Weekly Traffic Impacts - March 24 to March 30


Please be advised that there will be no impacts to traffic next week for the US 50 & CO 115 Roundabout project in Penrose, Fremont County. All work will be performed off the roadway.

No Planned Traffic Impacts


Monday, March 25 to Friday, March 29 - both directions of CO 115 - no planned lane closures
  • No lane closures are planned for this period
  • Working hours are 7 a.m. to 5 p.m. Monday to Friday
  • The project limits on CO 115 extend from MP 12.76 to MP 14.01
  • Starting in April, motorists can expect 24/7 lane closures on CO 115 during construction of the roundabout
  • These 24/7 closures will begin on the southbound side, followed by the northbound side, managed by temporary signals
  • The temporary signals will be installed on each end of the roundabout area to manage alternating directions of traffic into the open lane
  • Flaggers, signs and message boards are present to alert the public to restrictions within the work zone
  • Construction schedules are weather dependent and subject to change
Work includes finishing embankment cut and fills and asphalt paving the onsite detour from the eastbound US 50 off-ramp to CO 115. Some work is weather dependent.

 

Monday, March 25 to Friday, March 29 - Eastbound US 50 - no planned lane closures, but flaggers present at the off-ramp
  • No lane closures will be taken on eastbound US 50 during this period or for the immediate future
  • Flaggers are present at the eastbound US 50 off ramp to manage traffic flows during embankment and detour work
  • Working hours are 7 a.m. to 5 p.m. Monday to Friday
  • The project limits on US 50 extend from Mile Point 289.50 to MP 289.84
  • Traffic shifts, narrowed lanes and reduced speeds may exist later in the project
  • Signs and construction devices are present to alert the public to the work zone, closures and restrictions
  • Construction schedules are weather dependent and subject to change
Work includes finishing embankment cut and fills and asphalt paving the onsite detour from the eastbound US 50 off-ramp to CO 115. Some work is weather dependent.
Location and project limits of the US 50/CO 115 roundabout project, and graphic representation of the location and configuration of the roundabout.


General Impacts, Schedule & Scope of Work

  • The project began on March 4 and has an anticipated completion date of late October
  • Starting in April, motorists can expect 24/7 lane closures on CO 115 during construction of the roundabout
  • These 24/7 closures will begin on the southbound side, followed by the northbound side, managed by temporary signals
  • The temporary signals will be installed on each end of the roundabout area to manage alternating directions of traffic into the open lane
  • No immediate lane closures are expected on eastbound US 50
  • An onsite temporary detour will be in place this spring from the eastbound US 50 off ramp to CO 115
  • The project limits on US 50 extend from MP 289.50 to MP 289.84
  • The project limits on CO 115 extend from MP 12.76 to MP 14.01
  • Working hours are 7 a.m. to 5 p.m. Monday to Friday
  • Working hours will be extended during the summer months
  • This state funded project is designed to improve safety and traffic flow by adding a roundabout
  • The roundabout will be on the south side of CO 115 and intersect with the on and off ramps of eastbound US 50
  • No changes will be made to the westbound US 50 on and off ramps
  • Other work includes adding a concrete island and truck apron, and installing curb and gutter, lighting, and traffic signs
  • Roundabouts are proven to be a safer and more efficient method of traffic operations at certain intersections
  • Construction schedules are weather dependent and subject to change

Stay Connected!

 
Road ConditionsCOtrip.org 
COtrip Planner App
bit.ly/COtripapp
Project Travel Alertsbit.ly/COnewsalerts
Lane Closuresbit.ly/laneclosures
decorative image
@ColoradoDOT on Facebook
@ColoradoDOT on Twitter
@ColoradoDOT on Instagram
@ColoradoDOT on YouTube
@ColoradoDOT on Flickr
Copyright © 2024 Colorado Department of Transportation All rights reserved.

Our mailing address is:

Colorado Department of Transportation
2829 W Howard Place
Denver CO 80204


You are receiving this email because you requested information regarding construction updates for the <Project Name>. Update your preferences or unsubscribe from this list.






This email was sent to <<Email Address>>
why did I get this?    unsubscribe from this list    update subscription preferences
Colorado Department of Transportation · 2829 West Howard Place · Denver, CO 80204 · USA