Currently, several types of project delivery systems are available for publicly funded transportation projects. The most common systems are Design-Bid-Build, Construction Manager/General Contractor (CM/GC), and Design-Build. No single project delivery method is appropriate for every project. Each project must be examined individually to determine how it aligns with the attributes of each available delivery method.
https://www.codot.gov/programs/bridge/bridge-manuals/design_manual/bdm_section_38_2021.pdf
https://www.codot.gov/@@site-logo/siteLogo.png
Section 38 - Alternative Delivery
Currently, several types of project delivery systems are available for publicly funded transportation projects. The most common systems are Design-Bid-Build, Construction Manager/General Contractor (CM/GC), and Design-Build. No single project delivery method is appropriate for every project. Each project must be examined individually to determine how it aligns with the attributes of each available delivery method.