US 50 West of Gunnison

Project Status: Complete

Project Facts
 

  • Cost:
    $7.1 million
  • Average Annual Daily Traffic:
    12,540

Project Team

  • Contractor(s): Oldcastle SW Group

For this project, which ran from May to October 2016, crews improved the roadway's riding surface through pavement resurfacing, and repairing the bridge decks over the Gunnison River and overflow (from mile posts 155.49 to 155.67).

Work included:

  • cold-in-place recycle (CIP)
  • hot mix asphalt overlay
  • bridge deck rehabilitation
  • epoxy pavement marking