Project Facts
 

  • Cost:
    $10 million

Project Team

  • Contractor(s): TBD

Crews on this project will be improving numerous intersections, replacing signals, resurfacing the road and upgrading a bridge.

Project benefits include:

  • better surface quality.
  • upgraded guardrails.
  • enhanced safety through striping and signing.
  • extended life of the bridge.
  • safer crossings for pedestrians.
  • upgraded ADA ramps to meet current standards.

While project hours have not yet been determined, work is scheduled to be completed from July 2016 through 2018.

Project News
Closures Set June 17-21 for Bridge Repairs on I-25 at US 50B Jun 14, 2018
Overnight Closures Set for June 14-15 on I-25 and US 50B Project Jun 13, 2018
I-25/US 50B Bridge Repairs Require Closures June 3-7 Jun 01, 2018
Southbound I-25 Exit 100A Off-Ramp Closed Overnight May 9 May 07, 2018
Expect Overnight Closures April 22-27 on I-25 from Eagleridge Boulevard to US 50B Apr 19, 2018
I-25/US 50 Bridge Repairs to Require Closures April 18-20 Apr 13, 2018
Expect Closure Overnight April 10 for Bridge Repairs at I-25/US 50B Interchange Apr 05, 2018
US 50B On-Ramp to Southbound I-25 Closed Overnight April 4 for Bridge Repairs Apr 03, 2018
Road Work Resumes April 2 on East 4th Street (CO 96) in Pueblo Mar 29, 2018
Southbound I-25 at US 50B in Pueblo Closed Overnight March 29 Mar 28, 2018
Bridge Repairs to Require Southbound I-25 Exit to US 50B Closure March 25 Mar 23, 2018
I-25 Closed at US 50B Overnight March 22 for Bridge Repairs Mar 21, 2018
Prepare for Nighttime Right-Lane Closures of I-25 at US 50 March 18 Mar 16, 2018
Expect Closure of Southbound I-25 On-Ramp at US 50 B Overnight March 13 Mar 12, 2018
Crews to Close I-25 Southbound On-Ramp at US 50 B Overnight Mar 05, 2018
Nighttime Lane Restrictions on NB I-25 at US 50 B Feb 06, 2018
Nighttime Lane restrictions on NB I-25 at US 50 B Jan 24, 2018
Daytime Ramp Closures on US 50 & CO 96/47 Interchange extended due to unexpected road conditions Oct 24, 2017
Daytime Ramp Closures on US 50 & CO 96/47 Interchange Oct 16, 2017
Daytime Ramp Closures on US 50 & CO 96/47 Interchange Aug 07, 2017
I-25 Closed Overnight in Pueblo to Prep for Bridge Work Jun 30, 2017
Traffic Reduced to One Lane Overnight June 14 and 15 on I-25 in Pueblo Jun 09, 2017
Expect Delays in May on 4 Street in Pueblo for Traffic Signal Work Apr 27, 2017
Daytime Closure of East 4th Street to Northbound I-25 Runs through April Mar 23, 2017
Closures on East 4th Street Start Monday and run through March Mar 15, 2017
Traffic Signal Operations Begin Monday on East 4th Street Mar 10, 2017
Traffic Signal Operations on 4th Street in Pueblo Set for Feb. 27 - March 3 Feb 27, 2017
Full Overnight Closure Set for Feb. 26-27 on 4th Street (CO 96) in Pueblo Feb 23, 2017