US 36 Bridge Replacement East of Last Chance

Crews on this project removed and replaced two bridges on US Highway 36 in Washington County between mile points 139 and 142. On Monday, May 7, crews opened traffic onto the two new bridges. The project was officially completed in June 2018.

Project Facts

  • Cost: $3.8 million
    The project is funded through a combination of CDOT Regional Priority Program (RPP) and Construction Bridge Program (CBP) funds.
  • Location: On US 36, four miles east of Last Chance, Colo. (mile points 140.1 and 140.9), in Washington County
  • Contractor(s): JHL Constructors, Inc.

The Bridges