-
CO 59 Resurfacing from Seibert to Cope
CO 59 from Seibert to Cope - The project consists of overlaying the existing roadway with 2.5 inches of hot mix asphalt and in places patching degraded areas. ...
Located in
Projects
/
Archived Project Sites
-
Concrete Panel Replacement in Three Counties
Construction Complete, Interstates
Located in
Projects
/
Archived Project Sites
-
CO 13 at Rio Blanco Hill
Reconstructs five miles of CO 13 in asphalt, adds eight-foot shoulders and climbing and passing lanes. The improvements will enhance recreational bicycling in ...
Located in
Projects
/
Archived Project Sites
/
ARRA Project Files
-
Eisenhower/Johnson Tunnels Fixed Fire Suppression System
Located in
Projects
/
Archived Project Sites
-
CO 13 Widening & Reconstruction Near Craig
State Highways
Located in
Projects
/
Archived Project Sites
-
I-70 Bridge Replacement in Dotsero
The Colorado Department of Transportation is beginning the design phase of the Dotsero Colorado River “green” bridge replacement project. The bridge is located ...
Located in
Projects
/
Archived Project Sites
-
US 50 Surface Treatment, Otero and Bent Counties
Located in
Projects
/
Archived Project Sites
-
A much smoother ride along Colorado Highway 141 through Big Gypsum Valley
November 3, 2020 - Southwestern Colorado
Located in
News
/
2020
/
November 2020
-
CO 79 Resurfacing & Irrigation Pipe Replacement
Colorado Highways
Located in
Projects
/
Archived Project Sites
-
US 550 Montrose ADA Ramps
US Highways Montrose US 550 ADA Ramp Project
Located in
Projects
/
Archived Project Sites