FINAL SETTLEMENT SHE R100-289

PROJECT SHE R100-289 

PROJECT ID # 22025 

In accordance with the notice provisions contained in 38‑26‑107 C.R.S. 1973 as amended, the DEPARTMENT OF TRANSPORTATION, STATE OF COLORADO has established November 19, 2019 as the date of final settlement with Jalisco International, Inc., in Arapahoe and Douglas Counties. This project is a part of the Highway Safety Improvement Program and includes improvements at two locations. Site 1, installation of a raised median island on SH-83 (Parker Rd) & Longs Way, that includes, median cover, ADA curb ramps, curb and gutter and signing/striping. Site 2, US 40 (Colfax) & Dunkirk, includes full depth median widening to realign left turn lanes along Colfax with a proposed traffic signal replacement, including ADA curb ramps, curb and gutter, median cover and signing/striping.

Claims containing a verified statement of the amounts due and unpaid must be in the form of a written affidavit and must be received by the CONTROLLER, Department of Transportation at 2829 W. Howard Place, Denver, Colorado, 80204, on or before 5:00 p.m. of the final settlement date above.

Effective July 1, 2013, Colorado Department of Transportation will no longer advertise Notice of Final Settlements in newspapers and will only post Notice of Final Settlement advertisements on CDOT’s website (https://www.codot.gov/business).

Stephen Harelson, P.E., Chief Engineer, Department of Transportation.