Project Facts

  • Cost: $3.4 million
  • Contractor: Oldcastle SW Group, Inc.
  • Location: On I-70 westbound within the DeBeque Canyon, between mile points 48.630 and 49.019
  • Timeline: February to October 2018
I-70 Exit 49 Grand Mesa Ramp Project Map

Work on this project included:

  • extending the eastbound off-ramp by excavating rock and installing a wall to stabilize the rock face along I-70.
  • installing traffic lighting.
  • seeding.
  • upgrading signage and striping.