You are here: Home Projects Archived Project Sites Essential Culvert Repairs in Denver Metro Area Photo Gallery Photo Gallery https://www.codot.gov/projects/archived-project-sites/i25-essential-culvert-repairs-denver/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery collage culverts prior to repairs.JPG shoulder closure SB I25 at MP 191.jpg equipment mobilized at work zone I-25 MP 191.jpg Equipment for culvert work at I25 MP 191.jpg Inlet Wadsworth near Bowles.JPG Current condition of culvert at Wadsworth near Bowles.JPG Current condition of outlet CO 128.JPG Inlet Wadsworth near Bowles.JPG Inlet CO 128.JPG Crews cleaning culvert on CO 128 near CO 93.jpg Location of Boulder County Culvert at CO 128 near CO 93.jpg Crews removing debris from culvert CO 128 at 93.jpg Culvert cleaning equipment mobilized at CO 128 location.jpg Sediment filled and rusted culvert CO 128.jpg Culvert at CO 128 being prepared for spray lining.jpg Culvert at CO 128 being cleaned and drained.jpg Crews Clearing Culvert CO 128.jpg collage culvert cleaning CO 128.JPG southwest view of construction site at MP 191.jpg southbound I-25 at exit 191.jpg site of I-25 culvert at MP 191.jpg crews have begun construction at the culvert on I-25.jpg closeup drainage pipes at site of I-25 culvert.jpg southwest view I-25 culvert walls under construction.jpg equipment staged at I-25 MP 191.jpg covered concrete for curing at culvert on I-25.jpg crews poured part of the headwall and added rebar.jpg paved and covered head wall area.jpg close up crews forming and laying rebar wingwall.jpg crews forming and preparing headwall for concrete pour.jpg crews laying formwork and rebar for headwall.jpg close up crews forming and laying rebar wingwall.jpg crews forming and preparing headwall for concrete pour.jpg crews laying formwork and rebar for headwall.jpg Spectrashield water sealing at US 6.jpg Closeup of crews sealing culvert at US 6.jpg southeast view finished culvert.jpg new culvert at SB I-25 just south of ridge gate pkwy.jpg ground view newly finished culvert at I-25 MP 191.jpg closeup finished culvert at I-25 MP191.jpg ground view newly finished culvert at I-25 MP 191 (1).jpg
Photo Gallery https://www.codot.gov/projects/archived-project-sites/i25-essential-culvert-repairs-denver/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery collage culverts prior to repairs.JPG shoulder closure SB I25 at MP 191.jpg equipment mobilized at work zone I-25 MP 191.jpg Equipment for culvert work at I25 MP 191.jpg Inlet Wadsworth near Bowles.JPG Current condition of culvert at Wadsworth near Bowles.JPG Current condition of outlet CO 128.JPG Inlet Wadsworth near Bowles.JPG Inlet CO 128.JPG Crews cleaning culvert on CO 128 near CO 93.jpg Location of Boulder County Culvert at CO 128 near CO 93.jpg Crews removing debris from culvert CO 128 at 93.jpg Culvert cleaning equipment mobilized at CO 128 location.jpg Sediment filled and rusted culvert CO 128.jpg Culvert at CO 128 being prepared for spray lining.jpg Culvert at CO 128 being cleaned and drained.jpg Crews Clearing Culvert CO 128.jpg collage culvert cleaning CO 128.JPG southwest view of construction site at MP 191.jpg southbound I-25 at exit 191.jpg site of I-25 culvert at MP 191.jpg crews have begun construction at the culvert on I-25.jpg closeup drainage pipes at site of I-25 culvert.jpg southwest view I-25 culvert walls under construction.jpg equipment staged at I-25 MP 191.jpg covered concrete for curing at culvert on I-25.jpg crews poured part of the headwall and added rebar.jpg paved and covered head wall area.jpg close up crews forming and laying rebar wingwall.jpg crews forming and preparing headwall for concrete pour.jpg crews laying formwork and rebar for headwall.jpg close up crews forming and laying rebar wingwall.jpg crews forming and preparing headwall for concrete pour.jpg crews laying formwork and rebar for headwall.jpg Spectrashield water sealing at US 6.jpg Closeup of crews sealing culvert at US 6.jpg southeast view finished culvert.jpg new culvert at SB I-25 just south of ridge gate pkwy.jpg ground view newly finished culvert at I-25 MP 191.jpg closeup finished culvert at I-25 MP191.jpg ground view newly finished culvert at I-25 MP 191 (1).jpg