You are here: Home Projects Preventative Maintenance of I-25 bridges at 58th and 62nd Photo Gallery Photo Gallery https://www.codot.gov/projects/i25-58th-62nd-bridgemaintenance/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery Crews placing concrete over the steel superstructures of the northbound I-25 bridge at 62nd Avenue. Crews performing bridge deck repairs on the steel superstructure of northbound I-25 at the 62nd Avenue bridge to ensure vehicular loads are supported. Northbound right three lanes closed for bridge deck repairs on I-25 bridge at 62nd Avenue. Preparations for concrete panel replacements underway on southbound I-25 The project team prepares to replace a concrete bridge panel on southbound I-25 in September Crews pour new concrete bridge panels Freshly poured concrete panel curing on southbound I-25 Concrete removals in preparation of new panels on southbound I-25
Photo Gallery https://www.codot.gov/projects/i25-58th-62nd-bridgemaintenance/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery Crews placing concrete over the steel superstructures of the northbound I-25 bridge at 62nd Avenue. Crews performing bridge deck repairs on the steel superstructure of northbound I-25 at the 62nd Avenue bridge to ensure vehicular loads are supported. Northbound right three lanes closed for bridge deck repairs on I-25 bridge at 62nd Avenue. Preparations for concrete panel replacements underway on southbound I-25 The project team prepares to replace a concrete bridge panel on southbound I-25 in September Crews pour new concrete bridge panels Freshly poured concrete panel curing on southbound I-25 Concrete removals in preparation of new panels on southbound I-25