Projects

US 40 & CO 121 Traffic Signal Upgrades in Denver and Golden

Work this Week

Week of  April 19, 2021

Daytime operations
Hours: 7 a.m. – 5 p.m.

Crews are working on traffic signal and Americans with Disabilities (ADA) compliant curb ramp replacements at three different intersections in Jefferson and Denver County.

Intersection West Colfax Ave & Interplaza West in Golden

  • Working hours are 7 a.m. – 5 p.m. Monday through Friday
  • A single right lane closure in all directions will be in effect

Intersection of Wadsworth Blvd & West 29th Ave in Wheat Ridge

  • Working hours are 7 a.m. – 5 p.m. Monday through Friday
  • A single right lane closure in all directions will be in effect

Intersection of South Wadsworth Blvd & West Stanford Ave in Denver

  • Working hours are 7 a.m. – 5 p.m. Monday through Friday
  • A single right lane closure in all directions will be in effect

On Thursday, March 18, CDOT and contractor Lumin8 (formerly WL Contractors) installed one of Colorado’s first 85-foot mast arms at the intersection of Wadsworth Boulevard and Stanford Avenue in Denver during night work operations. The new mast arms increase signal visibility for motorists traveling towards and through the intersection. We invite you to look at the attached photos to see the work that was done.

85-foot mast arms have also been installed at the other two projects locations, Wadsworth Boulevard & 29th Avenue in Wheat Ridge, and Interplaza West and Colfax Avenue in Golden. To date, crews have installed new traffic signals at all three locations. Remaining work includes activating the new traffic signals and the installation of Americans with Disabilities (ADA) compliant curb ramps. The project is expected to be complete in May 2021.

Work Locations:

  • Intersection of Interplaza West and West Colfax Avenue in Golden
  • Intersection of Wadsworth Boulevard and West 29th Avenue in Bel Air
  • Intersection of South Wadsworth Boulevard and West Stanford Avenue in Denver

Project Facts

  • Cost: $1,700,000
  • Contractor:  WL Contractors
  • Timeline: January 2021 - May 2021
  • Locations:  Colfax and Interplaza West, Golden; Wadsworth Blvd. and West Stanford Ave., Denver, and at intersection of Wadsworth and West 29th in Bel Aire.


Proposed Work Schedule

  • Typical working hours are 7 a.m. - 5 p.m. Mondays through Fridays.

Travel Impacts

  • Traffic impacts include single lane closures and temporarily inaccessible curb ramps during upgrades.
  • Motorists can expect various single lane closures and shoulder closures within the work areas during daytime hours.
  • Some overnight work with lane closures may occur. Updates will be posted on the project page.
  • Slowdowns and delays are expected.
  • Please drive safely through the work area when crews are present.