Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • Site Directory Site Directory
    • A
    • Annual Reports
    • K
    • KForms
  • Spanish
  • Chinese (Simplified)
  • Vietnamese
CDOT Logo
Home
You are here:
  1. Home
Item type
New items since

Search results

RSS Subscribe to an always-updated RSS feed.

76 items matching your search terms.
Sort by relevance date (newest first) alphabetically
  1. Thanksgiving Holiday Traffic Counts Located in Travel Center / Eisenhower Tunnel / assets
  2. Hazardous Materials Risk Analysis - Executive Summary

    Risk Analysis Study of Hazardous Materials Trucks through Eisenhower/Johnson Memorial Tunnels

    Located in Travel Center / Eisenhower Tunnel / assets
  3. EJT 2013 EJT 2013 Located in Travel Center / Eisenhower Tunnel / assets
  4. Eisenhower Memorial Bore Located in Travel Center / Eisenhower Tunnel
  5. Control Room Control Room

    The "nerve center" of the Eisenhower Tunnel Complex. The control room has thirty 18" color TV screens and eight 32" color monitors whose cameras can tilt, ...

    Located in Travel Center / Eisenhower Tunnel / Photo Tour
  6. Variable Message Board Variable Message Board

    Video monitoring and variable message boards allow maintenance personnel to monitor and control traffic inside the tunnel.

    Located in Travel Center / Eisenhower Tunnel / Photo Tour
  7. Motorist Assist Motorist Assist

    Safety crews can quickly react when a vehicles stalls, catches on fire, or otherwise needs help in a hurry.

    Located in Travel Center / Eisenhower Tunnel / Photo Tour
  8. Reverse Lane Reverse Lane

    Reverse Lane is periodically implemented on Sunday afternoons during peak traffic weekends, in order to provide for uninterrupted traffic flow for eastbound ...

    Located in Travel Center / Eisenhower Tunnel / Photo Tour
  9. Tunnel Wash Tunnel Wash

    Washing the tunnel walls and ceilings are one of the many maintenance duties tunnel personnel perform during the summer months.

    Located in Travel Center / Eisenhower Tunnel / Photo Tour
  10. Wall Panel Replacement Wall Panel Replacement

    Wall panel replacement is another maintenance duty performed by tunnel personnel.

    Located in Travel Center / Eisenhower Tunnel / Photo Tour
  • Previous 10 items
  • 1
  • ...
  • 4
  • 5
  • 6
  • 7
  • 8
  • Next 6 items
Contact Us Contact Us Phone Icon 511 Icon
  • © 2024 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo