Library

Bridge Detail Manual

The CDOT Bridge Detailing Manual provides the policies and procedures for developing and checking contract plans and quantities. NOTE: 13.1 - Concrete Superstructure Details & 13.3 - Prestressed Concrete Superstructure Details - In Process
Bridge Detail Manual Revision Technical Memorandums
Memorandums that introduce and document changes to the Bridge Detail Manual.
File PDF document Table of Contents
08/2019
File PDF document Revision Log
08/2019 This revision log is a record of all the revisions to the Bridge Detail Manual since May 1981. It shows the date of the current and previous versions of each Chapter, and the initials of the persons who wrote the Chapter for the Staff Bridge Engineer.
File PDF document Introduction
4/12/00
File PDF document 1. General Instructions
02/2018
File PDF document 2. Drafting Standards & Procedures
03/2019
File PDF document 3. Checking Standards & Procedures
04/2018
File PDF document 4. Reinforcing
08/20/2014
4.12 Reinforcing Quantities
08/26/2014 Typical Diagram for Steel Rebar Quantity Calculations
File PDF document 5. General Information – Summary of Quantities
07/29/2011
File PDF document 6. General Layout
11/20/2018
File PDF document 7. Engineering Geology
4/12/00
File PDF document 8. Bridge Hydraulic Information
5/25/00
File PDF document 9. Construction Layout
7/13/17
File PDF document 10. Foundation Layout
03/2019
File PDF document 11. Abutment Details
8/19/2019
File PDF document 12. Pier Details
10/08/86
File PDF document 13.2 Steel Superstructure Details
10/08/86
File PDF document 14. Bridge Deck Elevations Sheets
12/2015
File 15.1 Wall Details
07/29/2013
File PDF document 16. Repair Details
12/15/10
File 17_Inspection Sketches
Chapter 17 Inspection Sketches 04/2018
File PDF document APPENDIX A - Abbreviations & Acronyms
1/2/09
File chemical/x-molconn-Z DM Appendix B
Microstation Configuration Details 2014 01
File PDF document APPENDIX C – AutoCAD
07/29/2011 The purpose of this appendix is to document historical issues with AutoCAD for help in opening archived drawings.
Filed under: ,
Contact Us
  • Staff Bridge Branch
    2829 W. Howard Place
    Denver, CO 80204
    303-757-9309

  • Michael Collins, P.E.
    State Bridge Engineer
    Branch Manager

  • Andrew Pott, P.E.
    Senior Design & Construction Engineer

  • Mohamed Zaina, P.E.
    Denver Metro Region Design & Construction Engineer

  • Daniel Groeneman, P.E.
    Southeast Colorado Region Design & Construction Engineer

  • Sam Abraham, P.E.
    Northwest Colorado Design & Construction Engineer

  • Ali Harajli, P.E.
    Northeast Colorado Design & Construction Engineer

  • Trever Wang, P.E.
    Southwest Colorado Design & Construction Engineer

  • Kevin Howland, P.E.
    Bridge Fabrication & Construction

  • Hoang Bui, P.E.
    Project Support & Overload Investigations

  • Lynn Croswell, P.E.
    Bridge Inspection Program

  • Natasha Butler, P.E.
    Bridge Asset Management

Colorado: The Official State Web Portal