US 160 Resurfacing from US 84 East to Treasure Falls

Project Facts

  • Cost: $7.5 million
  • Contractor(s): A & S Construction Company
  • Location: On US 160 from mile point (MP) 144.29 to MP 158.56
  • Timeline: May through November 2018

From May through November 2018, crews improved a 14-mile stretch of US Highway 160 within Archuleta and Mineral counties. The project extended from US Highway 84 east to the Treasure Falls parking area.

In addition to treating, repaving and striping the highway, the team:

  • repaired three bridges;
  • replaced mailboxes; and
  • upgraded guardrail.