-
CO 59 Resurfacing from Seibert to Cope
CO 59 from Seibert to Cope - The project consists of overlaying the existing roadway with 2.5 inches of hot mix asphalt and in places patching degraded areas. ...
Located in
Projects
/
Archived Project Sites
-
CO 69 Bridge Replacement Near Gardner
Keywords: State Highways
Located in
Projects
-
CO 71 Resurfacing south of Limon
Colorado Highways, CDOT will begin a resurfacing project on a 37-mile stretch of CO 71, south of Limon, between mile points (MP) 63.8 to 100.83.
Located in
Projects
/
Archived Project Sites
-
CO 79 Resurfacing & Irrigation Pipe Replacement
Colorado Highways
Located in
Projects
/
Archived Project Sites
-
CO 94 & Peyton Highway Intersection Improvements
Co 94 & Peyton Highway intersection east of Colorado Springs - CDOT will install safety improvements at the intersection of CO 94 & Peyton Highway in El Paso ...
Located in
Projects
/
Archived Project Sites
-
CO 116 Two Buttes Resurfacing Project
This project will resurface the highway. Other work items include, replacing guardrail, replacing delineators, sign replacement and at CR33 culvert ...
Located in
Projects
/
Archived Project Sites
-
CO 119 Repairs Between Boulder & Longmont
Keywords: Construction Completed
Located in
Projects
/
Flood-Related Projects
-
CO 145 Highway, Safety and Drainage Improvements, Telluride to Placerville
Highway, Safety and Drainage Improvements on CO 145, Telluride to Placerville The Colorado Department of Transportation and contractor Oldcastle SW Group, ...
Located in
Projects
/
Archived Project Sites
-
CO 392 Environmental Overview Study (EOS)
The CO 392 Environmental Overview Study identified a transportation solution supported by local and regional planning partners that identifies right of way, ...
Located in
Library
/
Studies
/
Completed Studies
-
CO 392 Resurfacing Lucerne to Briggsdale
Keywords: State Highways
Located in
Projects
/
Archived Project Sites