Chapter 5 - Preliminary Surveys 2010
The purpose of this chapter is to define the specifications that shall be followed while performing preliminary surveys for CDOT by CDOT surveyors or contract consultant surveyors...
Chapter5.doc
When a project has been identified to be built, a survey has to be completed to select the route, to locate existing features of the route, to identify areas of environmental impacts, to identify areas of Right of Way acquisition, to help to determine the costs of the project and to design the project...
Chapter5.pdf
Chapter5_Revisions.doc
Historical log of revisions made since 2003...