Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. US 160 McCabe Creek Culvert Replacement in Pagosa Springs
  4. Photo Gallery
Resources
  • Projects
  • Assets
  • Studies
  • Flood-Related Projects
  • Central 70
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • CDOT Projects Overview
  • C470 - Wadsworth Boulevard to I-70 NEPA and Preliminary Design
  • I-25 (US 36 to 104th Ave) Improvements
  • CO 7 Lower (Lyons to Raymond)
  • Santa Fe Drive Action Plan- A Planning & Environmental Linkages (PEL) Study | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • I-270 Corridor Improvements
  • Southeastern CO Centerline Rumble Strip Installation
  • Teller County
  • US 50 Bonforte to Avondale Resurfacing
  • Weld County ADA Ramps
  • US 285 Resurfacing between Monte Vista and Saguache
  • US 50 La Junta Microsurfacing
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • ITS Installation of Road Side Connected Vehicles
  • CO 133 Bowie Chip Seal
  • CO 1 Wellington South Resurfacing
  • I-70 Median Cable Rail in Eagle County
  • CO 115 Improvements - Colorado Springs to Penrose
  • CO 52 and Weld County Road 37 Intersection Improvements
  • CO 121/Wadsworth Signal Improvements in Jefferson County
  • Interstates
  • US Highways
  • State Highways
  • Denver Metro Area
  • Central/Eastern Colorado
  • Northeastern Colorado
  • Northwestern Colorado
  • Southeastern Colorado
  • Southwestern Colorado
  • I-70 Wildlife Fence in Eagle County
  • CO 72 Chipseal in Larimer County
  • CO 71 Passing Lane Construction from Limon to Brush
  • Southeastern Colorado Pavement Marking
  • CO 72 Frontage Road to Indiana Street Resurfacing
  • Denver Metro Bridge Safety Improvements
  • US 385 North of Cheyenne Wells
  • I-70 Wrong Way Detection Maintenance
  • US 85 Corridor Improvements
  • US 550 Chipeta Traffic Signal Installation
  • US 40 - Colfax and Quail Signal Replacement
  • CO 71 Bridge Repair Otero County
  • I-70 VSL and CO 74 & US 285 ITS Upgrades
  • US 160-CR 225 Intersection Improvements
  • I-76 Over Clear Creek Scour Mitigation
  • I-25 and CO-7: Interim Transit Improvements
  • CO 119 Boulder Canyon Tunnel Repairs
  • CO 52 Culvert Extension at Weld County Road 19
  • Clear Creek Scour Mitigation on I-70
  • I-70 Salt Wash Bridges Scour, Mesa County
  • US 34 Brush Lateral Canal Repair
  • C-470 Trail Bridge over Acres Green
  • US 287 & CO 52 Intersection Safety Improvements
  • I-25 & Alameda Bridge Replacement
  • CO 83 Douglas County Sign Replacement
  • US 85 at County Road 14.5 Intersection Improvements
  • I-70 Bridges over Ward Road
  • I-25 Concrete Panel Replacement
  • I-25 Walsenburg Bridge Replacement
  • Firestone-Longmont Mobility Hub
  • CO 12 Bridge Replacement in Las Animas County
  • CO 115 in Fremont County and US 50 in Pueblo County Sign Replacement
  • US 160 McCabe Creek Culvert Replacement in Pagosa Springs
    • Photo Gallery
      • Culvert work on US 160 McCabe Creek
      • Culvert work on US 160 McCabe Creek Crane View
      • Pouring concrete on US 160 at McCabe Creek
      • Drone Footage.jpg
Photo Gallery https://www.codot.gov/projects/us160-mccabe-creek-culverts-pagosa/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png

Photo Gallery

Culvert work on US 160 McCabe Creek thumbnail image Culvert work on US 160 McCabe Creek
Culvert work on US 160 McCabe Creek Crane View thumbnail image Culvert work on US 160 McCabe Creek Crane View
Pouring concrete on US 160 at McCabe Creek thumbnail image Pouring concrete on US 160 at McCabe Creek
Drone Footage.jpg thumbnail image Drone Footage.jpg

Contact Us

Project Hotline:  
970-507-3740

Project Email:
[email protected]

Photo Gallery

US 160 Pagosa Culvert Project Photos

Project News and Updates
  • Heavy summer rains extend completion date of US 160 McCabe Creek culvert project in Pagosa Springs Sep 01, 2022
  • US 160 McCabe Creek culvert replacement project in Pagosa Springs begins spring start up Mar 07, 2022
  • Winter Shutdown for US 160 McCabe Creek Culvert Replacement Project in Pagosa Springs Dec 22, 2021
  • US 160 McCabe Creek culvert replacement project to begin in August Jul 29, 2021
Project News and Updates - More…
Sign Up for Travel Alerts & News

CDOT Travel Alerts icon

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo