00 5.77 4.20 4.00 =============== 208-00005 Erosion Log Lin Foot =============================================== MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 50.00 3.35 19.00 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 3.35 4.70 5.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 3.35 4.74 5.68 =============== 208-00011 Erosion Bales (Weed Free) Each =================================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 20.00 20.00 20.79 17.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 20.00 20.79 17.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 20.00 20.79 17.25 =============== 208-00020 Silt Fence Lin Foot =============================================== MTCE R500-108 US 550 R5 MP 38.2 TO MP 49.8 03/10/11 500.00 2.50 21.47 1.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 500.00 2.50 21.47 1.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 500.00 2.50 21.47 1.25 =============== 208-00034 Gravel Bag Lin Foot =============================================== MTCE 133A-038 I-07P SH-133A MM 18.9 02/03/11 96.00 7.00 8.40 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 96.00 7.00 6.03 6.00 MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 1,000.00 4.00 4.47 3.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,000.00 4.00 4.48 3.89 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 8 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00034 Gravel Bag Lin Foot =============================================== MTCE 0702-315 I-70 MM 125.83 EB STRUCTURE F 11/17/11 96.00 5.00 7.20 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 96.00 5.00 7.20 2.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,192.00 4.32 4.90 4.12 =============== 208-00045 Conc Washout Str Each =================================================== MTCE 133A-038 I-07P SH-133A MM 18.9 02/03/11 1.00 1000.00 535.00 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 748.20 537.67 MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 1.00 560.00 1600.00 1940.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 560.00 936.12 1104.00 MTCE 0702-315 I-70 MM 125.83 EB STRUCTURE F 11/17/11 1.00 800.00 655.70 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 800.00 655.70 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 786.67 904.36 649.91 =============== 208-00050 Storm Drain Inlet Protection Each =================================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 5.00 100.00 122.54 143.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 100.00 122.54 143.75 MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 6.00 51.00 280.00 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 51.00 280.00 160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 73.27 167.53 152.61 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 9 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00051 Storm Drain Inlet Protection (Type 1) Lin Foot =============================================== MTCE1602-131 REGION 5 08/04/11 10.00 12.00 125.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 12.00 125.00 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 12.00 125.00 30.00 =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 60.00 40.00 45.00 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 40.00 53.05 76.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 40.00 49.27 66.57 =============== 210-00425 Res Bridge Railing Lin Foot =============================================== MTCE 0702-315 I-70 MM 125.83 EB STRUCTURE F 11/17/11 12.00 30.00 162.40 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 30.00 162.40 33.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 30.00 162.40 33.00 =============== 210-00750 Res Light Standard Each =================================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 15.00 600.00 440.50 141.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 600.00 440.50 141.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 600.00 440.50 141.50 =============== 210-00755 Res Light Standard Steel High Mast Each =================================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 2.00 5000.00 3263.67 2475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 5000.00 3263.67 2475.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5000.00 3263.67 2475.00 =============== 210-00810 Res Ground Sign Each =================================================== MTCE R300-177 US 50, SH 114,149,347 06/02/11 5.00 200.00 300.00 310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 200.00 300.00 310.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 200.00 300.00 310.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 10 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00815 Res Sign Panel Each =================================================== MTCER300-172 REGION 3 INTERSTATE 70 CORRID 02/17/11 10.00 60.00 108.75 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 60.00 108.75 150.00 MTCE R300-177 US 50, SH 114,149,347 06/02/11 2.00 50.00 55.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 50.00 55.00 40.00 MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 9.00 150.00 138.33 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 150.00 138.33 70.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 97.62 116.97 105.24 =============== 210-00827 Res Pull Box Each =================================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 6.00 375.00 230.50 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 375.00 230.50 230.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 375.00 230.50 230.00 =============== 210-00855 Res Traf Sig Control Cab Each =================================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 1.00 1500.00 2661.67 5727.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 2661.67 5727.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1500.00 2661.67 5727.00 =============== 212-00006 Seeding (Native) Acre =================================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 0.30 1500.00 1869.17 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.30 1500.00 1165.19 1958.91 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 11 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00006 Seeding (Native) Acre =================================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 0.50 2000.00 3009.33 1288.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.50 2000.00 3101.78 1933.53 R200-179 REGION-WIDE 12/01/11 0.20 1500.00 5150.08 3099.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.20 1500.00 5150.08 3099.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1750.00 2204.01 2140.74 =============== 212-00032 Soil Conditioning Acre =================================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 0.50 3000.00 1642.00 1096.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.50 3000.00 2571.59 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.50 3000.00 2539.21 2365.71 =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 0.50 800.00 1917.67 1533.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.50 800.00 2428.27 1512.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.50 800.00 1630.30 1346.74 =============== 213-00012 Spray-on Mulch Blanket Acre =================================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 0.30 1500.00 6458.50 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.30 1500.00 6458.50 5500.00 R200-179 REGION-WIDE 12/01/11 0.20 1500.00 5581.22 2923.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.20 1500.00 5581.22 2923.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.50 1500.00 3525.41 2805.94 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 12 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00061 Mulch Tackifier Pound ================================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 100.00 3.00 4.08 3.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 3.00 6.50 5.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 3.00 7.60 8.69 =============== 216-00201 Soil Reten Blanket (S-C)(BioD Cl 1) Sq Yard ================================================ MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 500.00 3.00 2.15 1.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 500.00 3.00 2.15 1.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 500.00 3.00 2.15 1.69 =============== 304-06000 ABC (CL 6) Ton ==================================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 225.00 18.00 31.26 29.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 225.00 18.00 31.26 29.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 225.00 18.00 31.26 29.58 =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 25.00 150.00 211.12 173.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 150.00 198.78 155.52 R200-179 REGION-WIDE 12/01/11 40.00 90.00 332.05 177.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 90.00 332.05 177.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65.00 113.08 238.75 159.19 =============== 403-32741 HMA (Gr SG) (75) (PG 64-22) Ton ==================================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 295.00 90.00 94.07 84.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 295.00 90.00 94.07 84.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 295.00 90.00 94.07 84.73 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 13 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 409-03055 Place CC Matl Sq Yard ================================================ MTCE R500-108 US 550 R5 MP 38.2 TO MP 49.8 03/10/11 462,462.00 0.45 0.59 0.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 462,462.00 0.45 0.59 0.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 462,462.00 0.45 0.59 0.23 =============== 411-10216 Emul Asph (CRS-2P) Gallon ================================================= MTCE R500-108 US 550 R5 MP 38.2 TO MP 49.8 03/10/11 237,838.00 2.50 2.73 2.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 237,838.00 2.50 2.73 2.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 237,838.00 2.50 2.73 2.05 =============== 411-10255 Emul Asph (SS) Gallon ================================================= MTCE R500-108 US 550 R5 MP 38.2 TO MP 49.8 03/10/11 29,069.00 2.50 2.48 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29,069.00 2.50 2.48 2.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29,069.00 2.50 2.48 2.00 =============== 503-00042 Drilled Caisson (42 In) Lin Foot =============================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 66.00 300.00 288.88 347.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 66.00 300.00 288.88 347.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66.00 300.00 469.14 409.04 =============== 503-00048 Drilled Caisson (48 In) Lin Foot =============================================== R200-179 REGION-WIDE 12/01/11 80.00 325.00 507.07 448.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 80.00 325.00 507.07 448.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 325.00 456.72 426.52 =============== 503-00054 Drilled Caisson (54 In) Lin Foot =============================================== R200-179 REGION-WIDE 12/01/11 138.00 300.00 578.64 556.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 138.00 300.00 578.64 556.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 138.00 300.00 578.64 556.57 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 14 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 515-00410 Concrete Sealer (Calcium Nitrite) Sq Yard ================================================ MTCE 0702-315 I-70 MM 125.83 EB STRUCTURE F 11/17/11 21.00 30.00 47.60 43.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21.00 30.00 47.60 43.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 30.00 47.60 43.00 =============== 518-01004 Br Expan Device (0-4 In) Lin Foot =============================================== MTCE 133A-038 I-07P SH-133A MM 18.9 02/03/11 141.50 200.00 143.00 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 141.50 200.00 143.00 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 141.50 200.00 143.00 60.00 =============== 518-01015 Br Expan Device (0-15 In) Lin Foot =============================================== MTCE 0702-315 I-70 MM 125.83 EB STRUCTURE F 11/17/11 33.50 3000.00 3827.40 3175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 33.50 3000.00 3827.40 3175.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.50 3000.00 3827.40 3175.00 =============== 518-02010 Elastomeric Conc End Dam Cubic Foot ============================================= MTCE 133A-038 I-07P SH-133A MM 18.9 02/03/11 38.00 650.00 583.50 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 38.00 650.00 583.50 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38.00 650.00 583.50 500.00 =============== 518-02030 Polyester Conc End Dam Cubic Foot ============================================= MTCE 0702-315 I-70 MM 125.83 EB STRUCTURE F 11/17/11 174.00 650.00 149.80 98.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 174.00 650.00 149.80 98.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 174.00 650.00 149.80 98.00 =============== 601-01000 Conc CL B Cubic Yard ============================================= MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 33.00 200.00 340.48 355.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 33.00 200.00 340.48 355.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.00 200.00 340.48 355.35 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 15 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03000 Conc CL D Cubic Yard ============================================= MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 22.00 400.00 566.61 587.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 400.00 566.61 587.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 400.00 566.61 587.65 =============== 601-03040 Conc CL D (Bridge) Cubic Yard ============================================= MTCE 133A-038 I-07P SH-133A MM 18.9 02/03/11 1.90 4000.00 2680.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.90 4000.00 2680.00 1500.00 MTCE 0702-315 I-70 MM 125.83 EB STRUCTURE F 11/17/11 1.00 1500.00 1914.40 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1500.00 1914.40 800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.90 3137.93 2490.50 1258.62 =============== 602-00020 Reinf Steel (Epoxy) Pound ================================================== MTCE 0702-315 I-70 MM 125.83 EB STRUCTURE F 11/17/11 700.00 2.00 2.94 3.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 700.00 2.00 2.94 3.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 700.00 2.00 2.94 3.35 =============== 606-00301 Gdrail Ty 3 (6-3) Lin Foot =============================================== R200-179 REGION-WIDE 12/01/11 1,300.00 12.00 19.20 17.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,300.00 12.00 19.20 17.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,300.00 12.00 22.80 17.28 =============== 606-01340 End Anchor Ty 3D Each =================================================== R200-179 REGION-WIDE 12/01/11 4.00 800.00 825.75 806.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 800.00 825.75 806.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 800.00 758.78 787.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 16 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-02003 End Anchor (Nonflared) Each =================================================== R200-179 REGION-WIDE 12/01/11 3.00 1600.00 2133.78 2070.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 1600.00 2133.78 2070.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1600.00 2133.78 2070.10 =============== 607-52910 Corner and Line Br Post (CL) Each =================================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 6.00 220.00 134.08 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 220.00 134.08 115.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 220.00 134.08 115.00 =============== 607-53172 Fence CL (72 In) Lin Foot =============================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 400.00 14.50 25.89 26.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 400.00 14.50 25.89 26.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 400.00 14.50 25.89 26.94 =============== 607-60274 24 Ft Gate D (CL) Each =================================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 1.00 1200.00 1797.41 2694.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1200.00 1797.41 2694.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1200.00 1797.41 2694.45 =============== 608-00000 Conc Sidewalk Sq Yard ================================================ MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 40.00 45.00 73.32 173.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 45.00 73.32 173.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 45.00 73.32 173.65 =============== 610-00030 Median Cover Matl (Conc) Sq Foot ================================================ MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 160.00 5.00 14.63 34.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 160.00 5.00 14.63 34.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 160.00 5.00 14.96 23.34 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 17 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00001 Delin (Ty I) Each =================================================== R200-179 REGION-WIDE 12/01/11 6.00 20.00 55.03 19.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 20.00 55.03 19.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 20.00 55.03 19.10 =============== 612-00003 Delin (Ty III) Each =================================================== R200-179 REGION-WIDE 12/01/11 6.00 20.00 60.11 21.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 20.00 60.11 21.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 20.00 60.11 21.44 =============== 612-00260 Loc Mark (Fib Opt)(Dome) Each =================================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 72.00 200.00 57.96 35.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 72.00 200.00 57.96 35.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72.00 200.00 61.65 37.66 =============== 613-00150 1-1/2 In Elec Cond Lin Foot =============================================== MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 1,970.00 19.00 24.50 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,970.00 19.00 24.50 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,970.00 19.00 24.50 21.00 =============== 613-00206 2 In Elec Cond (Bored) Lin Foot =============================================== MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 8,151.00 20.00 23.25 18.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,151.00 20.00 23.37 18.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,151.00 20.00 16.38 15.22 =============== 613-00208 Inst 2 In Elec Cond (Bored) Lin Foot =============================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 100.00 7.00 23.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 7.00 23.00 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 7.00 23.00 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 18 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00306 3 In Elec Cond (Bored) Lin Foot =============================================== MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 3,880.00 22.00 30.50 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,880.00 22.00 32.36 22.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,880.00 22.00 22.66 19.00 =============== 613-00700 Insp Trip Each =================================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 12.00 750.00 2225.00 2910.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 750.00 2225.00 2910.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 750.00 2225.00 2910.00 =============== 613-01200 2 In Elec Cond (P) Lin Foot =============================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 40,605.00 6.00 9.87 6.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40,605.00 6.00 9.57 6.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40,605.00 6.00 9.59 6.53 =============== 613-01202 Inst 2 In Elec Cond (P) Lin Foot =============================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 150.00 10.00 9.75 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 150.00 10.00 9.75 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 10.00 9.75 15.00 =============== 613-01300 3 In Elec Cond (P) Lin Foot =============================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 1,090.00 8.00 11.70 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,090.00 8.00 11.70 7.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,090.00 8.00 12.24 7.97 =============== 613-04010 Conduit LUMP SUM =============================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 1.00 8000.00 4715.08 5669.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 8000.00 4715.08 5669.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 8000.00 4715.08 5669.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 19 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07000 Pull Box (Spec) Each =================================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 9.00 600.00 2726.42 3047.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 600.00 2726.42 3047.50 MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 58.00 330.00 615.50 226.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 58.00 330.00 615.50 226.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 67.00 366.27 1286.03 605.01 =============== 613-07018 Pull Box (18"x12"x8") Each =================================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 2.00 200.00 376.08 425.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 200.00 376.08 425.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 200.00 376.08 425.50 =============== 613-07023 Pull Box (24"x36"x24") Each =================================================== MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 14.00 870.00 1707.50 1900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 870.00 813.94 909.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 870.00 819.72 916.13 =============== 613-07026 Pull Box (16"x24"x12") Each =================================================== MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 37.00 600.00 1027.50 910.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 37.00 600.00 1027.50 910.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37.00 600.00 1027.50 910.00 =============== 613-07039 Pull Box (30"x48"x18") Each =================================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 58.00 900.00 903.13 971.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 58.00 900.00 903.13 971.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 58.00 900.00 903.13 971.75 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 20 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07199 Inst Pull Box Each =================================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 10.00 330.00 324.33 345.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 330.00 324.33 345.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 330.00 324.33 345.00 =============== 613-08100 Elec Vault (6'x5'x6.5') Deep Each =================================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 1.00 8000.00 5959.83 6785.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 8000.00 5959.83 6785.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 8000.00 5959.83 6785.00 =============== 613-10000 Wiring LUMP SUM =============================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 1.00 2500.00 12011.64 16059.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2500.00 12011.64 16059.75 MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 1.00 30000.00 89015.00 37280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 30000.00 27108.42 20846.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 16250.00 19136.90 17035.69 =============== 613-20100 Inst Light Std Each =================================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 5.00 1250.00 469.00 205.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 1250.00 469.00 205.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1250.00 469.00 205.00 =============== 613-20200 Inst Lumin Each =================================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 15.00 200.00 150.67 205.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 200.00 150.67 205.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 200.00 150.67 205.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 21 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-20215 Inst Lumin Arm Each =================================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 15.00 300.00 184.00 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 300.00 184.00 105.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 300.00 184.00 105.00 =============== 613-40005 Inst Conc Foundation Pad Each =================================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 5.00 450.00 578.33 745.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 450.00 578.33 745.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 450.00 578.33 745.00 =============== 613-50102 Inst Lighting Ctrl Center Each =================================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 2.00 1200.00 1081.67 1160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1200.00 1081.67 1160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1200.00 1081.67 1160.00 =============== 613-50150 Secondary Serv Pedestal Each =================================================== MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 3.00 420.00 3993.00 4211.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 420.00 3993.00 4211.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 420.00 3993.00 4211.00 =============== 613-50155 Inst Secondary Serv Pedestal Each =================================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 2.00 300.00 881.67 1700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 300.00 881.67 1700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 300.00 881.67 1700.00 =============== 613-60600 Lighting Repair Hour =================================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 600.00 50.00 116.67 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 600.00 50.00 116.67 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 600.00 50.00 116.67 75.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 22 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-60700 Troubleshooting Hour =================================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 200.00 70.00 94.00 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 70.00 94.00 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 70.00 94.00 75.00 =============== 613-60800 Locate Utilities Hour =================================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 100.00 150.00 125.33 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 150.00 125.33 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 150.00 125.33 50.00 =============== 614-00011 Sign Panel (CL I) Sq Foot ================================================ MTCER500-118 SH 145, US 160, US 491, US 28 02/03/11 865.00 15.00 19.20 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 865.00 15.00 15.58 13.64 MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 28.00 17.00 22.33 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 28.00 17.00 22.33 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 893.00 15.06 15.72 13.89 =============== 614-00012 Sign Panel (CL II) Sq Foot ================================================ MTCER500-118 SH 145, US 160, US 491, US 28 02/03/11 3,760.00 17.00 22.60 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,760.00 17.00 19.59 16.96 MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 63.00 20.00 24.00 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 63.00 20.00 24.00 23.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 23 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00012 Sign Panel (CL II) Sq Foot ================================================ R200-179 REGION-WIDE 12/01/11 24.00 20.00 25.96 17.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24.00 20.00 25.96 17.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,847.00 17.07 19.63 17.01 =============== 614-00013 Sign Panel (CL III) Sq Foot ================================================ MTCER500-118 SH 145, US 160, US 491, US 28 02/03/11 1,754.00 24.00 26.60 25.00 MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 02/17/11 5,725.00 13.00 26.50 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,479.00 15.58 26.12 21.71 MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 707.00 38.00 30.67 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 707.00 38.00 30.67 24.00 R200-179 REGION-WIDE 12/01/11 3,181.00 21.00 30.68 18.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,181.00 21.00 30.68 18.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,367.00 18.49 27.52 20.87 =============== 614-00025 Inst Sign Panel (CL I) Sq Foot ================================================ MTCER300-172 REGION 3 INTERSTATE 70 CORRID 02/17/11 81.00 6.00 7.31 6.00 MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 02/17/11 1,513.00 8.00 5.19 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,594.00 7.90 5.30 6.00 MTCE R300-177 US 50, SH 114,149,347 06/02/11 13,324.00 4.50 4.25 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,324.00 4.50 4.25 4.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 24 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00025 Inst Sign Panel (CL I) Sq Foot ================================================ MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 173.00 9.00 7.67 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 173.00 9.00 7.67 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,091.00 4.91 4.50 4.26 =============== 614-00027 Inst Sign Panel (CL II) Sq Foot ================================================ MTCER300-172 REGION 3 INTERSTATE 70 CORRID 02/17/11 3,800.00 5.25 6.06 5.50 MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 02/17/11 5,678.00 8.00 6.81 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,478.00 6.90 6.51 8.20 MTCE R300-177 US 50, SH 114,149,347 06/02/11 1,566.00 5.50 5.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,566.00 5.50 5.00 5.00 MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 795.00 10.00 8.33 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 795.00 10.00 8.33 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,839.00 6.92 6.50 7.83 =============== 614-00028 Inst Sign Panel (CL III) Sq Foot ================================================ MTCER300-172 REGION 3 INTERSTATE 70 CORRID 02/17/11 8,800.00 5.00 6.00 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,800.00 5.00 6.00 4.50 MTCE R300-177 US 50, SH 114,149,347 06/02/11 100.00 9.00 12.00 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 9.00 12.00 18.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 25 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00028 Inst Sign Panel (CL III) Sq Foot ================================================ MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 433.00 11.00 10.33 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 433.00 11.00 10.33 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,333.00 5.32 6.19 4.90 =============== 614-00612 Steel Sign Post (W 6x12) Lin Foot =============================================== MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 84.00 34.00 39.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 84.00 34.00 39.00 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 84.00 34.00 39.00 35.00 =============== 614-00615 Steel Sign Post (W 6x15) Lin Foot =============================================== MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 92.00 50.00 46.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 92.00 50.00 46.00 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 92.00 50.00 42.90 38.54 =============== 614-00818 Steel Sign Post (W 8x18) Lin Foot =============================================== MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 34.00 60.00 54.67 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 34.00 60.00 54.67 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 60.00 54.67 50.00 =============== 614-00821 Steel Sign Post (W 8x21) Lin Foot =============================================== MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 34.00 70.00 63.33 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 34.00 70.00 63.33 52.00 R200-179 REGION-WIDE 12/01/11 36.00 47.50 76.98 41.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 36.00 47.50 76.98 41.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70.00 58.43 71.32 46.66 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 26 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01026 Steel Sign Post (W 10x26) Lin Foot =============================================== MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 32.00 51.00 72.00 59.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 32.00 51.00 72.00 59.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 51.00 72.00 59.00 =============== 614-01512 Steel Sign Supp (2-In Rd)(Post) Lin Foot =============================================== MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 02/17/11 253.00 12.50 5.81 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 253.00 12.50 3.72 2.77 MTCE R300-177 US 50, SH 114,149,347 06/02/11 1,282.00 5.00 6.75 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,282.00 5.00 6.75 5.50 MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 84.00 12.50 11.67 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 84.00 12.50 11.67 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,619.00 6.56 4.50 4.15 =============== 614-01522 Steel Sign Supp (2-In Rd)(Sock) Each =================================================== MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 02/17/11 16.00 80.00 73.50 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 80.00 56.14 62.58 MTCE R300-177 US 50, SH 114,149,347 06/02/11 24.00 60.00 80.00 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24.00 60.00 80.00 75.00 MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 9.00 80.00 108.33 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 80.00 108.33 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 49.00 70.20 58.82 65.15 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 27 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01573 Steel Sign Supp (2-1/2 Rd NP40)(Po&Slip) Each =================================================== R200-179 REGION-WIDE 12/01/11 2.00 750.00 502.69 286.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 750.00 502.69 286.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 750.00 502.69 286.54 =============== 614-01575 Steel Sign Supp (2-1/2 In Rd NP40)(Po) Lin Foot =============================================== MTCER500-118 SH 145, US 160, US 491, US 28 02/03/11 1,050.00 18.00 19.70 14.00 MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 02/17/11 971.00 18.00 14.25 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,021.00 18.00 17.38 13.04 MTCE R300-177 US 50, SH 114,149,347 06/02/11 3,500.00 14.00 15.00 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,500.00 14.00 15.00 19.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,521.00 15.46 16.35 16.82 =============== 614-01578 Steel Sign Supp (2-1/2 In Rd NP40)(Slip) Each =================================================== MTCER500-118 SH 145, US 160, US 491, US 28 02/03/11 73.00 175.00 358.00 190.00 MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 02/17/11 90.00 150.00 202.50 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 163.00 161.20 280.79 167.91 MTCE R300-177 US 50, SH 114,149,347 06/02/11 258.00 200.00 202.50 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 258.00 200.00 202.50 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 421.00 184.98 248.24 187.58 =============== 614-01585 Steel Sign Supp (2-1/2 In Rd 80) (Post) Lin Foot =============================================== MTCER500-118 SH 145, US 160, US 491, US 28 02/03/11 14.00 30.00 32.30 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 28 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01585 Steel Sign Supp (2-1/2 In Rd 80) (Post) Lin Foot =============================================== MTCER300-172 REGION 3 INTERSTATE 70 CORRID 02/17/11 24.00 25.00 27.75 20.00 MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 02/17/11 74.00 29.00 22.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 112.00 28.27 17.12 14.60 MTCE R300-177 US 50, SH 114,149,347 06/02/11 120.00 30.00 152.00 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 120.00 30.00 152.00 19.00 MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 931.00 22.00 23.33 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 931.00 22.00 23.33 19.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,163.00 23.43 19.31 15.52 =============== 614-01588 Steel Sign Supp (2-1/2 In Rd 80)(Slip) Each =================================================== MTCER300-172 REGION 3 INTERSTATE 70 CORRID 02/17/11 2.00 300.00 443.75 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 300.00 157.37 132.72 MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 75.00 140.00 278.33 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 75.00 140.00 278.33 225.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 77.00 144.16 171.34 149.20 =============== 614-03001 Conc Footing (Ty 1) Each =================================================== MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 6.00 1200.00 955.00 1050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 1200.00 955.00 1050.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1200.00 955.00 1050.00 =============== 614-03002 Conc Footing (Ty 2) Each =================================================== MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 6.00 1500.00 1313.33 1150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 1500.00 1313.33 1150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1500.00 1182.93 1078.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 29 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-03003 Conc Footing (Ty 3) Each =================================================== MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 2.00 1600.00 1558.33 1280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1600.00 1558.33 1280.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1600.00 1558.33 1280.00 =============== 614-03004 Conc Footing (Ty 4) Each =================================================== MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 2.00 2000.00 1740.00 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2000.00 1740.00 1400.00 R200-179 REGION-WIDE 12/01/11 2.00 1300.00 1516.78 1197.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1300.00 1516.78 1197.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1650.00 1612.45 1298.81 =============== 614-03006 Conc Footing (Ty 6) Each =================================================== MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 2.00 2200.00 3666.67 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2200.00 3666.67 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2200.00 3666.67 1800.00 =============== 614-10110 LED Warning Sign System (_Signs) Each =================================================== MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 1.00 25000.00 10500.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25000.00 10500.00 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 10500.00 5000.00 =============== 614-32400 Monotube Overhead Sign Cant (24 In Dia) Each =================================================== R200-179 REGION-WIDE 12/01/11 4.00 35000.00 40758.40 37694.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 35000.00 40758.40 37694.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 35000.00 37856.07 36107.30 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 30 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-41800 Monotube Overhead Sign Brdg (18 In Dia) Each =================================================== R200-179 REGION-WIDE 12/01/11 1.00 52000.00 57989.85 53027.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 52000.00 57989.85 53027.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 52000.00 57989.85 53027.40 =============== 614-42400 Monotube Overhead Sign Brdg (24 In Dia) Each =================================================== R200-179 REGION-WIDE 12/01/11 2.00 65000.00 73680.28 68325.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 65000.00 73680.28 68325.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 65000.00 73680.28 68325.11 =============== 614-70150 Ped Sig Face (16) (Countdown) Each =================================================== MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 32.00 100.00 645.00 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 32.00 100.00 645.00 550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 100.00 645.00 550.00 =============== 614-72860 Ped Push Button Each =================================================== MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 32.00 155.00 191.50 98.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 32.00 155.00 191.50 98.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 155.00 210.76 114.91 =============== 614-72875 Loop Detect Wire Lin Foot =============================================== MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 8,244.00 4.00 5.68 4.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,244.00 4.00 5.68 4.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,244.00 4.00 5.68 4.85 =============== 614-72876 Detect Amp (Loop) (2) Each =================================================== MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 45.00 325.00 215.00 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 45.00 325.00 215.00 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 325.00 215.00 180.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 31 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72892 Power Feed Wire Lin Foot =============================================== MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 110.00 7.00 197.00 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 110.00 7.00 197.00 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 110.00 7.00 197.00 4.00 =============== 614-75875 Inst Loop Detect Wire Lin Foot =============================================== MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 10,000.00 2.00 3.03 2.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,000.00 2.00 3.03 2.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,000.00 2.00 3.03 2.25 =============== 614-86000 Traf Sig Ctrler (M) Each =================================================== MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 2.00 14000.00 23567.50 24270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 14000.00 23567.50 24270.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 14000.00 23567.50 24270.00 =============== 614-86920 Mod Traf Sig Ctrler Cab Each =================================================== MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 8.00 3500.00 2425.00 2370.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 3500.00 2425.00 2370.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 3500.00 2425.00 2370.00 =============== 614-87010 Fiber Optic Cable (S Mode) (12 Fiber) Lin Foot =============================================== MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 13,033.00 2.40 1.75 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,033.00 2.40 1.71 2.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,033.00 2.40 1.71 2.00 =============== 614-87012 Fiber Optic Termination Pan - 12 Fiber Each =================================================== MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 8.00 750.00 1133.50 702.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 750.00 1133.50 702.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 750.00 1133.50 702.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 32 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87020 Optical Transceiver Each =================================================== MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 8.00 2500.00 1977.50 2195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 2500.00 2386.86 2046.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 2500.00 2386.86 2046.83 =============== 614-87350 Test Fiber Optic Cable LUMP SUM =============================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 1.00 5000.00 8382.00 4025.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 8382.00 4025.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 19156.65 33162.50 =============== 614-87401 Fiber Optic Cable (Spec) Lin Foot =============================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 56,150.00 0.75 0.81 0.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 56,150.00 0.75 0.81 0.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56,150.00 0.75 0.81 0.58 =============== 614-87424 Fiber Optic Cable (S Mode) (24 S) Lin Foot =============================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 1,500.00 1.50 1.15 0.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,500.00 1.50 1.15 0.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,500.00 1.50 1.69 1.28 =============== 614-87506 Splice FO Cable (6 Strand) Each =================================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 126.00 225.00 223.69 217.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 126.00 225.00 223.69 217.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 126.00 225.00 223.69 217.12 =============== 620-00020 Sanitary Facility Each =================================================== MTCE 133A-038 I-07P SH-133A MM 18.9 02/03/11 1.00 2000.00 330.56 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 33 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00020 Sanitary Facility Each =================================================== MTCE R500-108 US 550 R5 MP 38.2 TO MP 49.8 03/10/11 3.00 775.00 500.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 1081.25 504.26 430.00 MTCE 0702-315 I-70 MM 125.83 EB STRUCTURE F 11/17/11 1.00 650.00 434.20 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 650.00 434.20 175.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 995.00 575.15 396.11 =============== 625-00000 Const Surveying LUMP SUM =============================================== MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 1.00 2000.00 2670.67 2875.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2000.00 6077.62 2440.33 R200-179 REGION-WIDE 12/01/11 1.00 7500.00 4111.28 2339.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 7500.00 4111.28 2339.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4750.00 5735.65 2415.03 =============== 626-00000 Mobilization LUMP SUM =============================================== MTCER300-171 REGION 3 FY 11 REGION WIDE EP 01/06/11 1.00 1000.00 13160.05 2500.00 MTCER500-116 REGION 5 VARIOUS HIGHWAYS 01/27/11 1.00 25000.00 18250.00 500.00 MTCE 133A-038 I-07P SH-133A MM 18.9 02/03/11 1.00 25000.00 19891.00 3000.00 MTCER500-118 SH 145, US 160, US 491, US 28 02/03/11 1.00 35000.00 41345.00 33000.00 MTCE R500-117 R5 VARIOUS HIGHWAYS 02/10/11 1.00 20000.00 1000.00 1000.00 MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 1.00 45000.00 25813.09 48799.56 MTCER300-172 REGION 3 INTERSTATE 70 CORRID 02/17/11 1.00 25000.00 29875.00 12500.00 MTCER300-173 REGION 3 FY 11 SH 40 EPOXY ST 02/17/11 1.00 1000.00 2000.00 500.00 MTCE R100-187 REGION 1 EAST STENCIL PROJECT 02/17/11 1.00 5000.00 16800.00 22000.00 MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 02/17/11 1.00 10000.00 27000.19 30000.00 MTCE R500-108 US 550 R5 MP 38.2 TO MP 49.8 03/10/11 1.00 110000.00 120989.38 172000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 27454.55 32146.63 27207.17 MTCE R300-177 US 50, SH 114,149,347 06/02/11 1.00 25000.00 63750.00 72500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 25000.00 43963.77 32414.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 34 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00000 Mobilization LUMP SUM =============================================== MTCE R600-398 VARIOUS LOCATIONS IN REGION 6 07/07/11 1.00 20000.00 37500.00 40000.00 MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 1.00 55000.00 20340.00 25540.00 MTCE 070-011 INTERSTATE 70A, MM 155 TO MM 07/28/11 1.00 5000.00 36666.67 20000.00 MTCER300-181 SH 50A MM 95.41 - 81.60, SH 1 07/28/11 1.00 5000.00 13100.00 5000.00 MTCE1602-131 REGION 5 08/04/11 1.00 35000.00 90000.00 20000.00 MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 1.00 25000.00 51333.33 29000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 24166.67 34450.78 26943.22 MTCE 0702-315 I-70 MM 125.83 EB STRUCTURE F 11/17/11 1.00 25000.00 18071.60 16450.00 R200-179 REGION-WIDE 12/01/11 1.00 35000.00 53170.81 54378.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 30000.00 23946.74 26265.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 26600.00 32807.34 27588.95 =============== 626-01000 Public Info Services LUMP SUM =============================================== MTCE R500-108 US 550 R5 MP 38.2 TO MP 49.8 03/10/11 1.00 1000.00 3620.00 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 4306.60 2375.00 MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 1.00 7000.00 53967.50 18935.00 MTCE1602-131 REGION 5 08/04/11 1.00 2000.00 3000.00 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 4500.00 28483.75 10967.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 3333.33 7889.33 5612.67 =============== 627-00005 Epoxy Pvmt Mkg Gallon ================================================= MTCER300-171 REGION 3 FY 11 REGION WIDE EP 01/06/11 30,061.00 35.00 39.67 37.50 MTCER500-116 REGION 5 VARIOUS HIGHWAYS 01/27/11 38,762.00 37.00 41.73 41.15 MTCER300-173 REGION 3 FY 11 SH 40 EPOXY ST 02/17/11 16,025.00 38.00 40.31 37.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 84,848.00 36.48 41.00 39.43 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 35 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00005 Epoxy Pvmt Mkg Gallon ================================================= MTCE R600-398 VARIOUS LOCATIONS IN REGION 6 07/07/11 3,450.00 48.00 51.75 52.50 MTCER300-181 SH 50A MM 95.41 - 81.60, SH 1 07/28/11 8,096.00 50.00 49.94 46.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,546.00 49.40 50.21 48.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 96,394.00 38.03 45.28 42.98 =============== 627-00007 Epoxy Pvmt Mkg (Spec) Gallon ================================================= MTCE R600-398 VARIOUS LOCATIONS IN REGION 6 07/07/11 2,750.00 100.00 127.25 102.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,750.00 100.00 127.25 102.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,750.00 100.00 122.64 101.46 =============== 627-00011 Pvmt Mkg Paint (Waterborne) Gallon ================================================= MTCE R500-108 US 550 R5 MP 38.2 TO MP 49.8 03/10/11 2,367.00 29.00 34.58 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,367.00 29.00 35.27 30.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,367.00 29.00 36.03 30.67 =============== 627-00032 Raised Flex Pvmt Marker (Temp) Each =================================================== MTCE1602-131 REGION 5 08/04/11 1,000.00 1.00 3.25 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,000.00 1.00 3.25 2.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,000.00 1.00 3.25 2.50 =============== 627-01010 Preform Plastic Pvmt Mkg (TY I)(Inlaid) Sq Foot ================================================ MTCE R600-398 VARIOUS LOCATIONS IN REGION 6 07/07/11 4,200.00 10.00 11.98 8.95 MTCE 070-011 INTERSTATE 70A, MM 155 TO MM 07/28/11 22,000.00 8.50 12.95 10.10 MTCE1602-131 REGION 5 08/04/11 35,958.00 11.00 11.00 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 62,158.00 10.05 11.50 9.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 62,158.00 10.05 11.50 9.48 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 36 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-02010 Preform Plastic Pvmt Mkg (Ty II)(Inlaid) Sq Foot ================================================ MTCE R600-398 VARIOUS LOCATIONS IN REGION 6 07/07/11 102,200.00 9.00 9.98 8.95 MTCE1602-131 REGION 5 08/04/11 1,150.00 12.00 13.00 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 103,350.00 9.03 10.03 9.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 103,350.00 9.03 10.03 9.04 =============== 627-30205 Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ MTCE R500-108 US 550 R5 MP 38.2 TO MP 49.8 03/10/11 3,520.00 15.00 12.11 12.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,520.00 15.00 12.11 12.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,520.00 15.00 12.11 12.85 =============== 627-30405 Preform Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ MTCE R100-187 REGION 1 EAST STENCIL PROJECT 02/17/11 13,601.00 6.50 7.84 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13,601.00 6.50 8.23 7.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,601.00 6.50 8.45 7.58 =============== 627-30410 Preform Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ MTCE R100-187 REGION 1 EAST STENCIL PROJECT 02/17/11 33,612.00 5.00 5.57 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 33,612.00 5.00 5.62 5.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33,612.00 5.00 6.11 6.01 =============== 627-40003 Methyl Methacrylate Pvmt Mkg (Inlaid) Sq Foot ================================================ MTCE R500-117 R5 VARIOUS HIGHWAYS 02/10/11 10,400.00 9.00 8.75 8.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,400.00 9.00 8.75 8.75 MTCE1602-131 REGION 5 08/04/11 13,697.00 12.00 12.50 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,697.00 12.00 12.50 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24,097.00 10.71 11.15 12.67 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 37 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00000 Flagging Hour =================================================== MTCER500-116 REGION 5 VARIOUS HIGHWAYS 01/27/11 48.00 25.00 16.00 10.00 MTCE 133A-038 I-07P SH-133A MM 18.9 02/03/11 500.00 25.00 21.88 23.00 MTCER500-118 SH 145, US 160, US 491, US 28 02/03/11 500.00 23.00 11.40 20.00 MTCE R500-117 R5 VARIOUS HIGHWAYS 02/10/11 1,000.00 25.00 15.00 15.00 MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 160.00 18.00 24.40 17.25 MTCER300-172 REGION 3 INTERSTATE 70 CORRID 02/17/11 100.00 18.00 9.00 10.00 MTCE R100-187 REGION 1 EAST STENCIL PROJECT 02/17/11 600.00 10.00 14.00 18.00 MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 02/17/11 100.00 20.50 13.13 1.00 MTCE R500-108 US 550 R5 MP 38.2 TO MP 49.8 03/10/11 1,000.00 20.00 21.62 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,008.00 20.69 16.55 12.70 MTCE R300-177 US 50, SH 114,149,347 06/02/11 100.00 21.00 20.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 21.00 26.19 24.83 MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 100.00 20.00 30.13 34.00 MTCE1602-131 REGION 5 08/04/11 850.00 22.00 21.00 25.00 MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 100.00 25.00 30.83 22.00 MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 120.00 22.00 22.67 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,170.00 22.09 23.04 24.52 R200-179 REGION-WIDE 12/01/11 120.00 24.00 23.16 21.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 120.00 24.00 19.54 13.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,398.00 21.07 17.71 14.71 =============== 630-00007 Traf Ctrl Inspection Day ==================================================== MTCER500-118 SH 145, US 160, US 491, US 28 02/03/11 4.00 65.00 73.20 10.00 MTCE R500-117 R5 VARIOUS HIGHWAYS 02/10/11 6.00 150.00 300.00 300.00 MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 20.00 50.00 49.57 46.00 MTCE R500-108 US 550 R5 MP 38.2 TO MP 49.8 03/10/11 8.00 150.00 124.73 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 38.00 88.42 93.89 96.85 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 38 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00007 Traf Ctrl Inspection Day ==================================================== R200-179 REGION-WIDE 12/01/11 14.00 40.00 71.99 116.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 40.00 71.99 116.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 75.38 86.33 78.66 =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== MTCER500-116 REGION 5 VARIOUS HIGHWAYS 01/27/11 3.00 600.00 337.50 100.00 MTCE 133A-038 I-07P SH-133A MM 18.9 02/03/11 20.00 650.00 549.38 500.00 MTCER500-118 SH 145, US 160, US 491, US 28 02/03/11 70.00 275.00 150.40 50.00 MTCE R500-117 R5 VARIOUS HIGHWAYS 02/10/11 60.00 600.00 100.00 100.00 MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 50.00 320.00 387.25 57.50 MTCER300-172 REGION 3 INTERSTATE 70 CORRID 02/17/11 50.00 300.00 393.75 250.00 MTCE R100-187 REGION 1 EAST STENCIL PROJECT 02/17/11 70.00 100.00 240.00 400.00 MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 02/17/11 60.00 400.00 302.50 10.00 MTCE R500-108 US 550 R5 MP 38.2 TO MP 49.8 03/10/11 15.00 550.00 507.63 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 398.00 352.51 367.01 263.99 MTCE R300-177 US 50, SH 114,149,347 06/02/11 90.00 300.00 432.50 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 90.00 300.00 632.80 566.86 MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 30.00 400.00 650.00 690.00 MTCE 070-011 INTERSTATE 70A, MM 155 TO MM 07/28/11 20.00 200.00 316.67 100.00 MTCE1602-131 REGION 5 08/04/11 60.00 500.00 500.00 500.00 MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 50.00 600.00 603.33 450.00 MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 60.00 500.00 415.00 440.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 220.00 481.82 456.74 445.04 R200-179 REGION-WIDE 12/01/11 60.00 350.00 539.71 467.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60.00 350.00 453.48 237.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 768.00 383.20 417.34 343.52 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 39 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80305 Flagging Station Light Each =================================================== MTCE1602-131 REGION 5 08/04/11 2.00 200.00 220.00 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 200.00 220.00 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 200.00 387.03 729.81 =============== 630-80335 Barricade (3 M-A) (Temp) Each =================================================== R200-179 REGION-WIDE 12/01/11 10.00 150.00 72.86 175.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 150.00 72.86 175.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 150.00 75.65 125.77 =============== 630-80341 Const Traf Sign (A) Each =================================================== MTCER500-116 REGION 5 VARIOUS HIGHWAYS 01/27/11 20.00 35.00 25.50 10.00 MTCE 133A-038 I-07P SH-133A MM 18.9 02/03/11 8.00 30.00 21.75 25.00 MTCER500-118 SH 145, US 160, US 491, US 28 02/03/11 9.00 20.00 10.60 6.00 MTCE R500-117 R5 VARIOUS HIGHWAYS 02/10/11 9.00 45.00 50.00 50.00 MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 29.00 25.00 26.75 11.50 MTCER300-172 REGION 3 INTERSTATE 70 CORRID 02/17/11 18.00 13.00 3.25 2.00 MTCE R100-187 REGION 1 EAST STENCIL PROJECT 02/17/11 54.00 50.00 25.40 12.00 MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 02/17/11 2.00 50.00 13.00 1.00 MTCE R500-108 US 550 R5 MP 38.2 TO MP 49.8 03/10/11 31.00 35.00 38.39 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 180.00 35.38 20.92 18.55 MTCE R300-177 US 50, SH 114,149,347 06/02/11 18.00 10.00 15.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18.00 10.00 23.41 5.27 MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 17.00 20.00 48.50 55.00 MTCE 070-011 INTERSTATE 70A, MM 155 TO MM 07/28/11 8.00 15.00 26.67 10.00 MTCE1602-131 REGION 5 08/04/11 11.00 45.00 30.00 50.00 MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 2.00 50.00 33.33 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 38.00 27.76 33.13 38.84 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 40 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80341 Const Traf Sign (A) Each =================================================== R200-179 REGION-WIDE 12/01/11 30.00 20.00 24.66 52.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30.00 20.00 30.15 23.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 266.00 30.84 22.30 19.45 =============== 630-80342 Const Traf Sign (B) Each =================================================== MTCER500-116 REGION 5 VARIOUS HIGHWAYS 01/27/11 10.00 40.00 26.25 10.00 MTCE 133A-038 I-07P SH-133A MM 18.9 02/03/11 31.00 35.00 30.13 35.00 MTCER500-118 SH 145, US 160, US 491, US 28 02/03/11 36.00 25.00 10.60 6.00 MTCE R500-117 R5 VARIOUS HIGHWAYS 02/10/11 40.00 40.00 50.00 50.00 MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 35.00 30.00 38.04 11.50 MTCER300-172 REGION 3 INTERSTATE 70 CORRID 02/17/11 78.00 13.00 4.50 2.00 MTCE R100-187 REGION 1 EAST STENCIL PROJECT 02/17/11 30.00 50.00 25.00 10.00 MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 02/17/11 20.00 65.00 13.00 1.00 MTCE R500-108 US 550 R5 MP 38.2 TO MP 49.8 03/10/11 58.00 40.00 40.39 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 338.00 33.04 27.51 23.22 MTCE R300-177 US 50, SH 114,149,347 06/02/11 32.00 11.00 17.50 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 11.00 31.22 19.49 MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 27.00 20.00 51.25 55.00 MTCE 070-011 INTERSTATE 70A, MM 155 TO MM 07/28/11 44.00 15.00 28.33 10.00 MTCE1602-131 REGION 5 08/04/11 38.00 50.00 31.00 50.00 MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 15.00 60.00 48.67 30.00 MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 20.00 65.00 33.67 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 144.00 36.81 32.38 28.51 R200-179 REGION-WIDE 12/01/11 60.00 25.00 46.33 64.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60.00 25.00 44.44 48.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 574.00 31.92 30.00 26.08 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 41 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80343 Const Traf Sign (C) Each =================================================== MTCER300-172 REGION 3 INTERSTATE 70 CORRID 02/17/11 8.00 13.00 4.50 2.00 MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 02/17/11 7.00 75.00 13.00 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 41.93 41.07 42.52 MTCE R300-177 US 50, SH 114,149,347 06/02/11 4.00 12.00 25.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 12.00 38.34 19.74 MTCE 070-011 INTERSTATE 70A, MM 155 TO MM 07/28/11 8.00 15.00 30.00 10.00 MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 7.00 75.00 34.00 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 43.00 33.61 13.71 R200-179 REGION-WIDE 12/01/11 10.00 25.00 55.33 64.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 25.00 55.33 64.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44.00 35.73 39.93 30.36 =============== 630-80344 Const Traf Sign (Spec) Sq Foot ================================================ MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 112.00 6.00 11.27 11.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 112.00 6.00 12.57 13.92 MTCE1602-131 REGION 5 08/04/11 15.00 25.00 27.50 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 25.00 27.50 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 127.00 8.24 12.80 14.96 =============== 630-80350 Vert Panel Each =================================================== MTCER500-116 REGION 5 VARIOUS HIGHWAYS 01/27/11 30.00 15.00 16.00 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 42 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80350 Vert Panel Each =================================================== MTCER500-118 SH 145, US 160, US 491, US 28 02/03/11 30.00 15.00 10.00 7.00 MTCE R500-117 R5 VARIOUS HIGHWAYS 02/10/11 30.00 25.00 14.00 14.00 MTCER300-172 REGION 3 INTERSTATE 70 CORRID 02/17/11 30.00 10.00 6.75 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 16.25 11.07 10.25 MTCE1602-131 REGION 5 08/04/11 50.00 15.00 35.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 15.00 35.00 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 170.00 15.88 14.46 14.91 =============== 630-80355 Port Mesg Panel Each =================================================== MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 02/17/11 2.00 600.00 2000.25 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 600.00 1765.30 1623.40 MTCE 070-011 INTERSTATE 70A, MM 155 TO MM 07/28/11 1.00 500.00 1666.67 1000.00 MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 2.00 2500.00 3550.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1833.33 3477.43 3400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1340.00 1911.93 1749.37 =============== 630-80357 Flash Arrow Panel (B Ty) Each =================================================== MTCER500-116 REGION 5 VARIOUS HIGHWAYS 01/27/11 1.00 700.00 252.50 10.00 MTCER500-118 SH 145, US 160, US 491, US 28 02/03/11 2.00 750.00 237.40 600.00 MTCE R500-117 R5 VARIOUS HIGHWAYS 02/10/11 2.00 800.00 250.00 250.00 MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 2.00 400.00 378.25 345.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 657.14 300.82 342.86 MTCE1602-131 REGION 5 08/04/11 2.00 500.00 450.00 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 500.00 450.00 400.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 43 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80357 Flash Arrow Panel (B Ty) Each =================================================== R200-179 REGION-WIDE 12/01/11 4.00 250.00 676.68 701.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 250.00 676.68 701.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 507.69 438.54 462.07 =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== MTCER300-172 REGION 3 INTERSTATE 70 CORRID 02/17/11 2.00 500.00 325.25 200.00 MTCE R100-187 REGION 1 EAST STENCIL PROJECT 02/17/11 2.00 200.00 352.00 400.00 MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 02/17/11 2.00 1300.00 462.75 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 666.67 362.41 306.75 MTCE R300-177 US 50, SH 114,149,347 06/02/11 2.00 750.00 575.00 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 750.00 535.41 312.00 MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 1.00 400.00 1455.50 1651.00 MTCE 070-011 INTERSTATE 70A, MM 155 TO MM 07/28/11 2.00 500.00 233.33 100.00 MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 1.00 400.00 555.00 400.00 MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 2.00 1300.00 833.33 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 733.33 622.83 709.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 707.14 458.27 418.75 =============== 630-80359 Port Mesg Panel Day ==================================================== MTCE R300-177 US 50, SH 114,149,347 06/02/11 190.00 20.00 65.00 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 190.00 20.00 72.91 69.48 R200-179 REGION-WIDE 12/01/11 40.00 150.00 130.68 87.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 150.00 130.68 87.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 230.00 42.61 86.67 71.60 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 44 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80360 Drum Channel Dev Each =================================================== MTCE 133A-038 I-07P SH-133A MM 18.9 02/03/11 10.00 30.00 19.75 12.00 MTCER500-118 SH 145, US 160, US 491, US 28 02/03/11 20.00 10.00 10.20 7.00 MTCE R500-117 R5 VARIOUS HIGHWAYS 02/10/11 30.00 30.00 8.00 8.00 MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 30.00 15.00 18.31 17.25 MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 02/17/11 50.00 34.00 4.75 1.00 MTCE R500-108 US 550 R5 MP 38.2 TO MP 49.8 03/10/11 50.00 15.00 22.45 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 190.00 22.63 16.02 11.41 MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 50.00 34.00 21.67 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 34.00 31.73 35.00 R200-179 REGION-WIDE 12/01/11 75.00 10.00 21.44 29.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 75.00 10.00 21.44 29.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 315.00 21.43 19.02 18.98 =============== 630-80380 Traffic Cone Each =================================================== MTCER500-116 REGION 5 VARIOUS HIGHWAYS 01/27/11 40.00 10.00 7.00 2.00 MTCE 133A-038 I-07P SH-133A MM 18.9 02/03/11 200.00 10.00 3.16 3.50 MTCER500-118 SH 145, US 160, US 491, US 28 02/03/11 40.00 7.00 6.80 6.00 MTCE R500-117 R5 VARIOUS HIGHWAYS 02/10/11 300.00 7.00 5.00 5.00 MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 50.00 2.50 7.01 5.75 MTCER300-172 REGION 3 INTERSTATE 70 CORRID 02/17/11 400.00 3.00 1.56 1.00 MTCE R100-187 REGION 1 EAST STENCIL PROJECT 02/17/11 150.00 5.00 6.00 1.00 MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 02/17/11 200.00 14.00 6.00 1.00 MTCE R500-108 US 550 R5 MP 38.2 TO MP 49.8 03/10/11 600.00 10.00 5.65 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,980.00 7.91 5.11 4.02 MTCE R300-177 US 50, SH 114,149,347 06/02/11 200.00 8.00 4.50 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 200.00 8.00 4.90 4.84 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 45 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80380 Traffic Cone Each =================================================== MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 100.00 10.00 12.13 13.76 MTCE 070-011 INTERSTATE 70A, MM 155 TO MM 07/28/11 400.00 5.00 2.67 2.00 MTCE1602-131 REGION 5 08/04/11 300.00 10.00 3.00 5.00 MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 50.00 8.00 5.83 5.00 MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 200.00 14.00 6.67 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,050.00 8.76 4.11 3.42 R200-179 REGION-WIDE 12/01/11 300.00 10.00 5.40 9.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 300.00 10.00 6.46 8.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,530.00 8.34 5.00 4.44 =============== 630-80510 Mobile Pvmt Mkg Zone LUMP SUM =============================================== MTCER300-171 REGION 3 FY 11 REGION WIDE EP 01/06/11 1.00 1000.00 1500.00 2500.00 MTCER300-173 REGION 3 FY 11 SH 40 EPOXY ST 02/17/11 1.00 2500.00 2333.33 500.00 MTCE R500-108 US 550 R5 MP 38.2 TO MP 49.8 03/10/11 1.00 1500.00 3246.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1666.67 2533.48 1642.00 MTCER300-181 SH 50A MM 95.41 - 81.60, SH 1 07/28/11 1.00 2500.00 4400.00 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2500.00 4400.00 15000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1875.00 2790.61 3267.78 =============== 630-85040 Impact Atten (T-M-A) (Temp) Each =================================================== MTCE 133A-038 I-07P SH-133A MM 18.9 02/03/11 2.00 2000.00 944.38 600.00 MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 02/17/11 1.00 19500.00 6400.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 7833.33 5843.71 3127.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 46 ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85040 Impact Atten (T-M-A) (Temp) Each =================================================== MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 1.00 21000.00 13500.00 9000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 21000.00 9397.89 6750.00 R200-179 REGION-WIDE 12/01/11 2.00 5000.00 7039.33 7017.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 5000.00 7039.33 7017.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 9083.33 6206.89 3782.19 =============== 630-85041 Mobile Attenuator Day ==================================================== MTCER300-172 REGION 3 INTERSTATE 70 CORRID 02/17/11 50.00 60.00 156.25 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 60.00 156.25 75.00 MTCE R300-177 US 50, SH 114,149,347 06/02/11 10.00 200.00 487.50 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 200.00 239.91 247.63 MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 30.00 60.00 303.00 344.00 MTCE 070-011 INTERSTATE 70A, MM 155 TO MM 07/28/11 20.00 100.00 366.67 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 76.00 352.44 259.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 110.00 80.00 239.06 207.41