US 24 Stone Wall Repairs South of Cascade

Project Facts
  • Cost: $240,000
  • Contractor: American West Construction, LLC
  • Timeline: September - November 2018
  • Location: US Highway 24, just south of Cascade

About the Project

Crews on this project replaced a damaged section of stone walls off US 24 at mile point 294.2—an area affected by flooding in 2015. The work area was near a former Montessori school.

Specific repair work included replacement of a grouted boulder wall to stabilize the existing slope.