Denver Metro Sign Structures

Project Facts

Project Team

  • Contractor(s):
    WL Construction

I-25 Sign Bridge_denverMetroSignStructures

Crews replaced five overhead sign bridges and cantilever sign structures along I-25, I-70 and I-76 between late February and June 2017.

  1. First, crews constructed concrete supports for the new cantilever structures. Signs were replaced or reset on the new structures.

  2. Once the signs were placed, both northbound I-25 and westbound I-70 were closed overnight to remove the old sign bridges.

  3. Many of the affected signs were replaced with new signs that use "full-cube" prismatic reflective sheeting, which improves night visibility.

Sixteen signs were replaced or relocated.