Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • Spanish
  • Chinese (Simplified)
  • Vietnamese
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Archived Project Sites
  4. US 160 EIS
  5. Documents
Resources
  • Projects
  • Assets
  • Studies
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • Central 70
  • I-25 (US 36 to 104th Ave) Improvements
  • Santa Fe Drive Action Plan- A Planning & Environmental Linkages (PEL) Study | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • CO 115 Improvements - Colorado Springs to Penrose
  • I-70 Wildlife Fence in Eagle County
  • US 85 Corridor Improvements
  • I-70 VSL and CO 74 & US 285 ITS Upgrades
  • I-25 and CO-7: Interim Transit Improvements
  • CO 119 Boulder Canyon Tunnel Repairs
  • C-470 Trail Bridge over Acres Green
  • US 287 & CO 52 Intersection Safety Improvements
  • I-25 & Alameda Bridge Replacement
  • I-70 Bridges over Ward Road
  • I-25 Walsenburg Bridge Replacement
  • Firestone-Longmont Mobility Hub
  • CO 12 Bridge Replacement in Las Animas County
  • CO 207 & CO 266 Resurfacing
  • CO 74 Evergreen Lake North Trail
  • CO 109 Bridge over US 50, BNSF Railroad
  • US 24 Woodland Park Paving and ADA Curb Ramp Improvements
  • CO 21 and US 24 Signal Improvement Project in El Paso County
  • US 50 Passing Lane - Gunnison County
  • CO 172 Ignacio Resurfacing
  • US 385 Holyoke North Resurfacing
  • Drew Dix Parkway Dillon Drive at I-25 Interchange
  • Metro Denver Bridge Deck Safety Project
  • I-25 Resurfacing North of Walsenburg Project
  • CO 93 Resurfacing between US 6 and 58th Ave
  • I-70 Bridge Maintenance between Limon and Agate
  • US 6 & 20 Road Intersection Improvements
  • I-70 Concrete Slab Replacement from West Rifle to Silt
  • CO 64 Bridges west of Meeker
  • US 160 Priority Culverts in Southwestern Colorado
  • CO 318 Resurfacing Project Moffat County
  • US 285/CO 9 Intersection Improvements & Bridge Replacement
  • CO 114 Overlay, Gunnison to Saguache County
  • CO 64 & CO 13 Meeker Resurfacing Project
  • CO 133 Rockfall Project North of McClure Pass to South of Carbondale
  • CO 9 Surface Treatment in Summit and Grand County
  • US 160 Cortez Signal Improvements
  • CO 96 Overlay between Eads and Sheridan Lake
  • CO 2/CO 88/US 285 Denver Metro ADA Ramps
  • US 160 Pagosa West Resurfacing
  • US 36 Surface and Safety Improvements between Boulder and Lyons
  • I-70 Bridge Over Washington Street
  • CO 257 Resurfacing US 34 Business to Walnut Street
  • CO 83 Resurfacing in Douglas County
  • CO 138 Logan County Widening Project
  • US 85 Platteville Resurfacing Between CO 60 and CO 66
  • CO 14 and US 40 Crack Sealing in Jackson and Grand Counties
  • CDOT Retaining Wall Improvements in Jefferson County
  • CO 133 Culvert Repair in Bowie, CO
  • CO 13 Chip Seal North of Craig
  • Preventative Maintenance of I-25 bridges at 58th and 62nd
  • CO 71 Overlay between Ordway and Punkin Center
  • CO 121 Signal Improvements in Jefferson County
  • I-70 Glenwood Canyon Material Flows
  • US 287 Surface Improvement Project
  • I-70 B and CO 141 B Resurfacing Project in Mesa County
  • Eastbound I-70 Mount Vernon Truck Escape Ramp Reconstruction
  • US 550 Avalanche Control System
  • CO 96 Pueblo Intersection Project
  • US 34 - Signal Pole Replacement in Brush, Akron, Otis and Wray
  • I-76 Cable Rail Project Ft. Morgan to Brush
  • CO 133 Paonia Slope Stabilization
  • I-70 Eastbound Resurfacing in Clear Creek County
  • US 40 Berthoud Pass Paving Project
  • CO 194 Improvements between La Junta and Las Animas in Bent County
  • US 50 & CO 71 Intersection Improvements
  • I-70 Picadilly Design-Build Project (City of Aurora Project)
  • CO 151 Emergency Culvert north of Arboles
  • CO 30/Gun Club Rd. Widening at Hampden
  • CO 66 Intersection Improvements in Northeastern Colorado/Region 4
  • I-25 Concrete Panel Replacement from Fort Collins to Owl Canyon Road
  • I-270 Bridge Preventative Maintenance
  • I-70 Vail Pass Eastbound Resurfacing
  • CO 88/Belleview Traffic Safety Project
  • Northeastern Colorado Pavement Marking & Rumble Strips
  • Arapahoe County Curb Ramps along CO 30/6th Avenue
  • Southeast Colorado Sign Replacement (12 locations)
  • US 34 Weather Cameras from Greeley to Wiggins
  • US 24 Intersection Improvements Southwest of Manitou Springs
  • Archived Project Sites
    • CO 116 Two Buttes Resurfacing Project
    • Flood-Related Projects
    • US 160 EIS
      • Project Schedule
      • EIS Process
      • Final EIS
      • Public Involvement
      • Record Of Decision
      • Project Team
      • Project Area Map
      • US 160 EIS en Espanol
      • US 550 at US 160 Supplemental EIS
      • Documents
        • mainpic
        • A_Title Page
        • B_Signature Page
        • C_Disclosure
        • D_Executive Summary
        • E_Table of Contents
        • F_Chapter 1_Purpose and Need
        • G_Chapter 1 Figures
        • I_Chapter 2_Figures
        • H_Chapter 2_Alternatives
        • J_Chapter 3_Affected Environment
        • K_Chapter 3_Figures
        • L_Chapter 4_Environmental Consequences & Mitigation
        • M_Chapter 4_Figures
        • MASTER_Appendix_A_Traffic_Report
        • MASTER_Appendix_C_Wetlands_Analysis.pdf
        • Master Appendix B Traffic Noise Analysis
        • MASTER_Appendix_D_General_Correspondence
        • MASTER_Appendix_E_Hist_Preserv_Correspond
        • MASTER_Appendix_F_Form_AD-1006
        • N_Chapter 5_Final Section 4(f) Evaluation
        • O_Chapter 5_Figures
        • P_Chapter 6_Public Involvement & Agency Coordination
        • Q_Chapter 7_List of Preparers & Reviewers
        • R_Chapter 8_References
        • S_Addendum to Appendix E_Historic Preservation Correspondence
        • T_Appendix G_DEIS Public Hearing
        • U_Appendix H_BA, BE, and Biological Opinion
        • V_Appendix I_Air Quality
        • map
Documents https://www.codot.gov/projects/archived-project-sites/us160eis/documents https://www.codot.gov/@@site-logo/siteLogo.png

Documents

mainpic
A_Title Page
B_Signature Page
C_Disclosure
D_Executive Summary
E_Table of Contents
F_Chapter 1_Purpose and Need
G_Chapter 1 Figures
I_Chapter 2_Figures
H_Chapter 2_Alternatives
J_Chapter 3_Affected Environment
K_Chapter 3_Figures
L_Chapter 4_Environmental Consequences & Mitigation
M_Chapter 4_Figures
MASTER_Appendix_A_Traffic_Report
MASTER_Appendix_C_Wetlands_Analysis.pdf
Master Appendix B Traffic Noise Analysis
MASTER_Appendix_D_General_Correspondence
MASTER_Appendix_E_Hist_Preserv_Correspond
MASTER_Appendix_F_Form_AD-1006
  • 1
  • 2
  • Next 10 items

Tags:
  • Projects
  • Project: US160EIS
Stay Informed

Travel Alerts logo/image

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo