NOTICE OF FINAL SETTLEMENT STR M331-007

 

PROJECT STR M331-007

 PROJECT ID # 20790 

In accordance with the notice provisions contained in 38‑26‑107 C.R.S. 1973 as amended, the DEPARTMENT OF TRANSPORTATION, STATE OF COLORADO has established February 13, 2020 as the date of final settlement with The Walsenburg Sand & Gravel Co., in Huerfano County. This project consist of either replacing or installing new ADA curb ramp, sidewalks, minor culvert bridge improvements, and install permanent traffic control devices. The project includes, but is not limited to, the following elements: will modify the existing box culvert on Walsen Ave (I-25 C) between Pine St and Grand Ave to accommodate a multi-use shared path; provide sidewalk and ADA improvements along Walsen Ave between Spruce St and Grand Ave; provide a mid-block crossing (Rapid Rectangular Flashing Beacon - RRFB) between Spruce and Elm St to access the Library across Walsen Ave; provide sidewalk and ADA improvements along 7th St (US 160) between Ysidrio Ave and Olive Ave for the City Water Park, along with a Rapid Rectangular Flashing Beacon (RRFB) for the pedestrian crossing at Ysidrio Ave.

Claims containing a verified statement of the amounts due and unpaid must be in the form of a written affidavit and must be received by the CONTROLLER, Department of Transportation at 2829 W. Howard Place, Denver, Colorado, 80204, on or before 5:00 p.m. of the final settlement date above.

Effective July 1, 2013, Colorado Department of Transportation will no longer advertise Notice of Final Settlements in newspapers and will only post Notice of Final Settlement advertisements on CDOT’s website (https://www.codot.gov/business).

Stephen Harelson, P.E., Chief Engineer, Department of Transportation.