                                               Colorado Department of Transportation              13:09 Monday, January 22, 2018   1
                                                           2017 Cost Data
                                            PROJECTS BID FROM 01/01/17 THROUGH 12/31/17
------------------------------------------------------------------------------------------------------------------------------------
  BID           CONTRACTOR/
LETTING         PROJECT NUMBER                  LOCATION                         DIST  TERRAIN     BIDS       AWARDED BID   INDEX
------------------------------------------------------------------------------------------------------------------------------------
20170105        Casper Electric, Inc.                                                                2      $3,060,140.82   65.71
                NHPP0702-352                    HLT VMS CMS LUS REPLACEMENT       3     M

20170112        OLDCASTLE SW GROUP, INC.                                                             4      $1,192,574.70   86.02
                NHPP1602-145                    US 160 S. Fork to Monte Vista     5     P

20170119        BRANNAN SAND AND GRAVEL, LLC                                                         3      $5,232,750.15   94.53
                NHPP R600-440                   US40 (COLFAX BLVD) COLORADO BL    1     R

20170119        COULSON EXCAVATING COMPANY                                                           4      $5,571,866.50  103.44
                STA060A-019                     SH 60 Resurfacing US 287 to Mi    4     U

20170119        MAIN ELECTRIC LTD                                                                    2      $4,442,658.57   98.65
                NHPP1602-155                    US 160 Wolf Creek Fiber Optic     5     M

20170119        A and S CONSTRUCTION CO.                                                             2      $4,447,000.00   92.65
                NH1604-013                      US 160C Overlay, Jct. SH 389 E    2     P

20170119        ACME CONCRETE PAVING, INC.                                                           3      $4,900,000.00   75.24
                NHPP5502-093                    US 160/550 PCCP DIAMOND GRINDI    5     M

20170126        FLATIRON CONSTRUCTORS,  INC.                                                         6      $5,671,562.95   84.65
                STM0243-089                     Midpoint: Station 1019+50 Cent    2     R
                STM0243-089                     Midpoint: Station 1019+50 Cent    2     R

20170126        CC ENTRPRS TRAFFIC CONTROL SPECIALISTS                                               4        $227,668.00   65.70
                MTCER100-274                    MTCE R1 FY 17 SH 119 Signing      1     M

20170209        Myers and Sons Construction, LP                                                      7      $1,499,000.00   63.66
                NHPP145A-063                    SH 145 Wall Failure MP 76.05      5     M

20170209        APC SOUTHERN CONSTRUCTION COMPANY, LLC                                               3      $6,945,725.04   91.60
                STR0092-023                     SH 9 NORTH MP 101.6 TO 107, US    3     M

20170209        HABITAT CONSTRUCTION, LLC                                                            7        $483,898.96  120.97
                IM025A-039                      I-25 Critical Culvert at MP 12    2     P

20170209        ALL COWBOY EROSION CONTROL, LLC                                                      6        $169,515.65   80.51
                STA0931-032                     SH 93 Erosion Correction          4     M

20170216        ESCO CONSTRUCTION CO.                                                                3      $2,067,578.68   92.28
                NHPPR100-249                    Region 1 FY 17 US 040A Wall Re    1     M

20170216        INNOVATIVE MARKING SYSTEMS, INC.                                                     4      $1,736,040.00   98.11
                MTCER500-191                    R5 FY17 Striping                  5     M

20170302        OLDCASTLE SW GROUP, INC.                                                             3      $6,947,000.00   95.94
                NHPP4912-006                    US 491 Surface Treatment MP 27    5     R

20170302        ROCK and CO.                                                                         5      $1,999,484.00   83.61
                NHPP5502-087                    US 550 Cribwell Repair MM 68.7    5     M
                                               Colorado Department of Transportation              13:09 Monday, January 22, 2018   2
                                                           2017 Cost Data
                                            PROJECTS BID FROM 01/01/17 THROUGH 12/31/17
------------------------------------------------------------------------------------------------------------------------------------
  BID           CONTRACTOR/
LETTING         PROJECT NUMBER                  LOCATION                         DIST  TERRAIN     BIDS       AWARDED BID   INDEX
------------------------------------------------------------------------------------------------------------------------------------
20170302        FLATIRON CONSTRUCTORS,  INC.                                                         5      $6,996,496.46   94.85
                NHPP0402-091                    US 40 WEST OF STEAMBOAT SPRING    3     P

20170302        SIMON CONTRACTORS                                                                    5     $10,582,629.50   86.54
                STA0853-101                     US 85 FROM EATON (MP 275.5) TO    4     P

20170302        STURGEON ELECTRIC COMPANY, INC                                                       3      $4,311,059.00  108.11
                NHPP 0701-230                   Midpoint WB Bore                  3     M

20170302        Myers and Sons Construction, LP                                                      4      $1,736,068.00   64.30
                BR0252-449                      I-25 Woodmen NB                   2     R

20170302        TRICON 2, LLC                                                                        7      $4,860,000.00  103.40
                SHE160A-031                     SH 160 Passing Lanes              2     M

20170302        STURGEON ELECTRIC COMPANY, INC                                                       5      $1,257,319.00   84.72
                MTCER300-233                    MTCE R3 FY17/18 Signal Replace    3     M

20170309        ASPHALT SPECIALTIES CO., INC.                                                        4      $4,181,604.00   77.19
                STA2873-180                     US 287 (Federal) Resurfacing-1    1     R

20170309        A and S CONSTRUCTION CO.                                                             3      $8,931,917.00   92.16
                NHPP 0502-075                   US50 MP 127.0 TO MP 139.1 IN G    3     M

20170309        ASPHALT SPECIALTIES CO., INC.                                                        3        $787,779.00  128.07
                STA2873-183                     US 287 Repairs at LCR 17          4     R

20170309        KOLBE STRIPING INC.                                                                  3      $1,802,361.28   82.67
                MTCER300-239                    070A MP 0-75,131-173; 040A, 00    3     M

20170317        KIEWIT INFRASTRUCTURE CO.                                                            1     $11,636,336.92  100.00
                ER0341-089                      PR US 34 Big Thompson Canyon P    4     M

20170323        APC CONSTRUCTION CO., LLC                                                            3      $4,358,821.17  108.61
                STA0362-035                     US 36: Strasburg to Byers         1     R

20170323        SIMON CONTRACTORS                                                                    5      $4,673,587.40  108.47
                STA0243-087                     US 24 El Paso-Elbert CL Paving    4     P

20170323        EWING TRUCKING & CONSTRUCTION                                                        5        $482,898.75   97.52
                STE 0702-357                    I-70 West Vail Pass Basin         3     M

20170323        HAMILTON CONSTRUCTION CO.                                                            5        $758,895.50   64.83
                NHPP0703-434                    I-70 EBND MSE WALL/GUARDRAIL      1     M

20170323        ROADSAFE TRAFFIC SYSTEMS, INC                                                        3        $892,264.00   80.36
                MTCER300-240                    MTCE R3 FY 17/18 REGION WIDE S    3     M

20170323        ROADSAFE TRAFFIC SYSTEMS, INC                                                        3        $123,245.85   75.22
                MTCE2873-191                    R4 FY 17 Stencils #1              4     U
                                               Colorado Department of Transportation              13:09 Monday, January 22, 2018   3
                                                           2017 Cost Data
                                            PROJECTS BID FROM 01/01/17 THROUGH 12/31/17
------------------------------------------------------------------------------------------------------------------------------------
  BID           CONTRACTOR/
LETTING         PROJECT NUMBER                  LOCATION                         DIST  TERRAIN     BIDS       AWARDED BID   INDEX
------------------------------------------------------------------------------------------------------------------------------------
20170330        W.L. CONTRACTORS, INC.                                                               3      $1,078,435.90   83.71
                SHER100-246                     FY17 R1 Traffic Signal Replace    1     U

20170330        MARTIN MARIETTA MATERIALS                                                            4     $10,400,280.57  115.56
                STA067A-039                     SH 67 Divide to Cripple Creek     2     M

20170330        Mark Construction, Inc.                                                              4        $506,600.00  101.75
                MTCER300-238                    MTCE R3 FY 17/18 REGION WIDE S    3     M

20170330        ROADSAFE TRAFFIC SYSTEMS, INC                                                        2      $1,745,197.93  101.37
                SW01-932                        I-70 MP 146 TO 259                1     M

20170406        BRANNAN SAND AND GRAVEL, LLC                                                         2      $3,512,564.85  127.36
                STA095A-017                     SH 95 Sheridan Resurfacing 25t    1     U

20170406        APC CONSTRUCTION CO., LLC                                                            1      $5,286,017.40  129.61
                STA095A-018                     SH 95 Sheridan Resurfacing: Ha    1     R

20170406        SIMON CONTRACTORS                                                                    2      $7,860,100.56   92.97
                STA006A-057                     SH 6 EAST OF STERLING             4     P

20170406        APC SOUTHERN CONSTRUCTION COMPANY, LLC                                               3      $7,330,067.22   86.24
                STA 0503-089                    US 50 - Royal Gorge West_SH9 J    2     M

20170413        APC CONSTRUCTION CO., LLC                                                            3      $2,928,620.50  103.69
                STA0404-055                     SH 40 Colfax Resurfacing I-70     1     U

20170413        HAMILTON CONSTRUCTION CO.                                                            8      $2,996,540.15   84.85
                NHPP0703-433                    EJMT S Bore Barrier, Handrail,    1     M

20170420        LAWRENCE CONSTRUCTION CO.                                                           12     $10,200,000.00   75.56
                STA0503-085                     US 50 BNSF Railroad to Purcell    2     R

20170420        CASTLE ROCK CONST. CO. OF COLO, LLC                                                  5      $9,113,519.94   93.95
                STMSH45-001                     SH45 FROM MP 4.9-8.7 THRU PUEB    2     R

20170427        TEZAK HEAVY EQUIPMENT CO., INC.                                                      3        $337,348.73   91.80
                STRR500-169                     R5 US 84 MP 14.67 Priority Cul    5     R

20170427        ABCO CONTRACTING, INC.                                                               4      $4,174,637.50   89.38
                NHPP0704-240                    Package C (I-70 and I-25) Brid    1     U

20170427        OLDCASTLE SW GROUP, INC.                                                             1      $5,669,488.30   89.26
                NHPP 0701-238                   I-70B MP 4.20 TO MP 4.69, US6     3     U

20170427        TECHNOLOGY CONSTRUCTORS, INC.                                                        3      $3,608,729.00  102.39
                STAR500-190                     R5 Signal Replacement Chaffee     5     U

20170504        AMERICAN WEST CONSTRUCTION, LLC                                                      4      $1,149,975.00   95.50
                BR0361-117                      US 36 Culvert Repair MP 11.95     4     M
                                               Colorado Department of Transportation              13:09 Monday, January 22, 2018   4
                                                           2017 Cost Data
                                            PROJECTS BID FROM 01/01/17 THROUGH 12/31/17
------------------------------------------------------------------------------------------------------------------------------------
  BID           CONTRACTOR/
LETTING         PROJECT NUMBER                  LOCATION                         DIST  TERRAIN     BIDS       AWARDED BID   INDEX
------------------------------------------------------------------------------------------------------------------------------------
20170504        HAMON INFRASTRUCTURE, INC.                                                           3      $8,980,000.00  107.01
                NHPPC120-026                    US 85: I-76 to 168th              1     R

20170504        PAONIA, INC                                                                          2      $1,280,180.50   97.57
                STAR400-348                     Region 4 Controller and Cabine    4     U

20170511        INTERSTATE SEALANT & CONCRETE, INC.                                                  2      $1,398,949.50  100.76
                STAR100-255                     R1 FY18 CRACK SEAL                1     U

20170518        DILLIE AND KUHN, INC.                                                                3        $148,001.35   75.47
                AQC088A-035                     Traffic Signal/Fiber Optic Ins    00    U

20170518        PAONIA, INC                                                                          2        $528,333.00   98.94
                STM0211-026                     SH21 AND MESA RIDGE PKWY SIGNA    2     U

20170601        SEMA CONSTRUCTION, INC.                                                              4      $4,665,993.90   92.96
                STA0703-437                     I-70: 32ND TO 44TH                1     R

20170601        INNOVATIVE MARKING SYSTEMS, INC.                                                     3      $2,515,106.00   76.22
                MPR200-235                      FY 2018 PAVEMENT MARKING PROJE    2     R

20170601        T-P ENTERPRISES INC.                                                                 2        $501,307.23  111.40
                STMR200-240                     REGION WIDE EROSION CONTROL       2     R

20170608        TLM CONSTRUCTORS, INC.                                                               4        $775,026.00  132.48
                STR050A-031                     Storm Sewer on US 50C at James    2     R

20170615        KIRKLAND CONSTRUCTION, LLLP                                                          5        $495,861.00   75.54
                NHPP145A-074                    SH 145 SAWPIT DEBRIS FLOW         5     M

20170615        MCATEE CONSTRUCTION CO.                                                              3      $1,305,182.30   89.48
                STA0061-091                     SH 6 CHIPSEAL NEAR FLEMING        4     P

20170615        KIRKLAND CONSTRUCTION, LLLP                                                          4      $1,132,110.00  107.56
                NHPP 0702-381                   I-70 VAIL PASS FROST HEAVES       3     M

20170615        OLDCASTLE SW GROUP, INC.                                                             1        $651,475.00   94.65
                MTCE141A-048                    SH 141A WHITEWATER IN MESA COU    3     R

20170622        AMERICAN CIVIL CONSTRUCTORS, LLC dba A                                               6      $7,680,036.00   92.38
                ER0361-115                      US 36 Bridges                     4     R

20170622        INTERFACE COMMUNICATIONS COMPANY                                                     5      $1,039,500.00   97.02
                STA0072-019                     SH 7 FROM US 287 TO 75TH STREE    4     R

20170622        OLDCASTLE SW GROUP, INC.                                                             1      $1,452,622.00   95.47
                MTCE142A-002                    SH 142 CHIPSEAL                   5     P

20170622        PAONIA, INC                                                                          2      $1,799,255.80   89.73
                MTCE0253-259                    I25 FROM MP 229.29 TO MP 244.5    4     R
                                               Colorado Department of Transportation              13:09 Monday, January 22, 2018   5
                                                           2017 Cost Data
                                            PROJECTS BID FROM 01/01/17 THROUGH 12/31/17
------------------------------------------------------------------------------------------------------------------------------------
  BID           CONTRACTOR/
LETTING         PROJECT NUMBER                  LOCATION                         DIST  TERRAIN     BIDS       AWARDED BID   INDEX
------------------------------------------------------------------------------------------------------------------------------------
20170622        KOLBE STRIPING INC.                                                                  3        $191,060.00  104.66
                MTCER300-243                    R3 FY18 REGION WIDE ROUNDABOUT    3     M

20170628        KIEWIT INFRASTRUCTURE CO.                                                            1      $1,340,450.75  100.00
                ER0341-093                      PR US 34 BIG THOMPSON CANYON P    4     M

20170706        SEMA CONSTRUCTION, INC.                                                              5      $3,510,879.70   75.60
                NHPP2853-003                    US 285 MP 143.1- 148.0            5     R

20170706        TLM CONSTRUCTORS, INC.                                                              10        $383,432.00   96.81
                MTCE0762-054                    REGION 4 MTCE SECT1 I76 FORT M    4     P

20170713        CONNELL RESOURCES, INC.                                                              2        $704,924.68   95.62
                NHPP 2873-185                   US 287: Ted's Place Intersecti    4     R

20170713        STURGEON ELECTRIC COMPANY, INC                                                       2        $938,992.00  111.44
                ITSSW01-834                     ITS CAMERA PROJECT FY17           00    R

20170720        OLDCASTLE SW GROUP, INC.                                                             3      $3,399,704.70  105.44
                IM0701-212                      I-70 EXIT 49 GRAND MESA           3     M

20170720        JALISCO INTERNATIONAL, INC.                                                          3        $556,584.00  115.95
                SHE0141-024                     SH 14 Poudre Canyon Guardrail     4     M

20170720        JALISCO INTERNATIONAL, INC.                                                          1      $3,058,740.74   89.64
                NHPP 095A-019                   SH95:52ND TO 58TH/RALSTON(MM9.    1     R

20170720        STURGEON ELECTRIC COMPANY, INC                                                       2      $2,392,395.00   91.66
                CR100-283                       REGION 1 TRAFFIC SIGNAL CONTRO    1     U

20170727        JHL CONSTRUCTORS, INC                                                               13      $3,827,189.24  113.58
                BR0362-037                      US 36 at MP 140.1 and MP 140.9    4     P

20170727        AMERICAN WEST CONSTRUCTION, LLC                                                      3        $693,270.00  107.71
                ER0141-028                      PR SH 14 REPAIR WEST OF RUSTIC    4     R

20170727        DILLIE AND KUHN, INC.                                                                5      $1,884,034.20   75.07
                ITS0761-227                     ITS FIBER OPTICS ON I76 DENVER    00    P

20170803        DILLIE AND KUHN, INC.                                                                6        $747,597.10   67.19
                IM0762-052                      FIBER OPTICS AND ITS DEVICES I    4     P

20170810        KOLBE STRIPING INC.                                                                  3      $1,563,795.20   96.07
                MTCE0705-085                    FY 18 I-70 EPOXY FROM MM 328 T    4     P

20170817        AMERICAN WEST CONSTRUCTION, LLC                                                      2      $1,974,757.00  103.56
                NHPPR100-242                    R1 CRITICAL CULV REPAIR FY 17     1     R

20170817        Dykhuis Drilling Corp.                                                               3        $659,492.00   86.70
                MTCE131A-039                    SH 131 MP 0.053-68.721 IN EAGL    3     M
                                               Colorado Department of Transportation              13:09 Monday, January 22, 2018   6
                                                           2017 Cost Data
                                            PROJECTS BID FROM 01/01/17 THROUGH 12/31/17
------------------------------------------------------------------------------------------------------------------------------------
  BID           CONTRACTOR/
LETTING         PROJECT NUMBER                  LOCATION                         DIST  TERRAIN     BIDS       AWARDED BID   INDEX
------------------------------------------------------------------------------------------------------------------------------------
20170821        SEMA CONSTRUCTION, INC.                                                              2        $248,491.00  8610.2
                CR100-292                       I25/ORCHARD EMERGENCY REPAIR      1     U

20170824        Myers and Sons Construction, LP                                                      3      $1,120,000.00  112.11
                ER012A-047                      P-17-L Scour Critical SH 12 an    2     M

20170831        K.E.C.I. COLORADO, INC.                                                              2        $685,567.00  146.30
                NHPPR100-291                    I-225 SB RESTRIPING I-25 TO YO    1     R

20170901        KIEWIT INFRASTRUCTURE CO.                                                            1    $108,016,757.11  108.67
                ER0341-090                      PR US 34 BIG THOMPSON CANYON P    4     M

20170907        FLATIRON CONSTRUCTORS,  INC.                                                        11      $5,998,304.55   90.29
                BRR400-354                      Little-T Channel Work and SH 6    4     R
                ERR400-322                      PR SH 60 and SH 257 Structures    4     R

20170907        INTERFACE COMMUNICATIONS COMPANY                                                     3        $167,983.00   73.67
                NHPP0821-108                    SH 82 MP 45 OLVDS                 3     M

20170914        WORK ZONE TRAFFIC CONTROL                                                            3        $507,743.00   81.89
                MPR200-244                      REGION 2 FY18 SIGNING PROJECT     2     P

20170921        PAONIA, INC                                                                          3        $111,608.00   88.01
                AQCR100-258                     CDOT TSSIP 2016 SIG UPGRADE FE    00    U

20170921        JALISCO INTERNATIONAL, INC.                                                          5      $1,910,511.65   81.13
                SHE0831-119                     SH83 LIGHTING: DAYTON TO MISSI    1     U

20170921        A-1 CHIPSEAL COMPANY                                                                 5        $233,723.14   48.80
                MTCE R500-193                   R5 FY 18 Regionwide MTCE Crack    5     R

20171005        SIMON CONTRACTORS                                                                    7        $599,401.00   85.63
                STA094A-034                     Critical Culvert Project on SH    2     R

20171005        Dykhuis Drilling Corp.                                                               3        $548,510.00  109.70
                MTCE0705-084                    I-70 CRACK SEAL KANSAS STATE L    4     P

20171012        ROCK SOLID SOLUTIONS CORPORATION                                                     2      $1,564,594.00   91.13
                C0702-372                       I-70 GWC Rockfall Fence Improv    3     M

20171019        PAONIA, INC                                                                          6      $1,854,526.73  115.18
                ITSSW01-636                     VMS AND LUS UPGRADE FY 17         00    M

20171026        NORAA CONCRETE CONSTRUCTION CORPORATION                                              2        $435,528.00   71.24
                CR100-286                       R1 CURB RAMPS-PH 1                1     U

20171109        Kilgore Companies, LLC dba Elam Construc                                             3      $5,095,866.05  128.57
                SHE340A-018                     SH 340 REDLANDS PARKWAY ROUNDA    3     R

20171116        ANDERSON DRILLING, INC                                                               8      $1,327,746.00   77.02
                C133A-042                       SH 133 McClure Pass Slip          3     M
                                               Colorado Department of Transportation              13:09 Monday, January 22, 2018   7
                                                           2017 Cost Data
                                            PROJECTS BID FROM 01/01/17 THROUGH 12/31/17
------------------------------------------------------------------------------------------------------------------------------------
  BID           CONTRACTOR/
LETTING         PROJECT NUMBER                  LOCATION                         DIST  TERRAIN     BIDS       AWARDED BID   INDEX
------------------------------------------------------------------------------------------------------------------------------------
20171130        ZAK DIRT, INC.                                                                       6        $880,200.00   71.88
                NHPP 0703-431                   CLEAR CREEK ECOLOGIC RESTORATI    1     M

20171130        BRANNAN SAND AND GRAVEL, LLC                                                         5     $11,118,295.52   82.32
                NHPP0252-447                    I-25: MILE POST 194.04 TO MILE    1     R

20171130        APC SOUTHERN CONSTRUCTION COMPANY, LLC                                               3      $5,333,761.30   88.90
                IM025A-037                      I25 S. Trinidad Resurface and     2     R

20171130        OLDCASTLE SW GROUP, INC.                                                             4      $1,251,868.12   89.33
                STRR300-228                     SH 13 R3 VARIOUS CHIP SEALS       3     M

20171130        MORTON ELECTRIC, INC.                                                                5      $1,396,424.00  139.64
                ITSSW01-831                     ITS WEATHER STATION UPGRADES F    00    M

20171130        DILLIE AND KUHN, INC.                                                                4        $242,899.50   80.97
                ITSSW02-003                     ITS FIBER INSTALLATIONS FOR HQ    00    P

20171207        APC SOUTHERN CONSTRUCTION COMPANY, LLC                                               5      $6,727,609.67   83.68
                NHPP0702-354                    I-70 EAST SIDE VAIL PASS MP 19    3     M

20171207        ABCO CONTRACTING, INC.                                                               3        $542,288.00  144.79
                MTCE092A-027                    MTCE R3 FY18 SH 92 STR I-06-A     3     M

20171208        Myers and Sons Construction, LP                                                      1      $1,084,421.91   98.34
                NHPP0702-351                    I-70: HLT GARAGE DOOR REPLACEM    3     M

20171211        KIEWIT INFRASTRUCTURE CO.                                                            1        $870,457.55   93.16
                CC0341-100                      US 34 BIG THOMPSON CANYON MOOD    4     M

20171214        DRILL TECH DRILLING AND SHORING, INC.                                                3      $3,026,578.38   95.86
                NHPP006A-059                    US 6 CLEAR CREEK CANYON SH 93     1     M

20171221        TEZAK HEAVY EQUIPMENT CO., INC.                                                      7      $3,068,335.40   94.05
                BR3852-018                      POA SCOUR US 385                  4     P
                ERR400-328                      SH 52, SH 6, SH 63, SH 55, SH     4     P

20171221        TONY J. BELTRAMO AND SONS, INC.                                                      6      $1,762,738.75   80.12
                STA050A-027                     US 50C Storm Sewer 21st LANE      2     R

20171221        OLDCASTLE SW GROUP, INC.                                                             4      $4,753,678.20   82.44
                STR139A-034                     SH 139 DOUGLAS PASS MP 19.0 -     3     M

20171221        DIAMOND SURFACE, INC.                                                                2        $584,574.62  116.94
                FSA0361-122                     I-70 at Limon, US 40, US 287,     4     P

                                                                                                 ======= ================  ======
                                                                                          TOTALS   446    $440,113,099.44   96.11
                                               Colorado Department of Transportation              13:09 Monday, January 22, 2018   1
                                                           2017 Cost Data
                                                   BRIDGE COST PER SQUARE FOOT
                                                   (01/01/17 THROUGH 12/31/17)
------------------------------------------------------------------------------------------------------------------------------------
             PROJECT NUMBER/                TERR/                                            TOTAL         TOTAL        COST PER
DATE LET     PROJECT LOCATION               BRIDGE ID                 LENGTH     WIDTH     SQUARE FT       COST        SQUARE FOOT
------------------------------------------------------------------------------------------------------------------------------------

                                           BRIDGE REPAIR

170309       NHPP 0502-075                  M
             US50 MP 127.0 TO MP 139.1 IN G 0300                      993.0000   30.0000     29790.0      $674,676           $22.65
                                            0301                     1503.0000   30.0000     45090.0      $667,588           $14.81

170427       NHPP 0701-238                  U
             I-70B MP 4.20 TO MP 4.69, US6  H-02-J                    150.0000   31.5000      4725.0      $224,954           $47.61

171130       NHPP0252-447                   R
             I-25: MILE POST 194.04 TO MILE F-17-CO                   214.0000  118.0000     25252.0      $176,405            $6.99
                                            F-17-DE                   168.0000  106.0000     17808.0      $151,214            $8.49
                                            F-17-IV                   249.0000  132.3000     32942.7      $153,074            $4.65
                                            F-17-DK                   181.0000  140.0000     25340.0      $300,887           $11.87
                                            F-17-JU                   160.0000   67.8000     10848.0      $177,420           $16.36

171207       MTCE092A-027                   M
             MTCE R3 FY18 SH 92 STR I-06-A  0300                      278.4890   34.0000      9468.6      $307,813           $32.51
                                                                      WEIGHTED AVERAGE COST:
                                                                         NEW STRUCTURES     201264.3    $2,834,031           $14.08


                                           CONCRETE SLAB AND GIRDER

170406       STA 0503-089                   M
             US 50 - Royal Gorge West_SH9 J 0304 US 50 K-15-W         275.0000   40.0000     11000.0       $67,624            $6.15

170727       BR0362-037                     P
             US 36 at MP 140.1 and MP 140.9 0300                      150.0000   43.0000      6450.0      $715,844          $110.98
                                            0301                       68.0000   43.0000      2924.0      $477,404          $163.27
                                                                      WEIGHTED AVERAGE COST:
                                                                         NEW STRUCTURES      20374.0    $1,260,871           $61.89


                                           CONCRETE SLAB BRIDGE

170309       STA2873-180                    R
             US 287 (Federal) Resurfacing-1 0300                       29.0000   89.6000      2598.4       $35,812           $13.78

170907       ERR400-322                     R
             PR SH 60 and SH 257 Structures 0300                        0.0452   40.0000         1.8    $1,393,789      $770,901.00
                                            0301                        0.0393   40.0000         1.6    $1,293,392      $822,768.45
                                                                      WEIGHTED AVERAGE COST:
                                                                         NEW STRUCTURES       2601.8    $2,722,993        $1,046.59


                                           FABRICATED STEEL GIRDER

170302       BR0252-449                     R
             I-25 Woodmen NB                0304                      324.0000   72.0000     23328.0      $166,646            $7.14
                                                                      WEIGHTED AVERAGE COST:
                                                                         NEW STRUCTURES      23328.0      $166,646            $7.14
                                               Colorado Department of Transportation              13:09 Monday, January 22, 2018   2
                                                           2017 Cost Data
                                                   BRIDGE COST PER SQUARE FOOT
                                                   (01/01/17 THROUGH 12/31/17)
------------------------------------------------------------------------------------------------------------------------------------
             PROJECT NUMBER/                TERR/                                            TOTAL         TOTAL        COST PER
DATE LET     PROJECT LOCATION               BRIDGE ID                 LENGTH     WIDTH     SQUARE FT       COST        SQUARE FOOT
------------------------------------------------------------------------------------------------------------------------------------

                                           MISCELLANEOUS

170330       STA067A-039                    M
             SH 67 Divide to Cripple Creek  I-16-AA                    24.0000   25.0000       600.0      $104,842          $174.74
                                                                      WEIGHTED AVERAGE COST:
                                                                         NEW STRUCTURES        600.0      $104,842          $174.74
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018   1
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 201-00000      Clear and Grub                               LUMP SUM ===============================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17           1.00        30000.00        58467.86        40000.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17           1.00        15000.00        29235.54        15000.00
IM025A-039                     I-25 Critical Culvert at MP 1 02/09/17           1.00         7500.00        33787.06        13159.44
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           1.00        20000.00        37220.00        45000.00
SHE160A-031                    SH 160 Passing Lanes          03/02/17           1.00        20000.00        57068.72        10000.00
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17           1.00        20000.00        37580.00        16900.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17           1.00        25000.00        38468.60        35000.00
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17           1.00        20000.00        25918.80        16594.00
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17           1.00         2000.00        13107.00         6100.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   9.00        18950.00        38304.72        21972.60




STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17           1.00         2000.00        10478.57        11300.00
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           1.00        75000.00        51145.17        62214.25
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17           1.00        10000.00        12757.27        14271.81
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           1.00        10000.00        10000.00        10000.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17           1.00        80000.01        69057.34        65000.00
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17           1.00         5000.00        39035.80         8000.00
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17           1.00        10000.00        11005.00         5000.00
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17           1.00        30000.00        43500.00        10000.00
ER0361-115                     US 36 Bridges                 06/22/17           1.00        85000.00        94333.33        25000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   9.00        34111.11        45862.12        23420.67




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17           1.00        20000.00        83400.00       150000.00
NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17           1.00         6000.00         6750.00         1500.00
NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17           1.00         2000.00         2350.00         2350.00
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17           1.00        40000.00        48528.55        25000.00
ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17           1.00         6500.00        14866.67        15000.00
IM0762-052                     FIBER OPTICS AND ITS DEVICES  08/03/17           1.00         6000.00         5794.50         5000.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17           1.00        27500.00        69333.33        20000.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           1.00        28894.82       100000.00       100000.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17           1.00        45000.00        71126.61        50000.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   9.00        20210.54        49948.44        40983.33




STA094A-034                    Critical Culvert Project on S 10/05/17           1.00         5000.00         6555.55         1600.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018   2
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 201-00000      Clear and Grub                               LUMP SUM ===============================================
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           1.00        15000.00      2353200.00        24600.00
NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17           1.00        22500.00        31779.95        45000.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17           1.00        10000.00        43169.89         8509.68
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   4.00        13125.00       390825.17        19927.42
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  31.00        22840.46        88071.65        27648.36


=============== 201-00001      Clear and Grub                               Acre ===================================================


NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17           0.50         5000.00        79323.33        37970.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   0.50         5000.00        79323.33        37970.00




BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17           1.30         7000.00        16177.50        22500.00
ER0341-093                     PR US 34 BIG THOMPSON CANYON  06/28/17           0.50        57530.00        57530.00        57530.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   1.80        21036.11        19804.91        32230.56
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.30        17550.00        32204.58        33478.26


=============== 201-00005      Rem of Debris                                LUMP SUM ===============================================


ER0361-115                     US 36 Bridges                 06/22/17           1.00        10000.00         6855.80        25000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   1.00        10000.00         6855.80        25000.00




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           1.00         6608.05         4000.00         4000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00         6608.05         4000.00         4000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00         8304.03         6447.83        14500.00


=============== 202-00000      Rem Str and Obstructions                     LUMP SUM ===============================================


IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17           1.00         5000.00        15796.07        12500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00         5000.00        15796.07        12500.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018   3
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00000      Rem Str and Obstructions                     LUMP SUM ===============================================




STA094A-034                    Critical Culvert Project on S 10/05/17           1.00        22500.00        10824.20         7500.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17           1.00          150.00         2336.83          710.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   2.00        11325.00         8277.99         4105.25
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   3.00         9216.67        10012.93         6903.50


=============== 202-00001      Rem Structure                                Each ===================================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17           8.00         5000.00         7817.63         7500.00
STM0243-089                    Midpoint: Station 1019+50 Cen
STA0362-035                    US 36: Strasburg to Byers     03/23/17           1.00         2000.00         2139.61         1750.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   9.00         4666.67         7268.14         6350.00




ITSSW01-831                    ITS WEATHER STATION UPGRADES  11/30/17          13.00         1500.00         3704.15         1750.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  13.00         1500.00         3704.15         1750.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  22.00         2795.45         4855.03         3027.78


=============== 202-00002      Rem of Structure (Spec)                      Each ===================================================


STA0243-087                    US 24 El Paso-Elbert CL Pavin 03/23/17           1.00          150.00         6703.21         2200.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   1.00          150.00         6703.21         2200.00




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           1.00        18086.47        35000.00        35000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00        18086.47        35000.00        35000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00         9118.24        11419.34        18600.00


=============== 202-00003      Rem of Structure (Spec)                      LUMP SUM ===============================================


NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17           1.00        17790.00         5544.00         2500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   1.00        17790.00         5544.00         2500.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00        17790.00         5544.00         2500.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018   4
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00008      Tree Trimming                                Hour ===================================================


NHPP 0701-230                  Midpoint WB Bore              03/02/17           8.00          250.00          239.46          250.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   8.00          250.00          239.46          250.00




NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17          12.00          385.00          385.00          350.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  12.00          385.00          385.00          350.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  20.00          331.00          312.23          310.00


=============== 202-00010      Rem Tree                                     Each ===================================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17           6.00          400.00         1809.27          220.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17          25.00          600.00          504.00          250.00
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17           5.00         1000.00         1257.45          600.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  36.00          622.22          774.45          300.30




STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17           8.00          500.00         1002.51          307.54
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17          16.00          325.00          933.75          840.00
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17          24.00          300.00          667.00          675.00
ER0361-115                     US 36 Bridges                 06/22/17         185.00          350.00          385.82          150.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 233.00          348.28          449.26          256.87




IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17           4.00          500.00          840.92         1200.00
ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17          10.00          350.00          741.67          825.00
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17           4.00          330.00         1720.00         2300.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         219.00          437.97          485.00          485.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17           3.00          400.00          933.45          800.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 240.00          433.06          606.36          545.27




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17          30.00          350.00      1666943.33          300.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018   5
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00010      Rem Tree                                     Each ===================================================
NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17         250.00          500.00          237.19          300.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 280.00          483.93        94579.05          300.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 789.00          434.71        44746.63          362.12


=============== 202-00013      Rem Erosion Mat                              Sq Yard ================================================


STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17         120.00            6.00            0.78            0.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 120.00            6.00            0.78            0.50
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 120.00            6.00            0.78            0.50


=============== 202-00015      Rem Headwall                                 Each ===================================================


NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           3.00          900.00          565.00          565.00
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17           4.00          750.00         1545.00         1100.00
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17           1.00         3000.00         2501.80         1000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   8.00         1087.50         1621.83          886.88




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           1.00          582.19         2200.00         2200.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00          582.19         2200.00         2200.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   9.00         1031.35         1644.96         1032.78


=============== 202-00019      Rem Inlet                                    Each ===================================================


STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17           2.00          800.00         1325.20          600.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   2.00          800.00         1325.20          600.00




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           2.00         1000.00         1141.98         1041.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17          10.00          800.01         1359.52         1700.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018   6
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00019      Rem Inlet                                    Each ===================================================
ER0361-115                     US 36 Bridges                 06/22/17           3.00         1000.00          673.44          625.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  15.00          866.67         1115.49         1397.13




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17          33.00          444.78          460.00          460.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  33.00          444.78          460.00          460.00




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           1.00         1000.00          923.67          720.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   1.00         1000.00          923.67          720.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  51.00          593.68          945.07          746.22


=============== 202-00020      Rem CBC                                      Each ===================================================


ER0361-115                     US 36 Bridges                 06/22/17           1.00        30000.00        26960.69        15738.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   1.00        30000.00        26960.69        15738.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00        30000.00        26960.69        15738.00


=============== 202-00021      Rem Manhole                                  Each ===================================================


NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           2.00          800.00         1280.00         1500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   2.00          800.00         1280.00         1500.00




NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           1.00          800.00          515.00          515.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   1.00          800.00          515.00          515.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   3.00          800.00         1210.45         1171.67


=============== 202-00023      Rem Emb Prot Ty 3                            Each ===================================================


STA006A-057                    SH 6 EAST OF STERLING         04/06/17           5.00          583.00          888.79          950.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   5.00          583.00          888.79          950.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018   7
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00023      Rem Emb Prot Ty 3                            Each ===================================================




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           1.00         1139.94         2000.00         2000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00         1139.94         2000.00         2000.00




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           1.00          500.00          600.33          500.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17           3.00          450.00         1185.58          456.75
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   4.00          462.50         1039.27          467.56
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  10.00          590.49         1015.62          862.03


=============== 202-00024      Rem Emb Prot Ty 5                            Each ===================================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           1.00         1139.94         3100.00         3100.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00         1139.94         3100.00         3100.00




IM025A-037                     I25 S. Trinidad Resurface and 11/30/17           4.00          550.00         1259.02          477.05
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   4.00          550.00         1259.02          477.05
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   5.00          667.99         1400.63         1001.64


=============== 202-00025      Rem Ditch Lining                             Lin Foot ===============================================


NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17         120.00           15.00           18.75           10.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 120.00           15.00           18.75           10.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 120.00           15.00           18.75           10.00


=============== 202-00026      Rem S and D Pave                             Sq Yard ================================================


STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17         328.00           50.00           15.21           12.76
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018   8
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00026      Rem S and D Pave                             Sq Yard ================================================
ER0361-115                     US 36 Bridges                 06/22/17           2.00           55.00          171.97           20.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 330.00           50.03           15.68           12.80




ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17         252.00           20.00           24.33           16.02
BR3852-018                     POA SCOUR US 385
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 252.00           20.00           24.33           16.02
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 582.00           37.03           18.35           14.20


=============== 202-00027      Rem Riprap                                   Sq Yard ================================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17       1,200.00           20.00           18.54           14.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17          22.00           40.00           63.40           10.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               1,222.00           20.36           19.68           13.86




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17         164.00           10.00           20.07           18.95
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17         125.00           44.00           19.05           19.04
ER0361-115                     US 36 Bridges                 06/22/17       2,084.00           17.00           15.29           16.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               2,373.00           17.94           15.99           16.36




ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17         240.00           20.00           18.88           30.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 240.00           20.00           18.88           30.00




ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17         284.00           25.00           28.68           33.32
BR3852-018                     POA SCOUR US 385
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 284.00           25.00           28.68           33.32
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               4,119.00           19.26           18.05           18.22
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018   9
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00028      Rem of Eros Cntrl BMPS (Spec)                LUMP SUM ===============================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           1.00        75752.04       100000.00       100000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00        75752.04       100000.00       100000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00        75752.04       100000.00       100000.00


=============== 202-00031      Rem of Fire Hydrant                          Each ===================================================


NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           2.00         1150.00         1190.00         1500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   2.00         1150.00         1190.00         1500.00




STAR500-190                    R5 Signal Replacement Chaffee 04/27/17           3.00         2000.00         5330.00         6000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   3.00         2000.00         5330.00         6000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   5.00         1660.00         3151.05         4200.00


=============== 202-00032      Rem Valve                                    Each ===================================================


NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           5.00          750.00          820.00          300.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   5.00          750.00          820.00          300.00




STAR500-190                    R5 Signal Replacement Chaffee 04/27/17           3.00         1500.00         4636.67         3000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   3.00         1500.00         4636.67         3000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   8.00         1031.25         1830.29         1312.50


=============== 202-00033      Rem Pipe                                     Each ===================================================


SHE160A-031                    SH 160 Passing Lanes          03/02/17           1.00          500.00         1384.77          500.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17           7.00         1500.00         1764.80         1200.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   8.00         1375.00         1694.10         1112.50
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  10
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00033      Rem Pipe                                     Each ===================================================




ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17           2.00          500.00         1349.13         1030.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   2.00          500.00         1349.13         1030.00




STA094A-034                    Critical Culvert Project on S 10/05/17           1.00         3000.00         2086.37         2000.00
ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17           1.00         3000.00         6824.85         6073.92
BR3852-018                     POA SCOUR US 385
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   2.00         3000.00         4455.61         4036.96
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  12.00         1500.00         2087.41         1586.16


=============== 202-00035      Rem Pipe                                     Lin Foot ===============================================


STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17          63.00           30.00           61.50           50.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17         484.00           45.00           36.26           20.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17         100.00          100.00           57.77           55.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17         288.00           40.00           35.60           13.00
SHE160A-031                    SH 160 Passing Lanes          03/02/17           6.00           25.00          137.41           62.50
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17           6.00          100.00          212.20          100.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 947.00           48.51           43.61           25.83




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17         145.00           25.00           28.81           20.82
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17         299.00           75.00           74.67           24.00
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17          15.00           60.00           73.11           34.32
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17       1,622.00           30.00            9.50            9.50
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17          48.00           35.00           34.90           25.00
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17         104.00          170.00           56.80           15.00
ER0361-115                     US 36 Bridges                 06/22/17         316.00           40.00           29.86           33.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               2,549.00           42.22           33.09           15.42




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17       3,800.00           17.81           30.00           30.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  11
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00035      Rem Pipe                                     Lin Foot ===============================================
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17       1,062.00           22.00           15.94           17.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               4,862.00           18.73           19.39           27.16




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17         137.00           25.00           17.33           18.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 137.00           25.00           17.33           18.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               8,495.00           29.20           26.62           23.27


=============== 202-00037      Rem of End Section                           Each ===================================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17           8.00          300.00          269.18          150.00
STM0243-089                    Midpoint: Station 1019+50 Cen
IM025A-039                     I-25 Critical Culvert at MP 1 02/09/17           1.00          350.00          692.17          505.16
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17          13.00          300.00          526.00          300.00
SHE160A-031                    SH 160 Passing Lanes          03/02/17           9.00          475.00          416.46          100.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17           5.00          300.00          359.40          125.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  36.00          345.14          434.22          204.07




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           8.00          225.00          423.28          226.62
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17           2.00         1000.00          315.00          150.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           7.00          400.00          690.00          690.00
ER0361-115                     US 36 Bridges                 06/22/17           2.00          450.00          366.44          350.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  19.00          394.74          427.70          402.26




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           6.00          178.51          675.00          675.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   6.00          178.51          675.00          675.00




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           2.00          300.00          310.33          480.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  12
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00037      Rem of End Section                           Each ===================================================
ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17           2.00          450.00          698.15          564.04
BR3852-018                     POA SCOUR US 385
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   4.00          375.00          581.80          522.02
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  65.00          346.09          444.71          332.97


=============== 202-00040      Rem Elec Conduit                             Lin Foot ===============================================


SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17         318.00           10.00            4.23            8.20
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 318.00           10.00            4.23            8.20
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 318.00           10.00            4.23            8.20


=============== 202-00047      Rem Elec Equipment                           LUMP SUM ===============================================


NHPP 0701-230                  Midpoint WB Bore              03/02/17           1.00         5000.00         3589.65         3650.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   1.00         5000.00         3589.65         3650.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00         5000.00         3589.65         3650.00


=============== 202-00055      Rem of FO Cable                              Lin Foot ===============================================


NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17         500.00            1.50            1.05            1.05
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 500.00            1.50            1.05            1.05
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 500.00            1.50            1.05            1.05


=============== 202-00080      Rem Guard Post                               Each ===================================================


NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           2.00          160.00          759.00           95.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   2.00          160.00          759.00           95.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00          160.00          759.00           95.00


=============== 202-00090      Rem Delineator                               Each ===================================================


NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17         100.00           50.00           29.21            8.41
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  13
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00090      Rem Delineator                               Each ===================================================
NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17         450.00            7.00            5.63            6.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17         340.00            7.00            4.90            5.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17         158.00            7.00           11.51           25.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17           8.00           30.00           19.67           10.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17          19.00           15.00           12.95           20.00
SHE160A-031                    SH 160 Passing Lanes          03/02/17          99.00            5.00            5.98            5.56
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17           2.00           20.00           15.50           22.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17         250.00            6.50           10.27           21.00
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17         426.00            6.50            6.13            5.60
STA2873-183                    US 287 Repairs at LCR 17      03/09/17          51.00           10.00            5.17            4.50
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17           7.00           20.00           22.73            7.50
STA0243-087                    US 24 El Paso-Elbert CL Pavin 03/23/17         168.00           10.00            6.60            5.50
STA0362-035                    US 36: Strasburg to Byers     03/23/17          10.00           10.00           15.93           11.68
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17           5.00           15.00           36.50           60.00
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17       1,126.00            5.00            5.51            6.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               3,219.00            7.84            7.04            7.73




STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17       1,651.00            5.00            2.55            1.56
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17          53.00            5.00           11.30            3.30
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17         114.00            6.50            5.75            9.88
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          30.00            6.00            5.25            5.25
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17           4.00           25.00           77.75           20.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17          10.00           10.01           82.99           80.00
STA0703-437                    I-70: 32ND TO 44TH            06/01/17         300.00           14.00           39.43            6.50
ER0361-115                     US 36 Bridges                 06/22/17          18.00           10.00           13.87           14.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               2,180.00            6.43           10.05            3.26




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17          10.00           10.00           20.95           20.00
NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17          38.00            8.00           10.50           12.00
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17          14.00           10.00           30.67           75.00
NHPPR100-291                   I-225 SB RESTRIPING I-25 TO Y 08/31/17           2.00           10.00           19.00           25.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17       2,725.00            5.00            5.25            5.25
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               2,789.00            5.09            6.05            5.76




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17          26.00            5.00           18.83            5.50
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  14
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00090      Rem Delineator                               Each ===================================================
C133A-042                      SH 133 McClure Pass Slip      11/16/17          16.00           12.00           74.13           30.00
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17          30.00           13.00           94.80          100.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17         340.00            7.50            5.67            5.10
STR139A-034                    SH 139 DOUGLAS PASS MP 19.0 - 12/21/17         380.00            6.50            5.60            6.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 792.00            7.24           13.63            9.64
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               8,980.00            6.59            8.57            6.19


=============== 202-00150      Rem Wall                                     Each ===================================================


NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17           2.00        30000.00        69420.00        36100.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   2.00        30000.00        69420.00        36100.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00        30000.00        69420.00        36100.00


=============== 202-00155      Rem Wall                                     Lin Foot ===============================================


STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17         142.00           40.00           31.91           20.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 142.00           40.00           31.91           20.00




NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          82.00           20.00           39.50           39.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  82.00           20.00           39.50           39.50




ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17         100.00           35.00           41.00           13.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 100.00           35.00           41.00           13.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 324.00           33.40           35.44           22.77


=============== 202-00165      Rem Wall                                     LUMP SUM ===============================================


NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17           1.00         5000.00        17503.74         5000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   1.00         5000.00        17503.74         5000.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  15
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00165      Rem Wall                                     LUMP SUM ===============================================




ER0361-115                     US 36 Bridges                 06/22/17           1.00        16000.00         5996.95         6000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   1.00        16000.00         5996.95         6000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00        10500.00        12192.92         5500.00


=============== 202-00170      Grinding And Texturing Conc Pvmt             Sq Yard ================================================


NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17     149,514.00            7.50            9.83            8.90
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER             149,514.00            7.50            9.83            8.90




MTCE0762-054                   REGION 4 MTCE SECT1 I76 FORT  07/06/17          10.00          100.00          472.78          150.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  10.00          100.00          472.78          150.00




IM025A-037                     I25 S. Trinidad Resurface and 11/30/17         280.00           20.00           43.00           25.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 280.00           20.00           43.00           25.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR             149,804.00            7.53            9.99            8.94


=============== 202-00175      Rem Concrete                                 LUMP SUM ===============================================


NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           1.00         1000.00         1130.00         1130.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   1.00         1000.00         1130.00         1130.00




NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17           1.00         5000.00         2111.32         1500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   1.00         5000.00         2111.32         1500.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00         3000.00         1971.13         1315.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  16
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00190      Rem of Conc Median Cover Matl                Sq Yard ================================================


STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17         280.00           15.00            1.24            1.07
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17         133.00            9.00           21.80           10.00
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17         137.00           16.00           24.67           20.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 550.00           13.80           13.40            7.94




NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17       1,315.00           10.00            8.50            8.50
STM0211-026                    SH21 AND MESA RIDGE PKWY SIGN 05/18/17         840.00           15.00           17.50            5.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               2,155.00           11.95           13.55            7.14




SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17          10.00           20.00           60.50           13.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  10.00           20.00           60.50           13.00




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17         483.00           12.00            9.05            7.65
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 483.00           12.00            9.05            7.65
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               3,198.00           12.30           12.85            7.37


=============== 202-00195      Rem of Median Cover                          Sq Yard ================================================


STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17       5,297.00            9.00            4.48            5.75
STA0362-035                    US 36: Strasburg to Byers     03/23/17           6.00           12.00           81.23           58.09
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               5,303.00            9.00            4.53            5.81




STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17         179.00           25.00           32.19           35.20
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17         101.00           15.00           16.02           15.79
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17       1,024.00            9.75           10.67            4.37
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17          16.00           50.00          172.00          150.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,320.00           12.71           13.93           11.19
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               6,623.00            9.74            6.44            6.88
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  17
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00200      Rem Sidewalk                                 Sq Yard ================================================


NHPP1602-145                   US 160 S. Fork to Monte Vista 01/12/17         227.60           35.00           31.82           38.50
NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17       3,361.00           12.00           20.85           14.50
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17         136.00           17.00           27.13           20.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17         228.00           30.00           92.57           85.70
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17         524.00           25.00           18.60            4.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17         135.00           15.00           27.26           20.50
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17         199.00           12.00           33.27           19.50
STA0243-087                    US 24 El Paso-Elbert CL Pavin 03/23/17           6.00           20.00          270.43          330.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17          76.00           12.00           47.40           40.67
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17          27.00           12.00           35.33           31.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               4,919.60           15.51           25.98           19.19




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17         488.00           10.50           30.00           30.00
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17         288.00           20.00           16.01           11.00
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17          19.00           12.80           27.92           30.62
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17         441.00           25.00           33.67           33.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17         192.00           20.00           28.00           28.00
ER0361-115                     US 36 Bridges                 06/22/17           5.00           13.00           82.08           90.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,433.00           18.18           29.18           27.05




NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17         370.00           25.00            8.50            8.50
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17          65.00           20.00           28.60           35.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 435.00           24.25           13.73           12.46




CR100-286                      R1 CURB RAMPS-PH 1            10/26/17         718.00           25.00           23.75           25.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17         763.00           15.00            8.55            7.65
ITSSW02-003                    ITS FIBER INSTALLATIONS FOR H 11/30/17           7.00           25.00          172.68          105.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               1,488.00           19.87           15.59           16.48
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               8,275.60           17.22           24.44           19.71


=============== 202-00201      Rem Curb                                     Lin Foot ===============================================


NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17          22.00            7.00           13.43            9.30
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  18
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00201      Rem Curb                                     Lin Foot ===============================================
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17          31.00           15.00           18.50           30.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  53.00           11.68           16.74           21.41




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17          53.00           10.00           21.60           21.60
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17         763.00           15.00           12.69           10.20
STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17       1,963.00            3.00            4.67            3.17
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               2,779.00            6.43            6.43            5.45




NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17          78.00           13.00           12.00           12.00
SHE0141-024                    SH 14 Poudre Canyon Guardrail 07/20/17         400.00           10.00           15.00           12.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17       1,188.00            4.29           17.00           17.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               1,666.00            6.07           15.87           15.57
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               4,498.00            6.36            8.92            9.39


=============== 202-00202      Rem Gutter                                   Lin Foot ===============================================


STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17         300.00           15.00           16.50           10.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17         278.00           13.00           13.26           10.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 578.00           14.04           14.76           10.00




STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17          25.00           14.00           42.26           67.00
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17          80.00           25.00           28.67           22.00
ER0361-115                     US 36 Bridges                 06/22/17          41.00           12.00           28.05           17.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 146.00           19.47           29.65           28.30




NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17          75.00           25.00           12.50           12.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  75.00           25.00           12.50           12.50
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  19
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00202      Rem Gutter                                   Lin Foot ===============================================




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17          85.00           20.00            7.50            6.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  85.00           20.00            7.50            6.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 884.00           16.44           16.49           12.85


=============== 202-00203      Rem Curb and Gutter                          Lin Foot ===============================================


NHPP1602-145                   US 160 S. Fork to Monte Vista 01/12/17         416.00           10.00           14.18           13.50
NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17       4,940.00            6.00           10.57            7.20
NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17         180.00           15.00           23.00           25.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17       1,182.00           15.00           15.00           15.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17       2,966.00            6.00           19.44           16.07
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17         869.00            6.00           10.70            4.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17      14,183.00            7.00            5.22            4.25
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17         688.00            6.00           13.60           10.50
STA0362-035                    US 36: Strasburg to Byers     03/23/17         175.00            7.00           29.71           29.05
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17         432.00            7.00           11.42            9.25
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              26,031.00            7.10            8.34            7.34




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17       1,360.00            8.00           15.00           15.00
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17       2,360.00           12.00           10.94           10.20
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17         237.00            8.00           15.06           17.90
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17         398.00            5.00            7.56            7.37
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17       1,239.00            7.00            5.97            2.36
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17         640.00           20.00           19.33           12.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17       2,065.00            6.00            5.50            5.50
STA0703-437                    I-70: 32ND TO 44TH            06/01/17          60.00           12.00           36.95           50.00
ER0361-115                     US 36 Bridges                 06/22/17          41.00            8.00           15.68           13.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               8,400.00            9.29            9.76            9.18




NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17         306.00           15.00            8.00            8.00
NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17         626.00           12.00           12.50           12.50
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           8.00           11.74           70.00           70.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  20
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00203      Rem Curb and Gutter                          Lin Foot ===============================================
SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17          25.00           12.00           25.35           12.25
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 965.00           12.95           12.00           11.54




CR100-286                      R1 CURB RAMPS-PH 1            10/26/17       1,086.00           12.00           10.50           12.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17       2,006.00            6.00            4.35            3.80
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               3,092.00            8.11            5.98            6.68
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              38,488.00            7.81            8.46            7.80


=============== 202-00204      Rem C, G and Sidewalk                        Lin Foot ===============================================


STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17         552.00           11.00           23.94           20.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17          16.00           40.00           66.40            8.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 568.00           11.82           25.42           19.66
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 568.00           11.82           25.42           19.66


=============== 202-00206      Rem Conc Curb Ramp                           Sq Yard ================================================


NHPP1602-145                   US 160 S. Fork to Monte Vista 01/12/17         133.30           18.00           32.57           38.50
NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17         937.00           16.00           18.03           12.50
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17          52.00           30.00           26.80           30.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17         422.00           25.00          113.49          103.91
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17         140.00           15.00           34.20            6.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17          48.00           30.00           33.57           40.25
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17         237.00           25.00           38.04           27.50
STA0362-035                    US 36: Strasburg to Byers     03/23/17          24.00           30.00           74.03           40.67
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17          65.00           21.00           27.17           23.50
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17           1.80           20.00          791.37         2000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               2,060.10           19.94           43.22           37.69




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17         294.00           25.00           63.30           63.30
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17         361.00           20.00           62.68           81.00
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17         291.00           27.00           47.16           29.90
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  21
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00206      Rem Conc Curb Ramp                           Sq Yard ================================================
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           8.00           30.00          140.00          140.00
ER0361-115                     US 36 Bridges                 06/22/17           8.00           35.00           65.80           65.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 962.00           23.85           56.20           60.49




NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17         209.00           35.00           20.00           20.00
SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17           3.00           40.00          101.80           15.25
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 212.00           35.07           25.48           19.93




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17          70.00           35.00           27.00           20.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  70.00           35.00           27.00           20.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               3,304.10           22.37           45.13           42.82


=============== 202-00207      Rem of Brick Pavers                          Sq Yard ================================================


STE 0702-357                   I-70 West Vail Pass Basin     03/23/17          32.00           25.00           59.00           45.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  32.00           25.00           59.00           45.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  32.00           25.00           59.00           45.00


=============== 202-00210      Rem Conc Pavement                            Sq Yard ================================================


NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17       1,382.00           15.00           20.98           14.50
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17          79.00           20.00           28.80           40.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17          18.00           25.00           79.83           58.09
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17          11.00           15.00           34.33           35.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               1,490.00           15.39           22.32           16.53




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17         120.00           17.00           66.60           66.60
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17         204.00           18.00           28.85           11.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  22
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00210      Rem Conc Pavement                            Sq Yard ================================================
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17          98.00           23.00           49.61           29.90
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17          28.00           50.00           74.33           36.00
NHPP0704-240                   Package C (I-70 and I-25) Bri 04/27/17          17.00           20.00          155.75          133.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          96.00           20.00           11.75           11.75
STAR400-348                    Region 4 Controller and Cabin 05/04/17          37.00           40.00           40.00           45.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 600.00           21.84           48.31           32.05




MTCE0762-054                   REGION 4 MTCE SECT1 I76 FORT  07/06/17       2,350.00           20.00           50.32           30.00
NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17          35.00           40.00           48.50           57.00
NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17          61.00           20.00           30.00           30.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               2,446.00           20.29           50.26           30.39




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           6.00           50.00           49.92           80.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17          56.00           12.00           65.60           26.79
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  62.00           15.68           64.08           31.94
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               4,598.00           18.84           45.96           26.13


=============== 202-00212      Rem Conc Pavement (Spec)                     Sq Yard ================================================


STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17      39,824.00            8.00            7.37            7.40
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              39,824.00            8.00            7.37            7.40
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              39,824.00            8.00            7.37            7.40


=============== 202-00215      Rem Conc Pvmt (Planing)                      Sq Yard ================================================


STA2873-183                    US 287 Repairs at LCR 17      03/09/17         845.00            7.00           17.50           10.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 845.00            7.00           17.50           10.50
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 845.00            7.00           17.50           10.50


=============== 202-00217      Rem Conc Pvmt (Planing) (Spec)               Sq Yard ================================================


BR0252-449                     I-25 Woodmen NB               03/02/17       3,294.00           40.00           31.50           20.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               3,294.00           40.00           31.50           20.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  23
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00217      Rem Conc Pvmt (Planing) (Spec)               Sq Yard ================================================




NHPP0704-240                   Package C (I-70 and I-25) Bri 04/27/17       2,753.00           55.00           30.00           30.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               2,753.00           55.00           30.00           30.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               6,047.00           46.83           30.82           24.55


=============== 202-00220      Rem Asphalt Mat                              Sq Yard ================================================


NHPP1602-145                   US 160 S. Fork to Monte Vista 01/12/17          71.10           25.00           48.69           74.50
NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17          60.00            5.00           64.58           39.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17      11,349.00            4.00            4.29            4.50
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17       4,666.00           12.00           10.08           10.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17       1,489.00           40.00           19.10            9.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17      12,565.00            5.50            9.00           10.00
SHE160A-031                    SH 160 Passing Lanes          03/02/17       2,890.00           10.00            6.60            5.00
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17         431.00           30.00           48.60           45.00
NHPP 0701-230                  Midpoint WB Bore              03/02/17       9,850.00           10.00            4.02            4.00
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17         367.00            6.00           19.76           23.00
STA0243-087                    US 24 El Paso-Elbert CL Pavin 03/23/17       5,163.00            4.50            9.51            5.50
STA0362-035                    US 36: Strasburg to Byers     03/23/17       2,778.00            6.50            9.94            7.15
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17         127.00            7.00           65.40           50.00
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17          96.00            7.00           32.33           32.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              51,902.10            8.04            8.53            7.27




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17         100.00            7.00           27.60           27.60
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17          42.00            7.00          133.58          130.00
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17          50.00           11.00           34.46           35.30
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17      23,832.00            5.00            6.64            4.41
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17       1,110.00           20.00           19.80            8.40
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17      11,069.00           10.00            3.35            3.35
STAR400-348                    Region 4 Controller and Cabin 05/04/17          12.00           65.00           42.50           45.00
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17         155.00           10.00           29.00           35.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17       8,379.00            7.00           11.84           20.00
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17         920.00            7.50           10.96           10.00
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17          31.00           50.00           69.40           75.00
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17         561.00           10.00           63.75           50.00
ER0361-115                     US 36 Bridges                 06/22/17      10,940.00            7.50            5.32            2.70
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              57,201.00            7.18            7.24            7.07
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  24
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00220      Rem Asphalt Mat                              Sq Yard ================================================




NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17         201.00           15.00           12.75           10.50
NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17          17.00            7.50           50.00           50.00
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17       4,153.00            8.00            8.31            3.40
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17         999.00            7.25            8.57            5.27
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17      22,740.00            6.44            8.00            8.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17      11,316.00            5.00            4.56            4.00
BRR400-354                     Little-T Channel Work and SH
SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17      10,640.00            7.50           10.18            6.25
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER              50,066.00            6.52            6.68            6.31




CR100-286                      R1 CURB RAMPS-PH 1            10/26/17          44.00            9.00           25.00           30.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17       9,902.00            4.00            2.25            3.00
STRR300-228                    SH 13 R3 VARIOUS CHIP SEALS   11/30/17       4,363.00            4.50           12.44            4.25
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17       1,049.00            6.40           19.33            7.00
STA050A-027                    US 50C Storm Sewer 21st LANE  12/21/17       3,700.00            8.00            7.05           10.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER              19,058.00            5.03            6.94            4.93
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR             178,227.10            7.02            7.40            6.68


=============== 202-00222      Removal of Detour Pavement                   Sq Yard ================================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17       5,546.00           10.83           20.00           20.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               5,546.00           10.83           20.00           20.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               5,546.00           10.83           20.00           20.00


=============== 202-00226      Rem of Asph Mat (Special)                    Sq Yard ================================================


STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17      75,070.00            6.00            5.53            4.70
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17          35.00           20.00          245.60          185.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              75,105.00            6.01            5.62            4.78




STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17       1,852.00           13.00           10.66            4.37
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  25
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00226      Rem of Asph Mat (Special)                    Sq Yard ================================================
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17          47.00           73.00           74.07           35.70
NHPPC120-026                   US 85: I-76 to 168th          05/04/17          15.00           18.00          644.09         1500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,914.00           14.51           17.18           16.86
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              77,019.00            6.22            5.80            5.08


=============== 202-00240      Rem Asphalt Mat (Planing)                    Sq Yard ================================================


NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17     110,387.00            3.00            5.60            3.95
NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17       4,543.00           12.00           17.35           17.69
NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17       6,461.00           10.00            5.68            7.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17      90,464.00            2.20            3.00            3.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17      13,780.00            3.50            3.09            2.00
STM0243-089                    Midpoint: Station 1019+50 Cen
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17     309,270.00            3.50            2.39            1.53
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17     146,866.00            1.50            1.77            1.20
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17      79,176.00            2.50            2.32            1.79
SHE160A-031                    SH 160 Passing Lanes          03/02/17      37,673.00            2.00            2.61            1.98
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17       1,761.00           35.00            7.29            8.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17      50,879.00            2.75            2.16            1.90
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17       4,849.00            3.60            6.72           10.15
STA2873-183                    US 287 Repairs at LCR 17      03/09/17       5,460.00            3.50            8.90            6.70
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17     208,650.00            2.00            2.46            2.00
STA0243-087                    US 24 El Paso-Elbert CL Pavin 03/23/17      11,374.00            4.00            2.96            3.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17     123,850.00            2.75            3.09            2.33
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17       9,174.00            1.06            4.57            3.20
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER           1,214,617.00            2.74            2.76            2.22




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17     121,543.00            2.75            5.00            5.00
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17      78,724.00            3.50            4.80            4.40
STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17     239,934.00            1.50            1.64            1.62
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17     107,753.00            2.75            3.38            2.80
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17      31,716.00            5.00            1.97            1.20
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17     187,614.00            1.71            2.00            1.11
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17       7,259.00           10.00            6.33            6.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17      40,195.00            3.00            2.40            2.40
NHPPC120-026                   US 85: I-76 to 168th          05/04/17     280,420.00            2.75            2.69            1.70
STA0703-437                    I-70: 32ND TO 44TH            06/01/17      99,181.00            3.50            2.45            1.30
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17         270.00           35.00           36.60           30.00
ER0361-115                     US 36 Bridges                 06/22/17      34,178.00            4.00            2.34            2.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER           1,228,787.00            2.61            2.47            2.22
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  26
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00240      Rem Asphalt Mat (Planing)                    Sq Yard ================================================




NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17       2,723.00            5.50            7.05            6.60
NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17      29,364.00            6.00            2.50            2.50
SHE0141-024                    SH 14 Poudre Canyon Guardrail 07/20/17          56.00           20.00          118.33          100.00
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17       3,816.00            3.50            3.86            2.21
CR100-292                      I25/ORCHARD EMERGENCY REPAIR  08/21/17         900.00            1.00           15.32           15.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17     407,624.00            1.70            2.00            2.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17       4,867.00            2.50            2.65            2.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER             449,350.00            2.03            2.39            2.10




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17       5,290.00            8.00            2.50            2.50
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17     472,201.00            4.00            3.30            2.52
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17     260,437.00            2.25            1.73            1.38
MTCE092A-027                   MTCE R3 FY18 SH 92 STR I-06-A 12/07/17       1,016.00            2.50           17.00           11.00
NHPP0702-354                   I-70 EAST SIDE VAIL PASS MP 1 12/07/17     368,985.00            2.50            2.26            1.49
STR139A-034                    SH 139 DOUGLAS PASS MP 19.0 - 12/21/17       1,896.00            5.00            9.47            7.75
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER           1,109,825.00            3.11            2.69            1.93
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR           4,002,579.00            2.72            2.64            2.12


=============== 202-00241      Rem of Asph Mat (Planing)(Spec)              Cubic Yard =============================================


STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17       4,139.00            1.71            7.60            8.75
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               4,139.00            1.71            7.60            8.75
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               4,139.00            1.71            7.60            8.75


=============== 202-00246      Rem Asphalt Mat (Planing)(Special)           Sq Yard ================================================


NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17         719.00           10.00           23.87           30.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17         128.00            8.00           34.56           25.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17         249.00            7.00           42.16           21.50
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17       8,320.00           15.00            7.59           12.61
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17         263.00            9.00           26.96           25.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  27
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00246      Rem Asphalt Mat (Planing)(Special)           Sq Yard ================================================
STA0362-035                    US 36: Strasburg to Byers     03/23/17       3,568.00            3.00           15.06           11.67
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              13,247.00           11.16           12.11           13.83




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17         890.00            3.00           25.10           25.10
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17         192.00            5.00           30.62           38.40
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17         577.00           12.00           32.50           32.50
NHPPC120-026                   US 85: I-76 to 168th          05/04/17       1,892.00            3.00           20.02           15.00
STA0703-437                    I-70: 32ND TO 44TH            06/01/17       8,915.00            3.00           15.46           13.00
ER0361-115                     US 36 Bridges                 06/22/17         809.00            7.00           13.80            9.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              13,275.00            3.66           16.39           15.07




NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17       3,184.00           10.00            6.00            6.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               3,184.00           10.00            6.00            6.00




NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17       1,528.00           10.00           23.26           10.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               1,528.00           10.00           23.26           10.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              31,234.00            7.80           14.86           13.37


=============== 202-00250      Rem Pavement Marking                         Sq Foot ================================================


NHPP1602-145                   US 160 S. Fork to Monte Vista 01/12/17         130.00            2.50            2.60            2.75
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17      83,610.00            1.00            0.84            0.80
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17      31,200.00            2.00            1.59            1.20
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17         310.00           12.00            6.58           12.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17      16,927.00            1.35            1.03            0.91
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17      50,167.00            2.00            0.99            0.80
SHE160A-031                    SH 160 Passing Lanes          03/02/17      27,941.00            1.00            1.32            1.06
NHPP 0701-230                  Midpoint WB Bore              03/02/17       2,600.00            6.00            2.95            2.50
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17      18,300.00            1.50            1.23            1.20
STA2873-183                    US 287 Repairs at LCR 17      03/09/17       9,740.00            1.75            1.68            1.30
MTCER300-239                   070A MP 0-75,131-173; 040A, 0 03/09/17   1,318,586.00            0.62            0.49            0.48
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  28
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00250      Rem Pavement Marking                         Sq Foot ================================================
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17       4,000.00            2.00            1.68            1.65
MTCER300-240                   MTCE R3 FY 17/18 REGION WIDE  03/23/17       3,158.00            2.00            1.94            0.85
MTCE2873-191                   R4 FY 17 Stencils #1          03/23/17      11,693.00            1.50            3.90            1.45
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17         220.00            2.50            6.20            4.35
SW01-932                       I-70 MP 146 TO 259            03/30/17     940,669.00            0.53            0.59            0.52
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER           2,519,251.00            0.68            0.64            0.55




STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17       1,181.00            0.60            2.19            2.05
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17       2,500.00            1.00            2.76            2.81
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17       3,795.00            3.00            4.40            4.20
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17       3,376.00            3.00            3.00            3.00
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17         600.00            6.00            3.63            1.00
MPR200-235                     FY 2018 PAVEMENT MARKING PROJ 06/01/17   2,120,100.00            0.40            0.60            0.42
STA0061-091                    SH 6 CHIPSEAL NEAR FLEMING    06/15/17      54,439.00            0.80            0.83            0.70
MTCE141A-048                   SH 141A WHITEWATER IN MESA CO 06/15/17      70,207.00            1.25            0.75            0.75
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17         300.00            5.00           19.84           60.00
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17         500.00            4.00           19.60           50.00
MTCE142A-002                   SH 142 CHIPSEAL               06/22/17         494.00            3.00            5.00            5.00
MTCER300-243                   R3 FY18 REGION WIDE ROUNDABOU 06/22/17       4,000.00            5.00            4.30            5.00
ER0361-115                     US 36 Bridges                 06/22/17       1,500.00            0.75            2.99            3.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER           2,262,992.00            0.46            0.65            0.48




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17      26,000.00            1.00            0.85            0.75
NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17      13,034.00            1.50            1.30            1.35
NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17         366.00            0.60            6.00            6.00
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17         840.00            5.00           10.13            3.40
SHE0141-024                    SH 14 Poudre Canyon Guardrail 07/20/17       1,001.00            4.00            3.67            4.50
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17       1,100.00            3.00            3.97            3.97
MTCE0705-085                   FY 18 I-70 EPOXY FROM MM 328  08/10/17     638,968.00            0.51            0.53            0.50
NHPPR100-291                   I-225 SB RESTRIPING I-25 TO Y 08/31/17      12,700.00            1.00            2.13            2.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17     169,685.00            2.45            2.10            2.10
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17       2,200.00            3.50            4.55            4.25
BRR400-354                     Little-T Channel Work and SH
SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17       6,664.00            0.65            2.17            1.90
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER             872,558.00            0.94            0.79            0.89




CR100-286                      R1 CURB RAMPS-PH 1            10/26/17       1,448.00            5.00            3.75            3.50
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  29
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00250      Rem Pavement Marking                         Sq Foot ================================================
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17       6,250.00            2.00            2.00            2.00
STRR300-228                    SH 13 R3 VARIOUS CHIP SEALS   11/30/17      91,165.00            1.25            1.88            0.52
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17      32,800.00            1.00            1.49            1.35
NHPP0702-354                   I-70 EAST SIDE VAIL PASS MP 1 12/07/17      59,448.00            1.00            0.95            1.14
NHPP0702-351                   I-70: HLT GARAGE DOOR REPLACE 12/08/17       1,360.00            5.05            4.40            4.40
STA050A-027                    US 50C Storm Sewer 21st LANE  12/21/17      13,500.00            3.00            0.95            0.80
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER             205,971.00            1.33            1.44            0.94
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR           5,860,772.00            0.66            0.71            0.59


=============== 202-00254      Rem of Pvmt Mkg (12 In)                      Sq Foot ================================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17       2,260.00            3.00            3.49            3.50
STM0243-089                    Midpoint: Station 1019+50 Cen
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17       8,550.00            2.50            1.23            1.20
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              10,810.00            2.60            1.58            1.47
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              10,810.00            2.60            1.58            1.47


=============== 202-00260      Rem of Pvmt Mkg (On-Call)                    Sq Foot ================================================


SW01-932                       I-70 MP 146 TO 259            03/30/17      54,000.00            0.65            0.66            0.56
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              54,000.00            0.65            0.66            0.56
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              54,000.00            0.65            0.66            0.56


=============== 202-00300      Rem Bldg(s)                                  LUMP SUM ===============================================


NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17           1.00        10000.00         3992.17         3200.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   1.00        10000.00         3992.17         3200.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00        10000.00         3992.17         3200.00


=============== 202-00400      Rem Bridge                                   Each ===================================================


STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           1.00       100000.00       100131.42        85840.86
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   1.00       100000.00       100131.42        85840.86
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  30
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00400      Rem Bridge                                   Each ===================================================




BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17           2.00        40000.00        41042.80        27763.89
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           1.00        65519.75       125000.00       125000.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17           2.00        50000.00        66809.02        65000.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   5.00        49103.95        54324.72        62105.56
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   6.00        57586.63        63335.87        66061.44


=============== 202-00420      Rem Ped Rail                                 Lin Foot ===============================================


NHPP0703-433                   EJMT S Bore Barrier, Handrail 04/13/17       8,440.00           10.00            5.27            2.10
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               8,440.00           10.00            5.27            2.10
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               8,440.00           10.00            5.27            2.10


=============== 202-00425      Rem Bridge Railing                           Lin Foot ===============================================


NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17          52.00           25.00           28.30           20.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17          52.00           50.00           23.35           20.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17         140.00           30.00           55.21           65.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17         808.00           20.00           41.66           26.26
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17         216.00           25.00           58.46           61.10
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               1,268.00           23.39           46.03           35.96




STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17          87.00           50.00          232.18          191.55
NHPP0704-240                   Package C (I-70 and I-25) Bri 04/27/17          10.00           25.00          165.25           58.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17         330.00           30.00           20.50           20.50
NHPPC120-026                   US 85: I-76 to 168th          05/04/17           5.00           20.00          479.43          250.00
STA0061-091                    SH 6 CHIPSEAL NEAR FLEMING    06/15/17         187.00           60.00           17.17           16.00
ER0361-115                     US 36 Bridges                 06/22/17          40.00           50.00           14.21           10.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 659.00           42.22           65.10           43.48
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,927.00           29.83           50.83           38.53
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  31
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00426      Rem Bridge Railing (Spec)                    Lin Foot ===============================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17          71.00           46.00           48.00           48.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  71.00           46.00           48.00           48.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  71.00           46.00           48.00           48.00


=============== 202-00450      Rem Port Present Str (1)                     Sq Yard ================================================


BR0252-449                     I-25 Woodmen NB               03/02/17         564.00          140.00           82.25           40.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 564.00          140.00           82.25           40.00




NHPP0704-240                   Package C (I-70 and I-25) Bri 04/27/17       1,035.00          180.00           72.25           88.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,035.00          180.00           72.25           88.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,599.00          165.89           75.78           71.07


=============== 202-00453      Rem Port Present Str (2)                     Sq Yard ================================================


NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17         207.00          300.00          285.91          300.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17           8.00          300.00          571.40          975.00
BR0252-449                     I-25 Woodmen NB               03/02/17         136.00          270.00          251.25          205.00
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17       1,904.00          250.00          167.95          175.84
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17          14.00          300.00          422.92          350.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17         154.00          600.00          467.33          349.65
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               2,423.00          278.09          204.32          202.78




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17          46.00          510.00          506.00          506.00
STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17         148.00          350.00          250.17          248.50
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17          19.00          300.00          596.64          600.00
NHPP0704-240                   Package C (I-70 and I-25) Bri 04/27/17         396.00          350.00          218.50          135.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          32.00          400.00          360.00          360.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17         215.00          575.00          297.17          160.00
STA0703-437                    I-70: 32ND TO 44TH            06/01/17       1,366.00          500.00          247.33          280.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               2,222.00          467.59          250.13          249.02
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  32
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00453      Rem Port Present Str (2)                     Sq Yard ================================================




NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17          26.00          500.00          325.00          325.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  26.00          500.00          325.00          325.00




NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17         153.00          300.00          473.72          430.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17         115.00          325.00          273.12          294.35
MTCE092A-027                   MTCE R3 FY18 SH 92 STR I-06-A 12/07/17          19.00          350.00          415.00          245.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 287.00          313.33          411.55          363.40
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               4,958.00          366.22          241.69          233.44


=============== 202-00460      Rem Port Present Str (3)                     Sq Yard ================================================


NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17           7.00          450.00          608.41          600.00
BR0252-449                     I-25 Woodmen NB               03/02/17          54.00          505.00          400.00          400.00
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17          95.00          500.00          401.67          420.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17          29.00          700.00          741.18          641.52
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 185.00          530.92          454.94          455.70




STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17          58.00          550.00          394.60          403.80
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17           2.00          444.00         1814.14         1700.00
NHPP0704-240                   Package C (I-70 and I-25) Bri 04/27/17          70.00          700.00          440.25          195.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          17.00          500.00          300.00          300.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17          43.00          600.00          747.13          650.00
STA0703-437                    I-70: 32ND TO 44TH            06/01/17         107.00          550.00          509.05         1100.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 297.00          589.02          505.00          643.84




NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17           3.00          750.00         1200.00         1200.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   3.00          750.00         1200.00         1200.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  33
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00460      Rem Port Present Str (3)                     Sq Yard ================================================




NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17          15.00          600.00         1202.32          850.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17          12.00          450.00          606.58          659.75
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  27.00          533.33         1009.11          765.44
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 512.00          566.03          520.94          585.53


=============== 202-00495      Rem Port Present Str                         LUMP SUM ===============================================


NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           1.00         5000.00        14550.00        15000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   1.00         5000.00        14550.00        15000.00




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           1.00        15000.00        22574.69        15072.01
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   1.00        15000.00        22574.69        15072.01




STA094A-034                    Critical Culvert Project on S 10/05/17           1.00        15000.00         6029.81         6800.00
NHPP0702-351                   I-70: HLT GARAGE DOOR REPLACE 12/08/17           1.00         8893.70        15143.60        15143.60
ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17           1.00        30000.00        14937.77        25694.38
BR3852-018                     POA SCOUR US 385
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   3.00        17964.57        10794.44        15879.33
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   5.00        14778.74        15798.84        15542.00


=============== 202-00500      Rem Port Present Str                         Each ===================================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17          20.00          206.05          775.00          775.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  20.00          206.05          775.00          775.00




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           1.00         5000.00         1187.00         2460.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  34
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00500      Rem Port Present Str                         Each ===================================================
NHPP0702-351                   I-70: HLT GARAGE DOOR REPLACE 12/08/17           2.00        14920.65        18766.75        18766.75
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   3.00        11613.77         8218.90        13331.17
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  23.00         1694.01         2263.78         2412.76


=============== 202-00502      Rem Port Present Str                         Cubic Yard =============================================


NHPP 0701-230                  Midpoint WB Bore              03/02/17           4.00         2000.00         4891.92         2665.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   4.00         2000.00         4891.92         2665.00




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           4.30          327.34         2300.00         2300.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   4.30          327.34         2300.00         2300.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   8.30         1133.44         4208.16         2475.90


=============== 202-00503      Rem Port Present Str                         Sq Yard ================================================


NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17          47.00          300.00          533.41          450.00
BR0252-449                     I-25 Woodmen NB               03/02/17           1.00          400.00         1718.75         1775.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  48.00          302.08          581.79          477.60




NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          46.00          300.00          870.00          870.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  46.00          300.00          870.00          870.00




IM025A-037                     I25 S. Trinidad Resurface and 11/30/17          14.00          850.00          421.80          365.40
MTCE092A-027                   MTCE R3 FY18 SH 92 STR I-06-A 12/07/17           3.00          500.00         2800.00         2700.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  17.00          788.24          841.48          777.39
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 111.00          375.68          717.70          686.13
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  35
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00504      Rem Exp Device                               Lin Foot ===============================================


BR0252-449                     I-25 Woodmen NB               03/02/17         257.00          231.00          225.75          155.00
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17         360.00          200.00          184.92          193.76
STA0362-035                    US 36: Strasburg to Byers     03/23/17         112.00          400.00          355.28          305.11
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 729.00          241.66          225.51          197.20




STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17          59.00          195.00          141.69          220.50
NHPP0704-240                   Package C (I-70 and I-25) Bri 04/27/17         718.00          350.00          302.13          151.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          42.00          150.00           80.00           80.00
STA0703-437                    I-70: 32ND TO 44TH            06/01/17         349.00          350.00          178.13          110.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,168.00          334.98          252.23          139.71




NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17         271.00          475.00          150.00          150.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         351.00          152.83          150.00          150.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 622.00          293.20          150.00          150.00




NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17         583.00          300.00          312.24          230.00
MTCE092A-027                   MTCE R3 FY18 SH 92 STR I-06-A 12/07/17          90.00          120.00          279.33           88.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 673.00          275.93          309.45          211.01
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               3,192.00          293.07          257.15          169.88


=============== 202-00520      Rem of Exp Joint Matl                        Lin Foot ===============================================


STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17          60.00           60.00           58.34           51.77
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  60.00           60.00           58.34           51.77
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  60.00           60.00           58.34           51.77


=============== 202-00700      Rem Light Standard                           Each ===================================================


STM0211-026                    SH21 AND MESA RIDGE PKWY SIGN 05/18/17           2.00          400.00          357.50          200.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  36
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00700      Rem Light Standard                           Each ===================================================
STA0072-019                    SH 7 FROM US 287 TO 75TH STRE 06/22/17           1.00          800.00         2143.40          717.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   3.00          533.33         1349.67          372.33
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   3.00          533.33         1349.67          372.33


=============== 202-00705      Rem Light Standard Foundation                Each ===================================================


SHE160A-031                    SH 160 Passing Lanes          03/02/17           3.00          500.00          916.85          777.78
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   3.00          500.00          916.85          777.78




NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          26.00          250.00          485.00          485.00
STM0211-026                    SH21 AND MESA RIDGE PKWY SIGN 05/18/17           2.00          400.00          620.00          500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  28.00          260.71          503.00          486.07




IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17           4.00          500.00         1078.64          950.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   4.00          500.00         1078.64          950.00




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           1.00          500.00         1213.67          840.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   1.00          500.00         1213.67          840.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  36.00          313.89          777.96          571.76


=============== 202-00710      Rem Power Pole                               Each ===================================================


STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17           3.00          445.00         6060.00         6060.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   3.00          445.00         6060.00         6060.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   3.00          445.00         6060.00         6060.00


=============== 202-00725      Rem Ex Lighting Sys                          LUMP SUM ===============================================


NHPP 0701-230                  Midpoint WB Bore              03/02/17           1.00       131000.00        75938.00        66200.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   1.00       131000.00        75938.00        66200.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  37
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00725      Rem Ex Lighting Sys                          LUMP SUM ===============================================




IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17           1.00        10000.00         6500.00         5000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00        10000.00         6500.00         5000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00        70500.00        41219.00        35600.00


=============== 202-00750      Rem Luminaire                                Each ===================================================


NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           1.00          150.00          158.00          140.00
NHPP 0701-230                  Midpoint WB Bore              03/02/17         426.00          100.00          196.83          128.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 427.00          100.12          196.68          128.03




STA0703-437                    I-70: 32ND TO 44TH            06/01/17          20.00          200.00          196.57          520.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  20.00          200.00          196.57          520.00




NHPPR100-291                   I-225 SB RESTRIPING I-25 TO Y 08/31/17           4.00          160.00          650.00         1100.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   4.00          160.00          650.00         1100.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 451.00          105.08          199.32          154.03


=============== 202-00805      Rem Overhead Sign Str                        Each ===================================================


MTCE0253-259                   I25 FROM MP 229.29 TO MP 244. 06/22/17           8.00         5000.00         4303.50         5000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   8.00         5000.00         4303.50         5000.00




ITSSW01-636                    VMS AND LUS UPGRADE FY 17     10/19/17           1.00         4000.00         5035.83         5000.00
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17           1.00         5000.00         7134.70         6250.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   2.00         4500.00         5989.86         5625.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  10.00         4900.00         4990.54         5125.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  38
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00806      Rem Walkway                                  Lin Foot ===============================================


NHPP0703-433                   EJMT S Bore Barrier, Handrail 04/13/17       8,769.00           25.00           11.66            6.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               8,769.00           25.00           11.66            6.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               8,769.00           25.00           11.66            6.00


=============== 202-00810      Rem Ground Sign                              Each ===================================================


NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17           3.00          100.00          215.06          220.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17         243.00           93.00           65.31           70.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17         130.00           75.00           74.59           85.00
STM0243-089                    Midpoint: Station 1019+50 Cen
MTCER100-274                   MTCE R1 FY 17 SH 119 Signing  01/26/17          58.00           80.00           78.13           75.00
IM025A-039                     I-25 Critical Culvert at MP 1 02/09/17           2.00          150.00          185.82          107.25
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17          17.00          120.00          103.69           53.56
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           5.00          150.00          122.20           19.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17          17.00          150.00          170.36          255.00
SHE160A-031                    SH 160 Passing Lanes          03/02/17          46.00           90.53           69.07           33.33
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17         151.00           85.00          101.77          260.00
STA2873-183                    US 287 Repairs at LCR 17      03/09/17           4.00          150.00          184.33          145.00
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17           2.00           90.88          120.93           85.00
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17           5.00          100.00          120.00           80.00
MTCER300-238                   MTCE R3 FY 17/18 REGION WIDE  03/30/17         311.00           55.00           63.75           65.00
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17          97.00           72.00           74.03           90.30
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               1,091.00           78.18           76.53          101.38




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17           8.00           95.00          100.00          100.00
STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17         169.00           75.00           44.57           31.22
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17          13.00          100.00           60.96           44.14
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17           6.00           50.00           43.51           31.50
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17           1.00          200.00          421.67          480.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          31.00          100.00          135.00          135.00
STM0211-026                    SH21 AND MESA RIDGE PKWY SIGN 05/18/17           8.00          100.00          105.00          100.00
STA0703-437                    I-70: 32ND TO 44TH            06/01/17          33.00          100.00          159.19          110.00
MTCE0253-259                   I25 FROM MP 229.29 TO MP 244. 06/22/17         252.00           80.00          140.50          200.00
ER0361-115                     US 36 Bridges                 06/22/17          16.00           90.00           84.63           85.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 537.00           82.00           95.28          126.06




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17          10.00          100.00          221.00          100.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  39
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00810      Rem Ground Sign                              Each ===================================================
NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17          41.00          100.00          107.50          160.00
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17           4.00          100.00          151.67          180.00
SHE0141-024                    SH 14 Poudre Canyon Guardrail 07/20/17           2.00           60.00          500.00          350.00
NHPPR100-291                   I-225 SB RESTRIPING I-25 TO Y 08/31/17          10.00           94.00          210.00          200.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         393.00          151.52           79.00           79.00
MPR200-244                     REGION 2 FY18 SIGNING PROJECT 09/14/17         709.00           50.00          100.00           60.00
SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17           4.00          110.00          185.20           76.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               1,173.00           86.95          101.97           72.35




C0702-372                      I-70 GWC Rockfall Fence Impro 10/12/17           6.00          100.00          610.00         1000.00
ITSSW01-636                    VMS AND LUS UPGRADE FY 17     10/19/17           7.00         2000.00         2968.33           50.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17          18.00          100.00           55.67           82.00
C133A-042                      SH 133 McClure Pass Slip      11/16/17          11.00           85.00          127.02          100.00
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17          10.00          100.00          108.80          100.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17           2.00          100.00          184.50          178.50
NHPP0702-354                   I-70 EAST SIDE VAIL PASS MP 1 12/07/17           5.00           60.00          154.91          207.03
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  59.00          319.24          565.32          191.83
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               2,860.00           87.47          102.13           95.85


=============== 202-00815      Rem of Sign (Special)                        Each ===================================================


NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           4.00          150.00          200.00          200.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   4.00          150.00          200.00          200.00




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           2.00         1000.00         2547.00         2547.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   2.00         1000.00         2547.00         2547.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   6.00          433.33          982.33          982.33


=============== 202-00821      Rem Sign Panel                               Each ===================================================


NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17           2.00          200.00          116.20          105.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17          31.00           47.52           62.88          100.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  40
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00821      Rem Sign Panel                               Each ===================================================
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17           8.00           50.00          163.11           45.00
STM0243-089                    Midpoint: Station 1019+50 Cen
MTCER100-274                   MTCE R1 FY 17 SH 119 Signing  01/26/17         671.00           40.00           46.25           45.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17           3.00           58.00           71.28           42.85
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           2.00           65.00           44.60           26.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17          33.00           40.00           44.04           35.70
SHE160A-031                    SH 160 Passing Lanes          03/02/17           1.00           59.18          107.56          111.11
MTCER300-238                   MTCE R3 FY 17/18 REGION WIDE  03/30/17       1,950.00           20.00           21.50            6.00
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17          27.00           55.00           44.58           24.10
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               2,728.00           26.13           29.06           17.44




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17          20.00           50.00           76.50           76.50
STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17          34.00           40.00           39.82           31.22
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17           2.00           39.00           66.44           82.70
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17          10.00          100.00           53.08           33.10
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          16.00           60.00           50.00           50.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17          13.00           50.00           62.22           60.00
STM0211-026                    SH21 AND MESA RIDGE PKWY SIGN 05/18/17          10.00           35.00          142.50          200.00
STA0703-437                    I-70: 32ND TO 44TH            06/01/17          15.00           75.00          406.75         1100.00
MTCE0253-259                   I25 FROM MP 229.29 TO MP 244. 06/22/17          15.00           60.00          192.00          300.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 135.00           54.99          117.68          204.95




NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17           2.00          100.00          175.00          175.00
NHPPR100-291                   I-225 SB RESTRIPING I-25 TO Y 08/31/17          18.00           52.00          160.00          100.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           6.00          151.52          157.00          157.00
MPR200-244                     REGION 2 FY18 SIGNING PROJECT 09/14/17         389.00           45.00           21.00            8.00
SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17           3.00          100.00          130.24          150.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 418.00           47.49           27.33           15.92




IM025A-037                     I25 S. Trinidad Resurface and 11/30/17          13.00           75.00           60.27           40.80
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  13.00           75.00           60.27           40.80
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               3,294.00           30.22           31.90           25.03


=============== 202-00823      Rem Dynamic Message Sign                     Each ===================================================


NHPP0702-352                   HLT VMS CMS LUS REPLACEMENT   01/05/17         113.00          750.00         1300.20          950.40
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 113.00          750.00         1300.20          950.40
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  41
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00823      Rem Dynamic Message Sign                     Each ===================================================




ITSSW01-636                    VMS AND LUS UPGRADE FY 17     10/19/17           2.00         2000.00         3743.83         5000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   2.00         2000.00         3743.83         5000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 115.00          771.74         1423.41         1020.83


=============== 202-00825      Rem Flashing Beacon                          Each ===================================================


STM0211-026                    SH21 AND MESA RIDGE PKWY SIGN 05/18/17           6.00          850.00          457.50          200.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   6.00          850.00          457.50          200.00




MPR200-244                     REGION 2 FY18 SIGNING PROJECT 09/14/17           1.00          450.00          466.67          100.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00          450.00          466.67          100.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   7.00          792.86          459.33          185.71


=============== 202-00827      Rem of Pull Box                              Each ===================================================


NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17           1.00          500.00          785.50         1071.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17           4.00          200.00          213.07          135.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           8.00          300.00          251.00          215.00
SHE160A-031                    SH 160 Passing Lanes          03/02/17           1.00          100.00          269.25          222.22
NHPP 0701-230                  Midpoint WB Bore              03/02/17          23.00          200.00          201.36          275.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  37.00          227.03          230.39          274.52




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           7.00          250.00          130.42          110.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           6.00          175.00          110.00          110.00
STAR400-348                    Region 4 Controller and Cabin 05/04/17           6.00          200.00          290.00          500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  19.00          210.53          148.00          233.16
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  42
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00827      Rem of Pull Box                              Each ===================================================




ITSSW01-834                    ITS CAMERA PROJECT FY17       07/13/17           1.00          250.00          457.50          165.00
CR100-283                      REGION 1 TRAFFIC SIGNAL CONTR 07/20/17           1.00          250.00          415.00           80.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   2.00          250.00          436.25          122.50




IM025A-037                     I25 S. Trinidad Resurface and 11/30/17           1.00          250.00          603.33          510.00
ITSSW02-003                    ITS FIBER INSTALLATIONS FOR H 11/30/17          10.00          200.00          323.10          250.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  11.00          204.55          342.65          273.64
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  69.00          219.57          220.63          258.11


=============== 202-00828      Rem Traf Sig Equipment                       LUMP SUM ===============================================


STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17           1.00         1500.00         2908.91         2651.74
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           1.00        20000.00        14560.00        13000.00
MTCER300-233                   MTCE R3 FY17/18 Signal Replac 03/02/17           1.00        75000.00       144008.00        86000.00
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17           1.00         7500.00        36371.67        12615.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   4.00        26000.00        56917.61        28566.69




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17           1.00         7500.00        16900.00        16900.00
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17           1.00        14600.00        14425.20         5925.60
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           1.00        15000.00         5400.00         5400.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17           1.00         5000.00         6742.69         6500.00
STA0072-019                    SH 7 FROM US 287 TO 75TH STRE 06/22/17           1.00         4000.00         5330.00         1650.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   5.00        11611.11        11422.24         6675.33




NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17           1.00        15000.00        25000.00        25000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00        15000.00        25000.00        25000.00




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           1.00         5000.00         6133.67         8400.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   1.00         5000.00         6133.67         8400.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  11.00        15233.33        27547.53        13849.65
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  43
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00830      Rem Traf Sig Face                            Each ===================================================


STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17          52.00           60.00           48.68           60.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  52.00           60.00           48.68           60.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  52.00           60.00           48.68           60.00


=============== 202-00831      Rem Traf Sig Head                            Each ===================================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17           6.00          175.00          160.50           70.00
STM0243-089                    Midpoint: Station 1019+50 Cen
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   6.00          175.00          160.50           70.00




STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17           1.00          200.00           87.05           82.70
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           1.00          250.00          171.37          165.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   2.00          225.00          154.51          123.85




NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17           6.00          110.00          110.00          110.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   6.00          110.00          110.00          110.00




CR100-286                      R1 CURB RAMPS-PH 1            10/26/17           6.00          250.00          192.50          185.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   6.00          250.00          192.50          185.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  20.00          183.00          160.34          131.04


=============== 202-00832      Rem of Sign Panel (Spec)                     Each ===================================================


NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           3.00          500.00          400.00          400.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   3.00          500.00          400.00          400.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   3.00          500.00          400.00          400.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  44
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00840      Rem Traf Sig Pole                            Each ===================================================


STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           2.00         3000.00         1100.71         1102.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   2.00         3000.00         1100.71         1102.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00         3000.00         1100.71         1102.00


=============== 202-00845      Rem Traf Sig Controller                      Each ===================================================


SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           2.00          750.00          233.67          140.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   2.00          750.00          233.67          140.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00          750.00          233.67          140.00


=============== 202-00848      Rem Traf Sig Control+Cab                     Each ===================================================


STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           1.00         1000.00          703.11          661.00
STAR400-348                    Region 4 Controller and Cabin 05/04/17          16.00          700.00         1567.50         2500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  17.00          717.65         1331.76         2391.82
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  17.00          717.65         1331.76         2391.82


=============== 202-00855      Rem Traf Sig Control Cab                     Each ===================================================


NHPP0702-352                   HLT VMS CMS LUS REPLACEMENT   01/05/17           8.00         1000.00         1155.00          360.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   8.00         1000.00         1155.00          360.00




CR100-283                      REGION 1 TRAFFIC SIGNAL CONTR 07/20/17          24.00         1250.00         1255.00         1010.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  24.00         1250.00         1255.00         1010.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  32.00         1187.50         1230.00          847.50


=============== 202-00858      Rem Pedestal Pole                            Each ===================================================


NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17           1.00          325.00         2535.82         6670.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   1.00          325.00         2535.82         6670.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  45
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00858      Rem Pedestal Pole                            Each ===================================================




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           1.00         1500.00          337.25          275.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   1.00         1500.00          337.25          275.00




CR100-286                      R1 CURB RAMPS-PH 1            10/26/17           1.00          325.00          487.50          475.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   1.00          325.00          487.50          475.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   3.00          716.67          742.91         2473.33


=============== 202-00860      Rem Ped Push Button                          Each ===================================================


STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17           9.00           35.00           30.17           26.52
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   9.00           35.00           30.17           26.52




CR100-286                      R1 CURB RAMPS-PH 1            10/26/17           5.00          100.00           45.50           41.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   5.00          100.00           45.50           41.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  14.00           58.21           34.32           31.69


=============== 202-00870      Rem Coordination Unit                        Each ===================================================


IM0762-052                     FIBER OPTICS AND ITS DEVICES  08/03/17           1.00          100.00         5402.00         2500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00          100.00         5402.00         2500.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00          100.00         5402.00         2500.00


=============== 202-00888      Rem Video Detect Sys                         Each ===================================================


STA0072-019                    SH 7 FROM US 287 TO 75TH STRE 06/22/17           8.00          250.00          816.00          230.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   8.00          250.00          816.00          230.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   8.00          250.00          816.00          230.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  46
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-00889      Rem of Detect Warning                        Each ===================================================


STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17           1.00          200.00          625.75         1000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   1.00          200.00          625.75         1000.00




SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17           1.00         1000.00          248.00          275.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00         1000.00          248.00          275.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00          600.00          415.89          637.50


=============== 202-00895      Rem of Impact Attenuator                     Each ===================================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17          17.00         2097.63         2783.00         2783.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  17.00         2097.63         2783.00         2783.00




IM025A-037                     I25 S. Trinidad Resurface and 11/30/17           6.00         1260.00          331.73          195.18
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   6.00         1260.00          331.73          195.18
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  23.00         1879.12         1522.35         2107.92


=============== 202-00950      Rem Conc Found/Slab                          Sq Yard ================================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           2.00          450.32         2000.00         2000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   2.00          450.32         2000.00         2000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00          450.32         2000.00         2000.00


=============== 202-01000      Rem Fence                                    Lin Foot ===============================================


STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17          68.00            3.00           10.50           10.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17         132.00            5.00           11.40            5.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  47
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-01000      Rem Fence                                    Lin Foot ===============================================
STM0243-089                    Midpoint: Station 1019+50 Cen
IM025A-039                     I-25 Critical Culvert at MP 1 02/09/17         242.00            3.50            4.11            1.40
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17         560.00           25.00            9.75            1.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               1,002.00           15.68            8.11            2.34




STAR500-190                    R5 Signal Replacement Chaffee 04/27/17          12.00           25.00           35.33           48.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  12.00           25.00           35.33           48.00




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17      20,654.00            1.00            0.88            0.45
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17       2,021.00            2.00            1.92            1.70
ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17         371.00            3.00            2.83            1.50
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17         732.00            1.50            3.40            3.25
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER              23,778.00            1.13            1.24            0.66




C133A-042                      SH 133 McClure Pass Slip      11/16/17         402.00            3.00            7.86           20.00
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17         214.00            2.00           10.58            5.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 616.00            2.65            8.54           14.79
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              25,408.00            1.75            1.70            1.09


=============== 202-01010      Rem Silt Fence                               Lin Foot ===============================================


STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17         123.00            5.50            0.68            0.30
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 123.00            5.50            0.68            0.30
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 123.00            5.50            0.68            0.30


=============== 202-01015      Rem Rockfall Fence                           Lin Foot ===============================================


C0702-372                      I-70 GWC Rockfall Fence Impro 10/12/17         685.00          100.00          210.00          195.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 685.00          100.00          210.00          195.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 685.00          100.00          210.00          195.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  48
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-01030      Rem of Road Closure Gate                     Each ===================================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17           2.00         1000.00         1064.90          700.00
STM0243-089                    Midpoint: Station 1019+50 Cen
SHE160A-031                    SH 160 Passing Lanes          03/02/17           1.00          900.00         1163.75         1000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   3.00          966.67         1117.62          850.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   3.00          966.67         1117.62          850.00


=============== 202-01035      Rem of Gate                                  Each ===================================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17           2.00          200.00          709.16          400.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           1.00          350.00          272.00          500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   3.00          250.00          527.01          450.00




ER0361-115                     US 36 Bridges                 06/22/17           1.00          350.00          176.79          135.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   1.00          350.00          176.79          135.00




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17          10.00          400.00          133.65          150.00
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17           2.00          250.00          263.07          226.65
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17           1.00          200.00          141.70          122.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  13.00          361.54          173.35          159.64
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  17.00          341.18          213.96          194.39


=============== 202-01130      Rem Gdrail Ty 3                              Lin Foot ===============================================


NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17         450.00            6.00            4.18            6.00
NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17         416.00           10.00           34.03           62.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17       3,034.00            8.50            4.39            4.00
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17       1,225.00            6.00            7.11            6.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17       1,119.00            5.00            5.32            3.34
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  49
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-01130      Rem Gdrail Ty 3                              Lin Foot ===============================================
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17       3,263.00            7.00            5.50            6.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17       2,959.00            4.00            3.55            3.32
SHE160A-031                    SH 160 Passing Lanes          03/02/17         475.00          505.00           13.98            5.56
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17       1,743.00            5.00            8.29            7.50
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17          81.00            4.00           22.97            8.75
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17      19,796.00            5.00            3.53            3.64
STA0362-035                    US 36: Strasburg to Byers     03/23/17         990.00            3.00            4.85            4.47
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17       1,670.00            3.50            8.02           10.00
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17       9,931.00            3.30            3.88            4.05
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              47,152.00            9.96            5.03            4.90




STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17       3,317.00            3.00            2.27            1.56
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17         914.00            2.00            4.58            3.31
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17       5,250.00            4.75            3.37            3.15
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17         757.00            4.00            4.25            4.25
NHPPC120-026                   US 85: I-76 to 168th          05/04/17       5,772.00            3.00            1.57            1.50
STA0703-437                    I-70: 32ND TO 44TH            06/01/17       1,671.00            3.00            5.86            6.00
STA0061-091                    SH 6 CHIPSEAL NEAR FLEMING    06/15/17         418.00            4.70            4.50            4.00
MTCE0253-259                   I25 FROM MP 229.29 TO MP 244. 06/22/17         288.00            7.00            9.22           14.00
ER0361-115                     US 36 Bridges                 06/22/17         674.00            4.50            3.88            4.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              19,061.00            3.62            3.31            2.89




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17       1,650.00           10.00            4.44            3.50
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17       2,500.00            4.00            4.55            6.75
SHE0141-024                    SH 14 Poudre Canyon Guardrail 07/20/17         352.00            5.00            7.83            7.00
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17          50.00            3.23           28.90           29.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17      19,329.00            3.00            3.15            3.15
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17       1,229.00            5.00            4.39            4.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER              25,110.00            3.69            4.06            3.68




ITSSW01-636                    VMS AND LUS UPGRADE FY 17     10/19/17          55.00            5.00           18.17           45.90
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17       1,138.00            4.00            4.33            4.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17      12,534.00            4.50            4.58            4.14
NHPP0702-354                   I-70 EAST SIDE VAIL PASS MP 1 12/07/17      15,320.00            5.00            4.14            4.23
STR139A-034                    SH 139 DOUGLAS PASS MP 19.0 - 12/21/17       9,309.00            5.00            3.44            3.25
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER              38,356.00            4.81            4.11            4.02
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR             129,679.00            6.29            4.32            4.11
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  50
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-01140      Rem Gdrail Ty 4                              Lin Foot ===============================================


NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17       1,970.00           27.00           19.80            4.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               1,970.00           27.00           19.80            4.00




NHPP0703-433                   EJMT S Bore Barrier, Handrail 04/13/17       8,819.00           20.00           26.22           24.75
NHPP0704-240                   Package C (I-70 and I-25) Bri 04/27/17          57.00           25.00          185.75          230.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               8,876.00           20.03           26.73           26.07




NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17          10.00           25.00          176.96          170.00
NHPP0702-354                   I-70 EAST SIDE VAIL PASS MP 1 12/07/17       2,759.00           15.00           28.01           31.53
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               2,769.00           15.04           28.54           32.03
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              13,615.00           20.02           26.28           24.09


=============== 202-01170      Rem Gdrail Ty 7                              Lin Foot ===============================================


SHE160A-031                    SH 160 Passing Lanes          03/02/17         114.00           60.00           40.50           10.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 114.00           60.00           40.50           10.00




NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17          24.00           35.00           99.94           50.00
ER0361-115                     US 36 Bridges                 06/22/17         650.00           25.00            7.51           11.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 674.00           25.36            9.73           12.39




CR100-292                      I25/ORCHARD EMERGENCY REPAIR  08/21/17         160.00            1.00           96.29           55.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 160.00            1.00           96.29           55.00




ITSSW01-636                    VMS AND LUS UPGRADE FY 17     10/19/17         160.00           20.00           28.13           15.62
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  51
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-01170      Rem Gdrail Ty 7                              Lin Foot ===============================================
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17         268.00           15.00           93.38          100.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17          60.00           20.00           90.30           60.90
ITSSW01-831                    ITS WEATHER STATION UPGRADES  11/30/17          40.00           20.00           77.69          100.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 528.00           17.46           68.63           69.99
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,476.00           22.57           36.74           37.43


=============== 202-01180      Rem Median Barrier                           Lin Foot ===============================================


NHPP 0701-230                  Midpoint WB Bore              03/02/17       1,450.00           30.00           36.06           22.80
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               1,450.00           30.00           36.06           22.80




STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17         915.00           85.00            9.31            7.51
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 915.00           85.00            9.31            7.51




ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17         156.00           25.00           22.00           27.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 156.00           25.00           22.00           27.00




NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17         220.00           50.00          102.18          108.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 220.00           50.00          102.18          108.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               2,741.00           49.68           30.70           24.77


=============== 202-01300      Rem End Anchorage                            Each ===================================================


NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17           8.00          300.00          254.55          300.00
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17           2.00          500.00          333.69          228.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17           8.00          400.00          238.53          206.84
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17          16.00          210.00          295.00          275.00
SHE160A-031                    SH 160 Passing Lanes          03/02/17           3.00          156.00          468.06          444.44
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  52
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-01300      Rem End Anchorage                            Each ===================================================
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17           2.00          300.00          403.00          350.00
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17          54.00          300.00          184.37          190.40
STA0362-035                    US 36: Strasburg to Byers     03/23/17           4.00          250.00          411.81          226.63
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17           2.00          250.00          464.00          750.00
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17          34.00          330.00          229.65          242.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 133.00          300.36          254.13          239.55




STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17          71.00          300.00          228.69          156.08
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           6.00          500.00          301.29          215.00
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17           8.00          270.00          394.75          372.75
NHPPC120-026                   US 85: I-76 to 168th          05/04/17          31.00          250.00          130.33          125.00
STA0703-437                    I-70: 32ND TO 44TH            06/01/17          19.00          250.00          374.82          210.00
MTCE0253-259                   I25 FROM MP 229.29 TO MP 244. 06/22/17           4.00          300.00          521.00          825.00
ER0361-115                     US 36 Bridges                 06/22/17           8.00          300.00          227.46          220.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 147.00          289.52          257.98          192.37




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17           2.00          300.00          427.00          500.00
SHE0141-024                    SH 14 Poudre Canyon Guardrail 07/20/17           2.00          300.00          466.67          400.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   4.00          300.00          441.88          450.00




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           7.00          200.00          140.33          205.00
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17           1.00          250.00          879.00          225.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17          35.00          240.00          232.37          212.10
NHPP0702-354                   I-70 EAST SIDE VAIL PASS MP 1 12/07/17          40.00          250.00          315.33          221.65
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  83.00          241.57          286.42          216.26
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 367.00          282.72          265.54          217.68


=============== 202-01400      Removal of Cattle Guard                      Each ===================================================


NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17           1.00         2500.00         2140.00         2500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00         2500.00         2140.00         2500.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  53
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-01400      Removal of Cattle Guard                      Each ===================================================




STR139A-034                    SH 139 DOUGLAS PASS MP 19.0 - 12/21/17           1.00         4000.00         7990.34         7500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   1.00         4000.00         7990.34         7500.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00         3250.00         4740.15         5000.00


=============== 202-04000      Plug Structure                               Each ===================================================


NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           1.00          800.00         1820.00         5000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   1.00          800.00         1820.00         5000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00          800.00         1820.00         5000.00


=============== 202-04001      Plug Culvert                                 Each ===================================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17           4.00          750.00         3241.54         2000.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           3.00          500.00         3900.00         5000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   7.00          642.86         3582.12         3800.00




NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           1.00         1000.00          760.00          760.00
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17           3.00         3500.00         1702.50          890.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   4.00         2875.00         1630.00          857.50




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           1.00         1000.00         2892.00          875.00
ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17           1.00         2000.00        11212.77        17699.40
BR3852-018                     POA SCOUR US 385
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   2.00         1500.00         8716.54         9287.20
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  13.00         1461.54         4081.48         3727.67
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  54
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-04002      Clean Culvert                                Each ===================================================


IM025A-039                     I-25 Critical Culvert at MP 1 02/09/17           2.00         1750.00         3094.95          322.65
STA0931-032                    SH 93 Erosion Correction      02/09/17           2.00         2500.00         4517.41         2175.00
SHE160A-031                    SH 160 Passing Lanes          03/02/17           8.00         2500.00         2934.25         2812.50
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17          16.00         2000.00         1466.00         2900.00
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17           1.00         5000.00         3514.45         4500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  29.00         2258.62         2401.04         2703.29




STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17          61.00          800.00         2266.72         1025.15
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           7.00         2500.00         2005.89         1574.00
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17           1.00         1850.00         3265.68          797.04
NHPPC120-026                   US 85: I-76 to 168th          05/04/17          24.00          700.01         1516.26         1200.00
STA0703-437                    I-70: 32ND TO 44TH            06/01/17          10.00         2500.00         1786.16         2400.00
ER0361-115                     US 36 Bridges                 06/22/17           6.00         2500.00         2665.32         2000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 109.00         1146.33         2080.55         1276.60




ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17           3.00         1500.00         7933.33        15000.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17           2.00         3500.00         1994.45         1000.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   5.00         2300.00         3718.64         9400.00




NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17          10.00         2000.00         3249.10         3250.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17           5.00         2550.00         3713.23         4139.70
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  15.00         2183.33         3356.21         3546.57
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 158.00         1485.44         2356.00         2011.03


=============== 202-04003      Clean Culvert (Spec)                         Each ===================================================


STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17          42.00         1500.00         1292.70         1200.00
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17           3.00         1500.00         2133.33         1500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  45.00         1500.00         1335.44         1220.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  55
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-04003      Clean Culvert (Spec)                         Each ===================================================




SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17          20.00          300.00         1068.40         1275.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  20.00          300.00         1068.40         1275.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  65.00         1130.77         1239.04         1236.92


=============== 202-04005      Clean Valve Box                              Each ===================================================


NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17         175.00          300.00          270.48           75.50
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17           6.00          307.14          294.57          290.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17           1.00          390.00          761.74          589.69
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 182.00          300.73          274.20           85.40




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17          79.00          300.00          196.00          196.00
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17          80.00          280.00          125.05           75.00
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17          46.00          258.00          184.34          190.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 205.00          282.77          161.62          147.43




NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17           4.00          250.00          365.00          365.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   4.00          250.00          365.00          365.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 391.00          290.79          229.10          120.78


=============== 202-04006      Clean Culvert                                Hour ===================================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17          80.00          300.00          350.00          350.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  80.00          300.00          350.00          350.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  80.00          300.00          350.00          350.00


=============== 202-04010      Clean Inlet                                  Each ===================================================


NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17         162.00          600.00          958.90          252.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  56
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-04010      Clean Inlet                                  Each ===================================================
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17           2.00         1000.00         1324.00         2500.00
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17          33.00         1000.00          960.67          892.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17           2.00          900.00         1976.94         1769.07
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 199.00          673.37          974.26          395.97




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17          10.00          600.00         1130.00         1130.00
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17          37.00         1000.00          366.83          150.00
NHPP0703-433                   EJMT S Bore Barrier, Handrail 04/13/17         113.00         1200.00          638.15          480.00
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17           5.00          731.00         1530.44         1500.00
NHPP0704-240                   Package C (I-70 and I-25) Bri 04/27/17          10.00         1250.00          693.75          785.00
ER0361-115                     US 36 Bridges                 06/22/17           1.00         2500.00          689.75          625.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 176.00         1120.77          638.87          494.69




NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17           7.00         1000.00         1000.00         1000.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           1.00          393.19         1286.00         1286.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   8.00          924.15         1035.75         1035.75




NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17         178.00         1000.00          548.46          180.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 178.00         1000.00          548.46          180.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 561.00          920.94          687.42          367.54


=============== 202-04050      Clean Exp Joint                              Lin Foot ===============================================


BR0252-449                     I-25 Woodmen NB               03/02/17         965.00           20.00           22.00           11.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 965.00           20.00           22.00           11.00




STA0703-437                    I-70: 32ND TO 44TH            06/01/17          60.00           45.00           27.22            6.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  60.00           45.00           27.22            6.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  57
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-04050      Clean Exp Joint                              Lin Foot ===============================================




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17          84.00           50.00           29.00           29.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  84.00           50.00           29.00           29.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,109.00           23.62           22.44           12.09


=============== 202-05004      Sawing Concrete (4 In)                       Lin Foot ===============================================


NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17         375.00            6.00            3.50            4.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 375.00            6.00            3.50            4.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 375.00            6.00            3.50            4.00


=============== 202-05008      Sawing Concrete (8 In)                       Lin Foot ===============================================


STAR400-348                    Region 4 Controller and Cabin 05/04/17          94.00           10.00          138.00          250.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  94.00           10.00          138.00          250.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  94.00           10.00          138.00          250.00


=============== 202-05026      Sawing Asphalt Mat (6 In)                    Lin Foot ===============================================


IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17       1,930.00            3.50            3.33            3.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               1,930.00            3.50            3.33            3.50




STA050A-027                    US 50C Storm Sewer 21st LANE  12/21/17       8,513.00            3.00            3.07            1.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               8,513.00            3.00            3.07            1.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              10,443.00            3.09            3.09            1.46


=============== 202-05030      Sawing Asphalt Mat (10 In)                   Lin Foot ===============================================


STAR400-348                    Region 4 Controller and Cabin 05/04/17          21.00           10.00          144.00          250.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  21.00           10.00          144.00          250.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  58
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 202-05030      Sawing Asphalt Mat (10 In)                   Lin Foot ===============================================




SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17      18,036.00            5.00            3.89            2.60
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER              18,036.00            5.00            3.89            2.60
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              18,057.00            5.01            3.96            2.89


=============== 202-05100      Sandblasting Reinf Steel                     Sq Yard ================================================


NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          47.00           40.00           38.00           38.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  47.00           40.00           38.00           38.00




MTCE092A-027                   MTCE R3 FY18 SH 92 STR I-06-A 12/07/17          42.00           40.00           55.67           42.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  42.00           40.00           55.67           42.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  89.00           40.00           50.87           39.89


=============== 202-06530      Clean Drain Pipe (Spec)                      Each ===================================================


STA2873-183                    US 287 Repairs at LCR 17      03/09/17          10.00         2000.00         2202.00         3380.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  10.00         2000.00         2202.00         3380.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  10.00         2000.00         2202.00         3380.00


=============== 202-07200      Rem of Temporary Stream Crossing             Each ===================================================


ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17           2.00        30000.00        30000.00        30000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   2.00        30000.00        30000.00        30000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00        30000.00        30000.00        30000.00


=============== 203-00000      Uncl Excav                                   Cubic Yard =============================================


NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17         598.00           25.00           36.39           52.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  59
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 203-00000      Uncl Excav                                   Cubic Yard =============================================
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17          24.00          100.00          311.20           75.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17         212.00          112.00           89.83           41.60
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 834.00           49.27           70.69           50.02




STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17       1,403.00           36.00           36.41            8.49
ER0341-093                     PR US 34 BIG THOMPSON CANYON  06/28/17      18,900.00           17.25           17.25           17.25
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              20,303.00           18.55           20.74           16.64




NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17          30.00           60.00           72.50           60.00
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17       9,946.00           26.00           25.01           20.00
SHE0141-024                    SH 14 Poudre Canyon Guardrail 07/20/17          41.00          100.00          214.00           62.00
ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17       2,510.00           22.00           17.67            4.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17         556.00           45.00           23.67           40.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         171.00           50.22           85.00           85.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER              13,254.00           26.66           24.47           18.87




C0702-372                      I-70 GWC Rockfall Fence Impro 10/12/17          50.00          200.00          250.00          250.00
STRR300-228                    SH 13 R3 VARIOUS CHIP SEALS   11/30/17       2,909.00           30.00           27.44           13.75
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               2,959.00           32.87           29.33           17.74
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              37,350.00           23.25           25.27           18.27


=============== 203-00010      Uncl Excav (CIP)                             Cubic Yard =============================================


NHPP1602-145                   US 160 S. Fork to Monte Vista 01/12/17          19.40           30.00           36.65           30.25
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17       2,864.00           13.00           24.13           10.00
STA0931-032                    SH 93 Erosion Correction      02/09/17          81.00          275.00           85.08          125.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17         685.00           43.00          110.71           97.48
SHE160A-031                    SH 160 Passing Lanes          03/02/17      12,496.00           20.00           12.38           13.23
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17         280.00           25.00           87.75           47.00
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17         400.00           46.50           58.68           70.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              16,825.40           21.70           17.11           18.58
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  60
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 203-00010      Uncl Excav (CIP)                             Cubic Yard =============================================




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17          30.00           30.00          129.00          129.00
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17      72,044.00           20.00            9.17            2.10
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17      19,740.00            5.00           13.35            9.77
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17         240.00          100.00          183.00          144.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17       2,646.00           30.01           36.39           25.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              94,700.00           17.36            9.95            4.74




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17       2,385.00           15.00           24.20           17.00
NHPPR100-291                   I-225 SB RESTRIPING I-25 TO Y 08/31/17         115.00           80.00           96.50           90.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17     423,391.00           26.94           46.00           46.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER             425,891.00           26.89           45.43           45.85




C133A-042                      SH 133 McClure Pass Slip      11/16/17         930.00           40.00           81.88           68.00
NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17       9,653.00           15.00           16.70            8.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17       1,293.00           35.10           21.72           13.15
NHPP0702-354                   I-70 EAST SIDE VAIL PASS MP 1 12/07/17         353.00          100.00           75.23           91.16
CC0341-100                     US 34 BIG THOMPSON CANYON MOO 12/11/17       5,709.00           20.58           24.50           24.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER              17,938.00           21.19           25.21           18.37
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR             555,354.40           24.92           20.85           37.13


=============== 203-00012      Uncl Excav (CIP) (Spec)                      Cubic Yard =============================================


ER0361-115                     US 36 Bridges                 06/22/17      10,155.00           20.00           11.18           12.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              10,155.00           20.00           11.18           12.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              10,155.00           20.00           11.18           12.00


=============== 203-00014      Uncl Ex (River Bttm Matl Salv and Repl)      Cubic Yard =============================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17      20,558.00           33.95           50.00           50.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER              20,558.00           33.95           50.00           50.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              20,558.00           33.95           50.00           50.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  61
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 203-00015      Uncl Ex (Channel Grading)                    Cubic Yard =============================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17       5,675.00           62.06          100.00          100.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               5,675.00           62.06          100.00          100.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               5,675.00           62.06          100.00          100.00


=============== 203-00040      Uncl Excav (Spec)                            Cubic Yard =============================================


CC0341-100                     US 34 BIG THOMPSON CANYON MOO 12/11/17       3,991.00           22.63           30.87           30.87
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               3,991.00           22.63           30.87           30.87
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               3,991.00           22.63           30.87           30.87


=============== 203-00050      Unsuitable Material                          Cubic Yard =============================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17       1,330.00           17.00           16.99           10.00
STM0243-089                    Midpoint: Station 1019+50 Cen
SHE160A-031                    SH 160 Passing Lanes          03/02/17         150.00          300.00           48.47           62.50
STA0243-087                    US 24 El Paso-Elbert CL Pavin 03/23/17         500.00           35.00           49.88           28.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               1,980.00           42.98           31.35           22.83




NHPPC120-026                   US 85: I-76 to 168th          05/04/17           5.00           40.01          241.19           40.00
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17          25.00           50.00           71.66           71.61
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  30.00           48.34          110.78           66.34




BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17          50.00           20.00           49.18           11.62
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  50.00           20.00           49.18           11.62
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               2,060.00           42.50           33.20           23.37


=============== 203-00060      Emb Matl (CIP)                               Cubic Yard =============================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17      40,557.00           19.00           25.15           31.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  62
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 203-00060      Emb Matl (CIP)                               Cubic Yard =============================================
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17         149.00           75.00           77.20           65.00
IM025A-039                     I-25 Critical Culvert at MP 1 02/09/17       3,215.00           25.00           37.59           44.45
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17       9,787.00           26.00           45.40           38.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17          20.00          100.00          176.02          116.58
SHE160A-031                    SH 160 Passing Lanes          03/02/17      37,442.00           17.00           20.64           25.34
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17      15,466.00           14.00           12.68            7.10
STA0243-087                    US 24 El Paso-Elbert CL Pavin 03/23/17       2,992.00           30.00           36.35           26.60
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17         300.00           15.00           72.33           67.00
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17         585.00           30.00           75.56           84.80
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER             110,513.00           18.85           24.08           26.21




STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17       5,722.00            3.00           13.94            7.71
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17         678.00           55.00           56.94           53.83
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17      21,008.00           15.00            6.00            6.00
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17         750.00           40.00           49.00           60.00
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17       1,000.00           14.50           35.81           35.79
ER0361-115                     US 36 Bridges                 06/22/17      25,700.00           14.00           19.18            7.30
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              54,858.00           14.11           18.10            8.66




ITS0761-227                    ITS FIBER OPTICS ON I76 DENVE 07/27/17          16.00           16.00          178.59          250.00
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17       8,084.00           12.00           26.98           55.29
ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17         800.00           30.00           14.00           10.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17         657.00           30.00           44.00           65.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17      16,389.00           11.00           15.41           17.00
BRR400-354                     Little-T Channel Work and SH
SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17       2,444.00           20.00           44.00           30.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER              28,390.00           13.04           20.81           30.07




STA094A-034                    Critical Culvert Project on S 10/05/17       1,962.00           18.00           21.51           30.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17       6,125.00           20.00           21.33           13.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17           5.00          100.00          276.67          250.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               8,092.00           19.56           21.53           17.27
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR             201,853.00           16.77           22.06           21.12
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  63
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 203-00062      Emb Matl (CIP) (Spec)                        Cubic Yard =============================================


BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17          78.00           50.00           94.50          130.00
ER0341-093                     PR US 34 BIG THOMPSON CANYON  06/28/17         700.00            5.75            5.75            5.75
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 778.00           10.19           33.11           18.21
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 778.00           10.19           33.11           18.21


=============== 203-00066      Emb Matl (CIP) (R40)                         Cubic Yard =============================================


STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17      62,478.00           25.00           22.83           13.02
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              62,478.00           25.00           22.83           13.02




ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17       8,453.00           13.50           25.70           26.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               8,453.00           13.50           25.70           26.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              70,931.00           23.63           23.15           14.57


=============== 203-00100      Muck Excav                                   Cubic Yard =============================================


NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17       1,581.00           20.00           35.20           45.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17         200.00           40.00           41.57           60.42
NHPP 0701-230                  Midpoint WB Bore              03/02/17          15.00           55.00           60.38           55.60
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17          11.00          120.00          250.00          200.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               1,807.00           23.11           36.60           47.74




NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17       1,000.00           20.00           27.00           27.00
ER0361-115                     US 36 Bridges                 06/22/17         700.00           40.00           25.10           23.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,700.00           28.24           25.46           25.35




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17          20.00           70.00          100.00           30.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  64
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 203-00100      Muck Excav                                   Cubic Yard =============================================
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17         100.00           50.00           84.79          180.00
ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17       1,002.00           25.00           27.00           38.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17         580.00           30.00           32.56           42.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               1,702.00           28.70           33.14           47.61




CR100-286                      R1 CURB RAMPS-PH 1            10/26/17         250.00           50.00           31.50           28.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17         200.00           40.00           40.00           35.00
STR139A-034                    SH 139 DOUGLAS PASS MP 19.0 - 12/21/17          11.00          200.00          167.06           85.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 461.00           49.24           41.17           32.40
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               5,670.00           28.45           33.10           39.74


=============== 203-00400      Rock Excav                                   Cubic Yard =============================================


NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17       1,876.00           50.00           44.80           24.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               1,876.00           50.00           44.80           24.00




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17         748.00           60.00           37.28           23.17
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17         887.00           60.00          129.38           80.00
ER0361-115                     US 36 Bridges                 06/22/17       1,425.00           80.00           34.78           50.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               3,060.00           69.31           51.77           52.14




IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17         529.00           70.00          104.74           90.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17          30.00           55.00          171.00          163.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 559.00           69.19          108.30           93.92
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               5,495.00           62.71           52.69           46.78


=============== 203-00440      Rock Excav (Spec)                            Cubic Yard =============================================


NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17         551.00          120.00          188.00          105.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  65
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 203-00440      Rock Excav (Spec)                            Cubic Yard =============================================
ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17       1,537.00          190.00          190.00          190.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               2,088.00          171.53          188.72          167.57




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17       1,422.00           85.84           75.00           75.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               1,422.00           85.84           75.00           75.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               3,510.00          136.81          160.42          130.07


=============== 203-00500      Rock Fill                                    Cubic Yard =============================================


ER0341-093                     PR US 34 BIG THOMPSON CANYON  06/28/17       5,990.00           11.75           11.75           11.75
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               5,990.00           11.75           11.75           11.75




SHE0141-024                    SH 14 Poudre Canyon Guardrail 07/20/17          29.00          100.00          246.67           90.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  29.00          100.00          246.67           90.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               6,019.00           12.18           15.11           12.13


=============== 203-00510      Rock Fill (Spec)                             Cubic Yard =============================================


NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17         615.00           75.00           42.30            4.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 615.00           75.00           42.30            4.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 615.00           75.00           42.30            4.00


=============== 203-00600      Stripping                                    Cubic Yard =============================================


ER0361-115                     US 36 Bridges                 06/22/17       3,345.00           20.00           12.10           19.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               3,345.00           20.00           12.10           19.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               3,345.00           20.00           12.10           19.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  66
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 203-01100      Proof Rolling                                Hour ===================================================


STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17           5.00          100.00          128.25          150.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17          40.00          120.00          111.99           78.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17          25.00          140.00          131.92          135.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17           8.00          120.00          196.04          200.51
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  78.00          125.13          128.23          125.67




STA006A-057                    SH 6 EAST OF STERLING         04/06/17          20.00          138.00          106.22           95.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  20.00          138.00          106.22           95.00




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17          20.00          120.00          109.00          110.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         100.00          114.40          100.00          100.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17           4.00          125.00          120.75           78.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 124.00          115.65          107.43          100.90
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 222.00          120.99          118.97          107.43


=============== 203-01500      Blading                                      Hour ===================================================


NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17          50.00          150.00          158.68          130.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17           5.00          150.50          195.75          150.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17          80.00          150.00          174.73          115.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17          20.00          145.00          166.64          135.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17          18.00          145.00          127.00          100.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17          40.00          120.00          154.12          128.62
SHE160A-031                    SH 160 Passing Lanes          03/02/17          60.00          120.00          166.26          125.00
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17          20.00          125.00          142.33          120.00
STA2873-183                    US 287 Repairs at LCR 17      03/09/17          10.00          200.00          206.33          185.00
ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17          20.00          187.00          187.00          187.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17          60.00          130.00          185.14          160.13
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17          40.00          140.00          170.25          110.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 423.00          140.43          167.21          133.14
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  67
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 203-01500      Blading                                      Hour ===================================================




STA006A-057                    SH 6 EAST OF STERLING         04/06/17         200.00          135.00          162.34          145.00
STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17          20.00          150.00          124.31          152.92
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17         300.00           50.00          143.46          140.90
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17         160.00          134.00          155.00          100.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          10.00          150.00           90.00           90.00
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17          55.00          150.00          181.43          181.33
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17          10.00          150.00          175.60          125.00
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17          15.00          150.00          197.80          120.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 770.00          103.82          148.35          135.39




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17          40.00          150.00          149.00          175.00
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17          20.00          125.00          112.67           95.00
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17         100.00          150.00          146.41          169.98
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         100.00          175.82          190.00          190.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17          70.00          145.00          135.71          102.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 330.00          155.25          144.20          157.69




NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17          40.00          150.00          180.10          140.00
NHPP0702-354                   I-70 EAST SIDE VAIL PASS MP 1 12/07/17          40.00          150.00          155.77          193.87
STR139A-034                    SH 139 DOUGLAS PASS MP 19.0 - 12/21/17          40.00          145.00          138.03           90.00
ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17         100.00          130.00          161.96          170.71
BR3852-018                     POA SCOUR US 385
STA050A-027                    US 50C Storm Sewer 21st LANE  12/21/17         100.00          110.00          112.50           20.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 320.00          130.63          145.23          112.58
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,843.00          126.08          149.84          134.95


=============== 203-01510      Backhoe                                      Hour ===================================================


NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17          40.00          150.00          166.00          135.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17          30.00          145.00          128.40           62.00
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17          20.00          150.00          191.00          145.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  68
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 203-01510      Backhoe                                      Hour ===================================================
NHPP 0701-230                  Midpoint WB Bore              03/02/17          10.00          150.00          179.20          132.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17         120.00          130.00          140.40           75.00
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17          10.00          135.00          107.33           80.00
ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17          20.00          207.00          207.00          207.00
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17          40.00          160.00          140.10          100.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 290.00          146.00          148.82          101.45




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17          80.00          150.00          184.00          184.00
STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17          20.00          140.00          110.23          138.20
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17         300.00           50.00          127.21          127.17
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17         160.00          163.00          151.00          100.00
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17          40.00          135.00          152.50          110.00
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17          55.00          135.00          141.64          141.56
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17          20.00          140.00          114.75          100.00
ER0361-115                     US 36 Bridges                 06/22/17         100.00          125.00          137.83          185.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 775.00          108.39          133.33          134.61




IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17          25.00          135.00          118.00           79.00
ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17          10.00          165.00          201.67          165.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17          70.00          175.00          137.67          103.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         120.00          202.38          210.00          210.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17          70.00          140.00          139.22           96.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 295.00          174.10          146.23          144.93




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17          30.00          150.00           70.67          136.00
C133A-042                      SH 133 McClure Pass Slip      11/16/17          10.00          120.00          163.06          160.00
STR139A-034                    SH 139 DOUGLAS PASS MP 19.0 - 12/21/17          10.00          135.00          115.85           75.00
ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17         100.00          130.00          154.86          134.04
BR3852-018                     POA SCOUR US 385
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 150.00          133.67          145.54          132.23
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,510.00          130.96          138.71          130.02


=============== 203-01525      Backhoe (Spec)                               Hour ===================================================


C0702-372                      I-70 GWC Rockfall Fence Impro 10/12/17          40.00          200.00          132.50          140.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  40.00          200.00          132.50          140.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  40.00          200.00          132.50          140.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  69
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 203-01550      Dozing                                       Hour ===================================================


ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17          20.00          154.00          154.00          154.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  20.00          154.00          154.00          154.00




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17         300.00           50.00          165.62          174.61
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17         160.00          193.00          157.00          100.00
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17          55.00          143.00          148.50          148.42
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17          10.00          180.00          206.25          150.00
ER0361-115                     US 36 Bridges                 06/22/17         100.00          150.00          148.83          185.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 625.00          112.87          162.28          154.47




BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17          40.00          180.00          157.41          169.98
ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17          10.00          200.00          203.33          165.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17          40.00          200.00          165.33           96.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         110.00          171.52          165.00          165.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17          70.00          160.00          151.04          100.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 270.00          175.06          156.29          138.66




C133A-042                      SH 133 McClure Pass Slip      11/16/17          10.00          140.00          209.13          250.00
NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17         100.00          160.00          180.35          115.00
ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17         100.00          165.00          177.65          153.57
BR3852-018                     POA SCOUR US 385
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 210.00          161.43          180.65          139.80
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,125.00          137.59          164.24          147.93


=============== 203-01565      Hydraulic Excavator                          Hour ===================================================


STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17          20.00          170.00          160.06          200.18
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17          16.00          175.00          149.98          119.94
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17          20.00          200.00          176.00          150.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  56.00          182.14          165.40          159.33
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  70
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 203-01565      Hydraulic Excavator                          Hour ===================================================




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17          40.00          200.00          162.00          175.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  40.00          200.00          162.00          175.00




NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17         180.00          200.00          169.50          120.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 180.00          200.00          169.50          120.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 276.00          196.38          167.92          135.95


=============== 203-01580      Truck                                        Hour ===================================================


NHPP0702-354                   I-70 EAST SIDE VAIL PASS MP 1 12/07/17          40.00          125.00          105.74          108.69
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  40.00          125.00          105.74          108.69
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  40.00          125.00          105.74          108.69


=============== 203-01582      Truck (Dump)                                 Hour ===================================================


NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17          40.00          125.00          130.44          135.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17          10.00          104.00          107.81           83.28
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17          20.00          150.00          134.00          150.00
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17          10.00          120.00          107.33           80.00
ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17          20.00          118.00          118.00          118.00
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17          40.00          150.00          122.35           90.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 140.00          132.86          126.07          114.23




STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17          24.00          130.00          132.44           97.31
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17          55.00          110.00          127.24          127.17
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17          20.00          125.00          138.40          120.00
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17          20.00          140.00          135.00          120.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 119.00          121.60          133.07          118.74
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  71
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 203-01582      Truck (Dump)                                 Hour ===================================================




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17          40.00          115.00          115.00          120.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         100.00          109.37          135.00          135.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 140.00          110.98          121.67          130.71




C0702-372                      I-70 GWC Rockfall Fence Impro 10/12/17          40.00          125.00          107.50          110.00
C133A-042                      SH 133 McClure Pass Slip      11/16/17          10.00          100.00          128.13          135.00
NHPP006A-059                   US 6 CLEAR CREEK CANYON SH 93 12/14/17         200.00          200.00          292.00          239.00
STR139A-034                    SH 139 DOUGLAS PASS MP 19.0 - 12/21/17          10.00          120.00           96.25           80.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 260.00          181.54          247.38          209.04
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 659.00          145.38          172.37          155.95


=============== 203-01590      Front End Loader (Rubber)                    Hour ===================================================


NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17          10.00          125.00          154.67          120.00
ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17          20.00          159.00          159.00          159.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  30.00          147.67          156.40          146.00




STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17          90.00          130.00          143.55          143.47
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17          10.00          160.00          133.75          100.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 100.00          133.00          141.77          139.12




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17          40.00          150.00          130.00          125.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         100.00          150.19          160.00          160.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 140.00          150.14          140.00          150.00




C0702-372                      I-70 GWC Rockfall Fence Impro 10/12/17          40.00          200.00          165.00          155.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  72
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 203-01590      Front End Loader (Rubber)                    Hour ===================================================
C133A-042                      SH 133 McClure Pass Slip      11/16/17          10.00          120.00          165.63          175.00
NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17         140.00          165.00          145.04          110.00
NHPP006A-059                   US 6 CLEAR CREEK CANYON SH 93 12/14/17         160.00          250.00          215.83          280.50
STR139A-034                    SH 139 DOUGLAS PASS MP 19.0 - 12/21/17          10.00          125.00          145.91           97.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 360.00          204.31          169.55          192.22
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 630.00          178.25          162.07          172.21


=============== 203-01594      Combination Loader                           Hour ===================================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17          60.00          125.00          148.91           57.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17          40.00          120.00          117.27          135.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17          40.00          125.00          131.84          115.52
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17          38.00          150.00           85.20           62.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17          20.00          110.00          154.35          118.42
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17          40.00          120.00          155.00          110.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17         120.00          130.00          114.40          110.00
BR0252-449                     I-25 Woodmen NB               03/02/17          10.00          150.00          149.50           90.00
ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17          20.00          110.00          110.00          110.00
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17          10.00          150.00          131.95          100.00
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17          40.00          125.00          151.00          150.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 438.00          127.40          126.90          108.22




STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17         160.00          120.00          125.40          100.00
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17          30.00          130.00          128.65          120.95
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17          50.00          105.00          125.29          125.22
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17          15.00          160.00          120.40          100.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 255.00          120.59          125.31          107.41




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17          40.00          120.00           98.00           95.00
ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17          10.00          125.00          130.00          125.00
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17          40.00          154.00          137.00          118.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17          94.00          115.00          102.00           71.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         100.00          105.01          110.00          110.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 284.00          118.03          107.26           96.63
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  73
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 203-01594      Combination Loader                           Hour ===================================================




STA094A-034                    Critical Culvert Project on S 10/05/17          40.00          125.00          112.53          130.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17          30.00          120.00           78.00          136.00
NHPP0702-354                   I-70 EAST SIDE VAIL PASS MP 1 12/07/17          40.00          125.00          151.38          226.89
NHPP006A-059                   US 6 CLEAR CREEK CANYON SH 93 12/14/17          40.00          300.00          196.93          180.80
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 150.00          170.67          133.96          170.58
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,127.00          129.26          124.54          113.56


=============== 203-01597      Potholing                                    Hour ===================================================


NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17         150.00          200.00          249.16          166.00
NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17         160.00          250.00          178.99          157.98
NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17          10.00          300.00          275.90          245.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17          10.00          225.00          250.25          200.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17         100.00          220.00          248.76          186.36
STM0243-089                    Midpoint: Station 1019+50 Cen
MTCER100-274                   MTCE R1 FY 17 SH 119 Signing  01/26/17          40.00          250.00          163.75          150.00
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17          20.00          300.00          254.05          185.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17          40.00          220.00          272.52          262.55
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17          20.00          250.00          250.33          301.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17         138.00          250.00          268.60          200.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17           8.00          200.00          267.01          280.50
NHPP 0701-230                  Midpoint WB Bore              03/02/17          20.00          300.00          304.75          225.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17          40.00          225.00          218.40          205.00
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17          40.00          300.00          300.43          268.80
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17         120.00          200.00          227.14          200.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17         100.00          200.00          296.71          265.36
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17          10.00          250.00          313.45          175.00
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17          40.00          215.00          233.20          200.00
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17          60.00          200.00          218.33          155.00
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17          40.00          280.00          271.14          265.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               1,166.00          230.23          246.02          200.42




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17         200.00          200.00          192.00          192.00
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17          30.00          215.00          190.06          170.00
STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17          60.00          450.00          252.10          256.29
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17          40.00          208.00          211.59          210.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  74
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 203-01597      Potholing                                    Hour ===================================================
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17         100.00          100.00          207.59          250.00
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17          30.00          230.00          215.86          224.30
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17          80.00          300.00          376.67          420.00
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17           8.00          250.00          289.24          142.73
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17         100.00          200.00          300.00          300.00
STAR400-348                    Region 4 Controller and Cabin 05/04/17         180.00          200.00          205.00          175.00
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17          10.00          200.00          241.50          320.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17         120.00          200.00          228.59          325.00
STM0211-026                    SH21 AND MESA RIDGE PKWY SIGN 05/18/17          80.00          180.00          232.50          150.00
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17           2.00          400.00          420.84          420.63
STA0703-437                    I-70: 32ND TO 44TH            06/01/17         100.00          220.00          183.00          240.00
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17          40.00          250.00          239.55          185.00
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17          25.00          350.00          447.60          400.00
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17          25.00          240.00          356.25          400.00
MTCE0253-259                   I25 FROM MP 229.29 TO MP 244. 06/22/17         150.00          200.00          198.00          200.00
STA0072-019                    SH 7 FROM US 287 TO 75TH STRE 06/22/17         250.00          170.00          155.60          168.00
ER0361-115                     US 36 Bridges                 06/22/17         100.00          225.00          217.97          250.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,730.00          210.18          215.68          230.46




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17          40.00          250.00          312.00          250.00
ITSSW01-834                    ITS CAMERA PROJECT FY17       07/13/17          70.00          220.00          225.00          300.00
NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17          30.00          225.00          250.00          250.00
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17          20.00          220.00          199.33          320.00
CR100-283                      REGION 1 TRAFFIC SIGNAL CONTR 07/20/17         120.00          225.00          197.50          245.00
ITS0761-227                    ITS FIBER OPTICS ON I76 DENVE 07/27/17         250.00          170.00          161.99          160.00
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17          10.00          235.00          226.82          226.64
IM0762-052                     FIBER OPTICS AND ITS DEVICES  08/03/17          24.00          180.00          167.83          160.00
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17          10.00          660.00          300.00          300.00
NHPPR100-291                   I-225 SB RESTRIPING I-25 TO Y 08/31/17          20.00          250.00          237.50          300.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17          80.00          275.00          250.00          250.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17          80.00          200.00          223.48          200.00
BRR400-354                     Little-T Channel Work and SH
NHPP0821-108                   SH 82 MP 45 OLVDS             09/07/17          16.00          350.00          180.57            1.70
SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17          80.00          225.00          246.20          200.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 850.00          218.73          206.50          213.45




STA094A-034                    Critical Culvert Project on S 10/05/17          24.00          200.00          226.82          275.00
ITSSW01-636                    VMS AND LUS UPGRADE FY 17     10/19/17          40.00          200.00          198.52          150.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17          90.00          200.00          212.00          330.00
C133A-042                      SH 133 McClure Pass Slip      11/16/17          10.00          300.00          260.34          250.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  75
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 203-01597      Potholing                                    Hour ===================================================
NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17          10.00          200.00          242.05          225.00
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17          40.00          225.00          247.12          185.00
ITSSW01-831                    ITS WEATHER STATION UPGRADES  11/30/17          40.00          150.00          170.75          200.00
ITSSW02-003                    ITS FIBER INSTALLATIONS FOR H 11/30/17         100.00          250.00          125.25          180.00
NHPP0702-354                   I-70 EAST SIDE VAIL PASS MP 1 12/07/17          25.00          300.00          314.93          284.67
STR139A-034                    SH 139 DOUGLAS PASS MP 19.0 - 12/21/17         100.00          300.00          264.69          270.00
ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17          20.00          230.00          276.37          197.10
BR3852-018                     POA SCOUR US 385
STA050A-027                    US 50C Storm Sewer 21st LANE  12/21/17         100.00          260.00          230.00           70.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 599.00          240.23          219.89          209.53
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               4,345.00          221.38          221.85          216.37


=============== 203-01598      Potholing (Spec)                             Each ===================================================


ER0361-115                     US 36 Bridges                 06/22/17           1.00        15000.00         8662.50        25000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   1.00        15000.00         8662.50        25000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00        15000.00         8662.50        25000.00


=============== 203-01620      Sweeping                                     Hour ===================================================


BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17          20.00          130.00          135.91           73.66
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  20.00          130.00          135.91           73.66




NHPP006A-059                   US 6 CLEAR CREEK CANYON SH 93 12/14/17          10.00          200.00          361.50          593.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  10.00          200.00          361.50          593.50
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  30.00          153.33          159.25          246.94


=============== 203-01622      Sweeping (With Pickup Broom)                 Hour ===================================================


NHPP1602-145                   US 160 S. Fork to Monte Vista 01/12/17          20.00          150.00          290.00          230.00
NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17         100.00          150.00          145.00          140.00
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17          80.00          150.00          158.31          100.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  76
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 203-01622      Sweeping (With Pickup Broom)                 Hour ===================================================
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17         120.00          190.00          155.76          140.00
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17          30.00          190.00          138.67          205.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 350.00          167.14          161.77          141.57




STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17          96.00          200.00          184.80          179.40
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17          20.00          100.00          167.40          167.31
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17          10.00          170.00          222.62          175.00
MTCE142A-002                   SH 142 CHIPSEAL               06/22/17          20.00           25.00          225.00          225.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 146.00          160.27          189.82          183.69




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17          30.00          150.00          242.00          200.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  30.00          150.00          242.00          200.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 526.00          164.26          173.62          156.59


=============== 203-02300      Rock Scaler                                  Hour ===================================================


C0702-372                      I-70 GWC Rockfall Fence Impro 10/12/17          96.00          120.00          232.50          115.00
NHPP006A-059                   US 6 CLEAR CREEK CANYON SH 93 12/14/17       1,826.00          125.00          195.67          194.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               1,922.00          124.75          196.91          190.05
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,922.00          124.75          196.91          190.05


=============== 203-02324      Blast Vibration Monitoring                   LUMP SUM ===============================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           1.00        29290.80        45000.00        45000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00        29290.80        45000.00        45000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00        29290.80        45000.00        45000.00


=============== 203-02330      Laborer                                      Hour ===================================================


NHPP0702-352                   HLT VMS CMS LUS REPLACEMENT   01/05/17         180.00           45.00           76.00           60.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  77
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 203-02330      Laborer                                      Hour ===================================================
NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17          10.00           60.00           66.24           70.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17          60.00           46.30           60.50           50.00
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17          40.00           50.00           48.84           55.00
STA0931-032                    SH 93 Erosion Correction      02/09/17          40.00           40.00           43.47           22.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17          40.00           50.00           59.17           52.51
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17         100.00           35.00           38.60           35.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17          40.00           45.00           55.13           54.40
SHE160A-031                    SH 160 Passing Lanes          03/02/17          60.00           60.00           55.98           43.75
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17          20.00           60.00           57.60           50.00
NHPP 0701-230                  Midpoint WB Bore              03/02/17          50.00           45.00           52.19           55.60
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17         120.00           40.00           35.22           35.00
ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17          20.00           61.00           61.00           61.00
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17          90.00           50.00           59.90           60.00
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17          20.00           42.00           53.85           45.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 890.00           45.83           51.75           48.86




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17          80.00           50.00           50.40           50.40
NHPP0703-433                   EJMT S Bore Barrier, Handrail 04/13/17          10.00           50.00           50.24           60.00
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17          80.00           40.00           38.06           36.30
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17          32.00           50.00           56.22           48.67
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          50.00           45.00           26.00           26.00
STAR100-255                    R1 FY18 CRACK SEAL            05/11/17           5.00           42.00           49.00           80.00
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17          20.00           50.50           42.97           40.00
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17          20.00           55.00           52.20           50.00
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17          40.00           45.00           51.00           50.00
ER0361-115                     US 36 Bridges                 06/22/17          20.00           45.00           38.57           40.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 357.00           46.41           44.12           43.12




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17          40.00           50.00           46.60           35.00
ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17          10.00           50.00           50.33           46.00
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17          80.00           39.60           58.00           50.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         180.00           42.99           65.00           65.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 310.00           43.25           55.81           56.65




C0702-372                      I-70 GWC Rockfall Fence Impro 10/12/17          20.00           50.00          112.50           50.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17          30.00           40.00           41.67           93.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  78
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 203-02330      Laborer                                      Hour ===================================================
NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17          40.00           42.00           48.64           40.00
NHPP0702-354                   I-70 EAST SIDE VAIL PASS MP 1 12/07/17          40.00           60.00           52.54           87.70
NHPP0702-351                   I-70: HLT GARAGE DOOR REPLACE 12/08/17          50.00           37.48           44.56           44.56
NHPP006A-059                   US 6 CLEAR CREEK CANYON SH 93 12/14/17         120.00           70.00          113.00          131.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 300.00           55.18           74.84           89.49
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,857.00           47.02           54.17           55.62


=============== 206-00000      Str Excav                                    Cubic Yard =============================================


STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17          29.00           25.00           58.63           50.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17       3,152.00           33.00           16.92           15.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17         975.00           35.00           41.50           50.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17          87.00           40.00           37.20           17.00
SHE160A-031                    SH 160 Passing Lanes          03/02/17           5.00          300.00           90.88           50.00
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17           6.00          125.00          149.80           75.00
ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17       1,608.00           55.00           55.00           55.00
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17          96.00           16.00           53.25           40.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               5,958.00           39.37           29.90           38.41




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17       1,490.00           20.00           19.70           13.00
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17         152.00           35.00           43.58           19.75
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17       4,316.00           15.00           12.00           12.00
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17          41.00          150.00          211.80          100.00
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17         639.00           30.00           84.88           80.00
ER0361-115                     US 36 Bridges                 06/22/17       4,389.00           15.00           22.67           24.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              11,027.00           17.32           24.76           21.29




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17       4,125.00           22.00           22.25           17.00
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17         774.00           30.00           37.33           30.00
SHE0141-024                    SH 14 Poudre Canyon Guardrail 07/20/17          27.00           80.00          264.67           25.00
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17       2,472.00           20.00           14.29           18.13
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17          74.00           45.00          243.00          150.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17         353.00           60.00           42.67           67.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17          72.00           60.33          100.00          100.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17         741.00           35.00           19.89           15.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  79
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 206-00000      Str Excav                                    Cubic Yard =============================================
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               8,638.00           25.51           19.77           22.22




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17         220.00           25.00           20.67           27.00
ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17         120.00           25.00           52.14           32.55
BR3852-018                     POA SCOUR US 385
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 340.00           25.00           38.29           28.96
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              25,963.00           25.21           23.34           24.80


=============== 206-00010      Str Excav (Spec)                             Cubic Yard =============================================


NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17       1,046.00           40.00           49.89           50.00
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17       1,559.00           40.00           48.40           52.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               2,605.00           40.00           49.12           51.20




ER0361-115                     US 36 Bridges                 06/22/17      11,003.00           27.00           12.12           19.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              11,003.00           27.00           12.12           19.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              13,608.00           29.49           19.02           25.16


=============== 206-00050      Str Bkfl (Spec)                              Cubic Yard =============================================


NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17       1,666.00           40.00           77.00           50.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               1,666.00           40.00           77.00           50.00




NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17          41.00          350.00          319.20           80.00
ER0361-115                     US 36 Bridges                 06/22/17       3,345.00           65.00           16.99           24.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               3,386.00           68.45           20.04           24.68
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               5,052.00           59.07           36.63           33.03
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  80
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 206-00060      Str Bkfl (Spec) (Flow-Fill)                  Cubic Yard =============================================


STR139A-034                    SH 139 DOUGLAS PASS MP 19.0 - 12/21/17          33.00            0.99          249.38          140.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  33.00            0.99          249.38          140.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  33.00            0.99          249.38          140.00


=============== 206-00065      Str Bkfl (Flow-Fill)                         Cubic Yard =============================================


NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17          10.00          275.00          340.53          200.00
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17         338.00          210.00          289.00          160.00
SHE160A-031                    SH 160 Passing Lanes          03/02/17           9.00          180.00          243.00          200.00
ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17         816.00          328.00          328.00          328.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17          10.00          200.00          408.28          499.37
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17         276.00          155.00          331.80          250.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               1,459.00          265.78          316.74          273.83




STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17           6.00         1000.00          466.50          424.51
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17          15.00          200.00          419.07          336.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17       1,403.00          100.00          105.00          105.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,424.00          104.85          125.10          108.78




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         104.00          345.19          280.00          280.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17          32.00          300.00          196.68          180.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 136.00          334.56          215.68          256.47




ITSSW01-636                    VMS AND LUS UPGRADE FY 17     10/19/17          75.00          175.00          222.00          200.00
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17           6.00          250.00          715.70          750.00
NHPP0702-354                   I-70 EAST SIDE VAIL PASS MP 1 12/07/17          30.00          250.00          382.41          207.03
ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17         164.00          200.00          275.16          359.12
BR3852-018                     POA SCOUR US 385
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 275.00          199.73          278.19          307.66
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               3,294.00          193.53          259.99          204.59
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  81
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 206-00100      Str Bkfl (CL 1)                              Cubic Yard =============================================


STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17           8.00           68.75           90.00           50.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17         408.00           50.00           53.64           45.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17         774.00           60.00           69.05           55.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17          94.00           60.00           69.80           35.00
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17           2.00          100.00          315.80           90.00
ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17         108.00           84.00           84.00           84.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               1,394.00           59.04           66.79           54.36




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17       2,139.00           35.00           38.00           35.55
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17          90.00           70.00          107.22           76.67
ER0361-115                     US 36 Bridges                 06/22/17       1,551.00           50.00           47.97           53.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               3,780.00           41.99           41.16           43.69




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17       1,629.00           35.00           65.70           50.00
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17         415.00           50.00           61.09           57.00
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17       1,290.00           45.00           62.61           58.93
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17          30.00           85.00          281.50          335.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17         311.00           32.00           74.33           51.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         251.00           87.71          250.00          250.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17       1,034.00           55.00           48.97           40.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               4,960.00           45.81           61.05           62.73




STA094A-034                    Critical Culvert Project on S 10/05/17       1,625.00           30.00           33.92           40.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17         320.00           50.00           27.75           23.00
C133A-042                      SH 133 McClure Pass Slip      11/16/17         575.00           90.00          109.30           70.00
ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17         120.00           55.00           75.41           71.68
BR3852-018                     POA SCOUR US 385
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               2,640.00           46.63           55.05           45.91
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              12,774.00           46.29           53.34           52.68


=============== 206-00200      Str Bkfl (CL 2)                              Cubic Yard =============================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17         132.00           40.00           37.98           30.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  82
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 206-00200      Str Bkfl (CL 2)                              Cubic Yard =============================================
STM0243-089                    Midpoint: Station 1019+50 Cen
ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17         279.00           55.00           55.00           55.00
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17          72.00           32.00           61.30           35.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 483.00           47.47           49.92           47.59




ER0361-115                     US 36 Bridges                 06/22/17         108.00           35.00           27.59           18.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 108.00           35.00           27.59           18.00




BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17         136.00           50.00           44.43           58.93
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17          14.00           37.45          150.00          150.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17         386.00           55.00           18.54           15.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 536.00           53.27           26.44           29.67




ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17         444.00           30.00           38.36           28.58
BR3852-018                     POA SCOUR US 385
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 444.00           30.00           38.36           28.58
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,571.00           43.66           32.29           33.48


=============== 206-00360      Mechanical Reinforcement of Soil             Cubic Yard =============================================


STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17         729.00           25.00           36.58           19.46
ER0361-115                     US 36 Bridges                 06/22/17       1,286.00           20.00           17.97           20.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               2,015.00           21.81           27.86           19.80




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17         658.00           25.00           49.30           30.00
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17       1,290.00           20.00           21.74           36.26
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         237.00           32.32           40.00           40.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  83
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 206-00360      Mechanical Reinforcement of Soil             Cubic Yard =============================================
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17       1,034.00           20.00           20.68           20.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               3,219.00           21.93           24.36           30.03
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               5,234.00           21.88           25.55           26.10


=============== 206-00510      Filter Matl (CL A)                           Cubic Yard =============================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17       1,330.00           80.00           63.40           52.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17         137.00           75.00          150.67          132.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17         106.00          120.00           78.50           50.52
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               1,573.00           82.26           71.24           63.90




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17          63.00          100.00           80.36           59.43
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17         784.00           60.00          138.00          150.00
ER0361-115                     US 36 Bridges                 06/22/17       1,652.00           60.00           72.56           78.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               2,499.00           61.01           87.85          100.12




ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17       1,200.00           65.00           80.00          110.00
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17          10.00           96.00          346.50          525.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17         412.00           80.00           71.77           60.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               1,622.00           69.00           76.08           99.86




C133A-042                      SH 133 McClure Pass Slip      11/16/17          32.00          120.00          152.41           32.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17         647.00           95.00           61.30           59.89
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 679.00           96.18           71.91           58.58
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               6,373.00           72.04           80.32           89.34


=============== 206-00520      Filter Matl (CL B)                           Cubic Yard =============================================


NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           8.00          120.00          111.00           70.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  84
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 206-00520      Filter Matl (CL B)                           Cubic Yard =============================================
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17          25.00           70.00          113.35          106.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  33.00           82.12          112.78           97.65




ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17         306.00           68.00           95.67           88.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 306.00           68.00           95.67           88.00




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           1.00          200.00          313.67          240.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   1.00          200.00          313.67          240.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 340.00           69.76           98.87           89.38


=============== 206-01750      Shoring                                      LUMP SUM ===============================================


NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           1.00        10000.00        10440.00        10000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   1.00        10000.00        10440.00        10000.00




STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17           1.00        20000.00        44597.37        56292.12
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17           1.00        45000.00        37809.20         3000.00
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17           1.00        22000.00        14762.50        10000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   3.00        29000.00        31824.01        23097.37




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17           1.00       100000.00       101000.00       125000.00
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17           1.00       110000.00        67899.38        25000.00
ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17           1.00        10000.00        68433.33         1300.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   3.00        73333.33        83090.74        50433.33




C133A-042                      SH 133 McClure Pass Slip      11/16/17           1.00       200000.00       240469.88        70000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   1.00       200000.00       240469.88        70000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   8.00        64625.00        90884.59        37574.02
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  85
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 206-01781      Shoring (A 1)                                LUMP SUM ===============================================


ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17           1.00       155750.00       155750.00       155750.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   1.00       155750.00       155750.00       155750.00




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           1.00        10000.00        22953.66        10725.00
ER0361-115                     US 36 Bridges                 06/22/17           1.00        25000.00        50210.00        15200.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   2.00        17500.00        32039.11        12962.50




STA094A-034                    Critical Culvert Project on S 10/05/17           1.00        10000.00        13316.60        13000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   1.00        10000.00        13316.60        13000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   4.00        50187.50        31756.54        48668.75


=============== 206-01782      Shoring (A 2)                                LUMP SUM ===============================================


STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           1.00        10000.00        21842.16        10725.00
ER0361-115                     US 36 Bridges                 06/22/17           1.00        35000.00        28843.33        13500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   2.00        22500.00        24175.88        12112.50
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00        22500.00        24175.88        12112.50


=============== 206-01783      Shoring (A 3)                                LUMP SUM ===============================================


ER0361-115                     US 36 Bridges                 06/22/17           1.00        25000.00        24689.67         6318.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   1.00        25000.00        24689.67         6318.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00        25000.00        24689.67         6318.00


=============== 207-00205      Topsoil                                      Cubic Yard =============================================


NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17       1,786.00           20.00           52.00           59.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  86
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 207-00205      Topsoil                                      Cubic Yard =============================================
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17      12,996.00           12.00           10.54            5.00
STM0243-089                    Midpoint: Station 1019+50 Cen
IM025A-039                     I-25 Critical Culvert at MP 1 02/09/17         203.00           20.00           41.92           49.23
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17         215.00           25.00           37.80           10.00
SHE160A-031                    SH 160 Passing Lanes          03/02/17       5,063.00           12.00           12.14           15.00
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17         561.00           50.00           69.00           95.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17         411.00           12.00           69.89           53.07
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17          60.00           16.00           51.50           60.00
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17          35.00           11.00           60.00          110.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              21,330.00           13.89           16.15           20.80




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17          52.00           10.00          121.00          121.00
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17       7,744.00           10.00            9.51            8.24
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17       8,070.00           12.50           10.02            4.12
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17          83.00           55.00           93.67          100.00
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17         250.00           15.00           18.61            9.82
STAR400-348                    Region 4 Controller and Cabin 05/04/17           4.00          150.00           97.50          125.00
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17       2,100.00           15.00            6.31            1.25
NHPPC120-026                   US 85: I-76 to 168th          05/04/17      11,610.00           10.00           32.55           20.00
AQC088A-035                    Traffic Signal/Fiber Optic In 05/18/17           5.00          100.00           64.47          100.00
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17       1,650.00           13.00           47.48           47.45
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17         110.00           20.00           23.40           14.00
ER0361-115                     US 36 Bridges                 06/22/17       6,450.00           13.00           16.84           24.00
ER0341-093                     PR US 34 BIG THOMPSON CANYON  06/28/17         940.00           68.00           68.00           68.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              39,068.00           12.98           15.40           16.60




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17       1,076.00           30.00           10.85            5.50
ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17         241.00           14.00           60.00           45.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17         115.00           30.00           60.00           72.00
AQCR100-258                    CDOT TSSIP 2016 SIG UPGRADE F 09/21/17           5.00           75.00          102.67           25.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               1,437.00           27.47           19.19           17.51




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17         654.00           15.00           24.50           26.50
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17         637.00           20.00           28.25           27.74
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               1,291.00           17.47           26.35           27.11
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              63,126.00           13.71           15.83           17.96
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  87
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 207-00210      Stockpile Topsoil                            Cubic Yard =============================================


SHE160A-031                    SH 160 Passing Lanes          03/02/17         815.00            7.00            9.18           10.00
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17          60.00            9.00           26.01           26.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 875.00            7.14            9.92           11.10




STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17         250.00           15.00           16.07           12.22
STAR400-348                    Region 4 Controller and Cabin 05/04/17         109.00           25.00          110.00          150.00
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17       2,100.00           10.00            4.19            1.25
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17         110.00           15.00           10.51            7.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               2,569.00           11.34            7.76            8.88




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17       1,076.00           15.00            7.85            3.50
ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17          41.00            7.00           36.33           45.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               1,117.00           14.71            8.49            5.02
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               4,561.00           11.36            8.60            8.36


=============== 207-00305      Wetland Topsoil                              Cubic Yard =============================================


NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17          95.00           25.00           52.60           40.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  95.00           25.00           52.60           40.00




STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17          13.00           30.00           36.90           42.71
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  13.00           30.00           36.90           42.71




ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17          12.00           30.00          128.33           50.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  12.00           30.00          128.33           50.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 120.00           26.04           56.44           41.29
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  88
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 207-00310      Stockpile Wetland Topsoil                    Cubic Yard =============================================


STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17          13.00           45.00           33.57           42.71
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  13.00           45.00           33.57           42.71




ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17          12.00           30.00           78.33           50.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17          11.00           20.00          181.00          178.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  23.00           25.22          127.43          111.22
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  36.00           32.36           93.54           86.48


=============== 207-00405      Topsoil (Spec)                               Cubic Yard =============================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17      69,446.00           40.84           48.00           48.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER              69,446.00           40.84           48.00           48.00




CC0341-100                     US 34 BIG THOMPSON CANYON MOO 12/11/17       1,722.00           20.89           34.67           34.67
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               1,722.00           20.89           34.67           34.67
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              71,168.00           40.36           47.68           47.68


=============== 208-00001      Silt Dike                                    Lin Foot ===============================================


STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17         615.00           10.00           10.16            9.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 615.00           10.00           10.16            9.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 615.00           10.00           10.16            9.00


=============== 208-00002      Erosion Log Type 1 (12 In)                   Lin Foot ===============================================


NHPP1602-145                   US 160 S. Fork to Monte Vista 01/12/17          50.00            8.00            4.75            4.50
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  89
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00002      Erosion Log Type 1 (12 In)                   Lin Foot ===============================================
NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17       2,240.00            4.00            5.00            4.99
NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17       1,500.00            5.00            6.06            8.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17       2,000.00            4.50            3.64            3.25
STM0243-089                    Midpoint: Station 1019+50 Cen
STA0931-032                    SH 93 Erosion Correction      02/09/17         530.00            5.00            5.33            3.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17       1,200.00            5.00            4.85            3.52
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17       6,900.00            5.00            4.36            3.77
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17       4,610.00            5.00            5.53            4.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17       1,000.00            3.50            4.12            3.77
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17          30.00            5.00            6.56            6.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17       1,170.00            5.00            3.90            4.10
BR0252-449                     I-25 Woodmen NB               03/02/17         330.00            5.00            7.50            6.00
STA2873-183                    US 287 Repairs at LCR 17      03/09/17       3,000.00            6.50            6.83            2.50
ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17         250.00            9.00            9.00            9.00
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17         140.00           15.00            9.13           12.00
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17          80.00            4.50           17.00           15.00
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17       2,000.00            9.00            7.36            6.90
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              27,030.00            5.38            5.32            4.38




STA006A-057                    SH 6 EAST OF STERLING         04/06/17         300.00            5.00            5.38            5.50
STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17         200.00            4.00            5.96            4.88
NHPP0703-433                   EJMT S Bore Barrier, Handrail 04/13/17         300.00           10.00            7.84            6.00
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17       5,000.00            5.00            3.49            3.15
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17          60.00           25.00           21.00           12.00
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17         134.00            5.00            5.53            5.09
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17       1,000.00            5.00            4.60            4.60
STAR400-348                    Region 4 Controller and Cabin 05/04/17         540.00            7.00           21.50            8.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17       1,000.00            5.00            7.21            8.00
STM0211-026                    SH21 AND MESA RIDGE PKWY SIGN 05/18/17         100.00            7.00           10.50            8.00
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17         216.00            4.50            4.17            3.20
STA0703-437                    I-70: 32ND TO 44TH            06/01/17         100.00            5.00           14.32           16.00
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17         140.00            5.00            9.68           20.00
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17       1,000.00            8.00            9.41           20.00
ER0361-115                     US 36 Bridges                 06/22/17       8,057.00            5.00            4.17            3.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              18,147.00            5.37            4.80            5.10




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17         500.00            5.00            6.10            5.00
NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17          30.00            8.00           11.50           11.50
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17       1,600.00            5.00            4.58            4.50
CR100-283                      REGION 1 TRAFFIC SIGNAL CONTR 07/20/17         100.00            5.00           10.19           15.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  90
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00002      Erosion Log Type 1 (12 In)                   Lin Foot ===============================================
SHE0141-024                    SH 14 Poudre Canyon Guardrail 07/20/17         800.00           10.00            6.17            5.50
ITS0761-227                    ITS FIBER OPTICS ON I76 DENVE 07/27/17       2,000.00            8.00            4.34            4.50
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17       5,639.00            5.25            4.04            4.25
ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17         660.00            5.00            6.00            5.50
IM0762-052                     FIBER OPTICS AND ITS DEVICES  08/03/17         700.00            5.00            5.15            4.50
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17       1,000.00            6.60           12.00           13.50
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17       1,509.00            4.82            6.58            6.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17       2,500.00           13.15           13.00           13.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17       9,497.00            6.00            4.23            4.00
BRR400-354                     Little-T Channel Work and SH
NHPP0821-108                   SH 82 MP 45 OLVDS             09/07/17         400.00           10.00            8.67            5.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER              26,935.00            6.66            4.51            5.60




ITSSW01-636                    VMS AND LUS UPGRADE FY 17     10/19/17         200.00            5.00            7.57            5.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17       3,820.00            5.00            3.23            4.40
C133A-042                      SH 133 McClure Pass Slip      11/16/17         520.00            8.00            6.33            6.00
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17      12,493.00            5.00            5.29            4.75
ITSSW01-831                    ITS WEATHER STATION UPGRADES  11/30/17         300.00            5.00           16.78            5.00
ITSSW02-003                    ITS FIBER INSTALLATIONS FOR H 11/30/17         800.00            5.00            5.94            6.50
NHPP0702-354                   I-70 EAST SIDE VAIL PASS MP 1 12/07/17         100.00            6.00            9.47           10.35
CC0341-100                     US 34 BIG THOMPSON CANYON MOO 12/11/17       2,090.00            8.51            7.00            7.00
NHPP006A-059                   US 6 CLEAR CREEK CANYON SH 93 12/14/17         600.00            8.00           13.80            9.40
ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17       4,810.00            5.00            4.71            3.62
BR3852-018                     POA SCOUR US 385
STA050A-027                    US 50C Storm Sewer 21st LANE  12/21/17          90.00            5.00            8.29           13.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER              25,823.00            5.42            5.34            4.91
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              97,935.00            5.74            4.90            5.00


=============== 208-00004      Silt Berm                                    Lin Foot ===============================================


STA0931-032                    SH 93 Erosion Correction      02/09/17         120.00           13.00           16.08           10.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 120.00           13.00           16.08           10.00




STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17         615.00            6.00           10.16            9.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 615.00            6.00           10.16            9.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 735.00            7.14           12.34            9.16
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  91
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00007      Erosion Log Type 2 (8 In)                    Lin Foot ===============================================


STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17       1,300.00           10.00            5.16            3.03
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17         216.00            6.00            6.00            5.40
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,516.00            9.43            5.18            3.37
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,516.00            9.43            5.18            3.37


=============== 208-00008      Erosion Log Type 2 (12 In)                   Lin Foot ===============================================


SHE160A-031                    SH 160 Passing Lanes          03/02/17      16,045.00            4.00            5.07            5.97
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              16,045.00            4.00            5.07            5.97




STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17         130.00            8.00            8.81            6.00
STA0061-091                    SH 6 CHIPSEAL NEAR FLEMING    06/15/17         100.00            9.00            9.53            3.60
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 230.00            8.43            9.04            4.96




ITSSW01-834                    ITS CAMERA PROJECT FY17       07/13/17         300.00            8.00            7.50           10.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 300.00            8.00            7.50           10.00




IM025A-037                     I25 S. Trinidad Resurface and 11/30/17          80.00            9.00            6.33            5.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  80.00            9.00            6.33            5.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              16,655.00            4.16            5.12            6.02


=============== 208-00009      Erosion Log Type 2 (18 In)                   Lin Foot ===============================================


NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17         225.00            8.00            8.94            8.00
IM025A-039                     I-25 Critical Culvert at MP 1 02/09/17         730.00            7.50            8.45            7.51
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 955.00            7.62            8.57            7.63
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  92
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00009      Erosion Log Type 2 (18 In)                   Lin Foot ===============================================




STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17         216.00            6.75           12.55           11.40
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 216.00            6.75           12.55           11.40




ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17         390.00           10.00           14.50           12.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 390.00           10.00           14.50           12.00




STA094A-034                    Critical Culvert Project on S 10/05/17         240.00            6.00           12.53            4.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17          40.00           10.00           10.00            7.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 280.00            6.57           12.37            4.43
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,841.00            7.86           10.10            8.51


=============== 208-00011      Erosion Bales (Weed Free)                    Each ===================================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17          40.00           23.00           19.82           16.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17          40.00           15.00           23.34           23.18
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17         193.00           24.00           29.20           26.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 273.00           22.53           27.55           24.76




BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17          40.00           20.00           28.50           30.00
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17          13.00           17.00           23.61           18.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  53.00           19.26           27.82           27.06
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 326.00           22.00           27.59           25.16


=============== 208-00012      Erosion Log Type 1 (9 In)                    Lin Foot ===============================================


STA0362-035                    US 36: Strasburg to Byers     03/23/17         350.00           10.00           14.38            6.49
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 350.00           10.00           14.38            6.49
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  93
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00012      Erosion Log Type 1 (9 In)                    Lin Foot ===============================================




STA0072-019                    SH 7 FROM US 287 TO 75TH STRE 06/22/17       2,080.00            6.00            5.32            3.10
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               2,080.00            6.00            5.32            3.10
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               2,430.00            6.58            6.15            3.59


=============== 208-00013      Erosion Log Type 1 (20 In)                   Lin Foot ===============================================


STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17       2,900.00            8.00            7.06           10.00
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17       1,465.00           10.00            8.61            5.30
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               4,365.00            8.67            7.66            8.42




BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17          45.00            8.00            9.71           10.20
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  45.00            8.00            9.71           10.20
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               4,410.00            8.66            7.72            8.44


=============== 208-00015      Sand Bag                                     Each ===================================================


STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17          50.00           22.00            6.08            5.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  50.00           22.00            6.08            5.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  50.00           22.00            6.08            5.00


=============== 208-00019      Silt Fence (Reinforced)(Special)             Lin Foot ===============================================


ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17       1,020.00           60.00           60.00           60.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               1,020.00           60.00           60.00           60.00




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         237.00           67.89           65.00           65.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 237.00           67.89           65.00           65.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,257.00           61.49           60.94           60.94
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  94
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00020      Silt Fence                                   Lin Foot ===============================================


NHPP1602-145                   US 160 S. Fork to Monte Vista 01/12/17         500.00            2.00            2.01            1.75
NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17       1,955.00            3.00            2.60            2.20
NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17         250.00            3.00            3.91            5.75
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17      40,000.00            1.50            1.24            1.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17       6,900.00            2.00            2.72            3.07
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17       1,200.00            2.00            2.28            1.87
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17         650.00            5.00            3.11            3.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              51,455.00            1.69            1.52            1.65




STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17         200.00            2.00            2.42            2.10
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17       6,900.00            2.00            1.63            1.38
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17       5,000.00            1.40            1.22            1.05
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17         124.00           20.00           15.00            4.00
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17         100.00            5.00            2.65            2.36
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17       1,230.00            1.25            1.48            1.10
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17         520.00            2.50            2.56            2.50
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17         300.00            5.00            6.56           15.00
MTCE142A-002                   SH 142 CHIPSEAL               06/22/17         500.00            2.00            1.00            1.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              14,874.00            1.98            1.67            1.59




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17       3,000.00            2.00            2.64            2.00
ITSSW01-834                    ITS CAMERA PROJECT FY17       07/13/17         300.00            1.50            9.00           13.00
CR100-283                      REGION 1 TRAFFIC SIGNAL CONTR 07/20/17          50.00            2.00            6.19            7.00
ITS0761-227                    ITS FIBER OPTICS ON I76 DENVE 07/27/17       2,000.00            4.00            5.60            3.50
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17         250.00            4.00            7.60            8.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               5,600.00            2.78            4.02            3.44




STA094A-034                    Critical Culvert Project on S 10/05/17         325.00            2.00            3.19            1.00
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17      12,493.00            1.25            2.36            2.00
CC0341-100                     US 34 BIG THOMPSON CANYON MOO 12/11/17       1,262.00            5.32            5.00            5.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER              14,080.00            1.63            2.44            2.25
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              86,009.00            1.80            1.90            1.92
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  95
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00021      Silt Fence (Reinf)                           Lin Foot ===============================================


NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17         900.00           10.00            4.46            2.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 900.00           10.00            4.46            2.50
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 900.00           10.00            4.46            2.50


=============== 208-00023      Erosion Log (Type 3)(12 In)                  Lin Foot ===============================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17      67,202.00            5.90            7.00            7.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17       6,358.00            7.00            5.14            4.50
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER              73,560.00            6.00            6.05            6.78
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              73,560.00            6.00            6.05            6.78


=============== 208-00024      Erosion Log (Type 3)(20 In)                  Lin Foot ===============================================


BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17       1,410.00           10.00            9.38            9.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,410.00           10.00            9.38            9.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,410.00           10.00            9.38            9.00


=============== 208-00026      Coir Roll                                    Lin Foot ===============================================


ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17         512.00           15.00           14.94           15.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 512.00           15.00           14.94           15.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 512.00           15.00           14.94           15.00


=============== 208-00033      Sediment Trap                                Each ===================================================


SHE160A-031                    SH 160 Passing Lanes          03/02/17           2.00          200.00         1744.94         2875.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   2.00          200.00         1744.94         2875.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00          200.00         1744.94         2875.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  96
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00035      Aggregate Bag                                Lin Foot ===============================================


NHPP0702-352                   HLT VMS CMS LUS REPLACEMENT   01/05/17         150.00            8.00           25.00           30.00
NHPP1602-145                   US 160 S. Fork to Monte Vista 01/12/17          80.00           15.00            6.84            7.75
NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17         564.00            7.50           10.54            7.60
NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17         760.00            2.00            6.96            6.92
NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17         200.00            5.00            7.68            7.65
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17       1,570.00            8.00            6.68            8.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17         100.00            6.50            8.44            8.50
STM0243-089                    Midpoint: Station 1019+50 Cen
MTCER100-274                   MTCE R1 FY 17 SH 119 Signing  01/26/17         200.00            7.00           10.25           10.00
STA0931-032                    SH 93 Erosion Correction      02/09/17         300.00           10.00            7.75            5.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17         200.00            9.00            7.32            5.36
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17         120.00           10.00            9.55            6.15
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17         224.00           12.00            8.89            8.25
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17         100.00            8.00            6.66            6.79
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17         213.00           10.00           10.17           15.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17         174.00            7.50            8.90           17.75
BR0252-449                     I-25 Woodmen NB               03/02/17         100.00           10.00           12.75            7.00
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17         200.00            9.00            8.13           10.08
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17         200.00            8.00           14.50           19.30
ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17         120.00            7.00            7.00            7.00
STA0243-087                    US 24 El Paso-Elbert CL Pavin 03/23/17         500.00            8.00            6.98            6.20
STA0362-035                    US 36: Strasburg to Byers     03/23/17          20.00            8.00           23.50           26.53
MTCE2873-191                   R4 FY 17 Stencils #1          03/23/17         200.00           10.00           19.17            7.50
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17         120.00           10.00            9.87            5.00
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17          62.00            8.00           20.67           21.00
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17          30.00           71.00           29.54            8.20
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               6,507.00            7.98            8.94            8.98




STA006A-057                    SH 6 EAST OF STERLING         04/06/17         100.00            7.51            8.41            5.25
STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17         700.00           10.00           10.90           10.90
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17          70.00           10.00           17.12           15.60
NHPP0703-433                   EJMT S Bore Barrier, Handrail 04/13/17         500.00           10.00           12.08            7.00
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17         300.00            8.00           13.15           13.50
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17         400.00           10.00            6.73            5.52
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17         150.00            7.50            5.55            5.25
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17         540.00           25.00           22.33           14.00
NHPP0704-240                   Package C (I-70 and I-25) Bri 04/27/17         125.00           11.00           18.13            9.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17         100.00           10.00            4.30            4.30
STAR400-348                    Region 4 Controller and Cabin 05/04/17         204.00           10.00           23.50            6.00
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17         300.00            8.00            7.63            6.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17         500.00           10.00            8.19            4.00
STM0211-026                    SH21 AND MESA RIDGE PKWY SIGN 05/18/17         200.00           15.00           12.50            7.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  97
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00035      Aggregate Bag                                Lin Foot ===============================================
AQC088A-035                    Traffic Signal/Fiber Optic In 05/18/17         540.00           11.00            5.76            9.25
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17          25.00            9.00            6.76            4.80
STA0703-437                    I-70: 32ND TO 44TH            06/01/17         100.00            9.00           25.39           27.00
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17          36.00           20.00           15.55           27.00
STA0061-091                    SH 6 CHIPSEAL NEAR FLEMING    06/15/17         100.00            7.60           10.33            3.00
MTCE141A-048                   SH 141A WHITEWATER IN MESA CO 06/15/17         400.00           10.00            3.00            3.00
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17         100.00           10.00           15.43           25.00
STA0072-019                    SH 7 FROM US 287 TO 75TH STRE 06/22/17          80.00           10.00            9.54            6.70
ER0361-115                     US 36 Bridges                 06/22/17          56.00            8.00            9.69           10.00
ER0341-093                     PR US 34 BIG THOMPSON CANYON  06/28/17         375.00           12.00           12.00           12.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               6,001.00           11.43           10.82            8.95




ITSSW01-834                    ITS CAMERA PROJECT FY17       07/13/17         200.00            8.00            7.50           10.00
NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17         700.00            8.00            7.80            7.00
NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17         100.00           10.00           12.00           12.00
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17         200.00           10.00            5.00            3.00
CR100-283                      REGION 1 TRAFFIC SIGNAL CONTR 07/20/17         150.00           10.00           14.27           22.00
SHE0141-024                    SH 14 Poudre Canyon Guardrail 07/20/17          30.00            7.00            9.83           10.50
ITS0761-227                    ITS FIBER OPTICS ON I76 DENVE 07/27/17         500.00           10.00            6.63            7.50
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17         500.00            8.00            6.74            7.37
IM0762-052                     FIBER OPTICS AND ITS DEVICES  08/03/17         700.00           10.00            7.28            7.50
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17       1,000.00           13.20            9.63            7.85
MTCE131A-039                   SH 131 MP 0.053-68.721 IN EAG 08/17/17         400.00           10.00            7.33           13.00
NHPPR100-291                   I-225 SB RESTRIPING I-25 TO Y 08/31/17          12.00            8.00           32.50           40.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17       9,060.00           10.88           12.00           12.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17         421.00            7.50            6.93            5.00
BRR400-354                     Little-T Channel Work and SH
NHPP0821-108                   SH 82 MP 45 OLVDS             09/07/17         540.00           12.00           13.02            6.05
AQCR100-258                    CDOT TSSIP 2016 SIG UPGRADE F 09/21/17          16.00           12.00           18.67           15.00
SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17         648.00            9.00           12.00           10.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER              15,177.00           10.51            9.09           10.50




ITSSW01-636                    VMS AND LUS UPGRADE FY 17     10/19/17         100.00            8.00           13.02            5.00
CR100-286                      R1 CURB RAMPS-PH 1            10/26/17         200.00           12.00           19.00            8.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17         254.00            9.00            2.97            3.40
C133A-042                      SH 133 McClure Pass Slip      11/16/17         200.00           10.00            8.17            8.00
STRR300-228                    SH 13 R3 VARIOUS CHIP SEALS   11/30/17         400.00           10.00            6.75            5.00
NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17         500.00           20.00            6.58            6.90
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17         512.00            8.00           10.00           10.00
ITSSW01-831                    ITS WEATHER STATION UPGRADES  11/30/17         100.00           10.00           22.65            9.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  98
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00035      Aggregate Bag                                Lin Foot ===============================================
ITSSW02-003                    ITS FIBER INSTALLATIONS FOR H 11/30/17         232.00            8.00            6.75            6.00
MTCE092A-027                   MTCE R3 FY18 SH 92 STR I-06-A 12/07/17          50.00            8.00            5.83            3.00
NHPP0702-354                   I-70 EAST SIDE VAIL PASS MP 1 12/07/17         100.00            9.00           10.24           20.70
NHPP006A-059                   US 6 CLEAR CREEK CANYON SH 93 12/14/17         600.00           12.00           18.17           15.50
STR139A-034                    SH 139 DOUGLAS PASS MP 19.0 - 12/21/17         200.00            5.00            8.69            5.00
STA050A-027                    US 50C Storm Sewer 21st LANE  12/21/17         300.00           10.00            7.33            4.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               3,748.00           10.92            9.58            8.31
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              31,433.00           10.21            9.51            9.63


=============== 208-00036      Aggregate Bag (Special)                      Lin Foot ===============================================


ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17         200.00           15.00           15.00           15.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 200.00           15.00           15.00           15.00




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17      43,695.00           13.73           15.00           15.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER              43,695.00           13.73           15.00           15.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              43,895.00           13.74           15.00           15.00


=============== 208-00041      Rock Check Dam                               Each ===================================================


NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17          20.00          800.00          130.15          250.00
STA0931-032                    SH 93 Erosion Correction      02/09/17          49.00          750.00          785.00          670.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           2.00          500.00          385.60          108.00
ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17           4.00         1050.00         1050.00         1050.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  75.00          772.67          701.30          563.28




STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17          10.00          200.00          711.40          750.00
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17          10.00           75.00          669.71          669.31
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17           1.00          500.00         1297.60         1500.00
ER0361-115                     US 36 Bridges                 06/22/17           5.00          450.00         1018.33         1550.00
ER0341-093                     PR US 34 BIG THOMPSON CANYON  06/28/17           5.00         2303.00         2303.00         2303.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  31.00          548.87          886.52         1127.68
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018  99
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00041      Rock Check Dam                               Each ===================================================




ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17           1.00         3500.00         1216.67          750.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         330.00          545.98          700.00          700.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17           3.00          750.00         1619.34          542.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 334.00          556.66          787.13          698.73




CC0341-100                     US 34 BIG THOMPSON CANYON MOO 12/11/17           1.00         6318.00         3850.00         3850.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   1.00         6318.00         3850.00         3850.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 441.00          605.91          767.89          712.99


=============== 208-00045      Conc Washout Str                             Each ===================================================


NHPP1602-145                   US 160 S. Fork to Monte Vista 01/12/17           1.00         1500.00          948.75          950.00
NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17           4.00         1500.00         2137.70          966.00
NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17           3.00         1000.00         1036.50          973.00
NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17           2.00         2000.00         2524.08         3000.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17           4.00         1000.00         1639.14          800.00
STM0243-089                    Midpoint: Station 1019+50 Cen
MTCER100-274                   MTCE R1 FY 17 SH 119 Signing  01/26/17           4.00         1100.00         1000.00          500.00
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17           1.00         2000.00         1802.58         2000.00
IM025A-039                     I-25 Critical Culvert at MP 1 02/09/17           1.00         1500.00         1453.91         1760.90
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17           1.00          850.00         5479.87         5034.62
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17           3.00         2000.00          903.33         1480.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           2.00          700.00         1156.00          900.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17           1.00          800.00         1665.18          935.35
SHE160A-031                    SH 160 Passing Lanes          03/02/17           2.00         1320.00         2130.46         1000.00
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17           1.00         4400.00         1360.00          800.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17           2.00         1200.00         1104.00         1300.00
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17           2.00         1500.00         2006.67         1120.00
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17           2.00         1117.61         1804.93         1700.00
ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17           1.00        59200.00        59200.00        59200.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17           1.00         1500.00         4253.49         1140.73
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17           3.00         1500.00          743.33         1200.00
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17           1.00         2050.00         1598.75         1771.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  42.00         2794.65         1994.54         2751.39
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 100
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00045      Conc Washout Str                             Each ===================================================




STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17           6.00         2000.00          884.14          802.43
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           4.00         1500.00         1654.73          736.14
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17           4.00         1250.00         1352.00          750.00
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17           5.00         4000.00         2951.67         1200.00
NHPP0704-240                   Package C (I-70 and I-25) Bri 04/27/17           2.00         1500.00         1662.50         1500.00
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17           1.00         1650.00         1625.92         1047.75
NHPPC120-026                   US 85: I-76 to 168th          05/04/17           4.00         1500.00         1558.03         1400.00
AQC088A-035                    Traffic Signal/Fiber Optic In 05/18/17           1.00         2000.00          291.00          400.00
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17           1.00          799.99          895.51          894.94
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17           1.00         2000.00         2280.00         2000.00
MTCE0253-259                   I25 FROM MP 229.29 TO MP 244. 06/22/17           1.00         1400.00         1000.00          500.00
STA0072-019                    SH 7 FROM US 287 TO 75TH STRE 06/22/17           2.00         1000.00          708.80          262.00
ER0361-115                     US 36 Bridges                 06/22/17           8.00         1500.00         1088.33          850.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  40.00         1846.25         1437.75          938.15




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17           2.00         2000.00         1540.00         1000.00
ITSSW01-834                    ITS CAMERA PROJECT FY17       07/13/17          10.00         1200.00          553.50          607.00
SHE0141-024                    SH 14 Poudre Canyon Guardrail 07/20/17           1.00         2500.00         2433.33         1000.00
ITS0761-227                    ITS FIBER OPTICS ON I76 DENVE 07/27/17           4.00         1600.00          493.50          400.00
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17           1.00         1250.00         2329.59         1699.83
IM0762-052                     FIBER OPTICS AND ITS DEVICES  08/03/17           2.00         1090.00          652.00          500.00
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17           3.00         6050.00          897.00          450.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17           1.00         1200.00         1690.33         2221.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           2.00        83097.41        80000.00        80000.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17           2.00         1500.00         1294.16          500.00
BRR400-354                     Little-T Channel Work and SH
AQCR100-258                    CDOT TSSIP 2016 SIG UPGRADE F 09/21/17           1.00          700.00          284.00            1.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  29.00         7502.58         2469.52         6135.93




STA094A-034                    Critical Culvert Project on S 10/05/17           1.00         1250.00         1296.65         1900.00
ITSSW01-636                    VMS AND LUS UPGRADE FY 17     10/19/17           8.00          500.00          783.17          500.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           3.00         1500.00         1273.67          820.00
C133A-042                      SH 133 McClure Pass Slip      11/16/17           1.00         1600.00         2092.13         2500.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17           1.00         1460.00         2707.50         1522.50
NHPP0702-354                   I-70 EAST SIDE VAIL PASS MP 1 12/07/17           1.00         4000.00         3310.55         1552.74
NHPP0702-351                   I-70: HLT GARAGE DOOR REPLACE 12/08/17           1.00         3825.25         3300.00         3300.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 101
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00045      Conc Washout Str                             Each ===================================================
ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17           6.00         1500.00         1523.42          878.93
BR3852-018                     POA SCOUR US 385
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  22.00         1347.06         1356.32         1023.13
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 133.00         3296.51         1770.18         2656.73


=============== 208-00046      Pre-fab Conc Washout Str                     Each ===================================================


NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17           5.00         2000.00         3048.88         1860.00
NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17           1.00         1000.00         1022.50          500.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17          10.00         1500.00          963.75         1200.00
STA0931-032                    SH 93 Erosion Correction      02/09/17           1.00         1650.00         1134.50          750.00
BR0252-449                     I-25 Woodmen NB               03/02/17           2.00         2000.00         1187.50         1250.00
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17           2.00         2000.00         1986.80         1500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  21.00         1697.62         1512.38         1335.71




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17           3.00         2500.00         6460.00         6460.00
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17           3.00         2200.00         2214.13         1510.00
NHPP0703-433                   EJMT S Bore Barrier, Handrail 04/13/17           2.00         3000.00         1573.17         2250.00
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17           2.00         1805.00         2147.83         2170.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           4.00         2000.00         1200.00         1200.00
STAR400-348                    Region 4 Controller and Cabin 05/04/17           5.00          700.00          280.00          150.00
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17           4.00         2000.00         1352.50         1000.00
STA0703-437                    I-70: 32ND TO 44TH            06/01/17           2.00         2500.00         3465.48         6200.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  25.00         1928.40         1850.53         2188.00




MTCE0762-054                   REGION 4 MTCE SECT1 I76 FORT  07/06/17           1.00         1500.00         2284.37         2500.00
NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17           3.00         1500.00          850.00          500.00
NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17           2.00         2500.00         3125.00         3125.00
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17           2.00         1600.00         1110.93         2100.00
CR100-283                      REGION 1 TRAFFIC SIGNAL CONTR 07/20/17           1.00         2200.00          495.00          445.00
CR100-292                      I25/ORCHARD EMERGENCY REPAIR  08/21/17           1.00            1.00          263.00          525.00
NHPP0821-108                   SH 82 MP 45 OLVDS             09/07/17           1.00         1000.00         1268.33          705.00
SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17           2.00         1400.00         1679.40         2100.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  13.00         1553.92         1535.96         1563.46




C0702-372                      I-70 GWC Rockfall Fence Impro 10/12/17           2.00         5000.00         2775.00         1800.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 102
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00046      Pre-fab Conc Washout Str                     Each ===================================================
CR100-286                      R1 CURB RAMPS-PH 1            10/26/17           1.00         2500.00         2100.00         1200.00
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17           2.00         2500.00         2019.62          900.00
ITSSW01-831                    ITS WEATHER STATION UPGRADES  11/30/17          14.00          250.00          749.00          600.00
ITSSW02-003                    ITS FIBER INSTALLATIONS FOR H 11/30/17           3.00         1600.00          473.75          500.00
MTCE092A-027                   MTCE R3 FY18 SH 92 STR I-06-A 12/07/17           1.00         1500.00         1553.33          460.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  23.00         1186.96          972.98          737.39
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  82.00         1601.96         1409.02         1463.84


=============== 208-00051      Storm Drain Inlet Protection (Type I)        Lin Foot ===============================================


NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17         300.00           20.00           12.85           20.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17          18.00           25.00           27.71           50.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17         160.00           20.00            8.10            5.36
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17          14.00           20.00           15.87            9.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17          20.00           10.00            8.24            9.00
BR0252-449                     I-25 Woodmen NB               03/02/17          24.00           10.00           31.25           20.00
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17         300.00           15.00           14.78           19.00
MTCE2873-191                   R4 FY 17 Stencils #1          03/23/17         100.00           12.00           26.67           10.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 936.00           17.17           15.03           16.29




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17          70.00           10.00           15.20           15.20
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17          20.00           11.00           24.83           22.60
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17          20.00           20.00           14.80           14.29
NHPP0704-240                   Package C (I-70 and I-25) Bri 04/27/17         100.00           11.00           21.81           12.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          55.00           20.00            4.75            4.75
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17           7.00          150.00           13.54           12.50
ER0361-115                     US 36 Bridges                 06/22/17         259.00           10.00            6.65            6.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 531.00           13.48           10.58            9.24




NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17          60.00           20.00           26.00           26.00
CR100-283                      REGION 1 TRAFFIC SIGNAL CONTR 07/20/17         100.00           12.00           17.88           25.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 160.00           15.00           19.75           25.38




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17         121.00           15.00            2.97            3.40
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 103
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00051      Storm Drain Inlet Protection (Type I)        Lin Foot ===============================================
STA050A-027                    US 50C Storm Sewer 21st LANE  12/21/17          84.00           13.00           10.08            7.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 205.00           14.18            7.10            4.88
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,832.00           15.58           12.61           13.76


=============== 208-00052      Storm Drain Inlet Protection (Type II)       Lin Foot ===============================================


NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17         300.00           50.00           61.24           37.50
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17           2.00           40.00          149.60          200.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17          80.00           30.00           35.59           31.06
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17          50.00           35.00           10.62            5.15
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17         350.00           22.64           52.10           19.00
MTCE2873-191                   R4 FY 17 Stencils #1          03/23/17         100.00           45.00           61.67           15.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 882.00           35.89           51.30           25.56




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17         350.00           50.00           58.00           58.00
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17         325.00           50.00           60.26           55.00
STA0703-437                    I-70: 32ND TO 44TH            06/01/17          10.00           55.00           99.40          110.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 685.00           50.07           61.00           57.34




NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17          60.00           55.00           30.00           30.00
CR100-283                      REGION 1 TRAFFIC SIGNAL CONTR 07/20/17         100.00           50.00           46.38           82.00
AQCR100-258                    CDOT TSSIP 2016 SIG UPGRADE F 09/21/17          42.00           55.00           53.67           25.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 202.00           52.52           46.21           54.70




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           6.00           25.00           25.75           26.25
NHPP0702-351                   I-70: HLT GARAGE DOOR REPLACE 12/08/17          52.00           23.10           27.43           27.43
STA050A-027                    US 50C Storm Sewer 21st LANE  12/21/17          24.00           50.00           62.00           25.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  82.00           31.11           50.55           26.63
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,851.00           42.74           52.98           40.55


=============== 208-00053      Storm Drain Inlet Protect (Ty I)(84 In)      Each ===================================================


NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17           3.00          250.00          311.30          275.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 104
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00053      Storm Drain Inlet Protect (Ty I)(84 In)      Each ===================================================
STA0362-035                    US 36: Strasburg to Byers     03/23/17           1.00         1000.00         1495.39          383.30
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   4.00          437.50          459.31          302.08




STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17           2.00           20.00          250.27          230.00
STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17          10.00          300.00          225.39          211.18
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17         300.00           20.00          106.38           50.00
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           1.00           55.00          333.73          347.59
NHPPC120-026                   US 85: I-76 to 168th          05/04/17           5.00          100.01          222.21          350.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 318.00           30.17          115.34           61.85




ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17           1.00          750.00          213.48          216.00
BRR400-354                     Little-T Channel Work and SH
SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17          27.00          120.00          234.00          310.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  28.00          142.50          232.45          306.64




CR100-286                      R1 CURB RAMPS-PH 1            10/26/17           6.00          120.00          337.50          175.00
ITSSW02-003                    ITS FIBER INSTALLATIONS FOR H 11/30/17          13.00          250.00          165.00          100.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  19.00          208.95          197.34          123.68
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 369.00           52.32          140.95           86.22


=============== 208-00054      Storm Drain Inlet Protection (Type II)       Each ===================================================


NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17         162.00           40.00          162.65          131.00
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17          33.00          250.00          193.67          216.00
NHPP 0701-230                  Midpoint WB Bore              03/02/17           6.00           53.50          220.33           64.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 201.00           74.88          169.46          142.96




STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17         150.00           50.00          328.38          130.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 105
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00054      Storm Drain Inlet Protection (Type II)       Each ===================================================
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17           4.00          400.00          398.33          360.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17           5.00          100.01          412.13          550.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 159.00           60.38          332.78          148.99




CR100-286                      R1 CURB RAMPS-PH 1            10/26/17           6.00          250.00          387.50          275.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   6.00          250.00          387.50          275.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 366.00           71.45          243.20          147.74


=============== 208-00055      Rigid Inlet Prot Device                      Each ===================================================


STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17           4.00          165.00          249.09          230.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   4.00          165.00          249.09          230.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   4.00          165.00          249.09          230.00


=============== 208-00056      Storm Drain Inlet Protection (Type III)      Each ===================================================


STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17           2.00           50.00          484.50          800.00
STA0931-032                    SH 93 Erosion Correction      02/09/17           1.00         1250.00          383.00          150.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   3.00          450.00          441.00          583.33




NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           4.00          300.00          150.00          150.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   4.00          300.00          150.00          150.00




ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17           8.00          350.00          178.33          148.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   8.00          350.00          178.33          148.00




CR100-286                      R1 CURB RAMPS-PH 1            10/26/17           6.00          500.00          400.00          300.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 106
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00056      Storm Drain Inlet Protection (Type III)      Each ===================================================
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17         155.00          250.00          467.06          300.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 161.00          259.32          466.04          300.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 176.00          267.61          435.88          294.51


=============== 208-00060      Temporary Slope Drain                        Lin Foot ===============================================


STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17         246.00           14.50           55.68           55.65
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 246.00           14.50           55.68           55.65
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 246.00           14.50           55.68           55.65


=============== 208-00070      Vehicle Tracking Pad                         Each ===================================================


NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17           2.00         1750.00         3061.85         2550.00
NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17           2.00         2500.00         3016.75         3033.50
NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17           1.00         2000.00         6238.43         6500.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17           6.00         2000.00         2237.71         2500.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17           1.00         3500.00         2929.78         1950.00
IM025A-039                     I-25 Critical Culvert at MP 1 02/09/17           1.00         2200.00         2349.11         2005.77
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17           1.00         3000.00         2213.33         2340.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           2.00         2500.00         2060.00         1500.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17           1.00         1000.00         1794.68         2033.88
SHE160A-031                    SH 160 Passing Lanes          03/02/17           4.00         2290.00         2970.31         2250.00
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17           2.00         4000.00         4292.00         3750.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17           2.00         2000.00         1860.00         1350.00
ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17           4.00         3825.00         3825.00         3825.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17           1.00         2500.00         3521.17         3272.76
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17           1.00         5000.00         3618.90         2200.00
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17           1.00         2500.00         4100.00         4000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  32.00         2614.38         2907.89         2774.81




STA006A-057                    SH 6 EAST OF STERLING         04/06/17           1.00         1996.00         1663.07         1750.00
STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17           2.00         2500.00         1483.43         2050.29
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           4.00         2500.00         2804.14         1334.52
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17           4.00         2000.00         2730.00         2250.00
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17           2.00         2500.00         1883.39         1350.17
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 107
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00070      Vehicle Tracking Pad                         Each ===================================================
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           2.00         2000.00         1000.00         1000.00
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17           3.00         1540.00         1952.01         1950.74
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17           1.00         3500.00         3199.20         2000.00
ER0361-115                     US 36 Bridges                 06/22/17          12.00         1500.00         2266.67         1900.00
ER0341-093                     PR US 34 BIG THOMPSON CANYON  06/28/17           1.00         8335.00         8335.00         8335.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  32.00         2139.09         2464.10         1996.13




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17           2.00         2000.00         2250.00         3000.00
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17           1.00         2500.00         2220.23         1825.00
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17           2.00         2000.00         2745.82         3682.97
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17           1.00         2500.00         3821.33         1964.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17          89.00         2963.04         4200.00         4200.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17           4.00         2000.00         2524.26         2800.00
BRR400-354                     Little-T Channel Work and SH
NHPP0821-108                   SH 82 MP 45 OLVDS             09/07/17           1.00         2000.00         2341.33         2174.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 100.00         2867.11         3392.74         4043.29




STA094A-034                    Critical Culvert Project on S 10/05/17           1.00         2000.00         2635.82         1500.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           4.00         2000.00          622.00          765.00
NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17           1.00         2500.00         3102.17         3300.00
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17           2.00         3000.00         2979.00         2250.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17           1.00         2270.00         1966.67         1500.00
CC0341-100                     US 34 BIG THOMPSON CANYON MOO 12/11/17           1.00         5514.51         3600.00         3600.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  10.00         2628.45         2149.17         1746.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 174.00         2673.02         2873.44         3310.73


=============== 208-00071      Maint Aggregate (Veh Track Pad)              Cubic Yard =============================================


ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17         370.00           56.00           56.00           56.00
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17          28.00           75.00           80.80          100.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 398.00           57.34           62.81           59.10




ER0341-093                     PR US 34 BIG THOMPSON CANYON  06/28/17          80.00           40.00           40.00           40.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  80.00           40.00           40.00           40.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 108
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00071      Maint Aggregate (Veh Track Pad)              Cubic Yard =============================================




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17       8,240.00           65.77           80.00           80.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               8,240.00           65.77           80.00           80.00




NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17          30.00          100.00          141.92           40.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  30.00          100.00          141.92           40.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               8,748.00           65.27           79.70           78.55


=============== 208-00075      Pre-fab Vehicle Track Pad                    Each ===================================================


NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17           1.00         1000.00         1429.99          800.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17           4.00         1750.00         1330.00         2000.00
STA0931-032                    SH 93 Erosion Correction      02/09/17           3.00         1650.00         2264.54          575.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   8.00         1618.75         1802.83         1315.63




BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17           2.00         1500.00         1730.00         2200.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17           2.00         1000.01         2424.88         3000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   4.00         1250.01         2027.81         2600.00




NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17           2.00         1500.00         1325.00         1250.00
ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17           1.00         1000.00         3366.67         2850.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17           2.00         2000.00         2600.00         3000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   5.00         1600.00         2384.62         2270.00




ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17           9.00         2300.00         2354.63         1602.42
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 109
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00075      Pre-fab Vehicle Track Pad                    Each ===================================================
BR3852-018                     POA SCOUR US 385
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   9.00         2300.00         2354.63         1602.42
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  26.00         1794.23         2163.75         1796.03


=============== 208-00103      Removal and Disposal of Sediment (Labor)     Hour ===================================================


NHPP1602-145                   US 160 S. Fork to Monte Vista 01/12/17           8.00           28.00           56.94           55.00
NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17         145.00           45.00          153.98          107.00
NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17          20.00          100.00           70.53           66.05
NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17           8.00          100.00           73.91           70.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17         120.00           55.00           66.75           50.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17         200.00           65.00           53.16           33.00
STM0243-089                    Midpoint: Station 1019+50 Cen
MTCER100-274                   MTCE R1 FY 17 SH 119 Signing  01/26/17          10.00           55.00           81.25           55.00
STA0931-032                    SH 93 Erosion Correction      02/09/17          50.00           40.00           55.57           22.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17          60.00           60.00           54.17           52.51
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17          40.00           65.00           65.60           99.80
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17          80.00           50.00           41.40           35.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17          10.00           45.00           55.70           56.10
SHE160A-031                    SH 160 Passing Lanes          03/02/17         270.00           55.00           52.26           43.75
NHPP 0701-230                  Midpoint WB Bore              03/02/17           8.00           40.00           65.17           54.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17          20.00           60.00           35.22           40.00
BR0252-449                     I-25 Woodmen NB               03/02/17          15.00           50.00           57.75           35.00
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17          30.00           45.00           51.37           61.60
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17          15.00           55.50          124.75           80.00
ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17          20.00           44.00           44.00           44.00
STA0243-087                    US 24 El Paso-Elbert CL Pavin 03/23/17          10.00           40.00           84.46           45.00
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17          20.00           60.00           72.58           60.00
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17          52.00           50.00           87.90           65.00
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17          30.00           42.00           70.00           30.00
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17          20.00           45.00           91.63           35.70
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               1,261.00           54.63           64.82           54.63




STA006A-057                    SH 6 EAST OF STERLING         04/06/17          20.00           45.00           46.27           40.00
STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17          25.00           55.00          126.00          126.00
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17          80.00           65.00          127.13          116.00
STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17         200.00           70.00           50.42           51.26
NHPP0703-433                   EJMT S Bore Barrier, Handrail 04/13/17          10.00          110.00           58.99           60.00
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17          20.00           51.00          143.77          125.00
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17         400.00           50.00           53.24          127.02
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 110
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00103      Removal and Disposal of Sediment (Labor)     Hour ===================================================
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17          80.00           54.00           44.06           36.30
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17          40.00           80.00           61.67           60.00
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17          20.00           60.00           54.56           48.67
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          26.00           50.00           95.00           95.00
STAR400-348                    Region 4 Controller and Cabin 05/04/17          42.00           40.00           55.00           50.00
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17          90.00           50.00           55.50           40.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17          40.00           40.01          138.41           45.00
STM0211-026                    SH21 AND MESA RIDGE PKWY SIGN 05/18/17          10.00           90.00           62.50           40.00
AQC088A-035                    Traffic Signal/Fiber Optic In 05/18/17          10.00          100.00           29.89           48.00
STA0703-437                    I-70: 32ND TO 44TH            06/01/17          10.00           65.00           44.05           35.00
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17           5.00           75.00           61.30           40.00
STA0061-091                    SH 6 CHIPSEAL NEAR FLEMING    06/15/17           5.00           55.00           62.00           76.00
MTCE141A-048                   SH 141A WHITEWATER IN MESA CO 06/15/17          20.00           60.00           40.00           40.00
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17          20.00           70.00           51.40           50.00
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17          40.00           50.00           77.68           50.00
STA0072-019                    SH 7 FROM US 287 TO 75TH STRE 06/22/17          40.00           40.00           36.80           32.00
MTCE142A-002                   SH 142 CHIPSEAL               06/22/17           8.00           25.00           55.00           55.00
ER0361-115                     US 36 Bridges                 06/22/17         220.00           55.00           38.22           40.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,481.00           56.11           54.04           74.12




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17          40.00           50.00           47.80           35.00
ITSSW01-834                    ITS CAMERA PROJECT FY17       07/13/17          20.00           60.00           91.00           82.00
NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17          40.00           60.00           40.50           28.00
NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17          40.00           75.00           85.00           85.00
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17          50.00           55.00           52.98           60.00
CR100-283                      REGION 1 TRAFFIC SIGNAL CONTR 07/20/17          60.00           65.00           83.75           60.00
SHE0141-024                    SH 14 Poudre Canyon Guardrail 07/20/17          20.00           85.00           63.33           70.00
ITS0761-227                    ITS FIBER OPTICS ON I76 DENVE 07/27/17          40.00           60.00           42.65           48.00
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17          50.00           50.00           66.86           62.33
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17         140.00           66.00          124.00           50.00
MTCE131A-039                   SH 131 MP 0.053-68.721 IN EAG 08/17/17          20.00           55.00           46.33           49.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17          60.00           55.00           69.83           42.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17       1,200.00           42.99           50.00           50.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17         140.00           50.00           40.67           38.00
BRR400-354                     Little-T Channel Work and SH
NHPP0821-108                   SH 82 MP 45 OLVDS             09/07/17           6.00           50.00           56.33           34.00
AQCR100-258                    CDOT TSSIP 2016 SIG UPGRADE F 09/21/17           2.00           75.00           57.67           50.00
SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17          40.00           55.00           54.20           85.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               1,968.00           49.15           55.44           50.87




STA094A-034                    Critical Culvert Project on S 10/05/17          10.00           55.00           45.32           58.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 111
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00103      Removal and Disposal of Sediment (Labor)     Hour ===================================================
ITSSW01-636                    VMS AND LUS UPGRADE FY 17     10/19/17           8.00           50.00           58.33           75.00
CR100-286                      R1 CURB RAMPS-PH 1            10/26/17          30.00          100.00           93.50           42.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17          40.00           50.00           31.67           60.00
C133A-042                      SH 133 McClure Pass Slip      11/16/17          30.00           55.00           60.38           75.00
STRR300-228                    SH 13 R3 VARIOUS CHIP SEALS   11/30/17          20.00           60.00           48.75           40.00
NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17          10.00           52.00           60.29           40.00
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17          40.00          100.00          152.20           65.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17          20.00           45.00           61.67           75.00
ITSSW01-831                    ITS WEATHER STATION UPGRADES  11/30/17          28.00           50.00           70.99           45.00
NHPP0702-354                   I-70 EAST SIDE VAIL PASS MP 1 12/07/17          40.00           60.00           57.54           87.70
NHPP006A-059                   US 6 CLEAR CREEK CANYON SH 93 12/14/17          12.00          150.00          155.67           50.00
STR139A-034                    SH 139 DOUGLAS PASS MP 19.0 - 12/21/17          40.00           50.00           52.25           35.00
ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17          40.00           60.00           75.36           67.74
BR3852-018                     POA SCOUR US 385
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 368.00           65.82           73.00           59.42
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               5,078.00           53.75           58.85           59.30


=============== 208-00105      Removal and Disposal of Sediment (Equip)     Hour ===================================================


NHPP1602-145                   US 160 S. Fork to Monte Vista 01/12/17           8.00           65.00          132.94          135.00
NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17         145.00           92.00          224.52          183.00
NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17          20.00          100.00           81.93          162.15
NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17           8.00          200.00          129.88           16.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17         240.00          120.00          127.00          150.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17         200.00          100.00          104.59           63.00
STM0243-089                    Midpoint: Station 1019+50 Cen
STA0931-032                    SH 93 Erosion Correction      02/09/17          20.00          100.00          117.17           45.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17          60.00          100.00          125.01          105.02
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17          40.00          120.00          121.67          167.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17          60.00          125.00           99.00           60.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17           4.00          140.00          119.90          137.70
SHE160A-031                    SH 160 Passing Lanes          03/02/17         320.00          109.00          124.84          100.00
NHPP 0701-230                  Midpoint WB Bore              03/02/17           8.00          110.00          236.00          108.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17          20.00          110.00           86.78           80.00
BR0252-449                     I-25 Woodmen NB               03/02/17          35.00          110.00          102.50           65.00
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17          20.00          105.00          120.63          138.88
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17           5.00           99.30          387.59          125.00
ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17          20.00          110.00          110.00          110.00
STA0243-087                    US 24 El Paso-Elbert CL Pavin 03/23/17           4.00          100.00          161.32           65.00
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17          28.00          100.00          181.00          200.00
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17          30.00           95.00           80.00           50.00
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17          20.00           60.00          168.87          212.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               1,315.00          107.21          129.59          119.56
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 112
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00105      Removal and Disposal of Sediment (Equip)     Hour ===================================================




STA006A-057                    SH 6 EAST OF STERLING         04/06/17          20.00           90.00           90.04           75.00
STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17          15.00          100.00          241.00          241.00
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17          80.00          120.00          242.26          220.00
STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17          80.00          120.00          152.92          153.77
NHPP0703-433                   EJMT S Bore Barrier, Handrail 04/13/17          10.00          175.00          140.00          125.00
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17          10.00           97.00          223.42          238.00
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17         400.00           50.00          115.80          112.97
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17          80.00          110.00           98.40          100.00
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17          40.00          150.00          108.33          150.00
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17          10.00          120.00          118.18           89.54
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          13.00          100.00          155.00          155.00
STAR400-348                    Region 4 Controller and Cabin 05/04/17          42.00           85.00           65.00           50.00
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17          20.00          110.00          116.25          110.00
STM0211-026                    SH21 AND MESA RIDGE PKWY SIGN 05/18/17          20.00          175.00           60.00           35.00
AQC088A-035                    Traffic Signal/Fiber Optic In 05/18/17          10.00          150.00           43.84           65.00
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17         108.00           92.00          182.51          182.41
STA0703-437                    I-70: 32ND TO 44TH            06/01/17          10.00          120.00          103.75          110.00
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17           5.00          125.00          149.20          135.00
STA0061-091                    SH 6 CHIPSEAL NEAR FLEMING    06/15/17           5.00          112.00          145.00          225.00
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17          10.00          160.00           89.20           50.00
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17          40.00          120.00          208.63           50.00
STA0072-019                    SH 7 FROM US 287 TO 75TH STRE 06/22/17          10.00          140.00           50.60           48.00
MTCE142A-002                   SH 142 CHIPSEAL               06/22/17           8.00          135.00          135.00          135.00
ER0361-115                     US 36 Bridges                 06/22/17         220.00          110.00          106.60           89.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,266.00           93.75          119.87          120.56




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17          20.00          130.00           96.00           95.00
ITSSW01-834                    ITS CAMERA PROJECT FY17       07/13/17          20.00          110.00           70.50           41.00
NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17           8.00          140.00          132.50          125.00
NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17          40.00          150.00          160.00          160.00
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17          25.00          135.00          142.38          150.00
CR100-283                      REGION 1 TRAFFIC SIGNAL CONTR 07/20/17          60.00          175.00           93.75           80.00
SHE0141-024                    SH 14 Poudre Canyon Guardrail 07/20/17           8.00          200.00          132.00          150.00
ITS0761-227                    ITS FIBER OPTICS ON I76 DENVE 07/27/17          40.00          150.00           69.13           65.00
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17         100.00          120.00          110.30           96.32
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17         124.00          115.50          165.50          115.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17          60.00          115.00          113.00           69.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17       1,200.00          105.29          110.00          110.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17          70.00          100.00          104.81           62.00
BRR400-354                     Little-T Channel Work and SH
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 113
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00105      Removal and Disposal of Sediment (Equip)     Hour ===================================================
AQCR100-258                    CDOT TSSIP 2016 SIG UPGRADE F 09/21/17           2.00          150.00           77.67           75.00
SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17          40.00          110.00          106.00          118.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               1,817.00          112.64          110.42          105.51




STA094A-034                    Critical Culvert Project on S 10/05/17          10.00          110.00          105.30          125.00
ITSSW01-636                    VMS AND LUS UPGRADE FY 17     10/19/17           8.00          125.00          121.33           75.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17          40.00          120.00           63.00           93.00
C133A-042                      SH 133 McClure Pass Slip      11/16/17          20.00          110.00          136.65          160.00
NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17          10.00          110.00          139.58          110.00
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17          40.00          150.00          225.60          110.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17          20.00           80.00          123.33          100.00
NHPP0702-354                   I-70 EAST SIDE VAIL PASS MP 1 12/07/17          40.00          120.00          148.57          107.85
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 188.00          120.21          145.13          109.49
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               4,586.00          106.18          121.93          113.73


=============== 208-00106      Sweeping (Sediment Removal)                  Hour ===================================================


NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17         290.00          160.00          212.26          136.00
NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17          20.00          300.00          216.92          215.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17         480.00          125.00          142.00          100.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17         200.00          150.00          183.76          120.00
STM0243-089                    Midpoint: Station 1019+50 Cen
STA0931-032                    SH 93 Erosion Correction      02/09/17          40.00          140.00          157.59           65.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17          40.00          160.00          178.35          210.04
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17          40.00          200.00          151.00          148.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17          56.00          200.00          152.00          130.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17          40.00          100.00          235.35          291.04
SHE160A-031                    SH 160 Passing Lanes          03/02/17         330.00          150.00          162.59           87.50
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17          20.00          150.00          236.00          145.00
NHPP 0701-230                  Midpoint WB Bore              03/02/17           4.00          150.00          321.75           75.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17          20.00          145.00          135.80          160.00
BR0252-449                     I-25 Woodmen NB               03/02/17          35.00          150.00          141.25           65.00
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17         120.00          135.92          155.01          135.00
ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17          30.00          164.00          164.00          164.00
STA0243-087                    US 24 El Paso-Elbert CL Pavin 03/23/17         144.00          140.00          143.85           95.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17         100.00          150.00          215.58          235.88
MTCE2873-191                   R4 FY 17 Stencils #1          03/23/17          40.00          140.00          145.00           20.00
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17          40.00          200.00          181.80          200.00
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17          24.00          160.00          152.80          150.00
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17          38.00          135.92          171.33          204.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 114
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00106      Sweeping (Sediment Removal)                  Hour ===================================================
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17         100.00          225.00          202.11          195.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               2,251.00          151.20          167.29          127.95




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17         215.00          155.00          144.00          144.00
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17          80.00          170.00          181.73          130.00
STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17         144.00          200.00          158.13          179.40
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17         100.00          128.00          172.05          135.00
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17         800.00           50.00          133.44          109.70
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17          80.00          140.00          182.00           70.00
NHPP0704-240                   Package C (I-70 and I-25) Bri 04/27/17          40.00          165.00          143.75          145.00
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17           8.00          130.00          130.99          117.97
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          40.00          150.00          240.00          240.00
STAR400-348                    Region 4 Controller and Cabin 05/04/17          21.00          150.00          115.00           50.00
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17          80.00          140.00          116.50          130.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17         100.00          150.01          157.31          125.00
STAR100-255                    R1 FY18 CRACK SEAL            05/11/17         100.00          160.00          117.50          150.00
AQC088A-035                    Traffic Signal/Fiber Optic In 05/18/17          20.00          200.00          111.82          135.00
STA0703-437                    I-70: 32ND TO 44TH            06/01/17          10.00          160.00          163.58          220.00
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17           5.00          150.00          131.18          125.00
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17          40.00          150.00          215.88          100.00
STA0072-019                    SH 7 FROM US 287 TO 75TH STRE 06/22/17          80.00          135.00          103.60           63.00
ER0361-115                     US 36 Bridges                 06/22/17         440.00          150.00          125.43          135.00
ER0341-093                     PR US 34 BIG THOMPSON CANYON  06/28/17          20.00          208.00          208.00          208.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               2,423.00          120.52          135.80          126.90




MTCE0762-054                   REGION 4 MTCE SECT1 I76 FORT  07/06/17          20.00          140.00          167.17          138.00
ITSSW01-834                    ITS CAMERA PROJECT FY17       07/13/17          20.00          150.00          138.50          177.00
NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17          40.00          140.00          106.00           87.00
NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17          40.00          175.00          200.00          200.00
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17          50.00          150.00          155.17          190.00
CR100-283                      REGION 1 TRAFFIC SIGNAL CONTR 07/20/17          60.00          175.00          140.00          140.00
SHE0141-024                    SH 14 Poudre Canyon Guardrail 07/20/17          16.00          200.00          187.67          175.00
ITS0761-227                    ITS FIBER OPTICS ON I76 DENVE 07/27/17          40.00          175.00          123.29          135.00
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17          12.00          176.00          151.50          135.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17          10.00          150.00          116.33           69.00
NHPPR100-291                   I-225 SB RESTRIPING I-25 TO Y 08/31/17           5.00          155.00          177.50          130.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17       1,800.00          170.00          175.00          175.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17         120.00          140.00          152.27          140.00
BRR400-354                     Little-T Channel Work and SH
AQCR100-258                    CDOT TSSIP 2016 SIG UPGRADE F 09/21/17           8.00          150.00           93.00            5.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 115
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00106      Sweeping (Sediment Removal)                  Hour ===================================================
SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17         150.00          140.00          161.40          155.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               2,391.00          165.62          160.75          168.10




STA094A-034                    Critical Culvert Project on S 10/05/17          10.00          145.00          127.04          125.00
ITSSW01-636                    VMS AND LUS UPGRADE FY 17     10/19/17          16.00          150.00          165.83          100.00
CR100-286                      R1 CURB RAMPS-PH 1            10/26/17          50.00          165.00          147.50           45.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17          40.00          150.00           69.67           93.00
NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17          18.00          200.00          172.63           90.00
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17          40.00          165.00          189.76          150.00
ITSSW01-831                    ITS WEATHER STATION UPGRADES  11/30/17          28.00          125.00          104.38           58.00
ITSSW02-003                    ITS FIBER INSTALLATIONS FOR H 11/30/17          12.00          150.00          106.50          100.00
MTCE092A-027                   MTCE R3 FY18 SH 92 STR I-06-A 12/07/17           4.00          150.00          101.67          100.00
NHPP0702-354                   I-70 EAST SIDE VAIL PASS MP 1 12/07/17          40.00          160.00          248.58          232.91
NHPP0702-351                   I-70: HLT GARAGE DOOR REPLACE 12/08/17           2.00          102.39           79.44           79.44
STR139A-034                    SH 139 DOUGLAS PASS MP 19.0 - 12/21/17          20.00          120.00          179.38          125.00
ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17          40.00          155.00          171.10          155.17
BR3852-018                     POA SCOUR US 385
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 320.00          154.39          163.18          118.27
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               7,385.00          145.94          150.69          140.35


=============== 208-00107      Rem Trash                                    Hour ===================================================


NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17         145.00           70.00          153.98          107.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17          20.00           50.00           80.25           75.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17         200.00           65.00           96.09           50.00
STM0243-089                    Midpoint: Station 1019+50 Cen
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17          40.00           80.00          109.17           52.51
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17          40.00          100.00          112.00          136.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17          40.00          100.00           92.00           95.00
NHPP 0701-230                  Midpoint WB Bore              03/02/17           4.00          100.00           71.00           87.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17          20.00           80.00           72.82          160.00
BR0252-449                     I-25 Woodmen NB               03/02/17          35.00           50.00           69.50           50.00
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17          20.00           50.00           85.70           61.60
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17          20.00           68.62          157.80          115.00
ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17          10.00          193.00          193.00          193.00
STA0243-087                    US 24 El Paso-Elbert CL Pavin 03/23/17          40.00           55.00           87.78           45.00
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17           4.00          100.00          205.35          300.00
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17          20.00           90.00          156.80          100.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 658.00           72.65          109.59           88.02
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 116
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00107      Rem Trash                                    Hour ===================================================




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17          50.00           95.00          164.00          164.00
STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17          20.00          100.00           84.59          153.77
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17          30.00           75.00          121.64          120.00
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17         300.00           75.00           86.48          133.95
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17          80.00           87.00           53.52           39.60
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          26.00           75.00           48.00           48.00
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17          20.00           90.00          212.25           40.00
STAR100-255                    R1 FY18 CRACK SEAL            05/11/17           5.00          100.00           59.00          100.00
AQC088A-035                    Traffic Signal/Fiber Optic In 05/18/17           2.00          145.00           28.89           45.00
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17          93.00           90.00           62.60           35.00
STA0703-437                    I-70: 32ND TO 44TH            06/01/17          10.00          100.00           98.76          110.00
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17           5.00          150.00          102.28          105.00
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17          16.00          220.00          127.00           50.00
ER0361-115                     US 36 Bridges                 06/22/17          24.00           85.00           49.72           40.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 681.00           86.17           85.76           99.13




MTCE0762-054                   REGION 4 MTCE SECT1 I76 FORT  07/06/17          20.00           50.00           67.24           75.00
NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17          10.00           60.00           45.67           23.33
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17          50.00           55.00           76.82           65.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17          25.00           82.00           87.67           48.00
NHPPR100-291                   I-225 SB RESTRIPING I-25 TO Y 08/31/17           4.00           85.00           67.50           40.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         600.00          143.20          190.00          190.00
NHPP0821-108                   SH 82 MP 45 OLVDS             09/07/17          10.00           60.00           56.33           34.00
AQCR100-258                    CDOT TSSIP 2016 SIG UPGRADE F 09/21/17           2.00          150.00           41.00           10.00
SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17         120.00           85.00           99.00           67.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 841.00          123.38          123.35          153.08




CR100-286                      R1 CURB RAMPS-PH 1            10/26/17           5.00           70.00           97.50           45.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17          40.00           80.00           35.33           71.00
NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17          15.00          100.00          132.35           40.00
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17          40.00          125.00          192.80          150.00
MTCE092A-027                   MTCE R3 FY18 SH 92 STR I-06-A 12/07/17           4.00           50.00          111.00          133.00
NHPP0702-354                   I-70 EAST SIDE VAIL PASS MP 1 12/07/17          40.00           80.00          118.70          103.52
NHPP0702-351                   I-70: HLT GARAGE DOOR REPLACE 12/08/17           2.00          105.20           75.63           75.63
STR139A-034                    SH 139 DOUGLAS PASS MP 19.0 - 12/21/17          20.00           50.00           95.63           75.00
ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17          40.00           70.00          103.38           76.15
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 117
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00107      Rem Trash                                    Hour ===================================================
BR3852-018                     POA SCOUR US 385
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 206.00           84.76          118.22           92.40
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               2,386.00           95.43          101.22          115.66


=============== 208-00207      Erosion Control Management                   Day ====================================================


NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17         145.00          150.00          277.27          137.00
NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17         100.00          220.00          559.13          610.26
NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17          12.00          175.00          301.50          500.00
NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17          75.00          200.00          159.16          100.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17         150.00          215.00          237.25          300.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17         400.00          150.00          186.07           33.00
STM0243-089                    Midpoint: Station 1019+50 Cen
MTCER100-274                   MTCE R1 FY 17 SH 119 Signing  01/26/17          60.00           85.00          180.00           30.00
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17          20.00          200.00          365.36          135.00
IM025A-039                     I-25 Critical Culvert at MP 1 02/09/17          60.00          250.00          258.10           95.90
STA0931-032                    SH 93 Erosion Correction      02/09/17          25.00          200.00          215.50          150.00
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17          20.00          200.00          258.33          452.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17         200.00          450.00          203.60           50.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17         120.00          180.00          332.92          394.74
SHE160A-031                    SH 160 Passing Lanes          03/02/17         130.00          200.00          238.81           75.00
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17          36.00          350.00          336.00          550.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17         132.00          200.00          171.80          155.00
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17          15.00          250.00          403.33          504.00
STA2873-183                    US 287 Repairs at LCR 17      03/09/17          40.00          225.00          381.67          440.00
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17          10.00         1200.00          254.30           95.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17         190.00          214.00          357.51          471.75
MTCE2873-191                   R4 FY 17 Stencils #1          03/23/17           5.00          300.00          616.67          150.00
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17          36.00          500.00          290.90          250.00
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17          18.00          250.00          412.60          250.00
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17           8.00         1200.00          585.00          405.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               2,007.00          230.10          251.31          226.70




STA006A-057                    SH 6 EAST OF STERLING         04/06/17          30.00          150.00          307.54          510.00
STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17          85.00          225.00          340.00          340.00
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17          80.00          250.00          360.38          330.00
STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17         150.00          300.00          200.84          102.51
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17          70.00          300.00          335.23          309.00
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17         300.00          300.00          159.77          238.53
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17         218.00          300.00          224.80          109.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 118
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00207      Erosion Control Management                   Day ====================================================
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17          27.00          300.00          356.36          145.07
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          90.00          200.00          140.00          140.00
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17          90.00          200.00          189.50           40.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17         150.00          200.01          185.90          100.00
AQC088A-035                    Traffic Signal/Fiber Optic In 05/18/17           4.00          250.00          202.40          350.00
STA0703-437                    I-70: 32ND TO 44TH            06/01/17         150.00          250.00          186.83           45.00
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17          16.00          250.00          440.20          500.00
ER0361-115                     US 36 Bridges                 06/22/17         200.00          185.00          139.03          175.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,660.00          252.18          187.14          174.21




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17         115.00          230.00          185.00           35.00
ITSSW01-834                    ITS CAMERA PROJECT FY17       07/13/17           7.00         1000.00          549.50          870.00
NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17          23.00          165.00          222.50          115.00
NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17          40.00          275.00          285.00          285.00
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17         160.00          200.00          138.85          115.00
SHE0141-024                    SH 14 Poudre Canyon Guardrail 07/20/17           7.00          500.00          493.33          380.00
ITS0761-227                    ITS FIBER OPTICS ON I76 DENVE 07/27/17         225.00          300.00          290.12          380.65
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17          50.00          235.00          225.50          339.97
ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17          41.00          200.00          300.00          300.00
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17          12.00          250.00          317.00          250.00
CR100-292                      I25/ORCHARD EMERGENCY REPAIR  08/21/17           6.00            1.00           75.50          150.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17          90.00          221.67          440.94          142.82
NHPPR100-291                   I-225 SB RESTRIPING I-25 TO Y 08/31/17           3.00          275.00          300.00          100.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17         210.00          175.00          134.83           50.00
BRR400-354                     Little-T Channel Work and SH
AQCR100-258                    CDOT TSSIP 2016 SIG UPGRADE F 09/21/17           4.00          250.00          178.00           50.00
SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17         120.00          300.00          154.77          134.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               1,113.00          241.44          199.49          183.29




STA094A-034                    Critical Culvert Project on S 10/05/17          14.00          305.00          167.99          125.00
ITSSW01-636                    VMS AND LUS UPGRADE FY 17     10/19/17          16.00          225.00          246.67           16.00
CR100-286                      R1 CURB RAMPS-PH 1            10/26/17          10.00          150.00          440.00          280.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17         200.00          250.00           98.67          120.00
C133A-042                      SH 133 McClure Pass Slip      11/16/17          20.00          300.00          303.43          290.00
NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17          50.00          300.00          205.06          175.00
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17         205.00          250.00          289.80          325.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17         100.00          250.00          188.33          100.00
ITSSW01-831                    ITS WEATHER STATION UPGRADES  11/30/17          28.00          225.00          736.21          150.00
ITSSW02-003                    ITS FIBER INSTALLATIONS FOR H 11/30/17           5.00          300.00          656.75          400.00
NHPP006A-059                   US 6 CLEAR CREEK CANYON SH 93 12/14/17          35.00          320.00          498.67          585.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 683.00          257.13          258.49          214.72
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               5,463.00          242.50          218.38          199.41
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 119
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00300      Temporary Berms                              Lin Foot ===============================================


STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17         246.00            2.75            5.63            5.62
ER0341-093                     PR US 34 BIG THOMPSON CANYON  06/28/17         375.00           15.00           15.00           15.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 621.00           10.15            9.68           11.28




ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17         380.00           10.00           20.07           25.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 380.00           10.00           20.07           25.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,001.00           10.09           15.58           16.49


=============== 208-00301      Temporary Diversion                          Lin Foot ===============================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17      11,064.00          175.26          275.00          275.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER              11,064.00          175.26          275.00          275.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              11,064.00          175.26          275.00          275.00


=============== 208-00303      Temporary Diversion (Special)                Lin Foot ===============================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17       3,087.00          284.28          275.00          275.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               3,087.00          284.28          275.00          275.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               3,087.00          284.28          275.00          275.00


=============== 208-00400      Water Control                                LUMP SUM ===============================================


NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17           1.00        50000.00        39777.80        25000.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           1.00         6000.00        26360.00         2000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   2.00        28000.00        34187.05        13500.00




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           1.00        25000.00        41533.93        33500.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 120
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 208-00400      Water Control                                LUMP SUM ===============================================
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17           1.00        15000.00        14559.30        15177.90
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17           1.00        30000.00        13450.60         2500.00
ER0361-115                     US 36 Bridges                 06/22/17           1.00        75000.00       124785.60       150000.00
ER0341-093                     PR US 34 BIG THOMPSON CANYON  06/28/17           1.00       339940.00       339940.00       339940.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   5.00        96988.00        62888.58       108223.58




ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17           1.00        20000.00        35647.33        10942.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00        20000.00        35647.33        10942.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   8.00        70117.50        52742.34        72382.49


=============== 208-00500      Swale Protect Type 1                         Lin Foot ===============================================


ER0341-093                     PR US 34 BIG THOMPSON CANYON  06/28/17          40.00           40.45           40.45           40.45
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  40.00           40.45           40.45           40.45
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  40.00           40.45           40.45           40.45


=============== 208-00521      Temp Stream Crossing                         Each ===================================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           1.00       139501.45       230000.00       230000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00       139501.45       230000.00       230000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00       139501.45       230000.00       230000.00


=============== 210-00001      Res Structure                                Each ===================================================


NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           1.00         1500.00         2260.00         2500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   1.00         1500.00         2260.00         2500.00




ER0361-115                     US 36 Bridges                 06/22/17           3.00         1500.00         1277.87          620.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   3.00         1500.00         1277.87          620.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 121
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 210-00001      Res Structure                                Each ===================================================




ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17           1.00         1500.00         3616.67         3100.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00         1500.00         3616.67         3100.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   5.00         1500.00         1736.60         1492.00


=============== 210-00010      Res Mailbox Str                              Each ===================================================


NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           1.00          250.00          351.60          516.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   1.00          250.00          351.60          516.00




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17          18.00         2035.24         3800.00         3800.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  18.00         2035.24         3800.00         3800.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  19.00         1941.28         3050.35         3627.16


=============== 210-00011      Res Mailbox Str (Ty 1)                       Each ===================================================


NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17           4.00          500.00          332.59          350.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17          43.00          250.00          166.75          170.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  47.00          271.28          174.12          185.32




STA006A-057                    SH 6 EAST OF STERLING         04/06/17           4.00          225.00          327.02          260.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   4.00          225.00          327.02          260.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  51.00          267.65          180.63          191.18


=============== 210-00012      Res Mailbox Str (Ty 2)                       Each ===================================================


NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17           1.00          550.00          435.12          450.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 122
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 210-00012      Res Mailbox Str (Ty 2)                       Each ===================================================
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17           3.00          300.00          362.50          300.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17           4.00          400.00          424.73          408.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   8.00          381.25          396.81          372.75
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   8.00          381.25          396.81          372.75


=============== 210-00013      Res Mailbox Str (Ty 3)                       Each ===================================================


STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17           3.00          450.00          518.25          500.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17           2.00          425.00          475.23          433.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   5.00          440.00          503.91          473.40




ER0361-115                     US 36 Bridges                 06/22/17           1.00          550.00          425.00          565.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   1.00          550.00          425.00          565.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   6.00          458.33          484.18          488.67


=============== 210-00014      Res Mailbox Str (Ty 4)                       Each ===================================================


NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17          40.00          350.00          475.74          459.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  40.00          350.00          475.74          459.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  40.00          350.00          475.74          459.00


=============== 210-00015      Res End Section                              Each ===================================================


SHE160A-031                    SH 160 Passing Lanes          03/02/17           1.00          500.00          716.04          625.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   1.00          500.00          716.04          625.00




ER0361-115                     US 36 Bridges                 06/22/17           1.00         1500.00          704.96          700.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   1.00         1500.00          704.96          700.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00         1000.00          711.29          662.50
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 123
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 210-00030      Res Water Service                            Each ===================================================


NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           1.00         3500.00         1975.00         2700.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   1.00         3500.00         1975.00         2700.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00         3500.00         1975.00         2700.00


=============== 210-00037      Reset Irrigation Pump                        Each ===================================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17          30.00          789.84         1300.00         1300.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  30.00          789.84         1300.00         1300.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  30.00          789.84         1300.00         1300.00


=============== 210-00060      Res Marker                                   Each ===================================================


STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17           4.00          200.00          358.37          525.10
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17           1.00          500.00          179.80          250.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   5.00          260.00          305.85          470.08




NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17           2.00          500.00          260.00          415.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   2.00          500.00          260.00          415.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   7.00          328.57          297.11          454.34


=============== 210-00065      Res Monument (Ty 3A)                         Each ===================================================


STAR500-190                    R5 Signal Replacement Chaffee 04/27/17           4.00          750.00         1035.00         1080.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   4.00          750.00         1035.00         1080.00




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17          30.00         2500.00         2625.00         2625.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  30.00         2500.00         2625.00         2625.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  34.00         2294.12         2170.71         2443.24
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 124
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 210-00090      Res Delineator                               Each ===================================================


STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17           4.00           50.00           41.61          100.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17          11.00           25.00           22.90           26.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  15.00           31.67           27.12           45.73




STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17           2.00          200.00           83.37           50.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   2.00          200.00           83.37           50.00




SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17           1.00           90.00          165.00           54.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00           90.00          165.00           54.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  18.00           53.61           38.55           46.67


=============== 210-00425      Res Bridge Railing                           Lin Foot ===============================================


STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17          20.00          110.00          222.13          371.39
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  20.00          110.00          222.13          371.39
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  20.00          110.00          222.13          371.39


=============== 210-00473      Res TV Cameras                               Each ===================================================


STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17           4.00         1000.00         1341.00         1260.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           1.00         1200.00          850.00          850.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   5.00         1040.00         1317.62         1178.00




ITSSW01-636                    VMS AND LUS UPGRADE FY 17     10/19/17           2.00         1000.00         2090.17         1250.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   2.00         1000.00         2090.17         1250.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   7.00         1028.57         1598.55         1198.57
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 125
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 210-00476      Reset MVRD                                   Each ===================================================


STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           2.00         2000.00         1662.18         1765.00
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17           4.00         1000.00         1795.00         1680.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   6.00         1333.33         1722.55         1708.33
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   6.00         1333.33         1722.55         1708.33


=============== 210-00479      Res Radio Com Antenna                        Each ===================================================


STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17           1.00          700.00          671.00          671.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           1.00         1000.00          850.00          850.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   2.00          850.00          760.50          760.50
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00          850.00          760.50          760.50


=============== 210-00500      Reb Port Present Str                         Each ===================================================


NHPP0704-240                   Package C (I-70 and I-25) Bri 04/27/17           4.00         5000.00         1587.50         1300.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   4.00         5000.00         1587.50         1300.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   4.00         5000.00         1587.50         1300.00


=============== 210-00510      Reb Port Present Str                         LUMP SUM ===============================================


ER0361-115                     US 36 Bridges                 06/22/17           1.00        10000.00        11827.78         7350.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   1.00        10000.00        11827.78         7350.00




NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17           1.00         5000.00        10009.00         9500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   1.00         5000.00        10009.00         9500.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00         7500.00        11001.06         8425.00


=============== 210-00520      Reb Port Present Str                         Sq Yard ================================================


NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17          47.00          200.00         1070.45         1200.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  47.00          200.00         1070.45         1200.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 126
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 210-00520      Reb Port Present Str                         Sq Yard ================================================




STA0703-437                    I-70: 32ND TO 44TH            06/01/17           2.00         2000.00         5772.45        11900.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   2.00         2000.00         5772.45        11900.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  49.00          273.47         1439.23         1636.73


=============== 210-00530      Rebuild Port of Present Str                  Sq Foot ================================================


BR0252-449                     I-25 Woodmen NB               03/02/17           4.00         2153.00          606.25          525.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   4.00         2153.00          606.25          525.00




NHPPC120-026                   US 85: I-76 to 168th          05/04/17          24.00          350.00          389.92         1000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  24.00          350.00          389.92         1000.00




NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17          24.00          450.00          814.14          900.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  24.00          450.00          814.14          900.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  52.00          534.85          651.30          917.31


=============== 210-00750      Res Light Standard                           Each ===================================================


STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17           1.00         1500.00         3930.00         5000.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           6.00         2000.00          460.00          405.00
SHE160A-031                    SH 160 Passing Lanes          03/02/17           3.00         1350.00         2285.52         1666.67
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  10.00         1755.00         1454.70         1243.00




NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          26.00         1200.00          650.00          650.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  26.00         1200.00          650.00          650.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 127
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 210-00750      Res Light Standard                           Each ===================================================




IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17           4.00         2500.00         2000.00         1200.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   4.00         2500.00         2000.00         1200.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  40.00         1468.75         1304.92          853.25


=============== 210-00760      Res Luminaire                                Each ===================================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17           2.00          300.00          381.84          320.00
STM0243-089                    Midpoint: Station 1019+50 Cen
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   2.00          300.00          381.84          320.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00          300.00          381.84          320.00


=============== 210-00810      Res Ground Sign                              Each ===================================================


NHPP1602-145                   US 160 S. Fork to Monte Vista 01/12/17           3.00          360.00          337.99          261.50
NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17          23.00          215.00          284.45          159.00
NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17          10.00          300.00          287.55          275.10
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17          11.00          225.00          194.25          200.00
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17           1.00          500.00          459.03          230.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17           8.00          275.00          246.25          139.26
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17          23.00          300.00          202.00          260.00
SHE160A-031                    SH 160 Passing Lanes          03/02/17           7.00          360.00          390.69          388.89
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17           2.00          275.00          269.20          210.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17           4.00          237.00          457.69          437.98
MTCER300-238                   MTCE R3 FY 17/18 REGION WIDE  03/30/17           5.00          350.00          342.50          525.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  97.00          276.99          275.70          249.85




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17           4.00          250.00          230.00          230.00
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17           7.00          250.00          215.08          150.00
STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17           3.00          400.00          344.73          364.18
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17           2.00          110.00          452.37          367.50
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17          15.00          450.00          598.33          600.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           3.00          350.00          325.00          325.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 128
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 210-00810      Res Ground Sign                              Each ===================================================
NHPPC120-026                   US 85: I-76 to 168th          05/04/17          96.00          180.01          103.70          100.00
STM0211-026                    SH21 AND MESA RIDGE PKWY SIGN 05/18/17           2.00          800.00          440.00          100.00
ER0361-115                     US 36 Bridges                 06/22/17           2.00          300.00          402.25          396.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 134.00          234.71          195.14          181.82




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17           6.00          260.00          200.00          200.00
NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17           1.00          350.00          325.00          325.00
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17           3.00          280.00          525.00          400.00
SHE0141-024                    SH 14 Poudre Canyon Guardrail 07/20/17          13.00          100.00          333.33          400.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17          12.00          300.00          276.04          308.00
BRR400-354                     Little-T Channel Work and SH
SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17           6.00          200.00          293.02          102.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  41.00          215.85          287.46          298.37




CR100-286                      R1 CURB RAMPS-PH 1            10/26/17           1.00          215.00          200.00          250.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17          13.00          300.00          185.33          275.00
NHPP006A-059                   US 6 CLEAR CREEK CANYON SH 93 12/14/17           5.00          200.00          412.50          437.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  19.00          269.21          246.71          316.45
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 291.00          248.40          247.67          229.71


=============== 210-00815      Res Sign Panel                               Each ===================================================


STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17           2.00          300.00          171.34          241.02
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17          10.00          300.00          236.00          338.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17           5.00          170.00           97.36           52.00
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17           4.00          250.00          230.00          120.00
MTCER300-238                   MTCE R3 FY 17/18 REGION WIDE  03/30/17          10.00          100.00           81.25          130.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  31.00          208.06          146.48          190.39




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17           1.00          300.00          153.00          153.00
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17           8.00          300.00          154.23           75.00
STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17           5.00          180.00          176.15           88.44
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 129
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 210-00815      Res Sign Panel                               Each ===================================================
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           2.00          150.00           79.47           33.10
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17          24.00          200.00          283.33          210.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17           8.00          300.00          124.48          120.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  48.00          231.25          201.04          151.28




NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17           5.00          250.00          235.00          235.00
NHPPR100-291                   I-225 SB RESTRIPING I-25 TO Y 08/31/17           1.00          216.00          185.00          150.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           1.00           60.00          263.00          263.00
MPR200-244                     REGION 2 FY18 SIGNING PROJECT 09/14/17          13.00          105.00          143.33           80.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  20.00          144.55          157.40          131.40




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           1.00          150.00           86.67          109.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17           1.00          200.00          130.80          122.40
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   2.00          175.00          108.73          115.70
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 101.00          205.85          173.46          158.64


=============== 210-00825      Res Flashing Beacon                          Each ===================================================


NHPP0702-352                   HLT VMS CMS LUS REPLACEMENT   01/05/17           8.00         2000.00          720.00          240.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   8.00         2000.00          720.00          240.00




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           3.00         2000.00         1838.37         2206.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   3.00         2000.00         1838.37         2206.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  11.00         2000.00         1494.26          776.18


=============== 210-00827      Res Pull Box                                 Each ===================================================


NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17         135.00          650.00          253.50          195.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 130
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 210-00827      Res Pull Box                                 Each ===================================================
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           1.00          500.00          451.00          400.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 136.00          648.90          255.91          196.51




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17          14.00          550.00          177.00          177.00
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17           3.00          550.00          399.53          380.00
STM0211-026                    SH21 AND MESA RIDGE PKWY SIGN 05/18/17           4.00          348.00          707.50          500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  21.00          511.52          378.51          267.52




CR100-286                      R1 CURB RAMPS-PH 1            10/26/17           2.00          650.00          490.00          480.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           1.00          700.00          759.00          776.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   3.00          666.67          605.29          578.67
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 160.00          631.20          269.85          212.99


=============== 210-00831      Res Traf Sig Head                            Each ===================================================


NHPP0702-352                   HLT VMS CMS LUS REPLACEMENT   01/05/17          24.00         1500.00          780.00          360.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  24.00         1500.00          780.00          360.00




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           4.00          300.00          341.76          270.00
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17           8.00          600.00          917.00          236.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  12.00          500.00          533.51          247.33




NHPP0702-351                   I-70: HLT GARAGE DOOR REPLACE 12/08/17           2.00         3880.95         5280.00         5280.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   2.00         3880.95         5280.00         5280.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  38.00         1309.52          708.30          583.37


=============== 210-00840      Res Traf Sig Pole                            Each ===================================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17           2.00         3000.00         4193.14         2510.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 131
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 210-00840      Res Traf Sig Pole                            Each ===================================================
STM0243-089                    Midpoint: Station 1019+50 Cen
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   2.00         3000.00         4193.14         2510.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00         3000.00         4193.14         2510.00


=============== 210-00847      Res Trav Time Ind                            Each ===================================================


ITSSW01-636                    VMS AND LUS UPGRADE FY 17     10/19/17           2.00         1000.00         2415.17         1500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   2.00         1000.00         2415.17         1500.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00         1000.00         2415.17         1500.00


=============== 210-00848      Res Traf Sig Control+Cab                     Each ===================================================


STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           1.00         3500.00         2515.84         2427.63
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   1.00         3500.00         2515.84         2427.63
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00         3500.00         2515.84         2427.63


=============== 210-00860      Res Ped Push Button                          Each ===================================================


STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17           2.00          100.00         1450.00         1450.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   2.00          100.00         1450.00         1450.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00          100.00         1450.00         1450.00


=============== 210-00865      Res Ped Sig Head                             Each ===================================================


STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           2.00          300.00          266.24          220.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   2.00          300.00          266.24          220.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00          300.00          266.24          220.00


=============== 210-00867      Res Fire Preempt Unit                        Each ===================================================


NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           2.00          700.00          916.00          815.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 132
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 210-00867      Res Fire Preempt Unit                        Each ===================================================
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17           4.00          800.00         1008.33          375.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   6.00          766.67          966.36          521.67




NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           2.00         1000.00         1050.00         1050.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17           2.00          700.00          544.52          525.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   4.00          850.00          670.89          787.50
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  10.00          800.00          887.57          628.00


=============== 210-00890      Res Int Detect Sys (Camera)                  Each ===================================================


STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           5.00          750.00         1157.89         1213.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           3.00          800.00         1050.00         1050.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   8.00          768.75         1152.75         1151.88
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   8.00          768.75         1152.75         1151.88


=============== 210-01000      Res Fence                                    Lin Foot ===============================================


NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17          25.00           25.00          120.91           95.50
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17          20.00           40.00           46.35            6.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  45.00           31.67           78.30           55.72




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17       1,117.00            6.00            7.82            7.45
NHPP0704-240                   Package C (I-70 and I-25) Bri 04/27/17          62.00           25.00          104.50           90.00
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17         144.00            7.00           13.86            8.58
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17          30.00           20.00           19.37           20.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,353.00            7.29            9.81           11.63




ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17         335.00           19.40            9.00            7.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 133
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 210-01000      Res Fence                                    Lin Foot ===============================================
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17          60.00           20.00          153.00          153.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 395.00           19.49           17.11           29.18




STA094A-034                    Critical Culvert Project on S 10/05/17          76.00           20.00           10.51            7.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  76.00           20.00           10.51            7.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,869.00           10.97           11.07           16.21


=============== 210-01011      Res Gate                                     Each ===================================================


ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17           1.00          620.00          900.00          600.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17           1.00         1000.00          408.63          366.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   2.00          810.00          513.92          483.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00          810.00          513.92          483.00


=============== 210-01050      Res C L Fence                                Lin Foot ===============================================


STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17          13.00           20.00           60.41           36.24
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17         520.00           20.00           17.00           17.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 533.00           20.00           20.03           17.47




ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17          62.00           35.00           25.64           23.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  62.00           35.00           25.64           23.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 595.00           21.56           23.11           18.05


=============== 210-01130      Res Gdrail Ty 3                              Lin Foot ===============================================


NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17          50.00            8.80          155.00          130.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  50.00            8.80          155.00          130.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  50.00            8.80          155.00          130.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 134
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 210-01180      Reset Guardrail (Special)                    Lin Foot ===============================================


NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17         890.00           12.00           15.62           10.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 890.00           12.00           15.62           10.00




NHPP0702-351                   I-70: HLT GARAGE DOOR REPLACE 12/08/17      11,700.00            2.77            3.38            3.38
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER              11,700.00            2.77            3.38            3.38
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              12,590.00            3.42            6.75            3.85


=============== 210-01190      Reset Tensioned Cable Barrier                Lin Foot ===============================================


STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17       1,270.00           55.00           18.81           15.44
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,270.00           55.00           18.81           15.44
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,270.00           55.00           18.81           15.44


=============== 210-01200      Res End Anchorage                            Each ===================================================


NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17           4.00         2000.00         1009.08          450.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   4.00         2000.00         1009.08          450.00




STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17           1.00         2000.00         2029.72         2289.15
MTCE0253-259                   I25 FROM MP 229.29 TO MP 244. 06/22/17           1.00         2000.00         2850.00         5000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   2.00         2000.00         2357.83         3644.58
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   6.00         2000.00         1527.83         1514.86


=============== 210-02510      Relay Sprinkler System                       LUMP SUM ===============================================


SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           1.00         6000.00         3690.33         5470.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   1.00         6000.00         3690.33         5470.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00         6000.00         3690.33         5470.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 135
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 210-02900      Relay Riprap                                 Cubic Yard =============================================


STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17         679.00           50.00           37.83           53.46
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 679.00           50.00           37.83           53.46




ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17          60.00          100.00           34.60           70.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  60.00          100.00           34.60           70.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 739.00           54.06           37.59           54.80


=============== 210-03100      Replace Conc Pvmt                            Sq Yard ================================================


NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17         998.00          500.00          340.67          255.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 998.00          500.00          340.67          255.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 998.00          500.00          340.67          255.00


=============== 210-04000      Adj Structure                                Each ===================================================


NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17           5.00         2250.00         3317.66         1200.00
STA2873-183                    US 287 Repairs at LCR 17      03/09/17          17.00          650.00         2061.67         2400.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  22.00         1013.64         2347.12         2127.27
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  22.00         1013.64         2347.12         2127.27


=============== 210-04010      Adj Manhole                                  Each ===================================================


NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17         334.00         1100.00          893.39          750.00
NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17          18.00          500.00         2491.67         3000.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17          15.00          700.00          777.50          750.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17          38.00          800.00         1583.40         1050.19
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           5.00          600.00         1164.00          500.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17           3.00          650.00          740.10          940.00
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17          28.00          850.00          742.64          550.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 136
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 210-04010      Adj Manhole                                  Each ===================================================
STA0243-087                    US 24 El Paso-Elbert CL Pavin 03/23/17           8.00          800.00         1511.28         2200.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 449.00         1007.68         1013.16          877.45




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17         101.00          500.00          664.00          664.00
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17         148.00          900.00          822.24         1090.00
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17          99.00          500.00          732.43          700.00
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17           2.00         1200.00         1101.67          720.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           8.00          800.00          800.00          800.00
ER0361-115                     US 36 Bridges                 06/22/17           6.00          800.00          555.46          395.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 364.00          678.02          754.01          845.86




NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17          32.00          850.00          650.00          650.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  32.00          850.00          650.00          650.00




CR100-286                      R1 CURB RAMPS-PH 1            10/26/17           1.00         1100.00          525.00          550.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17          10.00          800.00          628.67          865.00
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17          10.00          850.00          986.38         1250.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  21.00          838.10          844.26         1033.33
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 866.00          859.18          917.42          859.55


=============== 210-04015      Modify Manhole                               Each ===================================================


NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17          12.00         1500.00         2523.91         1210.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  12.00         1500.00         2523.91         1210.00




NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           2.00         1500.00         1825.00         1825.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   2.00         1500.00         1825.00         1825.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  14.00         1500.00         2487.13         1297.86
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 137
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 210-04020      Modify Inlet                                 Each ===================================================


NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17          40.00          510.00         3389.38         3387.50
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17           1.00         3000.00         2418.00         1420.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  41.00          570.73         3350.52         3339.51




STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17           3.00         3000.00         5976.43         6700.00
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17           3.00         2000.00         3360.00         1000.00
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17           1.00         6000.00         5918.33         4200.00
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17           1.00         2000.00         3446.25         2500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   8.00         2875.00         4207.09         3725.00




IM025A-037                     I25 S. Trinidad Resurface and 11/30/17           4.00         1800.00         2925.42         1776.25
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   4.00         1800.00         2925.42         1776.25
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  53.00         1011.32         3464.96         3279.72


=============== 210-04025      Modify Structure                             Each ===================================================


NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           1.00         1000.00         1825.00         1825.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   1.00         1000.00         1825.00         1825.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00         1000.00         1825.00         1825.00


=============== 210-04027      Modify Str (Spec)                            Each ===================================================


NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17           1.00        15000.00        36594.82        27858.06
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   1.00        15000.00        36594.82        27858.06
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00        15000.00        36594.82        27858.06


=============== 210-04030      Modify Guardrail                             Lin Foot ===============================================


NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17         400.00           27.00           25.90           22.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 400.00           27.00           25.90           22.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 138
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 210-04030      Modify Guardrail                             Lin Foot ===============================================




STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17      10,957.00           10.00            4.97            4.16
STA0703-437                    I-70: 32ND TO 44TH            06/01/17       5,256.00           20.00            7.80            5.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              16,213.00           13.24            6.07            4.43




IM025A-037                     I25 S. Trinidad Resurface and 11/30/17         200.00            8.00           14.56           13.69
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 200.00            8.00           14.56           13.69
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              16,813.00           13.51            6.45            4.96


=============== 210-04035      Modify Guardrail (Spec)                      Lin Foot ===============================================


SHE160A-031                    SH 160 Passing Lanes          03/02/17         625.00           15.00            8.86           10.11
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17      11,977.00            8.00            2.41            2.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              12,602.00            8.35            3.02            2.88
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              12,602.00            8.35            3.02            2.88


=============== 210-04050      Adj Valve Box                                Each ===================================================


NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17         345.00          800.00          560.00          650.00
NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17           3.00          250.00         1208.33         1100.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17          82.00          250.00          462.00          350.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17          41.00          400.00         1013.38          840.15
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           5.00          500.00          560.00          250.00
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17          12.00          342.00          442.85          250.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17           2.00          275.00         1597.28          493.86
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 490.00          654.70          579.09          603.95




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17         155.00          350.00          362.00          362.00
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17         160.00          500.00          520.10          690.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 139
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 210-04050      Adj Valve Box                                Each ===================================================
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17          91.00          350.00          488.34          450.00
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17           6.00         1400.00         1200.00          360.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           4.00          250.00          280.00          280.00
ER0361-115                     US 36 Bridges                 06/22/17           6.00          400.00          380.96          300.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 422.00          421.56          486.72          503.65




NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17           8.00          500.00          400.00          400.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   8.00          500.00          400.00          400.00




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           8.00          400.00          175.33          140.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   8.00          400.00          175.33          140.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 928.00          545.16          543.61          552.58


=============== 210-04200      Adj Gdrail                                   Lin Foot ===============================================


NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17         450.00           10.00            8.23            6.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 450.00           10.00            8.23            6.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 450.00           10.00            8.23            6.00


=============== 211-00100      Drilling Hole                                Lin Foot ===============================================


STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17         240.00           40.00           61.63           47.20
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 240.00           40.00           61.63           47.20




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17       1,785.00          436.89          525.00          525.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               1,785.00          436.89          525.00          525.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               2,025.00          389.85          362.95          468.37
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 140
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 211-00225      4 Inch Core Drilled Hole                     Lin Foot ===============================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         643.00          195.35          235.00          235.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 643.00          195.35          235.00          235.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 643.00          195.35          235.00          235.00


=============== 211-01115      Rock Reinf (No.10)                           Lin Foot ===============================================


ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17         500.00           94.00           94.00           94.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 500.00           94.00           94.00           94.00




NHPP006A-059                   US 6 CLEAR CREEK CANYON SH 93 12/14/17       1,925.00          150.00          167.67          196.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               1,925.00          150.00          167.67          196.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               2,425.00          138.45          161.80          174.97


=============== 211-01300      Rock Anchor                                  Each ===================================================


IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17           6.00         2000.00         3610.41         4500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   6.00         2000.00         3610.41         4500.00




C0702-372                      I-70 GWC Rockfall Fence Impro 10/12/17          98.00         2500.00         2737.50         1250.00
NHPP006A-059                   US 6 CLEAR CREEK CANYON SH 93 12/14/17           4.00         1500.00         2093.17         3967.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 102.00         2460.78         2700.33         1356.57
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 108.00         2435.19         2772.81         1531.20


=============== 211-02275      Cement Grout                                 Cubic Yard =============================================


STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17          20.00          300.00          575.17          974.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  20.00          300.00          575.17          974.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 141
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 211-02275      Cement Grout                                 Cubic Yard =============================================




NHPP0703-433                   EJMT S Bore Barrier, Handrail 04/13/17          77.00          500.00         1399.74         1150.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  77.00          500.00         1399.74         1150.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  97.00          458.76         1304.96         1113.71


=============== 211-02277      Cement Grout (Voids)                         Cubic Yard =============================================


NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17          85.00          550.00         1025.00         1900.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17           8.00          500.00         1566.67         2800.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  93.00          545.70         1092.01         1977.42
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  93.00          545.70         1092.01         1977.42


=============== 211-03005      Dewatering                                   LUMP SUM ===============================================


ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17           1.00       178100.00       178100.00       178100.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   1.00       178100.00       178100.00       178100.00




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           1.00        25000.00        37099.32        13700.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   1.00        25000.00        37099.32        13700.00




ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17           1.00        10000.00        41233.33        42600.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           1.00      1551626.05      5000000.00      5000000.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17           1.00        80000.00       112263.64       110000.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   3.00       547208.68       423906.67      1717533.33




STA094A-034                    Critical Culvert Project on S 10/05/17           1.00        10000.00         6402.38         5000.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 142
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 211-03005      Dewatering                                   LUMP SUM ===============================================
CC0341-100                     US 34 BIG THOMPSON CANYON MOO 12/11/17           1.00        64723.65        10000.00        10000.00
ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17           1.00        57500.00        59246.65        28559.92
BR3852-018                     POA SCOUR US 385
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   3.00        53827.48        50062.28        21817.72
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   8.00       166369.52       120697.06       395768.54


=============== 212-00005      Seeding (Native)                             Pound ==================================================


STM0211-026                    SH21 AND MESA RIDGE PKWY SIGN 05/18/17           0.10          250.00         6465.00         2000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   0.10          250.00         6465.00         2000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   0.10          250.00         6465.00         2000.00


=============== 212-00006      Seeding (Native)                             Acre ===================================================


NHPP1602-145                   US 160 S. Fork to Monte Vista 01/12/17           0.50         1500.00         1513.14         1000.00
NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17           7.00         1200.00         2430.73         2461.45
NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17          16.00          550.00          211.76          200.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17           0.20         3000.00         7087.50         2000.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17          38.00          700.00          790.22          440.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17           0.23         4000.00         5576.73         4000.00
IM025A-039                     I-25 Critical Culvert at MP 1 02/09/17           0.40         2000.00        11539.14         1888.00
STA0931-032                    SH 93 Erosion Correction      02/09/17           0.45         3000.00         3001.17         1725.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17           0.90         5000.00         1350.02          662.57
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           2.27         4300.00          957.20          761.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17           0.50         6000.00         1572.80         1279.08
SHE160A-031                    SH 160 Passing Lanes          03/02/17           9.34          635.00          585.49          635.56
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17           0.36         5000.00         2730.00         2100.00
NHPP 0701-230                  Midpoint WB Bore              03/02/17           0.84         3000.00         1122.62         1350.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17          13.40          900.00          328.25          315.00
BR0252-449                     I-25 Woodmen NB               03/02/17           0.60         2500.00         6075.00         2500.00
STA2873-183                    US 287 Repairs at LCR 17      03/09/17           0.20         5000.00         6625.00         5600.00
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17           0.10          915.91        10916.62         9300.00
STA0243-087                    US 24 El Paso-Elbert CL Pavin 03/23/17           0.15        10000.00        10291.32         5200.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17           0.90         1000.00        10195.19        12088.58
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17           0.10         8000.00        11450.00         6850.00
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17           1.00         1000.00         1895.00          925.00
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17           0.10         1000.00        11788.33        25000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  93.54         1012.22         1022.30          891.76
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 143
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 212-00006      Seeding (Native)                             Acre ===================================================




STA006A-057                    SH 6 EAST OF STERLING         04/06/17           0.50          850.00         2258.37         2100.00
STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17           0.02         1000.00        83300.00        83300.00
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17           0.10         1000.00        50152.85        45600.00
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17          14.40          500.00          964.88          943.46
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17          15.00          730.00         1109.82          866.25
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17           0.20        12000.00        16256.67        16800.00
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17           0.49         1700.00         1672.66         1517.99
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          16.30          750.00          875.00          875.00
STAR400-348                    Region 4 Controller and Cabin 05/04/17           0.10         7500.00         5600.00         2800.00
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17           1.30         1000.00         1194.50          840.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17          14.40         1000.00         1767.05         2190.00
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17         135.00          500.00          227.03          250.00
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17           0.20         2500.00         3745.00         6425.00
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17           0.30         3000.00         4922.20        15000.00
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17           0.70         3000.00         6660.00        15000.00
MTCE0253-259                   I25 FROM MP 229.29 TO MP 244. 06/22/17           0.10         8000.00         5990.00         3100.00
STA0072-019                    SH 7 FROM US 287 TO 75TH STRE 06/22/17           0.29         3000.00         4864.20         2258.00
MTCE142A-002                   SH 142 CHIPSEAL               06/22/17           0.10         1500.00         2400.00         2400.00
ER0361-115                     US 36 Bridges                 06/22/17           5.85          800.00         1138.69         1400.00
ER0341-093                     PR US 34 BIG THOMPSON CANYON  06/28/17           0.75         1195.00         1195.00         1195.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 206.10          625.90          817.58          704.15




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17           6.00         1000.00         1870.00         1300.00
ITSSW01-834                    ITS CAMERA PROJECT FY17       07/13/17           0.72          800.00         2757.00         3200.00
NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17           0.01        15000.00        61000.00        65000.00
NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17           0.20         4000.00         6000.00         6000.00
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17           1.00         4000.00         1506.67         1100.00
CR100-283                      REGION 1 TRAFFIC SIGNAL CONTR 07/20/17           0.10         3000.00         6175.00         8050.00
SHE0141-024                    SH 14 Poudre Canyon Guardrail 07/20/17           0.10         5000.00         6936.67         6400.00
ITS0761-227                    ITS FIBER OPTICS ON I76 DENVE 07/27/17          11.00         1500.00         1413.79         1800.00
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17           2.62         1000.00          994.49          849.92
ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17           1.00         1750.00          883.33          900.00
IM0762-052                     FIBER OPTICS AND ITS DEVICES  08/03/17           2.40         1300.00         1487.42         2000.00
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17           1.30          902.00        11500.00         3000.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17           1.20          723.33         2950.00         1750.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17          27.60          365.00          384.00          384.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17          11.20         1000.00          653.15          543.00
BRR400-354                     Little-T Channel Work and SH
NHPP0821-108                   SH 82 MP 45 OLVDS             09/07/17           0.20        10000.00         5158.33         2350.00
MPR200-244                     REGION 2 FY18 SIGNING PROJECT 09/14/17           0.12        10000.00         1833.33         2500.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 144
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 212-00006      Seeding (Native)                             Acre ===================================================
AQCR100-258                    CDOT TSSIP 2016 SIG UPGRADE F 09/21/17           0.10         2000.00         3330.00         3100.00
SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17           0.10          700.00        19962.86         9200.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  66.97          942.22         1173.01          999.04




STA094A-034                    Critical Culvert Project on S 10/05/17           0.30         1000.00         3260.79         2500.00
ITSSW01-636                    VMS AND LUS UPGRADE FY 17     10/19/17           0.35         4000.00         7246.67          714.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           1.40         2000.00         1183.67         2365.00
C133A-042                      SH 133 McClure Pass Slip      11/16/17           0.60         2000.00         1887.44         2070.00
NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17           1.00         1200.00         1257.96          900.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17           0.50         1500.00         3666.67         3000.00
ITSSW01-831                    ITS WEATHER STATION UPGRADES  11/30/17           0.80         5000.00        14359.00         4700.00
ITSSW02-003                    ITS FIBER INSTALLATIONS FOR H 11/30/17           0.38         5000.00         2539.00         2375.00
ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17           5.07          800.00          877.79          446.00
BR3852-018                     POA SCOUR US 385
STA050A-027                    US 50C Storm Sewer 21st LANE  12/21/17           1.00          900.00         2529.17         1500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  11.40         1623.33         2315.28         1436.55
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 378.01          807.62         1025.29          821.37


=============== 212-00007      Seeding (Native) (Hydraulic)                 Acre ===================================================


NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17           0.50         5000.00         2147.00          289.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   0.50         5000.00         2147.00          289.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   0.50         5000.00         2147.00          289.00


=============== 212-00009      Seeding (Temporary)                          Acre ===================================================


STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17          15.00          630.00          395.68          446.25
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  15.00          630.00          395.68          446.25




BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17           2.23          750.00          680.54          623.27
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   2.23          750.00          680.54          623.27
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  17.23          645.53          475.09          469.16
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 145
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 212-00011      Seeding (Lawn)                               Acre ===================================================


NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           0.10         4300.00         8046.40        11000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   0.10         4300.00         8046.40        11000.00




AQC088A-035                    Traffic Signal/Fiber Optic In 05/18/17           0.01        20000.00         9309.17         8000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   0.01        20000.00         9309.17         8000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   0.11         5188.68         8090.28        10830.19


=============== 212-00012      Seeding (Furnished)                          Acre ===================================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17          21.20           60.00           63.00           63.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  21.20           60.00           63.00           63.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  21.20           60.00           63.00           63.00


=============== 212-00022      Seeding (Riparian)                           Acre ===================================================


ER0341-093                     PR US 34 BIG THOMPSON CANYON  06/28/17           3.40         4060.00         4060.00         4060.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   3.40         4060.00         4060.00         4060.00




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           4.30         1850.00          861.00          861.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17           0.87         1500.00         1340.39          750.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   5.17         1791.10         1191.77          842.32




NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17           6.00        11000.00         1091.35          900.00
CC0341-100                     US 34 BIG THOMPSON CANYON MOO 12/11/17           1.53         1534.69         1587.58         1587.58
ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17           0.28         3000.00         2832.71          474.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 146
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 212-00022      Seeding (Riparian)                           Acre ===================================================
BR3852-018                     POA SCOUR US 385
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   7.81         8858.91         1197.00         1019.43
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  16.38         5631.99         1367.22         1594.66


=============== 212-00028      Seeding (Wetlands)                           Acre ===================================================


NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           0.20         4300.00         9860.00         7700.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   0.20         4300.00         9860.00         7700.00




STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17           0.02         3000.00        40103.05        36809.14
ER0361-115                     US 36 Bridges                 06/22/17           0.16         5000.00         5967.63        12000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   0.18         4771.43         8036.44        14835.33




ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17           0.10         8000.00        15866.67         9000.00
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17           0.10         7000.00        37200.00        24400.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17          13.30         1850.00         2310.00         2310.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  13.50         1933.70         3110.36         2523.19
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  13.88         2003.60         3846.68         2753.09


=============== 212-00032      Soil Conditioning                            Acre ===================================================


NHPP1602-145                   US 160 S. Fork to Monte Vista 01/12/17           0.50         1000.00         2807.31         3000.00
NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17           7.00         1200.00          973.50          747.00
NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17          16.00         2500.00          925.50          100.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17           0.20         3000.00        13522.50         7000.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17          38.00         2500.00         2660.29         1875.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17           0.23         8000.00        10204.56         4000.00
STA0931-032                    SH 93 Erosion Correction      02/09/17           0.45         3500.00         6850.51         5150.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17           0.90         5000.00         6097.07         2699.96
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17           0.50         3000.00         5394.33         3940.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           2.37         4300.00         3980.00         3500.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 147
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 212-00032      Soil Conditioning                            Acre ===================================================
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17           0.50         6000.00         5400.10         5518.20
SHE160A-031                    SH 160 Passing Lanes          03/02/17           9.34         2770.00         3036.97         3794.44
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17           0.36         6000.00         8042.00         7500.00
NHPP 0701-230                  Midpoint WB Bore              03/02/17           0.84         3000.00         4693.13         7250.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17          13.40         3000.00          775.95          495.00
BR0252-449                     I-25 Woodmen NB               03/02/17           0.60         2500.00        10812.50         2500.00
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17           0.10         2277.89        18904.99         6000.00
STA0243-087                    US 24 El Paso-Elbert CL Pavin 03/23/17           0.15        10000.00        20466.53        20500.00
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17           0.10         7000.00        15335.00        14550.00
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17           1.00         3000.00         4624.00         3500.00
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17           0.10         3000.00        21838.33        52000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  92.64         2645.57         2561.35         1768.59




STA006A-057                    SH 6 EAST OF STERLING         04/06/17           0.50         2732.00         3807.34         1100.00
STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17           0.02         3000.00       137700.00       137700.00
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17          14.40         3000.00         2998.83         2913.15
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17          15.00         2700.00         2972.40         2772.00
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17           0.20        15000.00        18458.33        19200.00
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17           0.49         3000.00         8703.76         8011.27
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          16.30         1500.00         3800.00         3800.00
STAR400-348                    Region 4 Controller and Cabin 05/04/17           0.10        10000.00         5600.00         2800.00
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17           1.30         2800.00         2622.50         2400.00
AQC088A-035                    Traffic Signal/Fiber Optic In 05/18/17           0.01        20000.00        15386.67         8000.00
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17          32.00         2550.00         3010.74         2780.00
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17           0.30         6000.00         8857.00        15000.00
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17           0.70         8000.00         4910.00        10000.00
MTCE0253-259                   I25 FROM MP 229.29 TO MP 244. 06/22/17           0.10        10000.00         5990.00         3100.00
STA0072-019                    SH 7 FROM US 287 TO 75TH STRE 06/22/17           0.29         4000.00         7447.20         5400.00
MTCE142A-002                   SH 142 CHIPSEAL               06/22/17           0.10         4000.00         6700.00         6700.00
ER0361-115                     US 36 Bridges                 06/22/17           6.01         3000.00         2636.39         1800.00
ER0341-093                     PR US 34 BIG THOMPSON CANYON  06/28/17           6.00         6350.00         6350.00         6350.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  93.81         2840.61         3154.43         3319.06




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17           6.00         1600.00         4280.00         4600.00
ITSSW01-834                    ITS CAMERA PROJECT FY17       07/13/17           0.72         2700.00         2757.00         3200.00
NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17           0.01        20000.00        61000.00        65000.00
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17           1.00         6000.00         1713.00         2450.00
CR100-283                      REGION 1 TRAFFIC SIGNAL CONTR 07/20/17           0.10        10000.00         6175.00         8050.00
SHE0141-024                    SH 14 Poudre Canyon Guardrail 07/20/17           0.10         9000.00         3483.33         3550.00
ITS0761-227                    ITS FIBER OPTICS ON I76 DENVE 07/27/17          11.00         3000.00         1939.81         2124.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 148
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 212-00032      Soil Conditioning                            Acre ===================================================
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17           2.62         2800.00         3082.03         3682.97
IM0762-052                     FIBER OPTICS AND ITS DEVICES  08/03/17           2.40         2800.00         2580.58         2300.00
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17           1.30         4290.00        13500.00         7000.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17           1.20         2658.33         7400.00         2500.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17          53.10         5150.00         5410.00         5410.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17          11.20         2500.00         2603.48         2610.00
BRR400-354                     Little-T Channel Work and SH
NHPP0821-108                   SH 82 MP 45 OLVDS             09/07/17           0.20        10000.00         8036.00         2333.00
AQCR100-258                    CDOT TSSIP 2016 SIG UPGRADE F 09/21/17           0.10         2000.00         8533.33         3100.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  91.05         4164.00         3315.44         4416.00




ITSSW01-636                    VMS AND LUS UPGRADE FY 17     10/19/17           0.35         4000.00         6649.50          714.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           1.40         5000.00         3278.67         6940.00
C133A-042                      SH 133 McClure Pass Slip      11/16/17           0.60         3000.00         3294.10         5200.00
NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17           8.00         3000.00         4103.31         3500.00
ITSSW01-831                    ITS WEATHER STATION UPGRADES  11/30/17           0.80         6000.00        10158.50         5900.00
ITSSW02-003                    ITS FIBER INSTALLATIONS FOR H 11/30/17           0.38         5000.00         2789.00         2375.00
CC0341-100                     US 34 BIG THOMPSON CANYON MOO 12/11/17           1.83         2340.01         3070.00         3070.00
ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17           5.35         2600.00         3314.00         2338.00
BR3852-018                     POA SCOUR US 385
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  18.71         3158.32         3995.24         3465.25
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 296.21         3206.47         3091.35         3277.34


=============== 212-00050      Sod                                          Sq Foot ================================================


STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17         300.00            5.00            3.55            3.50
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17      29,565.00            1.25            1.63            1.40
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              29,865.00            1.29            1.65            1.42




NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17       7,218.00            1.00            0.80            0.80
STAR400-348                    Region 4 Controller and Cabin 05/04/17         282.00            2.50            5.00            1.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               7,500.00            1.06            1.10            0.81




NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17         800.00            5.00            5.00            4.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 149
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 212-00050      Sod                                          Sq Foot ================================================
AQCR100-258                    CDOT TSSIP 2016 SIG UPGRADE F 09/21/17         412.00            5.00            4.50            3.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               1,212.00            5.00            4.78            3.83




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17         372.00            2.00            2.23            4.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 372.00            2.00            2.23            4.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              38,949.00            1.37            1.68            1.40


=============== 212-00900      Compost                                      Cubic Yard =============================================


ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17         260.00          125.00           39.34           40.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 260.00          125.00           39.34           40.00




CC0341-100                     US 34 BIG THOMPSON CANYON MOO 12/11/17         427.00           15.15           15.15           15.15
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 427.00           15.15           15.15           15.15
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 687.00           56.72           36.20           24.55


=============== 212-01200      Landscape Restoration                        LUMP SUM ===============================================


SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17           1.00         7500.00        13400.00        12700.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   1.00         7500.00        13400.00        12700.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00         7500.00        13400.00        12700.00


=============== 213-00000      Mulching                                     Acre ===================================================


ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17           1.00         1750.00         1775.00         2000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00         1750.00         1775.00         2000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00         1750.00         1775.00         2000.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 150
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 213-00002      Mulching (Weed Free Hay)                     Acre ===================================================


NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17          16.00          750.00            1.02            1.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17          34.00          750.00          493.26          311.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17           0.23         3000.00         7071.62         4000.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17          13.40          900.00          360.45          405.00
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17           0.10          748.69        17271.77         7050.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  63.73          789.66          459.86          264.39




STA006A-057                    SH 6 EAST OF STERLING         04/06/17           0.50          850.00         2258.37         2100.00
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           7.50          750.00          828.47          584.84
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17           0.20        12000.00        18075.00        18600.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17          14.40          800.01         1676.92          962.00
AQC088A-035                    Traffic Signal/Fiber Optic In 05/18/17           0.01        10000.00        11235.00         8000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  22.61          886.05         1189.09         1019.95




NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17           1.30         2695.00         9000.00         5500.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17           0.20          625.00         4166.67         5000.00
MPR200-244                     REGION 2 FY18 SIGNING PROJECT 09/14/17           0.12        10000.00          750.00          750.00
AQCR100-258                    CDOT TSSIP 2016 SIG UPGRADE F 09/21/17           0.10         2000.00         2196.67          850.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.72         2923.55         6950.52         4840.12




NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17           8.00         2000.00          750.53          550.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   8.00         2000.00          750.53          550.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  96.06          951.36          797.51          608.90


=============== 213-00003      Mulching (Weed Free)                         Acre ===================================================


NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17           7.00         1000.00         1868.16         1836.32
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17           0.90         5000.00         2144.59          696.28
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           2.37         4300.00         1125.20          761.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 151
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 213-00003      Mulching (Weed Free)                         Acre ===================================================
NHPP 0701-230                  Midpoint WB Bore              03/02/17           0.84         1500.00         1436.83         1650.00
BR0252-449                     I-25 Woodmen NB               03/02/17           0.60         1500.00         8500.00         1000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  11.71         2036.81         2070.48         1474.85




STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17           0.10         1500.00        24826.14        22600.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          14.00         1200.00          540.00          540.00
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17           0.20         2000.00         3445.00         4000.00
STA0072-019                    SH 7 FROM US 287 TO 75TH STRE 06/22/17           0.29         2500.00         5534.60         2233.00
ER0361-115                     US 36 Bridges                 06/22/17           0.05         1500.00        20148.20        37000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  14.64         1239.75         1772.26          896.01




ITSSW01-834                    ITS CAMERA PROJECT FY17       07/13/17           0.72         1000.00         2757.00         3200.00
NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17           0.20        40000.00         6000.00         6000.00
CR100-283                      REGION 1 TRAFFIC SIGNAL CONTR 07/20/17           0.10         1000.00         6175.00         8050.00
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17           4.85          750.00          869.13          679.93
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   5.87         2122.23          943.19         1295.85




ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17           5.35          800.00         1186.29          615.00
BR3852-018                     POA SCOUR US 385
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   5.35          800.00         1186.29          615.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  37.57         1563.44         1341.77         1098.88


=============== 213-00004      Mulching (Weed Free Straw)                   Acre ===================================================


NHPP1602-145                   US 160 S. Fork to Monte Vista 01/12/17           0.50         2000.00         1175.59         1000.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17           0.50          550.00         1616.59         1559.58
SHE160A-031                    SH 160 Passing Lanes          03/02/17           9.34          595.00          650.51          875.56
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  10.34          660.76          682.46          914.65




STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17           0.37         1500.00         2536.71         2310.13
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 152
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 213-00004      Mulching (Weed Free Straw)                   Acre ===================================================
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17          38.00          880.00          444.03          410.00
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17           0.30         2000.00         2455.40          600.00
MTCE142A-002                   SH 142 CHIPSEAL               06/22/17           0.10         2000.00         1900.00         1900.00
ER0361-115                     US 36 Bridges                 06/22/17           0.58         2500.00         2101.96         3300.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  39.35          921.09          580.97          475.70




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17           6.00         1000.00         1300.00         1000.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17           8.50          900.00          544.83          415.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  14.50          941.38          728.27          657.07




STA050A-027                    US 50C Storm Sewer 21st LANE  12/21/17           1.00          650.00         1493.33         1000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   1.00          650.00         1493.33         1000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  65.19          880.15          689.99          593.71


=============== 213-00007      Mulching (Wood Strand)                       Acre ===================================================


STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17           1.00         5500.00         1299.60         1200.00
ER0341-093                     PR US 34 BIG THOMPSON CANYON  06/28/17           6.00         8265.00         8265.00         8265.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   7.00         7870.00         6523.65         7255.71




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           5.70         9700.00        10185.00        10185.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   5.70         9700.00        10185.00        10185.00




CC0341-100                     US 34 BIG THOMPSON CANYON MOO 12/11/17           0.93         8030.45         7800.00         7800.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   0.93         8030.45         7800.00         7800.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  13.63         8646.24         8031.29         8517.87
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 153
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 213-00011      Mulching (Hydraulic)                         Acre ===================================================


ER0361-115                     US 36 Bridges                 06/22/17           4.10         2500.00         1175.83          440.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   4.10         2500.00         1175.83          440.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   4.10         2500.00         1175.83          440.00


=============== 213-00012      Spray-on Mulch Blanket                       Acre ===================================================


STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17           0.40         4000.00        14600.00         5500.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17           4.00         3500.00         3270.86         2600.00
STM0243-089                    Midpoint: Station 1019+50 Cen
STA0931-032                    SH 93 Erosion Correction      02/09/17           0.34         4000.00         5760.51         3035.00
STA2873-183                    US 287 Repairs at LCR 17      03/09/17           0.20         5000.00        15624.33        20000.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17           0.40         3500.00        18086.86        22997.79
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17           1.00         4000.00         5530.00         2500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   6.34         3684.54         5713.27         5560.14




STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17          30.00            1.70         2513.00         2835.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           2.00         4000.00         4800.00         4800.00
STAR400-348                    Region 4 Controller and Cabin 05/04/17           0.10        12000.00         3950.00         2200.00
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17           1.50         3500.00         3131.25         3100.00
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17           3.50         3200.00         3043.23         2810.00
ER0361-115                     US 36 Bridges                 06/22/17           2.90         3500.00         3062.76         2300.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  40.00          896.28         2632.65         2900.63




IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17           1.00         5000.00         4816.67         3400.00
ITS0761-227                    ITS FIBER OPTICS ON I76 DENVE 07/27/17          11.00         5000.00         2678.16         2640.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17          47.70         4500.00         4950.00         4950.00
NHPP0821-108                   SH 82 MP 45 OLVDS             09/07/17           0.20        10000.00         6130.00         7915.00
SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17           0.10         4000.00        23482.28         5100.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  60.00         4617.50         3869.69         4510.80




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           0.69         4000.00         2972.00         5615.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 154
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 213-00012      Spray-on Mulch Blanket                       Acre ===================================================
C133A-042                      SH 133 McClure Pass Slip      11/16/17           0.60         5000.00         5024.76         4200.00
NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17           8.00         4000.00         3074.26         2500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   9.29         4064.59         3241.03         2841.16
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 115.63         3234.64         3285.71         3847.56


=============== 213-00013      Spray-on Mulch Blanket                       Pound ==================================================


NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17       1,080.00           10.00            2.46            2.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               1,080.00           10.00            2.46            2.50




STA094A-034                    Critical Culvert Project on S 10/05/17         900.00            4.00            3.57            4.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 900.00            4.00            3.57            4.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,980.00            7.27            3.06            3.18


=============== 213-00061      Mulch Tackifier                              Pound ==================================================


NHPP1602-145                   US 160 S. Fork to Monte Vista 01/12/17          50.00            6.00            5.82            3.00
NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17         700.00            3.00            5.41            5.32
NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17       3,282.00            3.00            0.57            0.10
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17       6,800.00            2.75            2.34            2.10
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17          23.00           50.00           29.40           10.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17         200.00            4.00            4.51            3.48
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17         474.00            5.50            3.12            3.25
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17          50.00           60.00            7.39            7.96
SHE160A-031                    SH 160 Passing Lanes          03/02/17         929.00            3.00            3.28            2.11
NHPP 0701-230                  Midpoint WB Bore              03/02/17         168.00           10.00            8.89            9.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17       2,680.00            3.00            2.08            2.10
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17          20.00            2.61           23.94            3.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              15,376.00            3.32            2.52            1.95




STA006A-057                    SH 6 EAST OF STERLING         04/06/17         100.00            3.00           11.03           10.50
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 155
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 213-00061      Mulch Tackifier                              Pound ==================================================
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17          30.00            5.00           27.63           25.20
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17       1,504.00            5.00            2.54            3.20
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17       3,000.00            2.50            1.82            3.05
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17          30.00           40.00           61.67           60.00
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17          74.00           10.00            6.66            5.97
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17       2,800.00            2.75            2.70            2.70
NHPPC120-026                   US 85: I-76 to 168th          05/04/17       3,100.00            2.01            3.08            2.40
AQC088A-035                    Traffic Signal/Fiber Optic In 05/18/17          20.00           25.00           23.26           30.00
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17       9,832.00            2.25            1.95            1.80
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17          30.00           11.00           14.39           20.00
STA0072-019                    SH 7 FROM US 287 TO 75TH STRE 06/22/17          58.00            8.00           24.54            5.58
MTCE142A-002                   SH 142 CHIPSEAL               06/22/17           1.00            6.00            7.00            7.00
ER0361-115                     US 36 Bridges                 06/22/17          10.00            3.00           15.59            2.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              20,589.00            2.66            2.58            2.54




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17       3,000.00            3.00            3.63            3.20
NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17          30.00           15.00           36.00           36.00
CR100-283                      REGION 1 TRAFFIC SIGNAL CONTR 07/20/17          20.00           10.00           41.63           15.00
ITS0761-227                    ITS FIBER OPTICS ON I76 DENVE 07/27/17       2,200.00            3.00            2.70            3.20
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17         970.00            3.00            3.20            2.72
ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17         200.00           20.00            5.50            6.00
IM0762-052                     FIBER OPTICS AND ITS DEVICES  08/03/17         480.00            3.00            4.25            4.00
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17         260.00            6.60           81.50           13.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17          50.00            2.50           13.17           15.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17       1,694.00            3.50            2.04            1.80
BRR400-354                     Little-T Channel Work and SH
MPR200-244                     REGION 2 FY18 SIGNING PROJECT 09/14/17          24.00           25.00           22.67            8.00
AQCR100-258                    CDOT TSSIP 2016 SIG UPGRADE F 09/21/17           1.00          500.00          147.33           25.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               8,929.00            3.75            3.69            3.49




NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17       3,000.00            3.00            2.43            2.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               3,000.00            3.00            2.43            2.50
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              47,894.00            3.10            2.89            2.57


=============== 213-00065      Inorg Mulch                                  Cubic Yard =============================================


NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           4.00           70.00          170.00          170.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   4.00           70.00          170.00          170.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   4.00           70.00          170.00          170.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 156
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 213-00070      Landscape Weed Barr Fabric                   Sq Yard ================================================


STAR500-190                    R5 Signal Replacement Chaffee 04/27/17          59.00           15.00           15.67           12.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          38.00            4.00            3.00            3.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  97.00           10.69           13.43            8.47
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  97.00           10.69           13.43            8.47


=============== 213-00150      Bonded Fiber Matrix                          Acre ===================================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17          20.00         3000.00         2829.57         2400.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17           0.50         5000.00         4520.00         3130.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  20.50         3048.78         2865.03         2434.76




STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17           0.50         5000.00         6086.46         5620.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   0.50         5000.00         6086.46         5620.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  21.00         3095.24         2909.47         2579.55


=============== 213-00705      Landscape Boulder (Special)                  Each ===================================================


CC0341-100                     US 34 BIG THOMPSON CANYON MOO 12/11/17         134.00          192.37          134.52          134.52
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 134.00          192.37          134.52          134.52
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 134.00          192.37          134.52          134.52


=============== 214-00000      Landscape Maintenance                        LUMP SUM ===============================================


NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17           1.00        10000.00        15542.42        10310.00
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17           1.00         5000.00         5926.67         1480.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   2.00         7500.00        10734.55         5895.00




NHPPC120-026                   US 85: I-76 to 168th          05/04/17           1.00        30000.01        10035.91         6720.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 157
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 214-00000      Landscape Maintenance                        LUMP SUM ===============================================
ER0361-115                     US 36 Bridges                 06/22/17           1.00        22500.00        47615.00        18000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   2.00        26250.01        35088.64        12360.00




ITS0761-227                    ITS FIBER OPTICS ON I76 DENVE 07/27/17           1.00        15000.00         8333.60         9000.00
ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17           1.00         5000.00         9833.33        14000.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17           1.00        30000.00        23846.76        17025.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   3.00        16666.67        17551.70        13341.67




NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17           1.00        12000.00        62708.33        55000.00
ITSSW02-003                    ITS FIBER INSTALLATIONS FOR H 11/30/17           1.00         5000.00         4538.75         1500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   2.00         8500.00        39440.50        28250.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   9.00        14944.45        25183.92        14781.67


=============== 214-00001      Landscape Maintenance (2018)                 LUMP SUM ===============================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           1.00       126500.00       125000.00       125000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00       126500.00       125000.00       125000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00       126500.00       125000.00       125000.00


=============== 214-00002      Landscape Maintenance (2019)                 LUMP SUM ===============================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           1.00       173000.00       225000.00       225000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00       173000.00       225000.00       225000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00       173000.00       225000.00       225000.00


=============== 214-00003      Landscape Maintenance (2020)                 LUMP SUM ===============================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           1.00        75000.00       125000.00       125000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00        75000.00       125000.00       125000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00        75000.00       125000.00       125000.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 158
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 214-00004      Landscape Maintenance (Cedar Cove)           LUMP SUM ===============================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           1.00        75000.00       175000.00       175000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00        75000.00       175000.00       175000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00        75000.00       175000.00       175000.00


=============== 214-00005      Landscape Maintenance (24 Month)             LUMP SUM ===============================================


NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17           1.00         5000.00        11948.00         2000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   1.00         5000.00        11948.00         2000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00         5000.00        11948.00         2000.00


=============== 214-00145      Plant Protect Fence                          Lin Foot ===============================================


STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17       1,000.00            5.00            2.40            2.65
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,000.00            5.00            2.40            2.65
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,000.00            5.00            2.40            2.65


=============== 214-00155      Plant (B and B)                              Each ===================================================


ER0341-093                     PR US 34 BIG THOMPSON CANYON  06/28/17         662.00           40.00           40.00           40.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 662.00           40.00           40.00           40.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 662.00           40.00           40.00           40.00


=============== 214-00201      Deciduous Tree (Tubeling)                    Each ===================================================


ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17         247.00           10.00           12.55            9.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 247.00           10.00           12.55            9.00




NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17          70.00           25.00           10.33            8.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  70.00           25.00           10.33            8.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 317.00           13.31           12.26            8.78
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 159
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 214-00210      Deciduous Tree (1 In C)                      Each ===================================================


NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17          40.00          250.00           78.26           80.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  40.00          250.00           78.26           80.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  40.00          250.00           78.26           80.00


=============== 214-00215      Deciduous Tree (1.5 In C)                    Each ===================================================


STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17           5.00          330.00         1306.50         1000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   5.00          330.00         1306.50         1000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   5.00          330.00         1306.50         1000.00


=============== 214-00230      Deciduous Tree (3 In C)                      Each ===================================================


ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17           3.00          600.00          672.55          692.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   3.00          600.00          672.55          692.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   3.00          600.00          672.55          692.00


=============== 214-00280      Deciduous Tree (8 Ft)                        Each ===================================================


ER0361-115                     US 36 Bridges                 06/22/17          35.00          500.00          460.71          460.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  35.00          500.00          460.71          460.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  35.00          500.00          460.71          460.00


=============== 214-00301      Deciduous Shrub (Tubeling)                   Each ===================================================


ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17         649.00           10.00            8.74            8.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 649.00           10.00            8.74            8.00




NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17       1,360.00           15.00            8.64            8.70
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               1,360.00           15.00            8.64            8.70
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               2,009.00           13.38            8.69            8.47
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 160
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 214-00350      Deciduous Shrub (5 Gal)                      Each ===================================================


ER0361-115                     US 36 Bridges                 06/22/17       1,105.00           45.00           33.54           24.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,105.00           45.00           33.54           24.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,105.00           45.00           33.54           24.00


=============== 214-00410      Evergreen Tree (1 Gal)                       Each ===================================================


NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17          20.00          100.00           36.74           26.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  20.00          100.00           36.74           26.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  20.00          100.00           36.74           26.00


=============== 214-00901      Perennials (Tubeling)                        Each ===================================================


CC0341-100                     US 34 BIG THOMPSON CANYON MOO 12/11/17         108.00            2.89            3.00            3.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 108.00            2.89            3.00            3.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 108.00            2.89            3.00            3.00


=============== 214-01010      Brush Layer Cutting                          Each ===================================================


STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17          40.00            6.00            5.19            4.56
ER0361-115                     US 36 Bridges                 06/22/17       1,385.00            5.50            5.83           10.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,425.00            5.51            5.82            9.85
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,425.00            5.51            5.82            9.85


=============== 214-01011      Live Brush Mattress                          Lin Foot ===============================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17       2,261.00           10.00           26.50           26.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               2,261.00           10.00           26.50           26.50
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               2,261.00           10.00           26.50           26.50
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 161
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 214-01013      Live Willow Stakes                           Each ===================================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17      31,619.00            7.45            8.00            8.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER              31,619.00            7.45            8.00            8.00




CC0341-100                     US 34 BIG THOMPSON CANYON MOO 12/11/17         441.00           20.00           21.74           21.74
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 441.00           20.00           21.74           21.74
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              32,060.00            7.62            8.19            8.19


=============== 214-01014      Live Willow Brush                            Each ===================================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17      30,532.00            7.45            4.00            4.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER              30,532.00            7.45            4.00            4.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              30,532.00            7.45            4.00            4.00


=============== 214-01015      Willow Cuttings                              Each ===================================================


STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17       1,100.00            7.00            5.58            5.79
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17         105.00            7.00            4.63            3.50
ER0341-093                     PR US 34 BIG THOMPSON CANYON  06/28/17       3,160.00            9.50            9.50            9.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               4,365.00            8.81            6.29            8.42




ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17         350.00           10.00            5.33            6.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17         959.00            5.00            3.70            3.50
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               1,309.00            6.34            3.85            4.17
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               5,674.00            8.24            5.30            7.44


=============== 214-01018      Live Brush Soil Lift                         Lin Foot ===============================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17      10,744.00            5.00           45.00           45.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER              10,744.00            5.00           45.00           45.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              10,744.00            5.00           45.00           45.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 162
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 214-01019      Single Soil Lift                             Lin Foot ===============================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17       2,540.00            5.00           40.00           40.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               2,540.00            5.00           40.00           40.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               2,540.00            5.00           40.00           40.00


=============== 214-01025      Dormant Log Cutting                          Each ===================================================


NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17          50.00           60.00           86.83           85.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  50.00           60.00           86.83           85.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  50.00           60.00           86.83           85.00


=============== 214-01032      Large Woody Material                         Each ===================================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         341.00         1355.33         1665.00         1665.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 341.00         1355.33         1665.00         1665.00




CC0341-100                     US 34 BIG THOMPSON CANYON MOO 12/11/17          20.00          919.12         1600.00         1600.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  20.00          919.12         1600.00         1600.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 361.00         1331.16         1661.40         1661.40


=============== 214-01225      Inst Plant (Bareroot)                        Each ===================================================


ER0341-093                     PR US 34 BIG THOMPSON CANYON  06/28/17         850.00            7.50            7.50            7.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 850.00            7.50            7.50            7.50
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 850.00            7.50            7.50            7.50


=============== 214-01227      Rootwad                                      Each ===================================================


ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17          19.00         4000.00         1838.81          300.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 163
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 214-01227      Rootwad                                      Each ===================================================
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  19.00         4000.00         1838.81          300.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  19.00         4000.00         1838.81          300.00


=============== 214-01229      Wetland Sod Mat                              Sq Foot ================================================


ER0361-115                     US 36 Bridges                 06/22/17       6,581.00           10.00            6.17            5.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               6,581.00           10.00            6.17            5.00




NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17       4,950.00            8.00            6.80            7.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               4,950.00            8.00            6.80            7.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              11,531.00            9.14            6.44            5.86


=============== 214-01401      Nursery Stock Container (DRC #10)            Each ===================================================


ER0361-115                     US 36 Bridges                 06/22/17       4,700.00            3.00            3.53            3.25
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               4,700.00            3.00            3.53            3.25




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17       7,867.00            4.60            5.00            5.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17       4,108.00            4.00            3.86            3.25
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER              11,975.00            4.39            4.03            4.40
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              16,675.00            4.00            3.86            4.08


=============== 214-01402      Nursery Stock Container (DRC # 40)           Each ===================================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17       5,792.00           15.00           16.00           16.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               5,792.00           15.00           16.00           16.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               5,792.00           15.00           16.00           16.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 164
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 214-01403      Nursery Stock Container (DRC # 60)           Each ===================================================


BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17          80.00           45.00           30.63           26.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  80.00           45.00           30.63           26.50




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17       2,446.00           15.50           17.00           17.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               2,446.00           15.50           17.00           17.00




CC0341-100                     US 34 BIG THOMPSON CANYON MOO 12/11/17         499.00            9.34           10.00           10.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 499.00            9.34           10.00           10.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               3,025.00           15.26           17.27           16.10


=============== 214-01404      Nursery Stock Container (DRC # 180)          Each ===================================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         206.00           27.50           29.00           29.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 206.00           27.50           29.00           29.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 206.00           27.50           29.00           29.00


=============== 215-00000      Transplant Shrub                             Each ===================================================


NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17          10.00          100.00          190.60           75.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  10.00          100.00          190.60           75.00




STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17          15.00          200.00          149.03          137.08
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  15.00          200.00          149.03          137.08




ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17           7.00          800.00          256.67          200.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   7.00          800.00          256.67          200.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  32.00          300.00          187.05          131.44
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 165
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 216-00030      Soil Reten Blanket (Spec)                    Sq Yard ================================================


ER0361-115                     US 36 Bridges                 06/22/17       2,800.00            4.50            8.19            2.30
ER0341-093                     PR US 34 BIG THOMPSON CANYON  06/28/17       5,535.00           12.00           12.00           12.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               8,335.00            9.48            9.13            8.74




CC0341-100                     US 34 BIG THOMPSON CANYON MOO 12/11/17       3,019.00           10.10            9.00            9.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               3,019.00           10.10            9.00            9.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              11,354.00            9.65            9.11            8.81


=============== 216-00041      Soil Reten Blanket (S/C)                     Sq Yard ================================================


STE 0702-357                   I-70 West Vail Pass Basin     03/23/17         484.00            5.00            5.65            3.25
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 484.00            5.00            5.65            3.25




NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17         240.00            8.00            5.28           10.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 240.00            8.00            5.28           10.00




ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17       2,360.00            3.00            3.09            2.51
BR3852-018                     POA SCOUR US 385
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               2,360.00            3.00            3.09            2.51
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               3,084.00            3.70            3.53            3.21


=============== 216-00042      Soil Retent Blanket (BioD S/C)               Sq Yard ================================================


STAR500-190                    R5 Signal Replacement Chaffee 04/27/17         385.00           15.00           12.33           11.00
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17         618.00            5.00            4.31            3.92
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,003.00            8.84            7.39            6.64
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,003.00            8.84            7.39            6.64
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 166
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 216-00047      Soil Wrap (Coir and Jute)                    Sq Yard ================================================


ER0341-093                     PR US 34 BIG THOMPSON CANYON  06/28/17       1,350.00           13.50           13.50           13.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,350.00           13.50           13.50           13.50




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17      49,672.00            6.25            6.50            6.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER              49,672.00            6.25            6.50            6.50
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              51,022.00            6.44            6.69            6.69


=============== 216-00070      Geocell Confinement Sys                      Sq Yard ================================================


NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17          79.00           30.00          132.00           50.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  79.00           30.00          132.00           50.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  79.00           30.00          132.00           50.00


=============== 216-00101      Soil Reten Blanket (S-C)(PhotoD Cl 1)        Sq Yard ================================================


NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17         400.00            2.00            3.35            3.40
STA0243-087                    US 24 El Paso-Elbert CL Pavin 03/23/17         730.00            3.00            5.48            3.70
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17         968.00            3.03           10.42            5.25
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               2,098.00            2.82            7.00            4.36




NHPPC120-026                   US 85: I-76 to 168th          05/04/17       1,000.00            5.01           27.06            2.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,000.00            5.01           27.06            2.00




ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17       2,470.00            3.70            3.20            3.25
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               2,470.00            3.70            3.20            3.25
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 167
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 216-00101      Soil Reten Blanket (S-C)(PhotoD Cl 1)        Sq Yard ================================================




NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17         100.00           10.00            6.80            5.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 100.00           10.00            6.80            5.50
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               5,668.00            3.72            8.71            3.48


=============== 216-00201      Soil Reten Blanket (S-C)(BioD Cl 1)          Sq Yard ================================================


STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17         970.00            3.00            3.75            4.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17         800.00            5.00            2.72            2.30
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17         449.00            5.00            5.39            3.50
IM025A-039                     I-25 Critical Culvert at MP 1 02/09/17       1,700.00            2.75            5.63            4.48
STA0931-032                    SH 93 Erosion Correction      02/09/17         520.00            3.00            4.69            3.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17       3,025.00            2.50            3.10            2.60
SHE160A-031                    SH 160 Passing Lanes          03/02/17      14,809.00            2.00            2.76            2.91
STA0362-035                    US 36: Strasburg to Byers     03/23/17         773.00            2.50            5.96            5.01
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              23,046.00            2.36            3.16            3.11




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17         145.00            2.50           11.60           11.60
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17      33,300.00            3.00            2.15            2.04
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17       2,000.00            3.00            2.70            2.70
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17       1,400.00            3.50            2.14            1.80
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17       9,218.00            2.25            2.02            1.86
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17          21.00           10.00           24.70           50.00
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17       3,200.00            4.00            4.10            5.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              49,284.00            2.94            2.22            2.27




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17       4,000.00            3.00            3.32            2.25
NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17         450.00            4.50            4.13            4.25
SHE0141-024                    SH 14 Poudre Canyon Guardrail 07/20/17         100.00            3.50            7.45            7.75
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17          20.00            5.50           15.70           17.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17       5,343.00            6.88            4.96            3.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17      10,345.00            2.50            2.22            2.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 168
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 216-00201      Soil Reten Blanket (S-C)(BioD Cl 1)          Sq Yard ================================================
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER              20,258.00            3.81            2.68            2.41




ITSSW01-636                    VMS AND LUS UPGRADE FY 17     10/19/17       1,750.00            2.00            4.35            4.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17       3,351.00            3.00            2.30            3.60
C133A-042                      SH 133 McClure Pass Slip      11/16/17         310.00            5.00            3.85            5.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17         675.00            2.75            9.67           10.00
ITSSW01-831                    ITS WEATHER STATION UPGRADES  11/30/17       4,000.00            2.00            4.02            2.00
ITSSW02-003                    ITS FIBER INSTALLATIONS FOR H 11/30/17       1,800.00            2.50            3.28            4.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER              11,886.00            2.48            3.86            3.66
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR             104,474.00            2.93            2.60            2.64


=============== 216-00211      Soil Reten Blanket (Exc)(BioD Cl 1)          Sq Yard ================================================


CR100-283                      REGION 1 TRAFFIC SIGNAL CONTR 07/20/17         100.00            5.00            8.38            6.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 100.00            5.00            8.38            6.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 100.00            5.00            8.38            6.00


=============== 216-00221      Soil Reten Blanket (C)(BioD Cl 1)            Sq Yard ================================================


CC0341-100                     US 34 BIG THOMPSON CANYON MOO 12/11/17       1,000.00            5.45            5.00            5.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               1,000.00            5.45            5.00            5.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,000.00            5.45            5.00            5.00


=============== 216-00301      Turf Reinf Mat (Cl 1)                        Sq Yard ================================================


STA0931-032                    SH 93 Erosion Correction      02/09/17         100.00            6.00           14.22           18.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 100.00            6.00           14.22           18.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 100.00            6.00           14.22           18.00


=============== 216-00302      Turf Reinf Mat (Cl 2)                        Sq Yard ================================================


C133A-042                      SH 133 McClure Pass Slip      11/16/17         310.00            5.00            8.98            6.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 310.00            5.00            8.98            6.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 310.00            5.00            8.98            6.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 169
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 216-00303      Turf Reinf Mat (Cl 3)                        Sq Yard ================================================


STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17       2,458.00            4.75            4.86            4.48
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               2,458.00            4.75            4.86            4.48




IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17         525.00            9.00           11.07            7.75
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 525.00            9.00           11.07            7.75
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               2,983.00            5.50            6.36            5.06


=============== 217-00000      Herbicide Treatment                          Sq Yard ================================================


STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17      23,965.00            0.30            0.04            0.03
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17         300.00            1.20            3.36            5.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              24,265.00            0.31            0.14            0.09




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         400.00          120.00          125.00          125.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17       1,801.00            1.00            1.76            2.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               2,201.00           22.63            4.19           24.35
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              26,466.00            2.17            1.31            2.11


=============== 217-00015      Noxious Weed Management                      Sq Yard ================================================


STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17       1,230.00           80.00            3.17            7.72
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,230.00           80.00            3.17            7.72
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,230.00           80.00            3.17            7.72


=============== 217-00020      Herbicide Treatment                          Hour ===================================================


NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17           5.00          130.00          181.40          101.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 170
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 217-00020      Herbicide Treatment                          Hour ===================================================
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17          40.00          100.00           68.87           67.60
SHE160A-031                    SH 160 Passing Lanes          03/02/17          12.00          143.00          168.49          166.67
BR0252-449                     I-25 Woodmen NB               03/02/17           4.00          150.00          271.25          275.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  61.00          114.20          127.53          103.43




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17          20.00          100.00          115.00          115.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17          10.00          150.01          103.36           99.00
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17           5.00          142.00          213.00          425.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  35.00          120.29          143.01          154.71




NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17          12.00          303.00         1090.00          180.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  12.00          303.00         1090.00          180.00




NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17          10.00          100.00          304.82          350.00
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17          40.00          120.00          181.40          200.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  50.00          116.00          209.88          230.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 158.00          130.46          202.90          160.66


=============== 218-00000      Noxious Weed Management                      LUMP SUM ===============================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17           1.00        46800.00        75000.00        75000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00        46800.00        75000.00        75000.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00        46800.00        75000.00        75000.00


=============== 240-00000      Wildlife Biologist                           Hour ===================================================


NHPP0702-352                   HLT VMS CMS LUS REPLACEMENT   01/05/17           8.00          128.00          185.63          131.25
NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17          20.00          150.00          156.45          112.90
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 171
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 240-00000      Wildlife Biologist                           Hour ===================================================
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17          15.00          150.00          126.61          100.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17          40.00           85.00          135.34          136.53
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17          40.00          100.00          110.33          121.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17           8.00          120.00          204.00          125.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17          15.00          200.00          119.70           95.88
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17          15.00          100.00          227.00          220.00
NHPP 0701-230                  Midpoint WB Bore              03/02/17          40.00          150.00          247.65          215.00
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17          40.00          105.04           99.39          100.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17         120.00          100.00          168.69          117.94
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17          10.00          120.00          166.15          150.00
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17           5.00          285.00          150.97          236.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 376.00          116.92          157.55          133.72




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17          16.00          100.00          104.00          104.00
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17           8.00          101.00          135.44          125.00
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17          20.00          150.00          155.33          156.00
NHPP0704-240                   Package C (I-70 and I-25) Bri 04/27/17          40.00          100.00           90.00           95.00
STRR500-169                    R5 US 84 MP 14.67 Priority Cu 04/27/17          40.00          115.00          103.24           79.72
NHPPC120-026                   US 85: I-76 to 168th          05/04/17         120.00          100.01           89.83           95.00
STA0703-437                    I-70: 32ND TO 44TH            06/01/17          60.00          100.00          108.07          100.00
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17          40.00          150.00          111.63           50.00
ER0361-115                     US 36 Bridges                 06/22/17         226.00          105.00           91.25          100.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 570.00          108.31           96.51           96.09




ITSSW01-834                    ITS CAMERA PROJECT FY17       07/13/17          30.00          120.00          172.50          145.00
NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17          40.00          120.00          115.00          115.00
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17          40.00          110.00          124.67          200.00
ITS0761-227                    ITS FIBER OPTICS ON I76 DENVE 07/27/17         120.00          100.00          153.32          140.00
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17          20.00          143.00          257.50          165.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 250.00          110.64          153.72          148.20




ITSSW01-636                    VMS AND LUS UPGRADE FY 17     10/19/17          36.00          100.00          154.67          200.00
NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17          20.00          120.00          132.02          120.00
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17         120.00          120.00          140.62          120.00
MTCE092A-027                   MTCE R3 FY18 SH 92 STR I-06-A 12/07/17          10.00          105.00          206.67          270.00
NHPP006A-059                   US 6 CLEAR CREEK CANYON SH 93 12/14/17          80.00          125.00          124.33          123.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 266.00          118.23          140.68          137.37
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,462.00          112.73          127.38          122.19
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 172
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 240-00001      Wildlife Biologist                           Day ====================================================


NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          25.00          500.00          985.00          985.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  25.00          500.00          985.00          985.00




C0702-372                      I-70 GWC Rockfall Fence Impro 10/12/17           5.00         1000.00          928.75          950.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           2.00          500.00          588.67          765.00
C133A-042                      SH 133 McClure Pass Slip      11/16/17           2.00          500.00         1210.42         1500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   9.00          777.78         1005.82         1031.11
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  34.00          573.53          996.69          997.21


=============== 240-00010      Rem of Nests                                 Hour ===================================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17         100.00           90.00          113.19          100.00
STM0243-089                    Midpoint: Station 1019+50 Cen
IM025A-039                     I-25 Critical Culvert at MP 1 02/09/17           8.00          100.00          181.33          247.80
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17          40.00          115.00           89.67          101.00
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17          10.00          120.00          219.40          102.00
SHE160A-031                    SH 160 Passing Lanes          03/02/17          10.00          100.00          241.97          138.89
NHPP 0701-230                  Midpoint WB Bore              03/02/17          40.00          120.00          132.13          145.00
BR0252-449                     I-25 Woodmen NB               03/02/17          24.00          100.00          116.75           95.00
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17          40.00          105.45           81.31           72.00
ER0341-089                     PR US 34 Big Thompson Canyon  03/17/17           5.00          149.00          149.00          149.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17         120.00          115.00          176.88          112.04
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17          10.00          145.00          155.92          113.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 407.00          108.14          140.29          111.24




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17          16.00          120.00           99.00           99.00
STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17          80.00          110.00           79.10           67.30
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17          10.00          100.00          149.48          132.00
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17           8.00          120.00          174.00          222.00
NHPP0704-240                   Package C (I-70 and I-25) Bri 04/27/17          40.00          120.00          105.00          200.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          20.00           90.00          135.00          135.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17         120.00          100.01           86.32           90.00
STA0703-437                    I-70: 32ND TO 44TH            06/01/17          60.00           45.00          130.47           96.00
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17          10.00          105.00          135.80           83.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 173
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 240-00010      Rem of Nests                                 Hour ===================================================
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17          40.00          150.00           86.19           50.00
ER0361-115                     US 36 Bridges                 06/22/17          44.00          100.00           76.95          120.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 448.00          101.41          100.04          101.42




ITSSW01-834                    ITS CAMERA PROJECT FY17       07/13/17          10.00          105.00          167.50          135.00
NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17          40.00          120.00           78.00           78.00
IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17          40.00          110.00          118.00          190.00
NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17          20.00           99.00          217.50           85.00
ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17          20.00          120.00           91.46          131.39
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17          10.00           75.00          150.00          150.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 140.00          109.86          125.23          127.84




STA094A-034                    Critical Culvert Project on S 10/05/17          20.00          100.00           77.47           70.00
C0702-372                      I-70 GWC Rockfall Fence Impro 10/12/17           8.00          150.00          253.75          260.00
ITSSW01-636                    VMS AND LUS UPGRADE FY 17     10/19/17          36.00          100.00          137.17          200.00
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17          40.00          120.00          121.80           90.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17           8.00          125.00          148.33          100.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 112.00          112.50          121.57          134.64
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,107.00          106.07          119.64          111.75


=============== 240-00020      Netting                                      Sq Yard ================================================


NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17         800.00           10.00           12.15           14.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17         500.00           10.00           10.59            6.00
STM0243-089                    Midpoint: Station 1019+50 Cen
SHE160A-031                    SH 160 Passing Lanes          03/02/17          10.00           10.00          116.94          161.11
NHPP 0701-230                  Midpoint WB Bore              03/02/17         560.00           10.00           14.98           16.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               1,870.00           10.00           14.19           14.54




STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17         942.00           30.00           10.27            9.32
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17          50.00           75.00           28.62            7.17
NHPP0704-240                   Package C (I-70 and I-25) Bri 04/27/17         200.00           15.00           20.36           34.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 174
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 240-00020      Netting                                      Sq Yard ================================================
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17         750.00            8.00           18.00           18.00
ER0361-115                     US 36 Bridges                 06/22/17         900.00           13.00            7.70            4.70
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               2,842.00           18.55           11.33           11.85




ER012A-047                     P-17-L Scour Critical SH 12 a 08/24/17          13.00            8.00           95.33          123.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         500.00           21.34           20.00           20.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 513.00           21.00           25.45           22.61




STA094A-034                    Critical Culvert Project on S 10/05/17         225.00           10.00            8.01            8.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 225.00           10.00            8.01            8.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               5,450.00           15.49           12.29           13.58


=============== 240-00100      Prairie Dog Mgmt                             LUMP SUM ===============================================


ITSSW01-834                    ITS CAMERA PROJECT FY17       07/13/17           1.00         2000.00         6175.00        11850.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00         2000.00         6175.00        11850.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   1.00         2000.00         6175.00        11850.00


=============== 250-00010      Envir Health/Safety Mngmt                    LUMP SUM ===============================================


NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17           1.00         3500.00         6444.00         5388.00
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17           1.00         5000.00         4736.67         5410.00
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17           1.00         6000.00        17540.00        12000.00
NHPP 0701-230                  Midpoint WB Bore              03/02/17           1.00         5000.00         5170.50         5335.00
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17           1.00         3500.00         4117.20         3400.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   5.00         4600.00         8634.02         6306.60




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           1.00         5000.00         4812.24         4406.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 175
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 250-00010      Envir Health/Safety Mngmt                    LUMP SUM ===============================================
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17           1.00         6000.00         5441.67         4200.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17           1.00         5000.00        10000.00        10000.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   3.00         5333.33         5254.49         6202.00




NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17           1.00         8500.00         2600.00         2600.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                   1.00         8500.00         2600.00         2600.00




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17           1.00         5000.00         5418.67         6255.00
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17           1.00        10000.00         6972.80         2500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   2.00         7500.00         6390.00         4377.50
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  11.00         5681.82         6775.48         5590.36


=============== 250-00050      Monitoring Technician                        Hour ===================================================


NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17           8.00          110.00          115.69          121.38
NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17          10.00          120.00          213.49          380.00
NHPP 0701-230                  Midpoint WB Bore              03/02/17          50.00          100.00          147.75          120.00
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17          80.00           75.00           97.51           75.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 148.00           88.38          119.42          113.32




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17          40.00           75.00           89.37           82.00
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17          80.00          100.00          105.33          116.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          20.00          100.00          115.00          115.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 140.00           92.86           95.24          106.14




NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17          12.00           95.00           85.00           85.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  12.00           95.00           85.00           85.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 176
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 250-00050      Monitoring Technician                        Hour ===================================================




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17          50.00          100.00          135.33          305.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  50.00          100.00          135.33          305.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 350.00           92.06          108.19          136.86


=============== 250-00100      Environmental Health and Safety              LUMP SUM ===============================================


NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17           1.00         6000.00         6187.70         4800.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   1.00         6000.00         6187.70         4800.00




NHPP 0703-431                  CLEAR CREEK ECOLOGIC RESTORAT 11/30/17           1.00         3500.00         4869.69         2500.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                   1.00         3500.00         4869.69         2500.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                   2.00         4750.00         5309.02         3650.00


=============== 250-00110      Health and Safety Officer                    Hour ===================================================


NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17           5.00          200.00          233.66          390.00
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17          20.00          200.00          307.00          220.00
NHPP 0701-230                  Midpoint WB Bore              03/02/17          50.00          110.00          265.24          120.00
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17          80.00          100.00          121.69          105.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 155.00          119.35          193.05          133.87




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17          40.00          100.00          113.42          102.00
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17          10.00          120.00          169.67          204.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          20.00          120.00          130.00          130.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  70.00          108.57          117.23          124.57




NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17           4.00          120.00          115.00          115.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 177
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 250-00110      Health and Safety Officer                    Hour ===================================================
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17          80.00           87.14           80.00           80.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  84.00           88.70           81.67           81.67




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17          50.00          120.00          157.00          350.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  50.00          120.00          157.00          350.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 359.00          110.17          152.32          149.94


=============== 250-00120      Material Sampling and Delivery               Each ===================================================


NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17           2.00          600.00          353.25          106.50
NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17           5.00          200.00          439.74          235.00
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17           4.00          100.00          582.00          200.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  11.00          236.36          503.82          198.91




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17           5.00          100.00          196.47          111.00
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17           5.00          300.00          377.67          414.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  10.00          200.00          232.71          262.50
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  21.00          219.05          325.46          229.19


=============== 250-00200      Material Handling (Stockpile)                Cubic Yard =============================================


NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17          10.00          125.00          113.75          102.50
NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17           1.00           80.00         1980.10         1125.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  11.00          120.91          357.19          195.45




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17          50.00           50.00           58.98          397.00
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17          12.00          200.00           98.33          120.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          50.00           35.00           30.50           30.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 112.00           59.38           58.97          203.71
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 178
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 250-00200      Material Handling (Stockpile)                Cubic Yard =============================================




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17         555.00           35.00           15.17           29.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 555.00           35.00           15.17           29.50
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 678.00           40.42           31.14           60.97


=============== 250-00210      Solid Waste Disposal                         Cubic Yard =============================================


NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17          10.00          500.00          302.85          105.70
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  10.00          500.00          302.85          105.70




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17          50.00           50.00           59.32           35.00
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17          12.00         1000.00          178.33          120.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  62.00          233.87           66.06           51.45
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  72.00          270.83           73.28           58.99


=============== 250-00220      Hazardous Waste Disposal                     Cubic Yard =============================================


NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17           1.00          300.00         2563.43         1275.00
NHPP 0701-230                  Midpoint WB Bore              03/02/17           1.00          500.00         2666.33          605.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   2.00          400.00         2614.88          940.00




STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17          50.00          750.00          211.32           21.14
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17          12.00         2000.00          318.00          164.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17          50.00          100.00           37.25           37.25
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 112.00          593.75          204.23           43.64




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17         555.00          100.00           11.57           19.70
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 555.00          100.00           11.57           19.70
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 669.00          183.56           74.27           26.46
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 179
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 304-01000      ABC (CL 1)                                   Ton ====================================================


NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17         519.00           25.00           41.05           24.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 519.00           25.00           41.05           24.00




STR139A-034                    SH 139 DOUGLAS PASS MP 19.0 - 12/21/17          14.36          200.00          145.83           75.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  14.36          200.00          145.83           75.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 533.36           29.71           43.32           25.37


=============== 304-01005      ABC (CL 1)                                   Cubic Yard =============================================


NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17           8.00          260.00          272.67          200.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                   8.00          260.00          272.67          200.00




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17       2,159.00           36.00           40.67           58.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               2,159.00           36.00           40.67           58.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               2,167.00           36.83           41.52           58.52


=============== 304-02000      ABC (CL 2)                                   Ton ====================================================


NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17       1,311.00           45.00           42.61           41.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               1,311.00           45.00           42.61           41.00




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17       2,691.00           18.00           24.05           16.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               2,691.00           18.00           24.05           16.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               4,002.00           26.84           31.57           24.19
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 180
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 304-03000      ABC (CL 3)                                   Ton ====================================================


NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17      12,221.00           18.00           19.00           19.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              12,221.00           18.00           19.00           19.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              12,221.00           18.00           19.00           19.00


=============== 304-03005      ABC (CL 3)                                   Cubic Yard =============================================


STRR300-228                    SH 13 R3 VARIOUS CHIP SEALS   11/30/17       2,182.00           30.00           48.38           38.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               2,182.00           30.00           48.38           38.50
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               2,182.00           30.00           48.38           38.50


=============== 304-03006      ABC (CL 3) (Spec)                            Ton ====================================================


NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17          25.00           20.00           67.60           19.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  25.00           20.00           67.60           19.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  25.00           20.00           67.60           19.00


=============== 304-04000      ABC (CL 4)                                   Ton ====================================================


ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17         600.00           30.00           42.57           30.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 600.00           30.00           42.57           30.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 600.00           30.00           42.57           30.00


=============== 304-06000      ABC (CL 6)                                   Ton ====================================================


NHPP1602-145                   US 160 S. Fork to Monte Vista 01/12/17          11.60          100.00           60.32           46.00
NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17          20.00          100.00          108.92          115.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17      14,656.00           30.00           25.92           25.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17         246.00           50.00           62.27           45.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 181
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 304-06000      ABC (CL 6)                                   Ton ====================================================
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17      13,419.00           25.00           35.11           25.30
SHE160A-031                    SH 160 Passing Lanes          03/02/17      10,617.00           27.00           26.42           24.92
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17         236.00           50.00           89.00           60.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17      41,377.00           24.00           19.42           20.00
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17         346.00           35.00           72.25           54.00
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17         126.00           20.00           95.20          150.00
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17         600.00           60.00           39.10           29.80
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              81,654.60           26.12           24.99           22.78




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17          64.00           30.00           58.40           58.40
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17          78.00           20.00          168.61          160.00
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17      22,531.43           20.00           22.94           22.51
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17       1,115.00           70.00           66.33           58.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17       6,458.00           28.00           28.00           28.00
STMR200-240                    REGION WIDE EROSION CONTROL   06/01/17           2.00          200.00           93.25           93.20
ER0361-115                     US 36 Bridges                 06/22/17       4,157.00           25.00           32.07           34.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              34,405.43           23.76           24.35           26.46




MTCE0762-054                   REGION 4 MTCE SECT1 I76 FORT  07/06/17          10.00           50.00          255.42          100.00
NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17       1,081.00           15.00           28.65           23.00
NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17         160.00           45.00           51.00           37.00
NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17          49.00           17.00           38.00           38.00
SHE0141-024                    SH 14 Poudre Canyon Guardrail 07/20/17          80.00           80.00          161.67           50.00
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17         152.00           40.00           71.40           96.32
NHPPR100-291                   I-225 SB RESTRIPING I-25 TO Y 08/31/17          36.60           35.00           62.50           75.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               1,568.60           24.55           46.92           35.08




C133A-042                      SH 133 McClure Pass Slip      11/16/17         961.00           60.00           63.19           38.00
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17         500.00           15.00           90.20           70.00
STR139A-034                    SH 139 DOUGLAS PASS MP 19.0 - 12/21/17           5.39          200.00          202.91          150.00
ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17           5.00          200.00          245.74          214.17
BR3852-018                     POA SCOUR US 385
STA050A-027                    US 50C Storm Sewer 21st LANE  12/21/17         769.00           35.00           46.33           37.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               2,240.39           42.03           63.13           45.46
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR             119,869.02           25.72           25.73           24.57
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 182
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 304-06007      ABC (CL 6)                                   Cubic Yard =============================================


NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17         302.00           75.00           51.70           70.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17       1,510.00           30.00           51.25           25.00
IM025A-039                     I-25 Critical Culvert at MP 1 02/09/17         162.00           40.00           58.25           45.76
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17         244.00           25.00          133.66          130.69
NHPP 0701-230                  Midpoint WB Bore              03/02/17          15.00           90.00           53.83           54.00
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17           3.00          280.00          454.67          200.00
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17          61.00           30.45          101.66           46.00
STA0243-087                    US 24 El Paso-Elbert CL Pavin 03/23/17       1,808.00           30.00           62.50           65.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               4,105.00           33.82           61.69           53.58




STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17         840.00           50.00           56.37           37.11
STAR400-348                    Region 4 Controller and Cabin 05/04/17           6.00          125.00          160.00          225.00
BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17          27.00           60.00          128.50          150.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17       1,416.00           32.00           61.59           65.00
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17         187.00           80.00          132.63           70.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               2,476.00           42.26           67.93           57.23




IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17       1,781.00           54.00           64.02           60.00
ER0141-028                     PR SH 14 REPAIR WEST OF RUSTI 07/27/17          85.00           50.00           93.33          100.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17       1,773.00           60.00           53.51           40.00
BRR400-354                     Little-T Channel Work and SH
SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17         606.00           35.00           56.80           50.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               4,245.00           53.71           56.22           51.02




CR100-286                      R1 CURB RAMPS-PH 1            10/26/17         250.00           60.00           39.00           48.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17       1,648.00           49.00           44.17           64.50
STRR300-228                    SH 13 R3 VARIOUS CHIP SEALS   11/30/17         836.00           70.00           62.50           70.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17          20.00           60.00           80.67           50.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               2,754.00           56.45           51.05           64.57
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              13,580.00           46.17           58.48           55.67


=============== 304-06008      ABC (CL 6) (Spec)                            Cubic Yard =============================================


STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17         588.00           40.00           74.25           17.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 588.00           40.00           74.25           17.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 183
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 304-06008      ABC (CL 6) (Spec)                            Cubic Yard =============================================




STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17      13,540.00           25.00           13.96            3.30
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              13,540.00           25.00           13.96            3.30




ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17         164.00           70.00           63.73           53.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 164.00           70.00           63.73           53.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              14,292.00           26.13           17.18            4.43


=============== 304-06009      ABC (CL 6) (Spec)                            Ton ====================================================


NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17          74.00           60.00           66.49           65.00
SHE160A-031                    SH 160 Passing Lanes          03/02/17         277.00           32.00           34.70           32.64
STA2873-183                    US 287 Repairs at LCR 17      03/09/17         165.00           50.00           58.00           54.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 516.00           41.77           43.37           44.11




NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17         166.00           50.00           72.75           50.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 166.00           50.00           72.75           50.50
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 682.00           43.77           46.11           45.67


=============== 304-06011      ABC (CL 6)(Spec)(Install Only)               Cubic Yard =============================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17      20,543.00           34.08           50.00           50.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER              20,543.00           34.08           50.00           50.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              20,543.00           34.08           50.00           50.00


=============== 304-07000      ABC (CL 7)                                   Ton ====================================================


NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17       6,053.00           20.00           26.67           25.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               6,053.00           20.00           26.67           25.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 184
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 304-07000      ABC (CL 7)                                   Ton ====================================================




STR139A-034                    SH 139 DOUGLAS PASS MP 19.0 - 12/21/17       6,367.00           25.00           29.06           22.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               6,367.00           25.00           29.06           22.50
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              12,420.00           22.56           28.07           23.72


=============== 304-07005      ABC (CL 7)                                   Cubic Yard =============================================


C133A-042                      SH 133 McClure Pass Slip      11/16/17          19.00           90.00          167.56           71.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                  19.00           90.00          167.56           71.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  19.00           90.00          167.56           71.00


=============== 304-07009      ABC (CL 7) (Spec)                            Ton ====================================================


STA006A-057                    SH 6 EAST OF STERLING         04/06/17       4,214.00           20.00           23.63           23.75
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               4,214.00           20.00           23.63           23.75
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               4,214.00           20.00           23.63           23.75


=============== 304-08000      ABC (Shoulder Material)                      Ton ====================================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17       8,470.00           20.00           26.41           22.00
STM0243-089                    Midpoint: Station 1019+50 Cen
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17       3,851.00           30.00           35.29           28.10
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              12,321.00           23.13           29.45           24.91
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              12,321.00           23.13           29.45           24.91


=============== 304-08002      ABC (Shoulder Material)                      Cubic Yard =============================================


STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17       1,781.00           30.00           37.80           44.41
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,781.00           30.00           37.80           44.41
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 185
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 304-08002      ABC (Shoulder Material)                      Cubic Yard =============================================




IM025A-037                     I25 S. Trinidad Resurface and 11/30/17       1,260.00           35.00           36.63           41.90
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               1,260.00           35.00           36.63           41.90
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               3,041.00           32.07           37.32           43.37


=============== 304-09000      ABC (Spec)                                   Cubic Yard =============================================


STA0362-035                    US 36: Strasburg to Byers     03/23/17         606.00           20.00           97.05           59.99
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 606.00           20.00           97.05           59.99




STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17         620.00           20.00           51.55           44.66
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 620.00           20.00           51.55           44.66
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,226.00           20.00           74.04           52.24


=============== 304-09006      ABC (Spec)                                   Sq Yard ================================================


STAR500-190                    R5 Signal Replacement Chaffee 04/27/17          59.00           60.00           54.00           52.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  59.00           60.00           54.00           52.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  59.00           60.00           54.00           52.00


=============== 304-09014      ABC (Spec)                                   Ton ====================================================


NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17       6,857.00           20.00           30.15           23.21
SHE160A-031                    SH 160 Passing Lanes          03/02/17       1,626.00           35.00           29.16           32.64
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17       5,005.00           29.00           26.61           27.00
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17         464.00           50.00           76.45           51.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              13,952.00           25.97           30.25           26.59




ER0361-115                     US 36 Bridges                 06/22/17           3.00           30.00          154.75           60.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                   3.00           30.00          154.75           60.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 186
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 304-09014      ABC (Spec)                                   Ton ====================================================




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17         222.00           15.00           48.10           35.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 222.00           15.00           48.10           35.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              14,177.00           25.80           30.60           26.73


=============== 304-09100      ABC (RAP)                                    Ton ====================================================


NHPPR100-291                   I-225 SB RESTRIPING I-25 TO Y 08/31/17         112.70           80.00           65.50           80.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 112.70           80.00           65.50           80.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 112.70           80.00           65.50           80.00


=============== 306-01000      Reconditioning                               Sq Yard ================================================


STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17      11,174.00            5.00            2.63            2.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              11,174.00            5.00            2.63            2.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              11,174.00            5.00            2.63            2.00


=============== 307-00000      Hydrated Lime                                Ton ====================================================


NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17         692.00          200.00          211.06          211.59
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17         878.00          300.00          256.09          273.28
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17       1,118.00          250.00          261.13          276.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               2,688.00          253.46          248.37          258.74
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               2,688.00          253.46          248.37          258.74


=============== 310-00608      Full Depth Reclam. of HMA Pvmt (0-8 in.)     Sq Yard ================================================


STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17     168,437.00            1.00            2.52            1.46
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER             168,437.00            1.00            2.52            1.46
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR             168,437.00            1.00            2.52            1.46
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 187
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 310-00610      Full Depth Reclam. of HMA Pvmt (8-12 in)     Sq Yard ================================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17     151,070.00            3.50            3.17            2.25
STM0243-089                    Midpoint: Station 1019+50 Cen
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17      68,747.00            3.30            2.47            2.80
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER             219,817.00            3.44            2.90            2.51




STA006A-057                    SH 6 EAST OF STERLING         04/06/17     296,674.00            2.80            1.66            1.90
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER             296,674.00            2.80            1.66            1.90
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR             516,491.00            3.07            2.39            2.10


=============== 403-00720      HMA (Patching) (Asph)                        Ton ====================================================


NHPP1602-145                   US 160 S. Fork to Monte Vista 01/12/17          15.30          400.00          316.25          350.00
NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17          71.00          175.00          363.68          225.00
NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17         793.00          125.00          142.15          150.00
NHPP5502-093                   US 160/550 PCCP DIAMOND GRIND 01/19/17           5.00          500.00          380.74          265.00
STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17         100.00          150.00          225.00          200.00
STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17         400.00          175.00          161.76          155.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP145A-063                   SH 145 Wall Failure MP 76.05  02/09/17         446.00          300.00          267.27          250.00
STA0931-032                    SH 93 Erosion Correction      02/09/17           1.00          750.00          991.00          805.00
STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17         212.00          250.00          469.85          462.76
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17         286.00          150.00          188.40          190.00
SHE160A-031                    SH 160 Passing Lanes          03/02/17         100.00          170.00          243.13          200.00
NHPP5502-087                   US 550 Cribwell Repair MM 68. 03/02/17         432.00          300.00          337.00          275.00
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17         500.00          170.00          161.65          130.00
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17         306.30          163.00          313.33          540.00
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17       1,000.00          175.00          157.64          150.00
STA0243-087                    US 24 El Paso-Elbert CL Pavin 03/23/17         500.00          165.00          212.00          150.00
STA0362-035                    US 36: Strasburg to Byers     03/23/17         215.00          180.00          224.63          200.00
STE 0702-357                   I-70 West Vail Pass Basin     03/23/17          50.00          200.00          402.65          325.00
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17         145.00          150.00          253.20          205.00
SHER100-246                    FY17 R1 Traffic Signal Replac 03/30/17          50.00          195.00          275.00          265.00
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17         105.00          150.00          191.50          176.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               5,732.60          186.76          224.70          211.88




STA006A-057                    SH 6 EAST OF STERLING         04/06/17         100.00          165.00          170.87          165.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 188
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 403-00720      HMA (Patching) (Asph)                        Ton ====================================================
STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17          30.00          215.00          174.00          174.00
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17         150.00          225.00          388.46          410.00
STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17         597.00          150.00          159.48          133.43
NHPP0703-433                   EJMT S Bore Barrier, Handrail 04/13/17          20.00          220.00          652.41          250.00
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17          20.00          183.00          229.18          175.00
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17         100.00          250.00          250.43          275.00
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17         472.00          175.00          242.65          236.25
STAR500-190                    R5 Signal Replacement Chaffee 04/27/17         975.00          150.00          150.33          156.00
NHPP0704-240                   Package C (I-70 and I-25) Bri 04/27/17          50.00          200.00          300.00          275.00
NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17         237.00          220.00          150.00          150.00
STAR400-348                    Region 4 Controller and Cabin 05/04/17           3.20          400.00          305.00          200.00
NHPPC120-026                   US 85: I-76 to 168th          05/04/17         175.00          200.00          233.00          260.00
STA0703-437                    I-70: 32ND TO 44TH            06/01/17          26.00          215.00          301.88          320.00
STA0061-091                    SH 6 CHIPSEAL NEAR FLEMING    06/15/17          50.00          180.00          235.00          220.00
NHPP145A-074                   SH 145 SAWPIT DEBRIS FLOW     06/15/17          40.00          240.00          403.60          300.00
ER0361-115                     US 36 Bridges                 06/22/17         159.00          200.00          206.63          220.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               3,204.20          175.57          213.72          194.82




NHPP2853-003                   US 285 MP 143.1- 148.0        07/06/17       1,320.00          150.00          166.00          140.00
NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17         200.00          150.00          155.00          110.00
NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17         100.00          200.00          260.00          260.00
SHE0141-024                    SH 14 Poudre Canyon Guardrail 07/20/17          59.00          200.00          443.33          280.00
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17          10.00          250.00          383.65          283.31
CR100-292                      I25/ORCHARD EMERGENCY REPAIR  08/21/17          12.00            1.00          386.17          420.00
ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17         676.00          202.04          210.00          210.00
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17         300.00          175.00          167.82          153.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               2,677.00          168.62          176.82          166.25




CR100-286                      R1 CURB RAMPS-PH 1            10/26/17          10.00          200.00          200.00          180.00
SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17          56.00          200.00          192.00          275.00
C133A-042                      SH 133 McClure Pass Slip      11/16/17          20.00          300.00          369.70          250.00
NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17       1,500.00          250.00          176.40          135.00
IM025A-037                     I25 S. Trinidad Resurface and 11/30/17         462.00          195.50          149.46          128.37
NHPP006A-059                   US 6 CLEAR CREEK CANYON SH 93 12/14/17          10.00          400.00          928.73         1181.20
STR139A-034                    SH 139 DOUGLAS PASS MP 19.0 - 12/21/17           6.90          250.00          292.50          300.00
STA050A-027                    US 50C Storm Sewer 21st LANE  12/21/17         822.00          280.00          190.83           97.00
FSA0361-122                    I-70 at Limon, US 40, US 287, 12/21/17         100.00          200.00          300.00          250.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               2,986.90          247.88          184.61          134.80
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              14,600.70          193.48          204.27          183.61
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 189
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 403-00721      HMA (Patching) (Asph)                        Sq Yard ================================================


NHPP1602-155                   US 160 Wolf Creek Fiber Optic 01/19/17       4,543.00           50.00           58.36           66.71
NHPP 0701-230                  Midpoint WB Bore              03/02/17      16,500.00           25.00           30.06           24.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              21,043.00           30.40           34.45           33.61




STAR500-190                    R5 Signal Replacement Chaffee 04/27/17         257.00          120.00           77.00           76.00
STR050A-031                    Storm Sewer on US 50C at Jame 06/08/17       1,180.00           50.00           43.12           39.00
NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17         561.00          225.00          214.88          115.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               1,998.00          108.14           89.28           65.10




NHPPR100-242                   R1 CRITICAL CULV REPAIR FY 17 08/17/17          16.00          400.00          325.00          230.00
SHE0831-119                    SH83 LIGHTING: DAYTON TO MISS 09/21/17          40.00           66.00          230.00          145.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  56.00          161.43          243.10          169.29




ITSSW01-636                    VMS AND LUS UPGRADE FY 17     10/19/17         617.00          100.00          132.71           64.82
STRR300-228                    SH 13 R3 VARIOUS CHIP SEALS   11/30/17       4,363.00           20.00           42.94           33.75
NHPP0702-354                   I-70 EAST SIDE VAIL PASS MP 1 12/07/17       2,068.00           70.00           32.17           34.83
ERR400-328                     SH 52, SH 6, SH 63, SH 55, SH 12/21/17          70.00          200.00          143.81          100.17
BR3852-018                     POA SCOUR US 385
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               7,118.00           43.23           51.39           37.41
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              30,215.00           38.80           45.27           36.84


=============== 403-00800      Emerg Pothole Rep                            Ton ====================================================


NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17          15.00          275.00          894.88          750.00
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17          10.00          310.20         1066.31          785.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                  25.00          289.08          975.55          764.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                  25.00          289.08          975.55          764.00


=============== 403-09210      SMA                                          Ton ====================================================


ER0361-115                     US 36 Bridges                 06/22/17         317.00          150.00          208.42          255.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 317.00          150.00          208.42          255.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 317.00          150.00          208.42          255.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 190
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 403-09221      SMA (Fibers)(Asph)                           Ton ====================================================


NHPPC120-026                   US 85: I-76 to 168th          05/04/17      30,924.00          100.00          107.83          103.00
STA0703-437                    I-70: 32ND TO 44TH            06/01/17      10,166.00          100.00          131.28          120.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              41,090.00          100.00          114.98          107.21




NHPP0252-447                   I-25: MILE POST 194.04 TO MIL 11/30/17      64,825.00          123.00          116.81           97.25
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER              64,825.00          123.00          116.81           97.25
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR             105,915.00          114.08          116.28          101.11


=============== 403-09500      Furnish HMA                                  Ton ====================================================


STR139A-034                    SH 139 DOUGLAS PASS MP 19.0 - 12/21/17       2,658.00          100.00           87.96           85.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER               2,658.00          100.00           87.96           85.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               2,658.00          100.00           87.96           85.00


=============== 403-32851      HMA (Gr SG) (100) (PG 64-28)                 Ton ====================================================


CR100-292                      I25/ORCHARD EMERGENCY REPAIR  08/21/17         150.00            1.00          280.88          295.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 150.00            1.00          280.88          295.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 150.00            1.00          280.88          295.00


=============== 403-33721      HMA (Gr S) (75) (PG 58-28)                   Ton ====================================================


ER0361-115                     US 36 Bridges                 06/22/17       2,998.00           90.00           93.58           96.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               2,998.00           90.00           93.58           96.00




ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17      20,033.00           83.57           92.00           92.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER              20,033.00           83.57           92.00           92.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              23,031.00           84.41           92.75           92.52
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 191
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 403-33741      HMA (Gr S) (75) (PG 64-22)                   Ton ====================================================


STA0362-035                    US 36: Strasburg to Byers     03/23/17         751.00           87.00          121.25           99.60
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 751.00           87.00          121.25           99.60




BR0361-117                     US 36 Culvert Repair MP 11.95 05/04/17          52.00          150.00          293.00          285.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                  52.00          150.00          293.00          285.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 803.00           91.08          135.77          111.61


=============== 403-33751      HMA (Gr S) (75) (PG 64-28)                   Ton ====================================================


STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17      46,722.00           72.00           72.92           61.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              46,722.00           72.00           72.92           61.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              46,722.00           72.00           72.92           61.00


=============== 403-33841      HMA (Gr S) (100) (PG 64-22)                  Ton ====================================================


STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17         122.00           98.15          125.52           98.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER                 122.00           98.15          125.52           98.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 122.00           98.15          125.52           98.00


=============== 403-34651      HMA (Gr SX) (50) (PG 64-28)                  Ton ====================================================


ER0341-090                     PR US 34 BIG THOMPSON CANYON  09/01/17      54,822.00           88.76           98.00           98.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER              54,822.00           88.76           98.00           98.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              54,822.00           88.76           98.00           98.00


=============== 403-34701      HMA (Gr SX) (75)                             Ton ====================================================


STR0092-023                    SH 9 NORTH MP 101.6 TO 107, U 02/09/17      34,387.00           80.00           76.11           82.33
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 192
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 403-34701      HMA (Gr SX) (75)                             Ton ====================================================
NHPP0402-091                   US 40 WEST OF STEAMBOAT SPRIN 03/02/17      24,338.00           55.00           63.90           63.00
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17      34,860.00           55.00           61.08           56.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              93,585.00           64.19           66.83           67.50




IM0701-212                     I-70 EXIT 49 GRAND MESA       07/20/17       1,816.00           75.00           93.67           76.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               1,816.00           75.00           93.67           76.00




SHE340A-018                    SH 340 REDLANDS PARKWAY ROUND 11/09/17       4,043.00           75.00           53.67           80.00
C133A-042                      SH 133 McClure Pass Slip      11/16/17         322.00          150.00          172.00          300.00
MTCE092A-027                   MTCE R3 FY18 SH 92 STR I-06-A 12/07/17         138.00          190.00          272.67          318.00
NHPP0702-354                   I-70 EAST SIDE VAIL PASS MP 1 12/07/17      40,293.00           85.00           68.69           72.43
STR139A-034                    SH 139 DOUGLAS PASS MP 19.0 - 12/21/17      25,958.00           65.00           67.25           53.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER              70,754.00           77.59           68.75           67.25
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR             166,155.00           70.01           67.99           67.48


=============== 403-34721      HMA (Gr SX) (75) (PG 58-28)                  Ton ====================================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17       4,794.00           85.00           91.02           86.00
STM0243-089                    Midpoint: Station 1019+50 Cen
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17      31,118.00           75.00           77.17           70.60
SHE160A-031                    SH 160 Passing Lanes          03/02/17       7,409.00           98.00          100.62           99.44
NHPP0703-434                   I-70 EBND MSE WALL/GUARDRAIL  03/23/17          84.00          120.00          216.92          176.60
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              43,405.00           80.12           87.07           76.93
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              43,405.00           80.12           87.07           76.93


=============== 403-34724      HMA (GrSX)(75)(PG 58-28)(4 In)               Sq Yard ================================================


STM0243-089                    Midpoint: Station 1019+50 Cen .             65,444.00           19.00           16.47             .
STM0243-089                    Midpoint: Station 1019+50 Cen
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              65,444.00           19.00           16.47             .
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              65,444.00           19.00           16.47             .
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 193
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 403-34741      HMA (Gr SX) (75) (PG 64-22)                  Ton ====================================================


STA2873-183                    US 287 Repairs at LCR 17      03/09/17       3,619.00           87.00          103.33           85.00
STA0243-087                    US 24 El Paso-Elbert CL Pavin 03/23/17      23,652.00           70.00           83.67           72.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              27,271.00           72.26           85.32           73.73




NHPPR100-291                   I-225 SB RESTRIPING I-25 TO Y 08/31/17          19.10          100.00          382.50          300.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                  19.10          100.00          382.50          300.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              27,290.10           72.28           85.41           73.88


=============== 403-34751      HMA (Gr SX) (75) (PG 64-28)                  Ton ====================================================


STA060A-019                    SH 60 Resurfacing US 287 to M 01/19/17      35,728.00           77.00           92.25           72.00
SHE160A-031                    SH 160 Passing Lanes          03/02/17       7,397.00           75.00          105.80           89.17
STA0853-101                    US 85 FROM EATON (MP 275.5) T 03/02/17      24,597.00           77.00           78.94           66.00
STA0243-087                    US 24 El Paso-Elbert CL Pavin 03/23/17      21,268.00           76.00           95.95           90.35
STA0362-035                    US 36: Strasburg to Byers     03/23/17      18,331.00           90.00          103.08           87.85
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER             107,321.00           78.88           92.57           78.15




STA006A-057                    SH 6 EAST OF STERLING         04/06/17      78,299.00           82.00           86.28           81.00
STA0061-091                    SH 6 CHIPSEAL NEAR FLEMING    06/15/17       1,128.00          130.00          138.33          125.00
ER0361-115                     US 36 Bridges                 06/22/17       5,459.00           95.00          101.28          107.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              84,886.00           83.47           89.74           83.26




NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17       4,583.00           75.00           92.50           88.00
BR0362-037                     US 36 at MP 140.1 and MP 140. 07/27/17       1,493.00          135.00          136.60          143.35
ERR400-322                     PR SH 60 and SH 257 Structure 09/07/17       4,418.00          105.00           81.01           72.00
BRR400-354                     Little-T Channel Work and SH
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER              10,494.00           96.17           96.35           89.14
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR             202,701.00           81.70           92.23           80.86
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 194
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 403-34771      HMA (Gr SX) (75) (PG 76-28)                  Ton ====================================================


NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17      18,465.00           90.00           87.11           82.48
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              18,465.00           90.00           87.11           82.48
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              18,465.00           90.00           87.11           82.48


=============== 403-34801      HMA (Gr SX) (100)                            Ton ====================================================


NHPP 0701-238                  I-70B MP 4.20 TO MP 4.69, US6 04/27/17      16,797.00           55.00           51.25           51.25
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              16,797.00           55.00           51.25           51.25
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              16,797.00           55.00           51.25           51.25


=============== 403-34821      HMA (Gr SX) (100) (PG 58-28)                 Ton ====================================================


STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17      28,182.00           75.00           65.37           64.45
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              28,182.00           75.00           65.37           64.45




IM025A-037                     I25 S. Trinidad Resurface and 11/30/17      35,000.00           75.00           77.75           81.26
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER              35,000.00           75.00           77.75           81.26
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              63,182.00           75.00           72.23           73.76


=============== 403-34824      HMA (Gr SX)(100)(PG 58-28)(Special)          Ton ====================================================


STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17       5,052.00          100.00           71.64           69.93
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER               5,052.00          100.00           71.64           69.93
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               5,052.00          100.00           71.64           69.93


=============== 403-34841      HMA (Gr SX) (100) (PG 64-22)                 Ton ====================================================


STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17      23,571.09           80.00           75.15           78.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 195
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 403-34841      HMA (Gr SX) (100) (PG 64-22)                 Ton ====================================================
NHPPC120-026                   US 85: I-76 to 168th          05/04/17       2,439.00           90.00          116.50          110.00
STA0703-437                    I-70: 32ND TO 44TH            06/01/17       1,311.00           75.00          149.06          140.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              27,321.09           80.65           77.49           83.83
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              27,321.09           80.65           77.49           83.83


=============== 403-34851      HMA (Gr SX) (100) (PG 64-28)                 Ton ====================================================


STM0243-089                    Midpoint: Station 1019+50 Cen 01/26/17       6,932.00           90.00           84.28           79.00
STM0243-089                    Midpoint: Station 1019+50 Cen
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               6,932.00           90.00           84.28           79.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               6,932.00           90.00           84.28           79.00


=============== 403-34854      HMA (Gr SX)(100)(PG 64-28)(2 In)             Sq Yard ================================================


STM0243-089                    Midpoint: Station 1019+50 Cen .             65,444.00           10.00            8.90             .
STM0243-089                    Midpoint: Station 1019+50 Cen
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              65,444.00           10.00            8.90             .
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              65,444.00           10.00            8.90             .


=============== 403-34871      HMA (Gr SX) (100) (PG 76-28)                 Ton ====================================================


NHPP R600-440                  US40 (COLFAX BLVD) COLORADO B 01/19/17      16,679.00          100.00          113.28           90.00
NHPPR100-249                   Region 1 FY 17 US 040A Wall R 02/16/17          59.00          150.00          386.00          398.00
STA2873-180                    US 287 (Federal) Resurfacing- 03/09/17      25,680.00           95.00           84.51           74.50
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              42,418.00           97.04           94.27           81.04




STA095A-018                    SH 95 Sheridan Resurfacing: H 04/06/17      20,209.00           92.00           84.50           84.50
STA095A-017                    SH 95 Sheridan Resurfacing 25 04/06/17      11,368.00           80.00          111.49          124.00
STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17      14,838.00           92.00           99.32           78.20
STA0503-085                    US 50 BNSF Railroad to Purcel 04/20/17      11,622.87           90.00           90.20           94.00
STMSH45-001                    SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17       3,322.00          110.00          102.72           98.60
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              61,359.87           90.37           94.23           92.86
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 196
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 403-34871      HMA (Gr SX) (100) (PG 76-28)                 Ton ====================================================




NHPP 095A-019                  SH95:52ND TO 58TH/RALSTON(MM9 07/20/17       4,678.00           98.00          115.00          115.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               4,678.00           98.00          115.00          115.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR             108,455.87           93.31           94.49           89.19


=============== 403-36721      HMA (Gr ST)(75)(PG 58-28)                    Ton ====================================================


NH1604-013                     US 160C Overlay, Jct. SH 389  01/19/17      32,628.00           85.00           87.65           75.00
NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17       4,833.00           95.00           93.43           75.44
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17      49,755.00           80.00           89.33           80.60
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              87,216.00           82.70           89.15           78.22




STA 0503-089                   US 50 - Royal Gorge West_SH9  04/06/17      28,710.00           75.00           74.77           70.31
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER              28,710.00           75.00           74.77           70.31
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR             115,926.00           80.79           85.75           76.26


=============== 403-40000      HMA Safety Edge                              Lin Foot ===============================================


STM0243-089                    Midpoint: Station 1019+50 Cen .             31,000.00            1.25            0.92             .
STM0243-089                    Midpoint: Station 1019+50 Cen
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER              31,000.00            1.25            0.92             .




NHPP 2873-185                  US 287: Ted's Place Intersect 07/13/17       9,408.00            4.00            1.33            0.65
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER               9,408.00            4.00            1.33            0.65
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR              40,408.00            1.89            0.99            0.65


=============== 405-00100      Heating and Remixing Treatment               Sq Yard ================================================


STR139A-034                    SH 139 DOUGLAS PASS MP 19.0 - 12/21/17     177,212.00            5.00            5.22            4.95
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER             177,212.00            5.00            5.22            4.95
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR             177,212.00            5.00            5.22            4.95
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 197
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 405-00101      Heating and Remixing Treatment (Special)     Sq Yard ================================================


NHPP 0702-381                  I-70 VAIL PASS FROST HEAVES   06/15/17         372.00           75.00          134.00           50.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 372.00           75.00          134.00           50.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 372.00           75.00          134.00           50.00


=============== 406-09500      Cold Bitum Pvmt (Recycle)                    Sq Yard ================================================


NHPP4912-006                   US 491 Surface Treatment MP 2 03/02/17     167,860.00            2.50            4.03            3.94
NHPP 0502-075                  US50 MP 127.0 TO MP 139.1 IN  03/09/17     265,917.00            4.50            4.45            3.85
STA067A-039                    SH 67 Divide to Cripple Creek 03/30/17     338,682.00            2.60            5.08            5.20
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER             772,459.00            3.23            4.69            4.46
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR             772,459.00            3.23            4.69            4.46


=============== 408-01000      Hot Joint-Crack Sealant                      Ton ====================================================


STA0404-055                    SH 40 Colfax Resurfacing I-70 04/13/17          10.00         3875.00         3919.61         4910.00
STAR100-255                    R1 FY18 CRACK SEAL            05/11/17         227.00         4500.00         4312.50         4340.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE SECOND QUARTER                 237.00         4473.63         4288.15         4364.05




MTCE131A-039                   SH 131 MP 0.053-68.721 IN EAG 08/17/17          96.00         4600.00         4440.00         3720.00
MTCE R500-193                  R5 FY 18 Regionwide MTCE Crac 09/21/17          42.43         6940.00         7232.00         3398.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE THIRD  QUARTER                 138.43         5317.23         5624.29         3621.30




MTCE0705-084                   I-70 CRACK SEAL KANSAS STATE  10/05/17         105.00         3500.00         4229.33         3548.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FOURTH QUARTER                 105.00         3500.00         4229.33         3548.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR                 480.43         4503.91         4788.28         3971.69


=============== 408-01100      Joint Sealant                                Lin Foot ===============================================


BR0252-449                     I-25 Woodmen NB               03/02/17       1,103.00           15.00           21.25            9.00
                                                                      -------------- --------------- --------------- ---------------
                      WEIGHTED AVERAGE FOR THE FIRST  QUARTER               1,103.00           15.00           21.25            9.00
                                                                      ============== =============== =============== ===============
                                WEIGHTED AVERAGE FOR THE YEAR               1,103.00           15.00           21.25            9.00
                                               COLORADO DEPARTMENT OF TRANSPORTATION              13:12 Monday, January 22, 2018 198
                                           ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA
------------------------------------------------------------------------------------------------------------------------------------
                ITEM NUMBER/   ITEM DESCRIPTION/                            UNIT/
PROJECT NUMBER                 PROJECT LOCATION              DATE LET       QUANTITY      ENGR. EST.     AVERAGE BID     AWARDED BID
------------------------------------------------------------------------------------------------------------------------------------


=============== 409-01015      CC Matl (Ty I)                               Sq Yard ================================================


NHPP1602-145                   US 160 S. Fork to Monte Vista 01/12/17      37,946.00            1.00            0.97            0.95