You are here: Home Projects I-70 Mountain Corridor: Veterans Memorial Tunnels to Continental Divide I-70 Westbound Peak-Period Shoulder Lane Photo Gallery Photo Gallery https://www.codot.gov/projects/i70mountain/i-70-westbound-peak-period-shoulder-lane/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery Box Culvert Extension Work in Progress Westbound median grading MP 231 Eastbound I-70 median grading at MP 231 Wide shot box culvert extension and wall Rockblast 2 Rockslide Nov 29 at MP 236 Rockfall slide area near Fall River Road Rockfall cleanup on I70 Westbound I70 median work Culvert extension progress at Exit 241 Closeup of median widening westbound I70 Truck hauling in the median area median widening work west of Empire interchange Eastbound median work near Mile Point 231 Westbound median work exit 232 Attenuator truck at Exit 243 Rock scaling sign before Exit 241 On ramp closure at 239 Electrical conduit equipment in right shoulder at Exit 243 Wide shot culvert extension and wall Caisson Drill Rig for Sign near MP 239 Wall excavation and mats MP 235 Rock scalers at MP 239 Sediment basin 3 off CR 308 between MP 233 and 232 Exit 239 sound wall removals Paving median westbound I-70 Paving median near MP 231 MP 237 Wall Excavation MP 236 Wall Panel Grading MP 236 Wall Panels Closeup Construction retaining wall at MP 237 Wall under construction just east of Dumont Crews drill caissons in median for overhead signs Remaining timber soundwall at Exit 239 Closeup wall construction in progress MP 236 Retaining wall panels at MP 237 West view MSE wall construction overhead sign_ Backfill MSE wall MP 237 MSE wall panels MP 237 Progress CBC CIP wall Paving progress eastbound I-70 at MP 231 Progress paving westbound I70 MP 231 MSE wall construction mp 237 Crews installing rockfall system at Exit 239 Backfilling wall at MP 237 MSE wall construction progress at MP 237 Trenching MIner St Easterly view of MSE wall construction in progress at MP 237 Closeup wall construction MP 237 Westerly view of MSE wall construction in progress at MP 236 Closeup MSE wall construction MP 236 View of of median widening and paving westbound at MP 232 Progress median widening and paving eastbound at MP 232 Rockfall mesh anchor drilling Scaled Rock Westerly view of wall construction at MP 236 Eastbound view of median widening and paving MP 232 Westerly view of new express lane in progress Westbound view of median widening and paving MP 232 Progress Cast in Place Wall at CBC West view new soundwall MP 237 Backfill new wall MP 236 Southwest view new wall MP 237 Closeup rebar wall at MP 236 Backfill wall MP 236 CIP wall at Exit 241 West view of new CIP wall and CBC widening West view anchor slabs MP 236.5 Formwork new wall at MP 237 Water Line Street Closure.jpg Southeast view of new CBC.jpg Overhead view of CIP Wall at CBC.jpg Wall B rebar end anchor slab.jpg East view of Wall C in progress.jpg Widening and Paving Progress Backfilling CBC CIP Wall at Exit 241 Wall C with slabs and paving in place Wall D Rebar Placement Construction Wall D Installation rockfall mesh Form work Wall E Closeup of mesh fencing at Exit 239 Closeup slip form concrete over rebar Wall C Mats at east end of Wall E Finished wall Dumont Westbound I-70 view of finished wall and paved anchor slabs WB I-70 view of Wall D under construction Pedestrian Crossing Floor Complete Progress Backfill at CBC Westbound I-70 view of Wall D Closeup Wall E under construction Wall D before slip form concrete pouring Formwork Wall E under construction Closeup Panels and Rebar Wall D Looking thru Concrete Box Culvert Widening Over Concrete Box Culvert WB paving near 232 Exit 234 MSE wall Staining Walls Paving Closeup of night wall shoulder paving Night paving operations WB I-70 Mesh fencing detail Exit 239 Widening WB I-70 at Exit 239 Closeup anchor slab Wall C Back face construction Wall D Newly stained and painted Wall B Anchor slabs poured Wall C Closeup work on Wall A New shoulder paving Wagon Wheel Trail Closed Sign 240 On Ramp EB I70 closed Anchor slabs along westbound Eastbound median retaining wall Wide shot new wall at MP 234 Equipment at Wagon Wheel Trail Mobilization equipment for sanitary line at MP 240 WB I70 prep for median work WB I-70 widening at MP 239 Overhead sign installation at Central City Parkway Night milling operations Dumont Overnight milling west end of the project Soundwall Posts Exit 239 Drilling caissons soundwall Widening at soundwall MP 239 Westbound Express Lane MP 232 240 Crossover West Entry Ground Exit 240 Sewer Crossing Utility install 240 Road Widening Stained Wall at MP 239 Soudwall posts looking east Looking West Weigh In Motion Detour Area Looking east at completed MEXL from MP 235 Pedestrian Box Culvert Extension WB Widening in Idaho Springs Widening at MP 241 with barrier rebar Median Work at Water Wheel Park barrier slip forming EB I-70 MP 241 close up of WB traffic on left MP 235 showing new MEXL WB widening at MP 235 WB view of crews forming barrier near MP 241 Sections of the MEXL are done such as this one at MP 239.5 WIM Paving Daytime Asphalt Paving Paving operations 240.5 Final paving operations Exit 240 WB MEXL Sign Hidden Valley WB MEXL Sign Overhead monotubes Finished WB MEXL Lane Finished Section WB MEXL Lane 240 Bridge Curb Cuts WB MEXL from 240 Bridge Veterans Memorial Tunnels Finished MEXL Idaho Springs WB MEXL Sign Exit 243 WB I-70 MEXL entrance Idaho Springs WB I-70 MEXL advance sign Looking west I-70 MP235 Looking west I-70 MP240 New center median barrier under construction at Exit 240 Soundwall at Exit 239 Posts for soundwall at Exit 239 Sidewalk at Exit 240 WB on-ramp WB Approaching Exit 240 Looking west from 240 Bridge Water Wheel Trail_210703 (1).jpg Newly erected soundwall Miner to 239_210703 (1).jpg Looking east at WB MEXL MP 240_210703 (1).jpg Fencing Water Wheel Trail_210703 (1).jpg Barrel taper in MEXL at Veterans Tunnels_210703 (1).jpg Cars in WB MEXL at MP 240_210807.JPG Center Barrier at Exit 240_210807.JPG MEXL Lane Looking West from Dumont Bridge_210730.jpg MEXL near Lawson_210723.JPG Water Wheel Trail Beneath 70_210807.JPG Water Wheel Trail with new pedestrian rail_210905.jpg SE view new MEXL from Exit 232_210905.jpg MEXL looking west at Exit 240_210905.jpg Finished pedestrian crossing at MP 241.2_210905.jpg Emergency pullout just east of Exit 232_210905.jpg Westbound entrance to Veterans Memorial Tunnels Westbound Mountain Express Lane Mile Point 234.5 Westbound emergency pull-out area Westbound Mountain Express Lane in Idaho Springs Looking east at new Mountain Express Lane Looking east at new Mountain Express Lane Mile Point 232 WB I-70 at Exit 240.jpg WB I-70 MP 235 Dumont.jpg New WB MEXL signage west of Exit 239.jpg Lighted pedestrian underpass.jpg End of MEXL merging traffic sign at MP 232.jpg
Photo Gallery https://www.codot.gov/projects/i70mountain/i-70-westbound-peak-period-shoulder-lane/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery Box Culvert Extension Work in Progress Westbound median grading MP 231 Eastbound I-70 median grading at MP 231 Wide shot box culvert extension and wall Rockblast 2 Rockslide Nov 29 at MP 236 Rockfall slide area near Fall River Road Rockfall cleanup on I70 Westbound I70 median work Culvert extension progress at Exit 241 Closeup of median widening westbound I70 Truck hauling in the median area median widening work west of Empire interchange Eastbound median work near Mile Point 231 Westbound median work exit 232 Attenuator truck at Exit 243 Rock scaling sign before Exit 241 On ramp closure at 239 Electrical conduit equipment in right shoulder at Exit 243 Wide shot culvert extension and wall Caisson Drill Rig for Sign near MP 239 Wall excavation and mats MP 235 Rock scalers at MP 239 Sediment basin 3 off CR 308 between MP 233 and 232 Exit 239 sound wall removals Paving median westbound I-70 Paving median near MP 231 MP 237 Wall Excavation MP 236 Wall Panel Grading MP 236 Wall Panels Closeup Construction retaining wall at MP 237 Wall under construction just east of Dumont Crews drill caissons in median for overhead signs Remaining timber soundwall at Exit 239 Closeup wall construction in progress MP 236 Retaining wall panels at MP 237 West view MSE wall construction overhead sign_ Backfill MSE wall MP 237 MSE wall panels MP 237 Progress CBC CIP wall Paving progress eastbound I-70 at MP 231 Progress paving westbound I70 MP 231 MSE wall construction mp 237 Crews installing rockfall system at Exit 239 Backfilling wall at MP 237 MSE wall construction progress at MP 237 Trenching MIner St Easterly view of MSE wall construction in progress at MP 237 Closeup wall construction MP 237 Westerly view of MSE wall construction in progress at MP 236 Closeup MSE wall construction MP 236 View of of median widening and paving westbound at MP 232 Progress median widening and paving eastbound at MP 232 Rockfall mesh anchor drilling Scaled Rock Westerly view of wall construction at MP 236 Eastbound view of median widening and paving MP 232 Westerly view of new express lane in progress Westbound view of median widening and paving MP 232 Progress Cast in Place Wall at CBC West view new soundwall MP 237 Backfill new wall MP 236 Southwest view new wall MP 237 Closeup rebar wall at MP 236 Backfill wall MP 236 CIP wall at Exit 241 West view of new CIP wall and CBC widening West view anchor slabs MP 236.5 Formwork new wall at MP 237 Water Line Street Closure.jpg Southeast view of new CBC.jpg Overhead view of CIP Wall at CBC.jpg Wall B rebar end anchor slab.jpg East view of Wall C in progress.jpg Widening and Paving Progress Backfilling CBC CIP Wall at Exit 241 Wall C with slabs and paving in place Wall D Rebar Placement Construction Wall D Installation rockfall mesh Form work Wall E Closeup of mesh fencing at Exit 239 Closeup slip form concrete over rebar Wall C Mats at east end of Wall E Finished wall Dumont Westbound I-70 view of finished wall and paved anchor slabs WB I-70 view of Wall D under construction Pedestrian Crossing Floor Complete Progress Backfill at CBC Westbound I-70 view of Wall D Closeup Wall E under construction Wall D before slip form concrete pouring Formwork Wall E under construction Closeup Panels and Rebar Wall D Looking thru Concrete Box Culvert Widening Over Concrete Box Culvert WB paving near 232 Exit 234 MSE wall Staining Walls Paving Closeup of night wall shoulder paving Night paving operations WB I-70 Mesh fencing detail Exit 239 Widening WB I-70 at Exit 239 Closeup anchor slab Wall C Back face construction Wall D Newly stained and painted Wall B Anchor slabs poured Wall C Closeup work on Wall A New shoulder paving Wagon Wheel Trail Closed Sign 240 On Ramp EB I70 closed Anchor slabs along westbound Eastbound median retaining wall Wide shot new wall at MP 234 Equipment at Wagon Wheel Trail Mobilization equipment for sanitary line at MP 240 WB I70 prep for median work WB I-70 widening at MP 239 Overhead sign installation at Central City Parkway Night milling operations Dumont Overnight milling west end of the project Soundwall Posts Exit 239 Drilling caissons soundwall Widening at soundwall MP 239 Westbound Express Lane MP 232 240 Crossover West Entry Ground Exit 240 Sewer Crossing Utility install 240 Road Widening Stained Wall at MP 239 Soudwall posts looking east Looking West Weigh In Motion Detour Area Looking east at completed MEXL from MP 235 Pedestrian Box Culvert Extension WB Widening in Idaho Springs Widening at MP 241 with barrier rebar Median Work at Water Wheel Park barrier slip forming EB I-70 MP 241 close up of WB traffic on left MP 235 showing new MEXL WB widening at MP 235 WB view of crews forming barrier near MP 241 Sections of the MEXL are done such as this one at MP 239.5 WIM Paving Daytime Asphalt Paving Paving operations 240.5 Final paving operations Exit 240 WB MEXL Sign Hidden Valley WB MEXL Sign Overhead monotubes Finished WB MEXL Lane Finished Section WB MEXL Lane 240 Bridge Curb Cuts WB MEXL from 240 Bridge Veterans Memorial Tunnels Finished MEXL Idaho Springs WB MEXL Sign Exit 243 WB I-70 MEXL entrance Idaho Springs WB I-70 MEXL advance sign Looking west I-70 MP235 Looking west I-70 MP240 New center median barrier under construction at Exit 240 Soundwall at Exit 239 Posts for soundwall at Exit 239 Sidewalk at Exit 240 WB on-ramp WB Approaching Exit 240 Looking west from 240 Bridge Water Wheel Trail_210703 (1).jpg Newly erected soundwall Miner to 239_210703 (1).jpg Looking east at WB MEXL MP 240_210703 (1).jpg Fencing Water Wheel Trail_210703 (1).jpg Barrel taper in MEXL at Veterans Tunnels_210703 (1).jpg Cars in WB MEXL at MP 240_210807.JPG Center Barrier at Exit 240_210807.JPG MEXL Lane Looking West from Dumont Bridge_210730.jpg MEXL near Lawson_210723.JPG Water Wheel Trail Beneath 70_210807.JPG Water Wheel Trail with new pedestrian rail_210905.jpg SE view new MEXL from Exit 232_210905.jpg MEXL looking west at Exit 240_210905.jpg Finished pedestrian crossing at MP 241.2_210905.jpg Emergency pullout just east of Exit 232_210905.jpg Westbound entrance to Veterans Memorial Tunnels Westbound Mountain Express Lane Mile Point 234.5 Westbound emergency pull-out area Westbound Mountain Express Lane in Idaho Springs Looking east at new Mountain Express Lane Looking east at new Mountain Express Lane Mile Point 232 WB I-70 at Exit 240.jpg WB I-70 MP 235 Dumont.jpg New WB MEXL signage west of Exit 239.jpg Lighted pedestrian underpass.jpg End of MEXL merging traffic sign at MP 232.jpg