Phase 3: Southwest Quadrant Improvements  US 6 & Wadsworth Boulevard

Weekly Traffic Impacts & Work Update

 

Weekly Traffic Impacts - Feb. 25 to March 2


Please be advised of the following traffic impacts, restrictions, and planned work for next week for the Phase 3 Southwest Quadrant Improvements US 6 and Wadsworth Boulevard project in Jefferson County.

Weekday Impacts


Monday, Feb. 26 to Friday, March 1 - W. 6th Ave Frontage Road - weekday block to block closures
  • Daily block to block closures will exist along the Frontage Road south of US 6 from west of Meadowlark Drive to the Wadsworth Blvd. off-ramp, with minor detours to adjacent side streets
  • The closures will be taken from 7 a.m. to 5 p.m. Monday to Friday
  • Work will progress from west to east
  • Flaggers will be present to manage traffic flows
  • Local access to driveways will be maintained
Roadway work includes removing existing barrier and asphalt, reconditioning subgrade, and clearing and grubbing. Sound wall work includes cutting access for drilling and tying rebar for caissons.

24/7 Impacts


Sunday, Feb. 25 to Saturday, March 2 - W. 6th Ave Frontage Road on-ramp to eastbound US 6 - 24/7 closure, with detour in place
  • A 24/7 closure of the Frontage Road on-ramp to eastbound US 6 at Carr St. is in place until November, with detour signage in place
  • The suggested detour is Garrison St. south to 1st Ave., and east to Wadsworth to enter eastbound US 6
  • The closure is necessary to maintain safety during noise wall and auxiliary lane construction
  • Flaggers will be present to manage traffic flows, as needed
  • Signs will be in place to alert the public to detour routes, closures, and restrictions within the work zone
  • All construction schedules are weather dependent and subject to change

 

Pedestrian Traffic Alert - W. 6th Ave. Frontage Road - 24/7 Restricted Acess
 

Please be advised that no sidewalk access exists and no pedestrian traffic is permitted along the W. 6th Ave. Frontage Road south of U.S. Highway 6 between just west of Meadowlark Drive and the eastbound US 6 off ramp. The following restrictions are in place:
  • No sidewalk exists and no pedestrian access is permitted on the Frontage Road within the work zone
  • Construction activity is ongoing and extreme caution is advised
  • Pedestrians are being detoured south on Meadowlark Drive or adjacent side streets to bypass the work zone
  • Changing traffic conditions exist and motorists are also being detoured
  • Caution is advised as motorists navigate unfamiliar routes
  • These restrictions are in place until further notice
  • Signs, message boards and flaggers are present to manage traffic flow
Simulation of the chiseled limestone noise wall chosen for the US 6 & Wadsworth Blvd. improvement project.

General Impacts, Schedule & Scope of Work

  • The project began in late January and has an anticipated completion date of early 2025
  • Periodic overnight lane and ramp closures will be taken on eastbound  U.S. Highway 6 between Carr Street and the Wadsworth Blvd. interchange during certain work activities
  • These single overnight lane closures on eastbound US 6 will be in place from 7 p.m. to 6 a.m. weekdays and 7 p.m. to 9 a.m. on weekends, as needed
  • A 24/7 closure of the Frontage Road on-ramp to eastbound US 6 at Carr St. is in place until November, with detour signage in place
  • The suggested detour route is Garrison St. south to 1st Ave., then east to Wadsworth Blvd. to enter eastbound US 6
  • Daytime weekday block to block closures along the Frontage Road from west of Meadowlark Drive to the Wadsworth Blvd off-ramp will exist, with minor detours in place to adjacent side streets
  • No sidewalk access exists along the Frontage Road work zone and no pedestrian access is permitted
  • Pedestrians are being detoured south on Meadowlark Drive or adjacent side streets to bypass the work zone
  • Working hours are 7 a.m. to 5 p.m. Monday to Friday
  • Flaggers will be present on the Frontage Road as needed during working hours and local access will be maintained
  • The project limits on US 6 extend from MP 280.36 to MP 280.84
  • The project limits on the Frontage Road south of US 6 extend from just west of Meadowlark Drive to the Wadsworth Blvd off-ramp
  • Work on the auxiliary lane and noise walls will progress west to east
  • The project limits on Wadsworth Blvd extend from Highland Drive to 4th Ave or MP 12.21 to MP 12.66
  • Some overnight and weekend work can be expected later in the project
  • This state and federally funded project is the third of a five-phase project to reconstruct the US 6 & Wadsworth Interchange
  • This phase is designed to enhance pedestrian connectivity and mitigate traffic noise
  • Construction schedules are weather dependent and subject to change
  • For information on the overall project and future phases, please refer to this link

Stay Connected!

 
Webpagecodot.gov/projects/US6wadsworth/phase3
Hotline303.960.2825
Email:
us6andwadsworth@gmail.com
 
Road ConditionsCOtrip.org 
COtrip Planner App
bit.ly/COtripapp
Project Travel Alertsbit.ly/COnewsalerts
Lane Closuresbit.ly/laneclosures
decorative image
@ColoradoDOT on Facebook
@ColoradoDOT on Twitter
@ColoradoDOT on Instagram
@ColoradoDOT on YouTube
@ColoradoDOT on Flickr
Copyright © 2024 Colorado Department of Transportation All rights reserved.

Our mailing address is:

Colorado Department of Transportation
2829 W Howard Place
Denver CO 80204


You are receiving this email because you requested information regarding construction updates for the <Project Name>. Update your preferences or unsubscribe from this list.






This email was sent to <<Email Address>>
why did I get this?    unsubscribe from this list    update subscription preferences
Colorado Department of Transportation · 2829 West Howard Place · Denver, CO 80204 · USA