Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. US 287 & US 50 Resurfacing in Lamar
  4. Photo Gallery
Resources
  • Projects
  • Assets
  • Studies
  • Central 70
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • CDOT Projects Overview
  • C470 - Wadsworth Boulevard to I-70 NEPA and Preliminary Design
  • I-25 (US 36 to 104th Ave) Improvements
  • Santa Fe Drive Action Plan- A Planning & Environmental Linkages (PEL) Study | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • I-270 Corridor Improvements
  • Teller County
  • US 50 Bonforte to Avondale Resurfacing
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • ITS Installation of Road Side Connected Vehicles
  • I-70 Median Cable Rail in Eagle County
  • CO 115 Improvements - Colorado Springs to Penrose
  • CO 121/Wadsworth Signal Improvements in Jefferson County
  • Interstates
  • US Highways
  • State Highways
  • Denver Metro Area
  • Central/Eastern Colorado
  • Northeastern Colorado
  • Northwestern Colorado
  • Southeastern Colorado
  • Southwestern Colorado
  • I-70 Wildlife Fence in Eagle County
  • Southeastern Colorado Pavement Marking
  • CO 72 Frontage Road to Indiana Street Resurfacing
  • US 385 North of Cheyenne Wells
  • I-70 Glenwood Canyon Material Flows
  • US 85 Corridor Improvements
  • US 550 Chipeta Traffic Signal Installation
  • CO 71 Bridge Repair Otero County
  • I-70 VSL and CO 74 & US 285 ITS Upgrades
  • I-76 Over Clear Creek Scour Mitigation
  • I-25 and CO-7: Interim Transit Improvements
  • CO 119 Boulder Canyon Tunnel Repairs
  • Clear Creek Scour Mitigation on I-70
  • I-70 Salt Wash Bridges Scour, Mesa County
  • US 34 Brush Lateral Canal Repair
  • C-470 Trail Bridge over Acres Green
  • US 287 & CO 52 Intersection Safety Improvements
  • I-25 & Alameda Bridge Replacement
  • I-70 Bridges over Ward Road
  • I-25 Concrete Panel Replacement
  • I-25 Walsenburg Bridge Replacement
  • Firestone-Longmont Mobility Hub
  • CO 12 Bridge Replacement in Las Animas County
  • CO 115 in Fremont County and US 50 in Pueblo County Sign Replacement
  • CO 207 & CO 266 Resurfacing
  • CO 74 Evergreen Lake North Trail
  • CO 109 Bridge over US 50, BNSF Railroad
  • US 24 Woodland Park Paving and ADA Curb Ramp Improvements
  • CO 21 and US 24 Signal Improvement Project in El Paso County
  • US 50 Passing Lane - Gunnison County
  • CO 172 Ignacio Resurfacing
  • US 50 & CO 71 Intersection Improvements
  • US 385 Holyoke North Resurfacing
  • CO 170 Critical Culverts, Boulder County
  • Drew Dix Parkway Dillon Drive at I-25 Interchange
  • Metro Denver Bridge Deck Safety Project
  • Southeast Colorado Guardrail Replacement
  • I-25 Resurfacing North of Walsenburg Project
  • CO 93 Resurfacing between US 6 and 58th Ave
  • I-70 Bridge Maintenance between Limon and Agate
  • US 6 & 20 Road Intersection Improvements
  • I-70 Concrete Slab Replacement from West Rifle to Silt
  • CO 64 Bridges west of Meeker
  • US 24 Curve Correction in Teller County
  • US 160 Priority Culverts in Southwestern Colorado
  • CO 318 Resurfacing Project Moffat County
  • US 285/CO 9 Intersection Improvements & Bridge Replacement
  • I-70 East of DeBeque Resurfacing
  • CO 114 Overlay, Gunnison to Saguache County
  • CO 64 & CO 13 Meeker Resurfacing Project
  • CO 133 Rockfall Project North of McClure Pass to South of Carbondale
  • CO 9 Surface Treatment in Summit and Grand County
  • US 160 Cortez Signal Improvements
  • CO 96 Overlay between Eads and Sheridan Lake
  • CO 2/CO 88/US 285 Denver Metro ADA Ramps
  • US 160 Pagosa West Resurfacing
  • ADA Ramp Project on US 6 & South Frontage Road in Eagle and Vail
  • US 36 Surface and Safety Improvements between Boulder and Lyons
  • I-70 Bridge Over Washington Street
  • CO 257 Resurfacing US 34 Business to Walnut Street
  • CO 71 Passing Lane Construction from Limon to Brush
  • CO 67 Safety Improvements in Douglas & Teller Counties
  • US 85 at WCR 66 Acceleration Lanes in North Greeley
  • CO 83 Resurfacing in Douglas County
  • Southwest Colorado Pavement Marking
  • CO 92 Chip Seal Project in Montrose and Delta County
  • US 50 Cañon City Road Maintenance
  • CO 138 Logan County Widening Project
  • US 85 Platteville Resurfacing Between CO 60 and CO 66
  • CO 14 and US 40 Crack Sealing in Jackson and Grand Counties
  • CDOT Retaining Wall Improvements in Jefferson County
  • CO 133 Culvert Repair in Bowie, CO
  • CO 13 Chip Seal North of Craig
  • Preventative Maintenance of I-25 bridges at 58th and 62nd
  • US 287 & US 50 Resurfacing in Lamar
    • Photo Gallery
      • SB 287 7.7.22.jpg
      • NB 287 at Savage 7.7.22.jpg
      • MH A1 to MH A27-14-22.jpg
Photo Gallery https://www.codot.gov/projects/us287-us50-resurfacing-in-lamar/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png

Photo Gallery

SB 287 7.7.22.jpg thumbnail image SB 287 7.7.22.jpg
NB 287 at Savage 7.7.22.jpg thumbnail image NB 287 at Savage 7.7.22.jpg
MH A1 to MH A27-14-22.jpg thumbnail image MH A1 to MH A27-14-22.jpg

Contact Us

Project Hotline:  
719-755-0579

Project Email:
[email protected]

Photo Gallery

US 287/US 50 Resurfacing Project Photos

Project News and Updates
  • US Highway 287 Lamar resurfacing and roadway improvements Feb 22, 2021
Project News and Updates - More…
Sign Up for Travel Alerts & Project News

CDOT Travel Alerts icon

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo