Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Studies
  4. I-25 Colorado Springs Area Finding of No Significant Impact (FONSI)
  5. I-25 Colorado Springs Area FONSI
Resources
  • Projects
  • Studies
    • US 24 West Finding of No Significant Impact (FONSI)
    • North I-25 PEL Study, US 36 to CO 7
    • US 34 & US 85 Interchange PEL Study
    • I-25 and Arapahoe Road/SH 88 Interchange Environmental Assessment & FONSI
    • I-25 Colorado Springs Area Finding of No Significant Impact (FONSI)
      • I-25 Colorado Springs Area FONSI
        • Section 00 pages 00 Front Cover.pdf
        • Section 00 pages 01 Signature Page.pdf
        • Section 00 pages 02 Table of Contents.pdf
        • Section 01 Introduction.pdf
        • Section 02 Project Description.pdf
        • Section 03 Review Process.pdf
        • Section 04 pages 01-02 Response to Agency Comments.pdf
        • Section 04 pages 03-04 Colorado Division of Wildlife.pdf
        • Section 04 pages 05-10 USAFA.pdf
        • Section 04 pages 11 Fort Carson.pdf
        • Section 04 pages 12-13 US Dept of Interior.pdf
        • Section 04 pages 14-19 US EPA.pdf
        • Section 05 Response to Public.pdf
        • Section 06 pages 01 Response to Attorneys.pdf
        • Section 06 pages 03-05 Furniture Row.pdf
        • Section 06 pages 06-14 Picolan.pdf
        • Section 06 pages 15-27 Old North End.pdf
        • Section 06 pages 28-41 Old North End.pdf
        • Section 06 pages 42-54 Old North End.pdf
        • Section 06 pages 55-57 ONEN Attachments List.pdf
        • Section 07 Clarifications to the EA.pdf
        • Section 08 Findings.pdf
        • Section 09 pages 01-10 Section 4f.pdf
        • Section 09 pages 11-16 Section 4f.pdf
        • Section 09 pages 17-22 Section 4f.pdf
        • Section 10 Native American Consultation.pdf
        • Section 11 SHPO Memorandum of Agreement.pdf
        • Section 12 pages 01-02 Other Agency Correspondence.pdf
        • Section 12 pages 03-06 FHWA Letter to ACHP Don Klima.pdf
        • Section 12 pages 07-08 ACHP Letter to FHWA Douglas Bennett.pdf
        • Section 12 pages 09-10 NPS Letter to CDOT Lisa Schoch.pdf
      • Appendices
      • Re-Evaluation
    • CO 7 Cherryvale to 75th Street EA & FONSI
    • US 34, US 287 to Larimer County Rd. 3 EA and FONSI
    • US 36 Managed Lanes - Investment Grade Traffic and Revenue Study
    • South I-25 Corridor and US 85 Corridor FEIS & ROD
    • US 6 - 24 Road to SH 139 Access Control Plan
    • US 6/River Front Road Access Control Plan in Silt
    • 2009 Disparity Study and Appendices
    • I-25 Valley Highway Environmental Impact Statement (EIS) and ROD
    • I-25, Colorado Springs to Monument Environmental Assessment
    • SH 42 Planning and Environmental Linkage Study (PEL)
    • US 40 Section 4(f) Evaluation
    • US 50 West Wills Blvd to McCulloch Blvd EA
    • US 50 West PEL Study
    • SH 60 Access Control Plan
    • SH 60 Environmental Overview Study
    • I-70/32nd Avenue Interchange Environmental Assessment
    • I-70 Mountain Corridor Mobility and Operational Assessment
    • I-70 Mountain Corridor Short Term Mobility Solutions Report
    • I-70 Reversible Lane Study
    • I-70 Reversible (Zipper) Lane Study Phase II
    • I-70 Twin Tunnels Environmental Assessment
    • SH 88/Federal Boulevard Environmental Assessment and FONSI
    • SH 133 Carbondale Access Control Plan
    • US 160 Durango to Bayfield Final EIS
    • US 160 Durango to Bayfield ROD October 2006
    • US 285 Environmental Assessment with Appendices
    • US 287 at Lamar Environmental Assessment and FONSI
    • US 287 Loveland to Fort Collins Environmental Overview Study (EOS)
    • US 287 from CO 1 to the LaPorte Bypass EA and FONSI
    • US 385 High Plains Corridor
    • SH 402 EA and FONSI
    • C-470 Environmental Assessment & FONSI 2015
    • Denver Area Regional Bus Facility Study
    • Devolution Study Report
    • Eastern Colorado Mobility Study
    • Northwest Corridor EIS
    • Ports to Plains
    • Region 3 Intersection Priority
    • Studies & Assessments
  • Flood-Related Projects
  • Central 70
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • CDOT Projects Overview
  • cdot-travel-alerts.png
  • Assets
  • C470 - Wadsworth Boulevard to I-70 NEPA and Preliminary Design
  • I-25 (US 36 to 104th Ave) Improvements
  • CO 7 Lower (Lyons to Raymond)
  • Santa Fe PEL | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • I-270 Corridor Improvements
  • Southeastern CO Centerline Rumble Strip Installation
  • Northeastern Colorado Bridge Rehabilitation in Boulder County
  • Teller County
  • El Paso County Bridge Maintenance
  • US 50 Bonforte to Avondale Resurfacing
  • Weld County ADA Ramps
  • US 285 Resurfacing between Monte Vista and Saguache
  • US 50 La Junta Microsurfacing
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • ITS Installation of Road Side Connected Vehicles
  • CO 139 Douglas Pass Resurfacing Project
  • CO 133 Bowie Chip Seal
  • CO 1 Wellington South Resurfacing
  • CO 392 & CR 55 Turn Improvements
  • I-70 Median Cable Rail in Eagle County
  • CO 115 Improvements - Colorado Springs to Penrose
  • CO 52 and Weld County Road 37 Intersection Improvements
  • CO 121/Wadsworth Signal Improvements in Jefferson County
  • Interstates
  • US Highways
  • State Highways
  • Denver Metro Area
  • Central/Eastern Colorado
  • Northeastern Colorado
  • Northwestern Colorado
  • Southeastern Colorado
  • Southwestern Colorado
  • I-70 Wildlife Fence in Eagle County
  • Stencil Project in Teller & El Paso Counties
  • CO 72 Chipseal in Larimer County
  • CO 71 Passing Lane Construction from Limon to Brush
  • Southeastern Colorado Pavement Marking
  • US 85 & Meadows Parkway Culvert Rehabilitation
  • T-Rex Narrows Bridge Preventative Maintenance
  • CO 72 Frontage Road to Indiana Street Resurfacing
I-25 Colorado Springs Area FONSI https://www.codot.gov/projects/studies/i-25-finding-of-no-significant-impact-fonsi/I25ColoSpgsFONSI https://www.codot.gov/@@site-logo/siteLogo.png

I-25 Colorado Springs Area FONSI

Section 07 Clarifications to the EA.pdf
Section 08 Findings.pdf
Section 09 pages 01-10 Section 4f.pdf
Section 09 pages 11-16 Section 4f.pdf
Section 09 pages 17-22 Section 4f.pdf
Section 10 Native American Consultation.pdf
Section 11 SHPO Memorandum of Agreement.pdf
Section 12 pages 01-02 Other Agency Correspondence.pdf
Section 12 pages 03-06 FHWA Letter to ACHP Don Klima.pdf
Section 12 pages 07-08 ACHP Letter to FHWA Douglas Bennett.pdf
Section 12 pages 09-10 NPS Letter to CDOT Lisa Schoch.pdf
  • Previous 20 items
  • 1
  • 2

Tags:
  • Study
  • Library
Need More Help?

Sign Up for Travel Alerts & News

CDOT Travel Alerts icon

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo