Project Description
The main scope of work included rehabilitating the pavement and widening shoulders along a ten-mile stretch of US 385 north of Holyoke. Work included excavating subbase, milling, placing base course and asphalt overlays, making culvert extensions, striping, and adding rumble strips, pavement delineators and signs along the corridor. Other work included installing new ADA compliant curb ramps at intersections on US 385 from Johnson St. to Bignel St., and on U.S. Highway 6 from the US 385 intersection to Reynolds St. The new curb ramps are sloped for easier access, finished with a slip resistant surface, and include other features to meet ADA guidelines. Crews will return by spring to perform miscellaneous finishing work, with only minor traffic impacts expected.
|