Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • Site Directory Site Directory
    • A
    • Annual Reports
    • K
    • KForms
  • Spanish
  • Chinese (Simplified)
  • Vietnamese
CDOT Logo
Home
You are here:
  1. Home
Item type
New items since

Search results

RSS Subscribe to an always-updated RSS feed.

2053 items matching your search terms.
Sort by relevance date (newest first) alphabetically
  1. CDOT to begin repaving six miles of US 36 in Washington County on April 26

    April 14, 2021 - Northeastern Colorado - Work includes repaving the highway, repairing two bridges, and replacing guardrail to improve driver safety

    Located in News / 2021 / April 2021
  2. CDOT to begin resurfacing Colfax Avenue between Sable Boulevard and Peoria Street

    April 16, 2021

    Located in News / 2021 / April 2021
  3. US Highway 50 resurfacing between Coaldale and Texas Creek begins Monday

    April 23, 2021 - Southeastern Colorado

    Located in News / 2021 / April 2021
  4. Cascade Curve on US 550 is receiving a permanent guardrail beginning September 3

    August 26, 2024 - Southwestern Colorado - Following the holiday weekend, a temporary traffic signal will direct one-way traffic

    Located in News / 2024 / August
  5. CDOT’s I-25 North Express Lanes team asks drivers to be the solution and do their part in the cone zone

    August 26, 2024 - Northeastern Colorado - $625+ the cost of traffic violations for unsafe driving in active construction zone

    Located in News / 2024 / August
  6. US 34 Railroad Crossing Elimination Study Located in Projects / Studies
  7. US 34 Railroad Crossing Elimination Study Located in Projects / Studies
  8. US 160 Fort Garland East Safety Mitigation Located in Projects
  9. US 160 Fort Garland East Safety Mitigation

    Active Construction, US Highways

    Located in Projects
  10. US 6 and US 385 Bridge Replacements in Phillips County begins March 3

    Feb. 12, 2025 - Northeastern Colorado - Five bridges to be replaced; temporary structures in place for construction

    Located in News / 2025 / February
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • ...
  • 206
  • Next 10 items
Contact Us Contact Us Phone Icon 511 Icon
  • © 2024 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo