Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • Spanish
  • Chinese (Simplified)
  • Vietnamese
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Studies
  4. Completed Studies
  5. US 24 West
  6. Documents
Resources
  • Projects
  • Assets
  • Studies
    • US 24 West Finding of No Significant Impact (FONSI)
    • North I-25 PEL Study, US 36 to CO 7
    • US 34 & US 85 Interchange PEL Study
    • I-25 and Arapahoe Road/SH 88 Interchange Environmental Assessment & FONSI
    • I-25 Colorado Springs Area Finding of No Significant Impact (FONSI)
    • CO 7 Cherryvale to 75th Street EA & FONSI
    • US 34, US 287 to Larimer County Rd. 3 EA and FONSI
    • US 36 Managed Lanes - Investment Grade Traffic and Revenue Study
    • South I-25 Corridor and US 85 Corridor FEIS & ROD
    • US 6 - 24 Road to SH 139 Access Control Plan
    • US 6/River Front Road Access Control Plan in Silt
    • 2009 Disparity Study and Appendices
    • I-25 Valley Highway Environmental Impact Statement (EIS) and ROD
    • I-25, Colorado Springs to Monument Environmental Assessment
    • SH 42 Planning and Environmental Linkage Study (PEL)
    • US 40 Section 4(f) Evaluation
    • US 50 West Wills Blvd to McCulloch Blvd EA
    • US 50 West PEL Study
    • SH 60 Access Control Plan
    • SH 60 Environmental Overview Study
    • I-70/32nd Avenue Interchange Environmental Assessment
    • I-70 Mountain Corridor Mobility and Operational Assessment
    • I-70 Mountain Corridor Short Term Mobility Solutions Report
    • I-70 Reversible Lane Study
    • I-70 Reversible (Zipper) Lane Study Phase II
    • I-70 Twin Tunnels Environmental Assessment
    • SH 88/Federal Boulevard Environmental Assessment and FONSI
    • SH 133 Carbondale Access Control Plan
    • US 160 Durango to Bayfield Final EIS
    • US 160 Durango to Bayfield ROD October 2006
    • US 285 Environmental Assessment with Appendices
    • US 287 at Lamar Environmental Assessment and FONSI
    • US 287 Loveland to Fort Collins Environmental Overview Study (EOS)
    • US 287 from CO 1 to the LaPorte Bypass EA and FONSI
    • US 385 High Plains Corridor
    • SH 402 EA and FONSI
    • C-470 Environmental Assessment & FONSI 2015
    • Denver Area Regional Bus Facility Study
    • Devolution Study Report
    • Eastern Colorado Mobility Study
    • Northwest Corridor EIS
    • Ports to Plains
    • Region 3 Intersection Priority
    • Studies & Assessments
    • CO 119 Multi-modal Planning and Environmental Linkages Study
    • US 160-CR 225 Intersection Improvements
    • I-270 Corridor Improvements Study
    • Completed Studies
      • CO 392 Environmental Overview Study (EOS)
      • US 24 West
        • Schedule
        • Decision Making Process
        • Get Involved
        • Resources
        • Press Room
        • Environmental Assessment
        • Finding of No Significant Impact (FONSI)
        • Midland Greenway Advisory Committee
        • Right Of Way
        • Shifting Gears
        • Design Guidelines
        • Documents
          • US24W Environmental Assessment CSS Approach
          • US24W Schedule Flowchart
          • 04-22-09 Aesthetic Working Group Session
          • 01-21-09 Aesthetic Working Group Session
          • 11-19-08 Aesthetic Working Group Session
          • EA.pdf
          • Final Study Process Chart.pdf
          • history.pdf
          • launch_release.pdf
          • schedulechart10-27-04.pdf
          • team.pdf
          • US24_flowchart.pdf
          • US24_flowchart 10-21-04.pdf
          • US24_flowchart_web.pdf
          • us24_limits.pdf
          • vcc_3-05.pdf
          • web_schedule.pdf
          • Combined Idea List
          • Critical Issues with Comments
          • August 28, 2008 Open House
          • August 24, 2006 Open House
          • May 10, 2006 Open House
          • Planning Documents
          • Project Schedule 0908
          • Midland Greenway Brochure 2009
          • March 2008 Postcard
          • September 2005 Newsletter
          • Fall 2004 Newsletter
          • Spring 2007 Newsletter
          • Summer 2008 Newsletter
          • Project Update March 2007
          • What are the problems
          • Background Information
          • Project Planning
          • Alternatives
          • Since You Asked
          • Traffic and Design
          • Traffic Operations
          • Answers to Recent Questions
          • Economic Facts
          • Level 3 Alternatives Key Messages
          • Level 3 Evaluation of Alternatives
          • Noise Brochure
          • Build Alternative
          • PM Jan 20 2005
          • PM April 14, 2005
          • PM June 21, 2005
          • PM Nov 10, 2005
          • PM Jan 25, 2006
          • April 12, 2006
          • Design Option Aug 24 2006
          • Process Chart 3-05
          • Critical Issues
          • Spring 07 Newsletter
          • Frequently Asked Questions (FAQs)
          • Updated flow chart
          • Slide 13 Map
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • Central 70
  • I-25 (US 36 to 104th Ave) Improvements
  • Santa Fe Drive Action Plan- A Planning & Environmental Linkages (PEL) Study | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • CO 115 Improvements - Colorado Springs to Penrose
  • I-70 Wildlife Fence in Eagle County
  • US 85 Corridor Improvements
  • I-70 VSL and CO 74 & US 285 ITS Upgrades
  • I-25 and CO-7: Interim Transit Improvements
  • CO 119 Boulder Canyon Tunnel Repairs
  • C-470 Trail Bridge over Acres Green
  • US 287 & CO 52 Intersection Safety Improvements
  • I-25 & Alameda Bridge Replacement
  • I-70 Bridges over Ward Road
  • I-25 Walsenburg Bridge Replacement
  • Firestone-Longmont Mobility Hub
  • CO 12 Bridge Replacement in Las Animas County
  • CO 207 & CO 266 Resurfacing
  • CO 74 Evergreen Lake North Trail
  • CO 109 Bridge over US 50, BNSF Railroad
  • US 24 Woodland Park Paving and ADA Curb Ramp Improvements
  • CO 21 and US 24 Signal Improvement Project in El Paso County
  • US 50 Passing Lane - Gunnison County
  • CO 172 Ignacio Resurfacing
  • US 385 Holyoke North Resurfacing
  • CO 170 Critical Culverts, Boulder County
  • Drew Dix Parkway Dillon Drive at I-25 Interchange
  • Metro Denver Bridge Deck Safety Project
  • I-25 Resurfacing North of Walsenburg Project
  • CO 93 Resurfacing between US 6 and 58th Ave
  • I-70 Bridge Maintenance between Limon and Agate
  • US 6 & 20 Road Intersection Improvements
  • I-70 Concrete Slab Replacement from West Rifle to Silt
  • CO 64 Bridges west of Meeker
  • US 24 Curve Correction in Teller County
  • US 160 Priority Culverts in Southwestern Colorado
  • CO 318 Resurfacing Project Moffat County
  • US 285/CO 9 Intersection Improvements & Bridge Replacement
  • CO 114 Overlay, Gunnison to Saguache County
  • CO 64 & CO 13 Meeker Resurfacing Project
  • CO 133 Rockfall Project North of McClure Pass to South of Carbondale
  • CO 9 Surface Treatment in Summit and Grand County
  • US 160 Cortez Signal Improvements
  • CO 96 Overlay between Eads and Sheridan Lake
  • CO 2/CO 88/US 285 Denver Metro ADA Ramps
  • US 160 Pagosa West Resurfacing
  • US 36 Surface and Safety Improvements between Boulder and Lyons
  • I-70 Bridge Over Washington Street
  • CO 257 Resurfacing US 34 Business to Walnut Street
  • CO 83 Resurfacing in Douglas County
  • Southwest Colorado Pavement Marking
  • CO 138 Logan County Widening Project
  • US 85 Platteville Resurfacing Between CO 60 and CO 66
  • CO 14 and US 40 Crack Sealing in Jackson and Grand Counties
  • CDOT Retaining Wall Improvements in Jefferson County
  • CO 133 Culvert Repair in Bowie, CO
  • CO 13 Chip Seal North of Craig
  • Preventative Maintenance of I-25 bridges at 58th and 62nd
  • CO 71 Overlay between Ordway and Punkin Center
  • CO 121 Signal Improvements in Jefferson County
  • I-70 Glenwood Canyon Material Flows
  • US 287 Surface Improvement Project
  • CO 2 - Colorado Boulevard Resurfacing Project
  • I-70 B and CO 141 B Resurfacing Project in Mesa County
  • Eastbound I-70 Mount Vernon Truck Escape Ramp Reconstruction
  • US 550 Avalanche Control System
  • CO 96 Pueblo Intersection Project
  • US 34 - Signal Pole Replacement in Brush, Akron, Otis and Wray
  • I-76 Cable Rail Project Ft. Morgan to Brush
  • CO 133 Paonia Slope Stabilization
  • I-70 Eastbound Resurfacing in Clear Creek County
  • US 40 Berthoud Pass Paving Project
  • CO 194 Improvements between La Junta and Las Animas in Bent County
  • US 50 & CO 71 Intersection Improvements
  • I-70 Picadilly Design-Build Project (City of Aurora Project)
  • CO 151 Emergency Culvert north of Arboles
  • CO 30/Gun Club Rd. Widening at Hampden
  • CO 66 Intersection Improvements in Northeastern Colorado/Region 4
  • I-25 Concrete Panel Replacement from Fort Collins to Owl Canyon Road
  • I-270 Bridge Preventative Maintenance
  • I-70 Vail Pass Eastbound Resurfacing
  • CO 88/Belleview Traffic Safety Project
  • Northeastern Colorado Pavement Marking & Rumble Strips
  • Arapahoe County Curb Ramps along CO 30/6th Avenue
  • Southeast Colorado Sign Replacement (12 locations)
  • US 34 Weather Cameras from Greeley to Wiggins
  • US 24 Intersection Improvements Southwest of Manitou Springs
Documents Documentation specific to the US24W Corridor Project https://www.codot.gov/projects/studies/study-archives/us24west/documents https://www.codot.gov/@@site-logo/siteLogo.png

Documents

Documentation specific to the US24W Corridor Project
August 28, 2008 Open House
August 24, 2006 Open House
May 10, 2006 Open House
Planning Documents
Project Schedule 0908
Midland Greenway Brochure 2009
March 2008 Postcard
September 2005 Newsletter
Fall 2004 Newsletter
Spring 2007 Newsletter
Summer 2008 Newsletter
Project Update March 2007
What are the problems
Background Information
Project Planning
Alternatives
Since You Asked
Traffic and Design
Traffic Operations
Answers to Recent Questions
  • Previous 20 items
  • 1
  • 2
  • 3
  • Next 18 items

Need More Help?

Stay Informed

Travel Alerts logo/image

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo