Project Facts
- Cost: $2.8 million
Project Team
- Contractor(s): ESCO Construction Co.
In 2017, crews on this project repaired walls and US Highway 40 between mile point (MP) 244.37 and MP 248.09 at Berthoud Pass.
Work included:
- repairing deteriorating walls that reinforce unstable slopes above the roadways; and
- repairing expansion joints that allow water to flow through and contribute to the wall deterioration.