Ongoing Traffic Impacts


Monday, April 8 to Saturday, April 13 - CO 115 - daytime lane closures changing to 24/7 single-lane configuration, with alternating directions of traffic managed by temporary traffic signals
  • Lane closures in both directions of CO 115, traffic shifts and changing conditions will exist Monday to Wednesday
  • Starting on Wednesday evening (April 10), the southbound lane of CO 115 will be closed 24/7 within the project limits and alternating directions of traffic will be routed into the open northbound lane
  • The closure will be managed by temporary signals at each end of the proposed roundabout area
  • Motorists can expect short delays during these alternating traffic holds
  • Working hours are 7 a.m. to 5 p.m. Monday to Friday
  • The project limits on CO 115 extend from MP 12.76 to MP 14.01
  • Lanes are narrowed and caution is advised
  • Construction devices and barrier are in place to maintain safety
  • Flaggers, signs, and message boards exist to alert the public to closures and restrictions within the work zone
  • Construction schedules are weather dependent and subject to change
Work includes installing and activating temporary traffic signals and temporary barrier, striping the roadway, and implementing the traffic shift.

 

Wednesday, April 10 to Saturday, April 13 - Eastbound US 50 off-ramp to CO 115 - 24/7 onsite detour
  • Starting the evening of Wednesday, April 10, eastbound US 50 off-ramp traffic to CO 115 will be routed onto onsite detour pavement
  • The new off ramp detour configuration will be in place 24/7 during construction of the roundabout
  • Caution is advised as the new off-ramp will be shorter and require a sharp 90 degree turn
  • No lane closures are expected on mainline eastbound US 50
  • Working hours are 7 a.m. to 5 p.m. Monday to Friday
  • The project limits on US 50 extend from Mile Point 289.50 to MP 289.84
  • Traffic shifts, narrowed lanes and reduced speeds may exist later in the project
  • Flaggers, signs and construction devices are present to alert the public to the work zone, closures and restrictions
  • Please exercise caution as motorists famiiarize themselves with the new off ramp configuration 
  • Construction schedules are weather dependent and subject to change
Work includes asphalt paving, pavement striping, installing barrier, and implementing the shift to the new temporary off-ramp configuration.
Recent view of temporary onsite detour construction at the eastbound US 50 off ramp to CO 115. Photography by Jordyn Kurfiss.


General Impacts, Schedule & Scope of Work

  • The project began on March 4 and has an anticipated completion date of late October
  • Starting on April 10, CO 115 will be in a single lane configuration within the work zone, with alternating directions of traffic managed by temporary traffic signals
  • The single lane configuration consists of a 24/7 closure of the southbound lane with alternating directions of traffic routed into the open northbound lane
  • Motorists can expect short delays during alternating traffic holds
  • The temporary signals will be installed on each end of the roundabout area to manage alternating directions of traffic into the open lane
  • No immediate lane closures are expected on eastbound US 50
  • Starting on April 10, the eastbound US 50 off ramp to CO 115 will be in a 24/7 temporary configuration onto detour pavement
  • The new off ramp detour configuration will be in place 24/7 during construction of the roundabout
  • The project limits on US 50 extend from MP 289.50 to MP 289.84
  • The project limits on CO 115 extend from MP 12.76 to MP 14.01
  • Working hours are 7 a.m. to 5 p.m. Monday to Friday
  • Working hours will be extended during the summer months
  • This state funded project is designed to improve safety and traffic flow by adding a roundabout
  • The roundabout will be on the south side of CO 115 and intersect with the on and off ramps of eastbound US 50
  • No changes will be made to the westbound US 50 on and off ramps
  • Other work includes adding a concrete island and truck apron, and installing curb and gutter, lighting, and traffic signs
  • Roundabouts are proven to be a safer and more efficient method of traffic operations at certain intersections
  • Construction schedules are weather dependent and subject to change

Stay Connected!

 
Road ConditionsCOtrip.org 
COtrip Planner App
bit.ly/COtripapp
Project Travel Alertsbit.ly/COnewsalerts
Lane Closuresbit.ly/laneclosures
decorative image
@ColoradoDOT on Facebook
@ColoradoDOT on Twitter
@ColoradoDOT on Instagram
@ColoradoDOT on YouTube
@ColoradoDOT on Flickr
Copyright © 2024 Colorado Department of Transportation All rights reserved.

Our mailing address is:

Colorado Department of Transportation
2829 W Howard Place
Denver CO 80204


You are receiving this email because you requested information regarding construction updates for the <Project Name>. Update your preferences or unsubscribe from this list.






This email was sent to <<Email Address>>
why did I get this?    unsubscribe from this list    update subscription preferences
Colorado Department of Transportation · 2829 West Howard Place · Denver, CO 80204 · USA