Big Timbers Transportation Museum
Designs and constructs a transportation museum.
C-470/US 85 (Santa Fe Drive) Interchange
Constructs a flyover ramp from southbound Santa Fe Drive to eastbound C-470 to improve safety and mobility.
Clear Creek County Bakerville to Loveland Recreational Trail
Paves 2.88 miles of the existing 4.88 mile trail in asphalt.
I-70 between Kipling Street and Wadsworth Boulevard
Repairs or replaces concrete slabs for approximately three miles of I-70.
Northern Avenue Trail Enhancement
Pedestrian trail replacement and streetscape on Northern Avenue from Vinewood Lane to Prairie Avenue.
Platte River Pedestrian Bridge and Bicycle Path
Resurfaces seven miles of the Platte River pedestrain/bicycle path.
Pueblo Eastern Gateway Landscape
Landscaping and irrigation installation for the Eastern Gateway Landscape project located at the intersection of US 50B and SH 47.
State Highway 14, Muddy Pass
Resufaces 17 miles of SH 14 and improves shoulders and culverts.
State Highway 2 between 62nd Avenue and Quebec Parkway
Resurfaces 2.4 miles in asphalt.
State Highway 9 between Valley Brook and Coyne Valley in Breckenridge
Widens SH 9 to two lanes in each direction and constructs a new pedestrian bridge and a retaining wall. The project will also relocate a bike path and improve drainage.
Union Pacific Railroad Roundhouse
Restores the roundhouse to become a railroad museum.
US 24 west of Limon
Resurfaces 10.8 miles of US 24 in asphalt.
US 34 between Brush and Akron
Chip seals 15 miles of US 34.
US 85 between Titan Road and Cook Ranch
Widens one mile of US 85 to two lanes in each directions with shoulders and a raised median with controlled access. The existing roadway is only one lane in each direction with no shoulders.
C-470 between I-25 to Santa Fe Drive
Repairs or replaces concrete slabs on C-470 and resurfaces C-470 in asphalt. Rehabilitates the C-470 bike path between I-70 and I-25.
CO 13 at Rio Blanco Hill
Reconstructs five miles of CO 13 in asphalt, adds eight-foot shoulders and climbing and passing lanes. The improvements will enhance recreational bicycling in this area. This is the first phase of a larger project to improve CO 13 between Rifle and Meeker. Keywords: State Highways
I-70 between Vail Pass and Silverthorne
Resurfaces 14 miles of I-70 from milepost 190 to 204 as well as the right lane of eastbound I-70 between milepost 180 and 190. Numerous bridges along the I-70 corridor will also be rehabilitated by repairing expansion joints and bridge decks.
Documents
Documents for ARRA projects
I-25 between 6th Avenue and 23rd Avenue
Resurfaces approximately three miles of I-25 in asphalt.
I-25, US 36 and C-470
Installs ramp metering on the ramps from Sheridan Blvd. to westbound US 36, 84th Ave. to northbound I-25, Kipling Parkway to eastbound C-470 and Yosemite St. to westbound C-470.
I-25 at Alameda Avenue/Santa Fe Drive
Replaces the Alameda bridge over I-25 with one that is wider to accommodate an additional lane in each direction.
I-25 between US 34 and State Highway 392
Improves five miles of roadway surface on I-25.
I-70/State Highway 82/US 6 at the Glenwood Springs Interchange (#116)
This safety improvement project will upgrade traffic signals and improve ramp width and length to benefit both pedestrians and vehicles.
I-70 at Palisade Interchange (#42)
Improves safety by widening the acceleration and deceleration lanes at this interchange. The improvements will upgrade the interchange to current design standards.
I-70 between Pena Boulevard and Tower Road
Installs median cable guardrail to prevent crossover accidents.
I-70 West, Truck Parking Management
Installs various truck parking management components (electronic signs, closed-circuit cameras, power and communications systems), as identified in the I-70 Mountain Corridor PEIS, to provide notification during inclement weather.
I-76 at 96th Avenue
Constructs roundabouts at this interchange.
I-76 over UPRR and State Highway 224
Replaces two bridges on I-76.
I-25 Through Trinidad
Constructs the Purgatoire River Pedestrian Trail, adds street lights, parking lot paving, curb and gutter, drainage inlets, landscaping and sidewalk. This work will be added onto the existing contract for work taking place on I-25 through Trinidad.
I-70 at the Edwards Interchange (#163)
This safety improvement project will construct three roundabouts at the interchange.
State Highway 88 (Belleview) between Federal Boulevard and US 85 (Santa Fe Drive)
Resurfaces approximately one mile off SH 88 in asphalt.
State Highway 14 between Hatchery and Cameron Pass 4
Replaces the SH 52 bridge over Boulder Creek.
State Highway 257 at Garden Drive in Windsor
Installs a new traffic signal at this intersection.
State Highway 340 in Fruita
Installs two new traffic signals west of the I-70 interchange and makes intersection safety improvements for pedestrians and vehicles.
State Highway 52 over Boulder Creek
Replaces the SH 52 bridge over Boulder Creek.
State Highway 60 at I-25 in Johnstown
Installs a new traffic signal at this intersection.
State Highway 62, Dallas Divide between Ridgway and Telluride
Bid savings allowed for the project to be increased to resurface a total of 21.5 miles of SH 62 in asphalt and repair embankments. Project includes some work on US 550 as well.
State Highway 92 between Austin and Hotchkiss
Reconstructs five miles of SH 92 in asphalt and adds passing lanes and shoulders to improve recreational bicycling.
US 24/US 285 near Johnson Village
Reconstructs 11 miles of eastbound I-76 in concrete.
US 40 Colfax Ave between Kipling St and Sheridan Blvd
Resurfaces approximately three miles of US 40 in asphalt.
US 40/US 287 at Boyero
This is the next phase of a concrete reconstruction project along this corridor. The project will improve 8.7 miles of US 40/US 287 (mileposts 413-422 approximately). The US 40/US 287 corridor between Campo and Hugo is one of Colorado's 28 high priority strategic projects.
US 160 - Alamosa East
Resurfaces six miles of US 160 in asphalt.
US 160 at CR 222/223 east of Durango
Relocates this intersection and adds auxiliary lanes to improve sight distance.
US 160 between Shaw Creek and Del Norte
Resurfaces three miles of US 160 in asphalt.
US 285 at Shaffers Crossing
This is the next phase of a concrete reconstruction project along this corridor. The project will improve 8.7 miles of US 40/US 287 (mileposts 413-422 approximately). The US 40/US 287 corridor between Campo and Hugo is one of Colorado's 28 high priority strategic projects.
US 34 at Weld County Road 49
Installs a new traffic signal at this intersection.
US 36 at Broadway in Boulder
Installs a new traffic signal at this intersection.
US 36 between Estes Park and Lyons
Chip seals 22 miles of US 36 to improve the roadway surface condition.
US 6, State Highway 93, State Highway 58 (one intersection in Golden) and State Highway 128 at Simms Street
Replaces traffic signals at two locations.


 